NORTH AYRSHIRE COUNCIL 
26 June 2024 
North Ayrshire Council 
Title:    Treasury Management and Investment Annual Report
2023/24 
Purpose:  To report to Council on the Treasury Management and
Investment Annual Report and Prudential Indicators for
2023/24. 
Recommendation:  That Council notes :
(a) the Treasury Management and Investment Annual Report
for 2023/24 (Appendix 1); and 
(b) the Prudential and Treasury Indicators contained therein. 
1. Executive Summary 
1.1 The Council is required by regulations issued under the Local Government in Scotland
Act 2003 to produce an annual review of treasury management activities. The
purpose of the annual review is to report the performance of the Council’s treasury
operations and how this measures up against the Council’s Treasury Management
and Investment Strategy 2023/24. This is done through the publication of the annual
report which contains the actual prudential and treasury indicators for 2023/24.
1.2 This Treasury Management and Investment Annual Report meets the requirements of
the Scottish Government’s investment regulations, the CIPFA Code of Practice on
Treasury Management (the Code) and the CIPFA Prudential Code for Capital Finance
in Local Authorities (the Prudential Code).
1.3 The Treasury Management and Investment Annual Report 2023/24 for North Ayrshire
Council is attached at Appendix 1. Key points to note from the report are as follows:
• During 2023/24, the Council complied with its legislative and regulatory
requirements in relation to treasury activities; 
• Capital expenditure was below the level anticipated at the start of the year due to
changes in the profile of projects;
• Gross borrowing was lower than anticipated due to the revised profile of capital
projects and the use of internal funds, the latter being a key element of the
Treasury Management Strategy to minimise costs;
• During the year the Council undertook long term borrowing of £70m to support the
agreed Capital Investment Programme and to reduce the Council’s exposure to
interest rate risk: and
• The average loans fund pool rate increased from 3.14% to 3.19%.

Page 2

• On December 22nd the Council’s investments with 2 Money Market funds (MMF’s)
exceeded the recommended 10% limit. This was due to earlier cut off times for the
festive period, resulting in the Council being unable to recall funds.
• In March 2024 a £2m Lender’s Option Borrower’s Option (LOBO) loan was called
and repaid, reducing the Councils level of variable rate debt. A further £5m LOBO
has been repaid after the end of the financial year. 
2. Background 
2.1 The Chartered Institute of Public Finance and Accountancy (CIPFA) Code of Practice
for Treasury Management requires elected members to be provided with regular
reports on treasury management activities. The 2023/24 Annual Treasury
Management and Investment Strategy was approved by Council on 1 March 2023, the
mid-year report was submitted to the Cabinet on 7 November 2023 and treasury
prudential indicators were reported quarterly. This final outturn report ensures full
compliance with the CIPFA Code of Practice.
2.2 Current Position 
The 2023/24 annual report is attached at Appendix 1 and covers:
• Prudential and treasury indicators;
• Investment rate and outturn; and
• Performance measures.
2.3 Statutory Requirements
During 2023/24 the Council complied with its legislative and regulatory requirements.
It is a statutory duty for the Council to determine and keep under review its approved
borrowing limits and prudential indicators. Details within the report demonstrate that
the Council has operated within the treasury limits and prudential indicators as set out
in the Council's 2023/24 Annual Treasury Management and Investment Strategy
Statement (TMSS).
2.4 Borrowing Update
At 31 March 2024 the council has £48.950m variable rate debt which relates to
Lender’s Option Borrower’s Option (LOBO) loans where the lender has the option to
propose an increase in the interest rate at set dates.  This is a £2.000m reduction
from the prior year due to one of the LOBO loans being called and repaid in March
2024. The Council continues to work with treasury management advisers to identify
financially beneficial opportunities to repay LOBO loans and a further £5m loan has
been called in during May 2024, the Council again opted to repay the loan.
2.5 Investment Update
The Treasury strategy, approved by Council on 1 March 2023, recommended that no
more than 10% of the Council’s total investments are invested in any one Money
Market Fund (MMF).  On 22 December 2023, the Council was unable to recall funds
from 2 MMF’s due to earlier holiday cut-off times. As a result, the balances invested in
those 2 funds exceeded our recommended limits. This was rectified on the next
working day, 27th December 2023, with no negative impacts.

Page 3

2.6 General Services and Housing Revenue Account (HRA)
2.6.1 Capital Financing Costs - the General Fund budget of £17.381m for financing costs
and expenses on debt for 2023/24 was underspent by £5.189m, comparative
information for the HRA was a budget of £18.176m and an underspend of £7.587m.
The underspends are a result of a planned contribution to support the 10 year General
Fund capital programme; the re-profiling of planned capital expenditure and the
continuing strategy to delay new external borrowing by utilising cash balances,
resulting in savings on external interest costs. 
2.6.2 Interest on Revenue Balances - the General Fund budget of £0.140m for interest on
its revenue balances with a reported over-recovery of £0.212m in 2023/24,
comparative information for the HRA was a budget of £0.017m with a reported over-
recovery of £0.578m. The overall over-recovery is reflective of the higher bank rate
during 2023/24.
2.6.3 Service Concession Reprofiling - there was an in year underspend of £2.688m
following the adoption of the revised accounting arrangements under Local
Government Finance Circular 10/2022 for the recalculation of debt repayments arising
from the Council’s service concession contracts as approved by Council on 15
February 2023.
2.6.4 In accordance with agreed policy, the net General Fund underspend of £8.089m has
been transferred to the Loans Fund Reserve to support the funding strategy for the
ten year capital investment programme. 
3. Proposals 
3.1 It is proposed that Council notes :
(a) the contents of the Treasury Management and Investment Annual Report for
2023/24 (Appendix 1); and 
(b) the Prudential and Treasury Indicators contained therein. 
4. Implications/Socio-economic Duty 
Financial 
4.1 Capital Financing underspends within General Fund of £8.089m have been
transferred to the Loans Fund Reserve in line with agreed policy.
Within the HRA, the underspend of £8.165m has been partially utilised to offset in
year budgetary pressures with the balance being transferred to HRA reserves.
Human Resources 
4.2 None.

Page 4

Legal 
4.3 The Local Government in Scotland Act 2003 and supporting regulations require the
Council to produce an annual review of treasury management activities. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 The Treasury Management and Investment Annual Report supports the Council Plan
2023 to 2028 by maximising financial flexibility to support the delivery of our priorities. 
Community Wealth Building 
4.7 None. 
5. Consultation 
5.1 The Council's treasury advisors, Arlingclose Ltd, were consulted in the preparation of
this report. 
Mark Boyd
Head of Service (Finance) 
For further information please contact David Forbes, Senior Manager (Strategic
Business Partner), on 01294 324551 or DavidForbes@north-ayrshire.gov.uk. 
Background Papers
Capital Programme and Treasury Management Performance to 30 November 2023 –
Cabinet 23 January 2024; 
Treasury Management and Investment Mid-year Report 2023/24 – Cabinet 7 November
2023

Page 5

Annual Treasury Management and
Investment Report 
2023/24

Page 6

1 | P a g e
Contents              Page
1. Purpose 2 
2. Executive summary 3 
3. Prudential and Treasury Indicators for 2023/24 5 
a. The Council’s capital expenditure and financing 2023/24 5 
b. The Council’s overall borrowing need  6 
c. Limits to borrowing activity 7 
d. Treasury position at 31 March 2024 9 
e. Affordability PI 13 
4. Investment rates and outturn 2023/24 14 
5. Performance measurement 15

Page 7

2 | P a g e
Annual Treasury Management and Investment Report
2023/24
1. Purpose 
The Council is required by regulations issued under the Local Government in Scotland Act 2003
to produce an annual review of treasury management activities.  The purpose of this annual
review is to report the performance of the Council’s treasury operation and how this measures
up against the Council’s Treasury Management and Investment Strategy 2023/24.  This is done
through the publication of the annual report and actual prudential and treasury indicators for
2023/24.  
This report meets the requirements of the Scottish Government’s investment regulations, the
CIPFA Code of Practice on Treasury Management (the Code) and the CIPFA Prudential Code for
Capital Finance in Local Authorities (the Prudential Code). 
During 2023/24 the minimum requirement was that the following reports should be submitted
to Elected Members: 
• an annual treasury management and investment strategy (submitted to the Council on 1
March 2023)
• quarterly reporting of treasury prudential indicators
• a mid-year treasury update report (submitted to the Cabinet on 7 November 2023)
• an annual review following the end of the year describing the activity compared to the
strategy (this report) 
Regulations place responsibility on members for the review and scrutiny of treasury
management policy and activities.  This report is therefore important in that respect as it
provides details of the outturn position for treasury activities and highlights compliance with the
Council’s policies previously approved by members.   
However, the Treasury strategy, approved by Council on 1 March 2023, recommended that no
more than 10% of the Councils total investments are invested in any one Money Market Fund
(MMF).  On 22 December 2023, earlier than anticipated holiday cut-off times within the Fund
management companies resulted in the Council being unable to recall funds from 2 MMF’s. As a
result, the amounts invested in those 2 funds equated to 15% of the Council’s total Investments.
This was rectified on the next working day, 27th December 2023, with no negative impacts.

Page 8

3 | P a g e
2. Executive Summary 
During 2023/24, the Council complied with its legislative and regulatory requirements.   
The key prudential and treasury indicators detailing the impact of capital expenditure activities
during the year, with comparators, are summarised below.  In order to provide consistency
within all the tables in this report, all figures exclude the Council’s liabilities in respect of
PPP/NPD unless otherwise stated. 
TABLE 1 
A summary of performance is provided below with more detailed information provided in the
body of the report. 
Overall Capital Expenditure was below the level anticipated due to changes in the profile of
projects.   
The Capital Financing Requirement (CFR) is the underlying borrowing requirements of the
Council.  The reduction to the requirement during 2023/24 reflects changes in the profile of the
capital programme. 
Gross Borrowing reflects the actual borrowing which has been undertaken, this was lower than
anticipated due to the revised profile of capital projects and the use of internal funds, the latter
being a key element of the Treasury Management Strategy to minimise costs. 
The Operational Boundary is the maximum we would anticipate borrowing to fund the current
capital programme, building in flexibility for the timing of the different funding streams and
principal repayments. Due largely to the use of internal funds, the Council’s actual borrowing
position is well within the Operational Boundary. 
2022/23 2023/24 2023/24
Actual Estimate Actual
£m £m £m
Capital expenditure
General services                36.194              112.312                     85.435
HRA                30.478                39.730                     38.966
Total                66.672              152.042                   124.401
Capital Financing Requirement (CFR):
General services              219.809              269.594                   252.383
HRA              164.255              180.546                   184.503
Total              384.064              450.140                   436.886
Gross borrowing               245.566              325.829                   316.786
Operational Boundary               397.338              467.574                   474.582
Authorised Limit               437.072              514.331                   522.041
Total Operational Boundary (Including PPP/NPD)              497.477              555.306                   570.899
Total Authorised Limit (Including PPP/NPD)              537.211              602.063                   618.358
Liability Benchmark              233.139              304.843                   291.409
Investments                 31.456                30.000                     40.105
Prudential and treasury indicators

Page 9

4 | P a g e
The Authorised Limit is a statutory limit; it is the maximum amount of borrowing determined by
the Council and should not be exceeded. The Council has set the Authorised Limit at 10% above
the Operational Boundary to give some flexibility to raise funds for future year capital
investment. 
As noted above, the Council continues to use its internal funds to delay borrowing to minimise costs
but balances this with long term borrowing to support the agreed Capital Investment Programme and
to reduce the Council’s exposure to interest rate risk. The Council took out long term borrowing of
£70m in 2023/24. 
The average loans fund pool rate is the total interest paid during the year as a percentage of the
total loans fund advances.  In 2023/24 this increased from 3.14% to 3.19%.   
The maturity profile and balance between fixed and variable rate borrowing mitigates the
Council’s exposure to interest rate variations either now or when loans require to be refinanced. 
A total of £48.950m of the Council’s loans are at a variable rate, which is in line with the strategy. 
This is £2.000m reduction from the prior year due to a LOBO loan being called and repaid in
March 2024.  Furthermore, another loan for £5m was called and repaid in May 2024 as the
Council continues to work with treasury management advisers to identify financially beneficial
opportunities to repay LOBO loans. 
Affordability of borrowing is measured by the percentage of financing costs relative to the net
revenue stream of the General Fund and Housing Revenue Account; the percentage values were
lower than estimated for both the General Fund and the Housing Revenue Account.  Actuals for
2023/24 were 3.7% for the General Fund and 18.9% for the Housing Revenue Account. Capital
expenditure impacts on the revenue budget through financing charges so it is essential the
Council ensures the financing costs remain affordable and do not constitute an excessive
proportion of the revenue resources available. From a General Fund perspective, the Scottish
Local Authority average in 2022/23 was 5.4%, therefore demonstrating a prudent borrowing
policy. For the HRA, the Scottish average in 2022/23 was 21.3%. The level of loan charges is
deemed prudent and affordable within the framework of the 30 year Housing business plan.   
The average internal investment rate was 4.81% compared to a target of 4.25%. The rate secured in
2022/23 was 1.69%. The higher return secured in 2023/24 reflects the increase in the bank rate during
2023/24. 
Other prudential and treasury indicators and supporting information can be found in the main
body of this report. 
Conclusion 
The Head of Finance confirms that long-term borrowing is only undertaken for a capital purpose
and that the statutory borrowing limit (the authorised limit) has not been breached.

Page 10

5 | P a g e
3. Prudential and Treasury Indicators for 2023/24   
The Prudential Code establishes a framework to ensure that councils demonstrate effective
control over levels of, and decisions relating to, capital investment activity, including borrowing. 
Treasury indicators are used to ensure that risk is managed and controlled effectively.  Together
the Prudential and Treasury Indicators consider the affordability and impact of capital
expenditure decisions.  
These indicators help the Council to demonstrate public accountability in relation to borrowing
and investments.  As part of this accountability the report will summarise the following: - 
• The Council’s Capital Expenditure and Financing (section a);
• The Council’s Overall Borrowing Need (section b);
• Limits to Borrowing Activity (section c);
• Treasury Position at 31 March 2024 (section d); and
• Affordability Prudential Indicators (section e); 
(a) The Council’s Capital Expenditure and Financing 2023/24 
The Council incurs capital expenditure when it invests in its long-term assets.  Capital
Expenditure can be funded in two main ways: 
• Financed immediately through the application of capital or revenue resources (capital
receipts, capital grants, revenue contributions etc.), which have no impact on the Council’s
borrowing need; or
• If insufficient financing is available, or a decision is taken not to apply other resources, then
capital expenditure will give rise to borrowing which needs to be approved as part of the
Council’s capital investment plans.   
The tables below show the actual capital expenditure incurred in 2023/24 compared with the
planned investment alongside the amount financed immediately and the amount which gave rise
to borrowing. 
TABLE 2 
2022/23 2023/24 2023/24
Actual Estimate Actual
£m £m £m
Capital expenditure (Indicator 1)                36.194              112.312                     85.435
Financed in year                33.702                61.066                     51.400
Unfinanced capital expenditure                   2.492                51.246                     34.035
General Fund
2022/23 2023/24 2023/24
Actual Estimate Actual
£m £m £m
Capital expenditure (Indicator 1)                30.478                39.730                     38.966
Financed in year                16.484                18.446                     13.724
Unfinanced capital expenditure                 13.994                21.284                     25.242
HRA

Page 11

6 | P a g e
(b)  The Council’s Overall Borrowing Need (the Capital Financing
Requirement) 
This indicator outlines the Council’s Capital Financing Requirement (CFR).  The CFR is the total
historic outstanding capital expenditure which has not been paid from either a capital or revenue
resource and, therefore, needs to be funded from borrowing.  It is essentially a measure of the
Council’s underlying borrowing need. 
Part of the Council’s treasury activity is to meet the funding requirements for this borrowing
need.  The treasury management section organises the Council’s cash position to ensure that
sufficient cash is available to meet the capital plans and cash flow requirements.  This may be
sourced through borrowing from external bodies (such as the Government, the Public Works
Loan Board [PWLB], other Local Authorities, or the money markets), or utilising temporary cash
resources within the Council. 
The Council’s underlying borrowing need (CFR) is not allowed to rise indefinitely.  The Council is
required to make an annual revenue charge, called the Loans Fund Principal Repayment.  This is
effectively a repayment of the borrowing need and it is charged to revenue over the life of the
asset.  This charge reduces the CFR each year. This differs from the treasury management
arrangements which ensure that cash is available to meet capital commitments.  External debt
can also be borrowed or repaid at any time, but this does not change the CFR. 
The total CFR can also be reduced by: 
• the application of additional capital financing resources (such as capital receipts); or 
• increasing the annual revenue charge 
The Council’s CFR for the year is a key prudential indicator and is shown below.  The opening
balance includes PPP/ NPD schemes on the balance sheet, which increases the Council’s
borrowing need. This is shown in order to give a complete picture of the Council’s debt, however,
no borrowing is actually required against these schemes as a borrowing facility is included in the
contract and, as such, this is subsequently removed. 
Table 3 shows that, based on historic capital expenditure and this year’s capital expenditure, the
Council has a cumulative underlying need to borrow £436.886m at 31 March 2024.

Page 12

7 | P a g e
TABLE 3 
(c) Limits to Borrowing Activity 
Borrowing activity is constrained by the prudential indicators for CFR and gross borrowing and by
the authorised limit, to ensure that the Council operates its activities within well-defined limits. 
Gross borrowing and the CFR 
There is a need to ensure that gross debt does not, except in the medium term, exceed the total
CFR (i.e. the Council does not borrow more than it needs to fund its capital programme).  In
exceptional circumstances Councils are allowed to borrow to cover the current financial year plus
the next two financial years (i.e. to 2025/26).  This provides some flexibility to borrow in advance
where this is appropriate.   
Table 4 highlights the Council’s gross borrowing position against the CFR and confirms that the
Council has complied with this prudential indicator as gross borrowing is currently within the
CFR.  The Council is currently under borrowed by £120.101m due to the continuing strategy to
delay new external borrowing by utilising internal cash balances.   
TABLE 4 
As part of its Annual Treasury Management Strategy the Council sets limits for external
borrowing which it is not normally expected to exceed.  These limits are explained below. 
2022/23 2023/24 2023/24
Actual Estimate Actual
£m £m £m
Opening balance               352.988              384.064                   384.064
Add PPP/NPD liability              100.139                87.732                     96.317
Revised Opening Balance              453.127              471.796                   480.381
Add unfinanced capital expenditure (General Fund)                  2.492                51.246                     34.035
Add unfinanced capital expenditure (HRA)                13.994                21.284                     25.242
Less Loans Fund Principal Repayments                14.590                 (6.455)                    (6.455)
Sub-total              484.203              537.871                   533.203
Less PPP/NPD lease repayments             (100.139)              (87.732)                  (96.317)
Closing balance (Indicator 2)              384.064              450.139                   436.886
Annual Change (Indicator 3)                31.076                66.075                     52.822
CFR
2022/23 2023/24 2023/24
Actual Estimate Actual
£m £m £m
Gross borrowing position (Indicator 4)*              245.566              325.829                   316.786
CFR              384.064              450.140                   436.886
(Under)/Over Borrowed Position             (138.498)            (124.311)                (120.101)

Page 13

8 | P a g e
The Operational Boundary 
The operational boundary is the expected maximum borrowing position of the Council during the
year, taking account of the timing of various funding streams and the recharge of principal
repayments from the revenue account.  Periods where the actual position varies from the
boundary are acceptable subject to the authorised limit not being breached. 
The Authorised Limit 
The authorised limit represents a limit beyond which external debt is prohibited.  This limit is set
by Council and can only be revised by Cabinet approval.  It reflects the level of external
borrowing which, while not desirable, could be afforded in the short term but is not sustainable
in the longer term.  The current limit is set at 10% above the operational boundary. 
The following graph shows the trend of the Council’s gross borrowing against approved limits.
This demonstrates that during 2023/24 the Council’s gross borrowing was within both the
operational boundary and the authorised limit by a significant margin, due largely to the
continuing strategy to delay new external borrowing by utilising internal cash balances. 
Information on the re-profiling of capital expenditure can be found in the ‘Capital Programme
Performance to 31 March 2024’ report, presented to Cabinet on 4 June 2024. 
NB: Figures exclude PPP

Page 14

9 | P a g e
(d) Treasury Position at 31 March 2024 
The Council’s debt and investment position is organised by the treasury management service to
ensure adequate liquidity for revenue and capital activities, security for investments and to manage
risks within agreed parameters. Procedures and controls to achieve these objectives are well
established both through Member reporting and through the Council’s Treasury Management
Practices. 
Borrowing Strategy for 2023/24 
The borrowing strategy for 2023/24 anticipated bank interest rates remaining steady during
2023 before beginning to decline in 2024 and fixed borrowing rates to remain steady.  Variable,
or short-term rates, were expected to be the cheaper form of borrowing over the period. 
The Council has a strategy of taking a combination of temporary and permanent borrowing in
recognition of the Council’s longer term borrowing requirements and the market rates available
at that time. This balances short term financial savings with longer term security of costs. During
2023/24 the Council undertook £70m of long-term borrowing. 
Having begun the financial year at 4.25%, the Bank of England’s Monetary Policy Committee
(MPC) increased Bank Rate to 5.25% in August 2023 as the UK economy appeared resilient in the
face of the dual headwinds of higher inflation and interest rates. Bank Rate was maintained at
5.25% through to March 2024. 
The cost of short term borrowing from other local authorities has generally risen with Base Rate
over the year. Interest rates peaked at around 7% towards the later part of March 2024 as many
authorities required cash at the same time. These rates are expected to fall back to more normal
market levels from April 2024. 
The PWLB 20 year maturity certainty rate stood at 5.18% at 31st March compared to 4.70% at
the start of 23/24.  A new PWLB HRA rate which is 0.4% below the certainty rate was made
available from 15th June 2023. This rate will now be available to June 2025. The Council has
accessed this rate during 2023/24 to support the council house building programme and
investment in the housing stock.

Page 15

10 | P a g e
Borrowing Outturn for 2023/24 
At the beginning and end of 2023/24, the Councils treasury position was as follows: 
TABLE 5 
The Council’s gross debt position increased by £71.220m during 2023/24.  A summary of the
movement is outlined below. 
The Council’s Variable rate debt relates to Lender’s Option Borrower’s Option (LOBO) loans
where the lender has the option to propose an increase in the interest rate at set dates.  During
the year one of these loans for £2m was called and the Council opted to repay the loan.  The
Council continues to work with treasury management advisers to identify financially beneficial
opportunities to repay LOBO loans and with another £5m loan being called in May 2024 the
Council again opted to repay the loan. 
In accordance with the agreed strategy and taking appropriate cognisance of investment
concerns, both in terms of counterparty risk and low returns on investment, the Council used
internal short-term cash reserves to temporarily fund its remaining borrowing requirement. 
Rescheduling   
No rescheduling was done during the year as the average differential between PWLB new
borrowing rates and premature repayment rates made rescheduling not viable. 
£m % £m %
Fixed rate funding:
- PWLB 178.167 4.72% 245.280 4.77%
-Local Authorities 15.000 1.62% 21.250 4.27%
-Market 1.449 8.83% 1.306 9.79%
Variable rate funding:
- Market 50.950 5.10% 48.950 5.10%
Total debt 245.566 4.63% 316.786 4.81%
CFR 384.064 436.886
Over / (under) borrowing (138.498) (120.100)
Investments:
- Internally managed 31.456 0.73% 40.105 4.81%
Total investments 31.456 40.105
Rate/ ReturnRate/ Return31 March 2023
Principal
31 March 2024
Principal
Activity £m
Repayment 67.113
Repayment 6.250
Repayment (0.143)
Repayment (2.000)
71.220
Fixed - PWLB
Fixed - Local Authorities
Variable - Market
Net Decrease in Debt
Category of Debt
Fixed - Market

Page 16

11 | P a g e
Liability Benchmark 
The Liability Benchmark is a new indicator which compares the Council’s actual existing borrowing
against a liability benchmark that has been calculated to show the lowest risk level of borrowing. The
liability benchmark is an important tool to help establish whether the Council is likely to be a long-
term borrower or long-term investor in the future, and so shape its strategic focus and decision
making. It represents an estimate of the cumulative amount of external borrowing the Council must
hold to fund its current capital and revenue plans while keeping treasury investments at the minimum
level of £10m required to manage day-to-day cash flow. 
Following on from the medium-term forecasts in the table above, the long-term liability benchmark
assumes capital expenditure funded by borrowing will be in line with the 10 year capital plan and 30
year HRA business plan respectively, loans fund advances on new capital expenditure based on asset
life and income, expenditure and reserves all increasing by inflation of 2.5% a year with any specific
adjustments made for planned use of reserves. This is shown in the following chart together with the
maturity profile of the Council’s existing borrowing: 
2022/23 2023/24 2024/25 2025/26
Actual
£m
Actual
£m
Forecast
£m
Forecast
£m
Loans CFR         384.1        436.9        531.4        594.8
Less Balance sheet resources        (160.9)      (155.3)     (107.4)        (92.6)
Net loans requirement         223.2        281.6        424.0        502.2
Liquidity allowance           10.0          10.0          10.0          10.0
Liability Benchmark         233.2        291.6        434.0        512.2
Existing Borrowing        (252.2)      (307.2)     (304.2)      (296.3)
Liability Benchmark

Page 17

12 | P a g e
The maturity structure of the debt portfolio at 31 March 2024 is included in Table 6 and shows
the period when the Council is required to repay and/or refinance debt. It is important to ensure
a reasonable spread of debt to mitigate against high exposure levels in respect of refinancing.
The current profile ensures this: 
TABLE 6 
* Note that for 23/24 LOBOs of £38.950m have been shown as under 12 months to reflect the ability of these to
be called in by the investor at any time.  This does not change the maturity date but simply reflects the nature of
the debt.  Higher interest rates have increased the possibility of these loans being called with 2 loans totalling £7m
being called between March and May 2024. 
The impact of a 1% rise in interest rates based on the Councils current debt portfolio is shown in
the table below: 
Another indicator is used to manage risk and reduce the impact of adverse movement in interest
rates.  This sets a limit on the Council’s exposure to fixed and variable interest rates and was as
follows: 
TABLE 7 
Estimates of prudent Loans Fund repayment 
The purpose of the Loans Fund is to record advances for expenditure incurred or loans made to third
parties which a local authority has determined are to be financed from borrowing as set out in
Regulation 2 of The Local Authority (Capital Finance and Accounting) (Scotland) Regulations 2016
£m % £m %
Under 12 months                 43.481 18%                    62.650 20%
12 months and within 24 months                  2.950 1%                      2.950 1%
24 months and within 5 years                  6.207 3%                    13.845 4%
5 years and within 10 years                21.639 9%                    31.439 10%
10 years and within 20 years                33.177                     83.189
20 years and within 30 years                  6.225                     20.125
30 years and within 40 years              106.887                     92.588
40 years and within 50 years                15.000                           -   
50 years and above                10.000                     10.000
Total Borrowing              245.566 100%                  316.786 100%
31 March 2023
Actual
31 March 2024
Actual
70%
31 March 2023
Actual
65%
31 March 2024
Actual
2024/25 2025/26 2026/27
£m £m £m
Impact of1% increase in Interest rates       0.438        0.641        0.684
Impact of1% decrease in Interest rates      (0.167)      (0.252)      (0.294)
Interest rate Risk Exposure
2022/23 2023/24 2023/24
Actual Limit Actual
£m £m £m
Limit on fixed rate (principal)              194.616              306.895 267.836
Limit on variable rate (principal)                50.950                60.000 48.950

Page 18

13 | P a g e
[“the Regulations”].   The Loans Fund advance is effectively the repayment of the ‘principal’ linked to
the expenditure classified above which is unfinanced and is required to be funded from borrowing. 
Repayment of Loans Fund advances are required to be made in line with Scottish Government
statutory guidance on Loans Fund Accounting. 
The Council’s latest estimates of its Loans Fund account information are as follows: 
(e) Affordability Prudential Indicators 
These Prudential Indicators assess the affordability of capital investment plans and provide an
indication of the impact of capital investment plans on the Council’s overall finances.   
Actual financing costs as a proportion of net revenue stream 
This indicator identifies the trend in the cost of capital (borrowing and other long-term obligation
costs net of investment income) against the net revenue stream and is a measure of affordability
for debt repayment. Actuals for 2023/24 were 2.7% for the General Fund and 18.9% for the
Housing Revenue Account.  The reduction in the ratio within the HRA during 2023/24 is a result
of the review of the loans fund advances, as detailed in the mid year report, which realigned
advances to the most appropriate useful economic life. Capital expenditure impacts on the
revenue budget through financing charges so it is essential the Council ensures the financing
costs remain affordable and do not constitute an excessive proportion of the revenue resources
available. From a General Fund perspective, the Scottish Local Authority average in 2022/23 was
5.4%, therefore demonstrating a prudent borrowing policy. For the HRA, the Scottish average
was 21.3%. The level of loan charges is deemed prudent and affordable within the framework of
the 30 year Housing business plan. 
TABLE 8 
Year
Opening
Balance
£m
Advances to
GF
£m
Advances to
HRA
£m
Repayment  by
GF
£m
Repayment by
HRA
£m
Closing
Balance
£m
2023/24 Actual 384.064 34.035 25.242 -1.461 -4.994 436.886
2024/25 - 28/29 436.886 207.756 200.724 -11.995 -33.167 800.204
2029/30– 33/34 800.204 8.717 53.153 -17.345 -40.717 804.011
2034/35 – 38/39 804.011 0.000 78.267 -20.953 -51.677 809.649
2039/40 – 43/44 809.649 0.000 97.847 -54.626 -60.491 792.379
2044/45 – 48/49 792.379 0.000 10.337 -75.824 -65.470 661.422
2049/50 – 53/54 661.422 0.000 0.000 -92.292 -61.191 507.938
2054/55 – 58/59 507.938 0.000 0.000 -74.874 -57.287 375.777
2059/60 – 63/64 375.777 0.000 0.000 -45.191 -62.099 268.487
2064/65 – 68/69 268.487 0.000 0.000 -37.405 -61.267 169.814
2069/70 & later 169.814 0.000 0.000 -38.352 -131.462 0.000
2022/23 2023/24 2023/24
Actual Estimate Actual
General Services 1.9% 2.5% 2.7%
HRA 20.1% 20.5% 18.9%
Estimate of ratio of financing costs to net revenue stream

Page 19

14 | P a g e
4. Investment Rates and Outturn 2023/24 
Interest Rates 
The Bank of England increased the official Bank rate from 4.25% at the beginning of the year to
5.25% by the end of March 2024. Deposit rates have increased during 2023/24 as a result.   
Investment Policy 
The Council’s investment policy is governed by Scottish Government investment regulations, which
have been implemented in the annual investment strategy approved by the Council on 1 March 2023. 
This policy sets out the approach for choosing investment counterparties and is based upon: new bank
resolution regulations, where failing banks will not be bailed-out but ‘bailed-in’ by unsecured investors
that can include local authorities; the capacity of banks to absorb unexpected losses; and credit ratings
provided by the leading credit rating agencies. This is supplemented by additional market data (such
as economic data, credit default swaps, bank share prices etc.).   
Investment treasury indicator and limit 
This is a control on the total principal funds invested for greater than 1 year.  This limit is set with
regard to the Council’s liquidity requirements and to reduce the need for early sale of an investment,
and is based on the availability of funds after each year-end. 
All investments at 31 March 2024 mature within one year in line with the approved limit. 
Resources 
The Council’s cash balances comprise revenue and capital resources and cash flow monies.  The
Council’s cash resources were as follows: 
TABLE 9    
2023/24 2023/24 2024/25
Limit
£m
Actual
£m
Limit
£m
Principal sums invested for more than 1 year 10.000                -                   10.000                  
Maximum principal sums invested for more than 1 year
2022/23
Actual
2023/24
Actual
£m £m
1 April                43.506                31.456
31 March                31.456                40.105
Change in year               (12.050)                 8.649
Cash Balances

Page 20

15 | P a g e
Investments held by the Council 
The Council maintained an average balance of £38.955m of internally managed funds and utilised
cash balances during the year in support of the under-borrowed position.  The internally managed
funds, primarily invested in call accounts with banks, Money Market Funds and other UK local
authorities, earned a weighted average rate of return of 4.81%.  This compares to a rate of 1.69% in
2022/23.  Performance was above the target rate of 4.25% and reflects the increase in the bank rate
during 2023/24 and the short term nature of our investments and our overall investment objectives of
security and liquidity.   
The Councils Environmental, social and governance (ESG) policy states that when investing the Council
will prioritise banks that are signatories to the UN Principles for Responsible Banking and funds
operated by managers that are signatories to the UN Principles for Responsible Investment, the Net
Zero Asset Managers Alliance and/or the UK Stewardship Code. A list of ESG Initiative signatories is
updated quarterly by the Council’s treasury advisor Arlingclose to support the Council’s decision
making process for investing.   
5. Performance Measurement 
One of the key requirements in the Code is the formal introduction of performance measurement
relating to investments, debt and capital financing activities.  Whilst investment performance criteria
have been well developed and universally accepted, debt performance indicators continue to be a
more problematic area with the traditional average portfolio rate of interest acting as the main guide.   
The Council’s treasury management advisors are Arlingclose Limited. Arlingclose has five Scottish Local
Authorities in their client group and provide regular investment benchmarking information to the
Council.  In terms of performance in 2023/24, North Ayrshire Council’s average weighted rate of
return on investments during 23/24 was 4.81% (22/23 1.69%). The actual rate of return on
investments as at 31 March for North Ayrshire Council was 5.31% compared to the group average rate
of 5.03%. 
Emphasis will continue to be placed on investing with approved counterparties in accordance with the
approved strategy.