Argyll and Bute Council
Development & Economic Growth 
This report is a recommended response to the Scottish Government’s Energy Consents
and Deployment Unit (ECDU) consultation on the Section 36 Application to construct
and operate Breackerie Wind Farm, on land approximately 8km south west of
Campbeltown. 
Reference No: 23/02230/S36/ECU00004507
Applicant: The Scottish Government on behalf of EnergieKontor UK Ltd
Proposal: Electricity Act Section 36 consultation relevant to Breakerie Wind Farm
Site Address: Land approximately 8km south west of Campbeltown, Argyll & Bute 
(A) Section 36 application made up of the following elements: 
• Construction, 35 year operation and subsequent decommissioning, of up to 13 wind
turbines with a tip height of up to 200m (approximately 85.8MW)
• Associated turbine compound areas including foundations and hardstanding areas 
for erecting cranes at each turbine location; 
• On-site tracks connecting each turbine, using existing forestry tracks where
appropriate (approximately 4.02km) and construction of new tracks elsewhere
(approximately 7.47km); 
• An energy storage compound to store batteries with a 5MW capacity;
• Underground cables linking the turbines to the substation; 
• Use of up to four onsite existing borrow pits;
• A temporary construction compound including provision for onsite concrete batching; 
• On-site 132kv substation;
• Forestry felling and restocking; and
• Habitat Management provisions 
The grid connection does not form part of the section 36 application for the Proposed
Development. Any required consent for the grid connection would typically be sought by the
relevant owner of the local distribution or transmission network. The Network Operator would
be responsible for the consenting, construction and operation and maintenance of the grid
connection.
______________________________________________________________________
(B) RECOMMENDATION: 
That the ECU be notified accordingly that: 
1. Argyll & Bute Council does not object to the proposed development subject
to the inclusion of conditions recommended by consultees being included in
any consent. 
2. Argyll & Bute Council further recommends the following conditions and
provisions for legal agreements as discussed with the applicant to mitigate
the specific impacts of the Breackerie Wind Farm proposal: 
o Revision of height and/or location of T7 and T9 in consultation with
Argyll and Bute Council to reduce landscape and visual impact and
heritage impacts;

Page 2

o Aviation detection lighting system to avoid the visual impact on the
dark skies of the Mull of Kintyre;
o Reduced wind turbine micro-siting allowance of other wind turbines
to 50m to ensure no change from assessed proposal;
o Delivery of 80 ha compensatory biodiversity enhancement measures
at Largiebaan Nature Reserve and consideration of further on-site 
compensatory planting; and
o Noise protection measures (AM and fixed minimum limits). 
3. Regarding the outstanding Aviation matters, Argyll & Bute Council would
defer to the expert advice of National Air Traffic Systems and Glasgow
Prestwick Airport to resolve these matters with the ECU.
_____________________________________________________
(C) CONSULTATIONS: 
ENERGY CONSENT UNIT RESPONSES: 
NatureScot (28th March 2024) – advised the ECU that the Proposal does not raise
issues of National Interest, however NatureScot summarise the following key
considerations:
• Significant landscape and visual effects, including potentially weakening the
distinctive character of the Mull of Kintyre as a relatively undeveloped and remote
area with well expressed qualities of remoteness/ seclusion and high scenic
quality; 
• Potential operational effects on bats requiring further post construction monitoring
and potentially additional ‘feathering’ to minimise bat collision; and 
• Lack of detail on mitigation and proposed biodiversity enhancement measures,
particularly in relation to 1.41 ha of potentially affected habitat of Blanket bog which
is identified as a priority habitat in the UK BAP, Scottish Biodiversity List and Annex
1 of the ‘Habitats Directive’.
• Ornithological matters - concerns regarding the quality of the survey work and
subsequent assessment. 
NatureScot advises the ECU to encourage a reduction in turbine height with the aim
of reducing visibility/ intrusion on the currently undeveloped skyline; especially where
the turbines impinge into smaller scale settled landscapes/ highly scenic coastal
panoramas. NatureScot also confirms (6th May 2024) that the proposed height
reduction to turbines T7 and T9 would not alter its previous advice. 
Transport Scotland (TS) (21st November 2023) - advised the ECU they have no
objection. TS requests that conditions are attached in the event that the proposal
receives consent relating to: an Abnormal Loads Assessment; approval of the
proposed route for any abnormal loads; accommodation measures (removal of street
furniture, junction widening, traffic management); additional signing or temporary traffic
control measures must be undertaken by a recognised Quality Assured traffic
management consultant; abnormal load delivery trial run; Construction Traffic
Management Plan (CTMP); sheeting of all vehicles transporting construction material;
vehicle wheel cleansing facilities; and a Decommissioning Plan. 
Scottish Forestry (SF) (19th December 2023) – advised the ECU they support the
proposal for key-holing and habitat improvements within the forest, although this will
involve a large-scale intervention of 196ha tree felling. It is noted that this felling
provides an opportunity to improve the diversity of the woodland, particularly through
extending habitat networks and connecting to the proposed peatland restoration. They

Page 3

recommend the use of planning conditions to secure a revised forest plan for Slate
forest and a detailed compensatory planting condition alongside a Long Term Forest
Management Plan. The following queries are raised:
• The applicant should confirm no broadleaf felling will be taking place;
• The applicant should confirm the timber haulage for the 218+52 hectares has
been covered in the transport section in addition to the timescales and
proposed access routes for felling. 
Applicant response (2nd May 2024) – confirms no plans for removal of broadleaves
and sets out detail of the proposed timber haulage routes and time periods.
Deliveries / movements would be captured in the CTMP as per normal. 
Scottish Environment Protection Agency (SEPA) (15th January 2024) – advised
the ECU they have no objection and request conditions relating to: schedule of
mitigation; a 50m buffer around all water bodies and water course crossings; a
detailed site-specific Peat Management Plan (PMP) to detail maintain the hydrological
condition of the area between T5 and T9 due to the presence of relatively deep peat
and M6. The Peat Management Plan includes the use of floating tracks and
micrositing where possible between turbines T5 and T7 but these measures should
be extended to T9 due to the presence of M6 (mire); ensuring the peat surplus from
excavations is used for peatland restoration as detailed in the Habitat Management
Plan; Borrow pit restoration; Finalised Habitat Management Plan; Private water
supplies; and micrositing. 
Historic Environment Scotland (HES) (28th March 2024) – advised the ECU they do
not object to the proposal but have identified EIA significant effects on the setting of
two scheduled monuments in the vicinity of the proposed development, Lochorodale,
long cairn 1000m NW of (SM3653) and Lochorodale, long cairn 505m SW of
(SM3654). HS identifies the following mitigation which would reduce this level of effect:
• The deletion of turbines T6, T7, T8 and T9 or substantial height reduction
and/or relocation to an area of the development further from the cairn would
reduce the level of effect on the setting of the SM3653.
• The deletion or reduction in height or relocation of turbines, T7 and T8, that
align broadly with the axis of the cairn would reduce the level of effect on the
setting of Lochorodale, long cairn 505m SW of (SM3654). 
HES response to proposed revisions (3rd May 2024) welcome the consideration of
changes and advises that the proposed revisions to turbines 7 and 9 would not make
a material alteration to the impacts on the setting of the two scheduled monuments.
HES confirm that the suggested revisions would not raise issues of national interest. 
Marine Directorate (4th December 2023) – advised that the fish habitat surveys carried
out in winter 2022/23 found that the watercourses draining the proposed development
site provide suitable habitat for salmonid fish. Advise planning condition to secure an
integrated water quality and aquatic biota monitoring programme, with a monitoring
programme which follows MD-SEDD guidelines and includes fully quantitative
electrofishing surveys in all watercourses which are at risk of an impact and at control
sites where an impact is unlikely. Key hydrochemical parameters should be recorded
at a minimum of monthly intervals at sites where fish surveys are carried out.
Monitoring should commence at least one year prior to construction commencing and
continue during construction and for at least one year after construction is complete. 
Royal Society for the Protection of Birds (RSPB) (26th January 2024) – does not
object to the proposals and welcomes the siting of the majority of the proposal’s

Page 4

infrastructure within commercial forestry plantation (considered low biodiversity value)
but requested further information. RSPB welcomes the submission of the Outline
Habitat Management Plan and the proposed Bird Protection Plan and Open Ground
Management, but suggest additional planting to help reduce the attractiveness of key-
holed areas to Hen Harriers. Further queries related to the targeted survey results,
cumulative impacts and proposed levels of mitigation vs. enhancement. 
Applicant response to RSPB (12th February 2024) – provided further information on
ornithology surveys to confirm compliance with NatureScot Guidance and set out the
methodology for assessing cumulative impacts. Further detail was also provided on
the proposed peat restoration which was noted to include both restoration and
enhancement. 
Argyll District Salmon Fishery Board (9th March 2024) – advised that the proposed
wind farm is located within the headwaters of the Breakerie Water (Abhainn
Breacairigh) and the Conieglen Water, both of which support important populations of
Atlantic salmon and sea trout. The fish habitat survey conducted by Argyll Fisheries
Trust (Technical Appendix 8.4) identify habitats for migratory salmonids adjacent to
and immediately downstream of the proposed development site. Therefore, Argyll
DSFB request that pre and post construction monitoring of fish populations and
macroinvertebrates in these watercourses (as prescribed by Marine Directorate)
should be undertaken if the site is given permission to be developed. We would
strongly recommend that these guidelines are fully considered throughout the
proposed development to demonstrate that the interests of Argyll DSFB have been
protected. 
Scottish Water (9th November 2023) – advised the ECU they have no objection. This
does not confirm the proposal can be serviced.  Advice is provided on: drinking water
protected areas and surface water. 
Defence Infrastructure Organisation (17th November 2023) – advised the ECU they
have no objection subject to the following conditions: Aviation lighting and Aviation
Charting and Safety Management. 
Joint Radio Company Limited (9th November 2023) – advised the ECU no potential
problems are foreseen based on known interference scenarios and the data provided.
However, if any details of the wind farm change, particularly the disposition or scale of
any turbine(s), it will be necessary to re-evaluate the proposal. 
Glasgow Airport (13th November 2023) – advised the ECU the proposal is located
outwith the consultation area and as such no comment to make and need not be
consulted further. 
National Air Traffic Services Safeguarding (NATS) 9th November 2023) – advised
the ECU the proposal has been examined by their technical safeguarding teams and
a technical impact is anticipated on Prestwick Centre ATC and Military ATC, this has
been deemed to be unacceptable.  Accordingly, NATS issued a safeguarding
objection to the proposal. 
Glasgow Prestwick Airport (GPA) (23rd November 2023) – advised the ECU that
the proposal raises an aviation safety concern which may create an operational impact
on the Airport as an Air Navigation Services Provider (ANSP). As a result a standard
holding objection has been raised until all technical and operational aviation safety
matters detailed above are addressed to the satisfaction of the Airport, any aviation

Page 5

safety measures dictated by the Airport Wind Farm Safeguarding Process are
implemented, and a mitigation agreement is put in place for the life of the windfarm.
The Airport noted that it would be able to remove the holding objection should the
proposed radar line of sight assessment indicate that no turbines were visible to the
GPA PSR(s). 
Applicant’s response to GPA and NATS (email - 2nd May 2024) – further technical
work is being undertaken to resolve the issues raised, including a VHF report.
Following these reports, mitigation contracts will be drawn up between the applicant
and both NATS and GPA to ensure no impact on aviation matters – following which
the objections will be withdrawn. This is an approach that has been previously adopted
for other wind farm applications (e.g. Rowan Wind Farm (insert ref). It is further noted
that the resolution of aviation matters is within the remit of the ECU rather than the
local planning authority. 
Highlands & Islands Airport Limited (HIAL) (13th December 2023) – advised the
ECU that at the given position and height, this development would not infringe the
safeguarding criteria and operation of Campbeltown Airport and therefore no
objection is raised. 
Defence Infrastructure Organisation (17th November 2023) – advised the ECU they
have no objection subject to the following conditions: Aviation lighting and Aviation
Charting and Safety Management to maintain aviation safety. 
Crown Estate Scotland (25th February 2024) - confirm that the assets of Crown
Estate Scotland are not affected by this proposal and we therefore have no comments
to make. 
Ironside Farrar (Environmental Consultants on behalf of Scottish Government
ECU to audit Peat Landslide Hazard Risk Assessment (PLHRA)) (21st March 2024)
– advised the ECU that the PLHRA requires resubmission there are significant
shortcomings throughout the PLHRA and reworking of the PLHRA report is required to
support a robust assessment; areas for attention will be advised in the review findings
and outline guidance offered to support the developer in preparing a satisfactory
PLHRA. 
Applicant response to IF: this is a process that is a matter for the ECU rather than
the local planning authority and a revised PLHRA will be submitted to the ECU
accordingly before any decision. 
Campbeltown Community Council (17th December 2023) – have objected to the
proposal on the following grounds: impact on the last wild area of Mull of Kintyre;
landscape impact on the Mull of Kintyre Area of Panoramic Quality; cumulative
impacts on the tourism industry (particularly the dark skies and walkers/hikers) and
related impacts on tourism employment; concerns over traffic volumes on B842 and
B843 and potential incidents blocking access; and impacts on peat deposits and
impact on ground water supplies. 
ARGYLL & BUTE COUNCIL RESPONSES 
ABC Consultant Landscape Architect Review (17th April 2024) – concludes that
this proposal would have some significant adverse effects on landscape character
and on views although its location in a less sensitive larger scale forested upland
landscape, its siting in a slight dip between rolling hills (which affords a degree of

Page 6

screening) and its distance from more sensitive landscapes and key visual receptors
generally reduces the magnitude of these effects. 
A number of mitigation measures were identified that could potentially improve the
appearance of the wind farm and also provide optimum outcomes for biodiversity and
landscape character. Discussions have taken place with the applicant on the following
measures: 
• A reduction in the height of Turbines 7 and 9 to mitigate intrusion experienced
in views from the sensitive southern coast of the LLA. The applicant has
produced a wireline showing a reduction in the height of these two most
prominent turbines from 200m to 180m. 
• An alternative option to relocate these two turbines (retaining them at 200m
height) to a lower position so more of the tower is screened by the ridge.
Following review of the wireline produced 20/3/24 by the applicant a further
reduction of turbines 7 and 9 to 180m would be beneficial but that further
measures to reduce their prominence should be undertaken. This should
either involve a further reduction in the height of these two turbines (<180m)
or relocation of the two 180m high turbines further down the slope to the north-
east to benefit from greater screening of towers by Achnaslishaig Hill. 
The Landscape Consultant recommended the following conditions: 
• An Aircraft Detection Lighting System would substantially reduce the duration
and impact of night-time lighting.   
• Micro-siting of turbines to 50m (the applicant is seeking a 100m micro-siting
allowance) due to the steeply rolling nature of the proposal site where even
relatively small adjustments to the location of some turbines could potentially
result in a loss of landform screening and greater visual intrusion of turbines
in key views. 
In addition, the applicant was asked to consider more ambitious landscape and
biodiversity mitigation and enhancement package of proposals in line with the aims
of NPF4 Policy 3. The Landscape Architect noted that the proposed wind farm should
be used as an opportunity to form a catalyst to effect quicker and more far-reaching
improvements to biodiversity and landscape within the proposed development site. 
Applicant response to Landscape Architect (10th April 2024) – in addition to the
restoration of peat habitats, proposals to deliver 80 ha of new Atlantic Rainforest with
enhanced biodiversity and compensatory planting at the Largiebaan Nature Reserve
have been progressed with the Scottish Wildlife Trust (SWT) This would comprise
52.93 hectares of compensatory planting and a further 27.07 hectares as an off-site
biodiversity enhancement measures. We would be agreeable to a condition that
requires confirmation of mitigation and enhancement measures down under a
suspensive condition. 
ABC Roads & Amenity Services (24th November 2023) – comments were provided
should the site be accessed from the C10 Glenbreackerie Road: 1. There would be no
financial contribution from Argyll & Bute Council towards the work required to facilitate
the works or make good any damage directly attributable to the construction of the
wind farm. 2. The applicant should be made aware that they will be responsible for
making good any damage to the public road which is directly attributable to the
construction of the wind farm. Further comments were made in relation to the proposed
use of the U38 Moss Road and the B843 to transport several thousand tonnes of
material due as the single track road would not be able to sustain the regular HGV

Page 7

movements anticipated. Further comments were made in relation to the proposed use
of the U10 Glenbreackerie Road which is a narrow, lightly constructed, single-track
road with passing places and as such identified as a Severely Restricted Route with a
TTMP in place. A holding objection was raised in relation to the proposed use of these
roads and it was requested that the applicant review the Traffic Management Plan
(TMP). 
Applicant’s response to ABC Roads & Amenity Services advice (1st March 2024)
provided confirmation that the U38 Moss Road route would not be used for general
HGV traffic and instead the designated access for such traffic would be via the A83
trunk road and then the B843. The applicant noted it would accept a condition on the
use of Moss Road for general construction traffic with the designated route being via
the A83 and B843 and that a prescriptive CTMP condition could be used to designate
routes to be used and avoided for construction access. 
Further information was provided on the proposed routes for abnormal loads (of which
there will be around 368 movements) including on the unclassified C10 Glenbervie
Road and a package of necessary upgrades including verge widening to 5 m will be
required for a length of 1.2 km. The applicant noted it is content to accept a planning
condition on the technical approval process with Argyll & Bute Council along with a
scheme of mitigation for the C10 Glenbervie Road to be agreed post-consent; and a
wear and tear agreement. The applicant also provided further information on the site
access junction where the private windfarm access meets the C10 Glenbervie Road
to demonstrate the proposed junction design to widen the minor arm of the junction to
6m to allow two HGVs to pass and resurface the first 15m of the road in tarmac. 
Further comments from ABC Roads & Amenity Services (22nd March 2024)
Reiterated previous comments made in relation to the U38 Moss Road and C10
Glenbreackerie Road. No objection subject to the following conditions: U38 to be used
for abnormal loads only; all contractors to be made aware of U38 to be used for
abnormal loads only; applicant is to inspect and submit a U38 and C10 mitigation report
prior to any works starting; carriageway widening, strengthening, surfacing and
additional passing places for the proposed U38 Moss Road and U10 Glenbreakerie
Road (including new passing place signs); temporary carriageway widening to be
soiled and reseeded on completion of construction works; all street furniture required
to be removed is to be replaced with new; Traffic Management Plan to be submitted;
a detailed Method Statement to be submitted; A detailed condition survey to be carried
out on all haul routes between the A83 Tarbet - Campbeltown Trunk Road and the
application site; and, the public road between the A83 Tarbet - Campbeltown Trunk
Road and the application site to have weekly inspections. 
It was also noted that the applicant will be responsible for the cost of carrying out
repairs to the carriageway which are directly attributable to the works, as they appear.
Construction details for repairs to carriageway to be agreed with Roads & Infrastructure
Services, prior to any work starting on site. The Roads Engineer has also highlighted
the following notes for intimation to the Applicant: a Section 96 Legal Agreement will
be required and connection of site access to public road to be agreed with Roads &
Infrastructure Services, prior to any work starting on site. 
ABC Flood Risk Assessor ABC Flood Prevention Officer (12th December 2023)
– no objections subject to conditions to ensure that: watercourse crossings should
not reduce the existing capacity of the channel, and ideally designed to convey the 1
in 200 year plus climate change (46% allowance) flood event; and surface water
drainage should be designed in accordance with CIRIA C753 and ensure that post
development surface water runoff does not exceed the pre-development surface

Page 8

water runoff. The surface water drainage should be in operation prior to the start of
construction. 
ABC Access Team (2nd May 2024) – noted that the Kintyre way passes several wind
farms along its route and one more is unlikely to have a significant impact. Provided
comments relating to public access and recommendations for maintaining public
access during both construction and operation. 
ABC Noise Consultant (5th March 2024) – concludes that in general, good practice
has been adopted by the Applicant and further information requested on the sound
power levels of the turbines and assessment of operational noise. A lower limit for the
night-time period is recommended, and two options have been suggested for
consideration. Following a satisfactory response to the above issues from the
Applicant, it is considered that there would be no reasons to object to the scheme on
noise grounds. A suitably worded condition to limit the noise levels, tonality and
amplitude modulation should be applied to control noise levels from the proposed
scheme. It is expected that conditions relating to approve the final turbine selection
will already be included as it relates to other aspects than noise alone. 
Applicant’s Noise Consultant (TNEI) response to ABC Noise Consultant’s
advice (8th April 2024) – provided clarifications on the candidate turbine sound power
level data for the unconstrained and noise reduced operational modes; the use of
noise reduced operational modes; the calibration dates presented on one of the Field
Data Sheets and further information on the equipment used for the baseline
background noise survey. Rejected the need for an Amplitude Modulation condition
and the recommended lower night time fixed minimum limits, stating that Statutory
Nuisance powers should be used to address any noise complaints and that a night
time fixed minimum limit of 35 dB LA90 would be unduly restrictive to the renewable
energy output of the Proposed Development. 
ABC Noise Consultant (16th April 2024) - responded they are satisfied with
additional evidence provided adequate demonstration of the likely noise levels from
the scheme; the ability of the proposed turbine to be controlled as necessary in certain
wind speeds (as required) and the evidence equipment and calibration used for the
background noise survey is in accordance with good practice. It is the view of the
Council’s Noise Consultant that planning conditions relating to Amplitude Modulation
and lower fixed limit of 38 dB LA90 should be applied to consent. 
West of Scotland Archaeology Service (2nd February 2024) – support Historic
Environment Scotland (HES) advice concerning the effect of the proposals on the
setting of Scheduled Ancient Monuments (SAMs) in the surrounding landscape.
Advises that both Lochorodale cairn SAMs (SM3653, SM3654) will suffer a
significant detrimental effect on the ability to appreciate the monuments in an entirely
rural landscape setting when visiting the sites themselves and on approach from the
NE on the road. Advised the ECU that the proposed mitigation set out in the EIA
cultural heritage chapter would reduce any significant effect and these measures
should be secured through conditional consent. 
Please note: the above are summaries and the full consultee responses can be viewed
on the Energy Consent Unit and Argyll & Bute Council websites. 
__________________________________________________________________

Page 9

(D) REPRESENTATIONS: 
As the Council is not the determining Authority all letters of representation are
considered by the Energy Consents Unit.  At time of writing, public representation
figures stand at 9 objections, which are published on the ECU website. The main
issues raised are summarised below: 
• Concerns over safety, speed and noise issues on the single track access road;
• Adverse landscape and visual impact Intrusive impact of turbine, out of scale in
the landscape;
• Cumulative significant landscape impact with High Dalrioch Wind Farm
• Adverse impact on wildlife;
• Adverse impact on ornithology, including migratory birds;
• Adverse impact on tourism;
• Impact of aviation lighting on dark skies;
• Lack of Community Consultation;
• Poor local communication/consultation;
• Concerns over the impact of pylons to transport energy;
• Kintyre turning into an industrial landscape;
• Impact on wild space, local nature reserve at Largiebaan and SSSI;
• Concerns over construction impacts;
• Single track access road is inadequate;
• Loss of amenity value of the proposed site;
• Impact on the nature-based economy; and
• More wind farms will not reduce demand for energy. 
Public Consultation – Whilst not a statutory requirement for Section 36 applications, the
applicant has undertaken Public Consultation. Further information on this is contained in
the Breackerie Pre-Application Consultation (PAC) Report (October 2023) which is
available on the ECU website (reference: ECU00004507). 
Note: the comments raised above are addressed in the assessment of the proposal
at Appendix A of this report. The letters of representation above have been
summarised and that the full letters of representations are available on the Energy
Consents Units website. 
___________________________________________________________________ 
(E) SUPPORTING INFORMATION 
Has the application been the subject of: 
i) Environmental Impact Assessment Report (EIAR): Yes 
EIAR (October 2023) presented in 4 volumes:   
• Volume 1: Written Statement
• Volume 2: Figures 
• Volume 3: Visualisations
• Volume 4: Technical Appendices

Page 10

Key matters covered in the EIAR include: Introduction; EIA Methodology; Project
Description; Design Evolution; Renewable Energy & Planning Policy; Landscape &
Visual; Socio-economics & Tourism; Ecology; Ornithology; Hydrology, Hydrogeology,
Geology and Peat; Cultural Heritage; Noise; Traffic and Transport; Forestry; Other
Issues; and Schedule of Mitigation. 
The EIA Report should also be read in context with the following documents: 
• EIA Non-Technical Summary (NTS) 
• Planning Statement 
• Pre-Application Consultation Report (PAC Report)
• Design and Access Statement (DAS) which illustrates the approach to design
and access. 
ii) An appropriate assessment under the Conservation (Natural Habitats)
Regulations 1994:   No 
iii) A design or design/access statement:   Yes (October 2023) 
iv) A report on the impact of the proposed development e.g. Retail impact, transport
impact, noise impact, flood risk, drainage impact etc.: All relevant reports are
encompassed within the EIAR 
(F) Statutory Development Plan (NPF4 and LDP) and any other material
considerations over and above those listed above which have been taken into
account in the assessment of the application: 
Members are asked to note in the context of the Local Development Plan (LDP) and
planning process that this application has been submitted to the Scottish Government
under Section 36 (S36) of the Electricity Act 1989.  As part of the S36 application
process, the applicant is also seeking that the Scottish Ministers issue a Direction under
Section 57 (2) of the Town and Country Planning (Scotland) Act 1997 that deemed
planning permission be granted for the proposal.  In such instances, the LDP is not the
starting point for consideration of S36 applications, as Sections 25 and 37 of the Town
and Country Planning (Scotland) Act 1997 which establish the primacy of LDP policy in
decision-making, are not engaged in the deemed consent process associated with
Electricity Act applications.  Nonetheless, the adopted Argyll & Bute LDP2 2024 still
remains an important material consideration informing the Council’s response to the
proposal. 
Schedule 9 of the Electricity Act does require both the applicant and the decision-maker
to have regard to the preservation of amenity.  It requires that in the formulation of
proposals the prospective developer shall have regard to: 
(a) the desirability of preserving natural beauty, of conserving flora, fauna and geological
or physiological features of special interest and of protecting sites, buildings and objects
of architectural, historic or archaeological interest; and 
(b) shall do what he reasonably can to mitigate any effect which the proposals would
have on the natural beauty of the countryside or on any such flora, fauna, features, sites,
buildings or objects.

Page 11

Similarly, it obliges the Scottish Ministers in their capacity as decision maker to have
regard to the desirability of the matters at a) and the extent to which the applicant has
complied with the duty at b).  Consideration of the proposal against both the effect of
NPF4 and the adopted Argyll & Bute LDP2 2024 will ensure that proper consideration is
given by the Council to the extent which the proposal satisfies these Schedule 9 duties. 
(i) List of all Development Plan Policy considerations taken into account in
assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 4 – Natural Places
NPF4 Policy 5 – Soils
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 7 – Historic Assets and Places
NPF4 Policy 11 – Energy 
Liveable Places
NPF4 Policy 22 – Flood Risk and Water Management
NPF4 Policy 23 – Health and Safety 
Productive Places
NPF4 Policy 25 – Community Wealth Building
NPF4 Policy 26 – Business and Industry
NPF4 Policy 29 – Rural Development
NPF4 Policy 30 – Tourism
NPF4 Policy 33 – Minerals 
Annex B – National Statements of Need
3. Strategic Renewable Electricity Generation and Transmission Infrastructure 
Argyll and Bute Local Development Plan 2 (Adopted 2024) 
Spatial and Settlement Strategy
Policy 02 – Outwith Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 14 – Bad Neighbour Development
Policy 16 – Listed Buildings
Policy 19 – Scheduled Monuments
Policy 21 – Sites of Archaeological Importance 
Diverse and Sustainable Economy
Policy 22 – Economic Development
Policy 23 – Tourism Development, Accommodation, Infrastructure and Facilities
Policy 26 – Informal Public Outdoor Recreation and Leisure Related Development

Page 12

Policy 30 – The Sustainable Growth of Renewables 
Connected Places
Policy 36 – New Private Accesses
Policy 37 – Development Utilising an Existing Private Access or Existing Private Road
Policy 38 – Construction Standards for Public Roads
Policy 39 – Construction Standards for Private Accesses
Policy 41 – Off Site Highway Improvements 
Sustainable Communities
Policy 55 – Flooding
Policy 56 – Land Erosion
Policy 57 – Risk Appraisals
Policy 62 – Drainage Impact Assessments 
High Quality Environment
Policy 71 – Development Impact on Local Landscape Areas (LLA’s)
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 77 – Forestry, Woodland and Trees
Policy 78 – Woodland Removal
Policy 79 – Protection of Soil and Peat Resources 
Local Development Plan 2 Schedules 
(ii) List of all other material planning considerations taken into account in the assessment
of the application, having due regard to Annex A of Circular 3/2013. 
• Third Party Representations
• Consultation Reponses
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017)
• TN06 Sustainability Technical Note and Checklist (Oct. 2023)
• TN21 VII and LVIA Light Technical Note (Oct. 2023)
• TN07 Sustainable Buildings Technical Note and Checklist (Oct. 2023)
• ABC Landscape Studies
• ABC Economic Development Action Plan
• SEPA Standing Guidance for Development Management (Dec. 2022)
• Climate Change (Emissions Reduction Targets) (Scotland) Act 2019
• The Future of Energy in Scotland: Scottish Energy Strategy, Scottish Government
(December 2017)
• Onshore wind policy statement, Scottish Government (January 2017)
• Historic Environment Policy for Scotland (HEPS) (April 2019)
• The Scottish Government’s Policy on ‘Control of Woodland Removal’ (Forestry
Commission Scotland 2009) 
• SNH Review 78 – Landscape Assessment of Argyll and the Firth of Clyde (1996)
• SNH Siting and Designing Wind Farms in the Landscape Guidance, (August
2017)
• Guidance for Landscape and Visual Impact Assessment, 3rd Edition, Landscape
Institute and Institute of Environmental Management & Assessment, (2013);
• Onshore Wind Turbines: Planning Advice, Scottish Government (May 2014). 
• Planning Advice Note 1/2011: ‘Planning and Noise’

Page 13

• Scottish Government Good Practice Principles for Shared Ownership and
Community Benefit of Onshore Renewable Energy Developments; 
• Views of statutory and other consultees
• Planning history of the site
• Legitimate public concern or support expressed on relevant planning matters 
(G) Has the application been the subject of statutory pre-application consultation
(PAC):  Although PAC is not required for S36 applications a PAC Report (October 2023) is
submitted in support of the application. 
(H) Does the Council have an interest in the site:  No 
(I) Requirement for a pre-determination hearing: No 
(J) Is the proposal consistent with the Development Plan: Yes 
(K) Need for notification to Scottish Ministers or Historic Environment Scotland: No
___________________________________________________________________ 
Author of Report:   Shelley Gould   Date: 9th May 2024 
Reviewing Officer:   Sandra Davies   Date: 9th May 2024 
Fergus Murray 
Head of Development and Economic Growth

Page 14

COMMITTEE REPORT 
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  23/02230/S36 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. THE SECTION 36 CONSENTING REGIME 
1.1 In Scotland, any application to construct or operate an onshore power generating
station, in this case, a renewable energy development with an installed capacity of over
50 megawatts (MW) requires the consent of Scottish Ministers under Section 36 of the
Electricity Act 1989. Any ministerial authorisation given would include a ‘deemed
planning permission’ and in these circumstances there is then no requirement for a
planning application to be made to the Council as Planning Authority. The Council’s
role in this process is one of a consultee along with various other consultation bodies. 
1.2 It is open to the Council to either support or object to the proposal, and to recommend
conditions it would wish to see imposed in the event that authorisation is given by the
Scottish Government. In the event of an objection being raised by the Council, the
Scottish Ministers are obliged to convene a Public Local Inquiry (PLI) if they are minded
to approve the proposal. They can also choose to hold a PLI in other circumstances at
their own discretion. Such an Inquiry would be conducted by a Reporter(s) appointed
by the Directorate for Planning and Environmental Appeals. In the event that consent
is given, either where there has been no objection from the Council, or where
objections have been overruled following PLI, the Council as Planning Authority would
become responsible for the agreement of matters pursuant to conditions, and for the
ongoing monitoring and enforcement of such conditions. 
1.3 This report reviews the policy considerations which are applicable to this proposal and
the planning merits of the development, the views of bodies consulted by the Scottish
Government along with other consultations undertaken by the Council, and 3rd party
opinion expressed to the Scottish Government following publicity of the application by
them. It recommends views to be conveyed to the Scottish Government on behalf of
the Council before a final decision is taken on the matter.  The conclusion of this report
is to recommend that the Council does not raise an Objection to this Section 36
consultation for the reasons detailed in this report. 
2.  SUPPORTING THE SUSTAINABLE GROWTH OF RENEWABLES 
2.1 The Scottish Government has set ambitious targets for renewable energy generation
and the reduction of carbon emissions to achieve net zero by 2045 (Climate Change
(Emissions Reduction Targets) (Scotland) Act 2019). To support the delivery of
renewable energy generation, the Scottish Government included ‘Strategic Renewable
Electricity Generation and Transmission Infrastructure’ as ‘national development’ in the
National Planning Framework 4 (NPF4) to enable ‘a large and rapid increase in
electricity generation from renewable sources’. As a ‘national development’ the
principle of development does not need to be agreed in later consenting processes. 
2.2 NPF4 Policy 1 – Tackling the climate and nature crises is an overarching policy which
requires that when considering all development proposals significant weight will be
given to the global climate and nature crises. Argyll & Bute Council declared a climate
emergency in 2021 and in line with the provisions of NPF4 the 2024 Local
Development Framework 2 (LDP2) expects all developments to make a positive
contribution to meeting the Scottish Government’s targets for renewable energy
generation. The Council will therefore support renewable energy developments where

Page 15

these are consistent with the principles of sustainable development and it can be
adequately demonstrated that there would be no unacceptable significant adverse
effects.   
2.3 This proposal has been assessed primarily against the criterion in the two lead
Statutory Development Plan policies relating to renewable energy as follows: 
NPF4 Policy 11 – Energy requires that, in considering the impacts of the proposal,
significant weight will be placed on the contribution of the proposal to renewable energy
generation targets and on greenhouse gas emissions reduction targets. 
LDP2 Policy 30 – Supporting the Sustainable Growth of Renewables requires that
renewable energy developments are consistent with the principles of sustainable
development. It should also be adequately demonstrated that there would be no
unacceptable environmental effects, whether individual or cumulative, on local
communities, natural and historic environments, landscape character and visual
amenity, and that the proposals would be compatible with adjacent land uses. The
policy further sets out that applications for all wind turbine developments will be
assessed against the following criteria: 
• Impacts on communities and individual dwellings, including visual impact,
residential amenity, noise and shadow flicker; 
• Landscape and visual impacts; 
• Effects on the natural heritage, including birds; 
• Impacts on carbon rich soils, using the carbon calculator; 
• Public access, including impact on long distance walking and cycling routes and
those scenic routes identified in the NPF; 
• Impacts on the historic environment, including scheduled monuments, listed
buildings and their settings; 
• Impacts on tourism and recreation; 
• Impacts on aviation and defence interests and seismological recording; 
• Impacts on telecommunications and broadcasting installations, particularly
ensuring that transmission links are not compromised; 
• Impacts on road traffic and adjacent trunk roads; 
• Effects on hydrology, the water environment and flood risk; Cumulative impacts
arising from all of the considerations above; 
• Net economic impact, including local and community socio-economic benefits such
as employment, associated business and supply chain opportunities; 
• The scale of contribution to renewable energy generation targets; 
• Effect on greenhouse gas emissions; and 
• Impacts on trees, woods and forests. 
2.4 In assessing any application LDP2 Policy 30 sets out that the Council will additionally
have regard to the opportunities for energy storage, local energy networks, and long
term environmental management of the site. 
Contribution to renewable energy generation targets and greenhouse gas emissions 
2.5 The Proposed Development would generate renewable electricity and would therefore
displace carbon dioxide (CO2) emissions associated with electricity generation, which
would otherwise be supplied via other forms of power generation requiring the
combustion of fossil fuels. The Scottish Government Carbon Calculator for Wind Farm
on Peatlands has been used to calculate a payback period for the Proposed

Page 16

Development based on the full development lifecycle. The results of this assessment
indicate that the Proposed Development would have an expected payback period of
2.8 years compared to grid mix of electricity generation and would save approximately
157,802 tonnes of carbon dioxide per year (compared to a typical grid mix of electricity
supply). This equates to supplying 93,811 homes annually with renewable electricity
and a lifetime carbon savings of over 12.7Mt of CO2e. 
2.6 When decision makers are considering the impacts detailed in NPF4 Policy 11 they
need to give significant weight to the contribution of the proposed development to
renewable energy generation targets and on GHG emissions reduction targets. The
Onshore Wind Policy Statement (2017) sets a minimum target of 20GW of deployed
onshore wind by 2030 which is an additional 12GW. In addition, NPF4 Policy 1 –
Tackling the climate and nature crises states that significant weight is to be given to
the global climate and nature crises when considering all development proposals. 
Grid capacity and energy storage 
2.7 NPF4 Policy 11 – Energy requires that grid capacity should not constrain renewable
energy development.  It is for developers to agree connections to the grid with the
relevant network operator.  LDP2 Policy 30 – The Sustainable Growth of Renewables
requires all applications for wind turbine developments to be assessed against impacts
arising from opportunities for energy storage. 
2.8 This proposal includes a 5 MW battery energy storage system (BESS).  The benefit of
such a system would be to store energy from the proposal or excess electricity from
the national grid, providing stability to the electricity supply network, meeting energy
demands and providing improved energy security.   
Having due regard to the above it is considered that the proposal by its very
nature is consistent with the provisions of NPF4 Policy 1 – Tackling the climate
and nature crises, NPF4 Policy 11 – Energy and LDP Policy 30 – The Sustainable
Growth of Renewables which establish the primary policy framework for
assessing wind farms. 
3.        SETTLEMENT STRATEGY
3.1 LDP2 Policy 02 – Outwith Settlement Areas states that outwith the settlement areas
shown on the proposals map, development will only be acceptable where it accords
with being located within a Countryside Area, a Remote Countryside Area, or within
the Helensburgh and Lomond Green Belt subject to the criteria available. In the case
of the site, it is located within a Remote Countryside Area (as per the Kintyre Proposals
Map). Under part (i) of subcategory B, only specific categories of development on
appropriate sites will be generally be supported, including renewable energy related
development. 
3.2 In principle, LDP2 Policy 02 supports renewable energy and ancillary developments
Remote Countryside Areas, providing they accord with all other relevant policies.
Policy 02 draws particular attention to the need for development  proposals to accord
with LDP2 Policies 70 to 76 with respect to landscape and the natural environment and
sets out that development proposals will also be required to demonstrate that there will
be no unacceptable adverse effects (either individually or cumulatively) on natural
heritage resources, built and/or cultural heritage resources, and landscape and visual
amenity.

Page 17

3.3 LDP2 Policy 04 - Sustainable Development further sets out that in preparing new
development proposals, the developer should seek to demonstrate sustainable
development principles including (as relevant to this proposal) to: a) maximise the
opportunity for community benefit; i) respect the landscape character of an area; j)
avoid places with significant risk of flooding… or ground instability; and k) avoid having
a significant adverse impacts on land, air and water environment. The Breackerie Wind
Farm application is supported by an Environmental Impact Assessment Report (EIAR)
which sets out in detail the measures proposed to ensure the proposal is ‘Sustainable
Development’. 
3.4 The submitted EIAR demonstrates that the scale and location of the proposal, does
not produce adverse consequences in terms of landscape & visual impact (including
cumulative) and that the significant effects caused are mitigated through the wider
biodiversity and habitat creation measures proposed.  For the reasons detailed in
sections 4 to 22 of this report, it is considered that this proposal satisfies Development
Plan Policy in relation to Settlement Strategy and Sustainable Development.   
Having due regard to the above this proposal is consistent with the provisions
of NPF4, LDP2 Policy 02 - Outwith Settlement Areas and Policy 04 - Sustainable
development. 
4 .        LOCATION, NATURE AND DESIGN OF PROPOSED DEVELOPMENT
4.1 Spanning approximately 1373 hectares (ha), the site is situated at the southern end of
the Kintyre peninsula within an area of active commercial coniferous forestry. It is
around 8km south-west of Campbeltown, approximately 5.5km north of Southend, and
5km south of Machrihanish. The core of the site comprises a basin created by the
surrounding hills with the Lecknacreive Burn running generally north-west to south-
east. The summit of Tirfergus Hill (260m AOD) to the north is outwith the site boundary,
while the summits of Cnoc na Gabhar (239m AOD) and Cnoc Odhar (277m AOD) to
the east, as well as Achnaslishaig Hill (307m AOD) to the south and The Slate (384m
AOD) to the north-west all lie within the site boundary. 
4.2 The landscape comprises a rolling plateau of densely forested hills, contrasting with
local summits, with a small-scale valley to the immediate east which the B842 passes
through. This contains most of the settlement within the area. Land to the west and
south-west comprises steep coastal hills which drop steeply to the sea. To the north,
the landform flattens into a broad lowland plain between Machrihanish and
Campbeltown. 
4.3 Settlement within the wider area is relatively sparse, with some small settlements,
farms, and scattered residential properties located predominately to the eastern side
of the site. Within 5km of the site, the small settlements of Machrihanish, Drumlemble,
Stewarton, Killellan and Killeonan/Knocknaha are located to the north and north-east
of the site. Other small settlements within 10km of the site include Kilchenzie to the
north, Peninver to the north-east, and Millpark and Southend to the south-east. 
4.4 The nearest trunk road is the A83, which terminates in Campbeltown. The B842
extends south of Campbeltown via Stewarton towards Southend and serves as the
primary route south of Campbeltown. It passes the site approximately 1km to the east
in a north-south orientation. The B843 extends east/west from Campbeltown to
Machrihanish. There are a number of minor watercourses on the site including Allt Mor,
Allt Brandon, Allt Seilich, Allt a Ghillean Dubh, Allt Airighe Glaise and Allt Criche, which
flow into the Lecknacreive Burn. This runs in a generally south-easterly direction on

Page 18

the site and feeds into the Breakerie Water to the south of the site. The site straddles
a number of hillsides to form a rough bowl and as such is generally well drained with
an absence of lochans or pools. 
4.5  A local landscape designation covers the majority of the area south of Campbeltown
including the site: the Mull of Kintyre Local Landscape Area. The Proposed
Development would be the southern-most wind farm on the Kintyre Peninsula.
However, there are a number of proposed, consented and operational wind farm
developments located to the north of Campbeltown in addition to the proposed High
Dalrioch wind farm to the north west of the site (just south of Campbeltown) which is
currently at the scoping stage. 
4.6 The main components of the proposed development are: 
• Up to 13 turbines;
• Associated turbine compound areas including foundations and hardstanding
areas  for erecting cranes at each turbine location; 
• On-site tracks connecting each turbine, using existing forestry tracks where
appropriate (approximately 4.02km) and construction of new tracks elsewhere
(approximately 7.47km); 
• An energy storage compound to store batteries with a 5MW capacity which
would be within the construction compound footprint;
• Underground cables linking the turbines to the substation; 
• Use of up to four onsite existing borrow pits for the extraction of stone on-site;
• A temporary construction compound including provision for onsite concrete
batching; 
• On-site 132kv substation;
• Forestry felling and restocking; and
• Habitat Management provisions. 
4.7 The proposed development would provide approximately 85.8 MW of installed capacity
in addition to 5MW of battery storage capacity, depending on the turbine model
chosen. It is estimated by the Applicant that this installed capacity could generate
approximately 365,678MWh of renewable electricity each year. The proposed
development would be time-limited to 35 years from the first date of commercial
operation. The construction phase would last approximately eighteen months and
decommissioning would last approximately six months. 
4.8 Deemed planning permission is sought to permit a period of ten years between the
date of the Decision Notice and expiry of consent (should works not be commenced)
rather than the usual three years. This is to accommodate any potential grid delays. 
4.9 Connection to Electricity Grid - The grid connection does not form part of the section
36 application for the Proposed Development. Any required consent for the grid
connection would typically be sought by the relevant owner of the local distribution or
transmission network. The Network Operator would be responsible for the consenting,
construction and operation and maintenance of the grid connection.  
Infrastructure   
4.10 Scottish Water have advised the ECU that they have no objection to this proposal. This
does not confirm the proposal can be serviced.  Advice is also provided on: water
assessment; foul assessment; drinking water protected areas and surface water.

Page 19

4.11 Water Assessment – they have advised that there is no public Scottish Water, Water
infrastructure within the vicinity of this proposed development therefore they would
advise applicant to investigate private options. 
4.12 Foul Assessment – they have advised that there is no public Scottish Water, Waste
Water infrastructure within the vicinity of this proposed development therefore they
would advise applicant to investigate private treatment options. 
4.13 Drinking Water Protected Areas – they have confirmed that there are no Scottish Water
drinking water catchments or water abstraction sources, which are designated as
Drinking Water Protected Areas under the Water Framework Directive, in the area that
may be affected by the proposal.  
4.14 Surface Water - For reasons of sustainability and to protect customers from potential
future sewer flooding, Scottish Water have advised that they will not accept any surface
water connections into their combined sewer system. 
5. NET ECONOMIC IMPACT, INCLUDING LOCAL AND COMMUNITY SOCIO-
ECONOMIC BENEFITS 
5.1 NPF4 Policy 11 – Energy states that proposals will only be supported where they
maximise net economic impact, including local and community socio-economic
benefits such as employment, associated business and supply chain opportunities. N
LDP2 Policy 30 – Supporting the Sustainable Growth of Renewables requires all
applications for wind turbine developments to be assessed in terms of net economic
impact, including local and community socio-economic benefits such as employment,
associated business and supply chain opportunities. 
5.2 The project would bring socio-economic benefits to the local community, including the
creation of jobs and opportunities for local businesses and suppliers during the
construction phase and for the lifetime of the project. The Applicant is also committed
to paying a community benefit package of £5,000 per MW of installed capacity for
every year of operation in line with current Scottish Government guidance. There are
several options for distributing these funds for the benefit of the local community and
the applicant is in active discussions with established Community Development Trusts.
Community Benefit is not however, considered a ‘material planning consideration’ in
the determination of planning applications. If consent were to be granted, the
negotiation of any community benefit, either directly with the local community or under
the auspices of the Council, would take place outside the application process. 
5.3 Subject to further agreement, there are discussions ongoing between the Applicant
and the neighbouring Largiebaan reserve owned and operated by the Scottish Wildlife
Trust (SWT), to facilitate the planting of Atlantic rainforest as part of the off-site
compensation required via forestry felling and replanting. This will provide an additional
community benefit through required compensatory and biodiversity enhancement
measures and should be secured through a planning condition. 
5.4 Having due regard to the above it is considered a degree of net economic impact,
including local and community socio-economic benefits, typical of such
developments will be provided.  It is therefore concluded that the proposal is

Page 20

consistent with the provisions of NPF4 Policy 11 – Energy, Nand LDP2 Policy 30
– Supporting the Sustainable Growth of Renewables.
6.    IMPACTS ON COMMUNITIES AND INDIVIDUAL DWELLINGS, INCLUDING
RESIDENTIAL AMENITY, VISUAL IMPACT, NOISE AND SHADOW FLICKER 
6.1 NPF4 Policy 11 – Energy requires that project design and mitigation will demonstrate
how impacts on communities and individual dwellings, including, residential amenity,
visual impact, noise and shadow flicker have been addressed.  LDP2 Policy 30 – The
Sustainable Growth of Renewables requires all applications for wind turbine
developments to be assessed in terms of impacts on communities and individual
dwellings, including visual impact, residential amenity, noise and shadow flicker
(including cumulative).   
6.2 Noise - Mott MacDonald Ltd (MM) and Alistair Somerville Associates were
commissioned by Argyll & Bute Council to undertake a peer review of the noise
assessment for the proposed Breackerie wind farm.  This review included a desktop
assessment against current good practice, a check of the predicted noise levels from
the wind farm, and a site survey of the area surrounding the wind farm site including
the nearest residential receptors.  A report was produced which summarises the
findings of the review, sought further information and suggested suitably worded
conditions to limit the noise levels, tonality and amplitude modulation.
.
6.3 On 8th April 2024 the applicant provided additional information on the candidate turbine
sound power level data for the unconstrained and noise reduced operational modes,
details on the use of noise reduced operational modes, clarification on the calibration
dates presented on one of the Field Data Sheets and further information on the
equipment used for the baseline background noise survey. The applicant also
disagreed with the proposed conditions relating to amplitude Modulation (AM), noting
that these should be dealt with using Statutory Nuisance powers and that a night-time
fixed limit of 35 dB LA90 is adopted then this would be unduly restrictive to the
renewable energy output of the Proposed Development. 
6.4 Further to the submission of this additional information, (16th April 2024) the Council’s
noise consultant has responded to confirm that the technical matters pertaining to the
turbine power levels and mitigation and the background noise survey were
satisfactorily resolved. The following planning conditions are required to mitigate the
impact of noise on local communities: 
• Amplitude Modulation - The Council’s Noise Consultant confirms this condition is
necessary as set out in the Mott MacDonald Report and in line with recently
consented schemes by Scottish Ministers (Sanquhar II wind farm).
• Fixed Minimum Limits - A lower fixed night-time limit of 38 dB LA90 (as accepted
on other proposed schemes within Argyll and Bute) should be applied to ensure
the effectiveness of the AM and tonality condition at night.   
6.5 Shadow Flicker – there are only two properties in proximity to the site where shadow
flicker effects are theoretically possible: Lochorodale Woods (the northernmost of the
two properties to the northeast of T8) and Lochorodale (by the roadside). The former
is financially involved with the project and is used as an occasional leisure base for a
European-based landowner (and therefore not occupied year-round), whilst the latter
is presently unoccupied and has been for several years (although is occupiable). When

Page 21

applying corrections and allowances for the amount of sunlight received in Kintyre, no
property would receive significant effects. 
6.6 Any Residential Amenity and Visual Impact matters are considered below in the section
on Significant Landscape & Visual Impact. 
6.7 Having due regard to the above it is concluded that the proposal complies with
provisions of NPF4 Policy 11- Energy and LDP2 Policy 30 – The Sustainable
Growth of Renewables relating to potential shadow flicker and noise impacts
subject to the conditions referred to in paragraph 6.4 by the Council’s Noise
Consultant being attached to any consent. 
7. SIGNIFICANT LANDSCAPE AND VISUAL IMPACTS 
7.1  NPF4 Policy 11 – Energy requires that project design and mitigation demonstrates how
significant landscape and visual impacts have been addressed, recognising that such
impacts are to be expected for some forms of renewable energy.  Where impacts are
localised and/or appropriate design mitigation has been applied, they will generally be
considered to be acceptable. NPF4 Policy 4 (a)  – Natural Places states that proposals
which by virtue of type, location or scale will have an unacceptable impact on the
natural environment, will not be supported.  LDP2 Policy 30 – The Sustainable Growth
of Renewables requires all applications for wind turbine developments to be assessed
against landscape and visual impacts. LDP2 Policy 71 – Development Impacts on
Local Landscape Areas (LLA) states that the Council will resist development in or
affecting LLAs where its scale, location or design will have a significant adverse impact
on the character of the landscape. Proposals must demonstrate that any significant
adverse effects on the landscape quality for which the area has been designated are
clearly outweighed by social, economic or environmental benefits of community-wide
importance. 
7.2 The Council’s Consultant Landscape Architect, Carol Anderson has undertaken a
Landscape & Visual Review of this proposal, which is based on examination of the
Environmental Impact Assessment Report (EIAR) and site visits to identified key
viewpoints. The term ‘Mull of Kintyre’ is used in the review to refer to the whole of the
southern end of the Kintyre peninsula as this area has a distinct character which is
different from the rest of the Kintyre peninsula. 
7.3  Siting and design of the proposal: the Council’s landscape consultant agrees that the
location of the wind farm in a shallow dip between rolling hills would generally reduce
intrusion, particularly on the sensitive coasts of the Mull of Kintyre and that the proposal
would fit with the simple character of landform and landcover of the site and its
immediate surrounds. However, the Council’s consultant does not agree that the
proposed turbines (at 200m high to blade tip) would fit with the scale of the landscape
and in some close views they will appear overly large in relation to the relief of the hills
they are located within. Mitigation has been agreed in outline with the applicant with
the aim of reducing the dominant effects of some turbines in key views and this is
addressed in the conclusions set out below.

Page 22

7.4 Effects on landscape character - The Mull of Kintyre Upland Forest Moor Mosaic
Landscape Character Type (LCT), within which the proposed development is located,
has a large to medium scale. The rolling hills present in the core of this LCT are largely
forested and have a generally simple landform and landcover pattern. These key
characteristics reduce the susceptibility of much of this landscape although the
complexity of the landform and landscape pattern increases (and the scale reduces)
on the outer southern, eastern and northern fringes of these uplands where farmland
and settlement are present. The coastal parts of this LCT are additionally complex and
rugged with strong qualities of naturalness, and in the more remote high cliff coastal
edges to the south-west and west, a distinct sense of wildness can be experienced.
Susceptibility therefore varies significantly across the LCT. This LCT is covered by a
local landscape designation and additionally accommodates the nationally important
route of the Kintyre Way which increases the value associated with this landscape.
Effects on the character of part of this LCT would be direct, significant and adverse. 
7.5 There would be adverse significant indirect effects on the character of the adjacent
Hidden Glens LCT (Glen Breackerie) where the proposal would be widely visible and
the turbines would appear very large in relation to the small-medium scale of this
narrow glen. 
7.6 In terms of effects on wider seascape character (which takes into account the
combination of sea, coastal edge and land), there would be visibility of the proposal
from the expansive seas to the south and west of the Mull of Kintyre and from the
northern part of the small and remote island of Sanda. The proposal would introduce
man-made infrastructure into seascapes with a high degree of remoteness and
naturalness diminishing the sense of wildness associated with the Mull of Kintyre.
Effects on the character of this seascape are considered to be adverse but not
significantly so because of the mitigating factors of the relatively limited extent of
development visible (both vertical and horizontal), the location of the proposal ‘sunk
down’ in a dip between hills (which generally reduces its prominence) and its distance
from the coast and sea.   
7.7 Effects on designated landscapes - Theoretical visibility of the proposal is shown on
Figures 6.2a and 6.3a of the EIA. Beyond 10km of the proposal, visibility would
principally extend across the sparsely settled southern hills of the Kintyre peninsula.
There would be some visibility from the west coast of Kintyre but little visibility from the
east coast. There would be extensive visibility across the sea to the west and north-
west and to the south and south-east with the proposal seen at distances from around
5km. Within approximately 5-10km, visibility of the proposal from the north would be
principally concentrated across the sparsely settled southern hills of the Kintyre
peninsula, the farmed and settled lowlands and south-facing hill slopes between
Campbeltown and Machrinhanish. There would be patchy visibility of the proposal from
the southern coast and farmland of the Mull of Kintyre area and seen at distances of
>4km. Closer to the development site, there would be views from minor public roads
(one of these routes is aligned through the proposed wind farm site) and from the B842.
There would be no visibility of the proposal from the remote and rugged south-western
and western coast of the Mull of Kintyre. 
7.8 This proposal would have some significant adverse effects on landscape character and
on views although its location in a less sensitive larger scale forested upland
landscape, its siting in a slight dip between rolling hills (which affords a degree of
screening) and its distance from more sensitive landscapes and key visual receptors

Page 23

generally reduces the magnitude of these effects. The proposal would be located in the
Mull of Kintyre LLA. This LLA is likely to have been designated because of its diverse
and dramatic coastal scenery. There would be significant adverse effects on some of
the qualities likely to have formed the reasons for designation of the LLA but having
appraised the extent and nature of these effects, I do not consider that the integrity of
the designated area would be compromised. 
7.9 In general, although effects would be significant in views from the north, for example
from the A83 road (viewpoint 11) due to the introduction of new turbines in views where
none are presently seen, the turbines would be seen on a lower section of a generally
simple upland skyline reducing the severity of the effect. Similarly, while the proposal
would be clearly visible from the beaches of Machrihanish and Westport (and seen at
distances of around 6-10km) the location of the turbines away from the dramatic bluff
formed by the high summits and cliffs of the western Mull of Kintyre is a mitigating factor
reducing the magnitude of change. There would be visibility from the eastern part of
Campbeltown (Viewpoint 12) but I consider that effects would not be significant due to
the position of the turbines seen on a low section of skyline with some screening of
turbine bases by landform. 
7.10 Significant adverse effects on views would principally occur within approximately 10km
of the proposed development and with the key effects being from the following
locations: 
• The Kintyre Way Viewpoints 1, 2 and 5 illustrate views from the route but the
proposal would also be seen in views from the unclassified road which forms part
of this nationally important recreational route between Caskey Bay and Glen
Breackerie (over a distance of between 3-4km) where the turbines would be
prominent and would appear to overwhelm the relief of the rolling hills they are sited
within. Turbines 7 and 9 would be particularly intrusive in views seen along the
route from Keil Point travelling north-west into Glen Breackerie. 
• The B842 Viewpoints 3 and 7 illustrate these views. The turbines would appear
particularly dominant in Viewpoint 3 near Killellan and would overwhelm the relief
of the rolling hills they are sited within with access road construction/widening
clearly visible and adding to the magnitude of change. There would be similarly
close views from the unclassified road which branches from the B842 to traverse
the uplands and which would be aligned through the proposed wind farm site before
dropping down to Glen Breackerie.  
• Views from the sea to the south and from Sanda (Viewpoint 10) illustrates likely
views from the sea and the proposal’s disruption of the present harmonious layered
effect of hills which backdrop the coast. While the majority of turbine towers will be
screened by landform (thereby reducing intrusion to some degree) I disagree with
the judgement made in the LVIA that effects would not be significant given the
scenic quality and intactness of the upland landscape which is free of detractors in
these sea views. Similar visibility is predicted to extend across the northern part of
Sanda (although it is accepted that few people visit this island due to restrictions
imposed by its present owners). 
• Ben Ghuilean (Viewpoint 9) where views would be elevated and the proposal seen
at 7.7km with access tracks, keyhole felling and turbines adding to the already
unsightly forest operations and geometry of felling coupes. 
7.11 Night-time lighting effects -  Technical Appendix 6.4 of the EIA provides an assessment
of night-time effects. Four visualisations showing night-time effects have been
generated. The assessment concludes that there would be no significant effects

Page 24

associated with night-time lighting from these viewpoints. The Mull of Kintyre is
sparsely settled and has dark night skies. Our Consultant Landscape Architect
considers that the LVIA under-estimates the likely effects of night-time lighting from
Viewpoints 3 and 5. These viewpoints lie within the darker southern part of the study
area unlike Viewpoints 7 and 14 (Stewarton and Westport Beach) where baseline
lighting levels are increased due to the presence of Machrihanish airport, well-trafficked
roads and Campbeltown. The duration of significant adverse effects would extend into
night-time from Viewpoints 3 and 5, from Glen Breackerie and from temporary
anchorages off Carskey Bay and near Sanda on the southern coast of the Mull of
Kintyre. 
7.12 Cumulative landscape and visual effects with other proposed wind farms - The
proposal would introduce new wind farm development to the southern extremity of
Kintyre. As such there would be few cumulative landscape and visual effects with
operational and consented wind farms which are located further north on the peninsula
>12km distance with relatively little intervisibility occurring between developments.
There will however be adverse cumulative effects on sequential views from:
• The Kintyre Way with this proposal contributing to the increase in the incidence of
close-by wind turbines having significant adverse effects on people walking the
route.
• The A83 between Tarbert and Campbeltown where the proposal would be seen
sequentially with the operational Auchadaduie turbines and the Blary Hill and
Tangy wind farms and the consented Tangy repowering, Clachaig Glen, Airigh and
Rowan wind farms. 
• In views from Arran – although adverse in terms of extending extent of development
the proposal would sit low on the skyline of Kintyre (thereby reducing prominence
and intrusion) and the distinctive ‘bump’ of the Mull of Kintyre would remain largely
unaffected in these views. 
7.13 High Dalrioch wind farm proposal which lies approximately 5km from the Breackerie
proposal has greatest potential to result in significant adverse cumulative landscape
and visual effects in views from Campbeltown, Ben Ghuilean and from the farmed and
settled lowlands between Campbeltown and Machrinhanish 
7.14     Conclusions - Following an initial review of the proposal, including a field visit, a number
of mitigation measures were identified that could potentially improve the appearance
of the wind farm and also provide optimum outcomes for biodiversity and landscape
character. Discussions have taken place with the applicant on the following measures: 
• A reduction in the height of Turbines 7 and 9 to mitigate the degree of intrusion
experienced in views from the sensitive southern coast of the LLA and when
seen from the Kintyre Way where it is aligned in Glen Breackerie. The applicant
has produced a wireline showing a reduction in the height of these two most
prominent turbines from 200m to 180m. 
• Relocation of these two turbines (retaining them at 200m height) to a lower
position so more of the tower is screened by the ridge. Following review of the
revised wireline produced 20/3/24 by the applicant it appears a reduction of
turbines 7 and 9 to 180m would be beneficial but that further measures to
reduce their prominence should be undertaken. This should either involve a
further reduction in the height of these two turbines (<180m) or relocation of the
two 180m high turbines further down the slope to the north-east to benefit from
greater screening of towers by Achnaslishaig Hill.

Page 25

7.15 In addition, the applicant was asked to consider more ambitious landscape and
biodiversity mitigation and enhancement proposals in line with the aims of NPF4 Policy
3 - Biodiversity. The measures set out in Technical Appendix 8.5 (Habitat Management
Plan) principally relate to mitigation of the effects of the development rather than wider
biodiversity enhancement. It is noted in Chapter 3 of the EIA (paragraph 3.66) that
compensatory planting may involve the creation of Atlantic rainforest in the Largiebaan
Reserve. In response to the Council’s request, the applicant has set out a proposal to
create 80 hectares of Atlantic rainforest on the Largiebaan Reserve subject to the
agreement of the Scottish Wildlife Trust (SWT) (email dated 10/4/24). This would
comprise 52.93 hectares of compensatory planting and a further 27.07 hectares as an
off-site biodiversity enhancement measure. This would be a beneficial outcome in
terms of biodiversity and these measures should be secured by planning condition or
as part of the legal agreement. 
7.16 While the location of the proposal in a productive forest is likely to limit scope for
biodiversity enhancement, the Council’s Landscape Consultant considers that the
proposed wind farm should form a catalyst to effect quicker and more far-reaching
improvement to uniform and, in places, poorly designed forestry. The planting of native
woodlands (particularly to soften the often abrupt and angular edges of productive
forestry in key views) and the creation of more extensive open space and riparian
woodland along water courses within the Slate Forest landholding should be
undertaken. These measures have not yet been addressed by the applicant and should
also be considered as part of the outline habitat management plan and/or long term
forest management plan to be secured by condition. 
7.17 The effects of visible aviation lighting are also a concern and while it is accepted that
the day-time effects of the proposal would be of far greater significance and would be
likely to affect more people, the Mull of Kintyre area has notably dark skies which would
be significantly diminished by this proposal. It is therefore also strongly recommended
that an Aircraft Detection Lighting System should be installed at the earliest opportunity
as this would substantially reduce the duration and impact of night-time lighting and
this provision should be secured via planning condition.   
7.18  It is also recommended that a condition should be put in place to limit micro-siting of
turbines to 50m (the applicant is seeking a 100m micro-siting allowance). The reason
for restricting the micro-siting allowance is because of the steeply rolling nature of the
proposal site where even relatively small adjustments to the location of some turbines
could potentially result in a loss of landform screening and greater visual intrusion of
turbines in key views. 
7.19 Key visualisations for the Committee to review include: 
• Viewpoint 1: Kintyre Way, Glen Breackerie
• Viewpoint 3: B842 near Killellan
• Viewpoint 5: Minor road near Keil Point 
• Viewpoint 7: Stewarton
• Viewpoint 9: Ben Ghuilean
• Viewpoint 10: Kintyre Express Ferry Route
• Viewpoint 11: A83 between Kilkenzie and Drumore
• Viewpoint 12: Campbeltown
• Viewpoint 14: Westport beach
• Night-time visualisations N3 and N5
• Additional wireline visualisation produced by the applicant 20/3/24 from the sea
to the west of the Mull of Kintyre

Page 26

• The comparative wireline visualisations (Viewpoints 1-4, 10 and 14) should
also be reviewed as these show the differences between the Proposal and the
proposed reduction in height of turbines 7 and 9. 
7.20 Applicant’s response to ABC Landscape Comments – following discussions on
options to improve visual effects from the south, additional wirelines were provided to
demonstrate the difference from viewpoint 5 should T7 and T9 be limited to 180m in
the current position. Noted these reductions in height would also reduce impacts on
Scheduled Monuments as highlighted by HES. The applicant advised the ECU that
they would agree to a condition to limit the overall height in m AOD of turbines 7 and
9 – either as a movement downhill but retaining the tip height at 200m, or if the
turbines remain in their current position they would be limited to 180m to tip. The
wording of the condition to be agreed at a later stage with the Council to be consulted
on final co-ordinates.   
7.21 In response to the requested uplift in biodiversity enhancements, the applicant
provided further information on proposals to deliver 80 ha of enhanced biodiversity and
compensatory planting at the Largiebaan Nature Reserve have been progressed with
the Scottish Wildlife Trust (SWT) to deliver compensatory planting in the form of 80ha
new Atlantic rainforest in the Largiebaan Reserve (email dated 10/4/24). This would
comprise 52.93 hectares of compensatory planting and a further 27.07 hectares as an
off-site biodiversity enhancement measures. 
7.22 NatureScot have provided the ECU with the following landscape advice (summary) – 
• The Mull of Kintyre has its own distinctive regional character which forms a
marked contrast to the rest of the Kintyre peninsula and contains no consented
large-scale wind farm developments. The Proposal would introduce wind farm
development within the northwestern uplands of the Mull of Kintyre, south of
the Campbeltown Plain. The value and scenic qualities of the Mull are
recognised in part by the Argyll and Bute Council Mull of Kintyre Local
Landscape Area (LLA) designation. 
• The introduction of wind farm development into the Mull of Kintyre would reduce
the marked contrast with the length of the Kintyre peninsula where wind farm
development is concentrated, potentially weakening the distinctive character of
the Mull of Kintyre as a relatively undeveloped and remote area. Our advice
focusses on significant adverse effects in relation to the Mull of Kintyre. The
Proposal will diminish the experience of the Mull of Kintyre as a discrete area
with a strong sense of arrival, well expressed qualities of remoteness/ seclusion
and high scenic quality.
• While the Proposal would have significant adverse landscape and visual effects
it does not meet the threshold of national interest in line with our guidance. 
• Advised the Determining Authority to encourage the Applicant to explore a
reduction in turbine height with the aim of reducing visibility/ intrusion on the
currently undeveloped skyline; especially where the turbines impinge into
smaller scale settled landscapes/ highly scenic coastal panoramas. 
• It should be noted the potential for significant cumulative interactions would be
a future consideration for any similar applications within the Mull of Kintyre and
the potential significant erosion of distinctive regional character. 
7.23 Historic Environment Scotland (HES) - have provided the following landscape advice
(summary) – advised the ECU they do not object to the proposal but have identified
EIA significant effects on the setting of two scheduled monuments in the vicinity of the
proposed development, Lochorodale, long cairn 1000m NW of (SM3653) and

Page 27

Lochorodale, long cairn 505m SW of (SM3654). We have identified mitigation which
would help to reduce this level of effect:
• the deletion of turbines T6, T7, T8 and T9 or substantial height reduction and/or
relocation to an area of the development further from the cairn would reduce
the level of effect on the setting of the SM3653.
• the deletion or reduction in height or relocation of turbines, T7 and T8, that align
broadly with the axis of the cairn would reduce the level of effect on the setting
of Lochorodale, long cairn 505m SW of (SM3654). 
7.24 Officer’s Conclusion – based on the advice of the Council’s Consultant Landscape
Architect the impact of this Proposed Development does not warrant an objection on
landscape and visual impact grounds. Assessment of the impact on the Mull of Kintyre
LLA have found that the proposal would not damage the integrity of the area or the
qualities for which it has been identified. In addition, the applicant has reduced the
impact of turbines 7&9 through a lowering of 180m in height and has agreed to further
reduce the impact on these turbines through micrositing. Additional landscape and
biodiversity benefits have also been agreed as part of an overall package to mitigate
the landscape and visual impact and deliver local social and environmental benefits. 
7.25 The concerns raised by NatureScot and HES are noted and will be a matter for the
Energy Consents Unit to consider/resolve prior to Scottish Ministers reaching a
decision on this application. 
7.26 Having due regard to the above and the changes made to mitigate the significant
effects on the landscape it is concluded that provided these changes are
secured through the use of planning conditions, the proposal complies with the
provisions of NPF4 Policy 11 – Energy and  NPF4 Policy 4 – Natural Places, and
LDP2 Policy 30 – The Sustainable Growth of renewables, LDP2 Policy 71 –
Development Impacts on Local Landscape Areas (LLA)  and ABWECS (2017). 
8. IMPACTS ON TOURISM AND RECREATION 
8.1 NPF4 Policy 11 – Energy does not require Impacts on tourism to be considered,
however LDP2 Policy 30 – The Sustainable Growth of Renewables requires all
applications for wind turbine developments to be assessed against impacts on tourism
and recreation. 
8.2 Impacts on tourism and recreation – In Argyll & Bute the landscape is regarded as
being a particularly valued asset both in terms of its intrinsic qualities and in terms of
its value to the tourism economy. For all types of development the maintenance of
landscape character is an important facet of decision-making in the countryside,
regardless of the scale of development proposed. LDP2 identifies impacts on tourism
and recreation as a material consideration in the assessment of renewable energy
developments on the basis that inappropriate developments with significant adverse
effects which contribute to the degradation of landscape character are unlikely to be in
the interests of the Argyll tourism economy. 
8.3 As Tourism and Landscape & Visual matters are intrinsically linked, and there is little
evidence to demonstrate whether or not wind farms adversely affect tourism, it is
considered that such impacts are covered in the landscape and visual impact
assessment of the proposal. The assessment provided demonstrates that the
proposals will not visually impact upon any of the top 5 free or paid for tourism

Page 28

attractions in Argyll and Bute. However, the LVIA does identify significant impacts on
local tourist and recreation receptors in the operational phases, including: 
• one tourist accommodation property (Kilchrist Castle Cottages); 
• 4 land-based routes or groups of routes: Core Path C088(I) – Campbeltown to
Claonaig; C092(a) Mull of Kintyre Lighthouse; C086 – Machrihanish to West
Port; C087 (Sound of Kintyre Housing to beach); C447 (Darlochan to
Stewarton, Campbeltown); and C448 (Stewarton to Clochkeil, Campbeltown).
• 1 public beach (Westport Beach); and 
• one natural environment activity (Largiebaan Nature Reserve). 
8.4 A number of representations have also been received to the ECU relating to the impact
on tourism and walking routes, however, it is not considered that the impact of the
proposed development would be significant. 
8.5 Having due regard to the above it is considered that the proposals is consistent
with the provisions of NPF4 Policy 11 - Energy, NPF4 Policy 4 – Natural Places
and LDP2 Policy 30 – The Sustainable Growth of Renewables, LDP2 Policy 32
Active Travel; Argyll and Bute Landscape Wind Energy Capacity Study 2017
LDP2 TN12 Technical Note: Renewable Energy. 
9. PUBLIC ACCESS 
9.1 NPF4 Policy 11 – Energy requires that project design and mitigation demonstrates how
impacts on public access are addressed, including impact on long distance walking
and cycling routes and scenic routes.  LDP2 Policy 30 – The Sustainable Growth of
Renewables requires all applications for wind turbine developments to be assessed
against impacts on public access, including impact on long distance walking and
cycling routes and those scenic routes identified in the NPF. LDP2 Policy 32 – Active
Travel requires active travel and recreation to be integrated in developments from the
start of the wider design process and existing active travel networks should be
safeguarded and integrated with the development. 
9.2 The Council’s Access officer has noted that the whole area of the proposed windfarm
is land where the public can exercise their legal rights of access, and people can only
be excluded from land immediately around sites where construction is being carried
out.  Therefore the majority of the area should be open for the public throughout the
construction period and any closures should affect the minimum area for the shortest
period possible. People of all abilities can exercise their rights of access to walk,
cycle or ride a horse, therefore bridle gates should be installed wherever it is
necessary to install a locked gate or cattle grid.   The Council has powers to require a
landowner to install a bridle gate where the public’s rights of access are obstructed
by a locked gate or cattle grid.   
Officer opinion: The proposal will be visible from some key routes, but will not have
any adverse impact on public access and guidance has been provided to the
applicant to maintain access for the public when appropriate. 
9.3 Having due regard to the above subject to a condition to secure an Access
Management Plan in the event that consent is granted it is considered that the
proposal is consistent with the provisions of NPF4 Policy 11- Energy, NPF4
Policy 4 – Natural Places and LDP2 Policy 30 – The Sustainable Growth of
Renewables, LDP2 Policy 32 Active Travel;

Page 29

10. AVIATION AND DEFENCE INTERESTS INCLUDING SEISMOLOGICAL
RECORDING    
10.1 NPF4 Policy 11 – Energy requires that project design and mitigations demonstrates
how impacts on aviation and defence interests including seismological recording have
been addressed.  LDP2 Policy 30 – The Sustainable Growth of Renewables requires
impacts on aviation and defence interests and seismological recording and on
telecommunications links to be addressed. 
10.2 Highlands & Islands Airport Limited (HIAL) (13th December 2023) – advised the ECU
that at the given position and height, this development would not infringe the
safeguarding criteria and operation of Campbeltown Airport and therefore no objection
is raised. 
10.3 Defence Infrastructure Organisation (17th November 2023) – advised the ECU they
have no objection subject to the following conditions: Aviation lighting and Aviation
Charting and Safety Management to maintain aviation safety. 
10.4 Glasgow Airport have advised the ECU the proposal advised the ECU the proposal is
located outwith the consultation area and as such no comment to make and need not
be consulted further. 
10.5 Glasgow Prestwick Airport (GPA) (23rd November 2023) – advised the ECU that
the proposal raises an aviation safety concern which may create an operational impact
on the Airport as an Air Navigation Services Provider (ANSP). As a result a standard
holding objection has been raised until all technical and operational aviation safety
matters detailed above are addressed to the satisfaction of the Airport, any aviation
safety measures dictated by the Airport Wind Farm Safeguarding Process are
implemented, and a mitigation agreement is put in place for the life of the windfarm.
The Airport noted that it would be able to remove the holding objection should the
proposed radar line of sight assessment indicate that no turbines were visible to the
GPA PSR(s). 
10.6 National Air Traffic Services Safeguarding (NATS) 9th November 2023) – advised
the ECU the proposal has been examined by their technical safeguarding teams and
a technical impact is anticipated on Prestwick Centre ATC and Military ATC, this has
been deemed to be unacceptable.  Accordingly, NATS issued a safeguarding
objection to the proposal. 
10.7 Applicant’s response to GPA and NATS (10th April 2024) – further technical work
is being undertaken to resolve the issues raised, including a VHF report. Following
these reports, mitigation contracts will be drawn up between the applicant and both
NATS and GPA to ensure no impact on aviation matters and ensure the withdrawal
of the holding objections. This is an approach that has been previously adopted for
other wind farm applications (e.g. Rowan Wind Farm (insert ref). 
10.8 Further confirmation has been provided (7th May 2024) that GPA is optimistic that
appropriate mitigation of these effects will be possible and that an agreement can be
reached with the Applicant in respect of mitigation measures, which would allow GPA
to withdraw its objection. NATS has also confirmed (9th May 2024) that they are
confident that the implementation of the proposed ‘blanking contract' will address the
concerns effectively. It should also be noted that in the unlikely event the standing
objection is not withdrawn by either NATS or GPA, aviation matters fall within the remit

Page 30

of the ECU to resolve PRIOR to any decision by Scottish Ministers rather than with the
local planning authority. For this reason, officers do not recommended a holding
objection by the Council on aviation matters. 
10.9 Having due regard to the above, subject to the conditions recommended by the
Ministry of Defence, it is concluded the proposal is consistent with the
provisions of NPF4 Policy 11 – Energy, LDP2 Policy 30 – The Sustainable Growth
of Renewables. 
11. TELECOMMUNICATIONS AND BROADCASTING INSTALLATIONS 
11.1 Policy 11 – Energy of NPF4 requires that project design and mitigation demonstrates
how impacts on telecommunications and broadcasting installations, have been
addressed particularly, ensuring that transmission links are not compromised.  LDP2
Policy 30 – The Sustainable Growth of Renewables requires all applications for wind
turbine developments to be assessed against impacts on telecommunications and
broadcasting installations particularly ensuring that transmission links are not
compromised.    
11.2 Joint Radio Company Limited (9th November 2023) – advised the ECU no potential
problems are foreseen based on known interference scenarios and the data provided.
However, if any details of the wind farm change, particularly the disposition or scale of
any turbine(s), it will be necessary to re-evaluate the proposal. 
11.3 Having due regard to the above it is concluded that the proposal will not have
any adverse impacts on telecommunications, broadcasting installations and
transmission links (including cumulative impacts) and is consistent with the
provisions of NPF4 Policy 11- Energy and LDP2 Policy 30 – The Sustainable
Growth of Renewables. 
12. ROAD TRAFFIC AND ADJACENT TRUNK ROADS 
12.1 NPF4 Policy 11 – Energy requires that project design and mitigation demonstrates how
impacts on road traffic and on adjacent trunk roads have been addressed, including
during construction.  LDP2 Policy 30 – The Sustainable Growth of Renewables
requires all applications for wind turbine developments to be assessed against impacts
on road traffic and impacts on adjacent trunk roads.    
12.2 Transport Scotland (TS) - advised the ECU they have no objection. TS requests that
conditions are attached in the event that the proposal receives consent relating to: an
Abnormal Loads Assessment; approval of the proposed route for any abnormal loads;
accommodation measures (removal of street furniture, junction widening, traffic
management); additional signing or temporary traffic control measures must be
undertaken by a recognised Quality Assured traffic management consultant; abnormal
load delivery trial run; Construction Traffic Management Plan (CTMP); sheeting of all
vehicles transporting construction material; vehicle wheel cleansing facilities; and a
Decommissioning Plan. 
12.3 Following discussions between the Council’s Roads Engineer and the applicant’s
Transport Consultant, further information has been provided to clarify the proposals to
use U38 and C10 and no objection is raised. A number of conditions are requested to
be attached to any consent granted: U38 to be used for abnormal loads only; all
contractors to be made aware of U38 to be used for abnormal loads only; applicant is

Page 31

to inspect and submit a U38 and C10 mitigation report prior to any works starting;
carriageway widening, strengthening, surfacing and additional passing places for the
proposed U38 Moss Road and U10 Glenbreakerie Road (including new passing place
signs); temporary carriageway widening to be soiled and reseeded on completion of
construction works; all removed street furniture to be replaced with new; Traffic
Management Plan to include details of all materials, plant, equipment, components
and labour required during the construction, operation and decommissioning phase; a
detailed Method Statement in relation to access and transport of materials, plant and
equipment; detailed condition survey to be carried out on all haul routes between the
A83 Tarbet - Campbeltown Trunk Road and the application site; weekly carriageway
inspections on the public road between the A83 Tarbet - Campbeltown Trunk Road.
The applicant will be responsible for the cost of carrying out repairs to the carriageway
which are directly attributable to the works, as they appear with details for repairs to
carriageway to be agreed with Roads & Infrastructure Services, prior to any work
starting on site. 
12.4 The Roads Engineer has also highlighted the following notes for intimation to the
Applicant: a Section 96 Legal Agreement will be required and connection of site access
to public road to be agreed with Roads & Infrastructure Services, prior to any work
starting on site. 
12.5 Having due regard to the above, subject to the relevant conditions being
attached in the event that consent is granted it is concluded that the proposal is
consistent with the provisions of Policy 11 – Energy of National Planning
Framework 4, LDP2 Policy 30 – The Sustainable Growth of Renewables, LDP2
Policy 35 – Design of New and Existing, Public Roads and Private Access
Regimes and LDP2 Policy 38 – Construction Standards for Public Roads. 
13. HISTORIC ENVIRONMENT 
13.1 Policy 11 – Energy of NPF4 requires that project design and mitigation demonstrates
how impacts on the historic environment have been addressed.  Policy 7 – Historic
Assets and Places of NPF4 intent is to protect and enhance historic environment
assets and places, and to enable positive change as a catalyst for the regeneration of
places.  Policy LDP 6 – Supporting the Sustainable Growth of Renewables of the Argyll
& Bute Local Development Plan requires all applications for wind turbine developments
to be assessed against impacts on the historic environment, including scheduled
monuments, listed buildings and their settings. LDP2 Policy 19 – Scheduled
Monuments and LDP2 Policy 16 – Listed Buildings provide further guidance on
assessing development proposals against heritage impacts.  
13.2 Historic Environment Scotland (HES) – advised the ECU they do not object to the
proposal but have identified EIA significant effects on the setting of two scheduled
monuments in the vicinity of the proposed development, Lochorodale, long cairn
1000m NW of (SM3653) and Lochorodale, long cairn 505m SW of (SM3654). HS
identifies the following mitigation which would reduce this level of effect:
• The deletion of turbines T6, T7, T8 and T9 or substantial height reduction
and/or relocation to an area of the development further from the cairn would
reduce the level of effect on the setting of the SM3653.
• The deletion or reduction in height or relocation of turbines, T7 and T8, that
align broadly with the axis of the cairn would reduce the level of effect on the
setting of Lochorodale, long cairn 505m SW of (SM3654).

Page 32

13.4 In response to the proposed changes made to the Proposed Development to mitigate
landscape and visual impact assessment, HES responded (3rd May 2024) that while
they welcome the consideration of changes, the proposed revisions to the heights of
turbines 7 and 9 to 180m would not make a material alteration to the impacts on the
setting of the two scheduled monuments. HES confirm however that the suggested
revisions would not raise issues of national interest. 
13.5 The West of Scotland Archaeology Service (WOSAS) support Historic Environment
Scotland (HES) advice concerning the effect of the proposals on the setting of
Scheduled Ancient Monuments (SAMs) in the surrounding landscape. Advises that
both Lochorodale cairn SAMs (SM3653, SM3654) will suffer a significant detrimental
effect on the ability to appreciate the monuments in an entirely rural landscape setting
when visiting the sites themselves and on approach from the NE on the road. Advised
the ECU that the proposed mitigation set out in the EIA cultural heritage chapter would
reduce any significant effect and these measures should be secured through
conditional consent. 
13.6 Listed buildings - There is one C listed building which falls within the zone of theoretical
visibility (7 to 9 turbines visible) - Killenan lodge. Additional visualisations have been
provided to demonstrate the impact of the proposals on the setting of this building and
the Council’s Design and Conservation officer has commented: the historic importance
of the gate lodge is connected to its function of protecting the main house itself (which
in this case is now in ruin). Its historic setting would therefore primarily be inward to
the house, rather than outward, and unlikely to be particularly affected unless there is
a change of character in the immediate landscape. I would not consider that long views
towards these turbine tips to notably affect this setting. As such, the proposals are
consistent with LDP2 Policy 16 – Listed Buildings. 
13.7 Having due regard to the above it is considered that the proposal is consistent
with the provisions of NPF4 Policy 11 – Energy and Policy 7 – Historic Assets
and LDP2 Policy 30 – Supporting the Sustainable Growth of Renewables, LDP2
Policy 19 – Scheduled Monuments, LDP2 Policy 16 – Listed Buildings. 
14. HYDROLOGY, THE WATER ENVIRONMENT AND FLOOD RISK 
14.1 NPF4 Policy 11 – Energy requires that project design and mitigation demonstrates how
effects on hydrology, the water environment and flood risk have been addressed. 
LDP2 Policy LDP 30 – The Sustainable Growth of Renewables requires all applications
for wind turbine developments to be assessed against impacts arising from effects on
hydrology, the water environment and flood risk (including cumulative).  LDP2 Policy
56 – Land Erosion and LDP2 Policy 57 - Risk Appraisals provide guidance on the type
of development that will be generally permissible within specific flood risk areas and
require flood risk assessments, drainage impact assessments, or land erosion risk
appraisals to accompany application where required. 
14.2 ABC Flood Risk Assessor (12th December 2023) – no objections subject to conditions
to ensure that: watercourse crossings should not reduce the existing capacity of the
channel, and ideally designed to convey the 1 in 200 year plus climate change (46%
allowance) flood event; and surface water drainage should be designed in
accordance with CIRIA C753 to ensure that post development surface water runoff
does not exceed the pre-development surface water runoff. The surface water
drainage should be in operation prior to the start of construction.

Page 33

14.3 Having due regard to the above, subject to the relevant conditions being
attached in the event that consent is granted it is concluded that the proposal is
consistent with the provisions of NPF4 Policy 11 – Energy, LDP2 Policy 30 – The
Sustainable Growth of Renewables, LDP2 Policy 56 – Land Erosion and LDP2
Policy 57 - Risk Appraisals. 
15. NATURAL HERITAGE, INC. BIRDS  
15.1 Policy 11 – Energy of NPF4 requires that project design and mitigation demonstrate
how impacts on biodiversity, including birds have been addressed.  Policy 3 –
Biodiversity of NPF4 requires development proposals to protect biodiversity, reverse
biodiversity loss, deliver positive effects from development and strengthen nature
networks. Policy 5 – Soils of NPF4 supports the generation of energy from renewable
sources that optimises the contribution of the area to GHG emissions reduction targets
on peatland, carbon-rich soils and priority peatland. A detailed site specific assessment
will be required for development on peatland which will include the likely net effects of
the development on climate emissions and loss of carbon.  LDP2 Policy 30 – the
Sustainable Growth of Renewables requires all applications for wind turbine
developments to be assessed against impacts arising from effects on the natural
heritage, including birds and to be assessed against impacts on carbon rich soils, using
the carbon calculator (including cumulative). Policy 73 – Development Impact on
Habitats, Species and Biodiversity requires Development proposals will be
encouraged to incorporate, safeguard and enhance existing site biodiversity wherever
possible. 
Ornithology 
15.2 NatureScot confirmed to the ECU that the Proposal will not raise issues of national
interest with regards to the ornithological interest of the site but did raise queries
regarding the survey work (including the age of data), inputs into the modelling process
and subsequent assessment. The applicant has responded to these issues. NS also
noted that increased monitoring for bat and bird carcases at the operational stage
would allow for mitigation to reduce the impact on biodiversity and requested that this
be secured through the use of planning condition. NS also recommended revisions to
the Outline Habitat Management Plan to create better habitat away from the key holed
areas to reduce the attractiveness of the habitat for hen harriers, informed by existing
habitat quality and any known history of nesting locally in line with emerging guidance. 
15.3 RSPB has advised the ECU that it does not object to the proposals and welcomes the
siting of the majority of the proposal’s infrastructure within commercial forestry
plantation (considered low biodiversity value). RSPB also suggest additional planting
to help reduce the attractiveness of proposed key-holed areas to Hen Harriers. RSPB
queried the balance of mitigation vs enhancement measure in line with NPF4 Policy 3
– Biodiversity and requested conditions to secure: a Bird Protection Plan; Habitat
Management Plan; an Ecological Clerk of Works (ECoW); and, an appropriate
programme of post-construction monitoring alongside any consent. 
Peat   
15.4 According to the submitted EIAR, most of the Proposed Development site is classed
as Class 5 peat (where no peatland habitat is recorded, but where soils are carbon-
rich and comprise deep peat).

Page 34

15.5 Scottish Environment Protection Agency (SEPA) – advised the ECU they have no
objection and requested conditions relating to: schedule of mitigation; a 50m buffer
around all water bodies and water course crossings; a detailed site-specific Peat
Management Plan (PMP) to detail maintain the hydrological condition of the area
between T5 and T9 due to the presence of relatively deep peat and M6. The Peat
Management Plan includes the use of floating tracks and micrositing where possible
between turbines T5 and T7 but we require these measures to be extended to T9 due
to the presence of M6 (mire) AND ensure the peat surplus from excavations is used
for peatland restoration as detailed in the Habitat Management Plan; Borrow pit
restoration; Finalised Habitat Management Plan; Private water supplies; and
micrositing. 
15.6 To ensure that any changes to the peat reuse proposals because of further post
consent investigation are appropriate and in line with current guidance, SEPA request
a condition requiring a detailed site-specific Peat Management Plan (PMP) for
approval to the determining authority, in consultation with SEPA, at least two months
prior to commencement of development.  This should demonstrate how micrositing
and other measures have been used to further minimise peat disturbance following
ground investigations and detailed design work. 
15.7 Ironside Farrar (Environmental Consultants on behalf of Scottish Government
ECU to audit Peat Landslide Hazard Risk Assessment (PLHRA)) (21st March 2024)
– advised the ECU that further information is required to support a robust assessment;
areas for attention will be advised in the review findings and outline guidance offered
to support the developer in preparing a satisfactory PLHRA. At time of writing further
submissions have not yet been made, however it is noted that this will be a matter for
the ECU to resolve with the applicant prior to any decisions being made by the Scottish
Ministers on this proposal.   
Borrow pits 
15.8 The proposal seeks consent for use of up to four onsite existing borrow pits. NPF4
Policy 33 – Minerals states that development proposals for borrow pits will only be
supported where: the proposal is tied to a specific project and is time-limited; the
proposal complies with the mineral extraction criteria in Policy 33 taking into account
the temporary nature of the development; and appropriate restoration proposals are
enforceable and LDP2 Policy 31 – Minerals states that proposals for mineral extraction
will generally be supported for borrow pits where the proposal is found to be acceptable
after being assessed against National Planning Framework 4 Policy 33 criterion e). As
noted above, conditions will be used to secure appropriate restoration proposals in line
with SEPA recommendations. 
15.9 Officer comment - Officers are satisfied to support the recommendation of SEPA,
including suggested conditions in relation to peat matters and the restoration of borrow
pits. In terms of ornithology, officers are content with the assessment and
recommendations of NatureScot and RSPB, including the proposed conditions.
Proposals to deliver additional 80ha compensatory planting to create new areas of
Atlantic Rainforest within the Largiebaan Nature Reserve are also noted as making a
positive contribution towards the natural heritage in the immediate area surrounding
the proposed development site and these enhancement measures should be secured
by planning condition or legal agreement with appropriate consultation with NatureScot
and RSPB.

Page 35

15.10 Having due regard to the above, the proposal is consistent with the provisions
of NPF4 Policy 11 – Energy, NPF4 Policy 3 – Biodiversity, NPF4 Policy 5 Soils
and NPF4 Policy 31 – Minerals as well as LDP2 Policy 30 – The Sustainable
Growth of renewables, LDP2 Policy 73 – Development Impact on Habitats,
Species and Biodiversity, LDP2 Policy 79 – Protection of Soil and Peat
Resources and LDP2 Policy 31 - Minerals. 
16.    TREES, WOODS AND FORESTS 
16.1 NPF4 Policy 11 – Energy requires that project design and mitigation will demonstrate
how impacts on trees, woods and forests have been addressed. NPF4 Policy 6 –
Forestry, woodland and Trees intent is to protect and expand forests, woodland and
trees.   LDP2 Policy 77 – Forestry, Woodland and Trees states: Removal of woodland
resources will only be permitted where it would achieve significant and clearly defined
additional public benefits. These benefits will be secured by attaching a planning
condition or by requiring a developer to enter into a planning obligation. Where
woodland, hedgerows or individual trees are removed in association with
development, adequate provision must be made for the planting of new woodland
resources, including compensatory planting in accordance with the sequential
approach set out in LDP2 Policy 78 – Woodland Removal. 
16.2 The proposed development is situated within an active commercial coniferous forestry
plantation, dominated by sitka spruce. As a result of the proposed development, a total
of 271.43ha would be required to accommodate the infrastructure footprint, buffer for
bats, and management felling. A total of 218.5ha would subsequently be restocked on
site, with 52.93ha requiring to be replaced as off-site compensation. Subject to further
agreement, there are discussions ongoing between the Applicant and the neighbouring
Largiebaan reserve owned and operated by the Scottish Wildlife Trust (SWT), to
facilitate the planting of 80 ha Atlantic rainforest as part of the off-site compensation
required via forestry felling and replanting and the Control of Woodland Policy. 
16.3 This arrangement for compensatory planting would be in line with LDP2 Policy 78
which states that a sequential approach should be followed for all agreed
compensatory planting with on site as the most favourable approach and offsite (within
Argyll and Bute) as the next best option. Off-site compensatory planting must be set
out in a compensatory planting plan approved by Scottish Forestry and should be
conditioned as appropriate or dealt with through S75 or S69 agreements. 
16.4 Scottish Forestry – advised the ECU they support the proposal for key-holing and
habitat improvements within the forest, although this will involve a large-scale
intervention of 196ha tree felling. It is noted that this felling provides an opportunity to
improve the diversity of the woodland, particularly through extending habitat networks
and connecting to the proposed peatland restoration. They recommend the use of
planning conditions to secure a revised forest plan for Slate forest and a detailed
compensatory planting condition. 
16.5 Having due regard to the above it is concluded that subject to the conditions
recommended by Scottish Forestry being attached in the event that the proposal
receives consent it is consistent with the provisions of NPF4 Policies 11 –
Energy and 6 – Forestry, Woodland and Trees and LDP2 Policy 04 – Sustainable
Development; LDP2 Policy 73 – Development Impact on Habitats, Species and
Biodiversity, Policy 77 – Forestry, Woodland and Trees, LDP2 Policy 78 –
Woodland Removal.

Page 36

17. DECOMMISSIONING, SITE RESTORATION AND QUALITY OF SITE
RESTORATION PLANS 
17.1 NPF4 Policy 11 – Energy (e) requires that project design and mitigation demonstrates
how proposals for the decommissioning of developments, including ancillary
infrastructure, and site restoration have been addressed. It also requires that project
design and mitigation demonstrates how the quality of site restoration plans have been
addressed including the measures in place to safeguard or guarantee availability of
finances to effectively implement those plans. LDP2 Policy 30 – The Sustainable
Growth of Renewables requires all applications for wind turbine developments to be
assessed against impacts arising from the need for conditions relating to the
decommissioning of developments, including ancillary infrastructure, and site
restoration and the need for a robust planning obligation to ensure that operators
achieve site restoration.    
17.2 At the end of the project’s operational life (approximately 35 years), a decision would
be made as to whether to refurbish, remove, or replace the turbines. If refurbishment
or replacement were to be chosen, relevant planning applications would be made. If a
decision were to be taken to decommission the Proposed Development, this would
entail the removal of all the turbine components, transformers, the substation and
associated buildings. Access tracks and underground cables would be left in place and
foundations removed to a depth of 0.5 m below ground level to avoid environmental
impacts from removal. 
17.3 A Decommissioning Plan would set out environmental protection measures and
restoration principles which would be implemented. This Plan would be agreed with
ABC but it is recommended that this matter is covered by planning conditions
consistent with other projects across Argyll & Bute in the event that the proposal
obtains consent from the ECU.   It should be noted that a financial guarantee and bond
will also be required - this bond will need to be reviewed by independent consultants
every 5 years at the cost to the applicant. 
Having due regard to the above it is concluded that subject to an appropriate
condition being attached to secure decommissioning in the event that the
proposal receives consent the proposal is consistent with the provisions of
NPF4 Policy 11 – Energy and LDP2 Policy 30 – The Sustainable Growth of
Renewables. 
18. CUMULATIVE IMPACTS    
18.1 NPF4 Policy 11 – Energy requires that project design and mitigation will demonstrate
how cumulative impacts have been addressed. LDP2 Policy 30 – The Sustainable
Growth of Renewables also requires cumulative impacts to be addressed.   Any
cumulative impacts are mostly related to landscape and visual impact, which have
been covered in the preceding sections of this report. 
19. PERPETUITY 
19.1 Policy 11 – Energy of NPF4 requires that consents for development proposals may be
time limited.  Areas identified for wind farms are, however, expected to be suitable for
use in perpetuity.  It is acknowledged that areas identified for wind farms are expected
to be suitable for use in perpetuity.   However, as the operational life of the
Proposed Development would be 35 years, should consent be granted for this

Page 37

proposal Officers would expect it to be time limited to 35 years to reflect the life
of the wind farm as detailed in the EIAR. 
20. CONCLUSION 
20.1 This proposal is classed as “Strategic Renewable Electricity Generation” - a National
Development, due to its capacity to generate and store more than 50MW. The Scottish
Government gives considerable commitment to the delivery of renewable energy given
the priority set out in NPF4 to address the climate and biodiversity crises. It therefore
encourages Planning Authorities to support the development of wind farms where they
can operate successfully in appropriate locations. NPF4 is clear that significant weight
should be placed on the contribution of the proposal to renewable energy generation
targets and on greenhouse gas emission reduction targets. This proposal will result in
the generation of 85.8MW energy and the reduction of 157,802 tonnes of carbon
dioxide annually during its 35 year operational life. 
20.2 However, while there is clearly ‘in principle’ support for this type of development,
assessment against the wider provisions of the Development Plan, which includes
NPF4 and the Argyll & Bute LDP2 is required to determine the impact of the proposal. 
20.3 For Argyll and Bute Council, the visual impact on the landscape is a key consideration.
In this instance, the Council’s Landscape Consultant has identified some significant
adverse landscape and visual impacts, however, these are not considered to warrant
an objection on landscape and visual impact grounds. NPF4 further advises that where
impacts are localised and / or appropriate design mitigation has been applied (which
is the case for this proposal where height reduction and possible relocation of T7 and
T9 has been agreed) such effects will generally be considered acceptable. It is also
noted that a package of enhanced biodiversity measures including the creation of 80
ha Atlantic Rainforest at Largiebaan has been agreed with the applicant and host site
to mitigate and reduce these impacts.  
20.4 Other matters relating to impacts of the Proposed Development on noise, roads,
impacts on residential amenity, natural heritage, trees and woodland, soils, historic
environment, roads and traffic, hydrology and flood risk, tourism and recreation, public
access, telecommunications, including cumulative impacts have been assessed and
found to be acceptable. Where negative effects have been identified, these have
generally been found to be minor in nature and are either addressed through planning
conditions or outweighed by social, environmental or economic benefits consistent with
the provisions of the Development Plan in this regard. 
20.5 Outstanding matters relate to aviation and peat landslide risk. However, these matters
fall within the remit of the ECU to resolve appropriately with the applicant prior to any
decision by Scottish Ministers. These are not grounds for objection by the Council. 
20.6 In conclusion, it is recommended by Officers that the Council does not object to this
application subject to the inclusion of any conditions recommended by consultees in
any consent granted by the ECU.  In addition to the standard conditions applied to
most wind farm developments, the following conditions and provisions for legal
agreements have been identified as necessary to mitigate the specific impacts of the
Breackerie Wind Farm proposal: 
• Revision of height and/or location of T7 and T9 in consultation with Argyll and Bute
Council to reduce landscape and visual impact and heritage impacts;

Page 38

• Aviation detection lighting system to avoid the impact on the dark skies of the Mull
of Kintyre;
• Reduced wind turbine micro-siting allowance of 50m;
• Secure delivery of 80 ha compensatory biodiversity enhancement measures at
Largibaan Nature Reserve and consideration of further on-site  compensatory
planting; and
• Noise protection measures (AM and fixed minimum limits). 
21. RECOMMENDATION 
That the ECU be notified accordingly that: 
1. Argyll & Bute Council does not object to the proposed development subject
to the inclusion of conditions recommended by consultees being included in
any consent. 
2. Argyll & Bute Council further recommends the following conditions and
provisions for legal agreements as discussed with the applicant to mitigate
the specific impacts of the Breackerie Wind Farm proposal: 
o Revision of height and/or location of T7 and T9 in consultation with
Argyll and Bute Council to reduce landscape and visual impact and
heritage impacts;
o Aviation detection lighting system to avoid the visual impact on the
dark skies of the Mull of Kintyre;
o Reduced wind turbine micro-siting allowance of other wind turbines
to 50m to ensure no change from assessed proposal;
o Delivery of 80 ha compensatory biodiversity enhancement measures
at Largiebaan Nature Reserve and consideration of further on-site 
compensatory planting; and
o Noise protection measures (AM and fixed minimum limits). 
3. Regarding the outstanding Aviation matters, Argyll & Bute Council would
defer to the expert advice of National Air Traffic Systems and Glasgow
Prestwick Airport to resolve these matters with the ECU.