Argyll and Bute Council  
Development and Economic Growth       
This Supplementary Report is a recommended response to the Scottish Government’s
Energy Consents and Deployment Unit (ECDU) Section 36 consultation on the
proposed Breackerie wind farm on Land Approximately 8km south west of
Campbeltown, Argyll & Bute
_________________________________________________________________________  
Reference No: 23/002230/S36     
Applicant:       The Scottish Government on behalf of EnergieKontor UK Ltd
Proposal:  Electricity Act Section 36 consultation relevant to Breackerie Wind Farm  
Site Address:  Land Approximately 8km south west of Campbeltown, Argyll & Bute  
________________________________________________________________________   
SUPPLEMENTARY REPORT NO. 1 
1. INTRODUCTION 
Since publication of the Report of Handling, the Applicant has raised matters of clarification in
relation to the proposed conditions and their response to NatureScot, to be addressed by this
Supplementary Report. 
2. MINOR REVISIONS TO RECOMMENDATION: 
In relation to the recommended planning conditions, it is noted that should planning consent
be granted by Scottish Ministers, there would be further discussions to reach agreement on
the detailed wording of the planning conditions between the Council, the Energy Consents
Unit and the Applicant. As such, the proposed conditions and provisions for legal agreements
as set out in the Recommendation are intended to capture the key matters for inclusion
following the assessment of the proposal and are not the final wording. However, the proposed
clarifications are noted in the revised Recommendation below. 
That the ECU be notified accordingly that: 
1. Argyll & Bute Council does not object to the proposed development subject
to the inclusion of conditions recommended by consultees being included in
any consent. 
2. Argyll & Bute Council further recommends the following conditions and
provisions for legal agreements as discussed with the applicant to mitigate
the specific impacts of the Breackerie Wind Farm proposal: 
o Revision of height above AOD and/or location of T7 and T9 in
consultation with Argyll and Bute Council to reduce landscape and
visual impact and heritage impacts;
o Aviation detection lighting system to be installed as soon as
practicable, to avoid the visual impact on the dark skies of the Mull of
Kintyre;
o Reduced wind turbine micro-siting allowance of other wind turbines
to 50m to ensure no change from assessed proposal, unless
otherwise agreed;

Page 2

o Delivery of up to 80 ha compensatory biodiversity enhancement
measures at Largiebaan Nature Reserve, or an alternative location as
agreed in consultation with the Council and consideration of further
on-site  compensatory planting; and
o Noise protection measures (AM and fixed minimum limits). 
3. Regarding the outstanding Aviation matters, Argyll & Bute Council would
defer to the expert advice of National Air Traffic Systems and Glasgow
Prestwick Airport to resolve these matters with the ECU. 
Officer response: the suggested clarifications provide additional detail on the measurement of
height in AOD of the turbines and the consultation process with the Council on the proposed
reduced micro-siting of the turbines. The addition of ‘as soon as practicable’ clarifies potential
timescales for implementation of aviation lighting detection system. Until this system is
technically operational, aviation lighting will be required at night as set out in paragraph 7.17
of the Report of Handling. The addition of ‘up to’ and the suggested alternative location for the
provision of the compensatory planting are reasonable additions and would be in line with the
provisions of Argyll and Bute Local Development Plan 2 Policy 78, which seeks a sequential
approach to all compensatory planting. 
These matters do not raise any concerns or fundamentally change the recommendation. 
3. APPLICANT RESPONSE TO NATURESCOT 
The applicant also noted its response to previous queries raised by NatureScot. Further to
paragraph 15.2 of the Report of Handling, the applicant notes that they have responded in
detail to the ornithological matters raised by NatureScot by email on 9th May 2024. NatureScot
has responded to note the further response (13th May 2024). 
Officer comment: these matters have been suitably addressed and do not change
NatureScot’s previous advice or the officer recommendation. 
4. RECOMMENDATION 
It is recommended that the ECU be notified accordingly that: 
1. Argyll & Bute Council does not object to the proposed development subject to the
inclusion of conditions recommended by consultees being included in any consent. 
2. Argyll & Bute Council further recommends the following conditions and provisions
for legal agreements as discussed with the applicant to mitigate the specific
impacts of the Breackerie Wind Farm proposal: 
o Revision of height above AOD and/or location of T7 and T9 in consultation
with Argyll and Bute Council to reduce landscape and visual impact and
heritage impacts;
o Aviation detection lighting system to be installed as soon as practicable, to
avoid the visual impact on the dark skies of the Mull of Kintyre;
o Reduced wind turbine micro-siting allowance of other wind turbines to 50m
to ensure no change from assessed proposal, unless otherwise agreed;
o Delivery of up to 80 ha compensatory biodiversity enhancement measures
at Largiebaan Nature Reserve, or an alternative location as agreed in
consultation with the Council and consideration of further on-site 
compensatory planting; and

Page 3

o Noise protection measures (AM and fixed minimum limits). 
3. Regarding the outstanding Aviation matters, Argyll & Bute Council would defer to
the expert advice of National Air Traffic Systems and Glasgow Prestwick Airport to
resolve these matters with the ECU. 
   
Author of Report: Shelley Gould        Date: 21st May 2023
Reviewing Officer: Sandra Davies       Date: 21st May 2023 
 
 
Fergus Murray   