A Meeting of North Ayrshire Council will be held in the Council Chambers, Ground
Floor, Cunninghame House, Irvine, KA12 8EE on Wednesday, 25 February 2026
at 14:00 to consider the undernoted business.
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected
Members in accordance with the provisions of the Local Government
(Scotland) Act 2003.  Where possible, the meeting will be live-streamed
and available to view at https://north-ayrshire.public-
i.tv/core/portal/home. 
1 Apologies
2 Declarations of Interest
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda.
3 General Services Revenue Estimates 2026/27 to 2028/29
Submit report by the Head of Service (Finance) on (a) the Council's
revenue spending requirements and anticipated funding for 2026/27 to
2028/29, (b) the level of reserves and fund balances held by the Council
and (c) options to address the funding gap and the risks faced by the
Council (copy enclosed).
4 Capital Investment Programme 2026/27 to 2033/34
Submit report by the Head of Service (Finance) on the draft Capital
Investment Programme to 2033/34 (copy enclosed).
1

Page 2

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
5 Revenue Estimates 2026/27 - Common Good Funds and Trusts
Submit report by the Head of Service (Finance) on the anticipated annual
income and expenditure of the Common Good Funds and Trusts
administered by North Ayrshire Council and seek approval for the level of
funding to be made available for disbursement during 2026/27 (copy
enclosed).
6 Treasury Management and Investment Strategy 2026/2027
Submit report by the Head of Service (Finance) on the proposed Strategy
for Treasury Management and Investment activities within the Council for
the financial year 2026/27 (copy enclosed).
7 Urgent Items
Any other items which the Chair considers to be urgent.
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the
meeting is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited
to, for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public will not be filmed. However, by entering the
Council Chambers and using the press or public seating area, you
acknowledge that you may be filmed and that any information pertaining to
you contained in the video and oral recording of the meeting will be used
for webcasting or training purposes and for the purpose of keeping
historical records and making those records available to the public. In
making this use of your information the Council is processing data which is
necessary for the performance of a task carried out in the public interest.
If you have any queries regarding this and, in particular, if you believe
that use and/or storage of any particular information would cause, or be
likely to cause, substantial damage or distress to any individual, please
contact dataprotectionofficer@north-ayrshire.gov.uk
2

Page 3

North Ayrshire Council, Cunninghame House, Irvine KA12 8EE
North Ayrshire Council Sederunt
Nairn Angus-McDonald
John Bell
Marie Burns
Eleanor Collier
Joe Cullinane
Charles Currie
Scott Davidson
Anthea Dickson
Stewart Ferguson
Todd Ferguson
Robert Foster
Scott Gallacher
Tony Gurney
Alan Hill
Mary Hume
Cameron Inglis
Margaret Johnson
Amanda Kerr
Christina Larsen
Shaun Macaulay
Tom Marshall
Jean McClung
Louise McLaughlan
Matthew McLean
Davina McTiernan
Jim Montgomerie
Ian Murdoch
Donald Reid
Donald L Reid
Chloe Robertson
Ronnie Stalker
Angela Stephen
John Sweeney
Chair:
Apologies:
Attending:
3

Page 4

4

Page 5

NORTH AYRSHIRE COUNCIL 
25 February 2026 
North Ayrshire Council 
Title:    General Services Revenue Estimates 2026/27 to 2028/29 
Purpose:  To advise Council on (a) the Council's revenue spending
requirements and anticipated funding for 2026/27 to 2028/29;
(b) the level of reserves and fund balances held by the Council
and (c) options to address the funding gap and the risks faced
by the Council. 
Recommendation:  That Council: 
a) notes the anticipated funding available to meet the
Council’s expenditure requirements and notes the areas of
ongoing financial risk to the Council;
b) approves the Council's expenditure requirements for
2026/27 and notes the indicative requirements for 2027/28
and 2028/29;
c) notes the projected outturn position for 2025/26; 
d) notes the level of reserves and fund balances held by the
Council and approves any use and contributions to and
from these; 
e) approves efficiencies and savings to ensure a balanced
budget for 2026/27, consequentials and new proposals in
future years;
f) approves the schedule of Council fees and charges
detailed in Appendix 6;
g) Considers and approves the level of additional contribution
to the HSCP, noting the pressures and risks to the HSCP
and the Council set out at 2.8.2;
h) determines the level of Council Tax for 2026/27, noting the
recommendation that, in view of the projected deficit
position of the HSCP, that Council considers an increase in
excess of 7%;
i) notes the anticipated funding gaps for 2027/28 and
2028/29;
j) considers the equality and children’s rights impact of any
proposed service changes;
k) notes the feedback from the community Budget
engagement exercise to help inform budget plans;
l) notes further progress to date on the Council’s Sustainable
Change Programme and corporate Workforce Planning;
and 
m) approves the budget matrix for 2026/27.
Agenda Item 3
5

Page 6

1. Executive Summary 
1.1 Introduction
1.1. Section 93 of the Local Government Finance Act 1992 requires Councils to
determine the levels of expenditure in the forthcoming financial year, and thereafter
to set Council Tax sufficient to cover any unfunded balance.
1.2. This report provides Members with an overview of the Council's anticipated
financial position on the General Fund revenue budget for the next three financial
years, 2026/27 to 2028/29. It also sets out the information required to enable the
Council to set a balanced budget and its Council Tax for 2026/27 by 11 March as
required by statute.
1.3. The Long-Term Financial Outlook 2024/25 to 2033/24 report was presented to
Council on 13 December 2023. The updated Medium-Term Financial Outlook
2026/27 to 2028/29 was presented to Council on 5 November 2025. In addition,
regular Elected Member briefing sessions were held between October 2025 and
February 2026, during which officers provided Members with information on the
financial pressures and risks faced by the Council, most acutely from the projected
HSCP deficit position in 2026/27, and options to reduce net expenditure within the
context of the priorities set out in the Council Plan. 
Revenue Budget
1.4. When the Council set its budget for 2025/26 on 26 February 2025 the decisions
taken resulted in a balanced budget for 2025/26 with indicative remaining funding
gaps of £7.127m and £9.173m for 2026/27 and 2027/28 respectively. This position
assumed Council tax increases of 5% per annum and excluded any use of Council
reserves.
1.5. The Medium-Term Financial Plan (MTFP) for 2026/27 to 2028/29 builds on last
year’s MTFP and the analysis reflected in the Medium-Term Financial Outlook. The
proposals in this report provide a balanced budget for 2026/27, although it should
be noted that this required a planned use of £3.500m reserves, with indicative net
funding gaps remaining for 2027/28 and 2028/29 of £6.918m and £8.902m
respectively. This position incorporates the full year effect of proposed savings in
2026/27, a 5% planning assumption for Council tax increase currently and a
planned use of reserves of £1.788m in 2027/28. This position, along with the risks
to the Council through the pressures faced by the HSCP, continues to present a
significant challenge to the sustainability of the Council’s finances. A summary of
the key components underpinning this is provided at sections 2.6 and 2.7.
1.6. Detail is provided at section 2.5 on the anticipated level of earmarked,
unearmarked and specific reserves with unearmarked reserves projected at the
level of 2.0% equal to £9.699m, earmarked reserves of £89.178m and specific
reserves of £13.419m aligning with anticipated future commitments. The Council’s
Useable reserves position will continue to be monitored. 
1.7. The MTFP includes a range of savings proposals required to deliver a balanced
Budget position for 2026/27, and a profiled use of reserves to help mitigate the
6

Page 7

significant financial challenges facing the Council and this is set within the context
of a baseline Council Tax increase of 7% for 2026/27, however, it is recognised
that, in view of the projected deficit position of the HSCP, Council is asked to
consider a further increase to Council tax.   
Health and Social Care Partnership
1.8 The Director of the Health and Social Care Partnership (HSCP) has provided
Members with information on pressures and areas of potential savings to inform the
Council’s contribution to the Partnership. This information is not detailed within the
Council’s budget proposal on the basis that the final position will be determined by
the Integration Joint Board (IJB). It is recognised however, that the Medium-Term
Financial Plan of the HSCP anticipates significant cost pressures which presents a
risk to the financial sustainability of the Council.
1.9 The additional contribution for 2026/27 set out in the report is currently £13.759m.
This reflects the requirements of the HSCP to meet new expenditure commitments
(£8.798m) as well as additional funding from the Council of £4.961m, being the full
value of the additional core grant settlement to the Council, to help address existing
cost pressures. It should be stressed however that this level of contribution falls
short of the current projected deficit position of the HSCP in 2026/27. Current
projections indicate a deficit position on Social Care services of £12.609m, with this
potentially reduced to £10.376m through delivery of draft savings proposals. The
additional funding from the Council of £4.961m would potentially reduce this deficit
position to a best case scenario of £5.415m in 2026/27. This position also assumes
the delivery of in-year financial recovery actions for 2025/26. Current projections in
2025/26 indicate a residual risk overspend of £1.881m on Social Care at month 7.
Further areas of funding to support expenditure commitments is expected and still
to be distributed. This includes funding for free personal and nursing care.
1.10 The Integration Scheme approved by Scottish Ministers states that following
determination of the Council and NHS payment to the IJB, the IJB will refine its
Strategic Plan and planned service delivery to take account of the totality of
resources available. In order to deliver services within the level of available funding,
this will require the HSCP to further develop its Transformation and financial
recovery plans. 
Chief Finance Officer Assurance
1.11 The 2026/27 annual budget and 2026/27 to 2028/29 MTFP has been informed by
the Council’s Long-Term Financial Outlook and previous MTFP. Significant scrutiny
of the underlying assumptions and savings delivery has been undertaken to ensure
the 2026/27 annual budget is robust. It is the responsibility of Chief Officers,
including the HSCP, to manage any variance from the underlying assumptions.
1.12 The report notes at section 2.14 the significant risks to the financial sustainability of
service delivery. This includes uncertainty around future funding levels from
Scottish Government and the financial performance of the HSCP.  
1.13 As a mitigation to the risks facing the Council, there is the requirement for the
Council to hold a sufficient level of Reserves. The level of Reserves set out in the
Budget aligns with known future commitments. The Change and Service Re-design
Fund will require to be kept under review to ensure sufficient resources are
available to continue to support the Council’s Sustainable Change programme.
7

Page 8

Unearmarked reserves continue to remain at the lower level of recognised best
practice and reflects 2% of the Council’s revenue budget. 
2. Background 
2.1   Financial Context 
2.1.1 The Long-Term Financial Outlook 2024/25 to 2033/24 report was presented to
Council on 13 December 2023. This, along with the Medium-Term Financial
Outlook 2026/27 to 2028/29, which was presented to Council on 5 November 2025,
is the cornerstone of the Council’s strategic financial planning framework. This has
helped inform the development of the Medium-Term Financial Plan (MTFP)
2026/27 to 2028/29. 
2.1.2 The economic outlook for the Scottish and UK economy continues to be sluggish.  
In the UK and Scotland growth forecasts remain around 1.1% for 2026. Inflation for
December 2025 based on CPI was 3.4%, an increase from 3.2% in November and
more than the Bank of England (BoE) target of 2%. Inflation is expected to fall
further towards the BoE target during 2026. The Bank of England base interest fell
by 0.25% to 3.75% in December 2025. From a financial planning perspective
inflation continues to impact both revenue and capital costs, however, with regards
to pay, agreements have already been reached with bargaining groups through
2026/27.  
2.2        Scottish Government Funding 
2.2.1 The Scottish Budget was announced on the 13 January 2026 and the Draft Local
Government Finance Settlement for 2026/27 was published on the same day.
Funding support from the Scottish Government comprises: 
• general revenue grant; 
• non domestic rate income; and
• specific grant.
2.2.2 North Ayrshire Council's anticipated Scottish Government funding support, as
distributed, for 2026/27 is £399.449m. Subsequent to this notification, on 30
January 2026, COSLA Leaders approved further areas of distribution which will
likely change both the revenue and capital grant allocations across Councils. No
material change to the current position is anticipated at this time.
2.2.3 Prior to the Settlement announcement, significant work had been undertaken to
update a range of Grant Aided Expenditure (GAE) indicators. These indicators
reflect the measurement of need across Scottish Local authorities relative to other
local authorities. One of the areas of significant update included Adult Social Care
indicators which have been updated and included within the Settlement. The shift in
Social Care based indicators has favoured the Council based on our demographic
(+£3.3m distribution compared to last year excluding any new funding). Conversely,
those general population-based indicators, including pupil numbers, continue to
negatively impact the position, this being more prevalent within the Education
sector (-£1.3m reduction). The impact of the Floor calculation from the Settlement
for the Council is such that we continue to receive funding from the Floor i.e.
£1.356m in 2026/27, however this is a significant reduction of £3.601m from last
8

Page 9

year (£4.957m funding in 2025/26). In summary, what the Council has gained
through a more up to date assessment on need through the GAE indicators, has
been negated through less financial support from the Floor mechanism. This
reflects the complexity that currently exists within the local government funding
distribution mechanism.  
2.2.4 The Draft Local Government Settlement resulted in an increase of £4.961m in
uncommitted core grant funding (+1.29%) when compared to the 2025/26
settlement. The main elements of the budget announcement included;
• Increase in the General Revenue Grant of £253m to help contribute towards the
second year of local government pay deals and to support other local priorities,
including Adult Social Care;
• Baselining of £79.7m and £30m that was previously provided in-year from non-
recurring sources to support the pay deals;
• Allocates a further £17m to reflect the legacy costs of the first year of the SNCT
(Teachers) pay deal, with £47m SNCT funding still to be distributed;
• Baselined a further £773.8m of funding previously provided as in-year transfers;
• An additional £160m (£4.688m for NAC) and £22m to fund the Real Living Wage
uplift for commissioned services across adult social care and early learning and
childcare respectively. It is recognised however, that this level of funding is
insufficient to meet expenditure commitments;
• £7m to support an inflationary uplift in free personal nursing care, however, this is
still to be distributed;
• £0.7m increase to the School Clothing Grant;
• £3m to support expansion of Free School Meals;
• Enhanced revenue and capital support for inter-island connectivity. The details for
which has still to be provided; 
• Confirmation that local Authorities will retain all the funding paid to local authorities
by PackUK under the Extended Producer Responsibility scheme with no
adjustment to the Settlement. Elected members should note that this funding has
already been built into the NAC Budget planning for 2026/27. 
2.2.5 Unlike previous years, the Settlement announcement did not include any specific
expectations or conditions attached to the funding. It is recognised that this
approach is more consistent with the principles of the Verity House Agreement. In
particular; 
• The Settlement provides full discretion over decisions on Council tax, with no
freeze and no cap. However, the Scottish Government indicated that as the
Budget prioritises cost of living measures, Councils should look to minimise any
proposed increases.  
• No condition attached to the level of funding to be passported to Integration Joint
Boards (IJB’s), therefore providing flexibility to Councils. The Scottish Government
also stated the importance of sustainable funding for adult social care services;
however, it referenced the increase in general revenue grant as being the source
9

Page 10

of more sustainable funding to IJB’s which, in view of the scale of the challenges
facing the IJB, will fall significantly short of the levels of the projected deficit.  
• Similarly, with regards to teacher numbers there is no explicit condition around
maintaining teacher numbers. The Scottish Government has referenced good
progress nationally from Councils in maintaining teacher numbers and an
improved pupil teacher ratio in 2025. In terms of Additional Support Needs, there
is also confirmation that the £28m allocated in 2025/26 will continue in 2026/27.
The COSLA position regarding reduced class contact time is that there is no
funding currently within local government to facilitate this. The Scottish
Government will make £1m available to support pilot approaches around this. 
2.2.6 For non-domestic rates the Basic Property Rate (poundage) will provisionally be set
at 48.1p, a decrease from 49.8p last year. The Intermediate and Higher Property
Rates will also decrease to 53.5p (from 55.4p) and 54.8p (from 56.8p) respectively.
A new 15% relief will be available from 2026/27 up to 2028/29 for retail, hospitality
and leisure premises liable for the basic or intermediary property rate. Continuation
of 100% relief for Hospitality premises on islands, as well as retail and leisure will be
available and capped at £110,000 per ratepayer. This will run up to 31 March 2029. 
2.2.7 The Scottish Government has also published details of multi-year resource planning
assumptions with provisional allocations up to 2028/29, however, as things currently
stand this presents a very challenging fiscal position for Councils, with a broadly flat
cash projection across the years. The Scottish Government have indicated that this
will be subject to change as further UK Government announcements are made in the
coming years. The current 2027/28 and 2028/29 planning assumption is therefore that
the level of core revenue grant will be flat cash and remain at the same level for each
year. For context, a 1% reduction in core grant equates to around £4.000m. 
2.2.8 On the 12 February, 2026 the Cabinet Secretary for Finance and Local Government
announced the intention to amend the Budget Bill at Stage 2, to allocate a further £20m
funding to Local Government to address the shortfall in funding to support the real
living wage in commissioned care services. At the time of writing, the allocation to
North Ayrshire is unknown, however, it is recognised this funding will not materially
change the level of deficit position forecast by the HSCP in 2026/27. 
2.3        Council Tax 
2.3.1 Local authorities have discretion to increase Council Tax. Section 74 of the 1992
Act sets the proportions payable by each Council Tax band. As such, Councils can
only apply a standard percentage increase across all Council Tax bands, they
cannot vary the percentage increase between bands. The Scottish Government
announced that two new Council tax bands will be introduced from April 2028 and
initial preparation work would be progressed around this. The indication is that the
new bands would be aligned to property values over £1 million and £2 million.
2.3.2 Council Tax is a vital source of revenue for the Council. The 2026/27 Settlement
provides full discretion for local authorities on decisions on Council tax, with no
freeze or cap. The Scottish Government indicated that as the Budget prioritises
cost of living measures, Councils should look to minimise any proposed increases.
However, it is recognised that the level of Council tax should also consider the
10

Page 11

significant cost pressures and risks faced by the Council and the HSCP in
delivering vital sustainable services to citizens.  
2.3.3 The MTFP includes an initial baseline planning assumption for 2026/27 of an
increase of 7% Council Tax, with a current planning assumption of a further 5%
increase for 2027/28 and 2028/29. The 7% planning assumption is a consequence
of passporting all additional core revenue grant to the HSCP (i.e. £+4.961m). Whilst
this position would achieve a balanced budget for the Council in 2026/27, this level
of additional funding would still fall significantly short of the level of deficit that the
HSCP projects in 2026/27. The current position indicates a deficit projection on
Social Care services for 2026/27 of £12.609m which could potentially be further
reduced to £10.376m, subject to the IJB approving further policy-based savings. It
is also recognised that the current year outturn position of the HSCP could further
impact this position. The IJB will meet on 19 March to set its 2026/27 Budget.
Additional funding from the Council of £4.961m would potentially reduce the deficit
position to between £5.415m and £7.648m, depending on the decisions approved
by the IJB and the outturn position. For important context, to provide further
additional funding from Council tax to fully address this remaining projected deficit
position would require a Council tax increase of between 14.5% and 17.7%.
2.3.4 As part of the Budget process, the Council is required to agree funding to the
HSCP. Following this, the IJB is required to refine its Strategic Plan and planned
service delivery to take account of the totality of resources available and to
commission services within the level of available funding. It is recognised that the
current projected deficit position presents a significant challenge to the HSCP in
terms of the level of services it can provide within the funding that is available and
the potential impact that further cuts and savings would have on services and
service users. As a funder this current position presents an ongoing risk to the
Council. It is therefore recommended that Council considers a level of Council tax
increase in excess of 7% to help further address this risk.
2.3.5 Council Tax income currently represents around 16% of Council funding and is a
vital source of sustainable revenue for the Council. To illustrate the impact of
Council tax increases based on Band D (excluding charges for water and
wastewater) the undernoted table includes a range of potential increases aligned to
the deficit position facing the HSCP set out in section 2.3.3. The level of Council tax
increase and subsequent contribution to the HSCP also requires to be considered
within the context of the impact on the Council taxpayer.  
%
Potential
Increases
Band D
Band D - Valuation 
(at 1991 levels)
2025/26
Band D
Council
Tax
Band D
Increase
2026/27
Band D
Council
Tax 
7% £45,000 to £57,999 £1,553.77 £108.76 £1,662.53 
8% £45,000 to £57,999 £1,553.77 £124.30 £1,678.07 
9% £45,000 to £57,999 £1,553.77 £139.84 £1,693.61 
10% £45,000 to £57,999 £1,553.77 £155.38 £1,709.15 
11% £45,000 to £57,999 £1,553.77 £170.91 £1,724.68 
12% £45,000 to £57,999 £1,553.77 £186.45 £1,740.22 
13% £45,000 to £57,999 £1,553.77 £201.99 £1,755.76 
14% £45,000 to £57,999 £1,553.77 £217.53 £1,771.30 
15% £45,000 to £57,999 £1,553.77 £233.07 £1,786.84 
11

Page 12

16% £45,000 to £57,999 £1,553.77 £248.60 £1,802.37 
17% £45,000 to £57,999 £1,553.77 £264.14 £1,817.91 
18% £45,000 to £57,999 £1,553.77 £279.68 £1,833.45 
2.3.6 Comparative information on Band D is provided within the Council Tax leaflet
issued with Council Tax Bills. In 2025/26 North Ayrshire Council had the second
lowest level of Council tax increase in Scotland at 7%. North Ayrshire Council
currently has the 18th highest level of Council tax across the 32 local authorities.
Over 23% of households across North Ayrshire are currently in receipt of Council
Tax Reduction (CTR). The comparative information for 2025/26 on a per capita
basis is as follows;
Scotland     £1,543.00
North Ayrshire Council  £1,553.77 
2.3.7 The Scottish Government published the Council Tax (Variation for Unoccupied
Dwellings) (Scotland) Amendment Regulations 2023, under which councils have
the power to vary the Council Tax charge for second homes from the current 100%
charge, to include a premium of up to a further 100% of the applicable Council Tax
charge. Following a period of consultation during 2024/25, North Ayrshire Council
at its meeting on 12 February 2025 approved the application of the 100% premium.
Further discussions are currently being advanced to remove the current 100% cap
on the Council tax premium. Whilst this would offer Councils further flexibility, this
would have to be considered against North Ayrshire’s local circumstances,
including any further impact on Island communities. 
2.4 Probable Outturn 2025/26 
2.4.1 Based on the revenue financial performance report for 2025/26 at the end of
November 2025, a projected underspend of £0.885m is forecast. The factors
contributing to this were reported to Cabinet on 27 January 2026. 
2.4.2 Based on the position at the end of October 2025, the Health and Social Care
Partnership is projecting a year-end overspend of £4.946m, (1.5%), for 2025/26.
This is a decrease of £0.303m since the previous report. The Council services
element is reporting a projected overspend of £3.970m and the Health services
element is reporting a projected overspend of £0.976m. However, previously
identified financial recovery actions have reduced the projected overspend to
£1.939m, including £1.881m for Council Services, an increase of £0.924m from the
previous position, and £0.058m for Health services, a decrease of £0.718m. 
2.4.3 There is an increasing risk to achieving financial balance during 2025-26. Although
the HSCP will continue to progress recovery actions throughout the remainder of
the year, in the event of an overspend position the Council will have to consider
making interim funds available. The terms of this arrangement will be considered by
the Council’s Cabinet and the Integration Joint Board when the final outturn position
is known. It is recognised that the projected level of financial pressures and funding
for the HSCP over the medium-term presents a significant risk to the financial
sustainability of the Council. 
12

Page 13

2.5 Reserves and Fund Balances 
Introduction
2.5.1 Setting the General Fund Reserve is one of several related decisions in the
formulation of the MTFP and the annual revenue budget. In setting its budget the
Council must have a clear reserves policy that takes account of known
commitments, potential liabilities and the risk profile of the Council and providing
flexibility to deal with unforeseen circumstances. The right level of reserves
supports financially sustainable service delivery. The Council’s approach is in line
with CIPFA’s recommended practice as set out in the document “Local Authority
Reserves and Balances”.  
Application of Reserves
2.5.2 North Ayrshire Council has used reserves in setting its budget over several years.
This has included a reduction in unearmarked reserves, release of earmarked
reserves no longer required and application of in-year underspends. Use of
reserves provides only a temporary solution, and more sustainable approaches are
required. A summary of application of reserves is noted below;
• In 2017/18 £8.782m funded the HSCP Challenge Fund and supported non-
recurring expenditure.
• In 2018/19 and 2019/20 £3.500m and £3.880m respectively supported the core
recurring budget.
• In 2020/21, following a review of earmarked reserves, a total of £0.548m was
released to support the 2020/21 Budget.
• In 2021/22, following a review of corporate contingency funds, a total of £0.862m
was released to support the 2021/22 Budget.
• In 2022/23, no use of reserves was required to support the Budget.
• In 2023/24, a total of £3.503m contribution was made from reserves.
• In 2024/25, there was a planned contribution of £5.000m from reserves.
• In 2025/26 the Budget included the use of £4.000m from reserves. 
Reserves Policy
Unearmarked Reserve 
2.5.3 This reserve is held to ensure the Council remains in a prudent financial position in
2026/27 and could respond to major unforeseen incidents or emergencies. 
2.5.4 The Council will continue to face financial challenges through 2026/27 and across
the medium-term. Cost pressures and risks include the financial performance of the
HSCP, linked to pay and demographic pressures, future employee pay negotiations
beyond 2026/27, and the ongoing impact of inflationary related pressures across
Council budgets and the capital programme. 
2.5.5 It is anticipated on 31 March 2026 the balance of unearmarked reserves will be
£9.699m which equates to 2.0% of the Council’s net expenditure budget. This level
of unearmarked reserve is at the lowest end of the recommended range of 2% - 4%
for general reserves. 
13

Page 14

Earmarked Reserves
2.5.6 These Funds have been approved for carry forward to meet known commitments or
liabilities which will be settled in future years. Current earmarked funds include:
• Affordable Housing – accumulated from Council Tax collected from second
homes and long-term empty properties;
• Project-specific funds - these funds will be carried forward from 2025/26 to allow
for the completion of specific projects after 31 March 2026;
• Workforce Planning Fund – To support the Council’s workforce planning
programme;
• Prudential Investment Fund - resources to smooth the revenue implications of
loan charges supporting the Capital Investment Programme; 
• Change and Service Redesign Fund – supports delivery of the Council’s
Sustainable Change programme;
• Renewal Fund to support a range of projects across key themes identified
through the experiences from the pandemic; and  
• Investment Fund to support a range of sustainability and Community based
projects.
2.5.7 On the 15 February 2023 Council approved the use of Service Concession
flexibility to help mitigate the significant cost pressures and resultant revenue
budget gaps over the medium-term and to help address the impact of construction
cost volatility as part of delivering the Council’s ambitious Capital programme. The
Council Budget meeting of 1 March 2023 approved the use of £16.146m of the total
retrospective sum of £21.546m to be applied in a limited and controlled manner
across several financial years and, critically, that this runs in parallel with more
sustainable measures to reduce the cost base of the Council in line with available
funding. In view of the scale of the financial challenges facing the Council, this
remains an essential element of the Budget programme over the medium-term,
with £3.500m being utilised to support the 2026/27 Budget.  
Specific Reserves
2.5.8 Specific reserves are held as follows;
• Insurance Fund - the current balance on this Fund aligns with the most recent
actuarial valuation, provision for uninsured claims and outstanding liabilities.  
• Capital Fund – This supports delivery the capital investment programme. 
Summary
2.5.9 The projected accumulated balances on the Council's Funds and Reserves on 31
March 2026 are outlined in the table below, with the majority of these being
earmarked for specific purposes. The value of reserves is anticipated to increase
during 2025/26 by £4.608m. This being predominately due to the movement in
Prudential Investment Fund required to support delivery of the Capital programme. 
14

Page 15

2.5.10 Based on the current financial landscape and the risks the Council faces, the
current level of useable reserves, whilst sufficient for now, will require to be
continually reviewed against the level of risks across the Council and from the risks
associated with the HSCP funding and financial performance over the medium and
long-term. As reflected in this report, another mitigation to these risks is from the
considerations around the level of Council tax set by the Council and from the
delivery of further savings. To deliver future savings the Council will also need to
invest further to progress the change programme at scale and pace.   
2.6 Income Summary
2.6.1 Total funding available to the Council to finance its expenditure plans in 2026/27 is
noted in the table below. The main assumptions include;
• 2026/27 Scottish Government Funding in line with the Finance Circular of 13
January 2026. Subsequent to this notification, on 30 January 2026, COSLA
Leaders approved further areas of distribution which will likely change both the
revenue and capital grant allocations across Councils. No material change is
anticipated at this time. For future years a prudent flat cash position in core
funding is projected for years 2 and 3, excluding anticipated adjustments in
respect of loan charge support;
• The North Ayrshire Council meeting of 12 February 2025 approved the
application of a 100% Council Tax premium in respect of second homes and
approved a revised policy for non-domestic rates empty property relief. This
continues to be reflected in the anticipated income for 2026/27. A report will be
presented to Council at the end of June 2026 to outline the level of property
movement around second home ownership following one year of application of
Balance at
31 March
2025
Transfers
Approved by
Cabinet
27 Jan 2026
Projected
Transfers to
31 Mar 2026
Transfers
Included in
Budget
Paper
Projected
Balance at
31 Mar 2026
Anticipated
Future
Spend
Projected
Future
Balance
£m £m £m £m £m £m £m
General Fund
Unearmarked 9.181 - 0.885 (0.367) 9.699 - 9.699
General Fund Earmarked
Affordable Housing 2.617 (0.721) 1.126 - 3.022 (3.022) -
Project Specific Funds 21.621 (1.111) (0.095) 0.367 20.782 (20.782) -
Prudential Investment Fund 38.009 9.660 - - 47.669 (47.669) -
Change and Service
Redesign Fund 2.167 (0.192) (0.103) - 1.872 (1.872) -
Renewal Fund 5.242 (0.011) - - 5.231 (5.231) -
Investment Fund 4.295 (0.122) (0.273) - 3.900 (3.900) -
Workforce Planning Fund 0.757 (0.078) - - 0.679 (0.679) -
Future Budget Support 9.288 (4.000) - - 5.288 (5.288) -
Cost of Living Fund 1.092 (0.035) (0.322) - 0.735 (0.735) -
Total Earmarked Funds 85.088 3.390 0.333 0.367 89.178 (89.178) -
Total General Fund
Balances 94.269 3.390 1.218 - 98.877 (89.178) 9.699
Specific Reserves
Insurance Fund 2.233 - - - 2.233 (2.233) -
Capital Fund 11.186 - - 11.186 (11.186) -
Total Specific Reserves 13.419 - - - 13.419 (13.419) -
Total General Fund
Reserves 107.688 3.390 1.218 - 112.296 (102.597) 9.699
15

Page 16

the new policy. Council Tax increases of 5% for 2027/28 and 2028/29 have been
included within the planning assumptions at this time. This position will continue
to be influenced by the level of future Scottish Government funding;
• The contribution from earmarked reserves includes resources from the approved
Service Concessions flexibility across the MTFP;
• Outwith specific proposals, fees and charges have been uplifted by 5% annually. 
2026/27 2027/28 2028/29 
£m £m £m    
Aggregate External Finance 399.449  399.449  399.449 
Additional Aggregate External Finance
due:   
DHP Undistributed 3.034  3.034  3.034 
26-27 Pay Award Funding 1.246  1.246  1.246 
Council Tax 75.009  79.418  84.051 
Council Tax Income for Affordable
Housing 1.377  1.446  1.518 
Council Tax Second Homes Levy 1.359  1.400  1.470 
Contribution from Earmarked Reserves 3.500  1.788  - 
Total Funding Available  484.974  487.781  490.768 
2.7 Expenditure Requirement
2.7.1 The revised expenditure requirement for 2026/27 is £485.848m and is summarised
in Appendix 1.  This is the 2025/26 base budget adjusted to reflect the outcome of
a full review of service pressures, previously approved savings, operational budget
adjustments, national expenditure requirements and the baseline funding
contribution to the HSCP, noting that Council requires to carefully consider the total
level of contribution within the context of the deficit position projected by the HSCP.
The main assumptions and pressures are summarised below;
• Costs of continuing the current level of service;
• Inflationary related pressures, including pay awards, contractual commitments
and utilities;
• The financial implication of decisions already taken by the Council;
• Socio economic and demographic pressures.
2.7.2 Changes to the level of employer contributions to the Strathclyde pension fund
were confirmed during 2023/24. The rates included a temporary reduced
contribution rate for 2024/25 and 2025/26 of 6.5% and a 17.5% contribution rate for
2026/27. The Council’s expenditure requirements over the last 2 years were
adjusted to reflect the base contribution rate of 17.5%, however, the actual reduced
rate of 6.5% provided temporary financial benefit across 2024/25 and 2025/26,
16

Page 17

helping deliver strategic investment on a non-recurring basis. The HSCP also
benefitted from the reduced rate across this period. It is recognised however that
the increase in contribution rate to 17.5% from 1 April 2026 has contributed towards
the deficit position faced by the HSCP in 2026/27. The next triennial review of the
pension fund is due to be completed during 2026/27, and it is anticipated that
further benefit will accrue to the Council and the HSCP from 2027/28. This will be
reflected in the expenditure requirements for 2027/28 when confirmation of the new
contribution rate is known.  
2.7.3 Pay agreements are already in place for 2026/27 across the Scottish Joint Council
(SJC) and the Scottish Negotiating Committee for Teachers (SNCT) staff groups.
Through 2026/27 the Council requires to fund 3% of the agreed increases with the
balance being included or anticipated within the Scottish Government revenue
grant settlement. Agreed pay increases include 3.5% for SJC staff and with SNCT
increases taking effect based on academic years, a further 0.25% increase from
April 2026 on top of the 4% increase from August 2025, with a further 3.25%
increase from August 2026 to August 2027. The financial planning assumptions for
2027/28 and 2028/29 includes a 3% increase per year, with SNCT based on
academic year. This continues to be based on the limits of affordability rather than
any prediction as to the actual level of any pay agreement. It is also recognised that
the requirements for Councils and IJB’s to continue to fund pay increases at these
levels places significant financial strain on Councils when compared to the level of
Scottish Government grant funding received. 
2.7.4 Financing the Council’s Capital Investment Programme continues to present
challenges in terms of affordability. This is due to ongoing volatility and inflation
impacts within the construction sector. To ensure delivery of the Council’s
ambitious programme, the MTFP includes further revenue investment each year of
around £1.100m.
2.7.5 In establishing the expenditure requirements, no provision has been made for
general non pay inflation resulting in a reduction in the purchasing power of the
budgets affected. This is most acute across the range of services delivered through
the Place Directorate.
2.7.6 Operational budget adjustments not impacting on Council policy or causing material
changes to current service levels, are detailed in Appendix 2. These include
savings in 2026/27 of £4.202m.  
2.7.7 As part of the 2025/26 revenue budget, savings were approved which impacted
2026/27 and they are detailed at Appendix 3 and total £2.220m. 
2.7.8 Full details of expenditure requirements identified for 2026/27 to 2028/29, including
new national expenditure requirements and all contractual and inflationary related
pressures, as well as loans fund support to deliver the capital programme, are
detailed in appendix 4.
2.7.9 Based on this expenditure forecast and incorporating the savings achieved through
operational adjustments and those savings previously approved, remaining savings
of £0.874m / £8.098m / £9.344m are required for 2026/27, 2027/28 and 2028/29
respectively. This position incorporates the planned use of reserves totalling
£3.500m in 2026/27 and £1.788m in 2027/28. This funding landscape continues to
present a significant challenge to the Council over the medium-term. 
17

Page 18

2.8 Health and Social Care Partnership
2.8.1 Information on pressures and areas of proposed savings are shared with North
Ayrshire Council to inform the allocation of resources delegated to the IJB. As part of
the recent 2026/27 budget announcement and recognising the level of Scottish
Government Settlement and the pressures facing the HSCP, the Council’s Budget
currently includes a net contribution to the HSCP of £13.759m for 2026/27. This
contribution is inclusive of 3 main elements i.e. A share of Scottish Government
funding to support pay increases for 2025/26 and 2026/27 - £1.218m, funding to
meet new expenditure requirements in 2026/27 - £7.580m and an additional
baseline contribution from the Council of £4.961m, being the full value of the
additional core grant settlement to the Council, to help address existing cost
pressures.  
2.8.2 It should be stressed however that this level of additional contribution falls
significantly short of the current projected deficit of the HSCP in 2026/27. The
current position indicates a deficit projection on Social Care services for 2026/27 of
£12.609m which could potentially be further reduced to £10.376m, subject to the IJB
approving further policy-based savings. It is also recognised that the current year
outturn position of the HSCP could further impact this position. The IJB will meet on
19 March to set its 2026/27 Budget. Additional funding from the Council of £4.961m
would potentially reduce the deficit position to between £5.415m and £7.648m,
depending on the decisions approved by the IJB and the outturn position. This
position also assumes the delivery of in-year financial recovery actions for 2025/26.
Current projections in 2025/26 indicate a residual risk overspend of £1.881m on
Social Care at month 7. Further areas of funding to support expenditure
commitments is expected and still to be distributed. This includes funding for free
personal and nursing care. 
2.8.3 The Integration Scheme approved by Scottish Ministers states that, following
determination of the Council and NHS payments to the IJB, the IJB will refine its
Strategic Plan to take account of the totality of resources available and to
commission services within the level of available funding. It is recognised that the
current projected deficit position of the HSCP presents a significant challenge to the
HSCP in terms of the level of services it can provide within the funding that is
available and the potential impact that further cuts and savings could have on
services and service users. As noted in section 2.3.4 of the report, it is therefore
recommended that Council considers a level of Council tax increase in excess of 7%
to help address this risk and provide further sustainable funding to the HSCP. On the
12 February, 2026 the Cabinet Secretary for Finance and Local Government
announced the intention to amend the Budget Bill at Stage 2, to allocate a further
£20m funding to Local Government to address the shortfall in funding to support the
real living wage in commissioned care services. At the time of writing, the allocation
to North Ayrshire is unknown, however, it is recognised this funding will not
materially change the level of deficit position forecast by the HSCP in 2026/27. 
2.8.4 The current planning assumption for years 2027/28 and 2028/29 from the Council is
that the financial pressures facing the IJB will be met by savings and recovery
actions. The IJB has already utilised all remaining unearmarked reserves.   
18

Page 19

2.9 Efficiencies and Savings Proposals
2.9.1 Proposals for efficiencies and savings have been developed which will deliver a
balanced budget for 2026/27. Proposed savings, excluding the HSCP, are
summarised at Appendix 5 and total £0.874m.  
2.9.2 Apart from some specific charging arrangements and those charges set nationally, it
is proposed that the Council’s fees and charges in 2026/27 increase by 5%, with no
subsequent years increases included at this time. This position will be reviewed as
part of the 2027/28 Budget. Members should also note that no increase has been
proposed in respect of school meals charges which remains at £2.05. The schedule
included in Appendix 6 contains the charges with effect from 1 April 2026. It is
important to note that fees and charge levels in respect of the HSCP is a matter for
the IJB to consider. The range of HSCP fees and charges were considered and
approved by the IJB on the 12 February 2026. Full details are included within
Appendix 6. 
2.10 Equality and Children’s Rights Impacts of Budget Proposals
2.10.1 The Council has a legal duty to consider the equalities and children’s rights impact of
proposals on groups with protected characteristics, being age, disability; gender
reassignment; pregnancy and maternity; race; religion or belief; sex; and sexual
orientation. The Council also has a duty to assess the socio-economic impact of
proposals (The Fairer Scotland Duty) and Island proofing. This requires an
assessment of the impact of proposals on reducing inequalities.  
2.10.2 Proposals contained in this report have been screened to assess whether there are
any equalities and socio-economic impacts and, if so, the proposals have been
equalities and children’s rights impact assessed (ECRIA). 
2.10.3 The purpose of the ECRIA is to ensure that Members are fully informed in advance
of taking decisions. They do not prevent Members from making decisions. All
ECRIAs have an assessment of risk alongside mitigating actions. This enables
Council to consider if any detrimental impact can be minimised and any positive
impact maximised. 
2.10.4 A link to all the relevant assessments across the budget savings categories is
provided; ECRIA for Budget Proposals 2026/2027
2.10.5 Any alternative proposals from Members will require to be screened or assessed to
ensure Council is aware of impacts before making any decision.
2.10.6 Responsibility for the funding allocations within the HSCP rests with the IJB which
has responsibility for assessment of the impact of the decisions it takes. 
2.11 Community Budget Engagement
2.11.1 An extensive programme of engagement took place between 6 November and 19
December 2025, including surveys across 2 main themes as well as in person and
online focus groups. The approach was designed to support residents to contribute
their views, make the surveys more accessible and avoid digital exclusion.
2.11.2 The 2 main themes each included a range of proposals and are noted as follows: 
• Children and Young people
• Other Council Services 
19

Page 20

2.11.3 Response totalled 1,225 across the 2 themes with more detailed feedback on
proposals and considerable engagement with community groups across North
Ayrshire.  
2.11.4 This information has been examined by Officers to consider any further refinement to
proposals, for consideration by elected members in setting the budget on 25
February 2026. In parallel, it is used to inform the Equality and Children’s Rights
Impact Assessments (ECRIAs) at each stage to ensure we fully consider the impact
of proposals on our residents.
2.11.5 Full details of feedback across the areas was presented to Council on 11 February
2026, with elected members having received full details in advance of this on 28
January 2026. 
2.12 Sustainable Change Programme
2.12.1 Progress continues in further developing the Council’s ambitious Sustainable
Change Programme aligned to the Council’s priorities. At the 17 December, 2025
Council meeting, the Best Value – Controller of Audit report was presented. The
report was particularly positive and included reference to the Council being “ an
exemplar of how to do transformation well.“ This report recognises the work
undertaken to date and it is important that a pipeline of activity continues to be
identified, with a primary focus on generating financial efficiencies to help address
the significant financial pressures across the MTFP. 
2.12.2 The programme is governed through the Council’s Transformation Board and
includes a range of workstreams and service reviews. The current workstreams
include; 
• Use of Land and Property Assets including commercial and non-commercial
property - This includes a major operational property review within the Irvine
locality and a programme to maximise all commercial property revenue:
• Sustainability initiatives including major solar renewable energy investment in
Nethermains and Shewalton which have now been completed and have started
generating energy. A further pipeline of projects is currently being developed; 
• Digital Initiatives – Including Accessing Our Council and pilot initiatives with the
use of Artificial Intelligence (AI) technology, supported by a Council AI policy.
The pilot projects will help identify the operational benefits that AI can deliver. 
• A range of Service reviews including Waste Services, Housing Services,
Learning resources and the Brighter Pathways programme led by the HSCP
which looks at high-cost external residential placements for children and
considers alternative settings of care to deliver better outcomes and reduce cost.
• Work to support further regional collaboration opportunities continues to be
progressed including regional economic development where a report was
approved at Council on 11 February 2026.  
2.12.3 It is recognised that the more progress made through delivery of the Council’s
Sustainable Change Programme, the less impact there could be on delivery of the
Council’s core services. Between the period from 2021/22 to 2025/26 a total of
£7.137m has been generated in savings across this programme, with further
significant savings incorporated within the medium-term planning. The Council’s
Change and Service Re-design Fund requires to be kept under review to ensure it
20

Page 21

can continue to support the delivery of this programme. Due to the scale of the
financial challenge facing all Councils it is also important to consider and progress
areas of wider reform. National initiatives through the Improvement Service and
Digital Office continue to be at an early stage, however, this could provide further
opportunities for Councils to take a collective approach to areas of service delivery. 
2.13 Workforce Planning
2.13.1 The shape of the Council’s workforce is critical to the delivery of efficient and
effective services. It is a significant factor in how we transform our Council and
organise our workforce within the context of the Council’s key priorities and
available funding.  
2.13.2 In order to be successful it is key for the workforce strategy, and the planning
around this, to flow from the Council Plan and link to both people management and
operational processes. To ensure the Council’s priorities are met, workforce
planning must be flexible enough to manage short term activity but ultimately be
focused on medium to long-term needs. The workforce strategy, linked to the
Medium-Term Financial Plan, recognises and reflects significant external pressures
and financial uncertainty.
2.13.3 Influenced by the scale of the financial challenges facing the Council over the
coming years, there will continue to be organisational change, both in terms of
structures but also about how we work. Included within the 2024/25 Budget was the
outcome of Voluntary Early Release programme which released 85 posts and
delivered around £2.5m of annual savings. Moving forward, to ensure workforce
planning is effective against the backdrop of future budgetary constraints, this will
continue to be considered and integrated within a programme of service reviews
across the Council.
2.13.4 North Ayrshire Council employs 7,589 staff, equivalent to 6,400 full time equivalent
employees. Anticipated workforce implications associated with the MTFP over the
next 3 years are summarised in the undernoted table. In 2026/27 the workforce is
projected to reduce by approximately 42.5 Full Time Equivalent posts (FTE’s).
However, it should be stressed that all measures required to deliver a balanced
budget for 2027/28 and 2028/29 have not been included at this time. It is, therefore,
anticipated that this position will change through further development of the Budget
Programme in 2027/28.   
Category 2026/27        
FTE
2027/28         
FTE
2028/29     
FTE
Operational Budget Adjustments (12.0) (4.2) -
Previously Approved Savings (7.0) - -
Pressures and Growth - - -
New Savings Options (23.5) (17.5) -
Total Workforce Implications (42.5) (21.7) - 
2.13.5 Through a corporate workforce planning approach, any reduction to workforce
levels will continue to be managed through natural attrition, vacancy management
through the Vacancy Scrutiny Panel, redeployment and, where appropriate,
voluntary early release.
21

Page 22

2.14 Management of Risk
2.14.1 North Ayrshire’s financial framework is underpinned by strategic, corporate, and
operational risk registers. Given the significance of the financial risks the Council
faces, this report sets out in the table below a number of the key risks associated
with securing financial sustainability along with the likelihood and impact scoring.
For all areas of material risk to the Council and planned mitigations, this is reported
to Cabinet and the Audit and Scrutiny Committee through the Council’s Strategic
Risk Register. From the table below you will see the maximum risk score is
attached to the Financial Sustainability of the HSCP, which requires immediate
action to address. By extension, from the funding arrangements with the HSCP,
this risk also links through to the Financial Sustainability of the Council.                                                                           
Likelihood
Score
Impact
Score
Financial Sustainability of the Council –
Funding not keeping pace with cost-of-service
delivery. Impacted by inflationary pressures,
new burdens and the financial risk from the
projected HSCP deficit position
4 5
Financial Sustainability of the HSCP – The
HSCP is faced with significant cost pressures
across the medium-term, which is not matched
by the same level of funding to meet need.
This requires immediate action to address.
5 5
Inequalities – Linked to the current economic
conditions in the area and the growing demand
for services and need against a backdrop of
reducing budgets.
5 4
Cyber – Risk of compromise of business
operations.
4 4
Property Asset Risk – The condition of
properties has been impacted by the
inflationary impact on budgets as well as
previous budget reductions
4 5 
2.15 Revenue Budget - Objective and Subjective Analysis
2.15.1 The Codes of Financial Practice outline categories of service delivery, known as
the Objective Analysis, and categories of expenditure type, known as the
Subjective Analysis. Based on the baseline budget position presented within this
report, the budget matrix for 2026/27 is attached in Appendix 7.
2.15.2 Once this matrix is approved, services must spend in line with this and any
subsequent significant and planned variation to this budget (i.e. virement) over
£0.100m must be approved by Cabinet.
2.15.3 All North Ayrshire Council functions relating to health and social care are entirely
delegated to the Integrated Joint Board, subject to appropriate reporting throughout
the year to the Council.
22

Page 23

2.16 Summary
2.16.1 The estimated financial position included in this report presents a challenging fiscal
landscape for the Council with a Budget gap in 2026/27 of over £11m. It is also
recognised that this position is compounded by the projected deficit position facing
the HSCP in 2026/27 and the risk this has on the services provided by the HSCP
and ultimately the risk this presents to the Council as a funding partner. The
baseline planning assumption for a 7% increase in Council tax is a consequence of
passporting all additional Scottish Government core revenue grant to the HSCP
(i.e. £+4.961m). Whilst this position would achieve a balanced budget for the
Council in 2026/27, this level of additional funding would still fall significantly short
of the level of deficit that the HSCP projects in 2026/27. It is therefore
recommended that Council considers a level of Council tax increase in excess of
7% to help further address this risk, followed by 5% increases in each of the
subsequent 2 years.   
2.16.2 The report includes a package of measures to address the Council’s budget gap.
This includes savings and additional revenue generation in addition to an already
planned use of Council reserves. Feedback from the Council’s budget engagement
exercise has also been incorporated into the relevant impact assessments. 
2.16.3 The table below summarises the incremental budget implications and assumptions
included in the MTFP for 2026/27 to 2028/29, noting the operational adjustments
figure includes the additional costs associated with employer pension contributions
in 2026/27 (c£9m); 
2026/27     
£m
2027/28     
£m
2028/29       
£m
Council Tax Increase
7.00%*
minimum 5.00% 5.00%
SG Core Grant Movement +1.29% 0.00% 0.00%
Operational Adjustments
*(includes -£4.202m savings) +£4.598m* -£0.591m +£0.071m
Previously Approved Savings -£-2.220m - -
Expenditure Requirements
(excluding HSCP) +£15.646m +£11.496m +£12.260m
HSCP Funding (includes
£4.961m additional funding)
+£13.759m*
minimum - -
Use of Reserves -£3.500m -£1.788m £0
Savings to be Approved  -£0.874m -£1.180m -£0.442m 
2.16.4 The contribution to the HSCP includes 3 main elements i.e. A share of Scottish
Government funding to support pay increases for 2025/26 and 2026/27 - £1.218m,
funding to meet new expenditure requirements in 2026/27 - £7.580m and an
additional contribution from the Council of £4.961m, being the full value of the
additional core grant settlement to the Council, to help address existing cost
pressures, and noting that this level of additional contribution falls short of the
current projected deficit position of the HSCP in 2026/27. 
23

Page 24

2.16.5 The operational adjustments include savings of £4.202m identified across
Directorates for 2026/27. This is in addition to the £0.874m savings to be approved
for member consideration to deliver a balance budget in 2026/27. With previously
approved savings of £2.220m, the Budget sets out a full package of savings
totalling £7.296m to address the Council’s Budget gap. 
2.16.6 Proposed levels of fees and charges are outlined at Appendix 6. 
3. Proposals 
3.1 That Council: 
a) notes the anticipated funding available to meet the Council’s expenditure requirements
and notes the areas of ongoing financial risk to the Council;
b) approves the Council's expenditure requirements for 2026/27 and notes the indicative
requirements for 2027/28 and 2028/29;
c) notes the projected outturn position for 2025/26; 
d) notes the level of reserves and fund balances held by the Council and approves any
use and contributions to and from these; 
e) approves efficiencies and savings to ensure a balanced budget for 2026/27,
consequentials and new proposals in future years;
f) approves the schedule of Council fees and charges detailed in Appendix 6;
g) Considers and approves the level of additional contribution to the HSCP, noting the
pressures and risks to the HSCP and the Council set out at 2.8.2;
h) determines the level of Council Tax for 2026/27, noting the recommendation that, in
view of the projected deficit position of the HSCP, that Council considers an increase in
excess of 7%;
i) notes the anticipated funding gaps for 2027/28 and 2028/29;
j) considers the equality and children’s rights impact of any proposed service changes;
k) notes the feedback from the community Budget engagement exercise to help inform
budget plans;
l) notes further progress to date on the Council’s Sustainable Change Programme and
corporate Workforce Planning; and 
m) approves the budget matrix for 2026/27.  
24

Page 25

4. Implications/Socio-economic Duty 
Financial 
4.1 The financial implications are as outlined in the report. Members require to approve a
package of efficiencies and savings, excluding any decision taken by the IJB in respect
of social care services, totalling £0.874m for 2026/27. With savings of £4.202m within
the Council’s operational adjustments and previously approved savings of £2.220m, the
Budget includes a full package of savings totalling £7.296m to address the Council’s
Budget gap. The recommendations include an increase in Council Tax in excess of 7%
for 2026/27 in order to help address the significant pressures facing the HSCP. 
Human Resources 
4.2 The total anticipated impact on the workforce is a net reduction of 42.5 FTE posts in
2026/27. The Council has a robust workforce planning framework in place. In line with
this any reduction to the workforce will be managed through natural attrition, vacancies,
redeployment and voluntary early release. This will be effected by regular engagement
and participation with the Trade Unions. 
Legal 
4.3 The Council is obliged by the Local Government Finance Act 1992 to set a budget for
2026/27 and to do so in a manner and at such a time as to ensure that it is able lawfully
to set its Council Tax by 11 March. Failure to do so could result in several legal and
financial consequences, for both the Council and Members. 
Equality/Socio-economic 
4.4 Obligation in respect of equalities are set out at 2.10 of the report.
The Equality and Children’s Rights Impact Assessments (incorporating Fairer
Scotland Duty and Island Proofing) and a summary of screenings are available via the
link provided below.
ECRIA for Budget Proposals 2026/2027 
Climate Change and Carbon 
4.5 Proposals within the report, including measures to address energy consumption
reductions align with the Council’s priority of addressing climate change. 
Key Priorities 
4.6 The draft budget supports delivery of the outcomes as outlined in the Council Plan 2023-
2028. 
Community Wealth Building 
4.7 Recommendations included in the report align with the Council’s Community Wealth
Building Strategy. 
25

Page 26

Islands Communities Impact Assessment (ICIA) 
4.8 This has been captured as part of the Council’s Budget engagement process. Any
proposals with a unique island impact has been assessed accordingly. 
United Nations Rights of the Child (UNCRC) 
4.9 None 
Consumer Duty 
4.10 None 
5. Consultation 
5.1 Significant scrutiny and challenge of the underlying assumptions of the proposed budget
has taken place with the Executive Leadership Team and regular engagement with
Elected Members has taken place between September 2025 and February 2026. 
5.2 The key issues within this report have been presented to the Trade Unions. 
5.3 An extensive programme of engagement took place between 6 November and 19
December 2025, including surveys across 2 main themes as well as in person and
online focus groups. The results of the engagement programme were presented to
Council on the 11 February 2026, with elected members receiving advance sight of the
outputs on 28 January 2026. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Mark Boyd, Head of Service (Finance), on 01294
324560. 
Background Papers
0
26

Page 27

# Appendix 1
2026/27
Consequentials Rephased/New Total Consequentials Rephased/New Total
£000's £000's £000's £000's £000's £000's £000's
Funding
Aggregate external finance 399,449 399,449 399,449 399,449 399,449
Additional aggregate external finance due :
DHP Undistributed 3,034 3,034 3,034 3,034 3,034
Assumed 26-27 Pay Award Funding (Share of £47m) 1,246 1,246 1,246 1,246 1,246
Council Tax Income 75,009 79,418 79,418 84,051 84,051
Council Tax Income for Affordable Housing 1,377 1,446 1,446 1,518 1,518
Second Homes Levy 1,359 1,400 1,400 1,470 1,470
Contribution from General Reserves 3,500 1,788 1,788 - -
Total Funding Available 484,974 - 487,781 487,781 - 490,768 490,768
Expenditure
Base Budget 459,065 484,974 484,974 487,781 487,781
Operational Budget Adjustments
Wellbeing 58 68 68 71 71
Climate Change (882) (346) (346) - -
A Sustainable Council 5,422 (313) (313) - -
Total Operational Budget Adjustments 4,598 (591) - (591) 71 - 71
Savings Previously Approved
Wellbeing (1,747) - - - -
A Sustainable Council (473) - - - -
Total Savings Previously Approved (2,220) - - - - - -
Investments - Contractual/Unavoidable
Wellbeing 1,817 1,230 1,230 1,223 1,223
Communities & Local Democracy 29 4 4 - -
Climate Change - - - - -
A Sustainable Council - - - - -
Corporate Investment 9,182 10,162 10,162 11,037 11,037
Total Contractual / Unavoidable 11,028 - 11,396 11,396 - 12,260 12,260
North Ayrshire Council
Revenue Budget 2026/27
Revenue Budget Summary Position
2027/28 2028/29
# OFFICIAL-PROTECT INFORMATION
27

Page 28

OFFICIAL-PROTECT INFORMATION# Appendix 1
2026/27
Consequentials Rephased/New Total Consequentials Rephased/New Total
£000's £000's £000's £000's £000's £000's £000's
North Ayrshire Council
Revenue Budget 2026/27
Revenue Budget Summary Position
2027/28 2028/29
Investments - National/Local Pressures
Wellbeing - - - - -
Communities & Local Democracy - - - - -
Climate Change - - - - -
A Sustainable Council 117 100 100 - -
Total National / Local Pressures 117 - 100 100 - - -
New National Expenditure Requirements
Wellbeing 4,501 - - - -
Communities & Local Democracy - - - - -
A Sustainable Council - - - - -
Total National Expenditure Requirements 4,501 - - - - - -
Total Expenditure Requirements (excl HSCP) 15,646 - 11,496 11,496 - 12,260 12,260
Health and Social Care Partnership
HSCP Net Expenditure Requirements 1,218 - - - - - -
Additional Council Funding to the HSCP 4,961
New HSCP National Expenditure Requirements - Recurring 7,580 - - - - - -
Total Health and Social Care Partnership 13,759 - - - - - -
Total Expenditure Requirements 29,405 - 11,496 11,496 - 12,260 12,260
Additional Investment
Strategic Investment / Risk Provision - - - - - -
Reverse Previous Investment (5,000) - - - - - -
Total Adjustments 26,783 (591) 11,496 10,905 71 12,260 12,331
Total Expenditure Requirement 485,848 (591) 496,470 495,879 71 500,041 500,112
(Surplus)/Deficit for Year 875 (591) 8,689 8,098 71 9,273 9,344
New Savings Proposed
Wellbeing (638) (1,037) - (1,037) (399) - (399)
A Sustainable Council (236) (143) - (143) (43) - (43)
Total Savings Proposed (874) (1,180) - (1,180) (442) - (442)
Revised Expenditure Requirement 484,974 1,771 496,470 494,699 371 500,041 499,670
Revised (Surplus)/Deficit for Year if all Savings Proposals are Accepted - (1,771) 8,689 6,918 (371) 9,273 8,902
#
28

Page 29

# Appendix 2
Council Objective/Theme Operational Budget Adjustment Reference Category 2026/27 2027/28 2028/29
£'s £'s £'s
Wellbeing
Children, Young People and Communities One-Off Reduction in Playpark Maintenance Budget SP-PL-25-07 Amber 50,000 - -
Children, Young People and Communities Sub Total 50,000 - -
Other Contribution to Affordable Housing Reserve Green 8,000 68,000 71,000
Other Sub Total 8,000 68,000 71,000
Total 58,000 68,000 71,000
Climate Change
Charging for Services, Alternative Funding Proposed income from solar PV farms SP-PL-24-10 Green 11,933 - -
Charging for Services, Alternative Funding Sub Total 11,933 - -
Service Delivery Models People & ICT service review SP-CORP-26-01 Green (129,517) (75,201)
Service Delivery Models Review of Procurement Staffing SP-CORP-26-02 Green (35,000)
Service Delivery Models Additional Procurement Rebate Income SP-CORP-26-03 Green (40,000)
Service Delivery Models Review of Democratic Services Non Employee Budgets SP-CORP-26-04 Green (15,000)
Service Delivery Models Productivity Improvements (Cleaning Service) SP-ED-26-05 Green (79,087)
Service Delivery Models Review of Service Structures (FM) SP-ED-26-06 Green (577,600) (191,517)
Service Delivery Models Removal of Workscope & Governance budget SP/PL/26/02 Green (79,272)
Service Delivery Models Reduction in Directorate Support SP/PL/26/03 Green (18,000)
Service Delivery Models Sub Total (894,389) (345,805) -
Transport and Travel
Transport and Travel Sub Total - - -
Total (882,456) (345,805) -
A Sustainable Council
Charging for Services, Alternative Funding Increase in Income (Cleaning Services) SP-ED-26-03 Green (35,000) (65,000)
North Ayrshire Council
Revenue Budget 2026/27
Revenue Budget Operational Budget Adjustments
#
29

Page 30

# Appendix 2
Council Objective/Theme Operational Budget Adjustment Reference Category 2026/27 2027/28 2028/29
£'s £'s £'s
North Ayrshire Council
Revenue Budget 2026/27
Revenue Budget Operational Budget Adjustments
Charging for Services, Alternative Funding Reduction in budgeted bad debt provision SP-ED-26-04 Green (60,000) (65,000)
Charging for Services, Alternative Funding Planning Application Fee increase SP-C0M-26-02 Green (80,000)
Charging for Services, Alternative Funding Sub Total (175,000) (130,000) -
Children, Young People and Communities Sub Total - - -
Disinvestment
Disinvestment Sub Total - - -
Land, Property and Assets
Commercial Estate Transformation - Maximise Rental Income from
Existing and New Property SP-PL-24-01 Green (42,500) - -
Land, Property and Assets Reduction in tonnages at Household Waste Recycling Centres SP/PL/26/01 Green (150,000)
Land, Property and Assets
Reduction in Property Running Costs & Security through Demolition of
Surplus Assets
SP/PL/26/04
Green
(16,815)
Land, Property and Assets Property Estate - Maintenance Backlog BID-PL-26-09 Green (500,000) - -
Land, Property and Assets Sub Total (709,315) - -
Other Review of Revenues team operational budgets SP-CORP-26-05 Green (50,000) - -
Other Increasd income from Employee Benefits SP-CORP-26-06 Green (100,000) - -
Other Review of corporate reosurce budgets SP-CORP-26-07 Green (300,000) - -
Other Non Recurring Employers' Superannuation Rebate Green 9,530,000 - -
Other Packaging Extended Producer Responsibility Income SP-PL-26-06 Green (188,626) (182,720) -
Other
Anticipated additional funding from pack UK in respect of Extended
Producer Liability Obligation for Packaging SP-PL-26-06 Green (2,500,000)
Other Revised NDR Empty Property Policy SP-CORP-26-08 Green (84,801) - -
Other Sub Total 6,306,573 (182,720) -
Total 5,422,258 (312,720) -
TOTAL OPERATIONAL BUDGET ADJUSTMENTS 4,597,802 (590,525) 71,000
#
30

Page 31

# Appendix 3
Category 2026/27 2027/28 2028/29
£'s £'s £'s
Children, Young People and Communities Review of KA Leisure Services SP-COM-25-03/4 Green (299,000) -
Children, Young People and Communities Realign the level of Teaching Resource across North Ayrshire Schools SP-ED-25-01
Green
(733,783)
Children, Young People and Communities Review of School Crossing Patrols SP-ED-25-05 Green (46,002)
Children, Young People and Communities FM - Cleaning - Reduction in School/Early Years SP-ED-25-09 Green (47,731)
Children, Young People and Communities Redesign of Music Service SP-ED-25-11 Green (24,361)
Children, Young People and Communities Workforce Planning - Review of Education HQ Posts SP-ED-25-12 Green (56,000) - -
Sub Total (1,206,877) - -
Service Delivery Models Economic Development, Growth and Regeneration Service Review SP-PL-25-01 Green (320,000) -
Service Delivery Models Workforce Planning - Review of Roads Staffing Structures SP-PL-25-02/03 Amber (120,000) - -
Service Delivery Models Workforce Planning - Alternative working patterns within Streetscene SP-PL-25-05 Amber (100,000) - -
Sub Total (540,000) - -
Total (1,746,877) - -
Charging for Services, Alternative Funding Increased planning application fee income SP-COM-25-08 Green (20,000) - -
Charging for Services, Alternative Funding 5% Increase in Council Fees and Charges (Excluding School Meals
Charges) Amber
(196,709) - -
- -
(216,709) - -
Land, Property and Assets
Greater publicity, tracking and consumption monitoring of the Council's
energy consumption SP-PL-25-09 Amber (256,000) - -
- - -
Land, Property and Assets Sub Total (256,000) - -
Total (472,709) - -
North Ayrshire Council
-(2,219,586)TOTAL SAVINGS PREVIOUSLY APPROVED
Council Objective/Theme Saving Reference
Revenue Budget Adjustments Previously Approved
Revenue Budget 2026/27
Wellbeing
A Sustainable Council
-
#
31

Page 32

# Appendix 4
2026/27 2027/28 2028/29
£'s £'s £'s
Children, Young People and Communities NALL Energy/Superann Costs Contractual/Unavoidable BID-COM-24-04 532,000
Children, Young People and Communities PPP/DBFM Annual Contractual indexation Contractual/Unavoidable BID-ED-26-01 673,836 555,961 594,737
Children, Young People and Communities
Additional NDR costs Montgomerie Park Primary - from
the Capital Programme. Contractual/Unavoidable BID-ED-25-08 88,042
Transport & Travel SPT Annual Price Revision Contractual/Unavoidable BID-PL-26-01 - 200,276 113,524
Land & Property Indexation on Waste Processing Costs Contractual/Unavoidable BID-PL-25-04 31,764 50,890 144,426
Transport & Travel Statutory Provision of Transport & Journeys Contractual/Unavoidable BID-PL-26-02 241,768 265,945 292,539
Transport & Travel
Service, Maintenance and Repair of Fleet Vehicles and
Plant Assets Contractual/Unavoidable BID-PL-26-03 75,955 75,955 75,955
Transport & Travel Workplace EV Charger Maintenance Contractual/Unavoidable BID-PL-26-04 48,210 (8,940) 1,320
Cunninghame House Public Protection BID-COM-26-02 25,000
Livewell - Promotion of Health & Wellbeing activity Contractual/Unavoidable BID-CS-26-04 10,000
Corporate AED Replacement Programmme Contractual/Unavoidable BID-COM-26-01 90,000 90,000
Sub Total Contractual/Unavoidable 1,816,575 1,230,087 1,222,501
Children, Young People and Communities Improved pay for early learning and childcare workers New National Expenditure Requirements (392,000) - -
Children, Young People and Communities Teachers Pay New National Expenditure Requirements 1,049,000 - -
Children, Young People and Communities Additional Support for Learning New National Expenditure Requirements 678,000 - -
Children, Young People and Communities DHP New National Expenditure Requirements 3,034,000 - -
Children, Young People and Communities School Clothing Grant New National Expenditure Requirements 17,000 - -
Children, Young People and Communities ELC Additional New National Expenditure Requirements 266,000
Children, Young People and Communities Educational Psychologists New National Expenditure Requirements 3,000
Children, Young People and Communities Gaelic New National Expenditure Requirements 3,000
Children, Young People and Communities Preventing Homelessness New National Expenditure Requirements (195,000)
Children, Young People and Communities Scottish Assessors New National Expenditure Requirements 38,000
Sub Total New National Expenditure Requirements 4,501,000 - -
Total 6,317,575 1,230,087 1,222,501
Service Delivery Models
Additional revenue budget to support Datacentre co-
location model Contractual/Unavoidable BID-CS-26-05 13,000
Service Delivery Models Directorate Support Job Evaluation Contractual/Unavoidable BID-CS-26-06 12,000
Service Delivery Models CE Pay Review Contractual/Unavoidable BID-CS-26-07 4,000 4,000
Sub Total Contractual/Unavoidable 29,000 4,000 -
Sub Total New National Expenditure Requirements - - -
North Ayrshire Council
Revenue Budget 2026/27
Revenue Expenditure Requirements
Wellbeing
Communities & Local Democracy
ReferenceCouncil Objective/Theme Investment Category
#
32

Page 33

# Appendix 4
2026/27 2027/28 2028/29
£'s £'s £'s
North Ayrshire Council
Revenue Budget 2026/27
Revenue Expenditure Requirements
ReferenceCouncil Objective/Theme Investment Category
Total 29,000 4,000 -
Land & Property Inflationary Pressures on Reactive Maintenance National/Local Pressures BID-PL-25-09 100,000 100,000 -
Land & Property Electrical Safety Inspections National/Local Pressures BID-PL-25-12 (74,500)
Land & Property
Maintenance of Development Sites and Associated
Areas National/Local Pressures BID-PL-25-20 22,000
Sustainable Environment
Property Maintenance Budget & Solar Photovoltaic
Panels National/Local Pressures BID-PL-24-05/06 (30,000) - -
Land & Property
Mitigation of Water Ingress & Flooding through an
Enhanced Roof Maintenance Programme National/Local Pressures BID-PL-26-08 100,000
Sub Total National/Local Pressures 117,500 100,000 -
Total 117,500 100,000 -
Inflation Joint Board requisitions Contractual/Unavoidable 245,032 117,549 126,630
Inflation COSLA Membership Inflation (option 3) Contractual/Unavoidable BID-CS-26-08 9,770 8,060 6,932
Inflation Pay Award Contractual/Unavoidable 8,956,517 7,382,398 7,424,809
Inflation 25-26 Additional Pay Award (4.0% - 3.0%) Contractual/Unavoidable 2,036,031
Inflation Real Living Wage Contractual/Unavoidable 267,350
Inflation Corporate issues (energy, fuel, food, NDR) Contractual/Unavoidable 895,000 1,348,663 1,744,473
Sub Total 12,409,700 8,856,670 9,302,844
Other Loan charges Contractual/Unavoidable (3,228,013) 1,305,000 1,734,000
Sub Total (3,228,013) 1,305,000 1,734,000
Total 9,181,687 10,161,670 11,036,844
TOTAL REVENUE EXPENDITURE REQUIREMENTS 15,645,762 12,259,345
Council Wide Pressures
11,495,757
#
33

Page 34

# Appendix 5
£ £ £ £ £ £
Children, Young People and Communities SP-ED-26-01 Maintain alignment of teaching resource to
reduced pupil rolls across mainstream schools
Low Negative (590,391) (959,385) - (368,994) -
Children, Young People and Communities SP-ED-26-02 Maintain alignment of Pupil Support Assistant
hours to reduced pupil rolls across mainstream
schools
Low Negative (47,531) - (77,238) - (29,707) -
Total (637,922) - (1,036,623) - (398,701) -
Disinvestment SP-COM-26-03 Reduction in small grants Low Negative (80,000)
Service Deliery Models SP-PL-26-05 Review the waste collection frequency for purple
and blue bins
(Mainland and Cumbrae)
Low Negative (100,000) (100,000)
Charging for Services SP-COM-26-04 Increase to charges at Arran Outdoor Education
Centre
Low Negative (15,000)
Charging for Services SP-C0M-26-01 Increase Temporary Acommodation Rents Low Negative (41,000) (43,000) (43,000)
-
Total (236,000) - (143,000) - (43,000) -
A Sustainable Council
Consequential
Savings New Saving
Consequential
Savings
Wellbeing
New Saving
North Ayrshire Council
Revenue Budget 2026/27
Revenue Budget Savings to be Approved
Council Objective / Theme Savings Proposal Community Impact 2026/27 2027/28 2028/29
Proposed Saving
Workforce
implications
Reference
(441,701) -TOTAL SAVINGS TO BE APPROVED (873,922) - (1,179,623) -
#
34

Page 35

#
North Ayshire Council
Fees & Charges for 2026-2027 to 2028-2029
Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
2025 to 2026
£
Proposed
Charge 2026 to
2027
Indicative
Charge 2027 to
2028
Indicative
Charge 2028 to
2029
Basis of
increase 2026
to 2027
%
Basis of
increase 2027
to 2028
%
Basis of
increase 2028
to 2029
%
Note
CONTRIBUTION FEES & CHARGES
Corporate Services Legal - Licensing Raymond Lynch General - Amendment (1982 Act Para 9 - if due to Licence
Partnership) Contribution £146.00 £153.00 £153.00 £153.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch General - Amendment of Licence (1982 Act Para 9 consent to
Material Change - if not Licence Partnership) Contribution £41.00 £43.00 £43.00 £43.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Entertainment - Indoor Sports Entertainment Licence (when
another NAC Licence is held) Contribution £198.00 £208.00 £208.00 £208.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Entertainment - Indoor Sports Entertainment Licence (when no
other NAC Licences are held) Contribution £395.00 £415.00 £415.00 £415.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Entertainment - Public Entertainment Licence (Commercial
Premises with Fairground) Contribution £461.00 £484.00 £484.00 £484.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Entertainment - Public Entertainment Licence - Full Licence
(maximum duration of 3 years, and renewable) Contribution £421.00 £442.00 £442.00 £442.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Entertainment - Public Entertainment Licence - Temporary
Licence (maximum duration of 6 weeks, and not renewable) Contribution £374.00 £393.00 £393.00 £393.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - to sell pets (Activity A) Contribution £230.00 £242.00 £242.00 £242.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - to rehome animals (Activity B) Contribution £230.00 £242.00 £242.00 £242.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch
Animal Activity Licence - To operate an "Animal welfare
Establishment" (Activity C) If licence holder is OSCR registered
no fee
Contribution £0.00 £0.00 £0.00 £0.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - To operate an "Animal welfare
Establishment" (Activity C) If not OSCR registered Contribution £230.00 £242.00 £242.00 £242.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - to breed puppies (Activity D) Grant (one
year renewable) Contribution £552.00 £580.00 £580.00 £580.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - to breed puppies (Activity D) Renewal
(one year) Contribution £244.00 £256.00 £256.00 £256.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - to breed kittens (Activity E) Grant (one
year renewable) Contribution £552.00 £580.00 £580.00 £580.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - to breed kittens (Activity E) Renewal
(one year) Contribution £244.00 £256.00 £256.00 £256.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - to breed rabbits (Activity F) Grant (one
year renewable) Contribution £552.00 £580.00 £580.00 £580.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Activity Licence - to breed rabbits (Activity F) Renewal
(one year) Contribution £244.00 £256.00 £256.00 £256.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Boarding Licence (1 to 10 Animals) Contribution £98.00 £103.00 £103.00 £103.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Boarding Licence (11 to 20 Animals) Contribution £131.00 £138.00 £138.00 £138.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Boarding Licence (21 to 30 Animals) Contribution £171.00 £180.00 £180.00 £180.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Boarding Licence (31 to 50 Animals) Contribution £250.00 £263.00 £263.00 £263.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Boarding Licence (51 to 70 Animals) Contribution £322.00 £338.00 £338.00 £338.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal Boarding Licence (Over 70 Animals) Contribution £408.00 £428.00 £428.00 £428.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal - Registration - Performing Animals (Regulation) Act 1925 Contribution £59.00 £62.00 £62.00 £62.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Booking Office (with public access) Contribution £395.00 £415.00 £415.00 £415.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Booking Office (without public access) Contribution £264.00 £277.00 £277.00 £277.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Caravan Sites New system (relevant Permanenet sites -
Residential sites) / Old system (Holiday and touring sites) - no fee Contribution £749.00 £786.00 £786.00 £786.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Cinema Licence - grant or renewal for one year Contribution £322.00 £338.00 £338.00 £338.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Cinema Licence - grant or renewal for under a year - per month
(total not to exceed the one year fee) Contribution £108.00 £113.00 £113.00 £113.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Cinema Licence - Transfer Contribution £65.00 £68.00 £68.00 £68.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal - Dangerous Wild Animals - New & Renewal (maximum
duration of 12 months, and renewable) Contribution £349.00 £366.00 £366.00 £366.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch General - Duplicate Licence Contribution £41.00 £43.00 £43.00 £43.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Dealer - Knife Dealers Licence - New & Renewal (Full -
maximum duration of 3 years, and renewable) Contribution £395.00 £415.00 £415.00 £415.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Other CGSA - Late Hours Catering Licence - New & Renewal
(Full - maximum duration of 3 years, and renewable) Contribution £210.00 £221.00 £221.00 £221.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Other CGSA - Market Operators Licence Contribution £446.00 £468.00 £468.00 £468.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Dealer - Metal Dealers Licence (Premises & Itinerant) Contribution £138.00 £145.00 £145.00 £145.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Poisons - Registration to sell non medical poisons (new) Contribution £28.00 £29.00 £29.00 £29.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Poisons - Registration to sell non medical poisons (retention) Contribution £16.00 £17.00 £17.00 £17.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Dealer - Second Hand Dealers Licence - New (Full - maximum
duration of 3 years, and renewable) Contribution £277.00 £291.00 £291.00 £291.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Dealer - Second Hand Dealers Licence - Already Licenced (Full -
maximum duration of 3 years, and renewable) Contribution £146.00 £153.00 £153.00 £153.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch
Other CGSA - Sex Shop or Sexual Entertainment Venue Licence -
New & Renewal (Full - maximum duration of 3 years, and
renewable)
Contribution £2,346.00 £2,463.00 £2,463.00 £2,463.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Other CGSA - Skin Piercing or Tattooing Licence (with Premises) Contribution £415.00 £436.00 £436.00 £436.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Other CGSA - Skin Piercing or Tattooing Licence (without
Premises) Contribution £349.00 £366.00 £366.00 £366.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Street Trader Employee Licence - Full licence (maximum
duration of 3 years, and renewable) Contribution £158.00 £166.00 £166.00 £166.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Street Trader Employee Licence - Temporary Licence (maximum
duration of 3 years, and renewable) Contribution £119.00 £125.00 £125.00 £125.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Street Trader Operator - Substitute Vehicle Contribution £138.00 £145.00 £145.00 £145.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Street Trader Operator Licence - Full Licence (maximum duration
of 3 years, and renewable) Contribution £316.00 £332.00 £332.00 £332.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Street Trader Operator Licence - Temporary Licence (maximum
duration of 6 weeks, and not renewable) Contribution £216.00 £227.00 £227.00 £227.00 5.0% 0.0% 0.0%
#
Appendix 6
35

Page 36

#
Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
2025 to 2026
£
Proposed
Charge 2026 to
2027
Indicative
Charge 2027 to
2028
Indicative
Charge 2028 to
2029
Basis of
increase 2026
to 2027
%
Basis of
increase 2027
to 2028
%
Basis of
increase 2028
to 2029
%
Note
Corporate Services Legal - Licensing Raymond Lynch Animal - Zoo Licence (New - maximum duration of 4 years, and
renewable.  Vet inspections are charged in additiion) Contribution £349.00 £366.00 £366.00 £366.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal - Zoo Licence (Renewal - maximum duration of 6 years,
and renewable.  Vet inspections are charged in additiion) Contribution £349.00 £366.00 £366.00 £366.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal - Venison Dealer Contribution £146.00 £153.00 £153.00 £153.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal - Venison Employee / Agent Contribution £79.00 £83.00 £83.00 £83.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal - Game Dealers Contribution £5.00 £5.00 £5.00 £5.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Poisons - Registration (alteration of details in Register) Contribution £6.00 £6.00 £6.00 £6.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch STL - Grant - Secondary Letting - 1 to 4 Guests Contribution £276.00 £290.00 £290.00 £290.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch STL - Grant - Secondary Letting - 5 or more guests Contribution £441.00 £463.00 £463.00 £463.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch STL - Grant - Home Sharing and/or Home Letting - 1 to 4 Guests Contribution £138.00 £145.00 £145.00 £145.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch STL - Grant - Home Sharing and/or Home Letting - 5 or more
Guests Contribution £221.00 £232.00 £232.00 £232.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch STL - Renewal/Recurring Fee - Secondary Letting - 1 to 4
Guests Contribution £221.00 £232.00 £232.00 £232.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch STL - Renewal/Recurring Fee - Secondary Letting - 5 or more
Guests Contribution £386.00 £405.00 £405.00 £405.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch STL - Renewal/Recurring Fee - Home Sharing and/or Home
Letting - 1 to 4 Guests Contribution £110.00 £116.00 £116.00 £116.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch STL - Renewal/Recurring Fee - Home Sharing and/or Home
Letting - 5 or more Guests Contribution £193.00 £203.00 £203.00 £203.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal - Riding Establishment Licence (1 year, New & Renewal) Contribution £552.00 £580.00 £580.00 £580.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Animal - Riding Establishment Licence (One year, If already
licenced) Contribution £415.00 £436.00 £436.00 £436.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Replacement Door Sign Contribution £20.00 £21.00 £21.00 £21.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Replacement Licence resulting from change of
address Contribution £17.00 £18.00 £18.00 £18.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Replacement Plate Contribution £40.00 £42.00 £42.00 £42.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Replacement Tariff Card Contribution £17.00 £18.00 £18.00 £18.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Replacement Taxi / Private Hire Car Driver Badge Contribution £22.00 £23.00 £23.00 £23.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Replacement Window Stickers Contribution £22.00 £23.00 £23.00 £23.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Substitution of Vehicle (Taxi or Private Hire Car) Contribution £246.00 £258.00 £258.00 £258.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Licences - Taxi Driver's Licence - Full Licence (1 year, and
renewable) Contribution £98.00 £103.00 £103.00 £103.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Licences - Taxi Driver's Licence - Full Licence (maximum
duration of 3 years, and renewable) Contribution £230.00 £242.00 £242.00 £242.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Licences - Private Hire Car Driver Licence - Full licence
(maximum duration of 3 years, and renewable) Contribution £230.00 £242.00 £242.00 £242.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Licences - Private Hire Car Licence (Operator) -  Full
Licence (1 year, and renewable) Contribution £408.00 £428.00 £428.00 £428.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Licences - Private Hire Car Licence (Operator) -  Full
Licence (maximum duration of 3 years, and renewable) Contribution £684.00 £718.00 £718.00 £718.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Licences - Taxi Licence (1 year) Contribution £441.00 £463.00 £463.00 £463.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Licences - Taxi Licence (Operator) - Full Licence
(maximum duration of 3 years, and renewable) Contribution £762.00 £800.00 £800.00 £800.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch General - Variation of a Licence Contribution £67.00 £70.00 £70.00 £70.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Licences - Private Hire Car Driver's Licence - Full Licence
(1 yr, and renewable) Contribution £98.00 £103.00 £103.00 £103.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Inspection of Vehicle (Taxi or Private Hire Car) Contribution £102.00 £107.00 £107.00 £107.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Re-inspection of Vehicle (Taxi or Private Hire Car) Contribution £54.00 £57.00 £57.00 £57.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch TPHC Other - Re-seal of Taximeter Contribution £26.00 £27.00 £27.00 £27.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch
General - Civic Government (Scotland) Act 1982 - Temporary
Licence (duration specified in Licence, maximum 6 weeks, and
not renewable) (unless specifically mentioned in this table)
Contribution £198.00 £208.00 £208.00 £208.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch House in Multiple Occupation Licence (New) Contribution £1,105.00 £1,160.00 £1,160.00 £1,160.00 5.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch House in Multiple Occupation Licence (Already Licenced) Contribution £830.00 £872.00 £872.00 £872.00 5.0% 0.0% 0.0%
Corporate Services Registration Services Elaine Nixon Civil Marriages / Partnerships at Registration Office outwith office
hours Contribution £540.49 £560.00 £560.00 £560.00 5.0% 0.0% 0.0% Figure includes £155 statutory fee set by NRS which cannot be
increased.
Corporate Services Registration Services Elaine Nixon Civil Marriages / Partnerships at Registration Office during office
hours Contribution £332.11 £341.00 £341.00 £341.00 5.0% 0.0% 0.0% Figure includes £155 statutory fee set by NRS which cannot be
increased.
Corporate Services Registration Services Elaine Nixon All Ceremonies at approved venues - fee for attendance of a
Registrar during office hours Contribution £525.44 £544.00 £544.00 £544.00 5.0% 0.0% 0.0% Figure includes £155 statutory fee set by NRS which cannot be
increased.
Corporate Services Registration Services Elaine Nixon All Ceremonies at approved venues - fee for attendance of a
Registrar outwith office hours Contribution £593.74 £616.00 £616.00 £616.00 5.0% 0.0% 0.0% Figure includes £155 statutory fee set by NRS which cannot be
increased.
Corporate Services Registration Services Elaine Nixon Guest Supplement: during office hours when more than 4 guests
attend a marriage/civil partnership at Registration offices Contribution £177.11 £186.00 £186.00 £186.00 5.0% 0.0% 0.0%
Corporate Services Registration Services Elaine Nixon Naming & Renewal of Vows Ceremonies conducted at
Registration Offices during office hours Contribution £335.72 £353.00 £353.00 £353.00 5.0% 0.0% 0.0%
Corporate Services Registration Services Elaine Nixon Naming & Renewal of Vows Ceremonies conducted at
Registration Offices outwith office hours Contribution £402.85 £423.00 £423.00 £423.00 5.0% 0.0% 0.0%
Corporate Services Registration Services Elaine Nixon Civil Marriage/Partnership & Naming Ceremony booked together
and conducted at Registration Offices outwith office hours Contribution £700.24 £728.00 £728.00 £728.00 5.0% 0.0% 0.0% Figure includes £155 statutory fee set by NRS which cannot be
increased.
#
Appendix 6
36

Page 37

#
Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
2025 to 2026
£
Proposed
Charge 2026 to
2027
Indicative
Charge 2027 to
2028
Indicative
Charge 2028 to
2029
Basis of
increase 2026
to 2027
%
Basis of
increase 2027
to 2028
%
Basis of
increase 2028
to 2029
%
Note
Corporate Services Registration Services Elaine Nixon Civil Marriage/Partnership & Naming Ceremony booked together
and conducted at Approved Venues outwith office hours Contribution £781.27 £813.00 £813.00 £813.00 5.0% 0.0% 0.0% Figure includes £155 statutory fee set by NRS which cannot be
increased.
Corporate Services Registration Services Elaine Nixon Civil Marriage/Partnership & Naming Ceremony booked together
and conducted at Approved Venues during office hours Contribution £680.57 £707.00 £707.00 £707.00 5.0% 0.0% 0.0% Figure includes £155 statutory fee set by NRS which cannot be
increased.
Corporate Services Registration Services Elaine Nixon
Guest supplement: during office hours when more than 4 guests
attend a Civil Marriage/Partnership & Naming Ceremony at
Registration Offices
Contribution £456.11 £479.00 £479.00 £479.00 5.0% 0.0% 0.0%
Corporate Services Registration Services Elaine Nixon Private Citizenship Ceremony, Registration Office, Office Hours Contribution £160.91 £169.00 £169.00 £169.00 5.0% 0.0% 0.0%
Corporate Services Registration Services Elaine Nixon Private Citizenship Ceremony, Registration Office, Office Hours,
plus Guest Supplement for more than 4 Guests Contribution £295.20 £310.00 £310.00 £310.00 5.0% 0.0% 0.0%
Corporate Services Registration Services Elaine Nixon Civil Marriage/Partnership & Naming Ceremony booked together
and conducted at Registration Offices during office hours Contribution £611.11 £634.00 £634.00 £634.00 5.0% 0.0% 0.0% Figure includes £155 statutory fee set by NRS which cannot be
increased.
Health & Social Care All Eleanor Currie Maximum Weekly Non-Residential Charge Contribution £120.00 £126.00 £126.00 £126.00 5.0% 0.0% 0.0%
Health & Social Care Adults Eleanor Currie Care at Home Adults Contribution £23.08 £24.44 £24.44 £24.44 5.9% 0.0% 0.0%
Health & Social Care Adults Eleanor Currie Day Care - Older People (purchased and provided) Contribution £19.79 £23.75 £23.75 £23.75 20.0% 0.0% 0.0%
Health & Social Care Adults Eleanor Currie Day Care - Learning Disability (purchased and provided) Contribution £20.61 £25.77 £25.77 £25.77 25.0% 0.0% 0.0%
Health & Social Care Adults Eleanor Currie Day Care and Dirrans Centre (charges to Other Local
Authorities) Contribution £280.79 £294.83 £294.83 £294.83 5.0% 0.0% 0.0%
Health & Social Care Adults and Older People Eleanor Currie Community Alarms service - mainland (1st alarm in the
household) Contribution £6.85 £7.19 £7.19 £7.19 5.0% 0.0% 0.0%
Health & Social Care Adults and Older People Eleanor Currie Community Alarms service - mainland - weekly charge to HRA
for sheltered housing properties Contribution £6.85 £7.19 £7.19 £7.19 5.0% 0.0% 0.0%
Health & Social Care Adults and Older People Eleanor Currie Community Alarms service - Arran (1st alarm in the household) Contribution £3.43 £3.60 £3.60 £3.60 5.0% 0.0% 0.0%
Health & Social Care Adults and Older People Eleanor Currie Community Alarms service - mainland (2nd alarm in the
household) Contribution £3.43 £3.60 £3.60 £3.60 5.0% 0.0% 0.0%
Health & Social Care Adults and Older People Eleanor Currie Community Alarms service - Arran (2nd alarm in the household) Contribution £1.74 £1.83 £1.83 £1.83 5.0% 0.0% 0.0%
Health & Social Care Adults and Older People Eleanor Currie Meals on Wheels Contribution £3.89 £4.08 £4.08 £4.08 5.0% 0.0% 0.0%
Health & Social Care Older People Eleanor Currie Care at Home Older People per hour Contribution £23.08 £24.44 £24.44 £24.44 5.9% 0.0% 0.0%
Health & Social Care Adults Eleanor Currie Financial Intervention - Management of Service User Finances -
residential service users Contribution £3.50 £3.68 £3.68 £3.68 5.0% 0.0% 0.0%
Health & Social Care Adults Eleanor Currie Financial Intervention - Management of Service User Finances -
community based service users Contribution £5.50 £5.78 £5.78 £5.78 5.0% 0.0% 0.0%
Health & Social Care Adults Eleanor Currie Dirrans Centre Contribution £19.79 £23.75 £23.75 £23.75 20.0% 0.0% 0.0%
Health & Social Care Adults Eleanor Currie Respite (for an individual's care need rather than to give the carer
a break)  Age 16-24 Contribution £79.70 £83.69 £83.69 £83.69 5.0% 0.0% 0.0%
This charge depends on the Personal Allowance rate which will not be
known until early March.
Estimated pending the issuance of the Charging for Residential
Accommodation Guidance (CRAG).
Health & Social Care Adults Eleanor Currie Respite (for an individual's care need rather than to give the carer
a break)  Age 25 - 64 Contribution £98.50 £103.43 £103.43 £103.43 5.0% 0.0% 0.0%
This charge depends on the Personal Allowance rate which will not be
known until early March.
Estimated pending the issuance of the Charging for Residential
Accommodation Guidance (CRAG).
Health & Social Care Older People Eleanor Currie Respite (for an individual's care need rather than to give the carer
a break)  Age 65+ Contribution £183.65 £192.83 £192.83 £192.83 5.0% 0.0% 0.0%
This charge depends on the Personal Allowance rate which will not be
known until early March.
Estimated pending the issuance of the Charging for Residential
Accommodation Guidance (CRAG).
Health & Social Care Adults and Older People Eleanor Currie Trindlemoss House - permanent placement Contribution £1,471.78 £1,545.37 £1,545.37 £1,545.37 5.0% 0.0% 0.0% Estimated pending the issuance of the Charging for Residential
Accommodation Guidance (CRAG).
Health & Social Care Adults and Older People Eleanor Currie Montrose House - permanent residential placement (capital
below £34,999)* Contribution £881.98 £926.08 £926.08 £926.08 5.0% 0.0% 0.0% Estimated pending the issuance of the Charging for Residential
Accommodation Guidance (CRAG).
Health & Social Care Adults and Older People Eleanor Currie Montrose House - permanent residential placement (capital
above £35,000) Contribution £1,271.49 £1,335.06 £1,335.06 £1,335.06 5.0% 0.0% 0.0% Estimated pending the issuance of the Charging for Residential
Accommodation Guidance (CRAG).
Health & Social Care Adults and Older People Eleanor Currie Montrose House - permanent nursing placement (capital below
£34,999)* Contribution £1,021.57 £1,072.65 £1,072.65 £1,072.65 5.0% 0.0% 0.0% Estimated pending the issuance of the Charging for Residential
Accommodation Guidance (CRAG).
Health & Social Care Adults and Older People Eleanor Currie Montrose House - permanent nursing placement (capital above
£35,000) Contribution £1,471.78 £1,545.37 £1,545.37 £1,545.37 5.0% 0.0% 0.0% Estimated pending the issuance of the Charging for Residential
Accommodation Guidance (CRAG).
Health & Social Care Adults and Older People Eleanor Currie Sleepover Contribution £15.45 £16.50 £16.50 £16.50 6.8% 0.0% 0.0%
Health & Social Care Adults and Older People Eleanor Currie Direct Payments  -  Personal Assistants Contribution £16.94 £18.02 £18.02 £18.02 6.4% 0.0% 0.0%
Health & Social Care Adults and Older People Eleanor Currie Direct Payments  - Agency Rates Contribution £23.08 £24.44 £24.44 £24.44 5.9% 0.0% 0.0%
Health & Social Care Adults and Older People Eleanor Currie Direct Payments  - Sleepovers Contribution £15.83 £16.89 £16.89 £16.89 6.7% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hire of table linen Contribution £7.20 £7.55 £7.55 £7.55 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hire of twinkle curtain Contribution £90.50 £95.05 £95.05 £95.05 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hire of Red Carpet Contribution £44.95 £47.20 £47.20 £47.20 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Store Requests, hires and deliveries Contribution £38.70 £40.65 £40.65 £40.65 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Stores hire of tables go pack Contribution £6.65 £7.00 £7.00 £7.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Stores hire of tables round Contribution £12.90 £13.55 £13.55 £13.55 5.0% 0.0% 0.0%
#
Appendix 6
37

Page 38

#
Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
2025 to 2026
£
Proposed
Charge 2026 to
2027
Indicative
Charge 2027 to
2028
Indicative
Charge 2028 to
2029
Basis of
increase 2026
to 2027
%
Basis of
increase 2027
to 2028
%
Basis of
increase 2028
to 2029
%
Note
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Party Package Civic Centre Contribution £158.19 £166.10 £166.10 £166.10 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Wedding packages - Ceremony
and  Reception Contribution £994.92 £1,044.67 £1,044.67 £1,044.67 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Wedding packages - Reception only Contribution £713.71 £749.40 £749.40 £749.40 5.0% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Bed and breakfast (adult) Contribution £47.00 £50.00 £50.00 £50.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Dinner, bed and breakfast (adult) Contribution £61.00 £65.00 £65.00 £65.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Room hire Commercial large classroom Contribution £43.00 £46.00 £46.00 £46.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Room hire Family Function large classroom Contribution £25.00 £27.00 £27.00 £27.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Room hire NAC large classroom Contribution £23.00 £24.00 £24.00 £24.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Room hire general meeting large classroom Contribution £15.00 £16.00 £16.00 £16.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Room hire Childcare large classroom Contribution £7.00 £7.00 £7.00 £7.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Room hire Disabled/charity large classroom Contribution £5.00 £5.00 £5.00 £5.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Room hire Commercial small chartroom Contribution £22.00 £23.00 £23.00 £23.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Room hire Family Function small chartroom Contribution £14.00 £15.00 £15.00 £15.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Room hire NAC small chartroom Contribution £13.00 £14.00 £14.00 £14.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Room hire genral meeting small chartroom Contribution £6.00 £6.00 £6.00 £6.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Room hire Childcare small chartroom Contribution £3.00 £3.00 £3.00 £3.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Room hire Disabled/charity small chartroom Contribution £2.00 £2.00 £2.00 £2.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Catering - tea coffee / baking (per person) Contribution £4.00 £4.00 £4.00 £4.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Catering - soup & sandwich (per person) Contribution £6.00 £6.00 £6.00 £6.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Catering - buffet (salad bar) (per person) Contribution £8.00 £8.00 £8.00 £8.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Catering - Dinner (2 courses) (per person) Contribution £15.00 £16.00 £16.00 £16.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Catering - Cooked breakfast (per person) Contribution £5.00 £5.00 £5.00 £5.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Catering - Packed Lunches (per person) Contribution £5.00 £5.00 £5.00 £5.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Instructor NAC Users Half Day Rate Contribution £127.00 £135.00 £135.00 £135.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Instructor NAC Users Full Day Rate Contribution £255.00 £271.00 £271.00 £271.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Instructor Other Users Half Day Rate Contribution £255.00 £271.00 £271.00 £271.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Instructor Other Users Full Day Rate Contribution £510.00 £541.00 £541.00 £541.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell NAC School Groups 4 days/3 nights (per person) Contribution £193.00 £205.00 £205.00 £205.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell NAC School Groups 4 days/3 nights (per accompanying staff
member) Contribution £97.00 £103.00 £103.00 £103.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Other School / Groups 4 days/3 nights (per person) Contribution £347.00 £368.00 £368.00 £368.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Other School / Groups 4 days/3 nights (per accompanying staff
member) Contribution £173.00 £184.00 £184.00 £184.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Other 'Ayrshire' Authorities 4 days / 3 nights (per person) Contribution £270.00 £287.00 £287.00 £287.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Other 'Ayrshire' Authorities 4 days / 3 nights (per accompanying
staff member) Contribution £135.00 £143.00 £143.00 £143.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell NAC School Group 3 days/2 nights (per person) Contribution £128.00 £136.00 £136.00 £136.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell NAC School Group 3 days/2 nights (per person) Accompanying
staff Contribution £64.00 £68.00 £68.00 £68.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Other School / Groups 3 days/2 nights (per person) Contribution £260.00 £276.00 £276.00 £276.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Other School / Groups 3 days/2 nights (per accompanying staff
member) Contribution £130.00 £138.00 £138.00 £138.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Other 'Ayrshire' Authorities 3 days / 2 nights (per person) Contribution £194.00 £206.00 £206.00 £206.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Other 'Ayrshire' Authorities 3 days / 3 nights (per accompanying
staff member) Contribution £98.00 £104.00 £104.00 £104.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arran
Outdoor) Angela Morrell Camping Groups Outwith NAC (per person) Contribution £5.00 £5.00 £5.00 £5.00 6.147% 0.0% 0.0%
Communities & Housing Connected Communities (Arts) Lesley Forsyth Studio 1 - Category 1 User Contribution £24.85 £26.10 £26.10 £26.10 5.0% 0.0% 0.0%
Communities & Housing Connected Communities (Arts) Lesley Forsyth Studio 1 - Category 2 User Contribution £14.65 £15.40 £15.40 £15.40 5.0% 0.0% 0.0%
Communities & Housing Connected Communities (Arts) Lesley Forsyth Studio 1 - Category 3 Users Contribution £8.10 £8.50 £8.50 £8.50 5.0% 0.0% 0.0%
Increased charges have been included as a separate budget proposal
SP-COM-26-04. Rates reflect the 2026-27 charge on the basis that the
budget option is approved.  If this is not approved charges will refer to
2025-26 level.
Increased charges have been included as a separate budget proposal
SP-COM-26-04. Rates reflect the 2026-27 charge on the basis that the
budget option is approved.  If this is not approved charges will refer to
2025-26 level.
#
Appendix 6
38

Page 39

#
Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
2025 to 2026
£
Proposed
Charge 2026 to
2027
Indicative
Charge 2027 to
2028
Indicative
Charge 2028 to
2029
Basis of
increase 2026
to 2027
%
Basis of
increase 2027
to 2028
%
Basis of
increase 2028
to 2029
%
Note
Communities & Housing Connected Communities (Arts) Lesley Forsyth Studio 1 - Category 4 Users Contribution £3.60 £3.80 £3.80 £3.80 5.0% 0.0% 0.0%
Communities & Housing Connected Communities (Arts) Lesley Forsyth Studio 1 - Category 5 Users Contribution £3.60 £3.80 £3.80 £3.80 5.0% 0.0% 0.0%
Communities & Housing Connected Communities (Arts) Lesley Forsyth Studio 2 - Category 1 User Contribution £18.65 £19.60 £19.60 £19.60 5.0% 0.0% 0.0%
Communities & Housing Connected Communities (Arts) Lesley Forsyth Studio 2 - Category 2 User Contribution £10.95 £11.50 £11.50 £11.50 5.0% 0.0% 0.0%
Communities & Housing Connected Communities (Arts) Lesley Forsyth Studio 2 - Category 3 Users Contribution £6.10 £6.40 £6.40 £6.40 5.0% 0.0% 0.0%
Communities & Housing Connected Communities (Arts) Lesley Forsyth Studio 2 - Category 4 Users Contribution £2.75 £2.90 £2.90 £2.90 5.0% 0.0% 0.0%
Communities & Housing Connected Communities (Arts) Lesley Forsyth Studio 2 - Category 5 Users Contribution £2.75 £2.90 £2.90 £2.90 5.0% 0.0% 0.0%
Communities & Housing Connected Communities (Arts) Lesley Forsyth Theatre Hire - Commercial Contribution £83.00 £87.00 £87.00 £87.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities (Arts) Lesley Forsyth Theatre Hire - Non-Commercial Contribution £48.00 £50.00 £50.00 £50.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 1
user (eg Commercial Activities) - SMALL ROOM Contribution £24.85 £26.10 £26.10 £26.10 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 1
user (eg Commercial Activities) - LARGE ROOM Contribution £50.05 £52.55 £52.55 £52.55 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 2
user (eg Family Functions) - SMALL ROOM Contribution £14.65 £15.40 £15.40 £15.40 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 2
user (eg Family Functions) - LARGE ROOM Contribution £29.35 £30.80 £30.80 £30.80 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 3
user (eg Agency Letting) - SMALL ROOM Contribution £8.10 £8.50 £8.50 £8.50 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 3
user (eg Agency Letting) - LARGE ROOM Contribution £16.20 £17.00 £17.00 £17.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 4
user (eg Pre 5 groups) - SMALL ROOM Contribution £3.60 £3.80 £3.80 £3.80 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 4
user (eg Pre 5 groups) - LARGE ROOM Contribution £7.10 £7.45 £7.45 £7.45 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 5
user (eg Disabled org's) - SMALL ROOM Contribution £3.60 £3.80 £3.80 £3.80 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hall lets, Letting Commission  and School Letting - Category 5
user (eg Disabled Org's) - LARGE ROOM Contribution £7.10 £7.45 £7.45 £7.45 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Astro Pitch Youth Contribution £16.65 £17.50 £17.50 £17.50 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Astro Pitch Adult Contribution £25.05 £26.30 £26.30 £26.30 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Stores hire Chairs (per item charge) Contribution £1.30 £1.35 £1.35 £1.35 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Community Facilities) Donna Morrison Hire of additional chair covers (STH Weddings) Contribution £3.20 £3.35 £3.35 £3.35 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Large Field - Category 1 (Daily Rate) Contribution £180.00 £189.00 £189.00 £189.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Large Field - Category 2 (Daily Rate) Contribution £150.00 £158.00 £158.00 £158.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Large Field - Category 3 (Daily Rate) Contribution £125.00 £131.00 £131.00 £131.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Large Field - Category 4 (Daily Rate) Contribution £70.00 £74.00 £74.00 £74.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Large Field - Outwith Operational Hours (Charge per hour) Contribution £20.00 £21.00 £21.00 £21.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Small Field - Category 1 (Daily Rate) Contribution £120.00 £126.00 £126.00 £126.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Small Field - Category 2 (Daily Rate) Contribution £100.00 £105.00 £105.00 £105.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Small Field - Category 3 (Daily Rate) Contribution £75.00 £79.00 £79.00 £79.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Small Field - Category 4 (Daily Rate) Contribution £40.00 £42.00 £42.00 £42.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Small Field - Outwith Operational Hours (Charge per hour) Contribution £20.00 £21.00 £21.00 £21.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Facility Block - Category 1 (Daily Rate) Contribution £100.00 £105.00 £105.00 £105.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Facility Block - Category 2 (Daily Rate) Contribution £80.00 £84.00 £84.00 £84.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Facility Block - Category 3 (Daily Rate) Contribution £60.00 £63.00 £63.00 £63.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Facility Block - Category 4 (Daily Rate) Contribution £35.00 £37.00 £37.00 £37.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Facility Block - Outwith Operational Hours (Charge per hour) Contribution £20.00 £21.00 £21.00 £21.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Dayroom - Category 1 (Daily Rate) Contribution £55.00 £58.00 £58.00 £58.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Dayroom - Category 2 (Daily Rate) Contribution £40.00 £42.00 £42.00 £42.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Dayroom - Category 3 (Daily Rate) Contribution £25.00 £26.00 £26.00 £26.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Dayroom - Category 4 (Daily Rate) Contribution £15.00 £16.00 £16.00 £16.00 5.0% 0.0% 0.0%
#
Appendix 6
39

Page 40

#
Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
2025 to 2026
£
Proposed
Charge 2026 to
2027
Indicative
Charge 2027 to
2028
Indicative
Charge 2028 to
2029
Basis of
increase 2026
to 2027
%
Basis of
increase 2027
to 2028
%
Basis of
increase 2028
to 2029
%
Note
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Dayroom - Outwith Operational Hours (Charge per hour) Contribution £20.00 £21.00 £21.00 £21.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Racquet Hall - Category 1 (Charge per Hour) Contribution £50.05 £52.55 £52.55 £52.55 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Racquet Hall - Category 2 (Charge per Hour) Contribution £29.35 £30.80 £30.80 £30.80 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Racquet Hall - Category 3 (Charge per Hour) Contribution £16.20 £17.00 £17.00 £17.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Racquet Hall - Category 4 (Charge per Hour) Contribution £7.10 £7.45 £7.45 £7.45 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Room @ the Courtyard - Category 1 (Charge per Hour) Contribution £24.85 £26.10 £26.10 £26.10 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Room @ the Courtyard - Category 2 (Charge per Hour) Contribution £14.65 £15.40 £15.40 £15.40 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Room @ the Courtyard - Category 3 (Charge per Hour) Contribution £8.10 £8.50 £8.50 £8.50 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Room @ the Courtyard - Category 4 (Charge per Hour) Contribution £3.60 £3.80 £3.80 £3.80 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Portacabin Toilets - Category 1 (Daily Rate) Contribution £40.00 £42.00 £42.00 £42.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Portacabin Toilets - Category 2 (Daily Rate) Contribution £30.00 £32.00 £32.00 £32.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Portacabin Toilets - Category 3 (Daily Rate) Contribution £20.00 £21.00 £21.00 £21.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Portacabin Toilets - Category 4 (Daily Rate) Contribution £10.00 £11.00 £11.00 £11.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Portacabin Toilets - Outwith Operational Hours (Charge per
Hour) Contribution £20.00 £21.00 £21.00 £21.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Ranger Service - Category 1 (Charge per Hour) Contribution £80.00 £84.00 £84.00 £84.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Ranger Service - Category 2 (Charge per Hour) Contribution £50.00 £53.00 £53.00 £53.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Ranger Service - Category 3 (Charge per Hour) Contribution £35.00 £37.00 £37.00 £37.00 5.0% 0.0% 0.0%
Communities & Housing Connected Communities
(Country Parks) Lesley Forsyth Ranger Service - Category 4 (Charge per Hour) Contribution £20.00 £21.00 £21.00 £21.00 5.0% 0.0% 0.0%
Communities & Housing Planning Services Allan Finlayson Planning Search  fees Contribution £116.92 £122.77 £122.77 £122.77 5.0% 0.0% 0.0%
Communities & Housing Planning Services Allan Finlayson Section 50 Certificates Contribution £144.70 £151.94 £151.94 £151.94 5.0% 0.0% 0.0%
Communities & Housing Planning Services Allan Finlayson Press Adverts Arran Contribution £84.53 £88.76 £88.76 £88.76 5.0% 0.0% 0.0%
Communities & Housing Planning Services Allan Finlayson Press Adverts Mainland Contribution £186.51 £195.84 £195.84 £195.84 5.0% 0.0% 0.0%
Place Economic Growth
(Transportation) Claire Fitzsimmons Construction Consent Amendments Contribution £422.53 £443.66 £443.66 £443.66 5.0% 0.0% 0.0%
Place Economic Growth
(Transportation) Claire Fitzsimmons Supply of Traffic Count data Contribution £232.50 £244.13 £244.13 £244.13 5.0% 0.0% 0.0%
Communities & Housing Heritage Lesley Forsyth
Genealogy research hourly charge. Any additional costs incurred
as a result of the work e.g Scotland People Vouchers, printing
etc to be charged at cost
Contribution £22.00 £23.00 £23.00 £23.00 5.0% 0.0% 0.0%
Communities & Housing Libraries Lesley Forsyth Magnifying Sheets Contribution £2.50 £2.50 £2.50 £2.50 5.0% 0.0% 0.0%
Communities & Housing Libraries Lesley Forsyth Tea/Coffee Contribution £1.50 £1.50 £1.50 £1.50 5.0% 0.0% 0.0%
Communities & Housing Libraries Lesley Forsyth Street Plans Contribution £3.00 £3.00 £3.00 £3.00 5.0% 0.0% 0.0%
Communities & Housing Libraries Lesley Forsyth DVD Lending Service - DVD's per Week hire Contribution £2.00 £2.00 £2.00 £2.00 5.0% 0.0% 0.0%
Communities & Housing Libraries Lesley Forsyth DVD Lending Service - Day ones (New releases) 2 nights hire Contribution £2.50 £2.50 £2.50 £2.50 5.0% 0.0% 0.0%
Communities & Housing Libraries Lesley Forsyth Audio Charges - CD Contribution £0.50 £0.50 £0.50 £0.50 5.0% 0.0% 0.0%
Communities & Housing Libraries Lesley Forsyth Room Hire - Category 1 user (eg Commercial Activities) - SMALL
ROOM Contribution £24.85 £26.10 £26.10 £26.10 5.0% 0.0% 0.0%
Communities & Housing Libraries Lesley Forsyth Room Hire - Category 2 user (eg Family Functions) - SMALL
ROOM Contribution £14.65 £15.40 £15.40 £15.40 5.0% 0.0% 0.0%
Communities & Housing Libraries Lesley Forsyth Room Hire - Category 3 user (eg Agency Letting) - SMALL
ROOM Contribution £8.10 £8.50 £8.50 £8.50 5.0% 0.0% 0.0%
Communities & Housing Libraries Lesley Forsyth Room Hire - Category 4 user (eg Pre 5 groups) - SMALL ROOM Contribution £3.60 £3.80 £3.80 £3.80 5.0% 0.0% 0.0%
Communities & Housing Libraries Lesley Forsyth Room Hire - Category 5 user (eg Disabled org's) - SMALL
ROOM Contribution £3.60 £3.80 £3.80 £3.80 5.0% 0.0% 0.0%
Place Energy and Sustainablility Jennifer Wraith Electric Vehicle Charging Point - Destination/Kwh Contribution £0.50 £0.50 £0.50 £0.50 0.0% 0.0% 0.0%
Place Energy and Sustainablility Jennifer Wraith Electric Vehicle Charging Point - Journey/Kwh Contribution £0.70 £0.70 £0.70 £0.70 0.0% 0.0% 0.0%
Place Energy and Sustainablility Jennifer Wraith Overstay Flat Fee Contribution £30.00 £30.00 £30.00 £30.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services (Building
Standards) Scott McKenzie Clearance Certificates Contribution £272.16 £285.77 £285.77 £285.77 5.0% 0.0% 0.0%
Communities & Housing Protective Services (Building
Standards) Scott McKenzie Searches Contribution £116.92 £122.77 £122.77 £122.77 5.0% 0.0% 0.0%
Communities & Housing Protective Services (Building
Standards) Scott McKenzie Section 50 Certificates Contribution £144.70 £151.94 £151.94 £151.94 5.0% 0.0% 0.0%
Communities & Housing Protective Services (Building
Standards) Scott McKenzie Section 89 Certificates Contribution £473.24 £496.90 £496.90 £496.90 5.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Bacteriological Swimming Pool Sampling Contribution £59.04 £61.99 £61.99 £61.99 5.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Legionelia Swimming Pool Sampling Contribution £109.98 £115.48 £115.48 £115.48 5.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Food Hygiene Training Delegate Charge Contribution £33.57 £35.25 £35.25 £35.25 5.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Chemical Swimming Pool Sampling Contribution £81.04 £85.09 £85.09 £85.09 5.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Pest Control - Fumigations/Sprays for heavy infestations e.g.
bedbugs, fleas includes survey and revisit.  Contribution £89.10 £93.60 £93.60 £93.60 5.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Pest Control Charge - Insects (Domestic) Contribution £57.90 £60.80 £60.80 £60.80 5.0% 0.0% 0.0%
Charges set across Ayrshire in partnership with South and East
Ayrshire Councils.
#
Appendix 6
40

Page 41

#
Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
2025 to 2026
£
Proposed
Charge 2026 to
2027
Indicative
Charge 2027 to
2028
Indicative
Charge 2028 to
2029
Basis of
increase 2026
to 2027
%
Basis of
increase 2027
to 2028
%
Basis of
increase 2028
to 2029
%
Note
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Pest Control Charge - Rats/Mice/Insects (Commercial) Contribution £89.10 £93.60 £93.60 £93.60 5.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Pest Control Charge - Rats/Mice/Squirrels (Domestic) includes
up to 3 visits. Contribution £89.10 £93.60 £93.60 £93.60 5.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Pest Control Charge - Wasp Nests/Bees Contribution £57.90 £60.80 £60.80 £60.80 5.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Section 50 Certificates Contribution £144.70 £151.94 £151.94 £151.94 5.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Certificate of Compliance (not required as part of licence
application) Contribution £115.76 £121.55 £121.55 £121.55 5.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Health Certificate for export to China Contribution £41.67 £43.75 £43.75 £43.75 5.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Support Attestation Contribution £110.25 £115.76 £115.76 £115.76 5.0% 0.0% 0.0%
Communities & Housing Protective Services (Trading
Standards) Scott McKenzie Liquid fuel measuring instruments - first meter tested Contribution £184.07 £193.27 £193.27 £193.27 5.0% 0.0% 0.0%
Communities & Housing Protective Services (Trading
Standards) Scott McKenzie Liquid fuel measuring instruments
- each additional meter tested during same visit Contribution £113.45 £119.12 £119.12 £119.12 5.0% 0.0% 0.0%
Communities & Housing Protective Services (Trading
Standards) Scott McKenzie All other weighing and measuring equipment
- one officer on site (per hour) Contribution £99.56 £104.54 £104.54 £104.54 5.0% 0.0% 0.0%
Communities & Housing Protective Services (Trading
Standards) Scott McKenzie All other weighing and measuring equipment
- two or more officers on site (per hour) Contribution £159.76 £167.75 £167.75 £167.75 5.0% 0.0% 0.0%
Place Bereavement Service David Mackay Interment of Eighteen and Over Contribution £932.00 £979.00 £979.00 £979.00 5.0% 0.0% 0.0%
Place Bereavement Service David Mackay Purchase of Exclusive Right of Burial (New Lair) Contribution £994.00 £1,044.00 £1,044.00 £1,044.00 5.0% 0.0% 0.0%
Place Bereavement Service David Mackay Purchase of Exclusive Right of Burial (Woodland Area) Contribution £994.00 £1,044.00 £1,044.00 £1,044.00 5.0% 0.0% 0.0%
Place Bereavement Service David Mackay Interment of Cremated Remains (Aged 18 and over) Contribution £264.00 £277.00 £277.00 £277.00 5.0% 0.0% 0.0%
Place Bereavement Service David Mackay Interment of Cremated Remains (Aged 18 and over). Saturdays
and Public Holidays Contribution £395.00 £415.00 £415.00 £415.00 5.0% 0.0% 0.0%
Place Bereavement Service David Mackay Memorial Foundation Contribution £204.00 £214.00 £214.00 £214.00 5.0% 0.0% 0.0%
Place Bereavement Service David Mackay Dis-interments Contribution £1,124.00 £1,180.00 £1,180.00 £1,180.00 5.0% 0.0% 0.0%
Place Bereavement Service David Mackay Interment in common ground Contribution £292.00 £307.00 £307.00 £307.00 5.0% 0.0% 0.0%
Place Bereavement Service David Mackay Purchase of Exclusive Right of Burial - Cremated Remains Only
(New Lair) Contribution £546.00 £573.00 £573.00 £573.00 5.0% 0.0% 0.0%
Place Bereavement Service David Mackay Purchase of Exclusive Right of Burial - Cremated Remains Only
in Garden of Remembrance (New Lair) Contribution £546.00 £573.00 £573.00 £573.00 5.0% 0.0% 0.0%
Place Bereavement Service David Mackay Interment of Eighteen and Over (Saturdays and Public Holidays) Contribution £1,399.00 £1,469.00 £1,469.00 £1,469.00 5.0% 0.0% 0.0%
Place Bereavement Service David Mackay Transfer of Title Deeds/Duplicate Title Deeds Contribution £24.00 £25.00 £25.00 £25.00 5.0% 0.0% 0.0%
Place Bereavement Service David Mackay Memorial permit Contribution £50.00 £53.00 £53.00 £53.00 5.0% 0.0% 0.0%
School Meals FM Carolyn Hope Secondary School meals Contribution £2.05 £2.05 £2.05 £2.05 0.0% 0.0% 0.0%
School Meals FM Carolyn Hope Primary School meals Contribution £2.05 £2.05 £2.05 £2.05 0.0% 0.0% 0.0%
Largs Car Park Largs Car Park Thomas Reaney Car park charges - up to 2 hours Largs Car Park £2.50 £2.50 £2.50 £2.50 0.0% 0.0% 0.0%
Largs Car Park Largs Car Park Thomas Reaney Car park charges - up to 4 hours Largs Car Park £4.17 £4.17 £4.17 £4.17 0.0% 0.0% 0.0%
Largs Car Park Largs Car Park Thomas Reaney Car park charges - over 4 hours / all day Largs Car Park £8.33 £8.33 £8.33 £8.33 0.0% 0.0% 0.0%
Largs Car Park Largs Car Park Thomas Reaney Car park charges - every day thereafter Largs Car Park £8.33 £8.33 £8.33 £8.33 0.0% 0.0% 0.0%
Largs Car Park Largs Car Park Thomas Reaney Car park charges - annual permit per vehicle (limited to 30
permits) Largs Car Park £1,083.33 £1,083.33 £1,083.33 £1,083.33 0.0% 0.0% 0.0%
Largs Car Park Largs Car Park Thomas Reaney Gallowgate Public Toilets Charge Largs Car Park £0.33 £0.33 £0.33 £0.33 0.0% 0.0% 0.0%
Place Streetscene Services David Mackay Abandoned Trolley Charge Contribution £37.00 £39.00 £39.00 £39.00 5.0% 0.0% 0.0%
Place Streetscene Services David Mackay Grass Cutting Scheme Contribution £82.00 £86.00 £86.00 £86.00 5.0% 0.0% 0.0%
Place Streetscene Services David Mackay Fly posting and estate boards removal - varies by size. Minimum
charge of £34 Contribution £34.00 £36.00 £36.00 £36.00 5.0% 0.0% 0.0%
Place Streetscene Services David Mackay Dog Fouling clean up charge Contribution £34.00 £36.00 £36.00 £36.00 5.0% 0.0% 0.0%
Place Streetscene Services David Mackay Fly tipping clean up charges - varies by quantity. Minimum charge
of £126 Contribution £126.00 £132.00 £132.00 £132.00 5.0% 0.0% 0.0%
Place Streetscene Services David Mackay Waste disposal charge per tonne Contribution £173.16 £181.82 £181.82 £181.82 5.0% 0.0% 0.0%
Place Streetscene Services David Mackay Mis-use of public bin. Minimum service charge of £126 Contribution £126.00 £132.00 £132.00 £132.00 5.0% 0.0% 0.0%
Place Streetscene Services David Mackay Disposal of Waste within Caravans and trailers per tonne.
Excludes labour / transport charges Contribution £154.00 £162.00 £162.00 £162.00 5.0% 0.0% 0.0%
Place Transport Services Gordon Mitchell Tachograph Calibration Contribution £67.15 £70.51 £70.51 £70.51 5.0% 0.0% 0.0%
Place Transport Services Gordon Mitchell Tachograph 2 year Inspection Contribution £46.31 £48.63 £48.63 £48.63 5.0% 0.0% 0.0%
Place Transport Services Gordon Mitchell Tachograph 6 year Inspection Contribution £67.15 £70.51 £70.51 £70.51 5.0% 0.0% 0.0%
Place Transport Services Gordon Mitchell CPC Training Contribution £77.18 £81.04 £81.04 £81.04 5.0% 0.0% 0.0%
Place Transport Services Gordon Mitchell Per hire charge for transport hires to external groups. Contribution £26.63 £27.96 £27.96 £27.96 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Section 56 Roads Opening Permit Vehicle Access Crossing Contribution £120.00 £126.00 £126.00 £126.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Section 56 Road Opening Permit Other works involving
excavation in the public road Contribution £260.00 £273.00 £273.00 £273.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Section 58 Road Occupation Permits Builders Materials - for up
to 4 weeks Contribution £155.00 £163.00 £163.00 £163.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Section 58 Road Occupation Permits Cranes - for up to 4 weeks Contribution £155.00 £163.00 £163.00 £163.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Section 58 Road Occupation Permits Scaffolding - for up to 4
weeks Contribution £155.00 £163.00 £163.00 £163.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Section 85 Skip Permits - for up to 4 weeks Contribution £70.00 £74.00 £74.00 £74.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Section 59 Street Cafe Permit Contribution £155.00 £163.00 £163.00 £163.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Temporary Traffic Signal Permit (three way or more only).  This
would be in addition to Section 56 charge. Contribution £141.00 £148.00 £148.00 £148.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen
Temporary Traffic Signal Permit (three way or more only).  This
would be in addition to Section 56 charge.  Duration charge for
additional week.
Contribution £141.00 £148.00 £148.00 £148.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Property Enquiry Adoption Plan Contribution £70.00 £74.00 £74.00 £74.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen NRSWA Section 109 Permission (Standard Works - all works
except emergency which take between 4 and 10 working days) Contribution £390.00 £410.00 £410.00 £410.00 5.0% 0.0% 0.0%
#
Appendix 6
41

Page 42

#
Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
2025 to 2026
£
Proposed
Charge 2026 to
2027
Indicative
Charge 2027 to
2028
Indicative
Charge 2028 to
2029
Basis of
increase 2026
to 2027
%
Basis of
increase 2027
to 2028
%
Basis of
increase 2028
to 2029
%
Note
Place Roads Susan Macfadyen
NRSWA Section 109 Permission (Major Works - works normally
planned 6 months in advance and require longer than 10 working
days to complete)
Contribution £390.00 £410.00 £410.00 £410.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen NRSWA Section 109 Permission (Additional Street Charge) Contribution £100.00 £105.00 £105.00 £105.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen NRSWA Section 109 Permission (Additional Utility Charge) Contribution £390.00 £410.00 £410.00 £410.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen 5 day Temporary Traffic Order (by notice) Contribution £520.00 £546.00 £546.00 £546.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Emergency Temporary Traffic Order (by notice) Contribution £585.00 £614.00 £614.00 £614.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Temporary Traffic Orders (advertised in press).  Advertising
costs are extra. Contribution £835.00 £877.00 £877.00 £877.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Switching off Traffic Signals for third parties Contribution £190.00 £200.00 £200.00 £200.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Temporary signs for events. Contribution £140.00 £147.00 £147.00 £147.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Signs for new Housing Developments Contribution £440.00 £462.00 £462.00 £462.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen H Bar Markings (Access protection markings) Contribution £210.00 £221.00 £221.00 £221.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Early Start or retrospective permit (2 x permit charge) Contribution 0.0% 0.0% 0.0% These are additional charges to other permits and their cost is based
on the original permit charge.
Place Roads Susan Macfadyen Amendment / Extension to existing permit (50% of permit charge) Contribution 0.0% 0.0% 0.0% These are additional charges to other permits and their cost is based
on the original permit charge.
Place Roads Gary Wilson Amenity display licence Contribution £32.00 £34.00 £34.00 £34.00 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Car Park Charges (Bellmans Close) - Up to 60 minutes Contribution £1.50 £1.60 £1.60 £1.60 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Car Park Charges (Bellmans Close) - Up to 120 minutes Contribution £2.00 £2.10 £2.10 £2.10 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Car Park Charges (Bellmans Close) - Up to 240 minutes Contribution £3.50 £3.70 £3.70 £3.70 5.0% 0.0% 0.0%
Place Roads Susan Macfadyen Penalty Charge Notice Contribution £100.00 £100.00 £100.00 £100.00 0.0% 0.0% 0.0% DPE fee is set in accordance with the limits set nationally in accordance
with guidance issued by Scottish Ministers.
Place Roads Susan Macfadyen Penalty Charge Notice if paid within 14 days Contribution £50.00 £50.00 £50.00 £50.00 0.0% 0.0% 0.0% DPE fee is set in accordance with the limits set nationally in accordance
with guidance issued by Scottish Ministers.
Place Roads Susan Macfadyen Charge certificate served and where PCN remains unpaid after
day 56 Contribution £150.00 £150.00 £150.00 £150.00 0.0% 0.0% 0.0% DPE fee is set in accordance with the limits set nationally in accordance
with guidance issued by Scottish Ministers.
Place Waste Resources David Mackay Collection and Disposal of Commercial White Goods per item Contribution £173.79 £182.48 £182.48 £182.48 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Bin Repair - standard lock supply & fitting Contribution £26.29 £27.60 £27.60 £27.60 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Bin Repair - new forest lock lock supply & fitting Contribution £38.20 £40.11 £40.11 £40.11 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Bin Repair - push to lock supply & fitting Contribution £53.07 £55.72 £55.72 £55.72 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Bin Repair - lid supplied & lock fixed cost Contribution £163.63 £171.81 £171.81 £171.81 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Bin Repair - Push to lock lid and lock supply & fitting Contribution £190.41 £199.93 £199.93 £199.93 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Bin Repair - one front wheel supplied and fitted cost Contribution £85.50 £89.78 £89.78 £89.78 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Bin Repair - one back wheel supplied and fitted cost Contribution £92.61 £97.24 £97.24 £97.24 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste
Service 240 Litre Bin Contribution £6.73 £7.07 £7.07 £7.07 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste
Service 360 Litre Bin Contribution £10.10 £10.61 £10.61 £10.61 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste
Service 660 Litre Bin Contribution £18.49 £19.41 £19.41 £19.41 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste
Service 1100 Litre Bin Contribution £30.84 £32.38 £32.38 £32.38 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste
Service 1280 Litre Bin Contribution £35.96 £37.76 £37.76 £37.76 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 240 Litre
bin Contribution £7.26 £7.62 £7.62 £7.62 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 360 Litre
bin Contribution £10.89 £11.43 £11.43 £11.43 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 660 Litre
bin Contribution £19.94 £20.94 £20.94 £20.94 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 1100
Litre bin Contribution £33.29 £34.95 £34.95 £34.95 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 1280
Litre bin Contribution £38.83 £40.77 £40.77 £40.77 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Food/Organic 140 Litre
Bin Contribution £5.63 £5.91 £5.91 £5.91 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Garden Waste 240
Litre Bin Contribution £9.65 £10.13 £10.13 £10.13 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Food/Organic 500 Litre
Bin Contribution £20.12 £21.13 £21.13 £21.13 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 240
Litre bin Contribution £5.61 £5.89 £5.89 £5.89 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 140 Litre bin Contribution £2.11 £2.22 £2.22 £2.22 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Subcontractor Commercial Refuse Scheduled Bin Uplift
Food/Organic 140 Litre Bin Contribution £7.14 £7.50 £7.50 £7.50 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Subcontractor Commercial Refuse Scheduled Bin Uplift Garden
Waste 240 Litre Bin Contribution £12.25 £12.86 £12.86 £12.86 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Subcontractor Commercial Refuse Scheduled Bin Uplift
Food/Organic 500 Litre Bin Contribution £25.48 £26.75 £26.75 £26.75 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service 240
Litre Bin Contribution £3.37 £3.54 £3.54 £3.54 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service 360
Litre Bin Contribution £5.06 £5.31 £5.31 £5.31 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service 660
Litre Bin Contribution £9.25 £9.71 £9.71 £9.71 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service
1100 Litre Bin Contribution £15.41 £16.18 £16.18 £16.18 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service
1280 Litre Bin Contribution £17.99 £18.89 £18.89 £18.89 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 140 Litre
Bin Contribution £1.52 £1.60 £1.60 £1.60 5.0% 0.0% 0.0%
#
Appendix 6
42

Page 43

#
Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
2025 to 2026
£
Proposed
Charge 2026 to
2027
Indicative
Charge 2027 to
2028
Indicative
Charge 2028 to
2029
Basis of
increase 2026
to 2027
%
Basis of
increase 2027
to 2028
%
Basis of
increase 2028
to 2029
%
Note
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 240 Litre
Bin Contribution £2.60 £2.73 £2.73 £2.73 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 360 Litre
Bin Contribution £3.90 £4.10 £4.10 £4.10 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 660 Litre
Bin Contribution £7.15 £7.51 £7.51 £7.51 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 1100 Litre
Bin Contribution £11.91 £12.51 £12.51 £12.51 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Mixed Recyclate Service 1280 Litre
Bin Contribution £13.85 £14.54 £14.54 £14.54 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Food/Organic 140 Litre Bin Contribution £2.82 £2.96 £2.96 £2.96 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Garden Waste 240 Litre Bin Contribution £4.84 £5.08 £5.08 £5.08 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Charity Scheduled Bin Uplift Food/Organic 500 Litre Bin Contribution £10.05 £10.55 £10.55 £10.55 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate
Service 140 Litre Bin Contribution £3.02 £3.17 £3.17 £3.17 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate
Service 240 Litre Bin Contribution £5.19 £5.45 £5.45 £5.45 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate
Service  360 Litre Bin Contribution £7.80 £8.19 £8.19 £8.19 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate
Service  660 Litre Bin Contribution £14.29 £15.00 £15.00 £15.00 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate
Service  1100 Litre Bin Contribution £23.81 £25.00 £25.00 £25.00 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Mixed Recyclate
Service  1280 Litre Bin Contribution £27.71 £29.10 £29.10 £29.10 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Residual Waste 140 Litre
bin Contribution £4.25 £4.46 £4.46 £4.46 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Charity Refuse Scheduled Bin Uplift Residual Waste Service 140
Litre Bin Contribution £1.95 £2.05 £2.05 £2.05 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted Charity Residual Waste 140 Litre bin Contribution £2.13 £2.24 £2.24 £2.24 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Subcontractor Charity Commercial Collection Garden Waste 240
Litre bin Contribution £6.14 £6.45 £6.45 £6.45 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Commercial Refuse Scheduled Bin Uplift Residual Waste
Service 140 Litre Bin Contribution £3.93 £4.13 £4.13 £4.13 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub contract Sack Sales Pre-Paid - Trade Recycling per 100 Contribution £155.30 £163.07 £163.07 £163.07 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub contract Sack Sales Pre-Paid - Trade Waste per 50 Contribution £154.04 £161.74 £161.74 £161.74 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted Charity Residual Waste 240 Litre bin Contribution £3.64 £3.82 £3.82 £3.82 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted Charity Residual Waste 360 Litre bin Contribution £5.45 £5.72 £5.72 £5.72 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted Charity Residual Waste 660 Litre bin Contribution £9.98 £10.48 £10.48 £10.48 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Residual Waste 1100 Litre bin Contribution £16.63 £17.46 £17.46 £17.46 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Residual Waste 1280 Litre bin Contribution £19.41 £20.38 £20.38 £20.38 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 240 Litre bin Contribution £2.82 £2.96 £2.96 £2.96 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 360 Litre bin Contribution £4.21 £4.42 £4.42 £4.42 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 660 Litre bin Contribution £7.71 £8.10 £8.10 £8.10 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 1100 Litre bin Contribution £12.85 £13.49 £13.49 £13.49 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Mixed Recycling Waste 1280 Litre bin Contribution £14.96 £15.71 £15.71 £15.71 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Food/Organic Waste 140 Litre bin Contribution £3.57 £3.75 £3.75 £3.75 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted  Charity Food/Organic Waste 500 Litre bin Contribution £12.74 £13.38 £13.38 £13.38 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 140
Litre bin Contribution £3.37 £3.54 £3.54 £3.54 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 240
Litre bin Contribution £5.61 £5.89 £5.89 £5.89 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 360
Litre bin Contribution £8.41 £8.83 £8.83 £8.83 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 660
Litre bin Contribution £15.41 £16.18 £16.18 £16.18 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 1100
Litre bin Contribution £25.71 £27.00 £27.00 £27.00 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sub-Contracted Commercial Collection Mixed Recyclate 1280
Litre bin Contribution £29.88 £31.37 £31.37 £31.37 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Event container delivery & uplift Contribution £80.41 £84.43 £84.43 £84.43 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Contamination charge - 140/240/360 ltr bins Contribution £20.11 £21.12 £21.12 £21.12 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Contamination charge - 500/660/1100/1280 ltr bins Contribution £46.91 £49.26 £49.26 £49.26 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Container retrieval - 140/240/360 ltr bins Contribution £20.11 £21.12 £21.12 £21.12 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Container retrieval - 500/660/1100/1280 ltr bins Contribution £46.91 £49.26 £49.26 £49.26 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Arran Yellow Tip Permit Contribution £67.92 £71.32 £71.32 £71.32 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Arran Blue Tip Permit Contribution £113.12 £118.78 £118.78 £118.78 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Green - Treatment per Te Contribution £67.01 £70.36 £70.36 £70.36 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Soil - Treatment per Te Contribution £40.20 £42.21 £42.21 £42.21 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Scrap - Treatment per Te Contribution £40.20 £42.21 £42.21 £42.21 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Paper & Cardboard - Treatment per Te Contribution £40.20 £42.21 £42.21 £42.21 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Wood - Treatment per Te Contribution £40.20 £42.21 £42.21 £42.21 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Plastics - Treatment per Te Contribution £67.01 £70.36 £70.36 £70.36 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Bricks/rubble - Treatment per Te Contribution £40.20 £42.21 £42.21 £42.21 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Lampheads - Treatment per Te Contribution £40.20 £42.21 £42.21 £42.21 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Skip Charges 20cyd - no treatment Contribution £128.14 £134.55 £134.55 £134.55 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Skip Charges 35cyd - no treatment Contribution £229.17 £240.63 £240.63 £240.63 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Special Uplift - disposal - 1/4te Contribution £43.29 £45.45 £45.45 £45.45 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Special Uplift - disposal - 1/2te Contribution £86.58 £90.91 £90.91 £90.91 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Special Uplift - disposal - Te Contribution £173.16 £181.82 £181.82 £181.82 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Void Uplift bin charge (Up to full set) Contribution £58.15 £61.06 £61.06 £61.06 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Special Uplift Squad - 30 min Contribution £58.15 £61.06 £61.06 £61.06 5.0% 0.0% 0.0%
#
Appendix 6
43

Page 44

#
Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
2025 to 2026
£
Proposed
Charge 2026 to
2027
Indicative
Charge 2027 to
2028
Indicative
Charge 2028 to
2029
Basis of
increase 2026
to 2027
%
Basis of
increase 2027
to 2028
%
Basis of
increase 2028
to 2029
%
Note
Place Waste Resources David Mackay Special Uplift Squad - 60 min Contribution £116.28 £122.09 £122.09 £122.09 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Special uplift - Confidential waste per bag Contribution £7.20 £7.56 £7.56 £7.56 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Direct disposal and treatment EFW per Te Contribution £173.16 £181.82 £181.82 £181.82 5.0% 0.0% 0.0%
#
Appendix 6
44

Page 45

#
Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
2025 to 2026
£
Proposed
Charge 2026 to
2027
Indicative
Charge 2027 to
2028
Indicative
Charge 2028 to
2029
Basis of
increase 2026
to 2027
%
Basis of
increase 2027
to 2028
%
Basis of
increase 2028
to 2029
%
Note
COST PLUS FEES & CHARGES
Communities & Housing Libraries Lesley Forsyth Lost and Damaged Audio, based on actual costs Cost plus £0.00 £0.00 £0.00 £0.00 5.0% 0.0% 0.0%
Communities & Housing Libraries Lesley Forsyth Book Sales (NAC Stock), based on actual costs Cost plus £0.00 £0.00 £0.00 £0.00 5.0% 0.0% 0.0%
Communities & Housing Libraries Lesley Forsyth Black and White Photocopying/Printing A4 or A3  single-sided Cost plus £0.10 £0.10 £0.10 £0.10 5.0% 0.0% 0.0%
Communities & Housing Libraries Lesley Forsyth Black and White Photocopying/Printing A4 or A3 double-sided Cost plus £0.20 £0.20 £0.20 £0.20 5.0% 0.0% 0.0%
Communities & Housing Libraries Lesley Forsyth Colour Photocopying/Printing A4 or A3 single-sided Cost plus £0.40 £0.40 £0.40 £0.40 5.0% 0.0% 0.0%
Communities & Housing Libraries Lesley Forsyth Colour Photocopying/Printing A4 or A3 double-sided Cost plus £0.80 £0.80 £0.80 £0.80 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Special Uplift or POPs/WUDS Charges (for up to five items) Cost plus £29.17 £30.63 £30.63 £30.63 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Special Uplift or POPs/WUDS individual item Charges Cost plus £5.83 £6.12 £6.12 £6.12 5.0% 0.0% 0.0%
Place Waste Resources David Mackay New/Replacement Waste Container 360 Litre Cost plus £86.84 £91.18 £91.18 £91.18 5.0% 0.0% 0.0%
Place Waste Resources David Mackay New/Replacement Waste Container 1100 Litre Cost plus £473.98 £497.68 £497.68 £497.68 5.0% 0.0% 0.0%
Place Waste Resources David Mackay New/Replacement Waste Container Lid on Lid 1100 Litre Cost plus £517.41 £543.28 £543.28 £543.28 5.0% 0.0% 0.0%
Place Waste Resources David Mackay New/Replacement Waste Container 1280 Litre Cost plus £551.50 £579.08 £579.08 £579.08 5.0% 0.0% 0.0%
Place Waste Resources David Mackay New/Replacement Waste Container Lid on Lid 1280 Litre Cost plus £594.93 £624.68 £624.68 £624.68 5.0% 0.0% 0.0%
Place Waste Resources David Mackay New/Replacement Waste Container 240 Litre Cost plus £52.68 £55.31 £55.31 £55.31 5.0% 0.0% 0.0%
Place Waste Resources David Mackay New/Replacement Waste Container 140 Litre Cost plus £36.18 £37.99 £37.99 £37.99 5.0% 0.0% 0.0%
Place Waste Resources David Mackay New/Replacement Waste Container Lid on Lid 660 Litre Cost plus £446.82 £469.16 £469.16 £469.16 5.0% 0.0% 0.0%
Place Waste Resources David Mackay New/Replacement Waste Container 660 Litre Cost plus £396.28 £416.09 £416.09 £416.09 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sack Sales Pre-Paid - Trade Recycling per 100 Cost plus £145.47 £152.74 £152.74 £152.74 5.0% 0.0% 0.0%
Place Waste Resources David Mackay Sack Sales Pre-Paid - Trade Waste per 50 Cost plus £140.98 £148.03 £148.03 £148.03 5.0% 0.0% 0.0%
#
Appendix 6
45

Page 46

#
Directorate Service Manager Charge Description Charge Type
Current
Approved
Charge
excluding VAT
2025 to 2026
£
Proposed
Charge 2026 to
2027
Indicative
Charge 2027 to
2028
Indicative
Charge 2028 to
2029
Basis of
increase 2026
to 2027
%
Basis of
increase 2027
to 2028
%
Basis of
increase 2028
to 2029
%
Note
NATIONALLY SET FEES & CHARGES
Corporate Services Legal - Licensing Raymond Lynch Landlord Registration - Principal Nationally Set £75.00 £75.00 £75.00 £75.00 0.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Landlord Registration - Property Nationally Set £17.00 £17.00 £17.00 £17.00 0.0% 0.0% 0.0%
Corporate Services Legal - Licensing Raymond Lynch Landlord Registration - Late Application Nationally Set £149.00 £149.00 £149.00 £149.00 0.0% 0.0% 0.0%
Health & Social Care Adults and Older People Eleanor Currie Blue Badge (charge for a three year period) Nationally Set £20.00 £20.00 £20.00 £20.00 0.0% 0.0% 0.0%
Communities & Housing Planning Services Allan Finlayson Planning Application fees - Operations eg Construction of
buildings - planning permission in principle Nationally Set £714.00 £714.00 £714.00 £714.00 0.0% 0.0% 0.0%
Communities & Housing Planning Services Allan Finlayson Planning Application fees - Operations eg The erection of
buildings - planning permission in principle Nationally Set £714.00 £714.00 £714.00 £714.00 0.0% 0.0% 0.0%
Communities & Housing Planning Services Allan Finlayson
Planning Application fees - Operations eg The erection of
buildings  - where the area of gross floor space to be created
does not exceed 40 sq metres
Nationally Set £357.00 £357.00 £357.00 £357.00 0.0% 0.0% 0.0%
Communities & Housing Planning Services Allan Finlayson Planning Application fees - Uses of Land eg The change of use
of a building Nationally Set £714.00 £714.00 £714.00 £714.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services (Building
Standards) Scott McKenzie Building Warrant Application Fees, set by BSD, please refer to fees
section in link below for full list of charges: Nationally Set various various various various 0.0% 0.0% 0.0%
Building warrants 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges up to 1,000 tonnes Nationally Set £125.00 £125.00 £125.00 £125.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges 1,001 to 3,000 tonnes Nationally Set £170.00 £170.00 £170.00 £170.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges 3,001 to 10,000 tonnes Nationally Set £250.00 £250.00 £250.00 £250.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges 10,001 to 20,000 tonnes Nationally Set £325.00 £325.00 £325.00 £325.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges 20,001 to 30,000 tonnes Nationally Set £415.00 £415.00 £415.00 £415.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges over 30,000 tonnes Nationally Set £480.00 £480.00 £480.00 £480.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges extensions Nationally Set £95.00 £95.00 £95.00 £95.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges for vessels with the capacity to carry
between 50 and 1,000 persons Nationally Set £480.00 £480.00 £480.00 £480.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Ship inspection charges for vessels with the capacity to carry
more than 1,000 persons Nationally Set £820.00 £820.00 £820.00 £820.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Private water supplies - regulated supplies annual sampling and
risk assessment Nationally Set £261.00 £261.00 £261.00 £261.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Private water supplies - non regulated supplies Nationally Set £118.00 £118.00 £118.00 £118.00 0.0% 0.0% 0.0%
Communities & Housing Protective Services
(Environmental Health) Scott McKenzie Stray dog fee Nationally Set £25.00 £25.00 £25.00 £25.00 0.0% 0.0% 0.0%
Corporate Services Registration Services Elaine Nixon
Birth/Death certificate extract £10 up to one month after
Registration/when abbreviated extract is produced/during a
search session
Nationally Set £10.00 £10.00 £10.00 £10.00 0.0% 0.0% 0.0% New charge
Corporate Services Registration Services Elaine Nixon Birth/Death certificate extract £15 one month after the
Registration Nationally Set £15.00 £15.00 £15.00 £15.00 0.0% 0.0% 0.0% New charge
Corporate Services Registration Services Elaine Nixon Particular Search. One search Nationally Set £5.00 £5.00 £5.00 £5.00 0.0% 0.0% 0.0% New charge
Corporate Services Registration Services Elaine Nixon General Search. Multiple searches in one hour Nationally Set £15.00 £15.00 £15.00 £15.00 0.0% 0.0% 0.0% New charge
Corporate Services Registration Services Elaine Nixon Change of Civil Partnership to a Marriage by administrative route Nationally Set £45.00 £45.00 £45.00 £45.00 0.0% 0.0% 0.0% New charge
Place Streetscene Services David Mackay Fly Tipping fine Nationally Set £500.00 £500.00 £500.00 £500.00 0.0% 0.0% 0.0%
Place Streetscene Services David Mackay Littering / Fly Posting fine Nationally Set £80.00 £80.00 £80.00 £80.00 0.0% 0.0% 0.0%
Place Streetscene Services David Mackay Dog Fouling fine Nationally Set £80.00 £80.00 £80.00 £80.00 0.0% 0.0% 0.0%
Place Streetscene Services David Mackay Abandoned vehicles minimum charge Nationally Set £150.00 £150.00 £150.00 £150.00 0.0% 0.0% 0.0%
Place Streetscene Services David Mackay Storage of vehicles until dismantled. Daily charge Nationally Set £20.00 £20.00 £20.00 £20.00 0.0% 0.0% 0.0%
Place Streetscene Services David Mackay Abandoned caravans / trailers minimum charge Nationally Set £500.00 £500.00 £500.00 £500.00 0.0% 0.0% 0.0%
Place Waste Resources David Mackay Arran Active Waste Disposal Charge per tonne Nationally Set £126.15 £126.15 £126.15 £126.15 0.0% 0.0% 0.0%
Place Transport Services Gordon Mitchell MOT Class 4 Nationally Set £54.85 £54.85 £54.85 £54.85 0.0% 0.0% 0.0%
Place Transport Services Gordon Mitchell MOT Class 5 Nationally Set £59.55 £59.55 £59.55 £59.55 0.0% 0.0% 0.0%
Place Transport Services Gordon Mitchell MOT Class 7 Nationally Set £58.60 £58.60 £58.60 £58.60 0.0% 0.0% 0.0%
Place Roads Susan Macfadyen NRSWA Public Utility Sample Inspections Nationally Set £36.00 £36.00 £36.00 £36.00 0.0% 0.0% 0.0%
Place Roads Susan Macfadyen NRSWA Section 109 Permission (additional Inspections) Nationally Set £36.00 £36.00 £36.00 £36.00 0.0% 0.0% 0.0%
#
Appendix 6
46

Page 47

Appendix 7
Employee Costs Property Costs
Supplies &
Services
Transport &
Plant Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Costs Income TOTAL
Directorate £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Corporate Services 19,659 67 3,112 22 1,585 1,950 877 0 0 (4,537) 22,735
Communities & Housing 27,520 3,193 6,802 976 312 11,674 0 286 0 (33,364) 17,399
Education 167,648 1,200 24,739 113 186 8,974 580 0 71 (4,787) 198,724
Place 32,654 22,507 4,339 7,725 551 11,908 0 78 26 (20,903) 58,885
Other Corporate Items 1,895 896 9,782 302 3,169 5,068 25,502 566 0 (11,455) 35,725
Total Expenditure 249,376 27,863 48,774 9,138 5,803 39,574 26,959 930 97 (75,046) 333,468
Health & Social Care Partnership 151,506
Revised Total Expenditure 249,376 27,863 48,774 9,138 5,803 39,574 26,959 930 97 (75,046) 484,974
Funded by:
AEF 0 0 0 0 0 0 0 0 0 (403,729) (403,729)
Council Tax 0 0 0 0 0 0 16,262 0 0 (94,007) (77,745)
Contribution from Reserves 0 0 0 0 0 0 0 0 0 (3,500) (3,500)
Total Funding 0 0 0 0 0 0 16,262 0 0 (501,236) (484,974)
Subjective Analysis
North Ayrshire Council General Services Revenue Budget 2026-27
Summary by Directorate
47

Page 48

Appendix 7
Employee Costs Property Costs
Supplies &
Services Transport Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Income TOTAL
Objective Analysis £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Chief Executive's Office 233 0 1 1 5 0 0 0 0 (56) 184
Change Programme 56 0 0 0 0 0 0 0 0 0 56
Audit,Fraud,Safety & Insurance 1,009 61 39 5 18 7 0 0 0 (313) 826
Corporate Procurement 849 0 11 1 8 110 0 0 0 (198) 781
Financial Services 1,645 0 209 1 29 2 0 0 0 (173) 1,713
Revenues 666 0 59 1 232 4 0 0 0 (1,376) (414)
Employee Services 991 0 70 0 5 4 0 0 0 (38) 1,032
HR & OD 876 0 21 0 26 412 0 0 0 (45) 1,290
ICT 3,600 0 2,177 5 10 0 0 0 0 (240) 5,552
Business Support 1,714 0 6 0 2 0 0 0 0 (135) 1,587
Customer Services 3,228 0 300 2 47 1,153 877 0 0 (940) 4,667
Transformation Services 836 0 11 0 0 39 0 0 0 0 886
Legal & Licensing 1,357 0 32 4 38 0 0 0 0 (794) 637
Policy,Performance & Elections 573 0 20 1 19 5 0 0 0 (20) 598
Communications 548 0 8 1 2 0 0 0 0 (7) 552
Civil Contingencies 0 0 0 0 0 61 0 0 0 0 61
Committee Services 498 6 118 0 4 52 0 0 0 (126) 552
Member Services 364 0 29 0 1,136 101 0 0 0 (55) 1,575
Information Governance 616 0 1 0 4 0 0 0 0 (21) 600
Total 19,659 67 3,112 22 1,585 1,950 877 0 0 (4,537) 22,735
Subjective Analysis
North Ayrshire Council General Services Revenue Budget 2026-27
Corporate Services
48

Page 49

Appendix 7
Employee Costs Property Costs
Supplies &
Services Transport Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Income TOTAL
Objective Analysis £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Directorate and Support 196 0 0 0 0 0 0 0 0 (23) 173
Connected Communities 7,406 348 648 24 74 5,813 0 0 0 (678) 13,635
Planning Services 915 0 100 4 21 30 0 0 0 (812) 258
Protective Services 3,257 110 100 21 16 148 0 0 0 (1,236) 2,416
Building Services 10,792 130 5,603 884 18 3,287 0 0 0 (23,265) (2,551)
Property Governance 735 0 28 0 128 128 0 0 0 (1,019) 0
Other Housing 4,219 2,605 323 43 55 2,268 0 286 0 (6,331) 3,468
Total 27,520 3,193 6,802 976 312 11,674 0 286 0 (33,364) 17,399
Subjective Analysis
North Ayrshire Council General Services Revenue Budget 2026-27
Communities & Housing
49

Page 50

Employee Costs Property Costs
Supplies &
Services Transport Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Income TOTAL
Objective Analysis £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Early Years Education 17,766 9 219 4 33 5,607 0 0 0 (34) 23,604
Primary Education 51,158 0 2,561 25 5 1 0 0 0 0 53,750
Secondary Education 51,780 0 16,564 8 6 0 0 0 0 (8) 68,350
Additional Support Needs 22,444 0 163 43 23 2,177 0 0 0 (394) 24,456
Education - Other 3,099 114 405 10 95 1,186 580 0 71 (1,890) 3,670
Pupil Equity Fund 4,197 0 0 0 0 0 0 0 0 0 4,197
Facilities Management 17,204 1,077 4,827 23 24 3 0 0 0 (2,461) 20,697
Total 167,648 1,200 24,739 113 186 8,974 580 0 71 (4,787) 198,724
North Ayrshire Council General Services Revenue Budget 2026-27
Education
Subjective Analysis
50

Page 51

Appendix 7
Employee Costs Property Costs
Supplies &
Services Transport Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Income TOTAL
Objective Analysis £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Directorate & Support 244 0 2 0 7 0 0 0 0 0 253
Roads 5,376 30 2,889 31 81 1,001 0 0 0 (1,570) 7,838
Streetscene 8,630 149 373 190 24 95 0 0 0 (2,933) 6,528
Waste Resources 6,550 50 788 241 65 6,622 0 78 26 (5,191) 9,229
Economic Development 3,274 6 10 10 16 597 0 0 0 (186) 3,727
Growth & Investment 158 0 2 0 3 78 0 0 0 0 241
Property Management & Investment 5,607 15,044 136 51 338 135 0 0 0 (8,991) 12,320
Energy & Sustainability 539 7,200 4 1 6 253 0 0 0 (1,273) 6,730
Internal Transport 2,276 28 135 7,201 11 3,127 0 0 0 (759) 12,019
Total 32,654 22,507 4,339 7,725 551 11,908 0 78 26 (20,903) 58,885
Subjective Analysis
North Ayrshire Council General Services Revenue Budget 2026-27
Place
51

Page 52

Appendix 7
Employee Costs Property Costs
Supplies &
Services Transport Costs Admin Costs
Other Agencies,
Bodies &
Persons
Transfer
Payments
Other
Expenditure
Capital
Financing Income TOTAL
Objective Analysis £000 £000 £000 £000 £000 £000 £000 £000 £000 £000 £000
Joint Boards 0 0 0 0 0 3,798 0 0 0 0 3,798
Pension Costs 1,895 0 0 0 0 0 0 0 0 0 1,895
Loan Charges & Capital Charges 0 0 0 0 0 0 0 0 0 20,286 20,286
Central Telephones 0 0 0 0 350 0 0 0 0 0 350
Other Corporate Items 0 0 9,782 0 2,554 0 0 366 0 (3,770) 8,932
Insurance 0 896 0 302 265 1,270 25,502 0 0 (2,191) 26,044
Housing Benefit 0 0 0 0 0 0 0 200 0 (25,780) (25,580)
Total 1,895 896 9,782 302 3,169 5,068 25,502 566 0 (11,455) 35,725
Subjective Analysis
North Ayrshire Council General Services Revenue Budget 2026-27
Other Corporate Items
52

Page 53

NORTH AYRSHIRE COUNCIL 
25 February 2026 
North Ayrshire Council 
Title:    Capital Investment Programme 2026/27 to 2033/34 
Purpose:  To advise Council on the draft Capital Investment Programme to
2033/34 
Recommendation:  That Council :
(a)  approves the refreshed Capital Investment Programme to
2033/34 included in Appendix 3;
(b)  notes that the programme will be reviewed on an on-going
basis with the next major review in 2026/27; and 
(c)  approves the refreshed Capital Investment Strategy included
in Appendix 4. 
1. Executive Summary 
1.1 The General Services Capital Investment Programme 2025/26 to 2033/34 was
approved by Council on 26 February 2025. This report outlines the recommendations
of the refresh of the Capital Investment Programme carried out during 2025/26. The
next full review of the Programme will be carried out during 2026/27.
1.2 The refresh has incorporated all funding sources to 2033/34, including assumed levels
of general capital grant, specific grants and a prudent assessment of the level of
capital receipts over the period. Total available funding has been projected at
£168.218m. The balance of funding required to deliver the capital programme will be
met through prudential borrowing and this is anticipated at £155.697m.
1.3 The refresh considered the current Capital Investment Programme and takes
cognisance of subsequent changes, including:
• The ongoing impact of construction industry inflation, cost volatility and supply
chain issues across the overall Capital Investment Programme;
• Revised Scottish Government capital grants as detailed in the Local Government
Finance Settlement 2026/27;
• A review of spending profiles across key capital projects to support the Council’s
priorities; and  
• Revised levels of investment across projects, taking cognisance of Council
priorities, external funding sources and investing in core assets through asset
management plans. 
Agenda Item 4
53

Page 54

1.4 The proposed refreshed Capital Investment Programme, aligned to the Council Plan
priorities, is attached in Appendix 3 and will deliver a total programme of £323.916m
to 2033/34. 
1.5 Compliance with Regulations and the Prudential Code requires assurance to be
provided on affordability and sustainability of the Capital Investment programme, this
is provided in the Treasury Management and Investment Strategy (TMIS) which
follows this report on the Council agenda. The TMIS recognises that this will require to
be kept under review to ensure the underlying assumptions continue to apply. 
1.6 The longer-term affordability of the current and future Capital Investment Programmes
requires incremental increases to the current General Fund financing budgets. As part
of the next major review of the capital programme, due to be undertaken during
2026/27, a review of available General Fund financing budgets will be carried out to
determine any further changes required to support the delivery of the draft Capital
Investment Programme. 
1.7 In addition to the TMIS, there is a requirement for the Council to publish a Capital
Investment Strategy (CIS). As part of the refresh of the Capital Investment
Programme, a refresh of the current CIS has been undertaken during 2025/26. The
refreshed CIS is attached at Appendix 4. 
1.8 The Capital Investment Programme will continue to be reviewed on an on-going basis.
The primary focus at this time is on delivery of the current programme. Due to ongoing
risks associated with construction cost volatility and the higher cost of borrowing,
opportunities for further investment to be met from borrowing is extremely limited.
Major reviews will be undertaken on a 3-year basis, with the next due to be completed
during 2026/27. 
2. Background 
2.1 North Ayrshire Council approved the current Capital Investment Programme for the
period 2025/26 to 2033/34 on 26 February 2025. A refresh of the Programme was
undertaken during 2025/26. This report contains the outcome of that refresh.
Review of Capital Funding 
Scottish Government General Capital Grant
2.2 Local Government Finance Circular 1/2026 confirmed the level of General Capital
Grant as £9.895m for 2026/27.  
2.3 Projected at the core level of £9.895m to 2033/34, the total General Capital Grant for
the period is forecast as £78.706m.
2.4  North Ayrshire Council's anticipated Scottish Government general capital funding
support, as distributed, for 2026/27 is £9.895m. Subsequent to this notification, on 30
January 2026, COSLA Leaders approved further areas of distribution which will likely
change both the revenue and capital grant allocations across Councils. No material
change is anticipated at this time.
54

Page 55

Scottish Government Specific Capital Grants
2.5 In addition to the General Capital Grant, the Council will receive one Specific Grant:
• £1.561m to tackle Vacant and Derelict Land with projects requiring Scottish
Government approval. 
The Vacant and Derelict Land funding remains the same as that received during
2025/26 and has only been confirmed for 2026/27. 
2.6 In addition, the programme includes previous Specific Grant allocations in relation to a
number of programmes which have been carried over into 2026/27 in line with revised
project plans, including:
• £3.545m from the 2025/26 Vacant and Derelict Land allocation; and
• £0.609m from the 2025/26 Place Based Investment Programme.
2.7 As a result, the total forecast Specific Grant income to 2033/34 is £5.715m. 
Other Government Funding
2.8 The programme includes funding from the Scottish and UK Governments to support
the Ayrshire Growth Deal. The total anticipated funding over the period is £49.247m.
This has been aligned to the latest programme planning information. 
2.9 The UK Government previously confirmed that North Ayrshire Council has been
awarded £23.693m from the Levelling Up Fund to support the upgrading of the B714
to improve connectivity between North Ayrshire and the wider motorway network.
£16.769m of this award is anticipated for receipt during financial years 2026/27 to
2028/29. 
2.10 The UK Government has confirmed additional funding for 2025/26 and 2026/27 from
the UK Local Regeneration Fund of £17.457m, with £16.363m aligned to 2026/27. 
Other Internal Funds
2.11 The programme includes previously approved contributions from earmarked funds of
£0.710m to support the B714 Upgrade. 
Capital Receipts 
2.12 A review of projected income from capital receipts has been undertaken during
2025/26. This is forecast to realise income of £1.605m over the period of the
programme in relation to the sale of other Council owned assets. 
55

Page 56

Prudential Borrowing
2.13 The difference between the Council's Capital Investment Programme and funding from
the above sources is met through prudential borrowing of £155.697m. The Capital
Investment Programme will be delivered within the approved loan charges revenue
budget, utilising the balances held in the Prudential Investment Fund and Capital Fund
to smooth the revenue implications of the borrowing costs associated with the revised
programme.
Development of the Capital Investment Programme to 2033/34
2.14 The refresh of the Capital Investment Programme to 2033/34 incorporates the re-
profiling of a number of projects to better reflect current projected timelines and
revised levels of investment that take cognisance of the Council’s key priorities,
funding availability and lifecycle maintenance requirements informed through asset
management plans.
2.15  The current capital investment programme to 2033/34, as approved by Council on 26
February 2025, has been updated to reflect the changes to the Programme approved
by Cabinet during 2025/26, including any re-phasing of programmes to reflect updated
project plans. 
Re-Profiling
2.16 A total of £59.411m of planned expenditure has been re-profiled from 2025/26 into
2026/27 to 2033/34 in line with updated project delivery timelines. Full details of
individual projects re-phased from 2025/26 have been reported to Cabinet throughout
the year.  The reprofiling includes two significant funding allocations of £27.800m for
Ardrossan Campus and £16.363m Local Regeneration Fund received in year with
plans to spend in future years.
2.17 The phasing of expenditure within the Capital Investment Programme has been
reviewed to reflect historic expenditure patterns and organisational capacity. This has
resulted in the rephasing of approximately 7% of the planned expenditure in both
2025/26 and 2026/27 for delivery in later years, without impacting on the overall value
of investment within the programme. The actual levels of expenditure will be
continually monitored and reported to Cabinet throughout the life of the programme. 
Investments linked to Revised Funding
2.18 Local Government Finance Circular 1/2026, Vacant and Derelict Land specific grant
for 2026/27 has been confirmed at £1.561m and has been reflected in additional
investment at this level.
2.19 Millport Coastal Flood Protection scheme has reported a further underspend of
(£0.324m). This has been offset by anticipated additional funding of £1.342m funding
for Millburn Flood Protection Scheme reported in the Scottish Government Flooding
Return.
56

Page 57

Additional / Revised Investments
2.20 An additional investment of £0.275m has been included linked to the cyclical
replacement of traffic signals. This will support the replacement of ageing installations. 
2.21 Additional investment of £0.629m has been included to support the care at home
management system.  This is to procure and implement a new system to deliver a
reliable, real-time scheduling and mobile working platform. 
2.22 Additional investment of £1.250m for ICT investment to support the Council’s ICT
rolling replacement programme. This has been allocated to the last 3 years of the
programme to ensure a consistent profile of investment.
2.23 During 2025/26 a review was completed of the requirement to accommodate the Free
School Meal preparation works for Glebe Primary School and West Kilbride Primary
School. The work originally required for Glebe Primary School was reassessed due to
a lower than anticipated level of increase in school roll. Conversely, the scope of work
required for West Kilbride Primary School increased due to a further anticipated
increase in school roll, influenced by the level of housing developments in the area. As
such, budgets have been realigned within existing capital resources and reflected in
the Capital Budget Programme.
2.24 Recent years have witnessed significant cost volatility across the construction
industry, including inflationary pressures, limited availability of contractors, supply
chain issues and material shortages which have impacted tender returns and the cost
of materials. Where quantified, the resultant cost pressures have been recognised in
relation to specific projects. In order to continue to support the management of these
and other emerging risks, and to apply prudent financial planning, it is proposed that
an additional investment of £15.000m within the Flexibility budget is included over the
next three years. This position will continue to be monitored as works advance. 
2.25 The current approved Capital Investment Programme to 2033/34 is attached at
appendix 1. Full details of the proposed changes to the programme following the
review, as outlined above, are included in appendix 2. The revised Capital Investment
Programme covering the period from 2026/27 to 2033/34 is included in appendix 3.
This will deliver a total programme of investment of £323.916m.
Future Affordability
2.26 The Prudential Investment Fund was created as part of the 2015/16 budget strategy to
utilise short term underspends on General Fund financing budgets to offset longer
term pressures to support Prudential Borrowing arising from the Capital Investment
Programme. 
57

Page 58

2.27 Due to the significant investment planned by North Ayrshire Council over the period to
2033/34, set within the context of government grant forecasts and combined with the
additional cost pressures identified across a number of projects, it is projected that
these funds will be exhausted before the end of the current 10 year Capital Investment
Programme. In order to ensure the affordability of current and future capital
investments beyond this, it will be necessary to incrementally increase the current
General Fund financing budgets over the period of the programme. Additional funding
support to mitigate the significant cost increases and the increased cost of borrowing
includes the use of the recurring element of the Service Concession flexibility,
approved at Council on 15 February 2023, which resulted in an average contribution
of £3.437m from 2022/23 and the utilisation of the balance of savings from the
temporary reduction in the employers’ superannuation contributions during 2025/26
and 2026/27.
2.28 In addition to the application of these non-recurring funds, it is necessary to include an
indicative recurring pressure within the General Services Revenue Estimates 2026/27
to 2028/29. This includes an incremental contribution of £1.100m per annum from
2027/28. The impacts of inflationary pressures and interest rate fluctuations will
continue to be monitored on an ongoing basis and the resultant increases in revenue
contributions will be reviewed as part of the next major review of the capital
programme, due to be undertaken during 2026/27.
Treasury Management and Investment Strategy (TMIS)
2.29 Compliance with Regulation and the Prudential Code requires assurance to be
provided on affordability and sustainability of the Capital Investment Programme. This
is provided in the Treasury Management and Investment Strategy (TMIS) which
follows this report on the Council agenda. The TMIS recognises that this will require to
be kept under review to ensure the underlying assumptions continue to apply.
Capital Investment Strategy
2.30 In addition to the TMIS there is also a requirement for the Council to publish a Capital
Investment Strategy (CIS) which provides the overarching framework under which the
draft Capital Investment Programme has been developed. The current CIS was
approved by Council on 26 February 2025. During 2025/26 this has been refreshed
with the revised CIS included at Appendix 4.
Conclusion
2.31 The draft Capital Investment Programme 2026/27 to 2033/34, including proposed
funding, is attached at Appendix 3. This confirms total investment of £323.916m over
the period. The proposed investment aligns with the Council's key priorities, as set out
in the Council Plan 2023-2028, core asset management plans and the refreshed
Capital Investment Strategy, included at Appendix 4. 
58

Page 59

2.32 The programme is affordable based on the estimated funding streams set out in the
2026/27 to 2028/29 Medium Term Financial Plan and from the mitigating actions
noted earlier in this report to supplement the Loans Fund. These proposals have been
developed within a very challenging financial landscape impacted by a combination of
significant cost volatility across the Programme and an increased cost of borrowing.
The affordability of the Programme is also highlighted within the Treasury
Management and Investment Strategy, reported elsewhere on the agenda, and this
will be monitored on an ongoing basis. A further, full assessment of the Programme’s
affordability will be undertaken as part of the next major review of the capital
programme due for completion during 2026/27.  
3. Proposals 
3.1 It is proposed that Council :
(a)  approves the refreshed Capital Investment Programme to 2033/34 included in
appendix 3;
(b)  notes that the programme will be reviewed on an on-going basis with the next
major review in 2026/27; and 
(c)  approves the refreshed Capital Investment Strategy included in appendix 4. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The refreshed capital programme is based on a number of assumptions around the
availability of finance including capital grant and capital receipts. Given the forward
projection for 10 years, it is essential that these and the cost of projects are kept
under review.
There are a number of assumptions underpinning the current revenue projection
including; the level of loans fund support, the level of future interest rates, delivery of
the programme within the timelines outlined in the programme and application of the
Capital Fund and the Prudential Investment Fund to smooth the revenue implications
across the life of the plan.
Due to the long-term nature of the borrowing required to support this programme, a
review of available financing budgets has been undertaken with a view to increasing
the available funding and maintaining the future affordability of the Programme. 
Human Resources 
4.2 Through investment in the Capital Investment Programme, it is anticipated there will
be additional staffing requirements. This will be considered on a project basis. 
Legal 
4.3 None
59

Page 60

Equality/Socio-economic 
4.4 Where the Council is making decisions in relation to its spending priorities, it is obliged
to comply with the public sector equality duty set out in the Equalities Act 2010. To
meet this requirement, the Council assesses the impact of applying a decision against
key groups to ensure that certain groups are not disadvantaged by those decisions. A
number of the projects within the revised capital programme, will make a positive
contribution to the Council’s commitment to equalities. 
Climate Change and Carbon 
4.5 All projects within the revised plan will be delivered to minimise the impact on Climate
Change and Carbon. Further, specific projects within the plan will have a positive
environmental impact. 
Key Priorities 
4.6 The refreshed Capital Investment Programme 2026/27 to 2033/34 supports the delivery
of the outcomes as outlined in the Council Plan 2023-2028 by focusing our investment
on priorities, managing risk and supporting the delivery of key priorities. 
Community Wealth Building 
4.7 The Council will aim to maximise opportunities within the context of the 5 pillars of
Community Wealth Building from its investment programme. In particular, Ayrshire
Growth Deal and growth and investment projects will make a positive contribution to
economic regeneration across the region. 
Islands Communities Impact Assessment (ICIA) 
4.8 None 
United Nations Rights of the Child (UNCRC) 
4.9 None 
Consumer Duty 
4.10 None 
5. Consultation 
5.1 Executive Directors have been consulted as part of the refresh the current capital
investment programme and the identification of the proposed revisions and additions to
the programme detailed in this report. 
60

Page 61

Mark Boyd
Head of Service (Finance) 
For further information please contact Natalie Graham, Team Manager Corporate
(Financial Management), on 01294324533. 
Background Papers
Capital Investment Programme 2025/26 to 2033/34 – North Ayrshire Council 26 February
2025 
61

Page 62

#
Appendix 1
Project Description
Approved
2026/2027
Approved
2027/2028
Approved
2028/2029
Approved
2029/2030
Approved
2030/2031
Approved
2031/2032
Approved
2032/2033
Approved
2033/2034 Total
£ £ £ £ £ £ £ £ £
EXPENDITURE
Place
Roads Improvement / Reconstruction 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 30,400,000
Lighting 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 8,000,000
Millport Pier 984,960 984,960
Bridges infrastructure programme 560,000 560,000 560,000 560,000 560,000 560,000 560,000 560,000 4,480,000
B714 Improvements 11,488,805 11,488,805
Property lifecycle investment 1,600,000 1,100,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 8,700,000
Cemetery extns, walls & infra 145,602 11,521 157,123
Vehicles 2,980,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 16,980,000
Fleet Decarbonisation 1,950,000 1,500,000 3,450,000
Shewalton landfill 48,949 48,949
Lochshore Hub Play Area 9,420 10,640 11,180 11,740 42,980
Montgomerie Park Masterplan 75,000 650,000 350,000 490,000 500,000 2,065,000
Active Travel Tier 1 582,000 582,000 582,000 582,000 582,000 582,000 582,000 582,000 4,656,000
Access Paths Network Programme 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 400,000
Growth & Investment
Ayrshire Growth Deal:
AGD - i3 DPMC Phase 2 250,000 1,456,000 2,924,615 4,630,615
AGD - i3 Flexible Business Space Phase 2 3,360,497 1,718,760 5,079,257
AGD - Hunterston - Centre for Low Carbon Energy & Circular Economy 450,000 4,196,000 4,196,000 8,536,978 17,378,978
AGD - Great Harbour Phase 1 2,448,751 3,551,100 1,544,203 51,882 7,595,936
AGD - IMSE 473,740 3,200,000 3,250,000 2,897,747 9,821,487
AGD Marine Tourism - Ardrossan 2,500,000 2,500,000
AGD Marine Tourism - Arran 355,390 1,376,793 32,554 33,692 1,798,429
AGD Marine Tourism - Cumbrae 2,954,043 1,230,892 33,694 34,875 4,253,504
Ardrossan North Shore 1,730,304 1,730,304
Sub Total 37,248,512 28,042,655 23,834,246 21,048,914 9,492,000 8,992,000 8,992,000 8,992,000 146,642,327
Education
Fairlie Primary 115,000 10,000 125,000
Universal Free School Meals Expansion 1,546,260 3,081,142 332,174 329,741 5,289,317
Schools ICT Investment 1,203,908 752,000 752,000 752,000 752,000 752,000 752,000 752,000 6,467,908
Ardrossan New Build 28,634,232 23,031,226 2,715 51,668,173
Sub Total 31,499,400 26,874,368 1,086,889 1,081,741 752,000 752,000 752,000 752,000 63,550,398
Corporate Services
ICT Investment Fund 557,100 648,900 282,600 282,600 297,600 2,068,800
WAN 500,000 500,000
LAN/WiFi 1,500,000 1,500,000
Telephony 650,000 650,000
Sub Total 557,100 3,298,900 282,600 282,600 297,600 4,718,800
Health & Social Care Partnership
Improvement grants 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 4,000,000
Sub Total 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 4,000,000
North Ayrshire Council
Approved Capital Programme 2026/2027 - 2033/2034
#
62

Page 63

#
Appendix 1
Project Description
Approved
2026/2027
Approved
2027/2028
Approved
2028/2029
Approved
2029/2030
Approved
2030/2031
Approved
2031/2032
Approved
2032/2033
Approved
2033/2034 Total
£ £ £ £ £ £ £ £ £
North Ayrshire Council
Approved Capital Programme 2026/2027 - 2033/2034
Other
Flexibility / Infrastructure Fund 3,000,000 6,366,974 4,254,051 3,000,000 48,000 48,000 48,000 16,765,025
Sub Total 3,000,000 6,366,974 4,254,051 3,000,000 48,000 48,000 48,000 16,765,025
TOTAL EXPENDITURE 72,805,012 65,082,897 29,957,786 25,913,255 11,041,600 10,292,000 10,292,000 10,292,000 235,676,550
Approved
2026/2027
Approved
2027/2028
Approved
2028/2029
Approved
2029/2030
Approved
2030/2031
Approved
2031/2032
Approved
2032/2033
Approved
2033/2034 Total
£ £ £ £ £ £ £ £ £
INCOME
Prudential Borrowing 50,958,902 38,919,872 6,971,000 5,197,350 749,600 102,796,724
Specific Grants - AGD 7,632,930 14,871,025 12,694,786 10,423,905 45,622,646
Specific Grants - Active Travel Tier 1 582,000 582,000 582,000 582,000 582,000 582,000 582,000 582,000 4,656,000
Specific Grants - B714 Improvements 4,000,000 4,000,000
General Capital Grant - Flooding (1,914,000) (1,914,000)
General Capital Grant 9,710,000 9,710,000 9,710,000 9,710,000 9,710,000 9,710,000 9,710,000 9,710,000 77,680,000
Recovery & Renewal 710,180 710,180
Sale of land & buildings 1,125,000 1,000,000 2,125,000
TOTAL INCOME 72,805,012 65,082,897 29,957,786 25,913,255 11,041,600 10,292,000 10,292,000 10,292,000 235,676,550
#
63

Page 64

#
Appendix 2
Project Description
Changes
2026/2027
Changes
2027/2028
Changes
2028/2029
Changes
2029/2030
Changes
2030/2031
Changes
2031/2032
Changes
2032/2033
Changes
2033/2034 Total
£ £ £ £ £ £ £ £ £
EXPENDITURE Category
Place
Traffic Calming Specific Project 82,953 82,953
Cyclical Replacement of Traffic Signals Specific Project 100,000 100,000 75,000 275,000
Dockhead Street Saltcoats Specific Project 100,000 100,000
Millburn FPS External Funding 2,838,036 2,838,036
Coastal Adaptations Specific Project 57,930 100,000 100,000 257,930
B714 Improvements Specific Project 8,472,590 5,199,184 996,899 14,668,673
Property lifecycle investment Recurring 318,607 318,607
Cmty, Kilbirnie - New Specific Project 937,782 937,782
Fleet Decarbonisation Specific Project 1,202,000 1,202,000
Repurposing Property Grant Fund Specific Project 300,000 300,000
Place Based Investment Programme External Funding 114,374 114,374
PBIP – Kilwinning Abbey Improvements External Funding 250,000 250,000
VDLF 2026/27 Allocation External Funding 1,561,000 1,561,000
VDLF - Irvine Kyle Road Phase 2 External Funding 3,404,310 3,404,310
LUF3 - Annickbank External Funding 5,933,557 5,933,557
VDLF - Tree Planting External Funding 47,600 47,600
VDLF Stalled Spaces Fund External Funding 88,000 88,000
Lochshore Garden/Activity Hub External Funding 702,075 702,075
North Shore Residential External Funding 125,000 125,000
PBIP Dockhead Street External Funding 200,000 200,000
Active Travel Tier 1 External Funding (222,000) (582,000) (582,000) (582,000) (582,000) (582,000) (582,000) (582,000) (4,296,000)
Access Paths Network Programme Specific Project 350,000 350,000
Long Drive External Funding 405,248 405,248
Riverside Way External Funding 818,170 818,170
Strategic Investment Route External Funding 2,108,826 2,108,826
Kyle Road AT Route External Funding 1,027,678 1,027,678
Heatherhouse Junction External Funding 425,000 425,000
Growth & Investment
Ayrshire Growth Deal:
AGD - i3 DPMC Phase 2 External Funding (175,000) 180,017 1,225,000 1,230,017
AGD - i3 Flexible Business Space Phase 2 External Funding 1,206,458 (624,410) 582,048
AGD - i3 Flexible Business Space Phase 3 External Funding 412,024 4,500,000 4,500,000 9,412,024
AGD - Hunterston - Centre for Low Carbon Energy & Circular Economy External Funding (150,000) (396,000) (396,000) (4,714,711) (5,656,711)
AGD - Great Harbour Phase 1 External Funding (1,934,604) (3,267,006) (1,544,203) (51,882) (6,797,695)
AGD - Great Harbour Phase 2 External Funding 500,000 2,637,247 2,637,246 5,774,493
AGD - Great Harbour Phase 3 External Funding 2,090,000 2,090,000
AGD - IMSE External Funding (223,740) 5,402,646 5,178,906
AGD Marine Tourism - Ardrossan External Funding (2,500,000) (2,500,000)
AGD Marine Tourism - Arran External Funding 3,110 (1,149,137) 2,190,869 1,460,210 2,505,052
AGD Marine Tourism - Cumbrae External Funding (2,595,543) (1,003,236) 2,189,729 1,541,689 132,639
Sub Total 27,589,441 8,986,659 7,667,540 4,280,952 (582,000) (582,000) (582,000) (582,000) 46,196,592
North Ayrshire Council
Revisions to Capital Programme 2026/2027 - 2033/2034
#
64

Page 65

#
Appendix 2
Project Description
Changes
2026/2027
Changes
2027/2028
Changes
2028/2029
Changes
2029/2030
Changes
2030/2031
Changes
2031/2032
Changes
2032/2033
Changes
2033/2034 Total
£ £ £ £ £ £ £ £ £
North Ayrshire Council
Revisions to Capital Programme 2026/2027 - 2033/2034
Education
Fairlie Primary Specific Project 339,911 (10,000) 329,911
Universal Free School Meals Expansion Specific Project 2,085,797 (677,807) (332,174) (329,741) 746,075
Ardrossan New Build Specific Project 44,883,408 (12,490,686) 32,392,722
Sub Total 47,309,116 (13,178,493) (332,174) (329,741) 33,468,708
Communities and Housing
CCTV Review Specific Project 87,500 87,500
Sub Total 87,500 87,500
Corporate Services
ICT Investment Fund Specific Project (100,000) 150,000 50,000 425,000 425,000 400,000 1,350,000
WAN Specific Project (500,000) (500,000)
Telephony Specific Project (650,000) (650,000)
Connectivity Specific Project 150,000 1,150,000 1,300,000
Sub Total 50,000 150,000 50,000 425,000 425,000 400,000 1,500,000
Health & Social Care Partnership
Care at Home Management System Specific Project 594,431 34,995 629,426
Sub Total 594,431 34,995 629,426
Other
Flexibility / Infrastructure Fund Specific Project 2,160,254 4,594,578 745,949 (3,000,000) (48,000) (48,000) (48,000) 4,356,781
Core Infrastructure, property and Vehicles Renewal Investment Recurring 2,000,000 2,000,000
Sub Total 4,160,254 4,594,578 745,949 (3,000,000) (48,000) (48,000) (48,000) 6,356,781
TOTAL EXPENDITURE 79,790,742 437,739 8,231,315 951,211 (532,000) (205,000) (205,000) (230,000) 88,239,007
Changes
2026/2027
Changes
2027/2028
Changes
2028/2029
Changes
2029/2030
Changes
2030/2031
Changes
2031/2032
Changes
2032/2033
Changes
2033/2034 Total
£ £ £ £ £ £ £ £ £
INCOME
Prudential Borrowing 53,727,364 (1,010,048) 3,387,711 (3,620,617) (135,000) 192,000 192,000 167,000 52,900,410
Specific Grants - AGD (7,132,930) 547,522 5,240,604 4,968,828 3,624,024
Specific Grants - Active Travel Tier 1 (582,000) (582,000) (582,000) (582,000) (582,000) (582,000) (582,000) (582,000) (4,656,000)
Specific Grants - Vacant & Derelict Funding 5,106,031 5,106,031
Specific Grants - Place Based Investment Programme 608,628 608,628
Specific Grants - B714 Improvements 11,211,395 1,557,265 12,768,660
Specific Grants - Local Regeneration Fund Funding 16,363,134 16,363,134
General Capital Grant - Flooding 1,018,120 1,018,120
General Capital Grant (269,000) 185,000 185,000 185,000 185,000 185,000 185,000 185,000 1,026,000
Sale of land & buildings (260,000) (260,000) (520,000)
TOTAL INCOME 79,790,742 437,739 8,231,315 951,211 (532,000) (205,000) (205,000) (230,000) 88,239,007
#
65

Page 66

#
Appendix 3
Project Description
Revised
2026/2027
Revised
2027/2028
Revised
2028/2029
Revised
2029/2030
Revised
2030/2031
Revised
2031/2032
Revised
2032/2033
Revised
2033/2034 Total
£ £ £ £ £ £ £ £ £
EXPENDITURE
Place
Roads Improvement / Reconstruction 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 3,800,000 30,400,000
Traffic Calming 82,953 82,953
Cyclical Replacement of Traffic Signals 100,000 100,000 75,000 275,000
Dockhead Street Saltcoats 100,000 100,000
Lighting 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 8,000,000
Millport Pier 492,480 492,480 984,960
Millburn FPS 2,838,036 2,838,036
Coastal Adaptations 57,930 100,000 100,000 257,930
Bridges infrastructure programme 560,000 560,000 560,000 560,000 560,000 560,000 560,000 560,000 4,480,000
B714 Improvements 9,980,697 12,580,290 3,098,042 498,449 26,157,478
Property lifecycle investment 1,918,607 1,100,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 9,018,607
Cemetery extns, walls & infra 145,602 11,521 157,123
Cmty, Kilbirnie - New 937,782 937,782
Vehicles 2,980,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 16,980,000
Fleet Decarbonisation 1,950,000 2,702,000 4,652,000
Shewalton landfill 48,949 48,949
Repurposing Property Grant Fund 300,000 300,000
Place Based Investment Programme 114,374 114,374
PBIP – Kilwinning Abbey Improvements 250,000 250,000
Lochshore Hub Play Area 9,420 10,640 11,180 11,740 42,980
Montgomerie Park Masterplan 75,000 650,000 350,000 490,000 500,000 2,065,000
VDLF 2026/27 Allocation 1,561,000 1,561,000
VDLF - Irvine Kyle Road Phase 2 3,404,310 3,404,310
LUF3 - Annickbank 5,933,557 5,933,557
VDLF - Tree Planting 47,600 47,600
VDLF Stalled Spaces Fund 88,000 88,000
Lochshore Garden/Activity Hub 702,075 702,075
North Shore Residential 125,000 125,000
PBIP Dockhead Street 200,000 200,000
Active Travel Tier 1 360,000 360,000
Access Paths Network Programme 400,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 750,000
Long Drive 405,248 405,248
Riverside Way 818,170 818,170
Strategic Investment Route 2,108,826 2,108,826
Kyle Road AT Route 1,027,678 1,027,678
Heatherhouse Junction 425,000 425,000
North Ayrshire Council
Revised Capital Programme 2026/2027 - 2033/2034
#
66

Page 67

#
Appendix 3
Project Description
Revised
2026/2027
Revised
2027/2028
Revised
2028/2029
Revised
2029/2030
Revised
2030/2031
Revised
2031/2032
Revised
2032/2033
Revised
2033/2034 Total
£ £ £ £ £ £ £ £ £
North Ayrshire Council
Revised Capital Programme 2026/2027 - 2033/2034
Growth & Investment
Ayrshire Growth Deal:
AGD - i3 DPMC Phase 2 75,000 1,636,017 2,924,615 1,225,000 5,860,632
AGD - i3 Flexible Business Space Phase 2 4,566,955 1,094,350 5,661,305
AGD - i3 Flexible Business Space Phase 3 412,024 4,500,000 4,500,000 9,412,024
AGD - Hunterston - Centre for Low Carbon Energy & Circular Economy 300,000 3,800,000 3,800,000 3,822,267 11,722,267
AGD - Great Harbour Phase 1 514,147 284,094 798,241
AGD - Great Harbour Phase 2 500,000 2,637,247 2,637,246 5,774,493
AGD - Great Harbour Phase 3 2,090,000 2,090,000
AGD - IMSE 250,000 3,200,000 3,250,000 8,300,393 15,000,393
AGD Marine Tourism - Arran 358,500 227,656 2,223,423 1,493,902 4,303,481
AGD Marine Tourism - Cumbrae 358,500 227,656 2,223,423 1,576,564 4,386,143
Ardrossan North Shore 1,730,304 1,730,304
Sub Total 54,364,775 44,902,900 33,602,929 25,828,315 8,910,000 8,410,000 8,410,000 8,410,000 192,838,919
Education
Fairlie Primary 454,911 454,911
Universal Free School Meals Expansion 3,632,057 2,403,335 6,035,392
Schools ICT Investment 1,203,908 752,000 752,000 752,000 752,000 752,000 752,000 752,000 6,467,908
Ardrossan New Build 73,517,640 10,540,540 2,715 84,060,895
Sub Total 78,808,516 13,695,875 754,715 752,000 752,000 752,000 752,000 752,000 97,019,106
Communities and Housing
CCTV Review 87,500 87,500
Sub Total 87,500 87,500
Corporate Services
ICT Investment Fund 457,100 648,900 432,600 282,600 347,600 425,000 425,000 400,000 3,418,800
LAN/WiFi 1,500,000 1,500,000
Connectivity 150,000 1,150,000 1,300,000
Sub Total 607,100 3,298,900 432,600 282,600 347,600 425,000 425,000 400,000 6,218,800
Health & Social Care Partnership
Care at Home Management System 594,431 34,995 629,426
Improvement grants 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 4,000,000
Sub Total 1,094,431 534,995 500,000 500,000 500,000 500,000 500,000 500,000 4,629,426
Other
Flexibility / Infrastructure Fund 5,160,254 10,961,552 5,000,000 21,121,806
Core Infrastructure, property and Vehicles Renewal Investment 2,000,000 2,000,000
Sub Total 7,160,254 10,961,552 5,000,000 23,121,806
TOTAL EXPENDITURE 142,122,576 73,394,222 40,290,244 27,362,915 10,509,600 10,087,000 10,087,000 10,062,000 323,915,557
#
67

Page 68

#
Appendix 3
Project Description
Revised
2026/2027
Revised
2027/2028
Revised
2028/2029
Revised
2029/2030
Revised
2030/2031
Revised
2031/2032
Revised
2032/2033
Revised
2033/2034 Total
£ £ £ £ £ £ £ £ £
North Ayrshire Council
Revised Capital Programme 2026/2027 - 2033/2034
Revised
2026/2027
Revised
2027/2028
Revised
2028/2029
Revised
2029/2030
Revised
2030/2031
Revised
2031/2032
Revised
2032/2033
Revised
2033/2034 Total
£ £ £ £ £ £ £ £ £
INCOME
Prudential Borrowing 102,173,876 38,601,255 11,681,221 2,075,182 614,600 192,000 192,000 167,000 155,697,134
Specific Grants - AGD 500,000 15,418,547 17,935,390 15,392,733 49,246,670
Specific Grants - Vacant & Derelict Funding 5,106,031 5,106,031
Specific Grants - Place Based Investment Programme 608,628 608,628
Specific Grants - B714 Improvements 7,605,697 8,384,330 778,633 16,768,660
Specific Grants - Local Regeneration Fund Funding 16,363,134 16,363,134
General Capital Grant - Flooding (895,880) (895,880)
General Capital Grant 9,441,000 9,895,000 9,895,000 9,895,000 9,895,000 9,895,000 9,895,000 9,895,000 78,706,000
Recovery & Renewal 355,090 355,090 710,180
Sale of land & buildings 865,000 740,000 1,605,000
TOTAL INCOME 142,122,576 73,394,222 40,290,244 27,362,915 10,509,600 10,087,000 10,087,000 10,062,000 323,915,557
#
68

Page 69

Appendix 4 
Capital Investment Strategy 2026 - 2034  
69

Page 70

Introduction
The Capital Investment Strategy for North Ayrshire Council provides an overview of
how capital expenditure plans, capital financing and treasury management activity
contribute to the infrastructure and provision of services for the benefit of North
Ayrshire communities and citizens. This refreshed strategy takes a long-term view
and covers the period from 2026 - 2034. This is aligned to the Capital Investment
Programme. 
The Capital Investment Strategy is a reporting requirement of the Chartered Institute
of Public Finance and Accountancy (CIPFA) Prudential Code. Local authorities
produce many plans and strategies in the course of their operations. However, it is
recognised that within the context of capital planning, there is a need to produce an
overarching view that addresses the following key considerations:
• Ensuring that capital plans are aligned to the strategic priorities as set out in
the Council Plan.
• Ensuring that capital plans are affordable, prudent and sustainable.
• Demonstrating the linkage to local strategic planning and local asset
management planning.
• Ensuring that financing decisions are taken in accordance with good
professional practice and a full understanding of the risks involved.
• Demonstrating the council has robust governance arrangements to support its
capital planning activities.
70

Page 71

Background
North Ayrshire Council has ambitious plans to deliver significant capital investment
over the planning period across housing, schools, economic development and
infrastructure. Working in partnership with East Ayrshire, South Ayrshire, the UK and
Scottish Government, the Ayrshire Growth deal will see the regeneration of the
region through investment in strategic infrastructure across various sectors, including
life sciences, tourism, manufacturing and aerospace. 
Throughout 2025/26 the wider construction industry has reported significant, ongoing
inflationary pressures linked to a number of factors, including upward pressure on
input costs linked to international externalities such as ongoing global conflicts and
its impact on global supply chains; material and labour shortages; and increased
demand linked to reduced contractor availability. This has resulted in the
identification of increased cost risks in relation to a number of our investment
priorities.
The Capital Investment Strategy takes account of the Council’s strategic priorities
and considers any new investment within the context of outcomes, affordability or
invest to save. Decisions made over the course of the programme for capital and
treasury management will have financial consequences for the Council for many
years in the future. There is also recognition of the need to balance investment
between maintaining current assets and infrastructure against the ambitions for
acquiring new assets.  North Ayrshire Council’s Capital Investment Programme is
shaped and influenced by various associated strategies and plans. 
71

Page 72

The primary purpose of the Capital Investment Strategy is to provide an overarching
view of how various plans and strategies inform capital investment and to
demonstrate that this is both affordable and sustainable. The associated plans and
strategies each focus on specific priority areas and, through appropriate governance
structures, ultimately shape and influence the investment plans delivered through the
Capital Investment Programme. Underpinning the Capital Investment Programme is
the Treasury Management and Investment Strategy and Loans Fund Policy. Both
ultimately consider the delivery of the capital programme within the context of
affordability and risk and apply a measurement of what this means against key
prudential and treasury indicators. The aim being to demonstrate affordability and
sustainability over the long term.  
72

Page 73

Plans and strategies
Council Plan 2023 - 2028
The mission for North Ayrshire Council is “Working together to improve the lives
of our people in North Ayrshire.”  To deliver on this mission four key strategic
priorities, outlined below, have been developed to direct plans now and into the
future. 
Through appropriate governance frameworks all capital investment must
demonstrate that it is aligned to the Council’s strategic themes, with particular focus
and priority given to capital investment opportunities that meet multiple strategic
priorities.
Community Planning Partnerships and Local Outcomes
Improvement Plan
The North Ayrshire Community Planning Partnership is a partnership across a wide
range of organisations. The Local Outcomes Improvement Plan 2022 – 2030
provides a commitment by all partners to North Ayrshire communities and citizens
across three main priority areas:
73

Page 74

The Community Planning Partnership consists of 6 Locality Partnerships across
North Ayrshire. Key to the success of the Local Outcomes Improvement Plan is
working in partnership with a number of agencies to deliver better outcomes for
citizens and communities. The partnership includes Scottish Government, Police
Scotland, NHS Ayrshire and Arran, Skills Development Scotland, KA Leisure,
Scottish Fire and Rescue and Scottish Enterprise. Through the Local Development
Plan, one of the strategic policies is to deliver on local community priorities. Each
Locality Partnership has agreed their own local priorities. The following illustrates the
links between the locality priorities and those in the Local Outcomes Improvement
Plan:
• Wellbeing:
o Improving our mental health and wellbeing
o Improving access to financial services
o Increasing social inclusion
o Addressing social isolation
o Improving community wellbeing
o Improving access to facilities and amenities/regenerating community
facilities
o Affordable Housing
• Work:
o Alleviating poverty and promoting equality of access to opportunities
o Supporting skills and work opportunities
o Promoting the local economy and tourism
o Work and local community
• World:
o Improving our local environment
o Championing green health and the natural environment
o Moving around
o Transport
o Increasing civic pride and community engagement
74

Page 75

This framework of community engagement and structured partnership working is
vital when planning capital investment. More importantly, that local priorities are
considered as part of any strategic planning framework.
Health and Social Care Partnership Strategic Commissioning Plan
2022 - 2030
The North Ayrshire Health and Social Care Strategic Plan 2022 - 2030 was
developed through engagement and collaboration with local people, service users,
members of staff and other key stakeholders. It sets out our long-term ambitions for
improving the health and wellbeing of everyone who lives in North Ayrshire.
The 2022 - 2030 plan continues the existing vision that “all people who live in
North Ayrshire are able to have a safe, healthy and active life” and to achieve
this the HSCP focuses on key priorities: 
Asset Management Plans
Asset Management Plans aim to ensure that the Council holds the right assets and
that they are fit for purpose in terms of condition, suitability and accessibility. The
plans also provide the vehicle for identifying future investment needs across all asset
classes. In line with the Chartered Institute of Public Finance and Accountancy
(CIPFA) “Guide to Asset Management and Capital Planning in Local Authorities”
North Ayrshire has classified its assets into six categories:
• Open Space
• Property
• Fleet, Plant and Equipment
• Roads, Structures and Lighting
• ICT
• Housing
The Council’s assets play a key role in the delivery of a wide range of essential
services to our local communities, contribute to regeneration and help drive
economic growth. The plans set out clear actions and include details of lifecycle
investment costs required to maintain assets and infrastructure to an appropriate
standard that supports service delivery. The plans are updated on an annual basis
and chief officers across all Directorates hold the responsibility for maintaining the
plans and reporting progress to the Council’s Cabinet on a bi-annual basis. 
75

Page 76

A snapshot of the asset portfolio for North Ayrshire Council includes:
• Fleet and Plant: Around 620 vehicles and items of plant.
• Roads: Over 1,000 Kilometres of roads
• Structures: Around 400 bridges and structures
• Council Houses: Around 13,000 council houses
• Education: 65 schools and early years facilities
• Social Care: 21 social care facilities
• Street Lighting: over 23,000 street lighting columns
• Operational Buildings: over 70 offices, libraries and community centres
Both capital and revenue financial resources across the General Fund and Housing
Revenue Account are used to maintain the current asset base. From a capital
perspective, planned investment which has been incorporated in the current Capital
Investment Programme includes:
• Roads, structure and lighting
Planned investment of £79.5 million until 2033/34 including improvements to
the roads and street lighting network, upgrading of the B714, flood prevention
works, bridges infrastructure improvement and Active Travel projects. 
• Fleet, plant and equipment
Procurement and maintenance of all council fleet vehicles and plant ensuring
the fleet of 620 vehicles and heavy plant are maintained and operated in
accordance with the council’s Operator’s licence and Road Transport
legislation. Prioritisation of emissions reductions through decarbonisation of
vehicle fleet. Vehicle and plant capital investment is planned at £21.6 million
until 2033/34. 
• Property:
To ensure council properties meet all legislative requirement and they are
sustainable, energy efficient and maintained to a high standard as well as
ensuring the physical environment is able to support mobile and flexible work
programmes. Investment is planned at £9.1 million until 2033/34. It is also
recognised that through the Estates Strategy further rationalisation and
remodelling will continue to be progressed on a locality by locality basis, with
capital receipts incorporated into the capital programme. 
• Housing:
Underpinned by the Local Housing Strategy, the Strategic Housing Investment
Plan and the 30 Year Housing Revenue Account Business Plan, responsibility
for maintenance of around 13000 council houses, ensuring legislative
compliance and meeting the needs of tenants. In addition, delivery of an
ambitious house building and improvement programme over the period
2026/27 until 2029/30 will see capital investment by the council total £251.4
million. 
76

Page 77

• ICT:
The Technology Strategy sets out how ICT supports service delivery and
transformation. Significant changes to our ICT infrastructure have been
reflected in the ICT Asset Management Plan. To deliver on the six key
principles as outlined in the Technology Strategy £6.2 million investment until
2033/34 is planned. 
• Open Spaces:
The service maintains 2,410 hectares of public open space, a Country Park,
14 local parks, 44 cemeteries and burial grounds, 37 war memorials and
monuments, 275 hectares of woodlands, four allotments, 94 sports facilities
and playing fields, 116 Equipped Play Areas and Multi Use Games Areas
(MUGAs), residential greenspace, 38 water courses and open water features,
five promenades and 16 beaches, three of which are Sites of Special
Scientific Interest. The majority of investment is delivered through the Place
service revenue budget, however specific capital investment of £1.1 million is
planned until 2033/34 for cemetery infrastructure.
Local Housing Strategy 2023 - 2028 and Strategic Housing
Investment Plan 2026 - 2031
The Local Housing Strategy sets out the council’s ambition: ‘We want all our people
to live in the right homes, in great places, with access to any support services
they need’.
The strategy mirrors the format of Scotland’s first 20 year housing strategy, Housing
to 2040 and sets out four overarching outcomes which align to the four key
strategies in Housing to 2040:
Housing to 2040 Strategy Local Housing Strategy Outcome
More homes at the heart of great places Our places support thriving and
inclusive communities
Affordability and choice Our people have affordable homes in
the place they choose to live
Affordable warmth and zero emission
homes
Our homes are energy efficient and
release less emissions
Improving the quality of all homes Our homes are in good condition and
people can access any support services
they need 
77

Page 78

The Strategic Housing Investment Plan is an extension of, and aligns to, the Local
Housing Strategy, supporting the objectives of the Council Plan. 
The Strategic Housing Investment Plan also aligns with the Council’s Community
Wealth Building Strategy and supports the North Ayrshire Local Employability
Partnership Delivery Plan 2022- 2026 and the North Ayrshire Child Poverty Action
Plan 2023 - 2026. The Council’s housebuilding programme will support the Council’s
ambitions to encourage more young people into training and employment. Access to
good quality and affordable housing is a key asset in addressing child poverty, and
poverty overall.
The Strategic Housing Investment Plan will secure investment in a total of 1,038
properties across North Ayrshire and provide sustainable, affordable, accessible
high-quality homes which will contribute to the wider regeneration aims for the area.
The Council projects in the Strategic Housing Investment Plan represent investment
of £168.7 million (including an estimated £82.8 million Scottish Government grant
funding). Developments continue to be progressed across all six localities: Arran,
Garnock Valley, Irvine, Kilwinning, North Coast and Three Towns.
Public sector investment can have a transformational impact for communities, and
the Council explores site and area specific opportunities with partners to secure
maximum regeneration benefits. This supports the ambitions of the Council’s
Regeneration Delivery Plan to drive forward place-based development on strategic
regeneration sites, including town centres. Several Strategic Housing Investment
Plan projects completed to date are within, or near, town centres. The plan supports
major housing led regeneration including the replacement of the 275 homes in the
Fullarton tower blocks in Irvine and the provision of funding to assist the delivery of
Housing’s Estate Based Regeneration Programme. The Strategic Housing
Investment Plan also includes the provision of funding for 249 units to assist the
delivery of Housing’s Estate Based Regeneration Programme where stock is
required to be demolished or reconfigured.
The Strategic Housing Investment Plan prioritises new social housing developments
which include the provision of outdoor green space, and which support the principles
of 20-minute neighbourhoods, where feasible. Developments are also planned
utilising ‘secure by design’ principles.
The Council and its partners recognise that bringing former social housing stock into
ownership can assist with housing management and maintenance issues and
increase housing available through the North Ayrshire Housing Register. All
developing registered social landlord partners buyback programmes have been
prioritised within the Strategic Housing Investment Plan. 
New housing has a key role to play in carbon reduction, climate change mitigation,
and in the alleviation of fuel poverty. The Council and its partners will continue to
consider innovative and sustainable approaches to heat and power, such as low
carbon heat, solar photovoltaic panels and smart technologies.  The Council
recognises that a ‘fabric first’ approach to sustainability can provide benefits to
tenants, in terms of reducing heating costs. This investment aligns to the Council’s
Sustainable North Ayrshire Strategy 2024 - 2027 in supporting affordable warmth to
78

Page 79

households across North Ayrshire. Developments will also be designed to promote
sustainable travel.
All amenity and sheltered housing in North Ayrshire should be built to an ambulant
housing standard as a minimum. To ensure need is met now and in the future, the
new Local Housing Strategy increased the target to ensure at least 10% of all tenure
new build stock is suitable for wheelchair users (increased from 7% in the previous
strategy). 
Officers within the Place Directorate and the Health and Social Care Partnership
developed a new supported accommodation housing model which has been
implemented at sites across North Ayrshire to maximise tenant independence
The Local Housing Strategy recognises that the proportion of older people in North
Ayrshire is higher than that of Scotland as a whole. The Strategic Housing
Investment Plan estimates the delivery of a further 212 amenity homes. Alongside
the new build programme, the Council will continue to deliver its sheltered housing
re-provisioning programme, which includes £40 million investment in the
refurbishment of sheltered housing units out with the Strategic Housing Investment
Plan.
Regeneration Delivery Plan and Local Development Plan
The Regeneration Delivery Plan sets out our priorities for delivering on the
regeneration ambitions of the Council Plan and Community Wealth Building strategy,
working in partnership with communities. The Plan focuses on the delivery of
physical regeneration across North Ayrshire through an ambitious project-based
rolling action programme. The Regeneration Delivery Plan focuses activity around
the four key regeneration themes: 
79

Page 80

The Local Development Plan was adopted in November 2019 and aligns to the
themes set out in the Regeneration Delivery Plan, it brings a targeted local context in
guiding development and investment in North Ayrshire over the next 20 years. The
focus is supporting and growing the business base across key sectors including
manufacturing, engineering, life sciences, tourism and hospitality and regenerating
towns and communities. The overarching aim of the plan is to deliver the Community
Planning Partnership vision of a “Better Life” to the citizens and communities of
North Ayrshire. The plan outlines the land use strategy that supports delivery of the
Local Outcomes Improvement Plan 2022 - 2030 and focuses on four key strategic
policies: 
The Spatial Strategy is an overarching policy for supporting the Local Outcomes
Improvement Plan. This directs development to towns and villages to support
communities, the economy and environment, while recognising the value that the
countryside and coastal areas offer both as natural resources worthy of protection
and as an economic driver. An example of directing investment to towns is evidenced
by the Montgomerie Park development with Council investment in road and service
infrastructure to facilitate large scale housing development and regeneration and
using capital receipts from land sale as a key source of funding.
The Placemaking policy supports the Local Outcomes Improvement Plan by
ensuring that all development contributes to making quality places. This is measured
by six qualities that define a successful place:
80

Page 81

Through the Local Development Plan eight strategic development areas have been
identified: 
Working in partnership with the UK and Scottish Government and East Ayrshire and
South Ayrshire councils, the Ayrshire Growth Deal will regenerate the region through
investment in strategic infrastructure across various sectors, including life sciences,
tourism, manufacturing and aerospace, with total investment of over £251.5 million.
From a North Ayrshire perspective and to support investment into the strategic
development areas, including the Ayrshire Growth Deal and wider economic
regeneration activity, the Capital Investment Programme from 2025/26 to 2033/34
includes planned investment of £65.0 million. 
Finally, our Community Wealth Building Strategy helps to develop resilient, inclusive
local economies, with more local employment and a larger and more diverse
business base, ensuring that wealth is locally owned and benefits local people. All
capital and revenue investment will be considered within the context of the
Community Wealth Building Strategy, with maximising opportunities for local
suppliers through procurement a key priority and pillar of the strategy. 
Technology Strategy
The Technology Strategy was approved by North Ayrshire Council in August 2021
and sets out the vision, principles and key technologies that will support
transformational change across North Ayrshire Council. Solutions will be designed in
partnership to improve processes, service delivery and collaboration and ultimately
improve outcomes. The six key Technology Strategy principles are:
81

Page 82

Principle Detail
Deliberately designed Holistic view of the business and deliver
efficient, effective and agile solutions
People at the Core Solutions built around the needs of the
customers and people
Anytime, anywhere access Access to systems, applications and
information wherever they are
Cloud where appropriate Utilise cloud based technologies where
appropriate
Data driven Utilise data to effectively inform our
decision making
Secure by design Operate securely whilst still taking
advantage of technology innovations
Office 365 has been a transformative technology, enabling agile working and
simplifying collaboration. The ICT Asset Management Plan incorporates the
technology principles and, in terms of investment, a total of £6.2 million is planned
until 2033/34 to deliver technology solutions aligned to this strategy. From a financial
planning perspective, it is also recognised the shift from capital financing to revenue
through software as a service, will lead to a remodelling of the way in which ICT
investment is funded.
Estates Strategy
The key objective of North Ayrshire Council’s Estate Strategy is to achieve
rationalisation and remodelling of the Council’s property portfolio on a locality basis. 
The strategy is currently being reviewed to align with the Council Plan priorities of:
Wellbeing; Climate Change; Communities and Local Democracy; and Sustainable
Council.  
It supports the delivery of Community Wealth Building and Community
Empowerment by maximising the opportunities that property assets can provide to
local businesses and communities. 
82

Page 83

The Estates Strategy plays a key role in maximising capital investment across
multiple strategic priority areas, for example, moving away from the traditional like for
like school replacements to incorporating wider community campus facilities,
including leisure and health and social care facilities. This approach is evidenced
through the proposals for the Ardrossan Campus facility which will deliver primary,
secondary, and early years provision as well as community use sport, theatre and
leisure facilities. 
Also key is the generation of Capital receipts and reduction in running costs through
rationalisation of the Council’s property portfolio. This supports the capital
programme and provides flexibility in the Council’s Revenue account.
General Fund Capital Investment Programme
North Ayrshire Council takes a long-term approach to capital investment, covering a
10 year period. The plan is updated annually and 2026/27 represents year three of
the 10 year plan. A full refresh is undertaken every three years and will next take
place during 2026/27. The current Capital Investment programme is aligned to the
strategic priorities as set out in the Council Plan and is the product of the various
plans and strategies which impact on the assets and infrastructure of North Ayrshire
Council. Through the Community Planning Partnerships and the Local Development
Plan there is also clear linkage to local strategic planning and local asset planning.
Total capital investment of £323.9 million from the Council’s General Fund is planned
over the period from 2026/27 until 2033/34, supporting the four key strategic
priorities from the Council Plan:
• Wellbeing, 
• Communities and Local Democracy, 
• Climate Change and 
• A Sustainable Council. 
This includes planned expenditure of £65.0 million towards the Ayrshire Growth Deal
to 2033/34. It is recognised that the total level of investment across Ayrshire will be in
the region of £251.5 million (including £103.0 million commitments from both the UK
and Scottish Governments).
The capital plan includes £97.0 million planned investment in Education. The major
areas of education investment include:
• £6.0 million to Universal school meals expansion.
Improvements to current kitchen and dining facilities across the school estate
to create capacity for the anticipated uptake. 
• £84.1 million for the Ardrossan Campus.
New build project as part of an exciting wider community facility development. 
• £6.5 million to schools ICT investment.
Investment on ICT equipment within the school estate.
83

Page 84

Investment in education reflects the Council’s desire to ensure children and young
people have access to high quality facilities which support and promote excellent
learning and teaching. Well designed and well-equipped buildings also support the
promotion of positive health and well-being. 
It is also recognised that investment in education contributes to and can be
integrated within wider economic development and regeneration within the localities
and this is reflected in the nature of the planned development for Ardrossan Campus.
84

Page 85

Through stakeholder engagement, effective cross Directorate working within North
Ayrshire Council and collaboration with other agencies including the Scottish
Government, this new development combines education provision with community
facilities, residential, respite and housing provision as part of a wider focus on
economic regeneration.
Investing in core assets and infrastructure is key to ensuring sustainability. A planned
investment of £79.5 million within Roads, Bridges Infrastructure and Lighting
includes £38.9 million road improvements, £4.1 million on flood prevention works
and £26.2 million on the upgrading of the B714 following a successful application to
the UK Governments Levelling Up Fund. Property lifecycle investment of £9.0
million, to support the property asset management plan, will ensure Council
properties continue to be maintained to the appropriate standards in delivering
services to citizens and communities. The plan includes investment in several key
programmes of regeneration within North Ayrshire and, in respect of the Ayrshire
Growth Deal, on a wider pan Ayrshire basis.
The Capital Investment Programme 2026/27 – 2033/34 sets out the ambition of
North Ayrshire Council and supports the key strategic themes of the Council Plan.
Through investment that supports regeneration and delivers first class education and
community facilities, this strategic approach will help grow the population and the
local economy. It is also recognised that key to a sustainable environment is the
requirement to continue to invest in core assets and infrastructure.
Funding the Capital Investment Programme
Funding the Capital Investment Programme requires to be planned in an affordable
and sustainable manner. The funding sources to support delivery of the £323.9
million capital investment programme to 2033/34 include: 
85

Page 86

The major sources of funding include assumptions on the level of general capital
grant from Scottish Government to 2033/34 (£77.8 million), the level of specific
grants from the Scottish and UK Governments (£88.1 million) and the level of
prudential borrowing required (£155.7 million). The cost of borrowing is included
within the Council’s revenue budget process through the Medium-Term Financial
Plan and the impact of borrowing is included as part of the Council’s Treasury
Management and Investment Strategy. 
The Council takes a prudent approach when phasing the capital investment over the
period, with the main objective to ensure general capital grant from Scottish
Government is maximised. 
Other income sources are also explored including external income, grants, partner
contributions and capital receipts. The balance of funding is met from affordable
prudential borrowing with annual loans fund repayments made to reduce the debt.
This approach helps to ensure that investment in assets to deliver on the Council’s
strategic priorities is sustainable in the long term.  
86

Page 87

Treasury Management Strategy and Loans Fund Policy
The Prudential Code for Capital Finance in Local Authorities enables councils to set
their own borrowing limits with a requirement to ensure that investment plans are
affordable, prudent and sustainable. The Council can borrow over a number of years
to supplement its capital income, provided the resultant annual debt repayments can
be accommodated within future years’ revenue budgets. The Council’s annual
Treasury Management and Investment Strategy sets out the prudential indicators
and parameters over the medium to long term, with regular reporting to Council
members through:
• Annual Treasury Management and Investment Strategy
• Mid-year Treasury Update report
• Annual Report following the financial year end describing the activity
compared to the strategy
The key prudential and treasury indicators include:
• Capital expenditure and financing
• The council’s overall borrowing need (the Capital Financing Requirement)
• Limits to borrowing activity through the Operational Boundary and the
Authorised Limit. 
As reflected in the Treasury Management Strategy for 2026/27, the analysis of the
Capital Financing Requirement for North Ayrshire Council indicates that the
borrowing needs to support delivery of the capital programme will increase to
£897.382m by 2033/34. The analysis also indicates that this borrowing need
continues to be within the parameters of both the Operational Boundary (the
expected maximum borrowing position of the Council) and the Authorised Limit (the
limit beyond which external debt is prohibited). 
87

Page 88

Another key affordability indicator is the ratio of financing costs to net revenue
stream. This indicator identifies the trend in the cost of capital (borrowing and other
long-term liabilities, net of investment income) against the net revenue stream of the
Council. The estimates of financing costs include current commitments and those
arising from the capital programme. The Housing Revenue Account costs are
aligned with the 30 year business plan. 
The estimated ratio of debt to net revenue stream across the next three years
averages at 5.3% for General Services and 33.4% for the Housing Revenue
Account. From a General Fund perspective, the Chartered Institute of Public Finance
and Accountancy (CIPFA) Directors of Finance Performance Indicators 2024/2025
show a Scottish Local Authority average of 6.0%, therefore demonstrating a prudent
borrowing policy. For the Housing Revenue Account, the indicative Scottish average
in 2024/25 was 20.1%. The ratio within the Housing Revenue Account is indicative of
the significant capital investment programme as outlined in the Strategic Housing
Investment Plan. The level of loan charges is deemed prudent and affordable within
the framework of the 30 year Housing business plan.
The Liability Benchmark, another treasury prudential indicator, is an important tool
used to identify whether the Council is likely to be a long-term borrower or long-term
investor, allowing it to shape its strategic focus and decision making. The liability
benchmark itself represents an estimate of the cumulative amount of external
borrowing the Council must hold to fund its current capital and revenue plans while
keeping treasury investments at the minimum level required to manage day-to-day
cash flow. 
2025/26 2026/27 2027/28 2028/29
Probable Outturn Estimate Estimate Estimate
% % % %
General Services 3.7% 4.6% 5.4% 5.8%
HRA 26.3% 31.5% 33.8% 34.7%
Proportion of financing costs to net revenue stream
88

Page 89

Loans Fund Policy
In July 2016, the Scottish Government confirmed the new Loans Fund accounting
arrangements under the provisions of the Local Authority (Capital Finance and
Accounting) (Scotland) Regulations 2016. This regulation requires the Council to
outline its policy on the repayment of Loans Fund advances. The Loans Fund
advance is effectively the repayment of the principal linked to the capital expenditure
which is required to be funded from borrowing. The broad aim of prudent repayment
is to ensure that the authority’s unfinanced capital expenditure is financed over the
expected life of the asset and that each year’s repayment amount is reasonably
commensurate with the period and pattern of the benefits. 
From a governance perspective the Loans Fund policy of North Ayrshire Council is
included as part of the Treasury Management and Investment Strategy and
submitted for approval to the North Ayrshire Council committee on an annual basis.  
89

Page 90

Governance
Having robust governance arrangements in place is key to ensuring effective
strategic management of assets, from initial planning through to delivery, utilisation
and disposal. North Ayrshire Council delivers a governance framework through a
number of officer and member represented groups/committees. 
To ensure a consistent approach is adopted when considering any new capital
investment, a business case framework has been developed. The framework
includes key criteria across:
• Aims and strategic objectives
• Scope and benefits
• Options Appraisal
• Risks, Constraints and Dependencies
• Procurement arrangements
• Monitoring of key milestones
• Evaluation criteria and scoring
• Investment costs, funding and impact on revenue
All business cases are considered by the Capital Programme and Assets Group and
the Executive Leadership Team, with a recommendation being made to
Cabinet/Council, for inclusion of new projects into the Capital Investment
Programme. A key focus when assessing potential capital investment is the
alignment to the Council’s strategic priorities, with the aim being to maximise
opportunities where investment meets multiple strategic priorities and where there is
the potential to lever in external funding.
The current governance framework is illustrated below: 
90

Page 91

Service Project Boards are chaired by Executive Directors across each Directorate
area with representation from relevant service managers. Following approval by
North Ayrshire Council committee on the Capital Investment Programme, the Service
Project Board is responsible for ensuring robust project management is in place to
deliver projects on time and within budget.
Programme Boards provide a strategic focus at programme level and are chaired
by the responsible Chief Officer. Each programme can include a number of individual
projects across each Directorate which contribute to specific Council and programme
objectives. To ensure the objectives are met the Chief Officer for the programme is
responsible for strategic oversight including all projects that form part of the overall
programme.
The Capital Programme and Assets Group is chaired by the Head of Service
(Finance) and is responsible for:
• Ensuring a strategic and corporate overview of the Council’s capital
programme is in place.
• Developing and monitoring the Council’s capital investment programme,
tracking slippage on delivery and expenditure against approved budgets.
• Developing clear criteria for investment of Council resources on asset
matters and assessing all investment business cases.
• Developing a prudent capital receipts programme for inclusion in the
Council’s Capital Programme.
The Executive Leadership Team consists of the Chief Executive, Executive
Director Communities & Housing, Executive Director Place, Executive Director
Education, Head of Democratic Services, Head of People and ICT and Head of
Finance and is responsible for advising members on the relative priorities of the
Council’s long term investment needs and plays a key monitoring role in ensuring the
major capital projects deliver the anticipated benefits on time and within budget. The
Executive Leadership Team also considers all business cases for new areas of
capital investment as well as being the escalation point for any key strategic
decisions across the Capital Investment Programme prior to consideration by
Cabinet or Council.
Cabinet is chaired by the Leader of the Council and is the main decision-making
body of the Council. It consists of member portfolio holders from the Administration.
Cabinet receives regular progress reports and approves amendments to the Capital
Investment Programme.
North Ayrshire Council consists of all elected members and is chaired by the
Provost. The Council approves the corporate framework and the medium and longer
term Capital Investment Programme.  
91

Page 92

Knowledge and skills
North Ayrshire Council employs professionally qualified and experienced staff in
senior positions with responsibility for making capital expenditure, borrowing and
investment decisions.
The Head of Finance is a qualified accountant and holds the position of Section 95
officer for the Council. The Council’s Section 95 Officer is responsible for the proper
administration of the Council’s financial affairs and is required:
• to recommend treasury management policies/practices, review these regularly
and monitor compliance
• to submit regular treasury management updates
• to receive and review management information
• to review the performance of the treasury management function
• to ensure the adequacy of treasury management resources and skills and the
effective division of responsibilities within the treasury management function
• to approve the appointment of external service providers
Where the Council does not have the knowledge and skills required, use is made of
external advisers that are specialists in their field. The Council currently employs
Arlingclose Limited as treasury management advisers to ensure that we have access
to specialist knowledge and skills if required. 
Decisions to invest in land and property are overseen in accordance with council
policies and the priorities from our Council Plan, to capitalise on its position, power
and influence to deliver tangible improvements to the lives of people in North
Ayrshire. These decisions are made by suitably qualified personnel including
architects and surveyors.
Risk
There are risks inherent across all capital planning and project delivery activity. Key
planning risks are managed/mitigated through detailed business case development
prior to any capital investment project getting approved. From a project delivery
perspective, risk registers are maintained throughout the duration of the project and
in accordance with standard project management practice. The long-term view to
capital investment and the development of associated strategies also play a key role
in risk management. Examples include:
• Development of a 10 year capital programme, considering funding and
priorities in the long term
• Asset Management Plans and lifecycle maintenance which inform capital
plans in the long term
• Treasury Management and Investment Strategy which considers borrowing
levels in the long term.
• Local Housing Strategy and Strategic Housing Investment Plan takes a
medium and long-term view of housing and regeneration priorities.
92

Page 93

Conclusion
The Capital Investment Strategy for North Ayrshire Council provides an overview of
how capital expenditure plans, capital financing and treasury management activity
contribute to the infrastructure and provision of services for the benefit of North
Ayrshire communities and citizens. It is a reporting requirement of the Chartered
Institute of Public Finance and Accountancy (CIPFA) Prudential Code. 
The Strategy takes account of the Council’s strategic priorities and considers any
new investment within the context of outcomes and affordability. There is also
recognition of the need to balance investment between maintaining current assets
and infrastructure against the ambitions for acquiring new assets.
The current capital programme demonstrates an innovative approach in maximising
investment across multiple strategic priority areas, with developments that
incorporate education provision, community facilities, health and social care services
and housing. This approach, whilst providing key services that deliver positive
outcomes to communities, also contributes to the wider economic regeneration of
North Ayrshire, helping to grow the population and the local economy.
Working in partnership with the UK and Scottish Government and East Ayrshire and
South Ayrshire councils, the Ayrshire Growth Deal will regenerate the region through
investment in strategic infrastructure across various sectors, including life sciences,
tourism, manufacturing and aerospace, with total investment of over £251.5 million.  
93

Page 94

Related documents, strategies and plans
• Council Plan
• Local Development Plan
• Asset Management Plans
• Local Outcomes Improvement Plan
• Local Housing Strategy
• Strategic Housing Investment Plan
• North Ayrshire Local Employability Partnership Delivery Plan
• North Ayrshire Child Poverty Action Plan
• Technology Strategy
• Estates Strategy
• 10 Year Capital Investment Programme
• Regeneration Delivery Plan
• Treasury Management and Investment Strategy
• Loans Fund Policy
• HSCP Strategic Plan
• Sustainable North Ayrshire Strategy
94

Page 95

NORTH AYRSHIRE COUNCIL 
25 February 2026 
North Ayrshire Council 
Title:    Revenue Estimates 2026/27 – Common Good Funds and
Trusts 
Purpose:  To advise Council of the anticipated annual income and
expenditure of the Common Good Funds and Trusts
administered by North Ayrshire Council and seek approval for
the level of funding to be made available for disbursement during
2026/27. 
Recommendation:  That Council: 
(a)  approves the 2026/27 revenue estimates for the Common
Good Funds and registered Charitable Trusts detailed in
Appendix 1;
(b)  approves the amounts available for disbursement noted at
paragraphs 2.10 and 2.11;
(c)  agrees to capital spend from the dormant and low value
Trusts and Common Good Funds, and instructs officers to
seek approval from the Office of the Scottish Charity
Regulator (OSCR) prior to the disbursement of any grant
which would result in the winding up of a Trust
(d)      note that a review of trusts governing documents is
currently underway. 
1. Executive Summary 
1.1  The Council is the custodian of the Common Good Funds for the former burghs of
Ardrossan, Irvine, Largs, Millport, Saltcoats and Stevenston and a number of charitable
Trusts, which are largely composed of bequests made many years ago. 
1.2 This report provides Members with an overview of the financial position of each
Common Good Fund and Charitable Trust and recommends the level of expenditure
which can be disbursed from each for 2026/27. 
Agenda Item 5
95

Page 96

1.3 The Common Good Funds and Trusts make annual disbursements of grants to
groups and individuals. The level of funding available for these grants is normally set
at the net annual income of each Fund or Trust after meeting their expenditure
commitments. For Common Good Funds, where the expenditure commitments
exceed the annual income, the recommended budget for grant disbursement reflects
the level of disbursements in previous years or £5,000, whichever is the greater.
1.4 In order to encourage the utilisation of funds across communities, in particular where
the Trusts have been dormant or have low levels of income, it is recommended that,
with the exception of those Trusts with significant balances, the full balance of the
Trusts are approved as available for disbursement. Any disbursement which utilises
the full capital balance will result in closure and will require the approval of OSCR. 
Approval is currently being sought from OSCR for the winding up of the James Dyer
Simpson Fund, H Watt Trust and JH Watt Trust. During 2025/26 and 2026/27, the
funds within Dalry Trust, Kilwinning Trust, Kilbirnie & Glengarnock Trust, Largs Trust,
Douglas Sellers Trust and Anderson Park Trust will likely be exhausted. Approval will
be sought from OSCR for the disbursement of any remaining capital and winding up
of these Trusts.
1.5 The external investments held by the Charitable Trusts have been assessed against
the Trust Investment Policy 2025/26 and two investments within Margaret Archibald
Bequest were sold as being inconsistent with the policy. Capital was reinvested within
North Ayrshire Council’s Loans Fund during 2025/26. These funds are invested for the
full benefit of the trust. 
2. Background 
2.1 The Council is the custodian of the Common Good Funds for the former burghs of
Ardrossan, Irvine, Largs, Millport, Saltcoats and Stevenston. The purpose of the
Common Good Funds is to benefit the general population within the defined areas of
each of their respective towns. 
2.2 At its meeting on 15 May 2024, Council approved the allocation of £0.452m from
Irvine Common Good Fund to meet the costs of essential works required at Seagate
Castle. £0.156m works have been completed during 2025/26 to date and it is
expected the balance will be required to allow the completion of the works during the
remainder of 2025/26. 
2.3   At its meeting on 26 February 2025, Council approved the allocation of £0.055 from
Ardrossan Common Good to meet the cost of heating and lift repairs.  On 11 February
2026 a further £0.030m was requested at Council and subsequently approved.  It is
expected that these costs will be required to allow the completion of works during the
remainder of 2026/27.
2.4 The Common Good Funds make annual disbursements to groups and individuals
based on approved criteria. Current practice has been for the levels of grant available
for disbursement to be determined after all expenditure commitments and projected
income from assets has been assessed with any remaining surplus made available for
trustees to disburse and ensuring that capital balances are left intact. The
96

Page 97

disbursement of funds from the capital balance would normally require Council
approval. However, this would result in a lower budget for disbursement in all
Common Good Funds, with the exception of Stevenston. It is, therefore,
recommended that the budget for grants in each Common Good Fund is set at the
level of disbursements in previous years or £5,000, whichever is the greater. This will
result in a reduction in capital balances over the year for most Funds.
2.5 In the case of Irvine Common Good Fund, the level of expenditure exceeds the level
of income. In order to maximise the benefits to the community, it is proposed that the
budget for grant disbursement is set at a level which reflects previous years’
disbursements.
Charitable Trusts
2.6 The Council also administers a number of Trusts which are largely composed of
bequests made many years ago. Of these Trusts, there are only two which accrue
significant levels of income; the Spier’s Trust and the Margaret Archibald Trust. The
Spier's Trust was founded in 1936 for the administration of Spier's School, Beith and
for the provision of certain educational grants and bursaries within the local area 
comprising the parishes of Beith, Dalry, Dunlop, Kilbirnie, Lochwinnoch and Neilston.
The purpose of the Margaret Archibald Trust is "to apply the capital and income from
time to time, at the discretion of the Council, for the charitable purpose of persons in
need who have attained sixty-five years of age, living in the Parish of Dalry, Ayrshire".
2.7 The remaining Trusts comprise four town Trusts, covering Dalry, Kilbirnie &
Glengarnock, Kilwinning and Largs, which provide assistance to persons in need
within the defined area of each fund; the North Ayrshire Council Trust, which
incorporates a further seven smaller funds; two minor Trusts and a number of sundry
bequests listed on Appendix 2. 
2.8  Historically a number of Trusts have experienced periods of dormancy where no grant
applications have been received. OSCR is keen that charities fulfil their charitable
purposes and the Council’s external auditors have previously expressed concern
about the continued lack of activity in these Trusts. If no other action is taken, the
annual external audit fee and administrative charges will eventually exhaust these
Trusts. As such, the utilisation of available funds through a particular project which
complies with the Trust’s purposes should be considered. It is, therefore,
recommended that, with the exception of those Trusts with significant balances, the
full balances of the town and minor Trusts are made available for disbursement. It
should be noted that any disbursement which would result in the winding up of a
registered Trust must be approved by OSCR before the relevant Locality Partnership
agrees the grant. For those Trusts with significant balances, it is proposed that the
budgets for grant disbursement are set at a level which reflects previous years’
disbursements.
2.9  It is projected that the funds within Dalry Trust, Kilwinning Trust, Kilbirnie &
Glengarnock Trust, Largs Trust, Douglas Sellers Trust and Anderson Park Trust may
be exhausted during 2025/26 or 2026/27. Approval will be sought from OSCR for the
disbursement of any remaining capital and winding up of these Trusts as appropriate.
97

Page 98

2.10 The following table summarises the anticipated income and expenditure for each
Common Good Fund and Trusts and the proposed budget for grant disbursement for
each: 
2.11 The remaining smaller trusts administered by the Council are listed in Appendix 2.
Projected income for 2026/27 is £640 and during 2025/26, thus far, there have been
no disbursements. Therefore, the full balance of £15,697 is available for disbursement
during 2026/27.
2.12 OSCR have advised that a review of our governing documents for trusts should be
completed every three years.  All charity trustees should have a copy of the governing
documents and understand the rules contained within.  A review lead by Legal
Services is currently underway.
2.13 The external investments held by the Charitable Trusts have been assessed against
the Trust Investment Policy 2025/26, and two investments within Margaret Archibald
Bequest were sold as being inconsistent with the policy. Capital was reinvested within
North Ayrshire Council’s Loans Fund during 2025/26. These funds are invested for the
full benefit of the trust. Details of the external investment market valuations at 31
December 2025 are provided in appendix 3 for information.
3. Proposals 
3.1 That Council: 
(a) approves the 2026/27 revenue estimates for the Common Good Funds and
registered Charitable Trusts detailed in Appendix 1;
Estimated
Balance at 1
April 2026
Estimated
Income
2026/27
Estimated
Expenditure
2026/27
Available for
Disbursement
Estimated
Balance at 31
March 2027
£ £ £ £ £
Common Good Fund
Ardrossan 443,226 62,586 (87,930) (30,347) 387,535
Irvine 704,188 86,703 (208,218) (41,041) 541,632
Largs 452,966 33,696 (28,470) (10,000) 448,192
Millport 70,827 2,798 (585) (5,000) 68,040
Saltcoats 9,383 186 (78) (5,000) 4,491
Stevenston 229,733 25,946 (1,898) (24,048) 229,733
TOTAL 1,910,322 211,915 (327,179) (115,436) 1,679,622
Registered Charitable Trusts
Dalry 1,603 12 (289) (1,326) 0
Kilbirnie & Glengarnock 2,852 1 (24) (2,829) 0
Kilwinning 0 0 0 0 0
Largs 2,152 12 (294) (1,870) 0
Speir's Trust 73,217 6,887 (1,572) (5,315) 73,217
Margaret Archibald Trust 274,031 17,461 (2,649) (14,812) 274,031
Douglas Sellers Trust 175 0 0 (175) 0
Anderson Park Trust 24 0 0 (24) 0
NAC Charitable Trust 39,146 3,868 (435) (3,433) 39,146
TOTAL 393,200 28,241 (5,263) (29,784) 386,394
98

Page 99

(b) approves the amounts available for disbursement noted at paragraphs 2.10
and 2.11;
(c) agrees to capital spend from the dormant and low value Trusts and Common
Good Funds, and instructs officers to seek approval from the Office of the
Scottish Charity Regulator (OSCR) prior to the disbursement of any grant which
would result in the winding up of a Trust
(d)  note that a review of trusts governing documents is due within 2026.  
99

Page 100

4. Implications/Socio-economic Duty 
Financial 
4.1 Approval of the budgets will allow each Locality Partnership to disburse individual
grants up to the approved levels. 
All income and expenditure which relates to Common Good properties must be
charged to the relevant Common Good Fund. 
Human Resources 
4.2 None 
Legal 
4.3 All expenditure from Trusts and Common Good Funds must be for the purposes of the
Trust or meet the Common Good criteria of benefitting the inhabitants of the Common
Good area. Under the Trusts and Succession (Scotland) Act 2024, Trustees have a
duty to review all investment decisions to ensure that due regard has been given to
the suitability of the investment taking account of proper advice. 
Equality/Socio-economic 
4.4 The disbursement of grants to individuals and groups is in support of the general
purpose of the prevention or relief of poverty by reason of age, ill-health, disability,
financial hardship or other disadvantage. 
Climate Change and Carbon 
4.5 Any recommendations for the disposal of investments held on behalf of the Trusts are
consistent with the Council’s values and will exclude investment in counterparties which
have significant involvement in activities which contribute to carbon intensive industries. 
Key Priorities 
4.6 This report directly supports the Council Plan 2023 to 2028 by providing support for
communities through the disbursement of grants to groups and individuals. 
Community Wealth Building 
4.7 None 
Islands Communities Impact Assessment (ICIA) 
4.8 None 
100

Page 101

United Nations Rights of the Child (UNCRC) 
4.9 None 
Consumer Duty 
4.10 None 
5. Consultation 
5.1 Legal Services have been consulted on the recommendations and procedures for
winding up the Trusts. 
Mark Boyd
Head of Finance (Corporate Services) 
For further information please contact Natalie Graham, Team Manager Corporate
(Financial Management), on 01294 324533. 
Background Papers
North Ayrshire Council Trust Funds - Investment Strategy 2024/25 – Council 18 December
2024
North Ayrshire Council Charitable Trusts: Unaudited Trustees’ Annual Report 2024/25 –
Council, 25 June 2025 
101

Page 102

Index of Common Good and Trust Funds 
Page
Appendix 1 
Common Good Funds 
Ardrossan            1
Irvine             2
Largs             3
Millport            4
Saltcoats            4
Stevenston            5 
Trusts 
North Ayrshire Council (Dalry) Charitable Trust       6
North Ayrshire Council (Kilbirnie & Glengarnock) Charitable Trust    6
North Ayrshire Council (Kilwinning) Charitable Trust      7
North Ayrshire Council (Largs) Charitable Trust       7
Margaret Archibald Trust          8
Douglas Sellers Trust          8
Anderson Park Trust          9
North Ayrshire Council Charitable Trust        9
Speir’s Trust           10 
Appendix 2 
Sundry Bequests          11 
Appendix 3 
External Investments         12 
102

Page 103

Appendix 1
Page | 1 
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION 
Budget
2025/26 
Projected
Outturn
2025/26 
Proposed
Budget
2026/27
£ £ £
356,170     411,046     Projected Common Good Balance Brought Forward at 1 April 443,226    
INCOME
46,000       46,668       Rental - Ardrossan Civic Centre 46,668      
19,230       18,163       Loans Fund Interest (on cash balances) 15,918      
65,230       64,831       TOTAL INCOME FOR THE YEAR 62,586      
EXPENDITURE
Property Costs
55,000       0 External Property Repairs - Ardrossan Civic Centre 85,000      
Others
1,858        2,304        Administration - Charge from Finance 2,930       
56,858       2,304        SUB TOTAL OF EXPENDITURE 87,930      
8,372 62,527 SURPLUS/(DEFICIT) FOR THE YEAR BEFORE GRANTS (25,344)
30,347       30,347       Available for Disbursement as Grants 30,347      
(21,975) 32,180 FINAL SURPLUS/(DEFICIT) FOR THE YEAR INCLUDING GRANTS (55,691)
334,195     443,226     COMMON GOOD BALANCE CARRIED FORWARD AT 31 MARCH 387,535    
COMMON GOOD FUND - ARDROSSAN
103

Page 104

Page | 2 
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION 
* For the upkeep of ground at the Moor, Low Green, Recreational Parks, Galt Avenue, Old Parish Church,
Redburn Community Centre, Berry Drive 
104

Page 105

Page | 3 
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION 
* For the upkeep of ground at Douglas Park. 
105

Page 106

Page | 4 
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION   
106

Page 107

Page | 5 
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION 
107

Page 108

Page | 6 
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION 
108

Page 109

Page | 7 
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION 
109

Page 110

Page | 8 
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION 
110

Page 111

Page | 9 
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION 
111

Page 112

Page | 10 
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION 
112

Page 113

Page | 11 
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION
Appendix 2 - Sundry Bequests 
Name of Funds Investment
Projected
Income
2026/27
Available for
Disbursement 
2026/27
Purpose of Bequest  
£ £ £  
Isabella McPhee Memorial
Fund                   3,244  138  3,382 
Largs - Annual Putting
Competition (Mackerston)
N Stewart                   1,842  78  1,920 
Provision of Liberty at
Rothesay and Arran
Sturrock                   3,332  142  3,473 
Upkeep of Springside
Community Centre
Clark Trophy                      621  26  648  Road Safety Competition
Ayrshire Accident Relief                   4,391  187  4,578  Accident Relief
Cast/Florist/N Child                      318  14  331  No information available
Miss Hanslip Bequest                   1,308  56  1,364  No information available
Total 15,057 640 15,697                 
113

Page 114

Page | 12 
OFFICIAL-PROTECT INFORMATION
OFFICIAL-PROTECT INFORMATION
Appendix 3 - External Investments 
Margaret Archibald Bequest Sector Nominal
Value
(£)
Market Value
at 31/12/25 
(£)
GlaxoSmithKline plc Healthcare 1,183.00 86,335
Marks & Spencer plc Consumer Staples 400.00 4,868 
Diageo plc Beverages 400.40 22,937
Barclays plc Financials 336.00 6,397
Unilever plc Consumer Staples 37.00 58,563
Total  N/A 179,100 
North Ayrshire Council
Charitable Trust
Sector Nominal
Value
(£)
Market Value
at 31/3/25
(£)
JPM UK Higher Income Fund Financials 1,789.50 9,177
Merchants Trust Financials 406.25 9,685
Alliance Trust Financials 72.50 37,075
Zeneca Group plc Healthcare 67.50 37,233
Diageo Consumer Staples 217.00 12,431
Total  N/A 105,602 
114

Page 115

NORTH AYRSHIRE COUNCIL 
25 February 2026 
North Ayrshire Council 
Title:    Treasury Management and Investment Strategy 2026/27 
Purpose:  To seek approval for the proposed Strategy for Treasury
Management and Investment activities within the Council for
the financial year 2026/27. 
Recommendation:  That Council approves the Treasury Management and
Investment Strategy for 2026/27 as attached at Appendix 1 
1. Executive Summary 
1.1 The Council is required by regulations issued under the Local Government in Scotland
Act 2003 and the Chartered Institute of Public Finance and Accountancy’s Treasury
Management in the Public Services: Code of Practice 2021 Edition (the CIPFA Code)
to approve a Treasury Management Strategy before the start of each financial year.
The Council is also required by regulation to have regard to CIPFA’s Prudential Code
for Capital Finance in Local Authorities (2021) under Part 7 of the Local Government
in Scotland Act 2003. In addition, the Consent by Scottish Ministers for the Investment
of Money by Scottish Local Authorities, which came into force in April 2010, requires
the Authority to approve an Investment Strategy before the start of each financial
year.
1.2 The Treasury Management and Investment Strategy attached to this report complies
fully with these requirements and provides:
• a summary of the Council’s capital plans;
• an outline of the treasury management strategy in relation to borrowing and the
impact of capital plans on this borrowing; and
• an outline of the investment strategy including the type of instruments available for
investment and our permitted counterparties.
1.3 The strategy provides key prudential and treasury indicators to 2033/34 which
articulate the operational parameters associated with Treasury Management and
Investment as well as offering assurance in relation to the affordability and
sustainability of capital investment plans. 
Agenda Item 6
115

Page 116

1.4 The key points highlighted in this report are;
• the continuation of an “under borrowed” position; and
• interest rate forecasts predict that the UK Bank Rate will decline mid-2026 to
3.25% and will remain steady until at least 2028. 
1.5 As recommended under the CIPFA Prudential and Treasury Management Codes,
updated performance information in relation to the treasury management and
prudential indicators are reported to Cabinet on a quarterly basis as part of the regular
Revenue and Capital Monitoring arrangements. 
2. Background 
2.1 CIPFA defines treasury management as: 
‘The management of the local authority’s investments and cash flows, its banking,
money market and capital market transactions; the effective control of the risks
associated with those activities; and the pursuit of optimum performance consistent
with those risks.’
2.2 The Local Government Scotland Act 2003 and the Prudential Code requires the
Council to approve an annual Treasury Management and Investment Strategy which
outlines the Council's strategy in relation to borrowing and the Council's strategy for
managing investments giving priority to the security and liquidity of those investments.
2.3 The Treasury Management and Investment Strategy 2026/27 is attached at Appendix
1. The overall objectives of the strategy are as follows:
Borrowing 
• to minimise the revenue cost of borrowings;
• to manage the Council’s cash flow;
• to manage the borrowing repayment profile;
• to assess interest rates’ movements and borrow/invest accordingly;
• to monitor and review the level of variable rate loans held in order to take
advantage of interest rate movements; and
• to identify and evaluate opportunities for debt rescheduling.
Investments
• to protect capital security of the invested funds;
• to obtain the best market return whilst recognising that security and liquidity are
key priorities;
• to specify criteria for identifying creditworthy counterparties; and
• to specify the types of investments permitted and appropriate limits for each. 
116

Page 117

2.4 The strategy provides detailed key prudential and treasury indicators to 2033/34,
aligned to the Council’s capital investment programme, which articulate the
operational parameters associated with Treasury Management and Investment as
well as offering assurances in relation to the affordability and sustainability of the
capital investment strategy, including; 
• the General Services Capital Programme to 2033/34; and
• the Housing Revenue Account Business Plan to 2054/55
2.5 The strategy also links with the key objectives of the Prudential Code that capital
investment programmes:
• should be set at a level that delivers the Council’s strategic priorities; and 
• are affordable in terms of the impact of the resultant debt repayments on
revenue budgets. 
2.6 The Treasury Management and Investment Strategy includes prudential indicators
which are critical in assessing the affordability of capital investment plans and their
impact on the Council's overall finances. The indicator used to demonstrate
affordability is the proportion of financing costs to the net revenue stream (for both
General Fund and Housing Revenue Account).
2.7 There are a number of other key indicators designed to ensure that the Council
operates within well-defined limits. The strategy, therefore, specifies:
• limits we do not expect external debt to exceed; 
• appropriate levels of fixed rate borrowing versus variable rate borrowing;
• upper and lower limits on the maturity of the debt portfolio, which reduces the
Council's exposure to large sums falling due for refinancing at any one time; and
• limits on investments placed for more than 365 days.
2.8 The Council expects to hold an 'under-borrowed' position at 31 March 2026. This
means that the capital borrowing need (the Capital Financing Requirement) has not
been fully funded by debt, due to the level of the Council's internal funds. The use of
internal funds instead of borrowing will continue in order to minimise borrowing costs.
This under-borrowed position will decline through time as internal funds reduce and
borrowing is required to be undertaken to replace internal funding.  
117

Page 118

2.9 The Treasury Management and Investment Strategy includes details of the Council’s
policy on repayment of loans fund advances. The Council’s policy complies with the
options currently available under the Local Authority (Capital Financing and
Accounting) (Scotland) Regulations 2016 and the asset lives and methodologies used
have been reviewed to provide for the prudent repayment of advances 
3. Proposals 
3.1 That Council approves the Treasury Management and Investment Strategy for
2026/27 as attached at Appendix 1. 
4. Implications/Socio-economic Duty 
Financial 
4.1 Financial implications are detailed in the report attached at Appendix 1. 
Human Resources 
4.2 None 
Legal 
4.3 The Local Government in Scotland Act 2003 and supporting regulations require the
Council to set out its Treasury Strategy for borrowing and to prepare an Annual
Investment Strategy. The Local Authority (Capital Financing and Accounting)
(Scotland) Regulations 2016 require the Council to set a policy for the repayment of
loans fund advances. 
Equality/Socio-economic 
4.4 None 
Climate Change and Carbon 
4.5 None 
Key Priorities 
4.6 The Treasury Management Strategy aligns with the Council Plan 2023-28 by ensuring
robust governance arrangements are in place to fulfil the Council’s statutory duties,
manage risk and support delivery of key priorities. 
118

Page 119

Community Wealth Building 
4.7 None 
Islands Communities Impact Assessment (ICIA) 
4.8 None 
United Nations Rights of the Child (UNCRC) 
4.9 None 
Consumer Duty 
4.10 None 
5. Consultation 
5.1 The Council's treasury advisors, Arlingclose Ltd, were consulted in the preparation of
the Strategy. 
Mark Boyd
Head of Service (Finance) 
For further information please contact Natalie Graham, Team Manager Corporate
(Financial Management), on 01294 324533. 
Background Papers
Treasury Management and Investment Strategy 2025-26 – North Ayrshire Council 26
February 2025 
119

Page 120

Treasury Management  and
Investment Strategy 2026/27 
120

Page 121

2 | P a g e
Table of Contents 
1 Purpose 3   
2 Executive Summary 5   
3 Capital and Prudential Indicators 2026/27 – 2028/29 7 
Capital Expenditure and Financing 7 
The Council's Overall Borrowing Need (the Capital Financing Requirement) 8 
The Liability Benchmark 9 
Limits to Borrowing Activity 10 
Affordability Prudential Indicators 11   
4 Treasury Management Strategy 12 
Interest Rate Forecast 12 
Current Portfolio Position 13 
Controls on Borrowing Activity 14 
LOBOs 15 
Policy on Borrowing in Advance of Need 15 
Debt Rescheduling 15 
Borrowing Sources 15 
Policy on Use of Financial Derivative 16 
Policy on Repayment of Loans Fund Advances 16   
5 Investment Strategy 17 
Current Portfolio Position 18 
Environmental, Social and Governance (ESG) Policy 18 
Creditworthiness Policy 18 
Bail-in Risk 19 
Investment Strategy and Permitted Investments 20 
Summary of Material Investments, Guarantees and Liabilities 21 
Monitoring of Investment Strategy 21   
Appendices 
Appendix 1: Prudential Indicators 2030 - 2034 22 
Appendix 2: Treasury Risk Register 25 
Appendix 3: Permitted Investments, Risks and Mitigating Controls 27 
Appendix 4: Policy on Repayment of Loans Fund Advances 32 
Appendix 5: Economic Background 34  
121

Page 122

3 | P a g e
1 Purpose 
The Council is required by regulations issued under the Local Government in Scotland Act
2003 and the Chartered Institute of Public Finance and Accountancy’s Treasury Management
in the Public Services: Code of Practice 2021 Edition (the CIPFA Code) to approve a
Treasury Management Strategy before the start of each financial year. The Council is also
required by regulation to have regard to CIPFA’s Prudential Code for Capital Finance in Local
Authorities (2021) under Part 7 of the Local Government in Scotland Act 2003. 
In addition, the Consent by Scottish Ministers for the Investment of Money by Scottish Local
Authorities, which came into force in April 2010, requires the Authority to approve an
Investment Strategy before the start of each financial year.  
This strategy meets these requirements fully. 
Three main reports on Treasury Management activity are presented to Members each
year, incorporating a variety of policies, estimates and actuals. These are: 
• Annual Treasury Management and Investment Strategy (this report), which is
submitted to full Council before the start of each financial year.   
• Mid-Year Treasury Management and Investment Report, submitted to Cabinet
as soon as possible following 30 September each year.   
• Annual Treasury Management and Investment Report, submitted to full Council
annually by the 30 June following the end of each financial year. 
Responsibilities 
Regulations place responsibility on Members for the review and scrutiny of treasury
management policy and activities. The following Scheme of Delegation has been adopted by
the Council:  
Full Council 
• to receive and review reports on treasury management policies, practices and activities;
• to approve the annual Treasury Management and Investment Strategy. 
122

Page 123

4 | P a g e
Cabinet 
• to approve amendments to the treasury management policy statement and treasury
management practices;
• to approve the division of responsibilities;
• to receive and review regular monitoring reports and act on recommendations. 
Section 95 Officer 
The Council’s Section 95 Officer is responsible for the proper administration of the Council’s
financial affairs and is required: 
• to recommend treasury management policies / practices, review these regularly and
monitor compliance;
• to submit regular treasury management updates;
• to receive and review management information;
• to review the performance of the treasury management function;
• to ensure the adequacy of treasury management resources and skills and the effective
division of responsibilities within the treasury management function; and
• to approve the appointment of external service providers. 
External Treasury Advisers 
The Council recognises that there is value in employing external providers of treasury
management services, in order to access specialist skills and resources. 
However, it recognises that the responsibility for treasury management decisions remains
with the Council at all times and officers will ensure that undue reliance is not placed upon
external advice. 
The Council’s current external treasury management advisors are Arlingclose Limited.  The
contract started on 5 April 2021 and is due to expire on 4 April 2026. A current tender exercise
is underway and will be awarded to the successful bidder from 5 April 2026. The Council will
ensure that the terms of their appointment and the methods by which their value is assessed
are properly agreed, documented and subject to regular review. 
123

Page 124

5 | P a g e
2 Executive Summary 
The treasury management function ensures that the Council’s funds are managed in
accordance with the relevant professional codes, so that sufficient cash is available to meet
service activity. This involves both the organisation of the cashflow and, where capital plans
require, the organisation of approporiate borrowing facilities.   
CIPFA defines treasury management as: 
“The management of the organisation’s borrowing, investments and cashflows, including its
banking, money market and capital market transactions; the effective control of the risks
associated with those activities; and the pursuit of optimum performance consistent with those
risks.” 
This document outlines the Council’s Annual Treasury Management Strategy and Annual
Investment Strategy providing: 
• a summary of the Council’s capital plans;
• an outline of the treasury management strategy in relation to borrowing and the
impact of capital plans on this borrowing; and
• an outline of the investment strategy including the type of instruments available for
investment and our permitted counterparties. 
Key prudential and treasury indicators are provided throughout this strategy which
clearly articulate the operational parameters in relation to Treasury Management and
Investment, as well as providing assurances in relation to the affordability and
sustainability of capital investment plans. Table 1 contains the key prudential and
treasury indicators within the report.   
Table 1 
2025/26 2026/27 2027/28 2028/29
Prudential and Treasury
Indicators Probable Outturn Estimate Estimate Estimate
£m £m £m £m
Capital Expenditure:
General Services                              88.766                  142.123                    73.394                    40.290
HRA                              44.558                    70.103                    84.367                    62.879
Total                            133.324                  212.226                  157.761                  103.169
Loans Capital Financing
Requirement (CFR):
General Services                            370.740                  470.500                  505.862                  513.984
HRA                            214.956                  256.479                  309.575                  343.422
Total                            585.696                  726.979                  815.437                  857.406
Gross Borrowing                            530.392                  683.675                  772.133                  814.102
Operational Boundary for
Borrowing                            608.036                  740.741                  829.870                  868.463
Authorised Limit for Borrowing                            668.840                  814.815                  912.857                  955.309
Total Operational Boundary
(Including PPP/NPD)                            686.626                  814.458                  897.893                  931.010
Total Authorised Limit (Including
PPP/NPD)                            747.430                  888.532                  980.880               1,017.856
Liability Benchmark                            485.610                  641.737                  744.564                  786.881
Investments                              30.000                    30.000                    30.000                    30.000
124

Page 125

6 | P a g e
A summary of this is provided as follows, with more detailed information provided in the
body of the report. 
Capital Expenditure for the General Fund (GF) reflects the capital investment programme
for 2026/27 to 2033/34 and Housing Revenue Account (HRA) reflects the capital investment
programme for 2026/27 and the capital investment plans included in the latest business plan.
To ensure the financial consequences of the new programme are fully transparent, all
relevant indicators have been projected to 2033/34 and these can be found in Appendix 1. 
The Capital Financing Requirement (CFR) is the underlying borrowing requirements of
the Council.   
Gross Borrowing reflects the actual borrowing which has been undertaken. This is projected
to be lower than the CFR as the Council continues with its strategy to use internal funds. 
The Operational Boundary is the maximum borrowing and other long-term liabilities to
fund previous years’ and the current year capital programme, building in flexibility for the
timing of the different funding streams and principal repayments. The operational
boundary includes any other long-term liabilities (e.g. PPP/NPD schemes, finance
leases) however no borrowing is actually required against these schemes as a borrowing
facility is included in the contract. 
The Authorised Limits is set at 10% above the Operational Boundary to give some
flexibility around raising funds for future year capital investment. 
The Liability Benchmark is an estimate of the cumulative amount of external borrowing
the Council must hold to fund its current capital and revenue plans while keeping treasury
investments at the minimum level required to manage day-to-day cash flow. 
Affordability of borrowing is measured by the percentage of financial costs relative to
the net revenue stream of the GF and HRA. 
Full details of these can be found on page 11. 
The average investment rate estimated for 2026/27 is 3.25% and is reflective of the
Council’s appetite for risk, the short term nature of investments and the permitted
instruments and counterparties selected.   
Other prudential and treasury indicators and supporting information can be found in the
main body of this report. 
Client Status 
The second Market in Financial Instruments Directive (MiFID II), introduced in January 2018,
classifies Local Authorities as “retail clients” unless they choose to opt-up to “professional
client” status. This has the advantages of lower fees and access to a greater range of
products and investment firms. The Council continues to opt-up to professional client status. 
In order to meet the professional client criteria, the Council must hold a £10m investment
125

Page 126

7 | P a g e
portfolio at all times and have at least one officer with the necessary level of experience and
knowledge to understand the risks involved in the management of the investments.       
3 Capital and Prudential Indicators 2026/27 – 2028/29 
In exercising its power to borrow, the Local Authority (Capital Finance and Accounting)
(Scotland) Regulations 2016 require the Authority to have regard to the Chartered
Institute of Public Finance and Accountancy’s Prudential Code for Capital Finance in
Local Authorities (the Prudential Code). The Prudential Code is a framework to ensure
Councils demonstrate effective control over levels of, and decisions relating to, capital
investment activity, including borrowing. The Treasury indicators are used to ensure that
risk is managed and controlled effectively. Together the Prudential and Treasury
Indicators consider the affordability and impact of capital expenditure decisions and set
out the Council’s overall capital framework. 
Capital Expenditure and Financing 
This prudential indicator is a summary of the Council’s capital expenditure plans, both
those agreed previously and those forming part of the 2026/27 budget setting.   
The 2026/27 budget proposes an updated Capital Investment Programme for General
Services to 2033/34 and updated investment plans for the HRA for 2026/27 and the
capital investment plans included in the latest business plan. All projects within the
Capital Programme are linked to the Council’s key strategic priorities. These are also
covered in the Capital Investment Strategy, produced in line with the requirements of the
Prudential Code. To ensure that the financial consequences of the new programme are
fully transparent, all relevant indicators have been projected to 2033/34 and these can be
found in Appendix 1. Table 2 shows the capital expenditure plans and how they are being
financed by capital or revenue resources over the next three years. The borrowing figure
in Table 2 is the difference between the estimates for total capital expenditure and the
other funding sources. 
Table 2  
2025/26 2026/27 2027/28 2028/29
Probable Outturn Estimate Estimate Estimate
£m £m £m £m
General Services Capital
expenditure                              88.766                  142.123                    73.394                    40.290
Funded by:
Borrowing                              56.990                  102.174                    38.601                    11.681
Receipts / Grants                              31.589                    39.949                    34.793                    28.609
Funded from Revenue                                0.187                           -                              -                              -   
Funded from Reserves                                     -                              -                              -                              -   
Total                              88.766                  142.123                    73.394                    40.290
HRA Capital expenditure                              44.558                    70.103                    84.367                    62.879
Funded by:
Borrowing                              24.571                    48.869                    59.218                    40.474
Receipts / Grants                              10.196                    12.872                    15.888                    16.087
Funded from Revenue                                8.349                      5.580                      5.284                      5.447
Funded from Reserves                                1.442                      2.782                      3.977                      0.871
Total                              44.558                    70.103                    84.367                    62.879
Estimates of Capital
Expenditure and Income
126

Page 127

8 | P a g e
The Council’s Overall Borrowing Need (the Capital Financing Requirement) 
This indicator outlines the Council’s Capital Financing Requirement (CFR). The CFR is
simply the total historic outstanding capital expenditure which has not been paid from
either a capital or a revenue resource and, therefore, needs to be funded from borrowing.
It is essentially a measure of the Council’s underlying borrowing need. 
Part of the Council’s treasury activity is to meet the funding requirements for this
borrowing need. The treasury management section organises the Council’s cash position
to ensure that sufficient cash is available to meet the capital plans and cash flow
requirements. This may be sourced through borrowing from external bodies (such as the
Government, through the Public Works Loan Board [PWLB], or the money markets), or
utilising temporary cash resources within the Council. 
The Council’s underlying borrowing need (CFR) is not allowed to rise indefinitely. The
Council is required to make an annual revenue charge, called the Loans Fund Principal
Repayment. This is effectively a repayment of the borrowing need and it is charged to
revenue over the life of the asset. This charge reduces the CFR each year. This differs
from the treasury management arrangements, which ensure that cash is available to
meet the payment of capital commitments on an ongoing basis. External debt can also
be borrowed or repaid at any time, but this does not change the CFR. 
The total CFR can also be reduced by: 
• the application of additional capital financing resources (such as unapplied capital
receipts); or 
• increasing the annual revenue charge. 
The Council’s CFR is shown below and is a key prudential indicator. The opening
balances include the PPP/NPD schemes on the balance sheet, which increase the
Council’s borrowing need. This is shown to give a complete picture of the Council’s debt.
However, no borrowing is actually required against these schemes as a borrowing facility
is included in the contract and, as such, this is subtracted from the total CFR to identify
the Loans CFR. The Loans CFR is forecast to rise over the next few years as capital
expenditure financed by borrowing increases. 
Table 3 
2025/26 2026/27 2027/28 2028/29
Probable Outturn Estimate Estimate Estimate
£m £m £m £m
General Services                 449.330                  544.217                  573.885                  576.531
HRA                 214.956                  256.479                  309.575                  343.422
Sub-total                 664.286                  800.696                  883.460                  919.953
Less PPP/NPD long-term liability                  (78.590)                  (73.717)                  (68.023)                  (62.547)
Loans Capital Financing Requirement (CFR)                 585.696                  726.979                  815.437                  857.406
Movement in CFR
General Services                   99.760                    35.362                      8.122
HRA                   41.523                    53.096                    33.847
Annual Change                 141.283                    88.458                    41.969
Capital Financing Requirement (CFR)
127

Page 128

9 | P a g e
Liability Benchmark 
The liability benchmark, which is now a treasury prudential indicator, is an important tool to
help establish whether the Council is likely to be a long-term borrower or long-term investor in
the future, and so shape its strategic focus and decision making. The liability benchmark itself
represents an estimate of the cumulative amount of external borrowing the Council must hold
to fund its current capital and revenue plans while keeping treasury investments at the
minimum level required to manage day-to-day cash flow.  
Table 4 
Following on from the medium-term forecasts in the table above, the long-term liability
benchmark assumes capital expenditure funded by borrowing will be in line with the 10
year capital plan and 30 year HRA business plan respectively, loans fund advances on
new capital expenditure based on asset life and income, expenditure and reserves all
increasing by inflation of 2.5% a year with any specific adjustments made for planned use
of reserves. This is shown in the chart below together with the maturity profile of the
Council’s existing borrowing: 
2024/25 2025/26 2026/27 2027/28 2028/29
Actual
£m
Estimate
£m
Forecast
£m
Forecast
£m
Forecast
£m
Loans CFR 513.672 585.696 726.979 815.437 857.406
Less Balance sheet resources (157.921) (110.086) (95.242) (80.873) (80.525)
Net loans requirement 355.751 475.610 631.737 734.564 776.881
Liquidity allowance 10.000 10.000 10.000 10.000 10.000
Liability Benchmark 365.751 485.610 641.737 744.564 786.881
Liability Benchmark
128

Page 129

10 | P a g e
The Liability benchmark graph above is used to inform the Council’s borrowing strategy.  The
shaded grey area shows the Councils current debt and the gap between this and the Liability
benchmark line is how much more borrowing the Council likely needs to undertake to support
its current capital plans once taking into account its balance sheet resources.  The above
graph indicates that long term borrowing for the period of up to 25 years would be most
appropriate to meet the Councils borrowing needs and mitigate against interest rate risk. 
Limits to borrowing activity 
The Operational Boundary 
The operational boundary is the expected maximum borrowing position of the Council
during the year, taking account of the timing of various funding streams and the recharge
of principal repayments from the revenue account. Periods where the actual position
varies from the boundary are acceptable, subject to the authorised limit not being
breached. 
The Authorised Limit 
The authorised limit represents a limit beyond which external debt is prohibited. This limit
is set by Council and can only be revised by Council approval. It reflects the level of
external borrowing which, while not desirable, could be afforded in the short term, but is
not sustainable in the longer. The current limit is set at 10% above the Operational
Boundary. 
The following graph shows the projected levels of the Operational Boundary and
Authorised Limit for Borrowing, compared with the Council’s CFR and gross debt
position. CIPFA’s Prudential Code for Capital Finance in Local Authorities recommends
that the Council’s total debt should not exceed the highest forecast CFR over the next
three years. This provides Councils with some flexibility to borrow to meet future capital
investment requirements but provides a balance to ensure debt is not held for long
periods of time without an underlying need to fund capital investment. The graph below
confirms that the Council expects to comply with this recommendation. 
*NB: Figures exclude PPP/NP
129

Page 130

11 | P a g e
Affordability Prudential Indicators 
These Prudential Indicators assess the affordability of capital investment plans and
provide an indication of the impact of capital investment plans on the Council’s overall
finances. The cost impact of borrowing decisions are reflected in the Council’s budget as
loan charges. These have been projected to 2033/34 in line with the capital plan. 
Actual and estimates of the proportion of financing costs to net revenue stream. 
This indicator identifies the trend in the cost of capital (borrowing and other long-term liabilities
net of investment income) against the net revenue stream and reflects the profile of the loans
fund advances together with future capital investment. The estimates of financing costs
include current commitments and those arising from the capital programme. The HRA costs
are aligned with the 30-year business plan. 
Table 5 
Capital expenditure impacts on the revenue budget through financing charges, so it is
essential that the Council ensures the financing costs remain affordable and do not
constitute an excessive proportion of the revenue resources available. From a General
Fund perspective, the CIPFA Directors of Finance Performance Indicators 2024/25 show
a Scottish Local Authority average of 6.0%, therefore demonstrating a prudent borrowing
policy. For the HRA, the indicative Scottish average in 2024/25 was 20.1%. The ratio
within the HRA is indicative of the significant capital investment programme as outlined in
the Strategic Housing Investment Plan. The level of loan charges is deemed prudent and
affordable within the framework of the 30 year Housing business plan.  
2025/26 2026/27 2027/28 2028/29
Probable Outturn Estimate Estimate Estimate
% % % %
General Services 3.7% 4.6% 5.4% 5.8%
HRA 26.3% 31.5% 33.8% 34.7%
Proportion of financing costs to net revenue stream
130

Page 131

12 | P a g e
4 Treasury Management Strategy 
The treasury management function ensures that the Council’s funds are managed in
accordance with the relevant professional codes, so that sufficient cash is available to meet
service activity. This involves both the organisation of the cashflow and, where capital plans
require, the organisation of approporiate borrowing facilities. The strategy covers the relevant
treasury / prudential indicators, the current and projected debt positions and the annual
investment strategy. The primary objectives of the Council’s borrowing strategy is to minimise
the revenue impact of borrowing and to effectively manage the repayment profile of the debt. 
The treasury strategy aligns with the Council Plan by contributing to “maximising financial
flexibilities to help support delivery of priorities” and “Maximising value from the use of our
assets” as referred to under the priority of “A Sustainable Council”.  The Council Plan can be
found on the Council’s website at: www.north-ayrshire.gov.uk. 
Economic Outlook 
Interest rate forecast 
Interest rate forecasts are key to forecasting the costs of future borrowing. The Council’s
treasury management adviser Arlingclose is forecasting that the bank rate will decline
during 2026 before settling at 3.25%. The projected rates are shown in the following
graph alongside an assessment of PWLB borrowing rates to December 2028: 
131

Page 132

13 | P a g e
Current Portfolio Position 
The Council’s projected treasury portfolio position at 31 March 2026, with future year
estimates, is summarised below. Table 6 shows the probable outturn of gross debt at 31
March 2026, and the estimated gross debt 2026/27– 2028/29,  against the underlying capital
borrowing need (the CFR) highlighting any over or under borrowing. Both the external debt
and CFR exclude the Council’s liabilities in respect of the PPP/NPD schemes. 
Table 6 
Within the prudential indicators there are a number of key indicators to ensure that the
Council operates within well-defined limits. One of these is that the Council’s gross debt
should not, except in the short term, exceed the total of the CFR. This allows some flexibility
for limited early borrowing for future years but ensures that borrowing is not undertaken for
revenue purposes. 
The Council’s borrowing strategy continues to address the key issue of affordability without
compromising the longer-term stability of the debt portfolio. The Council is currently under-
borrowed. This means that the capital financing requirement (CFR), has not been fully funded
with loan debt because the cash supporting the Council’s internal balances and cashflow is
being used as a temporary measure. 
Against this background and the risks within the economic forecast, caution will be adopted
within 2026/27 treasury operations. The Section 95 Officer will monitor interest rates and
adopt a pragmatic approach to changing circumstances. For example: 
• if it is anticipated that there is a significant risk of a sharp fall in long and short-term
rates, then long-term borrowings will be postponed and potential rescheduling from fixed
rate funding into short-term borrowing will be considered. 
• if it is anticipated that there is a significant risk of a sharp rise in long and short-term
rates than that currently forecast, then the portfolio position will be re-appraised with the
likely action that fixed rate funding will be drawn whilst interest rates are still lower than
they are expected to be in the next few years. 
Any such decisions will be reported to the Cabinet as part of the mid-year and annual treasury
outturn report.  A summary of treasury risks and mitigating controls can be found at Appendix
2.  
2025/26 2026/27 2027/28 2028/29
Probable Outturn Estimate Estimate Estimate
£m £m £m £m
Gross Debt at 31 March                 530.392                  683.675                  772.133                  814.102
CFR                 585.696                  726.979                  815.437                  857.406
(Under)/Over Borrowed Position                  (55.304)                  (43.304)                  (43.304)                  (43.304)
Current Portfolio Position (excluding PPP/NPD)
132

Page 133

14 | P a g e
Controls on Borrowing Activity 
The purpose of these controls is to manage the risk and impact of any adverse
movement in interest rates.  However, if they are set to be too restrictive, they may impair
opportunities to reduce costs / improve performance. The indicators are: 
• Upper limits on variable interest rate exposure. This identifies a maximum limit for
variable interest rates based upon the debt position net of investments; 
• Upper limits on fixed interest rate exposure. This is similar to the previous indicator
and covers a maximum limit on fixed interest rates. 
Table 7 
• Maturity structure of borrowing. These gross limits are set to reduce the Council’s
exposure to large sums falling due for refinancing; both upper and lower limits are
required. 
Table 8 
* Note the Under 12 months figure in the above table includes £9.500m LOBOs which have call options in year. 
The impact of a 1% rise in interest rates based on the Councils current debt portfolio is
shown in the table below: 
Table 9 
*Note there is a lower impact of a 1% reduction as the LOBO loans are unlikely to be called when the rate reduces. 
2025/26 2026/27 2027/28 2028/29 2029/2030
Probable Outturn Limit Limit Limit Limit
£m £m £m £m £m
Limits on fixed interest rates
based on net debt             502.042              668.840              814.815              912.857              955.309
Limits on variable interest
rates based on net debt               28.350                60.000                60.000                60.000                60.000
2025/26 2026/27 Lower Upper
Probable Outturn Probable Outturn Limit Limit
£m % % %
Under 12 months                29.945 7% 0% 50%
12 months and within 24 months                 7.622 2% 0% 50%
24 months and within 5 years               49.071 12% 0% 50%
5 years and within 10 years               98.343 24% 0% 75%
10 years and above             221.847 55% 25% 90%
Total Borrowing                 406.827 100%
Maturity Profile of Borrowing
2026/27 2027/28 2028/29
£m £m £m
Impact of 1% increase in Interest rates       0.130        0.273        0.348
Impact of 1% decrease in Interest rates      (0.011)      (0.087)      (0.170)
Interest rate Risk Exposure
133

Page 134

15 | P a g e
LOBOs 
The Council currently holds £29.500m of Lender’s Option Borrower’s Option (LOBO)
loans where the lender has the option to propose an increase in the interest rate at set
dates, following which the Council has the option to either accept the new rate or to repay
the loan at no additional cost. Similar to other debt held by the Council we continue to
work with treasury management advisers to identify financially beneficial opportunities to
repay LOBO loans.   
Policy on Borrowing in Advance of Need 
The Council will not borrow more than, or in advance of, its needs purely to profit from the
investment of the extra sum borrowed. Any decision to borrow in advance will be within
forward approved CFR estimates and will be considered carefully to ensure that value for
money can be demonstrated and that the Council can ensure the security of such funds. 
Risks associated with any advance borrowing activity will be subject to appraisal and
subsequent reporting in either the mid-year or annual treasury report. 
Debt Rescheduling 
As short-term borrowing rates are cheaper than longer term fixed interest rates, there may be
potential opportunities to generate savings by switching from long-term to short-term debt.
However, these savings will need to be considered in the light of the current treasury position
and the cost of any premiums incurred on early debt repayment.   
Potential reasons for debt rescheduling include: 
• the generation of cash savings and / or discounted cashflow savings; or
• the enhancement of the portfolio balance (amend the maturity profile and / or risk). 
The recent rise in interest rates means that more favourable debt rescheduling
opportunities should arise than in previous years.  All debt rescheduling proposals will be
reported to Cabinet / full Council as part of the annual or mid-year report. 
Borrowing Sources 
Approved sources of long-term and short-term borrowing are: 
• HM Treasury’s PWLB lending facility (formerly the Public Works Loan Board) and
any successor body;
• National Wealth Fund Ltd (formerly UK Infrastructure Bank Ltd)
• Any institution approved for investments (see Appendix 3);
• Any other bank or building society authorised to operate in the UK;
• Any other UK public sector body;
• UK public and private sector pension fund (except Strathclyde Pension Fund);
• Capital market bond investors; or
• Other special purpose companies created to enable local authority bond issues.
134

Page 135

16 | P a g e
In addition, capital finance can be raised by the following methods that are not borrowing,
but are classed as other debt liabilities: 
• Leases;
• Hire purchase;
• Private Finance Initiatives (including PPP/NPD); or
• Sale and leaseback arrangements.
• Similar asset based finance 
Alternatives to PWLB 
North Ayrshire Council has previously raised the majority of its long-term borrowing from the
PWLB but will consider long-term loans from other sources including banks, pensions and
local authorities. The Council will also investigate the possibility of issuing bonds and similar
instruments, which may offer lower interest costs and reduce over-reliance on one source of
funding in line with the CIPFA Code. An example of this is where organisations issue bonds
on the capital markets and lend the proceeds to local authorities. As these will represent a
more complex form of borrowing, any decision to borrow in this way will be the subject of a
separate report to Council. 
PWLB loans are no longer available to local authorities planning to buy investment assets
primarily for yield. The Council therefore intends to avoid this activity in order to retain its
access to PWLB loans. 
Policy on Use of Financial Derivatives 
A financial derivative is a contract, which derives its value from the performance of an
underlying entity. They are used for a number of purposes, including insuring against price
movements. In the absence of any explicit legal power to do so, the Council will not use
standalone financial derivatives (such as swaps, forwards, future and options). Derivatives
embedded into loans and investments, including pooled funds and forward starting
transactions, may be used and the risks that they present will be managed in line with the
overall treasury risk management strategy. 
Policy on Repayment of Loans Fund Advances 
The prudent repayment of Loans Fund Advances are made under the provisions of The
Local Authority (Capital Finance and Accounting) (Scotland) Regulations 2016, which
came into force on 1 April 2016.   
These Regulations require North Ayrshire Council to outline its policy on the repayment
of loans fund advances. The loans fund advance is effectively the repayment of the
‘principal’ linked to the capital expenditure which is funded from borrowing.   
135

Page 136

17 | P a g e
The statutory guidance identifies a number of options for the prudent repayment of
advances, including basing the repayments on: 
• the depreciation charges made against the assets;
• the life of the assets, using either the annuity or equal instalments methodology; or
• the funding or income streams attached to the assets. 
For the majority of projects undertaken by the Council, the policy is to repay loans fund
advances linked to asset life using the annuity methodology. However, where
appropriate, the repayment of advances arising from projects with associated income
streams will be matched to the profile of the income. 
The Council will continue to consider the most appropriate repayment methods, which
align to the benefits of the assets and ensure a prudent repayment, for existing and
future advances. 
The policy is outlined in full in Appendix 4. 
5 Investment Strategy 
The Council’s investment strategy has regard to the Local Government Investment (Scotland)
Regulations (and accompanying finance circular) and the 2021 revised CIPFA Treasury
Management in Public Services Code of Practice and Cross Sectoral Guidance Notes (“the
CIPFA TM Code”). The Council’s objective when investing money is to strike an appropriate
balance between risk and return, minimising the risk of incurring losses from defaults or of
receiving unsuitably low investment income.  The Council aims to be a responsible investor
and will consider environmental, social and governance (ESG) issues when investing. 
The aim of the Investment Strategy is to provide security of investment and minimisation of
risk by generating a list of high creditworthy counterparties which will enable diversification. 
Investment instruments identified for use in the financial year, along with their associated risks
and controls can be found in Appendix 3.   
Counterparty limits are set through the Council’s Treasury Management Practices. The
maximum that will be lent to any one organisation (other than the UK Government) will be £10
million.  A group of banks under the same ownership, will be treated as a single organisation
for limit purposes.   
The Council uses purpose-built cash flow forecasting software to determine the maximum
period for which funds may prudently be committed. The forecast is compiled on a prudent
basis to minimise the risk of the Council being forced to borrow on unfavourable terms to
meet its financial commitments. Limits on long-term investments are set by reference to the
Council’s revenue budget and cash flow forecast. 
Given the risk of bail-in (as defined on page 19) and continued low returns from short-term
unsecured bank investments, the Council will take opportunities, as cash flows permit, to
further diversify into more secure asset classes during 2026/27. This diversification will
mitigate further risks associated with investments.
136

Page 137

18 | P a g e
Current Portfolio Position 
Table 10 
Environmental, Social and Governance (ESG) Policy 
Environmental, social and governance (ESG) considerations are increasingly a factor in
global investors’ decision making, but the framework for evaluating investment
opportunities is still developing and therefore the Council’s ESG policy does not currently
include ESG scoring or other real-time ESG criteria at an individual investment level.
When investing in banks and funds, the Council will prioritise banks that are signatories
to the UN Principles for Responsible Banking and funds operated by managers that are
signatories to the UN Principles for Responsible Investment, the Net Zero Asset
Managers Alliance and/or the UK Stewardship Code. A list of ESG Initiative signatories is
updated quarterly by the Council’s treasury advisor Arlingclose to support the Council’s
decision making process for investing. 
Creditworthiness policy 
In accordance with the above, and in order to minimise risk, the Council has clearly stipulated
the minimum acceptable credit quality of counterparties for inclusion on its lending list. The
Council uses Arlingclose’s Approved Counterparties List which takes full account of the
ratings, outlooks and watches published by all three ratings agencies. Ratings are monitored
on a real time basis with any changes notified electronically supplemented by weekly update. 
Investment decisions are made by reference to the lowest published long-term credit rating
and analysis from the Council’s treasury management advisers. The Council considers high
credit quality organisations and investments as those having a credit rating of A- or higher
and which are domiciled in the UK or in a foreign country with a sovereign rating of AA+ or
higher. For money market funds that are more diversified, “high credit quality” is defined as
those having a credit rating of A- or higher. However, in addition to credit ratings, the Council
will consider investments in organisations based on independent analysis from our treasury
management advisors.   
All credit ratings are monitored by the Treasury Team who are alerted to changes in ratings of
the main rating agencies through Arlingclose’s weekly updates and following credit
developments. Where a downgrade results in the counterparty or investment scheme no
longer meeting the Council’s minimum criteria, any investment will be withdrawn immediately,
where breakage costs are not excessive.  
2025/26 2026/27 2027/28 2028/29
Probable Outturn Estimate Estimate Estimate
£m £m £m £m
Investments at 31 March                   30.000                    30.000                    30.000                    30.000
Net Debt at 31 March                 500.392                  653.675                  742.133                  784.102
Current Portfolio Position
137

Page 138

19 | P a g e
When deteriorating financial market conditions affect the creditworthiness of all
organisations, as happened in 2008, 2020 and 2022, this is not generally reflected in
credit ratings, but can be seen in other market measures. In these circumstances, the
Council will restrict its investments to those organisations of higher credit quality and
reduce the maximum duration of its investments to maintain the required level of security.
The extent of these restrictions will be in line with prevailing financial market conditions. If
these restrictions mean that insufficient commercial organisations of high credit quality
are available to invest the Council’s cash balances, then the surplus will be deposited
with the UK Government, or with other local authorities.  This will cause investment
returns to fall but will protect the principal sum invested. 
The Council recognises that credit ratings are good, but not comprehensive, indicators of
investment default. Full regard is therefore given to other available information on the credit
quality of the organisations in which it invests including credit default swap prices, financial
statements, information on government support, reports in the financial press and analysis
from the Council’s treasury management adviser. No investment will be made with an
organisation if there are substantive doubts about its credit quality, even though it may
otherwise meet the above criteria. 
Bail-in Risk 
Since the financial crisis, global authorities have embarked on a wide ranging review of
the banking sector to ensure that the cost to the public purse of any future crises is
contained. One of the most significant changes has arisen from the Financial Services
(Banking Reform) Act 2013 which added the bail-in of certain unsecured creditors to the
Special Resolution Regime (SRR) granted to the Bank of England under the Banking Act
2009. Bail-in is the opposite of bail-out and requires the country’s banking authority to
bail-in funds from existing investments if a bank requires it to remain financially
sustainable. 
Local authority deposits in banks are unsecured and because other previously unsecured
creditors such as retail investors have become preferred under UK and EU Directives, it
means that the risks associated with local authority unsecured investments in banks have
risen. 
The best solution to mitigating against bail-in risk is to invest with high quality and credit
worthy institutions. The identification of these institutions remains a key objective of the
investment strategy. Ensuring diversification of investment counterparties is also an
effective risk management approach and is reflected in investment counterparty limits. 
138

Page 139

20 | P a g e
Investment Strategy and Permitted Investments 
The Investment Regulations (Code on the Investment of Money by Local Authorities) require
the Council to approve all types of investments to be used and to set appropriate limits for the
amount that can be held in each investment type.  In determining its permitted investments,
the Council must identify the treasury risks associated with each type of instrument and the
controls put in place to limit risk on each investment type. Full details can be found in
Appendix 3. 
Investment Returns Expectations   
The Bank Rate is forecast to gradually fall during 2026.  Bank Rate forecasts for financial year
ends (March) are: 
• 2025/26 3.50%
• 2026/27 3.25%
• 2027/28 3.25% 
The estimated rates for returns on investments placed for periods up to 100 days during each
financial year for the next three years are as follows: 
• 2025/26 3.50%
• 2026/27 3.25%
• 2027/28 3.25% 
Investment Treasury Indicator and Limit 
This is a control on the total principal funds invested for greater than 1 year.  This limit is set
with regard to the Council’s liquidity requirements and to reduce the need for early sale of an
investment, and is based on the availability of funds after each year-end. 
Table 11 
For cashflow management, the Council will seek to utilise its 15 and 30 day notice accounts,
money market funds and short-dated deposits (overnight to three months) in order to benefit
from the compounding of interest. 
2025/26 2026/27 2027/28 2028/29
Probable Outturn
£m
Limit
£m
Limit
£m
Limit
£m
Principal sums invested for more than 1 year 5.000                     10.000                   10.000                   10.000                  
Maximum principal sums invested for more than 1
year
139

Page 140

21 | P a g e
Summary of Material Investments, Guarantees and Liabilities 
In line with the requirements in respect of the Council’s Capital Investment Strategy
information is provided on material Investments, Guarantees and Liabilities. Reporting of
this fits better within the TMIS. Information is provided in the table below; 
The Council has the current historic investments on the balance sheet as at 31st March
2025: 
The long-term debtors represent loan finance provided by the Council to other parties
which relates to Advances for House Purchases.   
Monitoring of Investment Strategy 
An update on the investment position of the Council will be reported to Cabinet in the 2026/27
Mid-Year Treasury report and the Annual Treasury Report will be submitted to the Council
after the end of the financial year. 
Category Value as at 31st March 2025
£m
Long-term Debtors                                          0.044
Total                                          0.044
140

Page 141

22 
Appendix 1: Prudential Indicators 2030 to 2034 
* A negative annual change in CFR reflects a reduction in the need to finance capital investment from borrowing.
2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m
General Services Capital expenditure                     27.363                      10.510                      10.087                      10.087                      10.062
Funded by:
Borrowing                       2.075                        0.615                        0.192                        0.192                        0.167
Receipts / Grants                     25.288                        9.895                        9.895                        9.895                        9.710
Funded from Revenue                            -                                -                                -                                -                                -   
Funded from Reserves                            -                                -                                -                                -                                -   
Total                     27.363                      10.510                      10.087                      10.087                        9.877
HRA Capital expenditure                     35.943                      24.003                      31.863                      32.584                      33.590
Funded by:
Borrowing                     21.831                      15.035                      21.605                      22.003                      21.389
Receipts / Grants                       5.621                             -                                -                                -                                -   
Funded from Revenue                       7.149                        7.335                      10.258                      10.581                      12.201
Funded from Reserves                       1.342                        1.633                             -                                -                                -   
Total                     35.943                      24.003                      31.863                      32.584                      33.590
Estimates of Capital Expenditure and
Income
2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m
General Services                   569.677                    560.540                    550.119                    538.660                    525.899
HRA                   358.588                    365.279                    378.260                    390.234                    401.467
Sub-total                   928.265                    925.819                    928.379                    928.894                    927.366
Less PPP/NPD long-term liability                   (56.667)                   (50.841)                   (44.793)                   (38.127)                   (29.984)
Sub-total                   871.598                    874.978                    883.586                    890.767                    897.382
Movement in CFR
General Services                     (0.974)                     (3.311)                     (4.373)                     (4.793)                     (4.618)
HRA                     15.166                        6.691                      12.981                      11.974                      11.233
Annual Change                     14.192                        3.380                        8.608                        7.181                        6.615
Capital Financing Requirement (CFR)
141

Page 142

23 
2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m
General Services 5.9% 6.1% 6.2% 6.3% 6.3%
HRA 33.8% 34.9% 33.9% 34.6% 33.9%
2029/30 2030/31 2031/32 2032/33 2033/34
Current Portfolio Position Estimate Estimate Estimate Estimate Estimate
(excluding PPP/NPD) £m £m £m £m £m
Gross Debt at 31 March                   828.294                    831.674                    840.282                    847.463                    854.078
CFR                   871.598                    874.978                    883.586                    890.767                    897.382
(Under)/Over Borrowed Position                   (43.304)                   (43.304)                   (43.304)                   (43.304)                   (43.304)
2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m
Investments at 31 March                     30.000                      30.000                      30.000                      30.000                      30.000
Net Debt at 31 March                   798.294                    801.674                    810.282                    817.463                    824.078
2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m
Anticipated borrowing                   882.654                    888.881                    896.775                    905.781                    912.508
PPP/NPD long-term liability                     56.667                      50.841                      44.793                      38.127                      29.984
Operational Boundary                   939.321                    939.722                    941.568                    943.908                    942.492
2029/30 2030/31 2031/32 2032/33 2033/34
Estimate Estimate Estimate Estimate Estimate
£m £m £m £m £m
Operational Boundary + 10%                   970.919                    977.769                    986.453                    996.359                 1,003.759
PPP/NPD long-term liability                     56.667                      50.841                      44.793                      38.127                      29.984
Authorised Limit                1,027.586                 1,028.610                 1,031.246                 1,034.486                 1,033.743
Proportion of financing costs to net
revenue stream
Current Portfolio Position
Authorised Limit
Operational Boundary
142

Page 143

24 
Graph 2029/30 2030/31 2031/32 2032/33 2033/34
Gross Debt at 31 March 828.294                  831.674                  840.282                  847.463                  854.078                 
CFR (Borrowing need) 871.598                  874.978                  883.586                  890.767                  897.382                 
Operational Boundary 882.654 888.881 896.775 905.781 912.508
Authorised Limit 970.919 977.769 986.453 996.359 1,003.759
143

Page 144

25 
Appendix 2: Treasury Risk Register 
Risk Title Description Consequence of Risk Current Controls RAG
Status
Credit and
Counterparty
Risk
This is the risk of failure by a counterparty
(bank or building society) to meet its
contractual obligations to the organisation
particularly due to the counterparty’s
diminished creditworthiness, and the
resulting detrimental effect on the
organisation’s capital or current (revenue)
resources. There are no counterparties
where this risk is zero although AAA rated
organisations have a very high level of
creditworthiness.
That investment funds will not be
returned in full to the Council as
per the contractual obligation of
the counterparty.
The Council sets minimum
credit criteria to determine
which counterparties and
countries are of sufficiently
high creditworthiness to
invest securely.  
The RAG status is Amber
because this risk will never
be fully eliminated. 
Amber 
Liquidity Risk This is the risk that cash will not be available
when it is needed.   Whilst it could be said
that all counterparties are subject to at least a
very small level of liquidity risk, in this
document, liquidity risk has been treated as
whether or not instant access to cash can be
obtained from each form of investment
instrument.  While some forms of investment
e.g. gilts, Certificates of Deposit, corporate
bonds can usually be sold immediately if the
need arises, there are two caveats: - a) cash
may not be available until a settlement date
up to three days after the sale; and b) there is
an implied assumption that markets will not
freeze up and so the instrument in question
will find a ready buyer.  
That the Council has insufficient
access to cash to enable it to
carry out its activities.
The Council has a cash flow
forecasting model to enable
it to determine how long
investments can be made
for and how much can be
invested.  This has a high
level of assurance around
regular cash inflows and
outflows.
Some of the Council’s
cashflow related
investments are invested in
Money Market Funds which
provide very high daily
liquidity. 
Green
144

Page 145

26 
Risk Title Description Consequence of Risk Current Controls RAG
Status
Market Risk This is the risk that, through adverse market
fluctuations in the value of the sums that the
Council borrows and invests, there is a
detrimental impact on the Council.
That investment funds will not be
returned in full to the Council as
per the contractual obligation of
the counterparty due to market
variations.
Only a proportion of the
Council’s investments will
be invested in instruments
whose value are subject to
market movements.  The
proportion will not exceed
the maximum percentage
the Council will invest in
investments over 1 year
Green
Interest Rate
Risk
This is the risk that fluctuations in the levels
of interest rates create an unexpected or
unbudgeted burden on the organisation’s
finances, against which the organisation has
failed to protect itself adequately.  The
Council has set limits for its fixed and
variable rate exposure in its Treasury
Indicators in this report
That the Council will be faced with
unexpected higher interest costs
due to market variations.
The Council manages this
risk by having a view of the
future course of interest
rates and then formulating
a treasury management
strategy accordingly which
aims to maximise
investment earnings
consistent with control of
risk or alternatively, seeks
to minimise expenditure on
interest costs on
borrowing.
Green
Legal and
Regulatory Risk
This is the risk that the organisation itself, or
an organisation with which it is dealing in its
treasury management activities, fails to act in
accordance with its legal powers or
regulatory requirements, including failure to
comply with the CIPFA Codes and that the
organisation suffers losses accordingly.
That investment funds will not be
returned in full to the Council due
to the failure of the counterparty
to comply with their contractual
obligations
The Council will not
undertake any form of
investing until it has
ensured that it has all
necessary powers and has
complied with all
regulations.  
Green
145

Page 146

27 
Appendix 3: Permitted Investments, Risks and Mitigating Controls 
Type of Investment Description and Risk Mitigating Controls Council Limits
Banks Unsecured These are accounts, deposits,
certificates of deposit and senior
unsecured bonds with banks and
building societies, other than
multilateral development banks,
which are established by more than
one country, e.g. European
Investment Bank.  These
investments are subject to the risk of
credit loss via a bail-in should the
regulator determine that the bank is
failing or likely to fail.   
Diversifying investments is crucial to
managing bail-in risk, in addition to
determining proportionate counterparty and
maturity limits. Certificates of Deposit, which
are tradable on the secondary market and
which can be sold prior to maturity, will also
assist in managing credit risk.  
The combined secured and
unsecured investments in any
one bank will not exceed £10m.
Banks Secured These are covered bonds, secured
deposits, reverse repurchase
agreements and other collateralised
arrangements with banks and
building societies.  Reverse
purchase agreements involve the
purchase of securities with the
agreement to sell at a future date at
a higher price.  Collateralised
arrangement are an investment with
collateral such as properties or debt. 
These investments are secured on the
bank’s assets, which limits the potential
losses in the unlikely event of insolvency,
and means that they are exempt from bail-
in.  Where there is no investment specific
credit rating, but the collateral upon which
the investment is secured has a credit
rating, the higher of the collateral credit
rating and the counterparty credit rating will
be used to determine cash and time limits. 
The combined secured and
unsecured investments in any
one bank will not exceed £10m.
146

Page 147

28 
Type of Investment Description and Risk Mitigating Controls Council Limits
Operational Bank
Accounts
The Council will incur operational
exposures to its banking services
provider, Royal Bank of Scotland,
through current accounts.  The
bank is currently on the Council's
lending list as its credit ratings are
above the investment credit rating
criteria of A-. These balances are
not classed as investments but are
still subject to the risk of bail-in and
balances will therefore be
minimised. 
The Bank of England has stated that in
the event of failure, banks with assets
greater than £25 billion (which applies to
Royal Bank of Scotland) are more likely
to be bailed in than made insolvent,
increasing the chance of the Council
maintaining operational continuity.  .
The Council monitors its
operational accounts on a daily
basis, transferring any surplus
funds to investment accounts and
there for minimising the amount
held in the operational bank
account at any time.
Government These are loans, bonds and bills
issued or guaranteed by national
governments, regional and local
authorities and multilateral
development banks.  Includes the
UK Debt Management Office. 
These investments are not subject to bail-
in, and there is an insignificant risk of
insolvency.  
Investments with the UK Central
Government may be made in
unlimited amounts for up to 50
years.
Corporates These are loans, bonds and
commercial paper issued by
companies other than banks and
registered social landlords. Loans to
unrated companies will only be
made if approved through a
separate report to Council. 
These investments are not subject to bail-
in, but are exposed to the risk of the
company going insolvent.  This risk will be
mitigated by taking independent external
advice and diversifying investments over a
number of counterparties. 
Loans to unrated companies
would be made as part of a
diversified pool in order to spread
the risk widely.
147

Page 148

29 
Type of Investment Description and Risk Mitigating Controls Council Limits
Registered Social
Landlords
These are loans and bonds issued
by, guaranteed by or secured on the
assets of Registered Social
Landlords (Housing Associations). 
These bodies are regulated by the
Scottish Housing Regulator and by
the Homes and Communities
Agency for Registered Providers of
Social Housing in England. 
As providers of public services, they retain
the likelihood of receiving government
support if needed and are therefore
considered low risk.  
Policy driven, managing all
associated risks.
Money Market Funds These are diversified investment
vehicles consisting of the any of the
above investment types, plus equity
shares and property. These funds
have the advantage of providing
wide diversification of investment
risks, coupled with the services of a
professional fund manager in return
for a management fee.  
Short-term Money Market Funds that offer
same-day liquidity and very low or no
volatility will be used as an alternative to
instant access bank accounts.
It is recommended that no more
than £10m is invested in any one
MMF and that the amount
invested is no more than 0.5% of
the size of a MMF used for
liquidity purposes. 
For pooled investment vehicles
that invest in bonds, equities and
property, all of which operate on a
variable net asset value (VNAV) it
is recommended that no more
than 10% of the Council’s total
investments are invested in each
fund.  These investments will be
held for periods greater than 1
year. 
148

Page 149

30 
Type of Investment Description and Risk Mitigating Controls Council Limits
Investment
Properties
These are non-operational
properties that are being held
pending disposal, or for a longer-
term rental income stream.  They
are highly illiquid assets with high
risk to value (the potential for
property prices to fall or for rental
voids).  
In larger investment portfolios, some small
allocation of property-based investment
may counterbalance/ complement the wider
cash portfolio.  Property holding will be re-
valued regularly and reported annually with
gross and net rental streams. 
Member approval required and each
application must be supported by the
service rationale behind the loan and the
likelihood of partial or full default.
Policy driven, managing all
associated risks.
Loans to third
parties, including soft
loans
These are service investments either
at market rates of interest, or below
market rates (soft loans).  These
types of investments may exhibit
credit risk and are likely to be highly
illiquid.
Each third party loan requires Member
approval and each application must be
supported by the service rationale behind
the loan and the likelihood of partial or full
default.  Interest payments and loan
repayments will be monitored and the
likelihood of partial or full default re-
assessed regularly.
Policy driven, amount and loan
maturity limit will be determined
on a case-by-case basis.
Loans to a local
authority company
These are service investments either
at market rates of interest, or below
market rates (soft loans).  These
types of investments may exhibit
credit risk and are likely to be highly
illiquid.
Each loan to a local authority company
requires Member approval and each
application must be supported by the
service rationale behind the loan and the
likelihood of partial or full default. 
Interest payments, loan repayments, and
their timeliness will be monitored and the
likelihood or partial or full default
reassessed regularly.
Policy driven, amount and loan
maturity limit determined on a
case-by-case basis, managing all
associated risks.
149

Page 150

31 
Type of Investment Description and Risk Mitigating Controls Council Limits
Shareholdings in a
local authority
company
These are service investments,
which may exhibit market risk and
are likely to be highly illiquid.
Each equity investment in a local authority
company requires Member approval and
each application must be supported by the
service rationale behind the investment and
the likelihood of loss.  Service investments
will be subject to scrutiny by Financial
Services on a regular basis and will include
scrutiny of financial statements issued by
the local authority company.
Policy driven, amount determined
on a case-by-case basis,
managing all associated risks.
Non-local authority
shareholdings
These are non-service investments,
which may exhibit market risk, will
only be considered for longer term
investments and are likely to be
liquid.
Any non-service equity investment will
require separate Member approval and
each application must be supported by the
service rationale behind the investment and
the likelihood of loss.  Non-service
investments will be subject to scrutiny by
Financial Services on a regular basis,
reported to Members, and will include
scrutiny of financial statements issued by
the company.
Policy driven, amount and
anticipated time frame for
shareholding determined on a
case-by-case basis, managing all
associated risks. 
150

Page 151

32 
Appendix 4: Policy on Repayment of Loans Fund Advances 
Policy on Repayment of Loans Fund Advances 
The purpose of the Loans Fund is to record advances from the loan fund for expenditure
incurred, or loans made to third parties, which a local authority has determined are to be
financed from borrowing as set out in Regulation 2 of The Local Authority (Capital Finance
and Accounting) (Scotland) Regulations 2016 [“the Regulations”]. The Council is also
statutorily required to repay Loans Fund advances and to prudently determine the periods
over which it will repay Loans Fund advances and the amount of repayments in any financial
year.   
Loans Fund advances comprise several items and the estimated opening balances for
2026/27, where applicable for North Ayrshire Council, are: 
• capital expenditure (£585.697m);
• grants to third parties and expenditure on third party assets which would be classified
as capital expenditure by a local authority (£0m);
• loans to third parties (£0m); and
• expenditure for which a borrowing consent has been issued by the Scottish
Government (£0m). 
Prudent repayment of Loans Fund advances 
The loans fund advance is effectively the repayment of the ‘principal’ linked to the expenditure
classified above which is unfinanced and is required to be funded from borrowing.
Repayment of loans fund advances are required to be made in line with Scottish Government
statutory guidance on Loans Fund Accounting, most recently issued in 2024. The Council’s
annual accounts require to include a disclosure of details of Loans Fund transactions. The
HRA Loans Fund advances and associated annual repayments are identified separately from
that of the General Fund. 
The broad aim of prudent repayment is to ensure that the Council’s unfinanced capital
expenditure is repaid over the period of years in which that expenditure is expected to provide
a benefit and that each year’s repayment amount is reasonably commensurate with the
period and pattern of the benefits. Where a loans fund advance is made for an asset, that
period will be the asset’s useful life. Where an asset life cannot reasonably be established,
the repayment period will not exceed 50 years. 
The statutory guidance requires the Council to approve a policy on Loans Fund repayments
each year and recommends a number of options for calculating prudent repayments. North
Ayrshire Council’s policy is as follows: 
For the majority of projects undertaken by the Council the policy is to use the asset life
method to repay loans fund advances on an annuity basis, which is similar to the
repayment of a mortgage where principal payments are lower at the start of the mortgage
and build up to deliver full repayment over the term of the mortgage. As well as annuity,
the asset life method has the option of equal instalments. 
151

Page 152

33 
The Council will continue to consider the most appropriate repayment method which
aligns to the benefits of the assets and ensures a prudent repayment. 
In addition, there are some projects where income streams are attached to the project
which can be reasonably associated with the borrowing which will be undertaken.  In
these circumstances it may be more appropriate for the advances to be repaid on a
profile which matches this income. For these unique projects, loans fund advances may
be profiled for repayment to match the income and not on the annuity basis.   
These options comply with the statutory guidance and the Council will continue to
consider all options available to it. 
The repayment of Loans Fund advances will therefore be equal to the annual amount
determined in accordance with the Local Authority (Capital Finance and Accounting)
(Scotland) Regulations 2016. 
The above regulations state that Council’s may vary the period and/or amount of the
repayments if they consider it prudent to do so. As a result, officers continue to review existing
loans fund advances for opportunities to ensure the most prudent repayment method is being
used. 
Estimates of prudent Loans Fund repayment 
The Council’s latest estimates of its Loans Fund account information are as follows: 
Policy on Apportioning Interest to the HRA 
Interest and expenses on all new borrowing is allocated to the HRA based on the share of
total borrowing taken each year. 
Credit arrangements
Loans Fund advances are not made for credit arrangements such as leases and service
concession (PFI/PPP) arrangements, but a statutory charge to revenue similar to a Loans Fund
repayment is made to repay the associated debt. Except where flexible arrangements have
previously been approved, the charge will be equal to the contractual unitary payment due for
the financial year after deducting (a) those amounts which have been already charged to
revenue such as interest and (b) actual or prepaid lifecycle replacement costs.
Year
Opening
Balance
£m
Advances to
GF
£m
Advances to
HRA
£m
Repayment  by
GF
£m
Repayment by
HRA
£m
Closing
Balance
£m
2024/25 actual 436.885 65.444 18.976 -1.500 -6.138 513.670
2025/26 513.670 56.990 24.571 -2.578 -6.957 585.697
2026/27 -30/31 585.697 155.146 185.348 -16.186 -35.103 874.901
2031/32 – 35/36 874.901 0.551 106.943 -21.965 -50.351 910.079
2036/37 – 40/41 910.079 0.000 154.256 -41.011 -65.130 958.195
2041/42– 45/46 958.195 0.000 47.491 -69.359 -75.617 860.710
2046/47 - 50/51 860.710 0.000 0.000 -90.672 -80.919 689.119
2051/52 – 55/56 689.119 0.000 0.000 -106.544 -73.286 509.290
2056/57 – 60/61 509.290 0.000 0.000 -60.310 -73.848 375.132
2061/62 – 65/66 375.132 0.000 0.000 -49.667 -77.424 248.042
2066/67– 70/71 248.042 0.000 0.000 -34.678 -71.841 141.522
2071/72 & later 141.522 0.000 0.000 -36.047 -105.475 0.000
152

Page 153

34 
Appendix 5: Economic Background – Arlingclose’s View January 2026 
Economic Outlook 
The most significant impacts on the Authority’s treasury management strategy for
2026/27 are expected to include: the influence of the government’s 2025 Autumn
Budget, lower short-term interest rates alongside higher medium- and longer-term rates,
slower economic growth, together with ongoing uncertainties around the global
economy, stock market sentiment, and geopolitical issues. 
The Bank of England’s Monetary Policy Committee (MPC) cut Bank Rate to 3.75% in
December 2025, as expected. The vote to cut was 5-4, with the minority instead
favouring holding rates at 4.0%. Those members wanting a cut judged that disinflation
was established while those preferring to hold Bank Rate argued that inflation risks
remained sufficiently material to leave rates untouched at this stage. 
Figures from the Office for National Statistics showed that the UK economy expanded
by 0.1% in the third quarter of the calendar year, this was unrevised from the initial
estimate. The most recent Monetary Policy Report (November) projected modest
economic growth, with GDP expected to rise by 0.2% in the final calendar quarter of
2025. Annual growth is forecast to ease from 1.4% before improving again later,
reflecting the delayed effects of lower interest rates, looser monetary conditions,
stronger global activity, and higher consumer spending. The view of modest economic
growth going forward was echoed by the Office for Budget Responsibility in its Economic
and fiscal outlook published in line with the Autumn Statement which revised down its
estimate of annual real GDP to around 1.5% on average between 2025 and 2030. 
CPI inflation was 3.2% in November 2025, down from 3.6% in the previous month and
below the 3.5% expected. Core CPI eased to 3.2% from 3.4%, contrary to forecasts of
remaining at 3.6%. Looking forward, the MPC continues to expect inflation to fall, to
around 3% in calendar Q1 2026, before steadily returning to the 2% target by late 2026
or early 2027. 
The labour market continues to ease with rising unemployment, falling vacancies and
flat inactivity. In the three months to October 2025, the unemployment rate increased to
5.1%, higher than the level previously expected by the BoE, while the employment rate
slipped to 74.9%. Pay growth for the same period eased modestly, with total earnings
(including bonuses) growth at 4.7% and while regular pay was 4.6%. 
The US Federal Reserve also continued to cut rates, including reducing the target range
for the Federal Funds Rate by 0.25% at its December 2025 meeting, to 3.50%-3.75%,
in line with expectations. The minutes of the meeting noted that most Fed policymakers
judged that further rate cuts would be likely in 2026 if inflation continues to ease,
however they were still divided in their assessment of the risks between inflation and
unemployment. 
The European Central Bank (ECB) kept its key interest rates unchanged in December
for a fourth consecutive meeting, maintaining the deposit rate at 2.0% and the main
refinancing rate at 2.15%. The ECB maintained that future policy decisions will remain
data-dependent, that inflation is close to its 2% target and that the euro area economy
153

Page 154

35 
continues to expand despite a challenging global environment, including heightened
geopolitical risks and trade tensions. 
Credit outlook 
Credit Default Swap (CDS) prices, which spiked in April 2025 following President
Trump’s ‘Liberation Day’ tariff announcements, have since trended lower, returning to
levels broadly consistent with their 2024 averages. Although CDS prices rose modestly
in October, the overall credit outlook remains stable, and credit conditions are expected
to remain close to the range seen over the past two years. 
While lower interest rates may weigh on banks’ profitability, strong capital positions,
easing inflation, steady economic growth, low unemployment, and reduced borrowing
costs for households and businesses all support a favourable outlook for the
creditworthiness of institutions on (the authority’s treasury management advisor)
Arlingclose’s counterparty list. Arlingclose’s advice on approved counterparties and
recommended investment durations is kept under continuous review and will continue
to reflect prevailing economic and credit conditions. 