Page 1

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
North Ayrshire Council 
A Special Meeting of the North Ayrshire Council will be held in the Council
Chambers, Ground Floor, Cunninghame House, Irvine, KA12 8EE on
Wednesday, 28 February 2024 at 14:00 to consider the undernoted business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Apologies 
2 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda. 
3 General Services Revenue Estimates 2024/25 to 2026/27
Submit report by the Head of Service (Finance) on (a) the Council's
revenue spending requirements and anticipated funding for 2024/25 to
2026/27, (b) the level of reserves and fund balances held by the Council
and (c) options to address the funding gap (copy enclosed). 
4 Capital Investment Programme 2024/25 to 2033/34
Submit report by the Head of Service (Finance) on the draft Capital
Investment Programme to 2033/34 (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
5 Revenue Estimates 2024/25 - Common Good Funds and Trusts  
Submit report by the Head of Service (Finance) on the anticipated annual
income and expenditure of the Common Good Funds and Trusts
administered by North Ayrshire Council and to seek approval for the level
of grant funding to be made available for disbursement in 2024/25 (copy
enclosed). 
6 Treasury Management and Investment Strategy 2024/25
Submit report by the Head of Service (Finance) on the proposed Strategy
for Treasury Management and Investment activities within the Council for
the financial year 2024/25 (copy enclosed). 
7 Urgent Items
Any other items which the Provost considers to be urgent.  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-
ayrshire.public-i.tv/core/portal/home, where it will be capable of repeated
viewing.  At the start of the meeting, the Provost/Chair will confirm if all or
part of the meeting is being filmed/recorded/live-streamed.   
You should be aware that the Council is a Data Controller under the
Data Protection Act 2018.  Data collected during the webcast will be
retained in accordance with the Council’s published policy, including, but
not limited to, for the purpose of keeping historical records and making
those records available via the Council’s internet site.   
Generally, the press and public seating areas will not be filmed.
However, by entering the Council Chambers, using the press or public
seating area or (by invitation) participating remotely in this meeting, you
are consenting to being filmed and consenting to the use and storage of
those images and sound recordings and any information pertaining to you
contained in them for webcasting or training purposes and for the
purpose of keeping historical records and making those records available
to the public. If you do not wish to participate in a recording, you should
leave the meeting.  This will constitute your revocation of consent. 
If you have any queries regarding this and, in particular, if you believe
that use and/or storage of any particular information would cause, or be
likely to cause, substantial damage or distress to any individual, please
contact dataprotectionofficer@north-ayrshire.gov.uk. 
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
North Ayrshire Council Sederunt 
John Bell
Timothy Billings
Marie Burns
Eleanor Collier
Joe Cullinane
Scott Davidson
Anthea Dickson
Stewart Ferguson
Todd Ferguson
Robert Foster
Scott Gallacher
John Glover
Tony Gurney
Alan Hill
Cameron Inglis
Margaret Johnson
Amanda Kerr
Christina Larsen
Shaun Macaulay
Jean McClung
Nairn McDonald
Matthew McLean
Louise McPhater
Davina McTiernan
Tom Marshall
Jim Montgomerie
Ian Murdoch
Donald Reid
Donald L Reid
Chloe Robertson
Ronnie Stalker
Angela Stephen
John Sweeney 
Chair: 
Apologies: 
Attending: 
3

Page 4

4

Page 5

NORTH AYRSHIRE COUNCIL 
28 February 2024                                                                                                                                                            
North Ayrshire Council 
Title:    General Services Revenue Estimates 2024/25 to 2026/27  
Purpose:  To advise Council on (a) the Council's revenue spending requirements
and anticipated funding for 2024/25 to 2026/27; (b) the level of
reserves and fund balances held by the Council and (c) options to
address the funding gap. 
Recommendation:  That Council: 
a) notes the anticipated funding available to meet the Council’s
expenditure requirements and notes the areas of ongoing financial
risk to the Council;
b) approves the Council's expenditure requirements for 2024/25 and
notes the indicative requirements for 2025/26 and 2026/27;
c) approves the new strategic investments outlined in section 2.7.3 of
the report;
d) notes the projected outturn position for 2023/24; 
e) notes the level of reserves and fund balances held by the Council
and approves any use and contributions to and from these; 
f) approves the additional contribution to the HSCP noted at 2.8.1;
g) approves efficiencies and savings to ensure a balanced budget for
2024/25, consequentials and new proposals in future years;
h) approves the schedule of Council fees and charges detailed in
Appendix 6;
i) determines the level of Council Tax for 2024/25 and agrees to
freeze Council tax at 2023/24 levels, noting the Scottish
Government funding to support this, as set out in section 2.3;
j) notes the anticipated funding gaps for 2025/26 and 2026/27;
k) considers the equality and children’s rights impact of any proposed
service changes;
l) notes the feedback from the community Budget engagement
exercise to help inform budget plans;
m) notes progress to date on the Council’s Sustainable Change
Programme and corporate Workforce Planning; and 
n) approves the budget matrix for 2024/25. 
Agenda Item 3
5

Page 6

1. Executive Summary 
Introduction 
1.1. Section 93 of the Local Government Finance Act 1992 requires Councils to
determine the levels of expenditure in the forthcoming financial year, and
thereafter to set council tax sufficient to cover any unfunded balance.
1.2. This report provides Members with an overview of the Council's anticipated
financial position on the General Fund revenue budget for the next three
financial years, 2024/25 to 2026/27. It also sets out the information required to
enable the Council to set a balanced budget and its Council Tax for 2024/25
by 11 March as required by statute.
1.3. The Long-Term Financial Outlook 2024/25 to 2033/24 report, incorporating
the Medium-Term Financial Outlook 2024/25 to 2026/27 was presented to
Council on 13 December 2023. In addition, regular Elected Member briefing
sessions were held between October 2023 and February 2024, during which
officers provided Members with information on the financial pressures faced
by the Council and options to reduce net expenditure within the context of the
priorities set out in the new Council Plan 2023-2028. 
Revenue Budget 
1.4. When the Council set its budget for 2023/24 on 1 March 2023 the decisions
taken resulted in a balanced budget for 2023/24 with indicative funding gaps
of £17.126m and £10.834m for 2024/25 and 2025/26 respectively. 
1.5. The Medium-Term Financial Plan (MTFP) for 2024/25 to 2026/27 builds on
last year’s MTFP and the analysis reflected in the Medium-Term Financial
Outlook.  The proposals in this report provide a balanced budget for 2024/25,
although it should be noted that this required a planned use of £5.000m
reserves, with indicative net funding gaps remaining for 2025/26 and 2026/27
of £8.141m and £8.558m respectively. This position incorporates the full year
effect of proposed savings in 2024/25 and a planned use of reserves of
£4.000m in 2025/26 and £3.500m in 2026/27 and continues to present a
significant challenge to the sustainability of the Council’s finances. A summary
of the key components underpinning this is provided at section 2.7.
1.6. Detail is provided at section 2.5 on the anticipated level of earmarked,
unearmarked and specific reserves with unearmarked reserves projected at
the level of 2.0% equal to £8.445m, earmarked reserves of £78.090m and
specific reserves of £6.365m aligning with anticipated future commitments.
The Council’s Useable reserves position will continue to be monitored. 
1.7. The MTFP includes a range of savings proposals required to deliver a
balanced Budget position for 2024/25, and a profiled use of reserves to help
mitigate the significant financial challenges facing the Council and this is set
within the context of a proposed Council tax freeze for 2024/25 to help
address the financial pressures faced by communities. Against this backdrop
6

Page 7

the reduction in employer pension contributions in 2024/25 has provided an
opportunity for non-recurring investment to support priorities. The proposed
investment is outlined in section 2.7.3 of the report. Council is asked to
consider these proposals. 
Health and Social Care Partnership
1.8    The Director of the Health and Social Care Partnership (HSCP) has provided
Members with information on pressures and areas of potential savings to
inform the Council’s proposed contribution to the Partnership. This information
is not detailed within the Council’s budget proposal on the basis that the final
position will be determined by the Integration Joint Board (IJB). 
1.9 The proposed additional contribution for 2024/25 is currently £5.292m. This
reflects the requirements as set out in the local government finance
settlement. Further funding in respect of the HSCP is expected and still to be
distributed.
1.10 The Integration Scheme approved by Scottish Ministers states that following
determination of the Council and NHS payment to the IJB, the IJB will refine
its Strategic Plan and planned service delivery to take account of the totality of
resources available, delivering a balanced budget.
Chief Finance Officer Assurance
1.11 The 2024/25 annual budget and 2024/25 to 2026/27 MTFP has been informed
by the Council’s Long-Term Financial Outlook and previous MTFP. Significant
scrutiny of the underlying assumptions and savings delivery has been
undertaken to ensure the 2024/25 annual budget is robust. It is the
responsibility of Chief Officers, including the HSCP, to manage any variance
from the underlying assumptions.
1.12 The report notes at 2.14 the significant risks to the financial sustainability of
service delivery. Within this context, apart from the uncertainty around future
funding levels from Scottish Government, there are two significant financial
risks that the Council is managing. They include the risk of the 2024/25 pay
award being agreed at a level in excess of the budgeted 3% contribution and
without any further Scottish Government support this would have a material
impact on the Council’s finances. The ongoing position around maintaining
teacher numbers runs contrary to the Council’s individual circumstances,
impacted through a reduction in the pupil roll demographic and Attainment
Challenge funding. There is a risk that an element of funding to support
teachers could be withdrawn. Discussions continue with Scottish Government
in this regard. 
1.13 Allied to the risks facing the Council, there is the requirement for the Council
to hold a sufficient level of Reserves. The level of Reserves set out in the
Budget aligns with known future commitments. The Change and Service
Redesign Fund will require to be kept under review to ensure sufficient
resources are available to continue to support the Council’s Sustainable
Change programme. Unearmarked reserves continue to remain at the lower
7

Page 8

level of recognised best practice and reflects 2% of the Council’s revenue
budget.
1.14 The Scottish Government have also agreed in a letter dated 8 February 2024
to confirm the approach to the approximate £45.000m expected in
consequentials resulting from the announcement of funding for councils in
England. It is anticipated that the position around this will be known in March
2024. 
2. Background 
2.1 Financial Context
2.1.1 The Long-Term Financial Outlook 2024/25 to 2033/24 report, incorporating
the Medium-Term Financial Outlook 2024/25 to 2026/27 was presented to
Council on 13 December 2023. This is the cornerstone of the Council’s
strategic financial planning framework. This has helped inform the
development of the Medium-Term Financial Plan 2024/25 to 2026/27. 
2.1.2 The economic outlook for the Scottish, UK and global economy continues to
be influenced by the impact of global events, resulting in inflation higher (CPI
4% January 2024) than the Bank of England target of 2% and interest rates
remaining at 5.25%. The level of inflation will remain an important factor in
local government pay negotiations across several bargaining groups. The
impact of inflation on the Council’s cost base, coupled with an increased cost
of borrowing to support the Capital programme, continues to place significant
strain on the sustainability of the Council’s finances.    
2.2 Scottish Government Funding
2.2.1 The Local Government Finance Settlement for 2024/25 was published on 21
December 2023. Funding support from the Scottish Government comprises: 
• general revenue grant; 
• non domestic rate income; and
• specific grant.
2.2.2 North Ayrshire Council's anticipated Scottish Government funding support, as
distributed, for 2024/25 is £353.087m.
2.2.3 The Settlement resulted in a reduction of £2.191m in core grant funding (-
0.64%) when compared to the 2023/24 settlement. The main elements of the
budget announcement from a national perspective includes the following; 
• £950.9 million of funding has now been baselined into the General
Revenue Grant noted as part of the commitment under the Verity House
Agreement to review ring-fenced funding. This is not additional funding,
simply a baselining of funding that comes with existing commitments; 
• £242 million to support teacher pay uplifts; and 
• £266.2 million of resource to support local government pay. 
8

Page 9

• £145.5m (NAC £3.775m) to continue to maintain teachers and support
staff. On the 12 February 2024 the Cabinet Secretary for Education and
Skills announced that this funding for 2024/25 would now be held as a
Specific Resource Grant, and those grants will be conditional on Councils
agreeing to maintain teacher numbers. Further engagement with
individual councils will take place to consider each Council’s individual
circumstances and to agree grant conditions, including the number of
teachers expected to be maintained. The circumstances for North
Ayrshire include the reduction in Scottish Attainment Challenge funding
and a falling pupil roll demographic; 
• An additional £6m to support the expansion of Free School Meals; This
includes £4.000m allocated (NAC £0.148m) to support P6/P7 pupils with
families in receipts of the Scottish Child payment. The balance of £1.5m is
still to be distributed and will be used to address school meal debt. Further
details to follow around this. 
• An additional £11.5m to support the uprating of Free Personal and
Nursing Care rates is still to be distributed;
• Additional funding of £230m to deliver a £12 per hour minimum pay
settlement for adult social care workers in commissioned services via
agreed contract uplifts is still to be distributed; 
• An additional £6.8m nationally for Discretionary Housing Payments. 
2.2.4 The Settlement announcement also included updates on areas of potential
financial flexibility to be progressed as part of the Verity House Agreement
and development of the Fiscal Framework; 
• The Scottish Government are open to considering adjusting the funding
floor percentage. In the short-term this would provide further funding
uncertainty and from an NAC perspective “the floor” adjustment helps
mitigate the financial impact of a reducing population demographic.
COSLA has subsequently indicated to Scottish Government that this
should not be considered as part of the 24/25 Budget.
• The SG is progressing discussions to increase discretion for local
authorities to determine and set fees and charges locally. Areas for
discussion include building warrant and verification fees. Progress around
this should help inform the 2025/26 Budget.
• The settlement did not include additional funding for teacher pension
contributions. The rate is set to increase from 23% to 26% from 1 April
2024. The UK Government has stated that the funding will be allocated to
individual UK Government departments in Spring 2024 through
consequentials. The Scottish Government has subsequently committed to
pass this funding to local authorities when it is received which amounts to
c£2.000m per annum for NAC.
• Further discussion on flexibility around Education funding lines will take
place within the Education Assurance Board once it is operational. The
expectation is also that Councils will continue to honour the existing joint
agreement on provision of free school meals on a universal basis.
9

Page 10

• The Scottish Government have confirmed that they have no plans in the
immediate future to commence the Capital Accounting Review which was
proposed in the Resources Spending Review in May 2022. From an NAC
perspective this is welcome as this could have a significant financial
impact, linked to the prescribed accounting treatment of loans Fund
repayments, and impact the affordability of delivery of the capital
programme across both the general fund and the HRA. This impact would
apply across Scotland and continues to present a risk to the Council. 
2.2.5 The 2024-25 Non-Domestic Basic Property Rate (‘poundage’) is provisionally
set at 49.8 pence, the same rate as last year. The Intermediate Property Rate
(levied on properties with a rateable value from £51,001 to £100,000) and
Higher Property Rate (levied on properties with a rateable value over
£100,000) will increase by inflation to 54.5 pence and 55.9 pence
respectively. 
2.2.6 A 100% non-domestic rates relief will be available in 2024-25 for properties in
the hospitality sectors on islands, as defined by the Islands (Scotland) Act
2018, capped at £110,000 per ratepayer. This will provide economic benefit to
the island communities. 
2.2.7 In terms of Scottish Government requirements, the Deputy First Minister
confirmed that funding allocated to IJB’s for Free Personal and Nursing Care
and adult social care pay in commissioned services should be additional and
not substitutional to each Council's 2023-24 recurring budgets for adult social
care services that are delegated. Where there is evidence that funding is not
passed across to be used for the policy intent, the Scottish Government
reserves the right to reclaiming this. 
2.2.8 As noted in section 2.2.3 of the report the requirement to maintain teaching
and support staff numbers will require further engagement with individual
councils to consider individual circumstances and agree grant conditions,
including the number of teachers expected to be maintained. The
circumstances for North Ayrshire include the reduction in Scottish Attainment
Challenge funding and a falling pupil roll demographic. Funding included in
the Settlement to support teachers included the national allocation of
£145.500m, of which the NAC share is £3.775m. The Cabinet Secretary for
Education and Skills outlined in a letter dated 12 February 2024 that these
funds will now be distributed via Specific Resource Grants. It is recognised
that this position presents a financial risk to the Council, however, the extent
of this risk will likely depend on the outcome of discussions with the Scottish
Government on the Council’s individual circumstances. 
2.2.9 For 2025/26 and 2026/27 the current planning assumption is that the level of
core grant support will be flat cash and remain at the same level for each
year. For context a 1% reduction in core grant equates to around £3.000m.
This assumption is based on a broadly flat cash funding position for local
government, as reflected in the Scottish Government Spending Review
published in May 2022. 
10

Page 11

2.3 Council Tax 
2.3.1 Local authorities have discretion to increase Council Tax. Section 74 of the
1992 Act sets the proportions payable by each council tax band. As such,
Councils can only apply a standard percentage increase across all Council
Tax bands, they cannot vary the percentage increase between bands. 
2.3.2 The 2024/25 Settlement did not include funding to support a Council Tax
freeze, however this is the Scottish Government’s intention. The Depute First
Minister issued a letter to Councils on 2 February 2024 setting out the details
of an alternative distribution of funding to support a Council tax freeze. The
total funding available is £147.200m with a NAC allocation of £3.453m. It is
important to note that this funding is conditional on the Council agreeing a
Council tax freeze for 2024/25. Any council not agreeing to freeze Council Tax
will not receive a share of this funding. It has also been confirmed by the
Scottish Government that this funding will be baselined into future year
Revenue Grant funding. 
2.3.3 The MTFP includes a planning assumption for 2024/25 of a freeze in Council
tax, this being supported with Scottish Government funding and baselined into
future years. This is followed by a current planning assumption of a further 3%
increase for 2025/26 and 2026/27. Council Tax income is a vital source of
funding and represents around 17% of Council funding. 
2.3.4 The planning assumption of a Council Tax freeze will result in Council Tax
charges for 2024/25 remaining at 2023/24 levels. This is illustrated in the
undernoted table for each property band (excluding charges for water and
waste water charges). Water and waste water charges are set by the Scottish
Water Board and recent notification indicates a 8.8% increase. 
2.3.5 Comparative information on Band D is provided within the Council Tax leaflet
that is issued with Council Tax Bills. The comparative information for 2023/24
is as follows;
Scotland     £1,417.00  
North Ayrshire Council  £1,452.12
A Under £26,999 £968.08 - £968.08
B £27,000 to £34,999 £1,129.42 - £1,129.42
C £35,000 to £44,999 £1,290.77 - £1,290.77
D £45,000 to £57,999 £1,452.12 - £1,452.12
E £58,000 to £79,999 £1,907.92 - £1,907.92
F £80,000 to £105,999 £2,359.69 - £2,359.69
G £106,000 to £211,999 £2,843.73 - £2,843.73
H Over £212,000 £3,557.69 - £3,557.69
Band Valuation
(at 1991 levels)
2023/24
Council Tax
Proposed
Increase
2024/25
Council Tax
11

Page 12

2.3.6 Following a recent consultation, the Scottish Government has now published
the Council Tax (Variation for Unoccupied Dwellings) (Scotland) Amendment
Regulations 2023, under which councils will have the power to vary the
Council Tax charge for second homes from the current 100% charge to
include a premium of up to a further 100% of the applicable Council Tax
charge.  
2.3.7 The main policy intent behind these powers is to mitigate the negative impacts
of second home ownership across our communities through the promotion of
a behavioural change across second homeowners which leads to a better
balance between second homes and more permanently occupied homes.
This could also help increase the supply in the private rented sector and
benefit local economies with a shift in more housing occupancy throughout
the year. It is also recognised that within the context of the Medium-Term
Financial Outlook, these powers could result in significant additional revenue
to the Council, therefore helping to protect vital services. 
2.3.8 In deciding whether and how to use these new powers, the Council must have
regard to island communities, given the number of second homes on the Isles
of Arran and Cumbrae. On 14 February 2024 Council agreed to consult on the
proposal to implement an increased Council Tax charge on second homes in
North Ayrshire. The results of the consultation will be shared with elected
members and be included for consideration as part of the 2025/26 Budget
process. 
2.4 Probable Outturn 2023/24 
2.4.1 Based on the revenue financial performance report for 2023/24 at the end of
November 2023, a projected overspend of £0.264m is forecast. The factors
contributing to this were reported to Cabinet on 16 January 2024. 
2.4.2 No further material movement is anticipated to the end of the 2023/24
financial year end, however, the overall level of overspend has been reducing
throughout the year and is trending towards a break-even position on 31
March 2024. This is the position reflected in the level of anticipated Council
reserves on 31 March 2024. This position could be subject to change as the
Council continues to face significant inflationary cost pressures across a
range of areas. Any overspend position at 31 March 2024 will require to be
met from existing earmarked reserves.   
2.5 Reserves, Fund Balances and Investment
Introduction
2.5.1 Setting the General Fund Reserve is one of several related decisions in the
formulation of the MTFP and the annual revenue budget. In setting its budget
the Council must have a clear reserves policy that takes account of known
commitments, potential liabilities and the risk profile of the Council and
12

Page 13

providing flexibility to deal with unforeseen circumstances. The right level of
reserves supports financially sustainable service delivery. The Council’s
approach is in line with CIPFA’s recommended practice as set out in the
document “Local Authority Reserves and Balances”.  
Application of Reserves 
2.5.2 North Ayrshire Council has used reserves in setting its budget over several
years. This has included a reduction in unearmarked reserves, release of
earmarked reserves no longer required and application of in-year
underspends. Use of reserves provides a temporary solution but it is
recognised that more sustainable approaches are required. A summary of
application of reserves is noted below;
• In 2017/18 £8.782m funded the HSCP Challenge Fund and supported
non-recurring expenditure;
• In 2018/19 and 2019/20 £3.500m and £3.880m respectively supported the
core recurring budget.
• In 2020/21, following a review of earmarked reserves, a total of £0.548m
was released to support the 2020/21 Budget.
• In 2021/22, following a review of corporate contingency funds, a total of
£0.862m was released to support the 2021/22 Budget.
• In 2022/23, no use of reserves was required to support the Budget.
• In 2023/24, a total of £3.503m contribution was made from reserves. 
Reserves Policy 
Unearmarked Reserve 
2.5.3 This reserve is held to ensure the Council remains in a prudent financial
position in 2024/25 and could respond to major unforeseen incidents or
emergencies. 
2.5.4 The Council will continue to face several financial challenges through 2024/25
and beyond. These include the ongoing impact of inflationary pressures
across Council budgets and the capital programme and the risk of additional
costs through delivery of new policy commitments and more recently, through
the risk of funding being withheld in the policy area of maintaining teacher
numbers.
2.5.5 One of the most significant financial risks to the Council is the level of
anticipated pay award that Councils would require to fund in 2024/25 and
beyond. The current planning assumption included in the MTFP is 3%
funding. It is noted that the relevant bargaining groups have set out initial
positions which far exceed this level. From a budget planning perspective, it is
anticipated that any agreed pay increase in excess of 3% would require to be
funded by Scottish Government. It is recognised however that there is a risk in
making this assumption. For context, inflation based on the CPI measure
remains at 4% as January 2024. Any pay award in excess of a 3% increase
that requires to be funded by the Council would require the Council in the first
13

Page 14

instance to draw funding from current reserves, and for the recurring pressure
to be incorporated into the 2025/26 Budget process.
2.5.6 It is anticipated on 31 March 2024 the balance of unearmarked reserves will
be £8.445m which equates to 2.0% of the Council’s net expenditure budget.
This level of unearmarked reserve is at the lowest end of the recommended
range of 2% - 4% for general reserves. 
Earmarked Reserves
2.5.7 These Funds have been approved for carry forward to meet known
commitments or liabilities which will be settled in future years. Current
earmarked funds include:
• Affordable Housing – accumulated from Council Tax collected from
second homes and long-term empty properties;
• Project-specific funds - these funds will be carried forward from
2023/24 to allow for the completion of specific projects after 31 March
2024;
• Workforce Planning Fund – To support the workforce planning
programme and help address in-year pay award risks;
• Prudential Investment Fund - resources to smooth the revenue
implications of loan charges supporting the Capital Investment
Programme; 
• Change and Service Redesign Fund – supports delivery of the
Council’s Sustainable Change programme;
• Renewal Fund to support a range of projects across key themes
identified through the experiences from the pandemic; and  
• Investment Fund to support a range of sustainability and Community
based projects.
2.5.8 On the 15 February 2023 Council approved the use of Service Concession
flexibility to help mitigate the significant cost pressures and resultant revenue
budget gaps over the medium-term and to help address the impact of
construction cost volatility as part of delivering the Council’s ambitious Capital
programme. The Council Budget meeting of 1 March 2023 approved the use
of £16.146m of the total retrospective sum of £21.546m to be applied in a
limited and controlled manner across several financial years and, critically,
that this runs in parallel with more sustainable measures to reduce the cost
base of the Council in line with available funding. In view of the scale of the
financial challenges facing the Council, this is an essential element of the
Budget programme over the medium-term.   
14

Page 15

Specific Reserves
2.5.9 Specific reserves are held as follows; 
• Insurance Fund - the current balance on this Fund aligns with the most
recent actuarial valuation, provision for uninsured claims and outstanding
liabilities.  
• Capital Fund – This supports delivery the proposed capital investment
programme. 
Summary
2.5.10 The projected accumulated balances on the Council's Funds and Reserves at
31 March 2024 are outlined in the table below, with the majority of these being
earmarked for specific purposes. The value of reserves is anticipated to
reduce during 2023/24 by £29.095m. 
2.5.11 Based on the current financial landscape and the risks the Council faces the
current level of Reserves is considered prudent. This position will be subject
to continued review.
2.6 Income Summary
2.6.1 Total funding available to the Council to finance its expenditure plans in
2024/25 is noted in the table below. The main assumptions are as follows; 
Balance at
31 March
2023
Transfers
Approved by
Cabinet
24 Jan 2024
Projected
Transfers to
31 Mar 2024
Transfers
Included in
Budget
Paper
Projected
Balance at
31 Mar 2024
Anticipated
Future
Spend
Projected
Future
Balance
£m £m £m £m £m £m £m
General Fund
Unearmarked 8.053 - (0.264) 0.656 8.445 - 8.445
General Fund Earmarked
Education DMR 0.006 (0.006) - - - - -
Affordable Housing 2.038 (2.444) 1.168 - 0.762 (0.762) -
Project Specific Funds 32.136 (6.991) (1.335) (0.656) 23.154 (23.154) -
Prudential Investment Fund 18.904 (0.109) 5.627 - 24.422 (24.422) -
Change and Service
Redesign Fund 2.493 (0.290) (0.107) - 2.096 (2.096) -
Renewal Fund 12.939 (0.084) (3.316) - 9.539 (9.539) -
Investment Fund 11.119 (0.257) (4.975) - 5.887 (5.887) -
Workforce Planning Fund 6.739 - (4.965) - 1.774 (1.774) -
Future Budget Support 14.288 - - (5.000) 9.288 (9.288) -
Cost of Living Fund 1.400 (0.232) - - 1.168 (1.168) -
Total Earmarked Funds 102.062 (10.413) (7.903) (5.656) 78.090 (78.090) -
Total General Fund
Balances 110.115 (10.413) (8.167) (5.000) 86.535 (78.090) 8.445
Specific Reserves
Insurance Fund 2.998 - - - 2.998 (2.998) -
Capital Fund 8.882 0.035 (5.550) - 3.367 (3.367) -
Total Specific Reserves 11.880 0.035 (5.550) - 6.365 (6.365) -
Total General Fund
Reserves 121.995 (10.378) (13.717) (5.000) 92.900 (84.455) 8.445
15

Page 16

• 2024/25 Scottish Government Funding in line with the Finance Circular of
21 December 2023 and the position has been updated to reflect recent
funding announcements to support a Council tax freeze and various
clarifications on subsequent distributions. A flat cash position in core
funding is projected for years 2 and 3, excluding anticipated adjustments in
respect of loan charge support. This position includes the baselining of
2024/25 funding to support a Council tax freeze; 
• An assumed Council Tax freeze for 2024/25 based on 2023/24 levels, with
an appropriate adjustment for the number of households and further
assumed increases of 3% per annum for 2025/26 and 2026/27
respectively; 
• Funding from Scottish Government to support an increase in teacher
superannuation costs from 1 April 2024 has been included. The Scottish
Government has committed to passporting this funding to local authorities
following receipt from UK Government through consequentials in Spring
2024; 
• The contribution from earmarked reserves includes resources from the
approved Service Concessions flexibility across the MTFP; 
• Funding to support Non Domestic Rates Empty Property Relief was
devolved to local authorities in 2023/24; and 
• Outwith specific proposals, fees and charges have been uplifted by 5%
annually. 
2024/25 2025/26 2026/27
£m £m £m
Aggregate External Finance 353.087 352.627 352.627
Additional Aggregate External Finance due:
Teachers' Induction Scheme 0.734 0.734 0.734
Teachers' Superannuation Funding 2.116 2.116 2.116
Council Tax Freeze Funding 3.453 3.453 3.453
Council Tax 64.483 66.840 69.282
Council Tax Income for Affordable Housing 1.198 1.235 1.271
Contribution from Earmarked Reserves 5.000 4.000 3.500
Less NDR Empty Property Relief (2.803) (2.803) (2.803)
Total Funding Available 427.268 428.202 430.180
16

Page 17

2.7 Expenditure Requirement 
2.7.1 The revised expenditure requirement for 2024/25 is £431.427m and is
summarised in Appendix 1.  This is the 2023/24 base budget adjusted to
reflect the outcome of a full review of service pressures, previously approved
savings, operational budget adjustments, national expenditure requirements
and the proposed funding contribution to the Health and Social Care
Partnership. The main assumptions and pressures are summarised below;
• Costs of continuing the current level of service;
• Inflationary pressures, including assumed pay awards, teachers pensions,
contractual commitments and utilities;
• The financial implication of decisions already taken by the Council;
• Socio economic and demographic pressures;
2.7.2 Changes to the level of employer contributions to the Strathclyde pension
fund have been confirmed during 2023/24. The new rates include a 6.5%
contribution rate for 2024/25 and 2025/26 and a 17.5% contribution rate for
2026/27. The Council’s expenditure requirements have been adjusted to
reflect the new base contribution rate of 17.5%, however, the reduced rate of
6.5% has created an opportunity for non-recurring strategic investment across
2024/25 and 2025/26. It is essential however that the Council continues to
address the structural funding gaps over the medium-term. The balance of
investment after addressing pressures in loans fund support, which is required
to deliver the Council’s capital programme, totals £3.614m in 2024/25.  
2.7.3 To continue to progress the Council’s ambitious sustainability programme in
contributing towards net zero and delivering a vital source of future revenue to
the Council, and to invest in our town centres, Council is asked to approve the
following non-recurring strategic investments for 2024/25; 
• £1.914m – Contribution to a renewable energy development at i3. This  
will contribute towards the total estimated £3.300m capital cost of
construction of a 2MW wind turbine at the i3 strategic site. It is estimated
that this would produce an annual energy yield of up to 5.3m KWH’s and
could deliver an annual revenue source of up to £0.500m per annum. To
realise the full financial return on investment to support the Budget
programme, further contributions towards capital construction will be
considered as part of 2025/26 Budget.   
• £1.700m – Locality based town centre fund - The Fund would support
community led place-based investment for regeneration and town centre
projects across localities. Potential projects could include town centre
improvements and initiatives, infrastructure projects and green and open
space improvements. It will be delivered following the Community
Investment Fund (CIF) methodology and include the co-production of the
application with the Regeneration team. Awards of between £5,000 and
£100,000 will be permitted on this basis. 
17

Page 18

2.7.4 In the absence of an agreed pay settlement for 2024/25 through COSLA, the
SJC and SNCT (from August 2024), the financial planning assumption for pay
inflation for 2024/25 remains at 3% and further 3% increases for 2025/26 and
2026/27 respectively. This is based on the limits of affordability rather than
any prediction as to the level of pay agreement. The risk associated with this
assumption is noted in section 2.5.5 of the report. 
2.7.5 In establishing the expenditure requirements, no provision has been made for
general non pay inflation resulting in a reduction in the purchasing power of
the budgets affected. This is most acute across the range of services
delivered through the Place Directorate. 
2.7.6 Operational budget adjustments not impacting on Council policy or causing
material changes to current service levels, are detailed in Appendix 2. 
2.7.7 As part of the 2023/24 revenue budget, savings were approved which
impacted 2024/25 and 2025/26 and they are detailed at Appendix 3.
2.7.6 Full details of expenditure requirements identified for 2024/25 to 2026/27,
including new national expenditure requirements and all contractual and
inflationary related pressures, as well as loans fund support to deliver the
capital programme, are detailed in appendix 4.
2.7.7 Based on this expenditure forecast and incorporating the savings achieved
through operational adjustments and those savings previously approved,
remaining savings of £4.159m / £9.305m / £8.931m are required for 2024/25,
2025/26 and 2026/27 respectively. This position incorporates the planned use
of reserves totalling £5.000m in 2024/25, £4.000m in 2025/26 and £3.500m in
2026/27. This funding landscape continues to present a significant challenge
to the Council over the medium-term. 
2.8 Health and Social Care Partnership
2.8.1 Information on pressures and areas of proposed savings are shared with
North Ayrshire Council to inform the allocation of resources delegated to the
IJB. As part of the recent 2024/25 budget announcement the Council plans to
make a net contribution to the HSCP of £5.292m. It should also be noted that
further resource distributions to the HSCP, aligned to specific policy areas, are
expected throughout the course of 2024/25.
2.8.2 As a condition of the settlement, funding should be additional and not
substitutional to each Council's 2023-24 recurring budgets for adult social
care services that are delegated.  
2.8.3 In recognition of the role of the Council and the Integration Joint Board (IJB),
the financial information presented in this report is limited to the proposed
contribution the Council will make to the IJB based on those funds which have
already been distributed by the Scottish Government as part of the local
18

Page 19

government settlement, noting that final distribution of resources is a matter
for the IJB. 
2.8.4 The Integration Scheme approved by Scottish Ministers states that, following
determination of the Council and NHS payments to the IJB, the IJB will refine
its Strategic Plan to take account of the totality of resources available.
Accordingly, the proposed financial contribution to the IJB of £5.292m in
2024/25 represents the full allocation required from the settlement for the
HSCP to meet new and existing spending commitments, recognising that
further distributions from Scottish Government will also occur throughout
2024/25 for particular policy areas. For years 2025/26 and 2026/27 the
financial planning assumption from the Council is that the financial pressures
facing the IJB will be met by savings. 
2.8.5 The IJB currently holds a level of unearmarked reserves totalling £5.821m
which equates to around 2.1% of the initial approved IJB budget for 2023/24.
This is within, but towards the lower end of the target range of 2%-4%. Based
on the reported position to the IJB on 14 December 2023, a deficit of £3.858m
is forecast which will impact the reserves position in 2023/24. 
2.9 Efficiencies and Savings Proposals 
2.9.1 Proposals for efficiencies and savings have been made which will deliver a
balanced budget for 2024/25. There are estimated net budget shortfalls of
£8.141m and £8.558m in 2025/26 and 2026/27. This position, however,
incorporates the planned use reserves of £5.000m in 2024/25, £4.000m in
2025/26 and £3.500m in 2026/27. The use of reserves is not a sustainable
solution, but necessary due to the scale of the Budget challenges. Proposed
savings, excluding the HSCP, are summarised at Appendix 5. The approach
to the Budget Programme continues to focus on minimising the impact on
communities, Council services, and the workforce, whilst delivering more
financial efficiencies through the Council’s Sustainable Change programme. It
is recognised that this approach will continue to get more challenging over the
medium-term. 
2.9.2 With the exception of some specific charging arrangements and those
charges set nationally, it is proposed that the Council’s fees and charges in
2024/25 increase by 5%, with similar indicative increases in 2025/26 and
2026/27. This position will be reviewed in advance of the 2025/26 Budget.
Members should note that no increase has been proposed in respect of
school meals. The schedule included in Appendix 6 contains the charges with
effect from 1 April 2024. It is important to note that fees and charge levels in
respect of the HSCP is a matter for the IJB to consider. 
2.10 Equality and Children’s Rights Impacts of Budget Proposals
2.10.1 The Council has a legal duty to consider the equalities and children’s rights
impact of proposals on groups with protected characteristics, being age,
disability; gender reassignment; pregnancy and maternity; race; religion or
19

Page 20

belief; sex; and sexual orientation. The Council also has a duty to assess the
socio-economic impact of proposals (The Fairer Scotland Duty) and Island
proofing. This requires an assessment of the impact of proposals on reducing
inequalities.  
2.10.2 Proposals contained in this report have been screened to assess whether
there are any equalities and socio-economic impacts and, if so, the proposals
have been equalities and children’s rights impact assessed (ECRIA). 
2.10.3 The purpose of the ECRIA is to ensure that Members are fully informed in
advance of taking decisions. They do not prevent Members from making
decisions. All ECRIAs have an assessment of risk alongside mitigating
actions. This enables Council to consider if any detrimental impact can be
minimised and any positive impact maximised. 
2.10.4 A link to all the relevant assessments across the budget savings categories is
provided below;
Full Impact Equality and Children's Rights Impact Assessments for Budget
Proposals (sharepoint.com).
2.10.5 Any alternative proposals from Members will require to be screened and
assessed to ensure Council is aware of impacts before making any decision.
2.10.6 Responsibility for the funding allocations within the HSCP rests with the IJB
which has responsibility for assessment of the impact of the decisions it takes. 
2.11 Community Budget Engagement 
2.11.1 A change in approach to Budget engagement was undertaken for the 2024/25
Budget. The development of an on-line Budget Challenge tool provided
citizens with the opportunity to set their own virtual Budget. The thinking
behind this approach was to demonstrate the challenges faced by the Council
in allocating financial resources across services against the backdrop of
funding constraints and cost pressures. The task required the participant to
set a balanced budget and therefore determine a level of relative priority
across the range of services provided by the Council. The tool was launched
on the 24 October 2023 and ran through 15 December 2023, with over 200
responses. This was followed up by an on-line locality engagement session
delivered on 30 January 2024, which included representation from a range of
community groups and associations. This process also included engagement
with young people around the Budget challenges to determine what is
important to them.  
2.11.2 Elected Members have been issued with details of the feedback from the
Budget Challenge exercise and are asked to consider this as part of the
Budget setting process. It is recognised however that the overall level of
response was relatively low and as such does not provide a representative
level of opinion for the area, however, from the feedback gathered, the areas
of services recognised as higher priority included; 
20

Page 21

• Roads
• Street Cleaning 
• Waste Services
• Street Lighting
• School Catering
• Additional Support Needs and Early Learning and Childcare
• Education and learning and Teaching 
2.11.3 Feeback from young people included prioritisation of areas including youth
work support, school catering and learning and teaching. 
2.12 Sustainable Change Programme 
2.12.1 Progress continues in developing an ambitious Sustainable Change
Programme aligned to the Council’s priorities. It is important that a pipeline of
activity continues to be identified, with a primary focus on generating financial
efficiencies to help address the significant financial pressures across the
MTFP. 
2.12.2 The programme has expanded further and is subject to regular review and
monitoring. The current workstreams include; 
• Use of Land and Property Assets including commercial and non-
commercial property;
• Transport and Travel and decarbonisation of the Council fleet;
• Sustainability initiatives including major solar renewable energy investment; 
• Accessing Our Council and Financial Inclusion services, maximising our
digital opportunities around support and contact.
• Service reviews including Early Learning and Childcare, Waste Services
and Housing Services 
2.12.3 It is recognised that the more progress made through delivery of the Council’s
Sustainable Change Programme, the less impact there could be on delivery of
the Council’s core services. The financial options to address the Budget gap
for 2024/25 include a range of measures from the work of this programme.
They include income maximisation in commercial property, renewable energy
investment that will deliver a revenue stream for the Council and a range of
measures from the review of waste services. The Council’s Change and
Service Re-design Fund requires to be kept under review to ensure it can
continue to support the delivery of this programme. 
2.13 Workforce Planning 
2.13.1 The shape of the Council’s workforce is critical to the delivery of efficient and
effective services. It is a significant factor in how we transform our Council and
organise our workforce within the context of the Council’s key priorities and
available funding.  
21

Page 22

2.13.2 In order to be successful it is key for the workforce strategy, and the planning
supporting this, to flow from the Council Plan and link to both people
management and operational processes. To ensure the Council’s priorities
are met, workforce planning must be flexible enough to manage short term
activity but ultimately be focused on medium to long-term needs, ensuring that
sustainable long-term savings are delivered. The workforce strategy, linked to
the Medium-Term Financial Outlook, recognises and reflects significant
external pressures and financial uncertainty.
2.13.3 Influenced by the scale of the financial challenges facing the Council over the
coming years, there will continue to be organisational change, both in terms of
structures but also, importantly, about how we work. During 2023/24 the
Council progressed a Voluntary Early Release programme. This process has
considered the scale of the financial challenges facing the Council and an
assessment of the impact on service delivery and associated costs of exit for
those staff who have volunteered for consideration. A report was presented to
the Staffing and Recruitment committee on 23 November 2023, and it is
anticipated that a total of 85 staff will be released by 31 March 2024.
2.13.4 North Ayrshire Council employs 7,510 staff, equivalent to 6,432 full time
equivalent employees. Anticipated workforce implications associated with the
MTFP over the next 3 years are summarised in the undernoted table. In
2024/25 the workforce is projected to reduce by 114.5 Full Time Equivalent
posts (FTE’s). However, it should be stressed that all measures required to
deliver a balanced budget for 2025/26 and 2026/27 have not been included at
this time. It is, therefore, anticipated that this position will change through
further development of the Budget Programme in 2025/26.    
Category 2024/25        
FTE
2025/26         
FTE
2026/27     
FTE
Operational Budget Adjustments (78.0) - -
Previously Approved Savings +7.0 - -
Pressures and Growth +20.0 - -
New Savings Options (63.5) - -    
Total Workforce Implications (114.5) - - 
2.13.5 Through a corporate workforce planning approach, any reduction to workforce
levels will continue to be managed through natural attrition, vacancy
management, redeployment and voluntary early release.
2.14 Management of Risk
2.14.1 North Ayrshire’s financial framework is underpinned by strategic, corporate,
and operational risk registers. Given the significance of the financial risks the
22

Page 23

Council faces, this report sets out in the table below a number of the key risks
associated with securing financial sustainability along with the likelihood and
impact scoring. For all areas of material risk to the Council and planned
mitigations, this is reported to Cabinet through the Council’s Strategic Risk
Register.                                                                             
Likelihood
Score
Impact
Score
Financial Environment – Funding not keeping
pace with cost-of-service delivery. Impacted by
inflationary pressures and conditions attached
to funding.
4 5
Financial Sustainability of the HSCP 4 4
Delivery of sustainable change programme
- To address projected budget deficit, however,
requires delivery at scale and pace.
3 4 
2.15 Revenue Budget - Objective and Subjective Analysis
2.15.1 The Codes of Financial Practice outline categories of service delivery, known
as the Objective Analysis, and categories of expenditure type, known as the
Subjective Analysis. Based on the budget presented within this report, the
budget matrix for 2024/25 is attached in Appendix 7.
2.15.2 Once this matrix is approved, services must spend in line with this and any
subsequent significant and planned variation to this budget (i.e. virement)
must be approved by Cabinet.
2.15.3 All North Ayrshire Council functions relating to health and social care are
entirely delegated to the Integrated Joint Board, subject to appropriate
reporting throughout the year to the Council.
2.16 Summary
2.16.1 The estimated financial position included in this report is set within the context
of global, UK and national events. Rising costs continue to be influenced by
inflation and the level of funding from Scottish Government for core services
has fallen in both cash and real terms when compared to 2023/24. The
Council continues to face a number of significant financial risks across policy
areas like maintaining teacher numbers and the uncertainty around the level
of 2024/25 pay award.
2.16.2 The Council via COSLA continues to have dialogue with Scottish Government
across a range of areas including fair funding, multi-year financial settlements,
maximising financial flexibility and the levels of funding ring-fenced to meet
23

Page 24

policy commitments. Currently, however, conditions around funding remain,
which places a disproportionate burden on other areas of Council services.
Based on the current cost and funding landscape, delivering balanced
Budgets over the medium-term will be extremely challenging and will require a
range of measures, including reduced investment in services, further service
reform / re-design, additional revenue generation, the use of statutory powers
available to the Council, financial efficiencies from the Sustainable Change
Programme, use of Council reserves and a future level of Council Tax
increase that recognises the level of inflation as well as the impact on citizens. 
2.16.3 The table below summarises the incremental budget implications and
assumptions included in the MTFP for 2024/25 to 2026/27; 
2.16.4 New non-recurring strategic investment of £3.614m is proposed to deliver
placed based investment and renewable energy investment.
2.16.5 The additional funding to the HSCP in 2024/25 represents the full allocation
required from the settlement for the HSCP to meet new and existing spending
commitments for those policy areas already distributed by Scottish
Government.
2.16.6 The operational adjustments includes savings of £4.098m identified across
Directorates for 2024/25. This is in addition to the £4.159m savings to be
approved for member consideration to deliver a balance budget in 2024/25. 
2.16.7 Proposed levels of fees and charges are outlined at Appendix 6. 
2024/25     
£m
2025/26     
£m
2026/27       
£m
Council Tax Increase 0.00% 3.00% 3.00%
SG Core Grant Movement -0.64% 0.00% 0.00%
Operational Adjustments -£13.045m -£0.372m +£9.636m
Previously Approved Savings +£0.590m -£0.020m -
Expenditure Requirements
(exc new funding and HSCP) +£28.912m +£9.423m +£6.273m
Non-Recurring Strategic
Investment +£3.614m +£1.386m -£5.000
HSCP Funding +£5.292m -£0.178m -    
Savings to be Approved  -£4.159m -£1.164m -£0.373m
24

Page 25

3 Proposals
That Council: 
a) notes the anticipated funding available to meet the Council’s expenditure
requirements and notes the areas of ongoing financial risk to the Council;
b) approves the Council's expenditure requirements for 2024/25 and notes the
indicative requirements for 2025/26 and 2026/27;
c) approves the new strategic investments outlined in section 2.7.3 of the report;
d) notes the projected outturn position for 2023/24; 
e) notes the level of reserves and fund balances held by the Council and
approves any use and contributions to and from these; 
f) approves the additional contribution to the HSCP noted at 2.8.1;
g) approves efficiencies and savings to ensure a balanced budget for 2024/25,
consequentials and new proposals in future years;
h) approves the schedule of Council fees and charges detailed in Appendix 6;
i) determines the level of Council Tax for 2024/25 and agrees to freeze Council
tax at 2023/24 levels, noting the Scottish Government funding to support this,
as set out in section 2.3;
j) notes the anticipated funding gaps for 2025/26 and 2026/27;
k) considers the equality and children’s rights impact of any proposed service
changes;
l) notes the feedback from the community Budget engagement exercise to help
inform budget plans;
m) notes progress to date on the Council’s Sustainable Change Programme and
corporate Workforce Planning; and 
n) approves the budget matrix for 2024/25. 
4 Implications / Socio-economic Duty 
Financial 
4.1 The financial implications are as outlined in the report.  Members require to
approve a package of efficiencies and savings, excluding any decision taken by
the IJB in respect of social care services, totalling £4.159m for 2024/25. The
recommendations are based on a Council Tax freeze at 2023/24 levels and this
is supported by additional Scottish Government funding. Any increase in net
expenditure above that outlined in the draft budget will require to be funded.
Failure to agree to the requirements outlined in the Scottish Government's
grant offer as outlined at 2.2.7 and 2.2.8 may result in a less favourable
settlement. These risks are outlined in the report. 
Human Resources 
4.2 The total anticipated impact on the workforce is a net reduction of 114.5 FTE
posts in 2024/25. The new savings proposals for 2024/25 results in a reduction
of 63.5 FTE posts. The Council has a robust workforce planning framework in
25

Page 26

place. In line with this any reduction to the workforce will be management
through natural attrition, vacancies, redeployment and voluntary early release.
This will be effected by regular engagement and participation with the Trade
Unions. 
Legal 
4.3 The Council is obliged by the Local Government Finance Act 1992 to set a
budget for 2024/25 and to do so in a manner and at such a time as to ensure
that it is able lawfully to set its Council Tax by 11 March. Failure to do so could
result in several legal and financial consequences, for both the Council and
Members. 
Equality/Socio-economic 
4.4 Obligation in respect of equalities are set out at 2.10 of the report. 
The Equality and Children’s Rights Impact Assessments (incorporating Fairer
Scotland Duty and Island Proofing) and a summary of screenings are available
via the link provided below. 
Full Impact Equality and Children's Rights Impact Assessments for Budget
Proposals (sharepoint.com). 
Environmental and Sustainability 
4.5 While setting of the budget has no direct environmental or sustainability
impacts, there may be impacts on individual services. It is also recognised that
the proposed new strategic investment for 2024/25 supports the Council’s
sustainability agenda and would contribute towards achieving net zero. 
Key Priorities 
4.6 The draft budget supports delivery of the outcomes as outlined in the new
Council Plan 2023-2028. 
Community Wealth Building 
4.7 Recommendations included in the report support investment for Community
Wealth Building for consideration by Council. 
5 Consultation 
5.1 Significant scrutiny and challenge of the underlying assumptions of the proposed
budget has taken place with the Executive Leadership Team and regular
engagement with Elected Members has taken place between November 2023
and February 2024. 
5.2 The key issues within this report have been presented to the Trade Unions.
26

Page 27

5.3 Community Budget engagement has been delivered through the launch of an
on-line Budget Challenge tool between 24 October 2023 and 15 December
2023. An on-line Budget engagement session with community groups and
associations took place on 30 January 2024. Full details of feedback has been
issued to elected members.
Mark Boyd
Head of Service (Finance) 
For further information please contact Mark Boyd, Head of Service (Finance)  on
01294-324560. 
Background Papers
None
27

Page 28

Appendix 1
2024/25
Consequentials Rephased/New Total Consequentials Rephased/New Total
£000's £000's £000's £000's £000's £000's £000's
Funding
Aggregate external finance 353,087 352,627 352,627 352,627 352,627
Additional aggregate external finance due :
Teachers' Induction Scheme 734 734 734 734 734
Assumed Teachers' Superannuation Funding 2,116 2,116 2,116 2,116 2,116
Assumed CT Freeze Funding 3,453 3,453 3,453 3,453 3,453
Council Tax Income 64,483 66,840 66,840 69,282 69,282
Council Tax Income for Affordable Housing 1,198 1,235 1,235 1,271 1,271
NDR Empty Property Relief (2,803) (2,803) (2,803) (2,803) (2,803)
Contribution from General Reserves 5,000 4,000 4,000 3,500 3,500
Total Funding Available 427,268 - 428,202 428,202 - 430,180 430,180
Expenditure
Base Budget 406,064 427,268 427,268 428,202 428,202
Operational Budget Adjustments
Inspiring Places (704) (517) (517) 70 70
Aspiring Communities (910) 410 410 - -
A Council for the Future (11,431) (265) (265) 9,566 9,566
Total Operational Budget Adjustments (13,045) - (372) (372) - 9,636 9,636
Savings Previously Approved
Inspiring Places 174 (20) (20) - -
Aspiring Communities 344 - - - -
A Council for the Future 72 - - - -
Total Savings Previously Approved 590 - (20) (20) - - -
Investments - Contractual/Unavoidable
Inspiring Places 336 213 213 213 213
Aspiring Communities 2,529 - 511 511 - 1,142 1,142
Corporate Investment 24,433 - 7,419 7,419 - 4,655 4,655
Total Contractual / Unavoidable 27,298 - 8,143 8,143 - 6,010 6,010
Investments - National/Local Pressures
Inspiring Places 498 - 468 468 - 121 121
Aspiring Communities 747 812 812 - 142 142
North Ayrshire Council
Revenue Budget 2024/25
Revenue Budget Summary Position
2025/26 2026/27
28

Page 29

Appendix 1
2024/25
Consequentials Rephased/New Total Consequentials Rephased/New Total
£000's £000's £000's £000's £000's £000's £000's
North Ayrshire Council
Revenue Budget 2024/25
Revenue Budget Summary Position
2025/26 2026/27
Total National / Local Pressures 1,245 - 1,280 1,280 - 263 263
New National Expenditure Requirements
Aspiring Communities 364 - - - - - -
A Council for the Future 5 - - - - - -
Total National Expenditure Requirements 369 - - - - - -
Total Expenditure Requirements (excl HSCP) 28,912 - 9,423 9,423 - 6,273 6,273
Health and Social Care Partnership
HSCP Net Expenditure Requirements 1,755 - (178) (178) - - -
New HSCP National Expenditure Requirements - Recurring 3,537 - . - - - -
Total Health and Social Care Partnership 5,292 - (178) (178) - - -
Total Expenditure Requirements 34,204 - 9,245 9,245 - 6,273 6,273
Additional Investment
New Investment 3,614 (3,614) 5,000 1,386 (5,000) - (5,000)
Total Adjustments 25,363 (3,614) 13,853 10,239 (5,000) 15,909 10,909
Total Expenditure Requirement 431,427 (3,614) 441,121 437,507 (5,000) 444,111 439,111
(Surplus)/Deficit for Year 4,159 (3,614) 12,919 9,305 (5,000) 13,931 8,931
New Savings Proposed
Inspiring Places (1,342) (116) - (116) (163) - (163)
Aspiring Communities (2,434) (848) - (848) - - -
A Council for the Future (383) (200) - (200) (210) - (210)
Total Savings Proposed (4,159) (1,164) - (1,164) (373) - (373)
Revised Expenditure Requirement 427,268 4,778 441,121 436,343 5,373 444,111 438,738
Revised (Surplus)/Deficit for Year if all Savings Proposals are Accepted - (4,778) 12,919 8,141 (5,373) 13,931 8,558
Net Contribution to the HSCP
Expenditure Requirements 20,303 6,283 6,283 6,131 6,131
Proposed Savings (15,011) (6,461) (6,461) (6,131) (6,131)
Net Adjustments to the Contribution to the HSCP 5,292 (178) (178) - -
29

Page 30

Appendix 2
Council Objective/Theme Operational Budget Adjustment Reference Category 2024/25 2025/26 2026/27
£'s £'s £'s
Inspiring Places
Charging for Services, Alternative Funding Streetscene - Street Furniture. This would only be a one off as
maintenance would be required in future years. SP-PL-24-03 Green (15,000) 15,000
Charging for Services, Alternative Funding Streetscene - Play Facilities. A one year reduction in the play facilities
budget. Maintenance will be required in future years. SP-PL-24-04 Green (50,000) 50,000
Charging for Services, Alternative Funding Proposed income from solar PV farms. SP-PL-24-10 Green (255,369) (244,542) 11,933
Charging for Services, Alternative Funding Sub Total (320,369) (179,542) 11,933
Land, Property and Assets Commercial Estate Transformation - Maximise Rental Income from
Existing and New Property SP-PL-24-01 Green (165,000) (85,000) (42,500)
Land, Property and Assets Sub Total (165,000) (85,000) (42,500)
Service Delivery Models Roads Restructure  SP-PL-24-08 Green (45,000) - -
Service Delivery Models Waste Review - Indexation on Waste Processing Contract Costs and
income. SP-PL-24-13 Green (173,636) (252,035) 100,604
Service Delivery Models Sub Total (218,636) (252,035) 100,604
Total (704,005) (516,577) 70,037
Aspiring Communities
Children, Young People and Communities One off savings in ELC due to the August opening of Montgomerie Park
School. SP-COM-24-02 Green (160,381) 160,381 -
Children, Young People and Communities Education turnover applied to non-teaching staff budgets to recognise
the standard pattern of activity SP-COM-24-22 Green (750,000) 250,000 -
Children, Young People and Communities Sub Total (910,381) 410,381 -
Total (910,381) 410,381 -
A Council for the Future
Other Contribution to Affordable Housing Reserve Green 30,000 37,000 36,000
Other Workforce Planning - Voluntary Early Release Programme - Presented
at Staffing and Recruitment Committee 20/11/23 Amber (2,483,773) - -
Other Non Recurring Employers' Superannuation Rebate Green (9,228,000) (302,000) 9,530,000
Service Delivery Models Democratic Services Restructure BID-CEX-24-01 Green 250,718 - -
Other Sub Total (11,431,055) (265,000) 9,566,000
Total (11,431,055) (265,000) 9,566,000
TOTAL OPERATIONAL BUDGET ADJUSTMENTS (13,045,441) (371,196) 9,636,037
North Ayrshire Council
Revenue Budget 2024/25
Revenue Budget Operational Budget Adjustments
30

Page 31

Appendix 3
Category 2024/25 2025/26 2026/27
£'s £'s £'s
Charging for Services, Alternative Funding Additional Building Warrant Income SP-PL-23-10 Green 125,000 -
Charging for Services, Alternative Funding Sub Total - 125,000 -
Land, Property and Assets Property Maintenance Budget review SP-PL-23-19 Amber 45,000 55,000 -
Land, Property and Assets Play Facilities SP-PL-23-26 Green 50,000 - -
Land, Property and Assets Office rationalisation (200,000)
Land, Property and Assets Sub Total 95,000 (145,000) -
Service Delivery Models Review of Roads Revenue Budget SP-PL-22-17 Amber (35,000)
Service Delivery Models Review of income for temporary furnished accommodation SP-PL-22-08 Green 100,000 -
Service Delivery Models Review of Key Holding Arrangements SP-PL-23-03 Green (36,270) -
Service Delivery Models Increase Homeless service turnover targets SP-PL-23-07 Green 50,000 -
Service Delivery Models Sub Total 78,730 - -
Total 173,730 (20,000) -
Children, Young People and Communities Review Early Learning and Childcare Staffing Entitlements SP-COM-23-02 (81,154)
Children, Young People and Communities Closure of Kilwinning Early Years Centre SP-COM-23-04 (24,231)
Children, Young People and Communities Review of Halls, Centres and Libraries SP-PL-22-04 Amber (103,424) - -
Children, Young People and Communities Non-recurring Savings from Early Learning and Childcare SP-COM-23-05 Green 552,863 -
Children, Young People and Communities Sub Total 344,054 - -
Total 344,054 - -
Service Delivery Models Review of Chief Exec Non Employee Budgets SP-CEX-23-01 Green 71,619 - -
Service Delivery Models Sub Total 71,619 - -
Total 71,619 - -
North Ayrshire Council
-589,403TOTAL SAVINGS PREVIOUSLY APPROVED
Council Objective/Theme Saving Reference
Revenue Budget Adjustments Previously Approved
Revenue Budget 2024/25
Inspiring Places
Aspiring Communities
A Council for the Future
(20,000)
31

Page 32

Appendix 4
2024/25 2025/26 2026/27
£'s £'s £'s
Putting residents and communities at the heart
of what we do
Statutory Provision of Transport and Journeys Contractual/Unavoidable BID-PL-24-01 167,861 136,700 136,700
Sustainable Environment Service, Maintenance and Repair of Fleet Vehicles and  Contractual/Unavoidable BID-PL-24-04 111,700 75,955 75,955
Well Connnected with Effective Infrastructure Procurement of road salt for the delivery of Winter
Maintenance Service
Contractual/Unavoidable BID-PL-24-11 56,243 - -
Sub Total Contractual/Unavoidable 335,804 212,655 212,655
- -
Sustainable Environment Carbon Reduction - The use of HVO as an alternative
road fuel
National/Local Pressures BID-PL-24-02 124,000 120,997 120,997
Sustainable Environment Property Maintenance Budget & Solar Photovoltaic
Panels
National/Local Pressures BID-PL-24-05/06 160,000 (30,000) -
Sustainable Environment Ongoing Maintenance Costs for Shewalton Lanfill National/Local Pressures BID-PL-24-16 213,737 - -
Sustainable Environment Managing Persistent Organic Pollutants with Waste
Upholstered Domestic Seating
National/Local Pressures BID-PL-24-17 - 377,365 -
Sub Total National/Local Pressures 497,737 468,362 120,997
Total 833,541 681,017 333,652
Land, Property and Assets PPP/DBFM annual indexation Contractual/Unavoidable BID-COM-24-01 1,241,382 450,957 531,851
Children, Young People and Communities Classroom Assistants Shortfall Contractual/Unavoidable BID-COM-24-03a 956,256 -
Children, Young People and Communities NALL Energy Costs Contractual/Unavoidable BID-COM-24-04 183,000 (15,000) 532,000
Children, Young People and Communities Food Inflation Contractual/Unavoidable BID-COM-24-06 75,492 -
Transport & Travel SPT Annual Price Revision Contractual/Unavoidable BID-PL-23-05 73,226 75,423 77,685
Sub Total Contractual/Unavoidable 2,529,356 511,380 1,141,536
Children, Young People and Communities Islands Officer National/Local Pressures BID-PL-23-27 11,356 56,782 -
Children, Young People and Communities Additional school running costs as a result of the capital
programme
National/Local Pressures BID-PL-21-01 & 23-
01
736,439 754,926 141,701
Sub Total National/Local Pressures 747,795 811,708 141,701
Children, Young People and Communities ELC Expansion New National Expenditure Requirements 212,000 - -
Children, Young People and Communities Free School Meals Expansion New National Expenditure Requirements 148,000 - -
Children, Young People and Communities Pupil Equity Fund New National Expenditure Requirements 10,000 - -
Children, Young People and Communities Educational Psychologists New National Expenditure Requirements (3,000) - -
Children, Young People and Communities Gaelic Education New National Expenditure Requirements (3,000) - -
North Ayrshire Council
Revenue Budget 2024/25
Revenue Expenditure Requirements
Inspiring Places
Aspiring Communities
ReferenceCouncil Objective/Theme Investment Category
32

Page 33

Appendix 4
2024/25 2025/26 2026/27
£'s £'s £'s
North Ayrshire Council
Revenue Budget 2024/25
Revenue Expenditure Requirements
ReferenceCouncil Objective/Theme Investment Category
Sub Total New National Expenditure Requirements 364,000 - -
Total 3,641,151 1,323,088 1,283,237
Other Barclay Review New National Expenditure Requirements 5,000 - -
Sub Total New National Expenditure Requirements 5,000 - -
Total 5,000 - -
Inflation Joint Board requisitions Contractual/Unavoidable 80,495 105,754 108,926
Inflation Pay Award Contractual/Unavoidable 5,326,999 6,513,231 6,722,472
Inflation 22/23 - 23/24 SNCT Pay Award Contractual/Unavoidable 3,990,155 - -
Inflation 23/24 SJC Pay Award Contractual/Unavoidable 4,510,958 - -
Inflation Teachers' Employers' Superannuation Contractual/Unavoidable 2,115,630 73,031 71,442
Inflation NDR Revaluation Contractual/Unavoidable 71,712 10,148 -
Inflation Corporate issues (energy, fuel, food, NDR) Contractual/Unavoidable 2,848,136 (323,050) 1,408,838
Sub Total 18,944,085 6,379,114 8,311,678
Other Loan charges Contractual/Unavoidable 5,488,010 1,040,302 (3,657,083)
Sub Total 5,488,010 1,040,302 (3,657,083)
Total 24,432,095 7,419,416 4,654,595
TOTAL REVENUE EXPENDITURE REQUIREMENTS 28,911,787 6,271,484
Council Wide Pressures
A Council for the Future
9,423,521
33

Page 34

Appendix 5
£ £ £ £ £ £
Service Delivery
Models SP-PL-24-02
Minor reduction in Roads Revenue Budget
mitigated through continued significant levels of
capital investment
Low Negative Amber (100,000) - - - - -
Service Delivery
Models SP-PL-24-05
Streetscene - Removal of communities
Christmas lights budget and funding for such
activities would require to be considered from
other funding sources. The remaining service
would still provide one christmas tree with
lighting per town.
Low Negative Amber (38,000) - - - - -
Service Delivery
Models SP-PL-24-06
Waste Review - Review of operating times
across Household Waste Recycling Centre
(HWRC) sites
Low Negative Amber (75,000) (2.00) - - - -
Service Delivery
Models SP-PL-24-07
Streetscene - Transition from summer bedding
plants to perennials and funding for such
activities to be considered from alternative
funding sources
None Green (24,500) - - - - -
Service Delivery
Models SP-PL-24-09 Waste - Cease issuing free food waste liners Low Negative Amber (29,250) - (9,750) - - -
Charging for
Services /
Alternative Funding
SP-PL-24-11
Waste Review - Introduce charging for garden
waste collections. Current assessment of £50
annual charge which is in line with other local
authorities.
Low Negative Red (588,163) 1.00 (106,730) - (163,029) -
Service Delivery
Models SP-PL-24-12
Promote further biodiversity and wild flower
areas across the school estate leading to a
reduction in grass cutting areas.
Low Positive Green (30,000) (1.00) - - - -
Service Delivery
Models SP-PL-24-15 Economic Development and Regeneration
Budget Savings Low Negative Amber (340,000) (2.00) - - - -
Service Delivery
Models SP-PL-24-16 Review service - Gypsy Traveller Unauthorised
Encampment sites Low Negative Amber (42,238) (1.00) - - - -
Service Delivery
Models SP-PL-24-17
Waste Review - Review collection frequency for
Absorbant hygiene Products (AHP) based on
current presentation rates from 2 weekly to 3
weekly to align with residual waste collection
service.
Low Negative Amber (75,000) (3.00) - - - -
Total (1,342,151) (8.00) - (116,480) - (163,029) -
Consequential
Savings New Saving
Consequential
Savings
Inspiring Places
Aspiring Communities
New Saving
North Ayrshire Council
Revenue Budget 2023/24
Revenue Budget Savings to be Approved
Council Objective /
Theme
Savings Proposal Community Impact Community
Impact
2023/24 2024/25 2025/26
Proposed Saving
Workforce
implications
Reference
34

Page 35

Appendix 5
Consequential
Savings New Saving
Consequential
Savings New Saving
North Ayrshire Council
Revenue Budget 2023/24
Revenue Budget Savings to be Approved
Council Objective /
Theme
Savings Proposal Community Impact Community
Impact
2023/24 2024/25 2025/26
Proposed Saving
Workforce
implications
Reference
Children, Young
People and
Communities
SP-COM-24-01
Review staffing allocations to primary and
secondary schools through the Devolved School
Management scheme and in the context of a
falling pupil roll and pupil teacher ratio
guidance.
None Amber (1,343,731) (35.00) (839,832) - - -
Children, Young
People and
Communities
SP-COM-24-03
Various Facilities Management procurement
savings across several items linked to purchase
volumes and commodity rationalisation
None Green (135,963) - - - - -
Children, Young
People and
Communities
SP-COM-24-05
Reduction of cleaning days in offices aligned to
current levels of footfall and cleaning within
depots aligned to operational requirements
None Amber (123,953) (5.14) - - - -
Children, Young
People and
Communities
SP-COM-24-06
Removal of  School Crossing Patrollers
currently allocated to roads with existing
crossings. 
Low Negative Amber (30,000) (1.22) - - - -
Children, Young
People and
Communities
SP-COM-24-07/21
Review of Facilities Management posts across
all areas of the service and a re-design of FM
services.
None Amber (128,590) (1.00) (8,500) - - -
Children, Young
People and
Communities
SP-COM-24-
08/11/16/17
Reduction of libraries opening hours by 20%
and review all supplies and operational budgets.
The proposal also includes a re-designed
school library service.
Low Negative Amber (438,437) (9.50) - - - -
Children, Young
People and
Communities
SP-COM-24-09
Cessation of evening lets in some secondary
schools and re-direction of lets into other
council buildings.
Low Negative Green (14,000) (0.50) - - - -
Children, Young
People and
Communities
SP-COM-24-10 Reduction of venue assistant core hours Low Negative Green (28,000) (1.00) - - - -
Children, Young
People and
Communities
SP-COM-24-12/13/18/19
Re-design of the Community Learning and
Development service and a reduction in
sessional budgets, non-payroll budgets and and
a re-design of CLD resourcing
Low Negative Amber (145,846) (1.00) - - - -
Children, Young
People and
Communities
SP-COM-24-14 Phase 1 of a review of administrative support in
Communities and Education None Green (38,559) (1.00) - - - -
Children, Young
People and
Communities
SP-COM-24-20 Remove Arts Participatory Budgeting fund Low Negative Amber (7,000) - - - - -
Total (2,434,079) (55.36) - (848,332) - - -
35

Page 36

Appendix 5
Consequential
Savings New Saving
Consequential
Savings New Saving
North Ayrshire Council
Revenue Budget 2023/24
Revenue Budget Savings to be Approved
Council Objective /
Theme
Savings Proposal Community Impact Community
Impact
2023/24 2024/25 2025/26
Proposed Saving
Workforce
implications
Reference
Other SP-CEX-24-01 ICT - Reduction in non employee budgets. None Green (123,000) - -
Other SP-CEX-24-02 Financial Services - Further Review of all non-
essential spend budgets Low Negative Green (70,000) - -
Other 5% Increase in Council Fees and Charges
(Excluding School Meals Charges) Low Negative Amber (189,378) - (199,974) (209,973)
Total (382,378) - - (199,974) - (209,973) -
A Council for the Future
(373,002) -TOTAL SAVINGS TO BE APPROVED (4,158,608) (63.36) (1,164,786) -
36

Page 37

North Ayshire Council
Fees & Charges for 2024-25 to 2026-27
Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2023/24)
£
Proposed
Charge
(2024/25)
Indicative
Charge
(2025/26)
Indicative
Charge
(2026/27)
Basis of
increase
2024/25
%
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Note
CONTRIBUTION FEES & CHARGES
Chief Executives Legal - Licensing Raymond Lynch General - Amendment (1982 Act Para 9 - if due to Licence Partnership) Contribution £132.00 £139.00 £146.00 £153.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch General - Amendment of Licence (1982 Act Para 9 consent to Material Change - if not Licence
Partnership) Contribution £37.00 £39.00 £41.00 £43.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Entertainment - Indoor Sports Entertainment Licence (when another NAC Licence is held) Contribution £180.00 £189.00 £198.00 £208.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Entertainment - Indoor Sports Entertainment Licence (when no other NAC Licences are held) Contribution £358.00 £376.00 £395.00 £415.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Entertainment - Public Entertainment Licence (Commercial Premises with Fairground) Contribution £418.00 £439.00 £461.00 £484.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Entertainment - Public Entertainment Licence - Full Licence (maximum duration of 3 years, and
renewable) Contribution £382.00 £401.00 £421.00 £442.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Entertainment - Public Entertainment Licence - Temporary Licence (maximum duration of 6
weeks, and not renewable) Contribution £339.00 £356.00 £374.00 £393.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal Activity Licence - to sell pets (Activity A) Contribution £209.00 £219.00 £230.00 £242.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal Activity Licence - to rehome animals (Activity B) Contribution £209.00 £219.00 £230.00 £242.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal Activity Licence - To operate an "Animal welfare Establishment" (Activity C) If licence
holder is OSCR registered no fee Contribution £0.00 £0.00 £0.00 £0.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal Activity Licence - To operate an "Animal welfare Establishment" (Activity C) If not OSCR
registered Contribution £209.00 £219.00 £230.00 £242.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal Activity Licence - to breed puppies (Activity D) Grant (one year renewable) Contribution £501.00 £526.00 £552.00 £580.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal Activity Licence - to breed puppies (Activity D) Renewal (one year) Contribution £221.00 £232.00 £244.00 £256.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal Activity Licence - to breed kittens (Activity E) Grant (one year renewable) Contribution £501.00 £526.00 £552.00 £580.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal Activity Licence - to breed kittens (Activity E) Renewal (one year) Contribution £221.00 £232.00 £244.00 £256.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal Activity Licence - to breed rabbits (Activity F) Grant (one year renewable) Contribution £501.00 £526.00 £552.00 £580.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal Activity Licence - to breed rabbits (Activity F) Renewal (one year) Contribution £221.00 £232.00 £244.00 £256.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal Boarding Licence (1 to 10 Animals) Contribution £89.00 £93.00 £98.00 £103.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal Boarding Licence (11 to 20 Animals) Contribution £119.00 £125.00 £131.00 £138.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal Boarding Licence (21 to 30 Animals) Contribution £155.00 £163.00 £171.00 £180.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal Boarding Licence (31 to 50 Animals) Contribution £227.00 £238.00 £250.00 £263.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal Boarding Licence (51 to 70 Animals) Contribution £292.00 £307.00 £322.00 £338.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal Boarding Licence (Over 70 Animals) Contribution £370.00 £389.00 £408.00 £428.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal - Registration - Performing Animals (Regulation) Act 1925 Contribution £53.00 £56.00 £59.00 £62.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Booking Office (with public access) Contribution £358.00 £376.00 £395.00 £415.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Booking Office (without public access) Contribution £239.00 £251.00 £264.00 £277.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Caravan Sites New system (relevant Permanenet sites - Residential sites) / Old system
(Holiday and touring sites) - no fee Contribution £679.00 £713.00 £749.00 £786.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Cinema Licence - grant or renewal for one year Contribution £292.00 £307.00 £322.00 £338.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Cinema Licence - grant or renewal for under a year - per month (total not to exceed the one
year fee) Contribution £98.00 £103.00 £108.00 £113.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Cinema Licence - Transfer Contribution £59.00 £62.00 £65.00 £68.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal - Dangerous Wild Animals - New & Renewal (maximum duration of 12 months, and
renewable) Contribution £316.00 £332.00 £349.00 £366.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch General - Duplicate Licence Contribution £37.00 £39.00 £41.00 £43.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Dealer - Knife Dealers Licence - New & Renewal (Full - maximum duration of 3 years, and
renewable) Contribution £358.00 £376.00 £395.00 £415.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Other CGSA - Late Hours Catering Licence - New & Renewal (Full - maximum duration of 3
years, and renewable) Contribution £190.00 £200.00 £210.00 £221.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Other CGSA - Market Operators Licence Contribution £405.00 £425.00 £446.00 £468.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Dealer - Metal Dealers Licence (Premises & Itinerant) Contribution £125.00 £131.00 £138.00 £145.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Poisons - Registration to sell non medical poisons (new) Contribution £26.00 £27.00 £28.00 £29.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Poisons - Registration to sell non medical poisons (retention) Contribution £14.00 £15.00 £16.00 £17.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Dealer - Second Hand Dealers Licence - New (Full - maximum duration of 3 years, and
renewable) Contribution £251.00 £264.00 £277.00 £291.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Dealer - Second Hand Dealers Licence - Already Licenced (Full - maximum duration of 3 years,
and renewable) Contribution £132.00 £139.00 £146.00 £153.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Other CGSA - Sex Shop or Sexual Entertainment Venue Licence - New & Renewal (Full -
maximum duration of 3 years, and renewable) Contribution £2,128.00 £2,234.00 £2,346.00 £2,463.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Other CGSA - Skin Piercing or Tattooing Licence (with Premises) Contribution £376.00 £395.00 £415.00 £436.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Other CGSA - Skin Piercing or Tattooing Licence (without Premises) Contribution £316.00 £332.00 £349.00 £366.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Street Trader Employee Licence - Full licence (maximum duration of 3 years, and renewable) Contribution £143.00 £150.00 £158.00 £166.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Street Trader Employee Licence - Temporary Licence (maximum duration of 3 years, and
renewable) Contribution £108.00 £113.00 £119.00 £125.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Street Trader Operator - Substitute Vehicle Contribution £125.00 £131.00 £138.00 £145.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Street Trader Operator Licence - Full Licence (maximum duration of 3 years, and renewable) Contribution £287.00 £301.00 £316.00 £332.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Street Trader Operator Licence - Temporary Licence (maximum duration of 6 weeks, and not
renewable) Contribution £196.00 £206.00 £216.00 £227.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal - Zoo Licence (New - maximum duration of 4 years, and renewable.  Vet inspections are
charged in additiion) Contribution £316.00 £332.00 £349.00 £366.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal - Zoo Licence (Renewal - maximum duration of 6 years, and renewable.  Vet inspections
are charged in additiion) Contribution £316.00 £332.00 £349.00 £366.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal - Venison Dealer Contribution £132.00 £139.00 £146.00 £153.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal - Venison Employee / Agent Contribution £71.00 £75.00 £79.00 £83.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal - Game Dealers Contribution £5.00 £5.00 £5.00 £5.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Poisons - Registration (alteration of details in Register) Contribution £6.00 £6.00 £6.00 £6.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch STL - Grant - Secondary Letting - 1 to 4 Guests Contribution £250.00 £263.00 £276.00 £290.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch STL - Grant - Secondary Letting - 5 or more guests Contribution £400.00 £420.00 £441.00 £463.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch STL - Grant - Home Sharing and/or Home Letting - 1 to 4 Guests Contribution £125.00 £131.00 £138.00 £145.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch STL - Grant - Home Sharing and/or Home Letting - 5 or more Guests Contribution £200.00 £210.00 £221.00 £232.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch STL - Renewal/Recurring Fee - Secondary Letting - 1 to 4 Guests Contribution £200.00 £210.00 £221.00 £232.00 5.0% 5.0% 5.0%
Appendix 6
37

Page 38

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2023/24)
£
Proposed
Charge
(2024/25)
Indicative
Charge
(2025/26)
Indicative
Charge
(2026/27)
Basis of
increase
2024/25
%
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Note
Chief Executives Legal - Licensing Raymond Lynch STL - Renewal/Recurring Fee - Secondary Letting - 5 or more Guests Contribution £350.00 £368.00 £386.00 £405.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch STL - Renewal/Recurring Fee - Home Sharing and/or Home Letting - 1 to 4 Guests Contribution £100.00 £105.00 £110.00 £116.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch STL - Renewal/Recurring Fee - Home Sharing and/or Home Letting - 5 or more Guests Contribution £175.00 £184.00 £193.00 £203.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal - Riding Establishment Licence (1 year, New & Renewal) Contribution £501.00 £526.00 £552.00 £580.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch Animal - Riding Establishment Licence (One year, If already licenced) Contribution £376.00 £395.00 £415.00 £436.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Other - Replacement Door Sign Contribution £18.00 £19.00 £20.00 £21.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Other - Replacement Licence resulting from change of address Contribution £15.00 £16.00 £17.00 £18.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Other - Replacement Plate Contribution £36.00 £38.00 £40.00 £42.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Other - Replacement Tariff Card Contribution £15.00 £16.00 £17.00 £18.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Other - Replacement Taxi / Private Hire Car Driver Badge Contribution £20.00 £21.00 £22.00 £23.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Other - Replacement Window Stickers Contribution £20.00 £21.00 £22.00 £23.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Other - Substitution of Vehicle (Taxi or Private Hire Car) Contribution £223.00 £234.00 £246.00 £258.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Licences - Taxi Driver's Licence - Full Licence (1 year, and renewable) Contribution £89.00 £93.00 £98.00 £103.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Licences - Taxi Driver's Licence - Full Licence (maximum duration of 3 years, and
renewable) Contribution £209.00 £219.00 £230.00 £242.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Licences - Private Hire Car Driver Licence - Full licence (maximum duration of 3 years,
and renewable) Contribution £209.00 £219.00 £230.00 £242.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Licences - Private Hire Car Licence (Operator) -  Full Licence (1 year, and renewable) Contribution £370.00 £389.00 £408.00 £428.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Licences - Private Hire Car Licence (Operator) -  Full Licence (maximum duration of 3
years, and renewable) Contribution £620.00 £651.00 £684.00 £718.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Licences - Taxi Licence (1 year) Contribution £400.00 £420.00 £441.00 £463.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Licences - Taxi Licence (Operator) - Full Licence (maximum duration of 3 years, and
renewable) Contribution £691.00 £726.00 £762.00 £800.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch General - Variation of a Licence Contribution £61.00 £64.00 £67.00 £70.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Licences - Private Hire Car Driver's Licence - Full Licence (1 yr, and renewable) Contribution £89.00 £93.00 £98.00 £103.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Other - Inspection of Vehicle (Taxi or Private Hire Car) Contribution £92.00 £97.00 £102.00 £107.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Other - Re-inspection of Vehicle (Taxi or Private Hire Car) Contribution £49.00 £51.00 £54.00 £57.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch TPHC Other - Re-seal of Taximeter Contribution £24.00 £25.00 £26.00 £27.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch General - Civic Government (Scotland) Act 1982 - Temporary Licence (duration specified in
Licence, maximum 6 weeks, and not renewable) (unless specifically mentioned in this table) Contribution £180.00 £189.00 £198.00 £208.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch House in Multiple Occupation Licence (New) Contribution £1,002.00 £1,052.00 £1,105.00 £1,160.00 5.0% 5.0% 5.0%
Chief Executives Legal - Licensing Raymond Lynch House in Multiple Occupation Licence (Already Licenced) Contribution £752.00 £790.00 £830.00 £872.00 5.0% 5.0% 5.0%
Chief Executives Registration Services Elaine Nixon Civil Marriages / Partnerships at Registration Office outwith office hours Contribution £504.65 £522.13 £548.24 £575.65 5.0% 5.0% 5.0%
Chief Executives Registration Services Elaine Nixon Civil Marriages / Partnerships at Registration Office during office hours Contribution £315.65 £323.68 £339.86 £356.85 5.0% 5.0% 5.0%
Chief Executives Registration Services Elaine Nixon All Ceremonies at approved venues - fee for attendance of a Registrar during office hours Contribution £491.00 £507.80 £533.19 £559.85 5.0% 5.0% 5.0%
Chief Executives Registration Services Elaine Nixon All Ceremonies at approved venues - fee for attendance of a Registrar outwith office hours Contribution £552.95 £572.85 £601.49 £631.56 5.0% 5.0% 5.0%
Chief Executives Registration Services Elaine Nixon Guest Supplement: during office hours when more than 4 guests attend a marriage/civil
partnership at Registration offices Contribution £160.65 £168.68 £177.11 £185.97 5.0% 5.0% 5.0%
Chief Executives Registration Services Elaine Nixon Naming & Renewal of Vows Ceremonies conducted at Registration Offices during office hours Contribution £304.50 £319.73 £335.72 £352.51 5.0% 5.0% 5.0%
Chief Executives Registration Services Elaine Nixon Naming & Renewal of Vows Ceremonies conducted at Registration Offices outwith office hours Contribution £365.40 £383.67 £402.85 £422.99 5.0% 5.0% 5.0%
Chief Executives Registration Services Elaine Nixon Civil Marriage/Partnership & Naming Ceremony booked together and conducted at Registration
Offices outwith office hours Contribution £649.55 £674.28 £707.99 £743.39 5.0% 5.0% 5.0%
Chief Executives Registration Services Elaine Nixon Civil Marriage/Partnership & Naming Ceremony booked together and conducted at Approved
Venues outwith office hours Contribution £723.05 £751.45 £789.02 £828.47 5.0% 5.0% 5.0%
Chief Executives Registration Services Elaine Nixon Civil Marriage/Partnership & Naming Ceremony booked together and conducted at Approved
Venues during office hours Contribution £631.70 £655.54 £688.32 £722.74 5.0% 5.0% 5.0%
Chief Executives Registration Services Elaine Nixon Guest supplement: during office hours when more than 4 guests attend a Civil
Marriage/Partnership & Naming Ceremony at Registration Offices Contribution £413.70 £434.39 £456.11 £478.92 5.0% 5.0% 5.0%
Chief Executives Registration Services Elaine Nixon Private Citizenship Ceremony, Registration Office, Office Hours Contribution £145.95 £153.25 £160.91 £168.96 5.0% 5.0% 5.0%
Chief Executives Registration Services Elaine Nixon Private Citizenship Ceremony, Registration Office, Office Hours, plus Guest Supplement for
more than 4 Guests Contribution £267.75 £281.14 £295.20 £309.96 5.0% 5.0% 5.0%
Chief Executives Registration Services Elaine Nixon Civil Marriage/Partnership & Naming Ceremony booked together and conducted at Registration
Offices during office hours Contribution £568.70 £589.39 £618.86 £649.80 5.0% 5.0% 5.0%
Health & Social Care All Eleanor Currie Maximum Weekly Non-Residential Charge Contribution £96.60 £106.26 £111.57 £117.15 10.0% 5.0% 5.0%
Health & Social Care Adults Eleanor Currie Care at Home Adults Contribution £16.79 £18.47 £19.39 £20.36 10.0% 5.0% 5.0%
Health & Social Care Adults Eleanor Currie Day Care (purchased and provided) Contribution £14.99 £16.49 £17.31 £18.18 10.0% 5.0% 5.0%
Health & Social Care Adults Eleanor Currie Day Care (charges to Other Las) Contribution £243.11 £267.42 £280.79 £294.83 10.0% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Guest Room Charges at Sheltered Housing Accommodations Contribution £5.51 £6.06 £6.36 £6.68 10.0% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Community Alarms service - mainland Contribution £5.32 £5.85 £6.14 £6.45 10.0% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Community Alarms service - Arran Contribution £2.60 £2.86 £3.00 £3.15 10.0% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Meals on Wheels Contribution £3.36 £3.70 £3.89 £4.08 10.0% 5.0% 5.0%
Health & Social Care Older People Eleanor Currie Care at Home Older People per hour Contribution £16.79 £18.47 £19.39 £20.36 10.0% 5.0% 5.0%
Health & Social Care Older People Eleanor Currie Day Care (purchased and provided) Older People Contribution £14.99 £16.49 £17.31 £18.18 10.0% 5.0% 5.0%
Health & Social Care Adults Eleanor Currie Respite (for an individual's care need rather than to give the carer a break)  Age 16-24 Contribution £69.56 £76.52 £80.35 £84.37 10.0% 5.0% 5.0%
This charge depends on the 24/25 Personal
Allowance rate which will not be known until early
March.
Health & Social Care Adults Eleanor Currie Respite (for an individual's care need rather than to give the carer a break)  Age 25 - 64 Contribution £86.63 £95.29 £100.05 £105.05 10.0% 5.0% 5.0%
This charge depends on the 24/25 Personal
Allowance rate which will not be known until early
March.
Health & Social Care Older People Eleanor Currie Respite (for an individual's care need rather than to give the carer a break)  Age 65+ Contribution £159.18 £175.10 £183.86 £193.05 10.0% 5.0% 5.0%
This charge depends on the 24/25 Personal
Allowance rate which will not be known until early
March.
Health & Social Care Adults Eleanor Currie Sleepover Contribution £13.18 £14.50 £15.23 £15.99 10.0% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Trindlemoss House - permanent placement Contribution £1,134.00 £1,190.70 £1,250.24 £1,312.75 5.0% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Montrose House - permanent residential placement Contribution £1,134.00 £1,190.70 £1,250.24 £1,312.75 5.0% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Montrose House - permanent nursing placement Contribution £1,312.50 £1,378.13 £1,447.04 £1,519.39 5.0% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Sleepover Contribution £13.18 £14.50 £15.23 £15.99 10.0% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Direct Payments  -  Personal Assistants Contribution £14.02 £15.42 £16.19 £17.00 10.0% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Direct Payments  - Agency Rates Contribution £16.79 £18.47 £19.39 £20.36 10.0% 5.0% 5.0%
Appendix 6
38

Page 39

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2023/24)
£
Proposed
Charge
(2024/25)
Indicative
Charge
(2025/26)
Indicative
Charge
(2026/27)
Basis of
increase
2024/25
%
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Note
Health & Social Care Adults and Older People Eleanor Currie Direct Payments  - Sleepovers Contribution £13.08 £14.39 £15.11 £15.87 10.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hire of table linen Contribution £6.50 £6.85 £7.20 £7.55 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hire of twinkle curtain Contribution £82.10 £86.20 £90.50 £95.05 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hire of Red Carpet Contribution £40.75 £42.80 £44.95 £47.20 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Store Requests, hires and deliveries Contribution £35.10 £36.85 £38.70 £40.65 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Stores hire of tables go pack Contribution £6.05 £6.35 £6.65 £7.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Stores hire of tables round Contribution £11.70 £12.30 £12.90 £13.55 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Party Package Civic Centre Contribution £143.50 £150.67 £158.20 £166.11 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Wedding packages - Ceremony
and  Reception Contribution £902.42 £947.54 £994.92 £1,044.67 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Wedding packages - Reception only Contribution £647.33 £679.71 £713.70 £749.39 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Holidays 3 days/2 nights (4 people) Contribution £622.00 £653.00 £686.00 £720.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Holidays 5 days/4 nights (4 people) Contribution £1,235.00 £1,297.00 £1,362.00 £1,430.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Bed and breakfast (adult) Contribution £43.00 £45.00 £47.00 £49.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Dinner, bed and breakfast (adult) Contribution £55.00 £58.00 £61.00 £64.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Half day activity (adult) Contribution £56.00 £59.00 £62.00 £65.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Half day activity (child) Contribution £39.00 £41.00 £43.00 £45.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Full day activity (adult) Contribution £111.00 £117.00 £123.00 £129.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Full day activity (child) Contribution £78.00 £82.00 £86.00 £90.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire Commercial large classroom Contribution £39.00 £41.00 £43.00 £45.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire Family Function large classroom Contribution £23.00 £24.00 £25.00 £26.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire NAC large classroom Contribution £21.00 £22.00 £23.00 £24.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire general meeting large classroom Contribution £13.00 £14.00 £15.00 £16.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire Childcare large classroom Contribution £7.00 £7.00 £7.00 £7.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire Disabled/charity large classroom Contribution £5.00 £5.00 £5.00 £5.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire Commercial small chartroom Contribution £20.00 £21.00 £22.00 £23.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire Family Function small chartroom Contribution £12.00 £13.00 £14.00 £15.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire NAC small chartroom Contribution £11.00 £12.00 £13.00 £14.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire genral meeting small chartroom Contribution £6.00 £6.00 £6.00 £6.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire Childcare small chartroom Contribution £3.00 £3.00 £3.00 £3.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire Disabled/charity small chartroom Contribution £2.00 £2.00 £2.00 £2.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Instructor day rate Contribution £231.00 £243.00 £255.00 £268.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell NAC School Group 5 days/4 nights (per person) Contribution £218.00 £229.00 £240.00 £252.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell NAC School Group 5 days/4 nights (per person) Accompanying Staff Contribution £109.00 £114.00 £120.00 £126.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Other school Group 5 days/4 nights (per person) Contribution £439.00 £461.00 £484.00 £508.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Other school Group 5 days/4 nights (per person) Accompanying staff Contribution £219.00 £230.00 £242.00 £254.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Other school Group 4 days/3 nights (per person) Contribution £175.00 £184.00 £193.00 £203.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Other school Group 4 days/3 nights (per person) Accompanying staff Contribution £88.00 £92.00 £97.00 £102.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell NAC School Group 3 days/2 nights (per person) Contribution £116.00 £122.00 £128.00 £134.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell NAC School Group 3 days/2 nights (per person) Accompanying staff Contribution £58.00 £61.00 £64.00 £67.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Other school Group 3 days/2 nights (per person) Contribution £231.00 £243.00 £255.00 £268.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Other school Group 3 days/2 nights (per person) accompanying staff Contribution £116.00 £122.00 £128.00 £134.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 1 - Commercial Contribution £27.00 £28.00 £29.00 £30.00 5.0% 5.0% 5.0%
Appendix 6
39

Page 40

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2023/24)
£
Proposed
Charge
(2024/25)
Indicative
Charge
(2025/26)
Indicative
Charge
(2026/27)
Basis of
increase
2024/25
%
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Note
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 1 - Non-Commercial Contribution £19.00 £20.00 £21.00 £22.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 2 - Commercial Contribution £20.00 £21.00 £22.00 £23.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 2 - Non-Commercial Contribution £8.00 £8.00 £8.00 £8.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Theatre Hire - Commercial Contribution £75.00 £79.00 £83.00 £87.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Theatre Hire - Non-Commercial Contribution £44.00 £46.00 £48.00 £50.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 1 user (eg Commercial Activities) -
SMALL ROOM Contribution £22.50 £23.65 £24.85 £26.10 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 1 user (eg Commercial Activities) -
LARGE ROOM Contribution £45.40 £47.65 £50.05 £52.55 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 2 user (eg Family Functions) -
SMALL ROOM Contribution £13.30 £13.95 £14.65 £15.40 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 2 user (eg Family Functions) -
LARGE ROOM Contribution £26.60 £27.95 £29.35 £30.80 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 3 user (eg Agency Letting) -
SMALL ROOM Contribution £7.35 £7.70 £8.10 £8.50 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 3 user (eg Agency Letting) -
LARGE ROOM Contribution £14.70 £15.45 £16.20 £17.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 4 user (eg Pre 5 groups) - SMALL
ROOM Contribution £3.30 £3.45 £3.60 £3.80 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 4 user (eg Pre 5 groups) - LARGE
ROOM Contribution £6.45 £6.75 £7.10 £7.45 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 5 user (eg Disabled org's) -
SMALL ROOM Contribution £3.25 £3.45 £3.60 £3.80 6.2% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 5 user (eg Disabled Org's) -
LARGE ROOM Contribution £6.40 £6.75 £7.10 £7.45 5.7% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Astro Pitch Youth Contribution £15.10 £15.85 £16.65 £17.50 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Astro Pitch Adult Contribution £22.70 £23.85 £25.05 £26.30 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Stores hire Chairs (per item charge) Contribution £1.20 £1.25 £1.30 £1.35 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hire of additional chair covers (STH Weddings) Contribution £2.90 £3.05 £3.20 £3.35 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Campsite Contribution £10.00 £11.00 £12.00 £13.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Events Fields Contribution £117.00 £123.00 £129.00 £135.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Campsite Field Contribution £70.00 £74.00 £78.00 £82.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Visitor Facility Block - Full Day Contribution £79.00 £83.00 £87.00 £91.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Visitor Facility Block - Half Day Contribution £39.50 £41.50 £43.50 £45.50 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Portacabin Toilets Contribution £20.00 £21.00 £22.00 £23.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Ranger Service - All Other Groups Contribution £32.00 £34.00 £36.00 £38.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Racquet Hall - NAC Group / School Contribution £14.70 £15.50 £16.50 £17.50 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Racquet Hall - Non Commercial Contribution £26.60 £28.00 £29.50 £31.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Racquet Hall - Commercial Contribution £45.50 £48.00 £50.50 £53.00 5.0% 5.0% 5.0%
Communities & Housing Planning Services Allan Finlayson Planning Search  fees Contribution £106.05 £111.35 £116.92 £122.77 5.0% 5.0% 5.0%
Communities & Housing Planning Services Allan Finlayson Section 50 Certificates Contribution £131.25 £137.81 £144.70 £151.94 5.0% 5.0% 5.0%
Communities & Housing Planning Services Allan Finlayson Press Adverts Arran Contribution £76.67 £80.50 £84.53 £88.76 5.0% 5.0% 5.0%
Communities & Housing Planning Services Allan Finlayson Press Adverts Mainland Contribution £169.17 £177.63 £186.51 £195.84 5.0% 5.0% 5.0%
Place Economic Growth
(Transportation) Claire Fitzsimmons Construction Consent Amendments Contribution £383.25 £402.41 £422.53 £443.66 5.0% 5.0% 5.0%
Place Economic Growth
(Transportation) Claire Fitzsimmons Supply of Traffic Count data Contribution £210.89 £221.43 £232.50 £244.13 5.0% 5.0% 5.0%
Communities & Housing Heritage Lesley Forsyth Genealogy research hourly charge. Any additional costs incurred as a result of the work e.g
Scotland People Vouchers, printing etc to be charged at cost Contribution £20.00 £21.00 £22.00 £23.00 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Magnifying Sheets Contribution £2.10 £2.50 £2.50 £2.50 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Tea/Coffee Contribution £1.30 £1.50 £1.50 £1.50 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Street Plans Contribution £3.00 £3.00 £3.00 £3.00 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth DVD Lending Service - DVD's per Week hire Contribution £1.80 £2.00 £2.00 £2.00 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth DVD Lending Service - Day ones (New releases) 2 nights hire Contribution £2.10 £2.50 £2.50 £2.50 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Audio Charges - CD Contribution £0.30 £0.50 £0.50 £0.50 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Room Hire - Category 1 user (eg Commercial Activities) - SMALL ROOM Contribution £22.50 £23.65 £24.85 £26.10 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Room Hire - Category 2 user (eg Family Functions) - SMALL ROOM Contribution £13.30 £13.95 £14.65 £15.40 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Room Hire - Category 3 user (eg Agency Letting) - SMALL ROOM Contribution £7.35 £7.70 £8.10 £8.50 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Room Hire - Category 4 user (eg Pre 5 groups) - SMALL ROOM Contribution £3.30 £3.45 £3.60 £3.80 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Room Hire - Category 5 user (eg Disabled org's) - SMALL ROOM Contribution £3.25 £3.45 £3.60 £3.80 6.2% 5.0% 5.0%
Place Energy and Sustainablility Jennifer Wraith Electric Vehicle Charging Point - Destination/Kwh Contribution £0.19 £0.31 £0.33 £0.35 63.2% 5.0% 5.0%
Place Energy and Sustainablility Jennifer Wraith Electric Vehicle Charging Point - Journey/Kwh Contribution £0.30 £0.37 £0.39 £0.41 23.3% 5.0% 5.0%
Place Energy and Sustainablility Jennifer Wraith Overstay Flat Fee Contribution £10.00 £30.00 £32.00 £34.00 200.0% 5.0% 5.0%
Appendix 6
40

Page 41

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2023/24)
£
Proposed
Charge
(2024/25)
Indicative
Charge
(2025/26)
Indicative
Charge
(2026/27)
Basis of
increase
2024/25
%
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Note
Communities & Housing Protective Services
(Building Standards) Scott McKenzie Clearance Certificates Contribution £246.86 £259.20 £272.16 £285.77 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Building Standards) Scott McKenzie Searches Contribution £106.05 £111.35 £116.92 £122.77 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Building Standards) Scott McKenzie Section 50 Certificates Contribution £131.25 £137.81 £144.70 £151.94 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Building Standards) Scott McKenzie Section 89 Certificates Contribution £429.24 £450.70 £473.24 £496.90 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Bacteriological Swimming Pool Sampling Contribution £53.55 £56.23 £59.04 £61.99 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Legionelia Swimming Pool Sampling Contribution £99.75 £104.74 £109.98 £115.48 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Food Hygiene Training Delegate Charge Contribution £30.45 £31.97 £33.57 £35.25 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Chemical Swimming Pool Sampling Contribution £73.50 £77.18 £81.04 £85.09 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Support Attestation Contribution £100.00 £105.00 £110.25 £115.76 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Pest Control - Fumigations/Sprays for heavy infestations e.g. bedbugs, fleas includes survey
and revisit.  Contribution £80.90 £84.90 £89.10 £93.60 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Pest Control Charge - Insects (Domestic) Contribution £52.50 £55.10 £57.90 £60.80 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Pest Control Charge - Rats/Mice/Insects (Commercial) Contribution £80.90 £84.90 £89.10 £93.60 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Pest Control Charge - Rats/Mice/Squirrels (Domestic) includes up to 3 visits. Contribution £80.90 £84.90 £89.10 £93.60 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Pest Control Charge - Wasp Nests/Bees Contribution £52.50 £55.10 £57.90 £60.80 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Section 50 Certificates Contribution £131.25 £137.81 £144.70 £151.94 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Certificate of Compliance (not required as part of licence application) Contribution £105.00 £110.25 £115.76 £121.55 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Health Certificate for export to China Contribution £37.80 £39.69 £41.67 £43.75 5.0% 5.0% 5.0%
Communities & Housing Protective Services (Trading
Standards) Scott McKenzie Liquid fuel measuring instruments - first meter tested Contribution £166.95 £175.30 £184.07 £193.27 5.0% 5.0% 5.0%
Communities & Housing Protective Services (Trading
Standards) Scott McKenzie Liquid fuel measuring instruments
- each additional meter tested during same visit Contribution £102.90 £108.05 £113.45 £119.12 5.0% 5.0% 5.0%
Communities & Housing Protective Services (Trading
Standards) Scott McKenzie All other weighing and measuring equipment
- one officer on site (per hour) Contribution £90.30 £94.82 £99.56 £104.54 5.0% 5.0% 5.0%
Communities & Housing Protective Services (Trading
Standards) Scott McKenzie All other weighing and measuring equipment
- two or more officers on site (per hour) Contribution £144.90 £152.15 £159.76 £167.75 5.0% 5.0% 5.0%
Place Bereavement Service Wallace Turpie/ David
Mackay Interment of Eighteen and Over Contribution £846.00 £888.00 £932.00 £979.00 5.0% 5.0% 5.0%
Place Bereavement Service Wallace Turpie/ David
Mackay Purchase of Exclusive Right of Burial (New Lair) Contribution £902.00 £947.00 £994.00 £1,044.00 5.0% 5.0% 5.0%
Place Bereavement Service Wallace Turpie/ David
Mackay Purchase of Exclusive Right of Burial (Woodland Area) Contribution £902.00 £947.00 £994.00 £1,044.00 5.0% 5.0% 5.0%
Place Bereavement Service Wallace Turpie/ David
Mackay Interment of Cremated Remains (Aged 18 and over) Contribution £239.00 £251.00 £264.00 £277.00 5.0% 5.0% 5.0%
Place Bereavement Service Wallace Turpie/ David
Mackay Memorial Foundation Contribution £185.00 £194.00 £204.00 £214.00 5.0% 5.0% 5.0%
Place Bereavement Service Wallace Turpie/ David
Mackay Dis-interments Contribution £1,019.00 £1,070.00 £1,124.00 £1,180.00 5.0% 5.0% 5.0%
Place Bereavement Service Wallace Turpie/ David
Mackay Interment in common ground Contribution £265.00 £278.00 £292.00 £307.00 5.0% 5.0% 5.0%
Place Bereavement Service Wallace Turpie/ David
Mackay Purchase of Exclusive Right of Burial - Cremated Remains Only (New Lair) Contribution £495.00 £520.00 £546.00 £573.00 5.0% 5.0% 5.0%
Place Bereavement Service Wallace Turpie/ David
Mackay
Purchase of Exclusive Right of Burial - Cremated Remains Only in Garden of Remembrance
(New Lair) Contribution £495.00 £520.00 £546.00 £573.00 5.0% 5.0% 5.0%
Place Bereavement Service Wallace Turpie/ David
Mackay Interment of Eighteen and Over (Saturdays and Public Holidays) Contribution £1,269.00 £1,332.00 £1,399.00 £1,469.00 5.0% 5.0% 5.0%
Place Bereavement Service Wallace Turpie/ David
Mackay Transfer of Title Deeds/Duplicate Title Deeds Contribution £22.00 £23.00 £24.00 £25.00 5.0% 5.0% 5.0%
Place Bereavement Service Wallace Turpie/ David
Mackay Memorial permit Contribution £46.00 £48.00 £50.00 £53.00 5.0% 5.0% 5.0%
School Meals FM Carolyn Hope Secondary School meals Contribution £2.05 £2.05 £2.05 £2.05 0.0% 0.0% 0.0%
School Meals FM Carolyn Hope Primary School meals Contribution £2.05 £2.05 £2.05 £2.05 0.0% 0.0% 0.0%
Place Largs Car Park Wallace Turpie/ David
Mackay Car park Charges - up to 1 hour Largs Car Park £0.83 £0.83 £0.83 £0.83 0.0% 0.0% 0.0%
Place Largs Car Park Wallace Turpie/ David
Mackay Car park Charges - over 1 hour up to 3 hours Largs Car Park £2.50 £2.50 £2.50 £2.50 0.0% 0.0% 0.0%
Place Largs Car Park Wallace Turpie/ David
Mackay Car park Charges - over 3 hours Largs Car Park £4.17 £4.17 £4.17 £4.17 0.0% 0.0% 0.0%
Place Largs Car Park Wallace Turpie/ David
Mackay Gallowgate Public Toilets Charge Largs Car Park £0.33 £0.33 £0.33 £0.33 0.0% 0.0% 0.0%
Place Streetscene Services Wallace Turpie/ David
Mackay Abandoned Trolley Charge Contribution £33.00 £35.00 £37.00 £39.00 5.0% 5.0% 5.0%
Place Streetscene Services Wallace Turpie/ David
Mackay Grass Cutting Scheme Contribution £74.00 £78.00 £82.00 £86.00 5.0% 5.0% 5.0%
Place Streetscene Services Wallace Turpie/ David
Mackay Fly posting removal - varies by poster size. Minimum charge of £30 per poster Contribution £30.00 £32.00 £34.00 £36.00 5.0% 5.0% 5.0%
Appendix 6
41

Page 42

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2023/24)
£
Proposed
Charge
(2024/25)
Indicative
Charge
(2025/26)
Indicative
Charge
(2026/27)
Basis of
increase
2024/25
%
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Note
Place Streetscene Services Wallace Turpie/ David
Mackay Dog Fouling clean up charge Contribution £30.00 £32.00 £34.00 £36.00 5.0% 5.0% 5.0%
Place Streetscene Services Wallace Turpie/ David
Mackay Fly tipping clean up charges - varies by quantity. Minimum charge of £114.06 Contribution £114.06 £120.00 £126.00 £132.00 5.0% 5.0% 5.0%
Place Streetscene Services Wallace Turpie/ David
Mackay Landfill charge per tonne Contribution £140.00 £147.00 £154.00 £162.00 5.0% 5.0% 5.0%
Place Streetscene Services Wallace Turpie/ David
Mackay Mis-use of public bin. Minimum service charge of £114.06 Contribution £114.06 £120.00 £126.00 £132.00 5.0% 5.0% 5.0%
Place Streetscene Services Wallace Turpie/ David
Mackay Disposal of Waste within Caravans per tonne Contribution £140.00 £147.00 £154.00 £162.00 5.0% 5.0% 5.0%
Place Transport Services Gordon Mitchell Tachograph Calibration Contribution £60.90 £63.95 £67.15 £70.51 5.0% 5.0% 5.0%
Place Transport Services Gordon Mitchell Tachograph 2 year Inspection Contribution £42.00 £44.10 £46.31 £48.63 5.0% 5.0% 5.0%
Place Transport Services Gordon Mitchell Tachograph 6 year Inspection Contribution £60.90 £63.95 £67.15 £70.51 5.0% 5.0% 5.0%
Place Transport Services Gordon Mitchell CPC Training Contribution £70.00 £73.50 £77.18 £81.04 5.0% 5.0% 5.0%
Place Transport Services Gordon Mitchell Per hire charge for transport hires to external groups. Contribution £24.15 £25.36 £26.63 £27.96 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Section 56 Roads Opening Permit Vehicle Access Crossing Contribution £78.00 £82.00 £86.00 £90.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Section 56 Road Opening Permit Other works involving excavation in the public road Contribution £218.00 £229.00 £240.00 £252.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Section 56 Road Opening Permit Other works involving excavation in the public road.  Duration
charge for additional week. Contribution £103.00 £108.00 £113.00 £119.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Section 58 Road Occupation Permits Builders Materials - for up to 4 weeks Contribution £90.00 £95.00 £100.00 £105.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Section 58 Road Occupation Permits Cranes - for up to 4 weeks Contribution £90.00 £95.00 £100.00 £105.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Section 58 Road Occupation Permits Scaffolding - for up to 4 weeks Contribution £90.00 £95.00 £100.00 £105.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Section 85 Skip Permits - for up to 4 weeks Contribution £54.00 £57.00 £60.00 £63.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Temporary Traffic Signal Permit (three way or more only).  This would be in addition to Section
56 charge. Contribution £128.00 £134.00 £141.00 £148.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Temporary Traffic Signal Permit (three way or more only).  This would be in addition to Section
56 charge.  Duration charge for additional week. Contribution £128.00 £134.00 £141.00 £148.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Property Enquiry Adoption Plan Contribution £39.00 £41.00 £43.00 £45.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen NRSWA Section 109 Permission Contribution £333.00 £350.00 £368.00 £386.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen 5 day Temporary Traffic Order (by notice) Contribution £447.00 £469.00 £492.00 £517.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Emergency Temporary Traffic Order (by notice) Contribution £447.00 £469.00 £492.00 £517.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Temporary Traffic Orders (advertised in press).  Advertising costs are extra. Contribution £691.00 £726.00 £762.00 £800.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Supply of Traffic Count Data.  Price per site. Contribution £218.00 £229.00 £240.00 £252.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Supply / Use of information from the Saturn and ParamicsTraffic Models Contribution £1,407.00 £1,477.00 £1,551.00 £1,629.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Neighbourhood Watch Signs Contribution £39.00 £41.00 £43.00 £45.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Switching off Traffic Signals for third parties Contribution £154.00 £162.00 £170.00 £179.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Temporary signs for events. Contribution £103.00 £108.00 £113.00 £119.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Signs for new Housing Developments Contribution £397.00 £417.00 £438.00 £460.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen H Bar Markings (Access protection markings) Contribution £64.00 £67.00 £70.00 £74.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Amenity display licence Contribution £29.00 £30.00 £32.00 £34.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Car Park Charges (Bellmans Close) - Up to 60 minutes Contribution £1.25 £1.25 £1.25 £1.25 0.0% 0.0% 0.0%
Place Roads Susan Macfadyen Car Park Charges (Bellmans Close) - Up to 120 minutes Contribution £1.67 £1.67 £1.67 £1.67 0.0% 0.0% 0.0%
Place Roads Susan Macfadyen Car Park Charges (Bellmans Close) - Up to 240 minutes Contribution £2.92 £2.92 £2.92 £2.92 0.0% 0.0% 0.0%
Place Roads Susan Macfadyen Penalty Charge Notice Contribution £100.00 £100.00 £100.00 £100.00 0.0% 0.0% 0.0%
Place Roads Susan Macfadyen Penalty Charge Notice if paid within 14 days Contribution £50.00 £50.00 £50.00 £50.00 0.0% 0.0% 0.0%
Place Roads Susan Macfadyen Charge certificate served and where PCN remains unpaid after day 56 Contribution £150.00 £150.00 £150.00 £150.00 0.0% 0.0% 0.0%
Place Waste Resources David Mackay Collection and Disposal of Commercial White Goods per item Contribution £157.63 £165.51 £173.79 £182.48 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Bin Repair - standard lock supply & fitting Contribution £23.85 £25.04 £26.29 £27.60 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Bin Repair - new forest lock lock supply & fitting Contribution £34.65 £36.38 £38.20 £40.11 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Bin Repair - push to lock supply & fitting Contribution £48.13 £50.54 £53.07 £55.72 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Bin Repair - lid supplied & lock fixed cost Contribution £148.42 £155.84 £163.63 £171.81 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Bin Repair - Push to lock lid and lock supply & fitting Contribution £172.70 £181.34 £190.41 £199.93 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Bin Repair - one front wheel supplied and fitted cost Contribution £77.55 £81.43 £85.50 £89.78 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Bin Repair - one back wheel supplied and fitted cost Contribution £84.00 £88.20 £92.61 £97.24 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Special Uplift Charges Contribution £26.46 £27.78 £29.17 £30.63 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Special Uplift individual item Charges Contribution £5.29 £5.55 £5.83 £6.12 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste Service 240 Litre Bin Contribution £6.10 £6.41 £6.73 £7.07 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste Service 360 Litre Bin Contribution £9.16 £9.62 £10.10 £10.61 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste Service 660 Litre Bin Contribution £16.77 £17.61 £18.49 £19.41 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste Service 1100 Litre Bin Contribution £27.97 £29.37 £30.84 £32.38 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste Service 1280 Litre Bin Contribution £32.62 £34.25 £35.96 £37.76 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 240 Litre bin Contribution £6.58 £6.91 £7.26 £7.62 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 360 Litre bin Contribution £9.88 £10.37 £10.89 £11.43 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 660 Litre bin Contribution £18.09 £18.99 £19.94 £20.94 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 1100 Litre bin Contribution £30.19 £31.70 £33.29 £34.95 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 1280 Litre bin Contribution £35.22 £36.98 £38.83 £40.77 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Food/Organic 140 Litre Bin Contribution £5.10 £5.36 £5.63 £5.91 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Garden Waste 240 Litre Bin Contribution £8.75 £9.19 £9.65 £10.13 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Food/Organic 500 Litre Bin Contribution £18.25 £19.16 £20.12 £21.13 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 240 Litre bin Contribution £5.09 £5.34 £5.61 £5.89 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 140 Litre bin Contribution £1.91 £2.01 £2.11 £2.22 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Subcontractor Commercial Refuse Scheduled Bin Uplift Food/Organic 140 Litre Bin Contribution £6.48 £6.80 £7.14 £7.50 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Subcontractor Commercial Refuse Scheduled Bin Uplift Garden Waste 240 Litre Bin Contribution £11.11 £11.67 £12.25 £12.86 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Subcontractor Commercial Refuse Scheduled Bin Uplift Food/Organic 500 Litre Bin Contribution £23.11 £24.27 £25.48 £26.75 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service 240 Litre Bin Contribution £3.06 £3.21 £3.37 £3.54 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service 360 Litre Bin Contribution £4.59 £4.82 £5.06 £5.31 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service 660 Litre Bin Contribution £8.39 £8.81 £9.25 £9.71 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service 1100 Litre Bin Contribution £13.98 £14.68 £15.41 £16.18 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service 1280 Litre Bin Contribution £16.31 £17.13 £17.99 £18.89 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 140 Litre Bin Contribution £1.38 £1.45 £1.52 £1.60 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 240 Litre Bin Contribution £2.36 £2.48 £2.60 £2.73 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 360 Litre Bin Contribution £3.53 £3.71 £3.90 £4.10 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 660 Litre Bin Contribution £6.49 £6.81 £7.15 £7.51 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 1100 Litre Bin Contribution £10.80 £11.34 £11.91 £12.51 5.0% 5.0% 5.0%
Appendix 6
42

Page 43

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2023/24)
£
Proposed
Charge
(2024/25)
Indicative
Charge
(2025/26)
Indicative
Charge
(2026/27)
Basis of
increase
2024/25
%
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Note
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 1280 Litre Bin Contribution £12.56 £13.19 £13.85 £14.54 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Food/Organic 140 Litre Bin Contribution £2.56 £2.69 £2.82 £2.96 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Garden Waste 240 Litre Bin Contribution £4.39 £4.61 £4.84 £5.08 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Food/Organic 500 Litre Bin Contribution £9.11 £9.57 £10.05 £10.55 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate Service 140 Litre Bin Contribution £2.74 £2.88 £3.02 £3.17 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate Service 240 Litre Bin Contribution £4.70 £4.94 £5.19 £5.45 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate Service  360 Litre Bin Contribution £7.08 £7.43 £7.80 £8.19 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate Service  660 Litre Bin Contribution £12.96 £13.61 £14.29 £15.00 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate Service  1100 Litre Bin Contribution £21.60 £22.68 £23.81 £25.00 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate Service  1280 Litre Bin Contribution £25.13 £26.39 £27.71 £29.10 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 140 Litre bin Contribution £3.86 £4.05 £4.25 £4.46 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service 140 Litre Bin Contribution £1.77 £1.86 £1.95 £2.05 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Charity Residual Waste 140 Litre bin Contribution £1.93 £2.03 £2.13 £2.24 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Subcontractor Charity Commercial Collection Garden Waste 240 Litre bin Contribution £5.57 £5.85 £6.14 £6.45 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste Service 140 Litre Bin Contribution £3.56 £3.74 £3.93 £4.13 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub contract Sack Sales Pre-Paid - Trade Recycling per 100 Contribution £140.86 £147.90 £155.30 £163.07 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub contract Sack Sales Pre-Paid - Trade Waste per 50 Contribution £139.71 £146.70 £154.04 £161.74 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Charity Residual Waste 240 Litre bin Contribution £3.30 £3.47 £3.64 £3.82 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Charity Residual Waste 360 Litre bin Contribution £4.94 £5.19 £5.45 £5.72 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Charity Residual Waste 660 Litre bin Contribution £9.05 £9.50 £9.98 £10.48 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Residual Waste 1100 Litre bin Contribution £15.09 £15.84 £16.63 £17.46 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Residual Waste 1280 Litre bin Contribution £17.61 £18.49 £19.41 £20.38 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 240 Litre bin Contribution £2.56 £2.69 £2.82 £2.96 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 360 Litre bin Contribution £3.82 £4.01 £4.21 £4.42 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 660 Litre bin Contribution £6.99 £7.34 £7.71 £8.10 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 1100 Litre bin Contribution £11.66 £12.24 £12.85 £13.49 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 1280 Litre bin Contribution £13.57 £14.25 £14.96 £15.71 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Food/Organic Waste 140 Litre bin Contribution £3.24 £3.40 £3.57 £3.75 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Food/Organic Waste 500 Litre bin Contribution £11.55 £12.13 £12.74 £13.38 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 140 Litre bin Contribution £3.06 £3.21 £3.37 £3.54 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 240 Litre bin Contribution £5.09 £5.34 £5.61 £5.89 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 360 Litre bin Contribution £7.63 £8.01 £8.41 £8.83 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 660 Litre bin Contribution £13.98 £14.68 £15.41 £16.18 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 1100 Litre bin Contribution £23.32 £24.49 £25.71 £27.00 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 1280 Litre bin Contribution £27.10 £28.46 £29.88 £31.37 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Event container delivery & uplift Contribution £72.93 £76.58 £80.41 £84.43 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Contamination charge - 140/240/360 ltr bins Contribution £18.24 £19.15 £20.11 £21.12 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Contamination charge - 500/660/1100/1280 ltr bins Contribution £42.55 £44.68 £46.91 £49.26 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Container retrieval - 140/240/360 ltr bins Contribution £18.24 £19.15 £20.11 £21.12 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Container retrieval - 500/660/1100/1280 ltr bins Contribution £42.55 £44.68 £46.91 £49.26 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Arran Yellow Tip Permit Contribution £61.61 £64.69 £67.92 £71.32 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Arran Blue Tip Permit Contribution £102.60 £107.73 £113.12 £118.78 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Green - Treatment per Te Contribution £60.78 £63.82 £67.01 £70.36 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Soil - Treatment per Te Contribution £36.47 £38.29 £40.20 £42.21 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Scrap - Treatment per Te Contribution £36.47 £38.29 £40.20 £42.21 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Paper & Cardboard - Treatment per Te Contribution £36.47 £38.29 £40.20 £42.21 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Wood - Treatment per Te Contribution £36.47 £38.29 £40.20 £42.21 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Plastics - Treatment per Te Contribution £60.78 £63.82 £67.01 £70.36 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Bricks/rubble - Treatment per Te Contribution £36.47 £38.29 £40.20 £42.21 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Lampheads - Treatment per Te Contribution £36.47 £38.29 £40.20 £42.21 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Skip Charges 20cyd - no treatment Contribution £116.23 £122.04 £128.14 £134.55 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Skip Charges 35cyd - no treatment Contribution £207.87 £218.26 £229.17 £240.63 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Special Uplift - disposal - 1/4te Contribution £39.27 £41.23 £43.29 £45.45 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Special Uplift - disposal - 1/2te Contribution £78.53 £82.46 £86.58 £90.91 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Special Uplift - disposal - Te Contribution £157.06 £164.91 £173.16 £181.82 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Void Uplift bin charge (Up to full set) Contribution £52.74 £55.38 £58.15 £61.06 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Special Uplift Squad - 30 min Contribution £52.74 £55.38 £58.15 £61.06 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Special Uplift Squad - 60 min Contribution £105.47 £110.74 £116.28 £122.09 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Special uplift - Confidential waste per bag Contribution £6.53 £6.86 £7.20 £7.56 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Direct disposal and treatment EFW per Te Contribution £157.06 £164.91 £173.16 £181.82 5.0% 5.0% 5.0%
Appendix 6
43

Page 44

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2023/24)
£
Proposed
Charge
(2024/25)
Indicative
Charge
(2025/26)
Indicative
Charge
(2026/27)
Basis of
increase
2024/25
%
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Note
COST PLUS FEES & CHARGES
Communities & Housing Libraries Lesley Forsyth Lost and Damaged Audio, based on actual costs Cost plus £0.00 £0.00 £0.00 £0.00 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Book Sales (NAC Stock), based on actual costs Cost plus £0.00 £0.00 £0.00 £0.00 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Black and White Photocopying/Printing A4 or A3  single-sided Cost plus £0.10 £0.10 £0.10 £0.10 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Black and White Photocopying/Printing A4 or A3 double-sided Cost plus £0.20 £0.20 £0.20 £0.20 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Colour Photocopying/Printing A4 or A3 single-sided Cost plus £0.40 £0.40 £0.40 £0.40 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Colour Photocopying/Printing A4 or A3 double-sided Cost plus £0.80 £0.80 £0.80 £0.80 5.0% 5.0% 5.0%
Place Waste Resources David Mackay New/Replacement Waste Container 360 Litre Cost plus £78.76 £82.70 £86.84 £91.18 5.0% 5.0% 5.0%
Place Waste Resources David Mackay New/Replacement Waste Container 1100 Litre Cost plus £429.91 £451.41 £473.98 £497.68 5.0% 5.0% 5.0%
Place Waste Resources David Mackay New/Replacement Waste Container Lid on Lid 1100 Litre Cost plus £492.77 £492.77 £517.41 £543.28 0.0% 5.0% 5.0%
Place Waste Resources David Mackay New/Replacement Waste Container 1280 Litre Cost plus £500.23 £525.24 £551.50 £579.08 5.0% 5.0% 5.0%
Place Waste Resources David Mackay New/Replacement Waste Container Lid on Lid 1280 Litre Cost plus £566.60 £566.60 £594.93 £624.68 0.0% 5.0% 5.0%
Place Waste Resources David Mackay New/Replacement Waste Container 240 Litre Cost plus £47.78 £50.17 £52.68 £55.31 5.0% 5.0% 5.0%
Place Waste Resources David Mackay New/Replacement Waste Container 140 Litre Cost plus £32.82 £34.46 £36.18 £37.99 5.0% 5.0% 5.0%
Place Waste Resources David Mackay New/Replacement Waste Container 660 Litre Cost plus £359.44 £377.41 £396.28 £416.09 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sack Sales Pre-Paid - Trade Recycling per 100 Cost plus £131.94 £138.54 £145.47 £152.74 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sack Sales Pre-Paid - Trade Waste per 50 Cost plus £127.88 £134.27 £140.98 £148.03 5.0% 5.0% 5.0%
Appendix 6
44

Page 45

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2023/24)
£
Proposed
Charge
(2024/25)
Indicative
Charge
(2025/26)
Indicative
Charge
(2026/27)
Basis of
increase
2024/25
%
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Note
NATIONALLY SET FEES & CHARGES
Chief Executives Legal - Licensing Raymond Lynch Landlord Registration - Principal Nationally Set £75.00 £75.00 £75.00 £75.00 0.0% 0.0% 0.0%
Chief Executives Legal - Licensing Raymond Lynch Landlord Registration - Property Nationally Set £17.00 £17.00 £17.00 £17.00 0.0% 0.0% 0.0%
Chief Executives Legal - Licensing Raymond Lynch Landlord Registration - Late Application Nationally Set £149.00 £149.00 £149.00 £149.00 0.0% 0.0% 0.0%
Health & Social Care Adults and Older People Eleanor Currie Blue Badge (charge for a three year period) Nationally Set £20.00 £20.00 £20.00 £20.00 0.0% 0.0% 0.0%
Communities & Housing Planning Services Allan Finlayson Planning Application fees - Operations eg Construction of buildings - planning permission in
principle Nationally Set £600.00 £600.00 £600.00 £600.00 0.0% 0.0% 0.0%
Communities & Housing Planning Services Allan Finlayson Planning Application fees - Operations eg The erection of buildings - planning permission in
principle Nationally Set £600.00 £600.00 £600.00 £600.00 0.0% 0.0% 0.0%
Communities & Housing Planning Services Allan Finlayson Planning Application fees - Operations eg The erection of buildings  - where the area of gross
floor space to be created does not exceed 40 sq metres Nationally Set £300.00 £300.00 £300.00 £300.00 0.0% 0.0% 0.0%
Communities & Housing Planning Services Allan Finlayson Planning Application fees - Uses of Land eg The change of use of a building Nationally Set £600.00 £600.00 £600.00 £600.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Building Standards) Scott McKenzie
Building Warrant Application Fees, set by BSD, please refer to fees section in link below for full
list of charges:
https://www.north-ayrshire.gov.uk/planning-and-building-standards/building-standards/building-
warrants.aspx
Nationally Set various various various various 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges up to 1,000 tonnes Nationally Set £125.00 £125.00 £125.00 £125.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges 1,001 to 3,000 tonnes Nationally Set £170.00 £170.00 £170.00 £170.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges 3,001 to 10,000 tonnes Nationally Set £250.00 £250.00 £250.00 £250.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges 10,001 to 20,000 tonnes Nationally Set £325.00 £325.00 £325.00 £325.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges 20,001 to 30,000 tonnes Nationally Set £415.00 £415.00 £415.00 £415.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges over 30,000 tonnes Nationally Set £480.00 £480.00 £480.00 £480.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges extensions Nationally Set £95.00 £95.00 £95.00 £95.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges for vessels with the capacity to carry between 50 and 1,000 persons Nationally Set £480.00 £480.00 £480.00 £480.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges for vessels with the capacity to carry more than 1,000 persons Nationally Set £820.00 £820.00 £820.00 £820.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Private water supplies - regulated supplies annual sampling and risk assessment Nationally Set £261.00 £261.00 £261.00 £261.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Private water supplies - non regulated supplies Nationally Set £118.00 £118.00 £118.00 £118.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Stray dog fee Nationally Set £25.00 £25.00 £25.00 £25.00 0.0% 0.0% 0.0%
Place Streetscene Services Wallace Turpie/ David
Mackay Fly Tipping fine Nationally Set £200.00 £200.00 £200.00 £200.00 0.0% 0.0% 0.0%
Place Streetscene Services Wallace Turpie/ David
Mackay Littering / Fly Posting fine Nationally Set £80.00 £80.00 £80.00 £80.00 0.0% 0.0% 0.0%
Place Streetscene Services Wallace Turpie/ David
Mackay Dog Fouling fine Nationally Set £80.00 £80.00 £80.00 £80.00 0.0% 0.0% 0.0%
Place Streetscene Services Wallace Turpie/ David
Mackay Abandoned vehicles minimum charge Nationally Set £150.00 £150.00 £150.00 £150.00 0.0% 0.0% 0.0%
Place Streetscene Services Wallace Turpie/ David
Mackay Storage of vehicles until dismantled. Daily charge Nationally Set £20.00 £20.00 £20.00 £20.00 0.0% 0.0% 0.0%
Place Streetscene Services Wallace Turpie/ David
Mackay Abandoned caravans / trailers minimum charge Nationally Set £500.00 £500.00 £500.00 £500.00 0.0% 0.0% 0.0%
Place Transport Services Gordon Mitchell MOT Class 4 Nationally Set £54.85 £54.85 £54.85 £54.85 0.0% 0.0% 0.0%
Place Transport Services Gordon Mitchell MOT Class 5 Nationally Set £59.55 £59.55 £59.55 £59.55 0.0% 0.0% 0.0%
Place Transport Services Gordon Mitchell MOT Class 7 Nationally Set £58.60 £58.60 £58.60 £58.60 0.0% 0.0% 0.0%
Place Roads Susan Macfadyen NRSWA Public Utility Sample Inspections Nationally Set £36.00 £36.00 £36.00 £36.00 0.0% 0.0% 0.0%
Appendix 6
45

Page 46

Appendix 7
Employee Costs Property Costs
Supplies &
Services
Transport &
Plant Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Costs Income TOTAL
Directorate £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Chief Executives 17,539 68 2,950 23 1,363 1,873 853 0 0 (4,456) 20,212
Communities & Housing 25,600 2,890 6,482 690 282 10,375 0 104 0 (31,546) 14,877
Education 142,026 1,108 25,318 99 168 7,861 580 0 71 (4,487) 172,745
Place 29,087 21,208 3,739 7,032 556 11,762 0 78 0 (19,749) 53,712
Other Corporate Items 1,895 355 10,793 302 2,202 4,859 34,074 556 (80) (13,735) 41,223
Total Expenditure 216,147 25,629 49,283 8,146 4,571 36,730 35,507 739 (9) (73,973) 302,769
Health & Social Care Partnership 124,499
Revised Total Expenditure 216,147 25,629 49,283 8,146 4,571 36,730 35,507 739 (9) (73,973) 427,268
Funded by:
AEF 0 0 0 0 0 0 2,803 0 0 (359,390) (356,587)
Council Tax 0 0 0 0 0 0 14,006 0 0 (79,688) (65,681)
Contribution from Reserves 0 0 0 0 0 0 0 0 0 (5,000) (5,000)
Total Funding 0 0 0 0 0 0 16,809 0 0 (444,078) (427,268)
Subjective Analysis
North Ayrshire Council General Services Revenue Budget 2024-25
Summary by Directorate
46

Page 47

Appendix 7
Employee Costs Property Costs
Supplies &
Services Transport Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Income TOTAL
Objective Analysis £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Chief Executive's Office 208 0 1 1 5 0 0 0 0 (56) 159
Change Programme 8 0 0 0 0 0 0 0 0 0 8
Audit,Fraud,Safety & Insurance 902 61 31 5 19 7 0 0 0 (306) 719
Corporate Procurement 1,037 0 11 1 8 107 0 0 0 (158) 1,006
Financial Services 1,478 0 165 1 29 2 0 0 0 (173) 1,500
Revenues 547 0 55 1 169 0 0 0 0 (1,359) (587)
Employee Services 849 0 68 0 7 4 0 0 0 (38) 890
HR & OD 711 0 21 0 26 413 0 0 0 (56) 1,115
ICT 3,293 0 2,128 5 11 0 0 0 0 (239) 5,197
Business Support 1,383 0 6 0 2 0 0 0 0 (135) 1,256
Customer Services 2,825 0 247 2 48 1,093 853 0 0 (955) 4,112
Transformation Services 694 0 11 0 1 38 0 0 0 0 743
Legal & Licensing 1,212 0 32 5 38 0 0 0 0 (753) 534
Policy,Performance & Elections 581 0 20 1 10 7 0 0 0 (20) 599
Communications 492 0 8 1 4 0 0 0 0 (7) 498
Civil Contingencies 0 0 0 0 0 60 0 0 0 0 60
Committee Services 466 6 114 0 7 55 0 0 0 (125) 524
Member Services 300 0 31 0 975 88 0 0 0 (55) 1,340
Information Governance 553 0 2 0 4 0 0 0 0 (21) 538
Total 17,539 68 2,950 23 1,363 1,873 853 0 0 (4,456) 20,212
Subjective Analysis
North Ayrshire Council General Services Revenue Budget 2024-25
Chief Executives
47

Page 48

Appendix 7
Employee Costs Property Costs
Supplies &
Services Transport Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Income TOTAL
Objective Analysis £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Connected Communities 6,441 264 712 25 77 5,362 0 0 0 (635) 12,245
Planning Services 824 0 101 4 21 30 0 0 0 (610) 370
Protective Services 2,861 112 102 21 16 148 0 0 0 (1,352) 1,908
Building Services 10,083 117 5,345 579 14 2,833 0 0 0 (21,515) (2,543)
Property Governance 964 3 38 4 103 25 0 0 0 (1,142) (7)
Other Housing 3,916 2,395 184 44 51 1,971 0 104 0 (5,762) 2,903
Works Scoping & Assurance 510 0 1 13 1 5 0 0 0 (530) (0)
Total 25,600 2,890 6,482 690 282 10,375 0 104 0 (31,546) 14,877
Subjective Analysis
North Ayrshire Council General Services Revenue Budget 2024-25
Communities & Housing
48

Page 49

Employee Costs Property Costs
Supplies &
Services Transport Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Income TOTAL
Objective Analysis £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Early Years Education 15,769 9 217 4 36 4,495 0 0 0 0 20,529
Primary Education 42,464 0 2,443 9 0 77 0 0 0 (55) 44,938
Secondary Education 44,785 0 15,715 8 0 0 0 0 0 (3) 60,505
Additional Support Needs 17,893 0 60 46 23 2,004 0 0 0 (267) 19,759
Education - Other 2,785 156 395 10 86 1,274 580 0 71 (1,264) 4,093
Pupil Equity Fund 4,172 0 0 0 0 0 0 0 0 0 4,172
Facilities Management 14,160 943 6,489 21 23 10 0 0 0 (2,898) 18,749
Total 142,026 1,108 25,318 99 168 7,861 580 0 71 (4,487) 172,745
North Ayrshire Council General Services Revenue Budget 2024-25
Education
Subjective Analysis
49

Page 50

Appendix 7
Employee Costs Property Costs
Supplies &
Services Transport Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Income TOTAL
Objective Analysis £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Directorate & Support 221 0 2 0 7 0 0 0 0 (23) 207
Roads 4,834 28 2,290 31 79 977 0 0 0 (1,305) 6,933
Streetscene 7,627 160 381 197 21 168 0 0 0 (3,133) 5,420
Waste Resources 5,732 20 669 214 66 6,788 0 78 0 (4,413) 9,155
Economic Development 3,315 36 48 19 24 904 0 0 0 (320) 4,027
Growth & Investment 144 0 5 1 4 103 0 0 0 0 258
Property Management & Investment 4,730 13,362 216 52 338 81 0 0 0 (8,863) 9,916
Energy & Sustainability 447 7,574 4 1 6 218 0 0 0 (935) 7,314
Internal Transport 2,037 28 123 6,518 11 2,521 0 0 0 (757) 10,482
Total 29,087 21,208 3,739 7,032 556 11,762 0 78 0 (19,749) 53,712
Subjective Analysis
North Ayrshire Council General Services Revenue Budget 2024-25
Place
50

Page 51

Appendix 7
Employee Costs Property Costs
Supplies &
Services Transport Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Income TOTAL
Objective Analysis £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Joint Boards 0 0 0 0 0 3,590 0 0 0 0 3,590
Pension Costs 1,895 0 0 0 0 0 0 0 0 0 1,895
Loan Charges & Capital Charges 0 0 0 0 0 0 0 0 (80) 22,809 22,729
Central Telephones 0 0 0 0 350 0 0 0 0 0 350
Other Corporate Items 0 0 10,793 0 1,588 0 0 356 0 0 12,737
Insurance 0 355 0 302 265 1,269 0 0 0 (2,191) 0
Housing Benefit 0 0 0 0 0 0 34,074 200 0 (34,353) (78)
Total 1,895 355 10,793 302 2,202 4,859 34,074 556 (80) (13,735) 41,223
Subjective Analysis
North Ayrshire Council General Services Revenue Budget 2024-25
Other Corporate Items
51

Page 52

52

Page 53

NORTH AYRSHIRE COUNCIL 
28 February 2024 
North Ayrshire Council 
Title:    Capital Investment Programme 2024/25 to 2033/34 
Purpose:  To advise Council on the draft Capital Investment Programme to
2033/34 
Recommendation:  That Council : 
(a)  approves the revised Capital Investment Programme to
2033/34 included in appendix 3;
(b)  notes that the programme will be reviewed on an on-going
basis with the next major review in 2026/27; and 
(c)  approves the refreshed Capital Investment Strategy included
in appendix 4. 
1. Executive Summary 
1.1 This report outlines the recommendations of the full review of the capital investment
programme which was undertaken during 2023/24. 
1.2 The review considered the current Capital Investment Programme and takes
cognisance of subsequent changes, including: 
• The ongoing impact of construction industry inflation, cost volatility and supply
chain issues across the overall Capital Investment Programme;
• Reductions in Scottish Government capital grants as detailed in the Local
Government Finance Settlement 2024/25;
• A review of spending profiles across key capital projects to support the Council’s
priorities; and  
• Revised levels of investment across projects, taking cognisance of Council
priorities, external funding sources and investing in core assets through asset
management plans. 
1.3 The review included an assessment of all funding sources over the 10 years of the
plan, including assumed levels of general capital grant, specific grants and a prudent
assessment of the level of capital receipts over the period. Total available funding has
been projected at £189.987m. The balance of funding required to deliver the capital
programme will be met through prudential borrowing and this is anticipated at
£216.472m. 
1.4 The proposed Capital Investment Programme, aligned to the Council Plan priorities, is
attached in Appendix 3 and will deliver a total programme of £406.459m to 2033/34.
Agenda Item 4
53

Page 54

1.5 Compliance with Regulations and the Prudential Code requires assurance to be
provided on affordability and sustainability of the Capital Investment programme, this
is provided in the Treasury Management and Investment Strategy (TMIS) which
follows this report on the Council agenda. The TMIS recognises that this will require to
be kept under review to ensure the underlying assumptions continue to apply. 
1.6 The longer-term affordability of the current and future Capital Investment Programmes
requires incremental increases the current General Fund financing budgets. A review
of available General Fund financing budgets has been undertaken, with significant
increases in revenue support recommended, as part of the General Services Revenue
Estimates 2024/25 to 2026/27, to support the delivery of the draft Capital Investment
Programme. 
1.7 In addition to the TMIS, there is a requirement for the Council to publish a Capital
Investment Strategy (CIS). As part of the review of the Capital Investment
Programme, a review of the previous CIS has also been undertaken and a draft
revised CIS is attached at Appendix 4. 
1.8 The capital programme will continue to be reviewed on an on-going basis by Cabinet
with any additional funding brought forward for approval as appropriate. Major reviews
will be undertaken on a 3-year basis, with the next due to be completed during
2026/27. 
2. Background 
Capital Investment Programme 2024/25 to 2033/34 
2.1 North Ayrshire Council approved the current Capital Investment Programme for the
period 2023/24 to 2030/31 on 1 March 2023. A comprehensive review of the
Programme was undertaken during 2023/24. This report contains the outcome of that
review. 
Review of Capital Funding 
Scottish Government General Capital Grant 
2.2 Local Government Finance Circular 8/2023 confirmed the level of General Capital
Grant as £8.628m for 2024/25. This comprises a core General Capital element of
£9.068m, which is a reduction of (£0.939m) from that previously anticipated, less a
(£0.440m) reduction linked to the re-phasing of the Flooding Projects. In addition, the
Scottish Government has indicated that North Ayrshire will receive an allocation of
£0.100m during 2024/25 to support Coastal Change Adaptation. Projected at the core
level of £9.068m to 2033/34, the total General Capital Grant for the period is forecast
as £90.780m.  
54

Page 55

Scottish Government Specific Capital Grants 
2.3 In addition to the General Capital Grant, the Council will receive two Specific Grants: 
• £0.963m to tackle Vacant and Derelict Land with projects requiring Scottish
Government approval; and
• £0.587m, to fund Cycling, Walking and Safer Streets (CWSS). 
The Vacant and Derelict Land funding is a reduction of (£0.543m) from that received
during 2023/24 and has only been confirmed for 2024/25. However, the CWSS
funding has been projected at current levels to 2033/34. 
2.4 A further Specific Grant allocation of £0.925m to support the Renewal of Play Parks
programme has been confirmed outwith the Local Government Finance Settlement for
the period 2024/25 to 2025/26. 
2.5 In addition, the programme includes previous Specific Grant allocations in relation to a
number of programmes which have been carried over into 2024/25 in line with revised
project plans, including: 
• £1.414m from the 2023/24 Vacant and Derelict Land allocation;
• £0.500m from the 2023/24 Islands Pit Stops; and
• £0.505m from the 2023/24 Place Based Investment Programme. 
2.6 As a result, the total forecast Specific Grant income to 2033/34 is £9.214m. 
Other Government Funding 
2.7 The programme includes funding from the Scottish and UK Governments to support
the Ayrshire Growth Deal. The total anticipated funding over the period is £57.265m.
This has been aligned to the latest programme planning information. 
2.8 The UK Government previously confirmed that North Ayrshire Council has been
awarded £23.693m from the Levelling Up Fund to support the upgrading of the B714
to improve connectivity between North Ayrshire and the wider motorway network.
£21.553m of this award is anticipated for receipt during financial years 2024/25 to
2025/26. 
2.9 During 2024-25 the UK Government confirmed total funding of £0.253m to support the
Digital SIP Great Harbour project. £0.128m of this is anticipated during 2024/25. 
Other Internal Funds 
2.10 The programme includes previously approved contributions from earmarked funds of
£3.299m to support the Solar PV project and £5.595m to support the B714 Upgrade.
However, these have been reduced by £4.000m to facilitate the transfer of the
General Capital Grant support for the 2023/24 pay settlement to Revenue. 
55

Page 56

Capital Receipts 
2.11 A review of projected income from capital receipts has been undertaken during
2023/24. This is forecast to realise income of £4.143m over the period of the
programme in relation to the sale of other Council owned assets. 
Other External Funding 
2.12 In relation to additional grant funding from other external bodies, given the level of
uncertainty around securing these funds, only those funds which have been
confirmed, but not yet drawn down, have been included at this time. These include: 
Funding Source £m Project
NAVT 0.800 Marine Tourism
NAVT 0.110 Repurposing Property Grant Fund
NAVT 0.101 Irvine Enterprise Area
Sustrans 0.036 AGD Great Harbour 
£1.047m 
Prudential Borrowing 
2.13 The difference between the Council's Capital Investment Programme and funding from
the above sources is met through prudential borrowing of £216.472m. The Capital
Investment Programme will be delivered within the approved loan charges revenue
budget, utilising the balances held in the Prudential Investment Fund and Capital Fund
to smooth the revenue implications of the borrowing costs associated with the revised
programme. 
Development of the Capital Investment Programme to 2033/34 
2.14 The approach to developing the draft Capital Investment Programme to 2033/34
included: 
• A full review of the current programme to 2030/31;
• Identification of opportunities to reprioritise uncommitted projects;
• Review of the phasing of projects from a delivery and affordability perspective;
• Options appraisal of new requirements within the context of Council priorities;
• Consideration of lifecycle investment to protect core assets. 
2.15  The current capital investment programme to 2030/31, as approved by Council on 1
March 2023, has been updated to reflect the changes to the Programme approved by
Cabinet during 2023/24, including any re-phasing of programmes to reflect updated
project plans. 
Re-Profiling 
2.16 A total of £33.336m of planned expenditure has been re-profiled from 2023/24 into
2024/25 to 2033/34 in line with updated project delivery timelines. Full details of
individual projects re-phased from 2023/24 have been reported to Cabinet throughout
the year. 
56

Page 57

2.17 In order to address the recommendations made within the Audit Scotland report on the
audit of the 2022/23 annual accounts, the phasing of expenditure within the draft
Capital Investment Programme has been reviewed to reflect historic expenditure
patterns and organisational capacity. This has resulted in the rephasing of
approximately 19% of the planned expenditure in both 2024/25 and 2025/26 for
delivery in later years, without impacting on the overall value of investment within the
programme. The actual levels of expenditure will be continually monitored and
reported to Cabinet throughout the life of the programme. 
Lifecycle Investment 
2.18 Informed by the asset management plans, an additional £31.542m has been included
in the Capital Investment Programme to ensure the Council continues to invest in its
core assets and infrastructure. Many of these programmes include recurring annual
investment which has been extended to include the period between the end of the
current Capital Programme and 2033/34.These include: 
• £11.400m for Roads investment to maintain a steady state road condition over the
next ten years;
• £6.000m for the Vehicle Renewal programme;
• £4.200m for Property Lifecycle Investment to enable high priority cyclical and
statutory investment to extend the life of the Council’s core assets, ensuring that
they remain fit for purpose and supporting delivery of core front line services;
• £3.612m for Schools ICT investment; 
• £3.000m for Street Lighting replacement reflecting the age and condition of the
lighting network;
• £1.680m for the Bridges infrastructure programme;
• £1.500m to support the Improvement Grants programme; and
• £0.150m for the Access Paths Network programme. 
Additional Investments linked to Revised Funding 
2.19 On 23 January 2024 Cabinet noted the provisional award of £37.4m for the Levelling
up for Ayrshire – Commercial and Low Carbon Infrastructure project under round 3 of
the UK Government’s Levelling Up Fund (LUF). The bid centred around commercial
estate development and associated low carbon infrastructure in Irvine and around
Prestwick airport. However, all funding is currently provisional pending completion of
the current validation and onboarding process. The Council requires to provide a
minimum of 10% match funding to support all LUF bids and a provision for £2.000m of
match funding has been included within the Capital Investment Programme. 
2.20 Local Government Finance Circular 8/2023 confirmed the level of Cycling, Walking
and Safer Streets specific grant for 2024/25 at £0.587m. Expenditure has been
projected at this level for the full period of the Capital Investment Programme,
resulting in additional investment of £1.768m to 2033/34. In addition, Vacant and
Derelict Land specific grant for 2024/25 has been confirmed at £0.963m and has been
reflected in additional investment at this level. 
57

Page 58

Additional / Revised Investments 
2.21 In support of the Council’s Sustainable North Ayrshire Strategy 2024-27, an additional
investment of £5.430m in the decarbonisation of the Council’s fleet is included. This
investment will support the Council’s Fleet Decarbonisation Route Map through the
replacement of fossil fuelled vehicles with electric vehicles and more environmentally
sustainable fleet solutions. 
2.22 On 29 August 2023 Cabinet approved an additional investment of £5.000m to support
the B714 Upgrade project. As previously noted, the UK Government confirmed an
award of £23.693m from the Levelling Up Fund to support the upgrading of the B714
to improve connectivity between North Ayrshire and the wider motorway network. 
Following a review of the costs involved in the delivery of the project, together with
appropriate value engineering, it was determined that an additional investment of
£5.000m was required. The UK Government confirmed that no additional funding was
being made available to support this project and Cabinet approved the additional
investment, supported by funding from the Investment and Recovery & Renewal
Funds, additional allocations from anticipated capital receipts not currently committed
and the proposed utilisation of existing resources from within the existing programme. 
2.23 Following completion of the initial tender process for Ardrossan North Shore, an
additional investment of £3.914m is included to reflect the additional tender costs
through inflationary related cost volatility and the requirement to maintain an
appropriate level of contingency funding within the project. 
2.24 An additional investment of £2.500m has been included to support the anticipated
outcomes of the ongoing locality-based property review. This review is developing
options around how the Council best utilises its property assets within a Best Value
context, taking account of the needs of our communities, staff workstyles and climate
impact. This investment provision will remain under review as the programme of work
develops through 2024/25. 
2.25 On 7 November 2023 Cabinet approved changes to the Home Ownership Made Easy
(HOME) project with the site being transferred to the HRA for the provision of social
housing. This has resulted in the withdrawal of investment from the current General
Services Capital Investment Programme, including a (£1.033m) reduction in planned
expenditure for 2024/25. 
2.26 Recent years have witnessed periods of significant volatility across the construction
industry linked to the ongoing legacy impacts of the Covid-19 pandemic, the influence
of national economic developments and international externalities arising from global
conflicts and their impacts on costs and supply chains. These volatilities have
manifested locally through increased borrowing costs, inflationary pressures, limited
availability of contractors, supply chain issues and material shortages which are
impacting on tender returns and the cost of materials. Where the resultant cost
pressures have been quantified, additional expenditure requirements have been
identified in relation to specific projects. However, unquantified risks have also been
identified, or are anticipated, across a number of other projects, including the Upper
Garnock Flood Protection Scheme, Moorpark Primary School and Ardrossan Harbour
Landside works. In order to support the management of these and other emerging
risks, it is proposed that the £10.000m investment within the Flexibility budget over the
next five years is maintained.
58

Page 59

2.27 The current approved Capital Investment Programme to 2030/31 is attached at
appendix 1. Full details of the proposed changes to the programme following the
review, as outlined above, are included in appendix 2. The revised Capital Investment
Programme covering the period from 2024/25 to 2033/34 is included in appendix 3.
This will deliver a total programme of investment of £406.459m. 
Future Affordability 
2.28 The Prudential Investment Fund was created as part of the 2015/16 budget strategy to
utilise short term underspends on General Fund financing budgets to offset longer
term pressures to support Prudential Borrowing arising from the Capital Investment
Programme. 
2.29 Due to the significant investment planned by North Ayrshire Council over the period to
2033/34, set within the context of government grant forecasts and combined with the
additional cost pressures identified across a number of projects, it is projected that
these funds will be exhausted before the end of the current 10 year Capital Investment
Programme. In order to ensure the affordability of current and future capital
investments beyond this, it will be necessary to incrementally increase the current
General Fund financing budgets over the period of the programme. Additional funding
support to mitigate the significant cost increases and the increased cost of borrowing
includes the use of the recurring element of the Service Concession flexibility,
approved at Council on 15 February 2023, which resulted in an average contribution
of £3.437m from 2022/23 and the utilisation of the balance of savings from the
temporary reduction in the employers’ superannuation contributions during 2024/25
and 2025/26. 
2.30 In addition to the application of these non-recurring funds, it is necessary to include an
indicative recurring pressure within the General Services Revenue Estimates 2024/25
to 2026/27. This includes an incremental contribution of £0.250m per annum from
2024/25, increasing to £0.450m from 2025/26 and £0.500m per annum from 2026/27.
The impacts of inflationary pressures and interest rate fluctuations will continue to be
monitored on an ongoing basis and the resultant increases in revenue contributions
will be reviewed as part of the next major review of the capital programme, due to be
undertaken during 2026/27. 
Treasury Management and Investment Strategy (TMIS) 
2.31 Compliance with Regulation and the Prudential Code requires assurance to be
provided on affordability and sustainability of the Capital Investment Programme. This
is provided in the Treasury Management and Investment Strategy (TMIS) which
follows this report on the Council agenda. The TMIS recognises that this will require to
be kept under review to ensure the underlying assumptions continue to apply. 
Capital Investment Strategy 
2.32 In addition to the TMIS there is also a requirement for the Council to publish a Capital
Investment Strategy (CIS) which provides the overarching framework under which the
draft Capital Investment Programme has been developed. The current CIS was
approved by Council on 1 March 2023. During 2023/24 this has been refreshed with
the revised CIS included at Appendix 4. 
59

Page 60

Conclusion 
2.32 The draft Capital Investment Programme 2024/25 to 2033/34, including proposed
funding, is attached at Appendix 3. This confirms total investment of £406.459m over
the period. The proposed investment aligns with the Council's key priorities, as set out
in the Council Plan 2023-2028, core asset management plans and the refreshed
Capital Investment Strategy, included at Appendix 4. 
2.33 The programme is affordable based on the estimated funding streams set out in the
2024/25 to 2026/27 Medium Term Financial Plan and from the mitigating actions
noted earlier in this report to supplement the Loans Fund. These proposals have been
developed within a very challenging financial landscape impacted by a combination of
significant cost volatility across the Programme and an increased cost of borrowing.
The affordability of the Programme is also highlighted within the Treasury
Management and Investment Strategy, reported elsewhere on the agenda, and this
will be monitored on an ongoing basis. A further, full assessment of the Programme’s
affordability will be undertaken as part of the next major review of the capital
programme due for completion during 2026/27. 
3. Proposals 
3.1 It is proposed that Council : 
(a)  approves the draft Capital Investment Programme 2024/25 to 2033/34 included in
appendix 3;
(b)  notes that the programme will be reviewed on an on-going basis with the next
major review in 2026/27; and 
(c)  approves the refreshed Capital Investment Strategy included in appendix 4. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The revised capital programme is based on a number of assumptions around the
availability of finance including capital grant and capital receipts. Given the forward
projection for 10 years, it is essential that these and the cost of projects are kept
under review. 
There are a number of assumptions underpinning the current revenue projection
including; the level of loans fund support, the level of future interest rates, delivery of
the programme within the timelines outlined in the programme and application of the
Capital Fund and the Prudential Investment Fund to smooth the revenue implications
across the life of the plan. 
Due to the long-term nature of the borrowing required to support this programme, a
review of available financing budgets has been undertaken with a view to increasing
the available funding and maintaining the future affordability of the Programme. 
60

Page 61

Human Resources 
4.2 Through investment in the Capital Investment Programme, it is anticipated there will
be additional staffing requirements. This will be considered on a project basis. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 Where the Council is making decisions in relation to its spending priorities, it is obliged
to comply with the public sector equality duty set out in the Equalities Act 2010. To
meet this requirement, the Council assesses the impact of applying a decision against
key groups to ensure that certain groups are not disadvantaged by those decisions. A
number of the projects within the revised capital programme, will make a positive
contribution to the Council’s commitment to equalities. 
Environmental and Sustainability 
4.5 All projects within the revised plan will be delivered to minimise the impact on the
environment and maximise sustainability. Further, specific projects within the plan will
have a positive environmental impact. 
Key Priorities 
4.6 The refreshed Capital Investment Programme 2024/25 to 2033/34 supports the
delivery of the outcomes as outlined in the Council Plan 2023-2028 by focusing our
investment on priorities, managing risk and supporting the delivery of key priorities. 
Community Wealth Building 
4.7 The Council will aim to maximise opportunities within the context of the 5 pillars of
Community Wealth Building from its investment programme. In particular, Ayrshire
Growth Deal and growth and investment projects will make a positive contribution to
economic regeneration across the region. 
5. Consultation 
5.1 Executive Directors have been consulted as part of the review the current capital
investment programme and the identification of the proposed revisions and additions
to the programme detailed in this report.
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Capital Investment Programme 2023/24 to 2030/31 – North Ayrshire Council 1 March 2023
61

Page 62

Appendix 1
Project Description
Revised
24/25
Revised
25/26
Revised
26/27
Revised
27/28
Revised
28/29
Revised
29/30
Revised
30/31 Total
£ £ £ £ £ £ £ £
EXPENDITURE
Place
Roads Improvement / Reconstruction 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 26,600,000
Lighting 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 7,000,000
Millport Coastal FPS 20,035,000       20,035,000
Millport Pier 349,920       349,920
Millburn FPS 1,109,982       1,109,982
Bridges infrastructure programme 954,564 560,000 560,000 560,000 560,000 560,000 460,000 4,214,564
B714 Improvements 8,000,000 16,351,443      24,351,443
Property lifecycle investment 1,000,000 1,000,000 1,000,000 1,100,000 1,000,000 1,000,000 1,000,000 7,100,000
HOME  1,033,021       1,033,021
Cemetery extns, walls & infra 300,000 268,162 23,042     591,204
Cmty, Kilbirnie - Works 200,000       200,000
Cmty, Ardrossan - Extension 300,000       300,000
Renewal of Play Parks 347,000 578,000      925,000
Vehicles 1,022,023 2,000,000 2,977,977 2,000,000 2,000,000 2,000,000 2,000,000 14,000,000
Montgomerie Park Masterplan 50,000 100,000 600,000 350,000 490,000 500,000 2,090,000
Cycling / Walker / Safer Streets 586,000 586,000 586,000 586,000 586,000 586,000 586,000 4,102,000
Access Paths Network Programme 50,000 50,000 50,000 50,000 50,000 50,000 50,000 350,000 
Growth & Investment
Ayrshire Growth Deal:       
AGD - i3 DPMC Phase 1 394,551       394,551
AGD - i3 DPMC Phase 2 400,000 2,000,000 2,150,030     4,550,030
AGD - i3 Flexible Business Space Phase 1 978,000 2,419,000 7,591,500 411,818    11,400,318
AGD - Hunterston - Centre for Low Carbon Energy & Circular Economy 335,000 335,000 4,196,000 4,196,000 4,196,000 4,195,881  17,453,881
AGD - Great Harbour 4,025,000 4,188,000 2,335,000 2,221,000 86,000 88,474  12,943,474
AGD - IMSE 250,000 273,740 3,200,000 3,250,000 3,250,000  10,223,740
AGD Marine Tourism - Ardrossan 512,000 4,500,000 1,689,621     6,701,621
AGD Marine Tourism - Arran 30,000 40,000 150,000 1,600,000 104,611   1,924,611
AGD Marine Tourism - Cumbrae 50,000 150,000 1,600,000 96,750    1,896,750
Ardrossan Harbour & Landside 1,793,701 1,793,702      3,587,403
Irvine Enterprise Area 103,079       103,079
Ardrossan North Shore 10,912,238 1,694,804      12,607,042
Sub Total 59,621,079 43,614,111 30,082,910 21,421,568 16,982,611 17,020,355 9,396,000 198,138,634
Communities
Montgomerie Park School 15,413,953       15,413,953
Universal Free School Meals Expansion 122,420 1,538,830 2,090,270 1,944,294 333,087 3,067,241  9,096,142
Schools ICT Investment 752,000 752,000 752,000 752,000 752,000 752,000 752,000 5,264,000
Ardrossan New Build 15,183,238 19,000,185 35,238,359 4,600,000    74,021,782
Sub Total 31,471,611 21,291,015 38,080,629 7,296,294 1,085,087 3,819,241 752,000 103,795,877
North Ayrshire Council
Approved Capital Programme 2024/25 - 2030/31 (Base)
62

Page 63

Appendix 1
Project Description
Revised
24/25
Revised
25/26
Revised
26/27
Revised
27/28
Revised
28/29
Revised
29/30
Revised
30/31 Total
£ £ £ £ £ £ £ £
North Ayrshire Council
Approved Capital Programme 2024/25 - 2030/31 (Base)
Chief Executive
ICT Investment Fund 382,400 376,600 702,600 297,600 282,600 282,600 297,600 2,622,000
WAN   500,000    500,000
LAN/WiFi   1,500,000    1,500,000
Telephony   650,000    650,000
Sub Total 382,400 376,600 702,600 2,947,600 282,600 282,600 297,600 5,272,000
Health & Social Care Partnership
Community Alarms - Analogue to Digital 333,000       333,000
Improvement grants 500,000 500,000 500,000 500,000 500,000 500,000 500,000 3,500,000
Sub Total 833,000 500,000 500,000 500,000 500,000 500,000 500,000 3,833,000
Other
Flexibility / Infrastructure Fund 7,000,000 100,000     7,100,000
Sub Total 7,000,000 100,000     7,100,000
TOTAL EXPENDITURE 92,308,090 72,781,726 69,466,139 32,165,462 18,850,298 21,622,196 10,945,600 318,139,511 
Revised
24/25
Revised
25/26
Revised
26/27
Revised
27/28
Revised
28/29
Revised
29/30
Revised
30/31 Total
£ £ £ £ £ £ £ £
INCOME
Prudential Borrowing 68,762,811 33,183,283 50,474,139 13,173,462 1,218,552 (7,035,058) 352,600 160,129,789
Specific Grants - AGD 4,839,000 8,399,000 8,399,000 8,399,000 7,038,746 18,064,254  55,139,000
Specific Grants - Cycling, Walking & Safer Streets 586,000 586,000 586,000 586,000 586,000 586,000 586,000 4,102,000
Specific Grants - B714 Improvements 5,630,000 16,351,443      21,981,443
Specific Grants - Renewal of Play Parks 347,000 578,000      925,000
General Capital Grant 10,007,000 10,007,000 10,007,000 10,007,000 10,007,000 10,007,000 10,007,000 70,049,000
Recovery & Renewal 1,235,180       1,235,180
Grants & Contributions 901,099       901,099
Sale of land & buildings 3,677,000      3,677,000
TOTAL INCOME 92,308,090 72,781,726 69,466,139 32,165,462 18,850,298 21,622,196 10,945,600 318,139,511
63

Page 64

Appendix 2
Project Description
Changes
24/25
Changes
25/26
Changes
26/27
Changes
27/28
Changes
28/29
Changes
29/30
Changes
30/31
Changes
31/32
Changes
32/33
Changes
33/34 Total
£ £ £ £ £ £ £ £ £ £ £
EXPENDITURE
Place
Roads Improvement / Reconstruction       3,800,000 3,800,000 3,800,000 11,400,000
Traffic Calming 82,953       82,953
Lighting  1,000,000 1,000,000 1,000,000 3,000,000
Upper Garnock FPS 467,828 467,828
Millport Pier (329,920) 154,960 134,960 (40,000)
Millburn FPS 343,547 343,547
Coastal Adaptations 99,727 99,727
Bridges infrastructure programme (100,000) 100,000 560,000 560,000 560,000 1,680,000
Largs Promenade Seawall 50,000 50,000 100,000
B714 Improvements (5,435,000) (1,574,749) 12,211,695 5,201,946
Property lifecycle investment 51,160 400,000 600,000 1,000,000 1,000,000 1,000,000 4,051,160
Locality Based Property Review 1,000,000 1,500,000 2,500,000
HOME  (1,033,021) (1,033,021)
Cemetery extns, walls & infra (229,285) (63,365) 122,560 11,521 (158,569)
Cmty, Kilbirnie - Works (200,000)      (200,000)
Cmty, Ardrossan - Extension 150,000 450,000      600,000
Cmty, Kilbirnie - Walls 36,071 36,072      72,143
Cmty, Beith - Walls 51,416 51,417      102,833
Cmty, Abbey Tower - Walls 44,469 44,469      88,938
Cmty, Stev Hawkhill - Walls 51,196 51,196  102,392
Cmty, West Kilbride - Walls 47,282 47,282  94,564
Cmty, Kilbirnie - New 288,916 288,917  577,833
Goldcraigs Refurbishment 608,438 132,562  741,000
Vehicles (2,023) 2,023  2,000,000 2,000,000 2,000,000 6,000,000
Fleet Decarbonisation 2,320,000 1,660,000 1,950,000 5,930,000
Shewalton landfill  48,949  48,949
Solar PV Investment -  Nethermains 260,720 260,721  521,441
Solar PV Investment -  Shewalton 1,825,377 1,825,377  3,650,754
Repurposing Property Grant Fund 250,000  250,000
Islands Pit Stops 500,000 500,000
Place Based Investment Programme 350,000  350,000
Digital - SIPP Great Harbour 127,882 127,882
PBIP 36 Bank Street 50,000  50,000
PBIP Galt House 25,000  25,000
Montgomerie Park Masterplan 137,500 112,500 (25,000) 50,000 275,000
VDLF - 2024/25 allocation 963,000 963,000
VDLF - Irvine Kyle Road Phase 2 1,087,018 1,087,018
VDLF - Development Work 119,012 119,012
VDLF - Tree Planting 47,600 47,600
VDLF Stalled Spaces Fund 100,000 100,000
Cycling / Walker / Safer Streets 1,000 1,000 1,000 1,000 1,000 1,000 1,000 587,000 587,000 587,000 1,768,000
Access Paths Network Programme 445,000 50,000 50,000 50,000 595,000  
North Ayrshire Council
Capital Programme 2024/25 - 2033/34 - Revisions
64

Page 65

Appendix 2
Project Description
Changes
24/25
Changes
25/26
Changes
26/27
Changes
27/28
Changes
28/29
Changes
29/30
Changes
30/31
Changes
31/32
Changes
32/33
Changes
33/34 Total
£ £ £ £ £ £ £ £ £ £ £
North Ayrshire Council
Capital Programme 2024/25 - 2033/34 - Revisions
Growth & Investment 
Ayrshire Growth Deal:       
AGD - i3 DPMC Phase 1 5,898 300,000 305,898
AGD - i3 DPMC Phase 2 (300,449) (1,750,000) (693,169) 2,908,275 164,657
AGD - i3 Flexible Business Space Phase 1 1,047,920 (2,419,000) (7,591,500) (411,818) (9,374,398)
AGD - i3 Flexible Business Space Phase 2 600,000 4,900,000 4,900,000 148,000 352,000 10,900,000
AGD - Hunterston - Centre for Low Carbon Energy & Circular Economy 333,892 (1) 333,891
AGD - Great Harbour (2,737,647) (1,881,436) 516,490 2,552,566 1,804,928 (31,909) 222,992
AGD - IMSE 445,000 (352,253) 92,747
AGD Marine Tourism - Ardrossan (512,000) (4,500,000) (1,689,621) 2,000,000 2,500,000 224,285 (1,977,336)
AGD Marine Tourism - Arran 10,482 (37,837) (27,355)
AGD Marine Tourism - Cumbrae 175,000 775,000 600,000 899,504 2,449,504
Ardrossan Harbour & Landside (914,222) (17,372) 896,851 (34,743)
Irvine Enterprise Area (51,540) 51,540 
Ardrossan North Shore 18,500,543 35,500  18,536,043
Sub Total 20,255,740 422,591 13,436,289 8,207,997 4,620,091 (158,878) 101,000 8,997,000 8,997,000 8,997,000 73,875,830
Communities
Montgomerie Park School (2,364,552) (2,364,552)
Universal Free School Meals Expansion 392,425 (327,021) (544,010) 1,136,848 (913) (137,500) 519,829
Schools ICT Investment 451,908 451,908 451,908 752,000 752,000 752,000 3,611,724
Ardrossan New Build (8,080,621) 1,371,270 (4,559,147) 17,410,374  6,141,876
Sub Total (9,600,840) 1,496,157 (4,651,249) 18,547,222 (913) (137,500) 752,000 752,000 752,000 7,908,877
Chief Executive
ICT Investment Fund (158,700) 52,900 (145,500) 351,300    100,000
Telephony 115,000 115,000      230,000
Sub Total (43,700) 167,900 (145,500) 351,300       330,000
Health & Social Care Partnership
Community Alarms - Analogue to Digital (264,024) 68,977      (195,047)
Improvement grants  500,000 500,000 500,000 1,500,000
Sub Total (264,024) 68,977      500,000 500,000 500,000 1,304,953
Other
Flexibility / Infrastructure Fund (7,000,000) 3,223,000 3,521,036 3,155,964 2,900,000
Core Infrastructure, property and Vehicles Renewal Investment 2,000,000  2,000,000
Sub Total 2,000,000 (7,000,000) 3,223,000 3,521,036 3,155,964      4,900,000
TOTAL EXPENDITURE 12,347,176 (4,844,375) 11,862,540 30,627,555 7,775,142 (296,378) 101,000 10,249,000 10,249,000 10,249,000 88,319,660
65

Page 66

Appendix 2
Project Description
Changes
24/25
Changes
25/26
Changes
26/27
Changes
27/28
Changes
28/29
Changes
29/30
Changes
30/31
Changes
31/32
Changes
32/33
Changes
33/34 Total
£ £ £ £ £ £ £ £ £ £ £
North Ayrshire Council
Capital Programme 2024/25 - 2033/34 - Revisions
Changes
24/25
Changes
25/26
Changes
26/27
Changes
27/28
Changes
28/29
Changes
29/30
Changes
30/31
Changes
31/32
Changes
32/33
Changes
33/34 Total
£ £ £ £ £ £ £ £ £ £ £
INCOME
Prudential Borrowing 9,537,439 (3,597,408) 5,359,081 22,110,062 7,534,232 12,703,178 914,000 594,000 594,000 594,000 56,342,584
Specific Grants - AGD (1,435,109) (1,743,415) 6,731,279 9,455,493 1,178,910 (12,061,556) 2,125,602
Specific Grants - Cycling, Walking & Safer Streets 1,000 1,000 1,000 1,000 1,000 1,000 1,000 587,000 587,000 587,000 1,768,000
Specific Grants - Vacant & Derelict Funding 2,376,630 2,376,630
Specific Grants - Islands Pit Stop 500,000 500,000
Specific Grants - Place Based Investment Programme 505,000 505,000
Specific Grants - B714 Improvements (428,054) (428,054)
Specific Grants - Digital - SIPP Great Harbour 127,882 127,882
General Capital Grant - Flooding (440,000) 440,000 
General Capital Grant (839,273) (939,000) (939,000) (939,000) (939,000) (939,000) (939,000) 9,068,000 9,068,000 9,068,000 20,730,727
Capital Fund 885,000 885,000
Recovery & Renewal 1,359,673 703,707 710,180 2,773,560
Grants & Contributions 96,988 49,560 146,548
Sale of land & buildings 100,000 241,181 125,000 466,181
TOTAL INCOME 12,347,176 (4,844,375) 11,862,540 30,627,555 7,775,142 (296,378) 101,000 10,249,000 10,249,000 10,249,000 88,319,660
66

Page 67

Appendix 3
Project Description
Revised
24/25
Revised
25/26
Revised
26/27
Revised
27/28
Revised
28/29
Revised
29/30
Revised
30/31
Revised
31/32
Revised
32/33
Revised
33/34 Total
£ £ £ £ £ £ £ £ £ £ £
EXPENDITURE
Place
Roads Improvement / Reconstruction 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 38,000,000
Traffic Calming 82,953          82,953
Lighting 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 10,000,000
Upper Garnock FPS 467,828          467,828
Millport Coastal FPS 20,035,000          20,035,000
Millport Pier 20,000 154,960 134,960        309,920
Millburn FPS 1,453,529          1,453,529
Coastal Adaptations 99,727          99,727
Bridges infrastructure programme 854,564 560,000 560,000 560,000 560,000 560,000 560,000 560,000 560,000 560,000 5,894,564
Largs Promenade Seawall 50,000 50,000         100,000
B714 Improvements 2,565,000 14,776,694 12,211,695        29,553,389
Property lifecycle investment 1,051,160 1,400,000 1,600,000 1,100,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 11,151,160
Locality Based Property Review 1,000,000 1,500,000        2,500,000
Cemetery extns, walls & infra 70,715 204,797 145,602 11,521       432,635
Cmty, Ardrossan - Extension 450,000 450,000         900,000
Cmty, Kilbirnie - Walls 36,071 36,072         72,143
Cmty, Beith - Walls 51,416 51,417         102,833
Cmty, Abbey Tower - Walls 44,469 44,469         88,938
Cmty, Stev Hawkhill - Walls 51,196 51,196         102,392
Cmty, West Kilbride - Walls 47,282 47,282         94,564
Cmty, Kilbirnie - New 288,916 288,917         577,833
Goldcraigs Refurbishment 608,438 132,562         741,000
Renewal of Play Parks 347,000 578,000         925,000
Vehicles 1,020,000 2,000,000 2,980,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 20,000,000
Fleet Decarbonisation 2,320,000 1,660,000 1,950,000        5,930,000
Shewalton landfill    48,949       48,949
Solar PV Investment -  Nethermains 260,720 260,721         521,441
Solar PV Investment -  Shewalton 1,825,377 1,825,377         3,650,754
Repurposing Property Grant Fund 250,000          250,000
Islands Pit Stops 500,000          500,000
Place Based Investment Programme 350,000          350,000
Digital - SIPP Great Harbour 127,882          127,882
PBIP 36 Bank Street 50,000          50,000
PBIP Galt House 25,000          25,000
Montgomerie Park Masterplan 137,500 162,500 75,000 650,000 350,000 490,000 500,000    2,365,000
VDLF - 2024/25 allocation 963,000          963,000
VDLF - Irvine Kyle Road Phase 2 1,087,018          1,087,018
VDLF - Development Work 119,012          119,012
VDLF - Tree Planting 47,600          47,600
VDLF Stalled Spaces Fund 100,000          100,000
Cycling / Walker / Safer Streets 587,000 587,000 587,000 587,000 587,000 587,000 587,000 587,000 587,000 587,000 5,870,000
Access Paths Network Programme 495,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 945,000    
North Ayrshire Council
Revised Capital Programme 2024/25 - 2033/34
67

Page 68

Appendix 3
Project Description
Revised
24/25
Revised
25/26
Revised
26/27
Revised
27/28
Revised
28/29
Revised
29/30
Revised
30/31
Revised
31/32
Revised
32/33
Revised
33/34 Total
£ £ £ £ £ £ £ £ £ £ £
North Ayrshire Council
Revised Capital Programme 2024/25 - 2033/34
Growth & Investment   
Ayrshire Growth Deal:          
AGD - i3 DPMC Phase 1 400,449 300,000         700,449
AGD - i3 DPMC Phase 2 99,551 250,000 1,456,861 2,908,275       4,714,687
AGD - i3 Flexible Business Space Phase 1 2,025,920          2,025,920
AGD - i3 Flexible Business Space Phase 2 600,000 4,900,000 4,900,000 148,000 352,000      10,900,000
AGD - Hunterston - Centre for Low Carbon Energy & Circular Economy 668,892 335,000 4,196,000 4,196,000 4,196,000 4,195,880     17,787,772
AGD - Great Harbour 1,287,353 2,306,564 2,851,490 4,773,566 1,890,928 56,565     13,166,466
AGD - IMSE 445,000 250,000 273,740 3,200,000 3,250,000 2,897,747     10,316,487
AGD Marine Tourism - Ardrossan   2,000,000 2,500,000 224,285     4,724,285
AGD Marine Tourism - Arran 40,482 40,000 150,000 1,600,000 66,774      1,897,256
AGD Marine Tourism - Cumbrae 225,000 925,000 2,200,000 996,254       4,346,254
Ardrossan Harbour & Landside 879,479 1,776,330 896,851        3,552,660
Irvine Enterprise Area 51,539 51,540         103,079
Ardrossan North Shore 29,412,781 1,730,304         31,143,085
Sub Total 79,876,819 44,036,702 43,519,199 29,629,565 21,602,702 16,861,477 9,497,000 8,997,000 8,997,000 8,997,000 272,014,464
Communities
Montgomerie Park School 13,049,401          13,049,401
Universal Free School Meals Expansion 514,845 1,211,809 1,546,260 3,081,142 332,174 2,929,741     9,615,971
Schools ICT Investment 1,203,908 1,203,908 1,203,908 752,000 752,000 752,000 752,000 752,000 752,000 752,000 8,875,724
Ardrossan New Build 7,102,617 20,371,455 30,679,212 22,010,374       80,163,658
Sub Total 21,870,771 22,787,172 33,429,380 25,843,516 1,084,174 3,681,741 752,000 752,000 752,000 752,000 111,704,754
Chief Executive
ICT Investment Fund 223,700 429,500 557,100 648,900 282,600 282,600 297,600    2,722,000
WAN   500,000       500,000
LAN/WiFi   1,500,000       1,500,000
Telephony 115,000 115,000  650,000       880,000
Sub Total 338,700 544,500 557,100 3,298,900 282,600 282,600 297,600    5,602,000
Health & Social Care Partnership
Community Alarms - Analogue to Digital 68,976 68,977         137,953
Improvement grants 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 5,000,000
Sub Total 568,976 568,977 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 5,137,953
Other
Flexibility / Infrastructure Fund  3,323,000 3,521,036 3,155,964      10,000,000
Core Infrastructure, property and Vehicles Renewal Investment 2,000,000          2,000,000
Sub Total 2,000,000  3,323,000 3,521,036 3,155,964      12,000,000
TOTAL EXPENDITURE 104,655,266 67,937,351 81,328,679 62,793,017 26,625,440 21,325,818 11,046,600 10,249,000 10,249,000 10,249,000 406,459,171
68

Page 69

Appendix 3
Project Description
Revised
24/25
Revised
25/26
Revised
26/27
Revised
27/28
Revised
28/29
Revised
29/30
Revised
30/31
Revised
31/32
Revised
32/33
Revised
33/34 Total
£ £ £ £ £ £ £ £ £ £ £
North Ayrshire Council
Revised Capital Programme 2024/25 - 2033/34
Revised
24/25
Revised
25/26
Revised
26/27
Revised
27/28
Revised
28/29
Revised
29/30
Revised
30/31
Revised
31/32
Revised
32/33
Revised
33/34 Total
£ £ £ £ £ £ £ £ £ £ £
INCOME
Prudential Borrowing 78,300,250 29,585,875 55,833,220 35,283,524 8,752,784 5,668,120 1,266,600 594,000 594,000 594,000 216,472,373
Specific Grants - AGD 3,403,891 6,655,585 15,130,279 17,854,493 8,217,656 6,002,698     57,264,602
Specific Grants - Cycling, Walking & Safer Streets 587,000 587,000 587,000 587,000 587,000 587,000 587,000 587,000 587,000 587,000 5,870,000
Specific Grants - Vacant & Derelict Funding 2,376,630          2,376,630
Specific Grants - Islands Pit Stop 500,000          500,000
Specific Grants - Place Based Investment Programme 505,000          505,000
Specific Grants - B714 Improvements 5,201,946 16,351,443         21,553,389
Specific Grants - Digital - SIPP Great Harbour 127,882          127,882
Specific Grants - Renewal of Play Parks 347,000 578,000         925,000
General Capital Grant - Flooding (440,000) 440,000         
General Capital Grant 9,167,727 9,068,000 9,068,000 9,068,000 9,068,000 9,068,000 9,068,000 9,068,000 9,068,000 9,068,000 90,779,727
Capital Fund 885,000          885,000
Recovery & Renewal 2,594,853 703,707 710,180        4,008,740
Grants & Contributions 998,087 49,560         1,047,647
Sale of land & buildings 100,000 3,918,181     125,000    4,143,181
TOTAL INCOME 104,655,266 67,937,351 81,328,679 62,793,017 26,625,440 21,325,818 11,046,600 10,249,000 10,249,000 10,249,000 406,459,171
69

Page 70

Appendix 4
70

Page 71

Introduction 
The Capital Investment Strategy for North Ayrshire Council provides an overview of
how capital expenditure plans, capital financing and treasury management activity
contribute to the infrastructure and provision of services for the benefit of North
Ayrshire communities and citizens. This refreshed strategy takes a long-term view
and covers the period from 2024 to 2034. This is aligned to the Capital Investment
Programme. 
The Capital Investment Strategy is a reporting requirement of the CIPFA Prudential
Code. Local authorities produce many plans and strategies in the course of their
operations. However, it is recognised that within the context of capital planning, there
is a need to produce an overarching view that addresses the following key
considerations: - 
• Ensuring that capital plans are aligned to the strategic priorities as set out in the
Council Plan. 
• Ensuring that capital plans are affordable, prudent and sustainable. 
• Demonstrating the linkage to local strategic planning and local asset
management planning. 
• Ensuring that financing decisions are taken in accordance with good
professional practice and a full understanding of the risks involved. 
• Demonstrating the Council has robust governance arrangements to support its
capital planning activities 
71

Page 72

Background 
North Ayrshire Council has ambitious plans to deliver significant capital investment
over the planning period across housing, schools, economic development and
infrastructure. Working in partnership with East Ayrshire, South Ayrshire, the UK and
Scottish Government, the Ayrshire Growth deal will see the regeneration of the
region through investment in strategic infrastructure across various sectors, including
life sciences, tourism, manufacturing and aerospace. 
Throughout 2023/24 the wider construction industry has reported significant, ongoing
inflationary pressures linked to a number of factors, including additional costs as an
ongoing consequence of the Covid-19 pandemic; upward pressure on input costs
linked to international externalities such as ongoing global conflicts and its impact on
global supply chains; material and labour shortages; and increased demand linked to
reduced contractor availability. This has resulted in the identification of increased
cost risks in relation to a number of our investment priorities. 
The Capital Investment Strategy takes account of the Council’s strategic priorities
and considers any new investment within the context of outcomes, affordability or
invest to save. Decisions made over the course of the programme for capital and
treasury management will have financial consequences for the Council for many
years in the future. There is also recognition of the need to balance investment
between maintaining current assets and infrastructure against the ambitions for
acquiring new assets.  North Ayrshire Council’s Capital Investment Programme is
shaped and influenced by various associated strategies and plans. 
72

Page 73

The primary purpose of the Capital Investment Strategy is to provide an overarching
view of how various plans and strategies inform capital investment and to
demonstrate that this is both affordable and sustainable. The associated plans and
strategies each focus on specific priority areas and, through appropriate governance
structures, ultimately shape and influence the investment plans delivered through the
Capital Investment Programme. Underpinning the Capital Investment Programme is
the Treasury Management and Investment Strategy and Loans Fund Policy. Both
ultimately consider the delivery of the capital programme within the context of
affordability and risk and apply a measurement of what this means against key
prudential and treasury indicators. The aim being to demonstrate affordability and
sustainability over the long term. 
73

Page 74

Plans and Strategies 
Council Plan 2023-2028 
The mission for North Ayrshire Council is “Working together to improve the lives
of our people in North Ayrshire.”  To deliver on this mission 4 key strategic
priorities, outlined below, have been developed to direct plans now and into the
future. 
Through appropriate governance frameworks all capital investment must
demonstrate that it is aligned to the Council’s strategic themes, with particular focus
and priority given to capital investment opportunities that meet multiple strategic
priorities. 
74

Page 75

Community Planning Partnerships and Local Outcomes Improvement Plan 
The North Ayrshire Community Planning Partnership is a partnership across a wide
range of organisations. The Local Outcomes Improvement Plan (LOIP) 2022 –
2030 provides a commitment by all partners to North Ayrshire communities and
citizens across three main priority areas: 
The Community Planning Partnership consists of 6 Locality Partnerships across
North Ayrshire. Key to the success of the LOIP is working in partnership with a
number of agencies to deliver better outcomes for citizens and communities. The
partnership includes Scottish Government, Police Scotland, NHS Ayrshire and Arran,
Skills Development Scotland, KA Leisure, Scottish Fire and Rescue and Scottish
Enterprise. Through the Local Development Plan, one of the strategic policies is to
deliver on local community priorities. Each Locality Partnership has agreed their own
local priorities. The following diagram illustrates the links between the locality
priorities and those in the LOIP: 
75

Page 76

This framework of community engagement and structured partnership working is
vital when planning capital investment. More importantly, that local priorities are
considered as part of any strategic planning framework. 
Health and Social Care Partnership Strategic Commissioning Plan 2022-2030 
The North Ayrshire Health & Social Care Strategic Plan 2022-2030 was developed
through engagement and collaboration with local people, service users, members of
staff and other key stakeholders. It sets out our long-term ambitions for improving the
health and wellbeing of everyone who lives in North Ayrshire. 
The 2022-2030 plan continues the existing vision that “all people who live in North
Ayrshire are able to have a safe, healthy and active life” and to achieve this the
HSCP focuses on key priorities: 
WELLBEING
WORK
WORLD
76

Page 77

Asset Management Plans 
Asset Management Plans aim to ensure that the Council holds the right assets and
that they are fit for purpose in terms of condition, suitability and accessibility. The
plans also provide the vehicle for identifying future investment needs across all asset
classes. In line with the CIPFA “Guide to Asset Management and Capital Planning in
Local Authorities” North Ayrshire has classified its assets into six categories: 
The Council’s assets play a key role in the delivery of a wide range of essential
services to our local communities, contribute to regeneration and help drive
economic growth. The plans set out clear actions and include details of lifecycle
investment costs required to maintain assets and infrastructure to an appropriate
standard that supports service delivery. The plans are updated on an annual basis
and chief officers across all Directorates hold the responsibility for maintaining the
plans and reporting progress to the Council’s Cabinet on a bi-annual basis. 
A snapshot of the asset portfolio for North Ayrshire Council includes: 
Both capital and revenue financial resources across the General Fund and Housing
Revenue Account are used to maintain the current asset base. From a capital
perspective, planned investment which has been incorporated in the current Capital
Investment Programme includes:
Fleet and Plant •Around
570
Vehicles
and items
of Plant
Roads • Over
1,000 Km
of roads
Structures •Around
400
bridges
and
structures
Street Lighting •Over 23,000
street
lighting
columns
Operational Buildings • Over 70 
offices,
libraries and
community
centres
Council Houses
•Around
13,000
Council
Houses
Schools and Early Years
•63
Schools
and Early
Years
Facilities
Social Care •21 Social
Care
Facilities
77

Page 78

Local Housing Strategy 2023-28 and Strategic Housing Investment Plan 2024-
29 
The Local Housing Strategy sets out the Council’s ambition: ‘We want all our people
to live in the right homes, in great places, with access to any support services they
need.” 
The strategy mirrors the format of Scotland’s first 20 year housing strategy, Housing
to 2040 and sets out four overarching outcomes which align to the four key strategies
in Housing to 2040: 
•Planned investment of £112.8m to 2033/34 including improvements to the roads and
street lighting network, upgrading of the B714, flood prevention works at Upper
Garnock and Millport and bridges infrastructure improvement.
Roads,
Structures
and Lighting
•Procurement and maintenance of all Council fleet vehicles and plant ensuring the
fleet of 566 vehicles and heavy plant are maintained and operated in accordance with
the Council’s Operator’s licences and Road Transport legislation. Prioritisation of
emissions reductions through decarbonisation of vehicle fleet. Vehicle and plant
capital investment is planned at £25.9m to 2033/34.
Fleet,Plant
and
Equipment
•To ensure Council properties meet all legislative requirements and they are sustainable, energy
efficient and maintained to a high standard as well as ensuring the physical environment is able
to support mobile and flexible work programmes, Investment is planned at £18.6m to 2033/34.
It is also recognised that through the Estates Strategy further rationalisation and remodelling
will continue to be progressed on a locality by locality basis, with capital receipts incorporated
into the capital programme.
Property
•Underpinned by the Local Housing Strategy, the Strategic Housing Investment Plan
and the 30 Year HRA Business Plan, responsibility for maintenance of around 13,000
council houses, ensuring legislative compliance and meeting the needs of tenants. In
addition, delivery of an ambitious house building and improvement programme over
the period 2024/25-2028/29 will see capital investment by the Council total £352.0m.
Housing
•The Technology Strategy sets out how ICT supports service delivery and transformation.
Significant changes to our ICT infrastructure have been reflected in the ICT Asset
Management Plan. To deliver on the 6 key principles as outlined in the Technology
Strategy £5.6m investment to 2033/34 is planned.
ICT
•The service maintains 2,410 hectares of public open space, a Country Park, 14 local parks, 44
cemeteries and burial grounds, 37 war memorials & monuments, 366 hectares of woodlands, 3
allotments, 91 sports facilities and playing fields, 84 equipped play areas and 12 multi-use games
areas, residential greenspace, 38 water courses and open water features, 5 promenades and 16
beaches, three of which are Sites of Special Scientific Interest. The majority of investment is
delivered through the Place service revenue budget, however, specific capital investment of 
£2.4m is planned to 2033/34 for cemetery infrastructure.
Open
Spaces
78

Page 79

The Strategic Housing Investment Plan is an extension of, and aligns to, the Local
Housing Strategy, supporting the objectives of the Council Plan. 
The Strategic Housing Investment Plan also aligns with the Council’s Community
Wealth Building Strategy and supports the North Ayrshire Child Poverty Action Plan
2022-2023. Access to good quality and affordable housing is a key asset in
addressing child poverty, and poverty overall.   
The SHIP will secure investment in a total of 1,302 properties across North Ayrshire
and provide sustainable, affordable, accessible high-quality homes which will
contribute to the wider regeneration aims for the area. The Council projects in the
SHIP represent investment of £194.464m (including an estimated £78.07m Scottish
Government grant funding). Developments continue to be progressed across all six
localities: 
Public sector investment can have a transformational impact for communities, and
the Council explores site and area specific opportunities with partners to secure
maximum regeneration benefits. This supports the ambitions of the Council’s
Regeneration Delivery Plan to drive forward place-based development on strategic
regeneration sites, including town centres. Several SHIP projects completed to date
are within, or near, town centres. The plan supports major housing led regeneration
including the replacement of the 275 homes in the Fullarton tower blocks in Irvine and 
the provision of funding to assist the delivery of Housing’s Estate Based Regeneration
Programme. 
The Strategic Housing Investment Plan prioritises new social housing developments
which include the provision of outdoor green space, and which support the principles
of 20-minute neighbourhoods, where feasible. Developments are also planned
utilising ‘secure by design’ principles.   
The Council and its partners recognise that bringing former social housing stock into
ownership can assist with housing management and maintenance issues and
increase housing available through the North Ayrshire Housing Register. All
developing registered social landlord partners with stock in North Ayrshire now have
provision for buyback programmes in the SHIP.  
Housing to
2040
Strategy
Local
Housing
Strategy
Outcome
More homes at
the heart of
great places
Affordability and
choice
Affordable
warmth and
zero emission
homes
Improving the
quality of all
homes
Our places
support thriving
and inclusive
communities
Our people
have affordable
homes in the
place they
choose to live
Our homes are
energy efficient
and release less
emissions
Our homes are in
good condition
and people can
access any
support services
they need
Arran Garnock
Valley Irvine Kilwinning North
Coast
Three
Towns
79

Page 80

New housing has a key role to play in carbon reduction, climate change mitigation,
and in the alleviation of fuel poverty. The Council and its partners will continue to
consider innovative and sustainable approaches to heat and power, such as low
carbon heat, solar photovoltaic panels and smart technologies.  The Council
recognises that a ‘fabric first’ approach to sustainability can provide benefits to
tenants, in terms of reducing heating costs. This investment aligns to the Council’s
Environmental Sustainability and Climate Change Strategy in supporting affordable
warmth to households across North Ayrshire. Developments will also be designed to
promote sustainable travel. 
All amenity and sheltered housing in North Ayrshire should be built to an ambulant
housing standard as a minimum. To ensure need is met now and in the future, the
new Local Housing Strategy increased the target to ensure at least 10% of all tenure
new build stock is suitable for wheelchair users (increased from 7% in the previous
strategy). 
Officers within the Place Directorate and the Health and Social Care Partnership
developed a new supported accommodation housing model which has been
implemented at sites across North Ayrshire to maximise tenant independence 
The Local Housing Strategy recognises that the proportion of older people in North
Ayrshire is higher than that of Scotland as a whole. The SHIP estimates the delivery
of a further 311 amenity homes and 28 sheltered housing units. Alongside the new
build programme, the Council will continue to deliver its sheltered housing re-
provisioning programme, which includes £25m investment in the refurbishment of
sheltered housing units out with the SHIP. 
Regeneration Delivery Plan and Local Development Plan 
The Regeneration Delivery Plan sets out our priorities for delivering on the
regeneration ambitions of the Council Plan and Community Wealth Building strategy,
working in partnership with communities.  The Plan focuses on the delivery of
physical regeneration across North Ayrshire through an ambitious project-based
rolling action programme.  The Regeneration Delivery Plan focuses activity around
the four key regeneration themes: 
Mission
Enhancing local wealth and the creation of fair jobs and maximising the
potential of all our places through working in partnership with out communities
and businesses
Strengthening
Communities
Inclusive and
Green Economy Placemaking Enabling
Infrastructure
80

Page 81

The Local Development Plan was adopted in November 2019 and aligns to the
themes set out in the Regeneration Delivery Plan, it brings a targeted local context in
guiding development and investment in North Ayrshire over the next 20 years. The
focus is supporting and growing the business base across key sectors including
manufacturing, engineering, life sciences, tourism and hospitality and regenerating
towns and communities. The overarching aim of the plan is to deliver the Community
Planning Partnership vision of a “Better Life” to the citizens and communities of
North Ayrshire. The plan outlines the land use strategy that supports delivery of the
Local Outcomes Improvement Plan 2022 – 2030 and focuses on four key strategic
policies: 
The Spatial Strategy is an overarching policy for supporting the LOIP. This directs
development to towns and villages to support communities, the economy and
environment, while recognising the value that the countryside and coastal areas offer
both as natural resources worthy of protection and as an economic driver. An
example of directing investment to towns is evidenced by the Montgomerie Park
development with Council investment in road and service infrastructure to facilitate
large scale housing development and regeneration and using capital receipts from
land sale as a key source of funding. 
The Placemaking policy supports the LOIP by ensuring that all development
contributes to making quality places. This is measured by six qualities that define a
successful place: 
Distinctive
Welcoming
Safe and
Pleasant
Adaptable
Resource
Efficient
Easy to
Move
Around and
Beyond
81

Page 82

Through the Local Development Plan eight strategic development areas have been
identified: 
Working in partnership with the UK and
Scottish Government and East Ayrshire and
South Ayrshire councils, the Ayrshire Growth
Deal will regenerate the region through
investment in strategic infrastructure across
various sectors, including life sciences,
tourism, manufacturing and aerospace, with
total investment of over £251.5m. From a North
Ayrshire perspective and to support investment
into the strategic development areas, including
the Ayrshire Growth Deal and wider economic
regeneration activity, the Capital Investment
Programme from 2024/25 to 2033/34 includes
planned investment of £70.6m. 
Finally, our Community Wealth Building Strategy helps to develop resilient, inclusive
local economies, with more local employment and a larger and more diverse
business base, ensuring that wealth is locally owned and benefits local people. All
capital and revenue investment will be considered within the context of the
Community Wealth Building Strategy, with maximising opportunities for local
suppliers through procurement a key priority and pillar of the strategy. 
Technology Strategy 
The Technology Strategy was approved by North Ayrshire Council in August 2021
and sets out the vision, principles and key technologies that will support
transformational change across North Ayrshire Council. Solutions will be designed in
partnership to improve processes, service delivery and collaboration and ultimately
improve outcomes. The six key Technology Strategy principles are: 
Hunterston
Ardrossan
Harbour and
North Shore
i3 - Irvine Montgomerie
Park, Irvine
Kilbirnie Irvine
Harbourside Brodick Cumbrae-
Millport
Deliberately
designed
•Holistic view of
the business and
deliver efficient,
effective and
agile solutions
People at the
core
•Solutions built
around the
needs of
customers and
people
Anytime,
anywhere access
•Access to
systems,
applications and
information
wherever they
are
Cloud where
appropriate
•Utilise cloud
based
technologies
where
appropriate
Data driven
•Utilise data to
effectively
inform our
decision making
Secure by design
•Operate securely
whilst still 
taking advantage
of technology
innovations
82

Page 83

Office 365 has been a transformative technology, enabling agile working and
simplifying collaboration.  The ICT Asset Management Plan incorporates the
technology principles and, in terms of investment, a total of £5.6m is planned to
2033/34 to deliver technology solutions aligned to this strategy. From a financial
planning perspective it is also recognised the shift from capital financing to revenue
through software as a service, will lead to a remodelling of the way in which ICT
investment is funded. 
Estates Strategy 
The key objective of North Ayrshire Council’s Estate Strategy is to achieve
rationalisation and remodelling of the Council’s property portfolio on a locality basis. 
The Estates Strategy plays a key role in maximising capital investment across
multiple strategic priority areas, e.g. moving away from the traditional like for like
school replacements to incorporating wider community campus facilities, including
leisure and health and social care facilities. This approach was evidenced through
the Largs campus facility which delivered primary, secondary, and early years
provision as well as community use sport, theatre and leisure facilities. 
Through rationalisation of the Council’s property portfolio, a key funding component
to support the capital programme and provide flexibility in the Council’s Revenue
account, is the generation of capital receipts. Anticipated income from land and
property capital receipts planned to support the capital programme totals £4.1m to
2033/34. 
The neighbourhood approach outlined in the Estates Strategy also recognises
community empowerment and, in particular, provides support to communities for
asset transfers. This engagement is progressed through the Community Planning
Partnerships. 
83

Page 84

General Fund Capital Investment Programme 
North Ayrshire Council takes a long-term approach to capital investment, covering a
10-year period. The plan is updated annually and 2024/25 represents year 1 of the
10-year plan. A full refresh is undertaken every 3 years. The current Capital
Investment programme is aligned to the strategic priorities as set out in the Council
Plan and is the product of the various plans and strategies which impact on the
assets and infrastructure of North Ayrshire Council. Through the Community
Planning Partnerships and the Local Development Plan there is also clear linkage to
local strategic planning and local asset planning. 
Total capital investment of £406.5m from the Council’s General Fund is planned over
the period from 2024/25 to 2033/34, supporting the 3 key strategic priorities from the
Council Plan. This includes planned expenditure of £70.6m towards the Ayrshire
Growth Deal to 2033/34. It is recognised that the total level of investment across
Ayrshire will be in the region of £251.5m (including £103m commitments from both
the UK and Scottish Governments). 
Capital Programme 2024/25 to 2033/34
Total Investment
£406.5m 
84

Page 85

The capital plan includes £111.7m planned investment in Education. The major
areas of education investment include; 
Investment in education reflects the Council’s desire
to ensure children and young people have access to
high quality facilities which support and promote
excellent learning and teaching. Well designed and
well-equipped buildings also support the promotion of
positive health and well-being. 
It is also recognised that investment in education
contributes to and can be integrated within wider
economic development and regeneration within
the localities and this is reflected in the nature of
the planned developments for Ardrossan
Academy and Montgomerie Park school. Through
stakeholder engagement, effective cross
Directorate working within North Ayrshire Council and collaboration with other
agencies including the Scottish Government, these new developments combine
education provision with community facilities, residential, respite and housing
provision as part of a wider focus on economic regeneration. 
Investing in core assets and infrastructure is key to ensuring sustainability. A
planned investment of £112.8m within Roads, Structures and Lighting includes
£38.0m road improvements, £22.0m on flood prevention works and £29.6m on the
upgrading of the B714 following a successful application to the UK Governments
Levelling Up Fund. Property lifecycle investment of £11.2m, to support the property
asset management plan, will ensure Council properties continue to be maintained to
the appropriate standards in delivering services to citizens and communities. The
plan includes investment in several key programmes of regeneration within North
Ayrshire and, in respect of the Ayrshire Growth Deal, on a wider pan Ayrshire basis. 
The Capital Investment Programme 2024/25 to 2033/34 sets out the ambition of
North Ayrshire Council and supports the key strategic themes of the Council Plan.
Through investment that supports regeneration and delivers first class education and
community facilities, this strategic approach will help grow the population and the
local economy. It is also recognised that key to a sustainable environment is the
requirement to continue to invest in core assets and infrastructure. 
Universal School meals
Expansion - £9.6m
•Improvements to current
kitchen and dining
facilities across the
school estate to create
capacity for the
anticipated uptake.
Ardrossan Campus-
£80.2m
•New build project as part
of an exciting wider
community facility
development
Montgomerie Park school
£13.0m
•New primary provision
linked to Montgomerie
park regeneration
project and housing
developments
Schools ICT Investment
£8.9m
•Investment on ICT
Equipment within the
School Estate
Figure 1 Artist impression of Ardrossan Campus
Figure 2 Artist impression of Montgomerie
Park Primary School
85

Page 86

Funding the Capital Investment Programme 
Funding the Capital Investment Programme requires to be planned in an affordable
and sustainable manner. The funding sources to support delivery of the £406.5m
capital investment programme to 2033/34 include; 
The major sources of funding include assumptions on the level of general capital
grant from Scottish Government to 2033/34 (£90.8m) and the level of prudential
borrowing (£216.5m) required. The cost of borrowing is included within the Council’s
revenue budget process through the Medium-Term Financial Plan and the impact of
borrowing is included as part of the Council’s Treasury Management and Investment
Strategy. 
The Council takes a prudent approach when phasing the capital investment over the
period, with the main objective to ensure general capital grant from Scottish
Government is maximised. 
Other income sources are also explored including external income, grants, partner
contributions and capital receipts. The balance of funding is met from affordable
prudential borrowing with annual loans fund repayments made to reduce the debt.
This approach helps to ensure that investment in assets to deliver on the Council’s
strategic priorities is sustainable in the long term. 
£216.5
£89.1
£90.8
£4.9 £1.1
£4.1
Funding the Capital Investment Programme £406.5million
Prudential Borrowing Specific Capital Grants General Capital Grant
Reserve Funds Other Grants and Contributions Capital Receipts
86

Page 87

Treasury Management Strategy and Loans Fund Policy 
The Prudential Code for Capital Finance in Local Authorities enables councils to set
their own borrowing limits with a requirement to ensure that investment plans are
affordable, prudent and sustainable. The Council can borrow over a number of years
to supplement its capital income, provided the resultant annual debt repayments can
be accommodated within future years’ revenue budgets. The Council’s annual
Treasury Management and Investment Strategy sets out the prudential indicators
and parameters over the medium to long term, with regular reporting to Council
members through: 
• Annual Treasury Management and Investment Strategy
• Mid-Year Treasury Update report
• Annual Report following the financial year end describing the activity compared
to the strategy 
The key prudential and treasury indicators include: 
• Capital expenditure and financing
• The Council’s overall borrowing need (the Capital Financing Requirement)
• Limits to borrowing activity through the Operational Boundary and the
Authorised Limit. 
As reflected in the Treasury Management Strategy for 2024/25, the analysis of the
Capital Financing Requirement for North Ayrshire Council indicates that the
borrowing needs to support delivery of the capital programme will increase to
£821.544m by 2030/31 and then reduce annually to 2033/34. The analysis also
indicates that this borrowing need continues to be within the parameters of both the
Operational Boundary (the expected maximum borrowing position of the Council)
and the Authorised limit (the limit beyond which external debt is prohibited).
87

Page 88

Another key affordability indicator is the ratio of financing costs to net revenue
stream. This indicator identifies the trend in the cost of capital (borrowing and other
long-term liabilities, net of investment income) against the net revenue stream of the
Council.  The estimates of financing costs include current commitments and those
arising from the capital programme.  The Housing Revenue Account (HRA) costs are
aligned with the 30-year business plan. 
The estimated ratio of debt to net revenue stream across the next 3 years averages
at 4.3% for General Services and 27.7% for the HRA. From a General Fund
perspective, the CIPFA Directors of Finance Performance Indicators 2022/23 show a
Scottish Local Authority average of 5.4%, therefore demonstrating a prudent
borrowing policy. For the HRA, the indicative Scottish average in 2022/23 was
21.4%. The rising ratio within the HRA is indicative of the significant capital
investment programme as outlined in the Strategic Housing Investment Plan. The
level of loan charges is deemed prudent and affordable within the framework of the
30 year Housing business plan. 
The Liability Benchmark, another treasury prudential indicator, is an important tool
used to identify whether the Council is likely to be a long-term borrower or long-term
investor, allowing it to shape its strategic focus and decision making. The liability
benchmark itself represents an estimate of the cumulative amount of external
borrowing the Council must hold to fund its current capital and revenue plans while
keeping treasury investments at the minimum level required to manage day-to-day
cash flow. 
2023/24 2024/25 2025/26 2026/27
Probable Outturn Estimate Estimate Estimate
% % % %
General Services 2.5% 3.5% 4.4% 4.9%
HRA 20.5% 24.0% 28.7% 30.5%
Proportion of financing costs to net revenue stream
88

Page 89

Loans Fund Policy 
In July 2016, the Scottish Government confirmed the new Loans Fund accounting
arrangements under the provisions of the Local Authority (Capital Finance and
Accounting) (Scotland) Regulations 2016. This regulation requires the Council to
outline its policy on the repayment of Loans Fund advances. The Loans Fund
advance is effectively the repayment of the principal linked to the capital expenditure
which is required to be funded from borrowing. The broad aim of prudent repayment
is to ensure that the authority’s unfinanced capital expenditure is financed over the
expected life of the asset and that each year’s repayment amount is reasonably
commensurate with the period and pattern of the benefits. 
From a governance perspective the Loans Fund policy of North Ayrshire Council is
included as part of the Treasury Management and Investment Strategy and
submitted for approval to the North Ayrshire Council committee on an annual basis. 
89

Page 90

Governance 
Having robust governance arrangements in place is key to ensuring effective
strategic management of assets, from initial planning through to delivery, utilisation
and disposal. North Ayrshire Council delivers a governance framework through a
number of officer and member represented groups / committees. 
To ensure a consistent approach is adopted when considering any new capital
investment, a business case framework has been developed. The framework
includes key criteria across: 
• Aims and strategic objectives
• Scope and Benefits
• Options Appraisal, 
• Risks, Constraints & Dependencies
• Procurement arrangements
• Monitoring of Key milestones
• Evaluation criteria & scoring  
• Investment costs, funding and impact on revenue 
All business cases are considered by the Capital Programme and Assets Group and
the Executive Leadership Team, with a recommendation being made to Cabinet /
Council, for inclusion of new projects into the Capital Investment Programme. A key
focus when assessing potential capital investment is the alignment to the Council’s
strategic priorities, with the aim being to maximise opportunities where investment
meets multiple strategic priorities and where there is the potential to lever in external
funding. 
The current governance framework is illustrated below: 
Cabinet
North
Ayrshire
Council
Executive
Leadership
Team
Strategic
Assets
Group
Service
Project
Boards
Programme
Boards
Capital
Programme
and Assets
Group
90

Page 91

The Strategic Assets Group provides a strategic focus on the Council’s property
assets. The key objective of the group is the effective utilisation of Council assets
and to reduce the public sector’s building footprint and deliver improved services
from a smaller, more efficient and fit for purpose estate. 
Service Project Boards are chaired by Executive Directors across each Directorate
area with representation from relevant service managers. Following approval by
North Ayrshire Council committee on the Capital Investment Programme, the Service
Project Board is responsible for ensuring robust project management is in place to
deliver projects on time and within budget. 
Programme Boards provide a strategic focus at programme level and are chaired
by the responsible Chief Officer. Each programme can include a number of individual
projects across each Directorate which contribute to specific Council and programme
objectives. To ensure the objectives are met the Chief Officer for the programme is
responsible for strategic oversight including all projects that form part of the overall
programme. 
The Capital Programme and Assets Group is chaired by the Head of Service
(Finance) and is responsible for: 
• Ensuring a strategic and corporate overview of the Council’s capital programme
is in place.
• Developing and monitoring the Council’s capital investment programme,
tracking slippage on delivery and expenditure against approved budgets.
• Developing clear criteria for investment of Council resources on asset matters
and assessing all investment business cases.
• Developing a prudent capital receipts programme for inclusion in the Council’s
Capital Programme. 
The Executive Leadership Team consists of the Chief Executive, Executive
Director Communities, Executive Director Place, Head of Democratic Services, Head
of People and ICT and Head of Finance and is responsible for advising members on
the relative priorities of the Council’s long term investment needs and plays a key
monitoring role in ensuring the major capital projects deliver the anticipated benefits
on time and within budget. The Executive Leadership Team also considers all
business cases for new areas of capital investment as well as being the escalation
point for any key strategic decisions across the Capital Investment Programme prior
to consideration by Cabinet or Council. 
Cabinet is chaired by the Leader of the Council and is the main decision-making
body of the Council. It consists of member portfolio holders from the Administration.
Cabinet receives regular progress reports and approves amendments to the Capital
Investment Programme. 
North Ayrshire Council consists of all elected members and is chaired by the
Provost. The Council approves the corporate framework and the medium and longer
term Capital Investment Programme. 
91

Page 92

Knowledge & Skills
North Ayrshire Council employs professionally qualified and experienced staff in
senior positions with responsibility for making capital expenditure, borrowing and
investment decisions. 
The Head of Finance is a qualified accountant and holds the position of Section 95
officer for the Council. The Council’s Section 95 Officer is responsible for the proper
administration of the Council’s financial affairs and is required: 
• to recommend treasury management policies / practices, review these regularly
and monitor compliance; 
• to submit regular treasury management updates; 
• to receive and review management information;
• to review the performance of the treasury management function;
• to ensure the adequacy of treasury management resources and skills and the
effective division of responsibilities within the treasury management function;
and 
• to approve the appointment of external service providers. 
Where the Council does not have the knowledge and skills required, use is made of
external advisers that are specialists in their field. The Council currently employs
Arlingclose Limited as treasury management advisers to ensure that we have access
to specialist knowledge and skills if required. 
Decisions to invest in land and property are overseen in accordance with Council
policies and the priorities from our Council plan, to capitalise on its position, power
and influence to deliver tangible improvements to the lives of people in North
Ayrshire. These decisions are made by suitably qualified personnel including
architects and surveyors. 
Risk 
There are risks inherent across all capital planning and project delivery activity. Key
planning risks are managed / mitigated through detailed business case development
prior to any capital investment project getting approved. From a project delivery
perspective, risk registers are maintained throughout the duration of the project and
in accordance with standard project management practice. The long-term view to
capital investment and the development of associated strategies also play a key role
in risk management. Examples include: 
• Development of a 10-year capital programme, considering funding and
priorities in the long term
• Asset Management Plans and lifecycle maintenance which inform capital plans
in the long term
• Treasury Management and Investment Strategy which considers borrowing
levels in the long term.
• Local Housing Strategy and Strategic Housing Investment Plan takes a medium
and long-term view of housing and regeneration priorities.
92

Page 93

Conclusion 
The Capital Investment Strategy for North Ayrshire Council provides an overview of
how capital expenditure plans, capital financing and treasury management activity
contribute to the infrastructure and provision of services for the benefit of North
Ayrshire communities and citizens. It is a reporting requirement of the CIPFA
Prudential Code. 
The Strategy takes account of the Council’s strategic priorities and considers any
new investment within the context of outcomes and affordability. There is also
recognition of the need to balance investment between maintaining current assets
and infrastructure against the ambitions for acquiring new assets. 
The current capital programme demonstrates an innovative approach in maximising
investment across multiple strategic priority areas, with developments that
incorporate education provision, community facilities, health and social care services
and housing. This approach, whilst providing key services that deliver positive
outcomes to communities, also contributes to the wider economic regeneration of
North Ayrshire, helping to grow the population and the local economy. 
Working in partnership with the UK and Scottish Government and East Ayrshire and
South Ayrshire councils, the Ayrshire Growth Deal will regenerate the region through
investment in strategic infrastructure across various sectors, including life sciences,
tourism, manufacturing and aerospace, with total investment of over £251.5m. 
93

Page 94

Related Documents / Strategies / Plans 
Council Plan
Local Development Plan
Asset Management Plans
Local Outcomes Improvement Plan
Local Housing Strategy
Strategic Housing Investment Plan
Technology Strategy
Estates Strategy
10 Year Capital Investment Programme
Regeneration Delivery Plan
Treasury Management and Investment Strategy
Loans Fund Policy
HSCP Strategic Plan
Environmental,Sustainability & Climate Change Strategy
94

Page 95

NORTH AYRSHIRE COUNCIL 
28 February 2024 
North Ayrshire Council 
Title:    Revenue Estimates 2024/25 – Common Good Funds and
Trusts 
Purpose:  To advise Council of the anticipated annual income and
expenditure of the Common Good Funds and Trusts
administered by North Ayrshire Council and seek approval for
the level of funding to be made available for disbursement
during 2024/25. 
Recommendation:  That Council: 
(a)      approves the 2024/25 revenue estimates for the Common
Good Funds and registered Charitable Trusts detailed in
Appendix 1;
(b)      approves the carry forward of funds from Irvine Common
Good Fund to meet the costs of essential works required
at Seagate Castle, as noted at paragraph 2.2;
(c)  approves the amounts available for disbursement noted at
paragraphs 2.12 and 2.13;
(d)  agrees to capital spend from the dormant and low value
Trusts and Common Good Funds, and instructs officers to
seek approval from the Office of the Scottish Charity
Regulator (OSCR) prior to the disbursement of any grant
which would result in the winding up of a Trust;
(e) notes that approval will now be sought from OSCR for the
winding up of the James Dyer Simpson Fund, H Watt
Trust  and J H Watt Trust, held within North Ayrshire
Charitable Trust. 
1. Executive Summary 
1.1 The Council is the custodian of the Common Good Funds for the former burghs of
Ardrossan, Irvine, Largs, Millport, Saltcoats and Stevenston and a number of
charitable Trusts, which are largely composed of bequests made many years ago. 
1.2 This report provides Members with an overview of the financial position of each
Common Good Fund and Charitable Trust and recommends the level of expenditure
which can be disbursed from each for 2024/25.
Agenda Item 5
95

Page 96

1.3 Following delays in previous financial years, previously approved essential works at
Seagate Castle have not yet been completed and Council is asked to approve the
carry forward of this budget to allow the completion of these works during 2024/25.
Should cost projections exceed estimates, a further report will be presented to
Council. 
1.4 The Common Good Funds and Trusts make annual disbursements of grants to
groups and individuals. The level of funding available for these grants is normally set
at the net annual income of each Fund or Trust after meeting their expenditure
commitments. For Common Good Funds, where the expenditure commitments
exceed the annual income, the recommended budget for grant disbursement reflects
the level of disbursements in previous years or £5,000, whichever is the greater. 
1.5 In order to encourage the utilisation of funds across communities, in particular where
the Trusts have been dormant or have low levels of income, it is recommended that,
with the exception of those Trusts with significant balances, the full balance of the
Trusts are approved as available for disbursement. Any disbursement which utilises
the full capital balance will result in closure and will require the approval of OSCR.
During 2024/25, the funds within Douglas Sellers Trust and Anderson Park Trust will
be exhausted. Approval will be sought from OSCR for the disbursement of any
remaining capital and winding up of these Trusts. 
1.6   During 2023/24 the remaining capital within James Dyer Simpson Fund, H Watt Trust
and J H Watt Trust, held within the North Ayrshire Charitable Trust, was disbursed.
Approval will be sought from OSCR for winding up of these Trusts. 
2. Background 
Common Good Funds 
2.1 The Council is the custodian of the Common Good Funds for the former burghs of
Ardrossan, Irvine, Largs, Millport, Saltcoats and Stevenston. The purpose of the
Common Good Funds is to benefit the general population within the defined areas of
each of their respective towns. 
2.2 At its meeting on 5 March 2020, Council approved the allocation of £0.250m from
Irvine Common Good Fund to meet the costs of works required at Seagate Castle.
Following delays in the completion of these works during previous financial years,
Council is asked to approve the carry forward of the £0.189m balance to allow the
completion of the works during 2024/25. As noted in the previous reports to Council,
working on a structure as historic as this may flag up further works which may need to
be addressed at the same time. Should cost projections exceed estimates, a further
report will be presented to Council. 
96

Page 97

2.3 The Common Good Funds make annual disbursements to groups and individuals
based on approved criteria. The levels of grant available for disbursement is
determined after all expenditure commitments and projected income from assets has
been assessed. Current practice has been for the remaining surplus to be made
available for trustees to disburse, ensuring that capital balances are left intact, with
the disbursement of funds from the capital balance requiring Council approval. It is
recommended that this practice continues for those Common Good Funds with
sufficient net income, with the minimum budget set at £5,000 for each. 
2.4 In the case of Irvine and Largs Common Good Funds, the level of expenditure
exceeds the level of income. In order to maximise the benefits to the community, it is
proposed that the budgets for grant disbursement are set at a level which reflects
previous years’ disbursements. 
Charitable Trusts 
2.5 The Council also administers a number of Trusts which are largely composed of
bequests made many years ago. Of these Trusts, there are only two which accrue
significant levels of income; the Spier’s Trust and the Margaret Archibald Trust. The
Spier's Trust was founded in 1936 for the administration of Spier's School, Beith and
for the provision of educational grants and bursaries for the benefit of the local area,
comprising the parishes of Beith, Dalry, Dunlop, Kilbirnie, Lochwinnoch and Neilston.
The purpose of the Margaret Archibald Trust is "to apply the capital and income from
time to time, at the discretion of the Council, for the charitable purpose of persons in
need who have attained sixty five years of age, living in the Parish of Dalry, Ayrshire". 
2.6 The remaining Trusts comprise four town Trusts, covering Dalry, Kilbirnie &
Glengarnock, Kilwinning and Largs, which provide assistance to persons in need
within the defined area of each fund; the North Ayrshire Council Trust, which
incorporates a further seven smaller funds; two minor Trusts and a number of sundry
bequests listed on Appendix 2. 
2.7  Historically a number of Trusts have experienced periods of dormancy where no grant
applications have been received. OSCR is keen that charities fulfil their charitable
purposes and the Council’s external auditors have previously expressed concern
about the continued lack of activity in these Trusts. If no other action is taken, the
annual external audit fee and administrative charges will eventually exhaust these
Trusts. As such, the utilisation of available funds through a particular project which
complies with the Trust’s purposes should be considered. It is, therefore,
recommended that, with the exception of those Trusts with significant balances, the
full balances of the town and minor Trusts are made available for disbursement. It
should be noted that any disbursement which would result in the winding up of a
registered Trust must be approved by OSCR before the relevant Locality Partnership
agrees the grant. For those Trusts with significant balances, it is proposed that the
budgets for grant disbursement are set at a level which reflects previous years’
disbursements. 
2.8  During 2024/25, the funds within Douglas Sellers Trust and Anderson Park Trust will
be exhausted. Approval will be sought from OSCR for the disbursement of the
remaining capital and winding up of these Trusts.
97

Page 98

2.9 As previously reported to Council in March 2023, the James Dyer Simpson Fund, H
Watt Trust and J H Watt Trust have disbursed all remaining funds and approval will
now be sought from OSCR for the winding up of these 3 Trusts by the Council’s Legal
Services Team. 
2.10 The following table summarises the anticipated income and expenditure for each
Common Good Fund and Trusts and the proposed budget for grant disbursement for
each: 
2.11 The remaining smaller trusts administered by the Council are listed in Appendix 2.
Projected income for 2024/25 is £232 and during 2023/24, thus far, there have been
no disbursements. Therefore, the full balance of £13,970 is available for disbursement
during 2024/25. 
Estimated
Balance at 1
April 2024
Estimated
Income
2024/25
Estimated
Expenditure
2024/25
Available for
Disbursement
Estimated
Balance at
31 March
2025
£ £ £ £ £
Common Good Fund
Ardrossan 344,472 44,320 (13,883) (30,437) 344,472
Irvine 1,118,352 83,875 (239,430) (41,041) 921,756
Largs 433,573 22,634 (29,061) (10,000) 417,145
Millport 68,823 1,150 (378) (5,000) 64,595
Saltcoats 14,781 230 (80) (5,000) 9,931
Stevenston 188,342 17,430 (1,030) (16,400) 188,342
TOTAL 2,168,342 169,639 (283,862) (107,878) 1,946,241
Registered Charitable Trusts
Dalry 1,823 30 (168) (1,685) 0
Kilbirnie & Glengarnock 2,975 40 (174) (2,841) 0
Kilwinning 37,618 630 (386) (37,862) 0
Largs 2,261 30 (176) (2,115) 0
Speir's Trust 61,666 4,230 (1,175) (3,055) 61,666
Margaret Archibald Trust 211,661 14,266 (504) (13,762) 211,661
Douglas Sellers Trust 164 0 (158) (6) 0
Anderson Park Trust 22 0 0 (22) 0
NAC Charitable Trust 47,644 2,694 (316) (2,378) 47,644
TOTAL 365,834 21,920 (3,057) (63,726) 320,971
98

Page 99

3. Proposals 
3.1 That Council: 
(a) approves the 2024/25 revenue estimates for the Common Good Funds and
registered Charitable Trusts detailed in Appendix 1; 
(b)  approves the carry forward of funds from Irvine Common Good Fund to meet
the costs of essential works required at Seagate Castle, as noted at
paragraph 2.2; 
(c)  approves the amounts available for disbursement noted at paragraphs 2.12
and 2.13;
(d)  agrees to capital spend from the dormant and low value Trusts and Common
Good Funds, and instructs officers to seek approval from the Office of the
Scottish Charity Regulator (OSCR) prior to the disbursement of any grant
which would result in the winding up of a Trust;
(e) notes that approval will now be sought from OSCR for the winding up of the
James Dyer Simpson Fund, H Watt Trust  and J H Watt Trust, held within
North Ayrshire Charitable Trust. 
4. Implications/Socio-economic Duty 
Financial 
4.1 Approval of the budgets will allow each Locality Partnership to disburse individual
grants up to the approved levels. 
All income and expenditure which relates to Common Good properties must be
charged to the relevant Common Good Fund. 
Human Resources 
4.2 None. 
Legal 
4.3 All expenditure from Trusts and Common Good Funds must be for the purposes of the
Trust or meet the Common Good criteria of benefitting the inhabitants of the Common
Good area. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
99

Page 100

Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by developing strong
relationships with communities and providing support for community organisations in
achieving their goals. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Legal Services have been consulted on the recommendations and procedures for
winding up the Trusts.
Click here to enter text.
Mark Boyd
Head of Service Finance(Chief Executives) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
None
100

Page 101

Index of Common Good and Trust Funds 
Page
Appendix 1 
Common Good Funds 
Ardrossan            1
Irvine             2
Largs             3
Millport            4
Saltcoats            4
Stevenston            5 
Trusts 
North Ayrshire Council (Dalry) Charitable Trust       6
North Ayrshire Council (Kilbirnie & Glengarnock) Charitable Trust    6
North Ayrshire Council (Kilwinning) Charitable Trust      7
North Ayrshire Council (Largs) Charitable Trust       7
Speir’s Trust            8
Margaret Archibald Trust          8
Douglas Sellers Trust          9
Anderson Park Trust          9
North Ayrshire Council Charitable Trust       10 
Appendix 2 
Sundry Bequests          11 
101

Page 102

1 | P a g e
Budget
2023/24 
Projected
Outturn
2023/24 
Proposed
Budget
2024/25
£ £ £
308,045     325,082     Projected Common Good Balance Brought Forward at 1 April 344,472    
INCOME
38,500      38,500      Rental - Ardrossan Civic Centre 38,500     
7,700        15,090      Loans Fund Interest (on cash balances) 5,820       
46,200      53,590      TOTAL INCOME FOR THE YEAR 44,320     
EXPENDITURE
Property Costs
12,000      0 External Property Repairs - Ardrossan Civic Centre 12,000
Others
1,586        1,586        Administration - Charge from Finance 1,883       
13,586      1,586        SUB TOTAL OF EXPENDITURE 13,883     
32,614 52,004 SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 30,437
32,614      32,614      Available for Disbursement as Grants 30,437     
0 19,390 FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS 0
308,045     344,472     COMMON GOOD BALANCE CARRIED FORWARD AT 31 MARCH 344,472    
COMMON GOOD FUND - ARDROSSAN
102

Page 103

2 | P a g e
Budget
2023/24 
Projected
Outturn
2023/24 
Proposed
Budget
2024/25
£ £ £
1,093,549  1,115,681      Projected Common Good Balance Brought Forward at 1 April 1,118,352    
INCOME
Property Rentals
25,000      25,000          Woodlands Centre 25,000         
11,500      11,500          Bank Street (Church of Latter Day Saints) 11,500         
13,385      13,385          Irvine Moor 13,385         
13,000      13,000          Ground East Road (McConnachies) 13,000         
2,000        2,000            East Road New Car Park 2,000           
Other Income
27,340      49,260          Loans Fund Interest (on cash balances) 18,990         
92,225      114,145        TOTAL INCOME FOR THE YEAR 83,875         
EXPENDITURE
Property Costs
500           500               General Repairs 500             
10,500      10,219          Rates on vacant properties (36/38 Bank Street) 10,500         
3,110        3,110            Electricity 1,837           
30,445      28,995          Grounds Maintenance* 30,445         
210,000     21,000          Property Maintenance - Seagate Castle 189,000       
1,000        980               Other Property Costs 1,000           
255,555     64,804          233,282       
Others
5,629        5,629            Administration - Charge from Finance 6,148           
5,629        5,629            6,148           
261,184     70,433          SUB TOTAL OF EXPENDITURE 239,430       
(168,959)    43,712          SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS (155,555)      
26,500      41,041          Available for Disbursement as Grants 41,041         
(195,459)    2,671            FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS (196,596)      
898,090     1,118,352      COMMON GOOD BALANCE CARRIED FORWARD AT 31 MARCH 921,756       
COMMON GOOD FUND - IRVINE
103

Page 104

3 | P a g e
* For the upkeep of ground at Douglas Park. 
Budget
2023/24 
Projected
Outturn
2023/24 
Proposed
Budget
2024/25
£ £ £
425,819     431,752      Projected Common Good Balance Brought Forward at 1 April 433,573    
INCOME
Property Rentals (Including Insurance Premiums)
7,315        7,315         Haylie House 7,315       
1,250        1,250         Douglas Park Bowling Club 1,250       
210           210            Douglas Park Grazings 210          
6,000        6,000         Douglas Park Tennis Club & Children's Nursery 6,539       
Other Income
10,650      19,000       Loans Fund Interest (on cash balances) 7,320       
25,425      33,775       TOTAL INCOME FOR THE YEAR 22,634     
EXPENDITURE
Property Costs
5,584        5,300         Electricity 10,976     
13,462      13,462       Grounds Maintenance* 14,714     
1,000        1,000         Other Property Costs 1,000       
Others
2,192        2,192         Administration - Charge from Finance 2,371       
22,238      21,954       SUB TOTAL OF EXPENDITURE 29,061     
3,187        11,821       SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS (6,427)      
10,000      10,000       Available for Disbursement as Grants 10,000     
(6,813)       1,821         FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS (16,427)    
419,006     433,573      COMMON GOOD BALANCE CARRIED FORWARD AT 31 MARCH 417,145    
COMMON GOOD FUND - LARGS
104

Page 105

4 | P a g e
Budget
2023/24 
Projected
Outturn
2023/24 
Proposed
Budget
2024/25
£ £ £
66,008 67,433 Projected Common Good Balance Brought Forward at 1 April 68,823     
INCOME
1,630 3,020 Loans Fund Interest (on cash balances) 1,150       
1,630 3,020 TOTAL INCOME FOR THE YEAR 1,150       
EXPENDITURE
Others
335 335 Administration - Charge from Finance 378          
335 335 SUB TOTAL OF EXPENDITURE 378          
1,295 2,685 SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 772
1,295 1,295 Available for Disbursement as Grants 5,000       
0 1,390 FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS 4,228
66,008 68,823      COMMON GOOD BALANCE CARRIED FORWARD AT 31 MARCH 64,595     
COMMON GOOD FUND - MILLPORT
Budget
2023/24 
Projected
Outturn
2023/24 
Proposed
Budget
2024/25
£ £ £
15,106      15,213      Projected Common Good Balance Brought Forward at 1 April 14,781     
INCOME
350           640           Loans Fund Interest (on cash balances) 230          
350           640           TOTAL INCOME FOR THE YEAR 230          
EXPENDITURE
73             72             Administration - Charge from Finance 80            
73             72             SUB TOTAL OF EXPENDITURE 80            
277 568 SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 150
1,000        1,000        Available for Disbursement as Grants 5,000       
(723) (432) FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS (4,850)
14,383      14,781      COMMON GOOD BALANCE CARRIED FORWARD AT 31 MARCH 9,931       
COMMON GOOD FUND - SALTCOATS
105

Page 106

5 | P a g e
Budget
2023/24 
Projected
Outturn
2023/24 
Proposed
Budget
2024/25
£ £ £
175,310     184,472     Projected Common Good Balance Brought Forward at 1 April 188,342    
INCOME
Property Rentals
14,250      14,250      New Street (Health & Social Care) 14,250     
Other Income
4,380        8,250        Loans Fund Interest (on cash balances) 3,180       
18,630      22,500      TOTAL INCOME FOR THE YEAR 17,430     
EXPENDITURE
902           902           Administration - Charge from Finance 1,030       
902           902 SUB TOTAL OF EXPENDITURE 1,030       
17,728      21,598      SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 16,400     
17,728      17,728      Available for Disbursement as Grants 16,400     
0 3,870        FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS 0
175,310     188,342     COMMON GOOD BALANCE CARRIED FORWARD AT 31 MARCH 188,342    
COMMON GOOD FUND - STEVENSTON
106

Page 107

6 | P a g e
Budget
2023/24 
Projected
Outturn
2023/24 
Proposed
Budget
2024/25
£ £ £
1,878        1,903        Projected Trust Balance Brought Forward at 1 April 1,823       
INCOME
47             80             Loans Fund Interest (on cash balances) 30            
47             80             TOTAL INCOME FOR THE YEAR 30            
EXPENDITURE
160           160           Administration - Charge to Finance 168          
160           160           SUB TOTAL OF EXPENDITURE FOR THE YEAR 168          
(113) (80) SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS (138)
1,765        0 Available for Disbursement as Grants 1,685       
(1,878) (80) FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS (1,823)
0 1,823        TRUST BALANCE CARRIED FORWARD AT 31 MARCH 0             
NAC (DALRY) CHARITABLE TRUST
Budget
2023/24 
Projected
Outturn
2023/24 
Proposed
Budget
2024/25
£ £ £
2,978        3,010        Projected Trust Balance Brought Forward at 1 April 2,975       
INCOME
75             130           Loans Fund Interest (on cash balances) 40            
75             130           TOTAL INCOME FOR THE YEAR 40            
EXPENDITURE
165           165           Administration - Charge from Finance 174          
165           165           SUB TOTAL OF EXPENDITURE FOR THE YEAR 174          
(90) (35) FINAL SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS (134)
2,888        -               Available for Disbursement as Grants 2,841       
(2,978) (35) FINAL SURPLUS/(DEFICIT) FOR THE YEAR (2,975)
0 2,975        TRUST BALANCE CARRIED FORWARD AT 31 MARCH 0
NAC (KILBIRNIE & GLENGARNOCK) CHARITABLE
TRUST
107

Page 108

7 | P a g e
Budget
2023/24 
Projected
Outturn
2023/24 
Proposed
Budget
2024/25
£ £ £
36,045      37,594      Projected Trust Balance Brought Forward at 1 April 37,618     
INCOME
934           1,650        Loans Fund Interest (on cash balances) 630          
934           1,650        TOTAL INCOME FOR THE YEAR 630          
EXPENDITURE
342           342           Administration - Charge from Finance 386          
342           342           SUB TOTAL OF EXPENDITURE FOR THE YEAR 386          
592 1,308 SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 244
36,637      1,284        Available for  Disbursement as Grants 37,862     
(36,045) 24 FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS (37,618)
0 37,618      TRUST BALANCE CARRIED FORWARD AT 31 MARCH 0             
NAC (KILWINNING) CHARITABLE TRUST
Budget
2023/24 
Projected
Outturn
2023/24 
Proposed
Budget
2024/25
£ £ £
3,301        3,328        Projected Trust Balance Brought Forward at 1 April 2,261       
INCOME
83             100           Loans Fund Interest (on cash balances) 30            
83             100           TOTAL INCOME FOR THE YEAR 30            
EXPENDITURE
167           167           Administration - Charge from Finance 176          
167           167           SUB TOTAL OF EXPENDITURE FOR THE YEAR 176          
(84) (67) SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS (146)
3,217        1,000        Available for Disbursement as Grants 2,115       
(3,301) (1,067) FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS (2,261)
0 2,261        TRUST BALANCE CARRIED FORWARD AT 31 MARCH 0
NAC (LARGS) CHARITABLE TRUST
108

Page 109

8 | P a g e
Budget
2023/24 
Projected
Outturn
2023/24 
Proposed
Budget
2024/25
£ £ £
8              22             Projected Trust Balance Brought Forward at 1 April 22            
INCOME
0 0 Loans Fund Interest (on cash balances) 0
0 0 TOTAL INCOME FOR THE YEAR 0
EXPENDITURE
Administration - Charge from Finance 0
0 0 SUB TOTAL OF EXPENDITURE FOR THE YEAR 0
0 0 SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 0
8              0 Available for Disbursement as Grants 22            
(8) 0 FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS (22)
0 22             TRUST BALANCE CARRIED FORWARD AT 31 MARCH 0
ANDERSON PARK TRUST
Budget
2023/24 
Projected
Outturn
2023/24 
Proposed
Budget
2024/25 
£  £  £
197,297     197,817     Projected Trust Balance Brought Forward at 1 April 211,661    
INCOME
10,130      10,688      Share dividends 10,696     
1,093        9,250        Loans Fund Interest (on cash balances) 3,570       
11,223      19,938      TOTAL INCOME FOR THE YEAR 14,266     
EXPENDITURE
302           444           Administration - Charge from Finance 504          
302           444           SUB TOTAL OF EXPENDITURE FOR THE YEAR 504          
10,921 19,494 SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 13,762     
10,921      5,650        Available for Disbursement as Grants 13,762     
0 13,844 FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS 0
197,297     211,661     TRUST BALANCE CARRIED FORWARD AT 31 MARCH 211,661    
MARGARET ARCHIBALD BEQUEST
109

Page 110

9 | P a g e
Budget
2023/24 
Projected
Outturn
2023/24 
Proposed
Budget
2024/25 
£  £  £
197,297     197,817     Projected Trust Balance Brought Forward at 1 April 211,661    
INCOME
10,130      10,688      Share dividends 10,696     
1,093        9,250        Loans Fund Interest (on cash balances) 3,570       
11,223      19,938      TOTAL INCOME FOR THE YEAR 14,266     
EXPENDITURE
302           444           Administration - Charge from Finance 504          
302           444           SUB TOTAL OF EXPENDITURE FOR THE YEAR 504          
10,921 19,494 SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 13,762     
10,921      5,650        Available for Disbursement as Grants 13,762     
0 13,844 FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS 0
197,297     211,661     TRUST BALANCE CARRIED FORWARD AT 31 MARCH 211,661    
MARGARET ARCHIBALD BEQUEST
Budget
2023/24 
Projected
Outturn
2023/24 
Proposed
Budget
2024/25
£ £ £
291           306           Projected Trust Balance Brought Forward at 1 April 164          
INCOME
7              10             Loans Fund Interest (on cash balances) 0
7              10             TOTAL INCOME FOR THE YEAR 0
EXPENDITURE
152           152           Administration - Charge from Finance 158          
152           152           SUB TOTAL OF EXPENDITURE FOR THE YEAR 158           
(145) (142) SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS (158)
146           0 Available for Disbursement as Grants 6             
(291) (142) FINAL SURPLUS/(DEFICIT) FOR THE YEAR (164)
0 164           TRUST BALANCE CARRIED FORWARD AT 31 MARCH 0
DOUGLAS SELLERS TRUST
110

Page 111

10 | P a g e
Budget
2023/24 
Projected
Outturn
2023/24 
Proposed
Budget
2024/25
£ £ £
42,363      44,194      Projected Trust Balance Brought Forward at 1 April 47,644     
INCOME
1,885        1,904        Dividends 1,904       
1,027        2,080        Loans Fund Interest (on cash balances) 790          
2,912        3,984        TOTAL INCOME FOR THE YEAR 2,694       
EXPENDITURE
284           284           Administration - Charge from Finance 316          
284           284           SUB TOTAL OF EXPENDITURE FOR THE YEAR 316          
2,628        3,700        SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 2,378       
2,628        250           Available for Disbursement as Grants 2,378       
0 3,450 FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS 0
42,363      47,644      TRUST BALANCE CARRIED FORWARD AT 31 MARCH 47,644     
NORTH AYRSHIRE COUNCIL CHARITABLE TRUST
(excluding SPIERS TRUST)
111

Page 112

Appendix 2
11 | P a g e
Name of Funds Investment
Projected
Income
2024/25
Available for
Disbursement
2024/25
Purpose of Bequest
£ £ £
Isabella McPhee Memorial Fund 2,962                 50                      3,012                 Largs - Annual Putting
Competition (Mackerston)
N Stewart 1,682                 28                      1,710                 Provision of Liberty at
Rothesay and Arran
Sturrock 3,033                 51                      3,084                 Upkeep of Springside
Community Centre
Clark Trophy 568                    10                      577                    Road Safety Competition
Ayrshire Accident Relief 4,009                 68                      4,077                 Accident Relief
Cast/Florist/N Child 290                    5                       295                    No information available
Miss Hanslip Bequest 1,195                 20                      1,215                 No information available
Total 13,738 232 13,970             
Sundry Bequests
112

Page 113

NORTH AYRSHIRE COUNCIL 
28 February 2024 
North Ayrshire Council 
Title:    Treasury Management and Investment Strategy 2024/25 
Purpose:  To seek approval for the proposed Strategy for Treasury
Management and Investment activities within the Council for the
financial year 2024/25. 
Recommendation:  That Council approves the Treasury Management and
Investment Strategy for 2024/25 as attached at Appendix 1 
1. Executive Summary 
1.1 The Council is required by regulations issued under the Local Government in Scotland
Act 2003 and the Chartered Institute of Public Finance and Accountancy’s Treasury
Management in the Public Services: Code of Practice 2021 Edition (the CIPFA Code) to
approve a Treasury Management Strategy before the start of each financial year. The
Council is also required by regulation to have regard to CIPFA’s Prudential Code for
Capital Finance in Local Authorities (2021) under Part 7 of the Local Government in
Scotland Act 2003. In addition, the Consent by Scottish Ministers for the Investment of
Money by Scottish Local Authorities, which came into force in April 2010, requires the
Authority to approve an Investment Strategy before the start of each financial year. 
1.2 The Treasury Management and Investment Strategy attached to this report complies
fully with these requirements and provides: 
• a summary of the Council’s capital plans;
• an outline of the treasury management strategy in relation to borrowing and the
impact of capital plans on this borrowing; and
• an outline of the investment strategy including the type of instruments available for
investment and our permitted counterparties. 
1.3 The strategy provides key prudential and treasury indicators to 2033/34 which clearly
articulate the operational parameters associated with Treasury Management and
Investment as well as offering assurance in relation to the affordability and sustainability
of capital investment plans.  
Agenda Item 6
113

Page 114

1.4 The key points highlighted in this report are;  
• the continuation of an “under borrowed” position; 
• interest rate forecasts predict that the UK Bank Rate will begin to decline in the
latter half of 2024 and continue to decline until December 2025;
• notes the introduction of International Financial Reporting Standard (IFRS)16
which from 1 April  2023 sees leases, which were previously off balance sheet,
now being included. Although leases form part of the other long term liability
figures which make up the Prudential Indicators, it is not currently anticipated
that the Indicators will be exceeded. The full impact will not be known until the
end of the financial year 2023/24, an updated report may be required to inform
the members of the detailed impact of IFRS 16 with amended Prudential
Indicators for approval. 
1.5 As recommended under the CIPFA Prudential and Treasury Management Codes,
updated performance information in relation to the treasury management and prudential
indicators are reported to Cabinet on a quarterly basis as part of the regular Revenue
and Capital Monitoring arrangements. 
2. Background 
2.1 CIPFA defines treasury management as: 
‘The management of the local authority’s investments and cash flows, its banking,
money market and capital market transactions; the effective control of the risks
associated with those activities; and the pursuit of optimum performance consistent with
those risks.’ 
2.2 The Local Government Scotland Act 2003 and the Prudential Code requires the Council
to approve an annual Treasury Management and Investment Strategy which outlines
the Council's strategy in relation to borrowing and the Council's strategy for managing
investments giving priority to the security and liquidity of those investments. 
2.3 The Treasury Management and Investment Strategy 2024/25 is attached at Appendix 1.
The overall objectives of the strategy are as follows: 
Borrowing 
• to minimise the revenue cost of borrowings;
• to manage the Council’s cash flow;
• to manage the borrowing repayment profile;
• to assess interest rates’ movements and borrow/invest accordingly;
• to monitor and review the level of variable rate loans held in order to take
advantage of interest rate movements; and
• to identify and evaluate opportunities for debt rescheduling. 
114

Page 115

Investments
• to protect capital security of the invested funds;
• to obtain the best market return whilst recognising that security and liquidity are key
priorities;
• to specify criteria for identifying creditworthy counterparties; and
• to specify the types of investments permitted and appropriate limits for each. 
2.4 The strategy provides detailed key prudential and treasury indicators to 2033/34,
aligned to the Councils current capital investment programme, which clearly articulate
the operational parameters associated with Treasury Management and Investment as
well as offering assurances in relation to the affordability and sustainability of capital
investment strategy, including; 
• the General Services capital plan to 2033/34; and
• the Housing Revenue Account Capital Plan to 2053/54 
2.5 The strategy also links with the key objectives of the Prudential Code that capital
investment programmes: 
• should be set at a level that delivers the Council’s strategic priorities; and 
• are affordable in terms of the impact of the resultant debt repayments on revenue
budgets. 
2.6 The Treasury Management and Investment Strategy includes prudential indicators
which are critical in assessing the affordability of capital investment plans and their
impact on the Council's overall finances. The indicator used to demonstrate
affordability is the proportion of financing costs to the net revenue stream (for both
General Fund and Housing Revenue Account). 
2.7 There are a number of other key indicators designed to ensure that the Council
operates within well-defined limits. The strategy, therefore, specifies: 
• limits we do not expect external debt to exceed; 
• appropriate levels of fixed rate borrowing versus variable rate borrowing;
• upper and lower limits on the maturity of the debt portfolio, which reduces the
Council's exposure to large sums falling due for refinancing at any one time; and
• limits on investments placed for more than 365 days. 
2.8 The Council expects to hold an 'under-borrowed' position at 31 March 2024. This means
that the capital borrowing need (the Capital Financing Requirement) has not been fully
funded by debt, due to the level of the Council's internal funds. The use of internal funds
instead of borrowing will continue in order to minimise borrowing costs. This under-
borrowed position will decline through time as internal funds reduce and borrowing is
required to be undertaken to replace internal funding. 
115

Page 116

2.9 The Treasury Management and Investment Strategy includes details of the Council’s
policy on repayment of loans fund advances. The Council’s policy complies with the
options currently available under the Local Authority (Capital Financing and Accounting)
(Scotland) Regulations 2016 and the asset lives and methodologies used have been
reviewed to provide for the prudent repayment of advances. 
3. Proposals 
3.1 That Council approves the Treasury Management and Investment Strategy for 2024/25
as attached at Appendix 1. 
4. Implications/Socio-economic Duty 
Financial 
4.1 Financial implications are detailed in the report attached at Appendix 1. 
Human Resources 
4.2 None. 
Legal 
4.3 The Local Government in Scotland Act 2003 and supporting regulations require the
Council to set out its Treasury Strategy for borrowing and to prepare an Annual
Investment Strategy. The Local Authority (Capital Financing and Accounting) (Scotland)
Regulations 2016 require the Council to set a policy for the repayment of loans fund
advances. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 The Treasury Management Strategy aligns with the Council Plan 2023-28 by ensuring
robust governance arrangements are in place to fulfil the Council’s statutory duties,
manage risk and support delivery of key priorities. 
Community Wealth Building 
4.7 None. 
116

Page 117

5. Consultation 
5.1 The Council's treasury advisors, Arlingclose Ltd, were consulted in the preparation of the
Strategy. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic Business
Partner), on 01294 324551. 
Background Papers
None   
117

Page 118

1 | P a g e
Treasury Management  and
Investment Strategy 2024/25 
Appendix 1
118

Page 119

2 | P a g e
Table of Contents 
1 Purpose 3   
2 Executive Summary 5   
3 Capital and Prudential Indicators 2024/25 – 2026/27 7 
Capital Expenditure and Financing 7 
The Council's Overall Borrowing Need (the Capital Financing Requirement) 8 
The Liability Benchmark 9 
Limits to Borrowing Activity 10 
Affordability Prudential Indicators 11   
4 Treasury Management Strategy 12 
Interest Rate Forecast 12 
Current Portfolio Position 13 
Controls on Borrowing Activity 14 
LOBOs 15 
Policy on Borrowing in Advance of Need 15 
Debt Rescheduling 15 
Borrowing Sources 15 
Policy on Use of Financial Derivative 16 
Policy on Repayment of Loans Fund Advances 16   
5 Investment Strategy 17 
Current Portfolio Position 18 
Environmental, Social and Governance (ESG) Policy 18 
Creditworthiness Policy 18 
Bail-in Risk 19 
Investment Strategy and Permitted Investments 20 
Summary of Material Investments, Guarantees and Liabilities 21 
Monitoring of Investment Strategy 21   
Appendices 
Appendix 1: Prudential Indicators 2028 to 2034 22 
Appendix 2: Treasury Risk Register 25 
Appendix 3: Permitted Investments, Risks and Mitigating Controls 27 
Appendix 4: Policy on Repayment of Loans Fund Advances 32 
Appendix 5: Economic Background 34  
119

Page 120

3 | P a g e
1 Purpose 
The Council is required by regulations issued under the Local Government in Scotland Act
2003 and the Chartered Institute of Public Finance and Accountancy’s Treasury Management
in the Public Services: Code of Practice 2021 Edition (the CIPFA Code) to approve a
Treasury Management Strategy before the start of each financial year. The Council is also
required by regulation to have regard to CIPFA’s Prudential Code for Capital Finance in Local
Authorities (2021) under Part 7 of the Local Government in Scotland Act 2003. 
In addition, the Consent by Scottish Ministers for the Investment of Money by Scottish Local
Authorities, which came into force in April 2010, requires the Authority to approve an
Investment Strategy before the start of each financial year.  
This strategy meets these requirements fully. 
Three main reports on Treasury Management activity are presented to Members each
year, incorporating a variety of policies, estimates and actuals. These are: 
• Annual Treasury Management and Investment Strategy (this report), which is
submitted to full Council before the start of each financial year.   
• Mid-Year Treasury Management and Investment Report, submitted to Cabinet
as soon as possible following 30 September each year.   
• Annual Treasury Management and Investment Report, submitted to full Council
annually by the 30 June following the end of each financial year. 
Responsibilities 
Regulations place responsibility on Members for the review and scrutiny of treasury
management policy and activities. The following Scheme of Delegation has been adopted by
the Council:  
Full Council 
• to receive and review reports on treasury management policies, practices and activities;
• to approve the annual Treasury Management and Investment Strategy. 
120

Page 121

4 | P a g e
Cabinet 
• to approve amendments to the treasury management policy statement and treasury
management practices;
• to approve the division of responsibilities;
• to receive and review regular monitoring reports and act on recommendations. 
Section 95 Officer 
The Council’s Section 95 Officer is responsible for the proper administration of the Council’s
financial affairs and is required: 
• to recommend treasury management policies / practices, review these regularly and
monitor compliance;
• to submit regular treasury management updates;
• to receive and review management information;
• to review the performance of the treasury management function;
• to ensure the adequacy of treasury management resources and skills and the effective
division of responsibilities within the treasury management function; and
• to approve the appointment of external service providers. 
External Treasury Advisers 
The Council recognises that there is value in employing external providers of treasury
management services, in order to access specialist skills and resources. 
However, it recognises that the responsibility for treasury management decisions remains
with the Council at all times and officers will ensure that undue reliance is not placed upon
external advice. 
The Council’s current external treasury management advisors are Arlingclose Limited.  The
contract started on  5 April 2021 and was in place for an initial 3 year period. A one year
extension has been agreed taking the existing contract to 5 April 2025. The Council will
ensure that the terms of their appointment and the methods by which their value is assessed
are properly agreed, documented and subject to regular review. 
121

Page 122

5 | P a g e
2 Executive Summary 
The treasury management function ensures that the Council’s funds are managed in
accordance with the relevant professional codes, so that sufficient cash is available to meet
service activity. This involves both the organisation of the cashflow and, where capital plans
require, the organisation of approporiate borrowing facilities.   
CIPFA defines treasury management as: 
“The management of the organisation’s borrowing, investments and cashflows, including its
banking, money market and capital market transactions; the effective control of the risks
associated with those activities; and the pursuit of optimum performance consistent with those
risks.” 
This document outlines the Council’s Annual Treasury Management Strategy and Annual
Investment Strategy providing: 
• a summary of the Council’s capital plans;
• an outline of the treasury management strategy in relation to borrowing and the
impact of capital plans on this borrowing; and
• an outline of the investment strategy including the type of instruments available for
investment and our permitted counterparties. 
Key prudential and treasury indicators are provided throughout this strategy which
clearly articulate the operational parameters in relation to Treasury Management and
Investment, as well as providing assurances in relation to the affordability and
sustainability of capital investment plans. Table 1 contains the key prudential and
treasury indicators within the report.   
Table 1 
2023/24 2024/25 2025/26 2026/27
Prudential and Treasury Indicators Probable Outturn Estimate Estimate Estimate
£m £m £m £m
Capital Expenditure:
General Services                 112.312                  104.655                    67.937                    81.329
HRA                   39.730                    52.417                    75.709                    65.552
Total                 152.042                  157.072                  143.646                  146.881
Loans Capital Financing Requirement (CFR):
General Services                 269.594                  346.096                  372.693                  425.982
HRA                 180.546                  198.552                  234.854                  264.527
Total                 450.140                  544.648                  607.547                  690.509
Gross Borrowing                 325.829                  478.337                  561.236                  656.198
Operational Boundary for Borrowing                 467.574                  558.072                  624.121                  705.352
Authorised Limit for Borrowing                 514.331                  613.879                  686.533                  775.887
Total Operational Boundary (Including PPP/NPD)                 555.306                  641.366                  702.711                  779.069
Total Authorised Limit (Including PPP/NPD)                 602.063                  697.173                  765.123                  849.604
Liability Benchmark                 160.988                  258.447                  329.296                  416.677
Investments                   30.000                    30.000                    30.000                    30.000
122

Page 123

6 | P a g e
A summary of this is provided as follows, with more detailed information provided in the
body of the report. 
Capital Expenditure for the General Fund (GF) reflects the capital investment programme
for 2024/25 to 2033/34 and Housing Revenue Account (HRA) reflects the capital investment
programme for 2024/25 and the capital investment plans included in the latest business plan.
To ensure the financial consequences of the new programme are fully transparent, all
relevant indicators have been projected to 2033/34 and these can be found in Appendix 1. 
The Capital Financing Requirement (CFR) is the underlying borrowing requirements of
the Council.   
Gross Borrowing reflects the actual borrowing which has been undertaken. This is projected
to be lower than the CFR as the Council continues with its strategy to use internal funds. 
The Operational Boundary is the maximum borrowing and other long-term liabilities to
fund previous years’ and the current year capital programme, building in flexibility for the
timing of the different funding streams and principal repayments. The operational
boundary includes any other long-term liabilities (e.g. PPP/NPD schemes, finance
leases) however no borrowing is actually required against these schemes as a borrowing
facility is included in the contract. 
The Authorised Limits is set at 10% above the Operational Boundary to give some
flexibility around raising funds for future year capital investment. 
The Liability Benchmark is an estimate of the cumulative amount of external borrowing
the Council must hold to fund its current capital and revenue plans while keeping treasury
investments at the minimum level required to manage day-to-day cash flow. 
Affordability of borrowing is measured by the percentage of financial costs relative to
the net revenue stream of the GF and HRA. 
Full details of these can be found on page 11. 
The average investment rate estimated for 2024/25 is 4.25% and is reflective of the
Council’s appetite for risk, the short term nature of investments and the permitted
instruments and counterparties selected.   
Other prudential and treasury indicators and supporting information can be found in the
main body of this report. 
Client Status 
The second Market in Financial Instruments Directive (MiFID II), introduced in January 2018,
classifies Local Authorities as “retail clients” unless they choose to opt-up to “professional
client” status. This has the advantages of lower fees and access to a greater range of
products and investment firms. The Council continues to opt-up to professional client status. 
In order to meet the professional client criteria, the Council must hold a £10m investment
portfolio at all times and have at least one officer with the necessary level of experience and
knowledge to understand the risks involved in the management of the investments.       
123

Page 124

7 | P a g e
3 Capital and Prudential Indicators 2024/25 – 2026/27 
In exercising its power to borrow, the Local Authority (Capital Finance and Accounting)
(Scotland) Regulations 2016 require the Authority to have regard to the Chartered
Institute of Public Finance and Accountancy’s Prudential Code for Capital Finance in
Local Authorities (the Prudential Code). The Prudential Code is a framework to ensure
Councils demonstrate effective control over levels of, and decisions relating to, capital
investment activity, including borrowing. The Treasury indicators are used to ensure that
risk is managed and controlled effectively. Together the Prudential and Treasury
Indicators consider the affordability and impact of capital expenditure decisions and set
out the Council’s overall capital framework. 
Capital Expenditure and Financing 
This prudential indicator is a summary of the Council’s capital expenditure plans, both
those agreed previously and those forming part of the 2024/25 budget setting.   
The 2024/25 budget proposes an updated Capital Investment Programme for General
Services to 2033/34 and updated investment plans for the HRA for 2024/25 and the
capital investment plans included in the latest business plan. All projects within the
Capital Programme are linked to the Council’s key strategic priorities. These are also
covered in the Capital Investment Strategy, produced in line with the requirements of the
Prudential Code. To ensure that the financial consequences of the new programme are
fully transparent, all relevant indicators have been projected to 2033/34 and these can be
found in Appendix 1. Table 2 shows the capital expenditure plans and how they are being
financed by capital or revenue resources over the next three years. The borrowing figure
in Table 2 is the difference between the estimates for total capital expenditure and the
other funding sources. 
Table 2 
2023/24 2024/25 2025/26 2026/27
Probable Outturn Estimate Estimate Estimate
£m £m £m £m
General Services Capital expenditure                 112.312                  104.655                    67.937                    81.329
Funded by:
Borrowing                   51.246                    78.300                    29.586                    55.833
Receipts / Grants                   59.661                    22.875                    37.647                    24.786
Funded from Revenue                     1.405                           -                              -                              -   
Funded from Reserves                          -                         3.480                      0.704                      0.710
Total                 112.312                  104.655                    67.937                    81.329
HRA Capital expenditure                   39.730                    52.417                    75.709                    65.552
Funded by:
Borrowing                   21.284                    24.116                    43.279                    37.306
Receipts / Grants                     6.785                    15.871                    21.483                    16.868
Funded from Revenue                     5.151                    11.492                      9.010                      7.422
Funded from Reserves                     6.510                      0.938                      1.937                      3.956
Total                   39.730                    52.417                    75.709                    65.552
Estimates of Capital Expenditure and Income
124

Page 125

8 | P a g e
The Council’s Overall Borrowing Need (the Capital Financing Requirement) 
This indicator outlines the Council’s Capital Financing Requirement (CFR). The CFR is
simply the total historic outstanding capital expenditure which has not been paid from
either a capital or a revenue resource and, therefore, needs to be funded from borrowing.
It is essentially a measure of the Council’s underlying borrowing need. 
Part of the Council’s treasury activity is to meet the funding requirements for this
borrowing need. The treasury management section organises the Council’s cash position
to ensure that sufficient cash is available to meet the capital plans and cash flow
requirements. This may be sourced through borrowing from external bodies (such as the
Government, through the Public Works Loan Board [PWLB], or the money markets), or
utilising temporary cash resources within the Council. 
The Council’s underlying borrowing need (CFR) is not allowed to rise indefinitely. The
Council is required to make an annual revenue charge, called the Loans Fund Principal
Repayment. This is effectively a repayment of the borrowing need and it is charged to
revenue over the life of the asset. This charge reduces the CFR each year. This differs
from the treasury management arrangements, which ensure that cash is available to
meet the payment of capital commitments on an ongoing basis. External debt can also
be borrowed or repaid at any time, but this does not change the CFR. 
The total CFR can also be reduced by: 
• the application of additional capital financing resources (such as unapplied capital
receipts); or 
• increasing the annual revenue charge. 
The Council’s CFR is shown below and is a key prudential indicator. The opening
balances include the PPP/NPD schemes on the balance sheet, which increase the
Council’s borrowing need. This is shown to give a complete picture of the Council’s debt.
However, no borrowing is actually required against these schemes as a borrowing facility
is included in the contract and, as such, this is subtracted from the total CFR to identify
the Loans CFR. The Loans CFR is forecast to rise over the next few years as capital
expenditure financed by borrowing increases. 
Table 3 
2023/24 2024/25 2025/26 2026/27
Probable Outturn Estimate Estimate Estimate
£m £m £m £m
General Services                 357.326                  429.390                  451.283                  499.699
HRA                 180.546                  198.552                  234.854                  264.527
Sub-total                 537.872                  627.942                  686.137                  764.226
Less PPP/NPD long-term liability                  (87.732)                  (83.294)                  (78.590)                  (73.717)
Loans Capital Financing Requirement (CFR)                 450.140                  544.648                  607.547                  690.509
Movement in CFR
General Services                   76.502                    26.597                    53.289
HRA                   18.006                    36.302                    29.673
Annual Change                   94.508                    62.899                    82.962
Capital Financing Requirement (CFR)
125

Page 126

9 | P a g e
Liability Benchmark 
The liability benchmark, which is now a treasury prudential indicator, is an important tool to
help establish whether the Council is likely to be a long-term borrower or long-term investor in
the future, and so shape its strategic focus and decision making. The liability benchmark itself
represents an estimate of the cumulative amount of external borrowing the Council must hold
to fund its current capital and revenue plans while keeping treasury investments at the
minimum level required to manage day-to-day cash flow.  
Table 4 
Following on from the medium-term forecasts in the table above, the long-term liability
benchmark assumes capital expenditure funded by borrowing will be in line with the 10
year capital plan and 30 year HRA business plan respectively, loans fund advances on
new capital expenditure based on asset life and income, expenditure and reserves all
increasing by inflation of 2.5% a year with any specific adjustments made for planned use
of reserves. This is shown in the chart below together with the maturity profile of the
Council’s existing borrowing: 
2022/23 2023/24 2024/25 2025/26 2026/27
Actual
£m
Estimate
£m
Forecast
£m
Forecast
£m
Forecast
£m
Loans CFR 384.1 450.1 544.6 607.5 690.5
Less Balance sheet resources -252.2 -299.2 -296.2 -288.3 -283.8
Net loans requirement 131.881            150.988            248.447            319.296            406.677           
Liquidity allowance 10.0 10.0 10.0 10.0 10.0
Liability Benchmark 141.881            160.988            258.447            329.296            416.677           
Liability Benchmark
126

Page 127

10 | P a g e
The Liability benchmark graph above is used to inform the Council’s borrowing strategy.  The
shaded grey area shows the Councils current debt and the gap between this and the Liability
benchmark line is how much more borrowing the Council likely needs to undertake to support
its current capital plans once taking into account its balance sheet resources.  The above
graph indicates that long term borrowing for the period of up to 25 years would be most
appropriate to meet the Councils borrowing needs and mitigate against interest rate risk. 
Limits to borrowing activity 
The Operational Boundary 
The operational boundary is the expected maximum borrowing position of the Council
during the year, taking account of the timing of various funding streams and the recharge
of principal repayments from the revenue account. Periods where the actual position
varies from the boundary are acceptable, subject to the authorised limit not being
breached. 
The Authorised Limit 
The authorised limit represents a limit beyond which external debt is prohibited. This limit
is set by Council and can only be revised by Council approval. It reflects the level of
external borrowing which, while not desirable, could be afforded in the short term, but is
not sustainable in the longer. The current limit is set at 10% above the Operational
Boundary. 
The following graph shows the projected levels of the Operational Boundary and
Authorised Limit for Borrowing, compared with the Council’s CFR and gross debt
position. CIPFA’s Prudential Code for Capital Finance in Local Authorities recommends
that the Council’s total debt should not exceed the highest forecast CFR over the next
three years. This provides Councils with some flexibility to borrow to meet future capital
investment requirements but provides a balance to ensure debt is not held for long
periods of time without an underlying need to fund capital investment. The graph below
confirms that the Council expects to comply with this recommendation. 
*NB: Figures exclude PPP/NPD
127

Page 128

11 | P a g e
Leasing – International Financial Reporting Standard (IFRS) 16 
From 1 April 2023, leases which were previously off balance sheet will now be included.
Although leases form part of the other long term liability figures which make up the
Prudential Indicators above, it is not currently anticipated that the Indicators will be
exceeded. The full impact will not be known until the end of the financial year 2023/24, an
updated report may be required to inform the members of the detailed impact of IFRS 16
with amended Prudential Indicators for approval. 
Affordability Prudential Indicators 
These Prudential Indicators assess the affordability of capital investment plans and
provide an indication of the impact of capital investment plans on the Council’s overall
finances. The cost impact of borrowing decisions are reflected in the Council’s budget as
loan charges. These have been projected to 2033/34 in line with the capital plan. 
Actual and estimates of the proportion of financing costs to net revenue stream. 
This indicator identifies the trend in the cost of capital (borrowing and other long-term liabilities
net of investment income) against the net revenue stream and reflects the profile of the loans
fund advances together with future capital investment. The estimates of financing costs
include current commitments and those arising from the capital programme. The HRA costs
are aligned with the 30-year business plan. 
Table 5 
Capital expenditure impacts on the revenue budget through financing charges, so it is
essential that the Council ensures the financing costs remain affordable and do not
constitute an excessive proportion of the revenue resources available. From a General
Fund perspective, the CIPFA Directors of Finance Performance Indicators 2022/23 show
a Scottish Local Authority average of 5.4%, therefore demonstrating a prudent borrowing
policy. For the HRA, the indicative Scottish average in 2022/23 was 21.4%. The rising
ratio within the HRA is indicative of the significant capital investment programme as
outlined in the Strategic Housing Investment Plan. The level of loan charges is deemed
prudent and affordable within the framework of the 30 year Housing business plan.  
2023/24 2024/25 2025/26 2026/27
Probable Outturn Estimate Estimate Estimate
% % % %
General Services 2.5% 3.5% 4.4% 4.9%
HRA 20.5% 24.0% 28.7% 30.5%
Proportion of financing costs to net revenue stream
128

Page 129

12 | P a g e
4 Treasury Management Strategy 
The treasury management function ensures that the Council’s funds are managed in
accordance with the relevant professional codes, so that sufficient cash is available to meet
service activity. This involves both the organisation of the cashflow and, where capital plans
require, the organisation of approporiate borrowing facilities. The strategy covers the relevant
treasury / prudential indicators, the current and projected debt positions and the annual
investment strategy. The primary objectives of the Council’s borrowing strategy is to minimise
the revenue impact of borrowing and to effectively manage the repayment profile of the debt. 
The treasury strategy aligns with the Council Plan by contributing to “maximising financial
flexibilities to help support delivery of priorities” and “Maximising value from the use of our
assets” as referred to under the priority of “A Sustainable Council”.  The Council Plan can be
found on the Council’s website at: www.north-ayrshire.gov.uk. 
Economic Outlook 
Interest rate forecast 
Interest rate forecasts are key to forecasting the costs of future borrowing. The Council’s
treasury management adviser Arlingclose is forecasting that the bank rate will begin to
decline in the latter half of 2024 and continue to decline until December 2025 before
settling at 3%. The projected rates are shown in the following graph alongside an
assessment of PWLB borrowing rates to December 2026: 
129

Page 130

13 | P a g e
Current Portfolio Position 
The Council’s projected treasury portfolio position at 31 March 2024, with future year
estimates, is summarised below. Table 6 shows the probable outturn of gross debt at 31
March 2024, and the estimated gross debt 2024/25 – 2026/27,  against the underlying capital
borrowing need (the CFR) highlighting any over or under borrowing. Both the external debt
and CFR exclude the Council’s liabilities in respect of the PPP/NPD schemes. 
Table 6 
Within the prudential indicators there are a number of key indicators to ensure that the
Council operates within well-defined limits. One of these is that the Council’s gross debt
should not, except in the short term, exceed the total of the CFR. This allows some flexibility
for limited early borrowing for future years but ensures that borrowing is not undertaken for
revenue purposes. 
The Council’s borrowing strategy continues to address the key issue of affordability without
compromising the longer-term stability of the debt portfolio. The Council is currently under-
borrowed. This means that the capital financing requirement (CFR), has not been fully funded
with loan debt because the cash supporting the Council’s internal balances and cashflow is
being used as a temporary measure. This strategy is currently prudent, as investment returns
are low and counterparty risk is high. Where possible, the Council will continue to use internal
funds but will balance this strategy against movements in interest rates as outlined above. 
Against this background and the risks within the economic forecast, caution will be adopted
within 2024/25 treasury operations. The Section 95 Officer will monitor interest rates and
adopt a pragmatic approach to changing circumstances. For example: 
• if it is anticipated that there is a significant risk of a sharp fall in long and short-term
rates, then long-term borrowings will be postponed and potential rescheduling from fixed
rate funding into short-term borrowing will be considered. 
• if it is anticipated that there is a significant risk of a sharp rise in long and short-term
rates than that currently forecast, then the portfolio position will be re-appraised with the
likely action that fixed rate funding will be drawn whilst interest rates are still lower than
they are expected to be in the next few years. 
Any such decisions will be reported to the Cabinet as part of the mid-year and annual treasury
outturn report.  A summary of treasury risks and mitigating controls can be found at Appendix
2.  
2023/24 2024/25 2025/26 2026/27
Probable Outturn Estimate Estimate Estimate
£m £m £m £m
Gross Debt at 31 March                 325.829                  478.337                  561.236                  656.198
CFR                 450.140                  544.648                  607.547                  690.509
(Under)/Over Borrowed Position                (124.311)                  (66.311)                  (46.311)                  (34.311)
Current Portfolio Position (excluding PPP/NPD)
130

Page 131

14 | P a g e
Controls on Borrowing Activity 
The purpose of these controls is to manage the risk and impact of any adverse
movement in interest rates.  However, if they are set to be too restrictive, they may impair
opportunities to reduce costs / improve performance. The indicators are: 
• Upper limits on variable interest rate exposure. This identifies a maximum limit for
variable interest rates based upon the debt position net of investments; 
• Upper limits on fixed interest rate exposure. This is similar to the previous indicator
and covers a maximum limit on fixed interest rates. 
Table 7 
• Maturity structure of borrowing. These gross limits are set to reduce the Council’s
exposure to large sums falling due for refinancing; both upper and lower limits are
required. 
Table 8 
* Note the Under 12 months figure in the above table includes £38.950m LOBOs which have call options in year. 
The impact of a 1% rise in interest rates based on the Councils current debt portfolio is
shown in the table below: 
Table 9 
*Note there is a lower impact of a 1% reduction as the LOBO loans are unlikely to be called when the rate reduces. 
2023/24 2023/24 2024/25 2025/26 2026/27
Probable Outturn Limit Limit Limit Limit
£m £m £m £m £m
Limits on fixed interest rates based on net debt                 274.879                  514.331                  613.879                  686.533                  775.887
Limits on variable interest rates based on net debt                   50.950                    60.000                    60.000                    60.000                    60.000
2023/24 2023/24 Lower Upper
Probable Outturn Probable Outturn Limit Limit
£m % % %
Under 12 months                    53.428 18% 0% 50%
12 months and within 24 months                     2.888 1% 0% 50%
24 months and within 5 years                   10.032 3% 0% 50%
5 years and within 10 years                   24.439 8% 0% 75%
10 years and above                 208.152 70% 25% 90%
Total Borrowing                 298.938 100%
Maturity Profile of Borrowing
2024/25 2025/26 2026/27
£m £m £m
Impact of1% increase in Interest rates       0.420        0.561        0.604
Impact of1% decrease in Interest rates      (0.191)      (0.302)      (0.344)
Interest rate Risk Exposure
131

Page 132

15 | P a g e
LOBOs 
The Council currently holds £50.950m of Lender’s Option Borrower’s Option (LOBO)
loans where the lender has the option to propose an increase in the interest rate at set
dates, following which the Council has the option to either accept the new rate or to repay
the loan at no additional cost. Similar to other debt held by the Council we continue to
work with treasury management advisers to identify financially beneficial opportunities to
repay LOBO loans.   
Policy on Borrowing in Advance of Need 
The Council will not borrow more than, or in advance of, its needs purely to profit from the
investment of the extra sum borrowed. Any decision to borrow in advance will be within
forward approved CFR estimates and will be considered carefully to ensure that value for
money can be demonstrated and that the Council can ensure the security of such funds. 
Risks associated with any advance borrowing activity will be subject to appraisal and
subsequent reporting in either the mid-year or annual treasury report. 
Debt Rescheduling 
As short-term borrowing rates are cheaper than longer term fixed interest rates, there may be
potential opportunities to generate savings by switching from long-term to short-term debt.
However, these savings will need to be considered in the light of the current treasury position
and the cost of any premiums incurred on early debt repayment.   
Potential reasons for debt rescheduling include: 
• the generation of cash savings and / or discounted cashflow savings; or
• the enhancement of the portfolio balance (amend the maturity profile and / or risk). 
The recent rise in interest rates means that more favourable debt rescheduling
opportunities should arise than in previous years.  All debt rescheduling proposals will be
reported to Cabinet / full Council as part of the annual or mid-year report. 
Borrowing Sources 
Approved sources of long-term and short-term borrowing are: 
• HM Treasury’s PWLB lending facility (formerly the Public Works Loan Board) and
any successor body;
• UK Infrastructure Bank Ltd
• Any institution approved for investments (see Appendix 3);
• Any other bank or buiding society authorised to operate in the UK;
• Any other UK public sector body;
• UK public and private sector pension fund (except Strathclyde Pension Fund);
• Capital market bond investors; or
132

Page 133

16 | P a g e
• UK Municipal Bonds Agency plc and other special purpose companies created to
enable local authority bond issues. 
In addition, capital finance can be raised by the following methods that are not borrowing,
but are classed as other debt liabilities: 
• Leases;
• Hire purchase;
• Private Finance Initiatives (including PPP/NPD); or
• Sale and leaseback arrangements.
• Similar asset based finance 
Alternatives to PWLB 
North Ayrshire Council has previously raised the majority of its long-term borrowing from the
PWLB but will consider long-term loans from other sources including banks, pensions and
local authorities. The Council will also investigate the possibility of issuing bonds and similar
instruments, which may offer lower interest costs and reduce over-reliance on one source of
funding in line with the CIPFA Code. One example of such funding is the UK Municipal Bonds
Agency, an organisation which issues bonds on the capital markets and lends the proceeds
to local authorities. As these will represent a more complex form of borrowing, any decision to
borrow in this way will be the subject of a separate report to Council. 
PWLB loans are no longer available to local authorities planning to buy investment assets
primarily for yield. The Council therefore intends to avoid this activity in order to retain its
access to PWLB loans. 
Policy on Use of Financial Derivatives 
A financial derivative is a contract, which derives its value from the performance of an
underlying entity. They are used for a number of purposes, including insuring against price
movements. In the absence of any explicit legal power to do so, the Council will not use
standalone financial derivatives (such as swaps, forwards, future and options). Derivatives
embedded into loans and investments, including pooled funds and forward starting
transactions, may be used and the risks that they present will be managed in line with the
overall treasury risk management strategy. 
Policy on Repayment of Loans Fund Advances 
The prudent repayment of Loans Fund Advances are made under the provisions of The
Local Authority (Capital Finance and Accounting) (Scotland) Regulations 2016, which
came into force on 1 April 2016.   
These Regulations require North Ayrshire Council to outline its policy on the repayment
of loans fund advances. The loans fund advance is effectively the repayment of the
‘principal’ linked to the capital expenditure which is funded from borrowing.   
133

Page 134

17 | P a g e
The statutory guidance identifies a number of options for the prudent repayment of
advances, including basing the repayments on: 
• the depreciation charges made against the assets;
• the life of the assets, using either the annuity or equal instalments methodology; or
• the funding or income streams attached to the assets. 
For the majority of projects undertaken by the Council, the policy is to repay loans fund
advances linked to asset life using the annuity methodology. However, where
appropriate, the repayment of advances arising from projects with associated income
streams will be matched to the profile of the income. 
The Council will continue to consider the most appropriate repayment methods, which
align to the benefits of the assets and ensure a prudent repayment, for existing and
future advances. 
The policy is outlined in full in Appendix 4. 
5 Investment Strategy 
The Council’s investment strategy has regard to the Local Government Investment (Scotland)
Regulations (and accompanying finance circular) and the 2021 revised CIPFA Treasury
Management in Public Services Code of Practice and Cross Sectoral Guidance Notes (“the
CIPFA TM Code”). The Council’s objective when investing money is to strike an appropriate
balance between risk and return, minimising the risk of incurring losses from defaults or of
receiving unsuitably low investment income.  The Council aims to be a responsible investor
and will consider environmental, social and governance (ESG) issues when investing. 
The aim of the Investment Strategy is to provide security of investment and minimisation of
risk by generating a list of high creditworthy counterparties which will enable diversification. 
Investment instruments identified for use in the financial year, along with their associated risks
and controls can be found in Appendix 3.   
Counterparty limits are set through the Council’s Treasury Management Practices. The
maximum that will be lent to any one organisation (other than the UK Government) will be £10
million.  A group of banks under the same ownership, will be treated as a single organisation
for limit purposes.   
The Council uses purpose-built cash flow forecasting software to determine the maximum
period for which funds may prudently be committed. The forecast is compiled on a prudent
basis to minimise the risk of the Council being forced to borrow on unfavourable terms to
meet its financial commitments. Limits on long-term investments are set by reference to the
Council’s revenue budget and cash flow forecast. 
Given the risk of bail-in (as defined on page 19) and continued low returns from short-term
unsecured bank investments, the Council will take opportunities, as cash flows permit, to
further diversify into more secure asset classes during 2024/25. This diversification will
mitigate further risks associated with investments.  
134

Page 135

18 | P a g e
Current Portfolio Position 
Table 10 
Environmental, Social and Governance (ESG) Policy 
Environmental, social and governance (ESG) considerations are increasingly a factor in
global investors’ decision making, but the framework for evaluating investment
opportunities is still developing and therefore the Council’s ESG policy does not currently
include ESG scoring or other real-time ESG criteria at an individual investment level.
When investing in banks and funds, the Council will prioritise banks that are signatories
to the UN Principles for Responsible Banking and funds operated by managers that are
signatories to the UN Principles for Responsible Investment, the Net Zero Asset
Managers Alliance and/or the UK Stewardship Code. A list of ESG Initiative signatories is
updated quarterly by the Council’s treasury advisor Arlingclose to support the Council’s
decision making process for investing. 
Creditworthiness policy 
In accordance with the above, and in order to minimise risk, the Council has clearly stipulated
the minimum acceptable credit quality of counterparties for inclusion on its lending list. The
Council uses Arlingclose’s Approved Counterparties List which takes full account of the
ratings, outlooks and watches published by all three ratings agencies. Ratings are monitored
on a real time basis with any changes notified electronically supplemented by weekly update. 
Investment decisions are made by reference to the lowest published long-term credit rating
and analysis from the Council’s treasury management advisers. The Council considers high
credit quality organisations and investments as those having a credit rating of A- or higher
and which are domiciled in the UK or in a foreign country with a sovereign rating of AA+ or
higher. For money market funds that are more diversified, “high credit quality” is defined as
those having a credit rating of A- or higher. However, in addition to credit ratings, the Council
will consider investments in organisations based on independent analysis from our treasury
management advisors.   
All credit ratings are monitored by the Treasury Team who are alerted to changes in ratings of
the main rating agencies through Arlingclose’s weekly updates and following credit
developments. Where a downgrade results in the counterparty or investment scheme no
longer meeting the Council’s minimum criteria, any investment will be withdrawn immediately,
where breakage costs are not excessive.  
2023/24 2024/25 2025/26 2026/27
Probable Outturn Estimate Estimate Estimate
£m £m £m £m
Investments at 31 March                   30.000                    30.000                    30.000                    30.000
Net Debt at 31 March                 295.829                  448.337                  531.236                  626.198
Current Portfolio Position
135

Page 136

19 | P a g e
When deteriorating financial market conditions affect the creditworthiness of all
organisations, as happened in 2008, 2020 and 2022, this is not generally reflected in
credit ratings, but can be seen in other market measures. In these circumstances, the
Council will restrict its investments to those organisations of higher credit quality and
reduce the maximum duration of its investments to maintain the required level of security.
The extent of these restrictions will be in line with prevailing financial market conditions. If
these restrictions mean that insufficient commercial organisations of high credit quality
are available to invest the Council’s cash balances, then the surplus will be deposited
with the UK Government, or with other local authorities.  This will cause investment
returns to fall but will protect the principal sum invested. 
The Council recognises that credit ratings are good, but not comprehensive, indicators of
investment default. Full regard is therefore given to other available information on the credit
quality of the organisations in which it invests including credit default swap prices, financial
statements, information on government support, reports in the financial press and analysis
from the Council’s treasury management adviser. No investment will be made with an
organisation if there are substantive doubts about its credit quality, even though it may
otherwise meet the above criteria. 
Bail-in Risk 
Since the financial crisis, global authorities have embarked on a wide ranging review of
the banking sector to ensure that the cost to the public purse of any future crises is
contained. One of the most significant changes has arisen from the Financial Services
(Banking Reform) Act 2013 which added the bail-in of certain unsecured creditors to the
Special Resolution Regime (SRR) granted to the Bank of England under the Banking Act
2009. Bail-in is the opposite of bail-out and requires the country’s banking authority to
bail-in funds from existing investments if a bank requires it to remain financially
sustainable. 
Local authority deposits in banks are unsecured and because other previously unsecured
creditors such as retail investors have become preferred under UK and EU Directives, it
means that the risks associated with local authority unsecured investments in banks have
risen. 
The best solution to mitigating against bail-in risk is to invest with high quality and credit
worthy institutions. The identification of these institutions remains a key objective of the
investment strategy. Ensuring diversification of investment counterparties is also an
effective risk management approach and is reflected in investment counterparty limits. 
136

Page 137

20 | P a g e
Investment Strategy and Permitted Investments 
The Investment Regulations (Code on the Investment of Money by Local Authorities) require
the Council to approve all types of investments to be used and to set appropriate limits for the
amount that can be held in each investment type.  In determining its permitted investments,
the Council must identify the treasury risks associated with each type of instrument and the
controls put in place to limit risk on each investment type. Full details can be found in
Appendix 3. 
Investment Returns Expectations   
The Bank Rate is forecast to gradually fall during the second half of 2024 and continue with
gradual reductions until December 2025.  Bank Rate forecasts for financial year ends (March)
are: 
• 2024/25 4.25%
• 2025/26 3.00%
• 2026/27 3.00% 
The estimated rates for returns on investments placed for periods up to 100 days during each
financial year for the next three years are as follows: 
• 2023/24 4.25%
• 2024/25 3.00%
• 2025/26 3.00% 
Investment Treasury Indicator and Limit 
This is a control on the total principal funds invested for greater than 1 year.  This limit is set
with regard to the Council’s liquidity requirements and to reduce the need for early sale of an
investment, and is based on the availability of funds after each year-end. 
Table 11 
For cashflow management, the Council will seek to utilise its money market funds and short-
dated deposits (overnight to three months) in order to benefit from the compounding of
interest. 
2023/24 2024/25 2025/26 2026/27
Probable Outturn
£m
Limit
£m
Limit
£m
Limit
£m
Principal sums invested for more than 1 year -                       10.000                   10.000                   10.000                  
Maximum principal sums invested for more than 1
year
137

Page 138

21 | P a g e
Summary of Material Investments, Guarantees and Liabilities 
In line with the requirements in respect of the Council’s Capital Investment Strategy
information is provided on material Investments, Guarantees and Liabilities. Reporting of
this fits better within the TMIS. Information is provided in the table below; 
The Council has the current historic investments on the balance sheet as at 31st March
2023: 
Category Value as at 31 March 2023
£m
Long-term Debtors 0.044
Total 0.044 
The long-term debtors represent loan finance provided by the Council to other parties
which relates to Advances for House Purchases.   
Monitoring of Investment Strategy 
An update on the investment position of the Council will be reported to Cabinet in the 2024/25
Mid-Year Treasury report and the Annual Treasury Report will be submitted to the Council
after the end of the financial year. 
138

Page 139

22
Appendix 1: Prudential Indicators 2028 to 2034 
* A negative annual change in CFR reflects a reduction in the need to finance capital investment from borrowing.
2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m £m £m
General Services Capital expenditure                     62.793                      26.625                      21.326                      11.047                      10.249                      10.249                      10.249
Funded by:
Borrowing                     35.284                        8.753                        5.668                        1.267                        0.594                        0.594                        0.594
Receipts / Grants                     27.509                      17.872                      15.658                        9.780                        9.655                        9.655                        9.655
Funded from Revenue                            -                                -                                -                                -                                -                                -                                -   
Funded from Reserves                            -                                -                                -                                -                                -                                -                                -   
Total                     62.793                      26.625                      21.326                      11.047                      10.249                      10.249                      10.249
HRA Capital expenditure                     80.075                      46.543                      25.272                      24.382                      24.928                      25.792                      26.804
Funded by:
Borrowing                     62.024                      33.999                      11.881                      11.435                      10.260                      10.366                        9.211
Receipts / Grants                       8.466                        1.566                        0.588                        0.004                             -                                -                                -   
Funded from Revenue                       9.585                      10.978                      12.803                      12.943                      14.668                      15.426                      17.593
Funded from Reserves                            -                                -                                -                                -                                -                                -                                -   
Total                     80.075                      46.543                      25.272                      24.382                      24.928                      25.792                      26.804
2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m £m £m
General Services                   526.200                    526.243                    523.368                    515.233                    505.572                    494.885                    482.934
HRA                   320.543                    348.064                    353.599                    357.152                    359.314                    360.353                    360.299
Sub-total                   846.743                    874.307                    876.967                    872.385                    864.886                    855.238                    843.233
Less PPP/NPD long-term liability                   (68.023)                   (62.547)                   (56.667)                   (50.841)                   (44.793)                   (38.127)                   (29.984)
Sub-total                   778.720                    811.760                    820.300                    821.544                    820.093                    817.111                    813.249
Movement in CFR
General Services                     32.195                        5.519                        3.005                      (2.309)                     (3.613)                     (4.021)                     (3.808)
HRA                     56.016                      27.521                        5.535                        3.553                        2.162                        1.039                      (0.054)
Annual Change                     88.211                      33.040                        8.540                        1.244                      (1.451)                     (2.982)                     (3.862)
Estimates of Capital Expenditure and
Income
Capital Financing Requirement (CFR)
139

Page 140

23 
2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m £m £m
General Services 5.4% 5.8% 5.7% 5.9% 6.0% 6.0% 5.9%
HRA 30.6% 31.6% 30.8% 31.8% 30.8% 31.1% 29.8%
2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34
Current Portfolio Position Estimate Estimate Estimate Estimate Estimate Estimate Estimate
(excluding PPP/NPD) £m £m £m £m £m £m £m
Gross Debt at 31 March                   744.409                    777.449                    785.989                    787.233                    785.782                    782.800                    778.938
CFR                   778.720                    811.760                    820.300                    821.544                    820.093                    817.111                    813.249
(Under)/Over Borrowed Position                   (34.311)                   (34.311)                   (34.311)                   (34.311)                   (34.311)                   (34.311)                   (34.311)
2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m £m £m
Investments at 31 March                     20.000                      20.000                      20.000                      20.000                      20.000                      20.000                      20.000
Net Debt at 31 March                   724.409                    757.449                    765.989                    767.233                    765.782                    762.800                    758.938
2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m £m £m
Anticipated borrowing                   791.587                    822.023                    829.897                    833.131                    832.398                    831.053                    826.916
PPP/NPD long-term liability                     68.023                      62.547                      56.667                      50.841                      44.793                      38.127                      29.984
Operational Boundary                   859.610                    884.570                    886.564                    883.972                    877.191                    869.180                    856.900
2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m £m £m
Operational Boundary + 10%                   870.746                    904.225                    912.887                    916.444                    915.638                    914.158                    909.608
PPP/NPD long-term liability                     68.023                      62.547                      56.667                      50.841                      44.793                      38.127                      29.984
Authorised Limit                   938.769                    966.772                    969.554                    967.285                    960.431                    952.285                    939.592
Proportion of financing costs to net
revenue stream
Current Portfolio Position
Authorised Limit
Operational Boundary
2027/28 2028/29 2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m £m £m
Loans CFR 778.703                  811.758                  820.298                  821.542                  820.091                  817.109                  813.247                 
Less Balance sheet resources (79.143)                   (80.754)                   (82.914)                   (86.815)                   (91.078)                   (95.174)                   (99.326)                  
Net loans requirement 699.560                  731.004                  737.384                  734.727                  729.013                  721.935                  713.921                 
Liquidity allowance 10.250                    10.506                    10.769                    11.038                    11.314                    11.597                    11.887                   
Liability Benchmark 709.810                  741.510                  748.153                  745.765                  740.327                  733.532                  725.808                 
Liability Benchmark
140

Page 141

24 
141

Page 142

25
Appendix 2: Treasury Risk Register 
Risk Title Description Consequence of Risk Current Controls RAG
Status
Credit and
Counterparty
Risk
This is the risk of failure by a counterparty
(bank or building society) to meet its
contractual obligations to the organisation
particularly due to the counterparty’s
diminished creditworthiness, and the
resulting detrimental effect on the
organisation’s capital or current (revenue)
resources. There are no counterparties
where this risk is zero although AAA rated
organisations have a very high level of
creditworthiness.
That investment funds will not be
returned in full to the Council as
per the contractual obligation of
the counterparty.
The Council sets minimum
credit criteria to determine
which counterparties and
countries are of sufficiently
high creditworthiness to
invest securely.  
The RAG status is Amber
because this risk will never
be fully eliminated. 
Amber 
Liquidity Risk This is the risk that cash will not be available
when it is needed.   Whilst it could be said
that all counterparties are subject to at least a
very small level of liquidity risk, in this
document, liquidity risk has been treated as
whether or not instant access to cash can be
obtained from each form of investment
instrument.  While some forms of investment
e.g. gilts, Certificates of Deposit, corporate
bonds can usually be sold immediately if the
need arises, there are two caveats: - a) cash
may not be available until a settlement date
up to three days after the sale; and b) there is
an implied assumption that markets will not
freeze up and so the instrument in question
will find a ready buyer.  
That the Council has insufficient
access to cash to enable it to
carry out its activities.
The Council has a cash flow
forecasting model to enable
it to determine how long
investments can be made
for and how much can be
invested.  This has a high
level of assurance around
regular cash inflows and
outflows.
Some of the Council’s
cashflow related
investments are invested in
Money Market Funds which
provide very high daily
liquidity. 
Green
142

Page 143

26
Risk Title Description Consequence of Risk Current Controls RAG
Status
Market Risk This is the risk that, through adverse market
fluctuations in the value of the sums that the
Council borrows and invests, there is a
detrimental impact on the Council.
That investment funds will not be
returned in full to the Council as
per the contractual obligation of
the counterparty due to market
variations.
Only a proportion of the
Council’s investments will
be invested in instruments
whose value are subject to
market movements.  The
proportion will not exceed
the maximum percentage
the Council will invest in
investments over 1 year
Green
Interest Rate
Risk
This is the risk that fluctuations in the levels
of interest rates create an unexpected or
unbudgeted burden on the organisation’s
finances, against which the organisation has
failed to protect itself adequately.  The
Council has set limits for its fixed and
variable rate exposure in its Treasury
Indicators in this report
That the Council will be faced with
unexpected higher interest costs
due to market variations.
The Council manages this
risk by having a view of the
future course of interest
rates and then formulating
a treasury management
strategy accordingly which
aims to maximise
investment earnings
consistent with control of
risk or alternatively, seeks
to minimise expenditure on
interest costs on
borrowing.
Green
Legal and
Regulatory Risk
This is the risk that the organisation itself, or
an organisation with which it is dealing in its
treasury management activities, fails to act in
accordance with its legal powers or
regulatory requirements, including failure to
comply with the CIPFA Codes and that the
organisation suffers losses accordingly.
That investment funds will not be
returned in full to the Council due
to the failure of the counterparty
to comply with their contractual
obligations
The Council will not
undertake any form of
investing until it has
ensured that it has all
necessary powers and has
complied with all
regulations.  
Green
143

Page 144

27
Appendix 3: Permitted Investments, Risks and Mitigating Controls 
Type of Investment Description and Risk Mitigating Controls Council Limits
Banks Unsecured These are accounts, deposits,
certificates of deposit and senior
unsecured bonds with banks and
building societies, other than
multilateral development banks,
which are established by more than
one country, e.g. European
Investment Bank.  These
investments are subject to the risk of
credit loss via a bail-in should the
regulator determine that the bank is
failing or likely to fail.   
Diversifying investments is crucial to
managing bail-in risk, in addition to
determining proportionate counterparty and
maturity limits. Certificates of Deposit, which
are tradable on the secondary market and
which can be sold prior to maturity, will also
assist in managing credit risk.  
The combined secured and
unsecured investments in any
one bank will not exceed £10m.
Banks Secured These are covered bonds, reverse
repurchase agreements and other
collateralised arrangements with
banks and building societies. 
Reverse purchase agreements
involve the purchase of securities
with the agreement to sell at a future
date at a higher price.  Collateralised
arrangement are an investment with
collateral such as properties or debt. 
These investments are secured on the
bank’s assets, which limits the potential
losses in the unlikely event of insolvency,
and means that they are exempt from bail-
in.  Where there is no investment specific
credit rating, but the collateral upon which
the investment is secured has a credit
rating, the higher of the collateral credit
rating and the counterparty credit rating will
be used to determine cash and time limits. 
The combined secured and
unsecured investments in any
one bank will not exceed £10m.
144

Page 145

28
Type of Investment Description and Risk Mitigating Controls Council Limits
Operational Bank
Accounts
The Council will incur operational
exposures to its banking services
provider, Clydesdale Bank, through
current accounts.  The bank is not
currently on the Council's lending
list as its credit ratings are below
the investment credit rating criteria
of A-. These balances are not
classed as investments but are still
subject to the risk of bail-in and
balances will therefore be
minimised. 
The Bank of England has stated that in
the event of failure, banks with assets
greater than £25 billion (which applies to
Clydesdale Bank) are more likely to be
bailed in than made insolvent, increasing
the chance of the Council maintaining
operational continuity.  .
The Council monitors its
operational accounts on a daily
basis, transferring any surplus
funds to investment accounts and
there for minimising the amount
held in the operational bank
account at any time.
Government These are loans, bonds and bills
issued or guaranteed by national
governments, regional and local
authorities and multilateral
development banks.  Includes the
UK Debt Management Office. 
These investments are not subject to bail-
in, and there is an insignificant risk of
insolvency.  
Investments with the UK Central
Government may be made in
unlimited amounts for up to 50
years.
Corporates These are loans, bonds and
commercial paper issued by
companies other than banks and
registered social landlords. Loans to
unrated companies will only be
made if approved through a
separate report to Council. 
These investments are not subject to bail-
in, but are exposed to the risk of the
company going insolvent.  This risk will be
mitigated by taking independent external
advice and diversifying investments over a
number of counterparties. 
Loans to unrated companies
would be made as part of a
diversified pool in order to spread
the risk widely.
145

Page 146

29
Type of Investment Description and Risk Mitigating Controls Council Limits
Registered Social
Landlords
These are loans and bonds issued
by, guaranteed by or secured on the
assets of Registered Social
Landlords (Housing Associations). 
These bodies are regulated by the
Scottish Housing Regulator and by
the Homes and Communities
Agency for Registered Providers of
Social Housing in England. 
As providers of public services, they retain
the likelihood of receiving government
support if needed and are therefore
considered low risk.  
Policy driven, managing all
associated risks.
Money Market Funds These are diversified investment
vehicles consisting of the any of the
above investment types, plus equity
shares and property. These funds
have the advantage of providing
wide diversification of investment
risks, coupled with the services of a
professional fund manager in return
for a management fee.  
Short-term Money Market Funds that offer
same-day liquidity and very low or no
volatility will be used as an alternative to
instant access bank accounts.
It is recommended that no more
than 10% of the Council’s total
investments are invested in any
one MMF and that the amount
invested is no more than 0.5% of
the size of a MMF used for
liquidity purposes. 
For pooled investment vehicles
that invest in bonds, equities and
property, all of which operate on a
variable net asset value (VNAV) it
is recommended that no more
than 10% of the Council’s total
investments are invested in each
fund.  These investments will be
held for periods greater than 1
year. 
146

Page 147

30
Type of Investment Description and Risk Mitigating Controls Council Limits
Investment
Properties
These are non-operational
properties that are being held
pending disposal, or for a longer-
term rental income stream.  They
are highly illiquid assets with high
risk to value (the potential for
property prices to fall or for rental
voids).  
In larger investment portfolios, some small
allocation of property-based investment
may counterbalance/ complement the wider
cash portfolio.  Property holding will be re-
valued regularly and reported annually with
gross and net rental streams. 
Member approval required and each
application must be supported by the
service rationale behind the loan and the
likelihood of partial or full default.
Policy driven, managing all
associated risks.
Loans to third
parties, including soft
loans
These are service investments either
at market rates of interest, or below
market rates (soft loans).  These
types of investments may exhibit
credit risk and are likely to be highly
illiquid.
Each third party loan requires Member
approval and each application must be
supported by the service rationale behind
the loan and the likelihood of partial or full
default.  Interest payments and loan
repayments will be monitored and the
likelihood of partial or full default re-
assessed regularly.
Policy driven, amount and loan
maturity limit will be determined
on a case-by-case basis.
Loans to a local
authority company
These are service investments either
at market rates of interest, or below
market rates (soft loans).  These
types of investments may exhibit
credit risk and are likely to be highly
illiquid.
Each loan to a local authority company
requires Member approval and each
application must be supported by the
service rationale behind the loan and the
likelihood of partial or full default. 
Interest payments, loan repayments, and
their timeliness will be monitored and the
likelihood or partial or full default
reassessed regularly.
Policy driven, amount and loan
maturity limit determined on a
case-by-case basis, managing all
associated risks.
147

Page 148

31
Type of Investment Description and Risk Mitigating Controls Council Limits
Shareholdings in a
local authority
company
These are service investments,
which may exhibit market risk and
are likely to be highly illiquid.
Each equity investment in a local authority
company requires Member approval and
each application must be supported by the
service rationale behind the investment and
the likelihood of loss.  Service investments
will be subject to scrutiny by Financial
Services on a regular basis and will include
scrutiny of financial statements issued by
the local authority company.
Policy driven, amount determined
on a case-by-case basis,
managing all associated risks.
Non-local authority
shareholdings
These are non-service investments,
which may exhibit market risk, will
only be considered for longer term
investments and are likely to be
liquid.
Any non-service equity investment will
require separate Member approval and
each application must be supported by the
service rationale behind the investment and
the likelihood of loss.  Non-service
investments will be subject to scrutiny by
Financial Services on a regular basis,
reported to Members, and will include
scrutiny of financial statements issued by
the company.
Policy driven, amount and
anticipated time frame for
shareholding determined on a
case-by-case basis, managing all
associated risks. 
148

Page 149

32
Appendix 4: Policy on Repayment of Loans Fund Advances 
Policy on Repayment of Loans Fund Advances 
The purpose of the Loans Fund is to record advances from the loan fund for expenditure
incurred, or loans made to third parties, which a local authority has determined are to be
financed from borrowing as set out in Regulation 2 of The Local Authority (Capital Finance
and Accounting) (Scotland) Regulations 2016 [“the Regulations”]. The Council is also
statutorily required to repay Loans Fund advances and to prudently determine the periods
over which it will repay Loans Fund advances and the amount of repayments in any financial
year.   
Loans Fund advances comprise several items and the estimated opening balances for
2024/25, where applicable for North Ayrshire Council, are: 
• capital expenditure (£454.140m);
• grants to third parties and expenditure on third party assets which would be classified
as capital expenditure by a local authority (£0m);
• loans to third parties (£0m); and
• expenditure for which a borrowing consent has been issued by the Scottish
Government (£0m). 
Prudent repayment of Loans Fund advances 
The loans fund advance is effectively the repayment of the ‘principal’ linked to the expenditure
classified above which is unfinanced and is required to be funded from borrowing.
Repayment of loans fund advances are required to be made in line with Scottish Government
statutory guidance on Loans Fund Accounting. The Council’s annual accounts require to
include a disclosure of details of Loans Fund transactions. The HRA Loans Fund advances
and associated annual repayments are identified separately from that of the General Fund. 
The broad aim of prudent repayment is to ensure that the Council’s unfinanced capital
expenditure is repaid over the period of years in which that expenditure is expected to provide
a benefit and that each year’s repayment amount is reasonably commensurate with the
period and pattern of the benefits. 
The statutory guidance requires the Council to approve a policy on Loans Fund repayments
each year and recommends a number of options for calculating prudent repayments. North
Ayrshire Council’s policy is as follows: 
For the majority of projects undertaken by the Council the policy is to use the asset life
method to repay loans fund advances on an annuity basis, which is similar to the
repayment of a mortgage where principal payments are lower at the start of the mortgage
and build up to deliver full repayment over the term of the mortgage. As well as annuity,
the asset life method has the option of equal instalments. 
The Council will continue to consider the most appropriate repayment method which
aligns to the benefits of the assets and ensures a prudent repayment. 
149

Page 150

33
In addition, there are some projects where income streams are attached to the project
which can be reasonably associated with the borrowing which will be undertaken.  In
these circumstances it may be more appropriate for the advances to be repaid on a
profile which matches this income. For these unique projects, loans fund advances may
be profiled for repayment to match the income and not on the annuity basis.   
These options comply with the statutory guidance and the Council will continue to
consider all options available to it. 
The repayment of Loans Fund advances will therefore be equal to the annual amount
determined in accordance with the Local Authority (Capital Finance and Accounting)
(Scotland) Regulations 2016. 
The above regulations state that Council’s may vary the period and/or amount of the
repayments if they consider it prudent to do so. As a result, officers continue to review existing
loans fund advances for opportunities to ensure the most prudent repayment method is being
used. 
Estimates of prudent Loans Fund repayment 
The Council’s latest estimates of its Loans Fund account information are as follows: 
Policy on Apportioning Interest to the HRA 
Interest and expenses on all new borrowing is allocated to the HRA based on the share of
total borrowing taken each year. 
Year
Opening
Balance
£m
Advances to
GF
£m
Advances to
HRA
£m
Repayment  by
GF
£m
Repayment by
HRA
£m
Closing
Balance
£m
2022/23 actual 352.989 2.492 13.994 19.962 -5.372 384.065
2023/24 384.065 51.246 21.284 -1.461 -4.994 450.140
2024/25 - 28/29 450.140 207.757 200.724 -13.655 -33.205 811.760
2029/30 – 33/34 811.760 8.717 53.153 -19.464 -40.918 813.247
2034/35 – 38/39 813.247 0.000 78.267 -23.657 -51.933 815.923
2039/40– 43/44 815.923 0.000 97.847 -58.078 -60.818 794.874
2044/45 – 48/49 794.874 0.000 10.337 -80.229 -65.921 659.061
2049/50 – 53/54 659.061 0.000 0.000 -97.915 -60.944 500.202
2054/55 – 58/59 500.202 0.000 0.000 -74.414 -56.485 369.303
2059/60 – 63/64 369.303 0.000 0.000 -44.604 -61.121 263.578
2064/65 – 68/69 263.578 0.000 0.000 -36.656 -60.019 166.904
2069/70 & later 166.904 0.000 0.000 -37.396 -129.507 0.000
150

Page 151

34
Appendix 5: Economic Background – Arlingclose’s View December
2023 
Economic Outlook 
The impact on the UK from higher interest rates and inflation, a weakening
economic outlook, an uncertain political climate due to an upcoming general
election, together with war in Ukraine and the Middle East, will be major influences
on the Authority’s treasury management strategy for 2024/25.
The Bank of England (BoE) increased Bank Rate to 5.25% in August 2023, before
maintaining this level for the rest of 2023. In December 2023, members of the
BoE’s Monetary Policy Committee voted 6-3 in favour of keeping Bank Rate at
5.25%. The three dissenters wanted to increase rates by another 0.25%. 
The November quarterly Monetary Policy Report (MPR) forecast a prolonged
period of weak Gross Domestic Product (GDP) growth with the potential for a mild
contraction due to ongoing weak economic activity. The outlook for CPI inflation
was deemed to be highly uncertain, with upside risks to CPI falling to the 2%
target coming from potential energy price increases, strong domestic wage growth
and persistence in price-setting. 
Office for National Statistics (ONS) figures showed CPI inflation was 3.9% in
November 2023, down from a 4.6% rate in the previous month and, in line with the
recent trend, lower than expected. The core CPI inflation rate declined to 5.1%
from the previous month’s 5.7%, again lower than predictions. Looking ahead,
using the interest rate path implied by financial markets the BoE expects CPI
inflation to continue falling slowly, but taking until early 2025 to reach the 2% target
before dropping below target during the second half 2025 and into 2026. 
ONS figures showed the UK economy contracted by 0.1% between July and
September 2023. The BoE forecasts GDP will likely stagnate through 2024. The
BoE forecasts that higher interest rates will constrain GDP growth, which will
remain weak over the entire forecast horizon. 
The labour market appears to be loosening, but only very slowly. The
unemployment rate rose slightly to 4.2% between June and August 2023, from
4.0% in the previous 3-month period, but the lack of consistency in the data
between the two periods made comparisons difficult. Earnings growth has
remained strong but has showed some signs of easing; regular pay (excluding
bonuses) was up 7.3% over the period and total pay (including bonuses) up 7.2%.
Adjusted for inflation, regular pay was 1.4% and total pay 1.3%. Looking forward,
the MPR showed the unemployment rate is expected to be around 4.25% in the
second half of calendar 2023, but then rising steadily over the forecast horizon to
around 5% in late 2025/early 2026. 
Having increased its key interest rate to a target range of 5.25-5.50% in August
2023, the US Federal Reserve appears now to have concluded the hiking cycle. It
is likely this level represents the peak in US rates following a more dovish meeting
outcome in December 2023. US GDP grew at an annualised rate of 4.9% between
July and September 2023, ahead of expectations for a 4.3% expansion and the
151

Page 152

35
2.1% reading for Q2. But the impact from higher rates has started to feed into
economic activity and growth will weaken in 2024. Annual CPI inflation was 3.1%
in November. 
Eurozone inflation has declined steadily since the start of 2023, falling to an
annual rate of 2.4% in November 2023. Economic growth has been weak and
GDP contracted by 0.1% in the three months to September 2023. In line with other
central banks, the European Central Bank has increased rates, taking its deposit
facility, fixed rate tender, and marginal lending rates to 3.75%, 4.25% and 4.50%
respectively. 
Credit outlook 
Credit Default Swap (CDS) prices were volatile during 2023, spiking in March on the
back of banking sector contagion concerns following the major events of Silicon Valley
Bank becoming insolvent and the takeover of Credit Suisse by UBS. After then falling
back in Q2 of calendar 2023, in the second half of the year, higher interest rates and
inflation, the ongoing war in Ukraine, and now the Middle East, have led to CDS prices
increasing steadily. 
On an annual basis, CDS price volatility has so far been lower in 2023 compared to
2022, but this year has seen more of a divergence in prices between ringfenced (retail)
and non-ringfenced (investment) banking entities once again. 
Moody’s revised its outlook on the UK sovereign to stable from negative to reflect its
view of restored political predictability following the volatility after the 2022 mini-budget.
Moody’s also affirmed the Aa3 rating in recognition of the UK’s economic resilience
and strong institutional framework. 
Following its rating action on the UK sovereign, Moody’s revised the outlook on five UK
banks to stable from negative and then followed this by the same action on five rated
local authorities. However, within the same update the long-term ratings of those five
local authorities were downgraded. 
There remain competing tensions in the banking sector, on one side from higher
interest rates boosting net income and profitability against another of a weakening
economic outlook and likely recessions that increase the possibility of a deterioration in
the quality of banks’ assets. 
However, the institutions on our adviser Arlingclose’s counterparty list remain well-
capitalised and their counterparty advice on both recommended institutions and
maximum duration remain under constant review and will continue to reflect
economic conditions and the credit outlook. 
152