North Ayrshire Council, Cunninghame House, Irvine KA12 8EE         
North Ayrshire Council 
A Special Meeting of the North Ayrshire Council will be held in the Council
Chambers, Ground Floor, Cunninghame House, Irvine, KA12 8EE on
Wednesday, 26 February 2025 at 14:00 to consider the undernoted business. 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home.   
1 Apologies 
2 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda.
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
3 Council Budget Engagement Petitions
Submit report by the Head of Service (Democratic) on the outcome of
consideration by Cabinet of the following five petitions relating to possible
Council Budget Options:  
Petition 1 - Save Saltcoats and Ardrossan Libraries from Budget Cuts  
Petition 2 - Possible parking charge enforcement in Kilwinning  
Petition 3 - Possible closure of Dreghorn Library  
Petition 4 - Proposed closure of Beith Library  
Petition 5 - Proposal to cut the Eglinton Park rangers service and closure
of the community garden 
4 General Services Revenue Estimates 2025/26 to 2027/28
Submit report by the Head of Service (Finance) on (a) the Council's
revenue spending requirements and anticipated funding for 2025/26 to
2027/28, (b) the level of reserves and fund balances held by the Council
and (c) options to address the funding gap (copy enclosed). 
5 Capital Investment Programme 2025/26 to 2033/34
Submit report by the Head of Service (Finance) on the draft Capital
Investment Programme to 2033/34 (copy enclosed). 
6 Revenue Estimates 2025/26 - Common Good Funds and Trusts
Submit report by the Head of Service (Finance) on the anticipated annual
income and expenditure of the Common Good Funds and Trusts
administered by North Ayrshire Council and seek approval for the level of
funding to be made available for disbursement during 2025/26 (copy
enclosed). 
7 Treasury Management and Investment Strategy 2025/2026
Submit report by the Head of Service (Finance) on the proposed Strategy
for Treasury Management and Investment activities within the Council for
the financial year 2025/26 (copy enclosed). 
8 Urgent Items
Any other items which the Chair considers to be urgent.
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE  
Webcasting  
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.    
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.    
Generally, the press and public will not be filmed. However, by entering the
Council Chambers and using the press or public seating area, you
acknowledge that you may be filmed and that any information pertaining to
you contained in the video and oral recording of the meeting will be used
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. In
making this use of your information the Council is processing data which is
necessary for the performance of a task carried out in the public interest.    
If you have any queries regarding this and, in particular, if you believe
that use and/or storage of any particular information would cause, or be
likely to cause, substantial damage or distress to any individual, please
contact dataprotectionofficer@north-ayrshire.gov.uk 
3

Page 4

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE 
North Ayrshire Council Sederunt 
Nairn Angus-McDonald
John Bell
Marie Burns
Eleanor Collier
Joe Cullinane
Charles Currie
Scott Davidson
Anthea Dickson
Stewart Ferguson
Todd Ferguson
Robert Foster
Scott Gallacher
Tony Gurney
Alan Hill
Mary Hume
Cameron Inglis
Margaret Johnson
Amanda Kerr
Christina Larsen
Shaun Macaulay
Jean McClung
Matthew McLean
Louise McLaughlan
Davina McTiernan
Tom Marshall
Jim Montgomerie
Ian Murdoch
Donald Reid
Donald L Reid
Chloe Robertson
Ronnie Stalker
Angela Stephen
John Sweeney     
Chair: 
Apologies: 
Attending: 
4

Page 5

NORTH AYRSHIRE COUNCIL 
26 February 2025 
Council 
Title:    Council Budget Engagement Petitions 
Purpose:  To advise Council of the outcome of consideration by Cabinet of
the following five petitions relating to possible Council Budget
Options: 
Petition 1 - Save Saltcoats and Ardrossan Libraries from 
Budget Cuts
Petition 2 - Possible parking charge enforcement in Kilwinning
Petition 3 - Possible closure of Dreghorn Library
Petition 4 - Proposed closure of Beith Library
Petition 5 - Proposal to cut the Eglinton Park rangers service
and closure of the community garden 
Recommendation:  Council is recommended to consider the representations from
the petitioners as part of the Council’s budget setting process
for the coming year. 
1. Executive Summary 
1.1 At its meeting on 18 February 2025, Cabinet considered five reports by the Head of
Service (Democratic) on petitions that had been received relating to possible Council
Budget options following the budget consultation process. The petitions are detailed
below: 
Petition 1 - Save Saltcoats and Ardrossan Libraries from Budget Cuts
Petition 2 - Possible parking charge enforcement in Kilwinning
Petition 3 - Possible closure of Dreghorn Library
Petition 4 - Proposed closure of Beith Library
Petition 5 - Proposal to cut the Eglinton Park rangers service and closure
of the community garden 
Cabinet agreed to refer the representations of the petitioners to Council for
consideration as part of the budget setting process. 
Agenda Item 3
5

Page 6

1.2 The Petitions were previously heard at the Audit and Scrutiny Committee and it was
agreed that the terms of the petitions be accepted and recommendations made to
Cabinet that the petitions be considered as part of the Council’s budget engagement
and budget setting process for the coming year. 
2. Background 
2.1 Petition 1 - Save Saltcoats and Ardrossan Libraries from Budget Cuts 
The terms of the petition is outlined below: 
“Our libraries are more than just buildings filled with books; they are vital community
hubs where learning and imagination flourish. For our children, they serve as safe
havens to explore their curiosity, develop their literacy skills and grow their confidence. 
The amazing staff at Ardrossan and Saltcoats libraries—Anne, Jean, Richard, and
Yvette—provide invaluable support and resources to everyone in the community. With
the proposed cuts opening hours will now be cut by 50% and the staffing will be dropped
from 4 amazing people to 2 who will be spread across both libraries. 
The libraries offer a multitude of classes/groups including but not limited to Bookbug,
Football memories, Crafting Group, Book group, ESOL group, hearing aid clinic, school
visits and many more. As well as organised groups the library is also a community safe
space where you can visit with no obligation to spend a penny. It is a place to meet,
chat, explore and learn. Reducing hours and making cuts would be a devastating blow
to these essential services and result in 2 dedicated staff members losing their jobs. 
Let's ensure that our libraries remain open and fully operational for future generations.
Sign this petition to protect our community's lifeline!” 
The principal spokespersons outlined their objections to the proposal and highlighted
the following points:-  
• The library facilities were a valuable and vital community resource and, in
particular, allowed parents, and others, to meet up and form friendships (while
promoting wellbeing and a sense of community) and also participate in
programmes and activities which were considered essential particularly during
a cost-of-living crisis. The proposed closure of Saltcoats Library and the
reduction of hours in Ardrossan Library would adversely impact on this;
• Combatting adult loneliness and isolation through the promotion of positive
mental health, achievement and sense of community;
• The central location of Saltcoats Library, allowing ease of access to the local
community and the possible reduction in footfall for local traders if any closure
went ahead;
• The benefits of encouraging digital and computer use, in the local community
and promoting equality of access; and
• The vitality of the libraries, in positively stimulating the minds of service users,
and their significant contribution and great use by the local community, and the
potential loss of all these benefits, if these proposals were to go ahead. 
6

Page 7

2.2 Petition 2 - Possible parking charge enforcement in Kilwinning 
The terms of the petition is outlined below: 
“Please find enclosed a petition on behalf of Dino and Sons, supported by our
customers, expressing unanimous opposition to the potential introduction of parking
charges in North Ayrshire. This petition represents not only the concerns of our business
but also those of the wider community, who stand firmly against any new financial
burdens placed on local residents and workers. 
As you are aware, the cost of living crisis continues to escalate at an alarming rate, with
no relief in sight for your constituents. Unfortunately, this marks the second time in as
many years that Kilwinning’s Main Street has faced the threat of parking charges, which
would impose yet another financial strain on families already struggling to make ends
meet. These charges would affect workers trying to support their families, local
households, and even those seeking essential healthcare. 
We understand that North Ayrshire Council has received over 4,400 responses to your
recent budget engagement exercise. Rather than organizing a collective petition with
local businesses and residents, we decided to take a different approach. From our shop
on Kilwinning Main Street, Dino and Sons, we have gathered over 1,000 signatures
from our loyal customers who strongly oppose these proposed charges. In addition, an
online survey conducted via our Facebook page has yielded over 800 additional
objections. 
We urge the Council to take these voices into account and reconsider the introduction
of parking charges. Over 1,100 written submissions from our customers, along with over
800 online signatures from the broader public, clearly show that these charges are not
acceptable. The question is not only whether it is fair to impose such fees but whether
it is justifiable to ask constituents to pay for the basic necessities of life – such as food,
healthcare, and the right to park at their homes. 
We sincerely hope that the Council will take heed of these concerns and protect the
livelihoods of those already facing significant economic challenges. A few quotes from
our invaluable customers on the subject of Parking Charges in Kilwinning’s Main Street: 
1. If I just want broccoli, instead of costing 69p, that would have cost me more than
double just to park my car, doesn’t this council care about the cost of living crisis? 
2. Picking on the easy targets, why don’t they charge retail parks instead? 
3. Myself and friends often enjoy wee day trips to Kilwinning from Neilston, visiting
shops and stay for lunch. It’s one of the last streets anywhere that has
independent family bakers, fruit and veg, butchers and even has clothes shops,
gift shops, your council should be helping it all it can instead of the constant
parking charge threats. 
4. I come here from Kilmarnock, our council destroyed the high street, now there’s
no food shops left. Can’t believe your council is willing to sacrifice a great wee
town due to taxing shopkeepers and its customers. 
7

Page 8

5. I depend on Dino’s delivering my shopping every Saturday – it’s a disgrace the
council’s threatening the only way I can get what I want and not at the
unaffordable quantities supermarkets want me to buy. 
6. Feels like they are trying to turn my street into a ghost town. 
7. Council’s booking everyone generating cash, enough is enough trying to kill off
the street, parking charges=death sentence for this street. 
The principal spokesperson outlined their objections to the proposal and highlighted
the following points:- 
• Imposition of parking charges on shoppers, workers and traders of Kilwinning’s
main street and the adverse effects this would have in term of footfall in the local
area;
• Extremely difficult trading conditions, given the current cost-of-living crisis, and
the struggle for local businesses to remain open;
• Transfer of the land at the Oxenward car park through a Compulsory Purchase
Order to the former Cunninghame District Council (which was supported by the
shop owners and residents) on the condition that the land would be used to
support the growth of Kilwinning and therefore the importance of honouring that
commitment and protecting the community from additional financial burdens;
• That, in light of the above, Kilwinning main street should be freed from the
unnecessary strain of any proposed car parking charges;
• The adverse effect on the local community of the parking charges, and the
financial strain on families trying to make ends meet; and
• The potential reduction in footfall in Kilwinning main street, if the imposition of
parking charges was to go ahead, regardless of the amount “not just £2”, which
could exacerbate difficult trading conditions which have already resulted in recent
business closures on the Main Street. 
2.3 Petition 3 - Possible closure of Dreghorn Library 
The terms of the petition is outlined below: 
“As long time customers of Dreghorn Library, we are deeply saddened by the proposed
closure.  This institution has been a cornerstone of our community, providing a wide
array of educational resources, enhancing literacy and fostering a deep sense of
community.  Not only will the closure of our local library be a devastating loss to our
educational landscape, but it will also leave many without access to critical services,
such as Internet and printing access.  Libraries are a vital part of communities providing
a safe space for people to learn, explore and connect with others.  Preserving our local
library, is more than just books; it’s about preserving our community and its assets. 
Please join us in saving our library.  Sign our petition today.” 
The principal spokespersons outlined their objections to the proposal and highlighted
the following points:- 
• The library was considered to be an essential hub of the community and was a
warm and welcoming place for friends, families, groups and individuals;
8

Page 9

• The regular events that were hosted, within the library, and the considerable
benefits to the local community in terms of being able to access them including
book bug, story time and promotion of children’s reading;
• The ongoing cost-of-living pressures, affecting members of the community, and
the benefits in being able to access free digital and computer facilities,
particularly for the unemployed and potential loss of these benefits if the library
was to close;
• Combatting adult loneliness and isolation by bringing people together,
particularly those who are elderly or vulnerable, while assisting in promoting a
sense of community;
• The central location of Dreghorn Library, allowing ease of access to the local
community of Dreghorn, as well as those in Bourtreehill and Springside; and
• The social interaction and mental health benefits and their contribution and
significant use by the local community, and the potential loss of all these benefits,
if these proposals were to go ahead. 
2.4 Petition 4 - Proposed closure of Beith Library 
The terms of the petition is outlined below: 
“Please find enclosed the following signatures from the people of Beith who are very
concerned at the closure of Beith Library. 
The people of Beith rely on the various services the library provides for them for all ages
in the community. 
Please can we ask you to pass on this petition to the relevant parties before the
February budget meeting. 
Please do not close this library as it has been at the heart of the community for many
years and our town cannot have the eyesore of another empty building.” 
The principal spokespersons outlined their objections to the proposal and highlighted
the following points:- 
• The library offered a safe and easily accessible hub, for all ages, as well as
encouraging and fostering community spirit and friendship;
• Combatting adult loneliness and social isolation, especially in the elderly
population by bringing the community together through the many social and
group activities available within the library, particularly given difficulties of older
citizens and those with disabilities in accessing public transport;
• The loss of educational facilities if the proposal was to go ahead as it was
extensively used by Beith Primary and Nursery children due to its close location
and ease of getting there;
• The central location of the library, allowing ease of access to the local community
and if the closure went ahead, another empty building in the town, the possible
reduction in footfall for local traders and the difficulty for residents to access
facilities in other locations due to the lack of public transport in the Garnock
Valley;
• The benefits of encouraging digital and computer use, in the local community
particularly those affected by cost-of-living pressures including those using the
library facilities for seeking employment opportunities; and
9

Page 10

• The value of the libraries, in bringing people together through the many group
activities on offer, and the potential loss of all these benefits, if this proposal was
to proceed. 
2.5 Petition 5 - Proposal to cut the Eglinton Park Rangers Service and closure of the
community garden 
The terms of the petition is outlined below: 
“North Ayrshire Council are proposing to CUT the park ranger service from Eglinton
Country Park as part of their annual budget review. 
Removing the rangers service will result in Eglinton losing it's 'Country Park' status and
instead it will become open land that the council is not required to maintain as much. It
will also bring an end to education visits, several volunteer programmes, irreplaceable
knowledge about the park and many more key attributes that the service currently
delivers. 
The community garden which has prospered over the last 4 years under the stewardship
of the rangers service and many dedicated volunteers will be closed and left abandoned. 
The council will meet in February 2025 to decide on the fate of the park - help us lobby
the council to keep Eglinton Country Park a place for all to enjoy and keep the only
country park in North Ayrshire!” 
The principal spokespersons outlined their objections to the proposal and highlighted
the following points:- 
• The benefits in keeping the rangers service at Eglinton Park and all the
associated initiatives;
• The strength of feeling as shown in the growth of signatures on the online petition
which has been shared widely on social media, as well as featuring in local
newspapers and radio;
• The value of volunteers including the hours contributed and potential loss of
volunteering opportunities in and around the park;
• The removal of the park ranger service would likely result in the loss of the
Eglinton Path Stewards, a dedicated group of volunteers who maintain some of
the park’s gardens and pathways;
• The loss of skills and specialist knowledge in relation to countryside management
and biodiversity;
• The loss of social value for a relatively small financial saving;
• The potential, though disputed, ‘loss of country park status’;
• The loss of the community garden; and 
• The Council’s duties in terms of the Nature Conservation (Scotland) Act 2004
and the feeling that the proposal is at odds with the North Ayrshire local
biodiversity action plan. 
2.6 The Cabinet agreed to refer  the 5 petitions to Council with the recommendation that
the petitions are considered as part of the Council’s budget setting process for the
coming year. 
10

Page 11

3. Proposals 
3.1 That Council  considers the representations from the petitioners as part of the
Council’s budget setting process for the coming year. 
4. Implications/Socio-economic Duty 
Financial 
4.1 None arising from this report. 
Human Resources 
4.2 None arising from this report. 
Legal 
4.3 None arising from this report. 
Equality/Socio-economic 
4.4 None arising from this report. 
Climate Change and Carbon 
4.5 None arising from this report. 
Key Priorities 
4.6 None arising from this report. 
Community Wealth Building 
4.7 None arising from this report. 
5. Consultation 
5.1 This report follows as a result of the budget engagement process with communities. 
Aileen Craig
Head of Service (Democratic) 
For further information please contact Hayley Young, Senior Committee Services
Officer, on 01294 324136. 
Background Papers
0
11

Page 12

12

Page 13

NORTH AYRSHIRE COUNCIL 
26 February 2025                                                                                                                                                            
North Ayrshire Council 
Title:    General Services Revenue Estimates 2025/26 to 2027/28  
Purpose:  To advise Council on (a) the Council's revenue spending
requirements and anticipated funding for 2025/26 to 2027/28; (b)
the level of reserves and fund balances held by the Council and
(c) options to address the funding gap. 
Recommendation:  That Council: 
a) notes the anticipated funding available to meet the Council’s
expenditure requirements and notes the areas of ongoing
financial risk to the Council;
b) approves the Council's expenditure requirements for 2025/26
and notes the indicative requirements for 2026/27 and
2027/28;
c) approves the new strategic investments and risk provision
outlined in section 2.7.2 of the report;
d) notes the projected outturn position for 2024/25; 
e) notes the level of reserves and fund balances held by the
Council and approves any use and contributions to and from
these; 
f) approves the additional contribution to the HSCP noted at
2.8.1;
g) approves efficiencies and savings to ensure a balanced
budget for 2025/26, consequentials and new proposals in
future years;
h) approves implementation of the revised service delivery
model for the previously approved school library saving
outlined at paragraphs 2.7.7 to 2.7.9;
i) approves the schedule of Council fees and charges detailed
in Appendix 6;
j) determines the level of Council Tax for 2025/26, noting the
recommendation for a 7% increase;
k) notes the anticipated funding gaps for 2026/27 and 2027/28;
l) considers the equality and children’s rights impact of any
proposed service changes;
m) notes the feedback from the community Budget engagement
exercise to help inform budget plans;
n) notes progress to date on the Council’s Sustainable Change
Programme and corporate Workforce Planning; and 
o) approves the budget matrix for 2025/26.  
Agenda Item 4
13

Page 14

1. Executive Summary 
Introduction
1.1. Section 93 of the Local Government Finance Act 1992 requires Councils to
determine the levels of expenditure in the forthcoming financial year, and
thereafter to set Council Tax sufficient to cover any unfunded balance.
1.2. This report provides Members with an overview of the Council's anticipated
financial position on the General Fund revenue budget for the next three financial
years, 2025/26 to 2027/28. It also sets out the information required to enable the
Council to set a balanced budget and its Council Tax for 2025/26 by 11 March as
required by statute.
1.3. The Long-Term Financial Outlook 2024/25 to 2033/24 report was presented to
Council on 13 December 2023. The updated Medium-Term Financial Outlook
2025/26 to 2027/28 was presented to Council on 9 October 2024. In addition,
regular Elected Member briefing sessions were held between October 2024 and
February 2025, during which officers provided Members with information on the
financial pressures and risks faced by the Council and options to reduce net
expenditure within the context of the priorities set out in the Council Plan. 
Revenue Budget
1.4. When the Council set its budget for 2024/25 on 28 February 2024 the decisions
taken resulted in a balanced budget for 2024/25 with indicative remaining funding
gaps of £10.718m and £8.721m for 2025/26 and 2026/27 respectively.
1.5. The Medium-Term Financial Plan (MTFP) for 2025/26 to 2027/28 builds on last
year’s MTFP and the analysis reflected in the Medium-Term Financial Outlook.
The proposals in this report provide a balanced budget for 2025/26, although it
should be noted that this required a planned use of £4.000m reserves, with
indicative net funding gaps remaining for 2026/27 and 2027/28 of £3.579m and
£7.385m respectively. This position incorporates the full year effect of proposed
savings in 2025/26 and a planned use of reserves of £3.500m in 2026/27 and
£1.788m in 2027/28. This position continues to present a significant challenge to
the sustainability of the Council’s finances. A summary of the key components
underpinning this is provided at sections 2.6 and 2.7.
1.6. Detail is provided at section 2.5 on the anticipated level of earmarked,
unearmarked and specific reserves with unearmarked reserves projected at the
level of 2.0% equal to £9.181m, earmarked reserves of £77.096m and specific
reserves of £11.504m aligning with anticipated future commitments. The Council’s
Useable reserves position will continue to be monitored. 
1.7. The MTFP includes a range of savings proposals required to deliver a balanced
Budget position for 2025/26, and a profiled use of reserves to help mitigate the
significant financial challenges facing the Council and this is set within the context
of a proposed Council Tax increase of 7% for 2025/26. This has also been
impacted by the position in respect of employers’ national insurance funding for
Councils, with anticipated funding of 60% of the cost of direct staff included within
14

Page 15

the Budget. Against this challenging backdrop the reduction in employer pension
contributions in 2025/26 has provided some flexibility to address the significant
risks facing the Council and provide an opportunity for a level of non-recurring
strategic investment to support priorities. Details of the proposed investment and
risk provision is outlined in section 2.7.2 of the report. Council is asked to consider
these proposals. 
Health and Social Care Partnership
1.8 The Director of the Health and Social Care Partnership (HSCP) has provided
Members with information on pressures and areas of potential savings to inform
the Council’s proposed contribution to the Partnership. This information is not
detailed within the Council’s budget proposal on the basis that the final position will
be determined by the Integration Joint Board (IJB). It is recognised however, that
the Medium-Term Financial Plan of the HSCP anticipates significant cost
pressures which presents a risk to the financial sustainability of the Council.
1.9 The proposed additional contribution for 2025/26 is currently £13.280m. This
reflects the requirements as set out in the local government finance settlement and
includes funding to support new expenditure commitments as well as additional
uncommitted funding from the Council of £2.114m, being the HSCP share of the
additional core grant settlement, to help address existing cost pressures. It is also
important to note that full funding in respect of the additional cost associated with
the change in employer national insurance contributions has been passported to
the HSCP, with the shortfall of £0.759m borne by the Council. Further areas of
funding to support expenditure commitments is expected and still to be distributed.
1.10 The Integration Scheme approved by Scottish Ministers states that following
determination of the Council and NHS payment to the IJB, the IJB will refine its
Strategic Plan and planned service delivery to take account of the totality of
resources available. In order to deliver services within the level of available
funding, this will require the HSCP to fully develop its Transformation and financial
recovery plans. 
Chief Finance Officer Assurance
1.11 The 2025/26 annual budget and 2025/26 to 2027/28 MTFP has been informed by
the Council’s Long-Term Financial Outlook and previous MTFP. Significant
scrutiny of the underlying assumptions and savings delivery has been undertaken
to ensure the 2025/26 annual budget is robust. It is the responsibility of Chief
Officers, including the HSCP, to manage any variance from the underlying
assumptions.
1.12 The report notes at section 2.14 the significant risks to the financial sustainability
of service delivery. Within this context, apart from the uncertainty around future
funding levels from Scottish Government and the financial performance related to
the HSCP, there are two significant financial risks that the Council is managing.
They include the risk of the 2025/26 pay award being agreed at a level more than
the budgeted 3% contribution and without any further Scottish Government
support this would have a material impact on the Council’s finances. The ongoing
position around maintaining teacher numbers runs contrary to the Council’s
15

Page 16

individual circumstances, impacted through a reduction in the pupil roll
demographic and Attainment Challenge funding. Although the Council continues to
progress discussions with the Scottish Government around areas of accepted
mitigation, there remains a small risk that an element of funding to support
teachers could be withdrawn. 
1.13 Allied to the risks facing the Council, there is the requirement for the Council to
hold a sufficient level of Reserves. The level of Reserves set out in the Budget
aligns with known future commitments. The Change and Service Redesign Fund
will require to be kept under review to ensure sufficient resources are available to
continue to support the Council’s Sustainable Change programme. Unearmarked
reserves continue to remain at the lower level of recognised best practice and
reflects 2% of the Council’s revenue budget. 
2. Background 
2.1 Financial Context
2.1.1 The Long-Term Financial Outlook 2024/25 to 2033/24 report, incorporating the
Medium-Term Financial Outlook 2024/25 to 2026/27 was presented to Council on
13 December 2023. This, along with the Medium-Term Financial Outlook 2025/26
to 2027/28, is the cornerstone of the Council’s strategic financial planning
framework. This has helped inform the development of the Medium-Term Financial
Plan 2025/26 to 2027/28. 
2.1.2 The economic outlook for the Scottish, UK and global economy continues to be
volatile. In the UK growth remains relatively stagnant, with 0.1% increase in GDP
in the last quarter of 2024. Inflation for 2024 based on CPI was 2.5% which is
more than the Bank of England target of 2%. Inflation is expected to increase
again during 2025. The Bank of England base interest fell by 0.25% to 4.5% in
February 2025. The level of inflation will remain an important factor in local
government pay negotiations across all bargaining groups. Pay negotiations for
2025/26 are currently being progressed. The impact of inflation on the Council’s
cost base, coupled with an increased cost of borrowing to support the Capital
programme, continues to place significant strain on the Council’s finances. 
2.2 Scottish Government Funding
2.2.1 The Scottish Budget was announced on the 4 December 2024 and Local
Government Finance Settlement for 2025/26 was published on 12 December
2024. Funding support from the Scottish Government comprises: 
• general revenue grant; 
• non domestic rate income; and
• specific grant.
2.2.2 North Ayrshire Council's anticipated Scottish Government funding support, as
distributed, for 2025/26 is £375.310m.
2.2.3 The Local Government Settlement resulted in an increase of £7.254m in core
grant funding (+2.05%) when compared to the 2024/25 settlement. The main
elements of the budget announcement included;
16

Page 17

• National Increase in the General Revenue Grant of £289m. This comes with no
additional commitments; 
• An additional £15m to support the expansion of Free School Meals. NAC
(£0.379m);
• From the 2024-25 Scottish Joint Council (SJC) and teachers (SNCT) pay deals,
baselining an additional £77.5m (NAC £2.056m) and £43m (NAC £1.135m) of
resource respectively; 
• Baselining £86.2m (NAC £1.736m) to support the higher cost of employers’
pension contributions for teachers; 
• Additional £125m and £25.7m to fund the Real Living Wage uplift for
commissioned services across adult social care and early learning and
childcare respectively; 
• £10m nationally to support an inflationary uplift in free personal nursing care; 
• Further £41m nationally of resource to reflect the costs of maintaining teacher
numbers at 2023 levels with an additional £28m to be made available to
enhance additional support for learning services. This funding has still to be
distributed;
• Maintaining £4m (NAC £0.231m) of support for island communities to reflect the
higher costs of delivering services in island communities in lieu of the
conclusion of the ongoing review of the Special Islands Needs Allowance;
• £33m (NAC £1.059m) to support development of people working in children’s
social work; 
2.2.4 The Settlement announcement also included details on areas where Scottish
Government set out a number of expectations; 
• The Settlement provided full discretion over decisions on Council Tax, with no
freeze and no cap. However, it is intended to enable local authorities to deliver
the key services and outcomes upon which communities rely, therefore the
Scottish Government hope this will enable councils to minimise any proposed
increases in the Council Tax, given the ongoing cost of living pressures
affecting people in communities.
• The additional funding allocated as General Revenue Grant for Integration
Authorities, in support of the real living wage uplift in commissioned services
and for Free Personal and Nursing Care should continue to be additional and
not substitutional to each Council's 2024-25 recurring budgets for delegated
adult social care services.
• Establishment of a joint Education Assurance Board. The Board will drive
activity to achieve shared objectives to improve attainment, attendance and
improve relationships and behaviour. The Board will aim to provide assurance
that jointly, Local Government and Scottish Government are supporting
improvement, and will draw on a range of data and evidence including
independent scrutiny bodies such as HM Inspector of Education.
• Local authorities will commit to maintaining or restoring teacher numbers to the
2023 baseline in 2025-26. The budget uprates the value of this funding to
£186.5 million from 2025-26 (from £145.5m). This funding aims to ensure that
teacher numbers, set out in the publication Summary statistics for schools in
Scotland 2023, published on 12 December 2023, being met or exceeded for
17

Page 18

each council, in the teacher numbers census of September 2025, noting that
there may be exceptional circumstances outwith a council’s control which need
to be able to taken into account. Those exceptional circumstances include:
o Reductions in aggregate Scottish Attainment Challenge funding in 2025-26
which result in a reduction in teacher numbers. This may be due to the
tapered approach between 2022-23 and 2025-26 to phasing out the nine
former challenge authority models and moving to Strategic Equity Funding for
all 32 Councils.
o Reductions in School Teaching Staff Grant Aided Expenditure (GAE) in
2025-26, which reflect changes to the Council's pupil roll.
o Situations where Councils have had to temporarily increase teaching
capacity to address a short-term spike in pupil numbers (which in the past
included Ukrainian refugee support). 
2.2.5 The Settlement did not include any funding to support the increase in employer
national insurance contributions that will come into effect from April 2025. Due to
the proportionally larger size of Scotland’s public sector compared to that of
England, it is anticipated that the Barnett consequentials passed through to
Scotland will not fully fund this change. For NAC the total cost of this policy
change in relation to direct staff is £6.618m (including the HSCP). The Scottish
Government recently confirmed that they will provide funding to Councils in
advance of the consequentials from the UK Government, however, this funding is
approximately 60% of the cost of direct staff within Scottish Councils. For NAC this
will leave an anticipated shortfall in funding of £2.647m (£1.888m NAC and
£0.759m in respect of the HSCP). Further, it should also be noted that the funding
does not provide any additional financial support to address costs associated with
commissioned services impacted by this policy change. Although not known at this
time, this will likely be significant, and the Council will require to make appropriate
financial provision to address this risk.  
2.2.6 The 2025-26 Non-Domestic Basic Property Rate (‘poundage’) is provisionally set
at 49.8 pence, the same rate as last year. The Intermediate and Higher Property
Rates will increase by inflation to 55.4p and 56.8p respectively. A new 40% relief
for Hospitality premises (including Music Venues with capacity up to 1,500) will be
introduced for 2025-26, where the property is liable for the Basic Property Rate
(rateable value up to £51,000), capped at £110,000 per business. The 100% relief
for Hospitality premises on islands and specified remote areas will continue in
2025-26, capped at £110,000 per business, and will also be available for music
venues with a capacity up to 1,500 per business from 1 April 2025.
2.2.7 For 2026/27 and 2027/28 the current planning assumption is that the level of core
grant support will be flat cash and remain at the same level for each year. For
context, a 1% reduction in core grant equates to around £3.500m. This
assumption is still based on a broadly flat cash funding position for local
government, as reflected in the Scottish Government Spending Review published
in May 2022. This is due to be updated in the spring of 2025. 
2.3 Council Tax
2.3.1 Local authorities have discretion to increase Council Tax. Section 74 of the 1992
Act sets the proportions payable by each Council Tax band. As such, Councils can
18

Page 19

only apply a standard percentage increase across all Council Tax bands, they
cannot vary the percentage increase between bands.
2.3.2 Council Tax is a vital source of revenue for the Council. The 2025/26 Settlement
did not include any funding to support a Council Tax freeze or introduce any cap,
instead asked that Councils look to minimise any increase. Although the level of
Scottish Government Settlement is more than forecast there remains several
significant cost pressures set against this funding, including assumptions around
the level of pay awards, employers’ national insurance costs and demographic
cost pressures requiring more investment for HSCP’s.  
2.3.3 In considering the costs pressures facing the Council over the medium-term and
the measures required to address this position, whilst still trying to minimise the
impact on communities and services, the MTFP includes a planning assumption
for 2025/26 of an increase of 7% in Council Tax, with a current planning
assumption of a further 5% increase for 2026/27 and 2027/28. Council Tax income
represents around 16% of Council funding. 
2.3.4 The anticipated Council Tax charge for 2025/26 is illustrated in the undernoted
table for each property band (excluding charges for water and waste water
charges). Water and waste water charges are set by the Scottish Water Board. 
2.3.5 Comparative information on Band D is provided within the Council Tax leaflet that
is issued with Council Tax Bills. The comparative information for 2024/25 is as
follows;
Scotland     £1,418.00
North Ayrshire Council  £1,452.12
2.3.6 The Scottish Government published the Council Tax (Variation for Unoccupied
Dwellings) (Scotland) Amendment Regulations 2023, under which councils have
the power to vary the Council Tax charge for second homes from the current
100% charge, to include a premium of up to a further 100% of the applicable
Council Tax charge. Following a period of consultation during 2024/25, North
Ayrshire Council at its meeting on 12 February 2025 approved the application of
the 100% premium. 
A Under £26,999 £968.08 £67.76 £1,035.84
B £27,000 to £34,999 £1,129.42 £79.06 £1,208.48
C £35,000 to £44,999 £1,290.77 £90.35 £1,381.12
D £45,000 to £57,999 £1,452.12 £101.65 £1,553.77
E £58,000 to £79,999 £1,907.92 £133.56 £2,041.48
F £80,000 to £105,999 £2,359.69 £165.18 £2,524.87
G £106,000 to £211,999 £2,843.73 £199.06 £3,042.79
H Over £212,000 £3,557.69 £249.04 £3,806.73
Band Valuation
(at 1991 levels)
2024/25
Council Tax
Proposed
Increase (7%)
2025/26
Council Tax
19

Page 20

2.4 Probable Outturn 2024/25
2.4.1 Based on the revenue financial performance report for 2024/25 at the end of
November 2024, a projected overspend of £0.689m is forecast. The factors
contributing to this were reported to Cabinet on 21 January 2025. 
2.4.2 This position could change following the events of the storm impact on 24 January
2025. The Scottish Government has activated the Bellwin scheme, and the
Council is currently gathering details of cost impacts, with a view to submitting a
claim in the next couple of months. It should be noted, however, that the
conditions of the Bellwin scheme are such that the Council requires to fund any
costs up to 0.2% of the annual budget, therefore up to £0.785m for NAC. The
position reflected in the level of anticipated Council reserves on 31 March 2025 is
that any overspend to 31 March 2025 will be met from existing earmarked
reserves.
2.4.3 The HSCP financial performance report to December 2024 was presented to the
Integration Joint Board on 6 February 2025. The overall projected outturn is a
year-end overspend of £5.824m for 2024-25, reduced to £4.415m through
identified financial recovery actions. The NAC element of this as a funding partner
is a year-end overspend of £4.285m, reduced to £3.106m through recovery
actions. There is an increasing risk to achieving financial balance during 2024-25.
Although the HSCP will continue to progress recovery actions throughout the
remainder of the year, in the event of an overspend position the Council will have
to consider making interim funds available. The terms of this arrangement will be
considered by the Council’s Cabinet and the Integration Joint Board when the final
outturn position is known. It is recognised that the projected level of financial
pressures and funding for the HSCP over the medium-term presents a significant
risk to the financial sustainability of the Council. Elected members will continue to
be updated on this position.       
2.5 Reserves, Fund Balances and Investment
Introduction
2.5.1 Setting the General Fund Reserve is one of several related decisions in the
formulation of the MTFP and the annual revenue budget. In setting its budget the
Council must have a clear reserves policy that takes account of known
commitments, potential liabilities and the risk profile of the Council and providing
flexibility to deal with unforeseen circumstances. The right level of reserves
supports financially sustainable service delivery. The Council’s approach is in line
with CIPFA’s recommended practice as set out in the document “Local Authority
Reserves and Balances”.  
Application of Reserves
2.5.2 North Ayrshire Council has used reserves in setting its budget over several years.
This has included a reduction in unearmarked reserves, release of earmarked
reserves no longer required and application of in-year underspends. Use of
reserves provides only a temporary solution, and more sustainable approaches
are required. A summary of application of reserves is noted below;
20

Page 21

• In 2017/18 £8.782m funded the HSCP Challenge Fund and supported non-
recurring expenditure.
• In 2018/19 and 2019/20 £3.500m and £3.880m respectively supported the core
recurring budget.
• In 2020/21, following a review of earmarked reserves, a total of £0.548m was
released to support the 2020/21 Budget.
• In 2021/22, following a review of corporate contingency funds, a total of
£0.862m was released to support the 2021/22 Budget.
• In 2022/23, no use of reserves was required to support the Budget.
• In 2023/24, a total of £3.503m contribution was made from reserves.
• In 2024/25, there was a planned contribution of £5.000m from reserves. 
Reserves Policy
Unearmarked Reserve 
2.5.3 This reserve is held to ensure the Council remains in a prudent financial position in
2025/26 and could respond to major unforeseen incidents or emergencies. 
2.5.4 The Council will continue to face financial challenges through 2025/26 and across
the medium-term. Cost pressures and risks include the financial performance of
the HSCP, employee pay negotiations, employer national insurance contributions
for direct staff and commissioned services and the ongoing impact of inflationary
related pressures across Council budgets and the capital programme. 
2.5.5 It is anticipated on 31 March 2025 the balance of unearmarked reserves will be
£9.181m which equates to 2.0% of the Council’s net expenditure budget. This
level of unearmarked reserve is at the lowest end of the recommended range of
2% - 4% for general reserves. 
Earmarked Reserves
2.5.6 These Funds have been approved for carry forward to meet known commitments
or liabilities which will be settled in future years. Current earmarked funds include:
• Affordable Housing – accumulated from Council Tax collected from second
homes and long-term empty properties;
• Project-specific funds - these funds will be carried forward from 2024/25 to allow
for the completion of specific projects after 31 March 2025;
• Workforce Planning Fund – To support the Council’s workforce planning
programme;
• Prudential Investment Fund - resources to smooth the revenue implications of
loan charges supporting the Capital Investment Programme; 
• Change and Service Redesign Fund – supports delivery of the Council’s
Sustainable Change programme;
• Renewal Fund to support a range of projects across key themes identified
through the experiences from the pandemic; and  
• Investment Fund to support a range of sustainability and Community based
projects.
2.5.7 On the 15 February 2023 Council approved the use of Service Concession
flexibility to help mitigate the significant cost pressures and resultant revenue
21

Page 22

budget gaps over the medium-term and to help address the impact of construction
cost volatility as part of delivering the Council’s ambitious Capital programme. The
Council Budget meeting of 1 March 2023 approved the use of £16.146m of the
total retrospective sum of £21.546m to be applied in a limited and controlled
manner across several financial years and, critically, that this runs in parallel with
more sustainable measures to reduce the cost base of the Council in line with
available funding. In view of the scale of the financial challenges facing the
Council, this remains an essential element of the Budget programme over the
medium-term.  
Specific Reserves
2.5.8 Specific reserves are held as follows;
• Insurance Fund - the current balance on this Fund aligns with the most recent
actuarial valuation, provision for uninsured claims and outstanding liabilities.  
• Capital Fund – This supports delivery the capital investment programme. 
Summary
2.5.9 The projected accumulated balances on the Council's Funds and Reserves on 31
March 2025 are outlined in the table below, with the majority of these being
earmarked for specific purposes. The value of reserves is anticipated to reduce
during 2024/25 by £7.993m. 
2.5.10 Based on the current financial landscape and the risks the Council faces the
current level of Reserves requires to be increased to help address new and
Balance at
31 March
2024
Transfers
Approved by
Cabinet
24 Jan 2025
Projected
Transfers to
31 Mar 2025
Transfers
Included in
Budget
Paper
Projected
Balance at
31 Mar 2025
Anticipated
Future
Spend
Projected
Future
Balance
£m £m £m £m £m £m £m
General Fund
Unearmarked 8.445 - (0.689) 1.425 9.181 - 9.181
General Fund Earmarked
Affordable Housing 1.925 (0.394) 1.198 - 2.729 (2.729) -
Project Specific Funds 23.009 (3.771) (1.711) (1.425) 16.102 (16.102) -
Prudential Investment Fund 26.884 7.673 (0.050) - 34.507 (34.507) -
Change and Service
Redesign Fund 2.431 (0.203) (0.662) - 1.566 (1.566) -
Renewal Fund 9.123 (2.659) (0.705) - 5.759 (5.759) -
Investment Fund 5.033 (0.125) - - 4.908 (4.908) -
Workforce Planning Fund 0.909 - - - 0.909 (0.909) -
Future Budget Support 14.288 (5.000) - - 9.288 (9.288) -
Cost of Living Fund 1.338 (0.010) - - 1.328 (1.328) -
Total Earmarked Funds 84.940 (4.489) (1.930) (1.425) 77.096 (77.096) -
Total General Fund
Balances 93.385 (4.489) (2.619) - 86.277 (77.096) 9.181
Specific Reserves
Insurance Fund 2.558 - - - 2.558 (2.558) -
Capital Fund 9.831 (0.885) - - 8.946 (8.946) -
Total Specific Reserves 12.389 (0.885) - - 11.504 (11.504) -
Total General Fund
Reserves 105.774 (5.374) (2.619) - 97.781 (88.600) 9.181
22

Page 23

increasing risks associated with the HSCP financial performance over the
medium-term and the impact of the increase to employer national insurance
contributions likely to be passed through from commissioned services. The
Council will also require to invest to progress the change programme at scale and
pace and deliver future savings as part of the Budget programme. This is outlined
further in section 2.7.2 of the report. 
2.6 Income Summary
2.6.1 Total funding available to the Council to finance its expenditure plans in 2025/26 is
noted in the table below. The main assumptions include;
• 2025/26 Scottish Government Funding in line with the Finance Circular of 12
December 2024 and the position has been updated to reflect recent funding
announcements in respect of Council’s anticipated funding in respect of
employers’ national insurance contributions, in advance of any consequentials
from the UK Government being confirmed. A flat cash position in core funding is
projected for years 2 and 3, excluding anticipated adjustments in respect of loan
charge support;
• The North Ayrshire Council meeting of 12 February 2025 approved the
application of a 100% Council Tax premium in respect of second homes and
approved a revised policy for non-domestic rates empty property relief. This has
been reflected in the anticipated income for 2025/26. Council Tax increases of
5% for 2026/27 and 2027/28 have been included within the planning
assumptions at this time. This position will be influenced by the level of future
Scottish Government funding;
• Funding from Scottish Government to support teacher numbers has been
included. This continues to be subject to ongoing discussion which includes
areas of accepted mitigation where teacher numbers have not been maintained.
These mitigations include circumstances where Councils have lost funding
through the Attainment Challenge fund and where reductions in pupil roll have
led to less funding through GAE lines. Both these areas have impacted North
Ayrshire. It is also recognised that further funding to support teachers and
additional support needs was announced as part of the Budget, however,
allocations have still to be confirmed;
• The contribution from earmarked reserves includes resources from the
approved Service Concessions flexibility across the MTFP;
• Outwith specific proposals, fees and charges have been uplifted by 5%
annually.
23

Page 24

2.7 Expenditure Requirement
2.7.1 The revised expenditure requirement for 2025/26 is £461.612m and is
summarised in Appendix 1.  This is the 2024/25 base budget adjusted to reflect
the outcome of a full review of service pressures, previously approved savings,
operational budget adjustments, national expenditure requirements and the
proposed funding contribution to the Health and Social Care Partnership. The
main assumptions and pressures are summarised below;
• Costs of continuing the current level of service;
• Inflationary pressures, including assumed pay awards, employers’ national
insurance contributions, contractual commitments and utilities;
• The financial implication of decisions already taken by the Council;
• Socio economic and demographic pressures.
2.7.2 Changes to the level of employer contributions to the Strathclyde pension fund
were confirmed during 2023/24. The new rates included a 6.5% contribution rate
for 2024/25 and 2025/26 and a 17.5% contribution rate for 2026/27. The Council’s
expenditure requirements have been adjusted to reflect the new base contribution
rate of 17.5%, however, the reduced rate of 6.5% has provided financial flexibility
of £5.000m in 2025/26 to help address areas of material financial risk to the
Council, albeit it is recognised that this would only provide temporary funding.
There is also some scope for non-recurring strategic investment in 2025/26. It is
recommended that investment helps achieve future cost avoidance or future
savings. Council is asked to approve the following use of non-recurring funding for
2025/26;
• £4.000m – Funds will be earmarked to help address areas of material financial
risk to the Council and support the Change programme. The areas of risk
include the financial performance of the HSCP and associated financial risk to
the Council as a funding partner in the event of further overspends being
incurred, the impact of the employer national insurance contributions increase
and pass through costs from commissioned services, the risk of any agreed pay
awards for 2025/26 exceeding the current 3% funding level from the Council
2025/26 2026/27 2027/28
£m £m £m
Aggregate External Finance 375.310 375.310 375.310
Additional Aggregate External Finance due:
Teachers Numbers Funding 3.775 3.775 3.775
NI Increase Contribution 3.971 3.971 3.971
Council Tax 69.491 73.455 77.632
Council Tax Income for Affordable Housing 1.213 1.274 1.338
Council Tax Second Homes Levy 1.305 1.370 1.439
Contribution from Earmarked Reserves 4.000 3.500 1.788
Total Funding Available 459.065 462.655 465.253
24

Page 25

and the ongoing risk associated with teacher number funding being reduced if
areas of Council mitigation are not formally agreed by the Scottish Government.
It is also recognised that the Council requires to continue to invest to deliver the
Sustainable Change programme and generate further financial savings to
address budget gaps. Specific allocations within the £4.000m will be refined as
more information is known through 2025/26.
• £0.500m – Investment in the North Ayrshire roads infrastructure to bring total
investment levels (capital and revenue) closer to the required steady state
maintenance levels and avoid further future costs.
• £0.500m – Sustainability investment across the Council’s property estate to
focus on cost effective measures to help reduce energy consumption and
generate financial savings. 
2.7.3 In the absence of an agreed pay settlement for 2025/26 through the SJC and
SNCT bargaining groups, the financial planning assumption for pay increase for
2025/26 remains at 3%, noting the risks in section 2.7.2 above, and further 3%
increases for 2026/27 and 2027/28 respectively. This continues to be based on the
limits of affordability rather than any prediction as to the actual level of any pay
agreement. 
2.7.4 In establishing the expenditure requirements, no provision has been made for
general non pay inflation resulting in a reduction in the purchasing power of the
budgets affected. This is most acute across the range of services delivered
through the Place Directorate.
2.7.5 The Scottish Government has confirmed that the cost of implementing the SLARC
recommendations has been included within the uncommitted funding as part of the
Local Government Settlement for 2025/26. Regulations are due to be laid in the
coming weeks and come into force on the 1 April 2025 to implement the pay
recommendations. This has been included within the Council’s expenditure
requirements.
2.7.6 Operational budget adjustments not impacting on Council policy or causing
material changes to current service levels, are detailed in Appendix 2. Notification
was received in November 2024 from the Department for Environment, Food and
Rural Affairs (DEFRA) which included an interim assessment of up to £4.660m of
revenue due to the Council during 2025/26, following the implementation of
Producer Responsibility Obligations for Packaging on businesses with a turnover
of more that £1m per annum. In short, fees will be charged by DEFRA to
businesses who produce packing for their products. The fees are intended to
cover the waste collection, disposal and recycling of the packaging, with the
revenue then allocated to waste authorities across the UK. The first revenue
allocation is anticipated in November 2025, however, at this time final confirmation
is still required on revenue allocation levels and around any obligations attached to
this funding. The 2025/26 revenue budget includes assumed funding of £1.335m
from this source. This is a risk-based approach, and it is anticipated will help fund
additional cost pressures in waste services as well as allowing the Council to defer
at this time any consideration for introducing charges for garden waste collection.
This position will be monitored during 2025/26, and any further changes will be
considered as part of the 2026/27 Budget.   
25

Page 26

2.7.7 As part of the 2024/25 revenue budget, savings were approved which impacted
2025/26 and 2026/27 and they are detailed at Appendix 3. At the Council’s budget
setting meeting of 28th February 2024, a budget saving totalling £0.438m was
approved. This saving had several elements, including the implementation of a re-
designed school library service. This element of the saving totalled £0.190m. A
proposed service delivery model was developed within the revised financial
envelope available. 
2.7.8 Following stakeholder feedback, the matter was discussed further at the Council
meeting of 15th May 2024, where it was agreed to delay the implementation of the
school library redesign to allow further work on the development and
communication of the replacement model. Officers subsequently undertook
engagement with headteachers, parent council representatives and pupils. This
informed preparation of alternative service delivery models, within the original
resource envelope, for consideration. 
2.7.9 Informed by the engagement feedback, a revised proposal to create 4 x Grade 4,
'Library Assistants (Secondary Schools)’ posts, operating on a part time (14 hours
per week) term time basis across all mainland secondary schools is recommended
for implementation. This proposal has been discussed with trade unions and
affected staff. The key duties of the postholders will be maintaining the library,
facilitating access to books and ICT resources, study sessions, encouraging
reading, offering a safe space for pupils, delivering lunchtime after school activities
and special themed days, for example the annual Book Week Scotland event.
These duties reflect the priorities expressed by stakeholders as part of the
engagement exercise. It is therefore recommended that Council approves
implementation of the revised service delivery model for the school library service.
2.7.10 Full details of expenditure requirements identified for 2025/26 to 2027/28,
including new national expenditure requirements and all contractual and
inflationary related pressures, as well as loans fund support to deliver the capital
programme, are detailed in appendix 4.
2.7.11 Based on this expenditure forecast and incorporating the savings achieved
through operational adjustments and those savings previously approved,
remaining savings of £2.547m / £5.399m / £7.618m are required for 2025/26,
2026/27 and 2027/28 respectively. This position incorporates the planned use of
reserves totalling £4.000m in 2025/26, £3.500m in 2026/27 and £1.788m in
2027/28. This funding landscape continues to present a significant challenge to
the Council over the medium-term. 
2.8 Health and Social Care Partnership
2.8.1 Information on pressures and areas of proposed savings are shared with North
Ayrshire Council to inform the allocation of resources delegated to the IJB. As part
of the recent 2025/26 budget announcement and recognising the level of Scottish
Government Settlement and the pressures facing the HSCP, the Council plans to
make a net contribution to the HSCP of £13.280m. It should also be noted that
further resource distributions to the HSCP, aligned to specific policy areas, are
expected throughout the course of 2025/26.
26

Page 27

2.8.2 As a condition of the settlement, funding should be additional and not
substitutional to each Council's 2024-25 recurring budgets for adult social care
services that are delegated.
2.8.3 The contribution to the HSCP includes additional funding from the Council of
£2.114m, being the HSCP share of the additional Scottish Government core grant
settlement to help address cost pressures. It is also important to note that full
funding in respect of the additional cost associated with the change in employer
national insurance contributions has been passported to the HSCP, with the
shortfall of £0.759m (being 40% of the total cost) borne by the Council.
2.8.4 The Integration Scheme approved by Scottish Ministers states that, following
determination of the Council and NHS payments to the IJB, the IJB will refine its
Strategic Plan to take account of the totality of resources available. Accordingly,
the proposed financial contribution to the IJB of £13.280m in 2025/26 represents
more than the allocation required from the settlement conditions and will be used
by the HSCP to meet new and existing spending commitments, recognising that
further distributions from Scottish Government will also occur throughout 2025/26
for policy areas. Elected members should note however that the Medium-Term
Financial Plan of the HSCP anticipates further significant cost pressures across
2025/26 and 2026/27. At this time the Social Care services of the HSCP project an
estimated Budget gap in 2025/26 of over £3.175m which will require identification
of further savings and recovery actions to address. The position in 2026/27 is
compounded by the return of the employer superannuation contribution rate to
17.5%, from the current discounted rate of 6.5%. The estimated Budget gap in
2026/27 ranges from a best-case scenario of an £8.960m deficit to a worst-case
deficit of £17.189m. This position presents a material risk to the financial
sustainability of the Council.
2.8.5 The current planning assumption for years 2026/27 and 2027/28 from the Council
is that the financial pressures facing the IJB will be met by savings and recovery
actions. 
2.8.6 It is anticipated that the IJB will utilise all remaining unearmarked reserves by the
31 March 2025. 
2.9 Efficiencies and Savings Proposals
2.9.1 Proposals for efficiencies and savings have been made which will deliver a
balanced budget for 2025/26. There are estimated net budget shortfalls of
£3.579m and £7.385m in 2026/27 and 2027/28. This position, however,
incorporates the planned use reserves of £4.000m in 2025/26, £3.500m in
2026/27 and £1.788m in 2027/28. The use of reserves is not a sustainable
solution, but necessary due to the scale of the Budget challenges. Proposed
savings, excluding the HSCP, are summarised at Appendix 5. The approach to the
Budget Programme continues to focus on engagement with communities to
consider the impact on services, forging a path to financial sustainability, delivery
of the Council’s Sustainable Change programme and where possible minimising
the impact on communities and services through using existing powers as
opposed to service cuts. It is recognised that this approach will continue to be
challenging over the medium-term. 
27

Page 28

2.9.2 Apart from some specific charging arrangements and those charges set nationally,
it is proposed that the Council’s fees and charges in 2025/26 increase by 5%, with
similar indicative increases in 2026/27 and 2027/28. This position will be reviewed
again in advance of the 2026/27 Budget. Members should note that no increase
has been proposed in respect of school meals charges which remains at £2.05.
The schedule included in Appendix 6 contains the charges with effect from 1 April
2025. It is important to note that fees and charge levels in respect of the HSCP is
a matter for the IJB to consider. A range of HSCP fees and charges in respect of
provided adult social care services were approved by the IJB on the 6 February
2025. Full details are included within Appendix 6. 
2.10 Equality and Children’s Rights Impacts of Budget Proposals
2.10.1 The Council has a legal duty to consider the equalities and children’s rights impact
of proposals on groups with protected characteristics, being age, disability; gender
reassignment; pregnancy and maternity; race; religion or belief; sex; and sexual
orientation. The Council also has a duty to assess the socio-economic impact of
proposals (The Fairer Scotland Duty) and Island proofing. This requires an
assessment of the impact of proposals on reducing inequalities.  
2.10.2 Proposals contained in this report have been screened to assess whether there
are any equalities and socio-economic impacts and, if so, the proposals have been
equalities and children’s rights impact assessed (ECRIA). 
2.10.3 The purpose of the ECRIA is to ensure that Members are fully informed in
advance of taking decisions. They do not prevent Members from making
decisions. All ECRIAs have an assessment of risk alongside mitigating actions.
This enables Council to consider if any detrimental impact can be minimised and
any positive impact maximised. 
2.10.4 A link to all the relevant assessments across the budget savings categories is
provided; ECRIA for Budget Proposals 2025 and 2026
2.10.5 Any alternative proposals from Members will require to be screened and assessed
to ensure Council is aware of impacts before making any decision.
2.10.6 Responsibility for the funding allocations within the HSCP rests with the IJB which
has responsibility for assessment of the impact of the decisions it takes. 
2.11 Community Budget Engagement
2.11.1 An extensive programme of engagement took place between 10 October and 25
November 2024 including surveys across six main themes as well as in person
and online focus groups. The approach was designed to support our residents to
contribute their views, make the surveys more accessible and avoid digital
exclusion.
2.11.2 The six main themes each included a number of proposals and are noted as
follows: 
• Additional Council Tax Levy on Second Homes
• Community Facilities and Car Parking
• Schools and Related Services for Children and Young People
28

Page 29

• Service Delivery
• Taxes and Levies
• Waste Services
2.11.3 This has resulted in 4,461 responses across the six themes, more detailed
feedback on proposals and considerable engagement with community groups
across North Ayrshire. The engagement has also enabled residents to bring
petitions on specific options to the Audit and Scrutiny Committee and Cabinet,
demonstrating a high level of engagement with democracy within communities. 
2.11.4 This information has been examined by Officers in order to further develop
proposals for consideration by Elected Members in setting the budget on 26
February. In parallel, it is used to inform the Equality and Children’s Rights Impact
Assessments (ECRIAs) at each stage to ensure we fully consider the impact of
proposals on our residents.
2.11.5 Full details of feedback across all areas were presented to Council on 12 February
2025, for Elected member consideration in advance of setting the Council Budget
on 26 February 2025.
2.12 Sustainable Change Programme
2.12.1 Progress continues in developing an ambitious Sustainable Change Programme
aligned to the Council’s priorities. It is important that a pipeline of activity continues
to be identified, with a primary focus on generating financial efficiencies to help
address the significant financial pressures across the MTFP. 
2.12.2 The programme is governed through the Council’s Transformation Board and
includes a range of workstreams and service reviews. The current workstreams
include; 
• Use of Land and Property Assets including commercial and non-commercial
property - This includes a major operational property review within the Irvine
locality and a programme to maximise all commercial property revenue:
• Transport and Travel and decarbonisation of the Council fleet;
• Sustainability initiatives including major solar renewable energy investment in
Nethermains and Shewalton due to start generating power in April 2025; 
• Digital Initiatives – Including Accessing Our Council and Financial Inclusion
services, maximising our digital opportunities around support and contact.
• A range of Service reviews including Waste Services, Housing Services,
Learning resources, Additional support needs, Economic Development, Growth
and Regeneration and the Brighter Pathways programme led by the HSCP
which looks at high cost external residential placements for children and
considers alternative settings of care to deliver better outcomes and reduce
cost. 
2.12.3 It is recognised that the more progress made through delivery of the Council’s
Sustainable Change Programme, the less impact there could be on delivery of the
Council’s core services. Between the period from 2021/22 to 2024/25 a total of
£3.136m has been generated in savings across this programme, with further
significant savings incorporated within the medium-term planning. The Council’s
Change and Service Re-design Fund requires to be kept under review to ensure it
can continue to support the delivery of this programme. Due to the scale of the
29

Page 30

financial challenge facing all Councils it is also important to consider and progress
areas of wider reform. National initiatives through the Improvement Service and
Digital Office are still at an early stage, however, this could provide further
opportunities for Councils to take a collective approach to areas of service
delivery. The Council also continues to explore opportunities for sharing services
on a regional basis. 
2.13 Workforce Planning
2.13.1 The shape of the Council’s workforce is critical to the delivery of efficient and
effective services. It is a significant factor in how we transform our Council and
organise our workforce within the context of the Council’s key priorities and
available funding.  
2.13.2 In order to be successful it is key for the workforce strategy, and the planning
supporting this, to flow from the Council Plan and link to both people management
and operational processes. To ensure the Council’s priorities are met, workforce
planning must be flexible enough to manage short term activity but ultimately be
focused on medium to long-term needs, ensuring that sustainable long-term
savings are delivered. The workforce strategy, linked to the Medium-Term
Financial Outlook, recognises and reflects significant external pressures and
financial uncertainty.
2.13.3 Influenced by the scale of the financial challenges facing the Council over the
coming years, there will continue to be organisational change, both in terms of
structures but also about how we work. Included within the 2024/25 Budget was
the outcome of Voluntary Early Release programme which released 85 posts and
delivered around £2.5m of annual savings. Moving forward, to ensure workforce
planning is effective against the backdrop of future budgetary constraints, this will
continue to be integrated within a programme of service reviews across the
Council.
2.13.4 North Ayrshire Council employs 7,621 staff, equivalent to 6,451 full time equivalent
employees. Anticipated workforce implications associated with the MTFP over the
next 3 years are summarised in the undernoted table. In 2025/26 the workforce is
projected to reduce by approximately 45.2 Full Time Equivalent posts (FTE’s).
However, it should be stressed that all measures required to deliver a balanced
budget for 2026/27 and 2027/28 have not been included at this time. It is,
therefore, anticipated that this position will change through further development of
the Budget Programme in 2026/27.   
Category 2025/26        
FTE
2026/27         
FTE
2027/28     
FTE
Operational Budget Adjustments (8.0) (5.0) -
Previously Approved Savings (0.7) - -
Pressures and Growth 6.0 - -
New Savings Options (42.5) (2.3) -
Total Workforce Implications (45.2) (7.3) - 
30

Page 31

2.13.5 Through a corporate workforce planning approach, any reduction to workforce
levels will continue to be managed through natural attrition, vacancy management
through the Vacancy Scrutiny Panel, redeployment and, where appropriate,
voluntary early release. 
2.14 Management of Risk
2.14.1 North Ayrshire’s financial framework is underpinned by strategic, corporate, and
operational risk registers. Given the significance of the financial risks the Council
faces, this report sets out in the table below a number of the key risks associated
with securing financial sustainability along with the likelihood and impact scoring.
For all areas of material risk to the Council and planned mitigations, this is
reported to Cabinet through the Council’s Strategic Risk Register.                                                                           
Likelihood
Score
Impact
Score
Financial Environment – Funding not keeping
pace with cost-of-service delivery. Impacted by
inflationary pressures, new burdens and limited
flexibility across policy areas.
4 5
Financial Sustainability of the HSCP – The
HSCP is faced with significant cost pressures
across the medium-term, which is not matched
by the same level of funding to meet need.
4 5
Inequalities – Linked to the current economic
conditions in the area and the growing demand
for services and need against a backdrop of
reducing budgets.
5 4
Property Asset Risk – The condition of
properties has been impacted by the
inflationary impact on budgets as well as
previous budget reductions
4 5 
2.15 Revenue Budget - Objective and Subjective Analysis
2.15.1 The Codes of Financial Practice outline categories of service delivery, known as
the Objective Analysis, and categories of expenditure type, known as the
Subjective Analysis. Based on the budget presented within this report, the budget
matrix for 2025/26 is attached in Appendix 7.
2.15.2 Once this matrix is approved, services must spend in line with this and any
subsequent significant and planned variation to this budget (i.e. virement) must be
approved by Cabinet.
2.15.3 All North Ayrshire Council functions relating to health and social care are entirely
delegated to the Integrated Joint Board, subject to appropriate reporting
throughout the year to the Council.
31

Page 32

2.16 Summary
2.16.1 The estimated financial position included in this report presents a challenging
fiscal landscape for the Council. The Council continues to face a number of
significant financial risks across key policy areas. Although Scottish Government
funding is 2.05% more than last year in cash terms, this has been outstripped by
pressures and risks across several areas including pay award assumptions,
employers’ national insurance contributions and funding for the HSCP, linked to
increasing demographic and inflationary cost pressures. 
2.16.2 The report also includes a package of measures to address the budget gap. This
includes savings and additional revenue generation in addition to an already
planned use of Council reserves. Feedback from the Council’s extensive budget
engagement and consultation exercise has also been carefully considered. The
position reflected in the report includes an assumed increase in Council Tax of 7%
in 2025/26, followed by 5% increases in each of the subsequent 2 years.  
2.16.3 The table below summarises the incremental budget implications and assumptions
included in the MTFP for 2025/26 to 2027/28; 
2025/26     
£m
2026/27     
£m
2027/28       
£m
Council Tax Increase 7.00% 5.00% 5.00%
SG Core Grant Movement +2.05% 0.00% 0.00%
Operational Adjustments -£2.254m +£8.184m -£0.120m
Previously Approved Savings -£0.008m - -
Expenditure Requirements
(excluding HSCP) +£20.308m +£5.805m +£10.336m
Non-Recurring Strategic
Investment and Risk Provision +£5.000m -£5.000m -
HSCP Funding +£13.280m - -
Use of Reserves -£4.000m -£3.500m -£1.788m
Savings to be Approved  -£2.547m -£5.399m -£7.618m 
2.16.4 New non-recurring strategic investment of £1.000m is proposed for Roads
(£0.500m) and sustainable property measures (£0.500m). The balance of
£4.000m to be earmarked to help address the significant risks facing the Council. 
2.16.5 The additional funding to the HSCP in 2025/26 meets the requirements from the
Local Government Settlement. The contribution to the HSCP includes additional
funding from the Council of £2.114m, being the HSCP share of the additional
Scottish Government core grant settlement to help address cost pressures. It is
also important to note that full funding in respect of the additional costs associated
32

Page 33

with the change in employer national insurance contributions has been passported
to the HSCP, with the shortfall of £0.759m (being 40% of the total cost) borne by
the Council.
2.16.6 The operational adjustments include savings of £2.254m identified across
Directorates for 2025/26. This is in addition to the £2.547m savings to be approved
for member consideration to deliver a balance budget in 2025/26. 
2.16.7 Proposed levels of fees and charges are outlined at Appendix 6.
3 Proposals
That Council: 
a) notes the anticipated funding available to meet the Council’s expenditure
requirements and notes the areas of ongoing financial risk to the Council;
b) approves the Council's expenditure requirements for 2025/26 and notes the
indicative requirements for 2026/27 and 2027/28;
c) approves the new strategic investments and risk provision outlined in section
2.7.2 of the report;
d) notes the projected outturn position for 2024/25; 
e) notes the level of reserves and fund balances held by the Council and
approves any use and contributions to and from these; 
f) approves the additional contribution to the HSCP noted at 2.8.1;
g) approves efficiencies and savings to ensure a balanced budget for 2025/26,
consequentials and new proposals in future years;
h) approves implementation of the revised service delivery model for the
previously approved school library saving outlined at paragraphs 2.7.7 to
2.7.9;
i) approves the schedule of Council fees and charges detailed in Appendix 6;
j) determines the level of Council Tax for 2025/26, noting the recommendation
for a 7% increase;
k) notes the anticipated funding gaps for 2026/27 and 2027/28;
l) considers the equality and children’s rights impact of any proposed service
changes;
m)notes the feedback from the community Budget engagement exercise to help
inform budget plans;
n) notes progress to date on the Council’s Sustainable Change Programme and
corporate Workforce Planning; and 
o) approves the budget matrix for 2025/26. 
4 Implications / Socio-economic Duty 
Financial 
4.1 The financial implications are as outlined in the report. Members require to
approve a package of efficiencies and savings, excluding any decision taken by
the IJB in respect of social care services, totalling £2.547m for 2025/26. The
recommendations are based on a Council Tax increase of 7% for 2025/26. 
33

Page 34

Human Resources 
4.2 The total anticipated impact on the workforce is a net reduction of 45.2 FTE posts
in 2025/26. The new savings proposals for 2025/26 results in a reduction of 42.5
FTE posts. The Council has a robust workforce planning framework in place. In
line with this any reduction to the workforce will be managed through natural
attrition, vacancies, redeployment and voluntary early release. This will be effected
by regular engagement and participation with the Trade Unions. 
Legal 
4.3 The Council is obliged by the Local Government Finance Act 1992 to set a budget
for 2025/26 and to do so in a manner and at such a time as to ensure that it is able
lawfully to set its Council Tax by 11 March. Failure to do so could result in several
legal and financial consequences, for both the Council and Members. 
Equality/Socio-economic 
4.4 Obligation in respect of equalities are set out at 2.10 of the report.
The Equality and Children’s Rights Impact Assessments (incorporating Fairer
Scotland Duty and Island Proofing) and a summary of screenings are available via
the link provided below.
ECRIA for Budget Proposals 2025 and 2026 
Environmental and Sustainability 
4.5 While setting of the budget has no direct environmental or sustainability impacts,
there may be impacts on individual services. It is also recognised that the
proposed new strategic investment for 2025/26 supports the Council’s
sustainability agenda. 
Key Priorities 
4.6 The draft budget supports delivery of the outcomes as outlined in the Council Plan
2023-2028. 
Community Wealth Building 
4.7 Recommendations included in the report align with the Council’s Community
Wealth Building Strategy. 
5 Consultation 
5.1 Significant scrutiny and challenge of the underlying assumptions of the proposed
budget has taken place with the Executive Leadership Team and regular
engagement with Elected Members has taken place between September 2024
and February 2025. 
5.2 The key issues within this report have been presented to the Trade Unions.
34

Page 35

5.3 An extensive programme of engagement took place between 10 October and 25
November 2024 including surveys across six main themes as well as in person
and online focus groups. The approach was designed to support our residents to
contribute their views, make the surveys more accessible and avoid digital
exclusion. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Mark Boyd, Head of Service (Finance)  on 01294-
324560. 
Background Papers
None
35

Page 36

Appendix 1
2025/26
Consequentials Rephased/New Total Consequentials Rephased/New Total
£000's £000's £000's £000's £000's £000's £000's
Funding
Aggregate external finance 375,310 375,310 375,310 375,310 375,310
Additional aggregate external finance due :
Assumed Teacher Funding 3,775 3,775 3,775 3,775 3,775
Assumed NI Increase Funding 3,971 3,971 3,971 3,971 3,971
Council Tax Income 69,491 73,455 73,455 77,632 77,632
Council Tax Income for Affordable Housing 1,213 1,274 1,274 1,338 1,338
Second Homes Levy 1,305 1,370 1,370 1,439 1,439
Contribution from General Reserves 4,000 3,500 3,500 1,788 1,788
Total Funding Available 459,065 - 462,655 462,655 - 465,253 465,253
Expenditure
Base Budget 427,268 459,065 459,065 462,655 462,655
Operational Budget Adjustments
Wellbeing 397 54 54 63 63
Climate Change (245) 12 12 - -
A Sustainable Council (2,406) 8,118 8,118 (183) (183)
Total Operational Budget Adjustments (2,254) 8,184 - 8,184 (120) - (120)
Savings Previously Approved
Wellbeing (8) - - - -
A Sustainable Council - - - - -
Total Savings Previously Approved (8) - - - - - -
Investments - Contractual/Unavoidable
Wellbeing 2,072 1,552 1,552 900 900
Communities & Local Democracy 53 - - - -
Climate Change - - - - -
A Sustainable Council 493 108 108 51 51
Corporate Investment 15,888 4,199 4,199 9,285 9,285
Total Contractual / Unavoidable 18,506 - 5,859 5,859 - 10,236 10,236
North Ayrshire Council
Revenue Budget 2025/26
Revenue Budget Summary Position
2026/27 2027/28
36

Page 37

Appendix 1
2025/26
Consequentials Rephased/New Total Consequentials Rephased/New Total
£000's £000's £000's £000's £000's £000's £000's
North Ayrshire Council
Revenue Budget 2025/26
Revenue Budget Summary Position
2026/27 2027/28
Investments - National/Local Pressures
Wellbeing - - - - -
Communities & Local Democracy 111 - - - -
Climate Change - - - - -
A Sustainable Council 342 (54) (54) 100 100
Total National / Local Pressures 453 - (54) (54) - 100 100
New National Expenditure Requirements
Wellbeing 1,115 - - - -
Communities & Local Democracy 231 - - - -
A Sustainable Council 3 - - - -
Total National Expenditure Requirements 1,349 - - - - - -
Total Expenditure Requirements (excl HSCP) 20,308 - 5,805 5,805 - 10,336 10,336
Health and Social Care Partnership
HSCP Net Expenditure Requirements 4,891 - - - - - -
New HSCP National Expenditure Requirements - Recurring 8,389 - . - - - -
Total Health and Social Care Partnership 13,280 - - - - - -
Total Expenditure Requirements 33,588 - 5,805 5,805 - 10,336 10,336
Additional Investment
Strategic Investment / Risk Provision 5,000 (5,000) (5,000) - - -
Reverse Previous Investment (1,982) - - - - - -
Total Adjustments 34,344 3,184 5,805 8,989 (120) 10,336 10,216
Total Expenditure Requirement 461,612 3,184 464,870 468,054 (120) 472,991 472,871
(Surplus)/Deficit for Year 2,547 3,184 2,215 5,399 (120) 7,738 7,618
New Savings Proposed
Wellbeing (1,936) (1,199) - (1,199) - - -
Climate Change - - - - - - - A Sustainable Council (611) (621) - (621) (233) - (233)
Total Savings Proposed (2,547) (1,820) - (1,820) (233) - (233)
Revised Expenditure Requirement 459,065 1,364 464,870 466,234 353 472,991 472,638
Revised (Surplus)/Deficit for Year if all Savings Proposals are Accepted - 1,364 2,215 3,579 (353) 7,738 7,385
Net Contribution to the HSCP
Expenditure Requirements 8,621 6,591 6,591 6,656 6,656
Proposed Savings (3,730) (6,591) (6,591) (6,656) (6,656)
Net Adjustments to the Contribution to the HSCP 4,891 - - - -
37

Page 38

Appendix 2
Council Objective/Theme Operational Budget Adjustment Reference Category 2025/26 2026/27 2027/28
£'s £'s £'s
Wellbeing
Children, Young People and Communities
One off savings in ELC due to the August opening of Montgomerie Park
School. SP-COM-24-02 Green 160,381 - -
Children, Young People and Communities
Education turnover applied to non-teaching staff budgets to recognise
the standard pattern of activity SP-COM-24-22 Green 250,000 - -
Children, Young People and Communities Workforce Planning - FM - Catering - Move to Term Time Working SP-ED-25-08 Green (68,050) - -
Children, Young People and Communities Workforce Planning - Review of Education HQ Posts SP-ED-25-12 Green (106,000) (56,000) -
Children, Young People and Communities One-Off Reduction in Playpark Maintenance Budget SP-PL-25-07 Amber (50,000) 50,000 -
Children, Young People and Communities Sub Total 186,331 (6,000) -
Land, Property and Assets
Streetscene - Street Furniture. This would only be a one off as
maintenance would be required in future years. SP-PL-24-03 Green 15,000 - -
Land, Property and Assets
Streetscene - Play Facilities. A one year reduction in the play facilities
budget. Maintenance will be required in future years. SP-PL-24-04 Green 50,000 - -
Land, Property and Assets Sub Total 65,000 - -
Other Contribution to Affordable Housing Reserve Green 145,543 60,000 63,000
Other Sub Total 145,543 60,000 63,000
Total 396,874 54,000 63,000
Climate Change
Charging for Services, Alternative Funding Proposed income from solar PV farms SP-PL-24-10 Green (244,542) 11,933 -
Charging for Services, Alternative Funding Sub Total (244,542) 11,933 -
Total (244,542) 11,933 -
North Ayrshire Council
Revenue Budget 2025/26
Revenue Budget Operational Budget Adjustments
38

Page 39

Appendix 2
Council Objective/Theme Operational Budget Adjustment Reference Category 2025/26 2026/27 2027/28
£'s £'s £'s
North Ayrshire Council
Revenue Budget 2025/26
Revenue Budget Operational Budget Adjustments
A Sustainable Council
Charging for Services, Alternative Funding Review Housing SLA SP-PL-25-08 Amber (50,000) - -
Charging for Services, Alternative Funding Increased planning application fee income SP-COM-25-08 Green (100,000) (20,000) -
Charging for Services, Alternative Funding Sub Total (150,000) (20,000) -
Land, Property and Assets
Commercial Estate Transformation - Maximise Rental Income from
Existing and New Property SP-PL-24-01 Green (85,000) (42,500) -
Land, Property and Assets
Greater publicity, tracking and consumption monitoring of the Council's
energy consumption SP-PL-25-09 Amber (243,000) (256,000) -
Land, Property and Assets NDR- Bridgegate Square Screen SP-COM-25-02 Green (6,100) - -
Land, Property and Assets Property Estate - Maintenance Backlog Green 500,000 (500,000) -
Land, Property and Assets Sub Total 165,900 (798,500) -
Other Non Recurring Employers' Superannuation Rebate Green (302,000) 9,530,000 -
Other Packaging Extended Producer Responsibility Income Green (1,335,464) (188,626) (182,720)
Other Continued channel shift to Digital Solutions
SP-CORP-25-
01/02 Green (100,000) (100,000) -
Other Review of Corporate Income SP-CORP-25-03 Green (250,000) - -
Other Revised NDR Empty Property Policy Green (252,843) (84,801) -
Other Sub Total (2,240,307) 9,156,573 (182,720)
Service Delivery Models Workforce Planning - Review of Roads Staffing Structures SP-PL-25-02/03 Amber (45,000) (120,000) -
Service Delivery Models Workforce Planning - Alternative working patterns within Streetscene SP-PL-25-05 Amber - (100,000) -
Service Delivery Models Review of Facilities Management Services SP-ED-25-07 Green (66,383) - -
Service Delivery Models Workforce Planning - Removal of vacant posts - Community Resources SP-COM-25-01 Green (69,220) - -
Service Delivery Models Sub Total (180,603) (220,000) -
Total (2,405,010) 8,118,073 (182,720)
TOTAL OPERATIONAL BUDGET ADJUSTMENTS (2,252,678) 8,184,006 (119,720)
39

Page 40

Appendix 3
Category 2025/26 2026/27 2027/28
£'s £'s £'s
Children, Young People and Communities Review of Facilities Management posts across all areas of the service
and a re-design of FM services.
SP-COM-24-07/21 Amber (8,500) -
Children, Young People and Communities Sub Total (8,500) - -
Total (8,500) - -
Charging for Services, Alternative Funding Additional Building Warrant Income SP-PL-23-10 Green 125,000 - -
Charging for Services, Alternative Funding Waste - Cease issuing free food waste liners SP-PL-24-09 Amber (9,750) -
Charging for Services, Alternative Funding Sub Total 115,250 - -
Land, Property and Assets Property Maintenance Budget review SP-PL-23-19 Amber 55,000 - -
Land, Property and Assets Our Future Working Environment - including Irvine Locality Property
Review
SP-PL-25-04 Amber (170,000) - -
Land, Property and Assets Sub Total (115,000) - -
Total 250 - -
North Ayrshire Council
-(8,250)TOTAL SAVINGS PREVIOUSLY APPROVED
Council Objective/Theme Saving Reference
Revenue Budget Adjustments Previously Approved
Revenue Budget 2025/26
Wellbeing
A Sustainable Council
-
40

Page 41

Appendix 4
2025/26 2026/27 2027/28
£'s £'s £'s
Children, Young People and Communities NALL Energy/Superann Costs Contractual/Unavoidable BID-COM-24-04 (15,000) 532,000
Children, Young People and Communities Regrading of Pupil Support Assistants Contractual/Unavoidable BID-ED-25-01 506,424
Children, Young People and Communities PPP/DBFM Annual Contractual indexation Contractual/Unavoidable
BID-ED-25-02/ BID-
PL-25-14 375,797 426,890 433,528
Children, Young People and Communities
Additional School running costs from the Capital
Programme. Contractual/Unavoidable BID-ED-25-08 360,095 88,042
Transport & Travel SPT Annual Price Revision Contractual/Unavoidable BID-PL-25-16 605,410 263,201 200,276
Transport & Travel Statutory Provision of Transport and Journeys Contractual/Unavoidable BID-PL-25-17 239,510 241,768 265,945
Sub Total Contractual/Unavoidable 2,072,236 1,551,901 899,749
Children, Young People and Communities ELC Pay Inflation New National Expenditure Requirements 970,000
Children, Young People and Communities Educational Psychologist Training New National Expenditure Requirements 15,000
Children, Young People and Communities Music Tuition charging New National Expenditure Requirements (4,000)
Children, Young People and Communities Pupil Equity Fund New National Expenditure Requirements 25,000
Children, Young People and Communities Free School Meal Expansion New National Expenditure Requirements 379,000
Children, Young People and Communities Gaelic Education New National Expenditure Requirements 7,000
Children, Young People and Communities Community Mental Health - Children & Young People New National Expenditure Requirements 341,000
Children, Young People and Communities School Clothing Grants New National Expenditure Requirements 8,000
Children, Young People and Communities Probationary Teachers New National Expenditure Requirements (626,000)
Sub Total New National Expenditure Requirements 1,115,000 - -
Total 3,187,236 1,551,901 899,749
Service Delivery Models Keyholding Contract for NAC Properties Contractual/Unavoidable BID-PL-25-07 53,360
Sub Total Contractual/Unavoidable 53,360 - -
Children, Young People and Communities Islands Officer National/Local Pressures BID-PL-23-27 55,361 - -
Children, Young People and Communities Education Estate Playground & Road Repairs National/Local Pressures BID-PL-25-13 55,000
Sub Total National/Local Pressures 110,361 - -
Children, Young People and Communities Island Cost of Living New National Expenditure Requirements 231,000
Sub Total New National Expenditure Requirements 231,000 - -
Total 394,721 - -
North Ayrshire Council
Revenue Budget 2025/26
Revenue Expenditure Requirements
Wellbeing
Communities & Local Democracy
ReferenceCouncil Objective/Theme Investment Category
41

Page 42

Appendix 4
2025/26 2026/27 2027/28
£'s £'s £'s
North Ayrshire Council
Revenue Budget 2025/26
Revenue Expenditure Requirements
ReferenceCouncil Objective/Theme Investment Category
Sustainable Environment
Service, Maintenance and Repair of Fleet Vehicles and
Plant Assets Contractual/Unavoidable BID-PL-24-04 75,955 75,955
Sustainable Environment Statutory Dam management - The Robin Dam Contractual/Unavoidable BID-PL-25-01 20,000
Sustainable Environment
Managing Persistent Organic Pollutants with Waste
Upholstered Domestic Seating Contractual/Unavoidable BID-PL-25-03 179,805 - -
Sustainable Environment Indexation on Waste Processing Contract Costs Contractual/Unavoidable BID-PL-25-04 161,218 31,764 50,890
Transport & Travel Road salt inflationary increase Contractual/Unavoidable BID-PL-25-05 56,243
Sub Total Contractual/Unavoidable 493,221 107,719 50,890
Land & Property Inflationary Pressures on Reactive Maintenance National/Local Pressures BID-PL-25-09 100,000 100,000 100,000
Land & Property Water Quality Risk Assessment Programme National/Local Pressures BID-PL-25-11 92,000 (72,000)
Land & Property Electrical Safety Inspections National/Local Pressures BID-PL-25-12 99,500 (74,500)
Land & Property
Maintenance of Development Sites and Associated
Areas National/Local Pressures BID-PL-25-20 80,000 22,000
Sustainable Environment
Property Maintenance Budget & Solar Photovoltaic
Panels National/Local Pressures BID-PL-24-05/06 (30,000) (30,000) -
Sub Total National/Local Pressures 341,500 (54,500) 100,000
Other Barclay Implementation New National Expenditure Requirements 3,000 - -
Sub Total New National Expenditure Requirements 3,000 - -
Total 837,721 53,219 150,890
Inflation Joint Board requisitions Contractual/Unavoidable (42,164) 105,008 108,159
Inflation Pay Award Contractual/Unavoidable 6,950,547 6,833,833 7,051,104
Inflation Employers NI Increase Contractual/Unavoidable 4,720,364 - -
Inflation Pay Award - 24-25 Additional Costs Contractual/Unavoidable 2,367,155 -
Inflation NDR Revaluation Contractual/Unavoidable 10,148 -
Inflation Corporate issues (energy, fuel, food, NDR) Contractual/Unavoidable 841,912 738,004 1,380,630
Sub Total 14,847,962 7,676,845 8,539,893
Other Loan charges Contractual/Unavoidable 1,040,302 (3,478,013) 745,000
Sub Total 1,040,302 (3,478,013) 745,000
Total 15,888,264 4,198,832 9,284,893
TOTAL REVENUE EXPENDITURE REQUIREMENTS 20,307,942 10,335,532
Council Wide Pressures
A Sustainable Council
5,803,952
42

Page 43

Appendix 5
£ £ £ £ £ £
Children, Young People and CommunitiesSP-COM-25-03/4 Review of KA Leisure Services Neutral (305,000) (325,000) - - -
Children, Young People and CommunitiesSP-ED-25-01 Realign the level of Teaching Resource across
North Ayrshire Schools
High Negative (1,174,053) (28.0) (733,783) - - -
Children, Young People and CommunitiesSP-ED-25-04 Review funding arrangements for Campus
Police Officers
Low Negative (91,000) - - - - -
Children, Young People and CommunitiesSP-ED-25-05 Review of School Crossing Patrols Low Negative (92,004) (6.2) (46,002) - - -
Children, Young People and CommunitiesSP-ED-25-09 FM - Cleaning - Reduction in School/Early Years High Negative (95,463) (4.5) (47,731) - - -
Children, Young People and CommunitiesSP-ED-25-11 Redesign of Music Service Low Negative (38,977) (1.0) (24,361) - - -
Children, Young People and CommunitiesSP-ED-25-13 Review of Educational Psychology Service Low Negative (63,500) (1.0) - - - -
Land & Property SP-COM-25-06 Review Services at Eglinton Park High Negative (76,184) (1.8) (22,114) - - -
Total (1,936,181) (42.5) (1,198,991) - - -
Service Delivery
Models
SP-PL-25-01 Economic Development, Growth and
Regeneration Service Review
Low Negative (400,000) - (400,000) - - -
Charging for
Services
5% Increase in Council Fees and Charges
(Excluding School Meals Charges)
Low Negative (210,934) (221,481) (232,555)
Total (610,934) - (621,481) - (232,555) -
A Sustainable Council
Consequential
Savings New Saving
Consequential
Savings
Wellbeing
New Saving
North Ayrshire Council
Revenue Budget 2025/26
Revenue Budget Savings to be Approved
Council Objective /
Theme
Savings Proposal Community Impact 2025/26 2026/27 2027/28
Proposed Saving
Workforce
implications
Reference
(232,555) -TOTAL SAVINGS TO BE APPROVED (2,547,115) (42.5) (1,820,472) -
43

Page 44

North Ayshire Council
Fees & Charges for 2025-26 to 2027-28
Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2024/25)
£
Proposed
Charge
(2025/26)
Indicative
Charge
(2026/27)
Indicative
Charge
(2027/28)
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Basis of
increase
2027/28
%
CONTRIBUTION FEES & CHARGES
Corporate Services Legal - Licensing Raymond Lynch General - Amendment (1982 Act Para 9 - if due to Licence
Partnership) Contribution £139.00 £146.00 £153.00 £161.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch General - Amendment of Licence (1982 Act Para 9 consent to
Material Change - if not Licence Partnership) Contribution £39.00 £41.00 £43.00 £45.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Entertainment - Indoor Sports Entertainment Licence (when
another NAC Licence is held) Contribution £189.00 £198.00 £208.00 £218.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Entertainment - Indoor Sports Entertainment Licence (when no
other NAC Licences are held) Contribution £376.00 £395.00 £415.00 £436.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Entertainment - Public Entertainment Licence (Commercial
Premises with Fairground) Contribution £439.00 £461.00 £484.00 £508.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Entertainment - Public Entertainment Licence - Full Licence
(maximum duration of 3 years, and renewable) Contribution £401.00 £421.00 £442.00 £464.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Entertainment - Public Entertainment Licence - Temporary
Licence (maximum duration of 6 weeks, and not renewable) Contribution £356.00 £374.00 £393.00 £413.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - to sell pets (Activity A) Contribution £219.00 £230.00 £242.00 £254.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - to rehome animals (Activity B) Contribution £219.00 £230.00 £242.00 £254.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch
Animal Activity Licence - To operate an "Animal welfare
Establishment" (Activity C) If licence holder is OSCR registered
no fee
Contribution £0.00 £0.00 £0.00 £0.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - To operate an "Animal welfare
Establishment" (Activity C) If not OSCR registered Contribution £219.00 £230.00 £242.00 £254.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - to breed puppies (Activity D) Grant (one
year renewable) Contribution £526.00 £552.00 £580.00 £609.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - to breed puppies (Activity D) Renewal
(one year) Contribution £232.00 £244.00 £256.00 £269.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - to breed kittens (Activity E) Grant (one
year renewable) Contribution £526.00 £552.00 £580.00 £609.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - to breed kittens (Activity E) Renewal
(one year) Contribution £232.00 £244.00 £256.00 £269.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - to breed rabbits (Activity F) Grant (one
year renewable) Contribution £526.00 £552.00 £580.00 £609.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - to breed rabbits (Activity F) Renewal
(one year) Contribution £232.00 £244.00 £256.00 £269.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Boarding Licence (1 to 10 Animals) Contribution £93.00 £98.00 £103.00 £108.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Boarding Licence (11 to 20 Animals) Contribution £125.00 £131.00 £138.00 £145.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Boarding Licence (21 to 30 Animals) Contribution £163.00 £171.00 £180.00 £189.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Boarding Licence (31 to 50 Animals) Contribution £238.00 £250.00 £263.00 £276.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Boarding Licence (51 to 70 Animals) Contribution £307.00 £322.00 £338.00 £355.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Boarding Licence (Over 70 Animals) Contribution £389.00 £408.00 £428.00 £449.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal - Registration - Performing Animals (Regulation) Act
1925 Contribution £56.00 £59.00 £62.00 £65.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Booking Office (with public access) Contribution £376.00 £395.00 £415.00 £436.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Booking Office (without public access) Contribution £251.00 £264.00 £277.00 £291.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch
Caravan Sites New system (relevant Permanenet sites -
Residential sites) / Old system (Holiday and touring sites) - no
fee
Contribution £713.00 £749.00 £786.00 £825.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Cinema Licence - grant or renewal for one year Contribution £307.00 £322.00 £338.00 £355.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Cinema Licence - grant or renewal for under a year - per month
(total not to exceed the one year fee) Contribution £103.00 £108.00 £113.00 £119.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Cinema Licence - Transfer Contribution £62.00 £65.00 £68.00 £71.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal - Dangerous Wild Animals - New & Renewal (maximum
duration of 12 months, and renewable) Contribution £332.00 £349.00 £366.00 £384.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch General - Duplicate Licence Contribution £39.00 £41.00 £43.00 £45.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Dealer - Knife Dealers Licence - New & Renewal (Full -
maximum duration of 3 years, and renewable) Contribution £376.00 £395.00 £415.00 £436.00 5.0% 5.0% 5.0%
44

Page 45

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2024/25)
£
Proposed
Charge
(2025/26)
Indicative
Charge
(2026/27)
Indicative
Charge
(2027/28)
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Basis of
increase
2027/28
%
Corporate Services Legal - Licensing Raymond Lynch Other CGSA - Late Hours Catering Licence - New & Renewal
(Full - maximum duration of 3 years, and renewable) Contribution £200.00 £210.00 £221.00 £232.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Other CGSA - Market Operators Licence Contribution £425.00 £446.00 £468.00 £491.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Dealer - Metal Dealers Licence (Premises & Itinerant) Contribution £131.00 £138.00 £145.00 £152.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Poisons - Registration to sell non medical poisons (new) Contribution £27.00 £28.00 £29.00 £30.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Poisons - Registration to sell non medical poisons (retention) Contribution £15.00 £16.00 £17.00 £18.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Dealer - Second Hand Dealers Licence - New (Full - maximum
duration of 3 years, and renewable) Contribution £264.00 £277.00 £291.00 £306.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Dealer - Second Hand Dealers Licence - Already Licenced (Full -
maximum duration of 3 years, and renewable) Contribution £139.00 £146.00 £153.00 £161.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch
Other CGSA - Sex Shop or Sexual Entertainment Venue Licence
- New & Renewal (Full - maximum duration of 3 years, and
renewable)
Contribution £2,234.00 £2,346.00 £2,463.00 £2,586.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Other CGSA - Skin Piercing or Tattooing Licence (with
Premises) Contribution £395.00 £415.00 £436.00 £458.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Other CGSA - Skin Piercing or Tattooing Licence (without
Premises) Contribution £332.00 £349.00 £366.00 £384.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Street Trader Employee Licence - Full licence (maximum
duration of 3 years, and renewable) Contribution £150.00 £158.00 £166.00 £174.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Street Trader Employee Licence - Temporary Licence (maximum
duration of 3 years, and renewable) Contribution £113.00 £119.00 £125.00 £131.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Street Trader Operator - Substitute Vehicle Contribution £131.00 £138.00 £145.00 £152.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Street Trader Operator Licence - Full Licence (maximum
duration of 3 years, and renewable) Contribution £301.00 £316.00 £332.00 £349.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Street Trader Operator Licence - Temporary Licence (maximum
duration of 6 weeks, and not renewable) Contribution £206.00 £216.00 £227.00 £238.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal - Zoo Licence (New - maximum duration of 4 years, and
renewable.  Vet inspections are charged in additiion) Contribution £332.00 £349.00 £366.00 £384.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal - Zoo Licence (Renewal - maximum duration of 6 years,
and renewable.  Vet inspections are charged in additiion) Contribution £332.00 £349.00 £366.00 £384.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal - Venison Dealer Contribution £139.00 £146.00 £153.00 £161.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal - Venison Employee / Agent Contribution £75.00 £79.00 £83.00 £87.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal - Game Dealers Contribution £5.00 £5.00 £5.00 £5.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Poisons - Registration (alteration of details in Register) Contribution £6.00 £6.00 £6.00 £6.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch STL - Grant - Secondary Letting - 1 to 4 Guests Contribution £263.00 £276.00 £290.00 £305.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch STL - Grant - Secondary Letting - 5 or more guests Contribution £420.00 £441.00 £463.00 £486.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch STL - Grant - Home Sharing and/or Home Letting - 1 to 4 Guests Contribution £131.00 £138.00 £145.00 £152.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch STL - Grant - Home Sharing and/or Home Letting - 5 or more
Guests Contribution £210.00 £221.00 £232.00 £244.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch STL - Renewal/Recurring Fee - Secondary Letting - 1 to 4
Guests Contribution £210.00 £221.00 £232.00 £244.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch STL - Renewal/Recurring Fee - Secondary Letting - 5 or more
Guests Contribution £368.00 £386.00 £405.00 £425.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch STL - Renewal/Recurring Fee - Home Sharing and/or Home
Letting - 1 to 4 Guests Contribution £105.00 £110.00 £116.00 £122.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch STL - Renewal/Recurring Fee - Home Sharing and/or Home
Letting - 5 or more Guests Contribution £184.00 £193.00 £203.00 £213.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal - Riding Establishment Licence (1 year, New & Renewal) Contribution £526.00 £552.00 £580.00 £609.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch Animal - Riding Establishment Licence (One year, If already
licenced) Contribution £395.00 £415.00 £436.00 £458.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Replacement Door Sign Contribution £19.00 £20.00 £21.00 £22.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Replacement Licence resulting from change of
address Contribution £16.00 £17.00 £18.00 £19.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Replacement Plate Contribution £38.00 £40.00 £42.00 £44.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Replacement Tariff Card Contribution £16.00 £17.00 £18.00 £19.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Replacement Taxi / Private Hire Car Driver Badge Contribution £21.00 £22.00 £23.00 £24.00 5.0% 5.0% 5.0%
45

Page 46

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2024/25)
£
Proposed
Charge
(2025/26)
Indicative
Charge
(2026/27)
Indicative
Charge
(2027/28)
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Basis of
increase
2027/28
%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Replacement Window Stickers Contribution £21.00 £22.00 £23.00 £24.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Substitution of Vehicle (Taxi or Private Hire Car) Contribution £234.00 £246.00 £258.00 £271.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Licences - Taxi Driver's Licence - Full Licence (1 year,
and renewable) Contribution £93.00 £98.00 £103.00 £108.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Licences - Taxi Driver's Licence - Full Licence (maximum
duration of 3 years, and renewable) Contribution £219.00 £230.00 £242.00 £254.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Licences - Private Hire Car Driver Licence - Full licence
(maximum duration of 3 years, and renewable) Contribution £219.00 £230.00 £242.00 £254.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Licences - Private Hire Car Licence (Operator) -  Full
Licence (1 year, and renewable) Contribution £389.00 £408.00 £428.00 £449.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Licences - Private Hire Car Licence (Operator) -  Full
Licence (maximum duration of 3 years, and renewable) Contribution £651.00 £684.00 £718.00 £754.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Licences - Taxi Licence (1 year) Contribution £420.00 £441.00 £463.00 £486.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Licences - Taxi Licence (Operator) - Full Licence
(maximum duration of 3 years, and renewable) Contribution £726.00 £762.00 £800.00 £840.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch General - Variation of a Licence Contribution £64.00 £67.00 £70.00 £74.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Licences - Private Hire Car Driver's Licence - Full Licence
(1 yr, and renewable) Contribution £93.00 £98.00 £103.00 £108.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Inspection of Vehicle (Taxi or Private Hire Car) Contribution £97.00 £102.00 £107.00 £112.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Re-inspection of Vehicle (Taxi or Private Hire Car) Contribution £51.00 £54.00 £57.00 £60.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Re-seal of Taximeter Contribution £25.00 £26.00 £27.00 £28.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch
General - Civic Government (Scotland) Act 1982 - Temporary
Licence (duration specified in Licence, maximum 6 weeks, and
not renewable) (unless specifically mentioned in this table)
Contribution £189.00 £198.00 £208.00 £218.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch House in Multiple Occupation Licence (New) Contribution £1,052.00 £1,105.00 £1,160.00 £1,218.00 5.0% 5.0% 5.0%
Corporate Services Legal - Licensing Raymond Lynch House in Multiple Occupation Licence (Already Licenced) Contribution £790.00 £830.00 £872.00 £916.00 5.0% 5.0% 5.0%
Corporate Services Registration Services Elaine Nixon Civil Marriages / Partnerships at Registration Office outwith
office hours Contribution £522.13 £540.49 £559.76 £580.00 5.0% 5.0% 5.0%
Corporate Services Registration Services Elaine Nixon Civil Marriages / Partnerships at Registration Office during office
hours Contribution £323.68 £332.11 £340.97 £350.27 5.0% 5.0% 5.0%
Corporate Services Registration Services Elaine Nixon All Ceremonies at approved venues - fee for attendance of a
Registrar during office hours Contribution £507.80 £525.44 £543.96 £563.41 5.0% 5.0% 5.0%
Corporate Services Registration Services Elaine Nixon All Ceremonies at approved venues - fee for attendance of a
Registrar outwith office hours Contribution £572.85 £593.74 £615.68 £638.71 5.0% 5.0% 5.0%
Corporate Services Registration Services Elaine Nixon Guest Supplement: during office hours when more than 4 guests
attend a marriage/civil partnership at Registration offices Contribution £168.68 £177.11 £185.97 £195.27 5.0% 5.0% 5.0%
Corporate Services Registration Services Elaine Nixon Naming & Renewal of Vows Ceremonies conducted at
Registration Offices during office hours Contribution £319.73 £335.72 £352.51 £370.14 5.0% 5.0% 5.0%
Corporate Services Registration Services Elaine Nixon Naming & Renewal of Vows Ceremonies conducted at
Registration Offices outwith office hours Contribution £383.67 £402.85 £422.99 £444.14 5.0% 5.0% 5.0%
Corporate Services Registration Services Elaine Nixon Civil Marriage/Partnership & Naming Ceremony booked together
and conducted at Registration Offices outwith office hours Contribution £674.28 £700.24 £727.50 £756.13 5.0% 5.0% 5.0%
Corporate Services Registration Services Elaine Nixon Civil Marriage/Partnership & Naming Ceremony booked together
and conducted at Approved Venues outwith office hours Contribution £751.45 £781.27 £812.58 £845.46 5.0% 5.0% 5.0%
Corporate Services Registration Services Elaine Nixon Civil Marriage/Partnership & Naming Ceremony booked together
and conducted at Approved Venues during office hours Contribution £655.54 £680.57 £706.85 £734.44 5.0% 5.0% 5.0%
Corporate Services Registration Services Elaine Nixon
Guest supplement: during office hours when more than 4 guests
attend a Civil Marriage/Partnership & Naming Ceremony at
Registration Offices
Contribution £434.39 £456.11 £478.92 £502.87 5.0% 5.0% 5.0%
Corporate Services Registration Services Elaine Nixon Private Citizenship Ceremony, Registration Office, Office Hours Contribution £153.25 £160.91 £168.96 £177.41 5.0% 5.0% 5.0%
Corporate Services Registration Services Elaine Nixon Private Citizenship Ceremony, Registration Office, Office Hours,
plus Guest Supplement for more than 4 Guests Contribution £281.14 £295.20 £309.96 £325.46 5.0% 5.0% 5.0%
Corporate Services Registration Services Elaine Nixon Civil Marriage/Partnership & Naming Ceremony booked together
and conducted at Registration Offices during office hours Contribution £589.39 £611.11 £633.92 £657.87 5.0% 5.0% 5.0%
46

Page 47

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2024/25)
£
Proposed
Charge
(2025/26)
Indicative
Charge
(2026/27)
Indicative
Charge
(2027/28)
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Basis of
increase
2027/28
%
Health & Social Care All Eleanor Currie Maximum Weekly Non-Residential Charge Contribution £106.26 £120.00 £126.00 £132.30 12.9% 5.0% 5.0%
Health & Social Care Adults Eleanor Currie Care at Home Adults Contribution £18.47 £23.08 £24.23 £25.44 25.0% 5.0% 5.0%
Health & Social Care Adults Eleanor Currie Day Care - Older People (purchased and provided) Contribution £16.49 £19.79 £20.78 £21.82 20.0% 5.0% 5.0%
Health & Social Care Adults Eleanor Currie Day Care - Learning Disability (purchased and provided) Contribution £16.49 £20.61 £21.64 £22.72 25.0% 5.0% 5.0%
Health & Social Care Adults Eleanor Currie Day Care and Dirrans Centre (charges to Other Local
Authorities) Contribution £267.42 £280.79 £294.83 £309.57 5.0% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Guest Room Charges at Sheltered Housing Accommodations Contribution £6.06
Health & Social Care Adults and Older People Eleanor Currie Community Alarms service - mainland (1st alarm in the
household) Contribution £5.85 £6.85 £7.19 £7.55 17.1% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Community Alarms service - mainland - weekly charge to HRA
for sheltered housing properties Contribution £5.85 £6.85 £7.19 £7.55 17.1% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Community Alarms service - Arran (1st alarm in the household) Contribution £2.86 £3.43 £3.60 £3.78 19.9% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Community Alarms service - mainland (2nd alarm in the
household) Contribution £3.43 £3.60 £3.78 17.1% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Community Alarms service - Arran (2nd alarm in the household) Contribution £1.74 £1.83 £1.92 19.9% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Meals on Wheels Contribution £3.70 £3.89 £4.08 £4.28 5.0% 5.0% 5.0%
Health & Social Care Older People Eleanor Currie Care at Home Older People per hour Contribution £18.47 £23.08 £24.23 £25.44 25.0% 5.0% 5.0%
Health & Social Care Older People Eleanor Currie Day Care (purchased and provided) Older People Contribution £16.49
Health & Social Care Adults Eleanor Currie Financial Intervention - Management of Service User Finances -
residential service users Contribution £3.50 £3.68 £3.86 5.0% 5.0% 5.0%
Health & Social Care Adults Eleanor Currie Financial Intervention - Management of Service User Finances -
community based service users Contribution £5.50 £5.78 £6.07 5.0% 5.0% 5.0%
Health & Social Care Adults Eleanor Currie Dirrans Centre Contribution £19.79 £20.78 £21.82 5.0% 5.0% 5.0%
Health & Social Care Adults Eleanor Currie Respite (for an individual's care need rather than to give the
carer a break)  Age 16-24 Contribution £76.52 £81.34 £85.41 £89.68 6.3% 5.0% 5.0%
Health & Social Care Adults Eleanor Currie Respite (for an individual's care need rather than to give the
carer a break)  Age 25 - 64 Contribution £95.29 £101.29 £106.35 £111.67 6.3% 5.0% 5.0%
Health & Social Care Older People Eleanor Currie Respite (for an individual's care need rather than to give the
carer a break)  Age 65+ Contribution £175.10 £186.13 £195.44 £205.21 6.3% 5.0% 5.0%
Health & Social Care Adults Eleanor Currie Sleepover Contribution £14.50 £15.45 £16.22 £17.03 6.6% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Trindlemoss House - permanent placement Contribution £1,190.70 £1,265.71 £1,329.00 £1,395.45 6.3% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Montrose House - permanent residential placement (capital below Contribution £825.94 £877.97 £921.87 £967.96 6.3% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Montrose House - permanent residential placement (capital above Contribution £1,190.70 £1,265.71 £1,329.00 £1,395.45 6.3% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Montrose House - permanent nursing placement (capital below £3 Contribution £948.59 £1,008.35 £1,058.77 £1,111.71 6.3% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Montrose House - permanent nursing placement (capital above £3 Contribution £1,378.13 £1,464.95 £1,538.20 £1,615.11 6.3% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Sleepover Contribution £14.50 £15.45 £16.22 £17.03 6.6% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Direct Payments  -  Personal Assistants Contribution £15.42 £16.94 £17.79 £18.68 9.9% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Direct Payments  - Agency Rates Contribution £18.47 £23.08 £24.23 £25.44 25.0% 5.0% 5.0%
Health & Social Care Adults and Older People Eleanor Currie Direct Payments  - Sleepovers Contribution £14.39 £15.83 £16.62 £17.45 10.0% 5.0% 5.0%
47

Page 48

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2024/25)
£
Proposed
Charge
(2025/26)
Indicative
Charge
(2026/27)
Indicative
Charge
(2027/28)
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Basis of
increase
2027/28
%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hire of table linen Contribution £6.85 £7.20 £7.55 £7.95 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hire of twinkle curtain Contribution £86.20 £90.50 £95.05 £99.80 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hire of Red Carpet Contribution £42.80 £44.95 £47.20 £49.55 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Store Requests, hires and deliveries Contribution £36.85 £38.70 £40.65 £42.70 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Stores hire of tables go pack Contribution £6.35 £6.65 £7.00 £7.35 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Stores hire of tables round Contribution £12.30 £12.90 £13.55 £14.25 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Party Package Civic Centre Contribution £150.67 £158.19 £166.10 £174.41 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Wedding packages - Ceremony
and  Reception Contribution £947.54 £994.92 £1,044.67 £1,096.90 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Wedding packages - Reception only Contribution £679.71 £713.71 £749.40 £786.87 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Bed and breakfast (adult) Contribution £45.00 £47.00 £49.00 £51.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Dinner, bed and breakfast (adult) Contribution £58.00 £61.00 £64.00 £67.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire Commercial large classroom Contribution £41.00 £43.00 £45.00 £47.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire Family Function large classroom Contribution £24.00 £25.00 £26.00 £27.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire NAC large classroom Contribution £22.00 £23.00 £24.00 £25.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire general meeting large classroom Contribution £14.00 £15.00 £16.00 £17.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire Childcare large classroom Contribution £7.00 £7.00 £7.00 £7.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire Disabled/charity large classroom Contribution £5.00 £5.00 £5.00 £5.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire Commercial small chartroom Contribution £21.00 £22.00 £23.00 £24.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire Family Function small chartroom Contribution £13.00 £14.00 £15.00 £16.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire NAC small chartroom Contribution £12.00 £13.00 £14.00 £15.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire genral meeting small chartroom Contribution £6.00 £6.00 £6.00 £6.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire Childcare small chartroom Contribution £3.00 £3.00 £3.00 £3.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Room hire Disabled/charity small chartroom Contribution £2.00 £2.00 £2.00 £2.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Catering - tea coffee / baking (per person) Contribution £4.00 £4.00 £4.00 £4.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Catering - soup & sandwich (per person) Contribution £6.00 £6.00 £6.00 £6.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Catering - buffet (salad bar) (per person) Contribution £8.00 £8.00 £8.00 £8.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Catering - Dinner (2 courses) (per person) Contribution £14.00 £15.00 £16.00 £17.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Catering - Cooked breakfast (per person) Contribution £5.00 £5.00 £5.00 £5.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Catering - Packed Lunches (per person) Contribution £5.00 £5.00 £5.00 £5.00 5.0% 5.0% 5.0%
48

Page 49

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2024/25)
£
Proposed
Charge
(2025/26)
Indicative
Charge
(2026/27)
Indicative
Charge
(2027/28)
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Basis of
increase
2027/28
%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Instructor NAC Users Half Day Rate Contribution £121.00 £127.00 £133.00 £140.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Instructor NAC Users Full Day Rate Contribution £243.00 £255.00 £268.00 £281.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Instructor Other Users Half Day Rate Contribution £243.00 £255.00 £268.00 £281.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Instructor Other Users Full Day Rate Contribution £486.00 £510.00 £536.00 £563.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell NAC School Groups 4 days/3 nights (per person) Contribution £184.00 £193.00 £203.00 £213.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell NAC School Groups 4 days/3 nights (per accompanying staff
member) Contribution £92.00 £97.00 £102.00 £107.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Other School / Groups 4 days/3 nights (per person) Contribution £330.00 £347.00 £364.00 £382.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Other School / Groups 4 days/3 nights (per accompanying staff
member) Contribution £165.00 £173.00 £182.00 £191.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Other 'Ayrshire' Authorities 4 days / 3 nights (per person) Contribution £257.00 £270.00 £284.00 £298.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Other 'Ayrshire' Authorities 4 days / 3 nights (per accompanying
staff member) Contribution £129.00 £135.00 £142.00 £149.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell NAC School Group 3 days/2 nights (per person) Contribution £122.00 £128.00 £134.00 £141.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell NAC School Group 3 days/2 nights (per person) Accompanying
staff Contribution £61.00 £64.00 £67.00 £70.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Other School / Groups 3 days/2 nights (per person) Contribution £248.00 £260.00 £273.00 £287.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Other School / Groups 3 days/2 nights (per accompanying staff
member) Contribution £124.00 £130.00 £137.00 £144.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Other 'Ayrshire' Authorities 3 days / 2 nights (per person) Contribution £185.00 £194.00 £204.00 £214.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Other 'Ayrshire' Authorities 3 days / 3 nights (per accompanying
staff member) Contribution £93.00 £98.00 £103.00 £108.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arran Outdoor) Angela Morrell Camping Groups Outwith NAC (per person) Contribution £5.00 £5.00 £5.00 £5.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 1 - Commercial Contribution £28.00
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 1 - Non-Commercial Contribution £20.00
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 2 - Commercial Contribution £21.00
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 2 - Non-Commercial Contribution £8.00
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 1 - Category 1 User Contribution £23.65 £24.85 £26.10 £27.40 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 1 - Category 2 User Contribution £13.95 £14.65 £15.40 £16.15 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 1 - Category 3 Users Contribution £7.70 £8.10 £8.50 £8.95 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 1 - Category 4 Users Contribution £3.45 £3.60 £3.80 £4.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 1 - Category 5 Users Contribution £3.45 £3.60 £3.80 £4.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 2 - Category 1 User Contribution £17.75 £18.65 £19.60 £20.60 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 2 - Category 2 User Contribution £10.45 £10.95 £11.50 £12.10 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 2 - Category 3 Users Contribution £5.80 £6.10 £6.40 £6.70 5.0% 5.0% 5.0%
49

Page 50

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2024/25)
£
Proposed
Charge
(2025/26)
Indicative
Charge
(2026/27)
Indicative
Charge
(2027/28)
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Basis of
increase
2027/28
%
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 2 - Category 4 Users Contribution £2.60 £2.75 £2.90 £3.05 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Studio 2 - Category 5 Users Contribution £2.60 £2.75 £2.90 £3.05 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Theatre Hire - Commercial Contribution £79.00 £83.00 £87.00 £91.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Arts) Lesley Forsyth Theatre Hire - Non-Commercial Contribution £46.00 £48.00 £50.00 £53.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 1
user (eg Commercial Activities) - SMALL ROOM Contribution £23.65 £24.85 £26.10 £27.40 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 1
user (eg Commercial Activities) - LARGE ROOM Contribution £47.65 £50.05 £52.55 £55.20 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 2
user (eg Family Functions) - SMALL ROOM Contribution £13.95 £14.65 £15.40 £16.15 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 2
user (eg Family Functions) - LARGE ROOM Contribution £27.95 £29.35 £30.80 £32.35 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 3
user (eg Agency Letting) - SMALL ROOM Contribution £7.70 £8.10 £8.50 £8.95 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 3
user (eg Agency Letting) - LARGE ROOM Contribution £15.45 £16.20 £17.00 £17.85 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 4
user (eg Pre 5 groups) - SMALL ROOM Contribution £3.45 £3.60 £3.80 £4.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 4
user (eg Pre 5 groups) - LARGE ROOM Contribution £6.75 £7.10 £7.45 £7.80 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 5
user (eg Disabled org's) - SMALL ROOM Contribution £3.45 £3.60 £3.80 £4.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 5
user (eg Disabled Org's) - LARGE ROOM Contribution £6.75 £7.10 £7.45 £7.80 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Astro Pitch Youth Contribution £15.85 £16.65 £17.50 £18.40 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Astro Pitch Adult Contribution £23.85 £25.05 £26.30 £27.60 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Stores hire Chairs (per item charge) Contribution £1.25 £1.30 £1.35 £1.40 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hire of additional chair covers (STH Weddings) Contribution £3.05 £3.20 £3.35 £3.50 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Campsite Contribution £11.00
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Events Fields Contribution £123.00
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Campsite Field Contribution £74.00
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Visitor Facility Block - Full Day Contribution £83.00
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Visitor Facility Block - Half Day Contribution £41.50
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Portacabin Toilets Contribution £21.00
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Ranger Service - All Other Groups Contribution £34.00
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Racquet Hall - NAC Group / School Contribution £15.50
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Racquet Hall - Non Commercial Contribution £28.00
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Racquet Hall - Commercial Contribution £48.00
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Large Field - Category 1 (Daily Rate) Contribution £180.00 £189.00 £198.00 0.0% 5.0% 5.0%
50

Page 51

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2024/25)
£
Proposed
Charge
(2025/26)
Indicative
Charge
(2026/27)
Indicative
Charge
(2027/28)
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Basis of
increase
2027/28
%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Large Field - Category 2 (Daily Rate) Contribution £150.00 £158.00 £166.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Large Field - Category 3 (Daily Rate) Contribution £125.00 £131.00 £138.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Large Field - Category 4 (Daily Rate) Contribution £70.00 £74.00 £78.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Large Field - Outwith Operational Hours (Charge per hour) Contribution £20.00 £21.00 £22.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Small Field - Category 1 (Daily Rate) Contribution £120.00 £126.00 £132.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Small Field - Category 2 (Daily Rate) Contribution £100.00 £105.00 £110.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Small Field - Category 3 (Daily Rate) Contribution £75.00 £79.00 £83.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Small Field - Category 4 (Daily Rate) Contribution £40.00 £42.00 £44.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Small Field - Outwith Operational Hours (Charge per hour) Contribution £20.00 £21.00 £22.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Facility Block - Category 1 (Daily Rate) Contribution £100.00 £105.00 £110.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Facility Block - Category 2 (Daily Rate) Contribution £80.00 £84.00 £88.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Facility Block - Category 3 (Daily Rate) Contribution £60.00 £63.00 £66.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Facility Block - Category 4 (Daily Rate) Contribution £35.00 £37.00 £39.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Facility Block - Outwith Operational Hours (Charge per hour) Contribution £20.00 £21.00 £22.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Dayroom - Category 1 (Daily Rate) Contribution £55.00 £58.00 £61.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Dayroom - Category 2 (Daily Rate) Contribution £40.00 £42.00 £44.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Dayroom - Category 3 (Daily Rate) Contribution £25.00 £26.00 £27.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Dayroom - Category 4 (Daily Rate) Contribution £15.00 £16.00 £17.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Dayroom - Outwith Operational Hours (Charge per hour) Contribution £20.00 £21.00 £22.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Racquet Hall - Category 1 (Charge per Hour) Contribution £47.65 £50.05 £52.55 £55.20 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Racquet Hall - Category 2 (Charge per Hour) Contribution £27.95 £29.35 £30.80 £32.35 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Racquet Hall - Category 3 (Charge per Hour) Contribution £15.45 £16.20 £17.00 £17.85 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Racquet Hall - Category 4 (Charge per Hour) Contribution £6.75 £7.10 £7.45 £7.80 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Room @ the Courtyard - Category 1 (Charge per Hour) Contribution £23.65 £24.85 £26.10 £27.40 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Room @ the Courtyard - Category 2 (Charge per Hour) Contribution £13.95 £14.65 £15.40 £16.15 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Room @ the Courtyard - Category 3 (Charge per Hour) Contribution £7.70 £8.10 £8.50 £8.95 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Room @ the Courtyard - Category 4 (Charge per Hour) Contribution £3.45 £3.60 £3.80 £4.00 5.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Portacabin Toilets - Category 1 (Daily Rate) Contribution £40.00 £42.00 £44.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Portacabin Toilets - Category 2 (Daily Rate) Contribution £30.00 £32.00 £34.00 0.0% 5.0% 5.0%
51

Page 52

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2024/25)
£
Proposed
Charge
(2025/26)
Indicative
Charge
(2026/27)
Indicative
Charge
(2027/28)
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Basis of
increase
2027/28
%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Portacabin Toilets - Category 3 (Daily Rate) Contribution £20.00 £21.00 £22.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Portacabin Toilets - Category 4 (Daily Rate) Contribution £10.00 £11.00 £12.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Portacabin Toilets - Outwith Operational Hours (Charge per
Hour) Contribution £20.00 £21.00 £22.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Ranger Service - Category 1 (Charge per Hour) Contribution £80.00 £84.00 £88.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Ranger Service - Category 2 (Charge per Hour) Contribution £50.00 £53.00 £56.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Ranger Service - Category 3 (Charge per Hour) Contribution £35.00 £37.00 £39.00 0.0% 5.0% 5.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Ranger Service - Category 4 (Charge per Hour) Contribution £20.00 £21.00 £22.00 0.0% 5.0% 5.0%
Communities & Housing Planning Services Allan Finlayson Planning Search  fees Contribution £111.35 £116.92 £122.77 £128.91 5.0% 5.0% 5.0%
Communities & Housing Planning Services Allan Finlayson Section 50 Certificates Contribution £137.81 £144.70 £151.94 £159.54 5.0% 5.0% 5.0%
Communities & Housing Planning Services Allan Finlayson Press Adverts Arran Contribution £80.50 £84.53 £88.76 £93.20 5.0% 5.0% 5.0%
Communities & Housing Planning Services Allan Finlayson Press Adverts Mainland Contribution £177.63 £186.51 £195.84 £205.63 5.0% 5.0% 5.0%
Place Economic Growth
(Transportation) Claire Fitzsimmons Construction Consent Amendments Contribution £402.41 £422.53 £443.66 £465.84 5.0% 5.0% 5.0%
Place Economic Growth
(Transportation) Claire Fitzsimmons Supply of Traffic Count data Contribution £221.43 £232.50 £244.13 £256.34 5.0% 5.0% 5.0%
Communities & Housing Heritage Lesley Forsyth
Genealogy research hourly charge. Any additional costs incurred
as a result of the work e.g Scotland People Vouchers, printing
etc to be charged at cost
Contribution £21.00 £22.00 £23.00 £24.00 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Magnifying Sheets Contribution £2.50 £2.50 £2.50 £2.50 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Tea/Coffee Contribution £1.50 £1.50 £1.50 £1.50 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Street Plans Contribution £3.00 £3.00 £3.00 £3.00 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth DVD Lending Service - DVD's per Week hire Contribution £2.00 £2.00 £2.00 £2.00 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth DVD Lending Service - Day ones (New releases) 2 nights hire Contribution £2.50 £2.50 £2.50 £2.50 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Audio Charges - CD Contribution £0.50 £0.50 £0.50 £0.50 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Room Hire - Category 1 user (eg Commercial Activities) - SMALL
ROOM Contribution £23.65 £24.85 £26.10 £27.40 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Room Hire - Category 2 user (eg Family Functions) - SMALL
ROOM Contribution £13.95 £14.65 £15.40 £16.15 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Room Hire - Category 3 user (eg Agency Letting) - SMALL
ROOM Contribution £7.70 £8.10 £8.50 £8.95 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Room Hire - Category 4 user (eg Pre 5 groups) - SMALL ROOM Contribution £3.45 £3.60 £3.80 £4.00 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Room Hire - Category 5 user (eg Disabled org's) - SMALL
ROOM Contribution £3.45 £3.60 £3.80 £4.00 5.0% 5.0% 5.0%
Place Energy and Sustainablility Jennifer Wraith Electric Vehicle Charging Point - Destination/Kwh Contribution £0.47 £0.50 £0.53 £0.56 6.4% 5.0% 5.0%
Place Energy and Sustainablility Jennifer Wraith Electric Vehicle Charging Point - Journey/Kwh Contribution £0.62 £0.70 £0.74 £0.78 12.9% 5.0% 5.0%
Place Energy and Sustainablility Jennifer Wraith Overstay Flat Fee Contribution £30.00 £30.00 £32.00 £32.00 0.0% 5.0% 0.0%
Communities & Housing Protective Services (Building
Standards) Scott McKenzie Clearance Certificates Contribution £259.20 £272.16 £285.77 £300.06 5.0% 5.0% 5.0%
Communities & Housing Protective Services (Building
Standards) Scott McKenzie Searches Contribution £111.35 £116.92 £122.77 £128.91 5.0% 5.0% 5.0%
Communities & Housing Protective Services (Building
Standards) Scott McKenzie Section 50 Certificates Contribution £137.81 £144.70 £151.94 £159.54 5.0% 5.0% 5.0%
Communities & Housing Protective Services (Building
Standards) Scott McKenzie Section 89 Certificates Contribution £450.70 £473.24 £496.90 £521.75 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Bacteriological Swimming Pool Sampling Contribution £56.23 £59.04 £61.99 £65.09 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Legionelia Swimming Pool Sampling Contribution £104.74 £109.98 £115.48 £121.25 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Food Hygiene Training Delegate Charge Contribution £31.97 £33.57 £35.25 £37.01 5.0% 5.0% 5.0%
52

Page 53

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2024/25)
£
Proposed
Charge
(2025/26)
Indicative
Charge
(2026/27)
Indicative
Charge
(2027/28)
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Basis of
increase
2027/28
%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Chemical Swimming Pool Sampling Contribution £77.18 £81.04 £85.09 £89.34 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Pest Control - Fumigations/Sprays for heavy infestations e.g.
bedbugs, fleas includes survey and revisit.  Contribution £84.90 £89.10 £93.60 £98.30 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Pest Control Charge - Insects (Domestic) Contribution £55.10 £57.90 £60.80 £63.80 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Pest Control Charge - Rats/Mice/Insects (Commercial) Contribution £84.90 £89.10 £93.60 £98.30 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Pest Control Charge - Rats/Mice/Squirrels (Domestic) includes
up to 3 visits. Contribution £84.90 £89.10 £93.60 £98.30 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Pest Control Charge - Wasp Nests/Bees Contribution £55.10 £57.90 £60.80 £63.80 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Section 50 Certificates Contribution £137.81 £144.70 £151.94 £159.54 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Certificate of Compliance (not required as part of licence
application) Contribution £110.25 £115.76 £121.55 £127.63 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Health Certificate for export to China Contribution £39.69 £41.67 £43.75 £45.94 5.0% 5.0% 5.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Support Attestation Contribution £105.00 £110.25 £115.76 £121.55 5.0% 5.0% 5.0%
Communities & Housing Protective Services (Trading
Standards) Scott McKenzie Liquid fuel measuring instruments - first meter tested Contribution £175.30 £184.07 £193.27 £202.93 5.0% 5.0% 5.0%
Communities & Housing Protective Services (Trading
Standards) Scott McKenzie Liquid fuel measuring instruments
- each additional meter tested during same visit Contribution £108.05 £113.45 £119.12 £125.08 5.0% 5.0% 5.0%
Communities & Housing Protective Services (Trading
Standards) Scott McKenzie All other weighing and measuring equipment
- one officer on site (per hour) Contribution £94.82 £99.56 £104.54 £109.77 5.0% 5.0% 5.0%
Communities & Housing Protective Services (Trading
Standards) Scott McKenzie All other weighing and measuring equipment
- two or more officers on site (per hour) Contribution £152.15 £159.76 £167.75 £176.14 5.0% 5.0% 5.0%
Place Bereavement Service David Mackay / Mark
McNeil Interment of Eighteen and Over Contribution £888.00 £932.00 £979.00 £1,028.00 5.0% 5.0% 5.0%
Place Bereavement Service David Mackay / Mark
McNeil Purchase of Exclusive Right of Burial (New Lair) Contribution £947.00 £994.00 £1,044.00 £1,096.00 5.0% 5.0% 5.0%
Place Bereavement Service David Mackay / Mark
McNeil Purchase of Exclusive Right of Burial (Woodland Area) Contribution £947.00 £994.00 £1,044.00 £1,096.00 5.0% 5.0% 5.0%
Place Bereavement Service David Mackay / Mark
McNeil Interment of Cremated Remains (Aged 18 and over) Contribution £251.00 £264.00 £277.00 £291.00 5.0% 5.0% 5.0%
Place Bereavement Service David Mackay / Mark
McNeil
Interment of Cremated Remains (Aged 18 and over). Saturdays
and Public Holidays Contribution £376.50 £395.00 £415.00 £436.00 5.0% 5.0% 5.0%
Place Bereavement Service David Mackay / Mark
McNeil Memorial Foundation Contribution £194.00 £204.00 £214.00 £225.00 5.0% 5.0% 5.0%
Place Bereavement Service David Mackay / Mark
McNeil Dis-interments Contribution £1,070.00 £1,124.00 £1,180.00 £1,239.00 5.0% 5.0% 5.0%
Place Bereavement Service David Mackay / Mark
McNeil Interment in common ground Contribution £278.00 £292.00 £307.00 £322.00 5.0% 5.0% 5.0%
Place Bereavement Service David Mackay / Mark
McNeil
Purchase of Exclusive Right of Burial - Cremated Remains Only
(New Lair) Contribution £520.00 £546.00 £573.00 £602.00 5.0% 5.0% 5.0%
Place Bereavement Service David Mackay / Mark
McNeil
Purchase of Exclusive Right of Burial - Cremated Remains Only
in Garden of Remembrance (New Lair) Contribution £520.00 £546.00 £573.00 £602.00 5.0% 5.0% 5.0%
Place Bereavement Service David Mackay / Mark
McNeil Interment of Eighteen and Over (Saturdays and Public Holidays) Contribution £1,332.00 £1,399.00 £1,469.00 £1,542.00 5.0% 5.0% 5.0%
Place Bereavement Service David Mackay / Mark
McNeil Transfer of Title Deeds/Duplicate Title Deeds Contribution £23.00 £24.00 £25.00 £26.00 5.0% 5.0% 5.0%
Place Bereavement Service David Mackay / Mark
McNeil Memorial permit Contribution £48.00 £50.00 £53.00 £56.00 5.0% 5.0% 5.0%
School Meals FM Carolyn Hope Secondary School meals Contribution £2.05 £2.05 £2.05 £2.05 0.0% 0.0% 0.0%
School Meals FM Carolyn Hope Primary School meals Contribution £2.05 £2.05 £2.05 £2.05 0.0% 0.0% 0.0%
Place Largs Car Park Thomas Reaney Car park Charges - up to 1 hour Largs Car Park £0.83 £0.00 £0.00 £0.00 5.0% 5.0% 5.0%
Place Largs Car Park Thomas Reaney Car park Charges - over 1 hour up to 3 hours Largs Car Park £2.50 £0.00 £0.00 £0.00 5.0% 5.0% 5.0%
53

Page 54

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2024/25)
£
Proposed
Charge
(2025/26)
Indicative
Charge
(2026/27)
Indicative
Charge
(2027/28)
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Basis of
increase
2027/28
%
Place Largs Car Park Thomas Reaney Car park Charges - over 3 hours Largs Car Park £4.17 £0.00 £0.00 £0.00 5.0% 5.0% 5.0%
Place Largs Car Park Thomas Reaney Car park charges - up to 2 hours Largs Car Park £0.00 £2.50 £2.63 £2.76 5.0% 5.0% 5.0%
Place Largs Car Park Thomas Reaney Car park charges - up to 4 hours Largs Car Park £0.00 £4.17 £4.38 £4.60 5.0% 5.0% 5.0%
Place Largs Car Park Thomas Reaney Car park charges - over 4 hours / all day Largs Car Park £0.00 £8.33 £8.75 £9.19 5.0% 5.0% 5.0%
Place Largs Car Park Thomas Reaney Car park charges - every day thereafter Largs Car Park £0.00 £8.33 £8.75 £9.19 5.0% 5.0% 5.0%
Place Largs Car Park Thomas Reaney Car park charges - annual permit per vehicle (limited to 30
permits) Largs Car Park £0.00 £1,083.33 £1,137.50 £1,194.38 5.0% 5.0% 5.0%
Place Largs Car Park Thomas Reaney Gallowgate Public Toilets Charge Largs Car Park £0.33 £0.33 £0.35 £0.37 0.0% 5.0% 5.0%
Place Streetscene Services David Mackay / Mark
McNeil Abandoned Trolley Charge Contribution £35.00 £37.00 £39.00 £41.00 5.0% 5.0% 5.0%
Place Streetscene Services David Mackay / Mark
McNeil Grass Cutting Scheme Contribution £78.00 £82.00 £86.00 £90.00 5.0% 5.0% 5.0%
Place Streetscene Services David Mackay / Mark
McNeil
Fly posting and estate boards removal - varies by size. Minimum
charge of £32 Contribution £32.00 £34.00 £36.00 £38.00 5.0% 5.0% 5.0%
Place Streetscene Services David Mackay / Mark
McNeil Dog Fouling clean up charge Contribution £32.00 £34.00 £36.00 £38.00 5.0% 5.0% 5.0%
Place Streetscene Services David Mackay / Mark
McNeil
Fly tipping clean up charges - varies by quantity. Minimum
charge of £120 Contribution £120.00 £126.00 £132.00 £139.00 5.0% 5.0% 5.0%
Place Streetscene Services David Mackay / Mark
McNeil Waste disposal charge per tonne Contribution £164.91 £173.16 £181.82 £190.91 5.0% 5.0% 5.0%
Place Streetscene Services David Mackay / Mark
McNeil Mis-use of public bin. Minimum service charge of £120 Contribution £120.00 £126.00 £132.00 £139.00 5.0% 5.0% 5.0%
Place Streetscene Services David Mackay / Mark
McNeil
Disposal of Waste within Caravans and trailers per tonne.
Excludes labour / transport charges Contribution £147.00 £154.00 £162.00 £170.00 5.0% 5.0% 5.0%
Place Transport Services Gordon Mitchell Tachograph Calibration Contribution £63.95 £67.15 £70.51 £74.04 5.0% 5.0% 5.0%
Place Transport Services Gordon Mitchell Tachograph 2 year Inspection Contribution £44.10 £46.31 £48.63 £51.06 5.0% 5.0% 5.0%
Place Transport Services Gordon Mitchell Tachograph 6 year Inspection Contribution £63.95 £67.15 £70.51 £74.04 5.0% 5.0% 5.0%
Place Transport Services Gordon Mitchell CPC Training Contribution £73.50 £77.18 £81.04 £85.09 5.0% 5.0% 5.0%
Place Transport Services Gordon Mitchell Per hire charge for transport hires to external groups. Contribution £25.36 £26.63 £27.96 £29.36 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Section 56 Roads Opening Permit Vehicle Access Crossing Contribution £82.00 £120.00 £126.00 £132.00 46.0% 5.0% 5.0%
Place Roads Susan Macfadyen Section 56 Road Opening Permit Other works involving
excavation in the public road Contribution £229.00 £260.00 £273.00 £287.00 13.5% 5.0% 5.0%
Place Roads Susan Macfadyen Section 58 Road Occupation Permits Builders Materials - for up
to 4 weeks Contribution £95.00 £155.00 £163.00 £171.00 63.0% 5.0% 5.0%
Place Roads Susan Macfadyen Section 58 Road Occupation Permits Cranes - for up to 4 weeks Contribution £95.00 £155.00 £163.00 £171.00 63.0% 5.0% 5.0%
Place Roads Susan Macfadyen Section 58 Road Occupation Permits Scaffolding - for up to 4
weeks Contribution £95.00 £155.00 £163.00 £171.00 63.0% 5.0% 5.0%
Place Roads Susan Macfadyen Section 85 Skip Permits - for up to 4 weeks Contribution £57.00 £70.00 £74.00 £78.00 22.8% 5.0% 5.0%
Place Roads Susan Macfadyen Section 59 Street Cafe Permit Contribution £0.00 £155.00 £163.00 £171.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Temporary Traffic Signal Permit (three way or more only).  This
would be in addition to Section 56 charge. Contribution £134.00 £141.00 £148.00 £155.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen
Temporary Traffic Signal Permit (three way or more only).  This
would be in addition to Section 56 charge.  Duration charge for
additional week.
Contribution £134.00 £141.00 £148.00 £155.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Property Enquiry Adoption Plan Contribution £41.00 £70.00 £74.00 £78.00 71.0% 5.0% 5.0%
Place Roads Susan Macfadyen NRSWA Section 109 Permission (Standard Works - all works
except emergency which take between 4 and 10 working days) Contribution £0.00 £390.00 £410.00 £431.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen
NRSWA Section 109 Permission (Major Works - works normally
planned 6 months in advance and require longer than 10
working days to complete)
Contribution £0.00 £390.00 £410.00 £431.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen NRSWA Section 109 Permission (Additional Street Charge) Contribution £0.00 £100.00 £105.00 £110.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen NRSWA Section 109 Permission (Additional Utility Charge) Contribution £0.00 £390.00 £410.00 £431.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen NRSWA Section 109 Permission (additional Inspections) Contribution £0.00 £36.00 £38.00 £40.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen 5 day Temporary Traffic Order (by notice) Contribution £469.00 £520.00 £546.00 £573.00 10.8% 5.0% 5.0%
Place Roads Susan Macfadyen Emergency Temporary Traffic Order (by notice) Contribution £469.00 £585.00 £614.00 £645.00 24.7% 5.0% 5.0%
Place Roads Susan Macfadyen Temporary Traffic Orders (advertised in press).  Advertising
costs are extra. Contribution £726.00 £835.00 £877.00 £921.00 15.0% 5.0% 5.0%
54

Page 55

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2024/25)
£
Proposed
Charge
(2025/26)
Indicative
Charge
(2026/27)
Indicative
Charge
(2027/28)
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Basis of
increase
2027/28
%
Place Roads Susan Macfadyen Switching off Traffic Signals for third parties Contribution £162.00 £190.00 £200.00 £210.00 17.0% 5.0% 5.0%
Place Roads Susan Macfadyen Temporary signs for events. Contribution £108.00 £140.00 £147.00 £154.00 30.0% 5.0% 5.0%
Place Roads Susan Macfadyen Signs for new Housing Developments Contribution £417.00 £440.00 £462.00 £485.00 5.5% 5.0% 5.0%
Place Roads Susan Macfadyen H Bar Markings (Access protection markings) Contribution £67.00 £210.00 £221.00 £232.00 213.0% 5.0% 5.0%
Place Roads Susan Macfadyen Amenity display licence Contribution £30.00 £32.00 £34.00 £36.00 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Early Start or retrospective permit (2 x permit charge) Contribution various 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Amendment / Extension to existing permit (50% of permit charge) Contribution various 5.0% 5.0% 5.0%
Place Roads Susan Macfadyen Car Park Charges (Bellmans Close) - Up to 60 minutes Contribution £1.50 £1.50 £1.60 £1.70 0.0% 5.0% 5.0%
Place Roads Susan Macfadyen Car Park Charges (Bellmans Close) - Up to 120 minutes Contribution £2.00 £2.00 £2.10 £2.20 0.0% 5.0% 5.0%
Place Roads Susan Macfadyen Car Park Charges (Bellmans Close) - Up to 240 minutes Contribution £3.50 £3.50 £3.70 £3.90 0.0% 5.0% 5.0%
Place Roads Susan Macfadyen Penalty Charge Notice Contribution £100.00 £100.00 £100.00 £100.00 0.0% 0.0% 0.0%
Place Roads Susan Macfadyen Penalty Charge Notice if paid within 14 days Contribution £50.00 £50.00 £50.00 £50.00 0.0% 0.0% 0.0%
Place Roads Susan Macfadyen Charge certificate served and where PCN remains unpaid after
day 56 Contribution £150.00 £150.00 £150.00 £150.00 0.0% 0.0% 0.0%
Place Waste Resources David Mackay Collection and Disposal of Commercial White Goods per item Contribution £165.51 £173.79 £182.48 £191.60 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Bin Repair - standard lock supply & fitting Contribution £25.04 £26.29 £27.60 £28.98 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Bin Repair - new forest lock lock supply & fitting Contribution £36.38 £38.20 £40.11 £42.12 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Bin Repair - push to lock supply & fitting Contribution £50.54 £53.07 £55.72 £58.51 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Bin Repair - lid supplied & lock fixed cost Contribution £155.84 £163.63 £171.81 £180.40 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Bin Repair - Push to lock lid and lock supply & fitting Contribution £181.34 £190.41 £199.93 £209.93 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Bin Repair - one front wheel supplied and fitted cost Contribution £81.43 £85.50 £89.78 £94.27 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Bin Repair - one back wheel supplied and fitted cost Contribution £88.20 £92.61 £97.24 £102.10 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste
Service 240 Litre Bin Contribution £6.41 £6.73 £7.07 £7.42 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste
Service 360 Litre Bin Contribution £9.62 £10.10 £10.61 £11.14 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste
Service 660 Litre Bin Contribution £17.61 £18.49 £19.41 £20.38 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste
Service 1100 Litre Bin Contribution £29.37 £30.84 £32.38 £34.00 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste
Service 1280 Litre Bin Contribution £34.25 £35.96 £37.76 £39.65 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 240
Litre bin Contribution £6.91 £7.26 £7.62 £8.00 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 360
Litre bin Contribution £10.37 £10.89 £11.43 £12.00 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 660
Litre bin Contribution £18.99 £19.94 £20.94 £21.99 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 1100
Litre bin Contribution £31.70 £33.29 £34.95 £36.70 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 1280
Litre bin Contribution £36.98 £38.83 £40.77 £42.81 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Food/Organic 140 Litre
Bin Contribution £5.36 £5.63 £5.91 £6.21 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Garden Waste 240
Litre Bin Contribution £9.19 £9.65 £10.13 £10.64 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Food/Organic 500 Litre
Bin Contribution £19.16 £20.12 £21.13 £22.19 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 240
Litre bin Contribution £5.34 £5.61 £5.89 £6.18 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 140 Litre bin Contribution £2.01 £2.11 £2.22 £2.33 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Subcontractor Commercial Refuse Scheduled Bin Uplift
Food/Organic 140 Litre Bin Contribution £6.80 £7.14 £7.50 £7.88 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Subcontractor Commercial Refuse Scheduled Bin Uplift Garden
Waste 240 Litre Bin Contribution £11.67 £12.25 £12.86 £13.50 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Subcontractor Commercial Refuse Scheduled Bin Uplift
Food/Organic 500 Litre Bin Contribution £24.27 £25.48 £26.75 £28.09 5.0% 5.0% 5.0%
55

Page 56

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2024/25)
£
Proposed
Charge
(2025/26)
Indicative
Charge
(2026/27)
Indicative
Charge
(2027/28)
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Basis of
increase
2027/28
%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service
240 Litre Bin Contribution £3.21 £3.37 £3.54 £3.72 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service
360 Litre Bin Contribution £4.82 £5.06 £5.31 £5.58 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service
660 Litre Bin Contribution £8.81 £9.25 £9.71 £10.20 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service
1100 Litre Bin Contribution £14.68 £15.41 £16.18 £16.99 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service
1280 Litre Bin Contribution £17.13 £17.99 £18.89 £19.83 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 140 Litre
Bin Contribution £1.45 £1.52 £1.60 £1.68 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 240 Litre
Bin Contribution £2.48 £2.60 £2.73 £2.87 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 360 Litre
Bin Contribution £3.71 £3.90 £4.10 £4.31 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 660 Litre
Bin Contribution £6.81 £7.15 £7.51 £7.89 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 1100 Litre
Bin Contribution £11.34 £11.91 £12.51 £13.14 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 1280 Litre
Bin Contribution £13.19 £13.85 £14.54 £15.27 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Food/Organic 140 Litre Bin Contribution £2.69 £2.82 £2.96 £3.11 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Garden Waste 240 Litre Bin Contribution £4.61 £4.84 £5.08 £5.33 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Food/Organic 500 Litre Bin Contribution £9.57 £10.05 £10.55 £11.08 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate
Service 140 Litre Bin Contribution £2.88 £3.02 £3.17 £3.33 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate
Service 240 Litre Bin Contribution £4.94 £5.19 £5.45 £5.72 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate
Service  360 Litre Bin Contribution £7.43 £7.80 £8.19 £8.60 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate
Service  660 Litre Bin Contribution £13.61 £14.29 £15.00 £15.75 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate
Service  1100 Litre Bin Contribution £22.68 £23.81 £25.00 £26.25 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate
Service  1280 Litre Bin Contribution £26.39 £27.71 £29.10 £30.56 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 140
Litre bin Contribution £4.05 £4.25 £4.46 £4.68 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service
140 Litre Bin Contribution £1.86 £1.95 £2.05 £2.15 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Charity Residual Waste 140 Litre bin Contribution £2.03 £2.13 £2.24 £2.35 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Subcontractor Charity Commercial Collection Garden Waste 240
Litre bin Contribution £5.85 £6.14 £6.45 £6.77 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste
Service 140 Litre Bin Contribution £3.74 £3.93 £4.13 £4.34 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub contract Sack Sales Pre-Paid - Trade Recycling per 100 Contribution £147.90 £155.30 £163.07 £171.22 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub contract Sack Sales Pre-Paid - Trade Waste per 50 Contribution £146.70 £154.04 £161.74 £169.83 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Charity Residual Waste 240 Litre bin Contribution £3.47 £3.64 £3.82 £4.01 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Charity Residual Waste 360 Litre bin Contribution £5.19 £5.45 £5.72 £6.01 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Charity Residual Waste 660 Litre bin Contribution £9.50 £9.98 £10.48 £11.00 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Residual Waste 1100 Litre bin Contribution £15.84 £16.63 £17.46 £18.33 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Residual Waste 1280 Litre bin Contribution £18.49 £19.41 £20.38 £21.40 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 240 Litre bin Contribution £2.69 £2.82 £2.96 £3.11 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 360 Litre bin Contribution £4.01 £4.21 £4.42 £4.64 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 660 Litre bin Contribution £7.34 £7.71 £8.10 £8.51 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 1100 Litre bin Contribution £12.24 £12.85 £13.49 £14.16 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 1280 Litre bin Contribution £14.25 £14.96 £15.71 £16.50 5.0% 5.0% 5.0%
56

Page 57

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2024/25)
£
Proposed
Charge
(2025/26)
Indicative
Charge
(2026/27)
Indicative
Charge
(2027/28)
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Basis of
increase
2027/28
%
Place Waste Resources David Mackay Sub-Contracted  Charity Food/Organic Waste 140 Litre bin Contribution £3.40 £3.57 £3.75 £3.94 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Food/Organic Waste 500 Litre bin Contribution £12.13 £12.74 £13.38 £14.05 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 140
Litre bin Contribution £3.21 £3.37 £3.54 £3.72 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 240
Litre bin Contribution £5.34 £5.61 £5.89 £6.18 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 360
Litre bin Contribution £8.01 £8.41 £8.83 £9.27 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 660
Litre bin Contribution £14.68 £15.41 £16.18 £16.99 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 1100
Litre bin Contribution £24.49 £25.71 £27.00 £28.35 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 1280
Litre bin Contribution £28.46 £29.88 £31.37 £32.94 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Event container delivery & uplift Contribution £76.58 £80.41 £84.43 £88.65 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Contamination charge - 140/240/360 ltr bins Contribution £19.15 £20.11 £21.12 £22.18 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Contamination charge - 500/660/1100/1280 ltr bins Contribution £44.68 £46.91 £49.26 £51.72 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Container retrieval - 140/240/360 ltr bins Contribution £19.15 £20.11 £21.12 £22.18 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Container retrieval - 500/660/1100/1280 ltr bins Contribution £44.68 £46.91 £49.26 £51.72 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Arran Yellow Tip Permit Contribution £64.69 £67.92 £71.32 £74.89 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Arran Blue Tip Permit Contribution £107.73 £113.12 £118.78 £124.72 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Green - Treatment per Te Contribution £63.82 £67.01 £70.36 £73.88 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Soil - Treatment per Te Contribution £38.29 £40.20 £42.21 £44.32 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Scrap - Treatment per Te Contribution £38.29 £40.20 £42.21 £44.32 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Paper & Cardboard - Treatment per Te Contribution £38.29 £40.20 £42.21 £44.32 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Wood - Treatment per Te Contribution £38.29 £40.20 £42.21 £44.32 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Plastics - Treatment per Te Contribution £63.82 £67.01 £70.36 £73.88 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Bricks/rubble - Treatment per Te Contribution £38.29 £40.20 £42.21 £44.32 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Lampheads - Treatment per Te Contribution £38.29 £40.20 £42.21 £44.32 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Skip Charges 20cyd - no treatment Contribution £122.04 £128.14 £134.55 £141.28 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Skip Charges 35cyd - no treatment Contribution £218.26 £229.17 £240.63 £252.66 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Special Uplift - disposal - 1/4te Contribution £41.23 £43.29 £45.45 £47.72 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Special Uplift - disposal - 1/2te Contribution £82.46 £86.58 £90.91 £95.46 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Special Uplift - disposal - Te Contribution £164.91 £173.16 £181.82 £190.91 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Void Uplift bin charge (Up to full set) Contribution £55.38 £58.15 £61.06 £64.11 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Special Uplift Squad - 30 min Contribution £55.38 £58.15 £61.06 £64.11 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Special Uplift Squad - 60 min Contribution £110.74 £116.28 £122.09 £128.19 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Special uplift - Confidential waste per bag Contribution £6.86 £7.20 £7.56 £7.94 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Direct disposal and treatment EFW per Te Contribution £164.91 £173.16 £181.82 £190.91 5.0% 5.0% 5.0%
57

Page 58

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2024/25)
£
Proposed
Charge
(2025/26)
Indicative
Charge
(2026/27)
Indicative
Charge
(2027/28)
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Basis of
increase
2027/28
%
COST PLUS FEES & CHARGES
Communities & Housing Libraries Lesley Forsyth Lost and Damaged Audio, based on actual costs Cost plus £0.00 £0.00 £0.00 £0.00 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Book Sales (NAC Stock), based on actual costs Cost plus £0.00 £0.00 £0.00 £0.00 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Black and White Photocopying/Printing A4 or A3  single-sided Cost plus £0.10 £0.10 £0.10 £0.10 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Black and White Photocopying/Printing A4 or A3 double-sided Cost plus £0.20 £0.20 £0.20 £0.20 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Colour Photocopying/Printing A4 or A3 single-sided Cost plus £0.40 £0.40 £0.40 £0.40 5.0% 5.0% 5.0%
Communities & Housing Libraries Lesley Forsyth Colour Photocopying/Printing A4 or A3 double-sided Cost plus £0.80 £0.80 £0.80 £0.80 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Special Uplift or POPs Charges (for up to five items) Cost plus £27.78 £29.17 £30.63 £32.16 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Special Uplift or POPs individual item Charges Cost plus £5.55 £5.83 £6.12 £6.43 5.0% 5.0% 5.0%
Place Waste Resources David Mackay New/Replacement Waste Container 360 Litre Cost plus £82.70 £86.84 £91.18 £95.74 5.0% 5.0% 5.0%
Place Waste Resources David Mackay New/Replacement Waste Container 1100 Litre Cost plus £451.41 £473.98 £497.68 £522.56 5.0% 5.0% 5.0%
Place Waste Resources David Mackay New/Replacement Waste Container Lid on Lid 1100 Litre Cost plus £492.77 £517.41 £543.28 £570.44 5.0% 5.0% 5.0%
Place Waste Resources David Mackay New/Replacement Waste Container 1280 Litre Cost plus £525.24 £551.50 £579.08 £608.03 5.0% 5.0% 5.0%
Place Waste Resources David Mackay New/Replacement Waste Container Lid on Lid 1280 Litre Cost plus £566.60 £594.93 £624.68 £655.91 5.0% 5.0% 5.0%
Place Waste Resources David Mackay New/Replacement Waste Container 240 Litre Cost plus £50.17 £52.68 £55.31 £58.08 5.0% 5.0% 5.0%
Place Waste Resources David Mackay New/Replacement Waste Container 140 Litre Cost plus £34.46 £36.18 £37.99 £39.89 5.0% 5.0% 5.0%
Place Waste Resources David Mackay New/Replacement Waste Container Lid on Lid 660 Litre Cost plus £425.54 £446.82 £469.16 £492.62 5.0% 5.0% 5.0%
Place Waste Resources David Mackay New/Replacement Waste Container 660 Litre Cost plus £377.41 £396.28 £416.09 £436.89 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sack Sales Pre-Paid - Trade Recycling per 100 Cost plus £138.54 £145.47 £152.74 £160.38 5.0% 5.0% 5.0%
Place Waste Resources David Mackay Sack Sales Pre-Paid - Trade Waste per 50 Cost plus £134.27 £140.98 £148.03 £155.43 5.0% 5.0% 5.0%
58

Page 59

Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
(2024/25)
£
Proposed
Charge
(2025/26)
Indicative
Charge
(2026/27)
Indicative
Charge
(2027/28)
Basis of
increase
2025/26
%
Basis of
increase
2026/27
%
Basis of
increase
2027/28
%
NATIONALLY SET FEES & CHARGES
Corporate Services Legal - Licensing Raymond Lynch Landlord Registration - Principal Nationally Set £75.00 £75.00 £75.00 £75.00 0.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Landlord Registration - Property Nationally Set £17.00 £17.00 £17.00 £17.00 0.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Landlord Registration - Late Application Nationally Set £149.00 £149.00 £149.00 £149.00 0.0% 0.0% 0.0%
Health & Social Care Adults and Older People Eleanor Currie Blue Badge (charge for a three year period) Nationally Set £20.00 £20.00 £20.00 £20.00 0.0% 0.0% 0.0%
Communities & Housing Planning Services Allan Finlayson Planning Application fees - Operations eg Construction of
buildings - planning permission in principle Nationally Set £600.00 £600.00 £600.00 £600.00 0.0% 0.0% 0.0%
Communities & Housing Planning Services Allan Finlayson Planning Application fees - Operations eg The erection of
buildings - planning permission in principle Nationally Set £600.00 £600.00 £600.00 £600.00 0.0% 0.0% 0.0%
Communities & Housing Planning Services Allan Finlayson
Planning Application fees - Operations eg The erection of
buildings  - where the area of gross floor space to be created
does not exceed 40 sq metres
Nationally Set £300.00 £300.00 £300.00 £300.00 0.0% 0.0% 0.0%
Communities & Housing Planning Services Allan Finlayson Planning Application fees - Uses of Land eg The change of use
of a building Nationally Set £600.00 £600.00 £600.00 £600.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services (Building
Standards) Scott McKenzie Building Warrant Application Fees, set by BSD, please refer to fees
section in link below for full list of charges: Nationally Set various various various various 0.0% 0.0% 0.0%
Building warrants
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges up to 1,000 tonnes Nationally Set £125.00 £125.00 £125.00 £125.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges 1,001 to 3,000 tonnes Nationally Set £170.00 £170.00 £170.00 £170.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges 3,001 to 10,000 tonnes Nationally Set £250.00 £250.00 £250.00 £250.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges 10,001 to 20,000 tonnes Nationally Set £325.00 £325.00 £325.00 £325.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges 20,001 to 30,000 tonnes Nationally Set £415.00 £415.00 £415.00 £415.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges over 30,000 tonnes Nationally Set £480.00 £480.00 £480.00 £480.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges extensions Nationally Set £95.00 £95.00 £95.00 £95.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges for vessels with the capacity to carry
between 50 and 1,000 persons Nationally Set £480.00 £480.00 £480.00 £480.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges for vessels with the capacity to carry
more than 1,000 persons Nationally Set £820.00 £820.00 £820.00 £820.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Private water supplies - regulated supplies annual sampling and
risk assessment Nationally Set £261.00 £261.00 £261.00 £261.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Private water supplies - non regulated supplies Nationally Set £118.00 £118.00 £118.00 £118.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Stray dog fee Nationally Set £25.00 £25.00 £25.00 £25.00 0.0% 0.0% 0.0%
Place Streetscene Services David Mackay / Mark
McNeil Fly Tipping fine Nationally Set £500.00 £500.00 £500.00 £500.00 0.0% 0.0% 0.0%
Place Streetscene Services David Mackay / Mark
McNeil Littering / Fly Posting fine Nationally Set £80.00 £80.00 £80.00 £80.00 0.0% 0.0% 0.0%
Place Streetscene Services David Mackay / Mark
McNeil Dog Fouling fine Nationally Set £80.00 £80.00 £80.00 £80.00 0.0% 0.0% 0.0%
Place Streetscene Services David Mackay / Mark
McNeil Abandoned vehicles minimum charge Nationally Set £150.00 £150.00 £150.00 £150.00 0.0% 0.0% 0.0%
Place Streetscene Services David Mackay / Mark
McNeil Storage of vehicles until dismantled. Daily charge Nationally Set £20.00 £20.00 £20.00 £20.00 0.0% 0.0% 0.0%
Place Streetscene Services David Mackay / Mark
McNeil Abandoned caravans / trailers minimum charge Nationally Set £500.00 £500.00 £500.00 £500.00 0.0% 0.0% 0.0%
Place Transport Services Gordon Mitchell MOT Class 4 Nationally Set £54.85 £54.85 £54.85 £54.85 0.0% 0.0% 0.0%
Place Transport Services Gordon Mitchell MOT Class 5 Nationally Set £59.55 £59.55 £59.55 £59.55 0.0% 0.0% 0.0%
Place Transport Services Gordon Mitchell MOT Class 7 Nationally Set £58.60 £58.60 £58.60 £58.60 0.0% 0.0% 0.0%
Place Roads Susan Macfadyen NRSWA Public Utility Sample Inspections Nationally Set £36.00 £36.00 £36.00 £36.00 0.0% 0.0% 0.0%
59

Page 60

Appendix 7
Employee Costs Property Costs
Supplies &
Services
Transport &
Plant Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Costs Income TOTAL
Directorate £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Corporate Services 16,204 68 3,006 22 1,354 1,934 853 0 0 (4,484) 18,955
Communities & Housing 24,185 2,973 6,799 973 179 10,674 0 104 0 (31,887) 14,000
Education 149,260 1,070 24,319 87 177 8,932 580 0 71 (4,415) 180,081
Place 27,603 22,979 4,228 7,374 556 12,239 0 78 0 (20,712) 54,345
Other Corporate Items 1,895 355 21,647 302 2,418 4,817 34,074 556 23,594 (36,772) 52,887
Total Expenditure 219,147 27,445 59,999 8,759 4,683 38,596 35,507 739 23,665 (98,269) 320,269
Health & Social Care Partnership 138,796
Revised Total Expenditure 219,147 27,445 59,999 8,759 4,683 38,596 35,507 739 23,665 (98,269) 459,065
Funded by:
AEF 0 0 0 0 0 0 2,803 0 0 (385,859) (383,056)
Council Tax 0 0 0 0 0 0 14,971 0 0 (86,980) (72,009)
Contribution from Reserves 0 0 0 0 0 0 0 0 0 (4,000) (4,000)
Total Funding 0 0 0 0 0 0 17,774 0 0 (476,839) (459,065)
Subjective Analysis
North Ayrshire Council General Services Revenue Budget 2025-26
Summary by Directorate
60

Page 61

Appendix 7
Employee Costs Property Costs
Supplies &
Services Transport Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Income TOTAL
Objective Analysis £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Chief Executive's Office 192 0 1 1 5 0 0 0 0 (56) 143
Change Programme 8 0 0 0 0 0 0 0 0 0 8
Audit,Fraud,Safety & Insurance 841 61 39 5 19 7 0 0 0 (313) 659
Corporate Procurement 952 0 11 1 8 107 0 0 0 (158) 921
Financial Services 1,333 0 165 1 29 2 0 0 0 (173) 1,355
Revenues 548 0 61 1 190 0 0 0 0 (1,380) (580)
Employee Services 782 0 70 0 5 4 0 0 0 (38) 823
HR & OD 681 0 21 0 26 413 0 0 0 (56) 1,085
ICT 3,033 0 2,147 5 11 0 0 0 0 (241) 4,954
Business Support 1,233 0 6 0 2 0 0 0 0 (135) 1,106
Customer Services 2,652 0 265 2 48 1,153 853 0 0 (933) 4,040
Transformation Services 644 0 11 0 1 39 0 0 0 0 694
Legal & Licensing 1,128 0 32 5 38 0 0 0 0 (774) 429
Policy,Performance & Elections 480 0 20 1 11 5 0 0 0 (20) 499
Communications 457 0 8 1 4 0 0 0 0 (7) 463
Civil Contingencies 0 0 0 0 0 60 0 0 0 0 60
Committee Services 418 6 118 0 5 53 0 0 0 (125) 476
Member Services 307 0 31 0 947 91 0 0 0 (55) 1,321
Information Governance 515 0 1 0 4 0 0 0 0 (21) 499
Total 16,204 68 3,006 22 1,354 1,934 853 0 0 (4,484) 18,955
Subjective Analysis
North Ayrshire Council General Services Revenue Budget 2025-26
Corporate Services
61

Page 62

Appendix 7
Employee Costs Property Costs
Supplies &
Services Transport Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Income TOTAL
Objective Analysis £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Directorate and Support 122 0 0 0 0 0 0 0 0 (23) 100
Connected Communities 6,134 258 665 24 74 5,051 0 0 0 (636) 11,571
Planning Services 765 0 101 4 21 30 0 0 0 (711) 210
Protective Services 2,671 113 101 21 16 148 0 0 0 (1,232) 1,838
Building Services 10,990 131 5,641 884 18 3,194 0 0 0 (23,408) (2,550)
Property Governance 0 0 0 0 0 0 0 0 0 0 0
Other Housing 3,503 2,472 290 41 49 2,252 0 104 0 (5,878) 2,833
Works Scoping & Assurance 0 0 (0) 0 0 0 0 0 0 0 (0)
Total 24,185 2,973 6,799 973 179 10,674 0 104 0 (31,887) 14,000
Subjective Analysis
North Ayrshire Council General Services Revenue Budget 2025-26
Communities & Housing
62

Page 63

Employee Costs Property Costs
Supplies &
Services Transport Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Income TOTAL
Objective Analysis £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Early Years Education 14,984 9 215 4 36 5,698 0 0 0 0 20,945
Primary Education 46,387 0 2,504 9 0 1 0 0 0 0 48,901
Secondary Education 47,924 0 16,025 8 0 0 0 0 0 0 63,957
Additional Support Needs 19,066 0 174 46 23 2,039 0 0 0 (264) 21,085
Education - Other 2,184 114 399 10 95 1,191 580 0 71 (1,890) 2,755
Pupil Equity Fund 4,197 0 0 0 0 0 0 0 0 0 4,197
Facilities Management 14,517 947 5,002 10 23 3 0 0 0 (2,261) 18,241
Total 149,260 1,070 24,319 87 177 8,932 580 0 71 (4,415) 180,081
North Ayrshire Council General Services Revenue Budget 2025-26
Education
Subjective Analysis
63

Page 64

Appendix 7
Employee Costs Property Costs
Supplies &
Services Transport Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Income TOTAL
Objective Analysis £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Directorate & Support 205 0 2 0 7 0 0 0 0 0 214
Roads 4,641 30 2,798 31 79 1,001 0 0 0 (1,441) 7,139
Streetscene 7,317 149 302 195 21 95 0 0 0 (2,906) 5,173
Waste Resources 5,519 46 738 241 66 6,799 0 78 0 (5,142) 8,345
Economic Development 2,872 36 28 19 24 780 0 0 0 (232) 3,527
Growth & Investment 137 0 5 1 4 103 0 0 0 0 250
Property Management & Investment 4,607 15,232 216 52 338 81 0 0 0 (8,948) 11,577
Energy & Sustainability 413 7,458 4 1 6 253 0 0 0 (1,285) 6,850
Internal Transport 1,892 28 135 6,835 11 3,127 0 0 0 (758) 11,270
Total 27,603 22,979 4,228 7,374 556 12,239 0 78 0 (20,712) 54,345
Subjective Analysis
North Ayrshire Council General Services Revenue Budget 2025-26
Place
64

Page 65

Appendix 7
Employee Costs Property Costs
Supplies &
Services Transport Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Income TOTAL
Objective Analysis £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Joint Boards 0 0 0 0 0 3,548 0 0 0 0 3,548
Pension Costs 1,895 0 0 0 0 0 0 0 0 0 1,895
Loan Charges & Capital Charges 0 0 0 0 0 0 0 0 23,594 (80) 23,514
Central Telephones 0 0 0 0 350 0 0 0 0 0 350
Other Corporate Items 0 0 21,647 0 1,803 0 0 356 0 (148) 23,658
Insurance 0 355 0 302 265 1,269 0 0 0 (2,191) 0
Housing Benefit 0 0 0 0 0 0 34,074 200 0 (34,353) (78)
Total 1,895 355 21,647 302 2,418 4,817 34,074 556 23,594 (36,772) 52,887
Subjective Analysis
North Ayrshire Council General Services Revenue Budget 2025-26
Other Corporate Items
65

Page 66

66

Page 67

NORTH AYRSHIRE COUNCIL 
26 February 2025 
North Ayrshire Council 
Title:    Capital Investment Programme 2025/26 to 2033/34 
Purpose:  To advise Council on the draft Capital Investment Programme to
2033/34 
Recommendation:  That Council :
(a)  approves the refreshed Capital Investment Programme to
2033/34 included in Appendix 3;
(b)  notes that the programme will be reviewed on an on-going
basis with the next major review in 2026/27; and 
(c)  approves the refreshed Capital Investment Strategy included
in Appendix 4. 
1. Executive Summary 
1.1 The General Services Capital Investment Programme 2024/25 to 2033/34 was
approved by Council on 28 February 2024. This report outlines the recommendations
of the refresh of the Capital Investment Programme carried out during 2024/25. The
next full review of the Programme will be carried out during 2026/27.
1.2 The refresh has incorporated all funding sources to 2033/34, including assumed levels
of general capital grant, specific grants and a prudent assessment of the level of
capital receipts over the period. Total available funding has been projected at
£174.223m. The balance of funding required to deliver the capital programme will be
met through prudential borrowing and this is anticipated at £157.260m.
1.3 The refresh considered the current Capital Investment Programme and takes
cognisance of subsequent changes, including:
• The ongoing impact of construction industry inflation, cost volatility and supply
chain issues across the overall Capital Investment Programme;
• Revised Scottish Government capital grants as detailed in the Local Government
Finance Settlement 2025/26;
• A review of spending profiles across key capital projects to support the Council’s
priorities; and  
• Revised levels of investment across projects, taking cognisance of Council
priorities, external funding sources and investing in core assets through asset
management plans. 
Agenda Item 5
67

Page 68

1.4 The proposed refreshed Capital Investment Programme, aligned to the Council Plan
priorities, is attached in Appendix 3 and will deliver a total programme of £331.483m
to 2033/34. 
1.5 Compliance with Regulations and the Prudential Code requires assurance to be
provided on affordability and sustainability of the Capital Investment programme, this
is provided in the Treasury Management and Investment Strategy (TMIS) which
follows this report on the Council agenda. The TMIS recognises that this will require to
be kept under review to ensure the underlying assumptions continue to apply. 
1.6 The longer-term affordability of the current and future Capital Investment Programmes
requires incremental increases the current General Fund financing budgets. As part of
the next major review of the capital programme, due to be undertaken during 2026/27,
a review of available General Fund financing budgets will be carried out to determine
any changes required to support the delivery of the draft Capital Investment
Programme. 
1.7 In addition to the TMIS, there is a requirement for the Council to publish a Capital
Investment Strategy (CIS). As part of the refresh of the Capital Investment
Programme, a refresh of the current CIS has been undertaken during 2024/25. The
refreshed CIS is attached at Appendix 4. 
1.8 The Capital Investment Programme will continue to be reviewed on an on-going basis.
The primary focus at this time is on delivery of the current programme. Due to ongoing
risks associated with construction cost volatility and the higher cost of borrowing,
opportunities for further investment to be met from borrowing is extremely limited.
Major reviews will be undertaken on a 3-year basis, with the next due to be completed
during 2026/27. 
2. Background 
Capital Investment Programme 2024/25 to 2033/34
2.1 North Ayrshire Council approved the current Capital Investment Programme for the
period 2024/25 to 2033/34 on 28 February 2024. A refresh of the Programme was
undertaken during 2024/25. This report contains the outcome of that refresh.
Review of Capital Funding 
Scottish Government General Capital Grant
2.2 Local Government Finance Circular 10/2024 confirmed the level of General Capital
Grant as £8.367m for 2025/26. This comprises:
Fund Value
(£m)
Comments
General Capital Grant Core 9.710 An increase of £0.642m
Less Flooding element (2.206) Underspend on Millport Coastal project
Coastal Change Adaptation 0.140 
Nature Restoration 0.145 Restoration of 2024/25 funding
68

Page 69

Play Parks 0.578 
Total General Capital Grant 8.367 
2.3 Projected at the core level of £9.710m to 2033/34, with a further reduction of
(£1.914m) anticipated in 2026/27 as a result of the underspend on the Millport Coastal
flooding project, the total General Capital Grant for the period is forecast as £84.133m.
Scottish Government Specific Capital Grants
2.4 In addition to the General Capital Grant, the Council will receive two Specific Grants:
• £1.561m to tackle Vacant and Derelict Land with projects requiring Scottish
Government approval; and
• £0.582m, to fund Active Travel. 
The Vacant and Derelict Land funding is an increase of £0.598m from that received
during 2024/25 and has only been confirmed for 2025/26. However, the Active Travel
funding has been projected at current levels to 2033/34.
2.5 In addition, the programme includes previous Specific Grant allocations in relation to a
number of programmes which have been carried over into 2025/26 in line with revised
project plans, including:
• £1.837m from the 2024/25 Vacant and Derelict Land allocation; and
• £0.316m from the 2024/25 Place Based Investment Programme.
2.6 As a result, the total forecast Specific Grant income to 2033/34 is £8.952m.
Other Government Funding
2.7 The programme includes funding from the Scottish and UK Governments to support
the Ayrshire Growth Deal. The total anticipated funding over the period is £53.869m.
This has been aligned to the latest programme planning information. 
2.8 The UK Government previously confirmed that North Ayrshire Council has been
awarded £23.693m from the Levelling Up Fund to support the upgrading of the B714
to improve connectivity between North Ayrshire and the wider motorway network.
£21.553m of this award is anticipated for receipt during financial years 2025/26 to
2026/27. 
2.9 The UK Government has confirmed additional funding for 2025/26 from the UK
Shared Prosperity Fund of £0.576m. 
Other Internal Funds
2.10 The programme includes previously approved contributions from earmarked funds of
£0.704m to support the Solar PV project and £0.710m to support the B714 Upgrade. 
69

Page 70

Capital Receipts 
2.11 A review of projected income from capital receipts has been undertaken during
2024/25. This is forecast to realise income of £3.625m over the period of the
programme in relation to the sale of other Council owned assets.
Other External Funding 
2.12 In relation to additional grant funding from other external bodies, given the level of
uncertainty around securing these funds, only those funds which have been
confirmed, but not yet drawn down, have been included at this time. As a result,
£0.101m NAVT funding to support the Irvine Enterprise Area has been included while
(£0.800m) of NAVT funding to support Marine Tourism has been reviewed pending
revisions to the Ayrshire Growth Deal programme.
Prudential Borrowing
2.13 The difference between the Council's Capital Investment Programme and funding from
the above sources is met through prudential borrowing of £157.260m. The Capital
Investment Programme will be delivered within the approved loan charges revenue
budget, utilising the balances held in the Prudential Investment Fund and Capital Fund
to smooth the revenue implications of the borrowing costs associated with the revised
programme.
Development of the Capital Investment Programme to 2033/34
2.14 The refresh of the Capital Investment Programme to 2033/34 incorporates the re-
profiling of a number of projects to better reflect current projected timelines and
revised levels of investment that take cognisance of the Council’s key priorities,
funding availability and lifecycle maintenance requirements informed through asset
management plans.
2.15  The current capital investment programme to 2033/34, as approved by Council on 28
February 2024, has been updated to reflect the changes to the Programme approved
by Cabinet during 2024/25, including any re-phasing of programmes to reflect updated
project plans. 
Re-Profiling
2.16 A total of £17.282m of planned expenditure has been re-profiled from 2024/25 into
2025/26 to 2033/34 in line with updated project delivery timelines. Full details of
individual projects re-phased from 2024/25 have been reported to Cabinet throughout
the year.
Investments linked to Revised Funding
2.17 Local Government Finance Circular 10/2024 confirmed the level of Cycling, Walking
and Safer Routes specific grant for 2025/26 at £0.582m. Expenditure has been
projected at this level for the full period of the Capital Investment Programme,
resulting in a reduction in investment of (£0.045m) to 2033/34. In addition, Vacant and
70

Page 71

Derelict Land specific grant for 2025/26 has been confirmed at £1.561m and has been
reflected in additional investment at this level. 
2.18 Following completion of the Millport Coastal Flood Protection scheme, a significant
underspend has been reported. Local Government Finance Circular 10/2024 includes
a deduction of £2.206m from the General Capital Grant aligned to this underspend,
due to the 80% funding from Scottish Government, with a further reduction of £1.914m
anticipated for 2026/27. The overall investment has been reduced by (£4.120m) to
reflect the reduced funding level.
2.19 Pending revisions to the Ayrshire Growth Deal programme in relation to Marine
tourism, the level of investment in Marine Tourism has been reduced by (£0.800m)
linked to the review of NAVT funding. Discussions on the appropriate utilisation of
available funding are ongoing and will be reported to Cabinet on an ongoing basis.
Additional / Revised Investments
2.20 An additional investment of £0.576m has been included linked to the UKSPF grant
funding. This will support a competitive community grants scheme and small scale
council led regeneration projects which align with the interventions of the UK Shared
Prosperity Fund and the regeneration delivery plan approved by Cabinet in May 2023.
2.21 Additional investment of £0.226m has been included to support internal alterations to
Fairie Primary School to create new classroom spaces in order to accommodate its
increasing roll. Fairlie Primary School currently operates using all of the available 5
classroom bays. As a result of new homes being built in the area and indications that
parental choice is to access non-denominational provision, the school roll is forecast
to increase to 118 from August 2025. This will require the creation of one additional
classroom.
2.22 Recent years have witnessed significant cost volatility across the construction
industry, including inflationary pressures, limited availability of contractors, supply
chain issues and material shortages which are impacting on tender returns and the
cost of materials. Where quantified, the resultant cost pressures have been
recognised in relation to specific projects. However, risks have also been identified, or
are anticipated, across a number of projects using industry cost estimates as an
indicator, including major works at Ardrossan North Shore through enabling works and
Ardrossan Campus. In order to support the management of these and other emerging
risks, and to apply prudent financial planning, it is proposed that an additional
investment of £15.000m within the Flexibility budget is included over the next five
years. This position will continue to be monitored as works advance and tenders are
finalised.
2.23 The current approved Capital Investment Programme to 2033/34 is attached at
appendix 1. Full details of the proposed changes to the programme following the
review, as outlined above, are included in appendix 2. The revised Capital Investment
Programme covering the period from 2025/26 to 2033/34 is included in appendix 3.
This will deliver a total programme of investment of £331.483m.
71

Page 72

Future Affordability
2.24 The Prudential Investment Fund was created as part of the 2015/16 budget strategy to
utilise short term underspends on General Fund financing budgets to offset longer
term pressures to support Prudential Borrowing arising from the Capital Investment
Programme. 
2.25 Due to the significant investment planned by North Ayrshire Council over the period to
2033/34, set within the context of government grant forecasts and combined with the
additional cost pressures identified across a number of projects, it is projected that
these funds will be exhausted before the end of the current 10 year Capital Investment
Programme. In order to ensure the affordability of current and future capital
investments beyond this, it will be necessary to incrementally increase the current
General Fund financing budgets over the period of the programme. Additional funding
support to mitigate the significant cost increases and the increased cost of borrowing
includes the use of the recurring element of the Service Concession flexibility,
approved at Council on 15 February 2023, which resulted in an average contribution
of £3.437m from 2022/23 and the utilisation of the balance of savings from the
temporary reduction in the employers’ superannuation contributions during 2024/25
and 2025/26 totalling £8.498m.
2.26 In addition to the application of these non-recurring funds, it is necessary to include an
indicative recurring pressure within the General Services Revenue Estimates 2025/26
to 2027/28. This includes an incremental contribution of £0.025m per annum from
2026/27. The impacts of inflationary pressures and interest rate fluctuations will
continue to be monitored on an ongoing basis and the resultant increases in revenue
contributions will be reviewed as part of the next major review of the capital
programme, due to be undertaken during 2026/27.
Treasury Management and Investment Strategy (TMIS)
2.27 Compliance with Regulation and the Prudential Code requires assurance to be
provided on affordability and sustainability of the Capital Investment Programme. This
is provided in the Treasury Management and Investment Strategy (TMIS) which
follows this report on the Council agenda. The TMIS recognises that this will require to
be kept under review to ensure the underlying assumptions continue to apply. 
Capital Investment Strategy
2.28 In addition to the TMIS there is also a requirement for the Council to publish a Capital
Investment Strategy (CIS) which provides the overarching framework under which the
draft Capital Investment Programme has been developed. The current CIS was
approved by Council on 28 February 2024. During 2024/25 this has been refreshed
with the revised CIS included at Appendix 4.
72

Page 73

Conclusion
2.29 The draft Capital Investment Programme 2025/26 to 2033/34, including proposed
funding, is attached at Appendix 3. This confirms total investment of £331.483m over
the period. The proposed investment aligns with the Council's key priorities, as set out
in the Council Plan 2023-2028, core asset management plans and the refreshed
Capital Investment Strategy, included at Appendix 4. 
2.30 The programme is affordable based on the estimated funding streams set out in the
2025/26 to 2027/28 Medium Term Financial Plan and from the mitigating actions
noted earlier in this report to supplement the Loans Fund. These proposals have been
developed within a very challenging financial landscape impacted by a combination of
significant cost volatility across the Programme and an increased cost of borrowing.
The affordability of the Programme is also highlighted within the Treasury
Management and Investment Strategy, reported elsewhere on the agenda, and this
will be monitored on an ongoing basis. A further, full assessment of the Programme’s
affordability will be undertaken as part of the next major review of the capital
programme due for completion during 2026/27. 
3. Proposals 
3.1 It is proposed that Council :
(a)  approves the refreshed Capital Investment Programme to 2033/34 included in
appendix 3;
(b)  notes that the programme will be reviewed on an on-going basis with the next
major review in 2026/27; and 
(c)  approves the refreshed Capital Investment Strategy included in appendix 4.
4. Implications/Socio-economic Duty 
Financial 
4.1 The refreshed capital programme is based on a number of assumptions around the
availability of finance including capital grant and capital receipts. Given the forward
projection for 10 years, it is essential that these and the cost of projects are kept
under review.
There are a number of assumptions underpinning the current revenue projection
including; the level of loans fund support, the level of future interest rates, delivery of
the programme within the timelines outlined in the programme and application of the
Capital Fund and the Prudential Investment Fund to smooth the revenue implications
across the life of the plan.
Due to the long-term nature of the borrowing required to support this programme, a
review of available financing budgets has been undertaken with a view to increasing
the available funding and maintaining the future affordability of the Programme. 
73

Page 74

Human Resources 
4.2 Through investment in the Capital Investment Programme, it is anticipated there will
be additional staffing requirements. This will be considered on a project basis. 
Legal 
4.3 None. 
Equality/Socio-economic 
4.4 Where the Council is making decisions in relation to its spending priorities, it is obliged
to comply with the public sector equality duty set out in the Equalities Act 2010. To
meet this requirement, the Council assesses the impact of applying a decision against
key groups to ensure that certain groups are not disadvantaged by those decisions. A
number of the projects within the revised capital programme, will make a positive
contribution to the Council’s commitment to equalities. 
Environmental and Sustainability 
4.5 All projects within the revised plan will be delivered to minimise the impact on the
environment and maximise sustainability. Further, specific projects within the plan will
have a positive environmental impact. 
Key Priorities 
4.6 The refreshed Capital Investment Programme 2025/26 to 2033/34 supports the
delivery of the outcomes as outlined in the Council Plan 2023-2028 by focusing our
investment on priorities, managing risk and supporting the delivery of key priorities. 
Community Wealth Building 
4.7 The Council will aim to maximise opportunities within the context of the 5 pillars of
Community Wealth Building from its investment programme. In particular, Ayrshire
Growth Deal and growth and investment projects will make a positive contribution to
economic regeneration across the region. 
5. Consultation 
5.1 Executive Directors have been consulted as part of the refresh the current capital
investment programme and the identification of the proposed revisions and additions
to the programme detailed in this report.
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
74

Page 75

Capital Investment Programme 2024/25 to 2030/31 – North Ayrshire Council 28 February
2024
75

Page 76

Appendix 1
Project Description
Revised
25/26
Revised
26/27
Revised
27/28
Revised
28/29
Revised
29/30
Revised
30/31
Revised
31/32
Revised
32/33
Revised
33/34 Total
£ £ £ £ £ £ £ £ £ £
EXPENDITURE
Place
Roads Improvement / Reconstruction 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 34,200,000
Lighting 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 9,000,000
Millport Pier 154,960 134,960        289,920
Bridges infrastructure programme 560,000 560,000 560,000 560,000 560,000 560,000 560,000 560,000 560,000 5,040,000
Largs Promenade Seawall 50,000         50,000
B714 Improvements 14,776,694 12,211,695        26,988,389
Property lifecycle investment 1,400,000 1,600,000 1,100,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 10,100,000
Locality Based Property Review 1,000,000 1,500,000        2,500,000
Cemetery extns, walls & infra 204,797 145,602 11,521       361,920
Cmty, Ardrossan - Extension 450,000         450,000
Cmty, Kilbirnie - Walls 36,072         36,072
Cmty, Beith - Walls 51,417         51,417
Cmty, Abbey Tower - Walls 44,469         44,469
Cmty, Stev Hawkhill - Walls 51,196         51,196
Cmty, West Kilbride - Walls 47,282         47,282
Cmty, Kilbirnie - New 288,917         288,917
Goldcraigs Refurbishment 132,562         132,562
Renewal of Play Parks 578,000         578,000
Vehicles 2,000,000 2,980,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 18,980,000
Fleet Decarbonisation 1,660,000 1,950,000        3,610,000
Shewalton landfill   48,949       48,949
Solar PV Investment -  Nethermains 260,721         260,721
Solar PV Investment -  Shewalton 1,825,377         1,825,377
Montgomerie Park Masterplan 162,500 75,000 650,000 350,000 490,000 500,000    2,227,500
Active Travel Tier 1 587,000 587,000 587,000 587,000 587,000 587,000 587,000 587,000 587,000 5,283,000
Access Paths Network Programme 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 450,000    
Growth & Investment   
AGD - i3 DPMC Phase 1 300,000         300,000
AGD - i3 DPMC Phase 2 250,000 1,456,861 2,908,275       4,615,136
AGD - i3 Flexible Business Space Phase 2 4,900,000 4,900,000 148,000 352,000      10,300,000
AGD - Hunterston - Centre for Low Carbon Energy & Circular Economy 335,000 4,196,000 4,196,000 4,196,000 4,195,880     17,118,880
AGD - Great Harbour 2,306,564 2,851,490 4,773,566 1,890,928 56,565     11,879,113
AGD - IMSE 250,000 273,740 3,200,000 3,250,000 2,897,747     9,871,487
AGD Marine Tourism - Ardrossan  2,000,000 2,500,000 224,285     4,724,285
AGD Marine Tourism - Arran 40,000 150,000 1,600,000 66,774      1,856,774
AGD Marine Tourism - Cumbrae 925,000 2,200,000 996,254       4,121,254
Ardrossan Harbour & Landside 1,776,330 896,851        2,673,181
Irvine Enterprise Area 51,540         51,540
Ardrossan North Shore 1,730,304         1,730,304
Sub Total 44,036,702 43,519,199 29,629,565 21,602,702 16,861,477 9,497,000 8,997,000 8,997,000 8,997,000 192,137,645
North Ayrshire Council
Approved Capital Programme 2025/26 - 2033/34
76

Page 77

Appendix 1
Project Description
Revised
25/26
Revised
26/27
Revised
27/28
Revised
28/29
Revised
29/30
Revised
30/31
Revised
31/32
Revised
32/33
Revised
33/34 Total
£ £ £ £ £ £ £ £ £ £
North Ayrshire Council
Approved Capital Programme 2025/26 - 2033/34
Education
Universal Free School Meals Expansion 1,211,809 1,546,260 3,081,142 332,174 2,929,741     9,101,126
Schools ICT Investment 1,203,908 1,203,908 752,000 752,000 752,000 752,000 752,000 752,000 752,000 7,671,816
Ardrossan New Build 20,371,455 30,679,212 22,010,374       73,061,041
Sub Total 22,787,172 33,429,380 25,843,516 1,084,174 3,681,741 752,000 752,000 752,000 752,000 89,833,983
Corporate Services
ICT Investment Fund 429,500 557,100 648,900 282,600 282,600 297,600    2,498,300
WAN  500,000       500,000
LAN/WiFi  1,500,000       1,500,000
Telephony 115,000  650,000       765,000
Sub Total 544,500 557,100 3,298,900 282,600 282,600 297,600    5,263,300
Health & Social Care Partnership
Community Alarms - Analogue to Digital 68,977         68,977
Improvement grants 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 4,500,000
Sub Total 568,977 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 4,568,977
Other
Flexibility / Infrastructure Fund 3,323,000 3,521,036 3,155,964      10,000,000
Sub Total 3,323,000 3,521,036 3,155,964      10,000,000
TOTAL EXPENDITURE 67,937,351 81,328,679 62,793,017 26,625,440 21,325,818 11,046,600 10,249,000 10,249,000 10,249,000 301,803,905 
Revised
25/26
Revised
26/27
Revised
27/28
Revised
28/29
Revised
29/30
Revised
30/31
Revised
31/32
Revised
32/33
Revised
33/34 Total
£ £ £ £ £ £ £ £ £ £
INCOME
Prudential Borrowing 29,585,875 55,833,220 35,283,524 8,752,784 5,668,120 1,266,600 594,000 594,000 594,000 138,172,123
Specific Grants - AGD 6,655,585 15,130,279 17,854,493 8,217,656 6,002,698     53,860,711
Specific Grants - Active Travel Tier 1 587,000 587,000 587,000 587,000 587,000 587,000 587,000 587,000 587,000 5,283,000
Specific Grants - B714 Improvements 16,351,443         16,351,443
Specific Grants - Renewal of Play Parks 578,000         578,000
General Capital Grant - Flooding 440,000         440,000
General Capital Grant 9,068,000 9,068,000 9,068,000 9,068,000 9,068,000 9,068,000 9,068,000 9,068,000 9,068,000 81,612,000
Recovery & Renewal 703,707 710,180        1,413,887
Grants & Contributions 49,560         49,560
Sale of land & buildings 3,918,181     125,000    4,043,181
TOTAL INCOME 67,937,351 81,328,679 62,793,017 26,625,440 21,325,818 11,046,600 10,249,000 10,249,000 10,249,000 301,803,905
77

Page 78

Appendix 2
Project Description
Changes
25/26
Changes
26/27
Changes
27/28
Changes
28/29
Changes
29/30
Changes
30/31
Changes
31/32
Changes
32/33
Changes
33/34 Total
£ £ £ £ £ £ £ £ £ £
EXPENDITURE
Place
Roads Improvement / Reconstruction 100,000 100,000
Traffic Calming 82,953 82,953
Dockhead Street Saltcoats 100,000 100,000
Millport Pier 850,000 850,000
Millburn FPS 2,636,098 2,636,098
Coastal Adaptations 88,000 88,000
Largs Promenade Seawall (50,000) (50,000)
Locality Based Property Review 1,036,481 (1,500,000) (463,519)
Woodlands Primary Playingfield Drainage 22,274 22,274
Cemetery extns, walls & infra 15,113 15,113
Cmty, Ardrossan - Extension (450,000) (450,000)
Cmty, Kilbirnie - Walls (27,072) (27,072)
Cmty, Beith - Walls (51,417) (51,417)
Cmty, Abbey Tower - Walls (44,469) (44,469)
Cmty, Stev Hawkhill - Walls (51,196) (51,196)
Cmty, West Kilbride - Walls (47,282) (47,282)
Cmty, Kilbirnie - New 450,000 450,000
Goldcraigs Refurbishment 695,018 695,018
Renewal of Play Parks (578,000) (578,000)
Fleet Decarbonisation 1,500,000 1,500,000
Place Based Investment Programme 100,000 100,000
UK Shared Prosperity Fund (SPF) 576,535 576,535
PBIP – Kilwinning Abbey Improvements 200,000 200,000
Lochshore Hub Play Area 8,970 9,420 10,640 11,180 11,740 51,950
Lochshore, Garnock Hub 40,991 40,991
VDLF 2025/26 Allocation 1,561,000 1,561,000
VDLF - Irvine Kyle Road Phase 2 1,803,061 1,803,061
VDLF - Tree Planting 47,600 47,600
Active Travel Tier 1 (5,000) (5,000) (5,000) (5,000) (5,000) (5,000) (5,000) (5,000) (5,000) (45,000)
North Ayrshire Council
Revisions to Capital Programme 2025/26 - 2033/34
78

Page 79

Appendix 2
Project Description
Changes
25/26
Changes
26/27
Changes
27/28
Changes
28/29
Changes
29/30
Changes
30/31
Changes
31/32
Changes
32/33
Changes
33/34 Total
£ £ £ £ £ £ £ £ £ £
North Ayrshire Council
Revisions to Capital Programme 2025/26 - 2033/34
Growth & Investment 
AGD - i3 DPMC Phase 2 (200,000) (1,206,861) (1,452,275) 2,924,615 65,479
AGD - i3 Flexible Business Space Phase 2 362,045 (1,539,503) 1,570,760 (352,000) 41,302
AGD - Hunterston - Centre for Low Carbon Energy & Circular Economy 15,000 (3,746,000) 4,341,098 610,098
AGD - Great Harbour 1,820,145 (402,739) (1,222,466) (346,725) (4,683) (156,468)
AGD - IMSE 200,000 200,000 400,000
AGD Marine Tourism - Ardrossan (2,000,000) (224,285) (2,224,285)
AGD Marine Tourism - Arran 6,362 205,390 (223,207) (34,220) 33,692 (11,983)
AGD Marine Tourism - Cumbrae (733,792) 754,043 234,638 33,694 34,875 323,458
Ardrossan Harbour & Landside 1,698,729 (896,851) 801,878
Irvine Enterprise Area 51,539 51,539
Ardrossan North Shore (1,309,240) 1,730,304 421,064
Sub Total 10,893,336 (6,270,687) (1,586,910) 2,231,544 4,187,437 (5,000) (5,000) (5,000) (5,000) 9,434,720
Education
Fairlie Primary 94,444 115,000 10,000 219,444
Universal Free School Meals Expansion (13,621) (2,600,000) (2,613,621)
Schools ICT Investment (200,000) (200,000)
Ardrossan New Build 9,791,879 (2,044,980) 1,020,852 2,715  8,770,466
Sub Total 9,672,702 (1,929,980) 1,030,852 2,715 (2,600,000)    6,176,289
Communities and Housing
Castles & Historic Monuments 38,303 38,303
Abbey Tower 66,613 66,613
Sub Total 104,916         104,916
Corporate Services
ICT Investment Fund 50,000     50,000
Telephony 97,000     97,000
Sub Total 147,000         147,000
Health & Social Care Partnership
Community Alarms - Analogue to Digital (68,977)      (68,977)
Care First Replacement 253,065       253,065
Sub Total 184,088         184,088
Other
Flexibility / Infrastructure Fund 6,867,531 (323,000) 2,845,938 1,098,087 3,000,000 48,000 48,000 48,000 13,632,556
Sub Total 6,867,531 (323,000) 2,845,938 1,098,087 3,000,000  48,000 48,000 48,000 13,632,556
TOTAL EXPENDITURE 27,869,573 (8,523,667) 2,289,880 3,332,346 4,587,437 (5,000) 43,000 43,000 43,000 29,679,569
79

Page 80

Appendix 2
Project Description
Changes
25/26
Changes
26/27
Changes
27/28
Changes
28/29
Changes
29/30
Changes
30/31
Changes
31/32
Changes
32/33
Changes
33/34 Total
£ £ £ £ £ £ £ £ £ £
North Ayrshire Council
Revisions to Capital Programme 2025/26 - 2033/34
Changes
25/26
Changes
26/27
Changes
27/28
Changes
28/29
Changes
29/30
Changes
30/31
Changes
31/32
Changes
32/33
Changes
33/34 Total
£ £ £ £ £ £ £ £ £ £
INCOME
Prudential Borrowing 24,877,323 (4,874,318) 3,636,348 (1,781,784) (470,770) (517,000) (594,000) (594,000) (594,000) 19,087,799
Specific Grants - AGD 1,590,800 (7,497,349) (2,983,468) 4,477,130 4,421,207 8,320
Specific Grants - Active Travel Tier 1 (5,000) (5,000) (5,000) (5,000) (5,000) (5,000) (5,000) (5,000) (5,000) (45,000)
Specific Grants - Vacant & Derelict Funding 3,397,568 3,397,568
Specific Grants - Place Based Investment Programme 316,043 316,043
Specific Grants - UK Shared Prosperity Fund 576,535 576,535
Specific Grants - B714 Improvements 1,201,946 4,000,000 5,201,946
Specific Grants - Renewal of Play Parks (578,000) (578,000)
General Capital Grant - Flooding (2,646,000) (1,914,000) (4,560,000)
General Capital Grant 1,505,000 642,000 642,000 642,000 642,000 642,000 642,000 642,000 642,000 6,641,000
Grants & Contributions 51,539  51,539
Sale of land & buildings (2,418,181) 1,125,000 1,000,000 (125,000) (418,181)
TOTAL INCOME 27,869,573 (8,523,667) 2,289,880 3,332,346 4,587,437 (5,000) 43,000 43,000 43,000 29,679,569
80

Page 81

Appendix 3
Project Description
Revised
25/26
Revised
26/27
Revised
27/28
Revised
28/29
Revised
29/30
Revised
30/31
Revised
31/32
Revised
32/33
Revised
33/34 Total
£ £ £ £ £ £ £ £ £ £
EXPENDITURE
Place
Roads Improvement / Reconstruction 3,900,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 34,300,000
Traffic Calming 82,953         82,953
Dockhead Street Saltcoats 100,000         100,000
Lighting 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 9,000,000
Millport Pier 154,960 984,960        1,139,920
Millburn FPS 2,636,098         2,636,098
Coastal Adaptations 88,000         88,000
Bridges infrastructure programme 560,000 560,000 560,000 560,000 560,000 560,000 560,000 560,000 560,000 5,040,000
B714 Improvements 15,499,584 11,488,805        26,988,389
Property lifecycle investment 1,400,000 1,600,000 1,100,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 10,100,000
Locality Based Property Review 2,036,481         2,036,481
Woodlands Primary Playingfield Drainage 22,274         22,274
Cemetery extns, walls & infra 219,910 145,602 11,521       377,033
Cmty, Kilbirnie - Walls 9,000         9,000
Cmty, Kilbirnie - New 738,917         738,917
Goldcraigs Refurbishment 827,580         827,580
Vehicles 2,000,000 2,980,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 18,980,000
Fleet Decarbonisation 1,660,000 1,950,000 1,500,000       5,110,000
Shewalton landfill   48,949       48,949
Solar PV Investment -  Nethermains 260,721         260,721
Solar PV Investment -  Shewalton 1,825,377         1,825,377
Place Based Investment Programme 100,000         100,000
UK Shared Prosperity Fund (SPF) 576,535         576,535
PBIP – Kilwinning Abbey Improvements 200,000         200,000
Lochshore Hub Play Area 8,970 9,420 10,640 11,180 11,740     51,950
Montgomerie Park Masterplan 162,500 75,000 650,000 350,000 490,000 500,000    2,227,500
Lochshore, Garnock Hub 40,991         40,991
VDLF 2025/26 Allocation 1,561,000         1,561,000
VDLF - Irvine Kyle Road Phase 2 1,803,061         1,803,061
VDLF - Tree Planting 47,600         47,600
Active Travel Tier 1 582,000 582,000 582,000 582,000 582,000 582,000 582,000 582,000 582,000 5,238,000
Access Paths Network Programme 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 450,000
North Ayrshire Council
Revised Capital Programme 2025/26 - 2033/34
81

Page 82

Appendix 3
Project Description
Revised
25/26
Revised
26/27
Revised
27/28
Revised
28/29
Revised
29/30
Revised
30/31
Revised
31/32
Revised
32/33
Revised
33/34 Total
£ £ £ £ £ £ £ £ £ £
North Ayrshire Council
Revised Capital Programme 2025/26 - 2033/34
Growth & Investment   
Ayrshire Growth Deal:         
AGD - i3 DPMC Phase 1 300,000         300,000
AGD - i3 DPMC Phase 2 50,000 250,000 1,456,000 2,924,615      4,680,615
AGD - i3 Flexible Business Space Phase 2 5,262,045 3,360,497 1,718,760       10,341,302
AGD - Hunterston - Centre for Low Carbon Energy & Circular Economy 350,000 450,000 4,196,000 4,196,000 8,536,978     17,728,978
AGD - Great Harbour 4,126,709 2,448,751 3,551,100 1,544,203 51,882     11,722,645
AGD - IMSE 450,000 473,740 3,200,000 3,250,000 2,897,747     10,271,487
AGD Marine Tourism - Ardrossan   2,500,000      2,500,000
AGD Marine Tourism - Arran 46,362 355,390 1,376,793 32,554 33,692     1,844,791
AGD Marine Tourism - Cumbrae 191,208 2,954,043 1,230,892 33,694 34,875     4,444,712
Ardrossan Harbour & Landside 3,475,059         3,475,059
Irvine Enterprise Area 103,079         103,079
Ardrossan North Shore 421,064 1,730,304        2,151,368
Sub Total 54,930,038 37,248,512 28,042,655 23,834,246 21,048,914 9,492,000 8,992,000 8,992,000 8,992,000 201,572,365
Education
Fairlie Primary 94,444 115,000 10,000       219,444
Universal Free School Meals Expansion 1,198,188 1,546,260 3,081,142 332,174 329,741     6,487,505
Schools ICT Investment 1,003,908 1,203,908 752,000 752,000 752,000 752,000 752,000 752,000 752,000 7,471,816
Ardrossan New Build 30,163,334 28,634,232 23,031,226 2,715      81,831,507
Sub Total 32,459,874 31,499,400 26,874,368 1,086,889 1,081,741 752,000 752,000 752,000 752,000 96,010,272
Communities and Housing
Castles & Historic Monuments 38,303         38,303
Abbey Tower 66,613         66,613
Sub Total 104,916         104,916
Corporate Services
ICT Investment Fund 479,500 557,100 648,900 282,600 282,600 297,600    2,548,300
WAN  500,000       500,000
LAN/WiFi  1,500,000       1,500,000
Telephony 212,000  650,000       862,000
Sub Total 691,500 557,100 3,298,900 282,600 282,600 297,600    5,410,300
Health & Social Care Partnership
Care First Replacement 253,065         253,065
Improvement grants 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 4,500,000
Sub Total 753,065 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 4,753,065
Other
Flexibility / Infrastructure Fund 6,867,531 3,000,000 6,366,974 4,254,051 3,000,000  48,000 48,000 48,000 23,632,556
Sub Total 6,867,531 3,000,000 6,366,974 4,254,051 3,000,000  48,000 48,000 48,000 23,632,556
TOTAL EXPENDITURE 95,806,924 72,805,012 65,082,897 29,957,786 25,913,255 11,041,600 10,292,000 10,292,000 10,292,000 331,483,474
82

Page 83

Appendix 3
Project Description
Revised
25/26
Revised
26/27
Revised
27/28
Revised
28/29
Revised
29/30
Revised
30/31
Revised
31/32
Revised
32/33
Revised
33/34 Total
£ £ £ £ £ £ £ £ £ £
North Ayrshire Council
Revised Capital Programme 2025/26 - 2033/34
Revised
25/26
Revised
26/27
Revised
27/28
Revised
28/29
Revised
29/30
Revised
30/31
Revised
31/32
Revised
32/33
Revised
33/34 Total
£ £ £ £ £ £ £ £ £ £
INCOME
Prudential Borrowing 54,463,198 50,958,902 38,919,872 6,971,000 5,197,350 749,600    157,259,922
Specific Grants - AGD 8,246,385 7,632,930 14,871,025 12,694,786 10,423,905     53,869,031
Specific Grants - Active Travel Tier 1 582,000 582,000 582,000 582,000 582,000 582,000 582,000 582,000 582,000 5,238,000
Specific Grants - Vacant & Derelict Funding 3,397,568         3,397,568
Specific Grants - Place Based Investment Programme 316,043         316,043
Specific Grants - UK Shared Prosperity Fund 576,535         576,535
Specific Grants - B714 Improvements 17,553,389 4,000,000        21,553,389
General Capital Grant - Flooding (2,206,000) (1,914,000)       (4,120,000)
General Capital Grant 10,573,000 9,710,000 9,710,000 9,710,000 9,710,000 9,710,000 9,710,000 9,710,000 9,710,000 88,253,000
Recovery & Renewal 703,707 710,180        1,413,887
Grants & Contributions 101,099         101,099
Sale of land & buildings 1,500,000 1,125,000 1,000,000       3,625,000
TOTAL INCOME 95,806,924 72,805,012 65,082,897 29,957,786 25,913,255 11,041,600 10,292,000 10,292,000 10,292,000 331,483,474
83

Page 84

Appendix 4 
Capital Investment Strategy 2025 to 2034  
84

Page 85

Introduction
The Capital Investment Strategy for North Ayrshire Council provides an overview of
how capital expenditure plans, capital financing and treasury management activity
contribute to the infrastructure and provision of services for the benefit of North
Ayrshire communities and citizens. This refreshed strategy takes a long-term view
and covers the period from 2025 to 2034. This is aligned to the Capital Investment
Programme. 
The Capital Investment Strategy is a reporting requirement of the Chartered Institute
of Public Finance and Accountancy (CIPFA) Prudential Code. Local authorities
produce many plans and strategies in the course of their operations. However, it is
recognised that within the context of capital planning, there is a need to produce an
overarching view that addresses the following key considerations:
• Ensuring that capital plans are aligned to the strategic priorities as set out in
the Council Plan.
• Ensuring that capital plans are affordable, prudent and sustainable.
• Demonstrating the linkage to local strategic planning and local asset
management planning.
• Ensuring that financing decisions are taken in accordance with good
professional practice and a full understanding of the risks involved.
• Demonstrating the council has robust governance arrangements to support its
capital planning activities.
85

Page 86

Background
North Ayrshire Council has ambitious plans to deliver significant capital investment
over the planning period across housing, schools, economic development and
infrastructure. Working in partnership with East Ayrshire, South Ayrshire, the UK and
Scottish Government, the Ayrshire Growth deal will see the regeneration of the
region through investment in strategic infrastructure across various sectors, including
life sciences, tourism, manufacturing and aerospace. 
Throughout 2024/25 the wider construction industry has reported significant, ongoing
inflationary pressures linked to a number of factors, including upward pressure on
input costs linked to international externalities such as ongoing global conflicts and
its impact on global supply chains; material and labour shortages; and increased
demand linked to reduced contractor availability. This has resulted in the
identification of increased cost risks in relation to a number of our investment
priorities.
The Capital Investment Strategy takes account of the Council’s strategic priorities
and considers any new investment within the context of outcomes, affordability or
invest to save. Decisions made over the course of the programme for capital and
treasury management will have financial consequences for the Council for many
years in the future. There is also recognition of the need to balance investment
between maintaining current assets and infrastructure against the ambitions for
acquiring new assets.  North Ayrshire Council’s Capital Investment Programme is
shaped and influenced by various associated strategies and plans. 
86

Page 87

The primary purpose of the Capital Investment Strategy is to provide an overarching
view of how various plans and strategies inform capital investment and to
demonstrate that this is both affordable and sustainable. The associated plans and
strategies each focus on specific priority areas and, through appropriate governance
structures, ultimately shape and influence the investment plans delivered through the
Capital Investment Programme. Underpinning the Capital Investment Programme is
the Treasury Management and Investment Strategy and Loans Fund Policy. Both
ultimately consider the delivery of the capital programme within the context of
affordability and risk and apply a measurement of what this means against key
prudential and treasury indicators. The aim being to demonstrate affordability and
sustainability over the long term.  
87

Page 88

Plans and strategies
Council Plan 2023 to 2028
The mission for North Ayrshire Council is “Working together to improve the lives
of our people in North Ayrshire.”  To deliver on this mission four key strategic
priorities, outlined below, have been developed to direct plans now and into the
future. 
Through appropriate governance frameworks all capital investment must
demonstrate that it is aligned to the Council’s strategic themes, with particular focus
and priority given to capital investment opportunities that meet multiple strategic
priorities.
Community Planning Partnerships and Local Outcomes
Improvement Plan
The North Ayrshire Community Planning Partnership is a partnership across a wide
range of organisations. The Local Outcomes Improvement Plan 2022 – 2030
provides a commitment by all partners to North Ayrshire communities and citizens
across three main priority areas:
88

Page 89

The Community Planning Partnership consists of 6 Locality Partnerships across
North Ayrshire. Key to the success of the Local Outcomes Improvement Plan is
working in partnership with a number of agencies to deliver better outcomes for
citizens and communities. The partnership includes Scottish Government, Police
Scotland, NHS Ayrshire and Arran, Skills Development Scotland, KA Leisure,
Scottish Fire and Rescue and Scottish Enterprise. Through the Local Development
Plan, one of the strategic policies is to deliver on local community priorities. Each
Locality Partnership has agreed their own local priorities. The following illustrates the
links between the locality priorities and those in the Local Outcomes Improvement
Plan:
• Wellbeing:
o Improving our mental health and wellbeing
o Improving access to financial services
o Increasing social inclusion
o Addressing social isolation
o Improving community wellbeing
o Improving access to facilities and amenities/regenerating community
facilities
o Affordable Housing
• Work:
o Alleviating poverty and promoting equality of access to opportunities
o Supporting skills and work opportunities
o Promoting the local economy and tourism
o Work and local community
• World:
o Improving our local environment
o Championing green health and the natural environment
o Moving around
o Transport
o Increasing civic pride and community engagement
89

Page 90

This framework of community engagement and structured partnership working is
vital when planning capital investment. More importantly, that local priorities are
considered as part of any strategic planning framework.
Health and Social Care Partnership Strategic Commissioning Plan
2022 to 2030
The North Ayrshire Health and Social Care Strategic Plan 2022 to 2030 was
developed through engagement and collaboration with local people, service users,
members of staff and other key stakeholders. It sets out our long-term ambitions for
improving the health and wellbeing of everyone who lives in North Ayrshire.
The 2022 to 2030 plan continues the existing vision that “all people who live in
North Ayrshire are able to have a safe, healthy and active life” and to achieve
this the HSCP focuses on key priorities: 
Asset Management Plans
Asset Management Plans aim to ensure that the Council holds the right assets and
that they are fit for purpose in terms of condition, suitability and accessibility. The
plans also provide the vehicle for identifying future investment needs across all asset
classes. In line with the Chartered Institute of Public Finance and Accountancy
(CIPFA) “Guide to Asset Management and Capital Planning in Local Authorities”
North Ayrshire has classified its assets into six categories:
• Open Space
• Property
• Fleet, Plant and Equipment
• Roads, Structures and Lighting
• ICT
• Housing
The Council’s assets play a key role in the delivery of a wide range of essential
services to our local communities, contribute to regeneration and help drive
economic growth. The plans set out clear actions and include details of lifecycle
investment costs required to maintain assets and infrastructure to an appropriate
standard that supports service delivery. The plans are updated on an annual basis
and chief officers across all Directorates hold the responsibility for maintaining the
plans and reporting progress to the Council’s Cabinet on a bi-annual basis. 
90

Page 91

A snapshot of the asset portfolio for North Ayrshire Council includes:
• Fleet and Plant: Around 620 vehicles and items of plant.
• Roads: Over 1,000 Kilometres of roads
• Structures: Around 400 bridges and structures
• Council Houses: Around 13,000 council houses
• Education: 63 schools and early years facilities
• Social Care: 21 social care facilities
• Street Lighting: over 23,000 street lighting columns
• Operational Buildings: over 70 offices, libraries and community centres
Both capital and revenue financial resources across the General Fund and Housing
Revenue Account are used to maintain the current asset base. From a capital
perspective, planned investment which has been incorporated in the current Capital
Investment Programme includes:
• Roads, structure and lighting
Planned investment of £85.1 million until 2033 to 2034 including
improvements to the roads and street lighting network, upgrading of the B714,
flood prevention works, bridges infrastructure improvement and Active Travel
projects. 
• Fleet, plant and equipment
Procurement and maintenance of all council fleet vehicles and plant ensuring
the fleet of 620 vehicles and heavy plant are maintained and operated in
accordance with the council’s Operator’s licence and Road Transport
legislation. Prioritisation of emissions reductions through decarbonisation of
vehicle fleet. Vehicle and plant capital investment is planned at £24.1 million
until 2033 to 2034. 
• Property:
To ensure council properties meet all legislative requirement and they are
sustainable, energy efficient and maintained to a high standard as well as
ensuring the physical environment is able to support mobile and flexible work
programmes. Investment is planned at £15.1 million until 2033 to 2034. It is
also recognised that through the Estates Strategy further rationalisation and
remodelling will continue to be progressed on a locality by locality basis, with
capital receipts incorporated into the capital programme. 
• Housing:
Underpinned by the Local Housing Strategy, the Strategic Housing Investment
Plan and the 30 Year Housing Revenue Account Business Plan, responsibility
for maintenance of around 13000 council houses, ensuring legislative
compliance and meeting the needs of tenants.In addition, delivery of an
ambitious house building and improvement programme over the period 2025
to 2026 until 2029 to 2030 will see capital investment by the council total
£257.8 million. 
91

Page 92

• ICT:
The Technology Strategy sets out how ICT supports service delivery and
transformation. Significant changes to our ICT infrastructure have been
reflected in the ICT Asset Management Plan. To deliver on the six key
principles as outlined in the Technology Strategy £5.4 million investment until
2033 to 2034 is planned. 
• Open Spaces:
The service maintains 2,410 hectares of public open space, a Country Park,
14 local parks, 44 cemeteries and burial grounds, 37 war memorials and
monuments, 275 hectares of woodlands, four allotments, 94 sports facilities
and playing fields, 116 Equipped Play Areas and Multi Use Games Areas
(MUGAs), residential greenspace, 38 water courses and open water features,
five promenades and 16 beaches, three of which are Sites of Special
Scientific Interest. The majority of investment is delivered through the Place
service revenue budget, however specific capital investment of £1.1 million is
planned until 2033 to 2034 for cemetery infrastructure.
Local Housing Strategy 2023 to 2028 and Strategic Housing
Investment Plan 2025 to 2030
The Local Housing Strategy sets out the council’s ambition: ‘We want all our people
to live in the right homes, in great places, with access to any support services
they need’.
The strategy mirrors the format of Scotland’s first 20 year housing strategy, Housing
to 2040 and sets out four overarching outcomes which align to the four key
strategies in Housing to 2040:
Housing to 2040 Strategy Local Housing Strategy Outcome
More homes at the heart of great places Our places support thriving and
inclusive communities
Affordability and choice Our people have affordable homes in
the place they choose to live
Affordable warmth and zero emission
homes
Our homes are energy efficient and
release less emissions
Improving the quality of all homes Our homes are in good condition and
people can access any support services
they need 
92

Page 93

The Strategic Housing Investment Plan is an extension of, and aligns to, the Local
Housing Strategy, supporting the objectives of the Council Plan. 
The Strategic Housing Investment Plan also aligns with the Council’s Community
Wealth Building Strategy and supports the North Ayrshire Local Employability
Partnership Delivery Plan 2022 to 2026 and the North Ayrshire Child Poverty Action
Plan 2023 to 2026. The Council’s housebuilding programme will support the
Council’s ambitions to encourage more young people into training and employment.
Access to good quality and affordable housing is a key asset in addressing child
poverty, and poverty overall.
The Strategic Housing Investment Plan will secure investment in a total of 1,143
properties across North Ayrshire and provide sustainable, affordable, accessible
high-quality homes which will contribute to the wider regeneration aims for the area.
The Council projects in the Strategic Housing Investment Plan represent investment
of £173.6 million (including an estimated £80.6 million Scottish Government grant
funding). Developments continue to be progressed across all six localities: Arran,
Garnock Valley, Irvine, Kilwinning, North Coast and Three Towns.
Public sector investment can have a transformational impact for communities, and
the Council explores site and area specific opportunities with partners to secure
maximum regeneration benefits. This supports the ambitions of the Council’s
Regeneration Delivery Plan to drive forward place-based development on strategic
regeneration sites, including town centres. Several Strategic Housing Investment
Plan projects completed to date are within, or near, town centres. The plan supports
major housing led regeneration including the replacement of the 275 homes in the
Fullarton tower blocks in Irvine and the provision of funding to assist the delivery of
Housing’s Estate Based Regeneration Programme. The Strategic Housing
Investment Plan also includes the provision of funding for 242 units to assist the
delivery of Housing’s Estate Based Regeneration Programme where stock is
required to be demolished or reconfigured.
The Strategic Housing Investment Plan prioritises new social housing developments
which include the provision of outdoor green space, and which support the principles
of 20-minute neighbourhoods, where feasible. Developments are also planned
utilising ‘secure by design’ principles.
The Council and its partners recognise that bringing former social housing stock into
ownership can assist with housing management and maintenance issues and
increase housing available through the North Ayrshire Housing Register. All
developing registered social landlord partners buyback programmes have been
prioritised within the Strategic Housing Investment Plan. 
93

Page 94

New housing has a key role to play in carbon reduction, climate change mitigation,
and in the alleviation of fuel poverty. The Council and its partners will continue to
consider innovative and sustainable approaches to heat and power, such as low
carbon heat, solar photovoltaic panels and smart technologies.  The Council
recognises that a ‘fabric first’ approach to sustainability can provide benefits to
tenants, in terms of reducing heating costs. This investment aligns to the Council’s
Sustainable North Ayrshire Strategy 2024 to 2027 in supporting affordable warmth to
households across North Ayrshire. Developments will also be designed to promote
sustainable travel.
All amenity and sheltered housing in North Ayrshire should be built to an ambulant
housing standard as a minimum. To ensure need is met now and in the future, the
new Local Housing Strategy increased the target to ensure at least 10% of all tenure
new build stock is suitable for wheelchair users (increased from 7% in the previous
strategy). 
Officers within the Place Directorate and the Health and Social Care Partnership
developed a new supported accommodation housing model which has been
implemented at sites across North Ayrshire to maximise tenant independence
The Local Housing Strategy recognises that the proportion of older people in North
Ayrshire is higher than that of Scotland as a whole. The Strategic Housing
Investment Plan estimates the delivery of a further 236 amenity. Alongside the new
build programme, the Council will continue to deliver its sheltered housing re-
provisioning programme, which includes £38 million investment in the refurbishment
of sheltered housing units out with the Strategic Housing Investment Plan.
Regeneration Delivery Plan and Local Development Plan
The Regeneration Delivery Plan sets out our priorities for delivering on the
regeneration ambitions of the Council Plan and Community Wealth Building strategy,
working in partnership with communities. The Plan focuses on the delivery of
physical regeneration across North Ayrshire through an ambitious project-based
rolling action programme. The Regeneration Delivery Plan focuses activity around
the four key regeneration themes: 
94

Page 95

The Local Development Plan was adopted in November 2019 and aligns to the
themes set out in the Regeneration Delivery Plan, it brings a targeted local context in
guiding development and investment in North Ayrshire over the next 20 years. The
focus is supporting and growing the business base across key sectors including
manufacturing, engineering, life sciences, tourism and hospitality and regenerating
towns and communities. The overarching aim of the plan is to deliver the Community
Planning Partnership vision of a “Better Life” to the citizens and communities of
North Ayrshire. The plan outlines the land use strategy that supports delivery of the
Local Outcomes Improvement Plan 2022 to 2030 and focuses on four key strategic
policies: 
The Spatial Strategy is an overarching policy for supporting the Local Outcomes
Improvement Plan. This directs development to towns and villages to support
communities, the economy and environment, while recognising the value that the
countryside and coastal areas offer both as natural resources worthy of protection
and as an economic driver. An example of directing investment to towns is evidenced
by the Montgomerie Park development with Council investment in road and service
infrastructure to facilitate large scale housing development and regeneration and
using capital receipts from land sale as a key source of funding.
The Placemaking policy supports the Local Outcomes Improvement Plan by
ensuring that all development contributes to making quality places. This is measured
by six qualities that define a successful place:
95

Page 96

Through the Local Development Plan eight strategic development areas have been
identified: 
Working in partnership with the UK and Scottish Government and East Ayrshire and
South Ayrshire councils, the Ayrshire Growth Deal will regenerate the region through
investment in strategic infrastructure across various sectors, including life sciences,
tourism, manufacturing and aerospace, with total investment of over £251.5 million.
From a North Ayrshire perspective and to support investment into the strategic
development areas, including the Ayrshire Growth Deal and wider economic
regeneration activity, the Capital Investment Programme from 2024/25 to 2033/34
includes planned investment of £63.8 million. 
Finally, our Community Wealth Building Strategy helps to develop resilient, inclusive
local economies, with more local employment and a larger and more diverse
business base, ensuring that wealth is locally owned and benefits local people. All
capital and revenue investment will be considered within the context of the
Community Wealth Building Strategy, with maximising opportunities for local
suppliers through procurement a key priority and pillar of the strategy. 
Technology Strategy
The Technology Strategy was approved by North Ayrshire Council in August 2021
and sets out the vision, principles and key technologies that will support
transformational change across North Ayrshire Council. Solutions will be designed in
partnership to improve processes, service delivery and collaboration and ultimately
improve outcomes. The six key Technology Strategy principles are:
96

Page 97

Principle Detail
Deliberately designed Holistic view of the business and deliver
efficient, effective and agile solutions
People at the Core Solutions built around the needs of the
customers and people
Anytime, anywhere access Access to systems, applications and
information wherever they are
Cloud where appropriate Utilise cloud based technologies where
appropriate
Data driven Utilise data to effectively inform our
decision making
Secure by design Operate securely whilst still taking
advantage of technology innovations
Office 365 has been a transformative technology, enabling agile working and
simplifying collaboration. The ICT Asset Management Plan incorporates the
technology principles and, in terms of investment, a total of £5.4 million is planned
until 2033 to 2034 to deliver technology solutions aligned to this strategy. From a
financial planning perspective, it is also recognised the shift from capital financing to
revenue through software as a service, will lead to a remodelling of the way in which
ICT investment is funded.
Estates Strategy
The key objective of North Ayrshire Council’s Estate Strategy is to achieve
rationalisation and remodelling of the Council’s property portfolio on a locality basis. 
The strategy is currently being reviewed to align with the Council Plan priorities of:
Wellbeing; Climate Change; Communities and Local Democracy; and Sustainable
Council.  
It supports the delivery of Community Wealth Building and Community
Empowerment by maximising the opportunities that property assets can provide to
local businesses and communities. 
97

Page 98

The Estates Strategy plays a key role in maximising capital investment across
multiple strategic priority areas, for example, moving away from the traditional like for
like school replacements to incorporating wider community campus facilities,
including leisure and health and social care facilities. This approach is evidenced
through the proposals for the Ardrossan Campus facility which will deliver primary,
secondary, and early years provision as well as community use sport, theatre and
leisure facilities. 
Also key is the generation of Capital receipts and reduction in running costs through
rationalisation of the Council’s property portfolio. This supports the capital
programme and provides flexibility in the Council’s Revenue account.  
98

Page 99

General Fund Capital Investment Programme
North Ayrshire Council takes a long-term approach to capital investment, covering a
10 year period. The plan is updated annually and 2025 to 2026 represents year two
of the 10 year plan. A full refresh is undertaken every three years. The current
Capital Investment programme is aligned to the strategic priorities as set out in the
Council Plan and is the product of the various plans and strategies which impact on
the assets and infrastructure of North Ayrshire Council. Through the Community
Planning Partnerships and the Local Development Plan there is also clear linkage to
local strategic planning and local asset planning.
Total capital investment of £331.5 million from the Council’s General Fund is planned
over the period from 2025 to 2026 until 2033 to 2034, supporting the four key
strategic priorities from the Council Plan:
• Wellbeing, 
• Communities and Local Democracy, 
• Climate Change and 
• A Sustainable Council. 
This includes planned expenditure of £63.8 million towards the Ayrshire Growth Deal
to 2033 to 2034. It is recognised that the total level of investment across Ayrshire will
be in the region of £251.5 million (including £103 million commitments from both the
UK and Scottish Governments).
The capital plan includes £96.0 million planned investment in Education. The major
areas of education investment include:
• £6.5 million to Universal school meals expansion.
Improvements to current kitchen and dining facilities across the school estate
to create capacity for the anticipated uptake. 
• £81.8 million for the Ardrossan Campus.
New build project as part of an exciting wider community facility development. 
• £7.5 million to schools ICT investment.
Investment on ICT equipment within the school estate.
99

Page 100

Investment in education reflects the Council’s desire to ensure children and young
people have access to high quality facilities which support and promote excellent
learning and teaching. Well designed and well-equipped buildings also support the
promotion of positive health and well-being. 
It is also recognised that investment in education contributes to and can be
integrated within wider economic development and regeneration within the localities
and this is reflected in the nature of the planned development for Ardrossan Campus.
100

Page 101

Through stakeholder engagement, effective cross Directorate working within North
Ayrshire Council and collaboration with other agencies including the Scottish
Government, this new development combines education provision with community
facilities, residential, respite and housing provision as part of a wider focus on
economic regeneration.
Investing in core assets and infrastructure is key to ensuring sustainability. A planned
investment of £85.1 million within Roads, Bridges Infrastructure and Lighting
includes £34.5 million road improvements, £2.6 million on flood prevention works
and £27.0 million on the upgrading of the B714 following a successful application to
the UK Governments Levelling Up Fund. Property lifecycle investment of £10.1
million, to support the property asset management plan, will ensure Council
properties continue to be maintained to the appropriate standards in delivering
services to citizens and communities. The plan includes investment in several key
programmes of regeneration within North Ayrshire and, in respect of the Ayrshire
Growth Deal, on a wider pan Ayrshire basis.
The Capital Investment Programme 2025 to 2026 to 2033 to 2034 sets out the
ambition of North Ayrshire Council and supports the key strategic themes of the
Council Plan. Through investment that supports regeneration and delivers first class
education and community facilities, this strategic approach will help grow the
population and the local economy. It is also recognised that key to a sustainable
environment is the requirement to continue to invest in core assets and
infrastructure.
Funding the Capital Investment Programme
Funding the Capital Investment Programme requires to be planned in an affordable
and sustainable manner. The funding sources to support delivery of the £331.5
million capital investment programme to 2033/34 include: 
101

Page 102

The major sources of funding include assumptions on the level of general capital
grant from Scottish Government to 2033 to 2034 (£84.1 million), the level of specific
grants from the Scottish and UK Governments (£85.0m) and the level of prudential
borrowing required (£157.3 million). The cost of borrowing is included within the
Council’s revenue budget process through the Medium-Term Financial Plan and the
impact of borrowing is included as part of the Council’s Treasury Management and
Investment Strategy. 
The Council takes a prudent approach when phasing the capital investment over the
period, with the main objective to ensure general capital grant from Scottish
Government is maximised. 
Other income sources are also explored including external income, grants, partner
contributions and capital receipts. The balance of funding is met from affordable
prudential borrowing with annual loans fund repayments made to reduce the debt.
This approach helps to ensure that investment in assets to deliver on the Council’s
strategic priorities is sustainable in the long term.  
102

Page 103

Treasury Management Strategy and Loans Fund Policy
The Prudential Code for Capital Finance in Local Authorities enables councils to set
their own borrowing limits with a requirement to ensure that investment plans are
affordable, prudent and sustainable. The Council can borrow over a number of years
to supplement its capital income, provided the resultant annual debt repayments can
be accommodated within future years’ revenue budgets. The Council’s annual
Treasury Management and Investment Strategy sets out the prudential indicators
and parameters over the medium to long term, with regular reporting to Council
members through:
• Annual Treasury Management and Investment Strategy
• Mid-year Treasury Update report
• Annual Report following the financial year end describing the activity
compared to the strategy
The key prudential and treasury indicators include:
• Capital expenditure and financing
• The council’s overall borrowing need (the Capital Financing Requirement)
• Limits to borrowing activity through the Operational Boundary and the
Authorised Limit. 
As reflected in the Treasury Management Strategy for 2025 to 2026, the analysis of
the Capital Financing Requirement for North Ayrshire Council indicates that the
borrowing needs to support delivery of the capital programme will increase to
£803.959 million by 2028 to 2029 and then reduce annually to 2033 to 2034. The
analysis also indicates that this borrowing need continues to be within the
parameters of both the Operational Boundary (the expected maximum borrowing
position of the Council) and the Authorised Limit (the limit beyond which external
debt is prohibited).
103

Page 104

Another key affordability indicator is the ratio of financing costs to net revenue
stream. This indicator identifies the trend in the cost of capital (borrowing and other
long-term liabilities, net of investment income) against the net revenue stream of the
Council. The estimates of financing costs include current commitments and those
arising from the capital programme. The Housing Revenue Account costs are
aligned with the 30 year business plan. 
The estimated ratio of debt to net revenue stream across the next three years
averages at 4.6% for General Services and 31.1% for the Housing Revenue
Account. From a General Fund perspective, the Chartered Institute of Public Finance
and Accountancy (CIPFA) Directors of Finance Performance Indicators 2023 to 2024
show a Scottish Local Authority average of 5.8%, therefore demonstrating a prudent
borrowing policy. For the Housing Revenue Account, the indicative Scottish average
in 2023 to 2024 was 23.8%. The rising ratio within the Housing Revenue Account is
indicative of the significant capital investment programme as outlined in the Strategic
Housing Investment Plan. The level of loan charges is deemed prudent and
affordable within the framework of the 30 year Housing business plan.
The Liability Benchmark, another treasury prudential indicator, is an important tool
used to identify whether the Council is likely to be a long-term borrower or long-term
investor, allowing it to shape its strategic focus and decision making. The liability
benchmark itself represents an estimate of the cumulative amount of external
borrowing the Council must hold to fund its current capital and revenue plans while
keeping treasury investments at the minimum level required to manage day-to-day
cash flow. 
104

Page 105

Loans Fund Policy
In July 2016, the Scottish Government confirmed the new Loans Fund accounting
arrangements under the provisions of the Local Authority (Capital Finance and
Accounting) (Scotland) Regulations 2016. This regulation requires the Council to
outline its policy on the repayment of Loans Fund advances. The Loans Fund
advance is effectively the repayment of the principal linked to the capital expenditure
which is required to be funded from borrowing. The broad aim of prudent repayment
is to ensure that the authority’s unfinanced capital expenditure is financed over the
expected life of the asset and that each year’s repayment amount is reasonably
commensurate with the period and pattern of the benefits. 
From a governance perspective the Loans Fund policy of North Ayrshire Council is
included as part of the Treasury Management and Investment Strategy and
submitted for approval to the North Ayrshire Council committee on an annual basis.  
105

Page 106

Governance
Having robust governance arrangements in place is key to ensuring effective
strategic management of assets, from initial planning through to delivery, utilisation
and disposal. North Ayrshire Council delivers a governance framework through a
number of officer and member represented groups/committees. 
To ensure a consistent approach is adopted when considering any new capital
investment, a business case framework has been developed. The framework
includes key criteria across:
• Aims and strategic objectives
• Scope and benefits
• Options Appraisal
• Risks, Constraints and Dependencies
• Procurement arrangements
• Monitoring of key milestones
• Evaluation criteria and scoring
• Investment costs, funding and impact on revenue
All business cases are considered by the Capital Programme and Assets Group and
the Executive Leadership Team, with a recommendation being made to
Cabinet/Council, for inclusion of new projects into the Capital Investment
Programme. A key focus when assessing potential capital investment is the
alignment to the Council’s strategic priorities, with the aim being to maximise
opportunities where investment meets multiple strategic priorities and where there is
the potential to lever in external funding.
The current governance framework is illustrated below: 
106

Page 107

Service Project Boards are chaired by Executive Directors across each Directorate
area with representation from relevant service managers. Following approval by
North Ayrshire Council committee on the Capital Investment Programme, the Service
Project Board is responsible for ensuring robust project management is in place to
deliver projects on time and within budget.
Programme Boards provide a strategic focus at programme level and are chaired
by the responsible Chief Officer. Each programme can include a number of individual
projects across each Directorate which contribute to specific Council and programme
objectives. To ensure the objectives are met the Chief Officer for the programme is
responsible for strategic oversight including all projects that form part of the overall
programme.
The Capital Programme and Assets Group is chaired by the Head of Service
(Finance) and is responsible for:
• Ensuring a strategic and corporate overview of the Council’s capital
programme is in place.
• Developing and monitoring the Council’s capital investment programme,
tracking slippage on delivery and expenditure against approved budgets.
• Developing clear criteria for investment of Council resources on asset matters
and assessing all investment business cases.
• Developing a prudent capital receipts programme for inclusion in the Council’s
Capital Programme.
The Executive Leadership Team consists of the Chief Executive, Executive
Director Communities & Housing, Executive Director Place, Executive Director
Education, Head of Democratic Services, Head of People and ICT and Head of
Finance and is responsible for advising members on the relative priorities of the
Council’s long term investment needs and plays a key monitoring role in ensuring the
major capital projects deliver the anticipated benefits on time and within budget. The
Executive Leadership Team also considers all business cases for new areas of
capital investment as well as being the escalation point for any key strategic
decisions across the Capital Investment Programme prior to consideration by
Cabinet or Council.
Cabinet is chaired by the Leader of the Council and is the main decision-making
body of the Council. It consists of member portfolio holders from the Administration.
Cabinet receives regular progress reports and approves amendments to the Capital
Investment Programme.
North Ayrshire Council consists of all elected members and is chaired by the
Provost. The Council approves the corporate framework and the medium and longer
term Capital Investment Programme.  
107

Page 108

Knowledge and skills
North Ayrshire Council employs professionally qualified and experienced staff in
senior positions with responsibility for making capital expenditure, borrowing and
investment decisions.
The Head of Finance is a qualified accountant and holds the position of Section 95
officer for the Council. The Council’s Section 95 Officer is responsible for the proper
administration of the Council’s financial affairs and is required:
• to recommend treasury management policies/practices, review these regularly
and monitor compliance
• to submit regular treasury management updates
• to receive and review management information
• to review the performance of the treasury management function
• to ensure the adequacy of treasury management resources and skills and the
effective division of responsibilities within the treasury management function
• to approve the appointment of external service providers
Where the Council does not have the knowledge and skills required, use is made of
external advisers that are specialists in their field. The Council currently employs
Arlingclose Limited as treasury management advisers to ensure that we have access
to specialist knowledge and skills if required. 
Decisions to invest in land and property are overseen in accordance with council
policies and the priorities from our Council Plan, to capitalise on its position, power
and influence to deliver tangible improvements to the lives of people in North
Ayrshire. These decisions are made by suitably qualified personnel including
architects and surveyors.
Risk
There are risks inherent across all capital planning and project delivery activity. Key
planning risks are managed/mitigated through detailed business case development
prior to any capital investment project getting approved. From a project delivery
perspective, risk registers are maintained throughout the duration of the project and
in accordance with standard project management practice. The long-term view to
capital investment and the development of associated strategies also play a key role
in risk management. Examples include:
• Development of a 10 year capital programme, considering funding and
priorities in the long term
• Asset Management Plans and lifecycle maintenance which inform capital
plans in the long term
• Treasury Management and Investment Strategy which considers borrowing
levels in the long term.
• Local Housing Strategy and Strategic Housing Investment Plan takes a
medium and long-term view of housing and regeneration priorities.
108

Page 109

Conclusion
The Capital Investment Strategy for North Ayrshire Council provides an overview of
how capital expenditure plans, capital financing and treasury management activity
contribute to the infrastructure and provision of services for the benefit of North
Ayrshire communities and citizens. It is a reporting requirement of the Chartered
Institute of Public Finance and Accountancy (CIPFA) Prudential Code. 
The Strategy takes account of the Council’s strategic priorities and considers any
new investment within the context of outcomes and affordability. There is also
recognition of the need to balance investment between maintaining current assets
and infrastructure against the ambitions for acquiring new assets.
The current capital programme demonstrates an innovative approach in maximising
investment across multiple strategic priority areas, with developments that
incorporate education provision, community facilities, health and social care services
and housing. This approach, whilst providing key services that deliver positive
outcomes to communities, also contributes to the wider economic regeneration of
North Ayrshire, helping to grow the population and the local economy.
Working in partnership with the UK and Scottish Government and East Ayrshire and
South Ayrshire councils, the Ayrshire Growth Deal will regenerate the region through
investment in strategic infrastructure across various sectors, including life sciences,
tourism, manufacturing and aerospace, with total investment of over £251.5 million.  
109

Page 110

Related documents, strategies and plans
• Council Plan
• Local Development Plan
• Asset Management Plans
• Local Outcomes Improvement Plan
• Local Housing Strategy
• Strategic Housing Investment Plan
• North Ayrshire Local Employability Partnership Delivery Plan
• North Ayrshire Child Poverty Action Plan
• Technology Strategy
• Estates Strategy
• 10 Year Capital Investment Programme
• Regeneration Delivery Plan
• Treasury Management and Investment Strategy
• Loans Fund Policy
• HSCP Strategic Plan
• Sustainable North Ayrshire Strategy
110

Page 111

NORTH AYRSHIRE COUNCIL 
26 February 2025 
North Ayrshire Council 
Title:    Revenue Estimates 2025/26 – Common Good Funds and
Trusts 
Purpose:  To advise Council of the anticipated annual income and
expenditure of the Common Good Funds and Trusts
administered by North Ayrshire Council and seek approval for
the level of funding to be made available for disbursement
during 2025/26. 
Recommendation:  That Council: 
(a)  approves the 2025/26 revenue estimates for the Common
Good Funds and registered Charitable Trusts detailed in
Appendix 1;
(b)  approves the amounts available for disbursement noted at
paragraphs 2.9 and 2.10;
(c)  agrees to capital spend from the dormant and low value
Trusts and Common Good Funds, and instructs officers to
seek approval from the Office of the Scottish Charity
Regulator (OSCR) prior to the disbursement of any grant
which would result in the winding up of a Trust; and
(d)  approves the disposal of Trust external investments as
detailed at paragraph 2.11 to 2.13.   
1. Executive Summary 
1.1 The Council is the custodian of the Common Good Funds for the former burghs of
Ardrossan, Irvine, Largs, Millport, Saltcoats and Stevenston and a number of
charitable Trusts, which are largely composed of bequests made many years ago. 
1.2 This report provides Members with an overview of the financial position of each
Common Good Fund and Charitable Trust and recommends the level of expenditure
which can be disbursed from each for 2025/26.
1.3 The Common Good Funds and Trusts make annual disbursements of grants to
groups and individuals. The level of funding available for these grants is normally set
at the net annual income of each Fund or Trust after meeting their expenditure
commitments. For Common Good Funds, where the expenditure commitments
exceed the annual income, the recommended budget for grant disbursement reflects
the level of disbursements in previous years or £5,000, whichever is the greater.
Agenda Item 6
111

Page 112

1.4 In order to encourage the utilisation of funds across communities, in particular where
the Trusts have been dormant or have low levels of income, it is recommended that,
with the exception of those Trusts with significant balances, the full balance of the
Trusts are approved as available for disbursement. Any disbursement which utilises
the full capital balance will result in closure and will require the approval of OSCR.
During 2025/26, the funds within Dalry Trust, Kilwinning Trust, Kilbrinie & Glengarnock
Trust, Largs Trust, Douglas Sellers Trust and Anderson Park Trust will be exhausted.
Approval will be sought from OSCR for the disbursement of any remaining capital and
winding up of these Trusts.
1.5 The external investments held by the Charitable Trusts have been assessed against
the Trust Investment Policy 2024/25 and two investments have been identified as
being inconsistent with the policy. It is recommended that these investments are sold
and the capital re-invested with North Ayrshire Council’s Loans Fund. 
2. Background 
Common Good Funds 
2.1 The Council is the custodian of the Common Good Funds for the former burghs of
Ardrossan, Irvine, Largs, Millport, Saltcoats and Stevenston. The purpose of the
Common Good Funds is to benefit the general population within the defined areas of
each of their respective towns. 
2.2 At its meeting on 15 May 2024, Council approved the allocation of £0.513m from
Irvine Common Good Fund to meet the costs of essential works required at Seagate
Castle. £0.061m works have been completed to date that the proposed budgets
include the balance of £0.442m which will be required to allow the completion of the
works during 2025/26. 
2.3 The Common Good Funds make annual disbursements to groups and individuals
based on approved criteria. Current practice has been for the levels of grant available
for disbursement to be determined after all expenditure commitments and projected
income from assets has been assessed with any remaining surplus made available for
trustees to disburse and ensuring that capital balances are left intact. The
disbursement of funds from the capital balance would normally require Council
approval. However, this would result in a lower budget for disbursement in all
Common Good Funds, with the exception of Stevenston. It is, therefore,
recommended that the budget for grants in each Common Good Fund is set at the
level of disbursements in previous years or £5,000, whichever is the greater. This will
result in a reduction in capital balances over the year for most Funds.
2.4 In the case of Irvine Common Good Fund, the level of expenditure exceeds the level
of income. In order to maximise the benefits to the community, it is proposed that the
budget for grant disbursement is set at a level which reflects previous years’
disbursements.  
112

Page 113

Charitable Trusts
2.5 The Council also administers a number of Trusts which are largely composed of
bequests made many years ago. Of these Trusts, there are only two which accrue
significant levels of income; the Spier’s Trust and the Margaret Archibald Trust. The
Spier's Trust was founded in 1936 for the administration of Spier's School, Beith and
for the provision of certain educational grants and bursaries with the local area of
benefit comprising the parishes of Beith, Dalry, Dunlop, Kilbirnie, Lochwinnoch and
Neilston. The purpose of the Margaret Archibald Trust is "to apply the capital and
income from time to time, at the discretion of the Council, for the charitable purpose of
persons in need who have attained sixty-five years of age, living in the Parish of Dalry,
Ayrshire".
2.6 The remaining Trusts comprise four town Trusts, covering Dalry, Kilbirnie &
Glengarnock, Kilwinning and Largs, which provide assistance to persons in need
within the defined area of each fund; the North Ayrshire Council Trust, which
incorporates a further seven smaller funds; two minor Trusts and a number of sundry
bequests listed on Appendix 2. 
2.7  Historically a number of Trusts have experienced periods of dormancy where no grant
applications have been received. OSCR is keen that charities fulfil their charitable
purposes and the Council’s external auditors have previously expressed concern
about the continued lack of activity in these Trusts. If no other action is taken, the
annual external audit fee and administrative charges will eventually exhaust these
Trusts. As such, the utilisation of available funds through a particular project which
complies with the Trust’s purposes should be considered. It is, therefore,
recommended that, with the exception of those Trusts with significant balances, the
full balances of the town and minor Trusts are made available for disbursement. It
should be noted that any disbursement which would result in the winding up of a
registered Trust must be approved by OSCR before the relevant Locality Partnership
agrees the grant. For those Trusts with significant balances, it is proposed that the
budgets for grant disbursement are set at a level which reflects previous years’
disbursements.
2.8  It is projected that the funds within Dalry Trust, Kilwinning Trust, Kilbrinie &
Glengarnock Trust, Largs Trust, Douglas Sellers Trust and Anderson Park Trust may
be exhausted during 2025-26. Approval will be sought from OSCR for the
disbursement of any remaining capital and winding up of these Trusts as appropriate.
2.9 The following table summarises the anticipated income and expenditure for each
Common Good Fund and Trusts and the proposed budget for grant disbursement for
each:
113

Page 114

2.10 The remaining smaller trusts administered by the Council are listed in Appendix 2.
Projected income for 2025/26 is £733 and during 2024/25, thus far, there have been
no disbursements. Therefore, the full balance of £15,207 is available for disbursement
during 2025/26.
Trust Funds – Investment Strategy
2.11 Council approved the Trust Fund Investment Strategy 2024/25 on 18 December 2024.
The Strategy set out the principles which ensure that all investments are made on a
socially responsible basis with appropriate regard for Environmental, Social and
Governance issues through the exclusion of investment in any businesses whose
activities and practices pose a risk of serious harm to individuals or groups, or whose
activities are inconsistent with the Council’s values
2.12 Following an assessment of the external investments held by the Margaret Archibald
Trust and the North Ayrshire Council Charitable Trust, as detailed in Appendix 3, two
specific shareholdings have been identified as being inconsistent with the strategy:
Trust Margaret Archibald Margaret Archibald
Investment Royal Dutch Shell PLC British American Tobacco
PLC
Value at 31 March 2024 £16,958 £28,872
Sector Energy Tobacco
Recommendation Not aligned to Council’s
Investment strategy - Sell
Not aligned to Council’s
Investment strategy - Sell
Estimated
Balance at 1
April 2025
Estimated
Income 2025
to 2026
Estimated
Expenditure
2025 to 2026
Available for
Disbursement
Estimated
Balance at 31
March 2026
£ £ £ £ £
Common Good Fund
Ardrossan 356,170 65,230 (56,858) (30,347) 334,195
Irvine 1,139,500 97,105 (492,477) (41,041) 703,087
Largs 444,485 36,822 (32,342) (10,000) 438,965
Millport 68,302 3,310 (338) (5,000) 66,274
Saltcoats 11,362 550 (53) (5,000) 6,859
Stevenston 212,403 26,003 (995) (25,008) 212,403
TOTAL 2,232,222 229,020 (583,063) (116,396) 1,761,783
Registered Charitable Trusts
Dalry 1,726 80 (192) (1,614) 0
Kilbirnie & Glengarnock 2,936 140 (197) (2,879) 0
Kilwinning 3,114 150 (367) (2,897) 0
Largs 2,231 110 (194) (2,147) 0
Speir's Trust 67,169 6,754 (1,179) (5,575) 67,169
Margaret Archibald Trust 210,537 21,761 (1,223) (20,538) 210,537
Douglas Sellers Trust 162 0 0 (162) 0
Anderson Park Trust 22 0 0 (22) 0
NAC Charitable Trust 51,402 3,954 (319) (3,635) 51,402
TOTAL 339,299 32,949 (3,671) (39,469) 329,108
114

Page 115

2.13 it is recommended that the identified investments are sold and any capital receipts are
reinvested through North Ayrshire Council’s Loans Fund. The performance and
suitability of all other investments will continue to be monitored and reported to
Council within the Trustees’ Annual Report and Financial Statements after the end of
each financial year.
3. Proposals 
3.1  That Council: 
(a) approves the 2025/26 revenue estimates for the Common Good Funds and
registered Charitable Trusts detailed in Appendix 1;
(b) approves the amounts available for disbursement noted at paragraphs 2.9
and 2.10;
(c) agrees to capital spend from the dormant and low value Trusts and Common
Good Funds, and instructs officers to seek approval from the Office of the
Scottish Charity Regulator (OSCR) prior to the disbursement of any grant
which would result in the winding up of a Trust; and
(d) approves the disposal of Trust external investments as detailed at paragraph
2.11 to 2.13. 
4. Implications/Socio-economic Duty 
Financial 
4.1 Approval of the budgets will allow each Locality Partnership to disburse individual
grants up to the approved levels. 
All income and expenditure which relates to Common Good properties must be
charged to the relevant Common Good Fund. 
Human Resources 
4.2 None. 
Legal 
4.3 All expenditure from Trusts and Common Good Funds must be for the purposes of the
Trust or meet the Common Good criteria of benefitting the inhabitants of the Common
Good area. Under the Trusts and Succession (Scotland) Act 2024, Trustees have a
duty to review all investment decisions to ensure that due regard has been given to
the suitability of the investment taking account of proper advice. 
Equality/Socio-economic 
4.4 The disbursement of grants to individuals and groups is in support of the general
purpose of the prevention or relief of poverty by reason of age, ill-health, disability,
financial hardship or other disadvantage. 
115

Page 116

Environmental and Sustainability 
4.5 The recommendations for the disposal of investments held on behalf of the Trusts are
consistent with the Council’s values and will exclude investment in counterparties which
have significant involvement in activities which contribute to carbon intensive industries. 
Key Priorities 
4.6 This report directly supports the Council Plan 2019 to 2024 by supporting active and
strong communities through the disbursement of grants to groups and individuals. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 Legal Services have been consulted on the recommendations and procedures for
winding up the Trusts.
Click here to enter text.
Mark Boyd
Head of Service Finance(Chief Executives) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
North Ayrshire Council Trust Funds - Investment Strategy 2024/25 – Council 18 December
2024
North Ayrshire Council Charitable Trusts: Unaudited Trustees’ Annual Report 2023/24 –
Council, 26 June 2024
116

Page 117

Index of Common Good and Trust Funds 
Page
Appendix 1 
Common Good Funds 
Ardrossan            1
Irvine             2
Largs             3
Millport            4
Saltcoats            4
Stevenston            5 
Trusts 
North Ayrshire Council (Dalry) Charitable Trust       6
North Ayrshire Council (Kilbirnie & Glengarnock) Charitable Trust    6
North Ayrshire Council (Kilwinning) Charitable Trust      7
North Ayrshire Council (Largs) Charitable Trust       7
Margaret Archibald Trust          8
Douglas Sellers Trust          8
Anderson Park Trust          9
North Ayrshire Council Charitable Trust        9
Speir’s Trust           10 
Appendix 2 
Sundry Bequests          11 
Appendix 3 
External Investments         12 
117

Page 118

Appendix 1
Page | 1 
Budget
2024 to
2025 
Projected
Outturn
2024 to
2025 
Proposed
Budget
2025 to
2026
£ £ £
344,472     363,338     Projected Common Good Balance Brought Forward at 1 April 356,170    
INCOME
38,500       46,359       Rental - Ardrossan Civic Centre 46,000      
5,820        19,230       Loans Fund Interest (on cash balances) 19,230      
44,320       65,589       TOTAL INCOME FOR THE YEAR 65,230      
EXPENDITURE
Property Costs
12,000       40,632 External Property Repairs - Ardrossan Civic Centre 55,000
Others
1,883        1,778        Administration - Charge from Finance 1,858       
13,883       42,410       SUB TOTAL OF EXPENDITURE 56,858      
30,437 23,179 SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 8,372
30,437       30,347       Available for Disbursement as Grants 30,347      
0 (7,168) FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS (21,975)
344,472     356,170     COMMON GOOD BALANCE CARRIED FORWARD AT 31 MARCH 334,195    
COMMON GOOD FUND - ARDROSSAN
118

Page 119

Page | 2 
* For the upkeep of ground at the Moor, Low Green, Recreational Parks, Galt Avenue, Old Parish Church,
Redburn Community Centre, Berry Drive 
Budget
2024 to
2025 
Projected
Outturn
2024 to
2025 
Proposed
Budget
2025 to
2026
£ £ £
1,118,352  1,119,802  Projected Common Good Balance Brought Forward at 1 April 1,139,500 
INCOME
Property Rentals
25,000       25,000       Woodlands Centre 25,000      
11,500       11,500       Bank Street (Church of Latter Day Saints) 11,500      
13,385       12,885       Irvine Moor 11,385      
13,000       13,000       Ground East Road (McConnachies) 13,000      
2,000        2,000        East Road New Car Park 2,000        
Other Income
18,990       55,230       Loans Fund Interest (on cash balances) 34,220      
83,875       119,615     TOTAL INCOME FOR THE YEAR 97,105      
EXPENDITURE
Property Costs
500           0 General Repairs 500          
10,500       10,219       Rates on vacant properties (36/38 Bank Street) 11,354      
1,837        3,424        Electricity 1,470        
30,445       28,995       Grounds Maintenance* 30,445      
189,000     10,049       Property Maintenance - Seagate Castle 442,371    
1,000        1,083        Other Property Costs 1,000        
233,282     53,770       487,140    
Others
6,148        5,106        Administration - Charge from Finance 5,337        
6,148        5,106        5,337        
239,430     58,876       SUB TOTAL OF EXPENDITURE 492,477    
(155,555)    60,739       SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS (395,372)   
41,041       41,041       Available for Disbursement as Grants 41,041      
(196,596)    19,698       FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS (436,413)   
921,756     1,139,500  COMMON GOOD BALANCE CARRIED FORWARD AT 31 MARCH 703,087    
COMMON GOOD FUND - IRVINE
119

Page 120

Page | 3 
* For the upkeep of ground at Douglas Park. 
Budget
2024 to
2025 
Projected
Outturn
2024 to
2025 
Proposed
Budget
2025 to
2026
£ £ £
433,573     443,078     Projected Common Good Balance Brought Forward at 1 April 444,485    
INCOME
Property Rentals (Including Insurance Premiums)
7,315        7,312        Haylie House 7,312       
1,250        1,250        Douglas Park Bowling Club 1,250       
210           210           Douglas Park Grazings 210          
6,539        6,539        Douglas Park Tennis Club & Children's Nursery 6,500       
Other Income
7,320        21,540       Loans Fund Interest (on cash balances) 21,550      
22,634       36,851       TOTAL INCOME FOR THE YEAR 36,822      
EXPENDITURE
Property Costs
10,976       2,941        Electricity 8,781       
14,714       19,514       Grounds Maintenance* 20,443      
1,000        963           Other Property Costs 1,000       
Others
2,371        2,026        Administration - Charge from Finance 2,118       
29,061       25,444       SUB TOTAL OF EXPENDITURE 32,342      
(6,427)       11,407       SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 4,480       
10,000       10,000       Available for Disbursement as Grants 10,000      
(16,427)     1,407        FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS (5,520)
417,146     444,485     COMMON GOOD BALANCE CARRIED FORWARD AT 31 MARCH 438,965    
COMMON GOOD FUND - LARGS
120

Page 121

Page | 4 
Budget
2024 to
2025 
Projected
Outturn
2024 to
2025 
Proposed
Budget
2025 to
2026
£ £ £
68,823 70,315 Projected Common Good Balance Brought Forward at 1 April 68,302      
INCOME
1,150 3,310 Loans Fund Interest (on cash balances) 3,310       
1,150 3,310 TOTAL INCOME FOR THE YEAR 3,310       
EXPENDITURE
Others
378 323 Administration - Charge from Finance 338          
378 323 SUB TOTAL OF EXPENDITURE 338          
772 2,987 SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 2,972
5,000 5,000 Available for Disbursement as Grants 5,000       
-4,228 (2,013) FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS (2,028)
64,595 68,302       COMMON GOOD BALANCE CARRIED FORWARD AT 31 MARCH 66,274      
COMMON GOOD FUND - MILLPORT
Budget
2024 to
2025 
Projected
Outturn
2024 to
2025 
Proposed
Budget
2025 to
2026
£ £ £
14,781       15,863       Projected Common Good Balance Brought Forward at 1 April 11,362      
INCOME
230           550           Loans Fund Interest (on cash balances) 550          
230           550           TOTAL INCOME FOR THE YEAR 550          
EXPENDITURE
80             51             Administration - Charge from Finance 53            
80             51             SUB TOTAL OF EXPENDITURE 53            
150 499 SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 497
5,000        5,000        Available for Disbursement as Grants 5,000       
(4,850) (4,501) FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS (4,503)
9,931        11,362       COMMON GOOD BALANCE CARRIED FORWARD AT 31 MARCH 6,859       
COMMON GOOD FUND - SALTCOATS
121

Page 122

Page | 5 
Budget
2024 to
2025 
Projected
Outturn
2024 to
2025 
Proposed
Budget
2025 to
2026
£ £ £
188,342     203,751     Projected Common Good Balance Brought Forward at 1 April 212,403    
INCOME
Property Rentals
14,250       15,713       New Street (Health & Social Care) 15,713      
Other Income
3,180        10,290       Loans Fund Interest (on cash balances) 10,290      
17,430       26,003       TOTAL INCOME FOR THE YEAR 26,003      
EXPENDITURE
1,030        951           Administration - Charge from Finance 995          
1,030        951 SUB TOTAL OF EXPENDITURE 995          
16,400       25,052       SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 25,008      
16,400       16,400 Available for Disbursement as Grants 25,008      
0 8,652        FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS 0
188,342     212,403     COMMON GOOD BALANCE CARRIED FORWARD AT 31 MARCH 212,403    
COMMON GOOD FUND - STEVENSTON
122

Page 123

Page | 6 
Budget
2024 to
2025 
Projected
Outturn
2024 to
2025 
Proposed
Budget
2025 to
2026
£ £ £
1,878        1,827        Projected Trust Balance Brought Forward at 1 April 1,726       
INCOME
47             90             Loans Fund Interest (on cash balances) 80            
47             90             TOTAL INCOME FOR THE YEAR 80            
EXPENDITURE
160           191           Administration - Charge to Finance 192          
160           191           SUB TOTAL OF EXPENDITURE FOR THE YEAR 192          
(113) (101) SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS (112)
1,765        0 Available for Disbursement as Grants 1,614
(1,878) (101) FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS (1,726)
0 1,726        TRUST BALANCE CARRIED FORWARD AT 31 MARCH 0
NAC (DALRY) CHARITABLE TRUST
Budget
2024 to
2025 
Projected
Outturn
2024 to
2025 
Proposed
Budget
2025 to
2026
£ £ £
2,975        2,982        Projected Trust Balance Brought Forward at 1 April 2,936       
INCOME
40             150           Loans Fund Interest (on cash balances) 140          
40             150           TOTAL INCOME FOR THE YEAR 140          
EXPENDITURE
174           196           Administration - Charge from Finance 197          
174           196           SUB TOTAL OF EXPENDITURE FOR THE YEAR 197          
(134) (46) FINAL SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS (57)
2,841        0 Available for Disbursement as Grants 2,879       
(2,975) (46) FINAL SURPLUS/(DEFICIT) FOR THE YEAR (2,936)
0 2,936        TRUST BALANCE CARRIED FORWARD AT 31 MARCH 0
NAC (KILBIRNIE & GLENGARNOCK) CHARITABLE
TRUST
123

Page 124

Page | 7 
Budget
2024 to
2025 
Projected
Outturn
2024 to
2025 
Proposed
Budget
2025 to
2026
£ £ £
37,618       37,738       Projected Trust Balance Brought Forward at 1 April 3,114       
INCOME
630           160           Loans Fund Interest (on cash balances) 150          
630           160           TOTAL INCOME FOR THE YEAR 150          
EXPENDITURE
386           359           Administration - Charge from Finance 367          
386           359           SUB TOTAL OF EXPENDITURE FOR THE YEAR 367          
244 (199) SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS (217)
37,862       34,425       Available for  Disbursement as Grants 2,897       
(37,618) (34,624) FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS (3,114)
0 3,114        TRUST BALANCE CARRIED FORWARD AT 31 MARCH 0
NAC (KILWINNING) CHARITABLE TRUST
Budget
2024 to
2025 
Projected
Outturn
2024 to
2025 
Proposed
Budget
2025 to
2026
£ £ £
2,261        2,314        Projected Trust Balance Brought Forward at 1 April 2,231       
INCOME
30             110           Loans Fund Interest (on cash balances) 110          
30             110           TOTAL INCOME FOR THE YEAR 110          
EXPENDITURE
176           193           Administration - Charge from Finance 194          
176           193           SUB TOTAL OF EXPENDITURE FOR THE YEAR 194          
(146) (83) SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS (84)
2,115        0 Available for Disbursement as Grants 2,147       
(2,261) (83) FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS (2,231)
0 2,231        TRUST BALANCE CARRIED FORWARD AT 31 MARCH 0
NAC (LARGS) CHARITABLE TRUST
124

Page 125

Page | 8 
Budget
2024 to
2025 
Projected
Outturn
2024 to
2025 
Proposed
Budget
2025 to
2026 
£  £  £
211,661     202,288     Projected Trust Balance Brought Forward at 1 April 210,537    
INCOME
10,696       10,561       Share dividends 10,561      
3,570        10,210       Loans Fund Interest (on cash balances) 11,200      
14,266       20,771       TOTAL INCOME FOR THE YEAR 21,761      
EXPENDITURE
504           1,173        Administration - Charge from Finance 1,223       
504           1,173        SUB TOTAL OF EXPENDITURE FOR THE YEAR 1,223       
13,762 19,598 SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 20,538      
13,762       11,349       Available for Disbursement as Grants 20,538      
0 8,249 FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS 0
211,661     210,537     TRUST BALANCE CARRIED FORWARD AT 31 MARCH 210,537    
MARGARET ARCHIBALD BEQUEST
Budget
2024 to
2025 
Projected
Outturn
2024 to
2025 
Proposed
Budget
2025 to
2026
£ £ £
164           162           Projected Trust Balance Brought Forward at 1 April 162          
INCOME
0 0 Loans Fund Interest (on cash balances) 0
0 0 TOTAL INCOME FOR THE YEAR 0
EXPENDITURE
158           0 Administration - Charge from Finance 0
158           0 SUB TOTAL OF EXPENDITURE FOR THE YEAR 0
(158) 0 SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 0
6               0 Available for Disbursement as Grants 162          
(164) 0 FINAL SURPLUS/(DEFICIT) FOR THE YEAR (162)
0 162           TRUST BALANCE CARRIED FORWARD AT 31 MARCH 0
DOUGLAS SELLERS TRUST
125

Page 126

Page | 9 
Budget
2024 to
2025 
Projected
Outturn
2024 to
2025 
Proposed
Budget
2025 to
2026
£ £ £
22             22             Projected Trust Balance Brought Forward at 1 April 22            
INCOME
0 0 Loans Fund Interest (on cash balances) 0
0 0 TOTAL INCOME FOR THE YEAR 0
EXPENDITURE
Administration - Charge from Finance 0
0 0 SUB TOTAL OF EXPENDITURE FOR THE YEAR 0
0 0 SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 0
22             0 Available for Disbursement as Grants 22            
(22) 0 FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS (22)
0 22             TRUST BALANCE CARRIED FORWARD AT 31 MARCH 0
ANDERSON PARK TRUST
Budget
2024 to
2025 
Projected
Outturn
2024 to
2025 
Proposed
Budget
2025 to
2026
£ £ £
47,644       47,937       Projected Trust Balance Brought Forward at 1 April 51,402      
INCOME
1,904        1,294        Dividends 1,294       
790           2,480        Loans Fund Interest (on cash balances) 2,660       
2,694        3,774        TOTAL INCOME FOR THE YEAR 3,954       
EXPENDITURE
316           309           Administration - Charge from Finance 319          
316           309           SUB TOTAL OF EXPENDITURE FOR THE YEAR 319          
2,378        3,465        SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS 3,635       
2,378        0 Available for Disbursement as Grants 3,635       
0 3,465 FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS 0
47,644       51,402       TRUST BALANCE CARRIED FORWARD AT 31 MARCH 51,402      
NORTH AYRSHIRE COUNCIL CHARITABLE TRUST
(excluding SPIERS TRUST)
126

Page 127

Page | 10 
127

Page 128

Appendix 2
Page | 11 
Sundry Bequests 
Name of Funds Investment
Projected
Income 2025
to 2026
Available for
Disbursement 
2025 to 2026
Purpose of Bequest  
£ £ £  
Isabella McPhee
Memorial Fund 3,119 158 3,277 Largs - Annual Putting
Competition (Mackerston)
N Stewart 1,771 90 1,861 Provision of Liberty at
Rothesay and Arran
Sturrock 3,202 162 3,364 Upkeep of Springside
Community Centre
Clark Trophy 598 30 628 Road Safety Competition
Ayrshire Accident Relief 4,221 214 4,435 Accident Relief
Cast/Florist/N Child 305 15 320 No information available
Miss Hanslip Bequest 1,258 64 1,322 No information available
Total 14,474 733 15,207  
128

Page 129

Appendix 3
Page | 12 
External Investments 
Margaret Archibald Bequest Sector Nominal
Value
(£)
Market Value
at 31/3/24
(£)
GlaxoSmithKline plc Healthcare 1,183.00 80,851
Marks & Spencer plc Consumer Staples 400.00 3,910 
Diageo plc Beverages 400.40 41,835
Barclays plc Financials 336.00 2,460
Royal Dutch Shell plc Energy 562.50 16,958
Unilever plc Consumer Staples 37.00 47,905
British American Tobacco plc Tobacco 300.00 28,872
Total  N/A 222,790 
North Ayrshire Council
Charitable Trust
Sector Nominal
Value
(£)
Market Value
at 31/3/24
(£)
JPM UK Higher Income Fund Financials 1,789.50 7,516
Merchants Trust Financials 406.25 8,645
Alliance Trust Financials 72.50 35,572
Zeneca Group plc Healthcare 67.50 28,831
Diageo Consumer Staples 217.00 22,673
Total  N/A 103,236 
129

Page 130

130

Page 131

NORTH AYRSHIRE COUNCIL 
26 February 2025 
North Ayrshire Council 
Title:    Treasury Management and Investment Strategy 2025/26 
Purpose:  To seek approval for the proposed Strategy for Treasury
Management and Investment activities within the Council for
the financial year 2025/26. 
Recommendation:  That Council approves the Treasury Management and
Investment Strategy for 2025/26 as attached at Appendix 1 
1. Executive Summary 
1.1 The Council is required by regulations issued under the Local Government in Scotland
Act 2003 and the Chartered Institute of Public Finance and Accountancy’s Treasury
Management in the Public Services: Code of Practice 2021 Edition (the CIPFA Code)
to approve a Treasury Management Strategy before the start of each financial year.
The Council is also required by regulation to have regard to CIPFA’s Prudential Code
for Capital Finance in Local Authorities (2021) under Part 7 of the Local Government
in Scotland Act 2003. In addition, the Consent by Scottish Ministers for the Investment
of Money by Scottish Local Authorities, which came into force in April 2010, requires
the Authority to approve an Investment Strategy before the start of each financial
year.
1.2 The Treasury Management and Investment Strategy attached to this report complies
fully with these requirements and provides:
• a summary of the Council’s capital plans;
• an outline of the treasury management strategy in relation to borrowing and the
impact of capital plans on this borrowing; and
• an outline of the investment strategy including the type of instruments available for
investment and our permitted counterparties.
1.3 The strategy provides key prudential and treasury indicators to 2033/34 which
articulate the operational parameters associated with Treasury Management and
Investment as well as offering assurance in relation to the affordability and
sustainability of capital investment plans. 
Agenda Item 7
131

Page 132

1.4 The key points highlighted in this report are;
• the continuation of an “under borrowed” position; 
• interest rate forecasts predict that the UK Bank Rate will gradually decline in
2025 before settling at 3.75% by the end of the year;
• notes the introduction of International Financial Reporting Standard (IFRS)16
which from 1 April 2024 sees leases, which were previously off-balance sheet,
now being included. Although leases form part of the other long term liability
figures which make up the Prudential Indicators, it is not currently anticipated
that the Indicators will be exceeded. The full impact will not be known until the
end of the financial year 2024/25, an updated report may be required to inform
the members of the detailed impact of IFRS 16 with amended Prudential
Indicators for approval; and
• notes the Council’s limit for investment in Money Market Funds (MMF) changing
to £10m in line with the limits in place for currently approved banking institutions.  
1.5 As recommended under the CIPFA Prudential and Treasury Management Codes,
updated performance information in relation to the treasury management and
prudential indicators are reported to Cabinet on a quarterly basis as part of the regular
Revenue and Capital Monitoring arrangements. 
2. Background 
2.1 CIPFA defines treasury management as: 
‘The management of the local authority’s investments and cash flows, its banking,
money market and capital market transactions; the effective control of the risks
associated with those activities; and the pursuit of optimum performance consistent
with those risks.’
2.2 The Local Government Scotland Act 2003 and the Prudential Code requires the
Council to approve an annual Treasury Management and Investment Strategy which
outlines the Council's strategy in relation to borrowing and the Council's strategy for
managing investments giving priority to the security and liquidity of those investments.
2.3 The Treasury Management and Investment Strategy 2025/26 is attached at Appendix
1. The overall objectives of the strategy are as follows:
Borrowing 
• to minimise the revenue cost of borrowings;
• to manage the Council’s cash flow;
• to manage the borrowing repayment profile;
• to assess interest rates’ movements and borrow/invest accordingly;
• to monitor and review the level of variable rate loans held in order to take
advantage of interest rate movements; and
• to identify and evaluate opportunities for debt rescheduling. 
132

Page 133

Investments
• to protect capital security of the invested funds;
• to obtain the best market return whilst recognising that security and liquidity are
key priorities;
• to specify criteria for identifying creditworthy counterparties; and
• to specify the types of investments permitted and appropriate limits for each.
2.4 The strategy provides detailed key prudential and treasury indicators to 2033/34,
aligned to the Council’s capital investment programme, which articulate the
operational parameters associated with Treasury Management and Investment as
well as offering assurances in relation to the affordability and sustainability of the
capital investment strategy, including; 
• the General Services Capital Programme to 2033/34; and
• the Housing Revenue Account Business Plan to 2054/55
2.5 The strategy also links with the key objectives of the Prudential Code that capital
investment programmes:
• should be set at a level that delivers the Council’s strategic priorities; and 
• are affordable in terms of the impact of the resultant debt repayments on
revenue budgets. 
2.6 The Treasury Management and Investment Strategy includes prudential indicators
which are critical in assessing the affordability of capital investment plans and their
impact on the Council's overall finances. The indicator used to demonstrate
affordability is the proportion of financing costs to the net revenue stream (for both
General Fund and Housing Revenue Account).
2.7 There are a number of other key indicators designed to ensure that the Council
operates within well-defined limits. The strategy, therefore, specifies:
• limits we do not expect external debt to exceed; 
• appropriate levels of fixed rate borrowing versus variable rate borrowing;
• upper and lower limits on the maturity of the debt portfolio, which reduces the
Council's exposure to large sums falling due for refinancing at any one time; and
• limits on investments placed for more than 365 days.
2.8 The Council expects to hold an 'under-borrowed' position at 31 March 2025. This
means that the capital borrowing need (the Capital Financing Requirement) has not
been fully funded by debt, due to the level of the Council's internal funds. The use of
internal funds instead of borrowing will continue in order to minimise borrowing costs.
This under-borrowed position will decline through time as internal funds reduce and
borrowing is required to be undertaken to replace internal funding.  
133

Page 134

2.9 The Treasury Management and Investment Strategy includes details of the Council’s
policy on repayment of loans fund advances. The Council’s policy complies with the
options currently available under the Local Authority (Capital Financing and
Accounting) (Scotland) Regulations 2016 and the asset lives and methodologies used
have been reviewed to provide for the prudent repayment of advances. 
3. Proposals 
3.1 That Council approves the Treasury Management and Investment Strategy for
2025/26 as attached at Appendix 1. 
4. Implications/Socio-economic Duty 
Financial 
4.1 Financial implications are detailed in the report attached at Appendix 1. 
Human Resources 
4.2 None. 
Legal 
4.3 The Local Government in Scotland Act 2003 and supporting regulations require the
Council to set out its Treasury Strategy for borrowing and to prepare an Annual
Investment Strategy. The Local Authority (Capital Financing and Accounting)
(Scotland) Regulations 2016 require the Council to set a policy for the repayment of
loans fund advances. 
Equality/Socio-economic 
4.4 None. 
Environmental and Sustainability 
4.5 None. 
Key Priorities 
4.6 The Treasury Management Strategy aligns with the Council Plan 2023-28 by ensuring
robust governance arrangements are in place to fulfil the Council’s statutory duties,
manage risk and support delivery of key priorities. 
Community Wealth Building 
4.7 None. 
134

Page 135

5. Consultation 
5.1 The Council's treasury advisors, Arlingclose Ltd, were consulted in the preparation of
the Strategy. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551. 
Background Papers
Treasury Management and Investment Strategy 2024-25 – North Ayrshire Council 28
February 2024  
135

Page 136

Appendix 1 
Treasury Management  and
Investment Strategy 2025/26 
136

Page 137

2 | P a g e
Table of Contents 
1 Purpose 3   
2 Executive Summary 5   
3 Capital and Prudential Indicators 2025/26 – 2027/28 7 
Capital Expenditure and Financing 7 
The Council's Overall Borrowing Need (the Capital Financing Requirement) 8 
The Liability Benchmark 9 
Limits to Borrowing Activity 10 
Affordability Prudential Indicators 11   
4 Treasury Management Strategy 12 
Interest Rate Forecast 12 
Current Portfolio Position 13 
Controls on Borrowing Activity 14 
LOBOs 15 
Policy on Borrowing in Advance of Need 15 
Debt Rescheduling 15 
Borrowing Sources 15 
Policy on Use of Financial Derivative 16 
Policy on Repayment of Loans Fund Advances 16   
5 Investment Strategy 17 
Current Portfolio Position 18 
Environmental, Social and Governance (ESG) Policy 18 
Creditworthiness Policy 18 
Bail-in Risk 19 
Investment Strategy and Permitted Investments 20 
Summary of Material Investments, Guarantees and Liabilities 21 
Monitoring of Investment Strategy 21   
Appendices 
Appendix 1: Prudential Indicators 2029 to 2034 22 
Appendix 2: Treasury Risk Register 25 
Appendix 3: Permitted Investments, Risks and Mitigating Controls 27 
Appendix 4: Policy on Repayment of Loans Fund Advances 32 
Appendix 5: Economic Background 34  
137

Page 138

3 | P a g e
1 Purpose 
The Council is required by regulations issued under the Local Government in Scotland Act
2003 and the Chartered Institute of Public Finance and Accountancy’s Treasury Management
in the Public Services: Code of Practice 2021 Edition (the CIPFA Code) to approve a
Treasury Management Strategy before the start of each financial year. The Council is also
required by regulation to have regard to CIPFA’s Prudential Code for Capital Finance in Local
Authorities (2021) under Part 7 of the Local Government in Scotland Act 2003. 
In addition, the Consent by Scottish Ministers for the Investment of Money by Scottish Local
Authorities, which came into force in April 2010, requires the Authority to approve an
Investment Strategy before the start of each financial year.  
This strategy meets these requirements fully. 
Three main reports on Treasury Management activity are presented to Members each
year, incorporating a variety of policies, estimates and actuals. These are: 
• Annual Treasury Management and Investment Strategy (this report), which is
submitted to full Council before the start of each financial year.   
• Mid-Year Treasury Management and Investment Report, submitted to Cabinet
as soon as possible following 30 September each year.   
• Annual Treasury Management and Investment Report, submitted to full Council
annually by the 30 June following the end of each financial year. 
Responsibilities 
Regulations place responsibility on Members for the review and scrutiny of treasury
management policy and activities. The following Scheme of Delegation has been adopted by
the Council:  
Full Council 
• to receive and review reports on treasury management policies, practices and activities;
• to approve the annual Treasury Management and Investment Strategy. 
138

Page 139

4 | P a g e
Cabinet 
• to approve amendments to the treasury management policy statement and treasury
management practices;
• to approve the division of responsibilities;
• to receive and review regular monitoring reports and act on recommendations. 
Section 95 Officer 
The Council’s Section 95 Officer is responsible for the proper administration of the Council’s
financial affairs and is required: 
• to recommend treasury management policies / practices, review these regularly and
monitor compliance;
• to submit regular treasury management updates;
• to receive and review management information;
• to review the performance of the treasury management function;
• to ensure the adequacy of treasury management resources and skills and the effective
division of responsibilities within the treasury management function; and
• to approve the appointment of external service providers. 
External Treasury Advisers 
The Council recognises that there is value in employing external providers of treasury
management services, in order to access specialist skills and resources. 
However, it recognises that the responsibility for treasury management decisions remains
with the Council at all times and officers will ensure that undue reliance is not placed upon
external advice. 
The Council’s current external treasury management advisors are Arlingclose Limited.  The
contract started on  5 April 2021 and was in place for an initial 3 year period. A further one
year extension has been agreed taking the existing contract to 4 April 2026. The Council will
ensure that the terms of their appointment and the methods by which their value is assessed
are properly agreed, documented and subject to regular review. 
139

Page 140

5 | P a g e
2 Executive Summary 
The treasury management function ensures that the Council’s funds are managed in
accordance with the relevant professional codes, so that sufficient cash is available to meet
service activity. This involves both the organisation of the cashflow and, where capital plans
require, the organisation of approporiate borrowing facilities.   
CIPFA defines treasury management as: 
“The management of the organisation’s borrowing, investments and cashflows, including its
banking, money market and capital market transactions; the effective control of the risks
associated with those activities; and the pursuit of optimum performance consistent with those
risks.” 
This document outlines the Council’s Annual Treasury Management Strategy and Annual
Investment Strategy providing: 
• a summary of the Council’s capital plans;
• an outline of the treasury management strategy in relation to borrowing and the
impact of capital plans on this borrowing; and
• an outline of the investment strategy including the type of instruments available for
investment and our permitted counterparties. 
Key prudential and treasury indicators are provided throughout this strategy which
clearly articulate the operational parameters in relation to Treasury Management and
Investment, as well as providing assurances in relation to the affordability and
sustainability of capital investment plans. Table 1 contains the key prudential and
treasury indicators within the report.   
Table 1 
2024/25 2025/26 2026/27 2027/28
Prudential and Treasury Indicators Probable Outturn Estimate Estimate Estimate
£m £m £m £m
Capital Expenditure:
General Services                 115.585                    95.807                    72.805                    65.083
HRA                   52.099                    46.003                    71.869                    70.650
Total                 167.684                  141.810                  144.674                  135.733
Loans Capital Financing Requirement (CFR):
General Services                 335.887                  387.496                  435.779                  471.524
HRA                 205.388                  224.461                  270.506                  314.467
Total                 541.275                  611.957                  706.285                  785.991
Gross Borrowing                 469.138                  556.653                  659.783                  736.200
Operational Boundary for Borrowing                 556.786                  625.593                  721.093                  799.963
Authorised Limit for Borrowing                 612.465                  688.152                  793.202                  879.959
Total Operational Boundary (Including PPP/NPD)                 640.080                  704.183                  794.810                  867.986
Total Authorised Limit (Including PPP/NPD)                 695.759                  766.742                  866.919                  947.982
Liability Benchmark                 441.632                  527.163                  635.872                  715.938
Investments                   30.000                    30.000                    30.000                    30.000
140

Page 141

6 | P a g e
A summary of this is provided as follows, with more detailed information provided in the
body of the report. 
Capital Expenditure for the General Fund (GF) reflects the capital investment programme
for 2025/26 to 2033/34 and Housing Revenue Account (HRA) reflects the capital investment
programme for 2025/26 and the capital investment plans included in the latest business plan.
To ensure the financial consequences of the new programme are fully transparent, all
relevant indicators have been projected to 2033/34 and these can be found in Appendix 1. 
The Capital Financing Requirement (CFR) is the underlying borrowing requirements of
the Council.   
Gross Borrowing reflects the actual borrowing which has been undertaken. This is projected
to be lower than the CFR as the Council continues with its strategy to use internal funds. 
The Operational Boundary is the maximum borrowing and other long-term liabilities to
fund previous years’ and the current year capital programme, building in flexibility for the
timing of the different funding streams and principal repayments. The operational
boundary includes any other long-term liabilities (e.g. PPP/NPD schemes, finance
leases) however no borrowing is actually required against these schemes as a borrowing
facility is included in the contract. 
The Authorised Limits is set at 10% above the Operational Boundary to give some
flexibility around raising funds for future year capital investment. 
The Liability Benchmark is an estimate of the cumulative amount of external borrowing
the Council must hold to fund its current capital and revenue plans while keeping treasury
investments at the minimum level required to manage day-to-day cash flow. 
Affordability of borrowing is measured by the percentage of financial costs relative to
the net revenue stream of the GF and HRA. 
Full details of these can be found on page 11. 
The average investment rate estimated for 2025/26 is 3.75% and is reflective of the
Council’s appetite for risk, the short term nature of investments and the permitted
instruments and counterparties selected.   
Other prudential and treasury indicators and supporting information can be found in the
main body of this report. 
Client Status 
The second Market in Financial Instruments Directive (MiFID II), introduced in January 2018,
classifies Local Authorities as “retail clients” unless they choose to opt-up to “professional
client” status. This has the advantages of lower fees and access to a greater range of
products and investment firms. The Council continues to opt-up to professional client status. 
In order to meet the professional client criteria, the Council must hold a £10m investment
portfolio at all times and have at least one officer with the necessary level of experience and
knowledge to understand the risks involved in the management of the investments.       
141

Page 142

7 | P a g e
3 Capital and Prudential Indicators 2025/26 – 2027/28 
In exercising its power to borrow, the Local Authority (Capital Finance and Accounting)
(Scotland) Regulations 2016 require the Authority to have regard to the Chartered
Institute of Public Finance and Accountancy’s Prudential Code for Capital Finance in
Local Authorities (the Prudential Code). The Prudential Code is a framework to ensure
Councils demonstrate effective control over levels of, and decisions relating to, capital
investment activity, including borrowing. The Treasury indicators are used to ensure that
risk is managed and controlled effectively. Together the Prudential and Treasury
Indicators consider the affordability and impact of capital expenditure decisions and set
out the Council’s overall capital framework. 
Capital Expenditure and Financing 
This prudential indicator is a summary of the Council’s capital expenditure plans, both
those agreed previously and those forming part of the 2025/26 budget setting.   
The 2025/26 budget proposes an updated Capital Investment Programme for General
Services to 2033/34 and updated investment plans for the HRA for 2025/26 and the
capital investment plans included in the latest business plan. All projects within the
Capital Programme are linked to the Council’s key strategic priorities. These are also
covered in the Capital Investment Strategy, produced in line with the requirements of the
Prudential Code. To ensure that the financial consequences of the new programme are
fully transparent, all relevant indicators have been projected to 2033/34 and these can be
found in Appendix 1. Table 2 shows the capital expenditure plans and how they are being
financed by capital or revenue resources over the next three years. The borrowing figure
in Table 2 is the difference between the estimates for total capital expenditure and the
other funding sources. 
Table 2 
2024/25 2025/26 2026/27 2027/28
Probable Outturn Estimate Estimate Estimate
£m £m £m £m
General Services Capital expenditure                 115.585                    95.807                    72.805                    65.083
Funded by:
Borrowing                   85.002                    54.463                    50.959                    38.920
Receipts / Grants                   27.156                    40.640                    21.136                    26.163
Funded from Revenue                     1.585                           -                              -                              -   
Funded from Reserves                     1.842                      0.704                      0.710                           -   
Total                 115.585                    95.807                    72.805                    65.083
HRA Capital expenditure                   52.099                    46.003                    71.869                    70.650
Funded by:
Borrowing                   27.021                    26.107                    53.551                    50.192
Receipts / Grants                   12.648                    10.104                      9.228                      9.544
Funded from Revenue                   11.492                      8.349                      6.299                      7.348
Funded from Reserves                     0.938                      1.443                      2.791                      3.566
Total                   52.099                    46.003                    71.869                    70.650
Estimates of Capital Expenditure and Income
142

Page 143

8 | P a g e
The Council’s Overall Borrowing Need (the Capital Financing Requirement) 
This indicator outlines the Council’s Capital Financing Requirement (CFR). The CFR is
simply the total historic outstanding capital expenditure which has not been paid from
either a capital or a revenue resource and, therefore, needs to be funded from borrowing.
It is essentially a measure of the Council’s underlying borrowing need. 
Part of the Council’s treasury activity is to meet the funding requirements for this
borrowing need. The treasury management section organises the Council’s cash position
to ensure that sufficient cash is available to meet the capital plans and cash flow
requirements. This may be sourced through borrowing from external bodies (such as the
Government, through the Public Works Loan Board [PWLB], or the money markets), or
utilising temporary cash resources within the Council. 
The Council’s underlying borrowing need (CFR) is not allowed to rise indefinitely. The
Council is required to make an annual revenue charge, called the Loans Fund Principal
Repayment. This is effectively a repayment of the borrowing need and it is charged to
revenue over the life of the asset. This charge reduces the CFR each year. This differs
from the treasury management arrangements, which ensure that cash is available to
meet the payment of capital commitments on an ongoing basis. External debt can also
be borrowed or repaid at any time, but this does not change the CFR. 
The total CFR can also be reduced by: 
• the application of additional capital financing resources (such as unapplied capital
receipts); or 
• increasing the annual revenue charge. 
The Council’s CFR is shown below and is a key prudential indicator. The opening
balances include the PPP/NPD schemes on the balance sheet, which increase the
Council’s borrowing need. This is shown to give a complete picture of the Council’s debt.
However, no borrowing is actually required against these schemes as a borrowing facility
is included in the contract and, as such, this is subtracted from the total CFR to identify
the Loans CFR. The Loans CFR is forecast to rise over the next few years as capital
expenditure financed by borrowing increases. 
Table 3 
2024/25 2025/26 2026/27 2027/28
Probable Outturn Estimate Estimate Estimate
£m £m £m £m
General Services                 419.181                  466.086                  509.496                  539.547
HRA                 205.388                  224.461                  270.506                  314.467
Sub-total                 624.569                  690.547                  780.002                  854.014
Less PPP/NPD long-term liability                  (83.294)                  (78.590)                  (73.717)                  (68.023)
Loans Capital Financing Requirement (CFR)                 541.275                  611.957                  706.285                  785.991
Movement in CFR
General Services                   51.609                    48.283                    35.745
HRA                   19.073                    46.045                    43.961
Annual Change                   70.682                    94.328                    79.706
Capital Financing Requirement (CFR)
143

Page 144

9 | P a g e
Liability Benchmark 
The liability benchmark, which is now a treasury prudential indicator, is an important tool to
help establish whether the Council is likely to be a long-term borrower or long-term investor in
the future, and so shape its strategic focus and decision making. The liability benchmark itself
represents an estimate of the cumulative amount of external borrowing the Council must hold
to fund its current capital and revenue plans while keeping treasury investments at the
minimum level required to manage day-to-day cash flow.  
Table 4 
Following on from the medium-term forecasts in the table above, the long-term liability
benchmark assumes capital expenditure funded by borrowing will be in line with the 10
year capital plan and 30 year HRA business plan respectively, loans fund advances on
new capital expenditure based on asset life and income, expenditure and reserves all
increasing by inflation of 2.5% a year with any specific adjustments made for planned use
of reserves. This is shown in the chart below together with the maturity profile of the
Council’s existing borrowing: 
2023/24 2024/25 2025/26 2026/27 2027/28
Actual
£m
Estimate
£m
Forecast
£m
Forecast
£m
Forecast
£m
Loans CFR 436.886 541.274 611.957 706.284 785.989
Less Balance sheet resources (157.475) (109.642) (94.794) (80.412) (80.051)
Net loans requirement 279.411 431.632 517.163 625.872 705.938
Liquidity allowance 10.000 10.000 10.000 10.000 10.000
Liability Benchmark 289.411 441.632 527.163 635.872 715.938
Liability Benchmark
144

Page 145

10 | P a g e
The Liability benchmark graph above is used to inform the Council’s borrowing strategy.  The
shaded grey area shows the Councils current debt and the gap between this and the Liability
benchmark line is how much more borrowing the Council likely needs to undertake to support
its current capital plans once taking into account its balance sheet resources.  The above
graph indicates that long term borrowing for the period of up to 25 years would be most
appropriate to meet the Councils borrowing needs and mitigate against interest rate risk. 
Limits to borrowing activity 
The Operational Boundary 
The operational boundary is the expected maximum borrowing position of the Council
during the year, taking account of the timing of various funding streams and the recharge
of principal repayments from the revenue account. Periods where the actual position
varies from the boundary are acceptable, subject to the authorised limit not being
breached. 
The Authorised Limit 
The authorised limit represents a limit beyond which external debt is prohibited. This limit
is set by Council and can only be revised by Council approval. It reflects the level of
external borrowing which, while not desirable, could be afforded in the short term, but is
not sustainable in the longer. The current limit is set at 10% above the Operational
Boundary. 
The following graph shows the projected levels of the Operational Boundary and
Authorised Limit for Borrowing, compared with the Council’s CFR and gross debt
position. CIPFA’s Prudential Code for Capital Finance in Local Authorities recommends
that the Council’s total debt should not exceed the highest forecast CFR over the next
three years. This provides Councils with some flexibility to borrow to meet future capital
investment requirements but provides a balance to ensure debt is not held for long
periods of time without an underlying need to fund capital investment. The graph below
confirms that the Council expects to comply with this recommendation. 
*NB: Figures exclude PPP/NPD
145

Page 146

11 | P a g e
Leasing – International Financial Reporting Standard (IFRS) 16 
From 1 April 2024, leases which were previously off balance sheet will now be included.
Although leases form part of the other long term liability figures which make up the
Prudential Indicators above, it is not currently anticipated that the Indicators will be
exceeded. The full impact will not be known until the end of the financial year 2024/25, an
updated report may be required to inform the members of the detailed impact of IFRS 16
with amended Prudential Indicators for approval. 
Affordability Prudential Indicators 
These Prudential Indicators assess the affordability of capital investment plans and
provide an indication of the impact of capital investment plans on the Council’s overall
finances. The cost impact of borrowing decisions are reflected in the Council’s budget as
loan charges. These have been projected to 2033/34 in line with the capital plan. 
Actual and estimates of the proportion of financing costs to net revenue stream. 
This indicator identifies the trend in the cost of capital (borrowing and other long-term liabilities
net of investment income) against the net revenue stream and reflects the profile of the loans
fund advances together with future capital investment. The estimates of financing costs
include current commitments and those arising from the capital programme. The HRA costs
are aligned with the 30-year business plan. 
Table 5 
Capital expenditure impacts on the revenue budget through financing charges, so it is
essential that the Council ensures the financing costs remain affordable and do not
constitute an excessive proportion of the revenue resources available. From a General
Fund perspective, the CIPFA Directors of Finance Performance Indicators 2023/24 show
a Scottish Local Authority average of 5.8%, therefore demonstrating a prudent borrowing
policy. For the HRA, the indicative Scottish average in 2023/24 was 23.8%. The rising
ratio within the HRA is indicative of the significant capital investment programme as
outlined in the Strategic Housing Investment Plan. The level of loan charges is deemed
prudent and affordable within the framework of the 30 year Housing business plan.  
2024/25 2025/26 2026/27 2027/28
Probable Outturn Estimate Estimate Estimate
% % % %
General Services 3.0% 4.1% 4.6% 5.1%
HRA 23.4% 26.5% 29.3% 29.7%
Proportion of financing costs to net revenue stream
146

Page 147

12 | P a g e
4 Treasury Management Strategy 
The treasury management function ensures that the Council’s funds are managed in
accordance with the relevant professional codes, so that sufficient cash is available to meet
service activity. This involves both the organisation of the cashflow and, where capital plans
require, the organisation of approporiate borrowing facilities. The strategy covers the relevant
treasury / prudential indicators, the current and projected debt positions and the annual
investment strategy. The primary objectives of the Council’s borrowing strategy is to minimise
the revenue impact of borrowing and to effectively manage the repayment profile of the debt. 
The treasury strategy aligns with the Council Plan by contributing to “maximising financial
flexibilities to help support delivery of priorities” and “Maximising value from the use of our
assets” as referred to under the priority of “A Sustainable Council”.  The Council Plan can be
found on the Council’s website at: www.north-ayrshire.gov.uk. 
Economic Outlook 
Interest rate forecast 
Interest rate forecasts are key to forecasting the costs of future borrowing. The Council’s
treasury management adviser Arlingclose is forecasting that the bank rate will decline
during 2025 before settling at 3.75%. The projected rates are shown in the following
graph alongside an assessment of PWLB borrowing rates to December 2027: 
147

Page 148

13 | P a g e
Current Portfolio Position 
The Council’s projected treasury portfolio position at 31 March 2025, with future year
estimates, is summarised below. Table 6 shows the probable outturn of gross debt at 31
March 2025, and the estimated gross debt 2025/26 – 2027/28,  against the underlying capital
borrowing need (the CFR) highlighting any over or under borrowing. Both the external debt
and CFR exclude the Council’s liabilities in respect of the PPP/NPD schemes. 
Table 6 
Within the prudential indicators there are a number of key indicators to ensure that the
Council operates within well-defined limits. One of these is that the Council’s gross debt
should not, except in the short term, exceed the total of the CFR. This allows some flexibility
for limited early borrowing for future years but ensures that borrowing is not undertaken for
revenue purposes. 
The Council’s borrowing strategy continues to address the key issue of affordability without
compromising the longer-term stability of the debt portfolio. The Council is currently under-
borrowed. This means that the capital financing requirement (CFR), has not been fully funded
with loan debt because the cash supporting the Council’s internal balances and cashflow is
being used as a temporary measure. 
Against this background and the risks within the economic forecast, caution will be adopted
within 2025/26 treasury operations. The Section 95 Officer will monitor interest rates and
adopt a pragmatic approach to changing circumstances. For example: 
• if it is anticipated that there is a significant risk of a sharp fall in long and short-term
rates, then long-term borrowings will be postponed and potential rescheduling from fixed
rate funding into short-term borrowing will be considered. 
• if it is anticipated that there is a significant risk of a sharp rise in long and short-term
rates than that currently forecast, then the portfolio position will be re-appraised with the
likely action that fixed rate funding will be drawn whilst interest rates are still lower than
they are expected to be in the next few years. 
Any such decisions will be reported to the Cabinet as part of the mid-year and annual treasury
outturn report.  A summary of treasury risks and mitigating controls can be found at Appendix
2.  
2024/25 2025/26 2026/27 2027/28
Probable Outturn Estimate Estimate Estimate
£m £m £m £m
Gross Debt at 31 March                 469.138                  556.653                  659.783                  736.200
CFR                 541.275                  611.957                  706.285                  785.991
(Under)/Over Borrowed Position                  (72.137)                  (55.304)                  (46.502)                  (49.791)
Current Portfolio Position (excluding PPP/NPD)
148

Page 149

14 | P a g e
Controls on Borrowing Activity 
The purpose of these controls is to manage the risk and impact of any adverse
movement in interest rates.  However, if they are set to be too restrictive, they may impair
opportunities to reduce costs / improve performance. The indicators are: 
• Upper limits on variable interest rate exposure. This identifies a maximum limit for
variable interest rates based upon the debt position net of investments; 
• Upper limits on fixed interest rate exposure. This is similar to the previous indicator
and covers a maximum limit on fixed interest rates. 
Table 7 
• Maturity structure of borrowing. These gross limits are set to reduce the Council’s
exposure to large sums falling due for refinancing; both upper and lower limits are
required. 
Table 8 
* Note the Under 12 months figure in the above table includes £23.950m LOBOs which have call options in year. 
The impact of a 1% rise in interest rates based on the Councils current debt portfolio is
shown in the table below: 
Table 9 
*Note there is a lower impact of a 1% reduction as the LOBO loans are unlikely to be called when the rate reduces. 
2024/25 2024/25 2025/26 2026/27 2027/28
Probable Outturn Limit Limit Limit Limit
£m £m £m £m £m
Limits on fixed interest rates based on net debt                 435.188                  612.465                  688.152                  793.202                  879.959
Limits on variable interest rates based on net debt                   33.950                    60.000                    60.000                    60.000                    60.000
2024/25 2024/25 Lower Upper
Probable Outturn Probable Outturn Limit Limit
£m % % %
Under 12 months                    51.917 14% 0% 50%
12 months and within 24 months                     2.594 1% 0% 50%
24 months and within 5 years                     9.663 3% 0% 50%
5 years and within 10 years                   62.439 16% 0% 75%
10 years and above                 254.289 67% 25% 90%
Total Borrowing                 380.903 100%
Maturity Profile of Borrowing
2025/26 2026/27 2027/28
£m £m £m
Impact of1% increase in Interest rates       0.267        0.404        0.450
Impact of1% decrease in Interest rates      (0.061)      (0.170)      (0.194)
Interest rate Risk Exposure
149

Page 150

15 | P a g e
LOBOs 
The Council currently holds £33.950m of Lender’s Option Borrower’s Option (LOBO)
loans where the lender has the option to propose an increase in the interest rate at set
dates, following which the Council has the option to either accept the new rate or to repay
the loan at no additional cost. Similar to other debt held by the Council we continue to
work with treasury management advisers to identify financially beneficial opportunities to
repay LOBO loans.   
Policy on Borrowing in Advance of Need 
The Council will not borrow more than, or in advance of, its needs purely to profit from the
investment of the extra sum borrowed. Any decision to borrow in advance will be within
forward approved CFR estimates and will be considered carefully to ensure that value for
money can be demonstrated and that the Council can ensure the security of such funds. 
Risks associated with any advance borrowing activity will be subject to appraisal and
subsequent reporting in either the mid-year or annual treasury report. 
Debt Rescheduling 
As short-term borrowing rates are cheaper than longer term fixed interest rates, there may be
potential opportunities to generate savings by switching from long-term to short-term debt.
However, these savings will need to be considered in the light of the current treasury position
and the cost of any premiums incurred on early debt repayment.   
Potential reasons for debt rescheduling include: 
• the generation of cash savings and / or discounted cashflow savings; or
• the enhancement of the portfolio balance (amend the maturity profile and / or risk). 
The recent rise in interest rates means that more favourable debt rescheduling
opportunities should arise than in previous years.  All debt rescheduling proposals will be
reported to Cabinet / full Council as part of the annual or mid-year report. 
Borrowing Sources 
Approved sources of long-term and short-term borrowing are: 
• HM Treasury’s PWLB lending facility (formerly the Public Works Loan Board) and
any successor body;
• National Wealth Fund Ltd (formerly UK Infrastructure Bank Ltd)
• Any institution approved for investments (see Appendix 3);
• Any other bank or buiding society authorised to operate in the UK;
• Any other UK public sector body;
• UK public and private sector pension fund (except Strathclyde Pension Fund);
• Capital market bond investors; or
150

Page 151

16 | P a g e
• UK Municipal Bonds Agency plc and other special purpose companies created to
enable local authority bond issues. 
In addition, capital finance can be raised by the following methods that are not borrowing,
but are classed as other debt liabilities: 
• Leases;
• Hire purchase;
• Private Finance Initiatives (including PPP/NPD); or
• Sale and leaseback arrangements.
• Similar asset based finance 
Alternatives to PWLB 
North Ayrshire Council has previously raised the majority of its long-term borrowing from the
PWLB but will consider long-term loans from other sources including banks, pensions and
local authorities. The Council will also investigate the possibility of issuing bonds and similar
instruments, which may offer lower interest costs and reduce over-reliance on one source of
funding in line with the CIPFA Code. One example of such funding is the UK Municipal Bonds
Agency, an organisation which issues bonds on the capital markets and lends the proceeds
to local authorities. As these will represent a more complex form of borrowing, any decision to
borrow in this way will be the subject of a separate report to Council. 
PWLB loans are no longer available to local authorities planning to buy investment assets
primarily for yield. The Council therefore intends to avoid this activity in order to retain its
access to PWLB loans. 
Policy on Use of Financial Derivatives 
A financial derivative is a contract, which derives its value from the performance of an
underlying entity. They are used for a number of purposes, including insuring against price
movements. In the absence of any explicit legal power to do so, the Council will not use
standalone financial derivatives (such as swaps, forwards, future and options). Derivatives
embedded into loans and investments, including pooled funds and forward starting
transactions, may be used and the risks that they present will be managed in line with the
overall treasury risk management strategy. 
Policy on Repayment of Loans Fund Advances 
The prudent repayment of Loans Fund Advances are made under the provisions of The
Local Authority (Capital Finance and Accounting) (Scotland) Regulations 2016, which
came into force on 1 April 2016.   
These Regulations require North Ayrshire Council to outline its policy on the repayment
of loans fund advances. The loans fund advance is effectively the repayment of the
‘principal’ linked to the capital expenditure which is funded from borrowing.   
151

Page 152

17 | P a g e
The statutory guidance identifies a number of options for the prudent repayment of
advances, including basing the repayments on: 
• the depreciation charges made against the assets;
• the life of the assets, using either the annuity or equal instalments methodology; or
• the funding or income streams attached to the assets. 
For the majority of projects undertaken by the Council, the policy is to repay loans fund
advances linked to asset life using the annuity methodology. However, where
appropriate, the repayment of advances arising from projects with associated income
streams will be matched to the profile of the income. 
The Council will continue to consider the most appropriate repayment methods, which
align to the benefits of the assets and ensure a prudent repayment, for existing and
future advances. 
The policy is outlined in full in Appendix 4. 
5 Investment Strategy 
The Council’s investment strategy has regard to the Local Government Investment (Scotland)
Regulations (and accompanying finance circular) and the 2021 revised CIPFA Treasury
Management in Public Services Code of Practice and Cross Sectoral Guidance Notes (“the
CIPFA TM Code”). The Council’s objective when investing money is to strike an appropriate
balance between risk and return, minimising the risk of incurring losses from defaults or of
receiving unsuitably low investment income.  The Council aims to be a responsible investor
and will consider environmental, social and governance (ESG) issues when investing. 
The aim of the Investment Strategy is to provide security of investment and minimisation of
risk by generating a list of high creditworthy counterparties which will enable diversification. 
Investment instruments identified for use in the financial year, along with their associated risks
and controls can be found in Appendix 3.   
Counterparty limits are set through the Council’s Treasury Management Practices. The
maximum that will be lent to any one organisation (other than the UK Government) will be £10
million.  A group of banks under the same ownership, will be treated as a single organisation
for limit purposes.   
The Council uses purpose-built cash flow forecasting software to determine the maximum
period for which funds may prudently be committed. The forecast is compiled on a prudent
basis to minimise the risk of the Council being forced to borrow on unfavourable terms to
meet its financial commitments. Limits on long-term investments are set by reference to the
Council’s revenue budget and cash flow forecast. 
Given the risk of bail-in (as defined on page 19) and continued low returns from short-term
unsecured bank investments, the Council will take opportunities, as cash flows permit, to
further diversify into more secure asset classes during 2025/26. This diversification will
mitigate further risks associated with investments.  
152

Page 153

18 | P a g e
Current Portfolio Position 
Table 10 
Environmental, Social and Governance (ESG) Policy 
Environmental, social and governance (ESG) considerations are increasingly a factor in
global investors’ decision making, but the framework for evaluating investment
opportunities is still developing and therefore the Council’s ESG policy does not currently
include ESG scoring or other real-time ESG criteria at an individual investment level.
When investing in banks and funds, the Council will prioritise banks that are signatories
to the UN Principles for Responsible Banking and funds operated by managers that are
signatories to the UN Principles for Responsible Investment, the Net Zero Asset
Managers Alliance and/or the UK Stewardship Code. A list of ESG Initiative signatories is
updated quarterly by the Council’s treasury advisor Arlingclose to support the Council’s
decision making process for investing. 
Creditworthiness policy 
In accordance with the above, and in order to minimise risk, the Council has clearly stipulated
the minimum acceptable credit quality of counterparties for inclusion on its lending list. The
Council uses Arlingclose’s Approved Counterparties List which takes full account of the
ratings, outlooks and watches published by all three ratings agencies. Ratings are monitored
on a real time basis with any changes notified electronically supplemented by weekly update. 
Investment decisions are made by reference to the lowest published long-term credit rating
and analysis from the Council’s treasury management advisers. The Council considers high
credit quality organisations and investments as those having a credit rating of A- or higher
and which are domiciled in the UK or in a foreign country with a sovereign rating of AA+ or
higher. For money market funds that are more diversified, “high credit quality” is defined as
those having a credit rating of A- or higher. However, in addition to credit ratings, the Council
will consider investments in organisations based on independent analysis from our treasury
management advisors.   
All credit ratings are monitored by the Treasury Team who are alerted to changes in ratings of
the main rating agencies through Arlingclose’s weekly updates and following credit
developments. Where a downgrade results in the counterparty or investment scheme no
longer meeting the Council’s minimum criteria, any investment will be withdrawn immediately,
where breakage costs are not excessive.  
2024/25 2025/26 2026/27 2027/28
Probable Outturn Estimate Estimate Estimate
£m £m £m £m
Investments at 31 March                   30.000                    30.000                    30.000                    30.000
Net Debt at 31 March                 439.138                  526.653                  629.783                  706.200
Current Portfolio Position
153

Page 154

19 | P a g e
When deteriorating financial market conditions affect the creditworthiness of all
organisations, as happened in 2008, 2020 and 2022, this is not generally reflected in
credit ratings, but can be seen in other market measures. In these circumstances, the
Council will restrict its investments to those organisations of higher credit quality and
reduce the maximum duration of its investments to maintain the required level of security.
The extent of these restrictions will be in line with prevailing financial market conditions. If
these restrictions mean that insufficient commercial organisations of high credit quality
are available to invest the Council’s cash balances, then the surplus will be deposited
with the UK Government, or with other local authorities.  This will cause investment
returns to fall but will protect the principal sum invested. 
The Council recognises that credit ratings are good, but not comprehensive, indicators of
investment default. Full regard is therefore given to other available information on the credit
quality of the organisations in which it invests including credit default swap prices, financial
statements, information on government support, reports in the financial press and analysis
from the Council’s treasury management adviser. No investment will be made with an
organisation if there are substantive doubts about its credit quality, even though it may
otherwise meet the above criteria. 
Bail-in Risk 
Since the financial crisis, global authorities have embarked on a wide ranging review of
the banking sector to ensure that the cost to the public purse of any future crises is
contained. One of the most significant changes has arisen from the Financial Services
(Banking Reform) Act 2013 which added the bail-in of certain unsecured creditors to the
Special Resolution Regime (SRR) granted to the Bank of England under the Banking Act
2009. Bail-in is the opposite of bail-out and requires the country’s banking authority to
bail-in funds from existing investments if a bank requires it to remain financially
sustainable. 
Local authority deposits in banks are unsecured and because other previously unsecured
creditors such as retail investors have become preferred under UK and EU Directives, it
means that the risks associated with local authority unsecured investments in banks have
risen. 
The best solution to mitigating against bail-in risk is to invest with high quality and credit
worthy institutions. The identification of these institutions remains a key objective of the
investment strategy. Ensuring diversification of investment counterparties is also an
effective risk management approach and is reflected in investment counterparty limits. 
154

Page 155

20 | P a g e
Investment Strategy and Permitted Investments 
The Investment Regulations (Code on the Investment of Money by Local Authorities) require
the Council to approve all types of investments to be used and to set appropriate limits for the
amount that can be held in each investment type.  In determining its permitted investments,
the Council must identify the treasury risks associated with each type of instrument and the
controls put in place to limit risk on each investment type. Full details can be found in
Appendix 3. 
Investment Returns Expectations   
The Bank Rate is forecast to gradually fall during 2025.  Bank Rate forecasts for financial year
ends (March) are: 
• 2025/26 3.75%
• 2026/27 3.75%
• 2027/28 3.75% 
The estimated rates for returns on investments placed for periods up to 100 days during each
financial year for the next three years are as follows: 
• 2025/26 3.75%
• 2026/27 3.75%
• 2027/28 3.75% 
Investment Treasury Indicator and Limit 
This is a control on the total principal funds invested for greater than 1 year.  This limit is set
with regard to the Council’s liquidity requirements and to reduce the need for early sale of an
investment, and is based on the availability of funds after each year-end. 
Table 11 
For cashflow management, the Council will seek to utilise its 15 and 30 day notice accounts,
money market funds and short-dated deposits (overnight to three months) in order to benefit
from the compounding of interest. 
2024/25 2025/26 2026/27 2027/28
Probable Outturn
£m
Limit
£m
Limit
£m
Limit
£m
Principal sums invested for more than 1 year -                       10.000                   10.000                   10.000                  
Maximum principal sums invested for more than 1
year
155

Page 156

21 | P a g e
Summary of Material Investments, Guarantees and Liabilities 
In line with the requirements in respect of the Council’s Capital Investment Strategy
information is provided on material Investments, Guarantees and Liabilities. Reporting of
this fits better within the TMIS. Information is provided in the table below; 
The Council has the current historic investments on the balance sheet as at 31st March
2024: 
Category Value as at 31 March 2024
£m
Long-term Debtors 0.044
Total 0.044 
The long-term debtors represent loan finance provided by the Council to other parties
which relates to Advances for House Purchases.   
Monitoring of Investment Strategy 
An update on the investment position of the Council will be reported to Cabinet in the 2025/26
Mid-Year Treasury report and the Annual Treasury Report will be submitted to the Council
after the end of the financial year. 
156

Page 157

22
Appendix 1: Prudential Indicators 2029 to 2034 
* A negative annual change in CFR reflects a reduction in the need to finance capital investment from borrowing.
2028/29 2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m £m
General Services Capital expenditure                     29.958                      25.913                      11.042                      10.292                      10.292                      10.292
Funded by:
Borrowing                       6.971                        5.197                        0.750                             -                                -                                -   
Receipts / Grants                     22.987                      20.716                      10.292                      10.292                      10.292                      10.292
Funded from Revenue                            -                                -                                -                                -                                -                                -   
Funded from Reserves                            -                                -                                -                                -                                -                                -   
Total                     29.958                      25.913                      11.042                      10.292                      10.292                      10.292
HRA Capital expenditure                     42.038                      23.587                      22.851                      23.446                      24.138                      24.850
Funded by:
Borrowing                     20.952                        2.681                        4.946                      10.533                      10.673                        9.235
Receipts / Grants                     11.845                      15.125                             -                                -                                -                                -   
Funded from Revenue                       8.469                        5.193                      11.098                      12.913                      13.465                      15.615
Funded from Reserves                       0.772                        0.588                        6.807                             -                                -                                -   
Total                     42.038                      23.587                      22.851                      23.446                      24.138                      24.850
2028/29 2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m £m
General Services                   537.673                    534.212                    525.447                    515.081                    503.693                    491.044
HRA                   328.833                    325.151                    322.345                    325.008                    326.591                    326.805
Sub-total                   866.506                    859.363                    847.792                    840.089                    830.284                    817.849
Less PPP/NPD long-term liability                   (62.547)                   (56.667)                   (50.841)                   (44.793)                   (38.127)                   (29.984)
Sub-total                   803.959                    802.696                    796.951                    795.296                    792.157                    787.865
Movement in CFR
General Services                       3.602                        2.419                      (2.939)                     (4.318)                     (4.722)                     (4.506)
HRA                     14.366                      (3.682)                     (2.806)                       2.663                        1.583                        0.214
Annual Change                     17.968                      (1.263)                     (5.745)                     (1.655)                     (3.139)                     (4.292)
Estimates of Capital Expenditure and
Income
Capital Financing Requirement (CFR)
157

Page 158

23 
2028/29 2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m £m
General Services 5.5% 5.4% 5.5% 5.6% 5.6% 5.5%
HRA 30.5% 29.2% 29.8% 28.8% 29.2% 27.9%
2028/29 2029/30 2030/31 2031/32 2032/33 2033/34
Current Portfolio Position Estimate Estimate Estimate Estimate Estimate Estimate
(excluding PPP/NPD) £m £m £m £m £m £m
Gross Debt at 31 March                   750.587                    745.386                    735.711                    729.946                    722.664                    714.188
CFR                   803.959                    802.696                    796.951                    795.296                    792.157                    787.865
(Under)/Over Borrowed Position                   (53.372)                   (57.310)                   (61.240)                   (65.350)                   (69.493)                   (73.677)
2028/29 2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m £m
Investments at 31 March                     30.000                      30.000                      30.000                      30.000                      30.000                      30.000
Net Debt at 31 March                   720.587                    715.386                    705.711                    699.946                    692.664                    684.188
2028/29 2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m £m
Anticipated borrowing                   814.686                    812.425                    815.199                    807.484                    805.969                    801.392
PPP/NPD long-term liability                     62.547                      56.667                      50.841                      44.793                      38.127                      29.984
Operational Boundary                   877.233                    869.092                    866.040                    852.277                    844.096                    831.376
2028/29 2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m £m
Operational Boundary + 10%                   896.155                    893.668                    896.719                    888.232                    886.566                    881.531
PPP/NPD long-term liability                     62.547                      56.667                      50.841                      44.793                      38.127                      29.984
Authorised Limit                   958.702                    950.335                    947.560                    933.025                    924.693                    911.515
Proportion of financing costs to net
revenue stream
Current Portfolio Position
Authorised Limit
Operational Boundary
2028/29 2029/30 2030/31 2031/32 2032/33 2033/34
Forecast
£m
Forecast
£m
Forecast
£m
Forecast
£m
Forecast
£m
Forecast
£m
Loans CFR 803.956 802.693 796.948 795.293 792.154 787.862
Less Balance sheet resources (82.430) (85.377) (90.084) (95.174) (100.117) (105.138)
Net loans requirement 721.526 717.316 706.864 700.119 692.037 682.724
Liquidity allowance 10.250 10.506 10.769 11.038 11.314 11.597
Liability Benchmark 731.776 727.822 717.633 711.157 703.351 694.321
Liability Benchmark
158

Page 159

24 
159

Page 160

25
Appendix 2: Treasury Risk Register 
Risk Title Description Consequence of Risk Current Controls RAG
Status
Credit and
Counterparty
Risk
This is the risk of failure by a counterparty
(bank or building society) to meet its
contractual obligations to the organisation
particularly due to the counterparty’s
diminished creditworthiness, and the
resulting detrimental effect on the
organisation’s capital or current (revenue)
resources. There are no counterparties
where this risk is zero although AAA rated
organisations have a very high level of
creditworthiness.
That investment funds will not be
returned in full to the Council as
per the contractual obligation of
the counterparty.
The Council sets minimum
credit criteria to determine
which counterparties and
countries are of sufficiently
high creditworthiness to
invest securely.  
The RAG status is Amber
because this risk will never
be fully eliminated. 
Amber 
Liquidity Risk This is the risk that cash will not be available
when it is needed.   Whilst it could be said
that all counterparties are subject to at least a
very small level of liquidity risk, in this
document, liquidity risk has been treated as
whether or not instant access to cash can be
obtained from each form of investment
instrument.  While some forms of investment
e.g. gilts, Certificates of Deposit, corporate
bonds can usually be sold immediately if the
need arises, there are two caveats: - a) cash
may not be available until a settlement date
up to three days after the sale; and b) there is
an implied assumption that markets will not
freeze up and so the instrument in question
will find a ready buyer.  
That the Council has insufficient
access to cash to enable it to
carry out its activities.
The Council has a cash flow
forecasting model to enable
it to determine how long
investments can be made
for and how much can be
invested.  This has a high
level of assurance around
regular cash inflows and
outflows.
Some of the Council’s
cashflow related
investments are invested in
Money Market Funds which
provide very high daily
liquidity. 
Green
160

Page 161

26
Risk Title Description Consequence of Risk Current Controls RAG
Status
Market Risk This is the risk that, through adverse market
fluctuations in the value of the sums that the
Council borrows and invests, there is a
detrimental impact on the Council.
That investment funds will not be
returned in full to the Council as
per the contractual obligation of
the counterparty due to market
variations.
Only a proportion of the
Council’s investments will
be invested in instruments
whose value are subject to
market movements.  The
proportion will not exceed
the maximum percentage
the Council will invest in
investments over 1 year
Green
Interest Rate
Risk
This is the risk that fluctuations in the levels
of interest rates create an unexpected or
unbudgeted burden on the organisation’s
finances, against which the organisation has
failed to protect itself adequately.  The
Council has set limits for its fixed and
variable rate exposure in its Treasury
Indicators in this report
That the Council will be faced with
unexpected higher interest costs
due to market variations.
The Council manages this
risk by having a view of the
future course of interest
rates and then formulating
a treasury management
strategy accordingly which
aims to maximise
investment earnings
consistent with control of
risk or alternatively, seeks
to minimise expenditure on
interest costs on
borrowing.
Green
Legal and
Regulatory Risk
This is the risk that the organisation itself, or
an organisation with which it is dealing in its
treasury management activities, fails to act in
accordance with its legal powers or
regulatory requirements, including failure to
comply with the CIPFA Codes and that the
organisation suffers losses accordingly.
That investment funds will not be
returned in full to the Council due
to the failure of the counterparty
to comply with their contractual
obligations
The Council will not
undertake any form of
investing until it has
ensured that it has all
necessary powers and has
complied with all
regulations.  
Green
161

Page 162

27
Appendix 3: Permitted Investments, Risks and Mitigating Controls 
Type of Investment Description and Risk Mitigating Controls Council Limits
Banks Unsecured These are accounts, deposits,
certificates of deposit and senior
unsecured bonds with banks and
building societies, other than
multilateral development banks,
which are established by more than
one country, e.g. European
Investment Bank.  These
investments are subject to the risk of
credit loss via a bail-in should the
regulator determine that the bank is
failing or likely to fail.   
Diversifying investments is crucial to
managing bail-in risk, in addition to
determining proportionate counterparty and
maturity limits. Certificates of Deposit, which
are tradable on the secondary market and
which can be sold prior to maturity, will also
assist in managing credit risk.  
The combined secured and
unsecured investments in any
one bank will not exceed £10m.
Banks Secured These are covered bonds, secured
deposits, reverse repurchase
agreements and other collateralised
arrangements with banks and
building societies.  Reverse
purchase agreements involve the
purchase of securities with the
agreement to sell at a future date at
a higher price.  Collateralised
arrangement are an investment with
collateral such as properties or debt. 
These investments are secured on the
bank’s assets, which limits the potential
losses in the unlikely event of insolvency,
and means that they are exempt from bail-
in.  Where there is no investment specific
credit rating, but the collateral upon which
the investment is secured has a credit
rating, the higher of the collateral credit
rating and the counterparty credit rating will
be used to determine cash and time limits. 
The combined secured and
unsecured investments in any
one bank will not exceed £10m.
162

Page 163

28
Type of Investment Description and Risk Mitigating Controls Council Limits
Operational Bank
Accounts
The Council will incur operational
exposures to its banking services
provider, Clydesdale Bank, through
current accounts.  The bank is not
currently on the Council's lending
list as its credit ratings are below
the investment credit rating criteria
of A-. These balances are not
classed as investments but are still
subject to the risk of bail-in and
balances will therefore be
minimised. 
The Bank of England has stated that in
the event of failure, banks with assets
greater than £25 billion (which applies to
Clydesdale Bank) are more likely to be
bailed in than made insolvent, increasing
the chance of the Council maintaining
operational continuity.  .
The Council monitors its
operational accounts on a daily
basis, transferring any surplus
funds to investment accounts and
there for minimising the amount
held in the operational bank
account at any time.
Government These are loans, bonds and bills
issued or guaranteed by national
governments, regional and local
authorities and multilateral
development banks.  Includes the
UK Debt Management Office. 
These investments are not subject to bail-
in, and there is an insignificant risk of
insolvency.  
Investments with the UK Central
Government may be made in
unlimited amounts for up to 50
years.
Corporates These are loans, bonds and
commercial paper issued by
companies other than banks and
registered social landlords. Loans to
unrated companies will only be
made if approved through a
separate report to Council. 
These investments are not subject to bail-
in, but are exposed to the risk of the
company going insolvent.  This risk will be
mitigated by taking independent external
advice and diversifying investments over a
number of counterparties. 
Loans to unrated companies
would be made as part of a
diversified pool in order to spread
the risk widely.
163

Page 164

29
Type of Investment Description and Risk Mitigating Controls Council Limits
Registered Social
Landlords
These are loans and bonds issued
by, guaranteed by or secured on the
assets of Registered Social
Landlords (Housing Associations). 
These bodies are regulated by the
Scottish Housing Regulator and by
the Homes and Communities
Agency for Registered Providers of
Social Housing in England. 
As providers of public services, they retain
the likelihood of receiving government
support if needed and are therefore
considered low risk.  
Policy driven, managing all
associated risks.
Money Market Funds These are diversified investment
vehicles consisting of the any of the
above investment types, plus equity
shares and property. These funds
have the advantage of providing
wide diversification of investment
risks, coupled with the services of a
professional fund manager in return
for a management fee.  
Short-term Money Market Funds that offer
same-day liquidity and very low or no
volatility will be used as an alternative to
instant access bank accounts.
It is recommended that no more
than £10m is invested in any one
MMF and that the amount
invested is no more than 0.5% of
the size of a MMF used for
liquidity purposes. 
For pooled investment vehicles
that invest in bonds, equities and
property, all of which operate on a
variable net asset value (VNAV) it
is recommended that no more
than 10% of the Council’s total
investments are invested in each
fund.  These investments will be
held for periods greater than 1
year. 
164

Page 165

30
Type of Investment Description and Risk Mitigating Controls Council Limits
Investment
Properties
These are non-operational
properties that are being held
pending disposal, or for a longer-
term rental income stream.  They
are highly illiquid assets with high
risk to value (the potential for
property prices to fall or for rental
voids).  
In larger investment portfolios, some small
allocation of property-based investment
may counterbalance/ complement the wider
cash portfolio.  Property holding will be re-
valued regularly and reported annually with
gross and net rental streams. 
Member approval required and each
application must be supported by the
service rationale behind the loan and the
likelihood of partial or full default.
Policy driven, managing all
associated risks.
Loans to third
parties, including soft
loans
These are service investments either
at market rates of interest, or below
market rates (soft loans).  These
types of investments may exhibit
credit risk and are likely to be highly
illiquid.
Each third party loan requires Member
approval and each application must be
supported by the service rationale behind
the loan and the likelihood of partial or full
default.  Interest payments and loan
repayments will be monitored and the
likelihood of partial or full default re-
assessed regularly.
Policy driven, amount and loan
maturity limit will be determined
on a case-by-case basis.
Loans to a local
authority company
These are service investments either
at market rates of interest, or below
market rates (soft loans).  These
types of investments may exhibit
credit risk and are likely to be highly
illiquid.
Each loan to a local authority company
requires Member approval and each
application must be supported by the
service rationale behind the loan and the
likelihood of partial or full default. 
Interest payments, loan repayments, and
their timeliness will be monitored and the
likelihood or partial or full default
reassessed regularly.
Policy driven, amount and loan
maturity limit determined on a
case-by-case basis, managing all
associated risks.
165

Page 166

31
Type of Investment Description and Risk Mitigating Controls Council Limits
Shareholdings in a
local authority
company
These are service investments,
which may exhibit market risk and
are likely to be highly illiquid.
Each equity investment in a local authority
company requires Member approval and
each application must be supported by the
service rationale behind the investment and
the likelihood of loss.  Service investments
will be subject to scrutiny by Financial
Services on a regular basis and will include
scrutiny of financial statements issued by
the local authority company.
Policy driven, amount determined
on a case-by-case basis,
managing all associated risks.
Non-local authority
shareholdings
These are non-service investments,
which may exhibit market risk, will
only be considered for longer term
investments and are likely to be
liquid.
Any non-service equity investment will
require separate Member approval and
each application must be supported by the
service rationale behind the investment and
the likelihood of loss.  Non-service
investments will be subject to scrutiny by
Financial Services on a regular basis,
reported to Members, and will include
scrutiny of financial statements issued by
the company.
Policy driven, amount and
anticipated time frame for
shareholding determined on a
case-by-case basis, managing all
associated risks. 
166

Page 167

32
Appendix 4: Policy on Repayment of Loans Fund Advances 
Policy on Repayment of Loans Fund Advances 
The purpose of the Loans Fund is to record advances from the loan fund for expenditure
incurred, or loans made to third parties, which a local authority has determined are to be
financed from borrowing as set out in Regulation 2 of The Local Authority (Capital Finance
and Accounting) (Scotland) Regulations 2016 [“the Regulations”]. The Council is also
statutorily required to repay Loans Fund advances and to prudently determine the periods
over which it will repay Loans Fund advances and the amount of repayments in any financial
year.   
Loans Fund advances comprise several items and the estimated opening balances for
2025/26, where applicable for North Ayrshire Council, are: 
• capital expenditure (£541.275m);
• grants to third parties and expenditure on third party assets which would be classified
as capital expenditure by a local authority (£0m);
• loans to third parties (£0m); and
• expenditure for which a borrowing consent has been issued by the Scottish
Government (£0m). 
Prudent repayment of Loans Fund advances 
The loans fund advance is effectively the repayment of the ‘principal’ linked to the expenditure
classified above which is unfinanced and is required to be funded from borrowing.
Repayment of loans fund advances are required to be made in line with Scottish Government
statutory guidance on Loans Fund Accounting, most recently issued in 2024. The Council’s
annual accounts require to include a disclosure of details of Loans Fund transactions. The
HRA Loans Fund advances and associated annual repayments are identified separately from
that of the General Fund. 
The broad aim of prudent repayment is to ensure that the Council’s unfinanced capital
expenditure is repaid over the period of years in which that expenditure is expected to provide
a benefit and that each year’s repayment amount is reasonably commensurate with the
period and pattern of the benefits. Where a loans fund advance is made for an asset, that
period will be the asset’s useful life. Where an asset life cannot reasonably be established,
the repayment period will not exceed 50 years. 
The statutory guidance requires the Council to approve a policy on Loans Fund repayments
each year and recommends a number of options for calculating prudent repayments. North
Ayrshire Council’s policy is as follows: 
For the majority of projects undertaken by the Council the policy is to use the asset life
method to repay loans fund advances on an annuity basis, which is similar to the
repayment of a mortgage where principal payments are lower at the start of the mortgage
and build up to deliver full repayment over the term of the mortgage. As well as annuity,
the asset life method has the option of equal instalments. 
167

Page 168

33
The Council will continue to consider the most appropriate repayment method which
aligns to the benefits of the assets and ensures a prudent repayment. 
In addition, there are some projects where income streams are attached to the project
which can be reasonably associated with the borrowing which will be undertaken.  In
these circumstances it may be more appropriate for the advances to be repaid on a
profile which matches this income. For these unique projects, loans fund advances may
be profiled for repayment to match the income and not on the annuity basis.   
These options comply with the statutory guidance and the Council will continue to
consider all options available to it. 
The repayment of Loans Fund advances will therefore be equal to the annual amount
determined in accordance with the Local Authority (Capital Finance and Accounting)
(Scotland) Regulations 2016. 
The above regulations state that Council’s may vary the period and/or amount of the
repayments if they consider it prudent to do so. As a result, officers continue to review existing
loans fund advances for opportunities to ensure the most prudent repayment method is being
used. 
Estimates of prudent Loans Fund repayment 
The Council’s latest estimates of its Loans Fund account information are as follows: 
Policy on Apportioning Interest to the HRA 
Interest and expenses on all new borrowing is allocated to the HRA based on the share of
total borrowing taken each year. 
Credit arrangements
Loans Fund advances are not made for credit arrangements such as leases and service
concession (PFI/PPP) arrangements, but a statutory charge to revenue similar to a Loans Fund
repayment is made to repay the associated debt. Except where flexible arrangements have
previously been approved, the charge will be equal to the contractual unitary payment due for
the financial year after deducting (a) those amounts which have been already charged to
revenue such as interest and (b) actual or prepaid lifecycle replacement costs.
Year
Opening
Balance
£m
Advances to
GF
£m
Advances to
HRA
£m
Repayment  by
GF
£m
Repayment by
HRA
£m
Closing
Balance
£m
2023/24 actual 384.065 34.035 25.242 -1.461 -4.994 436.887
2024/25 436.887 85.002 27.021 -1.498 -6.137 541.275
2025/26 - 29/30 541.275 156.510 153.481 -14.852 -33.720 802.694
2030/31 – 34/35 802.694 0.750 44.913 -20.551 -43.048 784.758
2035/36 – 39/40 784.758 0.000 79.389 -31.818 -52.232 780.097
2040/41– 44/45 780.097 0.000 86.694 -62.620 -59.149 745.022
2045/46 – 49/50 745.022 0.000 11.809 -84.352 -64.293 608.186
2050/51 – 54/55 608.186 0.000 0.000 -102.738 -52.595 452.853
2055/56 – 59/60 452.853 0.000 0.000 -63.977 -51.452 337.424
2060/61 – 64/65 337.424 0.000 0.000 -44.834 -59.041 233.549
2065/66 – 69/70 233.549 0.000 0.000 -33.727 -56.220 143.602
2070/71 & later 143.602 0.000 0.000 -33.678 -109.924 0.000
168

Page 169

34
Appendix 5: Economic Background – Arlingclose’s View December
2024 
Economic Outlook 
The impact on the UK from the government’s Autumn Budget, slower expected
interest rate cuts, a short-term boost to but modestly weaker economic growth over
the medium term, together with the impact from President-elect Trump’s second
term in office and uncertainties around US domestic and foreign policy, will be major
influences on the Authority’s treasury management strategy for 2025/26. 
The Bank of England’s (BoE) Monetary Policy Committee (MPC) held Bank Rate at
4.75% at its December 2024 meeting, having reduced it to that level in November
and following a previous 25bp cut from the 5.25% peak at the August MPC meeting.
At the December meeting, six Committee members voted to maintain Bank Rate at
4.75% while three members preferred to reduce it to 4.50%. 
The November quarterly Monetary Policy Report (MPR) expected Gross Domestic
Product (GDP) growth to pick up to around 1.75% (four-quarter GDP) in the early
period of the BoE’s forecast horizon before falling back. The impact from the Budget
pushes GDP higher in 2025 than was expected in the previous MPR, before
becoming weaker. Current GDP growth was shown to be zero (0.0%) between July
and September 2024 and 0.4% between April and June 2024, a further downward
revision from the 0.5% rate previously reported by the Office for National Statistics
(ONS). 
ONS figures reported the annual Consumer Price Index (CPI) inflation rate at 2.6%
in November 2024, up from 2.3% in the previous month and in line with expectations.
Core CPI also rose, but by more than expected, to 3.6% against a forecast of 3.5%
and 3.3% in the previous month. The outlook for CPI inflation in the November MPR
showed it rising above the MPC’s 2% target from 2024 into 2025 and reaching
around 2.75% by the middle of calendar 2025. This represents a modest near-term
increase due to the ongoing impacts from higher interest rates, the Autumn Budget,
and a projected margin of economic slack. Over the medium-term, once these
pressures ease, inflation is expected to stabilise around the 2% target. 
The labour market appears to be easing slowly, but the data still require treating
with some caution. The latest figures reported the unemployment rate rose to 4.3%
in the three months to October 2024 and economic inactivity fell to 21.7%. Pay
growth for the same period was reported at 5.2% for both regular earnings
(excluding bonuses) and for total earnings. Looking ahead, the BoE MPR showed
the unemployment rate is expected to increase modestly, rising to around 4.5%, the
assumed medium-term equilibrium unemployment rate, by the end of the forecast
horizon. 
The US Federal Reserve has continued cutting interest rates, bringing down the Fed
Funds Rate by 0.25% at its December 2024 monetary policy meeting to a range of
4.25%-4.50%, marking the third consecutive reduction. Further interest rate cuts are
expected, but uncertainties around the potential inflationary impact of incoming
President Trump’s policies may muddy the waters in terms of the pace and
169

Page 170

35
magnitude of further rate reductions. Moreover, the US economy continues to
expand at a decent pace, rising at an (upwardly revised) annual rate of 3.1% in the
third quarter of 2024, and inflation remains elevated suggesting that monetary policy
may need to remain more restrictive in the coming months than had previously been
anticipated. 
Euro zone inflation rose above the European Central Bank (ECB) 2% target in
November 2024, hitting 2.2% as was widely expected and a further increase from
2% in the previous month. Despite the rise, the ECB continued its rate cutting cycle
and reduced its three key policy rates by 0.25% in December. Inflation is expected
to rise further in the short term, but then fall back towards the 2% target during 2025,
with the ECB remaining committed to maintaining rates at levels consistent with
bringing inflation to target, but without suggesting a specific path. 
Credit outlook 
Credit Default Swap (CDS) prices have typically followed a general trend
downwards during 2024, reflecting a relatively more stable financial period
compared to the previous year. Improved credit conditions in 2024 have also led to
greater convergence in CDS prices between ringfenced (retail) and non-ringfenced
(investment) banking entities again.
Higher interest rates can lead to a deterioration in banks’ asset quality through
increased loan defaults and volatility in the value of capital investments. Fortunately,
the rapid interest rate hikes during this monetary tightening cycle, while putting some
strain on households and corporate borrowers, has not caused a rise in defaults,
and banks have fared better than expected to date, buoyed by strong capital
positions. Low unemployment and robust wage growth have also limited the number
of problem loans, all of which are positive in terms of creditworthiness.
Moreover, while a potential easing of US financial regulations under a Donald Trump
Presidency may aid their banks’ competitiveness compared to institutions in the UK
and other regions, it is unlikely there will be any material impact on the underlying
creditworthiness of the institutions on the counterparty list maintained by
Arlingclose, the authority’s treasury adviser.
Overall, the institutions on our adviser Arlingclose’s counterparty list remain well-
capitalised and their counterparty advice on both recommended institutions and
maximum duration remain under constant review and will continue to reflect
economic conditions and the credit outlook. 