NORTH AYRSHIRE COUNCIL 
02 November 2022 
North Ayrshire Council 
Title:    Medium Term Financial Outlook 2023/24 to 2025/26 
Purpose:  To outline the financial challenges facing the Council over the
medium-term in order to help inform the development of budget
proposals. 
Recommendation:  That Council considers the financial position identified in the
Medium-Term Financial Outlook 2023/24 to 2025/26, notes the
scale of the financial challenges which the Council faces over
the medium term and brings forward proposals to set a
balanced budget for 2023/24. 
1. Executive Summary 
1.1 Local authorities continue to operate in an increasingly complex, challenging, and
uncertain environment with public sector funding not keeping pace with the increasing
costs and demand for services, with challenges continuing through the legacy impact
of the pandemic and more recently through the significant cost impact of inflation.  In
this climate it is important that Councils continue to take both a medium-term and
long-term view, however it is recognised the current level of volatility will require
immediate focus on the short-term impacts.  The Council’s Long-Term Financial
Outlook was updated and presented to Council on 16 December 2020.  This is the
cornerstone of the Council’s strategic financial framework and establishes a sound
basis for the development of the Medium-Term Financial Outlook and subsequent
annual budgets, enabling the Council to address the challenges it faces and best align
resources to key priorities. 
1.2 The Long-Term Financial Outlook 2021/22 to 2030/31 identified an estimated funding
shortfall of £120m over the next ten years which the Council requires to address.  This
is based on best estimates at the time with sensitivity analysis highlighting the
implications of changes to the underlying assumptions.  It is recognised that further
recent cost impacts will change this position over the long term, with an update
planned during 2023/24. 
1.3.  The Medium-Term Financial Outlook for the period 2023/24 to 2024/25 draws on the
same data and projections as the Long-Term Financial Outlook, however,
incorporates several more recent updates including the impact of inflation, output from
the Scottish Government Spending Review and assumptions related to both Scottish
Government and UK Government policy.  Importantly, the Scottish Government
Spending Review, published in May 2022, has indicated a broadly flat cash funding
position for Local Government over the medium-term.  When this funding landscape is

Page 2

set within the context of significant rising cost pressures, based on current planning
assumptions around financial pressures, Scottish Government funding levels and
Council tax funding this has identified a funding gap of £53.314m (including the
HSCP), £35.016m (excluding the HSCP) over the next 3 years which must be
addressed as part of the Council’s Medium-Term Financial Plan. 
1.4  To address the financial challenge the Council must examine its cost base and
carefully consider the allocation of available resources across Council priorities.  Due
to the scale of the challenge faced, minimising impacts on communities and services
will be extremely challenging. 
1.5.  Elected members have previously received briefings on the contents of the Medium-
Term Financial Outlook and officers are currently developing proposals to support the
Medium-Term Financial Plan for 2023/24 to 2025/26, which will be presented to
Council for consideration on 1 March 2023. 
2. Background 
Long-Term Financial Outlook (LTFO) 
2.1 The Long-Term Financial Outlook 2021/22 to 2030/31 was approved at Council on 16
December 2020 and outlined the potential impact of: 
• The strategic financial framework. 
• Local issues for North Ayrshire including current and anticipated demographic and
health profiles, employment and levels of deprivation and the impact these will have
on the Council's income and cost base. 
• Global and national economic performance. 
• Factors affecting Scottish Government funding and funding for Local Government. 
• The financial outlook for North Ayrshire including funding and expenditure
requirements. 
• A review of the Council's balance sheet including assets, debt, future liabilities and
reserves; and 
• The strategic response required by the Council to ensure future financial
sustainability. 
Key Messages 
2.2 The LTFO highlighted several key messages in relation to the anticipated financial
environment and the potential impact on funding and expenditure requirements of the
Council over the next 10 years, including: 
• Demographic Changes – North Ayrshire’s overall population is forecast to reduce
by 3.9% over the period, with reductions in the numbers of children and working

Page 3

age adults being offset by a projected 18.1% increase in Older People.  At the
same time the percentage of North Ayrshire residents living with disabilities or long-
term health and mental health issues is projected to be higher than the Scottish
average.  This will result in significant changes to demand for services, particularly
in Communities and Health and Social Care. 
• Economic Impacts – North Ayrshire’s economy has taken longer to recover from
previous challenges than other areas, with pre-Covid economic activity still below
pre-2008 levels.  The percentage of adults claiming out of work benefits is 40%
higher than the Scottish average and 26.8% of North Ayrshire’s SIMD datazones
are within the 15% most deprived in Scotland. 
• Other Expenditure Requirements – In addition to the demographic and economic
impacts on service demands, the expenditure requirements of the Council will be
subject to further pressures in relation to pay and price inflation and the revenue
implications of the Council’s ambitious General Services Capital investment
Programme, more recently through increased costs of borrowing, which will result in
increased budget pressures across the full timeframe of the LTFO.  
• External Funding – The economic impact of the pandemic on the UK and Scottish
economies is expected to result in real terms reductions in public expenditure
budgets.  Combining the anticipated reduction in the Scottish block grants with the
potential impact of any shortfall in the recovery of devolved revenues and the
continued direction of funding to support Scottish Government funding priorities
within Health, Social care and Education sectors, the LTFO is projecting ongoing
challenges to the overall local government funding position, resulting in anticipated
reductions in Aggregate External Finance allocations to North Ayrshire Council of
1% per annum in the medium term. 
• Council Tax Income and the Use of Reserves – As funding from the Scottish
Government in relation to core local government services reduces, North Ayrshire
Council will become increasing reliant on income from Council Tax and internal
reserves to fund service delivery.  The LTFO assumes a 3% per annum Council
Tax increase over the period.  However, it is anticipated that the Council’s Useable
Reserves will be reduced to the minimum recommended levels by 2024; and 
• The Financial Challenge - The LTFO identifies an estimated funding shortfall of
£120m over the next ten years.  This is based on best estimates with sensitivity
analysis highlighting that a 1% change in the underlying assumptions could result in
this increasing to as much as £228m over the same period.  It is recognised that
further recent cost impacts will change this position over the long term, with an
update planned during 2023/24. 
The Medium-Term Financial Outlook 
2.3 The Medium-Term Financial Outlook for the period 2023/24 to 2025/26 draws on the
same data and projections as the Long-Term Financial Outlook, however, brings into
sharp focus the short and medium-term impacts from recent key global, UK and
national events, all of which have contributed to an extremely challenging financial
landscape for citizens, communities, and local government finance.  The report
examines the medium-term impact arising from:

Page 4

• The Economic Outlook 
• The Scottish Landscape including factors affecting Scottish Government funding
and funding for Local Government 
• The financial outlook for North Ayrshire including the anticipated demographic
profile and the impact these will have on the Council’s cost base, key costs
pressures and funding anticipated from Government Grant, Council Tax and
Reserves 
• The Health and Social Care Partnership 
• The Council’s approach to ensure future sustainability and alignment of resources
with key priorities; and 
• The Capital Investment Programme. 
Economic Outlook 
2.4 Funding for public services is inextricably linked to the performance of global and
national economies and more recently through the volatility in financial markets.
Several key events have contributed to what has been and will likely continue to be a
very turbulent period for the economy. These events include; 
2.5 In 2022 and through to 2023 households will continue to experience reduced
disposable income as the result of a variety of factors, a number of which also
contribute to additional cost pressures for local government. 
Inflation 
2.6  Inflation to September 2022 sits at 10.1% based on the CPI measure.  The forecast is
for inflation to rise to 11.7% by January 2023.  Forecasters advise this would have
been higher, however, the recent UK Government intervention to Introduce an Energy
Price Guarantee Scheme for households (typical cap at £2,500) and Energy bill relief
scheme for businesses, has dampened the forecast.  Current indications are for
inflation to remain high through the early part of 2023, then falling towards the end of
2023.  The biggest price rises have been connected to basic goods, like food and
energy and costs of materials through the construction sector.  In summary; 
Sept 2022
– UK Govt
Fiscal
Event
Feb 2022
– War in
Ukraine
March
2020 –
COVID -
19
Pandemic
lockdown
Jan 2020
– UK
withdraw
al from
EU

Page 5

• Energy costs – over 54% increase in 2022. 
• Food costs – 9.8% increase in 2022 when compared to previous year
• Fuel costs – up to 80% increase in fuel costs
• Cost of materials – Building Cost Information Service (BCIS) report 20% +
annual increase in costs for construction sector
2.7 It is important to also note the impact rising inflation has on many contracts that are
linked to inflation indices.  This again will have a material effect on the financial
pressures facing local government. 
Public Sector Pay 
2.8 Trade unions have pushed for public sector pay to rise more in line with current
inflation levels.  From a local government perspective, a general 5% increase in
2022/23, with greater levels of increase applied at the lower grades equating to an
overall increase of around 6.5% to the pay bill, has been accepted by 3 of the
bargaining groups.  At the time of writing, negotiations continue with the teacher
unions, with strike action a real risk.  Although the Scottish Government has provided
a level of funding to support the pay negotiations, the level of increase requires local
authorities to fund around 3.60% of the 6.50% increase in the pay bill. 
2.9 Within the context of the local government funding landscape, this level of pay
increase presents significant affordability challenges to local government finances in
2022/23 and will increase the base budget requirements in 2023/24, however, it
should also be stressed, with inflation forecasts remaining high through the 1st 2
quarters of 2023, there remains a significant risk that pay negotiations for 2023/24 will
again centre around similar levels of increase.  Without further Scottish Government
funding support, absorbing this level of increase will prove extremely challenging.   
Interest Rates and Taxation 
2.10 Recent Interest rate rises have included 1.25% to 1.75% and more recently to the
current Bank of England base rate position of 2.25%.  The Bank of England Monetary
Policy Committee next meets on 3 November 2022.  Economic forecasters predict
that interest rates could rise to around 4% by the end of 2022, with further increases
predicted to around 5.0% by the 2nd quarter of 2023 to tackle inflation. 
2.11 The UK Government mini-budget announcement on 23 September 2022 included
several economic measures from cuts to the basic rate of tax, removal of top rate of
tax, energy support measures, removal of the 1.25% national insurance increase and
removal of the planned increase in corporation tax.  The intention behind the policy
was to stimulate economic growth, however, the reaction from the financial markets
impacted negatively on the value of sterling and led to an increase in the rates
associated with government bonds (Gilts).  At the time of writing most of the tax
cutting measures have already been reversed or deferred.  From a household
perspective the position has impacted on available mortgage rates and in terms of
local government borrowing through the Public Works Loan Board (PWLB), the
increase in Gilt yields has increased interest on borrowing by over 200 basis points
(2%).  Current forecasts indicate that rates will remain high over the next 3 years,
however, there remains a high level of volatility in the financial markets.  What also
remains unclear at this time is whether the reversal of measures will also be

Page 6

accompanied with public spending cuts.  This looks likely and could further impact the
level of block grant passported through to Scotland.   
The Scottish Landscape 
2.12 The Scottish Government (SG) Spending Review published in May 2022 reinforced
SG priorities of reducing child poverty, addressing the climate crisis, building a strong
and resilient economy, and helping public services recover from the pandemic.  The
current cost of living crisis and war in Ukraine has further influenced priorities and
placed additional pressure on government finances.  As things currently stand,
portfolios including Health and Social Care and Social Justice and Housing will see
planned annual growth in cash terms over the years to 2026-27.  Importantly,
however, from a local government funding perspective, the SG has indicated a
broadly “flat cash” position up to 2025-26, with growth expected in 2026-27. 
2.13 Although not a budget, the SG Spending Review is an indication of the level of overall
resource allocated to the local government portfolio.  When compared against the
current planning assumption of a 1% grant reduction for North Ayrshire Council, this is
considered a prudent assumption as the reducing population demographic relative to
other local authority areas will continue to reduce the proportionate share of funding to
North Ayrshire Council.  It is also unclear if the funding of new SG policy areas will be
met from this portfolio or transferred from another portfolio.  An example of which is
the expansion of universal free school meals to primary 6 and primary 7 pupils.  If this
is the case, then this will place further pressure on available funding.  The SG
Spending Review presents a very challenging funding landscape for local
government. 
2.14 On 7 September 2022 the Deputy First Minister (DFM) announced some details of an
Emergency Budget, with a commitment to release full details later in October 2022.
The headline announcement was set against the backdrop of the cost-of-living
challenges (including energy), rising inflation, rising interest rates, public sector pay
negotiations and new commitments linked to support for Ukrainian citizens.  The DFM
made clear the SG Programme for Government commitments for increasing the Child
payment in November and universal free school meal expansion for P6 and P7 pupils,
however, the areas of saving identified included;
• £53m reduction in employability funding
• £56m generated by the Scotwind clearing process, to be utilised and re-
instated at later date
• £33m use of ring-fenced agricultural funds
• £37m reduction in concessionary fares

Page 7

The SG state that they have identified areas with least impact on public services and
individuals.  Details of further savings will follow as well as any impact to local
authorities. 
2.15 From the information available to date, the short and medium-term economic outlook
for local government finance presents a very challenging picture.  The SG continue
to engage with local authorities via COSLA across a range of potential areas of
“financial flexibility”.  The extremely pressing desire from local authorities is to have
more autonomy over the use of resources and to deploy those resources based on
local priorities and needs, without restrictions or conditions from Scottish
Government across particular policy areas.  Although not a funding solution this
would at least provide local authorities with more flexibility around significant areas
of the budget.  Some of the key areas of discussion include; 
• Resources passported to Integration Joint Boards 
• Teacher numbers and pupil: teacher ratios / national standards
• Early learning and childcare resources,
• Council tax levels
• Visitor levy 
2.16 The SG have recently confirmed details of accounting based financial flexibilities.
The specific areas available to local authorities were initially developed during the
pandemic as a mechanism to help address additional cost pressures and lost
income. They include; 
• Loans fund principal repayment holiday
• Flexible use of capital receipts 
2.17 Use of such flexibilities is in effect the re-direction of resources in place to fund the
capital programme, for use to help address revenue pressures.  However, in view of
the significant cost pressures faced by the capital programme, it would be prudent at
this time to retain the resources in supporting delivery of the capital programme. 
2.18 In September 2022, the SG issued an updated Finance Circular to all local
authorities titled “Accounting for Service Concession Arrangements, Leases and
Similar Arrangements.”  This guidance includes the method of accounting for
PPP/PFI contracts and introduces a change in accounting to reflect such contracts in
a manner consistent with accounting for other local authority fixed assets and to
base this accounting over the useful economic life of the asset, rather than the term
of the contract.  It is recognised that the retrospective implementation of this
guidance could generate a potentially significant level of “one-off” saving to the
Council and a far reduced level of recurring saving. Due to the significance of this
change a report will be brought to Council on 14 December 2022 to consider the
implications of this change and to seek approval for its implementation. 
2.19 Although the use of “financial flexibilities” is important in helping to manage the
financial resources of the Council, the case for financial sustainability and fair
funding for local authorities must continue to be recognised, especially when the
level of SG general grant allocation is set within the context of significant inflationary
pressures, legacy pandemic pressures and demographic pressures.  It is vital that
productive dialogue around local government funding continues.  The SG

Page 8

commitment to a National Care Service by 2026 will further impact this position, with
Council HSCP budgets representing almost one third of total Council expenditure. 
Financial Outlook for North Ayrshire Council 
Allocation of Resources 
2.20 The Chart below summarises the allocation of resources for 2022/23 approved at
Council in March 2022, with around 60% of gross expenditure relating to employee
costs; 
2.21 As noted in section 2.15 of the report it is recognised that in the last number of years,
the level of influenceable budget which is not linked to Scottish Government
requirements or statutory contractual commitments, be it through the Health and
Social Care Partnership or large elements of the Communities budget, has greatly
reduced.  This continues to place a disproportionate level of pressure on the other
Council budgets and reinforces the desire for local authorities to have more flexibility
around resource allocation.   
Medium-Term Financial Pressures and Planning Assumptions 
2.22 Following an assessment of cost pressures and income levels anticipated over the
next 3 years further work has been completed in respect of the short and medium-
term impact of anticipated pressures, although it should be stressed that cost
forecasts are subject to a high degree of volatility at this time.  In addition, ongoing
work to review the General Services Capital Programme has identified significant
additional cost risks, mainly through the legacy impact of the pandemic and a very
high level of construction inflation.  When set within the context of the current planning
assumptions around funding, this has resulted in a projected medium-term funding
gap of £53.334m (including the HSCP) and £35.016m (excluding the HSCP) over the

Page 9

next 3 years. Areas of significant pressures identified within the Medium-Term
financial Outlook include: 
Workforce costs
2.23 Estimated pay settlement includes a general 5% increase in 2022/23, with greater
levels of increase applied at the lower grades equating to an overall increase of
around 6.5% to the pay bill. This has been accepted by 3 of the main bargaining
groups and is summarised across pay bandings as follows;
- A minimum of £1,925 increase for those on up to £39,000 per year;
- 5% increase for those between £39,000 and £60,000 per year; and
- A maximum increase of £3,000 for those earning more than £60,000 per
year. 
2.24 At the time of writing, negotiations continue with the teacher unions. The SG has
provided a total of £260.6m on a recurring basis to support the pay negotiations.  The
level of anticipated increase still requires local authorities to fund around 3.60% of the
6.50% increase in the pay bill.  This is 0.60% more than what was provided for in the
2022/23 Budget and will require to be met from existing Council resources. 
2.25 Within the context of the local government funding landscape, this level of pay
increase not only presents a significant affordability challenge to local government
finances in 2022/23, but it also increases the base budget requirements in 2023/24.
Further, with inflation forecasts remaining high through the 1st 2 quarters of 2023,
there remains a significant risk that pay negotiations for 2023/24 will centre around
similar levels of increase.  Currently the planning assumption for pay increases over
the next 3 years is 3% per annum.  This planning assumption is on the basis that the
SG would provide additional support to fund any further increase.  Without this
support, absorbing additional increases would prove extremely challenging and could
amount to an additional £8m on a recurring annual basis. 
Staff Group  2023/24
Planning
Assumption
2024/25
Planning
Assumption
2025/26
Planning
Assumption
Teachers  3% 3% 3%
Other Staff  3% 3% 3% 
Other Inflationary Costs 
2.26 As noted in section 2.6 of the report, significant Inflationary cost increases have been
included in forecasts for major utilities (electricity and gas), fuel, food and those
contractual commitments with increases linked to inflation indices.  In respect of
utilities, cost forecasts are based on rates already secured via Procurement Scotland
from the advance purchases and from available price indices applied to the balance of
expected energy need across each of the years.  What is uncertain at this time is the
extent to which the recent UK Government “Energy Bill Relief Scheme”
announcement will benefit those public sector organisations who purchase energy via
national frameworks.  Procurement Scotland is currently working with the Council’s
energy providers to ascertain the position.  A prudent position is reflected at this time.

Page 10

2.27 Major contracts linked to inflation indices include PPP contracts and waste contracts.
Cost impacts based on inflation forecasts over the next 3 years have been included in
the budget model.  In addition to this an allowance has been made to cover other
major contractual increases e.g., Strathclyde Passenger for Transport and to meet
legislative requirements.  
2.28 The Council makes no provision for general inflation.  It is recognised that due to the
high levels of inflation this will place further significant strain on operational budgets
across the Council.  The implications of this will include a reduced level of purchasing
power for a range of materials and commodities and possible re-phasing of
programmes / activities to operate within existing resources on an annual basis.  It is
important that elected members are kept fully informed of any impacts. 
2.29 The UK Government decision to reverse the 1.25% national insurance increase has
created an in-year saving and a recurring saving to the Council.  On the basis that this
position does not change, a recurring saving of around £1.2m per annum has been
included in the Budget model.  However, as noted in section 2.11 of the report, the
cost of borrowing to the Council to support delivery of the capital programme has
increased significantly over the last month.  This, along with high levels of construction
inflation places a significant burden on the affordability of the 10-year capital
programme.  It is therefore prudent at this time to re-direct this saving into the
Council’s Loans Fund to help support the additional funding required to deliver the
capital programme. 
Other Pressures and Risks 
2.30 The legacy impact of pressures from the pandemic will continue to trail through into
2023/24 and possibly beyond, whilst additional Scottish Government funding ceased
in 2021/22.  They include waste services costs, facilities management costs and
commercial and general income and financial pressures faced by North Ayrshire
Leisure Ltd.  No additional financial provision will be incorporated into the 2023/24
Budget; however, a balance of legacy resources remains to help mitigate the ongoing
risks. 
2.31 There remains a risk of additional cost pressures from Scottish Government policy
commitments.  Although the SG Spending Review indicates a broadly “flat cash”
funding landscape for local government, what is unclear is if this overall funding
envelope is also intended to fund policy commitments or if resources will be
transferred from another portfolio e.g. we would expect around £1m revenue funding
to support the expansion of primary 6 and primary 7 universal free school meals.  This
is therefore a risk within the context of the local government grant settlement.  From a
capital funding perspective, it is also clear that available SG capital funding is
insufficient to deliver this policy intent.  To address this risk the sum of £10m has
already been included in the capital plan from the 2022/23 Budget. 
2.32 The Scottish Government policy intent in delivering a National Care Service by 2026
will also have potentially wide ranging financial and operational implications for the
Council including the impact on funding, assets and staffing.  This is set within the
context of the current socio economic and demographic pressures, including: 
• A growing older population; 
• Increased demand for adult services; and

Page 11

• Increased demand for support of vulnerable children and young
people. 
Local Government Funding and Anticipated Budget Gap 
2.33 Single year settlements have been a feature of Scottish Government budget setting
since 2015/16.  This approach continues to create a high level of uncertainty around
future funding levels and impedes progress in delivering sustainable change.  This,
alongside the complex interaction of block allocations from the UK Treasury, Scottish
Government fiscal policy, priorities and commitments and the complexities of the
distribution formulae, makes it difficult to forecast future grant funding levels.  The
publication of the SG Spending Review in May 2022 provides an indication of the level
of overall financial resource.  As noted in section 2.12 of the report this indicates a
broadly “flat cash” funding position. 
2.34 With a predicted decline in overall population for North Ayrshire it is both reasonable
and prudent to assume that the level of future budget settlements will remain
challenging.  Based on this, a reduction of -1.0% has been incorporated in the 3 years
of the Medium-Term Financial Plan.  This remains consistent with the planning
assumption of several other Scottish local authorities.  The 2022/23 settlement
included a late allocation of £120m additional funding to local authorities announced
on 27 January 2022.  This was originally stated as non-recurring with North Ayrshire
Council receiving an allocation of £3.208m.  The SG have subsequently confirmed
this funding will now be baselined in the settlement and therefore recurring, with the
Medium-Term Financial Plan updated accordingly. 
2.35 The Medium-Term Financial Plan includes a planning assumption of an annual 3%
increase to Council Tax.  Council tax income is a vital source of funding and
represents around 17% of council funding i.e., £64m per annum.  With current inflation
sitting at 10.1%, this level of anticipated increase sits well below current inflation,
however, it is recognised that any level of increase will add a further burden to citizens
during the current cost-of-living crisis.  An important point to note when considering
the level of council tax to be set is the future year impact of any decision e.g., a
decision to maintain council tax at 2022/23 levels equates to around £2m less income.
Due to the recurring impact on the base budget for 2024/25 this would require an
increase in council tax in 2024/25 of more than 6% to simply recover the base income
position.  This is before the measures to address the budget gap for the year are even
put in place.  When considered within the context of the scale of the budget gap facing
the Council over the next 3 years, not only would this present a significant challenge
in delivering balanced budgets, but it is also more likely that members may have to
consider increases beyond 3% to deliver a balanced budget in 2023/24. 
2.36  Since 2017/18 the Council has used over £17m of reserves to support recurring
expenditure.  A full review of all revenue reserves will be carried out as part of the
Medium-Term Financial Plan.  Due to the scale of the budget gap forecast in 2023/24,
it is highly probable that use of Council reserves will be a requirement in delivering a
balanced budget, however, this approach does not offer a sustainable solution and
simply increases the budget gap further in subsequent years.

Page 12

2.37 A summary of the anticipated funding gap position of the Council (including the
HSCP) over the next three years is provided in the table below.  Further work
continues to refine the underlying assumptions.  Final savings proposals are being
progressed and will be presented to Council on 1 March 2023.   
2023/24 
£m
2024/25 
£m
2025/26 
£m
Total     
£m     
General Fund Gross
Funding Gap
£14.500 £10.661 £9.855 £35.016
HSCP Pressures £7.591 £5.412 £5.295 £18.298     
Total £22.091 £16.073 £15.150 £53.314 
Sensitivity Analysis 
2.38 Given the uncertainty that underpins the assumptions, sensitivity analysis has been
carried out on the key components. A +/-1% movement on these is noted below: 
•  Scottish Government Grant £3.0m; 
•  Council Tax Funding £0.65m; 
•  Payroll incl. HSCP £2.5m 
2.39  The anticipated General Fund budget gap for 2023/24 based on current planning
assumptions is £14.500m, with gaps of £10.661m and £9.855m for 2024/25 and
2025/26 respectively.  As noted in section 2.36 of the report, addressing the 2023/24
Budget gap will likely require the use of Council reserves.  It is important to note that
this is not a sustainable solution and will have the effect of increasing the gap further
in 2024/25.  To understand the potential impact of using reserves, the undernoted
table provides an example of delivering a balanced budget in 2023/24 with £7m
recurring savings and £7.5m non-recurring savings (including use of reserves).  The
effect in 2024/25 is an increase in Budget gap from £10.661m to £18.161m. 
2023/24               
£m
2024/25  
£m
2025/26  
£m    
General Fund Gross Funding Gap £14.500 £10.661 £9.855
Revised Gap with 23-24 Budget gap met
from £7m recurring savings and £7.5m non-
recurring savings 
£-  £18.161  £9.855 
Reserves Strategy 
2.40 The Council’s reserves are classified as either earmarked or unearmarked.  The
Council’s current unearmarked reserves, i.e., those set aside to allow the Council to
manage any unanticipated events, were reported in the 2021/22 Annual accounts as
£11.315m, equivalent to 2.9% of General Fund net budgeted expenditure.

Page 13

This compares to the recommended best practice of between 2% and 4% and the Council’s
approved Reserves Policy that unearmarked reserves are held at a minimum of 2% of
General Fund net budgeted expenditure.  In addition to the unearmarked reserves,
earmarked reserves have been established to meet a range of known commitments,
including the Council’s Investment fund and Recovery and Renewal Investment
programme, and it is anticipated that these will reduce significantly over the next few years. 
2.41 The level of Council reserves requires to be maintained at the right level to ensure the
Council’s future financial stability.  These are kept under review and considered bi-
annually on the setting of the Council’s budget and on closure of the Council's
Account. 
2.42 The Council also maintains statutory reserves in the form of an Insurance fund and
Capital Fund.  The Insurance Fund is maintained to meet the cost of future insurance
liabilities, while the current Capital Fund is earmarked to support the Council’s capital
investment programme and any capital financing requirements, as noted above. 
Health and Social Care Partnership (HSCP) 
2.43 The Integration Scheme sets out the Integrated Joint Board’s (IJB) responsibility for
financial planning and management of the HSCP’s resources.  The IJB has an implicit
statutory obligation to set a balanced budget. 
2.44 Information on anticipated pressures and proposed savings options are shared with
North Ayrshire Council to inform the allocation of resources delegated to the IJB.  The
level of contribution to the HSCP is based on an anticipated “flat cash” planning
assumption where the HSCP address budget pressures through the delivery of
equivalent savings and with the use of reserves.  The allocation of resources will also
continue to be influenced by any requirements set out in the local government finance
settlement.  The HSCP have identified financial pressures of £7.591m in 2023/24 and
£18.298m over the next 3 years.  The position for 2023/24 currently assumes the
passporting of Scottish Government funding to support the 2022/23 pay negotiations
on a recurring basis.  The share of SG funding amounts to £1.866m. 
2.45 The HSCP currently hold earmarked reserves of £24.305m, which includes COVID
related reserves, and unearmarked reserves of £7.248m, which represents around
2.5% of the HSCP Budget. 
2.46 The cumulative debt position to the Council at 31 March 2022 totals £2.320m.  The
Council has set aside the recurring sum of £1.486m to fund the repayment of this debt
and based on the current repayment profile, the debt to the Council will be fully repaid
during 2023/24.  In view of the scale of the financial challenges faced by the Council
in 2023/24 a mechanism to facilitate the early repayment of this debt in 2022/23 will
be explored.  This would release the recurring sum of £1.486m to support the Budget
programme. 
The Council’s Approach 
2.47 With a forecast reduction in resources occurring at the same time as increased cost
through extreme inflationary impacts and demographic pressures, the scale of the
financial challenge remains significant.  This is also set within the context of the

Page 14

savings which have already been delivered between 2010/11 and 2022/23 which
totals over £118m, equivalent to around 25% of the gross revenue budget. 
2.48 Prudent financial planning requires a medium- and long-term view to be taken on the
level of financial resources likely to be available to North Ayrshire Council in the years
ahead.  Due to the significant Budget gap anticipated in 2023/24, immediate focus
requires to be given to deliver a balanced budget in March 2023.  This will require the
identification of a significant level of savings and a review of current earmarked and
unearmarked reserves.  Resources to support the repayment of HSCP debt will also
be considered as part of the Budget Programme. 
2.49 The Council’s approach to addressing the financial challenges is influenced by the
Council’s key priorities.  It is important to allocate available financial resources, and
deliver positive outcomes aligned to these priorities, however, recognising resources
are becoming increasingly limited. This will require potentially reduced levels of
investment in areas that don’t closely align to these priorities.  This will be considered
when developing options as part of the Budget programme.  Work to develop the new
Council Plan is currently being progressed, with some initial key priorities identified
which include; 
• Addressing poverty and cost of living
• Communities
• Sustainability 
2.50 With over 60% of the Council’s financial resources represented by workforce related
budgets, it will be difficult for the Council to sustain the current level of workforce
within available financial resources over the medium-term.  When developing options
to address the Budget gap and aligned to the work undertaken to develop the
Council’s key priorities, workforce planning will be a key consideration through this
process.     
2.51 The Council’s sustainable change programme continues to be progressed across a
range of themes.  It is vital that the programme is delivered at scale and pace to
address the Budget gap over the short, medium, and long term and to try and help
reduce the impact on communities from Council services provided.  In progressing the
Budget programme, the areas of renewable energy development, supported with
financial resources in the Council’s Investment Fund, and the utilisation of the
Council’s land and property assets are recognised as areas where material financial
savings / returns on investment could be delivered.  However, in terms of timescale,
the opportunities for financial benefit are more likely to feature from 2024/25 onwards. 
Sustainable Change Programme
Sustainability
/ Renewable
Energy
Land and
Property
Assets
Accessing the
Council
Transport and
Travel

Page 15

2.52  It is important for local authorities to have more autonomy and financial flexibility over
the use of resources and to deploy those resources based on local priorities and
needs, without restrictions or conditions from Scottish Government across specific
policy areas.  As noted in section 2.15 of the report, local authorities through COSLA
will continue to progress a dialogue with Scottish Government across a range of areas
which include; 
• Resources passported to Integration Joint Boards 
• Teacher numbers and pupil: teacher ratios / national standards
• Early learning and childcare resources,
• Council tax levels
• Visitor levy 
2.53 In September 2022, the SG issued an updated Finance Circular to all local authorities
titled “Accounting for Service Concession Arrangements, Leases and Similar
Arrangements.”  This guidance includes the method of accounting for PPP/PFI
contracts and introduces a change in accounting treatment to reflect such contracts in
a manner consistent with accounting for other local authority fixed assets and base
the depreciation over the useful economic life of the asset, rather than the term of the
contract.  It is anticipated that the retrospective implementation of this guidance could
generate a potentially significant level of “one-off” saving to the Council and a far
reduced level of recurring saving.  Due to the significance of this change a report will
be brought to Council on 14 December 2022 to consider the implications of this
change and to seek approval for its implementation.  From a Budget planning
perspective, it is strongly recommended that any savings arising from this change are
used to address the pressures in the capital programme and the medium-term
financial position. 
Capital Investment Programme 
2.54 The General Services Capital Investment Programme 2022/23 to 2030/31 was
approved at Council on 2 March 2022.  The review currently being undertaken as part
of the 2023/24 Budget will focus on the affordability of the programme when
considering the additional cost pressures, mainly through high levels of construction
inflation and contractor claims following the pandemic.  The current assessment
indicates additional costs of more than £25m, however, this position remains volatile
and will require to be monitored.  The financing of the capital programme has been
recently affected by the significant increase in borrowing costs following an increase
of over 200 basis points (+2%) in Gilt yields which links directly to the rates available
through the Public Works Loans Board (PWLB).  Based on current and projected
borrowing rates the anticipated additional cost of borrowing to 2030/31 is estimated at
over £30m.  It is therefore prudent at this time to help address the financial risks, that
further financial provision is incorporated in the medium-term financial plan to
supplement the existing loans fund resources.  As noted in section 2.11 of the report,
the recent UK Government reversal of the 1.25% national insurance increase, will
provide around £1.2m per annum to help address the pressures. 
2.55 As well as the additional costs being incurred in the capital programme, it is also
recognised that, from the impact of inflation, the purchasing power of lifecycle
investments is greatly reduced.  This affects capital investments in roads, property,
vehicles, and other infrastructure.  To operate within available financial resources,

Page 16

even by sustaining the level of budgeted investment this will result in a real term
reduction in the level of investments across these areas and will lead to the
requirement to re-profile programme activity over a longer period. 
2.56 In terms of funding the capital programme, further prudent assessments will be
undertaken around the level and timing of capital receipts, the anticipated level of
Scottish Government capital grant, the anticipated funding profiles associated with the
Ayrshire Growth Deal and how the use of the Council’s loans fund reserve and capital
fund will support the programme across the 10 years. 
2.57 The anticipated revenue implications of the Capital Investment Programme have been
reflected in both the Medium- and Long-Term Financial Outlook.  However, any
further operating or staffing costs resulting from changes or additions to the Capital
Investment programme will result in an increased funding gap from the year of
completion. 
Progress and Next Steps 
2.58 In advance of the presentation of the Medium-Term Financial Outlook report, briefings
for Elected Members have been carried out. 
2.59 Officers continue to progress the Budget programme and develop options to address
the budget gap covering the period 2023/24 to 2025/26.  Progress to date will be
shared in further elected member sessions during November 2022. 
2.60 Discussions continue with the Integrated Joint Board to support a partnership
approach to development of the Health and Social Care Partnership’s budget. 
2.61 Community engagement sessions are planned during January 2023 across each
locality.  This process will also be supported by access to an on-line tool to capture  
feedback on priorities from our citizens and communities.  In view of the current
financial challenges, it is important that citizens both understand the scale of the
challenge and provide feedback on their views to help inform the prioritisation of
resources as part of the Budget setting process.  Elected Members will be provided
with the details of this feedback in advance of the Council Budget setting meeting. 
2.62 It is planned that proposals for the Medium-Term Financial Plan 2023/24 to 2025/26
will be presented to Council for consideration on 1 March 2023. 
3. Proposals 
3.1 That Council considers the financial position identified in the Medium-Term Financial
Outlook 2023/24 to 2025/26, notes the scale of the financial challenges which the
Council faces over the medium term and brings forward proposals to set a balanced
budget for 2023/24.

Page 17

4. Implications/Socio-economic Duty 
Financial 
4.1 The anticipated funding gap over the period 2023/24 to 2025/26, based on current
planning assumptions, is £53.314m (including the HSCP) and £35.016m (excluding
the HSCP).  Council will require to set a balanced budget for 2023/24 and future
years. The projected funding gap for 2023/24 is £14.500m. 
Human Resources 
4.2 It is anticipated that delivery of savings will impact on the Council’s future workforce.
The Council has established corporate and Service workforce plans which include;
active management of the size of its permanent workforce; vacancy management;
review of temporary contracts; together with selective use of voluntary severance and
early retirement.  Communication and regular consultation will continue to take place
with the workforce and Trade Unions. 
Legal 
4.3 It is a statutory requirement for the Council to set a balanced budget and appropriate
level of Council Tax to support this.  Development of a balance budget is contingent
on identification and subsequent delivery of savings alongside management of risk
and pressures.  Chief Officers will require to provide assurance that plans are in place
to secure delivery of proposed savings and deliver services within available financial
resources. 
Equality/Socio-economic 
4.4 An Equality Impact Assessment will be carried out for all options presented to Council
to assist Council’s in making decisions on the bridging of the funding gap. 
Environmental and Sustainability 
4.5 Significant elements of Council investment have been targeted towards sustainability
projects and this is reflected in the Council’s sustainable change programme.  This will
play a key role in supporting the Council’s journey towards net zero. 
Key Priorities 
4.6 In addressing the financial challenge which the Council faces it will seek to minimise
the impact this has on delivering its key priorities within the context of the Council Plan
2019-24.  Recognising also that early work has been undertaken in developing the
new Council Plan with initial areas of key priority across Poverty and cost of living,
communities and sustainability.

Page 18

Community Wealth Building 
4.7 All capital and revenue investment will continue be considered within the context of
the Council’s Community Wealth Building Strategy, with maximising opportunities for
local suppliers through procurement a key priority and pillar of the strategy.  Further,
this strategy is a vital reference for the Council’s sustainable change programme,
most notably through the Land and Property Assets theme. 
5. Consultation 
5.1 Development of the Council’s medium term financial plan is carried out collaboratively
across the Executive Leadership Team and with key Partners and stakeholders. 
Mark Boyd
Head of Service (Finance) 
For further information please contact  Mark Boyd,  Head of Finance, on 01294 324560 . 
Background Papers