NORTH AYRSHIRE COUNCIL 
19th March 2025                                                                                                                                                            
Planning Committee 
Locality  Kilwinning
Reference 24/00902/CON
Application Registered 5th December 2024
Decision Due 5th April 2025
Ward Kilwinning 
Recommendation  That the Council responds to the Scottish
Government Energy Consents Unit with no
objection to the proposed development subject to
the recommended conditions 
__________________________________________________________________ 
Location  Site to south of Bannoch Cottage, Old Glasgow Road
Kilwinning 
Applicant  GPC 1134 Ltd, 3rd Floor 1 Ashley Road, Altrincham
Proposal  Installation of a battery energy storage system and
associated infrastructure with a generating capacity of
up to 100MW (a consultation from the Scottish
Government Energy Consents Unit ref.
ECU00005128)
___________________________________________________________________ 
1. Description 
The Scottish Government's Energy Consents Unit has consulted the Council, as Planning
Authority, on an application under Section 36 of the Electricity Act 1989 from GPC 1134 Ltd. 
The application is for the development and installation of a battery energy storage system
and associated infrastructure with a generating capacity of between 50MW and 100MW.
The site consists of farmland that is used for silage production. The field is bounded to the
northwest by Old Glasgow Road (B778) and to the northeast by Bannoch Road. The total
site area is approximately 3.5 hectares, with the area to be developed around 1 hectare,
including the proposed access track.   
The site is located within a rural area of North Ayrshire that consists primarily of agricultural
land and woodlands. The site is approximately 400m from the northeast edge of the built-up
area of Kilwinning. The proposed access to the site would be taken from the B778 opposite

Page 2

the Bridgend Accident Repair Centre by cutting through a section of the existing hedgerow. 
There are several houses near to the northwest boundary, including Burnside Cottage,
Bluebell Lodge and Bannoch Cottages. The distance from the nearest houses to the
proposed BESS units would be approximately 140m. 
It is proposed to form a fenced compound for the siting of the BESS units.  The site plan
indicates 40 units of varying size and finished in dark grey or green. The units would all
contain fire suppression systems in line with industry standards. Other plant and
infrastructure would include access tracks, a 132kV transformer, compound building, an
auxiliary transformer, storage container, CCTV and a water tank.  The compound would be
securely fenced.  Trees would be planted around the compound to form screening. A
temporary SuDS pond, for the collection and treatment of surface water during the
construction phase, would be formed within the site. 
The energy stored within the proposed batteries at the site would be connected by cable to
the nearby Kilwinning Electricity Sub-Station, which is approximately 200m to the north on
the opposite side of Old Glasgow Road. The purpose of the development is to charge and
store surplus energy from the grid. Power would then be released back to the grid when
required. The purpose of BESS development is to help balance supply with demand due to
the increased use of intermittent power sources in the electricity supply network, primarily
from renewables such as wind, solar and hydro. 
The ground at the site is generally level at approximately 30m AOD.  The Old Glasgow Road
and Bannoch Road edges of the site are bounded by established hedgerow, predominately
hawthorn.  The southeastern edge is not bounded with a fence or hedgerow. The
southwestern edge follows the line of an overhead electricity line, but is not enclosed at
ground level. 
There are no trees or areas of woodland within the site itself. The field is under grass, used
mainly for silage production. This involves cropping the grass several times a year.  The
existing field access for tractors, harvesters, balers, etc. is on Bannoch Road, approximately
237m from its junction with Old Glasgow Road. 
Section 36 of the Electricity Act states that consent is required from the Scottish Ministers
for the construction of battery energy storage facilities with a capacity exceeding 50
megawatts. The Energy Consent Unit, in accordance with The Electricity (Applications for
Consent) Regulations 1990, has sought the views of the Council, as Planning Authority, on
the proposed development. 
In terms of the adopted LDP, the proposal is located within the countryside, and requires to
be considered against Strategic Policy 1 (The Countryside Objective), Strategic Policy 2
(Placemaking), Policy 14 (Green & Blue Infrastructure), Policy 15 (Landscape & Seascape),
Policy 16 (Protection of our Designated Sites); Policy 18 (Forestry, Woodland, Trees and
Hedgerows) and Policy 29 (Energy Infrastructure Development). National Planning
Framework 4 (NPF4) also requires consideration. 
The proposed development was screened for EIA purposes during January 2024 (ref.
24/00066/EIA). The conclusion reached was that EIA was not required.

Page 3

A range of consultations for Section 36 applications are undertaken by the Energy Consents
Unit of the Scottish Government, who have the statutory duty to determine such
applications. In this respect, the Council is a statutory consultee. 
2. Consultations and Representations 
Publicity for proposals of this type is carried out by the Energy Consents Unit, who consider
any public comments they receive as part of the decision-making process. The Energy
Consents Unit also consult a range of other statutory bodies to seek their views. 
To inform the Council's position on the proposals, a number of internal consultations were
undertaken, and are summarised below: 
NAC Active Travel & Transport - no transport related objections to this proposal subject to
the condition that a section 56 road opening permit will be required for works on the access
road that connects to the existing road network. 
Response: A section 56 road opening permit is a requirement of the Roads (Scotland) Act
1984 and is not a matter for regulation by a planning condition. An informative note could be
provided to the applicant in this regard. 
NAC Environmental Health - no objections. On assessment of the noise impact
assessment which have been submitted as part of the application, noise levels do not
exceed the levels outlined in BS4142 and therefore, noise should not be a deciding factor in
the planning process. A condition stating that the operation of the development must not
exceed the background noise level by 5dB(A) or more at the curtilage of any noise sensitive
property is recommended. 
Response: Noted. The recommended condition could be included in the Council's
response. 
West of Scotland Archaeology Service - No objection subject to condition. WSAS refers
to the results of an archaeological walkover survey and historic environment assessment
carried out on behalf of the applicant by Alastair Rees of ARCHAS Cultural Heritage Ltd.
This states that 'the walkover survey and Desk Based Assessment identified no sites of
interest within the development area and four sites/events within a 500m buffer of the study
area. No Prehistoric or Medieval sites were noted within 500m of the development area and
those sites noted comprise the sites of two limekilns, one in association with a quarry and a
farmstead. The other site comprised the site of an archaeological event, specifically a trial
trenching exercise that did not reveal any archaeological features' (paragraph 5.1.1). 
WSAS agree that this represents an accurate picture of the heritage baseline, at least in
terms of features that have been recorded previously, whose presence can be discerned
from comparison with desk-based sources, or which survive in an upstanding and visible
form that would allow them to be identified from surface inspection. 
However, there remains the possibility that significant archaeological material could survive
below the current ground level, which could be disturbed or removed by earth-moving
associated with construction of the proposed BESS. This potential is acknowledged in
paragraph 5.2.2 of the ARCHAS report, which states that 'there may however be impacts on

Page 4

any previously unknown and buried sites present within the development area. As it
appears that there has not been repeated industrial ploughing within the development area
then buried archaeological sites or deposits may survive within the area'. To address this
possibility, paragraph 5.3.1 of the Heritage Assessment states that 'the only advance
archaeological mitigation suggested would be the undertaking of an archaeological trial
trenching evaluation in advance of any groundworks. This would normally be expected to
comprise a percentage (normally 5-10%) evaluation of the area. 
WSAS agree that this approach would be acceptable, and would therefore advise that a
condition should be attached to any consent to secure the completion of a suitable
programme of fieldwork. In this instance, WSAS would advise that any WSI prepared in
relation to this condition should make provision for an initial programme of trial trenching
amounting to an 8% sample of the area that would be affected by construction of the BESS
and its associated infrastructure. If this does not encounter any significant sub-surface
features, deposits or artefacts, it is probable that no further work would be required beyond
this evaluation; however, the WSI would also need to include the possibility that additional
fieldwork such as monitoring or area excavation may be needed should the evaluation
identify material of this type. In the event that a second phase of on-site fieldwork were to be
necessary, it is likely that there would also be a requirement for a programme of
post-excavation analysis of the recovered material. 
Response: Noted. The recommended condition could be included in the Council's
response. 
3. Analysis 
As noted above, the consultation requires to be considered against LDP Strategic Policy 1
(The Countryside Objective), Strategic Policy 2 (Placemaking), Policy 14 (Green & Blue
Infrastructure), Policy 15 (Landscape & Seascape), Policy 16 (Protection of our Designated
Sites); Policy 18 (Forestry, Woodland, Trees and Hedgerows) and Policy 29 (Energy
Infrastructure Development).  NPF4 is also relevant to the proposed development. Each
policy is considered individually below. 
Strategic Policy 1 (The Countryside Objective)
Part c) of SP1 states that, in principle, the Council will support proposals in the countryside
for "developments with a demonstrable specific locational need including developments for
renewable energy production ie. wind turbines, hydroelectric schemes and solar farms." In
this case, it is proposed to develop a battery energy storage facility with the associated
ancillary infrastructure.  The majority of the application site would retain its
agricultural/pastoral use with additional woodland areas created for landscape
mitigation/screening purposes. Due to the proximity of the site to the Kilwinning Sub-Station,
it is considered that the proposed development has a specific locational need and accords
with SP1. 
Strategic Policy 2 (Placemaking)
The intention of SP2 is to ensure that all development contributes to making quality places. 
It safeguards, and where possible enhances, environmental or amenity impacts. In this
case, it is noted that the proposed battery storage units would be sited so as to minimise
impacts on housing near to the site (ie. a minimum of 140m from the BESS units and other
site infrastructure).  This would be achieved by forming the main compound away from the

Page 5

nearby housing and providing adequate screening in the form of woodland planting around
the compound. 
It should be noted that the proposed boundary fencing and BESS units would not exceed
2.4m above ground level, thus minimising any visual impact on the surrounding rural
landscape. The 132kV compound building would be considerably taller in height, at 6.1m.
However, this building would be sited around 180m away from the nearest housing.
Together with the proposed woodland planting around the boundary of the compound and
the distance from the nearest housing, it is not considered that the compound building would
have a significant adverse impact on the area. 
The site would largely be monitored remotely, with occasional maintenance visits as
required. Traffic to and from the site would therefore be infrequent and not a significant
source of traffic generation on the B778 once initial construction works are complete. 
It is considered that there would be no other amenity impacts arising from the development
in terms of noise, overshadowing or privacy impacts. Fire safety has been considered and a
fire safety management plan has been included with the application, including an
emergency response plan. The BESS units would be fitted with the latest industry standard
measures for fire protection, detection and control. It should also be noted that the site
would not be used for battery recycling purposes. In summary, it is considered that the
proposals are acceptable in terms of SP2. 
Policy 14 (Green & Blue Infrastructure) and Policy 15 (Policy 15 (Landscape &
Seascape)
Policy 14 requires that all proposals "seek to protect, create, enhance and/or enlarge our
natural features and habitats which make up our green and blue infrastructure."  As noted
above, the proposed development would include measures to enhance biodiversity through
the restoration of hedgerows, woodlands and the planting of trees. The policy notes that
"support will be given to proposals which seek to enhance biodiversity…. including the
restoration of degraded habitats and the avoidance of further fragmentation or isolation of
habitats." 
Policy 15 sets out to support development that protects and/or enhances our
landscape/seascape character, avoiding unacceptable adverse impacts on both designated
and non-designated landscape areas. 
The submitted planning statement highlights that the proposed planting works for the
development would "establish and create a valuable landscape and ecological assets within
the site that would screen and integrate the built elements in views from the wider landscape
and reinforce the existing vegetation within the site's wider settings." 
It is considered that additional tree planting would be required to expand the proposed
woodland buffer to the northwest of the proposed battery compound, potentially 20m in
width. This point was raised with the applicant’s agent who has agreed to this request. A
buffer of 20m would produce a more robust woodland edge to the most exposed part of the
site in relation to the B778 corridor and nearby housing, providing both habitat and
landscape benefits. An amended plan has been lodged with the Energy Consents Unit in
this regard.

Page 6

In the medium to long term, views into the site from the surrounding area would be largely
screened by the proposed new woodland around the compound. It would take a number of
decades for such planting to be effective.  It is therefore considered necessary to
recommend a condition to secure details of the external colour scheme for the plant and
machinery within the site in order to mitigate visual impacts whilst the woodland is immature. 
Suggested colours by the applicant are grey or green. 
Surface water run-off would primarily be managed via a SuDS scheme which would
incorporate nature positive measures to enhance biodiversity. 
Subject to appropriate conditions, the proposals are considered acceptable in terms of
Policies 14 and 15.   
Policy 16 (Protection of our Designated Sites)
The policy supports proposals which would not have an unacceptable effect on our valuable
natural environment as defined by a variety of legislative and planning designations. As
noted above, the site consists of farmland used for silage production, which is an intensive
form of farming using regular application of nitrogen-based fertilisers (usually cattle slurry).
The proposed development would reduce the extent of silage production land. The
introduction of woodland planting would be to the benefit of nature and wildlife. There are no
designated sites directly or indirectly affected by the proposed development. The proposals
are acceptable in respect of Policy 16. 
Policy 18 (Forestry, Woodland, Trees and Hedgerows) 
The policy seeks to resist the loss of established woodlands, trees and hedgerows. Where
loss is unavoidable as a result of development, compensatory planting is required. There
are no trees within the site.  A short length of hedgerow on the B778 would require to be cut
down to provide a means of access. As discussed above, the proposed development would
incorporate a woodland area around the compound. This would more than compensate for
the hedgerow to be removed. Subject to the recommended condition discussed above, the
proposals would be acceptable in terms of Policy 18. 
Policy 29 (Energy Infrastructure Development) 
This policy states that support will be given to energy infrastructure development where it
will contribute to the transition to a low carbon economy and have no unacceptable adverse
environmental impacts. The policy requires that consideration be given to environmental,
community and public safety aspects of a development. 
In terms of environmental impacts, the proposals would be acceptable in terms of the
detailed policies considered above, resulting in a biodiversity net gain in comparison with
the baseline conditions (farmland used for cattle grazing and some woodland). 
In terms of community impacts, it is considered that the proposals would contribute
significantly to the generation of renewable energy targets by supporting the balance of
supply and demand within the electricity transmission grid. There are no plans to create
pathways through the site (there are no designated footpaths within the site at present). It is
not considered that the proposals would have any adverse impacts on tourism and
recreation within North Ayrshire.

Page 7

In terms of public safety, the internal consultations carried out do not indicate any areas of
concern with the proposals. A Construction Environmental Management Plan (CEMP) could
be included as a recommended condition. 
The Scottish Fire and Rescue Service are not a statutory consultee, however, in response
to another BESS development proposal elsewhere in North Ayrshire earlier in 2025, the
Scottish Fire and Rescue Service recommended compliance with the current NFCC
guidance for BESS sites. A fire safety management plan has been included in the
submission. Recommended condition 1 would require the implementation of the fire safety
management plan during the operational phase of the proposed development. 
The decommissioning of the site following its operational period (excluding the woodland
area) could be secured by condition, which could be recommended as part of the Council's
consultation response.   
The proposals are considered to accord with Policy 29. 
The application has also been assessed against adopted National Planning Framework 4
and it has been determined that the proposal does not raise any significant strategic or local
planning issues which conflict with the foregoing assessment. In respect of this proposal, it
is noted that the key aims of NPF4 relate to the climate and nature crises.  The proposed
development would store electricity, primarily from renewable sources thus supporting the
transition to net zero. In addition, considerable benefits for biodiversity and nature would be
created through new woodland creation at the site. The remaining agricultural land could
also be retained and managed in the interests of food production, or for habitat purposes,
subject to the landowner's preference. 
Taking the foregoing into account, it is considered that the proposals accord with the
development plan. It is therefore recommended that the Council, as Planning Authority,
does not object to the proposed development and recommends the undernoted conditions
to the Scottish Government's Energy Consents Unit for its consideration. 
4. Full Recommendation 
That the Council responds to the Scottish Government Energy Consents Unit with no
objection to the proposed development subject to the recommended conditions as set
out below. 
Condition 
1. That the development hereby approved shall be implemented in accordance with the
submitted plans, drawings and recommendations contained in the application documents
unless otherwise indicated below, all to the satisfaction of North Ayrshire Council as
Planning Authority. 
Reason 
To secure the implementation of the development in accordance with the supporting
information.

Page 8

Condition 
2. That prior to the commencement of the development hereby approved, the applicant
shall submit a Construction Environmental Management Plan (inclusive of construction
traffic management) for the written approval of North Ayrshire Council as Planning
Authority, the scope and content of which shall be informed by the contents of the
application. Thereafter, the development shall be implemented in accordance with such
details as may be approved to the satisfaction of North Ayrshire Council as Planning
Authority. 
Reason 
In the interests of environmental protection during the construction phase. 
Condition 
3. That no development shall take place within the development site as outlined in red
on the approved plan until the developer has secured the implementation of a programme of
archaeological works in accordance with a written scheme of investigation which has been
submitted by the applicant, agreed by the West of Scotland Archaeology Service, and
approved by North Ayrshire Council as Planning Authority. Thereafter the developer shall
ensure that the programme of archaeological works is fully implemented and that all
recording and recovery of archaeological resources within the development site is
undertaken to the satisfaction of the Planning Authority in agreement with the West of
Scotland Archaeology Service. 
Reason 
To record/safeguard any archaeology within the site. 
Condition 
4. That details of the colour scheme for all plant, equipment and boundary treatment to
be sited or erected within the site shall be submitted for the written approval of North
Ayrshire Council as Planning Authority. 
Reason 
To ensure the colour scheme for the development is appropriate for the rural setting
of the site and its surroundings. 
Condition
5.  That, prior to the commencement of the development, the applicant shall submit for
the written approval of North Ayrshire Council as Planning Authority a finalised scheme of
woodland planting. The scheme shall include details of tree planting to be provided within
the field around the battery storage compound. Details of tree species, planting densities,
soil treatment and aftercare shall be included with the finalised scheme. Thereafter, the
scheme as may be approved shall be implemented prior the development becoming
operational and retained thereafter to the satisfaction of North Ayrshire Council as Planning
Authority. 
Reason 
To mitigate landscape and visual impacts and in the interests of amenity, biodiversity
and habitat creation.

Page 9

Condition 
6. That the rated noise level, as defined in BS:4142, from the operation of all
plant/equipment in relation to the battery energy storage system including all associated
infrastructure, shall not exceed the background noise level by 5dB(A) or more at the
curtilage of any noise sensitive property. 
Reason 
To safeguard nearby residents from adverse noise impacts arising from the
development. 
Condition 
7. That, unless otherwise agreed in writing by North Ayrshire Council as Planning
Authority, the BESS compound shall be decommissioned after 30 years of becoming
operational. A decommissioning plan shall be submitted for the written approval of North
Ayrshire Council as Planning Authority during the 29th year of operation, which shall include
details of restoration and aftercare for the BESS compound. Thereafter, the
decommissioning plan shall be implemented to the satisfaction of North Ayrshire Council as
Planning Authority. 
Reason 
To safeguard the amenity of the site and its surroundings. 
Allan Finlayson 
Chief Planning Officer           
For further information please contact Mr A Hume Planning Officer on 01294 324318.

Page 10

Appendix 1 – Location Plan           
DO NOT SCALE Reproduced from the Ordnance Survey mapping with the permission of the Controller of His Majesty’s Stationery
Office © Crown Copyright.  Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings.
North Ayrshire Council Licence Number AC0000825715.