Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
Planning Committee 
A Meeting of the Planning Committee of North Ayrshire Council will be held in the
Council Chambers, Ground Floor, Cunninghame House, Irvine, KA12 8EE on
Wednesday, 22 April 2026 at 14:00 to consider the undernoted business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.   Where possible, the meeting will be live-streamed
and available to view at  https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
2 Minutes
The accuracy of the Minutes of the meeting held on 18 March 2026 will
be confirmed and the Minutes signed in accordance with Paragraph 7 (1)
of Schedule 7 of the Local Government (Scotland) Act 1973 (copy
enclosed). 
3 26/00168/PP : Dundonald Links, Ayr Road, Irvine
Seeking permission to vary condition 15 of planning permission
19/00748/PPM to enable 34 of the consented holiday lodges to be
available for sale (rather than rental) (copy enclosed). 
4 National Planning Improvement Plan (NPIF)
Submit report by the Executive Director (Communities & Housing) to
advise of the completion and publicising of the Planning service’s
National Planning Improvement Framework (NPIF) and agree future use
(copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
5 Urgent Items
Any other items which the Chair considers to be urgent.  
Webcasting  
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at  https://north-ayrshire.public-
i.tv/core/portal/home,where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.    
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.    
Generally, the press and public will not be filmed. However, by entering the
Council Chambers and using the press or public seating area, you
acknowledge that you may be filmed and that any information pertaining to
you contained in the video and oral recording of the meeting will be used
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. In
making this use of your information the Council is processing data which is
necessary for the performance of a task carried out in the public interest.    
If you have any queries regarding this and, in particular, if you believe
that use and/or storage of any particular information would cause, or be
likely to cause, substantial damage or distress to any individual, please
contact  dataprotectionofficer@north-ayrshire.gov.uk 
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
Planning Committee Sederunt 
Robert Foster (Chair)
Cameron Inglis (Vice-Chair)
Scott Davidson
Stewart Ferguson
Margaret Johnson
Amanda Kerr
Davina McTiernan
Jim Montgomerie
Ian Murdoch
Ronnie Stalker 
Chair: 
Apologies: 
Attending: 
3

Page 4

4

Page 5

Planning Committee
18 March 2026 
At a Meeting of the Planning Committee of North Ayrshire Council at 2.00 p.m.
involving a combination of participation by remote electronic means and physical
attendance within the Council Chambers, Irvine. 
Present (Physical Participation)
Robert Foster, Cameron Inglis, Stewart Ferguson, and Ronnie Stalker. 
Present (Remote Participation)
Scott Davidson, Margaret Johnson, Amanda Kerr, Davina McTiernan, and Jim
Montgomerie. 
In Attendance
A. Finlayson, Chief Planning Officer (Communities and Housing); R. Lynch, Senior
Manager; C. Leslie, Solicitor (Legal); S. Wilson, Committee Services Officer; and M.
Burley, Senior Communications Officer (Communications) (Democratic Services)
(Corporate Services). 
Chair
Councillor Foster in the Chair. 
Apologies
Ian Murdoch. 
1. Declarations of Interest 
There were no declarations of interest by Members in terms of Standing Order
11 and Section 5 of the Code of Conduct for Councillors. 
2. Minutes 
The Minutes of the Meeting held on 28 January 2026 were confirmed and signed in
accordance with Paragraph 7 (1) of Schedule 7 of the Local Government (Scotland)
Act 1973. 
3.  26/00033/PP : Site to West and South of Mains Bungalow, Irvine 
Submitted a report by the Chief Planning Officer under Section 42 of the Town and
Country Planning (Scotland) Act 1997 seeking permission to vary condition 5 of
planning permission 25/00287/PPM to enable the phasing of site remediation
operations. 
Officers responded to Members’ questions and the Committee unanimously agreed
to approve planning permission. 
Agenda Item 2
5

Page 6

4. 25/00589/PP : Swinlees Quarry, Dalry 
Submitted a report by the Chief Planning Officer seeking permission to vary
condition 2 of planning permission N/15/00749/PP to extend the period of operations
for a further 10 years until 31 March 2036. 
The Committee unanimously agreed to approve planning permission. 
5. Urgent Items 
There were no urgent items. 
The meeting ended at 2.20 p.m. 
The full meeting proceedings can be viewed at
https://north-ayrshire.public-i.tv/core/portal/home 
6

Page 7

NORTH AYRSHIRE COUNCIL 
22nd April 2026                                                                                                                                                            
Planning Committee 
Locality  Irvine
Reference 26/00168/PP
Application Registered 11th March 2026
Decision Due 11th May 2026
Ward Irvine South 
Recommendation  Approved subject to Conditions 
__________________________________________________________________ 
Location  Dundonald Links, Ayr Road, Irvine 
Applicant  Darwin Alternative Investment 
Proposal  Variation of condition 15 of planning permission
19/00748/PPM to enable 34 of the consented holiday
lodges to be available for sale (rather than rental) 
___________________________________________________________________ 
1. Description 
Planning permission (ref. 19/00748/PPM) was granted on 4th December 2019 for a tourism
development at Dundonald Links consisting of the erection of a replacement clubhouse and
97 holiday lodges (to provide a total of 124 individual units) as well as other improvements
and upgrades to maintenance facilities, removal of the existing pre-fabricated clubhouse
building and the formation of a new road access onto Ayr Road.   
The development commenced in July 2020. The planning permission has now been
partially implemented, with the replacement clubhouse having opened in November 2021
and the first phase of the holiday lodges having also been built and in use. 
The applicant seeks planning permission to amend condition 15 of ref. 19/00748/PPM
which would enable 34 of the 124 holiday lodges to be made available for sale to private
owners. The applicant has stressed that the holiday lodges would still be used for holiday
purposes only and that they would not be made available for permanent residential use. 
An application under Section 42 of the Act, if granted, creates a new planning permission
without altering the conditions on the previously granted permission. The planning authority
Agenda Item 3
7

Page 8

must consider "only the question of the conditions to which planning permission should be
granted." 
No physical changes to the consented development are proposed in the application. The
holiday lodges which would be offered for sale would be identical to those already with
planning permission. The rationale for the proposal is to raise the substantial upfront capital
investment to carry out the remaining works to complete the development. 
Dundonald Links is located to the south of Irvine and is accessed from Ayr Road. The site is
allocated in the adopted North Ayrshire Local Development Plan for leisure and open space. 
2. Consultations and Representations 
Neighbour notification was undertaken in accordance with statutory requirements, and the
application was advertised in a local newspaper. No representations were received. 
No consultations required to be carried out. 
3. Analysis 
Section 42 of the Town and Country Planning (Scotland) Act 1997 is a mechanism which
allows for the submission of a planning application for the development of land without
complying with condition(s) subject to which a previous permission was granted. As noted
above, Section 42 of the Act stipulates that in this type of application the "planning authority
shall consider only the question of the conditions subject to which permission should be
granted." The main determining issue in this case is whether the proposed amendments to
condition 2 would accord with the relevant development plan policies for the site and in
respect of any other material planning considerations. 
Circular 4/1998 sets out the tests for planning conditions, as follows: 
- Need for a Condition 
- Relevance to Planning 
- Relevance to the Development to be Permitted 
- Ability to Enforce 
- Precision 
- Reasonableness 
Condition 15 of planning permission ref. 19/00748/PPM states the following: 
"That the occupation of the lodges hereby approved shall be limited to persons visiting
Dundonald Links for holiday purposes only. The maximum letting period to any individual or
group shall be limited to 30 days and shall not be re-let to the same persons) for consecutive
periods or for more than 30 days in any 12 month period, In addition, the lodges shall not be
sold, let, or sub-let for any other purpose without the prior written approval of North Ayrshire
Council as Planning Authority. For the avoidance of doubt, none of the lodges shall be
occupied as a permanent residence. 
Reason: To restrict the development to the terms of its justification/special need." 
8

Page 9

In this application, it is proposed to amend condition 15 as follows: 
"That the occupation of the lodges hereby approved shall be limited to persons visiting
Dundonald Links for holiday purposes only. In relation to the 90 letting lodges, the maximum
letting period to any individual or group shall be limited to 30 days and shall not be re-let to
the same persons) for consecutive periods or for more than 30 days in any 12 month period.
In relation to the 34 lodges which are available for sale, the site operator must maintain a
register of occupiers for each year, which is available at any time for viewing by the Planning
Authority. For the avoidance of doubt, none of the lodges shall be occupied as a permanent
residence. 
Reason: To restrict the development to the terms of its justification/special need." 
The proposed amendment confirms that no change of use of the holiday lodges to
residential housing is proposed in the application (including those already developed and
those yet to be developed). The sale of holiday lodges is considered acceptable within a
tourism development consisting of other holiday lodges. Ownership of the lodges does not
of itself present any planning issues within this setting.  Dundonald Links is a self-contained
land holding and is privately owned. There are no public roads or streets within Dundonald
Links and the entire site is managed by the applicant. 
The applicant does not intend for Dundonald Links to become a housing estate and
recognises that the control of occupancy to ensure the lodges are used only for holiday
purposes is the relevant planning consideration. They are seeking to secure additional
investment from purchasers to complete the development and secure the future of the
location as a high-quality tourist destination for North Ayrshire. It is anticipated that this
would generate additional visitor expenditure in the local economy. It is not considered that
the introduction of 34 owner occupied lodges would undermine the tourism potential of the
development as a whole. 
As noted above, the proposed condition would replicate the current restriction which prevent
all the lodges in the development from being occupied as a permanent residence,
irrespective of ownership status. With that safeguard in place, it is considered that the
amendments to condition 15 would be acceptable. 
As noted above, the use of planning conditions must be in accordance with the tests set out
in Circular 4/1998.  The proposed amendments to condition 15 would meet all six tests. 
With regard to National Planning Framework 4, it has been determined that the Section 42
application does not raise any significant strategic planning issues which conflict with the
foregoing assessment. 
The proposed amendments to condition 15 accords with the development plan and meet
the tests for planning conditions as set out in Circular 4/1998. There are no further material
considerations in relation to the application. It is therefore recommended that the application
is approved, subject to the conditions set out below. 
4. Full Recommendation 
Approved subject to Conditions 
9

Page 10

Condition 
1. That, prior to the commencement of phase 2 of the development, an appendix to the
transport statement (as submitted with planning application ref. 19/00748/PPM) shall be
prepared to consider the need for a ghost island right turn lane on Ayr Road at the main site
access and submitted for the written approval of North Ayrshire Council as Planning
Authority. The scope of the transport statement shall be agreed in writing with the planning
authority beforehand.  In the event that a ghost island right turn lane on Ayr Road is
required, the facility shall be provided prior to the completion of phase 2 of the development
to the satisfaction of North Ayrshire Council as Planning Authority, or, with the mutual
agreement of both parties, by an earlier date as may be deemed necessary in the interests
of the safe and efficient movement of traffic on Ayr Road. 
Reason 
In the interest of road safety. 
Condition 
2. That the development hereby approved shall be implemented in accordance with the
plans, drawings and specifications associated with planning permission ref. 19/00748/PPM
to the satisfaction of North Ayrshire Council as Planning Authority. 
Reason 
To define the terms of this planning permission. 
Condition 
3. That the occupation of the lodges hereby approved shall be limited to persons visiting
Dundonald Links for holiday purposes only. In relation to the 90 letting lodges, the maximum
letting period to any individual or group shall be limited to 30 days and shall not be re-let to
the same persons) for consecutive periods or for more than 30 days in any 12 month period.
In relation to the 34 lodges which are available for sale, the site operator must maintain a
register of occupiers for each year, which is available at any time for viewing by the Planning
Authority. For the avoidance of doubt, none of the lodges shall be occupied as a permanent
residence. 
Reason 
To restrict the development to the terms of its justification/special need. 
Allan Finlayson 
Chief Planning Officer           
For further information please contact Mr A Hume Planning Officer on 01294 324318. 
10

Page 11

NORTH AYRSHIRE COUNCIL 
22 April 2026 
Planning Committee 
Title:    National Planning Improvement Plan (NPIF) 
Purpose:  To advise Members of the completion and publicising of the
Planning service’s National Planning Improvement Framework
(NPIF) and agree future use 
Recommendation:  It is recommended that the Planning Committee: 
1) Notes the completion of the National Planning Improvement
Framework (NPIF) in respect of regulatory requirements, and 
2) Notes the intention to incorporate and publicise the NPIF in
future service delivery and community engagement. 
1. Executive Summary 
1.1 The Planning service has completed the preparation of its National Planning
Improvement Framework (NPIF). This report requests that Planning Committee notes
this outcome and agrees that the NPIF will be published and used in consultation with
all North Ayrshire communities to inform a future accountable and effective Planning
service delivery. 
2. Background 
2.1 The Planning (Scotland) Act 2019 introduced a new approach to measuring the
performance of planning authorities. It made it mandatory for planning authorities to
prepare a report on their performance and identify future improvement actions from
2025 onwards. This report is the National Planning Improvement Plan (NPIF), which
replaces the former Planning Performance Framework (PPF) and it is to be published
and submitted to Scottish Ministers. The Act also allowed Ministers to set out the form,
content, and process in publishing the NPIF, including the quantitative and qualitative
information to be included and any outcomes that are to be used to assess the
performance of all planning authorities in Scotland 
2.2 A new role of National Planning Improvement Champion (NPIC) was introduced in the
Act to monitor the performance of planning authorities and provide advice to them, as
considered appropriate, on the steps that might be taken to improve performance by
planning authorities. The NPIC post is based within the Improvement Service and
accountable to Scottish Ministers.
Agenda Item 4
11

Page 12

2.3 The National Planning Improvement Framework (NPIF) has been developed by the
NPIC and the framework process comprises the following 4 stages: 
• Stage 1 - where the planning authority undertakes a self-assessment exercise and
identifies improvement areas.  
• Stage 2 - where an improvement action plan and performance assessment arising
from stage 1 undergoes peer collaborative review. 
• Stage 3 - where the agreed improvement action plan and performance assessment
are provided to Scottish Ministers and the Council’s Chief Executive. 
• Stage 4 - where the NPIF and improvement action plan is published, actioned and
monitored. 
The North Ayrshire Planning service has now completed stages 1 -3 and will now
enter stage 4. 
2.4 The self-assessment of the Planning service is attached as Annex 1 to this report,
providing a full overview of performance and the Improvement Action Plan detailing
the improvement actions to be implemented in the next two years. 
2.5 The review of North Ayrshire Councils Planning service has been confirmed as
“making excellent progress”. This confirmation maintains a long history of service
delivery excellence and North Ayrshire’s Planning service continues to be one of the
top performing nationally. Notwithstanding this, the focus of the NPIF performance
assessment has been on identifying improvement actions to ensure the continuous
improvement of the Planning service. 
2.6 The key improvement actions identified include: 
• The undertaking of a service review to prepare a workforce planning strategy and
evaluation of resources.
• To further develop and undertake an evaluation of local, regional and national
challenges to Planning to ensure effective service delivery.
• To undertake a review and update of the Councils Planning Enforcement Charter. 
2.7 The NPIF Performance Assessment and Improvement Action Plan has now been
reviewed by the National Planning Improvement Champion who has confirmed it to
Scottish Ministers and the Council’s Chief Executive. 
2.8 The NPIF will now be published on the Councils website and consulted on with all
North Ayrshire community councils.  The Improvement Action Plan will therefore be in
the public domain and open to scrutiny by all North Ayrshire communities. There will
be regular checks by the Planning service and the National Planning Improvement
Champion on progress. It is also anticipated that every six months there will be a
review to evaluate what progress has been made on the agreed improvement actions. 
3. Proposals 
3.1 It is recommended that the Planning Committee notes the completion of the NPIF and
agrees that it should be published and consulted on and integrated in the future work of
the Planning service to be used as a basis for continued community engagement and
to inform future accountable and effective service delivery. 
12

Page 13

4. Implications/Socio-economic Duty 
Financial 
4.1 None. 
Human Resources 
4.2 None. 
Legal 
4.3 The legislative requirements for the preparation, submission and registration of NPIF’s
are set out in the Town and Country Planning (Scotland) Act 1997 as amended by the
Planning (Scotland) Act 2019. 
Equality/Socio-economic 
4.4 The Council is required to take account of the NPIF in the preparation of North
Ayrshire’s third Local Development Plan (LDP3) which will be subject of an equalities
impact assessment. and assessment on the impact of the plan on children. 
Climate Change and Carbon 
4.5 The Council is required to take account of the NPIF in the preparation of North
Ayrshire’s third Local Development Plan (LDP3) which will be subject of a Strategic
Environmental Assessment. 
Key Priorities 
4.6 Communities and Local Democracy are one of four interlinked and interdependent
priorities set out in the Council Plan (2023-28). The preparation of the NPIF and
consultation on it are a means of enabling local communities to be active in the
preparation of North Ayrshire’s next Local Development Plan and placemaking
approaches.   
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 The Council is required to take account of the NPIF in the preparation of North
Ayrshire’s third Local Development Plan (LDP3) which will be subject of an equalities
impact assessment on the impact of the plan on children. 
13

Page 14

Consumer Duty 
4.10 None. 
5. Consultation 
5.1 There is no legal requirement for the Council to consult with communities on the NPIF
however, doing so as intended, is good practice and an invaluable way of engaging
and involving in the work of the Planning service to best support communities. 
David W. Hammond
Executive Director (Communities and Housing 
For further information please contact Allan Finlayson, Chief Planning Officer,on 01294
324319. 
Background Papers
0
14

Page 15

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
National Planning Improvement Framework
(NPIF)
North Ayrshire Council
Performance Assessment 2025/26  March 2026
Cohort 3 
15

Page 16

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
16

Page 17

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Planning Authority: North Ayrshire Council
Lead officer: Allan Finlayson
Email: allaninlayson@north-ayrshire.gov.uk
Phone number: 07500 226257 
North Ayrshire Planning Service
The Planning Service in North Ayrshire, from January 2024, sits within the Housing and
Public Protection Service within the Communities and Housing Directorate. The Chief
Planning Officer heads a team of ten professional planners and four support staff split
between two teams: Development Management and Strategic Planning. 
Our Development Management team continue to deliver sector-leading determination
timescales for planning applications while handling a high number of cases per officer.
The Strategic Planning Team is at a progressed stage and on track in the preparation of
North Ayrshire’s third Local Development Plan, undertaking early engagement with
communities and stakeholders.   
Introduction
The Planning (Scotland) Act 2019 introduced a new approach to measuring the
performance of planning authorities and made it mandatory for authorities to prepare a
report on their performance after the end of each financial year. 
The National Planning Improvement Framework (NPIF) has been developed by the
National Planning Improvement Champion and aims to support a planning authority to
assess their performance, identify areas of improvement and ascertain how best to
action these to maximise their effectiveness and efficiency. 
The National Planning Improvement Framework aims to support the purpose of
planning to manage the development and use of land in the long-term public interest
through ensuring that: 
▪ The planning system enables the delivery of sustainable, liveable, and productive
places. 
▪ Planning services are equipped to work effectively and efficiently, embedding
continuous improvement. 
▪ Users are able to engage constructively with the planning system and planning
service. A self-assessment tool has been development and focuses on the attributes of
a high performing planning authority. The attributes are grouped into five themes as
detailed below. 
17

Page 18

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
18

Page 19

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
NPIF Scoring Matrix 
Engagement on the National Planning Improvement Framework (NPIF) 
On completion of a draft NPIF the Planning service fulfilled a required peer review
meeting with the National Planning Improvement Champion, the Improvement Service,
Elected Members and internal and external stakeholders. An intention to include the
attendance of external peer review partner (Angus Council) was not possible as a result
of matters out with North Ayrshire’s control. 
The peer review meeting examined the NPIF, discussed its content and the Planning
service in North Ayrshire with all attending parties. 
A decision was made not to invite a community council to the peer review meeting for
the reason that this would not be fully representative of all communities of North
Ayrshire. To fulfil the importance of engaging with all North Ayrshire’s communities it
was determined to update the NPIF with feedback received from the peer review
meeting attendees, the National Improvement Champion and the Improvement Service
and, thereafter, to consult on a revised NPIF with all community councils in North
Ayrshire. 
The revised draft NPIF was subsequently issued to all community councils in North
Ayrshire seeking comments. In addition, the Chief Planning Officer offered to present a
summary of the draft NPIF to all community councils at one of their meetings to inform
on the NPIF and assist in the submission of community views. 
Presentation of the NPIF was subsequently made to all responding community councils
and all feedback has been incorporated into the finalised NPIF. In summary, comments
19

Page 20

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
on the NPIF were positive as was feedback on community engagement with the
Planning service and North Ayrshire Council more widely. Attendance at community
council meetings also provided opportunity to discuss contentious planning
applications, future engagement opportunities in relation to the emerging Local
Development Plan and North Ayrshire Council more widely in respect of many matters
such as community wealth building, community wellbeing and community
infrastructure delivery.  Notwithstanding good experience of past engagement being
noted, discussion on lesson learning took place on how community engagement and
planning decision making could be improved in the future. The approach taken in
respect of community consultation on the NPIF was welcomed by all community
councils and acknowledged as good practice to be built on in the future. 
The only concerns raised by community councils in relation to the NPIF were made in
respect of identified staff resourcing which was seen as a potential impediment to the
success of future engagement with communities and the addressing of identified
community needs. The best examples of this related to impact on investigation and
enforcement of unauthorised development and the ability of the Planning service to
fully develop community engagement in respect of aspirations and concerns contained
in registered Local Place Plans (LPPs). 
20

Page 21

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
A high performing planning authority needs to have
the right number of people to do the work expected of
it with the rights skills set. It also needs to have a
strategy to ensure that it retains and recruits the right
staff in the future. It supports staff to upskill and to be
prepared for changes in policy, legislation, and new
circumstances. 
Please consider the following when thinking about this attribute and how you have
performed over the last year:  
 Does the planning authority have the sufficient level of staff to carry out all activities
within the required timeframes?
YES – although staff resource issues exist
 Does the planning authority have the ability to carry out all activities within the
required timeframes with its current budget?
YES
 Does the planning authority have the ability to carry out all activities within the
required timeframes with its current income?
YES
 Does the planning authority received responses from consultees within the
prescribed timescale when assessing planning applications?
YES 
 Does the planning authority have the ability to access the appropriate advice,
expertise, evidence, and data it requires?
YES
Narrative
The Development Management Team is one of the smallest pro-rata of all Scottish
Planning Authorities at only 5.75 FTE posts comprising of 1.75 FTE Senior Planning
Officers, 2 Planning Officers and 2 Assistant Planning Officers.  The team has 2 FTE
support staff with no enforcement or specialist officers.
The team has experienced significant resource issues in the last year with business
case justification required for the recruitment of a Planning Officer vacancy and
difficulties thereafter in recruiting an Assistant Planning Officer position following
internal promotion. The Planning Officer position was vacant, for 4 months and the
Assistant planning officer post was vacant for one year but has recently been filled.
ATTRIBUTE 1: THIS PLANNING AUTHORITY HAS SUFFICIENT
RESOURCES AND SKILLS TO MAXIMISE PRODUCTIVITY
21

Page 22

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Informal peer review of comparable Planning service resourcing has confirmed that the
team is as little as one third of the size of comparable authorities and with as much as
twice the caseload per officer.     
Consultees play a significant role in the processing of planning applications. Internal
consultation responses are generally received within the requested timescale.
However, there are regulatory pressures on our internal consultees and therefore
limited resources available to direct planning application consultations. External
consultation responses have been noticeably delayed as a result of pressure by
additional demands arising from the implementation of National Planning Framework
(NPF4), enhanced Local Development Plan (LDP) requirements and resourcing
pressures generally. Delay in the consultation process impacts on planning application
determination timescales and is outwith the control of the Planning service. 
The Strategic Planning Team is comprised of a Strategic Planning Manager, 2 Planning
Officers, 1 Assistant Planning Officer and a Technician. The team is currently operating
at a reduce resource following the loss of the Assistant Planning Officer to a promoted
post in a neighbouring authority As with the Development Management team the
Strategic Planning team is small when compared to comparable Planning Authorities
and has no specialist officer resource in areas such as historic buildings or landscape. 
The team is responsible primarily for all aspects of the preparation of the Council's
Local Development Plan and providing support to community bodies in the preparation
of Local Place Plans. The team consists of a manager, two planning officers, an
assistant planning officer and technician.   
The Strategic Planning Team has recently finalised an Evidence Report and submitted
this to Scottish Government as part of the “Gatecheck” process. The breadth of topics
to be covered and the data collection, analysis and engagement that is necessary to
pass the Gate Check stage provided a significant workload challenge for the team.
Identified risks related to the capacity for engagement with Key Agencies and the
impact of an Evidence Report being returned following Gate Check would have on the
planning authority being able to meet the Scottish Government expectation of having a
new style LDP in place within around 5 years of the Regulations coming into force i.e. by
May 2028. To date these risks have been managed and the LDP is on track for adoption
by May 2028. 
Budget provision has been made to support the preparation of the LDP, including the
procurement of specialists to provide appropriate advice, expertise, evidence and data,
specifically in relation to Transport Appraisal; Play Sufficiency Assessment and
landscape assessment.  
Informal review of the Planning service over the past year has identified the following
issues.
22

Page 23

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
 Difficulties in recruitment
 Career progression only possible where a vacancy becomes available
 Ageing workforce in senior positions
 Succession planning limitations
 Increasing legislative complexity without additional resource 
 Pressure of maintaining service excellence in the face of additional pressures
A formal review of the Planning service to examine these issues in more detail is
planned in the coming year. 
Action
Formal reviews of the Planning service will examine existing resource suitability for 
current and future workload, identify potential gaps in service provision, provide
risk  management and a pathway to ensure appropriate future service provision.
23

Page 24

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Professional and Financial Resources
The establishment resource of the Planning service is; 
Head Count:
Chief Planning Officer  1
Development Management  5.75
Development Planning   4  (currently 3 as a result of vacancy)
Technical Support    4
Total     14.75 (currently 13.75 as a result of vacancy 
RTPI Chartered Staff:  6 
Age Profile:
Under 30    2
30-39     5
40-49     5
50 and over    3 
The Chief Planning Officer monitors the service budget on a monthly basis with the
respective service Accountant.
Planning fee income for 25/26 was similar to that of previous years at approximately
£750,000. With outgoings of considerably less than this, the Planning service has
historically “over recovered” in respect of income against expenditure without a
resulting increase in resources. 
24

Page 25

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
25

Page 26

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Please consider the following when thinking about this attribute and how you have
performed over the last year: 
 Does the planning authority have a workforce planning strategy in place?
NO – this is an action
 Does the planning authority have the ability to support staff development and
upskilling and send staff on relevant courses?
YES – training budget exists
 Does the planning authority have a deliverable commitment to support staff health
and wellbeing?
YES – both corporately and within service
Narrative
North Ayrshire Council’s Performance Management Strategy and fair-work-first-
statement aim to aims to create a flexible, skilled, and motivated workforce that
supports the council's vision of a "Fair for All" North Ayrshire. The Council also has a
Wellbeing at Work policy Corporate Health, Safety & Wellbeing and is committed to
excellence in health, safety and wellbeing by preventing or minimising any adverse
impact of our activities and services, and by ensuring that its employees and
communities are safe and protected.
Beyond the identified Council policies there is no Planning workforce strategy however,
as previously noted, a review of the Planning service is programmed for the next year
which will establish service capacities, needs, and strategy for delivery. This work will
build on the informal review previously noted and inform in areas such as workforce
direction, recruitment strategy and financial opportunities/constraints. Action 
The recruitment of Town Planners and associated staff is a national challenge as
recognised in work such as the Royal Town Planning Institute /Heads of Planning
Scotland and Scottish Government Future Planners Project. A historic reduction in the
number of undergraduate Town Planning courses has been addressed with potential
geographic significance to North Ayrshire with the initiation of an accredited course at
the University of West of Scotland bolstering the only other undergraduate course at
Dundee University and the postgraduate course at Glasgow University. The North
Ayrshire Planning service does not currently have budget for intern or graduate
placements however this will be considered in the programmed Planning service
review. 
A more pressing concern, however, is the limited staff resource that can be dedicated
to the investigation into and enforcement of planning breaches. This is an ongoing
difficulty in meeting the expectations of customers concerned with enforcement
matters. The Planning service has no dedicated enforcement officer, and this obligation
ATTRIBUTE 2: THE PLANNING AUTHORITY HAS A VALUED AND
SUPPORTED WORKFORCE
26

Page 27

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
is shared between Development Management Officers who already have a higher than
nationally averaged workload in respect of application caseload. Therefore, the
investigation of additional staff resource for the service is an action. 
An additional resource concern is the absence of a managerial position in the
Development Management team to reflect the existence of such in the Strategic
Planning team. This is a staffing resourcing issue that will also be investigated as an
action. 
Opportunities to support Planning staff by means of training and upskilling are
constantly reviewed and a limited training budget exists for this. The Planning service is
also committed to enhancing the skills, talents, and confidence of staff through
attendance at relevant and suitable training and development courses which include
those hosted by the RTPI, relevant chapter events, HOPS and the Improvement Service
and other providers. 
27

Page 28

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Improvement Action Plan (People theme) 
Attribute Score 
(1=Making excellent progress, 5= No progress) 
1. The planning authority has sufficient resources and skills to maximise
productivity 
4
2. The planning authority has a value and supported workforce  2 
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/
Medium/ Low) and by when (short/ medium/ long term). 
Improvement Action
What action will you take?
What will the outcome be?
Owner Importance
High 
Medium
Low
Timescale 
Short term – 1 year
Medium term – 3 years
Long term – 3+ years
Resources
Service review Allan Finlayson High Short Internal
Workforce Planning strategy Allan Finlayson High Short  Internal/peer review
Enforcement resourcing
improvement
Allan Finlayson High Short 
Development Manager
resourcing improvement
Allan Finlayson Medium Medium 
28

Page 29

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
A high performing planning authority has a positive
culture through ensuring it has sound governance,
effective leadership and a commitment to continuous
improvement. The authority has an identified chief
planner, who is supported by a strong leadership group
to advise on decision-making, policy and operational
management. 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Has the planning authority undertaken an annual assessment of its performance and
acted upon areas previously identified as in need of improvement?
YES – annual informal assessment undertaken with committed action to formalise
 Has the planning authority achieved recognition at relevant awards or through
performance accreditation frameworks?
YES – previous award recognition however current resourcing issues preclude seeking
this at this time
 Has the planning authority engaged in peer review, good practice exchange or
improvement activities?
YES – informal peer review and lesson learning regularly undertaken 
 Has the planning authority addressed any complaints upheld by the Scottish Public
Services Ombudsman and have evidence of this and that it has learned from valid cases?
YES – previously however no SPSO cases within the reporting period
Narrative
Continuous improvement of the Planning service is always the subject of ongoing review
and focusses on Development Management and Local Development Planning
obligations.
Development Management performance has decreased slightly as a result of resourcing
difficulties but remains nationally leading and significantly higher than national averages.
The Local Development Plan (LDP) is currently on track for adoption before the 2028
Scottish Government target however programme slippage has been noted recently, again
as a result of resourcing issues and the delay experienced in Scottish Government’s
ATTRIBUTE 3: THIS PLANNING AUTHORITY HAS EMBEDDED
CONTINOUS IMPROVEMENT.
29

Page 30

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
consideration of the LDP Evidence Report at Gate Check stage. The LDP Development Plan
scheme is as up to date as possible in these circumstances.
National award recognition of the high standards of performance and achievements of the
Planning service has been achieved previously. Most notably awards have been given in
the Scottish Awards for Planning (2019) and Royal Town Planning Institute’s Awards for
Planning Excellence (2016 and 2017). Regrettably, given resourcing pressures, the focus of
the Planning service is now on maintaining performance and has not recently been in a
position to seek award recognition to promote the service excellence being maintained. 
Development Management Performance
Our decision-making demonstrates continuous evidence of nationally leading timescales
in the determination of all type of planning applications to assist the development and
meet customer expectations.
Development management performance has decreased slightly in the last year as a result
of long-term vacancies and recruitment difficulties however the performance of the
Planning service remains the highest in Scotland in most measurable indices and in the top
three of all.
The offer of processing agreements or other agreed project plan is made to prospective
applicants in advance of all major applications and availability publicised on planning
authority website.
Early collaboration with applicants and consultees on planning applications providing
clear and proportionate development advice is usually available in the promotion of free of
charge pre-application discussions for all prospective applications. This service is
currently suspended for less significant proposed developments on the basis of vacancy
and recruitment impacts but will be re-introduced as soon as possible following
successful recruitment.
Legal agreements are avoided where possible or invariably concluded within 6 months of
‘resolving to grant’ planning permission.
The Planning service Enforcement charter was last updated in March 2023 and is
therefore due for further updating. This is action for progression in the short term. Action 
Development Plan Progress
North Ayrshire’s Local development plan is currently on track for adoption in late 2027 in
advance of the Scottish Government 2028 target for all Planning Authorities.
The Development plan scheme was last adopted in November 2024 Development Plan
Scheme as required annually. Updating is currently postponed until confirmation of a
decision by Scottish Government at Gate Check. 
Engagement with stakeholders including Elected Members, industry, agencies, the public
and Scottish Government are engaged appropriately through all key stages of development
plan preparation. 
30

Page 31

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Continuous improvement: progress relevant service improvement commitments
identified through NPIF report. 
Delivery of 2025/26 Service Improvement Actions
Repositioning the Planning Service to promote Placemaking: 
 Ayrshire Growth Deal: Contribute to the implementation of the Ayrshire Growth Deal
in North Ayrshire and the wider growth and investment opportunities. 
In addition to supporting the delivery of major investment planned for Hunterston, the
Planning Service has supported the preparation of masterplans for Ayrshire Growth
Deal projects at i3 and the Great Harbour, both in Irvine. 
 Support economic recovery and renewal by contributing to a cross service/Council
approach to economic development, centred on placemaking and Community Wealth
Building. Exploring the alignment of planning and community wealth building, including
in context of NPF4.
The Planning Service continues to collaborate with Economic Development and
Community Wealth Building to input into the preparation of a Regional Economic
Strategy for Ayrshire and the Council’s Community Wealth Building initiatives to
support sustainable economic development within the Ayrshire region and North
Ayrshire communities. 
Driving Improved Performance:
 Development Management: Continue to provide an efficient and effective
Development Management Service. 
The Planning service continues to maintain sector-leading performance in comparison
with nationwide peers despite recent resourcing difficulties. 
 Service Delivery: review service delivery to identify potential opportunities to improve. 
The Planning service was operating under an extended period of resource constraint
since 2024 as a result of the filling of three vacancies out of a team of fifteen therefore
there has been limited opportunity to review potential service improvements.
Notwithstanding the above position, the Local Development team has continued to
develop community engagement. The team has significantly supported the preparation
of Local Plan Plans (LPPs) by local communities to engage, inform and support the
31

Page 32

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
preparation of the emerging Local Development Plan (LDP3). Collaboration with
Community Wellbeing colleagues in community engagement has been further
developed to deliver “one-stop” community consultation involving the Planning service
and the preparation of interdependent information resources such as Place Profiles 
North Ayrshire Place Profiles that collate information from cross Council services.
Modifications to the Development Management processes continue to be made to
ensure planning applications can be determined as efficiently as possible. Limited staff
resource requires that case officers have responsibility for enforcement, the validation
process, sending acknowledgement letters, consultations, posting site notices and
ensuring the Uniform database is maintained to support service standards being
upheld. 
Recent changes have been made to remove some information publicly displayed on
the Council’s Online Planning Information System (OPIS) such as objection comments
and consultation responses. The reason for this is that resource does not exist to
redact information and also that OPIS appears to be being used by some of the public
as an extension to social media platforms e.g. referring to and cross-referencing
comments to seek to direct application assessment. 
Promoting the plan-led system:
 Development Planning:  Following the timetable set out in the Development Plan
Scheme, develop Evidence Base to inform LDP3. 
The Development Plan Scheme was last adopted in November 2024, and we are on track
and nearing the end of the Evidence Reporting stage of LDP3 preparation. 
A strong emphasis is placed within the Strategic Planning Team service on sharing good
practice, skills, and knowledge, including via HOPS sub-forums, the Knowledge Hub
resource, and informal groups, including the Fife LDP Peer Review Group and regular
meetings with South and East Ayrshire.  
In 2025, the Chief Planning Officer “reached out” to peers in East and South Ayrshire to
further develop regional understanding of Planning and related matters and inform
collaborative working, for example, in respect of regional economic and spatial strategy,
and housing, climate and nature crises. This has progressed significantly in the
subsequent period to develop regional spatial and economic understanding and initiatives. 
2025/26 Service Improvement Actions
As a result of the Planning service operating under an extended period of resource
constraint no new improvement actions for the Planning Service have been set at this time. 
The Service is continuing to focus on the early stages of preparing Local Development Plan
3 and is on track for adoption in accordance with Scottish Government targets. 
32

Page 33

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Delivering an efficient and effective Development Management service is being maintained
with the highest level of performance being demonstrated in national comparison.
Notwithstanding the above, the Chief Planning Officer intends to continue to develop
regional collaboration in further discussion with neighbouring authorities in Inverclyde and
Renfrewshire Councils. Action 
33

Page 34

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Does the planning authority have an effective scheme of delegation in place?
YES – reviewed annually and up to date
 Have all councillors who exercise a planning function undergone statutory training and
is there is evidence of ongoing training for members?
YES – historically undertaken in advance of and beyond legislative requirement
 Have more than x % of officer recommendations have been overturned by councillors at
committee or Local Review Body.
NO – historically low numbers of overturned recommendations
Narrative
The Planning service is incorporated within North Ayrshire Council’s Communities,
Housing and Public Protection directorate. This directorate was newly formed in 2024 to
respond to the Council’s commitments in these service areas. 
The decision-making ability of the Planning service is established in the Council’s adopted
Scheme of Delegation, and this details the circumstances whereby planning applications
are required to be considered and determined by the Planning Committee. The scheme of
delegation provides decision making powers to the Chief Planning Officer on an extended
basis in the interests of efficiency in dealing with local planning applications however
major and sensitive applications are commonly determined by the Council’s Planning
Committee. The Scheme of Delegation was most recently adopted in October 2025 and is
regularly reviewed. 
The Local Review Body is the method of appealing decisions made by the Chief Planning
Officer under the Scheme of Delegation. The Local Review Body conducts reviews in
respect of the refusal of planning permission, failure to determine applications and the
imposition of conditions. 
In the last year, the Local Review Body (LRB) determined only four applications for
review. This is considered to demonstrate both general satisfaction with the decision
making of the Chief Planning Officer under the Scheme of Delegation and the
appropriateness of decisions made. The Local Review Body overturned only one officer
decision in this period.
ATTRIBUTE 4: THE PLANNING AUTHORITY HAS SOUND
GOVERNANCE 
34

Page 35

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
The Council’s Planning Committee is the decision-making board which determines
planning applications where delegation authority is not provided to officers. The Planning
Committee meets monthly to consider recommendations on planning applications and
Local Development matters as appropriate. In the past 12 months, 96% of applications
considered by the Planning Committee were decided in accordance with officer
recommendation. This equates to only one officer recommendation being overturned in
that period. 
The Planning (Scotland) Act 2019 requires that mandatory training is implemented for all
elected members who are involved in any decisions involving planning matters. It should
be noted that, as a commitment to effective decision making, North Ayrshire Council has
historically undertaken elected member training significantly in advance of this legislative
requirement. Training is undertaken on a six-monthly basis most recently in December
2024, June 2025 and December 2025. Interim and individual training can be provided at
any time e.g. for new Committee members as and when required. 
In the last year only two appeals to Scottish Ministers for planning decisions have been
made and both remain under consideration. One further planning appeal was submitted
but was rejected as being out with the remit of the DPEA. As noted above in respect of
delegated decisions, the low level of appeals to Scottish Ministers is considered to
demonstrate general satisfaction with and the appropriateness of decisions made.
Guidance to applicants on how to appeal either to Scottish Ministers or the Local Review
Body is available on the Council’s website Planning reviews and appeals.  
35

Page 36

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Does the planning authority have an identified Chief Planning Officer in place?
YES – since 2021, well in advance of regulatory requirement
 Does the Chief Planning Officer advise on corporate decision making and policy within
the broader organisation?  
YES
 Is the planning authority's Chief Planning Officer a member of the Royal Town Planning
Institute?
YES
 Does the Chief Planning Officer advise and support external bodies through engagement
in organisations’ committees, advisory groups or working groups?  
YES
 Does the planning authority have a strong leadership team that supports a culture of
continuous improvement?
YES - both corporately and within service 
Narrative
A Chief Planning Officer was appointed in 2021, in advance of the statutory requirement
being put in place by the Scottish Government in 2024. The officer in question is a
Chartered Member of the Royal Town Planning Institute (RTPI) and is the head of the
profession within the Council. The Chief Planning Officer provides advice throughout the
Council to other departments and services, other Senior Managers, Elected Members, and
members of the public in relation to planning matters. 
Guidance on the role of the Chief Planning Officer advises that the position should
strengthen leadership on planning and corporate recognition of the importance and
positive influence of planning within a Council. The duties and responsibilities of the Chief
Planning Officer are positioned around 5 main attributes: 
 Professional Advisor 
 Delivering National Planning Priorities 
ATTRIBUTE 5: THE PLANNING AUTHORITY HAS EFFECTIVE
LEADERSHIP  
36

Page 37

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
 Champion of place 
 Head of Profession 
 Performance Improvement
The role of the Chief Planning Officer as a Professional Advisor is to direct on the vision
and implementation of the National Planning framework (NPF4) and Local Development
plan for North Ayrshire spatial and associated development priorities.
The Chief Planning Officer is a member of the Council’s Senior Management Team (SLT)
and advises the Council’s Executive Leadership Team (ELT) and elected members in the
development and delivery of corporate objectives to promote and achieve the Strategic
Plan priorities in a spatial and place-based approach. 
The role of the Chief Planning Officer includes Delivering National Planning Priorities in
the alignment and delivery of national planning objectives within North Ayrshire. 
As a Champion of Place, the Chief Planning Officer directs and delivers place making
ambitions within the Council, is the Council’s placemaking champion and ensures a
collaborative approach to place making with other Council officers, elected members and
developers. 
The Chief Planning Officer is the Head of the Planning Profession in North Ayrshire and
the most senior responsible qualified officer for the Council’s Planning Service. The Chief
Planning Officer is the main contact for key stakeholders on planning and place and
represents the Council internally and externally on several groups requiring or benefitting
from input from the planning function. 
The Chief Planning Officer is ultimately responsible for the Performance and
Improvement of the planning service in North Ayrshire and the embedding of an ethos of
continuous improvement. 
The Chief Planning Officer in North Ayrshire participates and advises a number of internal
and external bodies to provide spatial and development planning advice. These include. 
 Ayrshire Economic Partnership Board 
 Ayrshire Economic Joint Committee
 Arran Housing Taskforce
 B714 Project Delivery Board
 Clyde Marine Planning Partnership
 North Ayrshire Inward Investment Group
 Irvine Town Board (Long Term Plan for Towns)
 Islands Group Board 
37

Page 38

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
 Ayrshire Planning Regional discussion group 
Reporting to the Chief Planning Officer are two Senior Planning Officers responsible for the
Council’s Development Management regulatory service and the Strategic Planning
Manager responsible for the Council’s Development Planning regulatory service. 
The Planning service benefits from a direct relationship to and strong support from the
Council’s Chief Executive, Executive Director of Communities and Housing and Head of
Housing and Public Protection. 
A culture of continuous improvement is expected, supported, and delivered in North
Ayrshire Council generally and specifically within the Planning service. 
The Chief Planning Officer, Strategic Planning Manager and Senior Planning Officers all
engage nationally to keep involved and informed in national Planning practice. This takes
the form of national engagement with Heads of Planning Scotland with participation in
both the Development Plan and Development Management groups. Involvement with the
Improvement Service is undertaken by Planning management and all staff in participation
with the Planning Skills programme. The Chief Planning Officer also presented to an
Improvement Service seminar on Customer Service, this being informed by North Ayrshire
Council and the Planning service commitment to community engagement and removing
barriers to customer service. All  of this has informed preparation of the NPIF. 
38

Page 39

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Improvement Action Plan (Culture theme) 
Attribute Score 
(1=Making excellent progress, 5= No progress) 
3. This Planning Authority has embedded continuous improvement  1
4. This Planning Authority has sound governance 1
5. This Planning Authority has effective leadership 1 
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/
Medium/ Low) and by when (short/ medium/ long term). 
Improvement Action
What action will you take?
What will the outcome be? 
Owner Importance
High 
Medium
Low
Timescale 
Short term – 1 year
Medium term – 3 years
Long term – 3+ years
Resources
Renfrewshire/Inverclyde
regional discussions. Further
develop and undertake
meetings with neighbouring
Councils to understand and
develop competing/co-
operative regional
challenges/opportunities.
Allan Finlayson Medium Short  Chief Planning Officer and
Strategic Planning manager
Enforcement Charter review Allan Finlayson/Iain
Davies
High Short 
39

Page 40

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
A high performing planning authority needs to have an
effective local development plan and other strategies in
place to provide a vision for the future of the area. It
needs to be able to set and deliver on policy ambitions
and priorities by clearly informing decision making and
providing certainty and predictability for communities,
developers and investment. The authority’s
development management systems need to be
effective in making the right decisions about
development and be efficient as possible in doing this.
The planning authority makes best use of digital
technology and how it manages and uses data. 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Does the planning authority have an up to date Local Development Plan in place and/ or
is on track to adoption?
YES – the extant LDP2 is up to date and the emerging LDP3 on track to adoption
 Does the planning authority have an up-to-date Regional Spatial Strategy in place/ or on
track to adoption? 
YES –  a RSS is not yet a legislative requirement however North Ayrshire is progressing
towards preparation of a combined RSS and Regional Economic Strategy in
partnership with South and East Ayrshire Councils
 Has the planning authority’s Local Development Plan Evidence Report been approved by
the Department of Planning and Environmental Appeals and/ or on track for approval?
NO – however the Evidence Report has been submitted to DPEA in advance of many
authorities and is currently receiving attention at Gate Check
 Has the application of the Local Development Plan’s policies been found to be deficient
at appeal or judicial review?
NO – policies of the extant LDP2 (2019) are widely considered to be almost entirely
aligned with the subsequent adoption of the National Planning Framework (NPF4) in
2023.  
ATTRIBUTE 6: THE PLANNING AUTHORITY HAS A ROBUST POLICY
AND EVIDENCE BASE 
40

Page 41

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Narrative
North Ayrshire Council’s development plan consists of Local Development Plan (LDP2),
which was adopted in November 2019  Adopted Local Development Plan and the Fourth
National Planning Framework (NPF4), adopted in February 2023 National Planning
Framework 4 - gov.scot. Together these provide an up-to-date development plan covering
North Ayrshire. The local development plan is supplemented by non-statutory planning
guidance documents Non-statutory planning guidance. 
Preparation of a new local development plan (LDP3) is well underway and on track for
adoption in 2027 in advance of Scottish Governments May 2028 deadline. The emerging
LDP’s Evidence Report was submitted to the Directorate of Planning and Environmental
Appeals (DPEA) for Gate Check assessment in January 2026 and a decision is expected in
April. 
Following approval by the appropriate committees of North, South and East Ayrshire
Councils, an indicative Regional Spatial Strategy for Ayrshire was submitted to the
Scottish Government in 2020. Guidance from the Scottish Government remains to be
progressed significantly. Notwithstanding this position, the Chief Planning Officers of all
Ayrshire Councils and Regeneration peers in all Councils  are progressing a combined
Regional Spatial Strategy and Regional Economic Strategy for Ayrshire Ayrshire regional
economic strategy. 
The above work will further develop regional understanding of Planning, Regeneration and
related matters and inform collaborative working, for example, in respect of regional
economic and spatial strategy, housing, climate and nature crises and infrastructure
delivery. Further developing regional discussion with neighbouring authorities in Inverclyde
and Renfrewshire Councils will be progressed in late 2026 to further develop this work and
is a committed action. 
41

Page 42

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Has the planning authority encouraged and promoted planning applications to be
submitted through the e-development portal?
YES – North Ayrshire receives almost entirely all planning applications through the e-
development portal. Notwithstanding this, the receipt of paper applications is
accommodated to assist with customer needs although this rarely occurs.
 Does the planning authority have a data governance strategy in place for the
management of planning data?
YES – both corporately and in service.
 Does the planning authority have the ability to use interactive web-mapping, GIS, and
spatial data?
YES – the service use of interactive and digital data is provided at a level significantly
beyond reasonable expectations of the small Planning team. This is considered a
testament to the professionalism of officers and their commitment to customer and
community engagement
 Does the planning authority have the ability to use digital approaches to engagement,
including website, social media, and other platforms?
YES – and, again, the use of these approaches is provided at a level significantly
beyond reasonable expectations of the small Planning team. 
Narrative
The North Ayrshire Council website has a number of pages dedicated to various aspects of
planning. The Council website has recently been updated to a new, clearer, and more
interactive platform, and officers of the Planning service have contributed to this process
to take the opportunity to update information and links as appropriate. In addition,
updating of the Planning pages is undertaken “in house” as and when required. Planning
and Building Standards 
In respect of Development Management, during 2025-26 96% of planning applications
received were submitted through the Planning Portal, accounting for almost all of the 600
applications received. Use of the Portal is actively encouraged and clear advice with links
is provided on the Planning pages of the Council’s website Make a planning application 
ATTRIBUTE 7: THE PLANNING AUTHORITY MAKES BEST USE OF
DATA AND DIGITAL TECHNOLOGY
42

Page 43

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
This approach minimises our handling of documents and ensures greater efficiency in
application receipt, validation, and assessment. Our processes are now fully electronic,
with any hard copy information quickly digitised and we have operated in this manner for
many years. 
The Planning service has developed an interactive Local Development Plan interactive
version of the LDP for the benefit of customer service to aid customer engagement in the
LDP process and also to provide direct digital access to detailed policies and additional
related information that provides more detail about how we will consider proposals for
specific uses or developments. A storymap presentation of the LDP is also available
online. 
The Strategic Planning Team also utilises interactive web-mapping and GIS – specifically
ArcGIS’s StoryMaps – to present a wide range of spatial data. This includes housing and
employment land audits. StoryMaps have been used to create Profiles for North Ayrshire’s
six localities. These have been produced to inform the preparation of our third Local
Development Plan LDP3 and support other placemaking activity. The profiles summarise
key social, cultural, environmental, and economic features of the areas.  
The Service has invested in a three-year Commonplace licence to support engagement on
the Local Development Plan through the creation of an online hub: Have Your Say Today -
North Ayrshire’s Third Local Development Plan - Commonplace.    
ArcSurvey GIS has been deployed for the current ‘Call for Ideas’ exercise, allowing
submitted information in support of promoted sites, including mapped boundaries, to be
digitised more easily: Call for Ideas   
The Planning Services makes spatial data available via the Corporate Open Data Portal
under the Open Government Licence for public sector information and in accordance with
North Ayrshire’s  Open Data Strategy and Publication Plan.   
43

Page 44

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Does the planning authority planning have the ability to make decisions on planning
applications within the required timeframes?
YES – planning application decisions in North Ayrshire are in the top three nationally
which is considered a significant achievement for a small Planning team which is
proportionally one of the smallest in Scotland
 Are less than x% of planning decisions overturned at appeal or judicial review?
YES 
 Does the planning authority have an up-to-date Enforcement Charter in place?
YES – however the Enforcement Charter is due for updating and this is committed as
an improvement action 
 Does the planning authority have the ability to resolve enforcement cases?
YES – however the investigation of enforcement  cases as quickly as would be
preferred remains challenging as there is no dedicated enforcement officer and cases
are investigated by Planning Officers
Narrative
North Ayrshire Council’s Development Management performance has historically
demonstrated nationally leading excellence in decision making timescales
notwithstanding a small team size and limited resources. Over the past 10 years, the
service has regularly been the highest performing Planning Authority across all planning
application determination categories (householder, local, major and national) measured
by Scottish Government Supporting documents - Planning Application Statistics 2024/25
(April 2024 to September 2024) - gov.scot 
Development management performance reduced slightly in the last year as a result of staff
resourcing issues. However, performance remains in the top three Planning Authorities in
all measured categories and the top performing in more categories than any other
Authority. 
Development Management performance in North Ayrshire is significantly above national
average performance levels monitored by Scottish Government Planning statistics -
gov.scot. 
ATTRIBUTE 8: THE PLANNING AUTHORITY HAS EFFECTIVE AND
EFFICIENT DECSION MAKING PROCESSES 
44

Page 45

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
The exceptional performance of the Planning service in North Ayrshire is a cornerstone in
serving the individual, community, and business needs of all our customers.
Commendably, this is achieved whilst providing a free of charge pre-application enquiry
service with no discretionary charging beyond statutory requirements. 
In the last year, the Local Review Body (LRB) determined only four applications for review.
This is considered to demonstrate both general satisfaction with the decision making of
the Chief Planning Officer under the Scheme of Delegation and the appropriateness of
decisions made. The Local Review Body overturned only one officer decision in this period. 
In the last year only two appeals to Scottish Ministers for planning decisions have been
made. One further planning appeal was submitted but was rejected as being out with the
remit of the DPEA. As noted previously, the low level of appeals to Scottish Ministers is
considered to demonstrate general satisfaction with and the appropriateness of decisions
made. 
Further evidence demonstrating general satisfaction with decision making is the very low
number of complaints received by the Planning service. Only three complaints have been
received in the last year and none have been upheld. Furthermore, no complaints
investigated were referred to SPSO. No applications for Judicial Review have been
received. The Planning service has also received a level of communication expressing
thanks for good service received significantly above the number of complaints received.
The extremely low level of complaints received, absence of escalation and decision
making challenge are considered to be a testament to decision making within the Planning
service in North Ayrshire. 
The Planning service Enforcement charter was last updated in March 2024 and is
therefore due for further updating. This is action for progression in the short term. Action
A more pressing concern, however, is the limited staff resource that can be dedicated to
the investigation into and enforcement of planning breaches. This is an ongoing difficulty in
meeting the expectations of customers concerned with enforcement matters. The
Planning service has no dedicated enforcement officer, and this obligation is shared
between Development Management Officers who already have a higher than any national
workload in respect of application caseload. Therefore, the investigation of additional staff
resource for the service is also an action. 
An additional resource concern is the absence of a managerial position in the
Development Management team to reflect the existence of such in the Strategic Planning
team. This is a staffing resourcing issue that will also be investigated as an action.
45

Page 46

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Improvement Action Plan (Tools theme) 
Attribute Score 
(1=Making excellent progress, 5= No progress) 
6. The planning authority has a robust policy and evidence base 1
7. The planning authority makes best use of data and digital technology  1
8. The planning authority has effective and efficient decision making
processes 
2
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/
Medium/ Low) and by when (short/ medium/ long term). 
Improvement Action
What action will you take?
What will the outcome be? 
Owner Importance
High 
Medium
Low
Timescale 
Short term – 1 year
Medium term – 3 years
Long term – 3+ years
Resources
Enforcement charter review Allan Finlayson/ Iain
Davies
High  Short 
Enforcement resourcing
improvement
Allan Finlayson High Short 
Development Manager
resourcing improvement
Allan Finlayson Medium Medium 
46

Page 47

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
A high performing planning authority should ensure a
wide range of people are involved in shaping their
future places. Engagement should be fair and inclusive,
early, collaborative, meaningful and proportionate and
should include difficult to reach groups. The authority
should engage with a wide range of partners at a
national, regional and local level to ensure a joined-up
approach and that links are made across policies and
programmes. The planning authority should
demonstrate good customer care, transparency and
effective communication. 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Does the planning authority have the ability to offer pre-application advice where it is
requested?
YES – North Ayrshire Council is one of a decreasing number of Planning Authorities to
offer free pre-application guidance. There are no plans to introduce charges as this
service is considered important in providing development guidance to customers,
communities and developers to the benefit of all.
 Has the planning authority held regular engagement events with developers and
communities?
YES – the Planning service regularly attends community events and meetings and
engages with the development industry nationally and locally
 Do the results from the customer and stakeholder survey show that customers are
satisfied with the service offer by the planning authority?
YES – consultation on this survey was widely circulated and the limited number of
responses and comments received should be taken as confirmation of satisfaction
with the Planning service in North Ayrshire. This position is corroborated by the
exceptionally low number of complaints received and the outweighing of these by
positive comments submitted by customers 
ATTRIBUTE 9: THE PLANNING AUTHORITY HAS GOOD CUSTOMER
CARE 
47

Page 48

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Narrative
The ethos of the Planning service is to be directly contactable with customers, wherever
possible, by all forms of communication. The service maintains a direct telephone service
and excellent links with the Council’s general Contact Centre telephone service.
Telephone calls are invariably either answered directly or returned the same day. Officers
at all levels can be contacted directly by telephone or email. Email responses are
invariably returned within 1-2 working days. 
This customer service ethos was noted by the Improvement Service and the Chief Planning
Officer was invited to present to a recent customer service workshop and training session. 
In respect of Development Management, the Planning service welcomes early
engagement with all applicants and developers prior to the submission of any application.
The service is strongly of the view that submission of informed, detailed, and
comprehensive applications results in quicker decision making and better quality of
developments. 
The Council offers a free of charge pre-application advice service intended to guide and
inform the formulation of all development proposals. Maintaining a free of charge service
for pre-application advice is becoming less common in Planning Authorities nationally
however North Ayrshire is committed to the continuation of this given the customer care
and development quality benefits that result. 
The Planning service also offers Processing Agreements for all National or Major
applications and for complex local developments. Details of the Processing Agreements
process is available on the Planning Website Make a planning application. A Processing
Agreement is used to set out the key processes in determining the application, identifying
what information is required and from whom and sets the timescales for the delivery of
various stages of the process. It is recognised that there are several benefits of Processing
Agreements including greater transparency in decision making, increased predictability
and certainty over the timing of key stages. 
The Strategic Planning Team has developed a positive working relationship with Homes
for Scotland, going back to the preparation of the adopted Local Development Plan, the
annual Housing Land Audit, and the early stages of preparing LDP3. 
The Service has engaged proactively with the majority of active Community Councils in
North Ayrshire over the past two-years, providing advice on how they can best engage with
the Planning system. 
48

Page 49

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Does the planning authority have a community engagement strategy and infrastructure
in place to ensure engagement is early, collaborative, meaningful and proportionate?
YES -  the Planning service in North Ayrshire is small, agile and with a demonstrable
track record of community engagement in fulfilment of a wider Council commitment.
There is not considered a need to formalise this in a community engagement strategy
which could be at the expense of the agility and directness of existing community
contact and engagement 
 Has the planning authority undertaken community engagement, for example consistent
and effective use of the Place Standard Tool, to inform decision-making processes? Has
the planning authority encouraged and promoted planning applications to be submitted
through the e-development portal?
YES – the Place Standard Tool is regularly utilized and the e-development portal is
promoted for the submission of all planning applications however applicants who
demonstrate that they cannot use the portal can be accommodated by alternative
submission eg. email or paper receipt. 
 Has the planning authority engaged with a good representation of the community
including young people, gypsies and travellers, people with protected characteristics,
including disability, race, age, sex and sexual orientation, and including people from a
range of socio-economic backgrounds?
YES – the Planning service engages with all customers and communities in North
Ayrshire
 Has the planning authority supported the production of Local Place Plans when
requested?
YES 
 Do the results from the customer and stakeholder survey show that stakeholders are
satisfied with their collaboration with the planning authority?
YES 
Narrative
The Planning service is strongly committed to collaboration with local communities,
public bodies, and other stakeholders at all relevant stages of the planning process.
ATTRIBUTE 10: THE PLANNING AUTHORITY HAS EFFECTIVE
ENGAGEMENT AND COLLABORATION WITH STAKEHOLDERS
AND COMMUNITIES
49

Page 50

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
In respect of Development Management, engagement is undertaken daily in often
challenging circumstances of polarized opinions. Notwithstanding this, the service is
committed to a “listen first” approach to development assessment and to the clear
demonstration of appropriate assessment in reports of handling and decision-making
accountability. 
The Strategic Planning Team has ensured that the current Development Plan Scheme
includes a Participation Statement setting out when consultation is likely to take place,
with whom and its likely form, including the steps to be taken to involve the public in the
preparation of  the local development plan.   
Early engagement to inform the Evidence Report/LDP3 was focused around the use of the
Place Standard Tool, to gather information on what local people think about the places
they live, work and visit in North Ayrshire: Have Your Say Today - Your Place Survey - North
Ayrshire’s Third Local Development Plan. This builds upon previous use of the Tool to
identify Community Planning locality priorities and evidences the strong links between
community planning and spatial planning in North Ayrshire.    
Specific engagement has been undertaken with children, young people and
gypsy/travellers. A commitment has been made via the Council’s emerging equality
outcomes to ensure new places, spaces and buildings will be inclusive and designed to
take account of the needs of people with disabilities and other protected characteristics,
including through their engagement in the preparation of LDP3.   
The Planning service has recently engaged with North Ayrshire schools STEAM week which
enables children to apply their science, technology, engineering, and mathematics
knowledge in contexts that make connections between the classroom and the world
around them. This work involves facilitating and participating in workshops in partnership
with the Council’s Education service. 
The Strategic Planning Team has supported six community bodies to prepare a Local Place
Plan (LPP) with all  plans now registered and a further plan expected soon. We have
prepared a ‘Handbook’ to guide community bodies preparing Local Place Plans and
engaged positively to support the preparation of these plans, providing advice and
technical support where required. This has been welcomed by a number of the community
bodies we have supported.  Local Place Plans are now registered for approximately 70% of
the communities of North Ayrshire. This is understood to be unmatched nationally and a
testament to the commitment to the Planning system by communities in North Ayrshire
and the support that they have received from the Planning service working with wider
Council services and specifically community development staff.
50

Page 51

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Improvement Action Plan (Engage theme) 
Attribute Score 
(1=Making excellent progress, 5= No progress) 
9. This planning authority has good customer care 1
10. The planning authority has effective engagement and collaboration with
stakeholders and communities.
1
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/
Medium/ Low) and by when (short/ medium/ long term). 
Improvement Action
What action will you take?
What will the outcome be? 
Owner Importance
High 
Medium
Low
Timescale 
Short term – 1 year
Medium term – 3 years
Long term – 3+ years
Resources     
51

Page 52

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
A high performing planning authority should
demonstrate place leadership by taking a collaborative
place-based approach in line with the Place Principle. It
should use the Place and Wellbeing Outcomes in
decision-making processes, to achieve the three spatial
principles outlined in NPF4: Sustainable places, where
we reduce emissions, restore and better connect
biodiversity; Liveable places, where we can all live
better, healthier lives; and Productive places, where we
have a greener, fairer and more inclusive wellbeing
economy. The planning authority should seek to ensure
that there are no impediments to delivering agreed
development. 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Is the planning authority aware of the Place and Wellbeing Outcomes, the evidence
that sits behind them and is it using them in decision-making processes?
YES
 Has the planning authority identified tools and approaches to delivering sustainable,
liveable, and productive places and is implementing them?
YES 
Narrative
In 2024 North Ayrshire Council established a new Communities, Housing and Public
Protection Directorate to provide greater focus on community delivery outcomes. This
has ensured a wider understanding of Place and Wellbeing Outcomes in the Directorate
composition. 
ATTRIBUTE 11: THE PLANNING AUTHORITY SUPPORTS THE
DELIVERY OF SUSTAINABLE, LIVEABLE AND PRODUCTIVE
PLACES
52

Page 53

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Within the Planning service there is a high awareness of Place and Wellbeing Outcomes
by officers and how these should be used in decision-making processes. 
A cornerstone policy in the extant LDP2 is SP1 (Placemaking) and this is an important
foundation on which all decisions are made and the criteria of policy SP1 are consistent
with both NPF4 and Place and Wellbeing Outcomes. 
LDP, NPF4 (combined being the Council’s statutory Development Plan) policies and non-
statutory Supplementary Guidance Place and Wellbeing Outcomes are all used to deliver
sustainable, liveable, and productive places in North Ayrshire. 
The Strategic Planning Team represents North Ayrshire Council as one of three
authorities working in partnership with Public Health Scotland (PHS), the Institute of
Health Equity (IHE) and local NHS health board to form the ‘Collaboration for Health Equity
in Scotland’ (CHES). This partnership aims to help local areas and community planning
partners to strengthen local plans – including LDPs – to reduce health inequalities and
improve wellbeing in their communities. It intends to support local partners to bridge the
gap between national policies and local implementation and understand the actions which
will have the greatest impact on health inequalities locally and help to overcome the
barriers to implementing these. The ultimate goal is to enable people to live longer,
healthier lives by addressing the root causes of health inequalities and preventing illness
before it starts.  
Working alongside colleagues in South Lanarkshire and Aberdeen City, supported by the
Place & Wellbeing Partnership Lead at the Improvement Service & Public Health Scotland,
we are exploring how the associated ‘Marmot 8’ principles along with the Place and
Wellbeing Outcomes can be embedded into both the evidence report and then LDP3.   
53

Page 54

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Has the planning authority provided clear and proportionate expectations of Section 75
agreements and set these out in the LDP and pre-application discussions and they are
concluded within 6 months of resolution to grant?
YES 
 Does the planning authority take a proportionate approach to imposing conditions?
YES - In North Ayrshire, conditions are proportionally applied for every decision
made and no discretionary charging for condition discharge is levied or
proposed as it is considered it would be to the detriment of customer service,
post decision development implementation and therefore community and
economic development.
 Does the planning authority have an ambitious local housing land requirement that
exceeds the Minimum All Tenure Housing land requirements in NPF4 and is it on track
to support delivery? 
YES
 Are the number of processing agreements the planning authority has agreed with
applicants increasing?
NO
 Does the planning authority have an effective delivery programme in place that
supports the delivery of development on the ground?
YES 
Narrative
To support development and regeneration in North Ayrshire the Planning service does not
routinely require developer contributions. The Local Development Plan expects the
majority of new development to be directed towards sites that have infrastructure or
services in place. Where further provision is required, the Supporting Development
Objective: Infrastructure and Services policy within the Adopted Local Development Plan
(p.16) sets out clear and proportionate expectations and the need for relevant
assessments is highlighted alongside each development site where potential
infrastructure deficiencies are known. 
ATTRIBUTE 12: THE PLANNING AUTHORITY SUPPORTS THE
DELIVERY OF CONSENTED DEVELOPMENT
54

Page 55

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
The Planning service has completed its Evidence Report and this is with DPEA at Gate
Check for consideration with a decision expected in April. In preparing the Evidence
Report, a draft Housing Evidence Paper was shared with Homes for Scotland; Registered
Social Landlords operating in North Ayrshire; developers and agents included on the LDP
mailing list; and parties who have approached the Strategic Planning team with an interest
in having housing sites allocated in LDP3. The Housing Evidence Paper was reissued
(without substantive changes) more widely for comment via the LDP Online Hub and
emails to community councils and the remainder of the LDP mailing list.   
The Paper proposes an indicative Local Housing Land Requirement figure of 4,500 homes,
which exceeds the MATHLR by 52.5%. A ‘Call for Ideas’ has been launched which will
assist in the allocation of deliverable land by LDP3 to meet the 10-year Local Housing Land
Requirement. 
A Draft Delivery Programme was submitted to Scottish Government on 8 April 2025, which
takes account of the views of the key agencies and other stakeholders. At this point, we do
not intend to publish the Delivery Programme rather we will seek approval alongside the
Evidence Report later in the year, following the finalisation of the 2024/25 Housing Land
Audit.   
In respect of Development Management, the free pre-application service supports the
submission of planning applications with necessary information provided to aid decision
making outcomes. 
A general presumption against the use of legal agreements minimises decision making
complication and delay 
The number of processing agreements being used is not increasing but continue to be
promoted on the Council’s website and offered where appropriate during the assessment
of planning applications. Limited uptake from applicants is considered to be another
indication of general satisfaction with decision making and the timescales for this as
evidence by demonstrated excellence in decision making performance. 
Processing agreements are automatically entered into for all major applications and some
complex local applications. The number is small annually (generally less than 10) and
dependent on the number of applications received but consistently applied. In addition,
processing agreements will always reasonably be entered into at an applicant’s request for
any application. 
55

Page 56

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
56

Page 57

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Improvement Action Plan (People theme) 
Attribute Score 
(1=Making excellent progress, 5= No progress) 
11. The planning authority supports the delivery of sustainable, liveable and
productive places
1
12. This planning authority supports the delivery of appropriate development 1 
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/
Medium/ Low) and by when (short/ medium/ long term). 
Improvement Action
What action will you take?
What will the outcome be? 
Owner Importance
High 
Medium
Low
Timescale 
Short term – 1 year
Medium term – 3 years
Long term – 3+ years
Resources     
57

Page 58

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
National Planning Improvement Framework
(NPIF)
North Ayrshire Council
Performance Assessment 2025/26  March 2026
Cohort 3 
58

Page 59

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
59

Page 60

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Planning Authority: North Ayrshire Council
Lead officer: Allan Finlayson
Email: allaninlayson@north-ayrshire.gov.uk
Phone number: 07500 226257 
North Ayrshire Planning Service
The Planning Service in North Ayrshire, from January 2024, sits within the Housing and
Public Protection Service within the Communities and Housing Directorate. The Chief
Planning Officer heads a team of ten professional planners and four support staff split
between two teams: Development Management and Strategic Planning. 
Our Development Management team continue to deliver sector-leading determination
timescales for planning applications while handling a high number of cases per officer.
The Strategic Planning Team is at a progressed stage and on track in the preparation of
North Ayrshire’s third Local Development Plan, undertaking early engagement with
communities and stakeholders.   
Introduction
The Planning (Scotland) Act 2019 introduced a new approach to measuring the
performance of planning authorities and made it mandatory for authorities to prepare a
report on their performance after the end of each financial year. 
The National Planning Improvement Framework (NPIF) has been developed by the
National Planning Improvement Champion and aims to support a planning authority to
assess their performance, identify areas of improvement and ascertain how best to
action these to maximise their effectiveness and efficiency. 
The National Planning Improvement Framework aims to support the purpose of
planning to manage the development and use of land in the long-term public interest
through ensuring that: 
▪ The planning system enables the delivery of sustainable, liveable, and productive
places. 
▪ Planning services are equipped to work effectively and efficiently, embedding
continuous improvement. 
▪ Users are able to engage constructively with the planning system and planning
service. A self-assessment tool has been development and focuses on the attributes of
a high performing planning authority. The attributes are grouped into five themes as
detailed below. 
60

Page 61

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
61

Page 62

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
NPIF Scoring Matrix 
Engagement on the National Planning Improvement Framework (NPIF) 
On completion of a draft NPIF the Planning service fulfilled a required peer review
meeting with the National Planning Improvement Champion, the Improvement Service,
Elected Members and internal and external stakeholders. An intention to include the
attendance of external peer review partner (Angus Council) was not possible as a result
of matters out with North Ayrshire’s control. 
The peer review meeting examined the NPIF, discussed its content and the Planning
service in North Ayrshire with all attending parties. 
A decision was made not to invite a community council to the peer review meeting for
the reason that this would not be fully representative of all communities of North
Ayrshire. To fulfil the importance of engaging with all North Ayrshire’s communities it
was determined to update the NPIF with feedback received from the peer review
meeting attendees, the National Improvement Champion and the Improvement Service
and, thereafter, to consult on a revised NPIF with all community councils in North
Ayrshire. 
The revised draft NPIF was subsequently issued to all community councils in North
Ayrshire seeking comments. In addition, the Chief Planning Officer offered to present a
summary of the draft NPIF to all community councils at one of their meetings to inform
on the NPIF and assist in the submission of community views. 
Presentation of the NPIF was subsequently made to all responding community councils
and all feedback has been incorporated into the finalised NPIF. In summary, comments
62

Page 63

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
on the NPIF were positive as was feedback on community engagement with the
Planning service and North Ayrshire Council more widely. Attendance at community
council meetings also provided opportunity to discuss contentious planning
applications, future engagement opportunities in relation to the emerging Local
Development Plan and North Ayrshire Council more widely in respect of many matters
such as community wealth building, community wellbeing and community
infrastructure delivery.  Notwithstanding good experience of past engagement being
noted, discussion on lesson learning took place on how community engagement and
planning decision making could be improved in the future. The approach taken in
respect of community consultation on the NPIF was welcomed by all community
councils and acknowledged as good practice to be built on in the future. 
The only concerns raised by community councils in relation to the NPIF were made in
respect of identified staff resourcing which was seen as a potential impediment to the
success of future engagement with communities and the addressing of identified
community needs. The best examples of this related to impact on investigation and
enforcement of unauthorised development and the ability of the Planning service to
fully develop community engagement in respect of aspirations and concerns contained
in registered Local Place Plans (LPPs). 
63

Page 64

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
A high performing planning authority needs to have
the right number of people to do the work expected of
it with the rights skills set. It also needs to have a
strategy to ensure that it retains and recruits the right
staff in the future. It supports staff to upskill and to be
prepared for changes in policy, legislation, and new
circumstances. 
Please consider the following when thinking about this attribute and how you have
performed over the last year:  
 Does the planning authority have the sufficient level of staff to carry out all activities
within the required timeframes?
YES – although staff resource issues exist
 Does the planning authority have the ability to carry out all activities within the
required timeframes with its current budget?
YES
 Does the planning authority have the ability to carry out all activities within the
required timeframes with its current income?
YES
 Does the planning authority received responses from consultees within the
prescribed timescale when assessing planning applications?
YES 
 Does the planning authority have the ability to access the appropriate advice,
expertise, evidence, and data it requires?
YES
Narrative
The Development Management Team is one of the smallest pro-rata of all Scottish
Planning Authorities at only 5.75 FTE posts comprising of 1.75 FTE Senior Planning
Officers, 2 Planning Officers and 2 Assistant Planning Officers.  The team has 2 FTE
support staff with no enforcement or specialist officers.
The team has experienced significant resource issues in the last year with business
case justification required for the recruitment of a Planning Officer vacancy and
difficulties thereafter in recruiting an Assistant Planning Officer position following
internal promotion. The Planning Officer position was vacant, for 4 months and the
Assistant planning officer post was vacant for one year but has recently been filled.
ATTRIBUTE 1: THIS PLANNING AUTHORITY HAS SUFFICIENT
RESOURCES AND SKILLS TO MAXIMISE PRODUCTIVITY
64

Page 65

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Informal peer review of comparable Planning service resourcing has confirmed that the
team is as little as one third of the size of comparable authorities and with as much as
twice the caseload per officer.     
Consultees play a significant role in the processing of planning applications. Internal
consultation responses are generally received within the requested timescale.
However, there are regulatory pressures on our internal consultees and therefore
limited resources available to direct planning application consultations. External
consultation responses have been noticeably delayed as a result of pressure by
additional demands arising from the implementation of National Planning Framework
(NPF4), enhanced Local Development Plan (LDP) requirements and resourcing
pressures generally. Delay in the consultation process impacts on planning application
determination timescales and is outwith the control of the Planning service. 
The Strategic Planning Team is comprised of a Strategic Planning Manager, 2 Planning
Officers, 1 Assistant Planning Officer and a Technician. The team is currently operating
at a reduce resource following the loss of the Assistant Planning Officer to a promoted
post in a neighbouring authority As with the Development Management team the
Strategic Planning team is small when compared to comparable Planning Authorities
and has no specialist officer resource in areas such as historic buildings or landscape. 
The team is responsible primarily for all aspects of the preparation of the Council's
Local Development Plan and providing support to community bodies in the preparation
of Local Place Plans. The team consists of a manager, two planning officers, an
assistant planning officer and technician.   
The Strategic Planning Team has recently finalised an Evidence Report and submitted
this to Scottish Government as part of the “Gatecheck” process. The breadth of topics
to be covered and the data collection, analysis and engagement that is necessary to
pass the Gate Check stage provided a significant workload challenge for the team.
Identified risks related to the capacity for engagement with Key Agencies and the
impact of an Evidence Report being returned following Gate Check would have on the
planning authority being able to meet the Scottish Government expectation of having a
new style LDP in place within around 5 years of the Regulations coming into force i.e. by
May 2028. To date these risks have been managed and the LDP is on track for adoption
by May 2028. 
Budget provision has been made to support the preparation of the LDP, including the
procurement of specialists to provide appropriate advice, expertise, evidence and data,
specifically in relation to Transport Appraisal; Play Sufficiency Assessment and
landscape assessment.  
Informal review of the Planning service over the past year has identified the following
issues.
65

Page 66

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
 Difficulties in recruitment
 Career progression only possible where a vacancy becomes available
 Ageing workforce in senior positions
 Succession planning limitations
 Increasing legislative complexity without additional resource 
 Pressure of maintaining service excellence in the face of additional pressures
A formal review of the Planning service to examine these issues in more detail is
planned in the coming year. 
Action
Formal reviews of the Planning service will examine existing resource suitability for 
current and future workload, identify potential gaps in service provision, provide
risk  management and a pathway to ensure appropriate future service provision.
66

Page 67

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Professional and Financial Resources
The establishment resource of the Planning service is; 
Head Count:
Chief Planning Officer  1
Development Management  5.75
Development Planning   4  (currently 3 as a result of vacancy)
Technical Support    4
Total     14.75 (currently 13.75 as a result of vacancy 
RTPI Chartered Staff:  6 
Age Profile:
Under 30    2
30-39     5
40-49     5
50 and over    3 
The Chief Planning Officer monitors the service budget on a monthly basis with the
respective service Accountant.
Planning fee income for 25/26 was similar to that of previous years at approximately
£750,000. With outgoings of considerably less than this, the Planning service has
historically “over recovered” in respect of income against expenditure without a
resulting increase in resources. 
67

Page 68

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
68

Page 69

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Please consider the following when thinking about this attribute and how you have
performed over the last year: 
 Does the planning authority have a workforce planning strategy in place?
NO – this is an action
 Does the planning authority have the ability to support staff development and
upskilling and send staff on relevant courses?
YES – training budget exists
 Does the planning authority have a deliverable commitment to support staff health
and wellbeing?
YES – both corporately and within service
Narrative
North Ayrshire Council’s Performance Management Strategy and fair-work-first-
statement aim to aims to create a flexible, skilled, and motivated workforce that
supports the council's vision of a "Fair for All" North Ayrshire. The Council also has a
Wellbeing at Work policy Corporate Health, Safety & Wellbeing and is committed to
excellence in health, safety and wellbeing by preventing or minimising any adverse
impact of our activities and services, and by ensuring that its employees and
communities are safe and protected.
Beyond the identified Council policies there is no Planning workforce strategy however,
as previously noted, a review of the Planning service is programmed for the next year
which will establish service capacities, needs, and strategy for delivery. This work will
build on the informal review previously noted and inform in areas such as workforce
direction, recruitment strategy and financial opportunities/constraints. Action 
The recruitment of Town Planners and associated staff is a national challenge as
recognised in work such as the Royal Town Planning Institute /Heads of Planning
Scotland and Scottish Government Future Planners Project. A historic reduction in the
number of undergraduate Town Planning courses has been addressed with potential
geographic significance to North Ayrshire with the initiation of an accredited course at
the University of West of Scotland bolstering the only other undergraduate course at
Dundee University and the postgraduate course at Glasgow University. The North
Ayrshire Planning service does not currently have budget for intern or graduate
placements however this will be considered in the programmed Planning service
review. 
A more pressing concern, however, is the limited staff resource that can be dedicated
to the investigation into and enforcement of planning breaches. This is an ongoing
difficulty in meeting the expectations of customers concerned with enforcement
matters. The Planning service has no dedicated enforcement officer, and this obligation
ATTRIBUTE 2: THE PLANNING AUTHORITY HAS A VALUED AND
SUPPORTED WORKFORCE
69

Page 70

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
is shared between Development Management Officers who already have a higher than
nationally averaged workload in respect of application caseload. Therefore, the
investigation of additional staff resource for the service is an action. 
An additional resource concern is the absence of a managerial position in the
Development Management team to reflect the existence of such in the Strategic
Planning team. This is a staffing resourcing issue that will also be investigated as an
action. 
Opportunities to support Planning staff by means of training and upskilling are
constantly reviewed and a limited training budget exists for this. The Planning service is
also committed to enhancing the skills, talents, and confidence of staff through
attendance at relevant and suitable training and development courses which include
those hosted by the RTPI, relevant chapter events, HOPS and the Improvement Service
and other providers. 
70

Page 71

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Improvement Action Plan (People theme) 
Attribute Score 
(1=Making excellent progress, 5= No progress) 
1. The planning authority has sufficient resources and skills to maximise
productivity 
4
2. The planning authority has a value and supported workforce  2 
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/
Medium/ Low) and by when (short/ medium/ long term). 
Improvement Action
What action will you take?
What will the outcome be?
Owner Importance
High 
Medium
Low
Timescale 
Short term – 1 year
Medium term – 3 years
Long term – 3+ years
Resources
Service review Allan Finlayson High Short Internal
Workforce Planning strategy Allan Finlayson High Short  Internal/peer review
Enforcement resourcing
improvement
Allan Finlayson High Short 
Development Manager
resourcing improvement
Allan Finlayson Medium Medium 
71

Page 72

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
A high performing planning authority has a positive
culture through ensuring it has sound governance,
effective leadership and a commitment to continuous
improvement. The authority has an identified chief
planner, who is supported by a strong leadership group
to advise on decision-making, policy and operational
management. 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Has the planning authority undertaken an annual assessment of its performance and
acted upon areas previously identified as in need of improvement?
YES – annual informal assessment undertaken with committed action to formalise
 Has the planning authority achieved recognition at relevant awards or through
performance accreditation frameworks?
YES – previous award recognition however current resourcing issues preclude seeking
this at this time
 Has the planning authority engaged in peer review, good practice exchange or
improvement activities?
YES – informal peer review and lesson learning regularly undertaken 
 Has the planning authority addressed any complaints upheld by the Scottish Public
Services Ombudsman and have evidence of this and that it has learned from valid cases?
YES – previously however no SPSO cases within the reporting period
Narrative
Continuous improvement of the Planning service is always the subject of ongoing review
and focusses on Development Management and Local Development Planning
obligations.
Development Management performance has decreased slightly as a result of resourcing
difficulties but remains nationally leading and significantly higher than national averages.
The Local Development Plan (LDP) is currently on track for adoption before the 2028
Scottish Government target however programme slippage has been noted recently, again
as a result of resourcing issues and the delay experienced in Scottish Government’s
ATTRIBUTE 3: THIS PLANNING AUTHORITY HAS EMBEDDED
CONTINOUS IMPROVEMENT.
72

Page 73

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
consideration of the LDP Evidence Report at Gate Check stage. The LDP Development Plan
scheme is as up to date as possible in these circumstances.
National award recognition of the high standards of performance and achievements of the
Planning service has been achieved previously. Most notably awards have been given in
the Scottish Awards for Planning (2019) and Royal Town Planning Institute’s Awards for
Planning Excellence (2016 and 2017). Regrettably, given resourcing pressures, the focus of
the Planning service is now on maintaining performance and has not recently been in a
position to seek award recognition to promote the service excellence being maintained. 
Development Management Performance
Our decision-making demonstrates continuous evidence of nationally leading timescales
in the determination of all type of planning applications to assist the development and
meet customer expectations.
Development management performance has decreased slightly in the last year as a result
of long-term vacancies and recruitment difficulties however the performance of the
Planning service remains the highest in Scotland in most measurable indices and in the top
three of all.
The offer of processing agreements or other agreed project plan is made to prospective
applicants in advance of all major applications and availability publicised on planning
authority website.
Early collaboration with applicants and consultees on planning applications providing
clear and proportionate development advice is usually available in the promotion of free of
charge pre-application discussions for all prospective applications. This service is
currently suspended for less significant proposed developments on the basis of vacancy
and recruitment impacts but will be re-introduced as soon as possible following
successful recruitment.
Legal agreements are avoided where possible or invariably concluded within 6 months of
‘resolving to grant’ planning permission.
The Planning service Enforcement charter was last updated in March 2023 and is
therefore due for further updating. This is action for progression in the short term. Action 
Development Plan Progress
North Ayrshire’s Local development plan is currently on track for adoption in late 2027 in
advance of the Scottish Government 2028 target for all Planning Authorities.
The Development plan scheme was last adopted in November 2024 Development Plan
Scheme as required annually. Updating is currently postponed until confirmation of a
decision by Scottish Government at Gate Check. 
Engagement with stakeholders including Elected Members, industry, agencies, the public
and Scottish Government are engaged appropriately through all key stages of development
plan preparation. 
73

Page 74

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Continuous improvement: progress relevant service improvement commitments
identified through NPIF report. 
Delivery of 2025/26 Service Improvement Actions
Repositioning the Planning Service to promote Placemaking: 
 Ayrshire Growth Deal: Contribute to the implementation of the Ayrshire Growth Deal
in North Ayrshire and the wider growth and investment opportunities. 
In addition to supporting the delivery of major investment planned for Hunterston, the
Planning Service has supported the preparation of masterplans for Ayrshire Growth
Deal projects at i3 and the Great Harbour, both in Irvine. 
 Support economic recovery and renewal by contributing to a cross service/Council
approach to economic development, centred on placemaking and Community Wealth
Building. Exploring the alignment of planning and community wealth building, including
in context of NPF4.
The Planning Service continues to collaborate with Economic Development and
Community Wealth Building to input into the preparation of a Regional Economic
Strategy for Ayrshire and the Council’s Community Wealth Building initiatives to
support sustainable economic development within the Ayrshire region and North
Ayrshire communities. 
Driving Improved Performance:
 Development Management: Continue to provide an efficient and effective
Development Management Service. 
The Planning service continues to maintain sector-leading performance in comparison
with nationwide peers despite recent resourcing difficulties. 
 Service Delivery: review service delivery to identify potential opportunities to improve. 
The Planning service was operating under an extended period of resource constraint
since 2024 as a result of the filling of three vacancies out of a team of fifteen therefore
there has been limited opportunity to review potential service improvements.
Notwithstanding the above position, the Local Development team has continued to
develop community engagement. The team has significantly supported the preparation
of Local Plan Plans (LPPs) by local communities to engage, inform and support the
74

Page 75

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
preparation of the emerging Local Development Plan (LDP3). Collaboration with
Community Wellbeing colleagues in community engagement has been further
developed to deliver “one-stop” community consultation involving the Planning service
and the preparation of interdependent information resources such as Place Profiles 
North Ayrshire Place Profiles that collate information from cross Council services.
Modifications to the Development Management processes continue to be made to
ensure planning applications can be determined as efficiently as possible. Limited staff
resource requires that case officers have responsibility for enforcement, the validation
process, sending acknowledgement letters, consultations, posting site notices and
ensuring the Uniform database is maintained to support service standards being
upheld. 
Recent changes have been made to remove some information publicly displayed on
the Council’s Online Planning Information System (OPIS) such as objection comments
and consultation responses. The reason for this is that resource does not exist to
redact information and also that OPIS appears to be being used by some of the public
as an extension to social media platforms e.g. referring to and cross-referencing
comments to seek to direct application assessment. 
Promoting the plan-led system:
 Development Planning:  Following the timetable set out in the Development Plan
Scheme, develop Evidence Base to inform LDP3. 
The Development Plan Scheme was last adopted in November 2024, and we are on track
and nearing the end of the Evidence Reporting stage of LDP3 preparation. 
A strong emphasis is placed within the Strategic Planning Team service on sharing good
practice, skills, and knowledge, including via HOPS sub-forums, the Knowledge Hub
resource, and informal groups, including the Fife LDP Peer Review Group and regular
meetings with South and East Ayrshire.  
In 2025, the Chief Planning Officer “reached out” to peers in East and South Ayrshire to
further develop regional understanding of Planning and related matters and inform
collaborative working, for example, in respect of regional economic and spatial strategy,
and housing, climate and nature crises. This has progressed significantly in the
subsequent period to develop regional spatial and economic understanding and initiatives. 
2025/26 Service Improvement Actions
As a result of the Planning service operating under an extended period of resource
constraint no new improvement actions for the Planning Service have been set at this time. 
The Service is continuing to focus on the early stages of preparing Local Development Plan
3 and is on track for adoption in accordance with Scottish Government targets. 
75

Page 76

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Delivering an efficient and effective Development Management service is being maintained
with the highest level of performance being demonstrated in national comparison.
Notwithstanding the above, the Chief Planning Officer intends to continue to develop
regional collaboration in further discussion with neighbouring authorities in Inverclyde and
Renfrewshire Councils. Action 
76

Page 77

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Does the planning authority have an effective scheme of delegation in place?
YES – reviewed annually and up to date
 Have all councillors who exercise a planning function undergone statutory training and
is there is evidence of ongoing training for members?
YES – historically undertaken in advance of and beyond legislative requirement
 Have more than x % of officer recommendations have been overturned by councillors at
committee or Local Review Body.
NO – historically low numbers of overturned recommendations
Narrative
The Planning service is incorporated within North Ayrshire Council’s Communities,
Housing and Public Protection directorate. This directorate was newly formed in 2024 to
respond to the Council’s commitments in these service areas. 
The decision-making ability of the Planning service is established in the Council’s adopted
Scheme of Delegation, and this details the circumstances whereby planning applications
are required to be considered and determined by the Planning Committee. The scheme of
delegation provides decision making powers to the Chief Planning Officer on an extended
basis in the interests of efficiency in dealing with local planning applications however
major and sensitive applications are commonly determined by the Council’s Planning
Committee. The Scheme of Delegation was most recently adopted in October 2025 and is
regularly reviewed. 
The Local Review Body is the method of appealing decisions made by the Chief Planning
Officer under the Scheme of Delegation. The Local Review Body conducts reviews in
respect of the refusal of planning permission, failure to determine applications and the
imposition of conditions. 
In the last year, the Local Review Body (LRB) determined only four applications for
review. This is considered to demonstrate both general satisfaction with the decision
making of the Chief Planning Officer under the Scheme of Delegation and the
appropriateness of decisions made. The Local Review Body overturned only one officer
decision in this period.
ATTRIBUTE 4: THE PLANNING AUTHORITY HAS SOUND
GOVERNANCE 
77

Page 78

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
The Council’s Planning Committee is the decision-making board which determines
planning applications where delegation authority is not provided to officers. The Planning
Committee meets monthly to consider recommendations on planning applications and
Local Development matters as appropriate. In the past 12 months, 96% of applications
considered by the Planning Committee were decided in accordance with officer
recommendation. This equates to only one officer recommendation being overturned in
that period. 
The Planning (Scotland) Act 2019 requires that mandatory training is implemented for all
elected members who are involved in any decisions involving planning matters. It should
be noted that, as a commitment to effective decision making, North Ayrshire Council has
historically undertaken elected member training significantly in advance of this legislative
requirement. Training is undertaken on a six-monthly basis most recently in December
2024, June 2025 and December 2025. Interim and individual training can be provided at
any time e.g. for new Committee members as and when required. 
In the last year only two appeals to Scottish Ministers for planning decisions have been
made and both remain under consideration. One further planning appeal was submitted
but was rejected as being out with the remit of the DPEA. As noted above in respect of
delegated decisions, the low level of appeals to Scottish Ministers is considered to
demonstrate general satisfaction with and the appropriateness of decisions made.
Guidance to applicants on how to appeal either to Scottish Ministers or the Local Review
Body is available on the Council’s website Planning reviews and appeals.  
78

Page 79

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Does the planning authority have an identified Chief Planning Officer in place?
YES – since 2021, well in advance of regulatory requirement
 Does the Chief Planning Officer advise on corporate decision making and policy within
the broader organisation?  
YES
 Is the planning authority's Chief Planning Officer a member of the Royal Town Planning
Institute?
YES
 Does the Chief Planning Officer advise and support external bodies through engagement
in organisations’ committees, advisory groups or working groups?  
YES
 Does the planning authority have a strong leadership team that supports a culture of
continuous improvement?
YES - both corporately and within service 
Narrative
A Chief Planning Officer was appointed in 2021, in advance of the statutory requirement
being put in place by the Scottish Government in 2024. The officer in question is a
Chartered Member of the Royal Town Planning Institute (RTPI) and is the head of the
profession within the Council. The Chief Planning Officer provides advice throughout the
Council to other departments and services, other Senior Managers, Elected Members, and
members of the public in relation to planning matters. 
Guidance on the role of the Chief Planning Officer advises that the position should
strengthen leadership on planning and corporate recognition of the importance and
positive influence of planning within a Council. The duties and responsibilities of the Chief
Planning Officer are positioned around 5 main attributes: 
 Professional Advisor 
 Delivering National Planning Priorities 
ATTRIBUTE 5: THE PLANNING AUTHORITY HAS EFFECTIVE
LEADERSHIP  
79

Page 80

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
 Champion of place 
 Head of Profession 
 Performance Improvement
The role of the Chief Planning Officer as a Professional Advisor is to direct on the vision
and implementation of the National Planning framework (NPF4) and Local Development
plan for North Ayrshire spatial and associated development priorities.
The Chief Planning Officer is a member of the Council’s Senior Management Team (SLT)
and advises the Council’s Executive Leadership Team (ELT) and elected members in the
development and delivery of corporate objectives to promote and achieve the Strategic
Plan priorities in a spatial and place-based approach. 
The role of the Chief Planning Officer includes Delivering National Planning Priorities in
the alignment and delivery of national planning objectives within North Ayrshire. 
As a Champion of Place, the Chief Planning Officer directs and delivers place making
ambitions within the Council, is the Council’s placemaking champion and ensures a
collaborative approach to place making with other Council officers, elected members and
developers. 
The Chief Planning Officer is the Head of the Planning Profession in North Ayrshire and
the most senior responsible qualified officer for the Council’s Planning Service. The Chief
Planning Officer is the main contact for key stakeholders on planning and place and
represents the Council internally and externally on several groups requiring or benefitting
from input from the planning function. 
The Chief Planning Officer is ultimately responsible for the Performance and
Improvement of the planning service in North Ayrshire and the embedding of an ethos of
continuous improvement. 
The Chief Planning Officer in North Ayrshire participates and advises a number of internal
and external bodies to provide spatial and development planning advice. These include. 
 Ayrshire Economic Partnership Board 
 Ayrshire Economic Joint Committee
 Arran Housing Taskforce
 B714 Project Delivery Board
 Clyde Marine Planning Partnership
 North Ayrshire Inward Investment Group
 Irvine Town Board (Long Term Plan for Towns)
 Islands Group Board 
80

Page 81

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
 Ayrshire Planning Regional discussion group 
Reporting to the Chief Planning Officer are two Senior Planning Officers responsible for the
Council’s Development Management regulatory service and the Strategic Planning
Manager responsible for the Council’s Development Planning regulatory service. 
The Planning service benefits from a direct relationship to and strong support from the
Council’s Chief Executive, Executive Director of Communities and Housing and Head of
Housing and Public Protection. 
A culture of continuous improvement is expected, supported, and delivered in North
Ayrshire Council generally and specifically within the Planning service. 
The Chief Planning Officer, Strategic Planning Manager and Senior Planning Officers all
engage nationally to keep involved and informed in national Planning practice. This takes
the form of national engagement with Heads of Planning Scotland with participation in
both the Development Plan and Development Management groups. Involvement with the
Improvement Service is undertaken by Planning management and all staff in participation
with the Planning Skills programme. The Chief Planning Officer also presented to an
Improvement Service seminar on Customer Service, this being informed by North Ayrshire
Council and the Planning service commitment to community engagement and removing
barriers to customer service. All  of this has informed preparation of the NPIF. 
81

Page 82

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Improvement Action Plan (Culture theme) 
Attribute Score 
(1=Making excellent progress, 5= No progress) 
3. This Planning Authority has embedded continuous improvement  1
4. This Planning Authority has sound governance 1
5. This Planning Authority has effective leadership 1 
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/
Medium/ Low) and by when (short/ medium/ long term). 
Improvement Action
What action will you take?
What will the outcome be? 
Owner Importance
High 
Medium
Low
Timescale 
Short term – 1 year
Medium term – 3 years
Long term – 3+ years
Resources
Renfrewshire/Inverclyde
regional discussions. Further
develop and undertake
meetings with neighbouring
Councils to understand and
develop competing/co-
operative regional
challenges/opportunities.
Allan Finlayson Medium Short  Chief Planning Officer and
Strategic Planning manager
Enforcement Charter review Allan Finlayson/Iain
Davies
High Short 
82

Page 83

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
A high performing planning authority needs to have an
effective local development plan and other strategies in
place to provide a vision for the future of the area. It
needs to be able to set and deliver on policy ambitions
and priorities by clearly informing decision making and
providing certainty and predictability for communities,
developers and investment. The authority’s
development management systems need to be
effective in making the right decisions about
development and be efficient as possible in doing this.
The planning authority makes best use of digital
technology and how it manages and uses data. 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Does the planning authority have an up to date Local Development Plan in place and/ or
is on track to adoption?
YES – the extant LDP2 is up to date and the emerging LDP3 on track to adoption
 Does the planning authority have an up-to-date Regional Spatial Strategy in place/ or on
track to adoption? 
YES –  a RSS is not yet a legislative requirement however North Ayrshire is progressing
towards preparation of a combined RSS and Regional Economic Strategy in
partnership with South and East Ayrshire Councils
 Has the planning authority’s Local Development Plan Evidence Report been approved by
the Department of Planning and Environmental Appeals and/ or on track for approval?
NO – however the Evidence Report has been submitted to DPEA in advance of many
authorities and is currently receiving attention at Gate Check
 Has the application of the Local Development Plan’s policies been found to be deficient
at appeal or judicial review?
NO – policies of the extant LDP2 (2019) are widely considered to be almost entirely
aligned with the subsequent adoption of the National Planning Framework (NPF4) in
2023.  
ATTRIBUTE 6: THE PLANNING AUTHORITY HAS A ROBUST POLICY
AND EVIDENCE BASE 
83

Page 84

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Narrative
North Ayrshire Council’s development plan consists of Local Development Plan (LDP2),
which was adopted in November 2019  Adopted Local Development Plan and the Fourth
National Planning Framework (NPF4), adopted in February 2023 National Planning
Framework 4 - gov.scot. Together these provide an up-to-date development plan covering
North Ayrshire. The local development plan is supplemented by non-statutory planning
guidance documents Non-statutory planning guidance. 
Preparation of a new local development plan (LDP3) is well underway and on track for
adoption in 2027 in advance of Scottish Governments May 2028 deadline. The emerging
LDP’s Evidence Report was submitted to the Directorate of Planning and Environmental
Appeals (DPEA) for Gate Check assessment in January 2026 and a decision is expected in
April. 
Following approval by the appropriate committees of North, South and East Ayrshire
Councils, an indicative Regional Spatial Strategy for Ayrshire was submitted to the
Scottish Government in 2020. Guidance from the Scottish Government remains to be
progressed significantly. Notwithstanding this position, the Chief Planning Officers of all
Ayrshire Councils and Regeneration peers in all Councils  are progressing a combined
Regional Spatial Strategy and Regional Economic Strategy for Ayrshire Ayrshire regional
economic strategy. 
The above work will further develop regional understanding of Planning, Regeneration and
related matters and inform collaborative working, for example, in respect of regional
economic and spatial strategy, housing, climate and nature crises and infrastructure
delivery. Further developing regional discussion with neighbouring authorities in Inverclyde
and Renfrewshire Councils will be progressed in late 2026 to further develop this work and
is a committed action. 
84

Page 85

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Has the planning authority encouraged and promoted planning applications to be
submitted through the e-development portal?
YES – North Ayrshire receives almost entirely all planning applications through the e-
development portal. Notwithstanding this, the receipt of paper applications is
accommodated to assist with customer needs although this rarely occurs.
 Does the planning authority have a data governance strategy in place for the
management of planning data?
YES – both corporately and in service.
 Does the planning authority have the ability to use interactive web-mapping, GIS, and
spatial data?
YES – the service use of interactive and digital data is provided at a level significantly
beyond reasonable expectations of the small Planning team. This is considered a
testament to the professionalism of officers and their commitment to customer and
community engagement
 Does the planning authority have the ability to use digital approaches to engagement,
including website, social media, and other platforms?
YES – and, again, the use of these approaches is provided at a level significantly
beyond reasonable expectations of the small Planning team. 
Narrative
The North Ayrshire Council website has a number of pages dedicated to various aspects of
planning. The Council website has recently been updated to a new, clearer, and more
interactive platform, and officers of the Planning service have contributed to this process
to take the opportunity to update information and links as appropriate. In addition,
updating of the Planning pages is undertaken “in house” as and when required. Planning
and Building Standards 
In respect of Development Management, during 2025-26 96% of planning applications
received were submitted through the Planning Portal, accounting for almost all of the 600
applications received. Use of the Portal is actively encouraged and clear advice with links
is provided on the Planning pages of the Council’s website Make a planning application 
ATTRIBUTE 7: THE PLANNING AUTHORITY MAKES BEST USE OF
DATA AND DIGITAL TECHNOLOGY
85

Page 86

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
This approach minimises our handling of documents and ensures greater efficiency in
application receipt, validation, and assessment. Our processes are now fully electronic,
with any hard copy information quickly digitised and we have operated in this manner for
many years. 
The Planning service has developed an interactive Local Development Plan interactive
version of the LDP for the benefit of customer service to aid customer engagement in the
LDP process and also to provide direct digital access to detailed policies and additional
related information that provides more detail about how we will consider proposals for
specific uses or developments. A storymap presentation of the LDP is also available
online. 
The Strategic Planning Team also utilises interactive web-mapping and GIS – specifically
ArcGIS’s StoryMaps – to present a wide range of spatial data. This includes housing and
employment land audits. StoryMaps have been used to create Profiles for North Ayrshire’s
six localities. These have been produced to inform the preparation of our third Local
Development Plan LDP3 and support other placemaking activity. The profiles summarise
key social, cultural, environmental, and economic features of the areas.  
The Service has invested in a three-year Commonplace licence to support engagement on
the Local Development Plan through the creation of an online hub: Have Your Say Today -
North Ayrshire’s Third Local Development Plan - Commonplace.    
ArcSurvey GIS has been deployed for the current ‘Call for Ideas’ exercise, allowing
submitted information in support of promoted sites, including mapped boundaries, to be
digitised more easily: Call for Ideas   
The Planning Services makes spatial data available via the Corporate Open Data Portal
under the Open Government Licence for public sector information and in accordance with
North Ayrshire’s  Open Data Strategy and Publication Plan.   
86

Page 87

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Does the planning authority planning have the ability to make decisions on planning
applications within the required timeframes?
YES – planning application decisions in North Ayrshire are in the top three nationally
which is considered a significant achievement for a small Planning team which is
proportionally one of the smallest in Scotland
 Are less than x% of planning decisions overturned at appeal or judicial review?
YES 
 Does the planning authority have an up-to-date Enforcement Charter in place?
YES – however the Enforcement Charter is due for updating and this is committed as
an improvement action 
 Does the planning authority have the ability to resolve enforcement cases?
YES – however the investigation of enforcement  cases as quickly as would be
preferred remains challenging as there is no dedicated enforcement officer and cases
are investigated by Planning Officers
Narrative
North Ayrshire Council’s Development Management performance has historically
demonstrated nationally leading excellence in decision making timescales
notwithstanding a small team size and limited resources. Over the past 10 years, the
service has regularly been the highest performing Planning Authority across all planning
application determination categories (householder, local, major and national) measured
by Scottish Government Supporting documents - Planning Application Statistics 2024/25
(April 2024 to September 2024) - gov.scot 
Development management performance reduced slightly in the last year as a result of staff
resourcing issues. However, performance remains in the top three Planning Authorities in
all measured categories and the top performing in more categories than any other
Authority. 
Development Management performance in North Ayrshire is significantly above national
average performance levels monitored by Scottish Government Planning statistics -
gov.scot. 
ATTRIBUTE 8: THE PLANNING AUTHORITY HAS EFFECTIVE AND
EFFICIENT DECSION MAKING PROCESSES 
87

Page 88

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
The exceptional performance of the Planning service in North Ayrshire is a cornerstone in
serving the individual, community, and business needs of all our customers.
Commendably, this is achieved whilst providing a free of charge pre-application enquiry
service with no discretionary charging beyond statutory requirements. 
In the last year, the Local Review Body (LRB) determined only four applications for review.
This is considered to demonstrate both general satisfaction with the decision making of
the Chief Planning Officer under the Scheme of Delegation and the appropriateness of
decisions made. The Local Review Body overturned only one officer decision in this period. 
In the last year only two appeals to Scottish Ministers for planning decisions have been
made. One further planning appeal was submitted but was rejected as being out with the
remit of the DPEA. As noted previously, the low level of appeals to Scottish Ministers is
considered to demonstrate general satisfaction with and the appropriateness of decisions
made. 
Further evidence demonstrating general satisfaction with decision making is the very low
number of complaints received by the Planning service. Only three complaints have been
received in the last year and none have been upheld. Furthermore, no complaints
investigated were referred to SPSO. No applications for Judicial Review have been
received. The Planning service has also received a level of communication expressing
thanks for good service received significantly above the number of complaints received.
The extremely low level of complaints received, absence of escalation and decision
making challenge are considered to be a testament to decision making within the Planning
service in North Ayrshire. 
The Planning service Enforcement charter was last updated in March 2024 and is
therefore due for further updating. This is action for progression in the short term. Action
A more pressing concern, however, is the limited staff resource that can be dedicated to
the investigation into and enforcement of planning breaches. This is an ongoing difficulty in
meeting the expectations of customers concerned with enforcement matters. The
Planning service has no dedicated enforcement officer, and this obligation is shared
between Development Management Officers who already have a higher than any national
workload in respect of application caseload. Therefore, the investigation of additional staff
resource for the service is also an action. 
An additional resource concern is the absence of a managerial position in the
Development Management team to reflect the existence of such in the Strategic Planning
team. This is a staffing resourcing issue that will also be investigated as an action.
88

Page 89

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Improvement Action Plan (Tools theme) 
Attribute Score 
(1=Making excellent progress, 5= No progress) 
6. The planning authority has a robust policy and evidence base 1
7. The planning authority makes best use of data and digital technology  1
8. The planning authority has effective and efficient decision making
processes 
2
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/
Medium/ Low) and by when (short/ medium/ long term). 
Improvement Action
What action will you take?
What will the outcome be? 
Owner Importance
High 
Medium
Low
Timescale 
Short term – 1 year
Medium term – 3 years
Long term – 3+ years
Resources
Enforcement charter review Allan Finlayson/ Iain
Davies
High  Short 
Enforcement resourcing
improvement
Allan Finlayson High Short 
Development Manager
resourcing improvement
Allan Finlayson Medium Medium 
89

Page 90

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
A high performing planning authority should ensure a
wide range of people are involved in shaping their
future places. Engagement should be fair and inclusive,
early, collaborative, meaningful and proportionate and
should include difficult to reach groups. The authority
should engage with a wide range of partners at a
national, regional and local level to ensure a joined-up
approach and that links are made across policies and
programmes. The planning authority should
demonstrate good customer care, transparency and
effective communication. 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Does the planning authority have the ability to offer pre-application advice where it is
requested?
YES – North Ayrshire Council is one of a decreasing number of Planning Authorities to
offer free pre-application guidance. There are no plans to introduce charges as this
service is considered important in providing development guidance to customers,
communities and developers to the benefit of all.
 Has the planning authority held regular engagement events with developers and
communities?
YES – the Planning service regularly attends community events and meetings and
engages with the development industry nationally and locally
 Do the results from the customer and stakeholder survey show that customers are
satisfied with the service offer by the planning authority?
YES – consultation on this survey was widely circulated and the limited number of
responses and comments received should be taken as confirmation of satisfaction
with the Planning service in North Ayrshire. This position is corroborated by the
exceptionally low number of complaints received and the outweighing of these by
positive comments submitted by customers 
ATTRIBUTE 9: THE PLANNING AUTHORITY HAS GOOD CUSTOMER
CARE 
90

Page 91

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Narrative
The ethos of the Planning service is to be directly contactable with customers, wherever
possible, by all forms of communication. The service maintains a direct telephone service
and excellent links with the Council’s general Contact Centre telephone service.
Telephone calls are invariably either answered directly or returned the same day. Officers
at all levels can be contacted directly by telephone or email. Email responses are
invariably returned within 1-2 working days. 
This customer service ethos was noted by the Improvement Service and the Chief Planning
Officer was invited to present to a recent customer service workshop and training session. 
In respect of Development Management, the Planning service welcomes early
engagement with all applicants and developers prior to the submission of any application.
The service is strongly of the view that submission of informed, detailed, and
comprehensive applications results in quicker decision making and better quality of
developments. 
The Council offers a free of charge pre-application advice service intended to guide and
inform the formulation of all development proposals. Maintaining a free of charge service
for pre-application advice is becoming less common in Planning Authorities nationally
however North Ayrshire is committed to the continuation of this given the customer care
and development quality benefits that result. 
The Planning service also offers Processing Agreements for all National or Major
applications and for complex local developments. Details of the Processing Agreements
process is available on the Planning Website Make a planning application. A Processing
Agreement is used to set out the key processes in determining the application, identifying
what information is required and from whom and sets the timescales for the delivery of
various stages of the process. It is recognised that there are several benefits of Processing
Agreements including greater transparency in decision making, increased predictability
and certainty over the timing of key stages. 
The Strategic Planning Team has developed a positive working relationship with Homes
for Scotland, going back to the preparation of the adopted Local Development Plan, the
annual Housing Land Audit, and the early stages of preparing LDP3. 
The Service has engaged proactively with the majority of active Community Councils in
North Ayrshire over the past two-years, providing advice on how they can best engage with
the Planning system. 
91

Page 92

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Does the planning authority have a community engagement strategy and infrastructure
in place to ensure engagement is early, collaborative, meaningful and proportionate?
YES -  the Planning service in North Ayrshire is small, agile and with a demonstrable
track record of community engagement in fulfilment of a wider Council commitment.
There is not considered a need to formalise this in a community engagement strategy
which could be at the expense of the agility and directness of existing community
contact and engagement 
 Has the planning authority undertaken community engagement, for example consistent
and effective use of the Place Standard Tool, to inform decision-making processes? Has
the planning authority encouraged and promoted planning applications to be submitted
through the e-development portal?
YES – the Place Standard Tool is regularly utilized and the e-development portal is
promoted for the submission of all planning applications however applicants who
demonstrate that they cannot use the portal can be accommodated by alternative
submission eg. email or paper receipt. 
 Has the planning authority engaged with a good representation of the community
including young people, gypsies and travellers, people with protected characteristics,
including disability, race, age, sex and sexual orientation, and including people from a
range of socio-economic backgrounds?
YES – the Planning service engages with all customers and communities in North
Ayrshire
 Has the planning authority supported the production of Local Place Plans when
requested?
YES 
 Do the results from the customer and stakeholder survey show that stakeholders are
satisfied with their collaboration with the planning authority?
YES 
Narrative
The Planning service is strongly committed to collaboration with local communities,
public bodies, and other stakeholders at all relevant stages of the planning process.
ATTRIBUTE 10: THE PLANNING AUTHORITY HAS EFFECTIVE
ENGAGEMENT AND COLLABORATION WITH STAKEHOLDERS
AND COMMUNITIES
92

Page 93

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
In respect of Development Management, engagement is undertaken daily in often
challenging circumstances of polarized opinions. Notwithstanding this, the service is
committed to a “listen first” approach to development assessment and to the clear
demonstration of appropriate assessment in reports of handling and decision-making
accountability. 
The Strategic Planning Team has ensured that the current Development Plan Scheme
includes a Participation Statement setting out when consultation is likely to take place,
with whom and its likely form, including the steps to be taken to involve the public in the
preparation of  the local development plan.   
Early engagement to inform the Evidence Report/LDP3 was focused around the use of the
Place Standard Tool, to gather information on what local people think about the places
they live, work and visit in North Ayrshire: Have Your Say Today - Your Place Survey - North
Ayrshire’s Third Local Development Plan. This builds upon previous use of the Tool to
identify Community Planning locality priorities and evidences the strong links between
community planning and spatial planning in North Ayrshire.    
Specific engagement has been undertaken with children, young people and
gypsy/travellers. A commitment has been made via the Council’s emerging equality
outcomes to ensure new places, spaces and buildings will be inclusive and designed to
take account of the needs of people with disabilities and other protected characteristics,
including through their engagement in the preparation of LDP3.   
The Planning service has recently engaged with North Ayrshire schools STEAM week which
enables children to apply their science, technology, engineering, and mathematics
knowledge in contexts that make connections between the classroom and the world
around them. This work involves facilitating and participating in workshops in partnership
with the Council’s Education service. 
The Strategic Planning Team has supported six community bodies to prepare a Local Place
Plan (LPP) with all  plans now registered and a further plan expected soon. We have
prepared a ‘Handbook’ to guide community bodies preparing Local Place Plans and
engaged positively to support the preparation of these plans, providing advice and
technical support where required. This has been welcomed by a number of the community
bodies we have supported.  Local Place Plans are now registered for approximately 70% of
the communities of North Ayrshire. This is understood to be unmatched nationally and a
testament to the commitment to the Planning system by communities in North Ayrshire
and the support that they have received from the Planning service working with wider
Council services and specifically community development staff.
93

Page 94

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Improvement Action Plan (Engage theme) 
Attribute Score 
(1=Making excellent progress, 5= No progress) 
9. This planning authority has good customer care 1
10. The planning authority has effective engagement and collaboration with
stakeholders and communities.
1
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/
Medium/ Low) and by when (short/ medium/ long term). 
Improvement Action
What action will you take?
What will the outcome be? 
Owner Importance
High 
Medium
Low
Timescale 
Short term – 1 year
Medium term – 3 years
Long term – 3+ years
Resources     
94

Page 95

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
A high performing planning authority should
demonstrate place leadership by taking a collaborative
place-based approach in line with the Place Principle. It
should use the Place and Wellbeing Outcomes in
decision-making processes, to achieve the three spatial
principles outlined in NPF4: Sustainable places, where
we reduce emissions, restore and better connect
biodiversity; Liveable places, where we can all live
better, healthier lives; and Productive places, where we
have a greener, fairer and more inclusive wellbeing
economy. The planning authority should seek to ensure
that there are no impediments to delivering agreed
development. 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Is the planning authority aware of the Place and Wellbeing Outcomes, the evidence
that sits behind them and is it using them in decision-making processes?
YES
 Has the planning authority identified tools and approaches to delivering sustainable,
liveable, and productive places and is implementing them?
YES 
Narrative
In 2024 North Ayrshire Council established a new Communities, Housing and Public
Protection Directorate to provide greater focus on community delivery outcomes. This
has ensured a wider understanding of Place and Wellbeing Outcomes in the Directorate
composition. 
ATTRIBUTE 11: THE PLANNING AUTHORITY SUPPORTS THE
DELIVERY OF SUSTAINABLE, LIVEABLE AND PRODUCTIVE
PLACES
95

Page 96

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Within the Planning service there is a high awareness of Place and Wellbeing Outcomes
by officers and how these should be used in decision-making processes. 
A cornerstone policy in the extant LDP2 is SP1 (Placemaking) and this is an important
foundation on which all decisions are made and the criteria of policy SP1 are consistent
with both NPF4 and Place and Wellbeing Outcomes. 
LDP, NPF4 (combined being the Council’s statutory Development Plan) policies and non-
statutory Supplementary Guidance Place and Wellbeing Outcomes are all used to deliver
sustainable, liveable, and productive places in North Ayrshire. 
The Strategic Planning Team represents North Ayrshire Council as one of three
authorities working in partnership with Public Health Scotland (PHS), the Institute of
Health Equity (IHE) and local NHS health board to form the ‘Collaboration for Health Equity
in Scotland’ (CHES). This partnership aims to help local areas and community planning
partners to strengthen local plans – including LDPs – to reduce health inequalities and
improve wellbeing in their communities. It intends to support local partners to bridge the
gap between national policies and local implementation and understand the actions which
will have the greatest impact on health inequalities locally and help to overcome the
barriers to implementing these. The ultimate goal is to enable people to live longer,
healthier lives by addressing the root causes of health inequalities and preventing illness
before it starts.  
Working alongside colleagues in South Lanarkshire and Aberdeen City, supported by the
Place & Wellbeing Partnership Lead at the Improvement Service & Public Health Scotland,
we are exploring how the associated ‘Marmot 8’ principles along with the Place and
Wellbeing Outcomes can be embedded into both the evidence report and then LDP3.   
96

Page 97

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Please consider the following when thinking about this attribute and how you have performed
over the last year: 
 Has the planning authority provided clear and proportionate expectations of Section 75
agreements and set these out in the LDP and pre-application discussions and they are
concluded within 6 months of resolution to grant?
YES 
 Does the planning authority take a proportionate approach to imposing conditions?
YES - In North Ayrshire, conditions are proportionally applied for every decision
made and no discretionary charging for condition discharge is levied or
proposed as it is considered it would be to the detriment of customer service,
post decision development implementation and therefore community and
economic development.
 Does the planning authority have an ambitious local housing land requirement that
exceeds the Minimum All Tenure Housing land requirements in NPF4 and is it on track
to support delivery? 
YES
 Are the number of processing agreements the planning authority has agreed with
applicants increasing?
NO
 Does the planning authority have an effective delivery programme in place that
supports the delivery of development on the ground?
YES 
Narrative
To support development and regeneration in North Ayrshire the Planning service does not
routinely require developer contributions. The Local Development Plan expects the
majority of new development to be directed towards sites that have infrastructure or
services in place. Where further provision is required, the Supporting Development
Objective: Infrastructure and Services policy within the Adopted Local Development Plan
(p.16) sets out clear and proportionate expectations and the need for relevant
assessments is highlighted alongside each development site where potential
infrastructure deficiencies are known. 
ATTRIBUTE 12: THE PLANNING AUTHORITY SUPPORTS THE
DELIVERY OF CONSENTED DEVELOPMENT
97

Page 98

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
The Planning service has completed its Evidence Report and this is with DPEA at Gate
Check for consideration with a decision expected in April. In preparing the Evidence
Report, a draft Housing Evidence Paper was shared with Homes for Scotland; Registered
Social Landlords operating in North Ayrshire; developers and agents included on the LDP
mailing list; and parties who have approached the Strategic Planning team with an interest
in having housing sites allocated in LDP3. The Housing Evidence Paper was reissued
(without substantive changes) more widely for comment via the LDP Online Hub and
emails to community councils and the remainder of the LDP mailing list.   
The Paper proposes an indicative Local Housing Land Requirement figure of 4,500 homes,
which exceeds the MATHLR by 52.5%. A ‘Call for Ideas’ has been launched which will
assist in the allocation of deliverable land by LDP3 to meet the 10-year Local Housing Land
Requirement. 
A Draft Delivery Programme was submitted to Scottish Government on 8 April 2025, which
takes account of the views of the key agencies and other stakeholders. At this point, we do
not intend to publish the Delivery Programme rather we will seek approval alongside the
Evidence Report later in the year, following the finalisation of the 2024/25 Housing Land
Audit.   
In respect of Development Management, the free pre-application service supports the
submission of planning applications with necessary information provided to aid decision
making outcomes. 
A general presumption against the use of legal agreements minimises decision making
complication and delay 
The number of processing agreements being used is not increasing but continue to be
promoted on the Council’s website and offered where appropriate during the assessment
of planning applications. Limited uptake from applicants is considered to be another
indication of general satisfaction with decision making and the timescales for this as
evidence by demonstrated excellence in decision making performance. 
Processing agreements are automatically entered into for all major applications and some
complex local applications. The number is small annually (generally less than 10) and
dependent on the number of applications received but consistently applied. In addition,
processing agreements will always reasonably be entered into at an applicant’s request for
any application. 
98

Page 99

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
99

Page 100

__________________________________________________________________________________ 
National Planning Improvement | Improvement Service 
Improvement Action Plan (People theme) 
Attribute Score 
(1=Making excellent progress, 5= No progress) 
11. The planning authority supports the delivery of sustainable, liveable and
productive places
1
12. This planning authority supports the delivery of appropriate development 1 
Based on the grading above, outline any areas of improvement that are required and by whom and their level of importance (High/
Medium/ Low) and by when (short/ medium/ long term). 
Improvement Action
What action will you take?
What will the outcome be? 
Owner Importance
High 
Medium
Low
Timescale 
Short term – 1 year
Medium term – 3 years
Long term – 3+ years
Resources     
100