NORTH AYRSHIRE COUNCIL 
24 June 2026 
North Ayrshire Council 
Title:    North Ayrshire Council Unaudited Annual Accounts 
2025/26 
Purpose:  To submit the unaudited Annual Accounts for the year to 31
March 2026 to the Council for approval. 
Recommendation:  That Council: 
(a)  Approves the Annual Accounts for 2025/26, subject to audit; 
(b)  Notes that Audit Scotland plan to complete their audit of    
the Accounts by mid-September 2026 and will present their
annual audit report to the Council’s Audit and Scrutiny
Committee thereafter; 
(c) Authorises the Audit and Scrutiny Committee to consider,
and approve for signature, the audited annual accounts
within the required timeframe. 
1. Executive Summary 
1.1 The Council prepares its Accounts on an annual basis to 31 March and is required by
the Local Authority Accounts (Scotland) Regulations 2014 to submit these Accounts to
the appointed auditor by 30 June each year. Audit Scotland plan to complete their
audit of the Accounts by mid-September 2026 and will present their annual audit
report to the Council’s Audit and Scrutiny Committee thereafter. A copy of the
Council’s unaudited accounts, containing the key financial statements, for the year to
31 March 2026 has been issued directly for Members’ approval prior to their
submission to the appointed auditor. Following approval today, a copy of the full set of
accounts will be published at the undernoted link: 
https://www.north-ayrshire.gov.uk/council-voting-elections/performance-and-
spending/budgets-and-finance
1.2  The 2025/26 Accounts have been prepared in accordance with the Code of Practice
on Local Authority Accounting in the United Kingdom (ACOP) and the requirements of
the International Financial Reporting Standards (IFRS).
1.3  The Annual Accounts provide an overview of the financial performance of the various
funds managed by the Council. The Management Commentary summarises the key
messages in relation to the Council’s financial and service performance for 2025/26
and outlines the financial plans, challenges and risks which the Council faces.

Page 2

1.4  The detailed financial performance for both Revenue and Capital are reported to
Cabinet throughout the financial year and the final Revenue Budget and Capital
Programme Financial Performance reports were submitted to Cabinet on 2 June
2026.
1.5  At 31 March 2026 the General Fund reported a net underspend of £2.014m for the
year after the earmarking of funds to support service delivery in 2026/27 and beyond.
1.6  The General Fund Unearmarked Balance at 31 March 2026 is confirmed as £11.195m
(2.3%). This is at the lower level of the recommended range of 2% - 4% for general
reserves. The balance of earmarked funds of £96.550m is detailed in paragraph 2.9.
1.7  At 31 March 2026 the Housing Revenue Account closed with a net underspend of
£3.942m. The HRA earmarked funds of £25.148m are detailed in paragraph 2.20 with
an uncommitted balance at 31 March 2026 of £1.928m.
1.8  Capital Expenditure for the year was £59.499m for the General Fund and £36.917m
for the HRA, representing significant ongoing investment in the Council’s assets.
1.9  The Common Good Funds closed with a balance of £2.195m and the Trust Funds
closed with a balance of £0.446m. The Annual Trustees’ Report and Financial
statements for the charitable trusts are subject to a separate report to Council.
1.10  The Health and Social Care Partnership reported an in-year underspend position of
£1.818m. 
2. Background 
2.1 The Annual Accounts provide an overview of the financial performance of the various
funds managed by the Council, including:
•  North Ayrshire Council General Fund (capital and revenue);
•  Housing Revenue Account (capital and revenue);
•  Six Common Good Funds; and
•  Charitable Trusts Funds.
2.2  The accounts also include “Group” accounts which recognise the material interest the
Council has in other organisations, including:
•  North Ayrshire Ventures Trust Ltd;
•  North Ayrshire Leisure Ltd;
•  Strathclyde Partnership for Transport;
•  Ayrshire Valuation Joint Board; and 
•  North Ayrshire Integration Joint Board.
2.3  The financial position of the Council and its Group is presented in the core financial
statements, including:
•  Comprehensive Income and Expenditure Statement (CIES) on page 59;
•  Movement in Reserves Statement (MiRS) on page 60;
•  Balance Sheet on page 61; and
•  Cash Flow Statement on page 62.

Page 3

2.4  The Local Authority Accounts (Scotland) Regulations 2014 require various disclosures
of the remuneration and pensions benefits of senior councillors and employees.
These are detailed in the Remuneration Report which can be found on page 35 of the
Annual Accounts.
2.5  The Council is legally required to make its draft accounts available for public
inspection for a three-week period during the audit. A notice was published on the
Council website and an advert placed in local newspapers during week beginning 8
June 2026 advising that the unaudited accounts would be available for inspection by
appointment and on the Council’s website between 30 June 2026 and 21 July 2026.
2.6  Under the Local Authority Accounts (Scotland) Regulations 2014 the Council, or a
committee of the Council with a remit including audit or governance, must meet to
approve the audited annual accounts for signature following confirmation of the
completion of the audit. A meeting of the Audit and Scrutiny Committee has been
arranged for 24 September 2026 to consider the audited annual accounts and
approve them for signature. This date is subject to alteration dependent on completion
of the audit by Audit Scotland.
General Fund Revenue
2.7  The final position for the General Fund Revenue Account at 31 March 26 was a net
underspend of £2.014m, after the earmarking of underspends to support service
delivery in 2026/27 and beyond. The following table details the final position on a
service by service basis:  
Service Expenditure
App
No.
Annual
Budget
£ million
Actual
Expenditure
to 31 March
2026
£ million
Variance for
year
(Fav)/Adv
£ million
Requests
for Carry
Forwards
£ million
Variance
after Carry
Forward
(Fav)/Adv
£ million
Corporate Services 1 22.748 21.767 (0.981) 0.186 (0.795)
Education 2 191.980 192.050 0.070 (0.193) (0.123)
Place 3 60.889 58.371 (2.518) 3.363 0.845
Communities & Housing 4 17.116 16.344 (0.772) 0.233 (0.539)
Other Corporate Items 5 15.971 10.781 (5.190) 3.357 (1.833)
Sub Total 308.704 299.313 (9.391) 6.946 (2.445)
Health and Social Care
Partnership 9 142.676 140.858 (1.818) 1.818 0.000
Balance for Services 451.380 440.171 (11.209) 8.764 (2.445)
Financing Charges 6 13.751 13.751 0.000 0.000 0.000
Contribution to Loans
Fund Reserve 6 10.187 10.187 0.000 1.500 1.500
Total Planned
Expenditure 475.318 464.109 (11.209) 10.264 (0.945)
Aggregate External
Finance 6 (394.613) (394.637) (0.024) 0.000 (0.024)
Council Tax 6 (71.939) (72.984) (1.045) 0.000 (1.045)
Use of Earmarked
Funds 6 (8.766) (8.766) 0.000 0.000 0.000
Total Planned Income (475.318) (476.387) (1.069) 0.000 (1.069)
Net Expenditure/
(Income) 0.000 (12.278) (12.278) 10.264 (2.014)

Page 4

2.8  The Council’s Health and Social Care Partnership reported an in year underspend
position of £1.818m. 
2.9  The following table summarises the movements on each of the Council’s General
Fund reserves during the year: 
2.10  General Fund (Unearmarked) – The uncommitted balance at 31 March 2026 was
£11.195m. This is equivalent to 2.3% of the Council’s annual budgeted expenditure,
compared to the recommended level of between 2% (£9.699m) and 4% (£19.398).
2.11  Loans Fund Reserve – funds arising from the Council’s Treasury Management and
Investment Strategy have been earmarked to support the Councils’ Capital
Investment Strategy.
2.12  Investment Fund – funds set aside to support investment in environmental projects,
infrastructure investment and Community Wealth Building activity. 
2.13  Renewal & Recovery Fund – funds earmarked to support the delivery of the Councils’
Recovery and Renewal Strategy through prioritised investment. 
2.14  Affordable Housing – 40% of Council Tax income on properties which are not a sole
or main residence plus 10% of Second Homes levies are earmarked for the provision
of new build affordable housing.
2.15  Change & Service Redesign Fund – funds have been earmarked to support the
delivery of the Sustainable Change programme.
2.16  Earmarked Funds – these funds relate to various specific projects for which monies
have been identified prior to 31 March 2026, but for which spending plans exist in
2026/27 and beyond. 
2.17  Insurance Fund – these funds represent the amount required to deal with potential
uninsured claims and Municipal Mutual Insurance (MMI) underwriting costs. 
Balance as
at 31 March
2025
Income Expenditure Balance as at 31
March 2026
Anticipated
Expenditure
Available
Balance
£ million £ million £ million £ million £ million £ million
Unearmarked Reserves 9.181 2.014 0 11.195 0 11.195
Loans Fund Reserve 38.009 11.687 0 49.696 (49.696)      0
Investment Fund 4.292 0.950 (1.758)        3.484 (3.484)        0
Renewal and Recovery Fund 5.242 0 (1.186)        4.056 (4.056)        0
Affordable Housing Reserve 2.617 1.276 (0.548)        3.345 (3.345)        0
Change and Service Redesign Fund 2.167 1.732 (0.572)        3.327 (3.327)        0
Future Budget Strategy 9.288 0 (4.000)        5.288 (5.288)        0
Other Earmarked Reserves 23.473 7.703 (3.822)        27.354 (27.354)      0
Total Earmarked Reserves 85.088 23.348 (11.886)      96.550 (96.550)      0
Capital Fund 2.233 0.092 (0.009)        2.316 (2.316)        0
Insurance Fund 11.186 0.68 0 11.866 (11.866)      0
Total General Fund Reserves 107.688 26.134 (11.895)      121.927 (110.732)    11.195   
General Fund Reserve

Page 5

2.18  Capital Fund – Capital receipts and funds allocated by Council in support of the
General Fund Capital Investment Programme 2025 to 2034.
General Fund Capital
2.19  General Fund Capital Expenditure amounted to £59.499m compared to the revised
budget of £59.499m. 
HRA Revenue
2.20 The final position for the Housing Revenue Account at 31 March 2026 was a net in
year underspend of £3.942m. A full analysis of HRA Revenue financial performance
was presented to Cabinet on 2 June 2026. The following table details the movements
on the Council’s HRA Reserves for the year: 
HRA Capital
2.21  HRA Capital Expenditure amounted to £36.917m, an underspend of £5.041m
compared to the revised annual budget for 2025/26 of £41.958m. The underspend
was primarily related to the profiling of expenditure on new build projects and
contingency not required in year.
Common Good Funds
2.22  A summary of the revenue and capital balances on the Common Good Funds is
provided below with further details provided on page 65 of the unaudited annual
accounts:  
Balance
as at 31
March
2025
Transfer
between
Funds
Income Expenditure
Balance
as at 31
March
2026
Anticipated
Expenditure
Available
Balance
£ million £ million £ million £ million £ million £ million £ million
Unearmarked Reserves 1.758 0.170 0.000 0.000 1.928 0.000 1.928
Council House Building Fund 13.213 3.942 (0.227)         16.928 (16.928)       0
Sustainability Fund 5.000 0 (0.495)         4.505 (4.505)         0
Transformation Programme 2.000 0 (0.213)         1.787 (1.787)         0
Other Earmarked Reserves 0.170 (0.170)   0 0 0 0 0
Total HRA Reserves 22.141 0 3.942 (0.935)         25.148 (23.220)       1.928
HRA Reserves
Balance as at
31 March 2025 Income Expenditure Balance as at
31 March 2026
£ million £ million £ million £ million
Ardrossan 0.412 0.055 (0.005) 0.462
Irvine 1.144 0.122 (0.325) 0.941
Largs 0.456 0.032 (0.034) 0.454
Millport 0.073 0.003 (0.002) 0.074
Saltcoats 0.015 0.001 (0.004) 0.012
Stevenston 0.229 0.026 (0.003) 0.252
Total Common Good 2.329 0.239 (0.373) 2.195
Common Good

Page 6

Trusts
2.23  A summary of the revenue and capital balances on the charitable trusts administered
by the Council is provided below with further details provided on page 66 of the
unaudited annual accounts. Charitable trusts, where the Council is the sole trustee,
are required to prepare their own Accounts and Trustees’ annual report. These are
subject to a separate external audit and a separate report to Council.  
3. Proposals 
3.1 It is proposed that Council:
(a)  Approves the Annual Accounts for 2025/26, subject to audit; 
(b)  Notes that Audit Scotland plan to complete their audit of the Accounts by mid-
September 2026 and will present their annual audit report to the Council’s Audit and
Scrutiny Committee thereafter; 
(c)  Authorises the Audit and Scrutiny Committee to consider, and approve for signature,
the audited annual accounts within the required timeframe. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The financial implications are as outlined in the report
Human Resources 
4.2 None. 
Legal 
4.3 Under the Local Authority Accounts (Scotland) Regulations 2014 the Council is required 
to submit its Unaudited Annual Accounts for external audit by 30 June each year. 
Equality/Socio-economic 
4.4 None. 
Balance as at
31 March 2025 Income Expenditure Balance as at
31 March 2026
£ million £ million £ million £ million
North Ayrshire Charitable Trust 0.120 0.008 (0.001) 0.127
Town Trusts 0.010 0.000 (0.004) 0.006
Douglas Sellers Trust 0.001 0.000 0.000 0.001
Anderson Park Trust 0.001 0.000 0.000 0.001
Margaret Archibald Trust 0.209 0.077 (0.018) 0.268
Other Bequests 0.041 0.002 0.000 0.043
Total Trusts 0.382 0.087 (0.023) 0.446
Trusts

Page 7

Climate Change and Carbon 
4.5 None. 
Key Priorities 
4.6 This report and the annual accounts directly support the Council Plan 2023 to 2028 by 
maximising financial flexibility to support the delivery of our priorities 
Community Wealth Building 
4.7 None. 
Islands Communities Impact Assessment (ICIA) 
4.8 None. 
United Nations Rights of the Child (UNCRC) 
4.9 None. 
Consumer Duty 
4.10 None. 
5. Consultation 
5.1 Officers from across all services were consulted during the preparation of the annual 
accounts 2025/26. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Natalie Graham, Senior Manager (Corporate
Finance), Financial Management, on 01294 324533. 
Background Papers
Revenue Budget 2025/26 – Financial Performance to 31 March 2026 – Cabinet 2 June
2026; 
Capital programme Performance to 31 March 2026 – Cabinet 2 June 2026

Page 8

ACCOUNTS
ANNUAL
2025/26

Page 9

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26    
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Table of Contents
Management Commentary 3
Statement of Responsibilities 34
Remuneration Report 35
Annual Governance Statement 47
Independent Auditor’s Report 55 
Core Financial Statements 59
Comprehensive Income and Expenditure Statement 59
Movement in Reserves Statement 60
Balance Sheet 61
Cash Flow Statement 62 
Supplementary Statements 63
Housing Revenue Account 63
Common Good and Trusts 65
Non-Domestic Rates Account 68
Council Tax Account 70 
Notes to the Accounts 72 
Notes to the Comprehensive Income and Expenditure Statement 72
Note 1: Expenditure and Funding Analysis 72
Note 2: Expenditure and Income Analysed by Nature 76
Note 3: Material Items 77
Note 4: Financing and Investment Income and Expenditure 77
Note 5: Other Operating Expenditure and Income 77
Note 6: Agency Services 78
Note 7: External Audit Fees 78
Note 8: Leases 78
Note 9: Grant Income 81 
Notes to the Movement in Reserves Statement 82
Note 10: Adjustments between Accounting Basis and Funding Basis under Regulations 82
Note 11: Transfers to or (from) Funds 84

Page 10

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26    
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Notes to the Balance Sheet 85
Note 12: Property, Plant and Equipment 85
Note 13: Fair Values 87
Note 14: Assets Held for Sale 88
Note 15: Capital Expenditure and Capital Financing 88
Note 16: Heritage Assets 92
Note 17: Intangible Assets 93
Note 18: Private Finance Initiatives, Non Profit Distributing Models and Similar Contracts 93
Note 19: Short Term Debtors 96
Note 20: Debtors for Local Taxation 97
Note 21: Long Term Debtors 97
Note 22: Inventories 97
Note 23: Short Term Borrowing 98
Note 24: Short Term Creditors 98
Note 25: Provisions 98
Note 26: Financial Instruments 99
Note 27: Risks arising from Financial Instruments 102
Note 28: Defined Benefit Pension Schemes 107
Note 29: Pensions Schemes Accounted for as Defined Contribution Schemes 114
Note 30: Unusable Reserves 114
Note 31: Related Parties 117
Note 32: Contingent Asset 118
Note 33: Contingent Liabilities 119
Note 34: Events after the Balance Sheet Date 120 
Notes to the Cash Flow Statement 120
Note 35: Cash Flow – Operating Activities 120
Note 36: Cash Flow – Investing Activities 121
Note 37: Cash Flow – Financing Activities 121
Note 38: Cash Flow – Cash and Cash Equivalents 121 
Notes to the Group Accounts 122
Note 39: Notes to the Group Accounts 122 
Accounting Policies and Assumptions 128
Note 40: Assumptions Made About the Future and Other Major Sources of Estimation
Uncertainty 128
Note 41: Accounting Standards issued, not yet Adopted 130
Note 42: Critical judgements in applying accounting policies 131
Note 43: Accounting Policies 132 
Glossary of Terms 148

Page 11

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26   
Page | 3 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Management Commentary
The Annual Accounts presents North Ayrshire residents, Elected Members and other stakeholders
with detailed information on the financial management and performance of the Council and its Group
for 2025/26, demonstrating the stewardship of the public funds which have been used to support the
Council’s key priorities. 
The format and content of the Annual Accounts accord with the Code of Practice on Local Authority
Accounting in the United Kingdom.
The Management Commentary outlines the key messages on the Council’s financial and service
performance for 2025/26 and looks ahead to the challenges and risks which we face in the future.
Key areas which the Management Commentary covers include:
• North Ayrshire by Numbers
• Our Political and Management Structures
• Our Key Strategies and Priorities
• Our Performance and Achievements during 2025/26
• Financial Planning, Performance and Sustainability for 2025/26
• Our Future Plans for 2026/27 and beyond.
North Ayrshire by Numbers
The Place
North Ayrshire covers an area of around 886 square kilometres with
over 50% of our land area being islands, including Arran and the
Cumbraes. The main settlements are Irvine, Kilwinning, Ardrossan,
Saltcoats, Stevenston, Beith, Dalry, Kilbirnie, Largs, Dreghorn,
Springside, West Kilbride, Seamill, Fairlie, Skelmorlie, Brodick and
Millport. 
North Ayrshire is a great place to live, work and visit. With access
to open countryside, towns, villages, and islands, there are
excellent lifestyle choices. The area’s natural assets provide access
to wonderful outdoor activities from walking and cycling to climbing
North Ayrshire’s highest mountain Goat Fell – on the Isle of Arran.
There are several golf courses, some of the finest sailing waters,
rich culture and heritage, and a wealth of great places to eat, visit
and explore.

Page 12

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26   
Page | 4 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The People
North Ayrshire is home to 134,010 residents living across 65,107
households, making us the fifteenth largest local authority in
Scotland in terms of population.
19,019 children and young people attend our schools and early
years centres.
North Ayrshire is home to 2.42% of Scotland’s population.
However, compared to the Scottish average, North Ayrshire has a
higher proportion of older residents, resulting in increased service
demands:
Age Profile North Ayrshire % Scotland %
Residents aged under 16 20,897 16% 896,833 16%
Residents aged 16 to 65 82,254 61% 3,583,029 65%
Residents aged 66 or over 30,859 23% 1,067,038 19%
TOTAL 134,010 100% 5,546,900 100%
Infrastructure
North Ayrshire Council maintains 1,044 kilometres of adopted roads, 44 burial grounds and around
2,400 hectares of parks and woodlands across North Ayrshire. Over 275 hectares are dedicated to
woodlands playing a crucial role in enhancing biodiversity, mitigating climate change and providing
accessible natural spaces for our communities.  
The Council supports a range of operational buildings on behalf of our communities, including:
9 Secondary Schools; 49 Primary Schools; 6 Early Learning and Childcare Centres; 1 Additional
Special Needs School; 32 Community Halls and Centres; and 15 Libraries. 
In addition, we manage the provision of 13,402 council houses.
Our Waste Services uplift 5.3 million bins each year and dispose of over 71,000 tonnes of waste
annually. Our Council continues to perform well with a recycling rate of 53%, making the Council the
9th highest performing in Scotland.
Through our partnership with North Ayrshire Leisure Limited, we provide a wide range of sport,
leisure and recreational facilities for our residents, including:
4 Leisure Centres; 6 Community Sports Hubs; 3 Campuses (providing gym and fitness facilities); 3
Golf Courses and a range of other outdoor sports facilities supporting a wide range of activities.

Page 13

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 5 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Economic Activity
In terms of Economic Activity, there are 2,995 businesses across
North Ayrshire. 
However, we report higher levels of worklessness and lower levels
of economic activity than the Scottish average: 
Economic Activity North Ayrshire Scotland
Economically Active Adults 72.80% 77.70%
Workless Households 24.70% 17.40%
Unemployment Rate 4.50% 3.70%
Adults with no formal
qualifications 6.90% 7.20%
Poverty and Deprivation 
The Scottish Index of Multiple Deprivation (SIMD) highlights that 74 of the 186 data zones within
North Ayrshire are among the 20% most deprived in Scotland. At 39.8%, this is the third highest in
Scotland. 
28% of households within North Ayrshire are defined as being in relative fuel poverty.
In addition, 20.8% of Children under 16 are living in relative low income families, the second highest
in Scotland, while 16.7% of Children under 16 are reported as living in absolute low income families
(before housing costs). 
Our Political and Management Structures
Political Structure
North Ayrshire Council has 33 Elected Members
representing 9 multi-member wards. North Ayrshire Council
is a minority Scottish National Party administration.
The Council comprises 12 SNP Group Members, 11 Labour
Group Members, 5 Conservative and Unionist Group
Members, 3 Independent Members and 2 Reform UK
Group Members.
During 2025/26, one councillor resigned from the Conservative and Unionist Group and is currently
an Independent Member. Although this changed the overall composition of the Council, there was
no change to the administration. At the Council Meeting on 11 February 2026, following the
resignations of Councillors Burns and Macaulay as Leader and Depute Leader of the Council,
Councillor Gurney was elected as Leader and Councillor Larsen as Depute Leader.
Full details of North Ayrshire’s elected members are available on our website.          
our   
onser  ti es   Independents  
Re or

Page 14

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 6 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Council Structure
North Ayrshire Council's ambition is to ensure that North Ayrshire is a great place to work, live, visit
and invest in.
Working with our partners, we deliver a range of local services from providing education, social care
and housing, to libraries and waste services.
The Council employs 7,575 staff, equivalent to 6,402 full time equivalents. 75% of staff are also
residents of North Ayrshire and directly benefit from the many services provided by the Council.
North Ayrshire Council’s most senior official is the Chief Executive, Craig Hatton. Craig, along with
the Executive Leadership Team, oversees the delivery of all of our services, including:

Page 15

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 7 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Our Key Strategies and Priorities 
North Ayrshire Council’s Council Plan 2023 to 2028 sets out our vision for North Ayrshire. 
Building on the progress of the previous Council Plan to identify the key priorities which will inform
how we allocate and target resources over the next five years.
Our Plan was developed alongside our communities and shows how we will deliver our aim of a
North Ayrshire that is Fair for All. Our four priorities are:
Priorities Description
Wellbeing To transition to a wellbeing economy, delivering prosperity, wellbeing and
resilience for local people.
Communities and
Local Democracy
We will have active, inclusive and resilient communities.
Climate Change Achieving net-zero by 2030.
A Sustainable
Council
A Community Wealth Building Council that is efficient and accessible,
maximising investment and focusing resources towards our priorities. 
The Council Plan aligns with Our Partnership Plan. 
The North Ayrshire Partnership Plan 2022 to 2030 is our Local Outcomes Improvement Plan. It is a
strategic plan which sets out what we want to achieve together as a partnership in North Ayrshire. It
is a binding plan on all Community Planning partner organisations and will influence how all partners
operate locally. It is a requirement under the Community Empowerment (Scotland) Act 2015.

Page 16

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 8 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Our Partnership Plan will deliver on our vision of “North Ayrshire – Fair for All” through three key
themes:
Key themes Description
Wellbeing We will address health inequalities. We will promote children and young people’s
wellbeing. We will enable community wellbeing.
Work We will increase employment. We will develop volunteering. We will better support
our young people.
World We will work together to reduce carbon emissions and mitigate the impacts of
climate change. We will increase active travel. We will increase carbon literacy
within our organisations and communities. 
Our partners in delivering the North Ayrshire Partnership Plan include Scottish Fire and Rescue,
Scottish Enterprise, Skills Development Scotland, Strathclyde Partnership for Transport. Police
Scotland, KA Leisure, Ayrshire College, TSI North Ayrshire, the Department for Work and Pensions,
NHS Ayrshire and Arran and the Scottish Government. 
The Golden Thread
Every task of every employee within our Council contributes to achieving better outcomes for the
people of North Ayrshire. This link is referred to as the “Golden Thread”. An overview is shown below:

Page 17

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 9 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Key Plans and Strategies supporting the delivery of the Council Plan include our Community Wealth
Building Strategy; Regional Economic Strategy; Community Plan; Health and Social Care Partnership
Strategic Plan; Education Service Improvement Plan; Child Poverty Action Plan; Children’s Services
Plan; Children’s Rights Report; Youth Participation and Citizenship Strategy; Island Plans;
Regeneration Delivery Plan; Local Housing Strategy; Strategic Housing Investment Plan; Local
Development Plan; Environmental Sustainability and Climate Change Strategy; and the KA Leisure
(North Ayrshire Leisure Limited) Business Plan. 
Our Performance and Achievements during 2025/26
Effective performance management’s core purpose is to improve the lives of the people we
serve. Our Performance Management Strategy shows how we support a culture of continuous
improvement within our Council to support our priorities and so provide the best outcomes for our
people. It includes an overview of planned developments to deliver continuous improvement and
ensure that effective and transparent performance management is central to our activities.
The Council’s Executive Leadership Team and Elected Members scrutinise our performance through
six monthly reports which detail progress against our Council Plan Performance Framework and
Delivery Plan. Information on all our performance reporting, including progress towards the Plan’s
priorities, can be viewed at Council Performance.
Performance Summary 
A summary of our performance against performance indicators and Council Plan delivery plan
actions using the latest published data is as follows: 
The Year End 2025/26 status will be presented to Cabinet in September.  There are 26 performance
indicators within our framework. At mid-year, the status of the framework shows that 11 are on target
and nine are slightly adrift/significantly adrift of target. Although there are a high number of
performance indicators which have not been updated at the time of the mid year report, progress
against the annual targets and the impact of Council activities gives confidence that performance is
on track, with some areas already meeting or exceeding targets.  The full mid year report can be
viewed on our website.

Page 18

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 10 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Local Government Benchmarking Framework 
The Local Government Benchmarking Framework provides an opportunity to benchmark our
performance with other local authorities in Scotland. This National Framework brings together
performance information from each of Scotland’s Councils and provides benchmarking data on one
hundred and eight indicators covering a wide range of key service areas, with thirty three of these
directly linked to our Council Plan. 
As at 30th September, the most recently published data, eleven of our fifteen updated priority
indicators are in the top two quartiles, which includes areas such as percentage of invoices sampled
that were paid within thirty days, proportion of the highest paid 5% of employees who are women,
and proportion of council dwellings meeting Scottish Housing Quality Standards. 
Our short term most recent one year comparison is showing an improvement in ten of our fifteen
updated priority indicators, with only four demonstrating a decline in performance. Improved
indicators include CO2 emissions area wide per capita, percentage of income due from Council Tax
received by the end of the year, and percentage of A class roads considered for maintenance
treatment. 
Overall, performance against 48% of reported indicators are above the Scottish Average with 48%
below the average and 4% in line with the average: 
Further information on how we compare can be viewed at the Improvement Service portal.  The full
analysis of the October 2025 data release, the most recent release approved by North Ayrshire
Council’s Cabinet, is available on our website. 
Looking back at 2025/26
Revaluation Rolling Programme 
The valuation of Land and Buildings is carried out on a rolling five year programme to ensure that all
Property, Plant and Equipment required to be measured at current value is revalued at least every
five years.  In addition to these formal valuations, the 2025/26 Code brings in a requirement to apply
annual indexation to these assets in the years between formal valuations, to ensure the value of an
asset is kept materially up to date as an approximation of market changes.  North Ayrshire Council
has applied indexation using BCIS indexation for properties valued on a depreciated replacement
cost basis and CBRE indices for all other property assets.

Page 19

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 11 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Council Plan Progress 
We have committed to a five-year plan that will deliver the priorities of
our communities over the life of the plan. Our Council Plan 2023 to
2028 was developed alongside our communities and shows how we
will deliver our aim of a North Ayrshire that is fair for all.
Throughout 2025/26 we have continued to deliver and improve
services and outcomes for the people of North Ayrshire while
addressing significant financial challenges. Specific examples of the
progress made in delivering our Council Plan priorities have included
the following:
Strategic Housing Investment
Our Housing Service continues to deliver our social house building
programme in the form of new build properties, refurbishment
projects, and buybacks of ex-local authority properties via the
Strategic Housing Investment Plan (SHIP) which aims to deliver
1,666 affordable new homes. As at 31 March 2026 a total of 975 new
homes had been delivered and there are a number of projects
currently on site, including: 
• 202 units at the Ayrshire Central Hospital site, Irvine.
• 50 units at the Garnock Academy site, Kilbirnie.
• 6 units at the former Kings Arms hotel, Irvine.
• 3 unit refurbishment project at Nelson Street, Largs. 
Educational Attainment
We have high aspirations for all and are committed to securing
improved educational outcomes for all children and young people.
This is reflected in our strategic priorities of improving literacy and
numeracy attainment and closing the attainment gap. The latest
attainment and school leavers data 2024/25 highlights:
❖ The overall performance in literacy and numeracy attainment was 
strong with 92% of school leavers achieving Level 4 in both 
measures.
❖ North Ayrshire school leavers continue to record high positive destination figure with 96%
achieving an initial positive destination.
❖ Performance in Level 5 literacy remains a strength.
❖ The poverty related literacy gap had reduced during 2024/25.

Page 20

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 12 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Ayrshire Growth Deal, Growth & Investment
Throughout 2025/26 work has continued in relation to the key
investment projects:
❖ Great Harbour, Irvine – Phase 1, Coastal Hub - physical works
including the playpark, skatepark, pump track, road realignment
and car park works are expected to complete in the Summer of
2026.  Phase 2, Maritime Mile - the design team for the
development of the harbourside from Irvine train station to the
Coastal Hub is in place, with a full business case due to be
completed early in 2027.
❖ Marine Tourism (Arran and Cumbrae) – The outline business case
for the Cumbrae project was approved by the Scottish
Government. Public consultation has been completed on Arran and the outline business case for
the Arran project is expected to be completed by the end of 2026.
❖ i3 Flexible Business Space programme, Irvine – The new unit developed as Phase 1 is now
occupied.  Flex Space phase 2 – the full business case was submitted to the Scottish
Government for their endorsement, with the construction planned to commence in Summer 2026. 
Design of Phase 3 - the final phase of this programme - has commenced, with construction
expected to start in Summer 2027.
❖ i3 Digital Process Manufacturing Centre, Irvine - Phase 1 was launched in February 2025, with
the final phase of equipment installation anticipated in Spring 2026. By Summer 2026 an
evaluation of Phase 1 operations will be complete, this will inform the feasibility and design for
Phase 2.
❖ The International Marine Science and Environmental project (IMSE) is being developed in
conjunction with partners the Field Studies Council at Millport and The Community of Arran
Seabed Trust (COAST).  The outline business case was submitted to both Governments in May
2026 for their consideration and approval. 
❖ Ardrossan North Shore enabling works – the main site enabling works including site remediation
were completed during Summer 2025.  The Ardrossan Campus area has been handed over to the
Campus development team and construction is underway. 
Solar PV Farms
Energisation of our two new solar photovoltaic farms, the first to
be owned and operated by a Scottish Local Authority, are now
complete. The two solar farms are expected to generate £0.4
million of revenue per year over a 25-year period resulting in a
total gross income of approximately £10 million. 
Both stations have brought the sterile land at these former landfill
sites back into use, demonstrating how we are embracing
sustainable transformational change to meet our council’s
challenges as well as realising community benefits from the use of
our land assets. The site at Nethermains will also see an
additional 4,000 trees planted, supporting our council’s Tree
Planting and Nature Network strategies.

Page 21

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 13 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Ardrossan Community Campus 
Construction of the ‘state-of-the-art’ new Ardrossan Community
Campus began in July. The campus provide education from age
2-18 and will feature shared community facilities – including a
library, learning hub, and indoor sports facilities featuring a
swimming pool, sports hall, gymnasium, dance studio and fitness
studio. It will also have outdoor sports facilities including two
sports pitches and a multi-use games area, an outdoor learning
landscape, recreational and growing spaces, along with
associated parking and infrastructure. 
Financial Inclusion - Money Smart 
Our welfare rights and debt advice service for North Ayrshire
residents launched as: ‘Money Smart’. North Ayrshire Health and
Social Care Partnership’s Money Smart service incorporates the
former Money Matters and Welfare Reform Advice teams, and will
provide free, confidential and impartial welfare rights advice.  This
forms part of the new Financial Inclusion Strategy for 2025-30
which was approved in September 2025. 
Financial Planning, Performance and Sustainability
Robust financial planning and management ensures that resources are targeted to our key priorities.
The financial framework to support this includes medium and long term financial planning for both
revenue and capital investment, as well as specific strategies for the utilisation of reserves and the
investment and management of available funds.

Page 22

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 14 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The General Services and Housing Revenue Account revenue budgets for 2025/26 were approved
by Council on 26 February 2025 and 12 February 2025, respectively. These budgets detailed
planned revenue expenditure of over £523.2 million to support day to day spending on services.
Alongside this, North Ayrshire Council approved plans to invest £141.8 million in the assets which
support delivery of our key priorities, including schools, housing, infrastructure and regeneration
activities.  
Financial Performance
Financial performance information is part of the Council’s Performance Management Framework with
General Fund and Housing Revenue Account financial performance regularly reported to Cabinet.
The financial performance of the Health and Social Care Partnership is noted within the General
Fund Cabinet reports, reflecting the historic challenges and financial risks presented by the delivery
of these services.
The following section summarises our financial performance for 2025/26.
General Fund Revenue Expenditure 2025/26 
The net expenditure for each service noted above varies from that reported in the Comprehensive
Income and Expenditure Statement as a result of a number of statutory accounting adjustments in
relation to capital accounting, pensions and other minor adjustments. Full details of these
adjustments are explained in Note 1 Expenditure and Funding Analysis on page 72. 
Service
Revised
Budget
(£ million)
Actual
Expenditure
/ Income
(£ million)
Variance
(£ million)
Accounting
Adjustments
(£ million)
Net
Expenditure
in the
Accounts
Chief Executive's 22.748 21.767 (0.981) 2.912 24.679
Education 191.980 192.050 0.070 (53.128) 138.922
Communities and
Housing 17.116 16.344 (0.772) 1.852 18.196
Place 60.889 58.371 (2.518) 28.157 86.528
Health and Social Care
Partnership 142.676 140.858 (1.818) 2.006 142.864
Other Corporate Items 15.971 10.796 (5.175) 0.528 11.324
Financing Costs 23.938 13.751 (10.187) (28.028) (14.277)
Total Expenditure 475.318 453.937 (21.381) (45.701) 408.236
Government Grants (351.766) (351.766) 0.000 (14.560) (366.326)
Non-Domestic Rates (42.847) (42.871) (0.024) (1.296) (44.167)
Council Tax (71.939) (72.984) (1.045) 0 (72.984)
Contribution from
Reserves (8.766) (8.766) 0 8.766 0
Total Income (475.318) (476.387) (1.069) (7.090) (483.477)
Contribution to
Reserves 0 22.450 22.450 52.791 75.241

Page 23

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 15 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Overall, services reported an underspend of £21.396 million, 4.5% of the available budget. Significant
variances reported by services included:
❖ (£10.187 million) underspend on capital financing costs aligned to our Treasury Management and
Investment Strategy, including the revision to the annual debt repayment charges under the
revised service concession arrangements and capital receipts received during the year.
❖ (£4.062 million) higher than anticipated income and other recoveries across services.
❖ (£2.193 million) lower than anticipated expenditure on employee costs reflecting staff turnover
levels and vacancy management activities across services. 
❖ (£1.818 million) underspend within the Health and Social Care Partnership.
❖ (£3.373 million) underspend in relation to centrally held provisions not required in year. 
These have been partly offset by overspends including:
❖ £1.746 million additional costs in relation to teachers including absence cover, budgeted turnover
and teacher salary pay levels.
❖ £1.299 million additional costs for external residential and non-residential placements for children.
The actual Contribution to Reserves of £22.465 million includes £10.187 million which will be retained
in line with our Treasury Management and Investment Strategy to support future financing costs
arising from our approved Capital Investment Programmes. During the year cabinet approved the
release of (£0.669 million) from reserves following a review of earmarked funds. 
Further contributions to reserves of £10.933 million were agreed by Cabinet during the year, these
include:
❖ £6.358 million in relation to service activity deferred until 2026/27.
❖ £1.257 million to support workforce planning costs and equal pay.
❖ £1.818 million in relation to Health and Social Care
❖ £1.500 million Contribution to Loans Fund Reserve to address the anticipated increased in
borrowing costs
After the earmarking of £20.451 million to meet future year expenditure and investment requirements,
a final in-year surplus of £2.014 million has been reported. This will be transferred to the General
Fund Unearmarked Reserves to increase the available balance to 2.3% of the General Services
Expenditure Budget, in line with the Council’s Reserves Policy.
For 2025/26, in-year council tax collection was 94% (94% in 2024/25). This was stable from the
previous year however, the 2025/26 financial year also included a 7% rise in Council Tax which was
the highest rise so far.
General Fund Reserves
Reserves are an important component of our Financial Framework, supporting financial stability and
providing flexibility to deliver change and transformation.
Unearmarked reserves ensure we can manage any unexpected financial demands without disrupting
delivery of Council services. The level of unearmarked reserves reflects the current financial
environment and degree of risk and uncertainty faced.

Page 24

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 16 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Following the reported net in-year breakeven position, the General Fund Unearmarked Balance at 31
March 2026 is confirmed as £11.195 million. This is at the lower end of the recommended range of
2% to 4% of the annual budget.
Full details of the Council’s General Fund Reserves are shown in Note 11 on page 84, along with
information on future commitments. The available balances within the General Fund Reserves are
summarised as follows: 
General Fund Capital Expenditure 2025/26
In 2025/26 the final spend for capital investment was £59.499 million, which was in line with the
revised budget of £59.499 million. Further details, including comparative figures for 2024/25 are
provided in Note 15 on page 88.
The exhibit below identifies the key projects and summarises how the programme was funded:
General Fund Reserves
1 April 2025
£ million
Movements
£ million
31 March 2026
£ million
Unearmarked Reserves 9.181 2.014 11.195
Loans Fund Reserve 38.009 11.687 49.696
Investment Fund 4.292 (0.808) 3.484
Renewal and Recovery Fund 5.242 (1.186) 4.056
Affordable Housing Reserve 2.617 0.728 3.345
Change and Service Redesign Fund 2.167 1.160 3.327
Future Budget Strategy 9.288 (4.000) 5.288
Other Earmarked Reserves 23.473 3.881 27.354
Total Earmarked Reserves 85.088 11.462 96.550
Capital Fund 11.186 0.680 11.866
Insurance Fund 2.233 0.083 2.316
Total General Fund Reserves 107.688 14.239 121.927

Page 25

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 17 
OFFICIAL INFORMATION
OFFICIAL INFORMATION 
Ardrossan North Shore £6.5m
Flood
Prevention &
Infrastructure
£2.7m
Solar PV £1.9m
Regeneration
Projects £3.7m
Roads & Lighting £9.8m
Smaller
Projects
£2.3m
Ardrossan Campus £17.5m
Ayrshire Growth Deal
£4.1m
ICT Investment
£1.4m
Property Lifecycle
£3.6m
Vehicles & Fleet £3.9m
Moorpark
Primary
School
£2.1m
CAPITAL EXPENDITURE 2025/26
£59.499 MILLION
Government Grants £20.7m
Other Internal Funding
£1.6mBorrowing £35.9m
External Funding
£1.3m
CAPITAL FUNDING 2025/26
£59.499 MILLION

Page 26

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 18 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Projects with the largest capital spends during 2025/26 have included: 
Ardrossan Campus, £17.5m 
B714 Upgrade, £4.1m 
Ardrossan North Shore, £6.5m 
The Great Harbour Coastal Hub, £3.1m

Page 27

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 19 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Housing Revenue Account 2025/26 
For 2025/26 the final expenditure on the Housing Revenue Account services was £62.554 million
against an approved budget of £64.220 million and a revised budget of £66.026 million. An analysis
of actual funding and expenditure is provided below. Full details are provided in the Housing
Revenue Account Income and Expenditure Statement on page 63. 
The actual expenditure for the Housing Revenue Account noted below varies from that reported in
the Comprehensive Income and Expenditure Statement as a result of a number of statutory
accounting adjustments in relation to capital accounting, pensions and other minor adjustments. Full
details of these adjustments are explained in Note 1 Expenditure and Funding Analysis on page 72. 
The lower than budgeted expenditure across the service was primarily related to:
❖ Reduced loan charges linked to a continuing strategy to delay new external borrowing by utilising
cash balances, resulting in savings on external interest costs, changes in the profile of the capital
programme and projected investment income returns (£2.436 million).
❖ Reduced expenditure on Property Repairs (£1.091 million).
❖ An over-recovery of rental and other income (£0.470 million).
The reported underspend of £3.942 million will be retained within the Housing Revenue Account
reserves to support future service delivery, including the Council House building programme. 
Service
Revised
Budget
(£ million)
Actual
Expenditure
/ Income
(£ million)
Variance
(£ million)
Accounting
Adjustments
(£ million)
Net
Expenditure
in the
Accounts
(£ million)
Employee Costs 5.294 5.294 0.000 0.430 5.724
Property Costs 25.627 24.536 (1.091) 0 24.536
Other Costs
8.835 8.890 0.055 0 8.890
Financing Costs 26.270 23.834 (2.436) (2.638) 21.196
Total Expenditure 66.026 62.554 (3.472) (2.208) 60.346
Council House Rents (62.592) (62.740) (0.148) 0 (62.740)
Other Rent and
Recharges (2.712) (2.821) (0.109) (15.042) (17.863)
Contribution from
Reserves (0.722) (0.935) (0.213) 0.935 0.000
Total Income (66.026) (66.496) (0.470) (14.107) (80.603)
Contribution to
Reserves 0 3.942 3.942 16.315 20.257

Page 28

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 20 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The accumulated Housing Revenue Account reserve at 31 March 2026 is £25.148 million: 
Housing Revenue Account Capital Expenditure 2025/26 
In 2025/26 the final Housing Revenue Account expenditure on capital investment was £36.917 million
against a budget of £41.958 million. The underspend was primarily in relation changes in the profile
of expenditure on new build projects including contingency budget not required in year. The chart
below identifies the key projects and how the programme was funded. Further details, including
comparative figures for 2024/25, are provided in Note 15 on page 88. 
Housing Revenue Account Reserves
1 April 2025
£ million
Movements
£ million
31 March 2026
£ million
Unearmarked Reserves 1.758 0.170 1.928
Council House Building Fund 13.213 3.715 16.928
Sustainability Fund 5.000 (0.495) 4.505
Transformation Programme 2.000 (0.213) 1.787
Other Earmarked Reserves 0.170 (0.170) 0
Total Earmarked Reserves 20.383 2.837 23.220
Total Housing Revenue Account
Reserves 22.141 3.007 25.148
Council House Build Programme £23.1m
Estates Based
Regeneration £1.2m
Improvements to Housing Stock £11.8m
Smaller Projects
£0.8m
HRA CAPITAL EXPENDITURE 2025/26
£36.917M

Page 29

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 21 
OFFICIAL INFORMATION
OFFICIAL INFORMATION 
Projects with the largest capital spends during 2025/26 have included new Council House building
projects across North Ayrshire. 
Use of Reserves £1.2m
Other Internal Funding £8.6m
Government Grant £14.4m Borrowing £12.8m
HRA CAPITAL FUNDING 2025/26
£36.917M

Page 30

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 22 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The Balance Sheet
The diagram below summarises the Council’s Balance Sheet as at 31 March 2026, with comparative
information provided for last financial year. The Balance Sheet brings together assets and liabilities,
year end balances, money owed to and by the Council and reserves. More information on the
balance sheet is provided on page 61. 
The Balance Sheet on page 61 summarises the Assets and Liabilities and shows a net worth of
£868.1 million. This is an increase from last year due to an increased value of Assets of £162.9
million offset by an increase in the value of Liabilities of (£20.0 million). The main changes to the
Council’s Balance Sheet are explained as follows.
Long Term Assets have increased in value by (£162.4 million). This is mostly the result of capital
investment in new and existing assets during the year, combined with increases in the value of our
property assets on revaluation, including the effects of applying indexation in line with new
requirement of the CIPFA Code of practice from 1st April 2025.  
Current Liabilities have increased by £10.3 million. This is primarily related to an increase in the value
of central government grants received in advance offset by a reduction in the value of short term
borrowing. 
Increased Long Term Borrowing of £13.5 million reflects additional borrowing undertaken across the
year to support the Council’s Capital Investment Programme. However, this remains lower than
anticipated, reflecting the ongoing strategy of utilising internal resources and temporary borrowing to
minimise costs. 
NET ASSETS £868.1m TOTAL RESERVES £868.1m
2026
Long Term Assets
(Property, Investments)
£1,422.6m
Current Assets (Cash,
Debtors, Investments) 
£113.4m
Long Term
Liabilities 
(Pensions, Borrowing) 
(£512.2m)
Current Liabilities
(Creditors, Borrowing,
etc.) 
(£155.7m)
Unusable Reserves
£721.0m
Usable Reserves
£147.1m
NET ASSETS £725.2 TOTAL RESERVES £725.2m
2025
Long Term Assets
(Property, Investments)
£1,260.2m
Current Assets (Cash,
Debtors, Investments) 
£112.2m
Long Term
Liabilities 
(Pensions, Borrowing) 
(£502.5m)
Current Liabilities
(Creditors, Borrowing,
etc.) 
(£144.7m)
Unusable Reserves
£595.4m
Usable Reserves
£129.8m

Page 31

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 23 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Financial Sustainability
The future financial sustainability of the Council has been identfied as one of the key strategic risks
facing the Council in the medium and longer terms. Demand pressures and funding constraints have
resulted in significantly increased challenges to the delivery of balanced budgets on an annual basis
with the use of unsustainable reserves and non-recurring savings options being utilised, along with
delivery of permanent savings, to bridge budget gaps. 
The undernoted metrics demonstrate the sufficiency of available reserves to support future service
delivery, the affordability of our capital investment plans in terms of their impact on our revenue streams
and the effectiveness of our budget monitoring activities. 2025/26 Scottish average data is not yet
available. However, the 2024/25 data for North Ayrshire is broadly in line  with the Scottish averages for
most of the indicators and compares favourably for the General Fund ratio of financing costs to net
revenue stream. 
Financial Sustainability
North Ayrshire
2025/26
North Ayrshire
2024/25
Scottish
Average 
2024/25
Ratio of usable General Fund reserves to
annual budget 22.6% 23.5% 23.9%
Ratio of uncommitted General Fund
balances to annual budget 2.3% 2.0% 2.3%
Ratio of financing costs to net revenue
stream – General Fund 3.7% 3.3% 5.8%
Ratio of financing costs to net revenue
stream – Housing Revenue Account 23.5% 21.3% 20.0%
Actual outturn as a percentage of
budgeted expenditure 99.8% 100% 100.0% 
The level of reserves supports financial sustainability and provides contingencies to support
unexpected financial demands. Although the ratio of uncommitted General Fund balances compared
to annual budget was below the Scottish average of 2.3% in 2024/25, this has been increased to
2.3% in 2025/26 and is in line with the Scottish average for 2024/25. This remains in line with the
Council’s reserves policy and is at the lower end of the recommended range of 2% to 4%.
The ratio of financing costs to revenue streams demonstrates prudence and ensures that our capital
investment plans are sustainable in the long term. Our ratio of financing costs sit below the Scottish
averages, indicating that we are less leveraged than other councils and have proportionally directed
more expenditure into other priority areas. The level of Housing Revenue Account loan charges is
deemed prudent and affordable within the framework of the current 30 year Housing Business Plan.
The effectiveness of our budget planning and control is demonstrated by our high performance
without exceeding the planned budget.
Treasury Management and Investment 
The Treasury Management and Investment Strategy outlines our approach to the management of our
investments and cash flows in accordance with the relevant professional codes and regulations.  
The key indicators noted below highlight our under borrowed position, as a result of our policy of
utilising internal funds to defer borrowing, the competitive interest rate achieved through the
management of our loans fund and the average interest rate achieved on our investments.

Page 32

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 24 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Treasury Management and Investment 2025/26 2024/25 2023/24
Capital Financing Requirement £552.8 million £513.7 million £436.9 million
Gross External Debt £421.9 million £428.9 million £316.8 million
Under Borrowed Position £130.9 million £84.8 million £120.1 million
Loans Fund Interest Rate 3.7% 3.3% 3.2%
Average Investment Rate 4.1% 4.7% 4.8%  
Outlook and Risks
Outlook
The Economy 
Economic performance has a significant impact on the availability of funding and demand for public
services. The Bank of England’s Monetary Policy Report for April 2026 noted that the conflict in the
Middle East has significantly increased the uncertainty surrounding the UK economic outlook. There
has been a significant energy price shock.  The severity and duration of the conflict is uncertain along
with the impact it will have on global energy supply and broader trade disruption. This leads to highly
uncertain levels of inflation and activity.
Consumer Price inflation was reported at 3.3% in March which was higher than had been projected
and largely reflected the higher fuel prices arising from the higher crude oil prices. This is likely to be
higher during 2026 as the effects of the energy prices pass through and there is also potential for
second-round effects in relation to price and wage setting.  
Within the UK, the economy started stronger than expected with GDP rising by 0.6% in the first
quarter of 2026.  However, growth is expected to slow later in the year amid global energy and supply
chain shocks
The impact within North Ayrshire will be felt in terms of a continuation of the recent increased
demand for Council services in the short term as families continue to face above target inflationary
pressures. 
The pressures on service delivery will continue as a result of core funding failing to keep pace with
increasing costs driven by wage and price inflation and the increased cost of borrowing to support
capital investment. 
orth Ayrshire  ouncil’s  l ns
Our Financial Plans 
Long Term Financial Planning
The Council’s Long-Term Financial Outlook 2024 to 2025 to 2033 to 2034 provides the cornerstone
of the Council’s strategic financial framework which helps guide the Council through the challenging
economic climate and continuing real terms reduction in resources and support the planning for
longer term financial sustainability of priority services. This has been exacerbated in recent years by
the impact of high levels of inflation.

Page 33

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 25 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The Long Term Financial Outlook identified an estimated funding shortfall of £127 million over the
next ten years, this includes anticipated pressures in relation to the Health and Social Care
Partnership.
The key messages highlighted within the Long Term Financial Outlook include:
• North Ayrshire’s overall population is forecast to reduce by 4.2% over the period, with reductions in
the numbers of children and working age adults being offset by a projected 17.1% increase in the
number of Older People. This will negatively impact on anticipated funding levels while resulting in
increased demand for services. 
• The percentage of adults claiming out of work benefits is 32% higher than the Scottish average
and 26.9% of North Ayrshire’s Scottish Index of Multiple Deprivation datazones are within the 15%
most deprived in Scotland, resulting in increased demand for cost-of-living supports such as
Council Tax Reduction benefits.
• The Council will be subject to further pressures in relation to pay and price inflation and the
revenue implications of the Council’s ambitious General Services Capital Investment Programme
which will result in increased budget pressures across the full timeframe of the Long Term
Financial Outlook.
• The Scottish Government Spending Review has previously indicated that a projected “flat cash”
level of funding for local government over the medium-term was anticipated. When set against a
backdrop of high inflationary costs this would lead to a significant budget gap. The Scottish
Government published their updated Medium Term Financial Strategy on the 25 June 2025.
• North Ayrshire Council will become increasing reliant on income from Council Tax and internal
reserves to fund service delivery.
Revenue
In February 2026, the Council agreed its General Fund Medium Term Financial Plan for 2026/27 to
2028/29, approving a General Services Revenue Budget of £485.0 million for 2026/27. 
The Medium Term Financial Plan includes a range of savings proposals, required to deliver a
balanced budget position for 2026/27, and a profiled use of reserves to help mitigate the significant
financial challenges facing the Council. This was set within the context of a Council Tax increase of
8.5% for 2026/27 and a 5% uplift in fees and charges. 
The Medium Term Financial Plan addresses significant budget pressures including inflationary
pressures in relation to pay awards, contractual commitments and utilities, socio economic and
demographic pressures and the increase in the Employer contributions to the Strathclyde pension
fund following a 2 year reduction. In addition, the Council’s Capital Investment Programme continues
to present challenges in terms of affordability due to ongoing volatility and inflation impacts within the
construction sector and the Medium Term Financial plan addresses this through further revenue
investment each year.
Significant cost pressures within the Health and Social Care Partnership present ongoing risks to the
financial sustainability of the Council. As a result, the Medium Term Financial Plan includes additional
funding to the partnership.

Page 34

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 26 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The Medium Term Financial Plan recognises additional Scottish Government funding for core
services. The Council has benefited from additional funding as a result of adult social care indicators
based on our demographics. However, North Ayrshire continues to be negatively impacted by
general population based indicators, including pupil numbers. In addition, confirmed Scottish
Government funding included baselining of support for the impact of pay awards across both
teaching and non-teaching staff, real living wage increases across adult social care services,
children’s social care services and early learning and childcare, and funding to support the expansion
of free school meals and the inflationary uplifts in free personal nursing care. 
Future funding projections have been predicated on a “flat cash” funding assumption combined with
increasing expenditure requirements driven by inflationary pressures, socio economic and
demographic pressures and increasing revenue costs of supporting the Council’s capital investment
programmes.
The Medium Term Financial Plan provides a balanced budget for 2026/27 with indicative funding
gaps remaining for 2027/28 and 2028/29 of £6.918 million and £8.902 million respectively. This
position incorporates the full year effect of approved savings in 2026/27 and the planned use of
reserves of £1.788 million in 2027/28. This continues to present a significant challenge to the
sustainability of the Council’s finances.
In addition to the General Fund Medium Term Financial Plan, North Ayrshire Council has approved
the Housing Revenue Account budget for 2026/27 of £68.248 million.
The impact of increasing service demand, inflation, borrowing costs and anticipated future asset
management requirements presents several financial risks to the HRA 30 Year Business Plan.
Following a tenant consultation and comprehensive review of the 30-year business plan, it was
determined that an average rent increase of 3.84% was required to maintain the current service
provision, maintain planned levels of investment in our existing homes and support investment in the
Strategic Housing Investment Plan. 
Capital
North Ayrshire Council has carried out a refresh of its capital investment plans and approved
revisions to the 10-year General Services Capital Investment Programme covering the period from
2026/27 to 2033/34. This programme will result in the investment of £323.9 million over the period on
key priorities including:
• £90.6 million to improve our school’s estate, including the delivery of a new school campus at
Ardrossan.
• £69.5 million on maintaining and improving our Roads and Lighting, including the upgrading of the
B714.
• £65.0 million working in partnership with East Ayrshire, South Ayrshire, the UK and Scottish
Government to deliver the Ayrshire Growth Deal which will see the regeneration of the region
through investment in strategic infrastructure across various sectors, including life sciences,
tourism, manufacturing and aerospace. 
• £21.6 million on updating and decarbonising our vehicles and fleet to support our Sustainable
North Ayrshire Strategy.

Page 35

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 27 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Our Capital Investment Strategy takes account of our strategic priorities and considers new
investment within the context of outcomes and affordability, recognising that decisions made over the
course of the Programme will have financial consequences for the Council for many years in the
future. 
Recent years have witnessed significant cost volatility across the construction industry, including
inflationary pressures, limited availability of contractors, supply chain issues and material shortages
which are impacting on tender returns and the cost of materials. In order to support the management
of these and other emerging risks, apply prudent financial planning and maintain the affordability of
our capital investment programme, significant earmarked reserves and incremental increases in
revenue budgets have been committed to support future borrowing costs.
An annual review of the Housing Revenue Account Business Plan provided assurance of the
financial sustainability of the management of the Council's housing stock over the remaining 29 years
of the 30-year Plan. This recognised the increased costs arising from property repairs and insurances
while delivering investment for improvements to our existing housing stock, increases to our
affordable housing stock, the continued development of our sheltered housing units and investments
to tackle climate change and contribute towards net zero. 
As a result, North Ayrshire Council has approved a Housing Revenue Account Capital Investment
Programme for 2026/27 of £70.1 million, including £18.5 million for stock improvements and £34.2
million to support the delivery of the Strategic Housing Investment Plan, which aims to deliver 1,666
affordable new homes.
Sustainable Change Programme
Progress continues to be made in developing the Council’s ambitious Sustainable Change
Programme, aligned to the Council’s priorities and set within the context of the Council Plan and our
Community Wealth Building Strategy.
It is important that a pipeline of activity continues to be identified, with a primary focus on generating
financial efficiencies to help address the significant financial pressures across the medium and longer
terms. 
The current workstreams include:
• Use of Land and Property Assets, incorporating a review of operational and non-operational
property.
• Transport and Travel efficiencies and decarbonisation of fleet.
• Sustainability initiatives including major renewable energy investment.
• Progress the Council’s Digital programme through the use of technology and innovation and
collaborative projects. 
The programme also includes delivery of a number of Service reviews across directorates and is
subject to regular review and monitoring by our Transformation Board, which includes the members
of our Executive Leadership Team, and is supported by a transformation team and our Change and
Service Redesign Fund to provide the investment necessary to deliver effective change. The recently
published Audit Scotland report on Best Value in North Ayrshire Council highlighted the very positive
progress being made and noted that £3.1m of financial efficiencies have already been delivered, with
plans for up to £8.5m of further efficiencies over the next three years.

Page 36

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 28 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Climate Change
Climate Change is one of the Council’s strategic priorities as detailed in the North Ayrshire Council
Plan 2023-28 and is driven by our Sustainable North Ayrshire Strategy 2024 to 2027. 
The Sustainable North Ayrshire Strategy 2024 to 2027 sets out the journey to achieving net zero
carbon emissions by 2030 through the implementation of nine strategic priorities, specific actions
across five workstreams and a proposed Carbon footprint and Project Register.
The five thematic workstreams are Energy, Nature, Transport, Waste and Adaptation and the nine
strategic principles help set the priorities and actions until 2027.  These are:
• We will take a whole system approach (including through behaviour change) to tackling climate
change as far as possible, including identification of optimal approaches to achieve social and
economic benefits alongside environmental ones.
• We will continue to clarify and report transparently on our emissions so that the North Ayrshire
emissions baseline is clearly understood.
• We will complete a Local Heat and Energy Efficiency Strategy to help understand where efforts to
reducing emissions and reducing fuel poverty are best focused.
• We will prioritise actions in relation to two of the biggest emissions sources where we will have the
most influence, commonly referred to as ‘heat and fleet’, including through project pathfinder
approaches for decarbonisation of domestic and non-domestic buildings and vehicles to bring
scale and pace to emissions reduction.
• We will work with stakeholders, including the Scottish Government, to articulate the potential costs
and skills requirements to meet our net-zero aspirations.
• We will expand on the need for adaptation measures, recognising mitigation alone will not combat
the impacts of climate changes on communities. 
• We will identify opportunities for expansion of carbon sinks and other carbon capture technologies,
which are expected to be an essential element of our net-zero strategy to mitigate residual
emissions by 2030.
• We will seek to expand the remit and membership of the Climate Change Steering Group to
enable us to work more closely with communities, taking account of outcomes from recent projects
such as Climate Action Towns and Carbon Neutral Islands.
• We will explore the potential for carbon accounting, including carbon budgets for Council services,
to support our journey to net-zero.
In order to ensure the prioritisation of climate change action, all actions to tackle climate change are
governed by the Council’s Sustainability Board and all reports to Council or Cabinet must highlight
any impact on climate change.  In addition, a Climate Change Steering Group has been established,
with members from various Council services, local businesses, voluntary sector and other public
service organisations.  The purpose of the group is to be a critical friend for the implementation of the
Sustainable North Ayrshire Strategy, and to share knowledge and experience, whilst recognising and
developing opportunities for collaboration.

Page 37

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 29 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Full details of the Council’s annual progress on climate change activities are peer reviewed and
published by the Sustainable Scotland Network in accordance with our Public Bodies Climate
Change Duties report requirement. This brings together work from various services and presents the
collaborative approach the Council is taking in tackling climate change. One of the key indicators of
progress is the level of carbon emissions from the Council’s property estate. This has shown a 75%
reduction over the past 21 years with further reductions anticipated in the medium term. 
Climate change risks are highlighted within our Strategic Risk Register and specific actions have
been included in the General Services and Housing Revenue Account capital programmes.  Project
level risks are identified through collaboration with consultants, contractors, the Sustainability Team
and design team members.  These are assessed using the risk matrix and monitored throughout the
development of each project.  
In terms of our actions over the short and medium term, the Council’s Investment Fund has been
created to support decarbonisation projects, which are maximised through the support from external
funding. In addition, actions on climate change are supported by other key strategies across the
Council, including: 
• North Ayrshire Nature Network Strategy
• Local Heat and Energy Efficiency Strategy
• Local Transport and Active Travel Strategy 2023 to 2028 
• Local Housing Strategy 2023 to 2028 
• Local Flood Risk Management Plan 2022 to 2028
• Local Outcomes Improvement Plan 2022 to 2030
The Council has also successfully developed two solar PV farms on former landfill sites, a first for a
local authority in Scotland.  The 7.5MW solar farm at Nethermains was energised on 19th September
2025, and aims to generate approximately 7,600MWh of electricity each year. The 5MW solar farm at
Shewalton was energised on 5th March 2026, and aims to generate approximately 5,400MWh each
year.  The income generated from the sale will be used to support Council services, with a proportion
of the income directed towards supporting local community groups.
The Council continues to engage with the Scottish Climate Intelligence Service to utilise the Climate
View platform to test various climate-related scenarios, and how by changing mitigation action
targets, we can better achieve decarbonisation, both across the estate and for area-wide emissions. 
A socialisation event has taken place in May 2026, to better understand the implications and benefits
to collaboration in this area.

Page 38

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 30 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Adaptation to climate change is vital and is a dedicated workstream within the Sustainable North
Ayrshire Strategy.  Work is ongoing to raise awareness and understanding of adapting to climate
change and the risk inaction poses to the natural and built environment.  The Council is following
Adaptation Scotland’s Capability Framework, with an internal working group assessing the progress
being made annually.  In addition, a Climate Ready Ayrshire programme has been established
between North, South and East Ayrshire Councils, to develop a strategy for regional adaptation.  This
will consider how to ensure resilience to climate change is enhanced now, for buildings, assets and
nature to withstand future extreme weather events and sea level rise.
Risks
North Ayrshire Council is committed to ensuring that it is proactive in identifying and managing the
risks impacting on the authority. The Council recognises that a certain amount of risk is inevitable if
the organisation is to achieve its objectives. 
The aim of risk management is to reduce the likelihood and/or impact of risk by identifying and
controlling risks to the Council. If risk is to be managed appropriately, and Services are aware of
these risks, risk management can contribute positively towards the organisation's decision-making
processes, making the Council more innovative and effective in its approach to service delivery.
The most significant risks are identified through the Council's Strategic Risk Register recognising the
challenges facing the Council and demonstrating the arrangements in place to manage these risks.
The Council reviews and updates the Strategic Risk Register on an annual basis. North Ayrshire
Council has identified eight risks which have been classified as either High or Very High, with five of
these identified as Very High risks.
Council Services have identified high level strategic actions within their planning for 2026/27 to help
the Council mitigate against these strategic risks. Those risks classified as Very High are as follows:
Risk Description Impact Mitigations and
Controls
Financial
Sustainability
The level of funding for
local government will fall
significantly below that
required to operate
services effectively,
requiring the Council to
take increasingly
challenging decisions. 
Our position is further
affected by a reducing
overall population but an
increasing elderly
population. This will
further impact on the
Council’s share of
available funding across
the short, medium and
longer terms.
Funding not keeping pace
with demand and
inflationary cost
pressures means that
there will be a reduction
in some service areas
potentially resulting in
higher risks for service
users. 
The future delivery of
balanced budgets will
become increasingly
challenging. 
The capital programme
could also be significantly
impacted leading to
reduced levels of capital
investment.
Robust monitoring of the
Council’s revenue and
capital budgets is in
place, including the
development of the Long
Term Financial Outlook
and the Medium Term
Financial Outlook.
The annual budget
process provides a
framework to address the
financial position of the
Council, including control
measures, the
sustainable change
programme and the
utilisation of available
statutory powers.

Page 39

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 31 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Risk Description Impact Mitigations and
Controls
Financial
Sustainability
of the Health
and Social
Care
Partnership
Resources have not kept
pace with the demand for
and cost of social care
services with significant
ongoing challenges
across the medium-term. 
The ongoing work to
develop new risk-sharing
arrangements between
the Council and Health
Board present a financial
risk to the Partnership
and Council.
Savings requirements
may not be in alignment
with the strategic plan. 
Reductions in early
intervention and
prevention may mean
that future demand is
increased. 
Active monitoring of the
financial position with
regular detailed reporting
to the Council's Cabinet. 
A three-year Medium-
term Financial Outlook is
updated on a rolling basis
each year.
The Partnership has
developed a new 3-year
Transformation Plan 
Community
Capacity
Building and
Empowerment
Unrealistic timescales for
progressing of aspects of
legislation, such as
Community Asset
Transfer.
Complying with the
complex and resource
intensive consultation
legislation in service
redesign.
Budget savings and
pressure on property
maintenance budgets.
Loss of potential benefits
of community capacity
building and
empowerment.
Over-engagement carries
disengagement and
engagement fatigue.
Disconnect between
Council aspirations and
community appetite for
asset transfers,
exacerbated by increased
property costs.
Ongoing commitment to
community empowerment
and locality partnerships.
Ringfenced Community
asset transfer funding
and internal revenue
investment focused on
building condition. 
Inequalities Residents of North
Ayrshire and, in
particular, certain
excluded groups, will
experience increasing
levels of poverty and its
effects as a result of the
economic situation and
public sector funding
challenges.
Health inequality is
closely linked to poverty,
employment and
people's earliest
experiences as children,
and will increase. 
A larger proportion of
population is projected to
be not economically
active in future.
The impact is greatest for
our children, young
people and families,
unemployed people and
those in in-work poverty,
and people exposed to
the risks of drug and
alcohol addiction.
Increased demand for
services, potential
increase in crisis
interventions and
negative impact on local
economy.
Tackling inequalities is a
key priority of the HSCP’s
Strategic Plan, setting out
actions to tackle
inequality through its
Partnership Pledge.
The Council has started
work with The
Collaboration for Health
Equity in Scotland, an
innovative partnership
between Public Health
Scotland and the Institute
for Health Equity and is
aimed at improving health
expectancy and reducing
health inequalities.

Page 40

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 32 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Risk Description Impact Mitigations and
Controls
The Council considers
reducing inequality at the
heart of its work and the
Community Planning
Partnership’s Local
Outcomes Improvement
Plan has a central
purpose of reducing
inequalities.
Property
Asset Risk
Restricted capital
budgets for investment in
the Council’s property
assets means they are in
declining condition and
have greater long term
investment needs. 
Nationally recognised
building safety issues,
including RAAC,
alongside ageing heating
and mechanical systems,
have highlighted the
growing burden of asset
management with critical
failures occurring and
limited ability to replace
assets on a planned
basis. 
Ongoing inflation and
volatility in construction
costs further constrains
the Council’s capacity to
address competing
priorities.
Maintenance issues and
failure of building
components are
increasingly likely to
result in disruption to
service delivery. 
There is also an
increasing risk of health
and safety and statutory
compliance obligations
not being achieved.
Significant property
incidents requiring
closures, decants, or
major interventions are
becoming more frequent
and often coincide with
severe weather events.
Property condition
information provides the
baseline to measure
lifecycle replacement
requirements across the
estate, targeting
investment on priorities.
The property
rationalisation
workstream will reduce
estate size and reduce
the financial burden of
the estate.
Post incident reviews are
undertaken to capture
lessons learned and
implement actions. 
Supplementary Information 
Common Good and Trust Funds
The Council administers six Common Good Funds for the former burgh areas of Ardrossan, Irvine,
Largs, Millport, Saltcoats and Stevenston. Overall, the Common Good Funds achieved an in-year
deficit of £0.134 million resulting in an accumulated surplus as at 31 March 2026 of £2.195 million.
Details of income and expenditure accounts and balance sheets can be found on page 65 of these
accounts.

Page 41

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 33 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The Council administers several Trust Funds, some of which are registered charities. Details of
income and expenditure accounts and balance sheets can be found on page 66 of these accounts.
Overall, the Trust Funds reported an in year surplus of £0.064 million resulting in an accumulated
surplus as at 31 March 2026 of £0.446 million. Separate annual accounts and a Trustees’ Annual
Report have been prepared for the charitable trusts. These are subject to separate external audit and
are available on the Council’s website. 
Group Accounts
The Council has a material interest in a number of other organisations and is therefore required to
produce Group Accounts. The Group results are presented alongside the results for the Council on
all the main statements. The effect of including the Group entities along with the Council Accounts is
an increase in both Reserves and Net Assets of £51.150 million. This represents the Council’s share
of the net assets in these entities. Further details of the associated entities that have been
incorporated into the financial statements can be found in Note 39 on page 122.
Where to Find More Information
If you would like more information, our Council website holds detailed information on the Council’s
strategies, plans and policies and our performance and spending. 
Craig Hatton Councillor Tony Gurney Mark Boyd
Chief Executive  Leader of the Council Head of Finance    
24 June 2026 24 June 2026        24 June 2026

Page 42

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 34 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Statement of Responsibilities
Responsibilities of the Council
The Council is required:
• To make arrangements for the proper administration of its financial affairs and to secure that the
proper officer of the Council has responsibility for the administration of those affairs (section 95 of
the Local Government (Scotland) Act 1973). In this Council, that officer is the Head of Finance.
• To manage its affairs to secure economic, efficient and effective use of resources and safeguard
its assets.
• Ensure the Annual Accounts are prepared in accordance with legislation (The Local Authority
Accounts (Scotland) Regulations 2014), and, so far as is compatible with that legislation, in
accordance with proper accounting practices (section 12 of the Local Government in Scotland Act
2003).
• To approve the Statement of Accounts. 
Councillor Tony Gurney
Leader of the Council 
Responsibilities of the Chief Financial Officer
The Head of Finance is responsible for the preparation of the Council’s Annual Accounts in
accordance with proper practices as required by legislation and as set out in the Chartered Institute
of Public Finance and Accountancy / Local Authority (Scotland) Accounts Advisory Committee Code
of Practice on Local Authority Accounting in the United Kingdom (the Accounting Code).
In preparing these annual accounts, the Head of Finance has:
• Selected appropriate accounting policies and applied them consistently.
• Made judgements and estimates that were reasonable and prudent.
• Complied with legislation.
• Complied with the local authority Accounting Code (in so far as it is compatible with legislation).
• Kept adequate accounting records that were up to date.
• Taken reasonable steps for the prevention and detection of fraud and other irregularities. 
I certify that the financial statements give a true and fair view of the financial position of North
Ayrshire Council and its group at the reporting date and the transactions of North Ayrshire Council
and its group for the year ended 31 March 2026. 
Mark Boyd
Head of Finance
24 June 2026

Page 43

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 35 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Remuneration Report
Introduction
The Local Authority Accounts (Scotland) Regulations 2014 (Scottish Statutory Instrument Number
2014/200) require local authorities in Scotland to prepare a Remuneration Report as part of the
annual statutory accounts.
The following report details North Ayrshire Council's remuneration policy for its Senior Councillors
and Senior employees, providing full details of the remuneration and pension benefits they receive. 
This report also provides information on the number of employees whose annual remuneration was
£50,000 or more, as well as summary information in relation to employees’ exit packages agreed
during the year.
All of the information disclosed in the tables within this Remuneration Report, with the exception of
tables 3 and 4, the Facility Time Statement and the Fair Pay section, are subject to independent
audit. The other sections of the Remuneration Report are reviewed by our Auditor to ensure that they
are consistent with the Financial Statements.
Remuneration of Councillors
The remuneration of Councillors is regulated by the Local Governance (Scotland) Act 2004
(Remuneration) Regulations 2007 (Scottish Statutory Instrument Number 2007/183), as amended. 
The Regulations provide for the grading of Councillors, for the purposes of remuneration
arrangements, as Leader of the Council, Provost, Senior Councillors and Councillors.  The Leader of
the Council and the Provost cannot be the same person for remuneration purposes.  A Senior
Councillor is a Councillor who holds a significant position of responsibility in the Council's political
structure.
The salary that is to be paid to the Leader of the Council is set out in the Regulations.  For 2025/26
the salary for the Leader of North Ayrshire Council was set at £50,063 (2024/25: £42,698) and the
salary for the Provost was set at £37,548 (2024/25: £32,024), the maximum level.  
The Regulations also set out the remuneration that may be paid to Senior Councillors and the total
number of Senior Councillors the Council may have. For 2025/26, the maximum salary which could
be paid to a Senior Councillor was £37,548 (2024/25: £32,024) with the maximum number of Senior
Councillors set at 14. The total remuneration for Senior Councillors (excluding the Provost and
Leader) should not exceed £444,710 (2024/25: £373,583). 
As at 31 March 2026 the Council had 10 Senior Councillors (2024/25:10). The annual salaries for the
Depute Leader and leader of largest minority were set at £37,548 (2024/25: £32,024), the maximum
level.  The remaining Senior Councillors annual salary was set at £31,765 (2024/25: £26,685), with
total remuneration of £298,670 (2024/25: £277,064).

Page 44

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 36 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
In line with Regulations the Council pays contributions to the Local Government Pension Scheme for
those Councillors who elect to become Councillor Members of the pension scheme. Glasgow City
Council administers the Local Government Pension Scheme on behalf of twelve unitary local
authorities including North Ayrshire Council.  Information on the scheme is available at SPFO.
Details of the Remuneration of Senior Councillors are shown in Table 1.  
Table 1: Remuneration of Senior Councillors 
Councillor Name and
Responsibility Date From
Date
To
Total
Remuneration
2025/26
£
Total
Remuneration
2024/25
£
Tony Gurney
Leader of the Council
(Full Time Equivalent £50,063)
Cabinet Member
12 February 
2026
April 2025
March 2026
11 February
2026
34,270 26,685
Marie Burns
Leader of the Council
(Full Time Equivalent £50,063)
April 2025 11 February
2026 46,838 42,698
Anthea Dickson
Provost April 2025 March 2026 37,548 32,024
Christina Larsen
Depute Leader of the Council
(Full Time Equivalent £37,548)
Cabinet Member
12 February 
2026
April 2025
March 2026
11 February
2026
32,557 26,685
Shaun Macaulay
Depute Leader of the Council
(Full Time Equivalent £37,548)
April 2025 11 February
2026 35,999 32,024
John Sweeney
Depute Provost April 2025 March 2026 31,765 26,685
Joe Cullinane
Leader of the Largest Minority April 2025 March 2026 37,548 28,555
Alan Hill
Cabinet Member April 2025 March 2026 31,765 26,685
Margaret Johnson
Cabinet Member
(Full Time Equivalent £31,765)
Cabinet Member
12 February 
2026
April 2025
March 2026
20 August
2025
14,339 26,685
Chloe Robertson
Cabinet Member
(Full Time Equivalent £31,765)
21 August
2025 March 2026 19,402 0
John Bell
Chair, Audit and Scrutiny April 2025 March 2026 31,765 26,685
Eleanor Collier
Chair, Licensing Committee April 2025 March 2026 31,765 26,685
Robert Foster
Chair, Planning Committee April 2025 March 2026 31,765 26,685
Total 417,326 348,781

Page 45

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 37 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Note: Total remuneration consists of salaries and allowances only. Remuneration paid to the Provost
and Leader of the Council in 2025/26 is £91,240 (2024/25: £74,722).  Total remuneration to the
remaining 10 Senior Councillors is £326,086 (2024/25: £277,064).
Remuneration of Employees
The salary of senior employees is set by reference to national arrangements.  The Scottish Joint
Negotiating Committee (SJNC) for Local Authority Services sets the salaries for the Chief Executives
of Scottish local authorities.  Circular CO-155 sets the salary for the Chief Executive of North Ayrshire
Council for the period 2025/26. Senior employees do not receive any other benefits.  Details of the
Remuneration of Senior Employees are shown in Tables 2a and 2b.
During 2025/26, the Chief Executive and the Executive Director (Communities & Housing) held
positions of Director in North Ayrshire Ventures Trust.  There was no remuneration associated with
these positions.
Table 2a:  Remuneration of Senior Employees of the Council
Name and Post Title
Date
From
Date
To
Salary and
Allowances
2025/26
£
Total
Remuneration
2025/26
£
Total
Remuneration
2024/25
£
Craig Hatton
Chief Executive
April
2025
March
2026 176,517 176,517 166,528
Craig Hatton
Returning Officer/
Counting Officer
April
2025
March
2026 0 0 3,155
Sam Anson
Executive Director,
Education
April
2025
March
2026 139,069 139,069 111,433
David Hammond
Executive Director,
Communities & Housing
April
2025
March
2026 139,069 139,069 133,720
Russell McCutcheon
Executive Director, Place
April
2025
March
2026 139,069 139,069 133,720
Aileen Craig
Monitoring Officer
April
2025
March
2026 118,291 118,291 111,889
Mark Boyd
Section 95 Officer
April
2025
March
2026 118,291 118,291 112,764
Andrew McClelland
Chief Education Officer
April
2025
March
2026 113,656 113,656 109,051
Scott Hunter
Chief Social Work Officer
April
2025
March
2026 106,736 106,736 102,630
Allan Finlayson
Chief Planning Officer
April
2025
March
2026 74,648 74,648 72,831
Total 1,125,346 1,125,346 1,057,721

Page 46

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 38 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Table 2b:  Remuneration of Senior Employees of the Subsidiary Bodies
Name and Post Title
Date
From
Date
To
Salary and
Allowances
2025/26
(£)
Total
Remuneration
2025/26
(£)
Total
Remuneration
2024/25
(£)
Malcolm McPhail
Chief Executive
North Ayrshire Leisure
Limited
April
2025
March
2026 117,218 117,218 112,702
Pension Benefits
Pension benefits for Councillors and local government employees are provided through the Local
Government Pension Scheme (LGPS).   
Councillors’ pension benefits are based on career average pay. Pay for pension purposes for each
year or part year ending 31 March (other than the pay in the final year commencing 1 April) is
increased by the cost of living, as measured by the appropriate index (or indices) between the end of
that year and the last day of the month in which their membership of the scheme ends. The total of
the revalued pay is then divided by the period of membership to calculate the career average pay.
This is the value used to calculate the pension benefits. 
Local government employees had a final salary pension scheme prior to 1 April 2015. This means
that pension benefits are based on the final year’s pay and the number of years that person has been
a member of the scheme up to 31 March 2015.  From 1 April 2015, benefits for local government
employees are based on career average pay.  Benefits are based on the pay received for each year
in the scheme, revalued for inflation until retirement.  All benefits accumulated prior to 1 April 2015
are protected.     
A five-tier contribution system is in place with contributions from scheme members based on how
much pay falls into each tier. This is designed to give more equality between the costs and benefits of
scheme membership. 
The tiers and member contribution rates for 2024/25 and 2025/26 are shown in Table 3.

Page 47

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 39 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Table 3: Member Contribution Rates 
Whole time pay bandings 2024/25 Employee
Contribution rate Whole time pay bandings 2025/26
On earnings up to and including £27,000 5.50% On earnings up to and including £27,500
On earnings on or above £27,001 and up
to £33,000 7.25% On earnings on or above £27,501 and up
to £33,600
On earnings on or above £33,001 and up
to £45,300 8.50% On earnings on or above £33,601 and up
to £46,100
On earnings on or above £45,301 and up
to £60,400 9.50% On earnings on or above £46,101 and up
to £61,400
On earnings on or above £60,401 12.00% On earnings on or above £61,401 
The rate and basis at which employees accrue their pension benefits has changed over time. This is
shown in Table 4. 
Table 4: Employee Benefit Calculation Rates
Time Period Pension Benefit Lump Sum Basis Accrual Basis  Accrual Rate
From 1 April 2015 Career Average 1/49th pensionable
pay each year n/a
From 1 April 2009 
to 31 March 2015 Final Salary 1/60th pensionable
pay each year n/a
Prior To 1 April
2009 Final Salary 1/80th pensionable
pay each year
3/80th final pensionable
salary and years of
pensionable service 
There is no automatic entitlement to a lump sum.  Members may opt to give up (commute) pension
for lump sum up to the limit set by the Finance Act 2004.
The value of the pension benefits of Senior Councillors is outlined in Table 5. They have been
calculated without exercising any option to commute pension entitlement into a lump sum and without
any adjustment for the effects of future inflation.     
The pension entitlements for Senior Councillors for the year to 31 March 2026 are shown in Table 5,
together with the contribution made by the Council to each Senior Councillor’s pension during the
year.

Page 48

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 40 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Table 5: Pension Benefits of Senior Councillors
Name
In-year
pension
contributions
for year to 31
March 2026
£
In-year
pension
contributions
for year to 31
March 2025
Accrued
Pension
Benefits at
31 March
2026
£
Accrued
Lump Sum
at 31
March
2026
£
Pension
Benefits
difference
from 31
March
2025
£
Lump
Sum
difference
from 31
March
2025
£
Alan Hill 2,065 1,734 9,705 2,225 637 (57)
Anthea Dickson 2,441 2,082 9,088 327 829 (2)
Chloe Robertson 1,250 0 1,865 0 548 0
Christina Larsen 2,116 1,734 4,597 0 716 0
Eleanor Collier 2,065 1,734 2,294 0 676 0
Joe Cullinane 2,441 2,007 9,851 0 1,006 0
John Bell 2,065 1,734 10,795 2,300 903 88
John Sweeney 2,065 1,734 4,571 0 715 0
Margaret Johnson 932 1,734 2,230 0 612 0
Robert Foster 2,065 1,734 5,130 0 723 0
Shaun Macaulay 2,340 2,082 5,011 0 835 0
Tony Gurney 2,228 1,734 9,100 1,994 686 (30)
Total 24,073 20,043 74,237 6,846 8,886 (1) 
Councillor Burns is not a member of the pension scheme.
Accrued Pension Benefits relate to all duties and not just those of the posts shown.
Pension entitlements for senior employees for the year to 31 March 2026 are shown below in Table
6a, together with the contribution made by the Council to each senior employee’s pension during the
year.

Page 49

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 41 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Table 6a:  Pension Benefits of Senior Employees of the Council
Name and Post
Title
In-year pension
contributions
for year to 31
March 2026
£
In-year
pension
contributions
for year to 31
March 2025
£
Accrued
Pension
Benefits at
31 March
2026
£
Accrued
Lump Sum
at 31
March
2026
£
Pension
Benefits
difference
from 31
March 2025
£
Lump Sum
difference
from 31
March 2025
£
Craig Hatton
Chief Executive 11,474 11,029 128,587 0 11,533 0
Sam Anson
Executive
Director,
Education
8,371 6,854 4,598 0 2,656 0
Russell
McCutcheon
Executive
Director, Place
8,390 8,042 78,897 112,503 5,155 4,663
David Hammond
Executive
Director,
Communities &
Housing
8,343 8,221 35,944 2,839 3,517 116
Aileen Craig
Monitoring Officer 7,689 7,273 45,037 39,996 3,674 1,538
Andrew
McClelland
Chief Education
Officer
7,388 7,088 20,100 0 2,616 0
Scott Hunter
Chief Social Work
Officer
6,938 6,671 34,034 27,766 26,913 27,766
Allan Finlayson
Chief Planning
Officer
4,852 4,734 4,004 0 1,691 0
Mark Boyd
Section 95 Officer 6,952 6,654 44,884 33,844 1,820 1,441
Total 70,397 66,566 396,085 216,948 59,575 35,524 
Chief Education Officer is based on Local Government Pension contributions only.

Page 50

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 42 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Table 6b:  Pension Benefits of Senior Employees of the Subsidiary Bodies
Name and Post
Title
In-year pension
contributions
for year to 31
March 2026
£
In-year
pension
contributions
for year to 31
March 2025
£
Accrued
Pension
Benefits at
31 March
2026
£
Accrued
Lump Sum
at 31
March
2026
£
Pension
Benefits
difference
from 31
March 2025
£
Lump Sum
difference
from 31
March 2025
£
Malcolm McPhail
Chief Executive -
North Ayrshire
Leisure Limited
6,997 4,379 3,414 0 2,039 0
Remuneration paid to Councillors
Salaries, allowances and expenses paid to all Councillors within North Ayrshire Council (including the
Senior Councillors previously listed) during the year are shown in Table 7.  There were no non-cash
expenses or benefits in kind paid during 2025/26.
Table 7: Total Remuneration Paid to Councillors 
Type of Remuneration 2025/26
£
2024/25
£
Salaries 961,968 789,589
Allowances 0 0
Expenses 18,435 18,395
Total 980,403 807,984 
The Annual return of Councillors' salaries and expenses for 2025/26 is available for any member of
the public to view at all Council libraries and public offices during normal working hours, and is also
available on the Council's website.
General Disclosure by Pay Bands
The Regulations require the Remuneration Report to provide information on the number of persons
whose remuneration was £50,000 or above. Remuneration consists of all payments made to
individuals, including salaries (including arrears of pay), expenses and any payments made to an
individual in respect of termination costs. Table 8 provides this information in bands of £5,000.

Page 51

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 43 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Table 8: Employees with Remuneration over £50,000 
Remuneration Bands
Number of
Teachers at
31 March
2026
Number of
Teachers at
31 March
2025
Number of
Other Staff at
31 March
2026
Number of
Other Staff at
31 March
2025
£50,000-£54,999 516 165 153 172
£55,000-£59,999 93 84 172 70
£60,000-£64,999 85 63 71 42
£65,000-£69,999 49 47 17 10
£70,000-£74,999 57 60 24 33
£75,000-£79,999 37 12 14 7
£80,000-£84,999 15 6 7 8
£85,000-£89,999 1 3 1 0
£90,000-£94,999 4 4 4 2
£95,000-£99,999 1 2 0 2
£100,000-£104,999 2 1 1 7
£105,000-£109,999 3 3 8 1
£110,000-£114,999 1 0 1 4
£115,000-£119,999 0 0 3 0
£120,000-£124,999 0 0 0 0
£125,000-£129,999 0 0 0 0
£130,000-£149,999 0 0 3 2
£150,000-£154,999 0 0 0 0
£155,000-£159,999 0 0 0 0
£160,000-£164,999 0 0 0 0
£165,000-£169,999 0 0 0 1
£170,000-£174,999 0 0 0 0
£175,000-£179,999 0 0 1 0
Total 864 450 480 361 
Exit Packages
The Council has set aside funding to support a voluntary early release scheme for employees as part
of the agreed savings package and to facilitate service redesign.  As a result, a number of staff left
the Council during 2025/26, either through the voluntary early release scheme or voluntary
redundancy. There were no compulsory redundancies.
For the purposes of this note, Exit Packages in Table 9 include:
• Redundancy payment.
• Strain on the fund cost (the amount which the Council is required to pay to the pension fund
because the employee has retired before the assumed retirement age).  
The figures include employees who have committed to leave during 2025/26, although their actual
leaving date may be later than 31 March 2026. Table 9 summarises the impact of the exit packages.

Page 52

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 44 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Table 9: Total Exit Packages 
Band
Number of
Employees
2025/26
Value
2025/26
£
Number of
Employees
2024/25
Value
2024/25
£
£0-£20,000 14 100,046 19 189,939
£20,001-£40,000 7 189,324 16 439,776
£40,001-£60,000 0 0 10 505,890
£60,001-£80,000 0 0 12 856,740
£80,001-£100,000 0 0 5 445,639
£100,001-£150,000 0 0 6 757,334
£150,001-£200,000 0 0 1 153,693
£200,001-£250,000 0 0 1 203,315
21 289,370 70 3,552,328 
Facility Time Statement
Under the Trade Union (Facility Time Publication Requirements) Regulation 2017, the Council is
required to collect and publish data in relation to its usage and spend of trade union facility time in
respect of employees who are trade union representatives.  Facility time is time off from an
employee’s job, granted by the Council, to enable the employee to carry out their trade union role.
For the reporting year 2025/26, 153 employees (2024/25: 123) were relevant trade union officials and
46 of these employees (2024/25: 23) spent a proportion of their working hours on facility time: 
Number of Employees who were relevant union
official during the relevant period Full-time equivalent employee number
153 140.89 
Percentage of Time Number of Employees
(Headcount)
0% 107
1% - 50% 42
51% - 99% 1
100% 3
The percentage of the total paybill spent on facility time was 0.09% (2024/25: 0.07%). 
Total Pay Bill spent on Facility Time Value
Total Cost of Facility Time £307,527
Total Pay Bill £331,535,251
Percentage of Total Pay Bill spent on Facility Time 0.09% 
For those employees who were trade union officials, the time spent on paid trade union activities as
percentage of their total paid facility time hours was 1.87% (2024/25: 1.48%).

Page 53

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 45 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Time spent on Trade Union Activities Value
Time spent on Trade Union Activities as a
percentage of Total paid Facility Time hours 1.87%
The Trade Union Facility Time Statement for 2025/26 is available for any member of the public to
view on the Council's website. 
Fair Pay
It is recommended by the Hutton Review of Fair Pay in the Public Sector, that local authorities use
pay multiples as a means of measuring the relationship between pay rates across the Council
workforce and that of senior managers. This helps to ensure that the salary of the highest paid
employee is not excessive and is consistent with the needs of the Council. North Ayrshire Council
does not have a policy on maintaining a specific pay multiple and there is no statutory duty to report
this. However, the Council is committed to following best practice. As such, the following figures are
provided: 
Description
Full Time
Equivalent
Salary
2025/26
Full Time
Equivalent
Salary
2024/25 Change
Range of staff remuneration £24,573 -
£181,176
£22,947 -
£166,528
£1,626 -
£14,648
Lowest earning employee's remuneration 24,573 22,947 1,626
Staff Average (salary & allowances) 38,812 37,118 1,694
Highest earning director's total remuneration 181,176 166,528 14,648
Ratio between highest earning director's total
remuneration and the lowest earning employee 7.37:1 7.26:1 1.52%
Ratio between highest earning director's total
remuneration and the average 4.67:1 4.49:1 4.01%
Median (total pay and benefits) 34,070 33,251 819
Median (salary only) 33,297 31,571 1,726
Ratio between highest earning director's total
remuneration and the median 5.32:1 5.01:1 6.19%
25th percentile (total pay and benefits) 28,775 26,966 1,809
25th percentile (salary only) 28,775 26,966 1,809
Ratio between highest earning director's total
remuneration and the 25th percentile 6.3:1 6.18.1 1.94%
75th percentile (total pay and benefits) 47,758 45,913 1,845
75th percentile (salary only) 47,758 45,913 1,845
Ratio between highest earning director's total
remuneration and the 75th percentile 3.79:1 3.63:1 4.41%
Note: the above figures exclude apprenticeships and training appointments which are outwith North
Ayrshire’s standard remuneration policy and are provided as part of the Council’s commitment to
address youth unemployment through the creation of training opportunities to support young people
progress towards fair work.

Page 54

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 46 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
North Ayrshire Council is a Living Wage employer and, as such, we are committed to paying all staff
the real Living Wage. From October 2025, this has been set at £13.45 per hour (2024: £12.60). The
highest earning director is the Chief Executive. The Chief Executive's salary is set independently by
the Scottish Joint Negotiating Committee (SJNC) for Local Authority Services.
For the year to 31 March 2026, the remuneration received by the Chief Executive increased by
8.80% to £181,176 FTE (2024/25: £166,528) per annum excluding any pension contributions. The
average FTE remuneration for the Council as a whole, excluding the Chief Executive, increased by
4.65% (2024/25: 5.21%) due to progression in Spinal Column Points (SCP) and pay award
settlements agreed with Trade Unions. 
In 2025/26, the highest paid directors' remuneration was 7.37 times larger than the lowest
remunerated employee (2024/25: 7.26). The Council's current median FTE remuneration is £34,070
per annum making North Ayrshire Council's pay multiple 5.32:1 for 2025/26 (2024/25: 5.01:1). 
Craig Hatton Councillor Tony Gurney
Chief Executive  Leader of the Council     
24 June 2026    24 June 2026

Page 55

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 47 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Annual Governance Statement
Executive Summary
North Ayrshire Council is responsible for ensuring that its business is conducted in accordance
with the law and proper standards, and that public money is safeguarded and properly
accounted for and used economically, efficiently and effectively to achieve Best Value. 
The Council is also responsible for putting in place proper arrangements for the governance of
its affairs and facilitating the effective exercise of its functions, which includes arrangements for
the management of risk. 
The Council has approved and adopted a Local Code of Corporate Governance, which is
consistent with the principles of the CIPFA/SOLACE Framework ‘Delivering Good Governance
in Local Government’ (2016). In 2025 an addendum was released to the 2016 Code which
replaced chapter 7 of the Framework with the seven principles of the 2016 Code remaining
unchanged. The Council has reviewed its governance arrangements to ensure that the Annual
Governance Statement reflects these revisions. A copy of the local code is available here. 
This statement explains how North Ayrshire Council complies with the Code of Corporate
Governance and meets the requirements of the ‘Code of Practice for Local Authority Accounting
in the UK: A Statement of Recommended Practice’, in relation to the Statement on the System of
Internal Financial Control. Based on the review, the Council considers that the governance
arrangements operating during 2025/26 were fit for purpose and provided reasonable assurance
over the achievement of objectives and the discharge of its responsibilities. 
• Arrangements were assessed as being effective in the following areas: 
• Strong member oversight through Cabinet and the Audit & Scrutiny Committee, supported
by a refresh of governance documents 
• Effective risk management arrangements, including review of the Council’s Strategic Risk
Register 
• Effective arrangements for financial management, supported by the development of a
Medium-Term Financial Outlook and Plan. 
• Positive Best Value Audit Scotland reports 
Areas Requiring Further Development/Strengthening/Key
Challenges 
A summary of the planned actions for 2026/27 are included at the end of this statement. One of
the main areas of focus is the strengthening of governance arrangements to support the HSCP.
This is being progressed through the work of the Finance Working Group and closer Integration
with all elected members through development of the annual budget process.

Page 56

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 48 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Improvement Actions 
The Council has progressed a range of governance developments through 2025/26 which are
included in the sections below. 
The Purpose of the Governance Framework
The governance framework comprises the systems and processes, and culture and values by which
the Council is directed and controlled.  It enables the Council to monitor the achievement of its
strategic objectives and to consider whether those objectives have led to the delivery of appropriate,
cost-effective services and the achievement of key outcomes.
The system of internal control is a significant part of that framework and is designed to manage risk
to a reasonable level.  The system of internal control is based on an ongoing process designed to
identify and prioritise the risks to the achievement of the Council’s objectives, to evaluate the
likelihood of those risks being realised and the impact should they be realised, and to manage them
effectively.
The Governance Framework
The Council’s Framework is built around the seven core principles and twenty one sub-principles that
set out the key building blocks of good governance. 
The key features of the governance framework that were in place during 2025/26 are below: 
• The Cabinet was the key decision-making Committee, comprising the Leader of the Council, the
Depute Leader and four members of the Administration, each with a specific portfolio of duties. An
Education Cabinet comprised the same members and included church and teaching profession
representatives.

Page 57

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 49 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
• The Audit and Scrutiny Committee, which is chaired by the Leader of an Opposition party, was in
place to consider all matters in relation to Internal and External Audit, Risk Management, Scrutiny
and Performance, as well as receiving reports on the findings of external scrutiny bodies. An
annual self-evaluation was carried out in October 2025 and reported to the Audit and Scrutiny
Committee in November 2025, utilising the CIPFA publication ‘Audit Committees: Practical
Guidance for Local Authorities and Police – 2022’. A cross-party Policy Advisory Panel assists in
the development of policy proposals for consideration and approval by Cabinet. 
• Strategic decision-making is governed by the Council’s key constitutional documents including
standing orders, scheme of administration, scheme of delegation to officers and financial
regulations and associated codes of financial practice. These were refreshed and approved by the
Council in September 2025.
• The Council has six Locality Partnerships, covering Irvine, Kilwinning, the Three Towns, Arran, the
North Coast and the Garnock Valley. Chaired by a local Elected Member, the Partnerships provide
the opportunity for Elected Members, Community Planning Partners and local community
representatives to identify specific priorities for action in each area, with a corresponding action
plan prepared alongside regular progress reports. A review of the Council’s Locality Planning
framework was completed last year through a self-assessment process with stakeholders and a
number of improvement recommendations are currently being implemented. 
• The Health and Social Care Partnership has an established governance framework through the
Integration Joint Board and an integrated senior management structure to support delivery of its
key objectives.
• The Council’s mission, vision and key priorities are outlined in the Council Plan 2023-2028 which is
underpinned by a delivery plan and a range of performance indicators. Regular interim reports are
provided to both Cabinet and the Audit and Scrutiny Committee on progress towards meeting the
Council Plan priorities.
• Progress with the Council’s Transformation programme continues to be governed and monitored
through the Transformation Board which is chaired by the Chief Executive.
• The Performance Management Strategy 2023-2028 demonstrates how the Council supports a
culture of continuous improvement and how the work of every employee is crucial to the
achievement of the overall vision of a North Ayrshire that is Fair For All. Regular reporting to
Elected Members takes place, and a wide range of performance information is available on the
North Ayrshire Performance Dashboard.
• The Council has adopted a ‘Code of Conduct’ for all its employees. Elected Members adhere to
the national ‘Code of Conduct for Councillors’ and a register of interests is in place. Annual
refresher training on the Councillors' Code of Conduct is provided, and Standards Commission
updates are sent to Elected Members on a regular basis – when received from the Commission. 
• The approach to risk management is set out in the Risk Management Policy and Strategy: “Risk
Focus”. The Council’s strategic risk register is refreshed annually and for 2025/26 was approved
by Cabinet in March 2025. Monitoring of progress against action points is reported to the Audit and
Scrutiny Committee at the mid-year point.
• Each Head of Service has a Workforce Plan in place for their portfolio of services which considers
PESTLE, workforce interventions and organisational change activities. These plans are aligned to
the Council’s Corporate Workforce Planning strategy.
• The Council has in place a development programme for all Elected Members. Leadership and
Development interventions on a variety of topics are available in person and online for all
employees. Leadership and management development opportunities are available through the
Leadership Academy which is available for Leaders at all levels across the Council.

Page 58

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 50 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
• The ‘Our Time to Talk’ approach is in place to ensure that managers and employees take time to
discuss how each employee is getting on at work; this focusses on the employee’s contribution to
their team and the Council, their wellbeing, and any development needs that contribute towards
meeting the team’s objectives or the employee’s career aspirations.
• The Council’s approach to asset management planning is based on CIPFA guidance which covers
six core classes of assets: property, open space, housing, roads, fleet, and ICT. Asset
management plans continue to be maintained across each of these areas. The strategy and
associated plans were recently reviewed, updated, and approved by Cabinet in December 2025. 
• A Capital Programme and Assets Group, consisting of senior officers from across Council services
and chaired by the Head of Finance, is in place. This group monitors the delivery of the Council’s
capital programme, helping to ensure that projects are delivered on time and within budget. The
work of this group is supported by individual Service Project Boards.
• The Council has a long-term financial outlook, which covers the period 2024/25 to 2033/34. This
sets out the scale of the potential financial challenge and the approach to proactively address it,
ensuring financial sustainability of the Council over the long-term.
• The Council has Internal Audit and Corporate Fraud teams to carry out independent and objective
reviews of governance and internal control arrangements, and investigate allegations of fraud and
error both within and against the authority.
• An Information Governance framework is in place which complies with the General Data Protection
Regulation, supported by a central team of staff within Democratic Services. This is further
supported through an Information Governance Procurement Framework. A corporate training
module is in place to support ongoing training, development and awareness which is completed on
an annual basis.
• The Council has a robust Corporate Health, Safety and Wellbeing Policy to help ensure it complies
with health and safety legislation. A Corporate Health and Safety Group, consisting of Elected
Members and various stakeholders, meet every quarter. 
• An annual report is prepared for Cabinet by the Council’s statutory Chief Social Work Officer.
• The Council has a two-stage Complaints Procedure, which provides a transparent and
standardised process for customers who wish to complain and enables the Council to manage
complaints more effectively and to identify any service improvements which may be required. 
The governance framework has been in place at North Ayrshire Council throughout the year ended
31 March 2026.
The System of Internal Financial Control
The system of internal financial control is based on a framework of regular management information,
financial regulations, administrative procedures (including segregation of duties), management
supervision, and a system of delegation and accountability. Development and maintenance of the
system is undertaken by Chief Officers within the Council. In particular, the system includes: 
• Financial regulations and codes of financial practice.
• Comprehensive budgeting systems.
• Regular reviews of periodic and annual financial reports that indicate financial performance against
the forecasts.
• Setting targets to measure financial and other performance.
• Clearly defined capital expenditure guidelines.
• Formal project management disciplines.

Page 59

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 51 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The Council’s financial management arrangements conform to the governance requirements of the
Chartered Institute of Public Finance and Accountancy statement on ‘The Role of the Chief Financial
Officer in Local Government (2016)’.
Regarding the entities incorporated into the Group Accounts, the Council is not aware of any
weaknesses within their internal control systems and has placed reliance on the individual
Statements of Internal Financial Control where appropriate.
Review of Effectiveness of the Governance Framework
North Ayrshire Council has responsibility for conducting, at least annually, a review of the
effectiveness of its governance framework including the system of internal control. The review of the
effectiveness of the framework is informed by the work of the Executive Leadership Team who have
responsibility for development and maintenance of the governance environment, the annual report by
the Senior Manager (Audit, Fraud, Safety, Risk and Insurance) and reports from the Council’s
external auditors, Audit Scotland, and other review agencies.
The annual review of the Council’s governance framework was undertaken with reference to the
2016 CIPFA Good Governance Framework and confirmed that core governance arrangements and
structures are operating effectively, thereby providing the basis for the conclusion set out within the
statement. 
The Section 95 Officer has overall responsibility for Internal Audit in North Ayrshire Council. The
Senior Manager (Audit, Fraud, Safety, Risk & Insurance) is responsible for the management of the
section and reports directly to the Section 95 Officer on all audit matters, with the independent right of
access to the Chief Executive and Chair of the Audit and Scrutiny Committee. With effect from 1 April
2025 the Public Sector Internal Audit Standards were replaced by the Global Internal Audit
Standards. A self-assessment against the new standards has taken place as part of Internal Audit’s
quality assurance and improvement arrangements. The results of this will be reported in the Annual
Internal Audit report. An associated action plan, setting out the improvements to be implemented, will
be presented to the Audit & Scrutiny Committee during 2026/27. Regular reporting was made to the
Council’s Audit and Scrutiny Committee throughout 2025/26. 
As detailed in the Internal Audit Charter, approved by the Audit and Scrutiny Committee in March
2025, the Internal Audit function has independent responsibility for examining, evaluating, and
reporting on the adequacy of internal control. The Senior Manager (Audit, Fraud, Safety, Risk &
Insurance) prepares an annual report, including an assurance statement containing a view on the
adequacy and effectiveness of the governance, risk management and internal control frameworks.
This was reported to the Audit and Scrutiny Committee on 29 May 2025 and the 2025/26 Annual
Audit Report was presented to the 4 June 2026 Committee. 
The Internal Audit Annual Report 2025/26 highlights a number of findings by the Council’s Internal
Audit section. Action plans are put in place to address control weaknesses on conclusion of each
audit and implementation of audit actions is tracked on a quarterly basis by the Council’s Audit and
Scrutiny Committee. None of these are considered material enough to have a significant impact on
the overall control environment and it is the opinion of the Senior Manager (Audit, Fraud, Safety, Risk
and Insurance) that the Council’s systems of internal control continue to provide reasonable
assurance against loss.

Page 60

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 52 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
From 1 April 2025, the CIPFA ‘Code of Practice for the Governance of Internal Audit in UK Local
Government’, operating alongside the new standards, replaced CIPFA’s statement on ‘The Role
of the Head of Internal Audit (2019)’. The self-assessment undertaken against the new
standards incorporated a review of this Code and, together with an action plan being developed
to ensure full conformance, forms part of Internal Audit’s Quality Assurance and Improvement
Programme. 
The Council’s Audit & Scrutiny Committee continues to adopt a proactive approach to requesting
items for scrutiny. 
Significant Governance Developments during 2025/26
A number of significant governance related developments occurred during 2025/26. They include: -
Completed the annual review of the Council’s key governance documents including Standing
Orders relating to Meetings and Proceedings of the Council and Committees, Scheme of
Administration, Scheme of Delegation to Officers, Guidelines on Member / Officer Relations,
Standing Orders for Contracts, Financial Regulations and Codes of Financial Practice 2025. 
North Ayrshire Council Unaudited Annual Accounts for 2024/25 were approved at Council in
June 2025 and the Audited Accounts approved in September 2025 through the Audit and
Scrutiny Committee. 
Following Cabinet approval of an interim governance structure to develop a long-term town plan,
North Ayrshire Council approved elected member representation to the Irvine Town Board. The
Board will oversee development of a planned £20million investment for the area. 
The Council’s Housing Service completed an independent review of a number of key Annual
Return on the Charter indicators, which are reported to the Scottish Housing Regulator. This
resulted in further improvements in our approach to data collation, analysis and reporting. 
The HSCP formed a Finance Working Group to address the current financial pressures and
develop financial recovery plans and savings. 
The Council’s Best Value Section 102 report was carried out by Audit Scotland with the results
presented to Council in December 2025. The report noted that the findings were extremely
positive highlighting a culture of continuous improvement, a proactive approach to addressing
inequalities and an exemplar in how to do transformation well. 
The Best Value thematic review for Transformation was carried out by Audit Scotland with the
findings presented to the Audit and Scrutiny Committee in May 2025. 
The Medium-Term Financial Outlook covering the period 2025/26 to 2027/28 was presented to
Council in October 2024. This also included the launch of an extensive Budget engagement and
Consultation process across North Ayrshire communities. The feedback from which was
presented to Council in February 2025 in advance of the Budget. The process resulted in
several Petitions submitted from communities which were considered by the Council’s Cabinet
and Audit and Scrutiny Committee.

Page 61

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 53 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The Council’s General Services Revenue Estimates covering the period 2026/27 to 2028/29 (the
Budget) were approved on 25 February 2026. 
Approval by the Audit and Scrutiny Committee of the Code of Corporate Governance statement
for 2025/26. This set out details of how North Ayrshire Council complies with the Delivery of
Good Governance in Local Government Framework. Approval of the 2026/27 Code of Corporate
Governance took place in March 2026 at the Audit & Scrutiny Committee. 
Review of the Council’s main strategic risks delivered through the Council’s Cabinet and Audit
and Scrutiny committees. 
In February 2026, the Council approved a shared Economic Development Service model in
partnership with East Ayrshire Council. This revised service delivery model will go live in June 2026,
supported by the establishment of a Project Board to oversee the governance and implementation of
the service.
Planned Actions for 2026/27
The Council has a number of planned actions for 2026/27 which will help to further strengthen the
governance framework:
• Further support to the Health and Social Care Partnership in addressing the financial pressures
faced and ensuring appropriate reporting and governance arrangements are in place throughout
the year. Progress will initially be driven through the work of the Finance Working Group. 
• Following the development and approval of a Council Artificial Intelligence policy, further
evaluation of the effectiveness of the Council’s Artificial Intelligence pilot programmes. 
• Continuation of close monitoring of the Council’s Absence management performance and
governed through the Council’s Executive Leadership team. This remains an area of focus for the
Council. 
• Continued support for the governance of the Irvine Town Board and Ayrshire Growth Deal
programme as they continue to progress investment plans. 
• Further support and progress for the Pride In Place programme for the Three Towns covering
Stevenson, Saltcoats and Ardrossan. 
• Progress delivery of the Council’s Transformation programme across various project workstreams
including regional collaboration programmes across Ayrshire. This will be underpinned by
appropriate governance arrangements. 
• Development of the Council’s Medium-Term Financial Plan for the period 2027/28 to 2029/30
including a robust community and elected member engagement programme.

Page 62

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 54 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Assurance
Subject to the above, and based on the assurances provided, we consider the governance and
internal control environment operating during 2025/26 to provide reasonable and objective assurance
that any significant risks impacting on the achievement of our actions will be identified and actions
taken to avoid or mitigate their impact. Systems are in place to continually review and improve the
governance and internal control environment, and action plans are in place to address identified
areas for improvement. 
Craig Hatton Councillor Tony Gurney
Chief Executive  Leader of the Council    
24 June 2026      24 June 2026

Page 63

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 55 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Independent Auditor’s Report
Independent Auditor’s Report to the  e  ers o   orth Ayrshire
Council and the Accounts Commission
This page is intentionally blank

Page 64

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 56 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
This page is intentionally blank

Page 65

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 57 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
This page is intentionally blank

Page 66

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 58 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
This page is intentionally blank

Page 67

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 59 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Core Financial Statements
Comprehensive Income and Expenditure Statement
The Comprehensive Income and Expenditure Statement shows the accounting cost in the year of
providing services in accordance with generally accepted accounting practices, rather than the
amount to be funded from taxation or rents. North Ayrshire Council raises taxation and rents to cover
expenditure in accordance with statutory requirements, this may be different from the accounting
costs. 
Service Notes
Authority
Gross
Expend
2025/26
£ million 
Authority
Gross
Income
2025/26
£ million 
Authority
Net Expend
2025/26
£ million 
Group
Net Expend
2025/26
£ million 
Authority
Gross
Expend
2024/25
£ million 
Authority
Gross
Income
2024/25
£ million 
Authority
Net Expend
2024/25
£ million 
Group
Net Expend
2024/25
£ million
(restated)
Corporate Services None 28.079 (3.400) 24.679 24.679 26.728 (3.248) 23.480 23.480
Education None 151.075 (12.153) 138.922 138.922 256.080 (12.397) 243.683 243.683
Communities and
Housing None 37.197 (19.001) 18.196 18.311 35.766 (17.369) 18.397 18.747
Place None 108.442 (21.914) 86.528 86.528 126.812 (22.098) 104.714 104.714
Health and Social Care
Partnership None 329.397 (186.533) 142.864 142.864 316.929 (177.313) 139.616 139.616
Other Corporate Items None 41.308 (29.984) 11.324 11.324 50.359 (37.925) 12.434 12.434
Cost Of General Fund
Services None 695.498 (272.985) 422.513 422.628 812.674 (270.350) 542.324 542.674
Housing Revenue
Account None 53.625 (65.562) (11.937) (11.937) 66.710 (61.673) 5.037 5.037
Net Cost of Services None 749.123 (338.547) 410.576 410.691 879.384 (332.023) 547.361 547.711
Associates and joint
ventures accounted for
on an equity basis
None 0 0 0 (1.689) 0 0 0 (0.534)
Other Operating
Expenditure and Income 5 (0.225) 0 (0.225) (0.225) 0.801 0 0.801 0.801
Financing and Investment
Income and Expenditure 4 74.775 (82.106) (7.331) (7.589) 69.094 (67.363) 1.731 1.368
Taxation and Non-
Specific Grant Income 9 0 (498.518) (498.518) (498.518) 0 (472.584) (472.584) (472.584)
(Surplus) or Deficit on
Provision of Services None 823.673 (919.171) (95.498) (97.330) 949.279 (871.970) 77.309 76.762
Deficit / (Surplus) on the
revaluation of fixed
assets
30 0 0 (65.721) (65.165) 0 0 36.059 35.964
Remeasurement of the
Net Defined Pension
Asset and Liability
28 0 0 18.271 18.271 0 0 (2.056) (2.601)
Share of other
comprehensive
expenditure and income
of associates and joint
ventures
none 0 0 0 (0.599) 0 0 0 (0.223)
Other Comprehensive
Income and
Expenditure
None 0 0 (47.450) (47.493) 0 0 34.003 33.140
Total Comprehensive
Income and
Expenditure
None 823.673 (919.171) (142.948) (144.823) 949.279 (871.970) 111.312 109.902

Page 68

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 60 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Movement in Reserves Statement
The Movement in Reserves Statement shows the movement in the year on the different reserves
held by the Council, analysed into ‘usable’ reserves i.e. those which can be applied to fund
expenditure or reduce local taxation and ‘unusable’ reserves.
The Statement shows how the movements of the Council’s reserves in the year are broken down
between gains and losses incurred in accordance with generally accepted accounting practices and
the statutory adjustments required to return the amounts chargeable to Council Tax or rents for the
year.
Description Notes
General
Fund
Balance
£ million
Statutory
Housing
Revenue
Account
£ million
Capital and
Other
Reserves
£ million
Total
Usable
Reserves
£ million
Unusable
Reserves
£ million
Total
Authority
Reserves
£ million
ouncil’s
Share of
Group
Entity
Reserves
£ million
(restated)
Total Group
Reserves
£ million
(restated)
Balance at 31 March 2024 11, 30 93.385 20.566 12.389 126.340 710.137 836.477 47.865 884.342
Total Comprehensive
Expenditure and Income none (82.431) 5.122 0 (77.309) (34.003) (111.312) 1.410 (109.902)
Adjustments between
accounting basis and funding
basis under regulations
10 84.755 (3.547) (0.410) 80.798 (80.798) 0 0 0
Net increase or (decrease)
before transfers to other
statutory reserves
none 2.324 1.575 (0.410) 3.489 (114.801) (111.312) 1.410 (109.902)
Transfers to other statutory
reserves none (1.440) 0 1.440 0 0 0 0 0
Net Increase or (Decrease) none 0.884 1.575 1.030 3.489 (114.801) (111.312) 1.410 (109.902)
Balance at 31 March 2025 11,30 94.269 22.141 13.419 129.829 595.336 725.165 49.275 774.440
Total Comprehensive
Expenditure and Income none 75.346 20.152 0 95.498 47.450 142.948 1.875 144.823
Adjustments between
accounting basis and funding
basis under regulations
10 (61.107) (17.145) 0 (78.252) 78.252 0 0 0
Net increase or (decrease)
before transfers to other
statutory reserves
none 14.239 3.007 0 17.246 125.702 142.948 1.875 144.823
Transfers to other statutory
reserves none (0.763) 0 0.763 0 0 0 0 0
Net Increase or (Decrease) none 13.476 3.007 0.763 17.246 125.702 142.948 1.875 144.823
Balance at 31 March 2026 11, 30 107.745 25.148 14.182 147.075 721.038 868.113 51.150 919.263

Page 69

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 61 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Balance Sheet
The Balance Sheet is a snapshot of the value at the reporting date of the assets and liabilities
recognised by the Council. The net assets of the Council (assets less liabilities) are matched by the
reserves held by the Council. Reserves are reported as either Usable Reserves, i.e. those reserves
that the Council may use to provide services, subject to the need to maintain a prudent level of
reserves and any statutory limitations on their use, or Unusable Reserves, those reserves that the
Council is not able to use to provide services including those reserves that hold unrealised gains or
losses and reserves that hold differences shown in the Movement in Reserves Statement.
Description Notes
Authority
at 31 March
2026
£ million
Group
at 31 March
2026
£ million
Authority
at 31 March
2025
£ million
(restated)
Group
at 31 March
2025
£ million
(restated)
Property, Plant & Equipment 12 1,421.300 1,422.214 1,258.987 1,259.901
Investment Property 39 0 4.731 0 5.287
Heritage Assets 16 1.299 1.299 1.192 1.192
Intangible Assets 17 0 0 0 0
Long Term Investments 39 0 0.153 0 0.153
Investment in Associates
and Joint Ventures 39 0 36.504 0 34.216
Net Pension Fund Assets 28 0 0 0 0
Long Term Debtors 21 0.044 0.044 0.044 0.044
Long Term Assets none 1,422.643 1,464.945 1,260.223 1,300.793
Inventories 22 1.385 1.437 1.357 1.409
Assets Held for Sale 14 0.035 0.035 0.432 0.432
Short Term Investments 26 20.644 20.644 10.369 10.369
Short Term Debtors 19 43.907 44.664 37.275 37.994
Cash and Cash Equivalents 38 47.371 47.524 62.729 62.882
Current Assets none 113.342 114.304 112.162 113.086
Short Term Borrowing 23 (33.678) (27.249) (54.451) (48.196)
Short Term Creditors 24 (120.988) (119.319) (88.364) (86.626)
Short Term Provisions 25 (1.026) (1.026) (1.876) (1.876)
Current Liabilities none (155.692) (147.594) (144.691) (136.698)
Long Term Borrowing 26 (391.108) (391.108) (377.608) (377.608)
Long Term Creditors 26 (101.627) (101.686) (104.854) (104.913)
Net Pension Fund Liabilities 28 (19.445) (19.598) (20.067) (20.220)
Long Term Liabilities none (512.180) (512.392) (502.529) (502.741)
Net Assets none 868.113 919.263 725.165 774.440
Usable Reserves 11 147.075 147.075 129.829 129.829
Unusable Reserves 30 721.038 721.038 595.336 595.336
Group Reserves 39 0 51.150 0 49.275
Total Reserves none 868.113 919.263 725.165 774.440 
The unaudited accounts were issued on 
24 June 2026.   
Mark Boyd, 
Head of Finance
24 June 2026

Page 70

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 62 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Cash Flow Statement
The Cash Flow Statement shows the changes in cash and cash equivalents of the Council during
the reporting period. The statement shows how the Council generates and uses cash and cash
equivalents by classifying cash flows as operating, investing and financing activities.
The amount of net cash flows arising from operating activities is a key indicator of the extent to which
the operations of the Council are funded by way of taxation and grant income or from the recipients of
services provided by the Council. 
Investing activities represent the extent to which cash outflows have been made for resources which
are intended to contribute to the Council’s future service delivery. This includes expenditure on
capital investment and income from capital receipts and grants.
Cash flows arising from financing activities are useful in predicting claims on future cash flows by
providers of capital (i.e. borrowing) to the Council and include any repayment of borrowing or new
borrowing made during the year.
The Council’s share of the cash flows of its associates and joint ventures is disregarded for the
purpose of this statement as their reserves are not available to fund services. 
Description Notes
Authority
2025/26
£ million
Group
2025/26
£ million
Authority
2024/25
£ million
Group
2024/25
£ million
(restated)
Net deficit on the provision of services none (95.498) (97.330) 77.309 76.762
Adjust for (surplus) or deficit attributable to
Associates and Joint Ventures 39 0 1.689 0 0.534
Adjust for net (surplus) or deficit on the
provision of services for non-cash movements 35 (18.453) (18.310) (171.221) (171.208)
Adjust for items included in the net deficit on
the provision of services that are investing and
financing activities
35 38.226 38.484 37.328 37.278
Net cash flows from Operating Activities none (75.725) (75.467) (56.584) (56.634)
Investing Activities 36 72.552 72.294 127.180 127.128
Financing Activities 37 18.531 18.531 (105.969) (105.927)
Net (increase) or decrease in Cash and
Cash Equivalents none 15.358 15.358 (35.373) (35.433)
Cash and Cash Equivalents at the beginning of
the reporting period none (62.729) (62.882) (27.356) (27.449)
Cash and Cash Equivalents at the end of
the reporting period 38 (47.371) (47.524) (62.729) (62.882)

Page 71

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 63 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Supplementary Statements
Housing Revenue Account
The Housing Revenue Account Income and Expenditure Statement shows the cost in the year of
providing housing services after making the necessary accounting entries in line with generally
accepted accounting practices, rather than the amount to be funded from rents and government
grants.  Councils charge rents to cover expenditure in accordance with regulations, this may differ
from the accounting cost.  The increase or decrease in the year, on the basis of which rents are
raised, is shown in the Movement on the Housing Revenue Account Statement. 
Housing Revenue Account Income and Expenditure
Statement
2025/26
£ million
2024/25
£ million
Dwelling Rents (62.976) (59.490)
Non-dwelling Rents (0.128) (0.159)
Other Income (0.688) (0.487)
Total Income (63.792) (60.136)
Repairs and Maintenance 24.971 23.696
Supervision and Management 11.794 9.844
Depreciation and Impairment on Non-Current Assets 14.660 30.569
Bad Debts and movement in Bad Debt Provision 0.384 1.038
Rent, Rates, Taxes and Other Charges 0.013 0
Sums directed by Scottish Government Ministers that are
expenditure in accordance with International Financial Reporting
Standards
0.032 0.026
Total Expenditure 51.854 65.173
Net (Income) or Expenditure on Services as included in the
Comprehensive Income and Expenditure Statement (11.938) 5.037
Corporate and Democratic Core 0.105 0.093
Net Income for Housing Revenue Account Services (11.833) 5.130
Taxation and Non-Specific Grant Income and Expenditure (15.041) (15.513)
(Gain) or Loss on Sale of Non-Current Assets 0 (0.012)
Interest Payable and Similar Charges 7.757 6.702
Interest and Investment Income (0.273) (0.989)
Pension Interest Cost and Expected Return on Pension Assets (0.762) (0.440)
Total (20.152) (5.122) 
The Council’s total housing stock at 31 March 2026 was 13,402 (13,410 at 31 March 2025) in the
following categories:
Stock One
Bedroom
Two
Bedroom
Three
Bedroom
Four
Bedroom
Five
Bedroom
Six
Bedroom Total
31 March
2026 3,033 6,031 3,901 433 3 1 13,402
31 March
2025 3,056 6,012 3,901 437 3 1 13,410

Page 72

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 64 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Movement on the Housing Revenue Account Statement 
Movement on the Housing Revenue Account Statement 2025/26
£ million
2024/25
£ million
(Surplus) or Deficit for the Year on Housing Revenue Account
Income and Expenditure Statement (20.152) (5.122)
Adjustments between Accounting Basis and Funding Basis
under statute 17.145 3.547
(Increase) or Decrease in Year on the Housing Revenue
Account (3.007) (1.575)
Balance on the Housing Revenue Account at 1 April (22.141) (20.566)
Balance on the Housing Revenue Account at 31 March (25.148) (22.141) 
Statutory Adjustments between Accounting Basis and Funding Basis 
Statutory adjustments between Accounting Basis and
Funding Basis
2025/26
£ million
2024/25
£ million
Depreciation and Impairment (14.660) (30.569)
Repayment of Debt 6.956 6.137
Capital grants and contributions applied to capital financing 15.042 15.513
Share of contributions to the Pensions Reserve 0.422 (0.016)
Share of transfer to the Financial Instruments Adjustment 0.323 0.439
Difference between any other item of income and expenditure
determined in accordance with the Code and determined in
accordance with statutory Housing Revenue Account
requirements
(0.008) (0.002)
Total Transfers to the Capital Adjustment Account 8.075 (8.498)
Gain or (Loss) on sale of non-current assets 0 0.012
Capital expenditure funded by the Housing Revenue Account 9.070 12.033
Total Adjustments between Accounting Basis and Funding
Basis under statute 17.145 3.547
Other Information 
Other Information 2025/26 2024/25
Average weekly rent (52 weeks) £91.13 £87.75
Bad debts written off in respect of former tenants - £0.804 million
Total Rent Arrears £5.446 million £5.066 million
Bad Debt Provision - housing rents £1.895 million £1.895 million
Bad Debt Provision - other debtors £1.672 million £1.287 million
Void Rent Loss £0.629 million £0.316 million

Page 73

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 65 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Common Good and Trusts 
Common Good 
The Common Good Funds administered by the Council are for the general benefit of its communities.
They were established either by Royal Charter or by former authorities.
In North Ayrshire, six funds exist for the former burghs of Ardrossan, Irvine, Largs, Millport, Saltcoats
and Stevenston. Under the current policy, all properties owned by the Common Good Funds are
investment properties and are held to generate an income which can be utilised to benefit the
communities covered by each Fund. The income generated from rentals, or the investment of any
capital sums held, are utilised to meet any expenditure commitments in relation to the maintenance of
the assets or the administration of the Funds. Any balance of income after meeting these expenditure
commitments is made available annually for disbursements in the form of grants to groups and
individuals based within the relevant communities. Any proposals for the disbursement of funds from
the capital balances held by each Common Good Fund requires the approval of North Ayrshire
Council. 
Movement in
Reserves Statement Ardrossan
£million
Irvine
£million
Largs
£million
Millport
£million
Saltcoats
£million
Stevenston
£million
Total
2025/26
£million
Total
2024/25
£million
Balance at 1 April 0.797 3.039 1.129 0.073 0.015 0.309 5.362 5.115
Surplus or (Deficit)
For the Year 0.050 (0.203) (0.002) 0.001 (0.003) 0.023 (0.134) 0.112
Surplus or (Deficit) on
the Revaluation of
Fixed Assets
(0.011) (0.397) (0.019) 0 0 (0.001) (0.428) 0.135
Balance at 31 March 0.836 2.439 1.108 0.074 0.012 0.331 4.800 5.362
Income and
Expenditure
Account
Ardrossan
£million
Irvine
£million
Largs
£million
Millport
£million
Saltcoats
£million
Stevenston
£million
Total
2025/26
£million
Total
2024/25
£million
Income (0.055) (0.122) (0.032) (0.003) (0.001) (0.026) (0.239) (0.246)
Expenditure 0.005 0.325 0.034 0.002 0.004 0.003 0.373 0.134
(Surplus) or Deficit
For the Year (0.050) 0.203 0.002 (0.001) 0.003 (0.023) 0.134 (0.112)
(Surplus) or Deficit
Brought Forward (0.412) (1.144) (0.457) (0.073) (0.014) (0.229) (2.329) (2.217)
Accumulated
(Surplus) or Deficit
as at 31 March
(0.462) (0.941) (0.455) (0.074) (0.011) (0.252) (2.195) (2.329)

Page 74

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 66 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Balance Sheet Ardrossan
£million
Irvine
£million
Largs
£million
Millport
£million
Saltcoats
£million
Stevenston
£million
31 March
2026
£million
31 March
2025
£million
Investment Properties 0.374 1.498 0.654 0 0 0.079 2.605 3.033
Cash invested in
North Ayrshire Council
on behalf of the funds
0.462 0.941 0.455 0.074 0.011 0.252 2.195 2.329
Net Assets 0.836 2.439 1.109 0.074 0.011 0.331 4.800 5.362
Unusable Reserves (0.374) (1.498) (0.654) 0 0 (0.079) (2.605) (3.033)
Common Good
Balance (0.462) (0.941) (0.455) (0.074) (0.011) (0.252) (2.195) (2.329)
Total Reserves (0.836) (2.439) (1.109) (0.074) (0.011) (0.331) (4.800) (5.362)
Details of the properties held by the Common Good Funds are listed on the Common Good Asset
Register. The balances reported above do not represent assets available to the Council. As such,
these balances have been included in the Council’s balance sheet under creditors.  None of the
Common Good Funds are registered charities. 
Trusts
The Trusts administered by the Council do not represent assets available to the Council.  As such,
these cash balances have been included in the Council’s balance sheet under creditors.  The Trust
statement below is prepared on an accruals basis.  This differs from the Trustees’ Annual Reports,
required by the Office of the Scottish Charity Regulator where the Council is sole trustee, which are
prepared on a receipts and payments basis.  A Trustees’ Annual Report has been prepared for all
trusts except ‘Other Bequests’, which are not registered with the Office of the Scottish Charity
Regulator.
Income and
Expenditure
Account
North
Ayrshire
Charitable
Trust
£million
Town
Trusts
£million
Douglas
Sellers
Trust
£million
Anderson
Park Trust
£million
Margaret
Archibald
Trust
£million
Other
Bequests
£million
Total
2025/26
£million
Total
2024/25
£million
Surplus at 1 April (0.120) (0.010) (0.001) (0.001) (0.209) (0.041) (0.382) (0.398)
Income (0.008) 0 0 0 (0.077) (0.002) (0.087) (0.027)
Expenditure 0.001 0.004 0 0 0.018 0 0.023 0.043
(Surplus) or Deficit
at 31 March (0.007) 0.004 0 0 (0.059) (0.002) (0.064) 0.016
Accumulated
Surplus as at 31
March
(0.127) (0.006) (0.001) (0.001) (0.268) (0.043) (0.446) (0.382)

Page 75

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 67 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Balance Sheet
North
Ayrshire
Charitable
Trust
£million
Town
Trusts
£million
Douglas
Sellers
Trust
£million
Anderson
Park Trust
£million
Margaret
Archibald
Trust
£million
Other
Bequests
£million
31 March
2026
£million
31 March
2025
£million
Investment Properties 0.116 0 0 0 0 0 0.116 0.110
Investments 0.013 0 0 0 0.140 0 0.153 0.153
Cash invested in
North Ayrshire Council
on behalf of the funds
0.114 0.006 0.001 0.001 0.128 0.043 0.293 0.229
Net Assets 0.243 0.006 0.001 0.001 0.268 0.043 0.562 0.492
Unusable Reserves (0.116) 0 0 0 0 0 (0.116) (0.110)
Common Good
Balance (0.127) (0.006) (0.001) (0.001) (0.268) (0.043) (0.446) (0.382)
Total Reserves (0.243) (0.006) (0.001) (0.001) (0.268) (0.043) (0.562) (0.492) 
Trust Purpose of funds
North Ayrshire
Charitable
Trust
For the prevention or relief of poverty, the provision of recreational facilities, or the
organisation of recreational activities, with the object of improving the conditions
of life for the persons for whom the facilities or activities are primarily intended
and the relief of those in need by reason of age, ill health, disability, financial
hardship or other disadvantage; and for the upkeep of war memorials and for the
encouragement and promotion of education.
Town Trusts For the prevention or relief of poverty, the provision of recreational facilities, or the
organisation of recreational activities, with the object of improving the conditions
of life for the persons for whom the facilities or activities are primarily intended
and the relief of those in need by reason of age, ill health, disability, financial
hardship or other disadvantage.
Douglas
Sellers Trust
For the provision of recreational facilities, or the organisation of recreational
activities in the Burgh of Irvine.
Anderson Park
Trust
For the provision of recreational facilities, or the organisation of recreational
activities in the Burgh of Largs.
Margaret
Archibald Trust
For the relief of those in need aged 65 years and over and who reside in the
Parish of Dalry.
Other
Bequests
For the provision of school prizes at designated schools (Education Bequests); or
for the maintenance of specific lairs within cemeteries (Burial Trusts); or other
sundry purposes.

Page 76

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 68 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Non-Domestic Rates Account
The Non-Domestic Rates Account is a statement that shows the gross income from rates and
deductions made under statute. The net income is paid to the Scottish Government as a contribution
to the National Non-Domestic Rates pool. 
The table below details the actual levels of National Non-Domestic Rates collected by North Ayrshire
Council, and the overall difference between the rates collected and the amount that the Council is
entitled to receive under the national pooling arrangement.
Non-Domestic Rates Account
2025/26
£ million
2024/25
£ million
(restated)
Gross rates levied 63.751 64.818
Reliefs and other deductions (15.823) (15.719)
Write-offs of Uncollectable debts and allowance for impairment (0.682) (0.665)
Net Non-Domestic Rate Income 47.246 48.434
Adjustment for years prior to the introduction of the pool (5.079) (5.153)
Net contribution to National Non-Domestic Rate pool 1.956 (0.152)
Net NDR Income transferred to General Fund 44.123 43.129
Non Domestic Rates Income Retained (NDRIS) 0.020 0.024
Net Non-Domestic Rates Income transferred to General
Fund 44.143 43.153 
The Non-Domestic Rates Incentivisation Scheme (NDRIS) permits the authority to retain half of the
NDR income which exceeds the income target set by the Scottish Government. Under NDRIS 2024-
2027, the Scottish Government has confirmed that North Ayrshire Council's final growth target for
2025/26 is 0.8% and the provisional growth target for 2026/27 is 0.8%.
Net Rateable Value Calculation
The amount paid for National Non-Domestic Rates is determined by the rateable value placed on the
property by the Assessor multiplied by the rate per pound, which is determined each year by the
Scottish Government.  
The National Non-Domestic Rates poundage rate set by the Scottish Government for 2025/26 was
56.8p for subjects with a rateable value more than £100,000, 55.4p for subjects with a rateable value
of more than £51,000 but equal to or less than £100,000 and 49.8p for subjects with a rateable value
equal to or less than £51,000.

Page 77

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 69 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
North Ayrshire Council Rateable Values at 1 April 2025 £ million
Commercial 80.100
Industrial and Freight Transport 35.043
Public Undertakings 4.323
Others 2.830
Less: Part Residential and Fishing Rights rateable values not billed for (0.253)
Total 122.043 
Analysis of Rateable Values
2025/26
£ million
Rateable Value at 1 April 2025 122.043
Adjustments (Full Year Rateable Value) (3.022)
Rateable Value at 31 March 2026 119.021
Less: Wholly Exempt Subjects (1.122)
Net Rateable Value at 31 March 2026 117.899

Page 78

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 70 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Council Tax Account
The Council Tax Account shows the gross income raised from council taxes levied and deductions
made under Statute.  
The resultant net income is transferred to the Comprehensive Income and Expenditure Statement of
the Council.
Local authorities raise taxes from their residents through Council Tax, which is a tax linked to
property values.  Each dwelling in a local Council area is placed into one of eight valuation bands (A
to H).  
The Council determines the annual tax for a band D property and all other properties are charged a
proportion of this, with lower valued properties (bands A to C) paying less and higher valued
properties (bands E to H) paying more. 
Council Tax Account
2025/26
£ million
2024/25
£ million
Gross Council Tax levied and contributions in lieu 101.760 94.432
Adjustment for prior years Council Tax 0.532 0.848
Total 102.292 95.280
Council Tax Reduction (15.178) (14.159)
Other discounts and reductions (11.072) (12.226)
Provision for Non-collection (3.058) (2.755)
Net Council Tax Income transferred to General Fund 72.984 66.140 
North Ayrshire Council Tax per Band
Based on the Council Tax base available to North Ayrshire Council, the band D charge for 2025/26
was £1,553.77 (2024/25: £1452.12). 
Band
2025/26
£
2024/25
£
A 1035.84 968.08
B 1208.48 1129.42
C 1381.12 1290.77
D 1553.77 1452.12
E 2041.48 1907.92
F 2524.87 2359.69
G 3042.79 2843.73
H 3806.73 3557.69

Page 79

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 71 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Calculation of Council Tax Base
Properties can be exempt if they are unoccupied or occupied by certain categories of resident. A reduction may be applied if a
resident is disabled. A discount of 25% is available for properties occupied by one liable person aged 18 or over. 
Council
Tax
Bands
Number of
Dwellings
Number of
Exempt
Dwellings
Disabled
Relief Discounts
Council
Tax
Reduction
Total
Number of
Dwellings
Ratio to
Band D
2025/26
Band D
Equivalent
Dwellings
2024/25
Band D
Equivalent
Dwellings
A* 0 0 (41) 5 28 8 56% 5 6
A 21,529 1,038 (46) 3,268 6,780 10,489 67% 6,993 6,977
B 18,733 564 41 2,212 4,145 11,771 78% 9,156 9,104
C 7,845 231 (1) 1,015 1,114 5,486 89% 4,876 4,819
D 7,521 158 (63) 796 499 6,131 100% 6,131 6,043
E 9,367 173 72 766 277 8,079 131% 10,616 10,487
F 4,338 65 23 278 80 3,892 163% 6,325 6,256
G 1,292 18 15 76 20 1,163 196% 2,277 2,240
H 61 0 0 5 0 56 245% 137 127
Total 70,686 2,247 0 8,421 12,943 47,075 46,516 46,059 
Council Tax Base Band D Equivalents 2025/26 2024/25
Total Band D Equivalent Dwellings 46,516 46,059
Contributions in respect of classes 17 and 24 dwellings: Band D equivalent 4 4
Sub Total 46,520 46,063
Less Bad Debt Provision at 4% (1,861) (1,843)
Total Council Tax Base Band D Equivalents 44,659 44,220

Page 80

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 72 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Notes to the Accounts
Notes to the Comprehensive Income and Expenditure Statement
Note 1: Expenditure and Funding Analysis
The Expenditure and Funding Analysis shows how annual expenditure is used and funded from
resources (government grants, rents, council tax and business rates) by the Council in comparison
with those resources consumed or earned by the Council in accordance with generally accepted
accounting practices. It also shows how this expenditure is allocated between the Council’s services.
Income and expenditure accounted for under generally accepted accounting practices is presented
more fully in the Comprehensive Income and Expenditure Statement. 
2025/26
Expenditure Financing Account
Net Expenditure
Chargeable to the
General Fund and
Housing Revenue
Account balances
£ million
Adjustments
between Funding
and Accounting
Basis
£ million
Net Expenditure
in the
Comprehensive
Income and
Expenditure
Statement
£ million
Corporate Services 21.767 2.912 24.679
Education 192.050 (53.128) 138.922
Communities and Housing 16.344 1.852 18.196
Place 58.371 28.157 86.528
Health and Social Care Partnership 140.858 2.006 142.864
Other Corporate Items 10.796 0.528 11.324
Cost of General Fund Services 440.186 (17.673) 422.513
Housing Revenue Account (3.007) (8.930) (11.937)
Net Cost of Services 437.179 (26.603) 410.576
Other Income and Expenditure (454.425) (51.649) (506.074)
(Surplus) or Deficit on the
Provision of Services (17.246) (78.252) (95.498)
Movement on General Fund and Housing Revenue Account Balances
2025/26
£ million
General Fund and Housing Revenue Account Balance at 1 April 2025 (116.410)
(Surplus) or Deficit on the Provision of Services (17.246)
Transfers to or from Other Statutory Services 0.763
General Fund and Housing Revenue Account Balance at 31 March 2026
(Note 11) (132.893)

Page 81

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 73 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
2024/25 
Expenditure Financing Account
Net Expenditure
Chargeable to
the General
Fund and
Housing
Revenue
Account
balances
£ million
Adjustments
between
Funding and
Accounting
Basis
£ million
Net Expenditure
in the
Comprehensive
Income and
Expenditure
Statement
£ million
Corporate Services 19.936 3.544 23.480
Education 175.995 67.688 243.683
Communities and Housing 15.231 3.166 18.397
Place 57.127 47.587 104.714
Health and Social Care Partnership 135.243 4.373 139.616
Other Corporate Items  8.350 4.084 12.434
Cost of General Fund Services 411.882 130.442 542.324
Housing Revenue Account (1.575) 6.612 5.037
Net Cost of Services 410.307 137.054 547.361
Other Income and Expenditure (414.206) (55.846) (470.052)
(Surplus) or Deficit on the
Provision of Services (3.899) 81.208 77.309 
Movement on General Fund and Housing Revenue Account Balances
2024/25
£ million
General Fund and Housing Revenue Account Balance at 1 April 2024 (113.951)
(Surplus) or Deficit on the Provision of Services (3.899)
Transfers to or from Other Statutory Services 1.440
General Fund and Housing Revenue Account Balance at 31 March 2025
(Note 11) (116.410) 
For statutory accounting purposes, the following adjustments are required to be included within the
Comprehensive Income and Expenditure Statement. 
These adjustments are not charged to the Council for Council Tax or Rent setting purposes and are
excluded from the General Fund and Housing Revenue Account Balances available to support
services.

Page 82

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 74 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
2025/26
Adjustments from the General Fund
to arrive at the Comprehensive
Income and Expenditure Statement
amounts
Adjustments
for Capital
Purposes
(Note A)
£ million
Net Change
for Pension
Adjustments
(Note B)
£ million
Other
Differences
(Note C)
£ million
Total
Adjustments
£ million
Chief Executive 1.673 1.088 0.151 2.912
Education (52.641) 3.074 (3.561) (53.128)
Communities and Housing 0.785 1.534 (0.467) 1.852
Place 28.419 1.780 (2.042) 28.157
Health and Social Care Partnership 0.265 4.797 (3.056) 2.006
Other Corporate Items (2.450) (0.766) 3.744 0.528
Cost of General Fund Services (23.949) 11.507 (5.231) (17.673)
Housing Revenue Account (16.409) (0.423) 7.902 (8.930)
Net Cost of Services (40.358) 11.084 2.671 (26.603)
Other Income and Expenditure (19.823) (29.977) (1.849) (51.649)
Difference between the General
Fund surplus and the
Comprehensive Income and
Expenditure Statement Surplus or
Deficit
(60.181) (18.893) 0.822 (78.252)
2024/25
Adjustments from the General Fund
to arrive at the Comprehensive
Income and Expenditure Statement
amounts
(Restated)
Adjustments
for Capital
Purposes
(Note A)
£ million
Net Change
for Pension
Adjustments
(Note B)
£ million
Other
Differences
(Note C)
£ million
Total
Adjustments
£ million
Chief Executive 2.003 1.455 0.086 3.544
Education 66.725 4.210 (3.247) 67.688
Communities and Housing 0.833 2.180 0.153 3.166
Place 47.430 2.425 (2.268) 47.587
Health and Social Care Partnership 0.369 6.616 (2.612) 4.373
Other Corporate Items 0.003 0.253 3.828 4.084
Cost of General Fund Services 117.363 17.139 (4.060) 130.442
Housing Revenue Account (3.126) 0.016 9.722 6.612
Net Cost of Services 114.237 17.155 5.662 137.054
Other Income and Expenditure (32.324) (18.215) (5.307) (55.846)
Difference between the General
Fund surplus and the
Comprehensive Income and
Expenditure Statement Surplus or
Deficit
81.913 (1.060) 0.355 81.208

Page 83

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 75 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Note A Adjustments for Capital Purposes
This column includes depreciation and impairment of non-current assets, amortisation of intangible
assets, capital grants and contributions which have been applied to capital financing, gains and
losses on the disposal of non-current assets, statutory charges for the financing of capital investment,
capital expenditure charged against the General Fund and Housing Revenue Account balances and
any adjustments involving the Capital Fund. 
Note B Pensions Adjustments 
Net change for the removal of pension contributions and the addition of International Accounting
Standard 19 Employee Benefits pension related expenditure and income.  This represents the
removal of the employer pension contributions made by the Council as allowed by statute and the
replacement with current service costs and past service costs; and the net interest on the defined
benefit liability charged to the Comprehensive Income and Expenditure Statement. 
Note C Other Differences 
Other differences between amounts debited or credited to the Comprehensive Income and
Expenditure Statement and amounts payable or receivable to be recognised under statute include
the amount by which finance costs charged to the Comprehensive Income and Expenditure
Statement are different from finance costs chargeable in the year in accordance with statutory
requirements, the amount by which officer remuneration charged to the Comprehensive Income and
Expenditure Statement on an accruals basis is different from remuneration chargeable in the year in
accordance with statutory requirements and the removal of the impact of internal recharges and
Agency transactions in accordance with Code requirements.

Page 84

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 76 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Note 2: Expenditure and Income Analysed by Nature
This note details the subjective analysis of the Gross Income and Expenditure reported on the Comprehensive income and
Expenditure Statement. 
Expenditure and
Income by Nature
Chief
Executive
£ million
Education
£ million
Communities
and Housing
£ million
Place
£ million
Health and
Social Care
Partnership
£ million
Other
Corporate
Items
£ million
Housing
Revenue
Account
£ million
Outwith
Services
£ million
2025/26
Total
£ million 
2024/25
Total
£ million
Employee Benefits
Expenses 19.007 166.170 29.935 34.174 89.120 0.981 5.724 0 345.111 336.902
Other Service Expenses 7.399 29.288 6.477 41.569 240.012 42.777 33.241 0 400.763 394.550
Depreciation,
Amortisation and
Impairment
1.673 (44.383) 0.785 32.699 0.265 (2.450) 14.660 0 3.249 147.932
Interest Payments 0 0 0 0 0 0 0 74.775 74.775 69.094
Losses on Disposal of
Assets 0 0 0 0 0 0 0 (0.225) (0.225) 0.801
Total Expenditure 28.079 151.075 37.197 108.442 329.397 41.308 53.625 74.550 823.673 949.279
Fees, Charges and
Other Service Income (3.400) (12.153) (19.001) (21.914) (186.533) (29.984) (65.562) (0.000) (338.547) (332.023)
Interest and Investment
Income 0 0 0 0 0 0 0 (82.106) (82.106) (67.363)
Council Tax 0 0 0 0 0 0 0 (72.984) (72.984) (66.140)
Government Grants and
Contributions 0 0 0 0 0 0 0 (425.534) (425.534) (406.444)
Total Income (3.400) (12.153) (19.001) (21.914) (186.533) (29.984) (65.562) (580.624) (919.171) (871.970)
(Surplus) or Deficit on
the Provision of
Services
24.679 138.922 18.196 86.528 142.864 11.324 (11.937) (506.074) (95.498) 77.309

Page 85

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 77 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Revenue from Contracts with Service Recipients
Income from service recipients is recognised as performance obligations are satisfied, normally as
services are rendered or goods are provided. North Ayrshire Council has examined the revenue
received from contracts with service recipients and has determined that the disclosure of Fees,
Charges and Other Service Income provides sufficient information and there are no other material
income factors requiring further disclosures.  New income streams will be reviewed on an annual
basis.
Note 3: Material Items
The Comprehensive Income and Expenditure Statement includes a surplus on the revaluation of our
Housing stock of £25.4 million. The valuation of our Housing stock is reviewed annually by the UK
Government’s District Valuer Service. As part of the 2025/26 valuation review, the District Valuer has
reported an increase in the Adjustment Factor which is applied to the open market value of the
Housing stock to account for its Social Housing value with a sitting tenant, rather than at vacant
possession. The District Valuer has indicated that the Adjustment Factor has increased from 44.88%
to 46.61%, as a direct result of the proportionately higher increase in North Ayrshire Council rents
compared to their market equivalents over the same period.
During 2025/26, North Ayrshire Council issued Housing Benefit payments of £25.9 million and
received funding of (£25.5 million), (2024/25: payments of £33.4 million and funding of (£33.5
million)). Details of the subsidy income received and all other items of material grant income are
included in Note 9 on page 81.
Note 4: Financing and Investment Income and Expenditure
Financing and Investment Income and Expenditure 2025/26
£ million
2024/25
£ million
Interest payable and similar charges 24.769 22.118
Pensions interest cost and expected return on pensions assets (30.739) (18.655)
Interest receivable and similar income (1.361) (1.732)
Total (7.331) 1.731 
Note 5: Other Operating Expenditure and Income 
Other Operating Expenditure and Income 2025/26
£ million
2024/25
£ million
(Gains)/losses on the disposal of non current assets (0.225) 0.801
Total (0.225) 0.801

Page 86

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 78 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Note 6: Agency Services 
The Council has received the following fee income in relation to the collection of water rates on behalf
of Scottish Water: 
Agency Income - Scottish Water 2025/26
£ million
2024/25
£ million
Agency income from Scottish Water (0.614) (0.606)
Cost of Collection associated with Scottish Water income 0.099 0.092 
Grants related to the payments to businesses and individuals in relation to the following schemes: 
Agency Grants Issued 2025/26
£ million
2024/25
£ million
Homes for Ukraine Scheme Household Thank You Payment Grant 0.061 0.085 
The Council also bills and collects Non-Domestic Rates on behalf of the Scottish Government. During
2025/26 the Council collected £42.167 million which was increased by (£1.956 million) from the
National Non-Domestic Rates Pool and a further £0.020m from the Non Domestic Rates
Incentivisation Scheme (2024/25: £43.281 million (restated) and reduction of (£0.152 million)
(restated) and a further £0.024m).
Note 7: External Audit Fees
The Council has incurred the following costs in relation to the audit of the Statement of Accounts,
certification of grant claims and statutory inspections provided by the Council’s external auditor: 
External Audit Fees 2025/26
£ million
2024/25
£ million
Fees payable with regard to external audit services carried out
by the appointed auditor for the year 0.403 0.385
Total 0.403 0.385 
Note 8: Leases
In 2025/2026, the Council has applied IFRS 16 Leases as adopted by the Code of Accounting Practice.
The main impact of the new requirements is that, for arrangements previously accounted for as
operating leases (i.e. without recognising the leased property as an asset and future rents as liability),
a right-of-use asset and a lease liability are to be brought into the balance sheet at 1 April 2025. Leases
for items of low value and leases that expire on or before 31 March 2025 are exempt from the new
arrangements. 
Council as Lessee
As a lessee, the Council previously classified leases as operating or finance leases based on its
assessment of whether the lease transferred significantly all of the risks and rewards incidental to
ownership of the underlying asset to the Council. Under IFRS16, the Council recognises right-of-use
assets and lease liabilities for most leases – i.e. these leases are on-balance sheet.

Page 87

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 79 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The Council decided to apply recognition exemptions to short-term leases and has elected not to
recognise right-of-use assets and lease liabilities for short term leases that have a term of 12 months
or less and leases of low value assets. The Council recognises the lease payments associated with
these leases as an expense on a straight-line basis over the lease term. The weighted average of the
incremental borrowing rates used to discount liabilities was 5.0 %
Right of Use Assets
The table below shows the change in the value of right-of-use assets held under leases by the
Council: 
Right of Use Assets Other Land
and Buildings
£ million
Vehicles, Plant
and
Equipment
£ million
2025/26
Total
£ million
Balance at 1 April 0.384 0.025 0.409
Additions 0 0 0
Revaluations 0.663 0.028 0.691
Depreciation 0.235 0.027 0.262
Disposals 0 0 0
Total 0.812 0.026 0.838 
The right of use assets recognised are a suite of fitness equipment, waste equipment and a fleet of
electric vehicles, with typical lives of between three and five years. The Council also leases a number
of other properties and pieces of land.
Transactions under leases
The Council incurred the following expenses and cash flows in relation to leases: 
Comprehensive income and expenditure statement 2025/26
£ million
2024/25
£ million
Interest expense on lease liabilities 0.029 0.016
Expense relating to short-term leases 0 0.039
Expense relating to exempt leases of low-value items 0.046 0.048
Cash flow statement 2025/26
£ million
2024/25
£ million
Total cashflow for leases 0.19 0.151
Cash payments for interest portion of lease liabilities 0.029 0.016
Low value lease payments where exemptions taken 0.046 0.047 
Maturity analysis of lease liabilities
The lease liabilities are due to be settled over the following time bands (measured at the
undiscounted amounts of expected payments):

Page 88

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 80 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Future Lease Liabilities 2025/26
£ million
2024/25
£ million
Not later than one year 0.215 0.136
Later than one year and not later than five years 0.402 0.093
More than five years 0.310 0.057
Total Undiscounted Liabilities 0.927 0.286 
Council as Lessor
The Council is not required to make any adjustment on transition to IFRS16 for leases in which it acts
as a lessor. 
Operating Leases
The Council leases out property under non-cancellable, operating leases for the provision of
community services, such as leisure facilities, and for economic development purposes to provide
suitable affordable premises for local businesses. 
The minimum lease payments receivable under non-cancellable leases in future years are shown in
the table below. (These figures do not include rents that are contingent upon events taking place after
the lease was entered into, such as adjustments following rent reviews).  
Future Minimum Lease Payments 2025/26
£ million
2024/25
£ million
Not later than one year 1.240 0.926
Later than one year and not later than five years 3.417 2.608
More than five years 4.159 2.816
Total 8.816 6.350 
Finance Leases
North Ayrshire Council has no finance leases where the Council is the lessor.

Page 89

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 81 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Note 9: Grant Income
The Council credited the following grants, contributions and donations to the Comprehensive Income
and Expenditure Statement in 2025/26:
Grants credited to Taxation and Non Specific Grant Income 2025/26
£ million
2024/25
£ million
General Revenue Grant (344.318) (326.332)
Council Tax (72.984) (66.140)
Capital Grants and Contributions (37.049) (36.983)
Non Domestic Rates (44.167) (43.129)
Total (498.518) (472.584)
Grants credited to Services 2025/26
£ million
2024/25
£ million
Health Resource Transfer (26.685) (25.787)
Housing Benefit Funding (25.458) (33.544)
Criminal Justice Grant (4.449) (3.828)
Extended Producer Responsibility (EPR) (4.350) 0
Pupil Equity Fund (4.073) (3.861)
Schools for the Future (3.374) (3.374)
No One Left Behind (2.491) (2.063)
UK Shared Prosperity Fund (2.091) (3.904)
Attainment Grant (1.696) (2.457)
Ayrshire Growth Deal (1.352) (1.979)
Alcohol and Drug Partnership Funding (1.251) (1.103)
Unaccompanied Asylum Seekers (0.972) (1.167)
Homes For Ukraine Scheme Local Authority Tariff Payment (0.822) (1.265)
Learning Estate Investment Programme (0.748) (0.499)
Benefit Admin Subsidy (0.614) (0.629)
Sportscotland Sport Facilities Grant (0.606) (0.593)
General Capital Grant (0.525) (0.494)
EMA and Activity Agreements (0.458) (0.474)
School Meals Test of Change (0.418) 0
Syrian Relocation Grant (0.415) (0.351)
Heating and Energy Efficiency Scotland (0.346) (0.244)
Child Poverty Strategy (0.257) 0
Milk & Healthy Snack Subsidy (0.253) (0.269)
Care Experienced Children and Young People (0.229) (0.355)
Grant to support people displace from ukraine (0.203) 0
Place Based Investment Programme (0.191) (0.185)
Creative Scotland Grant (0.190) 0
Paths for All (0.166) (0.228)
Criminal Justice Concerned Backlog (0.161) (0.360)
Other Minor Grants (2.737) (4.267)
Total (87.581) (93.280)

Page 90

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 82 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Notes to the Movement in Reserves Statement
Note 10: Adjustments between Accounting Basis and Funding Basis under
Regulations
This note details the adjustments that are made to the total Comprehensive Income and Expenditure
Statement recognised by the Council in accordance with proper accounting practice to the resources
that are specified by statutory provisions as being available to the Council to meet future capital and
revenue expenditure. 
2025/26
Reversal of items debited or
credited to the Comprehensive
Income and Expenditure
Statement
General
Fund
Balance
£ million
Statutory
Housing
Revenue
Account
£ million
Capital
and Other
Reserves
£ million
Total
Usable
Reserves
£ million
Unusable
Reserves
£ million
Charges for depreciation of non
current assets (51.762) 6.914 0 (44.848) 44.848
Amortisation of intangible assets 0 0 0 0 0
Impairment of non current assets 40.350 7.746 0 48.096 (48.096)
Capital grants and contributions
that have been applied to capital
financing
(22.008) (15.041) 0 (37.049) 37.049
(Gains) or losses on the disposal
of non current assets (0.224) (0.001) 0 (0.225) 0.225
Statutory provision for the
financing of capital investment (9.782) (6.957) 0 (16.739) 16.739
Capital expenditure charged
against the General Fund and
Housing Revenue Account
balances
(0.510) (9.071) 0 (9.581) 9.581
Adjustments involving the Capital
Fund 0 0 0 0 0
Amount by which finance costs
charged are different from finance
costs in accordance with statutory
requirements
(0.483) (0.322) 0 (0.805) 0.805
Reversal of items relating to post
employment benefits debited or
credited to the Surplus or Deficit
on the Provision of Services
(18.470) (0.423) 0 (18.893) 18.893
Amount by which officer
remuneration charged on an
accruals basis is different from
remuneration chargeable in the
year in accordance with statutory
requirements
1.781 0.009 0 1.790 (1.790)
Total Adjustments (61.108) (17.146) 0 (78.254) 78.254

Page 91

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 83 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Comparable Movements in 2024 to 2025:
2024/25
Reversal of items debited or
credited to the Comprehensive
Income and Expenditure
Statement
General
Fund
Balance
£ million
Statutory
Housing
Revenue
Account
£ million
Capital
and Other
Reserves
£ million
Total
Usable
Reserves
£ million
Unusable
Reserves
£ million
Charges for depreciation of non
current assets 27.449 24.111 0 51.560 (51.560)
Amortisation of intangible assets 0.030 0 0 0.030 (0.030)
Impairment of non current assets 89.884 6.458 0 96.342 (96.342)
Capital grants and contributions
that have been applied to capital
financing
(21.470) (15.513) 0 (36.983) 36.983
(Gains) or losses on the disposal
of non current assets 0.813 (0.012) 0 0.801 (0.801)
Statutory provision for the
financing of capital investment (8.298) (6.137) 0 (14.435) 14.435
Capital expenditure charged
against the General Fund and
Housing Revenue Account
balances
(3.369) (12.033) 0 (15.402) 15.402
Amount by which finance costs
charged are different from finance
costs in accordance with statutory
requirements
(0.644) (0.439) 0 (1.083) 1.083
Reversal of items relating to post
employment benefits debited or
credited to the Surplus or Deficit
on the Provision of Services
(1.076) 0.016 0 (1.060) 1.060
Amount by which officer
remuneration charged on an
accruals basis is different from
remuneration chargeable in the
year in accordance with statutory
requirements
1.436 0.002 0 1.438 (1.438)
Total Adjustments 84.755 (3.547) (0.410) 80.798 (80.798)

Page 92

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 84 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Note 11: Transfers to or (from) Funds  
This note details the amounts set aside from balances in reserves to provide financing for future
expenditure plans and the amounts posted back from reserves to meet expenditure in 2025/26.
Reserve
31 March
2025
£ million
Income
£ million
Expenditure
£ million
31 March
2026
£ million Purpose of Reserve
General Fund
Balance
unearmarked
9.181 2.014 0 11.195 The balance represents 2.0% of
budgeted expenditure.
Affordable Housing 2.617 1.276 (0.548) 3.345 Contributes towards the provision of new
build social housing.
Change & Service
Redesign Fund 2.167 1.732 (0.572) 3.327 Earmarked for delivery of the Council's
Change Programme.
Loans Fund
Reserve 38.009 11.687 0 49.696 Supports borrowing linked to the Capital
Investment Programme.
Investment Fund 2.441 0.950 (0.802) 2.589
Supports environmental projects,
infrastructure investment and Community
Wealth Building.
Renewal Fund 5.242 0 (1.186) 4.056 Supports delivery of the Council's
Renewal and Recovery Strategy.
Energy Smart 1.851 0 (0.956) 0.895 Supports reduction of fuel poverty and
increased affordable warmth.
Earmarked Funds 17.670 7.683 (2.893) 22.460 Various projects where spending plans
exist relating to 2026/27 or beyond.
Workforce Planning 2.706 0 (0.078) 2.628 Supports Workforce Planning and future
pay settlement risks.
Future Budget
Strategy 9.288 0 (4.000) 5.288 Support for Medium Term Financial
Planning strategy.
Education and Early
Learning 0.886 0 (0.153) 0.733 Supports expansion of Early Learning
provision and Education recovery plan.
Financial Insecurity 2.211 0.020 (0.698) 1.533 Funds earmarked to support Low Income
Families.
General Fund
Balance 94.269 25.362 (11.886) 107.745 Total General Fund Balances
Housing Revenue
Account 22.141 3.942 (0.935) 25.148
Balance includes £13.2m earmarked for
new house building and £1.8m retained
as contingency.
Total Balances 116.410 29.304 (12.821) 132.893 Total Balances
Insurance Fund 2.233 0.092 (0.009) 2.316 Supports share of outstanding claims
against the Council and its predecessors.
Capital Fund 11.186 0.680 0 11.866 Funds earmarked to support the 2026 to
2034 capital programme.
Total Other
Reserves 13.419 0.772 (0.009) 14.182 Total Other Reserves
Total Useable
Reserves 129.829 30.076 (12.830) 147.075 Available to support services

Page 93

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 85 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Notes to the Balance Sheet
Note 12: Property, Plant and Equipment
Movements in 2025/26: 
2025/26
Property, Plant and
Equipment
Council
Dwellings
£ million 
Other Land
and
Buildings
£ million 
Vehicles,
Plant and
Equipment
£ million 
Community
Assets
£ million 
Surplus
Assets
£ million 
Assets under
Construction
£ million 
Total
£ million 
Service
Concession
Assets
£ million
Cost or Valuation at
1 April 2025 532.269 450.266 34.346 7.375 8.944 138.178 1,171.378 140.988
Reclassification of
Assets 4.805 6.122 11.203 0.078 (0.397) (22.253) (0.442) 0
Additions 13.367 5.449 7.167 0.081 0 65.837 91.901 3.395
Revaluations
recognised in the
Revaluation Reserve
0 (3.359) 0 0 21.651 0 18.292 0.182
Impairments
recognised in the Net
Cost of Services
3.118 31.879 0 0 2.468 0 37.465 0.162
Derecognition -
Disposals 0 (0.675) (1.941) 0 0 0 (2.616) 0
Assets reclassified
(to) or from Held for
Sale
0 0.020 0 0 0.085 0 0.105 0
Balance at 31
March 2026 553.559 489.702 50.775 7.534 32.751 181.762 1,316.083 144.727
Accumulated
Depreciation and
Impairment at 1
April 2025
0 22.820 24.984 2.242 0 0 50.046 6.591
Reclassification of
Assets 0 0 0 0 0 0 0 0
Depreciation Charge 22.253 14.541 7.103 0.450 0.106 0 44.453 3.143
Depreciation written
out to the
Revaluation Reserve
(17.630) (29.706) 0 0 (0.106) 0 (47.442) 0
Depreciation written
out to the Net Cost of
Services
(4.623) (5.989) 0 0 0 0 (10.612) (8.595)
Derecognition -
Disposals 0 (0.030) (1.927) 0 0 0 (1.957) 0
Assets reclassified
(to) or from Held for
Sale
0 0 0 0 0 0 0 0
Balance at 31
March 2026 0 1.636 30.160 2.692 0 0 34.488 1.139
Net Book Value at
31 March 2026 553.559 488.066 20.615 4.842 32.751 181.762 1,281.595 143.588
Net Book Value at
31 March 2025 532.269 427.446 9.362 5.133 8.944 138.178 1,121.332 134.397

Page 94

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 86 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Comparative Movements in 2024/25: 
2024/25
Property,
Plant and
Equipment 
Council
Dwellings
£ million 
Other
Land and
Buildings
£ million 
Vehicles,
Plant and
Equipment
£ million 
Community
Assets
£ million 
Surplus
Assets
£ million 
Assets
under
Construction
£ million 
Total
£ million 
Service
Concession
Assets 
£ million 
Cost or
Valuation at 1
April 2024
549.811 485.733 52.577 7.003 6.097 144.586 1,245.807 140.858
Reclassification
of Assets 11.561 36.623 0.950 0.227 0.325 (86.179) (36.493) 0
Additions 24.696 36.441 4.041 0.354 0 79.771 145.303 26.390
Revaluations
recognised in
the Revaluation
Reserve
(46.057) (16.972) 0 0 2.754 0 (60.275) (12.908)
Impairments
recognised in
the Net Cost of
Services
(7.742) (91.066) 0 (0.003) 0 0 (98.811) (13.352)
Derecognition -
Disposals 0 (0.215) (23.222) (0.206) (0.800) 0 (24.443) 0
Assets
reclassified (to)
or from Held for
Sale
0 (0.278) 0 0 0.568 0 0.290 0
Balance at 31
March 2025 532.269 450.266 34.346 7.375 8.944 138.178 1,171.378 140.988
Accumulated
Depreciation
and
Impairment at
1 April 2024
0 16.778 43.742 2.008 0 0 62.528 3.717
Reclassification
of Assets 0 0 0 0 0 0 0 0
Depreciation
Charge 22.726 15.553 4.464 0.440 0 0 43.183 3.127
Depreciation
written out to
the Revaluation
Reserve
(22.726) (6.768) 0 0 0 0 (29.494) 0
Depreciation
written out to
the Net Cost of
Services
0 (2.715) 0 0 0 0 (2.715) (0.253)
Derecognition -
Disposals 0 (0.028) (23.222) (0.206) 0 0 (23.456) 0
Assets
reclassified (to)
or from Held for
Sale
0 0 0 0 0 0 0 0
Balance at 31
March 2025 0 22.820 24.984 2.242 0 0 50.046 6.591
Net Book
Value at 31
March 2025
532.269 427.446 9.362 5.133 8.944 138.178 1,121.332 134.397
Net Book
Value at 31
March 2024
549.811 468.955 8.835 4.995 6.097 144.586 1,183.279 137.141

Page 95

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 87 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The disclosures for Service Concession Assets are for information only. The costs and depreciation
are included in 'Other Land and Buildings'. 
Infrastructure Assets 
Due to practical difficulties in applying the Code of Practice on Local Authority Accounting in the
United Kingdom’s requirements in relation to the measurement of infrastructure assets and the
application of component accounting for the recognition and derecognition of replaced components of
infrastructure assets, the Scottish Government has issued Local Government Finance Circular
09/2022 Statutory Override – Accounting for Infrastructure Assets.
In accordance with this, North Ayrshire Council has applied the permitted statutory overrides to
exclude the reporting of gross cost and accumulated depreciation in relation to this class of asset and
to account for the derecognition of any replaced part of an infrastructure asset at nil value. The
movements in relation to Infrastructure Assets for 2025/26 and the 2024/25 comparator movements
are as follows: 
Infrastructure Assets 2025/26
£ million
2024/25
£ million
Net Book Value at 1 April 137.655 96.317
Reclassification of Assets 0.442 36.493
Additions 8.499 19.173
Revaluations 0 (10.255)
Depreciation Charge (6.891) (4.073)
Net Book Value at 31 March 139.705 137.655
Combined Property, Plant and Equipment 2025/26
£ million
2024/25
£ million
Infrastructure Assets Net Book Value at 31 March 139.705 137.655
Other Property, Plant and Equipment Net Book Value at 31
March 1,281.595 1,121.332
Total Property, Plant and Equipment 1,421.300 1,258.987 
Note 13: Fair Values
The Fair Value for the following assets has been based on the market value approach using current
market conditions and recent sales prices and other relevant information for similar assets within
North Ayrshire.  Market conditions are such that similar properties are actively purchased and sold
and the level of observable inputs are significant, leading to the properties being categorised at Level
2 in the Fair Value hierarchy. Fair values for the Council's Surplus Properties as at 31 March 2026
are as follows:

Page 96

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 88 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
North Ayrshire Council
Fair Value as at 31
March 2026
£ million
Fair Value as at 31
March 2025
£ million
Land 4.685 3.837
Offices 28.066 0
Total 32.751 3.837 
Fair values for the Investment Properties held by the Common Good and Trust Funds as at 31 March
2026 are as follows:
Common Good and Trust Funds
Fair Value as at 31
March 2026
£ million
Fair Value as at 31
March 2025
£ million2
Land 1.330 1.175
Offices 0.587 0.600
Community use 0.756 0.670
Total 2.673 2.445 
Note 14: Assets Held for Sale
The below table shows the movement in value of assets currently being held for sale expected to
complete within the year. 
Assets Held for Sale 2025/26
£ million
2024/25
£ million
Balance at 1 April 0.432 0.883
Property, Plant and Equipment newly classified as held for
sale (0.105) (0.290)
Revaluations 0 (0.002)
Assets disposed of during the year (0.292) (0.159)
Balance at 31 March 0.035 0.432 
Note 15: Capital Expenditure and Capital Financing
The total amount of capital expenditure incurred in the year is shown in the following table, together
with the resources that have been used to finance it. Where capital expenditure is to be financed in
future years by charges to revenue as assets are used by the Council, the expenditure results in an
increase in the Capital Financing Requirement, a measure of the capital expenditure incurred
historically by the Council that has yet to be financed. The table below excludes those assets
acquired under Private Finance Initiative or similar contracts (see Note 18).

Page 97

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 89 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Capital Financing Requirement
General
Fund
2025/26
£ million
Housing
Revenue
Account
2025/26
£ million
General
Fund
2024/25
£ million
Housing
Revenue
Account
2024/25
£ million
Opening Capital Financing Requirement 316.328 197.342 252.382 184.503
Property, Plant and Equipment Investment 59.585 0 91.025 0
Council Dwellings Investment 0 36.917 0 46.534
Total Investment 59.585 36.917 91.025 46.534
Sale of Assets (1.161) (0.015) (0.332) (0.012)
Grants and other contributions (22.008) (15.041) (21.470) (15.513)
Contribution from Reserves 0 0 (0.410) 0
Direct revenue contributions (0.510) (9.071) (3.369) (12.033)
Loans Fund Principal (2.578) (6.957) (1.498) (6.137)
Total Sources of Finance (26.257) (31.084) (27.079) (33.695)
Closing Capital Financing Requirement 349.656 203.175 316.328 197.342 
The full movement in Capital Financing Requirement was due to an increase in the underlying need
to borrow (unsupported by government financial assistance).
Depreciation and Revaluations 
As highlighted in Note 43: Accounting Policies, under Property, Plant and Equipment on pages 132 to
147, depreciation is provided for on a straight-line basis inclusive of the year of acquisition.  The
period for each applicable category is shown in the following table:
Category
Useful Life
Years Valuer Basis of Valuation
Date of last
full valuation
Council Dwellings 20 District
Valuer
Existing Use Value for Social
Housing 'Beacon Principle' 31 March 2025
Other Land and
Buildings 50 to 60
Internal
RICS
Valuer
Open Market Value Existing Use or
Depreciated Replacement Cost
Existing Use (Specialised
Operational Properties)
Valued on a 5
year rolling
programme
Other Land &
Buildings - Schools 50 to 60
Internal
RICS
Valuer
Depreciated Replacement Cost
Existing Use
Sample of
Schools
valued 31
March 2026
Surplus 50 Internal
RICS
Fair Value (Market Value) Highest
and Best Use 31 March 2026
Vehicles 4 to 10 n/a Historical Cost n/a
Infrastructure 30 to 40 n/a Historical Cost n/a
Plant and 5 to 20 n/a Historical Cost n/a
Community Assets 20 to 30 n/a Historical Cost n/a
The valuation of Land and Buildings is carried out on a rolling five year programme to ensure that all
Property, Plant and Equipment required to be measured at current value is revalued at least every five
years.

Page 98

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 90 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The assumptions applied in estimating the current values of property, plant and equipment are:
• The properties are in good structural condition and will be maintained to good level of
standard;
• The properties and any land are not contaminated and not subject to flooding; and
• The properties are being operated as per statutory regulations
Revaluations Council
Dwellings
£ million
Other Land
and
Buildings
£ million
Vehicles,
Plant and
Equipment
£ million
Community
Assets
£ million
Surplus
Assets
£ million
Total
£ million
Carried at Historic Cost 0 0 50.775 7.534 0 58.309
Valued at 31 March 2026 553.559 310.679 0 0 32.751 896.989
Indexed at 31 March 2026 0 179.022 0 0 0 179.022
Total Cost or Valuation 553.559 489.701 50.775 7.534 32.751 1,134.320 
Indexation 
In addition to these formal valuations, the 2025/26 Code brings in a requirement to apply annual
indexation to these assets in the years between formal valuations, to ensure the value of an asset is
kept materially up to date as an approximation of market changes. Indices used for 2025/26 annual
accounts are as per below:-
• BCIS TPI adjusted by a location factor – to be used to index DRC properties (excluding
associated land)
• CBRE Indices for each asset type:
- Offices
- Retail
- Industrial
- All Property (for all other commercial properties and land element of DRC assets)
The table below shows the indices applied to the property assets which were not valued in 2025/26. It
shows the percentage applied to each asset category; the period covered by each index and the impact
on the closing values of applying each of the indices. All indices reflect the movement for the year to
31 March 2026. 
Index %
Change
Impact on
closing PPE
value
£ million
BCIS 2.63% 3.710
CBRE - Offices -1.60% (0.146)
CBRE - Retail 1.00% 0.043
CBRE - Industrial 1.80% 0.134
CBRE - All Property 0.60% 0.036
Total indexation applied 2025/26 3.777 
Commitments under capital contracts
At 31 March 2026, the Council has approved capital investment programmes for both General
Services and the Housing Revenue Account, for construction or enhancement of Property, Plant and
Equipment.  Contractual commitments in place at 31 March 2026 totalled £125.376 million as follows
(2024/25: £62.674 million):

Page 99

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 91 
OFFICIAL INFORMATION
OFFICIAL INFORMATION 
General Services Programme - Major Projects At 31 March 2026
£ million
Ardrossan Campus 86.497
Great Harbour 0.798
New Cemetery, Kilbirnie 0.720
Fairlie Primary 0.600
School ICT 0.465
Abbey Tower 0.356
Property Lifecycle Investment 0.310
Roads 0.300
AGD Marine Tourism - Cumbrae 0.251
Goldcraigs Depot 0.189
ICT Projects 0.182
Skelmorlie Primary 0.176
Lochshore Community Gardens 0.173
Pennyburn Primary 0.163
Dalry Primary 0.158
Eclipse 0.153
Locality Based Property Review 0.109
Cunninghame House 0.109
Regeneration Projects 0.094
AGD Great Harbour Maritime Mile 0.091
Other Minor Commitments 0.197
Total 92.091 
Housing Revenue Account - Major Projects At 31 March 2026
£ million
Ayrshire Central 23.864
Central Heating & Rewiring 7.273
Nelson Street 0.852
Kings Arms 0.421
Garnock Academy 0.320
Saltcoats High Flats 0.133
Fergushill Road 0.121
Stanecastle 0.103
St Marys 0.086
James McFarlane 0.061
Cheviot Court 0.050
Other minor commitments 0.002
Total 33.286

Page 100

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 92 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Note 16: Heritage Assets
The Code of Practice on Local Authority Accounting in the United Kingdom defines a heritage asset
as ‘a tangible asset with historical, artistic, scientific, technological, geophysical or environmental
qualities that is held and maintained principally for its contribution to knowledge and culture’.  
All items are deemed to have indefinite lives and reasonably high residual values. Therefore, there is
no depreciation charge associated with the Council’s identified Heritage Assets.
North Ayrshire Council holds title to other Heritage Assets, whose value is not recognised in the
Balance Sheet. This is either because the value is not material, or it has not been deemed
practicable to obtain valuations, or there is no apparent market for their disposal. Such assets can be
grouped as follows:
• Castles - including Eglinton Castle, Kilwinning; Stanecastle, Irvine; and Ardrossan Castle,
Ardrossan.
• Eight Monuments - including Mackerston Fountain, Largs; Bonnie Lesley Monument, Stevenston;
and the Pencil Monument, Largs.
• Twenty three War Memorials.
• Museum and Gallery items valued at less than £10,000.
Valuation of some of the assets have continued to be undertaken by external valuers Lyon and
Turnbull during 2025/26. The list of assets will be updated regularly as and when valuations are
received throughout the year.
The valuation by Lyon and Turnbull was dated March 2026. The assets presented for valuation were
valued as at good gallery and retail outlet values but not for facsimile purposes. There were no
limitations mentioned on the values or the certificate.
In 2025/26, one revaluation has been commissioned and three new additions.  
Reconciliation of the carrying value of Heritage Assets held by North Ayrshire Council: 
Valuations
Civic
Regalia
and
Silverware
£ million
Fine Art
£ million
Historical
Artefacts
£ million
Public
Artworks
£ million
Total
£ million
Balance at 31 March 2024 0.288 0.214 0.315 0.199 1.016
Revaluations 0 0.176 0 0 0.176
Balance at 31 March 2025 0.288 0.390 0.315 0.199 1.192
Additions 0 0 0.104 0 0.104
Revaluations 0 0 0.003 0 0.003
Balance at 31 March 2026 0.288 0.390 0.422 0.199 1.299  
Civic Regalia and Silverware – This is the collection of Burgh Chains and items that are made of
silver. Key items include the Burgh Chains, sporting trophies and Eglinton Armour.
Fine Art – includes items classed as 2D visual art such as paintings, etchings, drawings etc. Key
items include two Sir John Lavery paintings.

Page 101

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 93 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Historical Artefacts - This is the main collection and includes all objects and artefacts. Key items
include the Ardrossan Sarcophagus, a Sculpture of Owen Kelly by Alexander Stoddart and a late
nineteenth century Fire Engine. 
Public Artworks - Any items of "art" that are permanently outdoors such as on roundabouts. Key
items includes pieces along Irvine Harbourside e.g. All at Sea, Carter and Horse and the Knight and
Horse at Eglinton Country Park.
Note 17: Intangible Assets
The Council accounts for its software as intangible assets, to the extent that the software is not an
integral part of a particular Information Technology system and accounted for as part of the hardware
item of Property, Plant and Equipment.  The intangible assets are in respect of purchased licenses. 
All software is given a finite useful life, based on assessments of the period that the software is
expected to be of use to the Council.  The useful lives assigned to the major software suites used by
the Council are five to six years.  The carrying amount of intangible assets is amortised on a straight-
line basis.  The movement on Intangible Asset balances during the year is as follows: 
Long Term Intangible Assets 2025/26
£ million
2024/25
£ million
Gross Carrying Amount at start of the year 0.638 4.627
Accumulation amortisation at start of the year (0.638) (4.597)
Net Carrying Amount at start of the year 0 0.030
Disposals - Gross Carrying Amount (0.341) (3.989)
Disposals - Amortisation 0.341 3.989
Amortisation for the period 0 (0.030)
Net Carrying Amount at end of year 0 (0.000)
Gross Carrying Amount at end of the year 0.297 0.638
Accumulation amortisation at end of the year (0.297) (0.638)
Net Carrying Amount at end of year (0.000) 0
Note 18: Private Finance Initiatives, Non Profit Distributing Models and Similar
Contracts
In 2025/26, the Council has applied IFRS 16 Leases as adopted by the Code of Accounting Practice. 
Under IFRS16, where indexation (or other changes in a rate) affects future service concession
payments, the lease liability requires to be remeasured. Instead of expensing the increased payment,
the net present value of future payments that comprise the liability is recalculated based on the revised
level of payments. IFRS 16 has been applied to the North Ayrshire Council Schools Public Private
Partnership Contract, Largs Campus Design Build Finance Maintain Contract and Clyde Valley Waste
Contract. 
For the Clyde Valley Waste Contract, the IFRS 16 compliant information available in 2024/25 has been
used to forecast 2025/26 valuations, pending receipt of new information from the contract managers.

Page 102

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 94 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
North Ayrshire Council Schools Public Private Partnership Contract
2025/26 was the nineteenth year of a thirty-year Public Private Partnership contract for the
construction, maintenance and operation of four schools: Stanley Primary, Arran High, Greenwood
Academy and St Matthew’s Academy. The schools provide leisure facilities to the community outwith
the school day. These are run by North Ayrshire Leisure Limited. The contract specifies minimum
standards for the services to be provided by the contractor, with deductions from the fee payable
being made if facilities are unavailable or performance is below the minimum standards. 
The contractor took on the obligation to construct the schools and maintain them in a minimum
acceptable condition and to procure and maintain the plant and equipment needed to operate the
schools. The buildings, and any plant and equipment installed in them, will be transferred to North
Ayrshire Council at the end of the contract for nil consideration. The Council only has rights to
terminate the contract if it compensates the contractor in full for costs incurred and future profits that
would have been generated over the remaining term of the contract.
Largs Campus Design, Build, Finance and Maintain Contract
2025/26 was the eighth year for Largs Campus of a twenty-five-year contract. This campus was
procured through a Design, Build, Finance and Maintain contract. This Campus covers a secondary
school, two primary schools and one early year’s centre.
The contract specifies minimum standards for the services to be provided by the contractor, with
deductions from the fee payable being made if facilities are unavailable or performance is below the
minimum standards.
The buildings, and any plant and equipment installed in them, will be transferred to North Ayrshire
Council, for nil consideration at the end of the contract. The Council only has rights to terminate the
contract if it compensates the contractor in full for costs incurred and future profits that would have
been generated over the remaining term of the contract.
Clyde Valley Waste Private Finance Initiative Contract
2025/26 was the seventh year for Clyde Valley Waste of a twenty five year contract. This plant was
procured through a Private Finance Initiative contract. The Council has a 17% share in the contract
for waste recycling which utilises the waste materials recovery facility at Bargeddie with residual
waste then processed at a thermal treatment site in Dunbar.
The contract specifies minimum standards for the services to be provided by the contractor, with
deductions from the fee payable being made if facilities are unavailable or performance is below the
minimum standards.
The buildings, and any plant and equipment installed in them, will not be transferred to North Ayrshire
Council at the end of the contract. The Council only has rights to terminate the contract if it
compensates the contractor in full for costs incurred and future profits that would have been
generated over the remaining term of the contract. 
Property Plant and Equipment
The assets used to provide services are recognised on the Council's Balance Sheet. Movements in
their value over the year are detailed in the analysis of the movement on the Property, Plant and
Equipment balance in Note 12.

Page 103

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 95 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Payments
For Public Private Partnership, the Council makes an agreed payment each year which is uplifted
each year by 2/3 of the increase in the retail price index. For Design, Build, Finance and Maintain, the
Council makes an agreed payment each year uplifted by 21% of the increase in the retail price index.
The Clyde Valley Waste contract is uplifted each year by applying the consumer price index to the
variable element of the contract. Payments can be reduced if the contractor fails to meet availability
and performance standards in any year. 
Remaining payments to be made under the Public Private Partnership, Design, Build, Finance and
Maintain and Clyde Valley Waste contracts at 31 March 2026 (based on an estimate of the cash
amount that will actually be paid and excluding availability or performance deductions) are as follows: 
Future Repayments
Service
Charges
£ million
Liability
Repayment
£ million
Interest
£ million
Contingent
Rentals
£ million
Total
£ million
Payable in 2026/27 12.365 6.858 4.712 0.610 24.545
Payable within 2 to 5 years 51.648 26.506 14.202 6.047 98.403
Payable within 6 to 10 years 70.891 29.305 10.075 15.976 126.247
Payable within 11 to 15 years 46.326 17.144 3.022 14.182 80.674
Payable within 16 to 20 years 23.690 4.311 0.370 2.074 30.445
Total 204.920 84.124 32.381 38.889 360.314 
Payments
Although the payments made to the contractors are described as unitary payments, they have been
calculated to compensate the contractor for the fair value of the services they provide, the capital
expenditure incurred and interest payable while the capital expenditure remains to be reimbursed.
The outstanding liabilities are as follows: 
Outstanding Liability 2025/26
£ million
2024/25
£ million
Balance outstanding at 1 April 115.984 96.318
Remeasurement on IFRS16 transition 0 0.652
Additions on IFRS16 transition 0 22.028
Revised opening Balance outstanding at 1 April 115.984 118.998
Payments during the year (7.043) (6.667)
Remeasurement on IFRS16 in year 3.395 3.653
Balance Outstanding at 31 March 112.336 115.984 
Service Concession Flexibility
During 2022/23, North Ayrshire Council adopted the revised accounting arrangements under Local
Government Finance Circular 10/2022 – Finance Leases and Service Concession Arrangements.
The application of this accounting arrangement recalculated the annual charges to the General Fund
in relation to the principal capital repayment element of service concession arrangements, including
Public Private Partnership and Design, Build, Finance and Maintain contracts. As a result, the
charges to the General Fund were rescheduled over the fifty year useful economic life of the assets
rather than the current contract terms, with the remaining adjustments as follows:

Page 104

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 96 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Repayment Adjustments
Liability
Repayment
£ million
Revised
Profile
£ million
Required
Adjustment
£ million
2025/26 4.286 1.119 (3.167)
Payable in 2026/27 4.382 1.184 (3.198)
Payable within 2 to 5 years 20.204 5.466 (14.738)
Payable within 6 to 10 years 31.885 8.833 (23.052)
Payable within 11 to 15 years 22.613 11.761 (10.852)
Payable within 16 to 20 years 4.756 15.692 10.936
Payable within 21 to 25 years 0 20.978 20.978
Payable within 26 to 30 years 0 28.094 28.094
Payable within 31 to 35 years 0 13.124 13.124
Payable within 36 to 40 years 0 9.789 9.789
Payable within 41 to 45 years 0 2.223 2.223
Total 88.126 118.263 30.137 
The application of this flexibility makes no change to the actual payments to the contractor or to the
value of interest or service charges made against the General Fund and the schools will still transfer
to North Ayrshire Council at the end of the current contract for nil consideration. The adjustments are
timing related and the overall repayments charged to the General Fund remain unchanged.
Note 19: Short Term Debtors
Amounts owed to the Council within the year as at 31 March 2026 are shown below: 
Debtors 2025/26
£ million
2024/25
£ million
Trade Receivables 14.947 9.979
Prepayments 2.663 2.138
Other Receivable Amounts 26.297 25.158
Total 43.907 37.275

Page 105

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 97 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Note 20: Debtors for Local Taxation
The past due but not impaired amount for local taxation (council tax and non-domestic rates) can be
analysed by age as follows: 
Debtors for Local Taxation
Council Tax
2025/26
£ million
Non-Domestic
Rates 2025/26
£ million
Council Tax
2024/25
£ million
Non-Domestic
Rates 2024/25
£ million
Less than 1 year 2.585 0.944 2.246 0.681
1 to 2 years 2.217 0.439 2.021 0.334
2 to 5 years 2.659 0 2.443 0
More than 5 years 0.930 0 0.565 0
Total 8.391 1.383 7.275 1.015 
Note 21: Long Term Debtors
Amounts owed to the Council within a period greater than one year are shown in the table below:
Long Term Debtors 2025/26
£ million
2024/25
£ million
Advances for House Purchases 0.044 0.044
Total 0.044 0.044 
Note 22: Inventories
Inventories include materials or supplies held to be consumed in the production process or in
rendering of services. Inventories are measured at the lower of cost and net realisable value. 
Movement in inventories are shown in the table below: 
Inventories
Balance at
1 April
2025
£ million
Purchases
£ million
Recognised
as an
Expense
£ million
Balance at
31 March
2026
£ million
Balance at
31 March
2025
£ million
Catering Consumables 0.173 3.107 (3.110) 0.170 0.173
Streetscene and Waste 0.035 0.138 (0.111) 0.062 0.035
Transport Fuel 0.109 1.720 (1.681) 0.148 0.109
Donated Covid Consumables 0.028 0.079 (0.074) 0.033 0.028
Other Consumables 0.001 0 0 0.001 0.001
Building Services Materials 0.734 4.140 (4.106) 0.768 0.734
Roads Maintenance Materials 0.277 8.055 (8.129) 0.203 0.277
Total 1.357 17.239 (17.211) 1.385 1.357

Page 106

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 98 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Note 23: Short Term Borrowing
External borrowing due for payment within the next year is shown in the table below: 
Short Term Borrowing 2025/26
£ million
2024/25
£ million
North Ayrshire Municipal Bank Limited (0.036) (0.036)
Public Works Loans Board (8.606) (8.360)
Market Debt, Lender Option Loans and Other Local Authorities (25.036) (46.055)
Total (33.678) (54.451)
Note 24: Short Term Creditors
Amounts owed by the Council within the year as at 31 March 2026 are shown in the table below: 
Creditors 2025/26
£ million
2024/25
£ million
(restated)
Trade Payables (41.956) (36.738)
Other Payables (79.032) (51.626)
Total (120.988) (88.364)
Grants and contributions which have a condition attached that remains to be satisfied at the balance
sheet date are recognised as grant receipts in advance. Included within the amounts above are grant
receipts in advance totalling £34.850 million (2024/25 £8.428 million).
Note 25: Provisions
Provisions are made where an event has taken place that gives the Council a legal or constructive
obligation that probably requires settlement by a transfer of economic benefits or service potential,
and a reliable estimate can be made of the amount of the obligation.  Movement in these provisions
are shown in the table below: 
Provisions Equal Pay /
Single Status
£ million
Termination
Benefits
£ million
Employee
Costs - Paid
Absences
£ million
Teachers
Maternity
Cover
£ million
Former
Authorities
£ million
Total
£ million
Balance at 1 April 2025 (0.026) (1.012) (0.300) (0.250) (0.288) (1.876)
Additional provisions
made (0.029) (0.150) 0.013 0.013 (0.009) (0.162)
Amounts used 0 1.012 0 0 0 1.012
Balance at 31 March
2026 (0.055) (0.150) (0.287) (0.237) (0.297) (1.026)

Page 107

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 99 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Equal Pay/Single Status
In 2014/15 a provision of £2.867 million was made in respect of Equal Pay and Single Status with a
balance of £0.026 million identified at 31 March 2025. During 2025/26 no provision was utilised. A
further provision has been made of £0.029m at 31 March 2026 in respect of further equal pay claims
against North Ayrshire Council.  The timing of the potential settlement of these claims is uncertain. 
Termination Benefits
During 2025/26 a provision of £0.150 million was required in relation to employee retiral commitments
the Council had in place at 31 March 2026.  These liabilities are expected to be discharged during
2026/27. 
Employee Costs - Paid Absences
In accordance with IAS19 Employee Benefits provision has been made of £0.287m for the costs of
paid employee absences arising from Flexi Time earned but not taken prior to 31 March 2026.  These
liabilities are expected to be discharged during 2026/27. 
Teachers Maternity Cover
During 2025/26 a provision of £0.237 million was required in respect of teachers’ holidays accrued
while on maternity leave. These liabilities are expected to be discharged during 2026/27. 
Former Authorities: Claims
The Council has a potential liability to meet expenditure incurred in respect of the former
Cunninghame District Council and Strathclyde Regional Council. This includes shared liability in
connection with estimated payments made by Municipal Mutual Insurance Limited (MMI) in respect of
known claims against the former Councils.  The timing of the settlement of these claims is uncertain. 
Note 26: Financial Instruments
Financial Assets
A financial asset is a right to receive cash or another financial instrument.  Financial assets held by
the Council during the year can be classified as follows:
• Cash in hand and in bank call accounts.
• Bank fixed term deposits (investments).
• Trade receivables (debtors).
• Loans made for service purposes, including soft loans.
Cash and cash equivalents
The bank overdraft figure reflects total debit balances on the Council’s group of bank accounts with
Royal Bank of Scotland.  The figure for Cash and Cash Equivalents in the balance sheet offsets the
overdraft with cash at bank and in hand, as detailed in Note 38.
Financial Liabilities
A financial liability is a contractual obligation to deliver cash or another financial asset to another
entity.  Financial liabilities held by the Council during the year can be classified as follows:
• Loans from the Public Works Loan Board, commercial lenders and other local authorities.
• Overdraft with the banks.
• Trade payables (creditors).
• Finance leases.

Page 108

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 100 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
• Public Private Partnership, Non Profit Distributing and similar contracts.
The following categories of financial instrument are carried in the Balance Sheet: 
2025/26
Financial Instruments at Amortised Cost
Long Term
31 March 2026
£ million
Current
31 March 2026
£ million
Total
£ million
Cash (including bank) 0 49.104 49.104
Bank overdraft 0 (1.733) (1.733)
Total Cash and Cash Equivalents 0 47.371 47.371
Short Term Investments 0 20.644 20.644
Investments 0.044 31.470 31.514
Total Financial Assets at Amortised Cost 0.044 99.485 99.529
Loans - Principal sums 390.661 31.288 421.949
Loans - Accrued interest 0 2.390 2.390
Effective Interest Rate adjustment 0.447 0 0.447
Total Borrowing 391.108 33.678 424.786
Trade payables 0 109.494 109.494
Service Concessions and similar liabilities 101.627 11.494 113.121
Total Creditors 101.627 120.988 222.615
Total Financial Liabilities at Amortised Cost 492.735 154.666 647.401 
2024/25
Financial Instruments at Amortised Cost
Long Term
31 March 2025
£ million
(restated)
Current
31 March 2025
£ million
(restated)
Total
£ million
Cash (including bank) 0 65.605 65.605
Bank overdraft 0 (2.876) (2.876)
Total Cash and Cash Equivalents 0 62.729 62.729
Short Term Investments 0 10.369 10.369
Investments 0.044 26.847 26.891
Total Financial Assets at Amortised Cost 0.044 99.945 99.989
Loans - Principal sums 377.133 51.743 428.876
Loans - Accrued interest 0 2.708 2.708
Effective Interest Rate adjustment 0.475 0 0.475
Total Borrowing 377.608 54.451 432.059
Trade payables 0 77.106 77.106
Service Concessions and similar liabilities 104.854 11.258 116.112
Total Creditors 104.854 88.364 193.218
Total Financial Liabilities at Amortised Cost 482.462 142.815 625.277

Page 109

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 101 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Fair Values of Assets and Liabilities
Financial liabilities and financial assets represented by loans and receivables are carried on the
balance sheet at amortised cost. Their fair value can be assessed by calculating the present value of
the cash flows that take place over the remaining life of the instruments, they have been categorised
at Level 2 in the Fair Value hierarchy using the following assumptions:
• Loans borrowed by the Council have been valued by discounting cash flows over the life of the
loan at appropriate market rates.
• For loans receivable, prevailing benchmark market rates have been used to provide the fair value.
• The fair values of Public Private Partnership and Non Profit Distributing liabilities have been
calculated by discounting the contractual cash flows (excluding service charge elements) at the
appropriate AA-rated corporate bond rate.
• No early repayment or impairment is recognised.
• The fair value of short-term instruments, including trade payables and receivables, is taken to be
the carrying amount or the billed amount.
The calculated fair values are as follows: 
Fair Value of Financial Liabilities
Carrying
Amount at
31 March
2026
£ million
Fair Value
at 31
March
2026
£ million
Carrying
Amount at
31 March
2025
£ million
Fair Value
at 31
March
2025
£ million
Public Works Loans Board Debt 388.117 372.827 374.311 360.525
Non-Public Works Loans Board Debt 143.325 34.137 126.678 40.715
Temporary Loans 6.429 6.429 21.717 21.717
Total Debt 537.871 413.393 522.706 422.957
Trade Creditors 109.494 109.494 77.106 77.106
Total Liabilities 647.365 522.887 599.812 500.063 
Fair Value of Financial Assets
Carrying
Amount at
31 March
2026
£ million
Fair Value
at 31
March
2026
£ million
Carrying
Amount at
31 March
2025
£ million
Fair Value
at 31
March
2025
£ million
Cash and Cash Equivalents 47.371 47.371 62.729 62.729
Short Term Deposits - less than 1 year 20.644 20.644 10.369 10.369
Trade Debtors 31.470 31.470 26.847 26.847
Total Assets 99.485 99.485 99.945 99.945 
The fair value is lower than the carrying amount because the Council’s portfolio of loans includes a
number of loans where the interest rate payable is lower than the current rates available for similar
loans in the market at the balance sheet date. This represents a notional future gain attributable to a
commitment to pay interest to lenders below current market rates.

Page 110

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 102 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The fair value of financial assets held at amortised cost may be higher than their balance sheet
carrying amount because the interest rate on similar investments is lower than that obtained when
the investment was originally made. This represents a notional future gain attributable to the
commitment to receive interest at more than current market rates.
Income, Expense, Gains and Losses
The gains and losses recognised in the Comprehensive Income and Expenditure Statement in
relation to financial instruments are made up as follows: 
2025/26
Gains and Losses
Liabilities
measured at
amortised cost
£ million
Loans and
receivables
measured at
amortised cost
£ million
Total
£ million
Interest expense (25.574) 0 (25.574)
Losses on derecognition 0.805 0 0.805
Total expense in Surplus or Deficit
on the Provision of Services (24.769) 0 (24.769)
Interest income 0 1.361 1.361
Total income in Surplus or Deficit
on the Provision of Services 0 1.361 1.361
Net gain or (loss) for the year (24.769) 1.361 (23.408) 
2024/25
Gains and Losses
Liabilities
measured at
amortised cost
£ million
Loans and
receivables
measured at
amortised cost
£ million
Total
£ million
Interest expense (23.201) 0 (23.201)
Losses on derecognition 1.083 0 1.083
Total expense in Surplus or
Deficit on the Provision of
Services
(22.118) 0 (22.118)
Interest income 0 1.732 1.732
Total income in Surplus or Deficit
on the Provision of Services 0 1.732 1.732
Net gain or (loss) for the year (22.118) 1.732 (20.386) 
Note 27: Risks arising from Financial Instruments
The Council has adopted the Chartered Institute of Public Finance and Accountancy’s Code of
Practice on Treasury Management and complies with the Chartered Institute of Public Finance and
Accountancy’s Prudential Code for Capital Finance in Local Authorities.

Page 111

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 103 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
As part of this, the Council approves a Treasury Management and Investment Strategy before 1 April
each financial year.  This sets out the Council’s exposure to the risks associated with financial
instruments and also the measures taken to mitigate such risks. 
The key risks are:
• Credit risk: the possibility that other parties might fail to pay amounts due to the Council.
• Liquidity risk: the possibility that the Council might not have cash available to meet its
commitments to make payments.
• Refinancing risk: the possibility that the Council may require to renew a financial instrument on
maturity at disadvantageous interest rates or terms.
• Market risk: the possibility that financial loss might arise for the Council as a result of changes in
market variables, such as interest rates or equity prices.
The Treasury Management and Investment Strategy for 2025/26 was approved by North Ayrshire
Council on 26 February 2025. 
Credit Risk: Investments
The Council manages credit risk by ensuring that investments are only placed with organisations of
high credit quality as set out in the annual Treasury Management and Investment Strategy.  These
include commercial entities with a minimum long-term credit rating of A-, the United Kingdom
government and other local authorities.  In recognition of the fact that credit ratings are not
comprehensive indicators of default, the Council has regard to other measures, including:
• credit watches and credit outlooks from credit rating agencies.
• Credit Default Swap spreads to give early warning of likely changes in credit ratings.
• sovereign ratings to select counterparties from only the most creditworthy countries.
The Council’s maximum exposure to credit risk in relation to its investments in banks and building
societies cannot be assessed generally as the risk of any institution failing to make interest payments
or repay the principal sum will be specific to each individual institution.  Recent experience has
shown that it is rare for such entities to be unable to meet their commitments.  A risk of
irrecoverability applies to all of the Council’s deposits, but there was no evidence at 31 March 2026
that this was likely to crystallise.  
Credit Risk Exposure at 31 March 2026:
Investments by
Counterparty at
31 March 2026
Up to 1
Month
£ million
Between 1
and 3
Months
£ million
Between 3
and 6
Months
£ million
Between 6
and 9
Months
£ million
Between 9
and 12
Months
£ million
More
than 12
months
Total
£ million
UK Banks 1.100 0 0 0 0 0 1.100
Debt
Management
Office
10.000 0 0 0 0 0 10.000
Other 48.359 0 0 5.000 0 5.000 58.359
Total 59.459 0 0 5.000 0 5.000 69.459

Page 112

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 104 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
All investment counterparties met the Credit rating criteria at the point of investment and at 31 March
2026. 
The Council does not expect any losses from non-performance by any of its counterparties in relation
to deposits and bonds. 
Allowances for expected credit losses have been determined for trade debtors using the simplified
approach. The changes in loss allowance for our Debtors held at Amortised Cost during the year are
as follows: 
2025/26
Lifetime Expected Credit Losses
Simplified
approach
£  million Total
Balance as at 1 April 2025 8.067 8.067
Changes due to modifications which did not
result in derecognition 1.209 1.209
Balance as at 31 March 2026 9.276 9.276 
2024/25
Lifetime Expected Credit Losses
Simplified
approach
£  million Total
Balance as at 1 April 2024 8.466 8.466
Changes due to modifications which did not
result in derecognition (0.399) (0.399)
Balance as at 31 March 2025 8.067 8.067
During the year, the Council wrote off financial assets with a contractual amount outstanding of
£1.509 million (2024/25: £2.738 million) which are still subject to enforcement activity.  
Credit Risk Exposure
The Council has the following exposure to credit risk at 31 March 2026: 
Credit Risk Credit Risk Rating
2025/26
£ million
2024/25
£ million
Simplified Approach Historic Experience 42.641 37.052
Total None 42.641 37.052 
Liquidity Risk
The Council manages its liquidity position through the setting and approval of prudential indicators,
the approval and monitoring of the Treasury Management and Investment Strategy and through a
comprehensive cash flow management system, as required by the Chartered Institute of Public
Finance and Accountancy’s Code of Practice, which seeks to ensure that cash is available when
needed.
The Council has ready access to borrowings at favourable rates from the Public Works Loans Board
and other local authorities and at higher rates from banks and building societies. There is no
significant risk that it will be unable to raise finance to meet its commitments.

Page 113

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 105 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Refinancing Risk
The Council maintains a significant debt and investment portfolio aligned to its underlying assets and
capital investment programme. Whilst the cash flow procedures above are considered alongside
refinancing risk procedures, longer-term risk to the Council relates to managing the exposure to
replacing financial instruments as they mature. This risk relates to both the maturing of longer-term
financial liabilities and longer-term financial assets. The approved treasury indicator limits for the
maturity structure of debt and the limits placed on investments placed for greater than one year in
duration are the key parameters used to address this risk. The Council’s approved treasury and
investment strategies address the main risks, and the treasury team address the operational risks
within the approved parameters. This includes:
• Monitoring the maturity profile of financial liabilities and amending the profile through either new
borrowing or the rescheduling of the existing debt.
• Monitoring the maturity profile of investments to ensure sufficient liquidity is available for the
Council’s day-to-day cash flow needs, and the spread of longer-term investments provide stability
of maturities and returns in relation to the longer-term cash flow needs.
The maturity analysis of the principal sums borrowed is as follows, with the maximum and minimum
limits for fixed interest rates maturing in each period (as approved by the Council in the Treasury
Management and Investment Strategy on 26 February 2025). All trade and other payables are due to
be paid in less than one year:
Loans Outstanding
Loans at
31 March
2026
£million
Leases at
31 March
2026
£million
Total at
31 March
2026
£million %
Approved
Upper
Limit
%
Approved
Lower
Limit
%
Total at
31 March
2025
£million
Less than one year 32.435 11.494 43.929 8% 50% 0% 58.541
Between one and
two years 20.000 10.677 30.677 6% 50% 0% 7.838
Between two and
five years 54.321 29.515 83.836 16% 50% 0% 75.144
Between five and 108.343 37.978 146.321 27% 75% 0% 129.279
More than ten years 206.848 23.457 230.305 43% 90% 25% 248.757
Total 421.947 113.121 535.068 100% 100% 0% 519.559
Public Works Loan
Board 385.951 0 385.951 none none none 372.392
Market Debt /
Lender Option 29.568 0 29.568 none none none 35.229
Temporary
borrowing 6.428 0 6.428 none none none 21.255
Service Concession 
/ Lease Liabilities 0 113.121 113.121 none none none 90.683
Total 421.947 113.121 535.068 none none none 519.559
Market Risk
Interest rate risk: The Council is exposed to risk in terms of interest rate movements on its
borrowings and investments.  Movements in interest rates have a complex impact on the Council. For
instance, a rise in interest rates would have the following effects (a fall in interest rates would have
the reverse effect):

Page 114

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 106 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
• Borrowings at variable rates – the interest expense charged to the Surplus or Deficit on the
Provision of Services will rise.
• Borrowings at fixed rates – the fair value of the borrowings will fall (no impact on revenue
balances).
• Investments at variable rates – the interest income credited to the Surplus or Deficit on the
Provision of Services will rise.
• Investments at fixed rates – the fair value of the assets will fall (no impact on revenue balances).
Borrowings are not carried at fair value, so changes in their fair value will have no impact on
Comprehensive Income and Expenditure.  However, changes in interest payable and receivable on
variable rate borrowings and investments will be charged to the Surplus or Deficit on the Provision of
Services and will affect the General Fund balance.  
The Council’s Treasury Management and Investment Strategy aims to mitigate these risks by setting
upper limits on its exposure to fixed and variable interest rates. For 2025/26 these limits were
£668.840 million of total borrowing on fixed rate borrowing and £60.000 million for variable rate
borrowing.
At 31 March 2026, £393.598 million of principal borrowing was exposed to fixed rates and £28.350
million to variable rates. This excludes liabilities in respect of Public Private Partnership and Non
Profit Distributing contracts.
The Council’s current portfolio of variable rate borrowing includes commercial loans known as Lender
Option Borrower Option, taken out between 1985 and 2008. Under these agreements, the lender has
an option at certain junctures to increase the interest rate offered. The borrower then has the option
to accept the new rate or to repay the loan.
It is likely that lenders will only exercise their options when market rates have risen above the
contractual loan rate.  Since the average rate of the current Lender Option Borrower Option portfolio
is 4.44%, the interest rate risk associated with the Council’s Lender Option Borrower Option loans is
not deemed to be significant and the potential penalties charges may make the redemption of the
loans an uneconomic option. The Council will continue to monitor the position in terms of changes to
the Bank of England base rate and the interest rates available in relation to alternative borrowing
options. 
If all interest rates had been 1% higher (with all other variables held constant) the financial effect
would be:

Page 115

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 107 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Impact on tax payers and rent payers At 31 March 2026
£  million
Increase on interest payable on variable rate borrowings 0.184
Increase in interest receivable on variable rate investments 0
Impact on Surplus or Deficit on the Provision of Services 0.184
Share of overall impact debited to the Housing Revenue Account 0.074
Decrease in fair value of fixed rate investment assets 0
Impact on Other Comprehensive Income and Expenditure 0
Decrease in fair value of fixed rate borrowing liabilities (no impact on the
Surplus or Deficit on the Provision of Services or Other Comprehensive
Income and Expenditure)
(32.907)
The impact of a 1% fall in interest rates would be as above but with the movements being reversed.
Price risk: This would only apply where an investment is held as available for sale.  The Council
currently holds no available for sale investments and, excluding the pension fund, does not currently
invest in equity shares or marketable bonds.
Foreign exchange risk: This would apply where funds are held in a foreign currency. At 31 March
2026, the Council held no foreign currency funds.
Note 28: Defined Benefit Pension Schemes
Participation in pension schemes
North Ayrshire Council participates in the Local Government (Scotland) Superannuation Scheme,
administered by Glasgow City Council through the Strathclyde Pensions Fund. This is a funded
defined benefits scheme, with both employer and employee making contributions, intended to
balance the pension liabilities with investment assets.
As part of the terms and conditions of employment for its officers, the Council makes contributions
towards the cost of post-employment benefits. Although these benefits will not actually be made until
employees retire, the Council has a commitment to make the payments and this needs to be
disclosed at the time the employees earn their future entitlement. 
In response to significant net asset values reported for 2022/23, Strathclyde Pension Fund confirmed
that the employer contribution rates for 2024/25 and 2025/26 would be reduced from 19.3% to 6.5%.
The rate will then increase to 17.5% from 2026/27.
The principal risks to the Council of the scheme are the longevity assumptions, statutory changes to
the scheme, structural changes to the scheme (i.e. large scale withdrawals from the scheme),
changes to inflation, bond yields and the performance of the equity investments held by the scheme.
These are mitigated to a certain extent by the statutory requirements to charge to the General Fund
and Housing Revenue Account the amounts required by statute as described in the accounting policy
note.
Transactions relating to post-employment benefits
The cost of retirement benefits is recognised in the cost of services when they are earned by
employees, rather than when the benefits are eventually paid as pensions. However, the charge
against Council Tax is based on the cash payable in the year, so the real cost of post-employment or
retirement benefits is reversed out of the General Fund via the Movement in Reserves Statement.

Page 116

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 108 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The following transactions have been made in the Comprehensive Income and Expenditure
Statement and the General Fund Balance via the Movement in Reserves Statement during the year: 
Local Government Pension Scheme
2025/26
£ million
2024/25
£ million
Current service cost within Cost of Services 24.539 31.068
Past service cost (including curtailments) within Cost of
Services 1.107 2.037
Net interest expense or (income) within Financing and
Investment 1.481 1.556
Total Post Employment Benefit Charged to the Surplus or
Deficit on the Provision of Services 27.127 34.661
Expected return on pension fund assets (excluding amounts
included in net interest) (38.548) 17.657
Actuarial (gains) or losses arising on changes in financial
assumptions 56.819 (19.713)
Total Post Employment Benefit Charged to the
Comprehensive Income and Expenditure Statement 45.398 32.605
Movement in Reserves: Reversal of net charges made to the
Surplus or Deficit on the Provision of Services for post
employment benefits in accordance with the Code
18.893 1.060
Movement in Reserves: Actuarial gains or (losses) on pension
assets and liabilities (18.271) 2.056
Contributions from employer payable to scheme 46.020 35.721 
Pension Assets and Liabilities Recognised in the Balance Sheet
The amount included in the Balance Sheet arising from the Council's obligation in respect of its
defined benefit plan is normally the net liability represented by the present value of the defined
benefit obligation and the fair value of the plan assets. However, since 2022/23 the actuarial gains
arising from changes in the financial assumptions have resulted in a net asset position. 
International Accounting Standard 19 Employee Benefits requires that the net defined benefit asset
recognised in the Balance Sheet is measured at the lower of the net asset position in the defined
benefit fund and the asset ceiling, which is defined as ‘the present value of any economic benefits
available in the form of refunds from the plan or reductions in future contributions to the plan’. 
As a result, the net pension asset to be recognised in the Balance Sheet has been revised to reflect
the Asset Ceiling adjustment advised by Strathclyde Pension Fund’s actuaries, Hymans Robertson:

Page 117

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 109 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Net Asset and Liability 2025/26
£ million
2024/25
£ million
Present value of the defined benefit obligation (892.217) (861.922)
Fair value of plan assets 1,505.704 1,397.759
Asset Ceiling adjustment (613.487) (535.837)
Net funded asset and (liability) arising from defined benefit
obligation 0 0
Present Value of Unfunded Obligations (19.445) (20.067)
Total net liability arising from defined benefit obligation (19.445) (20.067) 
As a result of the Asset Ceiling adjustment, the net liability of £19.445 million has been recognised at
31 March 2026. This is equivalent to the present value of the Council’s unfunded obligations under the
Local Government Pension Scheme. 
Assets and Liabilities in Post-Employment Benefits
A reconciliation of the Council's share of the present value of Strathclyde Pension Fund's defined
benefit obligation (liabilities) is as follows: 
Fair Value of Scheme Liabilities
2025/26
£ million
2024/25
£ million
Balance as at 1 April (861.922) (965.483)
Current service cost (24.539) (31.068)
Interest cost (50.006) (46.976)
Contributions by scheme participants (10.102) (9.626)
Actuarial gains arising on changes in financial assumptions 33.222 148.183
Changes in demographic assumptions (5.424) 1.652
Other experience (7.589) 9.055
Past service cost (including curtailments) (1.107) (2.037)
Benefits paid 35.250 35.113
Effect of business combinations and disposals 0 (0.735)
Balance as at 31 March (892.217) (861.922)
Reconciliation of Fair Value of Scheme Assets
A reconciliation of the movements in the Council's share of the fair value of Strathclyde Pension Fund's
assets is as follows:

Page 118

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 110 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Fair Value of Scheme Assets
2025/26
£ million
2024/25
£ million
Balance as at 1 April 1,397.759 1,359.027
Interest income 80.745 65.631
Return on plan assets excluding amounts included in net
interest 38.548 (17.657)
Other experience 0 0
Contributions from employer payable to the scheme 13.800 15.655
Contributions by scheme participants 10.102 9.626
Benefits paid (35.250) (35.113)
Effect of business combinations and disposals 0 0.590
Balance as at 31 March 1,505.704 1,397.759 
Asset Ceiling Adjustment
In accordance with International Accounting Standard 19 and the guidance issued under International
Financial Reporting Interpretations Committee – Interpretation 14, the Asset Ceiling has been
determined as follows: 
Asset Ceiling 2025/26
£ million
2024/25
£ million
Net present value of estimated future service costs 916.782 975.622
Net present value of future contributions (1,406.074) (1,385.649)
Asset Ceiling (489.292) (410.027) 
For 2025/26, as the net present value of estimated future service costs is less than the net present
value of future contributions, the Asset Ceiling is determined to be nil.  A net liability of £19.445
million has been recognised at 31 March 2026. This is equivalent to the present value of the council’s
unfunded obligations under the Local Government Pension Scheme. 
An lysis o   ension Fund’s Assets
North Ayrshire Council's share of the Pension Fund assets as at 31 March 2026 comprised: 
2025/26
Portfolio Composition
Quoted Prices
in Active
Markets
£ million
Quoted Prices
not in Active
Markets
£ million
Total
£ million Percentage
Equity Investments 316.627 675.047 991.674 66%
Debt Instruments 0 361.099 361.099 24%
Property 0 104.374 104.374 7%
Cash 0 48.557 48.557 3%
Balance as at 31 March 2026 316.627 1,189.077 1,505.704 100%

Page 119

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 111 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
2024/25
Portfolio Composition
Quoted Prices
in Active
Markets
£ million
Quoted Prices
not in Active
Markets
£ million
Total
£ million Percentage
Equity Investments 294.679 640.519 935.198 67%
Debt Instruments 0 323.094 323.094 23%
Property 0 105.458 105.458 8%
Cash 0 34.009 34.009 2%
Balance as at 31 March 2025 294.679 1,103.080 1,397.759 100% 
Asset and Liability Matching (ALM) Strategy 
The main fund (Fund 1) of Strathclyde Pension Fund does not have an asset and liability matching
strategy as this is used mainly by mature funds. The fund does match, to the extent possible, the
types of assets invested to the liabilities in the defined benefit obligation.  As is required by the
pensions and investment regulations, the suitability of various types of investment has been
considered, as has the need to diversify investments to reduce the risk being invested into too narrow
a range.  The Fund invests in equities, bonds, property and in cash. 
I p ct on the  ouncil’s   sh Flow 
The objectives of the fund are to keep employers' contributions at as constant a rate as possible. 
The Fund has agreed a strategy to achieve a funding rate of 100% in the longer term. The scheme is
a multi-employer defined benefit plan and employers' contributions have been determined so that
employee and employer rates are standard across all participating local authorities. Employer's
contributions have been set at 17.5% for 2026/27.
The actuary has estimated the total amount of contributions expected to be made by the Council to
Strathclyde Pension Fund in the year to 31 March 2027 at £29.822 million, compared to estimated
contributions for 2025/26 of £10.463 million. 
The assumed weighted average duration of the defined benefit obligation is 17 years.  
Basis for estimating assets and liabilities 
Liabilities have been assessed on an actuarial basis using the projected unit credit method, which
estimates the pensions that will be payable in future years dependent upon assumptions about
mortality rates, salary levels, etc. The Local Government Pension Scheme has been assessed by
Hymans Robertson, an independent firm of actuaries, based on the latest full valuation of the scheme
as at 31 March 2023. The valuation results have been projected forward to 31 March 2026 based on
a range of assumptions.

Page 120

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 112 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The significant assumptions used by the actuary were: 
Local Government Pension Scheme Assumptions
At 31 March
2026
At 31 March
2025
Long term expected rate of return on Equity Investments 6.3% 5.8%
Long term expected rate of return on Bonds 6.3% 5.8%
Long term expected rate of return on Other Assets 6.3% 5.8%
Long term expected rate of return on Cash 6.3% 5.8%
Longevity assumptions for current pensioners: Men (years) 20.2 19.8
Longevity assumptions for current pensioners: Women (years) 22.8 22.6
Longevity assumptions for future pensioners: Men (years) 20.9 20.6
Longevity assumptions for future pensioners: Women (years) 24.5 24.4
Rate of Inflation 3.0% 2.8%
Rate of increase in salaries 3.7% 3.4%
Rate of increase in pensions 3.0% 2.8%
Rate for discounting scheme liabilities 6.3% 5.8%
Take up of option to convert annual pension into retirement
lump sum for pre April 2009 service 75.0% 75.0%
Take up of option to convert annual pension into retirement
lump sum for post April 2009 service 75.0% 75.0%
The estimation of the defined benefit obligations is sensitive to the actuarial assumptions set out in
the table above. The following sensitivity analyses have been based on possible changes to the
assumptions which could reasonably occur at the end of the reporting period. For each change they
assume that the assumption being analysed changes while all other assumptions remain constant.
The estimations in the sensitivity analysis have followed the accounting policies for the scheme, i.e.
on an actuarial basis using the projected unit credit method. The methods and types of assumptions
used in preparing the sensitivity analysis did not change from those used in the previous period. 
Increase in Employer Liability £  million %
0.1% decrease in Real Discount Rate 14.364 2.0%
0.1% increase in the Salary Increase Rate 0.995 0.0%
0.1% increase in the Pension Increase Rate 13.364 1.0%
1 year increase in the member life expectancy 35.689 4.0% 
The impact of a decrease in these assumptions would be as above but with the movements reversed.
Court of Appeal ruling and regulatory changes
As part of the actuarial valuation of Strathclyde Pension Scheme, carried out at 31 March 2023, the
Scheme’s actuaries, Hymans Robertson, included the impact of recent Court of Appeal rulings and
other regulatory changes in their assessment of the Scheme’s liabilities. This included the impact of a
recent Court of Appeal in relation to transitional protection, consideration of the cost cap mechanism,
regulatory changes in relation to Guaranteed Minimum Pension provision and a recent employment
tribunal decision in relation to survivor benefit, known as the Goodwin ruling.

Page 121

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 113 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
When the Local Government Pension Scheme Scotland benefit structure was reformed in 2015,
transitional protections were applied to certain older members close to normal retirement age.
Following a Court of Appeal ruling that similar transitional protections in other Schemes were unlawful
on the grounds of age discrimination, there was a clear expectation that restitution would see many
more members receiving enhanced benefits. Members in service in 2012 and remaining in active
service at the time of the scheme change in 2015, are subject to an ‘underpin’ which ensures that
these members do not lose out from the introduction of the new scheme. The Scheme’s liabilities
have been valued to include the impact of this ruling, in line with the instructions issued by the
Scottish Public Pensions Agency.
The Cost Cap mechanism, designed to protect employers from significant increases in future pension
costs, now includes the McCloud judgement. An allowance has been made for this judgement in the
latest funding valuation results. 
Following the introduction of the new Single State Pension in April 2016, regulations in relation to the
Guaranteed Minimum Pension were revised to make pensions schemes responsible for ensuring that
the Guaranteed Minimum Pension for members reaching state pension age after 6 April 2016 keep
pace with inflation. Strathclyde Pension Fund’s actuary revised their assumptions on the basis that all
increases will be paid for by employers. This has served to increase the value placed on the
Scheme’s liabilities. The impact of Guaranteed Minimum Pension equalisation on historical transfers
is considered unlikely to be significant and no allowances have been included within the actuarial
calculations at this time. 
Following a Supreme Court ruling in 2017, all public service pension schemes were required to
provide equal survivor benefits for same-sex couples to that provided for widows. Following a recent
employment tribunal decision, a Written Ministerial Statement has concluded that female members in
opposite sex marriages are treated less favourably than female members in same sex marriage or
civil partnership and it is anticipated that regulatory amendments will now need to be made to extend
equal survivor benefits to male survivors of female members resulting in additional liabilities for
female members who died on or after 5 December 2005. The actuarial valuation in relation to this
estimates a very small impact for the typical Fund and no adjustments to account for this have been
included at this time. 
There are additional court cases, namely Walker and O’Brien, that may also impact Local
Government Pension Scheme benefits in the future. Allowances for potential remedies to these
judgements have been deferred pending further guidance from the relevant governing bodies in the
Local Government Pension Scheme.
No additional allowances have been made for the 2023 legal judgement for Section 37 confirmations
from the Virgin Media versus NTL Pension Trustees II Limited ruling as it is unknown whether there
would be any potential remedy required to public service schemes and the legal judgement is being
appealed.

Page 122

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 114 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Note 29: Pensions Schemes Accounted for as Defined Contribution Schemes
Teachers employed by the Council are members of the Teachers’ Pension Scheme, administered by
The Scottish Government. The Scheme provides teachers with specified benefits upon their
retirement, and the Council contributes towards the costs by making contributions based on a
percentage of members’ pensionable salaries.
The Scheme is technically a defined benefit scheme. However, the Scheme is unfunded and the
Scottish Government uses a notional fund as the basis for calculating the employers’ contribution rate
paid by local authorities. The Council is not able to identify its share of underlying financial position
and performance of the Scheme with sufficient reliability for accounting purposes. For the purposes
of this Statement of Accounts, it is therefore accounted for on the same basis as a defined
contribution scheme.
In 2025/26, the Council recognised £20.393 million in respect of teachers’ retirement benefits,
representing 25.72% of pensionable pay. The figures for 2024/25 were £19.659 million and 25.62%.
There were no contributions remaining payable at the year end. The estimated contribution for
2026/27 is £20.330 million. As a proportion of the total contributions into the Scheme during the year
to 31 March 2026, North Ayrshire Council’s contribution equates to approximately 2.27%.
The Council is responsible for the costs of any additional benefits awarded upon early retirement
outside of the terms of the teachers’ scheme. These costs are accounted for on a defined benefit
basis and detailed in note 28. There were no additional costs included for 2025/26.
Note 30: Unusable Reserves
Unusable reserves are those reserves that the Council is not able to utilise to provide services and
comprise:
Unusable Reserves 2025/26
£ million
2024/25
£ million
Revaluation Reserve 213.920 150.071
Capital Adjustment Account 542.926 480.710
Financial Instruments Adjustment Account (2.474) (3.279)
Pensions Reserve (19.445) (20.067)
Accumulated Absences Account (13.889) (12.099)
Total Unusable Reserves 721.038 595.336 
Revaluation Reserve
The Revaluation Reserve contains the gains made by the Council arising from increases in the value
of its Property, Plant and Equipment.  The balance is reduced when assets with accumulated gains
are:
• Re-valued downwards or impaired and the gains are lost.
• Used in the provision of services and the gains are consumed through depreciation.
• Disposed of and the gains are realised.
Only revaluation gains accumulated since 1 April 2007, the date that the Reserve was created, are
contained here. Accumulated gains arising before that date are consolidated into the balance on the
Capital Adjustment Account.

Page 123

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 115 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Revaluation Reserve 2025/26
£ million
2024/25
£ million
Balance at 1 April 150.071 192.291
Surplus or (deficit) on revaluation of non-current assets posted
to the CIES 65.721 (36.059)
Difference between fair value depreciation and historical cost
depreciation (4.093) (5.704)
Amount written off to the Capital Adjustment Account 2.221 (0.457)
Total Revaluation Reserve 213.920 150.071
Capital Adjustment Account
The Capital Adjustment Account absorbs the timing differences arising from the different
arrangements for accounting for the consumption of non-current assets and for financing the
acquisition, construction or enhancement of those assets under statutory provisions.  
The account is debited with the cost of acquisition, construction or enhancement as depreciation,
impairment losses and amortisations are charged to the Comprehensive Income and Expenditure
Statement (with reconciling postings from the Revaluation Reserve to convert fair value figures to a
historical cost basis).
The account is credited with the amounts set aside by the Council as finance for the costs of
acquisition, construction and enhancement.  The account contains revaluation gains accumulated on
Property, Plant and Equipment before 1 April 2007, the date that the Revaluation Reserve was
created to hold such gains.
Capital Adjustment Account 2025/26
£ million
2024/25
£ million
Balance at 1 April 480.710 556.052
Charges for depreciation and impairment of non current assets (1.377) (142.482)
Gains/(losses) on the disposal of non current assets 0.225 (0.344)
Capital grants and contributions credited to the Comprehensive
Income and Expenditure Statement that have been applied to
capital financing
37.049 36.983
Statutory provision for the financing of capital investment
charged against the General Fund and Housing Revenue 19.906 17.573
Statutory adjustment in relation to Service Concession
arrangements (3.167) (3.138)
Capital expenditure charged against the General Fund and
Housing Revenue Account balances 9.580 15.402
Use of Capital Fund to fund Capital expenditure 0 0.410
Movement in the donated assets account 0 0.254
Total Capital Adjustment Account 542.926 480.710 
Financial Instruments Adjustment Account
The Financial Instruments Adjustment Account absorbs the timing differences arising from the
different arrangements for accounting for income and expenses relating to certain financial
instruments and for bearing losses or benefiting from gains per statutory provisions.

Page 124

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 116 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Financial Instruments Adjustment Account 2025/26
£ million
2024/25
£ million
Balance at 1 April (3.279) (4.362)
Premiums incurred in previous financial years to be charged
against the General Fund Balance in accordance with statutory
requirements
0.775 0.776
Amount by which finance costs charged to the Comprehensive
Income and Expenditure Statement are different from finance
costs chargeable in the year in accordance with statutory
requirements
0.030 0.307
Total Financial Instrument Adjustment Account (2.474) (3.279) 
Pensions Reserve 
The Pensions Reserve absorbs the timing differences arising from the different arrangements for
accounting for post-employment benefits and for funding benefits in accordance with statutory
provisions. The Council accounts for post-employment benefits in the Comprehensive Income and
Expenditure Statement as the benefits are earned by employees accruing years of service, updating
the liabilities recognised to reflect inflation, changing assumptions and investment returns on any
resources set aside to meet the costs. However, statutory arrangements require benefits earned to
be financed as the Council makes employer’s contributions to pensions funds or eventually pays any
pensions for which it is directly responsible.  
The balance on the Pensions Reserve indicates a net liability. This has been determined by the
Scheme actuaries as the net present value of any economic benefits available in the form of refunds
or reductions in future contributions to Strathclyde Pension Fund, assuming that minimum funding
levels are maintained. 
Pensions Reserve 2025/26
£ million
2024/25
£ million
Balance at 1 April (20.067) (23.183)
Actuarial gains or (losses) on pensions assets and liabilities (18.271) (176.547)
Actuarial gains or (losses) on pensions assets and liabilities due
to asset ceiling 0 178.603
Reversal of items relating to retirement benefits debited or
credited to the Surplus or Deficit on the Provision of Services in
the Comprehensive Income and Expenditure Statement
18.893 1.060
Total Pensions Reserve (19.445) (20.067) 
Accumulated Absences Account 
The Accumulated Absences Account absorbs the differences that would otherwise arise on the
General Fund Balance from accruing for compensated absences earned but not taken in the year. 
Statutory arrangements require that the impact on the General Fund Balance is neutralised by
transfers to or from the Account.

Page 125

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 117 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Accumulated Absence Account 2025/26
£ million
2024/25
£ million
Balance at 1 April (12.099) (10.661)
Amount by which officer remuneration charged to the
Comprehensive Income and Expenditure Statement on an
accruals basis is different from remuneration chargeable in the
year in accordance with statutory requirements
(1.790) (1.438)
Total Accumulated Absence Account (13.889) (12.099) 
Note 31: Related Parties
The Council is required to disclose material transactions with related parties – bodies or individuals
that have the potential to control or influence the Council or to be controlled or influenced by the
Council.  Disclosure of these transactions allows the reader to assess the extent to which the Council
might have been constrained in its ability to limit another party’s ability to bargain freely with the
Council.
Scottish Government
The Scottish Government has effective control over the general operations of the Council – it is
responsible for providing the statutory framework within which the Council operates, provides the
majority of its funding in the form of grants and prescribes the terms of many of the transactions that
the Council has with other parties (e.g. council tax bills, housing benefits). Grants received from
government departments are set out in Note 9.
Members
Elected Members of the Council have direct control over the Council’s financial and operating
policies. The total of members’ allowances paid in 2025/26 is shown in the Remuneration Report.
During 2025/26 payment to voluntary organisations/charities to the value of £0.067 million were made
in which two members had an interest. Details of all member interests are recorded in the Register of
Members’ Interest.
Officers
The Chief Executive of North Ayrshire Council and the Director of Communities are Directors in North
Ayrshire Ventures Trust. There is no remuneration associated with these positions. Details of the
Council’s interests in these organisations are outlined in the Group Accounts at Note 39.
North Ayrshire Integration Joint Board
The North Ayrshire Integration Joint Board was established on 1 April 2015 as a partnership between
North Ayrshire Council and Ayrshire and Arran Health Board and is responsible for planning and
overseeing the delivery of a full range of community health and social work/social care services,
including those for older people, adults, children and families, people in the Criminal Justice System
and allied health professions. In the year 2025/26 the following North Ayrshire Council financial
transactions were made with North Ayrshire Integration Joint Board relating to the integrated and
social care functions:

Page 126

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 118 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Related Parties 2025/26
£ million
2024/25
£ million
Contribution made to North Ayrshire Integration Joint Board 142.673 135.242
Commissioning income received from North Ayrshire
Integration Joint Board 170.784 163.907
North Ayrshire Integration Joint Board balance due from the
Council 2.822 3.161
The balance due (to) or from the Council reflects the year end variance on health and social care
activities. 
Other Public Bodies
The Council has substantial interests in other public bodies, details of which are disclosed in the
Group Balance Sheet.
In addition, the Council received grants and income from other public bodies in 2025/26 as follows:
• Ayrshire & Arran Health Board (Health Resource Transfer) – grants and income of £26.685 million.
Other entities controlled or significantly influenced by the Council
Details of all other public bodies in which the Council has a significant interest are explained in the
Group Accounts at Note 39.
Note 32: Contingent Asset
At 31 March 2026, the Council has identified a contingent asset in relation to future developer
contributions. In relation to the granting of planning permission for the erection of dwellings in the
West Kilbride area, the developer has entered into an agreement under Section 75 of the Town and
Country Planning (Scotland) Act 1997 to provide North Ayrshire Council with an education
contribution of up to £0.758 million towards alleviating accommodation pressures at West Kilbride
Primary School. Receipt of the contribution is contingent on the completion of each individual
dwelling. Receipts of £0.180m have been confirmed to date leaving an outstanding contribution of up
to £0.578m.

Page 127

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 119 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Note 33: Contingent Liabilities
At 31 March 2026, the Council had identified a number of material contingent liabilities:
Municipal Mutual Insurance (MMI)
In March 2012 the Supreme Court judgement in the Employers’ Liability Policy Trigger Litigation ruled
that Municipal Mutual Insurance will be held liable for asbestos related cases up to 30 September 1992
when they ceased writing employee liability business and went into run off. Although the company is still
considering the overall liability position, it has now been confirmed that ‘clawback’ arrangements will be
activated in relation to claims paid. The Council's Insurance Fund accommodates known claims actuals
and estimated settlement costs in this respect. However, there is the possibility that further claims may
emerge resulting in a future liability. 
Historic Child Abuse
The Limitation (Childhood Abuse) (Scotland) Act 2017 received royal assent on 28 July 2017. The
principal effect of the legislation is to remove the three year time bar on survivors of abuse bringing
forward claims for compensation. This would apply for all claims from 1964 onwards and there is a
potential cost to the Council in respect of claims which may arise under the legislation. Under the
terms of the Local Government (Transitional Financial Provisions) (Scotland) Order 1996, Glasgow
City Council acts as the relevant accounting authority for residual matters relating to the former
Strathclyde Regional Council. Glasgow City Council has identified a number of outstanding claims at
31 March 2026 which may give rise to costs for North Ayrshire Council. However, the value of any
potential settlements remains uncertain pending completion of the legal process.
Equal Pay Claims
Following the settlement of Equal pay claims during 2025/26, there remains a risk that future claims
could be submitted. At this time, it is not currently possible to determine either the potential financial
exposure or probability around any future liability. This position will continue to be monitored. 
Supply Chain Issues and Cost Volatility
The impact of supply chain issues and cost volatility across the construction sector has resulted in
significant pressures for contractors who entered fixed price contracts. The Council is not
contractually liable for any additional payments, however, this may be subject to challenge. The level
of volatility may also impact on current and future projects as contractors may be less willing to enter
into further fixed price contracts.
Housing Benefit Income
Following changes in the guidance in relation to Housing Benefit claims for the provision of supported
accommodation, a review of current and historic claims submitted to the Department for Work and
Pensions is currently underway. Once completed, the review may result in partial repayment of
Housing Benefit income received over a number of financial years.

Page 128

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 120 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Note 34: Events after the Balance Sheet Date
The unaudited accounts were authorised for issuing on 24 June 2026 by the Head of Finance. Where
events taking place before this date provided information about conditions existing at 31 March 2026,
the figures in the financial statements and notes have been adjusted in all material respects to reflect
the impact of this information.  Events taking place after this date are not reflected in these accounts.
Notes to the Cash Flow Statement
Note 35: Cash Flow – Operating Activities 
The net deficit on the provision of services has been adjusted for the following movements: 
Net cash flow from Operating Activities 2025/26
£ million
2024/25
£ million
Net cash inflow from revenue activities (52.317) (36.198)
Interest received 1.361 1.732
Interest paid (24.769) (22.118)
Total (75.725) (56.584) 
Non-cash Movements 2025/26
£ million
2024/25
£ million
Depreciation and Impairment (3.248) (147.902)
Amortisation 0 (0.030)
Movement in Pension Liability 18.893 1.060
Decrease in Inventories 0.028 (0.144)
(Decrease) or Increase in Debtors 6.062 (22.812)
Increase in Bad Debt Provision (0.113) (0.311)
Decrease in Creditors (39.972) (0.798)
Carrying amount of non current assets sold (0.952) (1.146)
Other non cash items charged to the net surplus or deficit on
the provision of services 0.849 0.862
Total (18.453) (171.221) 
Investing and Financing Activities 2025/26
£ million
2024/25
£ million
Proceeds from sale of non current assets 1.177 0.345
Capital Grants 37.049 36.983
Total 38.226 37.328

Page 129

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 121 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Note 36: Cash Flow – Investing Activities 
Net cash flow from Investing Activities 2025/26
£ million
2024/25
£ million
Purchase of property, plant and equipment, investment
property and intangible assets 100.503 164.476
Proceeds from short term and long term investments 0 0
Purchase of short term and long term Investments 10.275 0.032
Proceeds from the sale of property, plant and equipment,
investment property and intangible assets (1.177) (0.345)
Other receipts from investing activities (37.049) (36.983)
Total 72.552 127.180 
Note 37: Cash Flow – Financing Activities 
Net cash flow from Financing Activities 2025/26
£ million
2024/25
£ million
Cash receipts of short term and long term borrowing (20.000) (155.000)
Cash payments for the reduction of the outstanding liabilities
relating to service concession contracts 11.258 6.523
Repayments of short and long term borrowing 27.273 42.508
Total 18.531 (105.969) 
Note 38: Cash Flow – Cash and Cash Equivalents 
Cash and cash equivalents 2025/26
£ million
2024/25
£ million
Cash held by officers 0.004 0.005
Bank current accounts (1.733) (2.876)
Short-term deposits 49.100 65.600
Total 47.371 62.729

Page 130

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 122 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Notes to the Group Accounts
Note 39: Notes to the Group Accounts
The Code of Practice on Local Authority Accounting in the United Kingdom 2025/26 (The Code)
requires local authorities to consider their interests in all types of entity. This includes other local
authorities or similar bodies defined in section 106 of the Local Government (Scotland) Act 1973 e.g.
statutory bodies such as transport authorities and valuation boards. Authorities are required to
prepare a full set of group accounts in addition to their own Council’s accounts where they have a
material interest in such entities. The financial statements in the Group Accounts of North Ayrshire
Council are prepared in accordance with the accounting policies set out in Note 43, with the additions
and exceptions shown below.
The Group Accounts consolidate the results of the Council with eight other entities.  These
organisations are entirely independent of the Council under law and for taxation.  
Retirement Benefits
North Ayrshire Leisure Limited, a subsidiary of the Council, also participates in the Strathclyde
Pension Scheme. In the accounts of North Ayrshire Leisure Limited, however, the cost of retirement
benefits is not reversed out after the Surplus or Deficit on provision of services. 
The net pension liability is included within its share of the overall deficit on the Group Comprehensive
Income and Expenditure Statement.
Valuation of Property, Plant and Equipment and Investment Properties
The basis of valuation across the combining entities is in accordance with the Code and there are no
material inconsistencies with the policies adopted by North Ayrshire Council.  The Strathclyde
Concessionary Travel Scheme Joint Committee has no Property, Plant or Equipment.

Page 131

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 123 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
2025/26
Group Property, Plant and
Equipment
Common
Good
Funds
£ million 
Trust
Funds
£ million 
North
Ayrshire
Ventures
Trust
£ million 
North
Ayrshire
Leisure
Limited
£ million 
Total
£ million
Cost or Valuation at 1 April
2025 3.033 0.110 2.144 1.184 6.471
Additions 0 0 0 0 0
Revaluations recognised in the
Revaluation Reserve (0.428) 0.006 (0.134) 0 (0.556)
Impairments recognised in the
Net Cost of Services 0 0 0 0 0
Derecognition - Disposals 0 0 0 0 0
Balance at 31 March 2026 2.605 0.116 2.010 1.184 5.915
Accumulated Depreciation
and Impairment at 1 April 2025 0 0 0 0.270 0.270
Depreciation Charge 0 0 0 0 0
Depreciation written out to the
Revaluation Reserve 0 0 0 0 0
Balance at 31 March 2026 0 0 0 0.270 0.270
Net Book Value at 31 March
2026 2.605 0.116 2.010 0.914 5.645
Net Book Value at 31 March
2025 3.033 0.110 2.144 0.914 6.201
2024/25
Group Property, Plant and
Equipment
Common
Good
Funds
£ million 
Trust
Funds
£ million 
North
Ayrshire
Ventures
Trust
£ million 
North
Ayrshire
Leisure
Limited
£ million
(restated) 
Total
£ million
(restated)
Cost or Valuation at 1 April
2024 2.898 0.110 2.184 0.935 6.127
Additions 0 0 0 0.249 0.249
Revaluations recognised in the
Revaluation Reserve 0.135 0 (0.040) 0 0.095
Balance at 31 March 2025 3.033 0.110 2.144 1.184 6.471
Accumulated Depreciation
and Impairment at 1 April 2024 0 0 0 0.152 0.152
Depreciation Charge 0 0 0 0.118 0.118
Balance at 31 March 2025 0 0 0 0.270 0.270
Net Book Value at 31 March
2025 3.033 0.110 2.144 0.914 6.201
Net Book Value at 31 March
2024 2.898 0.110 2.184 0.783 5.975

Page 132

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 124 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Depreciation 
The useful lives and categories of assets for the Group are:
Category of Asset Useful Economic Life
Buildings 1 to 100 years
Infrastructure up to 40 years
Plant and Equipment 1 to 30 years
Vehicles 1 to 25 years 
Inventories
The Council, North Ayrshire Leisure Limited and Strathclyde Partnership for Transport use the lower
of cost or net realisable value. None of the other bodies in the group hold inventories. 
onsider tion  or Acquisition o  Associ tes’  et Assets or  i  ilities
The Council has acquired its share of the net assets of its associates for a nil consideration and no
goodwill has been included in the Group Balance Sheet.
Basis of Consolidation
Subsidiaries are consolidated on a line-by-line basis. All other entities are accounted for under the
accounting conventions of the “acquisition basis” using the equity method – the Council’s share of the
net assets or liabilities of each entity is incorporated and adjusted each year by the Council’s share of
the entities’ results and its share of other gains and losses (recognised in the Group Comprehensive
Income and Expenditure Statement).
All entities have the same reporting date as the Council.  
Restrictions on transfer of funds
The Council’s share of the reserves of its associate and joint ventures is unusable i.e. it cannot be
used to fund the Council’s services or to reduce taxation. The subsidiary, North Ayrshire Leisure
Limited, is entirely independent of the Council under law and for taxation. The Council is unable to
access its reserves, whether classified as usable or otherwise in North Ayrshire Leisure Limited’s
own accounts.
Combining Entities 
Subsidiaries
A subsidiary is a body controlled by North Ayrshire Council. The Common Good Funds, Trust Funds,
North Ayrshire Ventures Trust Limited and North Ayrshire Leisure Limited have been treated as
subsidiaries with assets, liabilities, reserves, income and expenses being consolidated on a line-by-
line basis. 
North Ayrshire Leisure Limited’s annual accounts for the period ended March 2026 are not available
at this time. The Group accounts have been prepared using North Ayrshire Leisure Limited’s annual
accounts for the period ended March 2025.
The Group Comprehensive Income and Expenditure Statement on page 59 includes net
comprehensive income for the year of £0.413 million.

Page 133

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 125 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The Group Balance Sheet on page 61 includes net assets of £14.646 million in relation to these
bodies. Further details for each entity are as follows: 
Subsidiary Nature of Body Accounts available from
Common
Good Fund
To award community grants across North
Ayrshire
North Ayrshire Council,
Cunninghame House, Irvine,
KA12 8EE
Trust Funds To provide school prizes at designated schools,
maintain specified lairs within cemeteries and for
the benefit of the poor
North Ayrshire Council,
Cunninghame House, Irvine,
KA12 8EE
North
Ayrshire
Ventures
Trust
To award community grants across North
Ayrshire
North Ayrshire Council,
Cunninghame House, Irvine,
KA12 8EE
North
Ayrshire
Leisure Ltd
Provide facilities for recreation, sport, cultural and
other leisure activities for the benefit of the
community in North Ayrshire.  North Ayrshire
Council have an agreement in place whereby
they will pay for any redundancy or early
retirement costs incurred by NALL.
North Ayrshire Leisure Limited,
22 Quarry Road, Irvine, 
KA12 0TH 
2025/26
Share of Subsidiaries Share
Share of
Assets
£ million
Share of
Liabilities
£ million
Share of
Revenues
£ million
Share of
(Profit) or
Loss
£ million
Common Good Funds 100% 4.800 0 (0.227) 0.134
Trust Funds 100% 0.562 0 (0.085) (0.064)
North Ayrshire Ventures Trust 100% 8.523 (0.014) (0.522) (0.213)
North Ayrshire Leisure Limited 100% 1.792 (1.017) 0 0
2024/25 (restated)
Share of Subsidiaries Share
Share of
Assets
£ million
Share of
Liabilities
£ million
Share of
Revenues
£ million
Share of
(Profit) or
Loss
£ million
Common Good Funds 100% 5.362 0 (0.235) (0.112)
Trust Funds 100% 0.492 0 (0.025) 0.016
North Ayrshire Ventures Trust 100% 8.430 0 (0.580) (0.179)
North Ayrshire Leisure Limited 100% 1.792 (1.017) (5.983) 0.262 
Associates
An associate is a body over which North Ayrshire Council has significant influence. Strathclyde
Partnership for Transport, the Strathclyde Concessionary Travel Scheme Joint Committee and the
Ayrshire Valuation Joint Board have been treated as associates and have been consolidated on an
equity basis with a share of the surplus or deficit and net assets included within the group statements.
This is based on North Ayrshire Council’s contribution to the estimated running costs of each body. 
The Group Comprehensive Income and Expenditure Statement on page 59 includes net
comprehensive income for the year of £2.458 million.

Page 134

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 126 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The Group Balance Sheet on page 61 includes net assets of £35.093 million in relation to these
bodies. Further details for each entity are as follows:
Associate Nature of Body Accounts available from
Strathclyde
Partnership for
Transport
Regional transport partnership for the West of
Scotland
Strathclyde Partnership for
Transport, 131 St Vincent
Street, Glasgow, G2 5JF
Strathclyde
Concessionary
Travel
Scheme Joint
Committee
Oversees the operation of the Concessionary
Fares scheme for public transport in the West of
Scotland
Strathclyde Concessionary
Travel Scheme, Strathclyde
Partnership for Transport, 131
St Vincent Street, Glasgow, G2
5JF
Ayrshire
Valuation Joint
Board
Maintains the electoral, council tax and non-
domestic rates registers for the three councils of
North Ayrshire, East Ayrshire and South
Ayrshire
Ayrshire Valuation Joint Board,
9 Wellington Square, Ayr, KA7
1HL 
2025/26
Share of Associates Share
Share of
Assets
£ million
Share of
Liabilities
£ million
Share of
Revenues
£ million
Share of
(Profit) or
Loss
£ million
Strathclyde Partnership for
Transport 6% 36.750 (2.321) (8.306) (1.908)
Strathclyde Concessionary Travel
Scheme Joint Committee 7% 0.339 (0.020) (0.304) (0.059)
Ayrshire Valuation Joint Board 36% 0.438 (0.093) (1.086) 0.108
2024/25
Share of Associates Share
Share of
Assets
£ million
Share of
Liabilities
£ million
Share of
Revenues
£ million
Share of
(Profit) or
Loss
£ million
Strathclyde Partnership for
Transport 6% 33.074 (1.087) (7.738) (1.898)
Strathclyde Concessionary Travel
Scheme Joint Committee 7% 0.348 (0.087) (0.306) 0.102
Ayrshire Valuation Joint Board 36% 0.473 (0.086) (1.023) 0.087 
Joint Ventures
A joint venture is a body in which two or more parties have contractually agreed to share control.
North Ayrshire Council is a partner in one joint venture, the North Ayrshire Integration Joint Board.
The joint venture has been consolidated on an equity basis with a share of the surplus or deficit and
net assets included within the group statements. 
The Group Comprehensive Income and Expenditure Statement on page 59 includes net
comprehensive expenditure for the year of £0.170 million. In addition, the Group Comprehensive
Income and Expenditure Statement includes a 50% share of the reported (surplus) or deficit of the
North Ayrshire Integration Joint Board based on the agreed share of control.

Page 135

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 127 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The Group Balance Sheet on page 61 includes net assets of £1.411 million in relation to these
bodies. Further details for this entity are as follows:
Joint Venture Nature of Body Accounts available from
North Ayrshire
Integration
Joint Board
Its purpose is to improve the wellbeing of
families, our communities and of people who use
health and social care services.  The Integration
Scheme determines when the Council will have
shared responsibility for additional funding with
NHS Ayrshire and Arran and is linked to
demographic shifts and demand volumes linked
to service delivery.
There is an agreement that any over or
underspends are shared between the controlling
entities. The % splits vary depending on which
service is involved.
North Ayrshire Council,
Cunninghame House, Irvine,
KA12 8EE 
2025/26
Share of Joint Ventures Share
Share of
Assets
£ million
Share of
Liabilities
£ million
Share of
Revenues
£ million
Share of
(Profit) or
Loss
£ million
North Ayrshire Integration Joint
Board 50% 1.411 0 (200.169) 0.170
2024/25
Share of Joint Ventures Share
Share of
Assets
£ million
Share of
Liabilities
£ million
Share of
Revenues
£ million
Share of
(Profit) or
Loss
£ million
North Ayrshire Integration Joint
Board 50% 1.581 0 (189.866) 1.174
The net investments and liabilities included within the Group Balance Sheet for each Associate or 
Joint Venture are as follows: 
Investment in
Associates and
Joint Ventures
Strathclyde
Partnership
for Transport
£ million
Strathclyde
Concessionary
Travel Scheme
Joint
Committee
£ million
Ayrshire
Valuation
Joint Board
£ million
North
Ayrshire
Integration
Joint Board
£ million
Total
£ million
Total 34.429 0.319 0.345 1.411 36.504 
Non-material interests in other entities 
The Council does not have any other material interest in any entity not mentioned above.

Page 136

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 128 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Accounting Policies and Assumptions
Note 40: Assumptions Made About the Future and Other Major Sources of
Estimation Uncertainty  
The financial statements contain estimated figures that are based on assumptions made by the
Council about which there is a degree of uncertainty.  Estimates are made taking into account
historical experience, current trends and other relevant factors.  However, because balances cannot
be determined with certainty, actual results could be materially different from the assumptions and
estimates.  
The items in the Council’s Balance Sheet at 31 March 2026 for which there is a significant risk of
material adjustment in the forthcoming financial year are outlined in the table that follows: 
Item Uncertainties Effect if Actual Results Differ from
Assumptions
Pensions Asset or
Liability
Estimation of the net asset / liability in
relation to pensions depends on a
number of complex judgements relating to
the discount rate used, the rate at which
salaries are projected to increase,
changes in retirement ages, mortality
rates and expected returns on pension
fund assets. A firm of consulting actuaries
is engaged to provide the Pension Fund
with expert advice about the assumptions
to be applied.
In accordance with the requirements of
International Accounting Standard  19 and
International Financial Reporting
Interpretations Committee – Interpretation
14, the Council has applied an asset
ceiling of nil. This is on the basis that a
minimum funding requirement exists in
relation to the Strathclyde Pension Fund.
The effects on the net pensions asset or
liability of changes in individual
assumptions can be measured. For
instance, a 0.1% increase in the pension
increase rate assumption would result in
an increase in the pension liability of
£13.364 million. However, the
assumptions interact in complex ways.
If the current triennial valuation of the
Strathclyde Pension Fund determined
that no minimum funding requirement
exists, an additional net pension asset of
up to £632.932 million may be
recognised.

Page 137

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 129 
OFFICIAL INFORMATION
OFFICIAL INFORMATION 
Item Uncertainties Effect if Actual Results Differ from
Assumptions
Collection Levels of
Arrears
At 31 March 2026, the Council had a
balance of trade debtors of £21.303m  A
review of significant balances suggested
that an allowance for potential impairment
losses of 29.3% (£6.238m) was
appropriate.  However, in the current
economic climate, it is not certain that
such an allowance would be sufficient.
If collection rates were to deteriorate, a
10% increase in the amount of potential
impairment losses would require an
additional amount of £0.624m to be set
aside as an allowance.
Property, Plant and
Equipment
Assets are depreciated over useful lives
that are dependent on assumptions about
the level of repairs and maintenance that
will be incurred in relation to individual
assets. Any reduction in the current
spend on repairs and maintenance may
reduce the useful lives assigned to
assets.
If the useful life of an asset is reduced,
depreciation increases and the carrying
value of the asset falls. It is estimated
that the annual depreciation charge for
properties including Council houses
would increase by £1.917m if useful
lives were reduced by one year.
Private Finance
Initiatives, Non Profit
Distributing Models and
Similar Contracts
The Council is deemed to control the
services provided under the agreement
for the provision of educational
establishments. The accounting policies
for Public Private Partnership schemes
and similar arrangements have been
applied and the assets under the
contracts are included within Property,
plant and equipment on the Council’s
Balance Sheet. In terms of financial
modelling, Retail Price Index and Retail
Price Index X indices are used.
Any increase in these indices above that
which are set in the funding models will
require the Council to identify and
allocate additional funding to the
schemes. For instance, a 0.5% increase
in the index rate used in the model would
result in an increase of £11.242m in
unitary charge payments over the
remaining term of the arrangements.
Property Asset Values The 2025/26 Code brings in a
requirement to apply annual indexation to
Land and Building assets in the years
between formal valuations, to ensure the
value of an asset is kept materially up to
date as an approximation of market
changes.  Indices have been selected
and applied based on asset types as
outlined in note 15 on page 90.
A 1% change in the indexation rate for
each of the indices used would result in
a movement of £1.694m in the closing
value of the Council’s Property, Plant
and Equipment on the Council’s balance
sheet.

Page 138

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 130 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Note 41: Accounting Standards issued, not yet Adopted 
The Code requires the Council to disclose information about accounting changes that will be required
by new accounting standards in the 2026/27 Code due to be adopted in future years and the possible
impact.   
For the 2025/26 accounts, the accounting policy changes that require to be reported are covered by
the following accounting standards: 
Amendments to FRS 102 The Financial Reporting Standard applicable in the UK and Republic
of Ireland (Amendments to Heritage assets) issued in March 2024. The amendments provide further
guidance on how to determine whether an asset meets the definition of a heritage asset and the
requirements for leases of heritage assets. 
Amendments to the Classification and Measurement of Financial Instruments (Amendments to
IFRS 9 and IFRS 7) issued in May 2024. The amendments relate to settling financial liabilities using
an electronic payment system and assessing contractual cash flow characteristics of financial assets. 
Annual improvements to IFRS accounting standards – Volume 11 issued in July 2024. These
include amendments to IFRS 1 First time adoption of IFRS, IFRS7 and IFRS9 Financial Instrument
disclosures, IFRS Consolidated Financial Statements and IAS17 Statement of Cash Flows. 
Contracts Referencing Nature-dependent Electricity (Amendments to IFRS 9 and IFRS 7) issued
in December 2024. This amendment is intended to enable better reporting of the effects of nature-
dependent electricity contracts.   
In the applicable cases detailed above, implementation is required from 1 April 2026 or beyond,
meaning that there is no impact on the 2025/26 financial statements.

Page 139

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 131 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Note 42: Critical judgements in applying accounting policies
In applying the accounting policies set out in Note 43, the Council has had to make certain
judgements about complex transactions or those involving uncertainty about future events.  The
critical judgements made in the financial statements are:
Future Levels of Local Government Funding
There is a high degree of uncertainty about future levels of funding for local government. Under the
Council’s Medium Term Financial Plan and Long Term Financial Outlook, a potential funding gap of
£127million has been identified for the period to 2033/34. Through the development of robust
financial planning and management to ensure that resources are targeted at key priorities, the
Council has determined that any uncertainty over future funding is not yet sufficient to provide an
indication that the assets of the Council might be impaired as a result of a need to close facilities and
reduce levels of service provision. 
Cost Volatility
The long-term impact of the cost of living crisis, increases in interest rates predicted by the Bank of
England and the wider international impacts including the middle east conflict have resulted in
significant volatility in supply chain costs and contractor availability in relation to the energy, food, fuel
and construction sectors. This is likely to impact both on the costs of providing services and in the
demand for services from North Ayrshire residents going forward. The Council continues to monitor
the situation carefully and has determined that the potential increase to operating costs is not yet
sufficient to indicate that the assets of the Council might be impaired or that service levels may be
reduced.
Treatment of North Ayrshire Leisure Limited 
In accordance with International Financial Reporting Standard 10, the 2025/26 financial results of
North Ayrshire Leisure Limited have been consolidated on a Subsidiary basis within the Council’s
group accounts. As a result, 100% of North Ayrshire Leisure Limited’s assets and liabilities, with a net
value of £0.775 million, have been consolidated within the Group Balance Sheet.
Exposure to Possible Losses
The Council has considered its exposure to possible losses and, in accordance with International
Accounting Standard 37, made adequate provision where it is probable that an outflow of resources
will be required and can be measured reliably. Where it has not been possible to measure the
obligation, and its existence is dependent on future events, material contingent liabilities have been
disclosed in Note 33. These judgements have included the potential for future litigation in relation to
events prior to the formation of North Ayrshire Council in areas including employers’ liability and
historic child abuse and reflect North Ayrshire Council’s position as the statutory successor to a
number of former local authorities.

Page 140

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 132 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Private Finance Initiatives and Non-Profit Distributing Models
The Council has entered into Private Finance Initiatives, Non-Profit Distributing Models and similar
contracts for the provision of educational buildings, their maintenance and related facilities, and a
share in a contract for waste recycling, recovery and treatment. The Council has considered the tests
under International Financial Reporting Interpretations Committee – Interpretation 12 and determined
that it controls the services provided under the contracts and the residual value of the schools at the
end of the agreements. The accounting policies relating to Public Private Partnership or Non Profit
Distributing and similar contracts have been applied to these arrangements and assets with a net
book value of £143.588 million have been recognised as Property, Plant & Equipment on the
Council’s Balance Sheet. 
Note 43: Accounting Policies
General Principles
The Accounts summarise the Council’s transactions for the 2025/26 financial year and its position at
the year end of 31 March 2026.  The Council is required to prepare an annual Statement of Accounts
by the Local Authority Accounts (Scotland) Regulations 2014 and Section 12 of the Local Government
in Scotland Act 2003 requires that they are prepared in accordance with proper accounting practices.
These practices, under Section 21 of the 2003 Act, primarily comprise the Code of Practice on Local
Authority Accounting in the United Kingdom 2025/26, supported by International Financial Reporting
Standards (IFRS) and statutory guidance under Section 12 of the 2003 Act. 
The accounting convention adopted in the financial statements is principally historical cost, modified
by the revaluation of certain categories of non-current assets and financial instruments.
The accounts have been prepared on a going concern basis. 
Accruals of Income and Expenditure
Activity is accounted for in the year that it takes place, not simply when cash payments are made or
received. In particular:
• Revenue from contracts with service recipients, whether for services or the provision of goods, is
recognised when (or as) the goods or services are transferred to the service recipient in
accordance with the performance obligations of the contract.
• Supplies are recorded as expenditure when they are consumed. Where there is a gap between the
date supplies are received and their consumption, they are carried as inventories on the Balance
Sheet.
• Expenses in relation to services received (including services provided by employees) are recorded
as expenditure when the services are received rather than when payments are made.
• Interest payable on borrowings and receivable on investments is accounted for on the basis of the
effective interest rate for the relevant financial instrument rather than the cash flows fixed or
determined by the contract. 
• Suppliers’ invoices paid in the two weeks following the year end have been included together with
specific accruals in respect of further material items, provided the goods and services were
received prior to 31 March. 
• Where revenue and expenditure have been recognised but cash has not been received or paid, a
debtor or creditor for the relevant amount is recorded in the Balance Sheet.  The de minimis level
for recognition of such transactions has been agreed at £5,000, therefore all known transactions of
£5,000 or above have been included.

Page 141

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 133 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
• Where debts may not be settled, the balance of debtors is written down and a charge made to
revenue for the income that might not be collected. 
Allocation of Central Support Costs
A proportion of net central support services is allocated to services outwith the general fund. The
balance of the net central support services is reported on the basis of how the services are structured
and how the Council operates, monitors and manages financial performance.
Cash and Cash Equivalents
Cash is represented by cash in hand and deposits with financial institutions repayable without penalty
on notice of not more than 24 hours.  Cash equivalents are investments that mature in three months
or less from the date of acquisition and that are readily convertible to known amounts of cash with
insignificant risk of change in value.
In the Cash Flow Statement, cash and cash equivalents are shown net of bank overdrafts that are
repayable on demand and form an integral part of the Council’s cash management. 
Prior Period Adjustments, Changes in Accounting Policies and Estimates and Errors
Prior period adjustments may arise as a result of a change in accounting policies or to correct a material
error. Changes in accounting estimates are accounted for prospectively, i.e. in the current and future
years affected by the change and do not give rise to a prior period adjustment. 
Changes in accounting policies are only made when required by proper accounting practices or the
change provides more reliable or relevant information about the effect of transactions, other events
and conditions on the Council’s financial position or performance. When a change is made, it is applied
retrospectively (unless otherwise stated) by adjusting opening balances and comparative amounts for
the prior period as if the new policy had always been applied.
Material errors discovered in prior years are corrected retrospectively by amending opening balances
and comparative amounts for the prior period. 
Charges to Revenue for Non-Current Assets
Services are charged with the following amounts to record the cost of holding non-current assets during
the year:
• Depreciation attributable to the assets used by the relevant service.
• Revaluation and impairment losses on assets used by the service where there are no accumulated
gains in the Revaluation Reserve against which the losses can be written off. 
• Amortisation of intangible fixed assets attributable to the service. 
The Council is not required to raise council tax to cover depreciation, revaluation and impairment losses
or amortisation. However, it is required to make an annual contribution from revenue towards the
reduction in its overall borrowing requirement, equal to an amount calculated on a prudent basis
determined by the Council in accordance with the Statutory Repayment of Loans Fund Advances. This
is known as the Loans Fund Principal Repayment. Depreciation, revaluation and impairment losses
and amortisation are replaced by the Loans Fund Principal Repayments in the General Fund Balance
by way of an adjusting transaction within the Capital Adjustment Account in the Movement in Reserves
Statement for the difference between the two.

Page 142

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 134 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Employee Benefits 
Benefits Payable during Employment
Short-term employee benefits are those due to be settled wholly within 12 months of the year end.
They include such benefits as salaries, wages, overtime and paid annual leave for current employees
and are recognised as an expense in the year in which employees render service to the Council.  All
salaries and wages earned up to 31 March are included in the financial statements irrespective of when
the payment was made. An accrual is made for the cost of holiday entitlements earned by employees
but not taken before the year end and which employees can carry forward into the next financial year. 
The accrual is made at the wage and salary rates applicable in the following year, being the period in
which the benefits will be taken. Such accruals are required, under statute, to be reversed out of the
General Fund Balance by a credit to the Accumulating Compensated Absences Adjustment Account
in the Movement in Reserves Statement. 
Termination Benefits
Termination benefits are amounts payable as a result of a decision by the Council to terminate an
officer’s employment before the normal retirement date or an officer’s decision to accept voluntary
redundancy. They are charged on an accruals basis to the relevant services line in the Comprehensive
Income and Expenditure Statement at the point when the offer of termination can no longer be
withdrawn by the Council. Where termination benefits include the enhancement of pensions, the
General Fund balance is charged with the amount payable by the Council to the pension fund or
pensioner in the year. 
Post-Employment Benefits
The Council participates in two separate pension schemes:
• The Scottish Teachers’ Pension Scheme administered by the Scottish Government.
• The Local Government (Scotland) Pension Scheme administered by the Strathclyde Pension
Fund.
Both schemes provide defined benefits to members (retirement lump sums and pensions), earned
while employees work for the Council.  However, the arrangements for the teachers’ scheme mean
that liabilities for these benefits cannot be identified specifically to the Council.  The scheme is therefore
accounted for as if it were a defined contributions scheme.  No liability for future payments of benefits
is recognised in the Balance Sheet and the Education line in the Comprehensive Income and
Expenditure Statement is charged with the employer’s contributions payable to the Teachers’ Pension
Scheme in the year.
The Local Government Pension Scheme
The Local Government Pension Scheme is accounted for as a defined benefits scheme.
The assets and liabilities of Strathclyde Pension Fund attributable to the Council are included in the
Balance Sheet on an actuarial basis using the ‘projected credit unit method’, i.e. an assessment of the
future payments that will be made in relation to retirement benefits earned to date by employees, based
on assumptions about mortality rates, employee turnover rates, etc., and projected earnings for current
employees.
Assets and liabilities are discounted to their value at current prices, as advised by the actuaries,
Hymans Robertson, using an appropriate discount rate.

Page 143

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 135 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
The assets and liabilities of Strathclyde Pension Fund attributable to North Ayrshire Council are
included in the Balance Sheet at their fair value:
• Quoted securities – current bid price.
• Unquoted securities – professional estimate.
• Unitised securities – current bid price.
• Property – market value.
The change in the net pension asset or liability is analysed into the following components:
Service Costs:
• Current service cost – the increase in liabilities as a result of service earned by employees this
year. This is allocated in the Comprehensive Income and Expenditure Statement to the services
for which the employees worked.
• Past service cost (including curtailments) – the increase in liabilities as a result changes to the
scheme, including amendments or curtailments, where the changes impact on the service earned
by employees in previous years. These costs are charged to the Surplus or Deficit on the Provision
of Services in the Comprehensive Income and Expenditure Statement. 
• Net interest on the net defined benefit liability (asset), i.e. net interest expense for the Council – the
change during the period in the net defined benefit liability or asset that arises from the passage of
time. This is charged to the Financing and Investment Income and Expenditure line in the
Comprehensive Income and Expenditure Statement, calculated by applying the discount rate used
to measure the defined benefit obligation at the beginning of the period – taking into account any
changes in the net defined benefit liability or asset during the period as a result of contribution and
benefit payments. 
Remeasurements:
• Return on plan assets – excludes amounts included in net interest on the net defined liability
(asset). This is charged to the Pensions Reserve as Other Comprehensive Income and
Expenditure.
• Actuarial gains and losses – changes in the net pensions liability that arise because events have
not coincided with assumptions made at the last actuarial valuation or because the actuaries have
updated their assumptions. This is charged to the Pensions Reserve as Other Comprehensive
Income and Expenditure.
• Contributions paid to the Strathclyde Pension Fund – cash paid as employer’s contributions to the
pension fund in settlement of liabilities. This is not accounted for as an expense. 
Statutory provisions require the General Fund balance to be charged with the amount payable by the
Council to the pension fund or directly to pensioners in the year, not the amount calculated according
to the relevant accounting standards.  In the Movement in Reserves Statement, this means that there
are transfers to and from the Pensions Reserve to remove the notional debits and credits for retirement
or pension enhancement termination benefits and replace them with charges for the cash paid to the
pension fund and pensioners and any such amounts payable but unpaid at the year end.  The balance
that arises on the Pensions Reserve thereby measures the impact on the General Fund of being
required to account for retirement benefits on the basis of cash flows rather than as benefits earned by
employees.

Page 144

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 136 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Discretionary Benefits
The Council also has restricted powers to make discretionary awards to retirement benefits in the event
of early retirements. Any liabilities estimated to arise as a result of an award to any member of staff,
including teachers, are accrued in the year of the decision to make the award and accounted for using
the same policies as are applied to the Local Government Pension Scheme. 
Events After the Reporting Period 
These are events, both favourable and unfavourable, that occur between the end of the reporting period
(31 March) and the date when the financial statements are authorised for issue.  
The Statement of Accounts are adjusted to reflect events where they provide evidence of conditions
that existed at the end of the reporting period. 
Where events indicate conditions, which arose after the reporting period, which would have had a
material effect, the Statement of Accounts are not adjusted but a disclosure is made in the notes of the
nature of the event and the estimated financial effect.
Events taking place after the date of authorisation for issue are not reflected in the Statement of
Accounts.
Financial Instruments 
Financial Liabilities
Financial liabilities are recognised on the balance sheet when the Council becomes party to the
contractual provisions of a financial liability. Liabilities are initially measured at fair value and then
carried at amortised cost.  Annual charges to the Financing and Investment Income and Expenditure
line in the Comprehensive Income and Expenditure Statement for interest payable are based on the
carrying amount of the liability, multiplied by the effective interest rate of the instrument. The effective
interest rate is the rate that exactly discounts estimated future cash payments over the life of the
instrument to the amount at which it was originally recognised. 
For most of the borrowings that the Council has, this means that the amount presented in the balance
sheet is the outstanding principal repayable (plus accrued interest) and interest charged to the
Comprehensive Income and Expenditure Statement is the amount payable for the year according to
the loan agreement.
Costs associated with debt restructuring (premiums and discounts) are charged to the Financing and
Investment Income and Expenditure line in the Comprehensive Income and Expenditure Statement in
the year of repayment of the original debt in accordance with accounting regulations.
Where premiums and discounts have been charged to the Comprehensive Income and Expenditure
Statement, regulations permit the costs of restructuring to be released to revenue over the period of
the replacement loan.  The reconciliation of amounts charged to the Comprehensive Income and
Expenditure Statement to the net charge required against the General Fund balance is managed by a
transfer to or from the Financial Instruments Adjustment Account in the Movement in Reserves
Statement.

Page 145

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 137 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Financial Assets
Financial assets are classified and measured based on the reasons, or business model, for holding the
financial assets and the characteristics of the anticipated cash flows. There are three main classes of
financial assets measured at:
• Amortised cost.
• Fair value through profit or loss.
• Fair value through other comprehensive income.
The Council’s business model is to hold assets to collect contractual cash flows and our financial assets
are therefore classified as amortised cost.
Financial Assets Measured at Amortised Cost
Financial assets measured at amortised costs are recognised on the Balance Sheet when the Council
becomes party to the contractual provisions of a financial asset and are initially measured at fair value
and then carried at amortised cost. Annual credits to the Financing and Investment Income and
Expenditure line in the Comprehensive Income and Expenditure Statement for interest receivable are
based on the carrying amount of the asset multiplied by the effective rate of interest for the instrument. 
For the financial assets held by the Council, this means that the amount presented in the Balance
Sheet is the outstanding principal receivable (plus accrued interest) and interest credited to the
Comprehensive Income and Expenditure Statement is the amount receivable for the year in the loan
agreement.
Any gains or losses which arise on the derecognition of an asset are credited or debited to the
Financing and Investment Income and Expenditure line in the Comprehensive Income and Expenditure
Statement.
Expected Credit Loss Model
Potential impairment losses on Financial Assets Measured at Amortised Cost are determined using the
Expected Credit Loss Model. The Council recognises expected credit losses on all of its financial assets
held at amortised cost, either on a 12-month or lifetime basis. Only lifetime losses are recognised for
trade receivables (debtors).
Impairment losses are calculated to reflect the expectation that the future cash flows may not take
place because the borrower may default on their obligations. Credit risk plays a crucial part in assessing
the potential losses. Where risk has increased significantly since an asset was recognised, losses are
assessed on a lifetime basis. Where risk has not increased significantly or remains low, losses are
assessed on the basis of 12-month expected losses.
For any identified impairment losses, a charge is made to the Financing and Investment Income and
Expenditure line in the Comprehensive Income and Expenditure Statement.  
Government Grants and Contributions
Whether paid on account, by instalments or in arrears, government grants and third party contributions
and donations are recognised as due to the Council when there is reasonable assurance that:
• The Council will comply with the conditions attached to the payments.
• The grants or contributions will be received.

Page 146

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 138 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Amounts recognised as due to the Council are not credited to the Comprehensive Income and
Expenditure Statement until conditions attached to the grant have been satisfied.
Monies advanced as grants and contributions for which conditions have not been satisfied are carried
in the Balance Sheet as creditors.  When conditions are satisfied, the grant or contribution is credited
to the relevant service line (for revenue grants) or Taxation and Non-Specific Grant Income (for non-
ring-fenced revenue grants and all capital grants). 
Capital grants are then reversed out of the General Fund Balance in the Movement in Reserves
Statement. Where the grant has yet to be used to finance capital expenditure, it is posted to the Capital
Grants Unapplied Account within the Capital Fund.  
Capital grants which are used and amounts previously posted to the Capital Grants Unapplied Account
which have now been applied, are transferred to the Capital Adjustment Account.
Heritage Assets 
A heritage asset is defined as a tangible asset with historical, artistic, scientific, technological,
geophysical or environmental qualities that is held and maintained principally for its contribution to
knowledge and culture.
The Council holds heritage assets consisting of civic regalia and silverware, historical artefacts, fine art
and public artworks. The assets are held at valuation and no depreciation is charged on the assets.
Expenditure to maintain the assets is written off to the Comprehensive Income and Expenditure
Statement in the year of expenditure. Donated heritage assets are reflected in the balance sheet at
valuation with a gain equivalent to the value of the asset reported in the Comprehensive Income and
Expenditure Statement in the year of donation.
Measurement
The Council’s heritage assets are recognised on the Balance Sheet at values determined by specialist
external valuers and by experienced officers within the Connected Communities service.  Valuations
have been largely undertaken on an insurance basis at retail level.  Only items deemed to have a value
of £10,000 and above have been disclosed in the Balance Sheet.   
Disclosure
Not all of the Council’s identified heritage assets will be disclosed in the Balance Sheet.  It is not
deemed practicable to obtain external valuations for all items defined as heritage assets.  These
include: Museum and Gallery items with a value of less than £10,000, Castles, Monuments and War
Memorials. 
Intangible Assets 
Expenditure on non-monetary assets that do not have physical substance but are controlled by the
Council as a result of past events (e.g. software licences) is capitalised when it is expected that it will
bring benefits to the Council for more than twelve months. Intangible assets are measured initially at
cost.  The depreciable amount of an intangible asset is amortised over its useful life (generally between
5 and 10 years) to the relevant service line(s) in the Comprehensive Income and Expenditure
Statement.

Page 147

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 139 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Interest in Companies and Other Entities
The Council has interests in companies and other entities which have the nature of subsidiaries,
associates and joint ventures and require it to prepare group accounts. In the Council’s single entity
accounts, these interests are recorded as financial assets at cost, less any provision for losses.
Internal Transactions
Internal transactions between operational segments of the Council are included within the management
accounts for budgetary control purposes only. All internal transactions between services have been
excluded from the service expenditure analysis within the Comprehensive Income and Expenditure
Statement resulting in reductions in both the gross expenditure and gross income reported, with no
overall net impact.
Inventories 
Inventories include consumable stock and work-in-progress and are recognised in the Balance Sheet
at the lower of cost and net realisable value. The valuation of work-in-progress has been made at cost
plus an appropriate proportion of overheads, together with attributable profits and allowances for
foreseeable losses.
Investment Properties 
Investment properties are those that are used solely to earn rentals and/or for capital appreciation.
Investment properties are measured initially at cost and subsequently at fair value, being the price that
would be received to sell such an asset in an orderly transaction between market participants at the
measurement date. As a non-financial asset, investment properties are measured at highest and best
use. Properties are not depreciated but reviewed annually and revalued regularly to ensure their
carrying value reflects market conditions at the year end.  
Leases 
The Council adopted IFRS16 (Leases) with effect from 1 April 2024. The main impact of the
requirements of IFRS16 is that, for arrangements previously accounted for as operating leases (i.e.
without recognising the leased vehicles, plant, equipment, property and land as an asset, and future
rents as a liability), a right-of-use asset and a lease liability are now included on the balance sheet from
1 April 2024. 
As noted under Public Private Partnership, Non Profit Distributing and similar contracts, with effect from
1 April 2024 IFRS16 also applies to Service Concession Agreements and recognition of the resultant
remeasurement of the lease liability. 
The Council as Lessee
The Council classifies contracts as leases based on their substance. Contracts and parts of contracts,
including those described as contracts for services, are analysed to determine whether they convey
the right to control the use of an identified asset, through rights both to obtain substantially all the
economic benefits or service potential from that asset and to direct its use. The scope of IFRS16
Leases has been expanded to include arrangements with nil consideration, peppercorn or nominal
payments.

Page 148

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 140 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Initial measurement
Leases are recognised as right-of-use assets with a corresponding liability at the date from which the
leased asset is available for use (or from 1 April 2024, if later). The leases are typically for fixed periods
in excess of one year but may have extension options. The Council initially recognises lease liabilities
measured at the present value of lease payments, discounting by applying the Council’s incremental
borrowing rate wherever the interest rate implicit in the lease cannot be determined. Lease payments
included in the measurement of the lease liability include:
• Fixed payments, including in-substance fixed payments.
• Variable lease payments that depend on an index or rate, initially measured using the prevailing
index or rate as at the adoption date.
• Amounts expected to be payable under a residual value guarantee.
• The exercise price under a purchase option that the Council is reasonably certain to exercise.
• Lease payments in an optional renewal period if the Council is reasonably certain to exercise an
extension option.
• penalties for early termination of a lease, unless the Council is reasonably certain not to terminate
early. 
The right-of-use asset is measured at the amount of the lease liability, adjusted for any
prepayments made, plus any direct costs incurred to dismantle and remove the underlying asset or
restore the underlying asset on the site on which it is located, less any lease incentives received.
However, for peppercorn, nominal payments or nil consideration leases, the asset is measured at fair
value. 
Subsequent measurement
The right-of-use asset is subsequently measured using the fair value model. The Council considers the
cost model to be a reasonable proxy except for:
• Assets held under non-commercial leases.
• Leases where rent reviews do not necessarily reflect market conditions.
• Leases with terms of more than five years that do not have any provision for rent reviews.
• Leases where rent reviews will be at periods of more than five years. 
For these leases, the asset is carried at a revalued amount. In these financial statements, right-of-use
assets held under index-linked leases have been adjusted for changes in the relevant index, while
assets held under peppercorn or nil consideration leases have been valued using market prices or
rentals for equivalent land and properties.
The right-of-use asset is depreciated straight-line over the shorter period of remaining lease term and
useful life of the underlying asset as at the date of adoption.
The lease liability is subsequently measured at amortised cost, using the effective interest method.
The liability is remeasured when:
• There is a change in future lease payments arising from a change in index or rate.
• There is a change in the group’s estimate of the amount expected to be payable under a residual
value guarantee.
• The Council changes its assessment of whether it will exercise a purchase, extension or
termination option.
• There is a revised in-substance fixed lease payment.

Page 149

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 141 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
When such a remeasurement occurs, a corresponding adjustment is made to the carrying amount of
the right-of-use asset, with any further adjustment required from remeasurement being recorded in the
income statement. 
Low value and short lease exemption
The Council has elected to apply recognition exemptions to low value assets (below £10,000 when
new) and to short term leases i.e. existing leases that expire on or before 31 March 2026, and new
leases with a duration of less than 12 months. 
Lease expenditure
Expenditure in the Comprehensive Income and Expenditure Statement includes interest, straight line
depreciation, any asset impairments and changes in variable lease payments not included in the
measurement of the liability during the period in which the triggering event occurred. Lease payments
are debited against the liability. Rentals for leases of low-value items or shorter than 12 months are
expensed.
Depreciation and impairments are not charges against council tax, as the cost of non-current assets is
fully provided for under separate arrangements for capital financing. Amounts are therefore
appropriated to the capital adjustment account from the General Fund balance in the Movement in
Reserves Statement.
Rentals paid under operating leases for vehicles, plant and equipment are charged to the appropriate
service account in the Comprehensive Income and Expenditure Statement as an expense of the
services benefiting for use of the leased assets. 
The Council as Lessor
North Ayrshire Council has no finance leases where the Council is the lessor.  
The Council leases out property under non-cancellable leases. Income received is recognised in the
Comprehensive Income and Expenditure Statement against the services managing the leases. Where
the Council grants an operating lease over a property or an item of plant or equipment, the asset is
retained in the Balance Sheet.   
Property, Plant and Equipment 
Assets that have physical substance and are held for use in the supply of services, for rental to others,
or for administrative purposes and that are expected to be used during more than one financial year
are classified as Property, Plant and Equipment.
All valuations of land and buildings are carried out by Royal Institution of Chartered Surveyors qualified
valuers, with the exception of valuations of council dwellings which are based on beacon values
calculated by the District Valuer. Both valuations are in accordance with the methodologies and bases
of estimation as set out in the professional standards of Royal Institution of Chartered Surveyors.
Recognition
Expenditure on the acquisition, creation or enhancement of Property, Plant and Equipment is
capitalised on an accruals basis. Expenditure that merely maintains the condition of an asset (i.e.
repairs and maintenance) is charged as an expense when it is incurred.  
The Council has a de minimis level of £10,000 for expenditure to be classed as capital.  Land and
Buildings with a valuation below £10,000 are not recognised on the Council Balance Sheet.

Page 150

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 142 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Measurement
Assets are initially measured at cost, comprising:
• The purchase price. 
• Any costs attributable to bringing the asset to the location and condition necessary for it to be
capable of operating in the manner intended.
The Council does not capitalise borrowing costs incurred whilst assets are under construction. 
The cost of any asset acquired other than by purchase is deemed to be its fair value.
Assets are carried on the Balance Sheet using the following measurement bases:
• Council Dwellings - Fair value, determined using the basis of existing use value for social housing.
• Other Land and Buildings - Fair value, determined by the amount that would be paid for the asset
in its existing use. Where there is no market-based evidence of fair value because of the specialist
nature of an asset, depreciated replacement cost is used as an estimate of fair value.
• Other Land and Buildings (Schools) - Fair value, because of the specialist nature of the asset,
depreciated replacement cost is used as an estimate of fair value.
• Vehicles, Plant and Equipment - depreciated historical cost.
• Infrastructure Assets - depreciated historical cost.
• Community Assets - depreciated historical cost.
• Surplus Assets - fair value based on market value in highest and best use.
• Assets Under Construction - historical cost.
• Investment Properties (Common Good and Trusts only) - fair value based on market value in
highest and best use.
North Ayrshire Council conducts rolling five-year valuations for their operational property assets, these
valuations are conducted by our internal valuation team who are all members of the Royal Institution
of Chartered Surveyors.  In addition to these professional valuations, the 2025/26 Code brings in a
requirement to apply annual indexation to these assets in the years between formal valuations, to
ensure the value of an asset is kept materially up to date as an approximation of market changes. 
From 2025/26 annual indexation will be applied in each of the intervening years in accordance with the
Code, using published indices identified by our internal valuers. 
Increases in valuations are matched by credits to the Revaluation Reserve to recognise unrealised
gains. Where decreases in value are identified, the revaluation loss is accounted for as follows:
• Where there is a balance of revaluation gains for the asset in the Revaluation Reserve, the
carrying amount of the asset is written down against that balance (up to the amount of the
accumulated gains).
• Where there is no balance in the Revaluation Reserve or insufficient balance, the carrying amount
of the asset is written down against the relevant service line(s) in the Comprehensive Income and
Expenditure Statement.
The Revaluation Reserve contains revaluation gains recognised since 1 April 2007 only, the date of its
formal implementation. Gains arising before that date have been consolidated into the Capital
Adjustment Account.

Page 151

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 143 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Impairment
Assets are assessed at each year end to establish whether there is any indication that an asset may
be impaired.  For assets not formally valued in year, a wider review is completed to identify any changes
which require a valuation.  This review takes account of obscolescence, market conditions and changes
in the specific physical condition of the asset. Where indications exist, and any possible differences are
estimated to be material, the recoverable amount of the asset is estimated and, where this is less than
the carrying amount of the asset, an impairment loss is recognised for the shortfall.
Where impairment losses are identified, they are accounted for as follows:
• Where there is a balance of revaluation gains for the asset in the Revaluation Reserve, the
carrying amount of the asset is written down against that balance (up to the amount of the
accumulated gains).
• Where there is no balance in the Revaluation Reserve or insufficient balance, the carrying amount
of the asset is written down against the relevant service line(s) in the Comprehensive Income and
Expenditure Statement.
Where an impairment loss is subsequently reversed, the reversal is credited to the relevant service
line(s) in the Comprehensive Income and Expenditure Statement, up to the amount of the original loss,
adjusted for depreciation that would have been charged if the loss had not been recognised. 
Depreciation
Depreciation is provided for on all Property, Plant and Equipment assets. An exception is made for
assets without a determinable finite useful life (i.e. freehold land and certain Community Assets) and
assets that are not yet available for use (i.e. assets under construction).  Investment Properties and
Assets Held for Sale are not subject to depreciation.
Depreciation is charged on a straight-line basis over the useful life of the assets (as advised by a
suitably qualified officer).  Depreciation is charged in the year of acquisition but not in the year of sale. 
Where a Property, Plant and Equipment asset has major components whose cost is significant in
relation to the total cost of the item, the components are depreciated separately. For the purposes of
component accounting the Council considers significant components being those with a cost that is at
least 20% of the overall cost of the asset.  Individual assets shall be disregarded for component
accounting where their carrying value is below £2 million. 
Revaluation gains are also depreciated, with an amount equal to the difference between current value
depreciation charged on assets and the depreciation that would have been chargeable based on their
historical cost being transferred each year from the Revaluation Reserve to the General Fund.
Disposals
When it becomes probable that the carrying amount of an asset will be recovered principally through a
sale transaction rather than through its continuing use, it is reclassified as an Asset Held for Sale.  
The asset is revalued immediately before reclassification and then carried at the lower of this amount
and fair value less costs to sell.  Where there is a subsequent decrease to fair value less costs to sell,
the loss is posted to the Other Operating Expenditure line in the Comprehensive Income and
Expenditure Statement.  Gains in fair value are recognised only up to the amount of any previously
recognised losses.

Page 152

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 144 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Property, land and buildings are classified as ‘held for sale’ when the following criteria are met:
• The property is available for sale in its present condition.
• The sale is highly probable.
• The asset is being actively marketed for sale at a price that is reasonable in relation to its current
fair value.
• The sale is expected to qualify for recognition as a completed sale within one year.
When an asset is disposed of or decommissioned, the carrying amount of the asset in the Balance
Sheet is written off to the Other Operating Expenditure line in the CIES as part of the gain or loss on
disposal.  Receipts from disposals are credited to the same line in the CIES as part of the gain or loss
on disposal.  Any revaluation gains accumulated for the asset in the Revaluation Reserve are
transferred to the Capital Adjustment Account.
To comply with statutory guidance, this gain or loss is excluded when determining the General Fund
balance within the Movement in Reserves Statement.
The Council has determined, in accordance with Local Government Circular 09/2022 Statutory
Override Accounting for Infrastructure Assets for Scottish Local Authorities, that the carrying amount
to be derecognised in respect of a replaced part of an infrastructure asset is to be taken to be, and
accounted for, as a nil amount. In accordance with the circular the Council is not required to make
subsequent adjustments to the carrying amount of the asset with respect to that part.
Public Private Partnership, Non Profit Distributing and similar contracts 
Public Private Partnership, Non Profit Distributing and similar contracts are agreements to receive
services, where the responsibility for making available the property, plant and equipment needed to
provide the services passes to the Public Private Partnership or Non Profit Distributing contractor.  As
the Council is deemed to control the services that are provided under its Public Private Partnership and
Non Profit Distributing schemes and as ownership of the property, plant and equipment will pass to the
Council at the end of the contracts for no additional charge, the Council carries the assets used under
the contracts on its Balance Sheet as part of Property, Plant and Equipment.
The original recognition of these assets at fair value (based on the cost to purchase the property, plant
and equipment) was balanced by the recognition of a liability for amounts due to the scheme operator
to pay for the capital investment.  For North Ayrshire Council Schools Public Private Partnership
contract, the liability was written down by an initial capital contribution of £1.743 million.
The amounts payable to the Public Private Partnership and Non Profit Distributing operators each year
are analysed into four elements:
• Service charges and lifecycle replacement costs – value of services including cleaning and
janitorial services, repairs and maintenance, energy, non domestic rates and insurances debited to
the relevant service in the Comprehensive Income and Expenditure Statement.
• Interest payments – the interest charge on the outstanding Balance Sheet liability, debited to the
Financing and Investment Income and Expenditure line in the Comprehensive Income and
Expenditure Statement.

Page 153

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 145 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
• Contingent rent – increases in the amount to be paid for the property arising during the contract,
debited to the Financing and Investment Income and Expenditure line in the Comprehensive
Income and Expenditure Statement.
• Liability repayment – repayment of the principal owed to the Public Private Partnership operator,
applied to write down the Balance Sheet liability.
With effect from 1 April 2024, IFRS16 (Leases) also applies to service concession arrangements. Under
IFRS16, where indexation affects future service concession payments, the lease liability requires to be
remeasured. Instead of expensing the increased payment, the net present value of future payments
that comprise the liability is recalculated based on the revised level of payments.
In accordance with Scottish Local Government Finance Circular 10/2022, the Council has applied a
statutory accounting flexibility to the Public Private Partnership and Non Profit Distributing contracts to
realign the value of the Liability Repayment element of the unitary charge to reflect a prudent charge
for the repayment of the Liability across the useful economic life of the assets.
Provisions, Contingent Liabilities and Contingent Assets 
Provisions
Provisions are made where an event has taken place that gives the Council a legal or constructive
obligation that probably requires settlement by a transfer of economic benefits or service potential, and
a reliable estimate can be made of the amount of the obligation.  For instance, the Council may be
involved in a court case that could eventually result in the making of a settlement or the payment of
compensation.
Provisions are charged as an expense to the appropriate service line in the Comprehensive Income
and Expenditure Statement in the year that the Council becomes aware of the obligation, and measured
at the best estimate, at the balance sheet date, of the expenditure required to settle the obligation,
taking into account relevant risks and uncertainties.
When payments are eventually made, they are charged to the provision carried in the balance sheet. 
Estimated settlements are reviewed at the end of each financial year. Where it becomes less than
probable that a transfer of economic benefits will be required (or a lower settlement than anticipated is
made), the provision is reversed and credited back to the relevant service.
Where some or all of the payment required to settle a provision is expected to be recovered from
another party (e.g. from an insurance claim), this is only recognised as income for the relevant service
if it is virtually certain that reimbursement will be received if the Council settles the obligation.
Contingent Liabilities
A contingent liability arises where an event has taken place that gives the Council a possible obligation,
whose existence will only be confirmed by the occurrence or otherwise of uncertain future events not
wholly within the control of the Council.  Contingent liabilities also arise in circumstances where a
provision would otherwise be made but either it is not definite that an outflow of resources will be
required, or the amount of the obligation cannot be measured reliably.
Contingent liabilities are not recognised in the balance sheet but disclosed in a note to the accounts.

Page 154

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 146 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Contingent Assets
A contingent asset arises where an event has taken place that gives the Council a possible asset
whose existence will only be confirmed by the occurrence or otherwise of uncertain future events not
wholly within the control of the Council.
Contingent assets are not recognised in the balance sheet but disclosed in a note to the accounts
where it is probable that there will be an inflow of economic benefits or service potential.
Reserves 
Reserves are created by appropriating amounts out of the General Fund Balance in the Movement in
Reserves Statement.  When expenditure to be financed from a reserve is incurred, it is charged to the
appropriate service in that year to score against the Surplus or Deficit on the Provision of Services in
the Comprehensive Income and Expenditure Statement.  The reserve is then appropriated back into
the General Fund Balance in the Movement in Reserves Statement so that there is no net charge
against council tax for the expenditure.
Certain reserves are kept to manage the accounting processes for non-current assets, financial
instruments and retirement benefits and do not represent usable resources for the Council. These
reserves are explained in the relevant notes.
Revenue Expenditure Funded from Capital Under Statute 
Expenditure incurred during the year that may be capitalised under statutory provisions but does not
result in the creation of a non-current asset is charged as expenditure to the relevant service in the
Comprehensive Income and Expenditure Statement in the year.  Where the Council has determined to
meet the cost of this expenditure from existing capital resources or by borrowing, a transfer in the
Movement in Reserves Statement from the General Fund Balance to the Capital Adjustment Account
then reverses out the amounts charged so that there is no impact on the level of council tax.
Value Added Tax 
All income and expenditure excludes amounts relating to Value Added Tax, as all Value Added Tax
collected is payable to His Majesty’s Revenue and Customs and net Value Added Tax paid is fully
recoverable by the Council.
Fair Value Measurement 
The Council values some of its non-financial assets, such as Surplus Assets and Investment Properties
(Common Good Funds and Trusts only), and some of its financial instruments at Fair Value.  Fair Value
is the price that would be received either on the sale of an asset or to transfer a liability in an orderly
transaction between market participants at the measurement date.  
The Fair Value measurement assumes that the transaction to sell the asset or transfer the liability takes
place either:
• In the principal market for the asset.
• In the absence of a principal market, in the most advantageous market for the asset.
The Council measures the Fair Value of an asset or liability using the assumptions that market
participants would use when pricing the asset or liability, assuming that market participants act in their
economic best interest.

Page 155

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 147 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
When measuring the Fair Value of a non-financial asset, the Council takes into account a market
participant’s ability to generate economic benefits by using the asset in its highest and best use or by
selling it to another market participant that would use the asset in its highest and best use. The Council
uses valuation techniques that are appropriate in the circumstances and for which sufficient data is
available, maximising the use of relevant observable inputs and minimising the use of unobservable
inputs.
Inputs to the valuation techniques in respect of assets and liabilities for which Fair Value is measured
or disclosed in the Council’s financial statements are categorised within the fair value hierarchy, as
follows:
• Level 1 – quoted prices (unadjusted) in active markets for identical assets or liabilities that the
Council can access at the measurement date.
• Level 2 – inputs other than quoted prices included within Level 1 that are observable for the asset
or liability, either directly or indirectly.
• Level 3 – unobservable inputs for the asset or liability.

Page 156

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 148 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Glossary of Terms
Although the majority of the terminology used throughout the accounts is self-explanatory or defined
within the relevant sections, the following additional definitions and interpretations are provided to
assist readers’ understanding.
Accruals
The concept that income and expenditure are recognised as they are earned or incurred, not as
money is received or paid.
Actuarial Gains or Losses 
Actuarial gains or losses represent the movements in pension scheme liabilities which have arisen
because actual events have not coincided with the actuarial assumptions made at the last valuation.
These result in unforeseen movements in the net pension liability recognised by the Council.
Amortisation
Amortisation is the cost of reducing the value of an intangible asset over its useful economic life. A
charge is made against services for the value of the assets they have used during the year.
Assets
An asset is any item which has value including cash, investments, properties, vehicles, etc. Assets
are classified as short term, which will be consumed within the current year, or long term, which will
be used to provide services over more than one year.
Asset Ceiling
The asset ceiling is the maximum net asset recognised in relation to the Council’s share of the net
assets of Strathclyde Pensions Fund and is calculated as the present value of any economic benefits
available in the form of refunds from the Fund or reductions in future contributions to the Fund.
Capital Expenditure
Capital expenditure is expenditure on assets of lasting value whose useful life exceeds the current
year. This includes schools, roads, community facilities, council housing, etc. and is financed from
grants, receipts from the sale of assets, revenue contributions and borrowing.
Capital Financing
The methods used to pay for capital expenditure. This can include borrowing, grants, leasing, capital
receipts and revenue funding.
Capital Receipt
The proceeds from the disposal of land or other non-current assets.
Community Assets
Long term assets which have no determinable useful economic life and are held in perpetuity by the
Council, including parks and open spaces.

Page 157

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 149 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Contingent Assets and Liabilities
Contingent assets or liabilities are where an asset or liability is either uncertain and will only arise if
an event outwith the Council’s control occurs or where the amount of the potential asset or liability
cannot be reliably measured, e.g. the potential outcome of future court proceedings or insurance
claims.
Creditors
Creditors are a kind of liability. They represent payments owed by the Council to another person or
organisation for past events.
Debt Instruments
Debt instruments represent the value of investments in certificates of debt issued by companies or
governments including bonds, debentures, certificates and mortgages.
Debtors
Debtors are a kind of asset. They represent payments owed to the Council by another person or
organisation for past events.
Defined Benefit Pension Scheme
A defined benefit pension scheme is a scheme where the benefits due to participants are
predetermined based on earnings, length of service and age and are not directly dependent on the
contributions paid or investment returns realised.
Depreciation
Depreciation is the measure of the cost of wearing out, consuming or reducing the useful life of the
Council’s assets. A charge is made against services for the value of the assets they have used during
the year.
Entity
A corporate body, partnership, trust, unincorporated association or statutory body that is delivering a
service or carrying on a trade or business with or without a view to profit. It should have a separate
legal personality and is legally required to prepare its own single entity accounts.
Equity Investments
Equity investments represent the value of stocks and shares held in companies.
Fair Value
The fair value of an asset or liability is the price at which it could be exchanged or settled in an arm’s
length transaction between two willing, knowledgeable parties.
Financial Instrument
A financial instrument is any contract which gives rise to a financial asset or liability or an equity
instrument in another entity, this includes cash, debtors, creditors, loans, borrowings and shares in
other companies.
General Fund
The General Fund is the principal usable reserve of the Council. The activities financed from this
includes all revenue and capital income and expenditure not related to the Housing Revenue
Account.

Page 158

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 150 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Group Accounts
The Council’s Group includes its interest in any subsidiaries, associates or joint ventures.
Housing Revenue Account
The Housing Revenue Account includes all revenue and capital income and expenditure related to
the provision of social housing services.
Impairment
A reduction in the value of a non-current asset to below its carrying amount on the Balance Sheet.
Infrastructure Assets
Long term assets which cannot be transferred or sold, including roads, bridges and footpaths.
Inventories
Inventories are raw materials or goods which have been purchased but which have not yet been
consumed in the delivery of Council services.
Liabilities
A liability represents a payment owed to another person or organisation including loans, outstanding
invoices, provisions, contributions owed to third parties, etc. Short term liabilities are due to be paid
within the current year. Long term liabilities are amounts which will not be paid until a later year.
Net Book Value
The amount at which non-current assets are included in the Balance Sheet, i.e. their historical cost or
current value less the cumulative amounts provided for depreciation.
Pension Scheme Liabilities
The pension scheme liabilities are the benefits to be paid to members after the valuation date of the
scheme. The cost of the liabilities is recognised as a long-term liability of the Council, net of its share
of any pension scheme assets.
Peppercorn / Nominal Payments
In terms of lease payments these can be defined as lease payments substantially below market lease
payments.
Provisions
A provision is a kind of liability. Where a payment for a liability is certain or very likely to occur but the
exact amount and timing is not known, an amount must be put aside to meet the estimated future
costs.
Public Works Loan Board
A Central Government Agency which provides loans for one year and above to Councils at interest
rates based on those at which the Government can borrow itself.
Remuneration
All sums paid to or receivable by an employee and sums due by way of expenses or allowances (as
far as these sums are chargeable to income tax) and the monetary value of any other benefits
received other than in cash.

Page 159

North Ayrshire Council  
Comhairle Siorrach Àir a Tuath
Unaudited Annual Accounts 2025/26
Page | 151 
OFFICIAL INFORMATION
OFFICIAL INFORMATION
Reserves
Reserves are the accumulated surpluses or deficits generated from the General Fund or Housing
Revenue Account activities of the Council. Reserves are classified as either Usable, i.e. available to
fund Council services, or Unusable, which hold unrealised gains or losses which will only become
available to use in the provision of services once assets have been sold.
Revaluation
Revaluations are adjustments to the value of an asset to align the carrying value of an asset to an
independent assessment of the asset’s fair value.
Revenue Expenditure
Revenue expenditure includes the day-to-day costs of providing services including salaries and
wages, property costs, transport costs and supplies and services. It also includes the costs of the
repayment of loans used to finance capital expenditure.
Right of Use Asset