MINUTES of MEETING of PLANNING, PROTECTIVE SERVICES AND LICENSING
COMMITTEE held BY MICROSOFT TEAMS on WEDNESDAY, 19 JUNE 2024 
Present: Councillor Kieron Green (Chair) 
Councillor John Armour
Councillor Gordon Blair
Councillor Jan Brown
Councillor Daniel Hampsey
Councillor Graham Hardie 
Councillor Fiona Howard
Councillor Mark Irvine
Councillor Andrew Kain
Councillor Paul Donald Kennedy
Councillor Peter Wallace 
Attending: Stuart McLean, Committee Manager
Tim Williams, Area Team Leader
Tiwaah Antwi, Planning Officer
Norman Shewan, Planning Officer
Fiona Scott, Planning Officer
Shelley Gould, Senior Planning Officer
Alan Morrison, Regulatory Services Manager 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Audrey Forrest, Amanda Hampsey,
Liz McCabe and Dougie Philand. 
2. DECLARATIONS OF INTEREST 
Councillor Fiona Howard declared a non-financial interest in item 6 of the agenda having
previously objected to the application before she became a member of the Committee. 
She advised that she would leave the meeting during the consideration of this item of
business. 
Councillor Paul Kennedy declared a non-financial interest in item 6 of the agenda as he
was acquainted with the applicant.  He advised that he would leave the meeting during the
consideration of this item of business. 
3. MINUTES 
a) The Minute of the Planning, Protective Services and Licensing Committee held on 22
May 2024 at 11.00 am was approved as a correct record. 
b) The Minute of the Planning, Protective Services and Licensing Committee held on 22
May 2024 at 2.00 pm was approved as a correct record. 
c) The Minute of the Planning, Protective Services and Licensing Committee held on 28
May 2024 at 10.00 am was approved as a correct record. 
d) The Minute of the Planning, Protective Services and Licensing Committee held on 28
May 2024 at 11.00 am was approved as a correct record. 
4. TORLOISK ESTATE: CONVERSION AND EXTENSION OF STONE BARN
TO FORM DWELLINGHOUSE, INSTALLATION OF SEPTIC TANK AND
FORMATION OF VEHICULAR ACCESS: LAND WEST OF LAGGANULVA
FARM, ULVA FERRY, ISLE OF MULL (REF: 23/00185/PP)

Page 2

The Area Team Leader spoke to the terms of supplementary report number 2.  This
application was presented to the PPSL Committee on 22 May 2024.  The Committee
agreed to continue consideration of the application to this meeting and to request from
Planning Officers information on what the impact this proposed development would have
on access to, and operation of, the remaining agricultural land in terms of Policy 83 of
LDP2 – Safeguarding Agricultural and Croft Land. 
Planning Officers have sought further information from both the Applicant and the tenant
farmer and a request was made to continue consideration of this application to the PPSL
Committee meeting on 21 August 2024 to allow additional time for the requested
information to be prepared. 
Decision 
The Committee agreed to continue consideration of the application to the meeting of the
PPSL Committee on 21 August 2024 to allow for the requested information to be
prepared. 
(Reference: Report by Head of Development and Economic Growth dated 8 May 2024, 
supplementary report number 1 dated 21 May 2024 and supplementary report number 2
dated 10 June 2024, submitted) 
5. MR J HERROD: ERECTION OF DWELLINGHOUSE AND DETACHED
GARAGE, UPGRADE OF EXISTING ACCESS AND INSTALLATION OF
SEPTIC TANK WITH ASSOCIATED INFILTRATION SYSTEM:
LEANANMOR, MUASDALE (REF: 23/01358/PP) 
The Planning Officer spoke to the terms of the report.   This proposal seeks detailed
planning permission for the erection of a 1½ storey dwellinghouse and a single storey
detached garage with the minor settlement of Muasdale. 
The proposal has been subject to representation from 10 individuals raising concern on a
variety of matters that include impacts upon road safety, public access, impact on
landscape/visual amenity and impact on biodiversity.  There have been no objections
received from any statutory or non-statutory consultees. 
The site has previously benefitted from planning permission in principle for the erection of
a dwellinghouse, however, these permissions pre-dates the current Development Plan
and has been allowed to lapse unimplemented. 
Notwithstanding the concerns raised by third parties, the proposal is considered to be
consistent with the relevant provisions of the Development Plan (NPF4 and LDP2) and it
was recommended that planning permission be granted subject to the conditions and
reasons detailed in the report of handling. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction

Page 3

Additional Conditions 
PP - Approved Details & Standard Notes – Non EIA Development 
1. The development shall be implemented in accordance with the details specified on the
application form dated 12.07.2023, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan Herrod 23/100-
01 
Rev A. 13.07.2023
Site Plan Herrod 23/100-
02
Rev B. 07.02.2024
Floor Plans and
Elevations of
Dwellinghouse
Herrod 23/100-
03
Rev A. 13.07.2023
Floor Plans and
Elevations of
Detached Garage
Herrod 23/100-
04
Rev A. 13.07.2024 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. PP – Timescale to be Agreed for Completion 
No development shall commence until details of the proposed timescale for completion
of the approved development have been submitted to and approved by the Planning
Authority. Thereafter, the development shall be implemented in accordance with the
duly approved timescale for completion unless an alternative timescale for completion
is otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F. 
3. PP – Access, Parking and Turning As Shown 
The parking and turning area shall be laid out and surfaced in accordance with the
details shown on the approved plans prior to the development first being occupied and
shall thereafter be maintained clear of obstruction for the parking and manoeuvring of
vehicles. Notwithstanding the details on the approved plans, the access arrangements
shall be implemented to accord with the following requirements with the submission of
further information for approval as specified: 
1. Prior to the occupation of the development, the existing access on the A83 Trunk
Road shall be upgraded, generally in accordance with Herrod drawing No. 23/100-
02 Revision B dated 30.09.2023, to the satisfaction of the planning authority, after
consultation with Transport Scotland.

Page 4

2. The first 5 metres from the edge of the A83 trunk road shall be surfaced in a
bituminous surface and measures shall be adopted to ensure that all drainage from
the site does not discharge onto the trunk road. 
3. Prior to the commencement of development, details of the fencing / barrier
proposals along the trunk road boundary shall be submitted to, and approved by,
the planning authority, after consultation with Transport Scotland and thereafter
implemented prior to commencement of operation. The fencing / barrier proposals
shall be located such that they can be erected and maintained from within the
development without requiring access to the trunk road. 
Reasons: In the interest of road safety; to ensure that the standard of access layout
complies with the current standards and that the safety of traffic on the trunk road is
not diminished; to ensure that drivers of vehicles leaving the site are enabled to see
and be seen by vehicles on the trunk road carriageway and join the traffic stream
safely; to ensure that material from the site is not deposited on the trunk road to the
detriment of road safety; to ensure that the efficiency of the existing drainage network
is not affected; to minimise the risk to pedestrians and animals gaining  uncontrolled
access to the trunk road with consequential risk of accidents. 
4. No built development should take place below existing ground level of 3.76mAOD. 
Reason: In order to prevent unacceptable flood risk to people and property. To ensure
a precautionary approach to flood risk and to ensure the longevity and future resilience
of the development of the site to climate change and sea level rise by promoting flood
risk avoidance as set out in Policy 22 of NPF4. 
5. PP – Submission of Details of Materials 
Notwithstanding the effect of Condition 1, no development shall commence until written
details of the type and colour of materials to be used in the construction of external
walls, roofs, windows and doors have been submitted to and approved in writing by the
Planning Authority. The development shall thereafter be completed using the approved
materials or such alternatives as may be agreed in writing with the Planning Authority. 
Reason: In order to integrate the development into its surroundings. 
6. PP – Full Landscaping Scheme 
No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the
Planning Authority. The scheme shall comprise a planting plan and schedule which
shall include details of: 
i) Existing and proposed ground levels in relation to an identified fixed datum;
ii) Existing landscaping features and vegetation to be retained;
iii) Location design and materials of proposed walls, fences and gates;
iv) Proposed soft and hard landscaping works including the location, species
and size of every tree/shrub to be planted; 
v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these
benefits will be maintained for the lifetime of the development;

Page 5

vi) A programme for the timing, method of implementation, completion and
subsequent on-going maintenance. 
In the interests of biodiversity retention/enhancement, the proposed landscape scheme
should include consideration of the retention of the existing hedgerow along the
eastern and southern boundaries of the site in so far as this may be practicable to
comply with the requirements of condition 3. Which requires the formation of visibility
splays and agreement of boundary treatment along the edge of the A83(T) with
Transport Scotland. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity, and to comply with the requirements of NPF4 Policy 3. 
7. PP – Surface Water Drainage – No further detail required 
Notwithstanding the provisions of Condition 1, the development shall incorporate a
surface water drainage system which is consistent with the principles of Sustainable
urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS
Manual C753. The requisite surface water drainage shall be operational prior to the
development being brought into use and shall be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and to
prevent flooding. 
(Reference: Report by Head of Development and Economic Growth dated 6 June 2024,
submitted) 
Having declared an interest in the following item of business, Councillors Fiona Howard
and Paul Kennedy left the meeting at this point. 
6. MR JOE LAFFERTY: ERECTION OF DWELLINGHOUSE AND FORMATION
OF VEHICULAR ACCESS: GARDEN GROUND OF 47 CAMPBELL
STREET, HELENSBURGH (REF: 23/02259/PP) 
The Planning Officer spoke to the terms of the report.  The application is for a single 3-bed
dwelling in the private rear garden of a large, detached 2 storey sandstone villa within
Upper Helensburgh Conservation Area and the established settlement area of
Helensburgh. 
A total of 16 objections and 4 representations have been received.  It is considered that
the proposed development is in accordance with all the relevant provisions of NPF4 and

Page 6

the Argyll and Bute Local Development Plan 2 and that all the material land-use planning
issues arising are not unduly complex.  As such it is not considered that a hearing would
add value to the determination process. 
It was recommended that planning permission be granted subject to the conditions and
reasons detailed in the report. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 23rd November.2023, supporting information and, the approved
drawings listed in the table below unless the prior written approval of the planning
authority is obtained for an amendment to the approved details under Section 64 of the
Town and Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan 2954/100 Revision A 28.11.2023
Existing Site
Topography
showing
Retained and
Removed Trees
2954/101 Revision B 12.02.2024
Elevations, Site
Plan, Floor Plana
and Section
2954/110 Revision A 07.03.2024 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
2. PP – Timescale to be Agreed for Completion    
No development shall commence until details of the proposed timescale for completion
of the approved development have been submitted to and approved by the Planning
Authority.  Such details shall include a phasing scheme for the implementation of the
development in stages and shall include a plan differentiating each distinct phase of
the development and a schedule detailing the sequence in which development is to be
implemented. 
Thereafter, the development shall be implemented in accordance with the duly
approved timescale and phasing scheme unless an alternative timescale or an
amendment to the agreed sequence/timing of development is subsequently agreed in
writing by the Planning Authority.

Page 7

Reason: To ensure the development is implemented on a progressive basis having
regard to infrastructure and servicing requirements and in order to comply with the
requirements of NPF4 Policy 16F. 
3. PP - Junction with public road: 
Notwithstanding the provisions of Condition 1, the proposed access shall be formed in
accordance with the Council’s Roads Standard Detail Drawing 08/002B with the
exception of the width of the driveway which is specified below; and in accordance with
the following requirements: 
i. visibility splays of 2.4 metres to point X by 24  metres to point Y from the centre
line of the proposed access measured from the rear of the grass verge/line of
the front face of the existing boundary wall;
ii. a pedestrian visibility splay of 2.4 metres to point X by 2.4 metres to point Y
from the centre line of the proposed access;
iii. minimum driveway access width of 3.7 metres for the first 10 metres; 
iv. the first 5.0 metres of the access shall be surfaced with a bound material, such
as bitumen macadam or concrete, or any alternative material that has been
submitted to and approved in writing by the planning authority in consultation
with the road authority, prior to the final wearing surface being laid.
v. the proposed private access shall be graded, where possible, and designed to
incorporate surface water run-off from the access that drains within the
application site in order to prevent water and debris run-off onto the public road. 
Prior to work starting on site the access hereby approved shall be formed to at least
base course standard and the visibility splays shall be cleared of all obstructions such
that nothing shall disrupt visibility from a point 1.05 metres above the access at point X
to a point 0.6 metres above the public road carriageway at point Y. 
The final wearing surface on the access shall be completed prior to the development
first being brought into use and the visibility splays shall be maintained clear of all
obstructions thereafter. 
Reason: In the interests of road safety. 
4. PP - Parking and Turning As Shown 
The parking and turning area shall be laid out and surfaced in accordance with the
details shown on the approved plans unless an alternative layout for parking and
turning is approved in writing by the Planning Authority in consultation with Area Roads
prior to the commencement of development. 
The approved scheme shall be completed in accordance with the approved details
prior to the development first being occupied and shall thereafter be maintained clear
of obstruction for the parking and manoeuvring of vehicles. 
Reason: In the interest of road safety. 
5. PP - Electric Vehicle Charging – Residential with off street parking

Page 8

Prior to the commencement of the development (or such other timescale as may be
agreed in writing with the Planning Authority), a scheme detailing the provision of a
minimum 7kw electric vehicle charging point shall be submitted to and approved in
writing by the Planning Authority. Where charging cannot be provided then the
appropriate ducting to future proof the property must be installed. 
The approved charging point, or where relevant, the approved cable ducting shall be
installed in full prior to the first occupation of the development, and thereafter retained
in perpetuity unless otherwise agreed in writing by the planning authority  
Reason: to comply with the provisions of NPF4 Policy 13 Sustainable Transport and
LDP2 Policy 34 – Electric Vehicle Charging. 
6. PP – Submission of Details / Samples 
Notwithstanding the effect of Condition 1, no development shall commence until full
details and/or material samples, where specified (below) have been submitted to and
approved in writing by the Planning Authority. The details/samples shall include the
following: 
i. samples of the natural stone to be used in the development and written details of
the size and coursing and, means of pointing of all stone work:
ii. manufacturers specifications for the natural roof slates and all rainwater goods:
iii. details of the surface finish/colour for the fascias and window/door frames: and,
iv. details of the coping for the skews, unless this is proposed to be natural stone
subject to the provisions of 4 (i) above:
v. details for the hard surfacing of the parking/turning area and paving for paths and
terraces. 
The development shall thereafter be completed using the approved specifications or
such alternatives as may be agreed in writing with the Planning Authority. 
Reason: In order to integrate the development into its historic context and to ensure
that the proposed development will preserve enhance or support the character and
appearance of the conservation area. 
7. PP – Submission of Further Details for the Proposed Gateway/Gate 
Notwithstanding the effect of Condition 1, no development shall commence until full
details of the proposed new gateway, including the new gate piers, and the proposed
gates are submitted to and approved in writing by the planning authority. 
Thereafter the development shall be completed in accordance with the approved
details or such alternatives as may be agreed in writing with the Planning Authority. 
Reason: In order to integrate the development into its surroundings, to preserve the
character and integrity of this historic stone boundary wall and to ensure that the
development preserves, or where possible enhances the character and appearance of
the conservation area. 
8. PP – Tree Retention and Protection

Page 9

No development shall commence until a scheme for the retention and safeguarding of
trees during construction has been submitted to and approved by the Planning
Authority. The scheme shall comprise: 
i. Details of all trees to be removed and the location and canopy spread of trees to
be retained as part of the development;
ii. A programme of measures for the protection of trees during construction works
which shall include fencing at least one metre beyond the canopy spread of
each tree in accordance with BS 5837:2012 “Trees in Relation to Construction”. 
Tree protection measures shall be implemented for the full duration of construction
works in accordance with the duly approved scheme. No trees shall be lopped, topped
or felled other than in accordance with the details of the approved scheme unless
otherwise approved in writing by the Planning Authority. 
Reason: In order to retain trees as part of the development in the interests of
preserving/enhancing the character and appearance of the conservation area and the
amenity and nature conservation. 
9. PP – Full Landscaping Scheme 
No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the
Planning Authority. The scheme shall comprise a planting plan and schedule which
shall include details of: Amended March 2023 to include additional biodiversity element
for NPF4 condition 3C 
(i) Existing and proposed ground levels in relation to an identified fixed datum;
(ii) Existing landscaping features and vegetation to be retained;
(iii) Location design and materials of proposed walls, fences and gates;
(iv) Proposed soft and hard landscaping works including the location, species and
size of every tree/shrub to be planted;
(v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits
will be maintained for the lifetime of the development;
(vi) A programme for the timing, method of implementation, completion and
subsequent on-going maintenance. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority. The
biodiversity statement should refer to Developing with Nature guidance | NatureScot as
appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of preserving or enhancing the character and appearance of the conservation
area and contributing to biodiversity.

Page 10

10. PP – Submission of Finished Floor Levels 
No development shall commence until details of the proposed finished ground floor
level of the development relative to an identifiable fixed datum located outwith the
application site have been submitted to and approved in writing by the Planning
Authority. The development shall be implemented in accordance with the approved
details. 
Reason: In order to secure an acceptable relationship between the development and
its surroundings. 
11. PP – Surface Water Drainage – Further detail required 
Notwithstanding the provisions of Condition 1, no development shall commence until
full details of the intended means of surface water drainage to serve the development
have been submitted to and approved in writing by the Planning Authority. 
The duly approved scheme shall be implemented in full concurrently with the
development that it is intended to serve and shall be operational prior to the occupation
of the development and maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and to
prevent flooding. 
12. PP – Restriction of Engineering/Construction Activity by Time 
Notwithstanding the provisions of Condition 1, no engineering and/or construction
activity, including the unloading of vehicles shall be take place on the site outwith the
hours of 08:00 till 18:00 on weekdays; 09:00 – 13:00 on Saturdays. No engineering
and/or construction activity shall be carried out at any time during Sundays and Bank
Holidays. 
Reason: In order to protect the amenity of the area. 
13. PP – Construction Management Plan - Protection of Grass Verges 
Notwithstanding the provisions of condition 1, no development shall commence until a
Construction Management Plan has been submitted to and approved in writing by the
Planning Authority. The Management Plan should clearly indicate all grass verges on
the west side of Campbell Street and the south side of Barclay Drive adjacent to the
application site and provide details of how these grass verges (with the exception of
the proposed private access as identified on the approved drawings), are to be
protected from construction-related damage including, but not exclusively to vehicular
movements; storage of spoil and/or materials. 
Thereafter, the construction phase shall be carried out in full accordance with the
approved plan and the grass verges adjacent to the application site, with the exception
of the private driveway identified on the approved drawings, retained in their present
condition in perpetuity. 
In the event of any accidental damage to the aforesaid grass verges to Campbell
Street and/or Barclay Drive, the applicant/developer shall re-instate the grass and soil
to the condition of the verges prior to commencement of development.

Page 11

Reason: In order to retain the grass verges in the interests of preserving local visual
amenity and the character and appearance of this part of the conservation area. 
(Report by Head of Development and Economic Growth dated 6 June 2024, submitted) 
Councillors Fiona Howard and Paul Kennedy re-joined the meeting at this point. 
7. CRERAN HOMES LTD: ERECTION OF 6 DWELLINGHOUSES AND
INSTALLATION OF 2 SEPTIC TANKS: LAND SOUTH EAST OF
INVERBHREACH COTTAGES, BARCALDINE (REF: 23/02409/PP) 
The Planning Officer spoke to the terms of the report.  The application is seeking to
secure planning permission for the erection of 6 dwellinghouses, the formation of a private
access track and the installation of 2 septic tanks and soakaways.  The principle of
residential development on this site has been established by the adopted LDP2 which
identifies the site as a Housing Allocation (H4017) allocated for development with 50 units
with a 25% affordability requirement. 
A total of 18 objections and one representation has been received. 
The proposed small scale housing development is considered to be consistent with the
provisions of the adopted National Planning Framework 4 and Local Development Plan 2
with the issues raised by third parties not considered to raise material considerations of
sufficient significance to withhold planning permission. 
It was recommended that planning permission be granted subject to the conditions and
reasons detailed in the report. 
Decision 
The Committee agreed to grant planning permission subject to the following conditions
and reasons: 
Standard Time Limit Condition (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions 
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 15/12/23, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref.
No.
Version Date
Received
Pre-Development Surface Water
Run Off Layout 
0460-C-0004 P01  08/04/24 
Post-Development Surface Water 0460-C-0005 P01 08/04/24

Page 12

Run Off Layout 
Proposed Below Ground
Drainage Layout 
0460-C-0032 P03  08/05/24 
Location Plan  5021-02-301 B 19/12/23 
Site Plan  5021-02-302 B 19/12/23 
GF Plan HT01  5021-03-301 B 19/12/23 
GF Plan HT01H 5021-03-
301H
B 19/12/23 
FF Plan HT01  5021-03-302  B  19/12/23 
FF Plan HT01 Handed  5021-03-
302H
B 19/12/23 
GF Plan HT03  5021-03-305  B 19/12/23 
GF Plan HT03 Handed  5021-03-
305H
B 19/12/23
FF Plan HT03  5021-03-306  B  19/12/23 
FF Plan HT03 Handed  5021-03-
306H
B 19/12/23 
Elevations HT01  5021-04-301 B 19/12/23 
Elevations HT01 Handed  5021-04-
301H
B 19/12/23 
Colour Options HT01  5021-04-302 B 19/12/23 
Elevations HT03  5021-04-305 B 19/12/23 
Elevations HT03 Handed  5021-04-
305H
B 19/12/23 
Colour Options HT03  5021-04-306  B 19/12/23
Site Sections 01  5021-05-301 B 19/12/23 
Site Sections 02  5021-05-302  B  19/12/23 
Drainage, SUDS and Surface
Water Management Plan – 49
Pages 
21/03/24 
Flood Risk Assessment – 39
Pages  
12/02/24 
Greenfield Run Off    08/04/24 
Percolation Tests – 4 Pages    08/05/24 
Supporting Statement – 15 Pages    18/12/23 
Surface Water Network (Land
Drainage) – 13 Pages  
08/04/24 
Surface Water Network
(Soakaway) – 5 Pages  
08/04/24 
TN06 – Sustainability Checklist –
7 Pages 
18/12/23 
TN07 – Sustainable Buildings
Checklist – 4 Pages 
18/12/23 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details. 
Note to Applicant 
Regard should be had to Scottish Water and the Oban and District Access Panel
comments in relation to the proposed development, details of which are available to
view via the Public Access section of the Council’s website.

Page 13

2. PP – Vehicular Access 
No development shall commence until plans and particulars of the means of vehicular
access to serve the development have been submitted to and approved by the
Planning Authority in consultation with the Roads Authority. Such details shall
incorporate:   
i. Upgrade of the existing access at its junction with the B845 comprising a kerb
radius of 6 metres and provision of a 2 metre footway at the north west side of
the access road; 
ii. Visibility splays measuring 2.4 metres to point X by 75 metres to point Y from
the centre line of the junction; 
iii. Details of speed calming measures (speed cushions) within the development
road at locations to be agreed with the Roads Authority;
iv. Details of a passing place approximately midway on the private access road
serving Plots 3-04, 3-05 and 3-06;
v. Details of a 2 metre level service strip for pedestrian refuge along the extent of
the new private access roads;
vi. Details of a turning head to Figure 18 of The National Development Guide at the
end of the private access road serving Plots 3-04, 3-05  and 3-06;
vii. Details of a bin storage area at a point next to the private access road serving
Plots 3-01 and 3-02. 
Prior to work starting on site, the approved scheme of works in respect of junction
upgrade shall be formed to at least base course standard and the visibility splays shall
be cleared of all obstructions such that nothing shall disrupt visibility from a point 1.05
metres above the junction at point X to a point 0.6 metres above the public road
carriageway at point Y. The final wearing surface on the access shall be completed
prior to the development first being brought into use and the visibility splays shall be
maintained clear of all obstructions thereafter. 
The approved speed calming measures, passing place, service strips, turning head
and bin storage area shall be implemented in full prior to the development first being
occupied to the satisfaction of the Roads Authority. 
Reason: In the interests of road safety. 
Note to Applicant 
• A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained from
the Council’s Roads Engineers prior to the formation/alteration of a junction with the
public road. 
• The access shall be constructed and drained to ensure that no surface water is
discharged onto the public road. 
• No walls, fences, hedges etc. will be permitted within 2 metres from the channel line
of the public road. 
3. PP  - Sustainable Drainage System

Page 14

The surface water drainage system for the development shall be undertaken in
accordance with the Drainage, Suds and Surface Water Management Plan dated
March 2024 and the associated drawings set out in Condition 1 above and shall be
operational before the first occupation of the first dwellinghouse to be completed.   
Note to Applicant: 
Regard should be had to the consultation comments from JBA Consulting Ltd in
relation to the proposed development, details of which are available to view via the
Public Access section of the Council’s website. 
4. PP – Landscaping Scheme and Biodiversity Enhancement Measures 
No development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the
Planning Authority. The scheme shall comprise a planting plan and schedule which
shall include details of: 
vii) Existing and proposed ground levels in relation to an identified fixed datum;
viii) Existing landscaping features and vegetation to be retained;
ix) Location design and materials of proposed walls, fences and gates;
x) Proposed soft and hard landscaping works including the location, species
and size of every tree/shrub to be planted;
xi) A programme for the timing, method of implementation, completion and
subsequent on-going maintenance;
xii) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these
benefits will be maintained for the lifetime of the development. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority. 
Any trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required to be
planted unless otherwise approved in writing by the Planning Authority. 
All physical biodiversity enhancement measures (bird nesting boxes, ‘swift bricks’,
wildlife ponds, bat and insect boxes, hedgehog homes etc.) shall be implemented in
full before the development hereby approved is first brought into use. 
All biodiversity enhancement measures consisting of new or enhanced planting shall
be undertaken either in accordance with the approved scheme of implementation or
within the next available planting season following the development first being brought
into use. 
The biodiversity statement should refer to Developing with Nature guidance |
NatureScot as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the
interest of amenity and in order to comply with the requirements of NPF4 Policy 3.

Page 15

5. PP – Finishing Materials 
Notwithstanding the effect of Condition 1, no development shall commence until written
details of the proposed external finishing materials to be used in the construction of the
proposed dwellinghouses have been submitted to and approved in writing by the
Planning Authority. The development shall thereafter be completed using the approved
materials or such alternatives as may be agreed in writing with the Planning Authority. 
Reason: In order to integrate the development into its surroundings. 
6. PP - Electric Vehicle Charging – Residential with off street parking 
Prior to the commencement of the development (or such other timescale as may be
agreed in writing with the Planning Authority), a scheme detailing the provision of a
minimum 7kw electric vehicle charging point shall be submitted to and approved in
writing by the Planning Authority. Where charging cannot be provided then the
appropriate ducting to future proof the property must be installed.  
The approved charging point, or where relevant, the approved cable ducting shall be
installed in full prior to the first occupation of the development, and thereafter retained
in perpetuity unless otherwise agreed in writing by the planning authority  
Reason: to comply with the provisions of NPF4 Policy 13 Sustainable Transport and
LDP2 Policy 34 – Electric Vehicle Charging. 
(Reference: Report by Head of Development and Economic Growth dated 4 June 2024,
submitted) 
8. CHIVAS BROTHERS LTD: PROPOSAL OF APPLICATION NOTICE FOR
PROPOSED WHISKY DISTILLERY TOGETHER WITH VISITOR
FACILITIES, WATER ABSTRACTION, LONG SEA OUTFALL, ROAD
IMPROVEMENT WORKS AND ALL ASSOCIATED INFRASTRUCTURE:
LAND AT GARTBRECK FARM, MOSS ROAD, BOWMORE, ISLE OF ISLAY
(REF: 24/00796/PAN) 
The Senior Planning Officer spoke to the terms of the report.  The proposal site relates to
a former dairy farm located at Gartbreck on an area of otherwise undeveloped coastline
approximately 3 km south west of Bowmore.  The site is served by a single access road
that leads off the A846 Port Ellen to Bowmore road and also serves the Bowmore Waste
Water Treatment works and the Bowmore landfill and waste reclamation site. 
The site is located within the Countryside Zone and also lies within both Laggan Bay and
Peninsula designated Site of Special Scientific Interest (SSSI) and Special Protection
Area (SPA).   
The report sets out the information submitted to date as part of the Proposal of Application
Notice (PAN) and summarises the policy considerations, against which any future
planning application will be considered as well as potential material considerations and
key issues based upon the information received to date.   
It was recommended that Members note the content of the report and submissions and
provide such feedback as they consider appropriate in respect of the PAN to allow these

Page 16

matters to be considered by the Applicant in finalising any future planning application
submission. 
Decision 
The Committee noted the content of the report and requested that the following matters be
given consideration in finalising any future planning application submission – 
1. the impact of another distillery on the island as a whole and the cumulative impact of
the distilleries already on the island; 
2. any additional infrastructural requirements to support another distillery on the island; 
3. the commercial opportunities and economic benefits that may arise from the proposed
development; and 
4. a view from local Members given the issues with housing and transport on the island. 
(Reference: Report by Head of Development and Economic Growth dated 6 June 2024,
submitted) 
9. BUILDING STANDARDS PERFORMANCE REPORT 2023-24 
A report updating the Committee on progress which has been made to deliver the Building
Standards Balanced Scorecard 2023/25, highlighting achievements and performance in
2023-2024 and identifying additional priorities for the forthcoming year, was considered. 
Decision 
The Committee agreed to note and welcome the positive performance by Building
Standards in 2023/24. 
(Reference: Report by Executive Director with responsibility for Development and
Economic Growth dated 13 May 2024, submitted)