NORTH AYRSHIRE COUNCIL 26 February 2025 North Ayrshire Council Title: Capital Investment Programme 2025/26 to 2033/34 Purpose: To advise Council on the draft Capital Investment Programme to 2033/34 Recommendation: That Council : (a) approves the refreshed Capital Investment Programme to 2033/34 included in Appendix 3; (b) notes that the programme will be reviewed on an on-going basis with the next major review in 2026/27; and (c) approves the refreshed Capital Investment Strategy included in Appendix 4. 1. Executive Summary 1.1 The General Services Capital Investment Programme 2024/25 to 2033/34 was approved by Council on 28 February 2024. This report outlines the recommendations of the refresh of the Capital Investment Programme carried out during 2024/25. The next full review of the Programme will be carried out during 2026/27. 1.2 The refresh has incorporated all funding sources to 2033/34, including assumed levels of general capital grant, specific grants and a prudent assessment of the level of capital receipts over the period. Total available funding has been projected at £174.223m. The balance of funding required to deliver the capital programme will be met through prudential borrowing and this is anticipated at £157.260m. 1.3 The refresh considered the current Capital Investment Programme and takes cognisance of subsequent changes, including: • The ongoing impact of construction industry inflation, cost volatility and supply chain issues across the overall Capital Investment Programme; • Revised Scottish Government capital grants as detailed in the Local Government Finance Settlement 2025/26; • A review of spending profiles across key capital projects to support the Council’s priorities; and • Revised levels of investment across projects, taking cognisance of Council priorities, external funding sources and investing in core assets through asset management plans.
Page 2
1.4 The proposed refreshed Capital Investment Programme, aligned to the Council Plan priorities, is attached in Appendix 3 and will deliver a total programme of £331.483m to 2033/34. 1.5 Compliance with Regulations and the Prudential Code requires assurance to be provided on affordability and sustainability of the Capital Investment programme, this is provided in the Treasury Management and Investment Strategy (TMIS) which follows this report on the Council agenda. The TMIS recognises that this will require to be kept under review to ensure the underlying assumptions continue to apply. 1.6 The longer-term affordability of the current and future Capital Investment Programmes requires incremental increases the current General Fund financing budgets. As part of the next major review of the capital programme, due to be undertaken during 2026/27, a review of available General Fund financing budgets will be carried out to determine any changes required to support the delivery of the draft Capital Investment Programme. 1.7 In addition to the TMIS, there is a requirement for the Council to publish a Capital Investment Strategy (CIS). As part of the refresh of the Capital Investment Programme, a refresh of the current CIS has been undertaken during 2024/25. The refreshed CIS is attached at Appendix 4. 1.8 The Capital Investment Programme will continue to be reviewed on an on-going basis. The primary focus at this time is on delivery of the current programme. Due to ongoing risks associated with construction cost volatility and the higher cost of borrowing, opportunities for further investment to be met from borrowing is extremely limited. Major reviews will be undertaken on a 3-year basis, with the next due to be completed during 2026/27. 2. Background Capital Investment Programme 2024/25 to 2033/34 2.1 North Ayrshire Council approved the current Capital Investment Programme for the period 2024/25 to 2033/34 on 28 February 2024. A refresh of the Programme was undertaken during 2024/25. This report contains the outcome of that refresh. Review of Capital Funding Scottish Government General Capital Grant 2.2 Local Government Finance Circular 10/2024 confirmed the level of General Capital Grant as £8.367m for 2025/26. This comprises: Fund Value (£m) Comments General Capital Grant Core 9.710 An increase of £0.642m Less Flooding element (2.206) Underspend on Millport Coastal project Coastal Change Adaptation 0.140 Nature Restoration 0.145 Restoration of 2024/25 funding
Page 3
Play Parks 0.578 Total General Capital Grant 8.367 2.3 Projected at the core level of £9.710m to 2033/34, with a further reduction of (£1.914m) anticipated in 2026/27 as a result of the underspend on the Millport Coastal flooding project, the total General Capital Grant for the period is forecast as £84.133m. Scottish Government Specific Capital Grants 2.4 In addition to the General Capital Grant, the Council will receive two Specific Grants: • £1.561m to tackle Vacant and Derelict Land with projects requiring Scottish Government approval; and • £0.582m, to fund Active Travel. The Vacant and Derelict Land funding is an increase of £0.598m from that received during 2024/25 and has only been confirmed for 2025/26. However, the Active Travel funding has been projected at current levels to 2033/34. 2.5 In addition, the programme includes previous Specific Grant allocations in relation to a number of programmes which have been carried over into 2025/26 in line with revised project plans, including: • £1.837m from the 2024/25 Vacant and Derelict Land allocation; and • £0.316m from the 2024/25 Place Based Investment Programme. 2.6 As a result, the total forecast Specific Grant income to 2033/34 is £8.952m. Other Government Funding 2.7 The programme includes funding from the Scottish and UK Governments to support the Ayrshire Growth Deal. The total anticipated funding over the period is £53.869m. This has been aligned to the latest programme planning information. 2.8 The UK Government previously confirmed that North Ayrshire Council has been awarded £23.693m from the Levelling Up Fund to support the upgrading of the B714 to improve connectivity between North Ayrshire and the wider motorway network. £21.553m of this award is anticipated for receipt during financial years 2025/26 to 2026/27. 2.9 The UK Government has confirmed additional funding for 2025/26 from the UK Shared Prosperity Fund of £0.576m. Other Internal Funds 2.10 The programme includes previously approved contributions from earmarked funds of £0.704m to support the Solar PV project and £0.710m to support the B714 Upgrade.
Page 4
Capital Receipts 2.11 A review of projected income from capital receipts has been undertaken during 2024/25. This is forecast to realise income of £3.625m over the period of the programme in relation to the sale of other Council owned assets. Other External Funding 2.12 In relation to additional grant funding from other external bodies, given the level of uncertainty around securing these funds, only those funds which have been confirmed, but not yet drawn down, have been included at this time. As a result, £0.101m NAVT funding to support the Irvine Enterprise Area has been included while (£0.800m) of NAVT funding to support Marine Tourism has been reviewed pending revisions to the Ayrshire Growth Deal programme. Prudential Borrowing 2.13 The difference between the Council's Capital Investment Programme and funding from the above sources is met through prudential borrowing of £157.260m. The Capital Investment Programme will be delivered within the approved loan charges revenue budget, utilising the balances held in the Prudential Investment Fund and Capital Fund to smooth the revenue implications of the borrowing costs associated with the revised programme. Development of the Capital Investment Programme to 2033/34 2.14 The refresh of the Capital Investment Programme to 2033/34 incorporates the re- profiling of a number of projects to better reflect current projected timelines and revised levels of investment that take cognisance of the Council’s key priorities, funding availability and lifecycle maintenance requirements informed through asset management plans. 2.15 The current capital investment programme to 2033/34, as approved by Council on 28 February 2024, has been updated to reflect the changes to the Programme approved by Cabinet during 2024/25, including any re-phasing of programmes to reflect updated project plans. Re-Profiling 2.16 A total of £17.282m of planned expenditure has been re-profiled from 2024/25 into 2025/26 to 2033/34 in line with updated project delivery timelines. Full details of individual projects re-phased from 2024/25 have been reported to Cabinet throughout the year. Investments linked to Revised Funding 2.17 Local Government Finance Circular 10/2024 confirmed the level of Cycling, Walking and Safer Routes specific grant for 2025/26 at £0.582m. Expenditure has been projected at this level for the full period of the Capital Investment Programme, resulting in a reduction in investment of (£0.045m) to 2033/34. In addition, Vacant and
Page 5
Derelict Land specific grant for 2025/26 has been confirmed at £1.561m and has been reflected in additional investment at this level. 2.18 Following completion of the Millport Coastal Flood Protection scheme, a significant underspend has been reported. Local Government Finance Circular 10/2024 includes a deduction of £2.206m from the General Capital Grant aligned to this underspend, due to the 80% funding from Scottish Government, with a further reduction of £1.914m anticipated for 2026/27. The overall investment has been reduced by (£4.120m) to reflect the reduced funding level. 2.19 Pending revisions to the Ayrshire Growth Deal programme in relation to Marine tourism, the level of investment in Marine Tourism has been reduced by (£0.800m) linked to the review of NAVT funding. Discussions on the appropriate utilisation of available funding are ongoing and will be reported to Cabinet on an ongoing basis. Additional / Revised Investments 2.20 An additional investment of £0.576m has been included linked to the UKSPF grant funding. This will support a competitive community grants scheme and small scale council led regeneration projects which align with the interventions of the UK Shared Prosperity Fund and the regeneration delivery plan approved by Cabinet in May 2023. 2.21 Additional investment of £0.226m has been included to support internal alterations to Fairie Primary School to create new classroom spaces in order to accommodate its increasing roll. Fairlie Primary School currently operates using all of the available 5 classroom bays. As a result of new homes being built in the area and indications that parental choice is to access non-denominational provision, the school roll is forecast to increase to 118 from August 2025. This will require the creation of one additional classroom. 2.22 Recent years have witnessed significant cost volatility across the construction industry, including inflationary pressures, limited availability of contractors, supply chain issues and material shortages which are impacting on tender returns and the cost of materials. Where quantified, the resultant cost pressures have been recognised in relation to specific projects. However, risks have also been identified, or are anticipated, across a number of projects using industry cost estimates as an indicator, including major works at Ardrossan North Shore through enabling works and Ardrossan Campus. In order to support the management of these and other emerging risks, and to apply prudent financial planning, it is proposed that an additional investment of £15.000m within the Flexibility budget is included over the next five years. This position will continue to be monitored as works advance and tenders are finalised. 2.23 The current approved Capital Investment Programme to 2033/34 is attached at appendix 1. Full details of the proposed changes to the programme following the review, as outlined above, are included in appendix 2. The revised Capital Investment Programme covering the period from 2025/26 to 2033/34 is included in appendix 3. This will deliver a total programme of investment of £331.483m.
Page 6
Future Affordability 2.24 The Prudential Investment Fund was created as part of the 2015/16 budget strategy to utilise short term underspends on General Fund financing budgets to offset longer term pressures to support Prudential Borrowing arising from the Capital Investment Programme. 2.25 Due to the significant investment planned by North Ayrshire Council over the period to 2033/34, set within the context of government grant forecasts and combined with the additional cost pressures identified across a number of projects, it is projected that these funds will be exhausted before the end of the current 10 year Capital Investment Programme. In order to ensure the affordability of current and future capital investments beyond this, it will be necessary to incrementally increase the current General Fund financing budgets over the period of the programme. Additional funding support to mitigate the significant cost increases and the increased cost of borrowing includes the use of the recurring element of the Service Concession flexibility, approved at Council on 15 February 2023, which resulted in an average contribution of £3.437m from 2022/23 and the utilisation of the balance of savings from the temporary reduction in the employers’ superannuation contributions during 2024/25 and 2025/26 totalling £8.498m. 2.26 In addition to the application of these non-recurring funds, it is necessary to include an indicative recurring pressure within the General Services Revenue Estimates 2025/26 to 2027/28. This includes an incremental contribution of £0.025m per annum from 2026/27. The impacts of inflationary pressures and interest rate fluctuations will continue to be monitored on an ongoing basis and the resultant increases in revenue contributions will be reviewed as part of the next major review of the capital programme, due to be undertaken during 2026/27. Treasury Management and Investment Strategy (TMIS) 2.27 Compliance with Regulation and the Prudential Code requires assurance to be provided on affordability and sustainability of the Capital Investment Programme. This is provided in the Treasury Management and Investment Strategy (TMIS) which follows this report on the Council agenda. The TMIS recognises that this will require to be kept under review to ensure the underlying assumptions continue to apply. Capital Investment Strategy 2.28 In addition to the TMIS there is also a requirement for the Council to publish a Capital Investment Strategy (CIS) which provides the overarching framework under which the draft Capital Investment Programme has been developed. The current CIS was approved by Council on 28 February 2024. During 2024/25 this has been refreshed with the revised CIS included at Appendix 4.
Page 7
Conclusion 2.29 The draft Capital Investment Programme 2025/26 to 2033/34, including proposed funding, is attached at Appendix 3. This confirms total investment of £331.483m over the period. The proposed investment aligns with the Council's key priorities, as set out in the Council Plan 2023-2028, core asset management plans and the refreshed Capital Investment Strategy, included at Appendix 4. 2.30 The programme is affordable based on the estimated funding streams set out in the 2025/26 to 2027/28 Medium Term Financial Plan and from the mitigating actions noted earlier in this report to supplement the Loans Fund. These proposals have been developed within a very challenging financial landscape impacted by a combination of significant cost volatility across the Programme and an increased cost of borrowing. The affordability of the Programme is also highlighted within the Treasury Management and Investment Strategy, reported elsewhere on the agenda, and this will be monitored on an ongoing basis. A further, full assessment of the Programme’s affordability will be undertaken as part of the next major review of the capital programme due for completion during 2026/27. 3. Proposals 3.1 It is proposed that Council : (a) approves the refreshed Capital Investment Programme to 2033/34 included in appendix 3; (b) notes that the programme will be reviewed on an on-going basis with the next major review in 2026/27; and (c) approves the refreshed Capital Investment Strategy included in appendix 4. 4. Implications/Socio-economic Duty Financial 4.1 The refreshed capital programme is based on a number of assumptions around the availability of finance including capital grant and capital receipts. Given the forward projection for 10 years, it is essential that these and the cost of projects are kept under review. There are a number of assumptions underpinning the current revenue projection including; the level of loans fund support, the level of future interest rates, delivery of the programme within the timelines outlined in the programme and application of the Capital Fund and the Prudential Investment Fund to smooth the revenue implications across the life of the plan. Due to the long-term nature of the borrowing required to support this programme, a review of available financing budgets has been undertaken with a view to increasing the available funding and maintaining the future affordability of the Programme.
Page 8
Human Resources 4.2 Through investment in the Capital Investment Programme, it is anticipated there will be additional staffing requirements. This will be considered on a project basis. Legal 4.3 None. Equality/Socio-economic 4.4 Where the Council is making decisions in relation to its spending priorities, it is obliged to comply with the public sector equality duty set out in the Equalities Act 2010. To meet this requirement, the Council assesses the impact of applying a decision against key groups to ensure that certain groups are not disadvantaged by those decisions. A number of the projects within the revised capital programme, will make a positive contribution to the Council’s commitment to equalities. Environmental and Sustainability 4.5 All projects within the revised plan will be delivered to minimise the impact on the environment and maximise sustainability. Further, specific projects within the plan will have a positive environmental impact. Key Priorities 4.6 The refreshed Capital Investment Programme 2025/26 to 2033/34 supports the delivery of the outcomes as outlined in the Council Plan 2023-2028 by focusing our investment on priorities, managing risk and supporting the delivery of key priorities. Community Wealth Building 4.7 The Council will aim to maximise opportunities within the context of the 5 pillars of Community Wealth Building from its investment programme. In particular, Ayrshire Growth Deal and growth and investment projects will make a positive contribution to economic regeneration across the region. 5. Consultation 5.1 Executive Directors have been consulted as part of the refresh the current capital investment programme and the identification of the proposed revisions and additions to the programme detailed in this report. Mark Boyd Head of Service (Finance) For further information please contact David Forbes, Senior Manager (Strategic Business Partner), on 01294 324551. Background Papers
Page 9
Capital Investment Programme 2024/25 to 2030/31 – North Ayrshire Council 28 February 2024
Page 10
Appendix 1 Project Description Revised 25/26 Revised 26/27 Revised 27/28 Revised 28/29 Revised 29/30 Revised 30/31 Revised 31/32 Revised 32/33 Revised 33/34 Total £ £ £ £ £ £ £ £ £ £ EXPENDITURE Place Roads Improvement / Reconstruction 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 34,200,000 Lighting 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 9,000,000 Millport Pier 154,960 134,960 289,920 Bridges infrastructure programme 560,000 560,000 560,000 560,000 560,000 560,000 560,000 560,000 560,000 5,040,000 Largs Promenade Seawall 50,000 50,000 B714 Improvements 14,776,694 12,211,695 26,988,389 Property lifecycle investment 1,400,000 1,600,000 1,100,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 10,100,000 Locality Based Property Review 1,000,000 1,500,000 2,500,000 Cemetery extns, walls & infra 204,797 145,602 11,521 361,920 Cmty, Ardrossan - Extension 450,000 450,000 Cmty, Kilbirnie - Walls 36,072 36,072 Cmty, Beith - Walls 51,417 51,417 Cmty, Abbey Tower - Walls 44,469 44,469 Cmty, Stev Hawkhill - Walls 51,196 51,196 Cmty, West Kilbride - Walls 47,282 47,282 Cmty, Kilbirnie - New 288,917 288,917 Goldcraigs Refurbishment 132,562 132,562 Renewal of Play Parks 578,000 578,000 Vehicles 2,000,000 2,980,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 18,980,000 Fleet Decarbonisation 1,660,000 1,950,000 3,610,000 Shewalton landfill 48,949 48,949 Solar PV Investment - Nethermains 260,721 260,721 Solar PV Investment - Shewalton 1,825,377 1,825,377 Montgomerie Park Masterplan 162,500 75,000 650,000 350,000 490,000 500,000 2,227,500 Active Travel Tier 1 587,000 587,000 587,000 587,000 587,000 587,000 587,000 587,000 587,000 5,283,000 Access Paths Network Programme 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 450,000 Growth & Investment AGD - i3 DPMC Phase 1 300,000 300,000 AGD - i3 DPMC Phase 2 250,000 1,456,861 2,908,275 4,615,136 AGD - i3 Flexible Business Space Phase 2 4,900,000 4,900,000 148,000 352,000 10,300,000 AGD - Hunterston - Centre for Low Carbon Energy & Circular Economy 335,000 4,196,000 4,196,000 4,196,000 4,195,880 17,118,880 AGD - Great Harbour 2,306,564 2,851,490 4,773,566 1,890,928 56,565 11,879,113 AGD - IMSE 250,000 273,740 3,200,000 3,250,000 2,897,747 9,871,487 AGD Marine Tourism - Ardrossan 2,000,000 2,500,000 224,285 4,724,285 AGD Marine Tourism - Arran 40,000 150,000 1,600,000 66,774 1,856,774 AGD Marine Tourism - Cumbrae 925,000 2,200,000 996,254 4,121,254 Ardrossan Harbour & Landside 1,776,330 896,851 2,673,181 Irvine Enterprise Area 51,540 51,540 Ardrossan North Shore 1,730,304 1,730,304 Sub Total 44,036,702 43,519,199 29,629,565 21,602,702 16,861,477 9,497,000 8,997,000 8,997,000 8,997,000 192,137,645 North Ayrshire Council Approved Capital Programme 2025/26 - 2033/34
Page 11
Appendix 1 Project Description Revised 25/26 Revised 26/27 Revised 27/28 Revised 28/29 Revised 29/30 Revised 30/31 Revised 31/32 Revised 32/33 Revised 33/34 Total £ £ £ £ £ £ £ £ £ £ North Ayrshire Council Approved Capital Programme 2025/26 - 2033/34 Education Universal Free School Meals Expansion 1,211,809 1,546,260 3,081,142 332,174 2,929,741 9,101,126 Schools ICT Investment 1,203,908 1,203,908 752,000 752,000 752,000 752,000 752,000 752,000 752,000 7,671,816 Ardrossan New Build 20,371,455 30,679,212 22,010,374 73,061,041 Sub Total 22,787,172 33,429,380 25,843,516 1,084,174 3,681,741 752,000 752,000 752,000 752,000 89,833,983 Corporate Services ICT Investment Fund 429,500 557,100 648,900 282,600 282,600 297,600 2,498,300 WAN 500,000 500,000 LAN/WiFi 1,500,000 1,500,000 Telephony 115,000 650,000 765,000 Sub Total 544,500 557,100 3,298,900 282,600 282,600 297,600 5,263,300 Health & Social Care Partnership Community Alarms - Analogue to Digital 68,977 68,977 Improvement grants 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 4,500,000 Sub Total 568,977 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 4,568,977 Other Flexibility / Infrastructure Fund 3,323,000 3,521,036 3,155,964 10,000,000 Sub Total 3,323,000 3,521,036 3,155,964 10,000,000 TOTAL EXPENDITURE 67,937,351 81,328,679 62,793,017 26,625,440 21,325,818 11,046,600 10,249,000 10,249,000 10,249,000 301,803,905 Revised 25/26 Revised 26/27 Revised 27/28 Revised 28/29 Revised 29/30 Revised 30/31 Revised 31/32 Revised 32/33 Revised 33/34 Total £ £ £ £ £ £ £ £ £ £ INCOME Prudential Borrowing 29,585,875 55,833,220 35,283,524 8,752,784 5,668,120 1,266,600 594,000 594,000 594,000 138,172,123 Specific Grants - AGD 6,655,585 15,130,279 17,854,493 8,217,656 6,002,698 53,860,711 Specific Grants - Active Travel Tier 1 587,000 587,000 587,000 587,000 587,000 587,000 587,000 587,000 587,000 5,283,000 Specific Grants - B714 Improvements 16,351,443 16,351,443 Specific Grants - Renewal of Play Parks 578,000 578,000 General Capital Grant - Flooding 440,000 440,000 General Capital Grant 9,068,000 9,068,000 9,068,000 9,068,000 9,068,000 9,068,000 9,068,000 9,068,000 9,068,000 81,612,000 Recovery & Renewal 703,707 710,180 1,413,887 Grants & Contributions 49,560 49,560 Sale of land & buildings 3,918,181 125,000 4,043,181 TOTAL INCOME 67,937,351 81,328,679 62,793,017 26,625,440 21,325,818 11,046,600 10,249,000 10,249,000 10,249,000 301,803,905
Page 12
Appendix 2 Project Description Changes 25/26 Changes 26/27 Changes 27/28 Changes 28/29 Changes 29/30 Changes 30/31 Changes 31/32 Changes 32/33 Changes 33/34 Total £ £ £ £ £ £ £ £ £ £ EXPENDITURE Place Roads Improvement / Reconstruction 100,000 100,000 Traffic Calming 82,953 82,953 Dockhead Street Saltcoats 100,000 100,000 Millport Pier 850,000 850,000 Millburn FPS 2,636,098 2,636,098 Coastal Adaptations 88,000 88,000 Largs Promenade Seawall (50,000) (50,000) Locality Based Property Review 1,036,481 (1,500,000) (463,519) Woodlands Primary Playingfield Drainage 22,274 22,274 Cemetery extns, walls & infra 15,113 15,113 Cmty, Ardrossan - Extension (450,000) (450,000) Cmty, Kilbirnie - Walls (27,072) (27,072) Cmty, Beith - Walls (51,417) (51,417) Cmty, Abbey Tower - Walls (44,469) (44,469) Cmty, Stev Hawkhill - Walls (51,196) (51,196) Cmty, West Kilbride - Walls (47,282) (47,282) Cmty, Kilbirnie - New 450,000 450,000 Goldcraigs Refurbishment 695,018 695,018 Renewal of Play Parks (578,000) (578,000) Fleet Decarbonisation 1,500,000 1,500,000 Place Based Investment Programme 100,000 100,000 UK Shared Prosperity Fund (SPF) 576,535 576,535 PBIP – Kilwinning Abbey Improvements 200,000 200,000 Lochshore Hub Play Area 8,970 9,420 10,640 11,180 11,740 51,950 Lochshore, Garnock Hub 40,991 40,991 VDLF 2025/26 Allocation 1,561,000 1,561,000 VDLF - Irvine Kyle Road Phase 2 1,803,061 1,803,061 VDLF - Tree Planting 47,600 47,600 Active Travel Tier 1 (5,000) (5,000) (5,000) (5,000) (5,000) (5,000) (5,000) (5,000) (5,000) (45,000) North Ayrshire Council Revisions to Capital Programme 2025/26 - 2033/34
Page 13
Appendix 2 Project Description Changes 25/26 Changes 26/27 Changes 27/28 Changes 28/29 Changes 29/30 Changes 30/31 Changes 31/32 Changes 32/33 Changes 33/34 Total £ £ £ £ £ £ £ £ £ £ North Ayrshire Council Revisions to Capital Programme 2025/26 - 2033/34 Growth & Investment AGD - i3 DPMC Phase 2 (200,000) (1,206,861) (1,452,275) 2,924,615 65,479 AGD - i3 Flexible Business Space Phase 2 362,045 (1,539,503) 1,570,760 (352,000) 41,302 AGD - Hunterston - Centre for Low Carbon Energy & Circular Economy 15,000 (3,746,000) 4,341,098 610,098 AGD - Great Harbour 1,820,145 (402,739) (1,222,466) (346,725) (4,683) (156,468) AGD - IMSE 200,000 200,000 400,000 AGD Marine Tourism - Ardrossan (2,000,000) (224,285) (2,224,285) AGD Marine Tourism - Arran 6,362 205,390 (223,207) (34,220) 33,692 (11,983) AGD Marine Tourism - Cumbrae (733,792) 754,043 234,638 33,694 34,875 323,458 Ardrossan Harbour & Landside 1,698,729 (896,851) 801,878 Irvine Enterprise Area 51,539 51,539 Ardrossan North Shore (1,309,240) 1,730,304 421,064 Sub Total 10,893,336 (6,270,687) (1,586,910) 2,231,544 4,187,437 (5,000) (5,000) (5,000) (5,000) 9,434,720 Education Fairlie Primary 94,444 115,000 10,000 219,444 Universal Free School Meals Expansion (13,621) (2,600,000) (2,613,621) Schools ICT Investment (200,000) (200,000) Ardrossan New Build 9,791,879 (2,044,980) 1,020,852 2,715 8,770,466 Sub Total 9,672,702 (1,929,980) 1,030,852 2,715 (2,600,000) 6,176,289 Communities and Housing Castles & Historic Monuments 38,303 38,303 Abbey Tower 66,613 66,613 Sub Total 104,916 104,916 Corporate Services ICT Investment Fund 50,000 50,000 Telephony 97,000 97,000 Sub Total 147,000 147,000 Health & Social Care Partnership Community Alarms - Analogue to Digital (68,977) (68,977) Care First Replacement 253,065 253,065 Sub Total 184,088 184,088 Other Flexibility / Infrastructure Fund 6,867,531 (323,000) 2,845,938 1,098,087 3,000,000 48,000 48,000 48,000 13,632,556 Sub Total 6,867,531 (323,000) 2,845,938 1,098,087 3,000,000 48,000 48,000 48,000 13,632,556 TOTAL EXPENDITURE 27,869,573 (8,523,667) 2,289,880 3,332,346 4,587,437 (5,000) 43,000 43,000 43,000 29,679,569
Page 14
Appendix 2 Project Description Changes 25/26 Changes 26/27 Changes 27/28 Changes 28/29 Changes 29/30 Changes 30/31 Changes 31/32 Changes 32/33 Changes 33/34 Total £ £ £ £ £ £ £ £ £ £ North Ayrshire Council Revisions to Capital Programme 2025/26 - 2033/34 Changes 25/26 Changes 26/27 Changes 27/28 Changes 28/29 Changes 29/30 Changes 30/31 Changes 31/32 Changes 32/33 Changes 33/34 Total £ £ £ £ £ £ £ £ £ £ INCOME Prudential Borrowing 24,877,323 (4,874,318) 3,636,348 (1,781,784) (470,770) (517,000) (594,000) (594,000) (594,000) 19,087,799 Specific Grants - AGD 1,590,800 (7,497,349) (2,983,468) 4,477,130 4,421,207 8,320 Specific Grants - Active Travel Tier 1 (5,000) (5,000) (5,000) (5,000) (5,000) (5,000) (5,000) (5,000) (5,000) (45,000) Specific Grants - Vacant & Derelict Funding 3,397,568 3,397,568 Specific Grants - Place Based Investment Programme 316,043 316,043 Specific Grants - UK Shared Prosperity Fund 576,535 576,535 Specific Grants - B714 Improvements 1,201,946 4,000,000 5,201,946 Specific Grants - Renewal of Play Parks (578,000) (578,000) General Capital Grant - Flooding (2,646,000) (1,914,000) (4,560,000) General Capital Grant 1,505,000 642,000 642,000 642,000 642,000 642,000 642,000 642,000 642,000 6,641,000 Grants & Contributions 51,539 51,539 Sale of land & buildings (2,418,181) 1,125,000 1,000,000 (125,000) (418,181) TOTAL INCOME 27,869,573 (8,523,667) 2,289,880 3,332,346 4,587,437 (5,000) 43,000 43,000 43,000 29,679,569
Page 15
Appendix 3 Project Description Revised 25/26 Revised 26/27 Revised 27/28 Revised 28/29 Revised 29/30 Revised 30/31 Revised 31/32 Revised 32/33 Revised 33/34 Total £ £ £ £ £ £ £ £ £ £ EXPENDITURE Place Roads Improvement / Reconstruction 3,900,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 34,300,000 Traffic Calming 82,953 82,953 Dockhead Street Saltcoats 100,000 100,000 Lighting 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 9,000,000 Millport Pier 154,960 984,960 1,139,920 Millburn FPS 2,636,098 2,636,098 Coastal Adaptations 88,000 88,000 Bridges infrastructure programme 560,000 560,000 560,000 560,000 560,000 560,000 560,000 560,000 560,000 5,040,000 B714 Improvements 15,499,584 11,488,805 26,988,389 Property lifecycle investment 1,400,000 1,600,000 1,100,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 10,100,000 Locality Based Property Review 2,036,481 2,036,481 Woodlands Primary Playingfield Drainage 22,274 22,274 Cemetery extns, walls & infra 219,910 145,602 11,521 377,033 Cmty, Kilbirnie - Walls 9,000 9,000 Cmty, Kilbirnie - New 738,917 738,917 Goldcraigs Refurbishment 827,580 827,580 Vehicles 2,000,000 2,980,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 18,980,000 Fleet Decarbonisation 1,660,000 1,950,000 1,500,000 5,110,000 Shewalton landfill 48,949 48,949 Solar PV Investment - Nethermains 260,721 260,721 Solar PV Investment - Shewalton 1,825,377 1,825,377 Place Based Investment Programme 100,000 100,000 UK Shared Prosperity Fund (SPF) 576,535 576,535 PBIP – Kilwinning Abbey Improvements 200,000 200,000 Lochshore Hub Play Area 8,970 9,420 10,640 11,180 11,740 51,950 Montgomerie Park Masterplan 162,500 75,000 650,000 350,000 490,000 500,000 2,227,500 Lochshore, Garnock Hub 40,991 40,991 VDLF 2025/26 Allocation 1,561,000 1,561,000 VDLF - Irvine Kyle Road Phase 2 1,803,061 1,803,061 VDLF - Tree Planting 47,600 47,600 Active Travel Tier 1 582,000 582,000 582,000 582,000 582,000 582,000 582,000 582,000 582,000 5,238,000 Access Paths Network Programme 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 450,000 North Ayrshire Council Revised Capital Programme 2025/26 - 2033/34
Page 16
Appendix 3 Project Description Revised 25/26 Revised 26/27 Revised 27/28 Revised 28/29 Revised 29/30 Revised 30/31 Revised 31/32 Revised 32/33 Revised 33/34 Total £ £ £ £ £ £ £ £ £ £ North Ayrshire Council Revised Capital Programme 2025/26 - 2033/34 Growth & Investment Ayrshire Growth Deal: AGD - i3 DPMC Phase 1 300,000 300,000 AGD - i3 DPMC Phase 2 50,000 250,000 1,456,000 2,924,615 4,680,615 AGD - i3 Flexible Business Space Phase 2 5,262,045 3,360,497 1,718,760 10,341,302 AGD - Hunterston - Centre for Low Carbon Energy & Circular Economy 350,000 450,000 4,196,000 4,196,000 8,536,978 17,728,978 AGD - Great Harbour 4,126,709 2,448,751 3,551,100 1,544,203 51,882 11,722,645 AGD - IMSE 450,000 473,740 3,200,000 3,250,000 2,897,747 10,271,487 AGD Marine Tourism - Ardrossan 2,500,000 2,500,000 AGD Marine Tourism - Arran 46,362 355,390 1,376,793 32,554 33,692 1,844,791 AGD Marine Tourism - Cumbrae 191,208 2,954,043 1,230,892 33,694 34,875 4,444,712 Ardrossan Harbour & Landside 3,475,059 3,475,059 Irvine Enterprise Area 103,079 103,079 Ardrossan North Shore 421,064 1,730,304 2,151,368 Sub Total 54,930,038 37,248,512 28,042,655 23,834,246 21,048,914 9,492,000 8,992,000 8,992,000 8,992,000 201,572,365 Education Fairlie Primary 94,444 115,000 10,000 219,444 Universal Free School Meals Expansion 1,198,188 1,546,260 3,081,142 332,174 329,741 6,487,505 Schools ICT Investment 1,003,908 1,203,908 752,000 752,000 752,000 752,000 752,000 752,000 752,000 7,471,816 Ardrossan New Build 30,163,334 28,634,232 23,031,226 2,715 81,831,507 Sub Total 32,459,874 31,499,400 26,874,368 1,086,889 1,081,741 752,000 752,000 752,000 752,000 96,010,272 Communities and Housing Castles & Historic Monuments 38,303 38,303 Abbey Tower 66,613 66,613 Sub Total 104,916 104,916 Corporate Services ICT Investment Fund 479,500 557,100 648,900 282,600 282,600 297,600 2,548,300 WAN 500,000 500,000 LAN/WiFi 1,500,000 1,500,000 Telephony 212,000 650,000 862,000 Sub Total 691,500 557,100 3,298,900 282,600 282,600 297,600 5,410,300 Health & Social Care Partnership Care First Replacement 253,065 253,065 Improvement grants 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 4,500,000 Sub Total 753,065 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 4,753,065 Other Flexibility / Infrastructure Fund 6,867,531 3,000,000 6,366,974 4,254,051 3,000,000 48,000 48,000 48,000 23,632,556 Sub Total 6,867,531 3,000,000 6,366,974 4,254,051 3,000,000 48,000 48,000 48,000 23,632,556 TOTAL EXPENDITURE 95,806,924 72,805,012 65,082,897 29,957,786 25,913,255 11,041,600 10,292,000 10,292,000 10,292,000 331,483,474
Page 17
Appendix 3 Project Description Revised 25/26 Revised 26/27 Revised 27/28 Revised 28/29 Revised 29/30 Revised 30/31 Revised 31/32 Revised 32/33 Revised 33/34 Total £ £ £ £ £ £ £ £ £ £ North Ayrshire Council Revised Capital Programme 2025/26 - 2033/34 Revised 25/26 Revised 26/27 Revised 27/28 Revised 28/29 Revised 29/30 Revised 30/31 Revised 31/32 Revised 32/33 Revised 33/34 Total £ £ £ £ £ £ £ £ £ £ INCOME Prudential Borrowing 54,463,198 50,958,902 38,919,872 6,971,000 5,197,350 749,600 157,259,922 Specific Grants - AGD 8,246,385 7,632,930 14,871,025 12,694,786 10,423,905 53,869,031 Specific Grants - Active Travel Tier 1 582,000 582,000 582,000 582,000 582,000 582,000 582,000 582,000 582,000 5,238,000 Specific Grants - Vacant & Derelict Funding 3,397,568 3,397,568 Specific Grants - Place Based Investment Programme 316,043 316,043 Specific Grants - UK Shared Prosperity Fund 576,535 576,535 Specific Grants - B714 Improvements 17,553,389 4,000,000 21,553,389 General Capital Grant - Flooding (2,206,000) (1,914,000) (4,120,000) General Capital Grant 10,573,000 9,710,000 9,710,000 9,710,000 9,710,000 9,710,000 9,710,000 9,710,000 9,710,000 88,253,000 Recovery & Renewal 703,707 710,180 1,413,887 Grants & Contributions 101,099 101,099 Sale of land & buildings 1,500,000 1,125,000 1,000,000 3,625,000 TOTAL INCOME 95,806,924 72,805,012 65,082,897 29,957,786 25,913,255 11,041,600 10,292,000 10,292,000 10,292,000 331,483,474
Page 18
Appendix 4 Capital Investment Strategy 2025 to 2034
Page 19
Introduction The Capital Investment Strategy for North Ayrshire Council provides an overview of how capital expenditure plans, capital financing and treasury management activity contribute to the infrastructure and provision of services for the benefit of North Ayrshire communities and citizens. This refreshed strategy takes a long-term view and covers the period from 2025 to 2034. This is aligned to the Capital Investment Programme. The Capital Investment Strategy is a reporting requirement of the Chartered Institute of Public Finance and Accountancy (CIPFA) Prudential Code. Local authorities produce many plans and strategies in the course of their operations. However, it is recognised that within the context of capital planning, there is a need to produce an overarching view that addresses the following key considerations: • Ensuring that capital plans are aligned to the strategic priorities as set out in the Council Plan. • Ensuring that capital plans are affordable, prudent and sustainable. • Demonstrating the linkage to local strategic planning and local asset management planning. • Ensuring that financing decisions are taken in accordance with good professional practice and a full understanding of the risks involved. • Demonstrating the council has robust governance arrangements to support its capital planning activities.
Page 20
Background North Ayrshire Council has ambitious plans to deliver significant capital investment over the planning period across housing, schools, economic development and infrastructure. Working in partnership with East Ayrshire, South Ayrshire, the UK and Scottish Government, the Ayrshire Growth deal will see the regeneration of the region through investment in strategic infrastructure across various sectors, including life sciences, tourism, manufacturing and aerospace. Throughout 2024/25 the wider construction industry has reported significant, ongoing inflationary pressures linked to a number of factors, including upward pressure on input costs linked to international externalities such as ongoing global conflicts and its impact on global supply chains; material and labour shortages; and increased demand linked to reduced contractor availability. This has resulted in the identification of increased cost risks in relation to a number of our investment priorities. The Capital Investment Strategy takes account of the Council’s strategic priorities and considers any new investment within the context of outcomes, affordability or invest to save. Decisions made over the course of the programme for capital and treasury management will have financial consequences for the Council for many years in the future. There is also recognition of the need to balance investment between maintaining current assets and infrastructure against the ambitions for acquiring new assets. North Ayrshire Council’s Capital Investment Programme is shaped and influenced by various associated strategies and plans.
Page 21
The primary purpose of the Capital Investment Strategy is to provide an overarching view of how various plans and strategies inform capital investment and to demonstrate that this is both affordable and sustainable. The associated plans and strategies each focus on specific priority areas and, through appropriate governance structures, ultimately shape and influence the investment plans delivered through the Capital Investment Programme. Underpinning the Capital Investment Programme is the Treasury Management and Investment Strategy and Loans Fund Policy. Both ultimately consider the delivery of the capital programme within the context of affordability and risk and apply a measurement of what this means against key prudential and treasury indicators. The aim being to demonstrate affordability and sustainability over the long term.
Page 22
Plans and strategies Council Plan 2023 to 2028 The mission for North Ayrshire Council is “Working together to improve the lives of our people in North Ayrshire.” To deliver on this mission four key strategic priorities, outlined below, have been developed to direct plans now and into the future. Through appropriate governance frameworks all capital investment must demonstrate that it is aligned to the Council’s strategic themes, with particular focus and priority given to capital investment opportunities that meet multiple strategic priorities. Community Planning Partnerships and Local Outcomes Improvement Plan The North Ayrshire Community Planning Partnership is a partnership across a wide range of organisations. The Local Outcomes Improvement Plan 2022 – 2030 provides a commitment by all partners to North Ayrshire communities and citizens across three main priority areas:
Page 23
The Community Planning Partnership consists of 6 Locality Partnerships across North Ayrshire. Key to the success of the Local Outcomes Improvement Plan is working in partnership with a number of agencies to deliver better outcomes for citizens and communities. The partnership includes Scottish Government, Police Scotland, NHS Ayrshire and Arran, Skills Development Scotland, KA Leisure, Scottish Fire and Rescue and Scottish Enterprise. Through the Local Development Plan, one of the strategic policies is to deliver on local community priorities. Each Locality Partnership has agreed their own local priorities. The following illustrates the links between the locality priorities and those in the Local Outcomes Improvement Plan: • Wellbeing: o Improving our mental health and wellbeing o Improving access to financial services o Increasing social inclusion o Addressing social isolation o Improving community wellbeing o Improving access to facilities and amenities/regenerating community facilities o Affordable Housing • Work: o Alleviating poverty and promoting equality of access to opportunities o Supporting skills and work opportunities o Promoting the local economy and tourism o Work and local community • World: o Improving our local environment o Championing green health and the natural environment o Moving around o Transport o Increasing civic pride and community engagement
Page 24
This framework of community engagement and structured partnership working is vital when planning capital investment. More importantly, that local priorities are considered as part of any strategic planning framework. Health and Social Care Partnership Strategic Commissioning Plan 2022 to 2030 The North Ayrshire Health and Social Care Strategic Plan 2022 to 2030 was developed through engagement and collaboration with local people, service users, members of staff and other key stakeholders. It sets out our long-term ambitions for improving the health and wellbeing of everyone who lives in North Ayrshire. The 2022 to 2030 plan continues the existing vision that “all people who live in North Ayrshire are able to have a safe, healthy and active life” and to achieve this the HSCP focuses on key priorities: Asset Management Plans Asset Management Plans aim to ensure that the Council holds the right assets and that they are fit for purpose in terms of condition, suitability and accessibility. The plans also provide the vehicle for identifying future investment needs across all asset classes. In line with the Chartered Institute of Public Finance and Accountancy (CIPFA) “Guide to Asset Management and Capital Planning in Local Authorities” North Ayrshire has classified its assets into six categories: • Open Space • Property • Fleet, Plant and Equipment • Roads, Structures and Lighting • ICT • Housing The Council’s assets play a key role in the delivery of a wide range of essential services to our local communities, contribute to regeneration and help drive economic growth. The plans set out clear actions and include details of lifecycle investment costs required to maintain assets and infrastructure to an appropriate standard that supports service delivery. The plans are updated on an annual basis and chief officers across all Directorates hold the responsibility for maintaining the plans and reporting progress to the Council’s Cabinet on a bi-annual basis.
Page 25
A snapshot of the asset portfolio for North Ayrshire Council includes: • Fleet and Plant: Around 620 vehicles and items of plant. • Roads: Over 1,000 Kilometres of roads • Structures: Around 400 bridges and structures • Council Houses: Around 13,000 council houses • Education: 63 schools and early years facilities • Social Care: 21 social care facilities • Street Lighting: over 23,000 street lighting columns • Operational Buildings: over 70 offices, libraries and community centres Both capital and revenue financial resources across the General Fund and Housing Revenue Account are used to maintain the current asset base. From a capital perspective, planned investment which has been incorporated in the current Capital Investment Programme includes: • Roads, structure and lighting Planned investment of £85.1 million until 2033 to 2034 including improvements to the roads and street lighting network, upgrading of the B714, flood prevention works, bridges infrastructure improvement and Active Travel projects. • Fleet, plant and equipment Procurement and maintenance of all council fleet vehicles and plant ensuring the fleet of 620 vehicles and heavy plant are maintained and operated in accordance with the council’s Operator’s licence and Road Transport legislation. Prioritisation of emissions reductions through decarbonisation of vehicle fleet. Vehicle and plant capital investment is planned at £24.1 million until 2033 to 2034. • Property: To ensure council properties meet all legislative requirement and they are sustainable, energy efficient and maintained to a high standard as well as ensuring the physical environment is able to support mobile and flexible work programmes. Investment is planned at £15.1 million until 2033 to 2034. It is also recognised that through the Estates Strategy further rationalisation and remodelling will continue to be progressed on a locality by locality basis, with capital receipts incorporated into the capital programme. • Housing: Underpinned by the Local Housing Strategy, the Strategic Housing Investment Plan and the 30 Year Housing Revenue Account Business Plan, responsibility for maintenance of around 13000 council houses, ensuring legislative compliance and meeting the needs of tenants.In addition, delivery of an ambitious house building and improvement programme over the period 2025 to 2026 until 2029 to 2030 will see capital investment by the council total £257.8 million.
Page 26
• ICT: The Technology Strategy sets out how ICT supports service delivery and transformation. Significant changes to our ICT infrastructure have been reflected in the ICT Asset Management Plan. To deliver on the six key principles as outlined in the Technology Strategy £5.4 million investment until 2033 to 2034 is planned. • Open Spaces: The service maintains 2,410 hectares of public open space, a Country Park, 14 local parks, 44 cemeteries and burial grounds, 37 war memorials and monuments, 275 hectares of woodlands, four allotments, 94 sports facilities and playing fields, 116 Equipped Play Areas and Multi Use Games Areas (MUGAs), residential greenspace, 38 water courses and open water features, five promenades and 16 beaches, three of which are Sites of Special Scientific Interest. The majority of investment is delivered through the Place service revenue budget, however specific capital investment of £1.1 million is planned until 2033 to 2034 for cemetery infrastructure. Local Housing Strategy 2023 to 2028 and Strategic Housing Investment Plan 2025 to 2030 The Local Housing Strategy sets out the council’s ambition: ‘We want all our people to live in the right homes, in great places, with access to any support services they need’. The strategy mirrors the format of Scotland’s first 20 year housing strategy, Housing to 2040 and sets out four overarching outcomes which align to the four key strategies in Housing to 2040: Housing to 2040 Strategy Local Housing Strategy Outcome More homes at the heart of great places Our places support thriving and inclusive communities Affordability and choice Our people have affordable homes in the place they choose to live Affordable warmth and zero emission homes Our homes are energy efficient and release less emissions Improving the quality of all homes Our homes are in good condition and people can access any support services they need
Page 27
The Strategic Housing Investment Plan is an extension of, and aligns to, the Local Housing Strategy, supporting the objectives of the Council Plan. The Strategic Housing Investment Plan also aligns with the Council’s Community Wealth Building Strategy and supports the North Ayrshire Local Employability Partnership Delivery Plan 2022 to 2026 and the North Ayrshire Child Poverty Action Plan 2023 to 2026. The Council’s housebuilding programme will support the Council’s ambitions to encourage more young people into training and employment. Access to good quality and affordable housing is a key asset in addressing child poverty, and poverty overall. The Strategic Housing Investment Plan will secure investment in a total of 1,143 properties across North Ayrshire and provide sustainable, affordable, accessible high-quality homes which will contribute to the wider regeneration aims for the area. The Council projects in the Strategic Housing Investment Plan represent investment of £173.6 million (including an estimated £80.6 million Scottish Government grant funding). Developments continue to be progressed across all six localities: Arran, Garnock Valley, Irvine, Kilwinning, North Coast and Three Towns. Public sector investment can have a transformational impact for communities, and the Council explores site and area specific opportunities with partners to secure maximum regeneration benefits. This supports the ambitions of the Council’s Regeneration Delivery Plan to drive forward place-based development on strategic regeneration sites, including town centres. Several Strategic Housing Investment Plan projects completed to date are within, or near, town centres. The plan supports major housing led regeneration including the replacement of the 275 homes in the Fullarton tower blocks in Irvine and the provision of funding to assist the delivery of Housing’s Estate Based Regeneration Programme. The Strategic Housing Investment Plan also includes the provision of funding for 242 units to assist the delivery of Housing’s Estate Based Regeneration Programme where stock is required to be demolished or reconfigured. The Strategic Housing Investment Plan prioritises new social housing developments which include the provision of outdoor green space, and which support the principles of 20-minute neighbourhoods, where feasible. Developments are also planned utilising ‘secure by design’ principles. The Council and its partners recognise that bringing former social housing stock into ownership can assist with housing management and maintenance issues and increase housing available through the North Ayrshire Housing Register. All developing registered social landlord partners buyback programmes have been prioritised within the Strategic Housing Investment Plan.
Page 28
New housing has a key role to play in carbon reduction, climate change mitigation, and in the alleviation of fuel poverty. The Council and its partners will continue to consider innovative and sustainable approaches to heat and power, such as low carbon heat, solar photovoltaic panels and smart technologies. The Council recognises that a ‘fabric first’ approach to sustainability can provide benefits to tenants, in terms of reducing heating costs. This investment aligns to the Council’s Sustainable North Ayrshire Strategy 2024 to 2027 in supporting affordable warmth to households across North Ayrshire. Developments will also be designed to promote sustainable travel. All amenity and sheltered housing in North Ayrshire should be built to an ambulant housing standard as a minimum. To ensure need is met now and in the future, the new Local Housing Strategy increased the target to ensure at least 10% of all tenure new build stock is suitable for wheelchair users (increased from 7% in the previous strategy). Officers within the Place Directorate and the Health and Social Care Partnership developed a new supported accommodation housing model which has been implemented at sites across North Ayrshire to maximise tenant independence The Local Housing Strategy recognises that the proportion of older people in North Ayrshire is higher than that of Scotland as a whole. The Strategic Housing Investment Plan estimates the delivery of a further 236 amenity. Alongside the new build programme, the Council will continue to deliver its sheltered housing re- provisioning programme, which includes £38 million investment in the refurbishment of sheltered housing units out with the Strategic Housing Investment Plan. Regeneration Delivery Plan and Local Development Plan The Regeneration Delivery Plan sets out our priorities for delivering on the regeneration ambitions of the Council Plan and Community Wealth Building strategy, working in partnership with communities. The Plan focuses on the delivery of physical regeneration across North Ayrshire through an ambitious project-based rolling action programme. The Regeneration Delivery Plan focuses activity around the four key regeneration themes:
Page 29
The Local Development Plan was adopted in November 2019 and aligns to the themes set out in the Regeneration Delivery Plan, it brings a targeted local context in guiding development and investment in North Ayrshire over the next 20 years. The focus is supporting and growing the business base across key sectors including manufacturing, engineering, life sciences, tourism and hospitality and regenerating towns and communities. The overarching aim of the plan is to deliver the Community Planning Partnership vision of a “Better Life” to the citizens and communities of North Ayrshire. The plan outlines the land use strategy that supports delivery of the Local Outcomes Improvement Plan 2022 to 2030 and focuses on four key strategic policies: The Spatial Strategy is an overarching policy for supporting the Local Outcomes Improvement Plan. This directs development to towns and villages to support communities, the economy and environment, while recognising the value that the countryside and coastal areas offer both as natural resources worthy of protection and as an economic driver. An example of directing investment to towns is evidenced by the Montgomerie Park development with Council investment in road and service infrastructure to facilitate large scale housing development and regeneration and using capital receipts from land sale as a key source of funding. The Placemaking policy supports the Local Outcomes Improvement Plan by ensuring that all development contributes to making quality places. This is measured by six qualities that define a successful place:
Page 30
Through the Local Development Plan eight strategic development areas have been identified: Working in partnership with the UK and Scottish Government and East Ayrshire and South Ayrshire councils, the Ayrshire Growth Deal will regenerate the region through investment in strategic infrastructure across various sectors, including life sciences, tourism, manufacturing and aerospace, with total investment of over £251.5 million. From a North Ayrshire perspective and to support investment into the strategic development areas, including the Ayrshire Growth Deal and wider economic regeneration activity, the Capital Investment Programme from 2024/25 to 2033/34 includes planned investment of £63.8 million. Finally, our Community Wealth Building Strategy helps to develop resilient, inclusive local economies, with more local employment and a larger and more diverse business base, ensuring that wealth is locally owned and benefits local people. All capital and revenue investment will be considered within the context of the Community Wealth Building Strategy, with maximising opportunities for local suppliers through procurement a key priority and pillar of the strategy. Technology Strategy The Technology Strategy was approved by North Ayrshire Council in August 2021 and sets out the vision, principles and key technologies that will support transformational change across North Ayrshire Council. Solutions will be designed in partnership to improve processes, service delivery and collaboration and ultimately improve outcomes. The six key Technology Strategy principles are:
Page 31
Principle Detail Deliberately designed Holistic view of the business and deliver efficient, effective and agile solutions People at the Core Solutions built around the needs of the customers and people Anytime, anywhere access Access to systems, applications and information wherever they are Cloud where appropriate Utilise cloud based technologies where appropriate Data driven Utilise data to effectively inform our decision making Secure by design Operate securely whilst still taking advantage of technology innovations Office 365 has been a transformative technology, enabling agile working and simplifying collaboration. The ICT Asset Management Plan incorporates the technology principles and, in terms of investment, a total of £5.4 million is planned until 2033 to 2034 to deliver technology solutions aligned to this strategy. From a financial planning perspective, it is also recognised the shift from capital financing to revenue through software as a service, will lead to a remodelling of the way in which ICT investment is funded. Estates Strategy The key objective of North Ayrshire Council’s Estate Strategy is to achieve rationalisation and remodelling of the Council’s property portfolio on a locality basis. The strategy is currently being reviewed to align with the Council Plan priorities of: Wellbeing; Climate Change; Communities and Local Democracy; and Sustainable Council. It supports the delivery of Community Wealth Building and Community Empowerment by maximising the opportunities that property assets can provide to local businesses and communities.
Page 32
The Estates Strategy plays a key role in maximising capital investment across multiple strategic priority areas, for example, moving away from the traditional like for like school replacements to incorporating wider community campus facilities, including leisure and health and social care facilities. This approach is evidenced through the proposals for the Ardrossan Campus facility which will deliver primary, secondary, and early years provision as well as community use sport, theatre and leisure facilities. Also key is the generation of Capital receipts and reduction in running costs through rationalisation of the Council’s property portfolio. This supports the capital programme and provides flexibility in the Council’s Revenue account.
Page 33
General Fund Capital Investment Programme North Ayrshire Council takes a long-term approach to capital investment, covering a 10 year period. The plan is updated annually and 2025 to 2026 represents year two of the 10 year plan. A full refresh is undertaken every three years. The current Capital Investment programme is aligned to the strategic priorities as set out in the Council Plan and is the product of the various plans and strategies which impact on the assets and infrastructure of North Ayrshire Council. Through the Community Planning Partnerships and the Local Development Plan there is also clear linkage to local strategic planning and local asset planning. Total capital investment of £331.5 million from the Council’s General Fund is planned over the period from 2025 to 2026 until 2033 to 2034, supporting the four key strategic priorities from the Council Plan: • Wellbeing, • Communities and Local Democracy, • Climate Change and • A Sustainable Council. This includes planned expenditure of £63.8 million towards the Ayrshire Growth Deal to 2033 to 2034. It is recognised that the total level of investment across Ayrshire will be in the region of £251.5 million (including £103 million commitments from both the UK and Scottish Governments). The capital plan includes £96.0 million planned investment in Education. The major areas of education investment include: • £6.5 million to Universal school meals expansion. Improvements to current kitchen and dining facilities across the school estate to create capacity for the anticipated uptake. • £81.8 million for the Ardrossan Campus. New build project as part of an exciting wider community facility development. • £7.5 million to schools ICT investment. Investment on ICT equipment within the school estate.
Page 34
Investment in education reflects the Council’s desire to ensure children and young people have access to high quality facilities which support and promote excellent learning and teaching. Well designed and well-equipped buildings also support the promotion of positive health and well-being. It is also recognised that investment in education contributes to and can be integrated within wider economic development and regeneration within the localities and this is reflected in the nature of the planned development for Ardrossan Campus.
Page 35
Through stakeholder engagement, effective cross Directorate working within North Ayrshire Council and collaboration with other agencies including the Scottish Government, this new development combines education provision with community facilities, residential, respite and housing provision as part of a wider focus on economic regeneration. Investing in core assets and infrastructure is key to ensuring sustainability. A planned investment of £85.1 million within Roads, Bridges Infrastructure and Lighting includes £34.5 million road improvements, £2.6 million on flood prevention works and £27.0 million on the upgrading of the B714 following a successful application to the UK Governments Levelling Up Fund. Property lifecycle investment of £10.1 million, to support the property asset management plan, will ensure Council properties continue to be maintained to the appropriate standards in delivering services to citizens and communities. The plan includes investment in several key programmes of regeneration within North Ayrshire and, in respect of the Ayrshire Growth Deal, on a wider pan Ayrshire basis. The Capital Investment Programme 2025 to 2026 to 2033 to 2034 sets out the ambition of North Ayrshire Council and supports the key strategic themes of the Council Plan. Through investment that supports regeneration and delivers first class education and community facilities, this strategic approach will help grow the population and the local economy. It is also recognised that key to a sustainable environment is the requirement to continue to invest in core assets and infrastructure. Funding the Capital Investment Programme Funding the Capital Investment Programme requires to be planned in an affordable and sustainable manner. The funding sources to support delivery of the £331.5 million capital investment programme to 2033/34 include:
Page 36
The major sources of funding include assumptions on the level of general capital grant from Scottish Government to 2033 to 2034 (£84.1 million), the level of specific grants from the Scottish and UK Governments (£85.0m) and the level of prudential borrowing required (£157.3 million). The cost of borrowing is included within the Council’s revenue budget process through the Medium-Term Financial Plan and the impact of borrowing is included as part of the Council’s Treasury Management and Investment Strategy. The Council takes a prudent approach when phasing the capital investment over the period, with the main objective to ensure general capital grant from Scottish Government is maximised. Other income sources are also explored including external income, grants, partner contributions and capital receipts. The balance of funding is met from affordable prudential borrowing with annual loans fund repayments made to reduce the debt. This approach helps to ensure that investment in assets to deliver on the Council’s strategic priorities is sustainable in the long term.
Page 37
Treasury Management Strategy and Loans Fund Policy The Prudential Code for Capital Finance in Local Authorities enables councils to set their own borrowing limits with a requirement to ensure that investment plans are affordable, prudent and sustainable. The Council can borrow over a number of years to supplement its capital income, provided the resultant annual debt repayments can be accommodated within future years’ revenue budgets. The Council’s annual Treasury Management and Investment Strategy sets out the prudential indicators and parameters over the medium to long term, with regular reporting to Council members through: • Annual Treasury Management and Investment Strategy • Mid-year Treasury Update report • Annual Report following the financial year end describing the activity compared to the strategy The key prudential and treasury indicators include: • Capital expenditure and financing • The council’s overall borrowing need (the Capital Financing Requirement) • Limits to borrowing activity through the Operational Boundary and the Authorised Limit. As reflected in the Treasury Management Strategy for 2025 to 2026, the analysis of the Capital Financing Requirement for North Ayrshire Council indicates that the borrowing needs to support delivery of the capital programme will increase to £803.959 million by 2028 to 2029 and then reduce annually to 2033 to 2034. The analysis also indicates that this borrowing need continues to be within the parameters of both the Operational Boundary (the expected maximum borrowing position of the Council) and the Authorised Limit (the limit beyond which external debt is prohibited).
Page 38
Another key affordability indicator is the ratio of financing costs to net revenue stream. This indicator identifies the trend in the cost of capital (borrowing and other long-term liabilities, net of investment income) against the net revenue stream of the Council. The estimates of financing costs include current commitments and those arising from the capital programme. The Housing Revenue Account costs are aligned with the 30 year business plan. The estimated ratio of debt to net revenue stream across the next three years averages at 4.6% for General Services and 31.1% for the Housing Revenue Account. From a General Fund perspective, the Chartered Institute of Public Finance and Accountancy (CIPFA) Directors of Finance Performance Indicators 2023 to 2024 show a Scottish Local Authority average of 5.8%, therefore demonstrating a prudent borrowing policy. For the Housing Revenue Account, the indicative Scottish average in 2023 to 2024 was 23.8%. The rising ratio within the Housing Revenue Account is indicative of the significant capital investment programme as outlined in the Strategic Housing Investment Plan. The level of loan charges is deemed prudent and affordable within the framework of the 30 year Housing business plan. The Liability Benchmark, another treasury prudential indicator, is an important tool used to identify whether the Council is likely to be a long-term borrower or long-term investor, allowing it to shape its strategic focus and decision making. The liability benchmark itself represents an estimate of the cumulative amount of external borrowing the Council must hold to fund its current capital and revenue plans while keeping treasury investments at the minimum level required to manage day-to-day cash flow.
Page 39
Loans Fund Policy In July 2016, the Scottish Government confirmed the new Loans Fund accounting arrangements under the provisions of the Local Authority (Capital Finance and Accounting) (Scotland) Regulations 2016. This regulation requires the Council to outline its policy on the repayment of Loans Fund advances. The Loans Fund advance is effectively the repayment of the principal linked to the capital expenditure which is required to be funded from borrowing. The broad aim of prudent repayment is to ensure that the authority’s unfinanced capital expenditure is financed over the expected life of the asset and that each year’s repayment amount is reasonably commensurate with the period and pattern of the benefits. From a governance perspective the Loans Fund policy of North Ayrshire Council is included as part of the Treasury Management and Investment Strategy and submitted for approval to the North Ayrshire Council committee on an annual basis.
Page 40
Governance Having robust governance arrangements in place is key to ensuring effective strategic management of assets, from initial planning through to delivery, utilisation and disposal. North Ayrshire Council delivers a governance framework through a number of officer and member represented groups/committees. To ensure a consistent approach is adopted when considering any new capital investment, a business case framework has been developed. The framework includes key criteria across: • Aims and strategic objectives • Scope and benefits • Options Appraisal • Risks, Constraints and Dependencies • Procurement arrangements • Monitoring of key milestones • Evaluation criteria and scoring • Investment costs, funding and impact on revenue All business cases are considered by the Capital Programme and Assets Group and the Executive Leadership Team, with a recommendation being made to Cabinet/Council, for inclusion of new projects into the Capital Investment Programme. A key focus when assessing potential capital investment is the alignment to the Council’s strategic priorities, with the aim being to maximise opportunities where investment meets multiple strategic priorities and where there is the potential to lever in external funding. The current governance framework is illustrated below:
Page 41
Service Project Boards are chaired by Executive Directors across each Directorate area with representation from relevant service managers. Following approval by North Ayrshire Council committee on the Capital Investment Programme, the Service Project Board is responsible for ensuring robust project management is in place to deliver projects on time and within budget. Programme Boards provide a strategic focus at programme level and are chaired by the responsible Chief Officer. Each programme can include a number of individual projects across each Directorate which contribute to specific Council and programme objectives. To ensure the objectives are met the Chief Officer for the programme is responsible for strategic oversight including all projects that form part of the overall programme. The Capital Programme and Assets Group is chaired by the Head of Service (Finance) and is responsible for: • Ensuring a strategic and corporate overview of the Council’s capital programme is in place. • Developing and monitoring the Council’s capital investment programme, tracking slippage on delivery and expenditure against approved budgets. • Developing clear criteria for investment of Council resources on asset matters and assessing all investment business cases. • Developing a prudent capital receipts programme for inclusion in the Council’s Capital Programme. The Executive Leadership Team consists of the Chief Executive, Executive Director Communities & Housing, Executive Director Place, Executive Director Education, Head of Democratic Services, Head of People and ICT and Head of Finance and is responsible for advising members on the relative priorities of the Council’s long term investment needs and plays a key monitoring role in ensuring the major capital projects deliver the anticipated benefits on time and within budget. The Executive Leadership Team also considers all business cases for new areas of capital investment as well as being the escalation point for any key strategic decisions across the Capital Investment Programme prior to consideration by Cabinet or Council. Cabinet is chaired by the Leader of the Council and is the main decision-making body of the Council. It consists of member portfolio holders from the Administration. Cabinet receives regular progress reports and approves amendments to the Capital Investment Programme. North Ayrshire Council consists of all elected members and is chaired by the Provost. The Council approves the corporate framework and the medium and longer term Capital Investment Programme.
Page 42
Knowledge and skills North Ayrshire Council employs professionally qualified and experienced staff in senior positions with responsibility for making capital expenditure, borrowing and investment decisions. The Head of Finance is a qualified accountant and holds the position of Section 95 officer for the Council. The Council’s Section 95 Officer is responsible for the proper administration of the Council’s financial affairs and is required: • to recommend treasury management policies/practices, review these regularly and monitor compliance • to submit regular treasury management updates • to receive and review management information • to review the performance of the treasury management function • to ensure the adequacy of treasury management resources and skills and the effective division of responsibilities within the treasury management function • to approve the appointment of external service providers Where the Council does not have the knowledge and skills required, use is made of external advisers that are specialists in their field. The Council currently employs Arlingclose Limited as treasury management advisers to ensure that we have access to specialist knowledge and skills if required. Decisions to invest in land and property are overseen in accordance with council policies and the priorities from our Council Plan, to capitalise on its position, power and influence to deliver tangible improvements to the lives of people in North Ayrshire. These decisions are made by suitably qualified personnel including architects and surveyors. Risk There are risks inherent across all capital planning and project delivery activity. Key planning risks are managed/mitigated through detailed business case development prior to any capital investment project getting approved. From a project delivery perspective, risk registers are maintained throughout the duration of the project and in accordance with standard project management practice. The long-term view to capital investment and the development of associated strategies also play a key role in risk management. Examples include: • Development of a 10 year capital programme, considering funding and priorities in the long term • Asset Management Plans and lifecycle maintenance which inform capital plans in the long term • Treasury Management and Investment Strategy which considers borrowing levels in the long term. • Local Housing Strategy and Strategic Housing Investment Plan takes a medium and long-term view of housing and regeneration priorities.
Page 43
Conclusion The Capital Investment Strategy for North Ayrshire Council provides an overview of how capital expenditure plans, capital financing and treasury management activity contribute to the infrastructure and provision of services for the benefit of North Ayrshire communities and citizens. It is a reporting requirement of the Chartered Institute of Public Finance and Accountancy (CIPFA) Prudential Code. The Strategy takes account of the Council’s strategic priorities and considers any new investment within the context of outcomes and affordability. There is also recognition of the need to balance investment between maintaining current assets and infrastructure against the ambitions for acquiring new assets. The current capital programme demonstrates an innovative approach in maximising investment across multiple strategic priority areas, with developments that incorporate education provision, community facilities, health and social care services and housing. This approach, whilst providing key services that deliver positive outcomes to communities, also contributes to the wider economic regeneration of North Ayrshire, helping to grow the population and the local economy. Working in partnership with the UK and Scottish Government and East Ayrshire and South Ayrshire councils, the Ayrshire Growth Deal will regenerate the region through investment in strategic infrastructure across various sectors, including life sciences, tourism, manufacturing and aerospace, with total investment of over £251.5 million.
Page 44
Related documents, strategies and plans • Council Plan • Local Development Plan • Asset Management Plans • Local Outcomes Improvement Plan • Local Housing Strategy • Strategic Housing Investment Plan • North Ayrshire Local Employability Partnership Delivery Plan • North Ayrshire Child Poverty Action Plan • Technology Strategy • Estates Strategy • 10 Year Capital Investment Programme • Regeneration Delivery Plan • Treasury Management and Investment Strategy • Loans Fund Policy • HSCP Strategic Plan • Sustainable North Ayrshire Strategy