NORTH AYRSHIRE COUNCIL 
24 June 2026 
North Ayrshire Council 
Title:    Treasury Management and Investment Annual Report
2025/26 
Purpose:  To report to Council on the Treasury Management and
Investment Annual Report and Prudential Indicators for 2025/26. 
Recommendation:  That Council notes :
(a) the Treasury Management and Investment Annual Report
for 2025/26 (Appendix 1); and 
(b) the Prudential and Treasury Indicators contained therein. 
1. Executive Summary 
1.1 The Council is required by regulations issued under the Local Government in Scotland
Act 2003 to produce an annual review of treasury management activities. The
purpose of the annual review is to report the performance of the Council’s treasury
operations and how this measures up against the Council’s Treasury Management
and Investment Strategy 2025/26. This is done through the publication of the annual
report which contains the actual prudential and treasury indicators for 2025/26.
1.2 This Treasury Management and Investment Annual Report meets the requirements of
the Scottish Government’s investment regulations, the CIPFA Code of Practice on
Treasury Management (the Code) and the CIPFA Prudential Code for Capital Finance
in Local Authorities (the Prudential Code).
1.3 The Treasury Management and Investment Annual Report 2025/26 for North Ayrshire
Council is attached at Appendix 1. Key points to note from the report are as follows:
• During 2025/26, the Council complied with its legislative and regulatory
requirements in relation to treasury activities; 
• Capital expenditure was below the level anticipated at the start of the year due to
changes in the profile of projects;
• Gross borrowing was lower than anticipated due to the revised profile of capital
projects and the use of internal funds, the latter being a key element of the
Treasury Management Strategy to minimise costs;
• During the year the Council undertook long term borrowing of £20.000m to support
the agreed Capital Investment Programme and to reduce the Council’s exposure to
interest rate risk;
• The average loans fund pool rate increased from 3.30% to 3.65%; and

Page 2

• During the year one Lender’s Option Borrower’s Option (LOBO) loan, totalling
£5.600m was called and repaid, reducing the Councils level of variable rate debt. A
further £10.000m LOBO has been repaid in May 2026. 
2. Background 
2.1 The Chartered Institute of Public Finance and Accountancy (CIPFA) Code of Practice
for Treasury Management requires elected members to be provided with regular
reports on treasury management activities. The 2025/26 Annual Treasury
Management and Investment Strategy was approved by Council on 26 February
2025, the mid-year report was submitted to the Cabinet on 28 October 2025 and
treasury prudential indicators were reported quarterly. This final outturn report ensures
full compliance with the CIPFA Code of Practice.
2.2 Current Position 
The 2025/26 annual report is attached at Appendix 1 and covers:
• Prudential and treasury indicators;
• Investment rate and outturn; and
• Performance measures.
2.3 Statutory Requirements
During 2025/26 the Council complied with its legislative and regulatory requirements.
It is a statutory duty for the Council to determine and keep under review its approved
borrowing limits and prudential indicators. Details within the report demonstrate that
the Council has operated within the treasury limits and prudential indicators as set out
in the Council's 2025/26 Annual Treasury Management and Investment Strategy
Statement (TMSS).
2.4 Borrowing Update
At 31 March 2026 the council has £28.350m variable rate debt which relates to
Lender’s Option Borrower’s Option (LOBO) loans where the lender has the option to
propose an increase in the interest rate at set dates.  This is a £5.600m reduction
from the prior year due to one LOBO loan being called and repaid during the year.
The Council continues to work with treasury management advisers to identify
financially beneficial opportunities to repay LOBO loans and a further £10.00m loan
has been called during May 2026, the Council again opted to repay the loan.
2.5 General Services and Housing Revenue Account (HRA)
2.5.1 Capital Financing Costs - the General Fund budget of £23.654m for financing costs
and expenses on debt for 2025/26 was underspent by £6.043m, comparative
information for the HRA was a budget of £17.048m and an underspend of £2.335m.
The underspend is a result of a planned contribution to support the 10 year General
Fund capital programme; the re-profiling of planned capital expenditure and the
continuing strategy to delay new external borrowing by utilising cash balances,
resulting in savings on external interest costs.

Page 3

2.5.2 Interest on Revenue Balances - the General Fund budget of £0.140m for interest on
its revenue balances with a reported over-recovery of £0.977m in 2025/26,
comparative information for the HRA was a budget of £0.175m with a reported over-
recovery of £0.098m. The overall over-recovery is reflective of the higher bank rate
during 2025/26 than estimated at the time of setting the budget.
2.5.3 Service Concession Reprofiling - there was an in year underspend of £3.167m
following the adoption of the revised accounting arrangements under Local
Government Finance Circular 10/2022 for the recalculation of debt repayments arising
from the Council’s service concession contracts as approved by Council on 15
February 2023.
2.5.4 In accordance with agreed policy, the net General Fund underspend of £10.187m has
been transferred to the Loans Fund Reserve to support the funding strategy for the
ten year capital investment programme.  In addition, a further £1.500m has been
earmarked to support the Loans Fund as approved by Cabinet on 2 June 2026. 
3. Proposals 
3.1 It is proposed that Council notes :
(a)  the contents of the Treasury Management and Investment Annual Report for
2025/26 (Appendix 1); and 
(b)  the Prudential and Treasury Indicators contained therein. 
4. Implications/Socio-economic Duty 
Financial 
4.1 Capital Financing underspends within General Fund of £10.187m have been
transferred to the Loans Fund Reserve in line with agreed policy.
Within the HRA, the underspend of £2.433m has been transferred to HRA reserves. 
Human Resources 
4.2 None. 
Legal 
4.3 The Local Government in Scotland Act 2003 and supporting regulations require the 
Council to produce an annual review of treasury management activities. 
Equality/Socio-economic 
4.4 None. 
Climate Change and Carbon 
4.5 None.

Page 4

Key Priorities 
4.6 The Treasury Management and Investment Annual Report supports the Council Plan 
2023 to 2028 by maximising financial flexibility to support the delivery of our priorities. 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 The Council's treasury advisors, Arlingclose Ltd, were consulted in the preparation of 
this report. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Natalie Graham, Senior Manager Corporate
Finance, Financial Management, on 01294 324233. 
Background Papers
Capital Programme Performance to 31 March 2026 – Cabinet 2 June 2026 
Treasury Management and Investment Mid-year Report 2025/26 – Cabinet 28 October
2025.

Page 5

Annual Treasury Management and
Investment Report 
2025/26

Page 6

1 | P a g e
Contents              Page
1. Purpose 2 
2. Executive summary 3 
3. Prudential and Treasury Indicators for 2025/26 5 
a. The Council’s capital expenditure and financing 2025/26 5 
b. The Council’s overall borrowing need  6 
c. Limits to borrowing activity 7 
d. Treasury position at 31 March 2026 9 
e. Affordability PI 13 
4. Investment rates and outturn 2025/26 14 
5. Performance measurement 15

Page 7

2 | P a g e
Annual Treasury Management and Investment Report
2025/26
1. Purpose 
The Council is required by regulations issued under the Local Government in Scotland Act 2003
to produce an annual review of treasury management activities.  The purpose of this annual
review is to report the performance of the Council’s treasury operation and how this measures
up against the Council’s Treasury Management and Investment Strategy 2025/26.  This is done
through the publication of the annual report and actual prudential and treasury indicators for
2025/26.  
This report meets the requirements of the Scottish Government’s investment regulations, the
CIPFA Code of Practice on Treasury Management (the Code) and the CIPFA Prudential Code for
Capital Finance in Local Authorities (the Prudential Code). 
During 2025/26 the minimum requirement was that the following reports should be submitted
to Elected Members: 
• an annual treasury management and investment strategy (submitted to the Council on 26
February 2025)
• quarterly reporting of treasury prudential indicators
• a mid-year treasury update report (submitted to the Cabinet on 28 October 2025)
• an annual review following the end of the year describing the activity compared to the
strategy (this report) 
Regulations place responsibility on members for the review and scrutiny of treasury
management policy and activities.  This report is therefore important in that respect as it
provides details of the outturn position for treasury activities and highlights compliance with the
Council’s policies previously approved by members.

Page 8

3 | P a g e
2. Executive Summary 
During 2025/26, the Council complied with its legislative and regulatory requirements.   
The key prudential and treasury indicators detailing the impact of capital expenditure activities
during the year, with comparators, are summarised below.  In order to provide consistency
within all the tables in this report, all figures exclude the Council’s liabilities in respect of
PPP/NPD unless otherwise stated. 
TABLE 1 
* All figures in this report reflect the latest estimate contained within the 2026/27 Annual Treasury Management
and investment Strategy. 
A summary of performance is provided below with more detailed information provided in the
body of the report. 
Overall Capital Expenditure was below the level anticipated due to changes in the profile of
projects.   
The Capital Financing Requirement (CFR) is the underlying borrowing requirements of the
Council.  The reduction to the requirement during 2025/26 reflects changes in the profile of the
capital programme. 
Gross Borrowing reflects the actual borrowing which has been undertaken, this was lower than
anticipated due to the revised profile of capital projects and the use of internal funds, the latter
being a key element of the Treasury Management Strategy to minimise costs. 
2024/25 2025/26 2025/26
Actual Estimate Actual
£m £m £m
Capital expenditure
General services                91.025                88.766                     59.585
HRA                46.534                44.558                     36.917
Total              137.559              133.324                     96.502
Capital Financing Requirement (CFR):
General services              316.328              370.740                   349.654
HRA              197.342              214.956                   203.175
Total              513.670              585.696                   552.829
Gross borrowing               428.877              530.392                   421.948
Operational Boundary               555.119              608.036                   569.454
Authorised Limit               610.631              668.840                   626.399
Total Operational Boundary (Including PPP/NPD)              646.992              686.626                   682.572
Total Authorised Limit (Including PPP/NPD)              702.504              747.430                   739.517
Liability Benchmark              365.800              485.610                   452.700
Investments                 75.653                30.000                     69.459
Prudential and treasury indicators

Page 9

4 | P a g e
The Operational Boundary is the maximum we would anticipate borrowing to fund the current
capital programme, building in flexibility for the timing of the different funding streams and
principal repayments. Due largely to the use of internal funds, the Council’s actual borrowing
position is well within the Operational Boundary. 
The Authorised Limit is a statutory limit; it is the maximum amount of borrowing determined by
the Council and should not be exceeded. The Council has set the Authorised Limit at 10% above
the Operational Boundary to give some flexibility to raise funds for future year capital
investment. 
As noted above, the Council continues to use its internal funds to delay borrowing to minimise costs
but balances this with long term borrowing to support the agreed Capital Investment Programme and
to reduce the Council’s exposure to interest rate risk. The Council took out long term borrowing of
£20.000m in 2025/26. 
The average loans fund pool rate is the total interest paid during the year as a percentage of the
total loans fund advances.  In 2025/26 this increased from 3.30% to 3.65%.   
The maturity profile and balance between fixed and variable rate borrowing mitigates the
Council’s exposure to interest rate variations either now or when loans require to be refinanced. 
A total of £28.350m of the Council’s loans are at a variable rate, which is in line with the strategy. 
This is a £5.600m reduction from the prior year due to one LOBO loan being called and repaid
during the year.  Furthermore, another loan for £10.000m was called and repaid in May 2026 as
the Council continues to work with treasury management advisers to identify financially
beneficial opportunities to repay LOBO loans. 
Affordability of borrowing is measured by the percentage of financing costs relative to the net
revenue stream of the General Fund and Housing Revenue Account; the percentage values were
lower than estimated for both the General Fund and the Housing Revenue Account.  Actuals for
2025/26 were 3.7% for the General Fund and 23.5% for the Housing Revenue Account. Capital
expenditure impacts on the revenue budget through financing charges so it is essential the
Council ensures the financing costs remain affordable and do not constitute an excessive
proportion of the revenue resources available. From a General Fund perspective, the Scottish
Local Authority average in 2024/25 was 6.0%, therefore demonstrating a prudent borrowing
policy. For the HRA, the Scottish average in 2024/25 was 20.1%. The level of loan charges is
deemed prudent and affordable within the framework of the 30 year Housing business plan.  
The average internal investment rate was 4.12% compared to a target of 3.75%. The rate secured
in 2024/25 was 4.74%. The lower return secured in 2025/26 reflects the reductions in the bank
rate during 2025/26. 
Other prudential and treasury indicators and supporting information can be found in the main
body of this report. 
Conclusion 
The Head of Finance confirms that long-term borrowing is only undertaken for a capital purpose
and that the statutory borrowing limit (the authorised limit) has not been breached.

Page 10

5 | P a g e
3. Prudential and Treasury Indicators for 2025/26   
The Prudential Code establishes a framework to ensure that councils demonstrate effective
control over levels of, and decisions relating to, capital investment activity, including borrowing. 
Treasury indicators are used to ensure that risk is managed and controlled effectively.  Together
the Prudential and Treasury Indicators consider the affordability and impact of capital
expenditure decisions.  
These indicators help the Council to demonstrate public accountability in relation to borrowing
and investments.  As part of this accountability the report will summarise the following: - 
• The Council’s Capital Expenditure and Financing (section a);
• The Council’s Overall Borrowing Need (section b);
• Limits to Borrowing Activity (section c);
• Treasury Position at 31 March 2026 (section d); and
• Affordability Prudential Indicators (section e); 
(a) The Council’s Capital Expenditure and Financing 2025/26 
The Council incurs capital expenditure when it invests in its long-term assets.  Capital
Expenditure can be funded in two main ways: 
• Financed immediately through the application of capital or revenue resources (capital
receipts, capital grants, revenue contributions etc.), which have no impact on the Council’s
borrowing need; or
• If insufficient financing is available, or a decision is taken not to apply other resources, then
capital expenditure will give rise to borrowing which needs to be approved as part of the
Council’s capital investment plans.   
The tables below show the actual capital expenditure incurred in 2025/26 compared with the
planned investment alongside the amount financed immediately and the amount which gave rise
to borrowing. 
TABLE 2 
2024/25 2025/26 2025/26
Actual Estimate Actual
£m £m £m
Capital expenditure (Indicator 1)                91.025                88.766                     59.585
Financed in year                25.581                31.776                     23.678
Unfinanced capital expenditure                 65.444                56.990                     35.907
2024/25 2025/26 2025/26
Actual Estimate Actual
£m £m £m
Capital expenditure (Indicator 1)                46.534                44.558                     36.917
Financed in year                27.558                19.987                     24.127
Unfinanced capital expenditure                 18.976                24.571                     12.790
General Fund
HRA

Page 11

6 | P a g e
(b)  The Council’s Overall Borrowing Need (the Capital Financing
Requirement) 
This indicator outlines the Council’s Capital Financing Requirement (CFR).  The CFR is the total
historic outstanding capital expenditure which has not been paid from either a capital or revenue
resource and, therefore, needs to be funded from borrowing.  It is essentially a measure of the
Council’s underlying borrowing need. 
Part of the Council’s treasury activity is to meet the funding requirements for this borrowing
need.  The treasury management section organises the Council’s cash position to ensure that
sufficient cash is available to meet the capital plans and cash flow requirements.  This may be
sourced through borrowing from external bodies (such as the Government, the Public Works
Loan Board [PWLB], other Local Authorities, or the money markets), or utilising temporary cash
resources within the Council. 
The Council’s underlying borrowing need (CFR) is not allowed to rise indefinitely.  The Council is
required to make an annual revenue charge, called the Loans Fund Principal Repayment.  This is
effectively a repayment of the borrowing need and it is charged to revenue over the life of the
asset.  This charge reduces the CFR each year. This differs from the treasury management
arrangements which ensure that cash is available to meet capital commitments.  External debt
can also be borrowed or repaid at any time, but this does not change the CFR. 
The total CFR can also be reduced by: 
• the application of additional capital financing resources (such as capital receipts); or 
• increasing the annual revenue charge 
The Council’s CFR for the year is a key prudential indicator and is shown below.  The opening
balance includes PPP/ NPD schemes on the balance sheet, which increases the Council’s
borrowing need. This is shown in order to give a complete picture of the Council’s debt, however,
no borrowing is actually required against these schemes as a borrowing facility is included in the
contract and, as such, this is subsequently removed. 
Table 3 shows that, based on historic capital expenditure and this year’s capital expenditure, the
Council has a cumulative underlying need to borrow £552.829m at 31 March 2026.

Page 12

7 | P a g e
TABLE 3 
(c) Limits to Borrowing Activity 
Borrowing activity is constrained by the prudential indicators for CFR and gross borrowing and by
the authorised limit, to ensure that the Council operates its activities within well-defined limits. 
Gross borrowing and the CFR 
There is a need to ensure that gross debt does not, except in the medium term, exceed the total
CFR (i.e. the Council does not borrow more than it needs to fund its capital programme).  In
exceptional circumstances Councils are allowed to borrow to cover the current financial year plus
the next two financial years (i.e. to 2027/28).  This provides some flexibility to borrow in advance
where this is appropriate.   
Table 4 highlights the Council’s gross borrowing position against the CFR and confirms that the
Council has complied with this prudential indicator as gross borrowing is currently within the
CFR.  The Council is currently under borrowed by £130.881m due to the continuing strategy to
delay new external borrowing by utilising internal cash balances.   
TABLE 4 
As part of its Annual Treasury Management Strategy the Council sets limits for external
borrowing which it is not normally expected to exceed.  These limits are explained below. 
2024/25 2025/26 2025/26
Actual Estimate Actual
£m £m £m
Opening balance               436.885              513.670                   513.670
Add PPP/NPD liability                91.872                78.590                   113.118
Revised Opening Balance              528.758              592.260                   626.788
Add unfinanced capital expenditure (General Fund)                65.444                56.990                     35.907
Add unfinanced capital expenditure (HRA)                18.976                24.571                     12.790
Less Loans Fund Principal Repayments                 (7.635)                (9.535)                    (9.538)
Sub-total              605.543              664.286                   665.947
Less PPP/NPD lease repayments               (91.872)              (78.590)                (113.118)
Closing balance (Indicator 2)              513.670              585.696                   552.829
Annual Change (Indicator 3)                76.785                72.026                     39.159
CFR
2024/25 2025/26 2025/26
Actual Estimate Actual
£m £m £m
Gross borrowing position (Indicator 4)*              428.877              530.392                   421.948
CFR              513.670              585.696                   552.829
(Under)/Over Borrowed Position               (84.793)              (55.304)                (130.881)

Page 13

8 | P a g e
The Operational Boundary 
The operational boundary is the expected maximum borrowing position of the Council during the
year, taking account of the timing of various funding streams and the recharge of principal
repayments from the revenue account.  Periods where the actual position varies from the
boundary are acceptable subject to the authorised limit not being breached. 
The Authorised Limit 
The authorised limit represents a limit beyond which external debt is prohibited.  This limit is set
by Council and can only be revised by Cabinet approval.  It reflects the level of external
borrowing which, while not desirable, could be afforded in the short term but is not sustainable
in the longer term.  The current limit is set at 10% above the operational boundary. 
The following graph shows the trend of the Council’s gross borrowing against approved limits.
This demonstrates that during 2025/26 the Council’s gross borrowing was within both the
operational boundary and the authorised limit by a significant margin, due largely to the
continuing strategy to delay new external borrowing by utilising internal cash balances. 
Information on the re-profiling of capital expenditure can be found in the ‘Capital Programme
Performance to 31 March 2026’ report, presented to Cabinet on 2 June 2026. 
NB: Figures exclude PPP

Page 14

9 | P a g e
(d) Treasury Position at 31 March 2026 
The Council’s debt and investment position is organised by the treasury management service to
ensure adequate liquidity for revenue and capital activities, security for investments and to manage
risks within agreed parameters. Procedures and controls to achieve these objectives are well
established both through Member reporting and through the Council’s Treasury Management
Practices. 
Borrowing Strategy for 2025/26 
The borrowing strategy for 2025/26 anticipated bank interest rates declining gradually during 
the year and fixed borrowing rates to remain steady.  Variable, or short-term rates, were
expected to be the cheaper form of borrowing over the period. 
The Council has a strategy of taking a combination of temporary and permanent borrowing in
recognition of the Council’s longer term borrowing requirements and the market rates available
at that time. This balances short term financial savings with longer term security of costs. During
2025/26 the Council undertook £20.000m of long-term borrowing. 
Having begun the financial year at 4.50%, the Bank of England’s Monetary Policy Committee
(MPC) cut the Bank Rate by 0.25% in May, August and January, ending the year at 3.75%. 
For the majority of the year the cost of short-term borrowing from other local authorities was
higher than Base Rate at around 4.0% - 4.50%. However, from early 2026 rates began to rise in
response to conflict in the Middle East, peaking at around 7.0% in February and March 2026. 
The PWLB 20 year maturity certainty rate stood at 6.42% at 31st March compared to 6.11% at
the start of 25/26.  The PWLB HRA rate which is 0.4% below the certainty rate is available up to
March 2027. The Council has not accessed this rate during 2025/26 to support the council house
building programme and investment in the housing stock.

Page 15

10 | P a g e
Borrowing Outturn for 2025/26 
At the beginning and end of 2025/26, the Councils treasury position was as follows: 
TABLE 5 
The Council’s gross debt position decreased by £6.929 during 2025/26.  A summary of the
movement is outlined below. 
The Council’s Variable rate debt relates to Lender’s Option Borrower’s Option (LOBO) loans
where the lender has the option to propose an increase in the interest rate at set dates.  During
the year one of these loans totalling £5.600m were called and the Council opted to repay the
loans.  The Council continues to work with treasury management advisers to identify financially
beneficial opportunities to repay LOBO loans and with another £10.000m loan being called in
May 2026 the Council again opted to repay the loan. 
In accordance with the agreed strategy and taking appropriate cognisance of investment
concerns, both in terms of counterparty risk and low returns on investment, the Council used
internal short-term cash reserves to temporarily fund its remaining borrowing requirement. 
Rescheduling   
No rescheduling was done during the year as the average differential between PWLB new
borrowing rates and premature repayment rates made rescheduling not viable. 
£m % £m %
Fixed rate funding:
- PWLB 372.392 4.84% 385.952 4.84%
-Local Authorities 21.291 4.90% 6.465 4.14%
-Market 1.244 10.29% 1.181 10.83%
Variable rate funding:
- Market 33.950 5.26% 28.350 4.44%
Total debt 428.877 4.89% 421.948 4.82%
CFR 513.670 552.829
Over / (under) borrowing (84.793) (130.881)
Investments:
- Internally managed 75.653 4.74% 69.459 4.12%
Total investments 75.653 69.459
Rate/ ReturnRate/ Return31 March 2025
Principal
31 March 2026
Principal
Activity £m
Repayment 13.560
Repayment (14.826)
Repayment (0.063)
Repayment (5.600)
(6.929)
Fixed - PWLB
Fixed - Local Authorities
Variable - Market
Net Decrease in Debt
Category of Debt
Fixed - Market

Page 16

11 | P a g e
Liability Benchmark 
The Liability Benchmark is a new indicator which compares the Council’s actual existing borrowing
against a liability benchmark that has been calculated to show the lowest risk level of borrowing. The
liability benchmark is an important tool to help establish whether the Council is likely to be a long-
term borrower or long-term investor in the future, and so shape its strategic focus and decision
making. It represents an estimate of the cumulative amount of external borrowing the Council must
hold to fund its current capital and revenue plans while keeping treasury investments at the minimum
level of £10m required to manage day-to-day cash flow. 
Following on from the medium-term forecasts in the table above, the long-term liability benchmark
assumes capital expenditure funded by borrowing will be in line with the 10 year capital plan and 30
year HRA business plan respectively, loans fund advances on new capital expenditure based on asset
life and income, expenditure and reserves all increasing by inflation of 2.5% a year with any specific
adjustments made for planned use of reserves. This is shown in the following chart together with the
maturity profile of the Council’s existing borrowing: 
2024/25 2025/26 2026/27 2027/28
Actual
£m
Actual
£m
Forecast
£m
Forecast
£m
Loans CFR         513.7        552.8        721.4        810.0
Less Balance sheet resources        (157.9)      (110.1)       (95.2)        (80.9)
Net loans requirement         355.8        442.7        626.2        729.1
Liquidity allowance           10.0          10.0          10.0          10.0
Liability Benchmark         365.8        452.7        636.2        739.1
Existing Borrowing        (428.9)      (411.3)     (403.3)      (376.9)
Liability Benchmark

Page 17

12 | P a g e
The maturity structure of the debt portfolio at 31 March 2026 is included in Table 6 and shows
the period when the Council is required to repay and/or refinance debt. It is important to ensure
a reasonable spread of debt to mitigate against high exposure levels in respect of refinancing.
The current profile ensures this: 
TABLE 6 
* Note that for 25/26 LOBOs of £18.350m have been shown as under 12 months to reflect the ability of these to
be called in by the investor at any time.  This does not change the maturity date but simply reflects the nature of
the debt.  Higher interest rates have increased the possibility of these loans being called with one loan for £5.600m
having been called during 2025/26 and another loan for £10.000m being called in May 2026. 
The impact of a 1% rise in interest rates based on the Councils current debt portfolio is shown in
the table below: 
As a result of the Councils strategy to repay LOBO loans where it is financially beneficial, the repayment of one
loan totalling £5.600m during the year has reduced the short term interest rate risk to the Council. 
Another indicator is used to manage risk and reduce the impact of adverse movement in interest
rates.  This sets a limit on the Council’s exposure to fixed and variable interest rates and was as
follows: 
TABLE 7 
£m % £m %
Under 12 months                 44.954 10%                    25.996 6%
12 months and within 24 months                  4.917 1%                    26.441 6%
24 months and within 5 years                42.049 10%                    54.321 13%
5 years and within 10 years              102.667 24%                  108.343 26%
10 years and within 20 years              115.778                     88.335
20 years and within 30 years                15.925                     25.925
30 years and within 40 years                92.587                     82.587
40 years and within 50 years                       -                              -   
50 years and above                10.000                     10.000
Total Borrowing              428.877 100%                  421.948 100%
49%
31 March 2026
Actual
31 March 2026
Actual
55%
31 March 2025
Actual
31 March 2025
Actual
2026/27 2027/28 2028/29
£m £m £m
Impact of 1% increase in Interest rates       0.210        0.475        0.551
Impact of 1% decrease in Interest rates      (0.103)      (0.194)      (0.270)
Interest rate Risk Exposure
2024/25 2025/26 2025/26
Actual Limit Actual
£m £m £m
Limit on fixed rate (principal)              394.927              668.840 393.598
Limit on variable rate (principal)                33.950                60.000 28.350

Page 18

13 | P a g e
Estimates of prudent Loans Fund repayment
The purpose of the Loans Fund is to record advances for expenditure incurred or loans made to third
parties which a local authority has determined are to be financed from borrowing as set out in
Regulation 2 of The Local Authority (Capital Finance and Accounting) (Scotland) Regulations 2016
[“the Regulations”].   The Loans Fund advance is effectively the repayment of the ‘principal’ linked to
the expenditure classified above which is unfinanced and is required to be funded from borrowing. 
Repayment of Loans Fund advances are required to be made in line with Scottish Government
statutory guidance on Loans Fund Accounting. 
The Council’s latest estimates of its Loans Fund account information are as follows: 
(e) Affordability Prudential Indicators 
These Prudential Indicators assess the affordability of capital investment plans and provide an
indication of the impact of capital investment plans on the Council’s overall finances.   
Actual financing costs as a proportion of net revenue stream 
This indicator identifies the trend in the cost of capital (borrowing and other long-term obligation
costs net of investment income) against the net revenue stream and is a measure of affordability
for debt repayment. Actuals for 2025/26 were 3.7% for the General Fund and 23.5% for the
Housing Revenue Account.  Capital expenditure impacts on the revenue budget through
financing charges so it is essential the Council ensures the financing costs remain affordable and
do not constitute an excessive proportion of the revenue resources available. From a General
Fund perspective, the Scottish Local Authority average in 2024/25 was 6.0%, therefore
demonstrating a prudent borrowing policy. For the HRA, the Scottish average was 20.1%. The
level of loan charges is deemed prudent and affordable within the framework of the 30 year
Housing business plan. 
Year
Opening
Balance
£m
Advances to
GF
£m
Advances to
HRA
£m
Repayment  by
GF
£m
Repayment by
HRA
£m
Closing
Balance
£m
2025/26 Actual 513.670 35.907 12.790 -2.581 -6.957 552.829
2026/27 - 30/31 552.829 170.261 197.129 -15.413 -34.990 869.816
2031/32– 35/36 869.816 0.551 106.943 -21.255 -50.348 905.707
2036/37 – 40/41 905.707 0.000 154.256 -40.105 -65.126 954.732
2041/42 – 45/46 954.732 0.000 47.491 -68.202 -75.613 858.408
2046/47 – 50/51 858.408 0.000 0.000 -89.195 -80.909 688.303
2051/52 – 55/56 688.303 0.000 0.000 -104.660 -73.249 510.395
2056/57 – 60/61 510.395 0.000 0.000 -61.246 -73.801 375.348
2061/62 – 65/66 375.348 0.000 0.000 -49.667 -77.364 248.317
2066/67 – 70/71 248.317 0.000 0.000 -34.678 -71.765 141.874
2071/72 & later 141.874 0.000 0.000 -36.047 -105.827 0.000

Page 19

14 | P a g e
TABLE 8 
4. Investment Rates and Outturn 2025/26 
Interest Rates 
The Bank of England reduced the official Bank rate from 4.50% at the beginning of the year to
3.75% by the end of March 2026. Deposit rates have decreased during 2025/26 as a result.   
Investment Policy 
The Council’s investment policy is governed by Scottish Government investment regulations, which
have been implemented in the annual investment strategy approved by the Council on 26 February
2025.  This policy sets out the approach for choosing investment counterparties and is based upon:
new bank resolution regulations, where failing banks will not be bailed-out but ‘bailed-in’ by
unsecured investors that can include local authorities; the capacity of banks to absorb unexpected
losses; and credit ratings provided by the leading credit rating agencies. This is supplemented by
additional market data (such as economic data, credit default swaps, bank share prices etc.).   
Investment treasury indicator and limit 
This is a control on the total principal funds invested for greater than 1 year.  This limit is set with
regard to the Council’s liquidity requirements and to reduce the need for early sale of an investment,
and is based on the availability of funds after each year-end. 
With the exception of one investment, all investments at 31 March 2026 mature within one year
in line with the approved limit. 
Resources 
The Council’s cash balances comprise revenue and capital resources and cash flow monies.  The
Council’s cash resources were as follows: 
TABLE 9 
2024/25 2025/26 2025/26
Actual Estimate Actual
General Services 3.3% 3.7% 3.7%
HRA 21.3% 26.3% 23.5%
Estimate of ratio of financing costs to net revenue stream
2025/26 2025/26 2026/27
Limit
£m
Actual
£m
Limit
£m
Principal sums invested for more than 1 year 10.000                5.000                 10.000                  
Maximum principal sums invested for more than 1 year
2024/25
Actual
2025/26
Actual
£m £m
1 April                40.105                75.653
31 March                75.653                69.459
Change in year                35.548                 (6.194)
Cash Balances

Page 20

15 | P a g e
Investments held by the Council 
The Council maintained an average balance of £64.140m of internally managed funds and utilised
cash balances during the year in support of the under-borrowed position.  The internally managed
funds, primarily invested in call accounts with banks, Money Market Funds and other UK local
authorities, earned a weighted average rate of return of 4.12%.  This compares to a rate of 4.74% in
2024/25.  Performance was above the target rate of 3.75% and reflects the bank rate being higher at
the start of the year before declining, and the short term nature of our investments and our overall
investment objectives of security and liquidity.   
The Councils Environmental, Social and Governance (ESG) policy states that when investing the
Council will prioritise banks that are signatories to the UN Principles for Responsible Banking and
funds operated by managers that are signatories to the UN Principles for Responsible Investment, the
Net Zero Asset Managers Alliance and/or the UK Stewardship Code. A list of ESG Initiative signatories
is updated quarterly by the Council’s treasury advisor Arlingclose to support the Council’s decision
making process for investing.   
5. Performance Measurement 
One of the key requirements in the Code is the formal introduction of performance measurement
relating to investments, debt and capital financing activities.  Whilst investment performance criteria
have been well developed and universally accepted, debt performance indicators continue to be a
more problematic area with the traditional average portfolio rate of interest acting as the main guide.   
The Council’s treasury management advisors are Arlingclose Limited. Arlingclose has five Scottish Local
Authorities in their client group and provide regular investment benchmarking information to the
Council.  In terms of performance in 2025/26, North Ayrshire Council’s average weighted rate of
return on investments during 25/26 was 4.12% (24/25 4.74%). The actual rate of return on
investments as at 31 March for North Ayrshire Council was 3.84% compared to the group average rate
of 4.15%. 
Emphasis will continue to be placed on investing with approved counterparties in accordance with the
approved strategy.