Page 1

NORTH AYRSHIRE COUNCIL 
9 December 2025 
Local Development Plan Committee 
Title:    Evidence Report 
Purpose:  To update the Committee on the preparation of the Council’s
next Local Development Plan (LDP3) and seek approval of the
proposed Evidence Report. 
Recommendation:  That the Committee approves the proposed Evidence Report at
Appendix 1 for submission to Scottish Ministers. 
1. Executive Summary 
1.1 North Ayrshire Council, as the local planning authority, is required to prepare a local
development plan for the district and keep the plan under review. Scotland’s planning
system is plan-led, meaning decisions on planning applications are to be made in
accordance with the development plan, unless there are material considerations that
indicate otherwise. The development plan for North Ayrshire comprises the Adopted
Local Development Plan (LDP2) and National Planning Framework (NPF4). LDP2 was
approved by the Local Development Plan Committee on 17 September 2019 and sets
out a spatial strategy for development in North Ayrshire, including where new
development should and should not take place. 
1.2 In the context of wide-ranging planning reform, which makes significant changes to the
development planning system and the way local development plans are to be
prepared, work commenced on the review of LDP2 in 2023 by way of early
engagement with communities and other stakeholders and data collection. As part of
the reforms to the planning system, the period for review of local development plans
has been extended from five to 10 years. Every planning authority in Scotland is
expected have a new style LDP in place by May 2028, which is five years on from the
relevant provisions of new Regulations coming into force in 2023.
1.3 The Evidence Report brings together data and engagement outputs and is the first
stage in the preparation of North Ayrshire’s third Local Development Plan (LDP3). It
has been prepared in accordance with Section 16B of the Town and Country Planning
(Scotland) Act 1997, as amended by The Planning (Scotland) Act 2019. Evidence
Reports are a new stage in the development planning process. The purpose of the
Evidence Report is to support the quality and effectiveness of the LDP by establishing
a robust evidence base to inform the process of plan making, justify the content of the
Plan and provide a baseline for future monitoring.
1.4 The proposed Evidence Report comprises: an evaluation of the Adopted Local
Development Plan (LDP2); a summary of sustainable, older engagement undertaken

Page 2

in the preparation of the Evidence Report; and evidence relating to six topics: the
planning and delivery of liveable, sustainable and productive places and, more
specifically, housing, transport and infrastructure. The Position Statement summarises
the implications of the evidence for the Proposed Plan and the areas where the
evidence is uncertain or incomplete or is disputed by stakeholders.
1.5 The Evidence Report requires formal approval by the Council before it is submitted to
Scottish Ministers. Upon submission, Scottish Ministers will appoint a person to
assess whether the report contains sufficient information to enable the planning
authority to prepare a local development plan. This process is known as a ‘Gate
Check.’
2. Background 
2.1 North Ayrshire Council adopted LDP2 on 28 November 2019. The policies, proposals
and site allocations included within LDP2 – alongside the National Planning
Framework (NPF4) – are the basis for determining planning applications, with
decisions made in accordance with the development plan (LDP2 and NPF4) unless
material considerations indicate otherwise. Work has commenced on the preparation
of a new local development plan, which will replace LDP2. 
2.2 The Planning (Scotland) Act 2019 makes significant changes to the development
planning system and the way local development plans are to be prepared, as part of
wider reforms to the planning system. The new legislative provisions and regulations
relating to the development planning system came into force in May 2023 with local
development planning guidance published at the same time, setting out the Scottish
Ministers’ expectations for implementing this new system. In accordance with the
legislation, regulations and guidance, an Evidence Report has been prepared as the
first stage in preparing a new LDP for North Ayrshire. 
2.3 Evidence Reports are a key change to the development planning system. Replacing
the ‘Main Issues Report’, the purpose of the Evidence Report is to support the quality
and effectiveness of the LDP by establishing a robust evidence base – including the
views of local communities and those involved in the plan’s implementation – to inform
the process of plan making, justify the content of the plan and provide a baseline for
future monitoring. The Evidence Report is not expected to contain all the detail of
evidence but should provide a summary of what the evidence means for the plan.
2.4 An assessment of the Evidence Report, known as the Gate Check, will be carried out
by a person appointed by the Scottish Ministers. The Gate Check provides an
independent assessment of whether the planning authority has sufficient information
to prepare an LDP. It may be decided there is sufficient information, and, the planning
authority can then move to prepare and publish their Proposed Plan, or the Gate
Check may find there is not sufficient information and provide recommendations for
improving the Evidence Report, which must be resubmitted.
2.5 To date, there have been 19 completed Gate Checks, including three Gate Checks of
resubmitted Evidence Reports. Only seven Evidence Reports have been assessed as
sufficient, two which were resubmissions, giving a first-time ‘pass rate’ of 31% (five out
of 16). The Planning Service has sought to learn lessons from all the completed Gate
Checks in the preparation of the Evidence Report, which is summarised below.

Page 3

Evaluation of LDP2
2.6 After the introduction to the Evidence Report for LDP3, which describes how the
Evidence Report has been prepared and explains the structure of the report, an
evaluation of LDP2 is provided. As part of the preparation of the Evidence Report, the
guidance states a planning authority should evaluate whether the previous plan has
delivered on its outcomes, and spatial allocations, identify any lessons learnt for the
preparation of the new plan and consider the appropriateness of the previous spatial
strategy. 
2.7 A Draft Delivery Programme has been prepared alongside the Evidence Report and
assists in the evaluation of LDP2. The Draft Delivery Programme sets out how the
Council has progressed the implementation of LDP2 and identifies the further actions
to be undertaken to deliver the policies, proposals, and site allocations of the Plan. It
updates the previous Action Programme, which was published in February 2020. The
Draft Delivery Programme is summarised within the Evidence Report. 
2.8 Overall, it is considered that LDP2’s spatial strategy remains appropriate. The adopted
plan has directed most development to our towns, villages and developed coastline
where there is infrastructure capacity to support new development, where there is
access to existing services and where there are opportunities to re-use and redevelop
brownfield land. LDP2 has delivered on the outcome of housing delivery, particularly
within the private sector, stimulating an increase in private sector housebuilders
developing and interested in developing new homes in North Ayrshire. 
Stakeholder Engagement
2.9 New-style local development plans are expected to be people-centred. This means
considering how LDP3 can best meet the needs and aspirations of the different people
who have an interest in North Ayrshire; address longstanding inequalities and
eliminate discrimination; and implement community wealth building. Early,
collaborative, meaningful, and proportionate engagement, is requested, with all views
taken into account. The Evidence Report summarises of all engagement activities
undertaken, with the relevant outputs noted within the six topic-based schedules. A
more detailed overview of the engagement undertaken to date will be set out in the
Record of Engagement. 
2.10 The engagement undertaken in the preparation of the Evidence Report has taken
many forms, including online surveys, public drop-in events, presentations to
community bodies and meetings with key agencies. Engagement carried out by the
Council’s Planning Service directly, referred as ‘primary engagement’ has been
complemented by the outputs from engagement activities undertaken by other Council
departments, community planning partners, and community bodies, including in the
preparation of the North Ayrshire Partnership Plan and Locality Action Plans. This has
also included taking cognisance of the six registered Local Place Plans prepared by
community bodies across North Ayrshire and two Local Island Plans.
2.11 Our Council Plan 2023 to 2028 has communities and local democracy as one of four
interlinked and interdependent priorities. Through continuing the close alignment
between the LDP and Community and Locality Planning established at LDP2 and
developing relationships with communities and other stakeholders, our approach to
preparing LDP3 seeks to ensure opportunities and support for all residents to take part
in influencing the new plan, either directly or indirectly via their input into other

Page 4

strategies, including those which have been community-led. We will continue this
approach as we move to prepare the Proposed Plan, with a focus on placemaking. 
Topic 1 – Liveable Places
2.12 The ‘Liveable Places’ section of the Evidence Report aligns the preparation of the
LDP3 with place-based approaches that consider all the physical, social and economic
elements of North Ayrshire collectively to support and enhance the potential of the
people, physical and natural assets, understanding the issues, interconnections and
relationships relating to a place and co-ordinating action to improve outcomes define
place-based approaches. Local development planning guidance identifies
development planning as having a leadership role to play in putting place-based
approaches and the Place Principle into practice and as having a key role in
placemaking, a place-based approach which has a specific focus on creating good
quality places that promote people’s health, happiness and wellbeing.
2.13 In line with this aspiration, the Evidence Report summarises the challenges around
health inequality and child poverty experienced in parts of North Ayrshire. A declining
and aging population and issues around employment are also highlighted as important
to the context for LDP3. 
2.14 The implications for the Proposed Plan identified in relation to the policy setting and
relevant evidence include that LDP3 should be place-based, tell a clear and
compelling story about the future of the places in our area and seek to create good
quality places that promote people’s health, happiness and wellbeing. LDP3 will share
the vision of the North Ayrshire Partnership Plan: “North Ayrshire – Fair for All”,
reflecting a coherent approach consistent with the Place Principle and must explain
how the development and use of land can contribute to delivering this vision and the
clear priorities that have been established by our communities relating to wellbeing,
work and the world in which they live.   
Topic 2 – Housing
2.15 Local development plans have a key role in housing delivery, including by establishing
a local housing land requirement and the allocation of deliverable land to meet this
target. The Evidence Report summarises evidence on the housing needs of North
Ayrshire, including the needs of persons undertaking further and higher education,
older people and disabled people, and Gypsy/Travellers; housing delivery and existing
housing stock and land. 
2.16 LDP3 is required to identify a Local Housing Land Requirement (LHLR) for North
Ayrshire to meet the duty for a housing target and to represent how much land is
required for housebuilding. In setting out what the evidence means for the Proposed
Plan, the Evidence Report is expected to include an indicative LHLR. To promote an
ambitious and plan-led approach, the Local Housing Land Requirement is expected to
exceed the 10-year Minimum All-Tenure Housing Land Requirement (MATHLR) set
out in Annex E of NPF4, which is 2,950 for North Ayrshire. 
2.17 An indicative Local Housing Land Requirement (iLHLR) figure for North Ayrshire of
4,500 is proposed within the Evidence Report. This is the number of homes LDP3 will
require to plan for the delivery of over the ten-year plan period (2027 to 2037). A
transparent and understandable explanation of how the indicative LHLR has been
arrived is set out by the Evidence Report. In short, the figure meets our understanding

Page 5

of housing need in North Ayrshire; accords with policy aspirations to increase
housebuilding; and is considered achievable based on recent completions,
programmed delivery and the established housing land supply. 
2.18 The Evidence Report reflects on community engagement, evidence and changes
relevant to the delivery of affordable housing and adopts the position that the Council
is minded to reintroduce an affordable housing developer contribution policy. Further
evidence and stakeholder engagement is identified as required to inform the detail of a
policy, to be developed alongside the preparation of the Proposed Plan. The scope
and nature of any affordable housing developer contribution policy will be determined
by the further work to be undertaken, acknowledging the importance that any
contribution requirements do not undermine development viability and aspirations to
increase housebuilding. 
Topic 3 – Sustainable Places
2.19 The need for LDP3 to address the twin, reinforcing crises of the global climate and
nature emergencies as a priority is recognised within the Sustainable Places schedule
of the Evidence Report. Polices and priorities expressed at international, national, and
local levels, including NPF4, emphasise the need to reduce greenhouse gas
emissions, adapt to the future impacts of climate change and respond to a growing
nature crisis. LDP3 will have a significant role in the protection, recovery, restoration
and enhancement of our environment and the planning and delivery of sustainable
places.
2.20 Topic 3 summaries evidence in relation to a range of interrelated topics relevant to the
environment, including biodiversity, the historic environment, renewable energy, flood
risk, and the water environment. Blue and green infrastructure is identified as having a
key role to play in achieving a range of environmental objectives, including in relation
to climate change and biodiversity. The North Ayrshire Nature Networks is inherent
within green and blue infrastructure and central to increasing ecological connectivity
and restoration of nature. The Proposed Plan must identify and protect blue and green
infrastructure assets and networks, including the North Ayrshire Nature Network, and
set out opportunities for these to be enhanced and expanded, including by new
development that must be ‘nature positive.’
2.21 The need to make productive use of existing buildings, places and infrastructure,
optimising the use of land to provide services and resources by limiting urban
expansion and, accordingly, encouraging, promoting and facilitating the reuse of
brownfield, vacant and derelict land and empty buildings is highlighted alongside
supporting all forms of renewable and community energy generation, storage,
transmission and distribution infrastructure and emerging low-carbon and zero
emissions technologies and the requirement for an a precautionary approach to flood
risk. A Strategic Flood Risk Assessment has been prepared to identify areas in North
Ayrshire which are at risk of flooding. 
Topic 4 – Transport
2.22 The relationship between land use and transport is critical, with the location of new
development fundamental to its connectivity and the travel choices people are able
and choose to make. Transport is relevant not only in the context of greenhouse gas
emissions but also to health and wellbeing, the fairness of our society and the
inclusiveness of our economy. Evidence is set out under topic 4 on the existing

Page 6

transport network in North Ayrshire and planned strategic transport schemes,
including the upgrading of the B714. 
2.23 The overall policy context for transport can be summarised as reducing the need to
travel unsustainably. LDP3’s spatial strategy must reflect the sustainable travel
hierarchy and sustainable investment hierarchy, promoting and facilitating sustainable
travel modes, starting with walking, wheeling, and cycling, and making better use of
existing infrastructure and services. 
2.24 The Evidence Reports sets out our commitment to producing a transport appraisal of
the Proposed Plan. The appraisal and its outcomes are required to prioritise
sustainable travel consistent with the sustainable travel and investment hierarchies.
We will continue to engage with Transport Scotland to develop an appropriate
methodology for a proportionate, multi-modal transport appraisal. 
2.25 Capacity constraints on the strategic road network are highlighted as an issue in some
locations, including the Pennyburn Roundabout. The impact of the spatial strategy and
allocated development sites on the strategic (trunk) road network, in consultation with
Transport Scotland, must be assessed as part of the transport appraisal. The
preparation of LDP3 and the associated transport appraisal presents an opportunity to
review the Irvine Bay Transport Model Protocol, which was developed by the Council
in 2015 to mitigate potential congestion impacts arising from developments identified
in the first Local Development Plan (LDP1), should these be found to occur. 
Topic 5 – Productive Places
2.26 Through the actions of the Community Wealth Building Strategy, we are committed to
embedding community wealth building within LDP3 to ensure future development
takes account of local economic priorities and provides benefits for communities. A
strategic approach which enables community benefits to be delivered by all
development, not just Council or other anchor institution projects, is identified as
required to be progressed as an integral part of the preparation of the Proposed Plan,
to ensure the new plan is aligned with the Community Wealth Building Strategy.
2.27 Community Wealth Building aligns with national aspirations, including as set out in the
National Planning Framework, to create a greener, fairer, and more inclusive
wellbeing economy. The Evidence Report sets out the principle economic
characteristics of North Ayrshire that provide the rationale for our approach to
community wealth building aims to deliver a wellbeing economy that works for people
and planet and delivers social, economic, and environmental justice for all.
2.28 The ‘Productive Places’ topic also considers evidence relevant to our industrial land
supply, town centres and retail and has been informed by an appraisal of the
employment land supply and a retail capacity study. Tourism, culture, and creative
industries are additionally recognised as important to North Ayrshire’s economy. The
need for LDP3 and its associated Delivery Programme to support and help facilitate
Ayrshire Growth Deal projects and sustainable futures for our network of town and
village centres is highlighted. 
Topic 6 – Infrastructure
2.29 Infrastructure considerations are integral to development planning and decision-
making within the planning system, particularly in the context of delivery. National

Page 7

planning policy calls for an infrastructure first approach to land use planning which
puts infrastructure considerations at the heart of placemaking. As part of an evidence-
based approach, potential impacts on infrastructure and infrastructure needs should
be understood early in the development planning process. This section of the
Evidence Report considers health care, education, energy, digital and water
infrastructure within North Ayrshire.
2.30 Engagement with local communities has indicated that access to GPs and the
capacity of medical practices is a key concern, particularly in the context of new
housing development. This is also reflected in the engagement caried out by the
Health and Social Care Partnership. Primary healthcare services are understood to be
under considerable pressure due to a variety of factors. NHS Ayrshire and Arran and
the North Ayrshire HSCP are in the process of reviewing practice operating models,
quality indicators and identifying improvement work, which in turn will highlight future
accommodation requirements to meet these challenges and deliver on the long-term
‘Caring for Ayrshire’ ambition. LDP3 will need to reflect emerging solutions to the
modernisation of the primary healthcare estate.
2.31 Managing the school estate to match the evolving demand for school places with
supply to deliver education and other services is a major challenge for all local
authorities. In North Ayrshire, school rolls overall are declining in line with falling birth
rates, however, increased housebuilding is expected to create capacity issues in some
locations. The Proposed Plan should allocate housing development within school
catchments where there is capacity within the catchment schools (primary and
secondary) or where there is an agreeable solution, in line with the infrastructure first
principle. In this context, the potential requirement for developer contributions towards
education and healthcare infrastructure is noted, however, any such approaches will
require further evidence, particularly with regard to emerging models of healthcare
delivery and development viability. 
Summary
2.32 The Evidence Report summarises evidence gathered, including the views of
stakeholders, in relation to the six topic areas and sets out North Ayrshire Council’s
view on the implications of this evidence for the Proposed Plan. A review of the
adopted LDP has also been undertaken. These implications are summarised below: 
• LDP3 must address the twin reinforcing global climate emergency and nature
crises by supporting development that reduces emissions, adapts to current and
future risks of climate change, and promotes nature recovery and restoration. 
• A joined-up, collaborative, participative and inclusive place-based approach must
be taken to the preparation of LDP3. The plan should seek to create good quality
places that promote people’s health, happiness, and wellbeing; reduce
inequalities and are resilient to the effects of climate change.
• 20-minute neighbourhoods, and blue green infrastructure, with nature networks at
their heart, are important devices for delivering new development in our urban
areas that contributes to creating sustainable, liveable, and productive places.
• LDP3 must encourage, promote, and facilitate the delivery of more high quality,
affordable and sustainable homes, in the right locations, providing choice across
tenures that meet the diverse housing needs of people and communities across

Page 8

North Ayrshire. An indicative Local Housing Land Requirement of 4,500 new
homes over the LDP3 plan period to support this, delivery of which will require
additional housing allocations to be made. Within this figure, there is a need to
deliver new housing that will meet the needs of a population which is growing
older and for the continued delivery of affordable housing. Developer
contributions are identified as a means of supporting this. 
• Informed by a Transport Appraisal, LDP3’s spatial strategy must seek to reduce
the need to travel unsustainably and take account of existing transport
infrastructure capacity constraints.
• Community wealth building should be embedded within LDP3, to ensure future
development takes account of local economic priorities, provides benefits for
communities, and helps deliver a wellbeing economy that works for people and
planet and delivers social, economic, and environmental justice for all.
• Infrastructure constraints and requirements and deliverability must be central to
the preparation of the Proposed Plan as part of an ‘infrastructure first’ approach.
The capacity of local services, primarily health care facilities, has been identified
as a significant concern by local communities and we must work with the NHS
and HSCP to support emerging models of care. 
2.33 By working closely with key agencies and stakeholders, we have been able to limit the
number of disputes with the Evidence Report to one. Homes for Scotland dispute the
position set out regarding an Affordable Housing Developer Contribution policy,
seeking more general wording stating that the Council will consult on a potential
affordable housing policy. The Evidence Report states North Ayrshire Council is
minded to introduce an affordable housing developer contribution (AHDC) policy and,
in developing the policy, we will take an evidence-based approach to establishing
further evidence, including through engagement with key stakeholders involved in the
delivery of new homes in North Ayrshire.  
2.34 Historic Environment Scotland have advised they are content with the evidence
provided in the report and raise no disputes; SEPA have provided a statement of
agreement to the Strategic Flood Risk Assessment and for evidence relating to nature
networks, blue green infrastructure and the water environment; and NatureScot have
also confirmed its agreement with the draft evidence report. Transport Scotland have
confirmed that it is satisfied with the sufficiency of the transport evidence.
2.35 Where disputes over the sufficiency of the evidence remain, the Gate Check provides
an opportunity for the reporter to consider the different viewpoints and come to a view.
In this instance, the disputes centres more on the Council’s position rather than the
sufficiency of the evidence, which is the focus of the Gate Check process. 
Next Steps 
2.36  If approved by Members, the Evidence Report will be sent to Scottish Ministers. An
assessment of the Evidence Report (Gate Check) will be carried out by a person
appointed by the Scottish Ministers, usually a reporter from the Scottish Government
Planning and Environmental Appeals Division (DPEA). The Gate Check provides an
independent assessment of whether the Evidence Report contains sufficient
information to enable the Council to prepare an LDP. It is expected the Gate Check

Page 9

will take 3 months to complete. The outcome of the Gate Check has implications for
the timetable for the preparation of LDP3. If the Evidence Report is returned as
insufficient, time will be required to address the recommendations for improving the
report and a new Gate Check. A revised indicative timetable for the preparation of
LDP3 will be established following the Gate Check, with the aim of adopting the new
Plan before May 2028. A minimum of 12 months is expected to be required to prepare
a Proposed Plan, which is the next milestone in the process following notification that
the Evidence Report is sufficient. 
3. Proposals 
3.1 It is recommended that the Local Development Plan Committee approves the proposed
Evidence Report appended to this report for submission to Scottish Ministers. 
4. Implications/Socio-economic Duty 
Financial 
4.1 The programme for preparing and reviewing North Ayrshire’s local development plan
(LDP) can be delivered within existing staff resources and budgetary provision. The
spatial strategy and proposals of the new local development plan may have financial
implications, for example in relation to infrastructure or service provision, which must
be considered in the preparation of the plan. 
Human Resources 
4.2  As above. 
Legal 
4.3 The legislative requirements on the form and content of Evidence Reports and what
consultation and engagement should be undertaken are set out in the Town and
Country Planning (Scotland) Act 1997, as amended by the 2019 Act, and The Town
and Country Planning (Development Planning) (Scotland) Regulations 2023. 
Equality/Socio-economic 
4.4 The preparation of a new Local Development Plan for North Ayrshire will be required to
be subject of an equalities impact assessment and assessment on the impact of the
plan on children. 
Environmental and Sustainability 
4.5 The requirement for LDP3 to address the twin reinforcing global climate emergency and
nature crises by reducing emissions, adapting to current and future risks of climate
change, and promoting nature recovery and restoration is highlighted by the Evidence
Report. The preparation of a new Local Development Plan for North Ayrshire will be
required to be subject of a Strategic Environmental Assessment (SEA) and Habitat
Regulations Appraisal. The Environment Evidence Paper, which has informed the
Evidence Report, forms the Scoping Report for the SEA. The evidence presented in the
paper and Evidence Report forms the environmental baseline for the assessment.

Page 10

Key Priorities 
4.6 LDP3 will align with wider national priorities, programmes, and strategies, most directly
via National Planning Framework 4. This links with the Council’s key priorities of
wellbeing, communities and local democracy and climate change. The LDP is a key
mechanism for supporting Placemaking within North Ayrshire. 
Community Wealth Building 
4.7 The Evidence Report underlines a commitment to embedding community wealth
building within LDP3 to ensure future development takes account of local economic
priorities and supports the delivery of a wellbeing economy that works for people and
planet and delivers social, economic, and environmental justice for all. 
5. Consultation 
5.1 The Evidence Report summarises the stakeholder engagement that has been
undertaken in the preparation of the report, including as required by the legislation. 
DAVID W. HAMMOND
Executive Director (Communities and Housing) 
For further information please contact Alistair Gemmell, Strategic Planning Manager, on
01294 324021. 
Background Papers
0

Page 11

Evidence Report 
December 2025

Page 12

North Ayrshire’s third Local Development Plan
1
LDP Committee Version
Contents
Introduction ............................................................................................. 2
Evaluation of Adopted Local Development Plan ..................................... 5
Summary of Stakeholder Engagement ................................................. 11
Topic 1 - Liveable Places ...................................................................... 18
Topic 2 – Housing ................................................................................. 49
Topic 3 – Sustainable Places ................................................................ 88
Topic 4 – Transport ............................................................................. 124
Topic 5 – Productive Places ............................................................... 147
Topic 6 – Infrastructure ....................................................................... 171
Site Appraisal Methodology ................................................................ 192
Position Statement .............................................................................. 197
Appendix 1 – Evidence Index .............................................................. 201
Appendix 2 – Site Appraisal Matrix ..................................................... 203

Page 13

North Ayrshire’s third Local Development Plan
2
LDP Committee Version
Evidence Report
Introduction
North Ayrshire Council, as the local planning authority for North Ayrshire, is preparing
a new local development plan for the district. When adopted, the plan will become
North Ayrshire’s third Local Development Plan (LDP3). It will replace the Adopted
Local Development Plan (LDP2), which was adopted in November 2019. 
Local development planning guidance underlines that the planning system in
Scotland is plan-led. This means decisions on planning applications are to be made
in accordance with the development plan, unless there are material considerations
that indicate otherwise. The development plan for North Ayrshire comprises the local
development plan and National Planning Framework, presently National Planning
Framework 4 (NPF4).
LDP3 will be a new style plan. As part of wider planning reform, The Planning
(Scotland) Act 2019 makes significant changes to the development planning system
and the way local development plans are to be prepared, with the aim of making
them more effective, with greater community involvement and more focused on
delivery. A statutory ‘purpose of planning’ has been introduced for development
planning which is ‘to manage the development and use of land in the public interest,’
defined as anything which contributes to sustainable development or achieves
national outcomes. 
This document represents the Evidence Report for LDP3 required under section 16B
of the Town & Country Planning (Scotland) Act 1997, as amended by the 2019 Act. A
key change to the development planning system is that planning authorities must
now prepare an Evidence Report prior to preparing their Proposed Local
Development Plan. The purpose of the Evidence Report is to support the quality and
effectiveness of the LDP. A robust evidence base will inform the process of plan
making, justify the content of the plan and provide a baseline for future monitoring.
The legislative requirements and guidance on the form and content of Evidence
Reports and what consultation and engagement should be undertaken are set out in
the 1997 Act, The Town, and Country Planning (Development Planning) (Scotland)
Regulations 2023 and the local development planning guidance.
Preparation of the Evidence Report
Preparation of our Evidence Report began in earnest in March 2023 with the launch
of an online hub and survey – the ‘Your Place’ survey – aimed at gauging local
people’s views on the places they live, work, and visit in North Ayrshire. Alongside
this early engagement, a detailed scoping exercise was undertaken to identify the
matters to be addressed in the Evidence Report; the relevant baseline information
needed for each issue, including where further evidence was needed; the
stakeholders to be involved in collating and reviewing evidence; and all engagement

Page 14

North Ayrshire’s third Local Development Plan
3
LDP Committee Version
activity recently completed or underway in North Ayrshire relevant to the preparation
of the local development plan. 
Six Place Profiles, one for each of North Ayrshire’s localities (Arran, Garnock Valley,
Irvine, Kilwinning, North Coast and Cumbraes and the Three Towns) have been
prepared. These were published in November 2024. Updating and expanding
previous profiles prepared by the North Ayrshire Community Planning Partnership in
2017, the profiles summarise the main social, cultural, environmental and economic
features of each area organised in line with the three key themes of NPF4, namely
the planning and delivery of places that are sustainable, liveable and productive.
Alongside the facts and figures presented, the profiles also highlight community
opinions and priorities gathered through a range of engagement activities. 
Evidence Papers were then prepared on the topics of housing, environment, and
transport to support preparation of and engagement on the Evidence Report,
particularly with key agencies. The Environment Evidence Paper incorporates the
Strategic Environmental Assessment (SEA) Scoping Report. 
For the avoidance of doubt, the Place Profiles and Evidence Papers do not form part
the Evidence Report but collate much of the evidence that underpins this report and
will inform the preparation of the Proposed Plan. This Evidence Report does not
contain all the detail of the evidence, including engagement. Instead, it aims to
summarise the evidence with an emphasis on what it means for the plan. Further
detail on the engagement undertaken in support of the preparation of this Evidence
Report and how it has been taken into account is included within the Record of
Engagement. 
Structure of the Evidence Report
The evidence presented within the Evidence Report is structured into six topic-based
schedules: 
• Topic 1 – Liveable Places
• Topic 2 – Housing
• Topic 3 – Sustainable Places
• Topic 4 – Transport
• Topic 5 – Productive Places
• Topic 6 – Infrastructure
Appendix 1 sets out how evidence relating to the policies of the NPF4 has been
incorporated into the Evidence Report. 
Each schedule adopts the headings set out in the template for presenting information
on issues in the Evidence Report (Figure 7) included in the local development
planning guidance, with the links to evidence moved to the end of each schedule. 
Additionally, the Evidence Report includes an evaluation of LDP2; summary of the
engagement undertaken in the preparation of the Evidence Report and overview of
the site appraisal methodology. A Position Statement is provided to assist with the

Page 15

North Ayrshire’s third Local Development Plan
4
LDP Committee Version
Gate Check, as recommended by the Planning and Environmental Appeals Division
(DEPA), summarising the main areas where the evidence is disputed or uncertain.
Gate Check
Section 16B(5) and (6) of the Act require the Evidence Report to be approved by the
full Council before it is submitted to Scottish Ministers. Upon submission, Scottish
Ministers are to appoint a person to assess whether the report contains sufficient
information to enable the planning authority to prepare a local development plan.
This process is known as a ‘Gate Check.’ 
The Evidence Report was considered and approved by North Ayrshire Council at the
Local Development Plan Committee on [insert date]. With cognisance of Section
16B(6) of the Act, which states that Section 56 of the Local Government (Scotland)
Act 1973 (arrangements for discharge of functions by local authorities) does not
apply to the function of approving a proposed evidence report, the Local
Development Plan Committee satisfies the requirement that the Evidence Report be
approved by the full Council as all Elected Members are members of this committee.

Page 16

North Ayrshire’s third Local Development Plan
5
LDP Committee Version
Evaluation of Adopted Local Development Plan 
North Ayrshire’s current Adopted Local Development Plan (LDP2) was adopted on
28 November 2019. 
Paragraph 93 of the local development planning guidance states, as part of the
preparation of the Evidence Report, the planning authority should evaluate whether
the previous plan has delivered on its outcomes, and allocations, identify any
lessons learnt for the preparation of the new plan and consider the appropriateness
of the previous spatial strategy.
A Draft Delivery Programme has been prepared alongside the Evidence Report and
assists in the evaluation of LDP2. The Draft Delivery Programme sets out how the
Council has progressed the implementation of LDP2 and identifies the further actions
to be undertaken to deliver the policies, proposals, and site allocations of the Plan. It
updates the previous Action Programme, which was published in February 2020.
Changes to legalisation requires planning authorities to update their Action
Programmes, redesign them and publish them as Delivery Programmes.
Spatial Strategy and Placemaking
LDP2’s Spatial Strategy (Strategic Policy 1) is one of four strategic policies set out in
the local development plan which, in turn, are supported by detailed policies and
schedules of our housing sites, regeneration opportunities and employment
locations. 
The spatial strategy is the overarching policy for supporting the 2017 to 2022 Local
Outcomes Improvement Plan (LOIP) and North Ayrshire Community Planning
Partnership vision that every person in North Ayrshire is valued and should have the
best opportunities to live their life to their full potential. The vison of ‘North Ayrshire –
A better life’ looks forward 20 years to a North Ayrshire that is healthier, working,
thriving and safer. Embedding our Locality Planning Partnership priorities within the
plan and decision-making (Strategic Policy 4) further strengthens the links between
LDP2 and North Ayrshire’s communities.
LDP2’s spatial strategy directs development to towns and villages to support our
communities, economy, and environment, while recognising the value that our
countryside and coastal areas offer – both as natural resources and as an economic
driver. Strategic Policy 1 includes objectives and policies for how development can
enhance and protect our towns and villages, countryside, and coast. 
Overall, the spatial strategy has been successful in directing most development to
within our towns and villages. No large-scale (more than four homes) housing
developments have taken place outside of our towns and villages since LDP2 was
adopted; retail development has been restricted outwith town centres; the
regeneration of vacant and derelict land, including at Montgomerie Park, Ardrossan
North Shore and Lochshore has been supported and the policy has provided more
flexibility in supporting small scale developments on the Isles of Arran and Cumbrae.

Page 17

North Ayrshire’s third Local Development Plan
6
LDP Committee Version
The supporting development objective concerns the capacity of infrastructure and
services. The spatial strategy expects the majority of development to be directed
towards sites that have infrastructure or services in place, and the plan supports
developments where there is sufficient public infrastructure, public services and
where environmental impacts have been minimised. Only one development site has
required a developer contribution to be made, in relation to education capacity.
Developer contributions, including for affordable housing and open space are not
required by the plan. 
Strategic Development Areas
LDP2 identifies eight Strategic Development Areas. These locations are anticipated
to be major areas of change within North Ayrshire and form Strategic Policy 3 of the
plan. Delivery across the eight locations is varied; some are complete or within the
development phase while others have seen limited progress.
Hunterston
In December 2021, a development framework for Hunterston PARC was approved
by the Planning Committee and a Natural Capital Assessment has been undertaken
to support development that enhances the biodiversity of the area. The site at
Hunterston has been subject to several planning applications and investment
interest, including for a high voltage undersea cable manufacturing facility; land-
based aquaculture facility (RAS); and energy projects. No significant development
across the wider site, incorporating the Hunterston Estate (referred to in LDP2 as
‘Marketable Employment Land’) and the Hunterston Nuclear sites has commenced
to date. The ‘Hunterston Strategic Asset' is now identified as a National Development
by NPF4.
Ardrossan Cultural Quarter
Remediation of the site has been completed, along with a new coastal path
supporting active travel. Construction of a new community campus incorporating a
relocated Ardrossan Academy and Winton Primary, early years class, a six-lane
swimming pool, library and health and social care accommodation commenced in
July 2025. 
Limited progress has been made on the significant infrastructure improvements
required at Ardrossan Harbour to provide improved service reliability and resilience
for Arran’s lifeline ferry service. The Ardrossan Harbour Task Force continues to
progress this project (see Topic 4 – Transport). 
i3, Irvine
A Digital Process Manufacturing Centre (DPMC), to support companies transition to
digital manufacturing processes to improve productivity, efficiency and
competitiveness and reduce carbon emissions, has been delivered alongside a
flexible advanced manufacturing unit, increasing the provision of modern, energy
efficient industrial floorspace at i3.

Page 18

North Ayrshire’s third Local Development Plan
7
LDP Committee Version
A significant investment in the development of an AI data centre at i3 was announced
in September 2025. i3 will become a 1GW site and is expected to scale into one of
the largest AI infrastructure hubs in Europe, with the future potential to expand to
1.5GW.
Harbourside, Irvine
LDP2 supports the development of a ‘Maritime Mile’ at Irvine Harbourside, making
use of the area's unique location, heritage, and environment to promote new
residential, commercial, leisure and tourism facilities. Detailed proposals have
emerged via the Ayrshire Growth Deal ‘The Great Harbour’ project, a tourism-led
regeneration, place making and destination development project. 
The Great Harbour Masterplan was approved by the Council’s Planning Committee
in April 2024 and is a key step in the delivery of the Strategic Development Area. The
Masterplan expands on the ‘Maritime Mile’ concept, incorporating three activity hubs:
coastal, marine, and creative arts and maritime heritage. Phase 1, the coastal hub, is
in the delivery phase and includes a new outdoor play hub, currently under
construction. 
Montgomerie Park, Irvine
The Montgomerie Park Simplified Planning Zone (SPZ) was formally adopted in
November 2019 and Bellway Homes are now on site and have commenced
development of 146 homes. Remaining private sector housing phases are consented
and will deliver a further 255 homes and the Council is developing plans to develop
188 affordable homes on the site. 
A new primary school opened in August 2024 and the site to the north of the school
is consented for a neighbourhood retail opportunity. 
Kilbirnie
The Lochshore Concept Masterplan was adopted by the Council in 2020. The
Lochshore Park Hub, a sports and community space, was completed in 2022
alongside a regional play space and active travel route. Over 17,000 trees have also
been planted, including a 2,400-tree community woodland. 
Brodick Harbour
The new Brodick Ferry Terminal on the Isle of Arran officially opened on April 13,
2018. The £30 million investment transformed the harbour, delivering a new two-
berth pier and a modern two-story terminal building with a departure lounge, ticket
office, and other facilities. No further significant development has taken place within
the Arran Gateway or Market Road areas. 
Millport
The Conservation Area Regeneration Scheme (CARS) for Millport was completed in
March 2022. The scheme helped works to enhance numerous historic buildings with
a total spend of approx. £2 million. The Millport Coastal Flood Prevention Scheme

Page 19

North Ayrshire’s third Local Development Plan
8
LDP Committee Version
became operative on 13 January 2021. The site works started in Spring 2023 with
the offshore and onshore elements completed in October 2024. 
Housing Delivery
A key focus of LDP2 is to stimulate the housing market in North Ayrshire in support
of Council and Community Planning Partnership ambitions for population growth. We
consider that LDP2 has delivered on this outcome. 
We worked closely with industry body, Homes for Scotland, developers, and local
communities to allocate additional effective housing sites, backed by builders with a
track record, with the expectation that this could have a transformational impact on
the housing sector by stimulating demand and demonstrating that land values and
sales rates in the region could prove viable, and thereby promote other interests.
Five additional housing sites were allocated by the LDP following this approach and
form Schedule 2a of the plan.
LDP2 established a Housing Supply Target (HST) of 4,071 for the period 2019 to
2029. Completion data plus programming information for the plan period anticipates
that 4,289 units will be delivered in total, exceeding the HST by 218 homes. Around
39% of these homes (over 1,600) are expected to be delivered by the social sector.
Further detail on the performance of LDP2 in respect to housing delivery is set out
under Topic 2 – Housing: Performance of LDP2.
Delivery has been achieved on allocated sites (LDP2, Schedule 2a), housing supply
sites (Schedule 2b and 3), regeneration opportunities (Schedule 4) and windfall
sites. The Draft Delivery Programme notes the progress of all sites included in LDP2,
with associated actions for those where there has been no development. 
Detailed Policies
The overarching Strategic Policies are supported by detailed policies which are split
into four chapters relating to a successful and sustainable; natural resilient;
connected and low carbon North Ayrshire. The Draft Delivery Programme outlines
the progress in delivering these policies, actions and indicators related to
implementing these policies.
Implications for the Proposed Plan
Overall, it is considered that LDP2’s spatial strategy remains appropriate. The
adopted plan has directed most development to our towns, villages and developed
coastline where we have infrastructure capacity to support new development, where
there is access to existing services and where we have opportunities to re-use and
redevelop brownfield land. A more flexible approach has been adopted for our island
and rural communities, to promote a sustainable pattern of development that also
empowers our rural economy and communities to develop and thrive, while
protecting important natural assets.

Page 20

North Ayrshire’s third Local Development Plan
9
LDP Committee Version
LDP2 has delivered on the outcome of housing delivery, particularly within the
private sector, stimulating an increase in private sector housebuilders developing
and interested in developing new homes in North Ayrshire.
National Planning Framework 4 was adopted by Scottish Ministers on 13 February
2023 and became part of the development plan for North Ayrshire. NPF4 and LDP2
have operated alongside each other for over two years with limited conflict arising,
supporting the view that there is strong alignment between the policies of the
respective plans. 
The following implications for the Proposed Plan, based on the evaluation of the
adopted local development plan and consideration of lessons learnt for the
preparation of the new plan, are identified: 
• The overall spatial strategy for the Proposed Plan must take cognisance of the
spatial principles and importance given to the twin climate and biodiversity
crises by NPF4. This will influence where and how new development should
take place over the LDP3 plan period, with a stronger focus on making
productive use of existing buildings, places, infrastructure, and services;
limiting urban expansion and local living that improves community health and
wellbeing. 
• A new Local Outcomes Improvement Plan (LOIP) has been agreed by the
North Ayrshire Locality Planning Partnership since the preparation of LDP2
and community priorities may have evolved, particularly in the context of the
intervening coronavirus pandemic and cost of living crisis. LDP3 should
strengthen the strong alignment between spatial and community planning
demonstrated by LDP2 to support the delivery of the LOIP vision. 
• Most – but not all – of the Strategic Development Areas identified by LDP2
remain the key areas of focus in North Ayrshire. In some cases, projects have
evolved, including Ayrshire Growth Deal projects as they have progressed
through Outline and Strategic Business Case stages. The Proposed Plan
should consider current proposals for these areas, including agreed
Masterplans and Development Frameworks, to shape how these places and
others identified as significant will change over the LDP3 plan period. 
• Local development planning guidance expects new-style LDPs to be place-
based, visual plans with the inclusion of a clear spatial strategy reflected more
in a collection of maps, development briefs, and masterplans than in lengthy
written text and policy [para. 24]. This has implications for the format of LDP3,
which is likely to be much different to the adopted plan. Consideration must be
given to the need for ‘local’ policy guidance to support the implementation and
application of NPF4’s national planning policies. 
• Not all the sites allocated in LDP2 for development have come forward during
the anticipated timeframe, or at all. The Draft Delivery Programme highlights
the site allocations where no development has taken place. In preparing the

Page 21

North Ayrshire’s third Local Development Plan
10
LDP Committee Version
Proposed Plan, consideration must be given to the appropriate future use of
these sites, rather than simply continuing these allocations into the new plan. 
• Related, the deliverability of the proposals and site allocations included within
the Proposed Plan should be established, with specific actions incorporated
into the Delivery Programme. Compared to LDP2, the new plan would benefit
from providing more detail on the requirements for specific development sites,
including any developer contributions where justified, to achieve social,
environmental, and economic objectives.

Page 22

North Ayrshire’s third Local Development Plan
11
LDP Committee Version
Summary of Stakeholder Engagement
Local development plans seek to bring together many different sectors and interests
to achieve the desired change for people and places. Accordingly, and in line with
the Place Principle and aspirations for greater community involvement in plan
making which underpin the latest reforms to the planning system, stakeholder
engagement and the views of local communities are integral to the process of
preparing LDP3. 
Alongside being place-based and delivery-focused, new-style local development
plans are expected to be people-centred. This means considering how LDP3 can
best meet the needs and aspirations of the different people who have an interest in
North Ayrshire; address longstanding inequalities and eliminating discrimination;
implement community wealth building; and undertaking early, collaborative,
meaningful and proportionate engagement, with all views taken into account.
The engagement undertaken in the preparation of the Evidence Report has taken
many forms, including online surveys, public drop-in events, presentations to
community bodies and meetings with key agencies. Engagement carried out by the
Council’s Planning Service directly, referred to below at ‘primary engagement’ is
complemented by the outputs from engagement activities undertaken by other
Council departments, community planning partners, and community bodies. 
Our approach to considering ‘secondary engagement’ activities recognises the multi-
faceted nature of ‘place’ and that the views of communities on local issues, their
needs, aspirations, and priorities can be expressed in response to different
engagements, not just in relation to development planning. It also seeks to counter
issues of ‘consultation fatigue,’ where communities and individuals become weary,
disinterested, and distrustful when over-consulted or poorly consulted, often leading
to low participation, cynicism, and backlash. 
A summary of all engagement activities is provided below, with relevant outputs and
how these has been taken into account noted within the six topic-based schedules. A
more detailed overview of the engagement undertaken to date is set out in the
Record of Engagement. 
Requirements of the Act
Section 16B(2) of the Town and Country Planning (Scotland) Act 1997, as amended,
requires the planning authority to seek the views of particular groups of people, and
have regard to those views when preparing the Evidence Report. These groups are:
• the public at large
• children and young people
• key agencies (defined by regulation 25 of the 2023 Regulations)
In accordance with Section 16B(4), a statement on how the planning authority has
sought particular stakeholders’ views, and how these views are taken into account in
the report, is required to be provided within the Evidence Report. These groups are:

Page 23

North Ayrshire’s third Local Development Plan
12
LDP Committee Version
• the public at large
• children and young people
• disabled people
• Gypsies and Travellers (defined by regulation 4 of the 2023 Regulations)
• Community Councils
The Evidence Report must also set out how the authority have invited local
communities to prepare Local Place Plans, and what assistance they have provided. 
Primary Engagement
LDP3 Commonplace platform
To support the preparation of LDP3 we have used the online platform
‘Commonplace’. The web-based service acts as a hub, containing updates,
engagement opportunities and documents related to the LDP process. Since the
beginning of the project, the website has attracted over 9,000 views with over 450
contributions and has 390 subscribers who are notified when something is posted on
the platform.
See: Have Your Say Today - North Ayrshire’s Third Local Development Plan -
Commonplace
‘Your Place’ Survey
Our early engagement centred around the ‘Your Place’ survey. This was a
predominantly online survey using the same themes as the Place Standard Tool,
providing a well-established process of enabling discussion and a framework for
learning what stakeholders felt about their place. Several meetings, presentations
and drop in events were held to promote the survey, alongside social media posts.
The survey was live from April 2023 until December 2024. A total of 253 responses
were received to the ‘Your Place’ survey, including young persons (aged 13-17) and
children’s versions. 
Place Profile Engagement
The second key stage of our engagement with local communities was around the
Place Profiles. Views were specifically sought on the content of the profiles; any
evidence gaps and the main priorities for each locality. To support this process, we
hosted 11 drop-in events during October and November 2024 across North Ayrshire. 
A cumulative total of over 250 individuals attended these events, to share their views
or to hear more about the LDP process. 
Evidence Papers
Engagement with key agencies has focused on the preparation of three Evidence
Papers – on housing, environment, and transport. The housing and environment
papers were also published in March 2025 for wider stakeholder comment.

Page 24

North Ayrshire’s third Local Development Plan
13
LDP Committee Version
As a more technical document, we did not publish the Transport Evidence Paper, but
stakeholder engagement was undertaken in the preparation of the paper, which also
takes into account engagement carried out to inform the Council’s Local Transport
and Active Travel Strategy. 
Play Sufficiency Assessment
Consultation was a significant part of the Play Sufficiency Assessment (PSA)
process. The Planning Service liaised with the Council’s Youth Participation Officer to
make sure that the team reached as many young people as possible and, in total,
more than 1,300 views helped inform the assessment. More information is contained
within the PSA consultation report. 
Local Landscape Designation Study
The Council commissioned a study to review North Ayrshire’s locally designated
landscapes in 2023. Community engagement workshops were held in April, May and
June 2023 in Brodick, Largs, Kilbirnie and Millport on Great Cumbrae. Additional
consultation comments were received from online questionnaires. A detailed
breakdown of comments gathered can be found in Appendix B of the Local
Landscape Designation Evaluation Report. 
Retail Capacity Study
As part of a Retail Capacity Study, a telephone survey was undertaken in December
2023 to understand how people shop and access food and leisure in North Ayrshire.
The survey returned 1,000 responses and asked questions such as where people
liked to shop and what for. The survey also asked what their experience was like
shopping where they shop. A detailed assessment of what was said in response to
the surveys can be found in the Retail Capacity Study at Appendix B. 
Draft Evidence Report 
A full draft of the Evidence Report was shared with key agencies at the start of
November 2025 for final comment. Prior to this, a draft of the Sustainable Places
schedule was shared with Historic Environment Scotland, NatureScot and SEPA and
a draft of the Transport schedule was shared with Transport Scotland as part of a
collaborative approach to developing the Evidence Report. 
Homes for Scotland were also afforded the opportunity to comment on the Draft
Evidence Report, having previously reviewed the Housing and Environment Topic
Papers. 
Secondary Engagement
Local Place Plans
The Planning (Scotland) Act 2019 introduced a new right for communities to produce
Local Place Plans (LPPs): community-led plans setting out proposals for the
development and use of land and buildings. The aim of LPPs is to enhance

Page 25

North Ayrshire’s third Local Development Plan
14
LDP Committee Version
engagement in development planning by empowering communities to play a
proactive role in defining the future of their places.
We invited local communities to prepare Local Place Plans formally through the
publication of an ‘Invitation to prepare a local place plan,’ as required by Section
15A(a) of the Act. The invitation was published on 19 May 2023 on the Council’s
website and shared with all active community councils and sent to other community
bodies via the Community Planning Partnership. 
In the first instance, Sunday 30 June 2024 was intimated as the deadline for
submitting local place plans in order to be taken into account in the preparation of
LDP3. This was informally extended to the end of 2025, reflecting a change in the
timetable for preparing LDP3 and to enable all community bodies who intimated they
wished to prepare an LPP to submit one. 
A Handbook was prepared to support community bodies in deciding whether to
prepare a Local Place Plan, explain the process and set out the assistance available
to help them prepare an LPP. We have taken a pragmatic and personal approach to
supporting community bodies to prepare Local Place Plans, working closely with
them throughout the process to provide advice and practical and technical
assistance where required. 
To date, six Local Place Plans have been registered in North Ayrshire, with a further
one expected to be submitted before the end of 2025. Together, these Local Place
Plans will cover 9 of the 13 areas in North Ayrshire where there is an active
Community Council. Beyond the statutory requirement to take account of registered
local place plans when preparing LDP3, these plans and the community engagement
that has informed them contributes to developing a shared understanding of a place
as the basis for placemaking. 
See Local Place Plan Register
Place Frameworks
In 2022, the Council’s Regeneration Service commissioned three ‘Place
Frameworks’ – plans for Kilwinning, Largs and Saltcoats that identify priority issues
and bring together actions and initiatives to improve these three towns. Adopting a
place-based approach, the plans draw upon extensive community and stakeholder
engagement involving local residents, businesses, community organisations, and
relevant departments from across North Ayrshire Council. 
The plans were approved by the relevant Locality Planning Partnerships in June
2023. 
Local Island Plans
In March 2022, ten-year local island plans for Arran and Cumbrae were published.
These plans were developed with, and for, the island communities to drive the
development of community, economic and environmental wellbeing of Arran and
Cumbrae as part of an 'islands recovery and renewal' pilot, a partnership between
North Ayrshire Council, Scottish Government and Highland and Islands Enterprise.

Page 26

North Ayrshire’s third Local Development Plan
15
LDP Committee Version
The plans have been informed by short, focused engagement exercises to assess
perceptions of how, and if, COVID-19 had changed the priorities for the islands.
Irvine Neighbourhood Board
Irvine is one of nine Scottish towns to be awarded £20million as part of the UK
Government Plan for Neighbourhoods. This funding is phased over 10 years, to fund
regeneration and deliver new major improvements within the town. The Irvine
Neighbourhood Board is undertaking community engagement to inform a long-term
plan. 
Community and Locality Planning 
The Place Standard Tool has been used by the North Ayrshire Community Planning
Partnership and Locality Partnerships to identify local priorities. 
People’s Panel
The North Ayrshire People’s Panel is a survey overseen by the Community Planning
Partnership of 2000 local residents who have agreed to answer questions and
provide their views on the areas in which they live. Focus groups for 8-12 people in
each locality are also held, to find out a bit more about their views.
The Partnership uses this information to decide what action to take on the issues
that local residents tell us need to be improved. The most recent survey of the
People’s Panel was undertaken in 2024.
North Ayrshire Health and Social Care Partnership engagement
The North Ayrshire Health and Social Care Partnership (NAHSCP) have engaged
with around 2,900 service users and professionals across 47 events, incorporating
focus groups, surveys, workshops, and locality-based conversations between
January 2023 and December 2024. With the main purpose of informing its new
Strategic Plan, this engagement supports our understanding of the health needs of
the population. 
Statement of Engagement
The following section sets out how we have sought the views of stakeholders listed
at Section 16B(4) of the Act, and how these views have been taken into account in
the report. 
Public at Large
The primary means of engaging with the ‘public at large’ in North Ayrshire has been
via the ‘Your Place’ Survey and the Place Profiles. These have been promoted via
the online hub and mailing list, social media and via the community planning
partners, including Community Councils.
Acknowledging the limitations of the Planning Service’s resources and reach,
concerns around ‘consultation fatigue’ and value of related ‘place-based’ community
consultation which has taken place in North Ayrshire, the outputs from a range of

Page 27

North Ayrshire’s third Local Development Plan
16
LDP Committee Version
related engagement activities have also been incorporated within the Evidence
Report. 
This engagement approach has provided important qualitative evidence on the lived
experience of those who live and work in places in North Ayrshire, providing
information on people’s aspirations for their area and the type of issues they may
wish the LDP to address. Issues raised include the delivery of affordable housing
and housing to meet the needs of a population which is growing older; supporting
fragile island communities; access to health care services and public transport.
These priorities are reflected in the discussion of implications for the Proposed Plan
under each topic. 
Children and young people
North Ayrshire has a well-established Youth Participation and Citizenship Strategy
which sets out how young people across North Ayrshire can play an active role in
their schools and communities. A range of platforms exist to ensure young people’s
voices are heard, actioned, and respected in North Ayrshire, including Joint Cabinet,
Youth Council and Youth Forums. 
We have supported children and young people to complete age-appropriate versions
of the Place Standard, including at these events during the early stages of Evidence
Report preparation in 2023. We have also engaged directly with children and young
people in the preparation of the Play Sufficiency Assessment. 
The Garnock Valley Youth Forum are one of the seven community group members of
the working group that has prepared the Garnock Valley Local Place Plan, and the
views of children and young people have also informed the Cumbrae Local Place
Plan, Cumbrae and Arran Local Island Plans and Place Frameworks for Kilwinning,
Largs and Saltcoats. 
Engagement with children and young people has underlined the importance of
climate change to the younger generation in North Ayrshire. Commonly expressed
aspirations largely focus on the provision of spaces and facilities for leisure, sport,
and recreation. These are important components of what makes ‘liveable places’ and
is reflected under Topic 1. 
Disabled people
The Planning Service has connected with forums and groups that are aimed to
support equal opportunities for those living with disabilities. One example is the
Council’s own Disability Access Forum. As one of the biggest employers in North
Ayrshire, and one of the few employers that has staff working in every locality, the
forum is considered a good sounding board for the views of disabled people living in
North Ayrshire. 
Gypsies and Travellers
There is one Gypsy/Traveller site in North Ayrshire at Redburn Grove, Irvine which is
managed by the Council. The Planning Service have been liaising with the
Gypsey/Traveller community via the Council’s Tenant Participation Team, including

Page 28

North Ayrshire’s third Local Development Plan
17
LDP Committee Version
directly supporting the Redburn Grove Tenants Group to undertake the Place
Standard as the basis of engagement with Gypsy/Travellers in the area. 
The Tenant Participation Team provide support to – and engage regularly with – the
residents of Redburn Grove, including in relation to facilities at Redburn. Through
this engagement we understand that Redburn Grove is their preferred housing
solution and that there is sufficient accommodation for Gypsy/Travellers in North
Ayrshire. Work is ongoing to improve the Redburn site, taking account of the needs
and aspirations of the residents. 
Community Councils
There are currently 13 active community councils in North Ayrshire. We have been in
regular contact with active community councils throughout the process of preparing
the Evidence Report and in relation to the invitation to prepare a Local Place Plan,
providing updates and offers of support to engage in the process. We have attended
17 Community Council meetings since 2021; provided three community council
training sessions and information sessions for locality planning partnerships on the
LDP3 process, opportunities to engage and the role of Local Place Plans.
Eight of our community councils have progressed Local Place Plans; we consider
these to be excellent ways of understanding the views of community councils and
the wider communities they represent. A detailed assessment of submitted registered
Local Place Plans has been undertaken and has informed the Evidence Report by
highlighting the aspirations for local areas and the issues communities would like the
LDP to address.

Page 29

North Ayrshire’s third Local Development Plan
18
LDP Committee Version
Topic 1 - Liveable Places
Place is where people, location and resources combine to create a sense of identity
and purpose. North Ayrshire is a place, as are the localities, towns, villages, islands,
streets, parks, and landscapes within it. Places matter to people and influence our
wellbeing, productivity, and impact on the environment – and the impact of the
environment on us. 
Place-based approaches, underpinned by the Place Principle, consider all the
physical, social, and economic elements of a place collectively to support and
enhance the potential of the people, physical and natural assets within that place.
Understanding the issues, interconnections and relationships relating to a place and
co-ordinating action to improve outcomes define place-based approaches. In
collating and analysing relevant evidence and the views of communities, key
agencies and other stakeholders, the Evidence Report plays a central role in taking a
place-based approach to the preparation of LDP3. 
Alongside sustainable (Topics 3 and 4) and productive (Topics 5 and 6) places, the
National Planning Framework (NPF4) aims to support the planning and delivery of
liveable places where we can all live better, healthier lives. This chapter summarises
the evidence and relevant stakeholder engagement that help us understand the
social elements of North Ayrshire as a place, primarily focusing on its people.
Evidence relating to the following NPF4 policies is specifically considered: 
14. Design, quality, and place 
15. Local living and 20-minute neighbourhoods 
21. Play, recreation, and sport 
23. Health and safety
Information required by the Act and Regulations
Section 15 of the Planning Act concerns the form and content of local development
plans. Subsection 1(a) requires the local development plan to take account of
matters mentioned in subsection (5), including: 
• the principal physical, cultural, economic, and social, built heritage and
environmental characteristics of the district,
• the size, composition, health, and distribution of the population of the district,
• the health needs of the population of the district, 
• the extent to which there are rural areas within the district in relation to which
there has been a substantial decline in population.
Section 16B of the Planning Act relates to the evidence report. As per subsection (3),
the evidence report is to set out the planning authority’s view on the matters listed in
section 15(5), referred to above.
Sections 15(2A) and (2B) require a statement of the planning authority’s policies and
proposals as to the provision of public conveniences and water refill locations
respectively to be included in the local development plan.

Page 30

North Ayrshire’s third Local Development Plan
19
LDP Committee Version
Section 16D requires the planning authority to assess the sufficiency of play
opportunities in its area for children in preparing an evidence report. The Town and
Country Planning (Play Sufficiency Assessment) (Scotland) Regulations set out the
form and content of the Play Sufficiency Assessment and the persons who must be
consulted in its preparation.
The Town and Country Planning (Development Planning) (Scotland) Regulations
2023 (the 2023 Regulations) provide additional detail to the requirements set out in
primary legislation. Regulation nine sets out further information and considerations to
which the planning authority are to have regard to in preparing a local development
plan. Included within this list is the requirement to have regard to the location of
Control of Major Accident Hazard establishments and pipelines.
Summary of Evidence
Policy Context
The Place Principle is the overarching context for place-based working in Scotland.
Recent policy changes around empowerment, community planning, and public
service reform, alongside the complex challenges of the climate emergency and
public health, have given a renewed energy and focus on the approach and closer
alignment with the planning system. 
The principle recognises that places are shaped by the way resources, services and
assets are directed and used by the people who live and invest in them; that places
are at the heart of addressing the needs and realising the full potential of
communities; and that a more joined-up, collaborative, and participative approach to
services, land and buildings, across all sectors within a place, enables better
outcomes for everyone with increased opportunities for people and communities to
shape their own lives. The Place Principle asks all those responsible for providing
services and looking after assets in a place need to work and plan together, and with
local communities, to improve the lives of people, support inclusive and sustainable
economic growth and create more successful places. 
Placemaking is a place-based approach which has a specific focus on creating good
quality places that promote people’s health, happiness, and wellbeing. It concerns
the environment in which we live; the people that inhabit these spaces; and the
quality of life that comes from the interaction of people and their surroundings.
Placemaking is a collaborative approach involving the design and development of
places over time, with people and communities central to the process. 
Development planning has a key role in placemaking. The local development
planning guidance expects LDPs to be people-centred: putting people and
communities first; meeting people’s needs and aspirations; tackling inequalities and
prepared collaboratively. The guidance states development planning has a
leadership role to play in putting place-based approaches and the Place Principle
into practice.
Scotland’s Population Health Framework
In June 2025, the Scottish Government published Scotland’s Population Health
Framework, setting out Scottish Government’s and COSLA’s approach to improving

Page 31

North Ayrshire’s third Local Development Plan
20
LDP Committee Version
health and reducing inequalities over the next ten years. It highlights the intersecting
challenges of stalling life expectancies, the legacy of the Covid-19 pandemic,
widening inequalities, demographic trends, public sector financial pressures, and the
climate crisis and advocates for a renewed emphasis on prevention. Places and
communities are identified as one of the five interconnected drivers of health and
wellbeing, with a focus on how health and wellbeing considerations can be
embedded into the development and delivery of Local Development Plans, described
as “key to improving health outcomes.”
Figure 1 – Five prevention drivers of health and wellbeing (Scotland’s Population
Health Framework)  
National Planning Framework 4
NPF4 has a place-focus, establishing a national spatial strategy to support the
planning and delivery of sustainable, liveable and productive places, acknowledging
that the diverse character, assets and challenges of places across Scotland mean
the strategy will be taken forward in different ways in different places. 
A range of factors – from past industrial restructuring to the more recent coronavirus
pandemic and cost crisis – have created a social legacy of disadvantage, child
poverty, and poor health outcomes in some areas of Scotland. NFP4 recognises that
people living in Scotland have very different life chances, at least partly as a result of
the places where they live. 
In establishing spatial principles, a national spatial strategy and planning policies to
support the planning and delivery of liveable places, NPF4 aims to significantly
improve our places, address longstanding inequality and eliminate discrimination;

Page 32

North Ayrshire’s third Local Development Plan
21
LDP Committee Version
creating future places with homes and neighbourhoods that are healthier, affordable
and vibrant places to live. 
Our places can only work for everyone if the views of all users are properly
understood. Ensuring a fair and inclusive planning system is a cross-cutting theme of
NPF4, with the expectation that a wide range of people are involved in shaping their
future places. The national spatial strategy and policies set out in NPF4 support
development that helps to eliminate discrimination and promote equality. The
national spatial strategy is clear that future development must support a just
transition, and it highlights opportunities for development and regeneration that is
designed to tackle social, economic and health inequalities.
Local Outcomes Improvement Plan
The Community Empowerment (Scotland) Act 2015 requires Community Planning
Partnerships (CPP) to prepare and publish a local outcomes improvement plan
which sets out the local outcomes the CPP will prioritise for improvement; tackling
inequalities is a specific focus for all local outcomes improvement plans. 
The North Ayrshire Partnership Plan is North Ayrshire’s Local Outcomes
Improvement Plan (LOIP). It was agreed by the Community Planning Board on 3rd
March 2022 and covers the period 2022 to 2030. The Plan and Community Planning
Partnership share a vision of ‘North Ayrshire – Fair for All.’ 
The development of the North Ayrshire Partnership Plan takes account of what a
strategic needs assessment tells us about North Ayrshire, partner resource and
expertise, as well as public feedback. The plan has three key themes: 
• Wellbeing – We will address inequalities. We will promote children and young
people’s wellbeing. We will enable community wellbeing.
• Work – We will increase employment. We will develop volunteering. We will
better support our young people.
• World – We will work together to reduce carbon emissions and mitigate the
impacts of climate change. We will increase active travel. We will increase
carbon literacy within our organisations and communities.
Locality planning was also introduced in the Community Empowerment Act. North
Ayrshire is organised into six localities, each with its own Locality Partnership: Arran,
Garnock Valley, Irvine, Kilwinning, North Coast and Three Towns. 
The six Locality Planning Partnerships have decided on local priorities based on
information gathered about their own local areas. This includes national data, local
statistics, and the views of local people through the People’s Panel survey and by
using the Place Standard Tool to identify needs. The Arran Locality Partnership have
decided to adopt the themes of the Isle of Arran Local Island Plan, following an
extensive public engagement exercise. This ensures that the development of the
Arran Island Plan and the work of the Locality Partnership align.
Table 1 – North Ayrshire Locality Priorities and Locality Action Plans

Page 33

North Ayrshire’s third Local Development Plan
22
LDP Committee Version
Locality Action Plan Priorities 
Arran • Community
• Economy
• Environment 
Garnock Valley • Moving around (public transport, traffic, and parking)
• Work and local community
• Facilities and amenities
Irvine • Supporting skills and work opportunities
• Enhancing our mental health and wellbeing
• Alleviating poverty
• Championing green heath and the natural environment
Kilwinning • Supporting skills and work
• Improving our local environment
• Alleviating poverty and promoting equality of access to
opportunities
• Improving Community Wellbeing
North Coast • Improving access to financial services
• Increasing social inclusion
• Improving mental wellbeing
• Supporting skills and work opportunities
Three Towns • Promoting the local economy and tourism
• Regenerating community facilities
• Increasing civic pride and community engagement
• Improving community wellbeing
These locality priorities underpin the Locality Plans for each locality. These plans are
updated annually and adopt a primarily action-focused format, setting out specific
tasks aligned to locality and LOIP priorities. 
Council Plan
Our Council Plan 2023 to 2028 is a five-year plan to deliver the aim of ‘A North
Ayrshire that is fair for all’. Four interlinked and interdependent priorities are
identified: 
• Wellbeing: a transition to a wellbeing economy, delivering prosperity,
wellbeing, and resilience to local people. 
• Communities and Local Democracy: active, inclusive, and resilient
communities. 
• Climate Change: achieving net zero by 2030
• A Sustainable Council: a Community Wealth Building Council that is efficient
and accessible, maximising investment and focusing resources on our
priorities.
The plan was created, and will be delivered, in partnership with local communities.
Placemaking is identified as a key activity to support the strategic aim to have active,
inclusive, and resilient communities and the strong focus on working together to
improve the lives of our people reflects a commitment to place-based working in
North Ayrshire.

Page 34

North Ayrshire’s third Local Development Plan
23
LDP Committee Version
To inform and support the monitoring of the plan, the Council has developed a
Wellbeing Economy Dashboard which brings together a suite of socio-economic
indicators to aid understanding of inclusive growth trends across North Ayrshire. The
dashboard tracks data across five wellbeing domains: demographic indicators;
climate; early years and education; economy and community. 
Place and Wellbeing Outcomes
In response to reducing healthy life expectancy, the climate crisis, inequalities and
increasing demand for services at a time of reduced funding and budget cuts,
representatives from Public Health Scotland, Directors of Public Health, Heads of
Planning Scotland, COSLA, the Health Improvement Managers Network and the
Improvement Service have developed Place and Wellbeing Outcomes. 
As a key component of a place-based approach, the Place and Wellbeing Outcomes
aim to support decision-making and implementation to focus on a common set of
evidenced features that will enable each place to have a positive impact on the
wellbeing of people and planet while reducing inequality. Incorporating evidence
about the determinants of health and wellbeing in Scotland’s places, the resulting
Place and Wellbeing Outcomes fall into five overarching themes of Movement,
Spaces, Resources, Civic and Stewardship. They complement the Place Standard
Tool, used to provide a structure for a comprehensive, considered conversation
about a place between stakeholders, to provide a consistent and comprehensive set
of outcomes for all stakeholders to take collaborative action on delivering in every
place.
Figure 2 - Place and Wellbeing Outcomes

Page 35

North Ayrshire’s third Local Development Plan
24
LDP Committee Version
The Collaboration for Health Equity in Scotland (CHES)
North Ayrshire Council is one of three Scottish local authorities that are collaborating
with health experts on ways to improve health and well-being for residents. The local
authority and health board in each of the three areas will work alongside Public
Health Scotland (PHS) and University College London’s Institute of Health Equity
(IHE), on the two-year-long Collaboration for Health Equity in Scotland. 
Over the next two years, this partnership aims to help local areas and Community
Planning Partners to strengthen their local plans to reduce health inequalities and
improve wellbeing in their communities. By identifying and understanding the actions
which will have the greatest impact on health inequalities locally, and how the
barriers to implementing these can be overcome, the ultimate goal is to enable
people to live longer, healthier lives by addressing the root causes of health
inequalities and preventing illness before it starts. 
The Institute of Health Equity have adopted a place-based approach to health and
health inequalities. Eight actions or recommendations, also known as the ‘Marmot
principles,’ which focus on reducing health inequity by addressing the social
determinants of health have been developed to guide this approach. 
Mapping of the Place and Wellbeing Outcomes against the Marmot Principles shows
strong alignment. The majority of the Place and Wellbeing Outcomes make a direct
contribution to delivering the Marmot Principles. This highlights their essential role in
driving long-term, preventative, place-based action across all areas of health equity. 
North Ayrshire’s People
As noted above, North Ayrshire’s Partnership Plan (LOIP) has been informed by a
Strategic Needs Assessment which was prepared by Public Health Scotland and
published in January 2022. The assessment considers evidence in relation to
demographics; housing; general health; lifestyle and risk factors; hospital and
community care; children and young people; crime and fires, comparing figures for
North Ayrshire with East and South Ayrshire, Ayrshire as a whole and Scotland.
The Wellbeing Economy Dashboard and an updated Strategic Needs Assessment
(2025), supported by profiles prepared by the Public Health Scotland LIST (Local
Intelligence Support Team) for the North Ayrshire Health and Social Care
Partnership, are useful resources for understanding the size, composition, health
and distribution of the population of North Ayrshire. Source data is available from
National Records of Scotland, Scotland’s 2022 census and Scottish Public Health
Observatory. The Council also prepares annual locality economic profiles and
quarterly economic briefings. 
All these sources have informed the Place Profiles prepared for each of North
Ayrshire’s six localities. A summary of this evidence is presented below with a focus
on the key issues for North Ayrshire:  
Population 
The population of North Ayrshire at the last census was 133,413. Around two-thirds
of the population is concentrated in the adjacent localities of Irvine (39,237), the

Page 36

North Ayrshire’s third Local Development Plan
25
LDP Committee Version
Three Towns – Ardrossan, Saltcoats and Stevenston – (31,295) and Kilwinning
(16,982). Overall, around 90% of the population live in urban areas. Around 5% of
the population on the mainland is classed as living in accessible rural areas; the
islands of Arran (population 4,643) and Cumbrae (1,173) are remote rural
communities by the measure of the Scottish Government six-fold Urban Rural
Classification. 
Between 2001 and 2023, the population of North Ayrshire decreased by 1.7%. This
is the 29th highest percentage change out of the 32 council areas in Scotland. Over
the same period, Scotland’s population rose by 8.4%. The recent mid-year
populations estimate (Mid-2024) indicates a 0.2% increase in the population over the
12 months. While there were 912 more deaths than births, net migration was 1,200,
including 530 within Scotland. This could indicate a potential levelling off of the
depopulation trend, however it is considered too early to determine whether this is a
reversal of the trend.
Using data from the Improvement Service, the population of the area is projected to
decrease by 4% by 2030. 2022-based sub-national population projections for
Scottish council areas and health boards were published by National Records of
Scotland on 30 September 2025. This data indicates Scotland’s population is
projected to continue increasing; by 4.4% in the 10 years from mid-2022 to mid-
2032. North Ayrshire, however, is one of nine Council areas projected to experience
population decline. While North Ayrshire is projected to have positive net migration
over the 10 years to mid-2032 (+3.93%), the population overall is anticipated to
decrease by 3.1% due to natural change (births minus deaths) of -7.14%. 
Births time series data for North Ayrshire available from the National Records of
Scotland illustrates the long-term falling birth rate in North Ayrshire:
Figure 3 – Number of births, 1991 to 2024 
0
500
1,000
1,500
2,000
2,500
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024

Page 37

North Ayrshire’s third Local Development Plan
26
LDP Committee Version
In addition to a long-term declining population, North Ayrshire also has an aging
population. Comparing the 2011 and 2022 Census, the percentage of the population
aged 65 and over increased by 22%, from 25,898 to 31,660. This represents 23.7%
of the total population. On Arran and within the North Coast localities, the proportion
of people over the age of 65 is higher, at around 32%. Between 2001 and 2022,
Kilwinning saw a 62% increase in the number of residents aged over 65.
Census data from 2022 indicates that 98% of the population of North Ayrshire is
White (89% White Scottish, 7.5% Other White British or Irish, 1.4% Other White,
including 0.08% Gypsy/Traveller). The largest other ethnic group is Asian, Asian
Scottish, or Asian British accounting for 0.9% of the population. Of all people aged
16 and over who answered the question in the 2022 Census, 3% indicated they were
gay, lesbian, bisexual or a sexual orientation other than heterosexual/straight. 
Health
Life expectancy and healthy life expectancy in North Ayrshire are among the lowest
in the country. This presents a challenging context in supporting our population, who
also face some of the poorest health outcomes in Scotland. NHS Ayrshire and
Arran’s Department of Public Health have advised that not only are life expectancies
low, but they are also stagnant or declining. This is a very unusual and concerning
trend as until the last decade, life expectancies in high-income countries had been
steadily increasing, for over a century. Healthy life expectancy is also declining for
both males and females and in North Ayrshire and this trend exceeds that seen for
Scotland as a whole. These are very concerning indicators from a public health
perspective. 
Table 2 – Life expectancy indicators
Indicator North
Ayrshire
Scotland Rank (/ 32)
Life expectancy of males 74.9 76.8 29
Life expectancy of females 79.3 80.8 27
Healthy life expectancy of males 56.5 60.4 28
Healthy life expectancy of females 52.1 61.1 32
These figures mask further inequality between and within areas and localities in
North Ayrshire, highlighted in further detail within the Place Profiles. 
Approximately 29% of the population is living with at least one physical long-term
condition (LTC), which compares to a figure of 21.7% across Scotland. The
prevalence of long-term physical health conditions increases with age, as does the
co-occurrence of two or more conditions, known as multimorbidity. Overall, 4.2% of
those under the age of 65 have more than one LTC, compared to 39.3% of those
aged over 65. 
The most common conditions across North Ayrshire are asthma (7.47% of the
population), cancer (7.38%), arthritis (7.24%), coronary heart disease (6.99%), and
diabetes (4.94%). All these conditions are more prevalent in North Ayrshire than in
the Scottish population, particularly asthma for which the national rate is 4.72%.

Page 38

North Ayrshire’s third Local Development Plan
27
LDP Committee Version
Mental and physical wellbeing is shaped by the places and circumstances in which
we are born, grow, live, work, and age. Issues can develop when alcohol, smoking or
drug use shape lives. Alcohol and drug-related hospital admissions in North Ayrshire,
at 632 and 424 per 100,000 age-sex standardised population are both higher that
Scotland (621 and 211 admissions per 100,000). 
Overall, emergency hospital admissions, unscheduled acute specialty bed days,
delayed discharge bed days and potentially preventable hospital admissions per
100,000 population are all higher in North Ayrshire than in Scotland. 
Mental health indicators, including psychiatric patient hospitalisations, unscheduled
mental health specialty bed days and the percentage of the population prescribed
medication for anxiety, depression, and psychosis are also above the national
average. In 2020/21, 22% of people were prescribed medication for anxiety,
depression, or psychosis in North Ayrshire HSCP. This is a 35.3% increase from the
rate 10 years prior in 2010/11.
Deprivation and unemployment
The Scottish Index of Multiple Deprivation (SIMD) is a relative measure of
deprivation across 6,976 data zones covering all of Scotland. The most recent data
is from 2020. SIMD looks at the extent to which an area is deprived across seven
domains: income, employment, education, health, access to services, crime, and
housing. 
Analysis of the SIMD data shows North Ayrshire is the fifth most deprived council
region in Scotland with 28% (52) of all data zones within the 15% most deprived.
41% of North Ayrshire’s population live within the most deprived quintile (SIMD 1). 
Deprivation is concentrated in The Three Towns and Irvine localities, but Kilwinning
and the Garnock Valley also have above average deprivation and, as with life
expectancy, there are significant inequalities between and within areas and localities
in North Ayrshire. Deprivation in North Ayrshire is predominately attributed to
opportunities of employment, income, and health domains; in Arran access to
services is a contributing factor to deprivation. 
Table 3 – The percentage of population living in SIMD data zone quintiles by locality
Locality  SIMD1
(most
deprived)
SIMD2 SIMD3 SIMD4 SIMD5
(least
deprived)
Arran 0% 0% 39.1% 60.9% 0.0%
Garnock Valley 40.3% 24.5% 13.6% 14.4% 7.3%
Irvine 45.7% 28.4% 9.4% 13.5% 2.9%
Kilwinning 55.0% 7.9% 9.7% 19.2% 8.2%
North Coast 9.3% 12.1% 31.1% 16.7% 30.9%

Page 39

North Ayrshire’s third Local Development Plan
28
LDP Committee Version
Locality  SIMD1
(most
deprived)
SIMD2 SIMD3 SIMD4 SIMD5
(least
deprived)
Three Towns 57.3% 15.5% 13.5% 7.5% 6.3%
North Ayrshire 40.9% 18.5% 15.8% 15.0% 9.7%
The Council’s August 2025 Economic Briefing, reporting employment and
unemployment data for North Ayrshire for the period April 2024 to March 2025
sourced from the NOMIS labour market profile, puts North Ayrshire’s employment
rate at 65.6%. This compares to 74.0% for Scotland and 75.3% for the UK (UK rate
is April - June 2025). North Ayrshire’s unemployment rate is 5.3%. This is 1.9
percentage points higher than the Scottish rate of 3.4%. At 30.7%, North Ayrshire’s
economic inactivity rate is one of the highest in Scotland. 
The North Ayrshire claimant count (as a proportion of the working age population) in
March 2025 was 3.9%. This rate remains one of the highest in Scotland, however,
North Ayrshire’s position has improved slightly in this respect.
Child poverty
Child poverty is identified, including in Our Council Plan, as a significant challenge
for North Ayrshire. In North Ayrshire, 20.8% of children live in relative poverty before
housing costs. Relative to other local authorities, this is the second-highest rate of
child poverty in Scotland. Data published by the End Child Poverty coalition, which is
made up of more than 130 organisations including child welfare groups and social
justice groups, shows the child poverty level after housing costs reduced from 29.2%
in 2022-23 to 24.3% in 2023-24. This is against national averages of 24% and 23%,
respectively.
The percentage of children in poverty varies across North Ayrshire. Local area
statistics available from the Improvement Service on children in low-income families
indicate around 50% of children are in poverty in some areas of North Ayrshire,
including: Hayocks in Stevenston; Central Saltcoats; Ardeer; and Central Largs. The
percentage of children living in poverty has been mapped spatially.
Improvement Service Child Poverty Map
Addressing child poverty is the number one priority for North Ayrshire. In 2023, the
North Ayrshire Child Poverty Action Plan was published. The plan is part of a broader
effort to meet the Scottish Government's statutory targets set by the Child Poverty
(Scotland) Act 2017. These targets aim to significantly lower the percentage of
children living in poverty by 2030.
The North Ayrshire Child Poverty Action Plan Progress Report 2024 to 25 highlights
actions that North Ayrshire Council, NHS Ayrshire and Arran and partners in the
Community Planning Partnership have taken to reduce and mitigate the impact of
child poverty, focused around the three key drivers of child poverty: income from

Page 40

North Ayrshire’s third Local Development Plan
29
LDP Committee Version
employment; reducing the cost of living; and income through social security and
benefits in kind. 
Island populations
North Ayrshire is home to two populated islands, Arran and Great Cumbrae. As
noted above, these are remote rural communities by the measure of the Scottish
Government six-fold Urban Rural Classification. Local Island Plans published for
Arran and Cumbrae in May 2022, summarise key economic and demographic
evidence relation to the two islands.  
Additionally, the Scottish Islands Data Dashboard presents a compilation of Scottish
Islands data available from a range of published sources, designed to be used to
monitor progress against the strategic objectives outlined in The National Plan for
Scotland's Islands (2019) and for Island Community Impact Assessments (ICIA). 
The dashboard was first published in December 2023 and updated in spring/summer
2025, with an accompanying overview report published in September 2025.
Combined with Bute, Arran and the Cumbraes, the Dashboard shows that these
Clyde Coast Islands have seen the largest population decline between 2002 and
2022, at 13.2%. As with the mainland, population change by age group shows
substantial decreases in island populations below the age of 44, with increases in
those aged 65 to 74 (17.6%) and 75 and over (22.6%). 
Reporting data from the James Hutton Institute, the Scottish Islands Data Dashboard
shows that North Ayrshire’s islands will suffer population loss of children and working
age population of 23% and 35% respectively from 2018 to 2043. This is the highest
projected population loss of working age population among all island region sparsely
populated areas. 
Design, quality and place
The planning system’s role in applying the Place Principle is underlined by NPF4
policy 14 on design, quality, and place. NPF4 aims to encourage, promote and
facilitate well designed development that makes successful places by taking a
design-led approach. Together, all NPF4 policies will contribute to creating more
successful places, which are consistent with the six qualities of successful places
and deliver the Place and Wellbeing outcomes. 
In accordance with NPF4, LDP3 is required to be place-based and created in line
with the Place Principle. The Spatial Strategy of the LDP should be underpinned by
the six qualities of successful places: healthy, pleasant, connected, distinctive,
sustainable, and adaptable. LDP3 is expected to provide clear expectations for
design, quality and place taking account of local context, characteristics, and
connectivity of the area. 
Our historic environment is particularly important to sense of place and placemaking.
‘Identity and belonging’ is identified as one of Scotland’s Place and Wellbeing
Outcomes and can have a positive impact on people when everyone can benefit
from a place that has a positive identity, culture and history, where people feel like

Page 41

North Ayrshire’s third Local Development Plan
30
LDP Committee Version
they belong and are able to participate and interact positively with others. The
Sustainable Places schedule (Topic 3) highlights evidence relating to historic assets
in North Ayrshire; residents identify with these buildings and sites. 
This Evidence Report summarises a wide range of primary and secondary
community engagement activities, including using the Place Standard tool, carried
out across North Ayrshire, with further detail set out in the Report of Engagement.
The outputs of this engagement include the Council’s plan; the Community Planning
Partnership’s Partnership Plan; Locality priorities and action plans; Islands plans,
Place Frameworks and Local Place Plans. Together, along with the evidence set out
in this report on the principal physical, cultural, economic, social, built heritage and
environmental characteristics of North Ayrshire, these plans provide a strong basis
for understanding the local context, characteristics, connectivity of places in North
Ayrshire as a basis for preparing LDP3. 
A number of places in North Ayrshire are already the focus for significant change and
have been subjects of masterplanning exercises. These include Ardrossan North
Shore, Irvine Harbourside and Hunterston.
Local living and 20-minute neighbourhoods
The concept of local living centres on the ability of people to meet most of their daily
needs within a reasonable distance of their home, preferably by sustainable and
active travel methods. Local living encourages, promotes, and facilitates the
application of the Place Principle and the creation of connected and compact
neighbourhoods which prioritise quality of life, help tackle inequalities, increase
levels of health and wellbeing, and respond to the climate emergency. 20-minute
neighbourhoods are an approach to assessing places against this concept. 
NPF4 requires local development plans to support local living, including 20-minute
neighbourhoods within settlements through the spatial strategy, associated site
briefs, and masterplans. This should take into account the local context. 
Planning guidance published by the Scottish Government sets out in further detail
the benefits and context for local living and 20-minute neighbourhoods; the key
considerations for local living, introducing the ‘Local Living Framework’ as a tool to
consider the daily needs of a place; ways to support local living and 20-minute
neighbourhoods; and a range of case studies showing how place-based
interventions are supporting the implementation of local living across Scotland. 
Understanding existing settlement patterns, characteristics and challenges faced by
places with respect to local living is important to placemaking and to take account of
NPF4 policy, recognising that the principle of local living can be adjusted to include
varying geographical scales from cities and urban environments to rural and island
communities. 
To inform LDP3, prior to the publication of the Scottish Government guidance and
technical guidance developed by the Improvement Service Spatial Information
Service on mapping and analysing 20-minute neighbourhoods, we developed our
own methodology for understanding whether current settlements in North Ayrshire

Page 42

North Ayrshire’s third Local Development Plan
31
LDP Committee Version
operate as ‘20-minute neighbourhoods’ and for assessing new proposals in the
context of local living. The methodology and outputs of this analysis are set out in the
20 Minute Neighbourhood Analysis Report. 
Our approach analyses what access people have to essential daily facilities and
amenities within a 10-minute walk in each direction from their home, with a 10-
minute distance equated to 800 meters. A 10-minute cycle, representing 3.5
kilometres, was also assessed. Using residential address points, Ordnance Survey
Points of Interest data and our Open Space Audit data, all residential points
throughout North Ayrshire received a score of 0 to 6, with 0 being the lowest score
and indicating no access to essential daily facilities and amenities within the distance
threshold. The assessment was carried out at two levels: Tier 1 considered just food
and drink and open space, whereas Tier 2 introduced health facilities, including
pharmacies, GPs, dentists and hospitals, and educational facilities covering
nurseries and primary schools.
Overall, the assessment found that – as would be expected – residential properties
in urban areas scored on average higher (5.21 for Tier 1A) than those in rural areas
(1.16). Table 1 within the report provides the average Tier 1A and Tier 2A scores for
all settlements within North Ayrshire. Most towns in North Ayrshire scored highly (4.5
out of 6 and above) in terms of accessibility to open space and food and drink;
exceptions include Fairlie and smaller villages in the Garnock Valley, Barmill and
Gateside, and on the Isle of Arran. 
Associated mapping further illustrates how scoring varies within settlements. Irvine,
for example, scores relatively low at 4.68 (Tier 1) compared to other towns in North
Ayrshire and the mapping shows scores reducing towards the periphery of the town,
particularly to the north-east. Similarly, residential areas to the west of Kilwinning;
Seamill, West Kilbride; and to the north and south of Largs have below average
scores indicating poorer accessibility to green space and/or food and drink provision.
This pattern is also replicated with the more detailed Tier 2 analysis. 
Map of 20-minute Neighbourhood Analysis
Beyond the location of health facilities, primary schools and nurseries, our analysis
does not include other facilities that are used for community functions, such as for
the purposes of sport, leisure, arts, and cultural activities, or to support lifelong
learning or social interaction and which may also be used for support services within
a community for health and wellbeing. Town and village halls, community centres
and libraries, etc., which offer these services have been highlighted within the Place
Profiles (see Culture, Creativity and Community within the Liveable section of each
profile) and are referred to with regard to culture and creativity within the Productive
Places schedule.
There are also interrelationships between the 20-minute neighbourhood concept and
nature networks (see Topic 3) and active travel (Topic 4). The Nature Network
Framework states that “local nature network will connect people and communities to
nearby important areas for nature, deliver local priorities and work with other

Page 43

North Ayrshire’s third Local Development Plan
32
LDP Committee Version
mechanisms of delivering connectivity at the local level e.g. enhancing active travel
routes.”
Public conveniences and water refill locations
Sections 15(2A) and (2B) of Act require the local development plan to include a
statement of the planning authority’s policies and proposals as to the provision of
public conveniences and water refill locations, respectively. 
North Ayrshire Council’s agreed approach to the provision of public conveniences is
to support models of delivery which provide a good standard of facility and which are
delivered in an affordable and sustainable way. There are currently five Council
operated facilities: Gallowgate, The Pencil and Broomfields in Largs and the Braes
and Melbourne Gardens in Saltcoats. Further provision is made at Eglinton Park in
Kilwinning (during café opening hours). 
Some public conveniences in North Ayrshire have been transferred to community
groups via Temporary Occupational Licences or a Community Asset Transfer,
including nine facilities in Arran; three on Cumbrae; at Irvine Beach Park and the
Ardrossan South Beach Public Toilets (now refurbished into a café facility) have
been leased to Ardrossan Community Development Trust. 
The approach for the future operation of Council operated sites and current
outcomes were agreed by the Council’s Cabinet in February 2025. There is no
capital funding available to invest in the remaining Council-owned facilities, hence
the agreed approach to seek alternative models and funding, including community
asset transfer. The three sites in Largs are now funded via the Largs Car Park Fund,
with Gallowgate recently receiving significant investment to bring it to a very good
standard of facility. 
Scottish Water have installed four ‘Top Up Taps’ in North Ayrshire: at Brodick; Irvine
Harbourside; Largs; and Millport as part of the wider ‘Your Water Your Life’
campaign. The campaign is aimed at highlighting the vital role water plays in the
lives of people across the Scotland and encourages everyone to refill bottles and
drink water, described as the “nation’s greatest natural resource,” straight from the
tap. The locations of these taps can be viewed online. The planning authority
currently does not have a policy as to the provision of water refill locations, as
required to be included in the LDP by the Planning Act.  
Play, recreation and sport
North Ayrshire has lower proportion of adults meeting physical activity guideline than
Scotland as a whole (59% vs 65% in 2019-2023) and this proportion is static and
among the highest burden of ill-health and premature death associated with physical
inactivity of all council areas in Scotland, after accounting for age (see: The burden
of disease attributed to physical inactivity). 
The greatest benefits for health would be seen if the people who currently have very
low levels of activity become slightly more active – one of the most effective and
equitable ways of achieving this is likely to be through creating places which enable
people to be physically active as part of their daily lives.

Page 44

North Ayrshire’s third Local Development Plan
33
LDP Committee Version
Universal access to a range of high quality, safe, well-maintained, accessible places
with opportunities for play and recreation can have a positive impact on people’s
health and wellbeing. Alongside streets and spaces and natural spaces, play and
recreation is identified as one of the three place and wellbeing outcomes within the
‘Spaces’ theme. The evidence-based benefits of this outcome are set out in the
relevant Place and Wellbeing Outcome Briefing. 
NPF4 seeks to encourage, promote and facilitate spaces and opportunities for play,
recreation and sport and states that LDPs should identify sites for sports, play and
outdoor recreation for people of all ages. To aid this requirement, the Council has
produced an Open Space Audit, Play Sufficiency Assessment and consulted with
stakeholders, including the general public, young people and sportscotland. 
‘Physical Activity For Health: Scotland’s National Framework’ provides a framework
for action to improve levels of physical activity which is founded on evidence-based
international guidance from the World Health Organization. The document is
intended to provide a context for developing plans and strategies across transport,
education, planning and the environment, at both national and local level, such that
these plans can consider the importance of improving levels of activity to help
improve health outcomes and reduce health inequalities.
Scotland’s Play Vision Statement and Action Plan 2025-2030 is a Scottish
Government publication designed to reflect the vision of play for Scotland for the
next five years and the steps the Scottish Government will take within that time to
achieve their vision and aims. It highlights how spaces can be designed to help
encourage play and supplements the six qualities of successful places set out in
NPF4. 
The ‘Make Space for Girls’ campaign raises awareness of the lack of facilities for
teenage girls.  
KA Leisure is the registered charity committed to creating opportunities, inspiring
people, and changing lives using sport and physical activity in North Ayrshire. The
company is responsible for the management and operation of public facilities in
North Ayrshire and also deliver physical activity programmes in collaboration with a
range of partners, including North Ayrshire HSCP, which cover a range of health
conditions. 
There is currently no sports pitch or playing field strategy for North Ayrshire.
Recreation is one of many ecosystem services gained from blue and green
infrastructure and spaces for play, recreation and sport can come in many different
forms and deliver a range of benefits, not just to community wellbeing. Further
discussion is provided under the blue and green infrastructure section of the
Sustainable Places schedule, including commentary on the Council’s Open Space
Strategy, which was published in 2016, and open space audit. 
As highlighted by NHS Ayrshire and Arran’s Public Health Directorate, alongside
formal opportunities for play, recreation, and sport (i.e. people purposefully being
active), informal opportunities for people to be physically active as a routine part of

Page 45

North Ayrshire’s third Local Development Plan
34
LDP Committee Version
their daily lives are also important. This includes through active travel and public
transport, which usually involves some degree of associated physical activity, e.g. to
reach stops or stations, underlining the importance of transport (Topic 4) to creating
liveable places which enable physical activity and therefore improving health and
tackling inequalities.
Play Sufficiency Assessment
As required by Section 16D of the Act, the Council as planning authority has
assessed the sufficiency of play opportunities in North Ayrshire for children in
preparing this Evidence Report. The Play Sufficiency Assessment (PSA) was
published in March 2025. It assesses the quality, quantity, and accessibility of both
formal and informal play spaces in North Ayrshire and derives standards to establish
sufficiency. 
In terms of quantity, a standard of one play area per 1,000 people has been
established. Informed by the open space audit, the PSA distinguishes different types
of play space in North Ayrshire: Neighbourhood Equipped Area for Play (NEAP);
Local Equipped Area for Play (LEAP); Local Area for Play (LAP), Natural Play Space
and Activity Zones for aged 12+ years. The assessment identified 134 formal
equipped play spaces in North Ayrshire, including 38 spaces privately owned and
managed but accessible to the public. 
Map of play spaces in North Ayrshire
Table 1 of the PSA shows the number of play spaces per 1,000 population for North
Ayrshire’s main settlements. While overall there is an average of approximately one
play area per 1,000 people in North Ayrshire, provision does fall below this in eight
towns and villages, notably Stevenston (0.2 play spaces per 1,000) and West
Kilbride (0.4).
To assesses quality, the criteria set in Play Scotland's ‘Getting it Right for Play’ toolkit
has been used to set a ‘Play Quality Standard’ that provides an overall score with
three outcomes: good provision, acceptable provision, and underperforming. Only
Council-owned, formal play spaces have been quality assessed using the PSA
assessment tool. From the 108 play spaces scored, 10 sites were identified as
underperforming, 33 as acceptable with the majority (60% of the sites) considered to
be good provision. Average quality scores were provided for sites across each
locality, with averages ranging from 60.06% in Irvine to 68.96% in Kilwinning. 
The accessibility standard is an amount of a particular type of open space within a
specified distance, i.e. a distance threshold. An inclusivity assessment has also been
undertaken, considering the accessibility of play spaces for people with disabilities
and limited mobility. A commentary on play area accessibility is provided for each
locality within the PSA report, with areas falling out with distances thresholds for
specific types of play space identified. Such areas include residential areas to the
south of Skelmorlie and West Kilbride and Seamill; Chapelhill, to the northwest of
central Ardrossan; Hawkhill at the top end of Stevenston; areas to the north of Irvine
(Lawthorn and Perceton) and residential areas to the west of Kilwinning at Corsehill.

Page 46

North Ayrshire’s third Local Development Plan
35
LDP Committee Version
Bringing together the four components of the Play Sufficiency Assessment (quality,
quantity and accessibility assessments and consultation, noted below under
‘Summary of Stakeholder Engagement’) has highlighted that, in general, the
experience of playing in North Ayrshire is a positive one.
The quality of play space provision is generally well spread throughout the Council
area, and all settlements contain play spaces considered good or acceptable. With
regards to quantity, all settlements are considered to have a good provision of open
space that is considered acceptable or good that can provide opportunities for play.
Issues have been identified in relation to accessibility to certain types of provisions in
some of our towns and villages. 
Sports provision
Sportscotland have provided information on facilities and draft extract from their
Facility Planning Model (FPM) outputs for halls, pools, and synthetic grass pitches.
This has been cross-referenced with data from the Council’s Estates team. Included
within North Ayrshire’s sports provision is 144 pitches: 55 sports halls across 32
different facilities and 31 outdoor tennis courts. Additionally, there are 22 golf courses
and 34 bowling greens in North Ayrshire across 25 bowling clubs. 
Map of sports provision in North Ayrshire. 
The FPM is a tool which provides an objective assessment of the relationship
between the likely demand for the following sports facilities (sports halls over 3
courts in size; swimming pools and full-size synthetic pitches) and their supply.
Further information on it is available on Sportscotland’s website. 
The FPM is a model which predicts likely patterns of demand, it does not predict
actual usage.  What is needed and where in relation to places for sport requires
more detailed analysis and local engagement.  
In summary some of the key outputs of the FPM are as follows:
• The average age of North Ayrshire’s pools, halls and synthetic grass pitches
(SGP) is newer than the national average.
• Courts per head are higher than the national average, non-commercial
waterspace per head is lower than the average and the SGP per head is
similar to the national average.
• Unmet demand is mainly due to people living too far from a facility. 
• At Council level, used capacity is predicted to be lower than the national
average across the facility types. 
• Walking accessibility to halls and pools is better for those in the 10% most
deprived areas compared to the Council average. For SGPs, accessibility is
worse for those in the 10% most deprived areas. 
• The model predicts that the Portal in Irvine and Garnock Community Campus
will be the two busiest facilities in 2033 with the Portal predicted to reach
100% capacity for its halls and pools. 
• At Council level, used capacity is predicted to be lower than the national
average across the facility types providing halls.

Page 47

North Ayrshire’s third Local Development Plan
36
LDP Committee Version
Health and safety
A place-based approach can support improved health outcomes and address health
inequalities. Placemaking specifically focuses on creating good quality places that
promote people’s health, happiness, and wellbeing. NPF4 seeks to protect people
and places from environmental harm, mitigate risks arising from safety hazards and
encourage, promote, and facilitate development that improves health and wellbeing. 
LDP3 and its spatial strategies should seek to tackle health inequalities, particularly
in places which are experiencing the most disadvantage and create healthier places,
for example through opportunities for physical activity, healthier lifestyles, land for
community food growing and allotments, and awareness of locations of concern for
suicide.
The Act also requires the evidence report to set out the planning authority’s view on
– and the local development plan to take account of – the infrastructure of the
district, including health care facilities and how that infrastructure is used. LDP3
should identify the health and social care services and infrastructure needed in the
area, including potential for co-location of complementary services, in partnership
with Health Boards and Health and Social Care Partnerships. This is addressed
within the infrastructure schedule of the Evidence Report. 
Evidence regarding the health and health needs of the North Ayrshire population –
including the inequalities in health experienced in the area – is considered above
under ‘North Ayrshire’s People.’
Air quality
Environmental factors which influence health and wellbeing can include: the nature
and distribution of poor air quality; noise; odour; lighting and blue green
infrastructure. 
Air pollution has significant effects on public health and the environment. Exposure
to air pollution is harmful to human health in terms of premature mortality and
morbidity, mainly related to respiratory and cardiovascular disease. Air pollution can
impact on the more vulnerable members of society – the very young, the elderly and
those with existing health conditions such as asthma, respiratory and heart disease,
thus making air quality an important health inequalities issue. Evidence indicates
these conditions are more prevalent in North Ayrshire than elsewhere in the country. 
Air pollution also effects ecosystems: pollution and its deposition onto vegetation,
soil and water can damage vegetation directly or indirectly through the addition of
nutrients or changes in acidity levels within a habitat.
Air quality in Scotland has generally significantly improved since the mid-twentieth
century, particularly in relation to CO and SO2, with a significant fall in both NO2 and
PM10 emissions since 2008. Currently, drivers of air pollution include fine
particulates from the combustion of fuels (such as from road transport, biomass, and
waste disposal), as well as from other energy generation and industry, such as
agriculture. Ferries and other marine vessels also release a significant proportion of
total anthropogenic air pollutants, including NOx, SOx, PM, and VOCs.

Page 48

North Ayrshire’s third Local Development Plan
37
LDP Committee Version
Since the Local Air Quality Management (LAQM) review and assessment process
was introduced, local authorities across Scotland have been required to review and
assess the air quality. Where targets are not met, local authorities must declare an
Air Quality Management Area (AQMA) and produce an action plan setting out
measures to address the issues identified. No AQMAs are currently in place in North
Ayrshire. 
Environmental Health monitor pollutants in 23 different locations and submit detailed
reports on the various stages of the review process both to the Scottish Government
and the Scottish Environment Protection Agency (SEPA). There is one continuous
monitoring station measuring PM10/PM2.5 (particulate matter less than 10 microns
and 2.5 microns) and NO2 (Nitrogen dioxide) situated on the High Street in Irvine. Air
quality is generally good, most notable NO2 and PM10 being recorded as low
throughout 2023. 
Previous monitoring reports identified two areas of concern in terms of emissions
from road traffic – High Street, Irvine and New Street, Dalry – due to congestion. The
2022 Local Air Quality Management Progress Report set out the changes in air
quality following the implementation of mitigation projects to address these issues,
which included public realm improvements on High Street Irvine, and the Dalry
bypass. The report demonstrated that these measures resulted in improvements in
air quality.
Food environment
The food environment encompasses facilities for home cooking; retail shops; out-of-
home food provision (including restaurants and takeaways); allotments and other
opportunities for individual and community involvement in food production (such as
private and community gardens); and local agricultural production.
Obesity Action Scotland have produced headline statistics which cover the Ayrshire
and Arran Health Board in relation to obesity prevalence (adults, children and
maternal), levels of fruit and vegetable consumption, food insecurity, type 2 diabetes
prevalence and rates of physical activity. They have found that 70% of the adult
population are overweight, 34% are obese and 5% are severely obese. These are
both higher than the national figures which are 67%, 29% and 4%, respectively.
Figures are higher amongst men compared to women. 
There is an improving picture in relation to children, based on Primary 1 Body Mass
Index (BMI) statistics. The percentage of children at risk of becoming overweight and
at risk of obesity has fallen over the last three years and is lower than the national
average.
Less than 1 in 5 adults (15%) in the health board area meet the recommended
guidelines for 5 or more portions of fruit and vegetables per day. 72% reported
eating fewer than 5 portions per day and 13% reported eating no fruit and
vegetables. Across the health board, 10% of adults report being food insecure i.e.
worried that they would run out of food. This is over national average of 9% (2022).
In obesogenic environments, inactivity and overconsumption of energy dense foods
is easy, affordable, and widely accepted, making an unhealthy lifestyle the default
option.

Page 49

North Ayrshire’s third Local Development Plan
38
LDP Committee Version
Health policies, including Scotland’s diet and healthy weight delivery plan reflect the
importance of places which provide opportunities for access to healthy food. The
Scottish Government has set out a vision for Scotland to be “a ‘Good Food Nation’,
where people from every walk of life take pride and pleasure in, and benefit from, the
food they produce, buy, cook, serve, and eat each day.” The Good Food Nation
(Scotland) Act 2022 provides the legislative framework that enables this vision. The
Act places duties on Scottish Ministers, local authorities, and health boards to
produce Good Food Nation Plans. These Plans will set out the main outcomes to be
achieved in relation to food-related issues, the policies needed to do this and the
measures that will be used to assess progress.
Alongside people’s health and physical and mental wellbeing, the Good Food Nation
policy and plans aim to support the environment, social and economic wellbeing, and
tackle child poverty.
Access to opportunities for food growth and allotments are important elements of
local living, our blue green infrastructure and creating healthier places. LDPs should
identify areas where proposals for healthy food and drink outlets can be supported
and land for community food growing and allotments.
North Ayrshire Council has four allotment associations or organisations who lease
and occupy Council land with a total of 521 plots:
• Eglinton Growers – Irvine Road, Kilwinning
• Garnock Valley Allotment Association – Sersley Drive, Kilbirnie
• Organic Growers of Fairlie - Fairlie Community Garden, Pier Road
• Three Towns Growers - Elm Park, Ardrossan
In addition to the above sites, the following organisations manage allotments:
• The Arran Community Land Initiative (Whiting Bay)
• West Kilbride Allotments (Ballees Farm near Dalry Road, West Kilbride)
In October 2025, Dalry Community Sports Club were awarded grant funding from the
Council’s Communities and Place Fund for phase 1 of the Dalry Community
Allotment Project, delivering new community growing space within the town. 
The Council does not directly manage any of the allotment sites. All aspects of the
allocation, management and maintenance of the allotments are the responsibility of
the respective allotment organisation or association and their tenants. However, the
Council’s Connected Communities service liaises directly with the allotment groups,
and the Streetscene service monitors and administers the Council’s dedicated
allotments mailbox for all allotment related enquiries.
The Council produces an Allotments Report each year which details waiting lists and
plot availability at each location. In 2025, the allotment sites across North Ayrshire
have a combined total of 640 allotment plots (of varying sizes), including polytunnel
and raised beds. North Ayrshire Council is aware of a collective total of 32 individuals
awaiting allocation of an allotment plot, with no individual being on a waiting list for
five or more years. This is below the statutory 50% ratio between waiting lists and

Page 50

North Ayrshire’s third Local Development Plan
39
LDP Committee Version
plot numbers across North Ayrshire which is the trigger threshold that would require
the Council to take action and consider new allotment provision.
The Council’s Food Growing Strategy (2024) sets out the range of activity and an
action plan to develop closer links between food growing and community food
provision through the North Ayrshire Food Forum.  
An analysis of the food environment has been undertaken as part of a Retail
Capacity Study, covered under Topic 5 in relation to town centres and retail. This
analysis has been informed by a review of the distribution of food shops; analysis of
responses to questions about food shopping habits and experience from the
household survey; results from North Ayrshire Council’s People’s Panel on access to
food/fresh food and survey responses from foodbank/community larder operators. 
Alongside the distribution of shops selling food, affordability is identified as a key
issue. Deprivation and rurality are identified as key factors in accessing affordable
food, including in limited more-affluent areas where there is less choice resulting in
higher prices/limited ranges of food goods available in shops. The study also shows
the location of North Ayrshire’s Foodbanks and Community Larders. There were 15
Community Larders as of December 2023, with a total average footfall of 589 across
North Ayrshire. The Study concludes that there is high widespread usage of
community larder/foodbanks in North Ayrshire and that this would normally indicate
that there is difficultly (for one reason or another) in accessing fresh food in local
shops. 
Research published in 2018 on the relationship between the food environment and
the planning system sought to consider how the planning system could best support
the creation of an improved food environment in Scotland. Bad or unhealthy food
environments are defined as a consequence of poor access to fresh food and
increased exposure to readily available energy-dense food. Overall, the research
notes that evidence suggests that increased exposure to outlets selling unhealthy
food increases a person’s likelihood of gaining weight.
Subsequent to this research, NPF4 Policy 27, relating to town, local and commercial
centres allows for development proposals for hot food take aways to be resisted if
further provision would undermine the character and amenity of the area or the
health and wellbeing of communities. Data from the Council’s Environmental Health
service indicates there are 235 premises in North Ayrshire providing hot food
takeaway, distributed as follows:
Table 4: Premises
providing hot food
takeaway by
Locality
Number of
premises
Population Population per
premises
Arran 8 4643 580
Garnock Valley 32 19995 625
Irvine 71 39237 553
Kilwinning 23 16982 738
North Coast 31 21259 686

Page 51

North Ayrshire’s third Local Development Plan
40
LDP Committee Version
Three Towns 70 31295 447
The location of these premises has also been mapped:
Map of premises providing hot food takeaway
Locations of concern for suicide
Suicide is a complex issue that affects all communities and sectors across Scotland.
Suicide is not caused by a single factor and the pathway to suicide is not
straightforward, it involves an interplay of risk factors, circumstances, and life events.
When these factors come together, people may experience feelings of
hopelessness, entrapment, and despair, often leading to an increase in suicidal
thoughts and behaviours. 
By addressing the locally identified priorities across North Ayrshire’s six Locality
Planning Partnerships—such as reducing deprivation, improving mental health
support, tackling isolation, and enhancing community cohesion, we can create
protective environments that contribute to reducing the risk factors associated with
suicide and strengthen the resilience of individuals and communities. Enhancing
people’s mental health and wellbeing has been identified as a priority in North
Ayrshire, including specifically within the Irvine locality by the Locality Planning
Partnership.
In September 2022, the Scottish Government published the Creating Hope Together:
suicide prevention strategy 2022 to 2032 and suicide prevention action plan 2022 to
2025, jointly with the Convention of Scottish Local Authorities (COSLA). The strategy
uses an outcomes-based model to set out the range of changes (outcomes) that we
understand are needed to achieve the vision of reducing the number of suicide
deaths in Scotland, whilst tackling the inequalities which contribute to suicide. 
One of four priorities of the strategy is to build a whole of Government and society
approach to address the social determinants which have the greatest link to suicide
risk. Social determinants of health – the social, cultural, political, economic and
environmental conditions in which people are born, grow up, live, work and age, and
their access to power, decision making, money and resources that give rise to these
conditions of daily life – play a central role in mental wellbeing at a population level
and among those who may or may not have a diagnosed mental illness and who are
prescribed medication.. Experiences of relationship and structural inequality such as
insecurity of income, housing and food, are all factors which can impact on the
mental health of individuals, families and communities and may increase risk of
suicide.
In relation to placemaking, factors such as transport: access to services, training,
employment, safe, secure, and appropriate housing, and green space; and the cost
of living, can all impact on people’s health and wellbeing, including mental health.
Suicide prevention in Ayrshire and Arran is being taken forward through coordinated
efforts both at a pan-Ayrshire level and within each local authority area, with work
focused on addressing risk to suicide, increasing awareness and improving

Page 52

North Ayrshire’s third Local Development Plan
41
LDP Committee Version
interventions and support, in line with the national Creating Hope Together strategy’s
emphasis on compassionate, community-led, and multi-agency approaches.
The Pan Ayrshire Suicide Prevention group is a long-standing strategic suicide
prevention group. In recent years, this group has offered opportunities for a wide
range of partners to attend learning events aimed at increasing knowledge and
understanding in relation to specific areas of suicide prevention work. The Locations
of Concerns learning event was attended by the Planning Service and offered the
opportunity to learn about good practice from practitioners working in this area of
suicide prevention across Scotland.
Guidance has been published by Public Health Scotland on action to address
suicides at locations of concern to support community planning partnerships (CPPs)
and local multi-agency steering groups to develop strategies to prevent suicides at
identified locations of concern; to prevent the emergence of further locations of
concern by incorporating suicide prevention measures into infrastructure
development and maintenance; and support multi-agency collaboration, recognising
that suicide prevention is a whole-community responsibility. The guidance can inform
local planning processes to help make suicide safe places and communities. 
Coal mining and Major Hazard Sites
Regulation 9 of the 2023 Regulations sets out further information and considerations
to which the planning authority are to have regard to in preparing a local
development plan. Included within this list are the objectives of preventing major
accidents and limiting the consequences of such accidents for human health and the
environment and the need in the long term to maintain appropriate safety distances
from major hazard sites and major accident hazard pipelines. 
Large areas of North Ayrshire, particularly the Garnock Valley, Three Towns and
Irvine are included within a Coal Mining Reporting Area which represents the known
extent of coal mining activity. The Mining Remediation Authority (previously known as
the Coal Authority) holds information on mine entries and development high risk
areas, these representing the part of the coal mining reporting area which contain
one or more recorded coal mining related features at surface or shallow depth.
These features pose a potential risk to surface stability and public safety [see Mining
Remediation Authority Map Viewer]. 
There are Major Hazard Sites in North Ayrshire with associated Health and Safety
Executive (HSE) consultation zones. An Office for Nuclear Regulation (ONR)
consultation zone also exists for development in the vicinity of Hunterston A & B
power stations. Decommissioning of both power stations has commenced. 
There are ten Health and Safety Executive (HSE) ‘Consultation Zones for Major
Hazard Sites’ and four ‘Explosive Safeguarding Zones’ in North Ayrshire, including in
relation to pharmaceutical plants, explosives works and bonded warehouse
complexes. With regards to major accident hazard (MAH) pipelines, there are two
high-pressure transmission gas pipelines in North Ayrshire.

Page 53

North Ayrshire’s third Local Development Plan
42
LDP Committee Version
GIS data on the location of major hazard sites is available to the Council for internal
use only, supplied by HSE on the understanding that it is to be used to help
determine HSE's planning advice only. 
Summary of Stakeholder Engagement
The Place Principle encourages better collaboration and community involvement in
order to promote a shared understanding of place and a clear vision on how better
outcomes for people and communities can be delivered. 
The Planning (Scotland) Act 2019 introduced measures to put community voices at
the heart of the planning system in Scotland. Measures include the preparation of
guidance to assist with engagement activities in the preparation of local development
plans. Effective Community Engagement in Local Development Plans – People and
planning describes the context and benefits of engagement. As highlighted by the
guidance, places matter to people. By engaging in planning, people have an
opportunity to help shape the future of their places and influence outcomes.
The Stakeholder Engagement schedule describes how we have met the
requirements of the Act and Regulations in relation to stakeholder engagement
relevant to the preparation of the Evidence Report and the separate Record of
Engagement details the engagement activities considered as relevant to the
preparation of the Evidence Report and LDP3. Key outputs are summarised within
the Evidence Report in relation to the topic-based schedules. 
The Place Standard has been used in North Ayrshire to inform local priorities by
each of our six Locality Planning Partnerships. We have engaged with local
communities via the ‘Your Place Survey’ – based on the Place Standard tool – and
on Place Profiles, which present an overview of evidence relating to North Ayrshire’s
six localities. The engagement on the profiles, including public ‘drop-in’ meetings,
focused on the needs and wants of communities. 
Place-based plans
Local Places Plans for West Kilbride, Stevenston, Cumbrae, Largs, Fairlie, the
Garnock Valley and a draft plan for Skelmorlie; Place Frameworks completed for
Kilwinning, Largs and Saltcoats; the Local Island Plans for Arran and Cumbrae and
emerging Long-Term Plan for Irvine, in addition to the Masterplan for Irvine’s Great
Harbour, have been developed following engagement with local people alongside
wider place-based engagement, provide us with an understanding of the local
context of our places; their qualities, challenges and the priorities and aspirations of
the people who live, work and visit. 
Health needs
Between January 2023 and December 2024, North Ayrshire Health and Social Care
Partnership (NAHSCP) conducted an engagement programme to inform its 2025–
2028 Strategic Plan. The process involved nearly 2,900 participants across 47
events, incorporating focus groups, surveys, workshops, and locality-based

Page 54

North Ayrshire’s third Local Development Plan
43
LDP Committee Version
conversations. The engagement prioritised inclusivity, with targeted outreach to
seldom-heard groups such as unpaid carers, rural residents, neurodiverse
individuals, and minority communities, including Gypsy/Travellers. Specific
engagement was carried out with children and young people in 2025. 
The engagement was designed not only to hear from a broad cross-section of
service users and professionals but to reflect the real experiences of those living and
working within the local health and social care system. In doing so, it sought to
understand what people value, where they encounter barriers, and what they would
like to see change. The Engagement Report and Youth Engagement Report 2025
set out what was learned from this engagement. 
Access to services is identified as the most consistent concern. Barriers to timely
and equitable access—especially in rural and island communities—were widely
reported. Infrequent public transport and the centralisation of services leave many in
Arran, Garnock Valley, and the North Coast feeling isolated. Transport barriers
compound existing access issues, especially for those without personal vehicles.
Among children and young people, mental health; substance use; neurodiversity and
support for families facing challenges are the biggest priorities.
Play sufficiency
An extensive consultation programme was designed to gain understanding of the
experience of children and play in North Ayrshire and inform the Play Sufficiency
Assessment. This consisted of two in-person, conference style events (one for
primary school children and one for secondary school pupils), online promotion and
surveys. The Council’s Youth Participation Officer and team was crucial in designing
the consultation and the content of the in-person events, which included a selection
of pupils from every secondary school and at least one primary school from each
locality. In addition to the events, three different online surveys were designed (one
for primary school, secondary school and one for parents of any age). In total, the
engagement activities managed to consider more than 1,300 views have been
considered to inform the PSA, albeit some people may have responded to more than
one survey or took part in more than one event. Full details of the consultation can
be found in the Play Sufficiency Assessment report.
Key agencies input
The Planning Service hold quarterly meetings with the North Ayrshire’s Health
Improvement Lead from NHS Ayrshire and Arran’s Department of Public Health. The
Health Improvement Lead’s input has informed the Evidence Report. 
A draft of the full Evidence Report was shared with NHS Ayrshire & Arran on 7
October 2025. Within a combined response, the Public Health Directorate focus on
substantive issues regarding data interpretation or presentation, which in their view,
affect the sufficiency of the evidence. They additionally made comments on the draft
document regarding the potential inclusion of other relevant data sources (and some
minor typographical errors). These comments relate to sections on ‘Health,’ ‘Child
Poverty,’ ‘Play recreation and sport’ and ‘Food environment’ within this scheduled of

Page 55

North Ayrshire’s third Local Development Plan
44
LDP Committee Version
the report. These sections have been updated accordingly, as detailed in the Record
of Engagement. 
Additional guidance on locations of concern for suicide was provided by the Senior
Health Improvement Programme Officer on 21 October 2025.
Early engagement with SportScotland was undertaken to ensure that the Evidence
Report contains the most relevant, accurate and up to date data. In addition to the
Facilities Report and draft extract from the Facility Planning Model (FPM),
SportScotland shared evidence detailing the importance of the contribution of
physical activity and sport to Scotland. This included how physical activity and sport
contributes to meeting the aims of the National Performance Framework Outcomes,
the Public Health Priorities, the Active Scotland Outcomes, and the COSLA Policy
Priorities.
SportScotland have reviewed the play, recreation, and sport section of the draft
Evidence Report, providing comments and suggested changes relating mainly to the
FPM, to ensure the data is appropriately caveated given it is a model which makes a
range of assumptions. The suggested changes have been made to the final
Evidence Report.
Summary of Implications for the Proposed Plan 
Our view on what this evidence and stakeholder engagement means for LDP3 is
summarised below:
Tackling demographic challenges
North Ayrshire’s population is facing a range of challenges relating to child poverty,
health inequality, a declining and aging population, deprivation, and employment.
These challenges underline the importance that LDP3 supports NPF4 in delivering
liveable, sustainable, and productive places. Supported by the provision of
affordable, warm homes (Topic 2) and reducing the need to travel (Topic 4), new
development can contribute to reversing population decline, particularly among the
working-age population and help increase income from employment and reduce the
cost of living for local communities.
Challenges faced on the mainland are often magnified on our islands, Arran, and
Cumbrae, due to their rurality and the inherent difficulty in accessing services.
Appropriate island-specific approaches within LDP3 are required here. 
A place-based approach
North Ayrshire’s third Local Development Plan (LDP3) will be central to how NPF4
and the Place Principle is implemented in North Ayrshire. LDP3 should be place-
based and use the place principle to tell a clear and compelling story about the future
of the places in our area. By adopting a placemaking approach, the spatial strategy,
policies, and proposals of the new plan should seek to create good quality places
that promote people’s health, happiness and wellbeing and tackle health inequalities.

Page 56

North Ayrshire’s third Local Development Plan
45
LDP Committee Version
This must be a joined-up, collaborative, and participative approach based on a
shared understanding of how local places are experienced in the context of wider
data about socio-economic and environmental characteristics. The wide range of
evidence and community engagement outputs summarised within this report provide
the basis for this and underpins the preparation of LDP3. 
Through North Ayrshire’s Partnership Plan (our Local Outcomes Improvement Plan
(LOIP)) and the Locality Planning Partnership Locality Action Plans, clear priorities
have been established by our communities relating to wellbeing, work, and the world
in which they live. These themes align well with NPF4’s focus on the delivery of
sustainable, liveable, and productive places.
The vision of the North Ayrshire Partnership Plan: “North Ayrshire – Fair for All” –
must be shared by LDP3, reflecting a coherent approach consistent with the Place
Principle. LDP3 must explain how the development and use of land can contribute to
delivering this vision. 
As per the Equality Act 2010, the Public Sector Equality duty is applicable and
Equality Impact Assessments, Fairer Scotland Duty Assessments and Island
Communities Impact Assessments will be undertaken in the preparation of the
Proposed Plan. The UN Convention on the Rights of the Child also means that
young people must be encouraged to play an active role in planning.
Design, quality and place 
LDP3 should provide clear expectations for design, quality and place taking account
of the local context, characteristics, and connectivity of the area. Consideration of the
six qualities of successful places: healthy, pleasant, connected, distinctive,
sustainable, and adaptable will underpin this. The use of design frameworks, briefs,
masterplans, and design codes can support this approach. Where not incorporated
as part of the new local development plan, the requirement for detailed design
guidance for new development proposed by LDP3 should be identified within the
Delivery Programme.
Various engagements with children and young people have stressed the importance
of spaces and facilities for leisure, sport, and recreation; generally, places where
they can meet and spend time with friends. Well-connected, well-designed, and
maintained streets and spaces which are inclusive, attractive places to use, enjoy
and interact with others are identified as one the 13 Place and Wellbeing Outcomes.
In providing a framework for future development, including site-specific design
guidance, LDP3 should seek to safeguard and create appropriate public spaces.
Evidence included within open space audit and Play Sufficiency Assessment (PSA)
can support this approach (see Play, recreation, and sport below). 
Local living and 20-minute neighbourhoods 
LDP3’s spatial strategy should support local living. This means new and existing
communities planned together with homes and key local infrastructure, informed by
local communities and businesses, in a manner that enables people to meet the
majority of their daily needs within a reasonable distance of their home. The creation

Page 57

North Ayrshire’s third Local Development Plan
46
LDP Committee Version
of high-quality, compact, and connected neighbourhoods will support health and
wellbeing, reduce inequalities and are resilient to the effects of climate change.
By adopting the principles of placemaking, local living and 20-minute
neighbourhoods, LDP3 can create opportunities to enable more people to be more
active – particularly those at highest risk of illness related to physical inactivity – and
therefore to improve physical and mental health at an individual and population level 
To support the achievement of this, we have developed a methodology that enables
the accessibility of places, including proposed development sites, to basic needs to
be assessed: food and drink, open space, education, and health care. It is noted that
policy 15 provides a more detailed list of the elements that having local access to
supports local living, including sustainable modes of transport; employment;
opportunities for food growth and allotments and diverse housing options. These
elements should also be considered. A site assessment methodology has been
developed to support this. 
In addition to delivering new development that is consistent with the principle of local
living, opportunities to strengthen existing places, for example through the creation of
new, high-quality blue and green infrastructure and improving sustainable transport
infrastructure that is accessible to all, should be explored. 
Play, recreation and sport 
Our new local development plan must identify sites for sports, play and outdoor
recreation for people of all ages. The loss of outdoor sports facilities and children’s
outdoor play provision should generally be avoided; instead, opportunities to improve
natural and built environments, with more equitable access to opportunities for play,
recreation and physical activity should be considered as part of enhancing and
expanding blue and green infrastructure. New provision should be well-designed,
high quality, accessible and inclusive.
The open space audit and Play Sufficiency Assessment (PSA) help identify such
sites and where existing provision could be improved in relation to the quality,
quantity, and accessibility of open space, including formal and informal play spaces
in North Ayrshire. 
Health and safety
The evidence and implications for the Proposed Plan set out in this section align to
the overall requirement that North Ayrshire’s third Local Development Plan must
encourage, promote and facilitate the creation of healthier places through
development that improves health and wellbeing. By committing to the adoption of
the Place Principle and placemaking, LDP3’s spatial strategy and specific
development proposals should deliver high-quality, well connected, and inclusive
places. 
Consideration of local priorities, including those highlighted by the Locality Planning
Partnerships; the Place and Wellbeing Outcomes and emerging outputs from the
work of the Collaboration for Health Equity in Scotland will inform the preparation of

Page 58

North Ayrshire’s third Local Development Plan
47
LDP Committee Version
the Proposed Plan with the aim of reducing health inequity by addressing the social
determinants of health.  
In view of the health challenges and inequalities faced in some parts of North
Ayrshire, the spatial strategy and policy framework established by LDP3 should
consider how improvements can be made to the food environment, including in
relation to hot food takeaways.
LDP3 must support the creation of suicide safe places and communities, taking
account of locations of concern. We will continue to engage with pan-Ayrshire work
to prevent suicide, the North Ayrshire Strategic Suicide Prevention Group, and the
suicide review process to inform the LDP3, enabling consideration to be given to
reducing suicide risk in our communities. This includes steps to mitigate risks
associated with buildings and other infrastructure and spaces. 
The spatial strategy of LDP3 should allow for appropriate distances between new
development and major hazard sites, pipelines, and sites with hazardous
substances.
Statements of Agreement / Dispute 
No statements from stakeholders have been received highlighting agreement or
disputes with the evidence presented in this schedule. The comments of NHS
Ayrshire and Arran and SportScotland have been taken into account and the
Evidence Report updated accordingly. 
Links to Evidence
1) Scottish Government, Scotland's Population Health Framework (June 2025)
2) North Ayrshire Council, Our Council Plan 2023 to 2028 (June 2023)
3) North Ayrshire Council, Wellbeing Economy Dashboard (August 2025)
4) North Ayrshire Community Planning Partnership, The North Ayrshire
Partnership Plan – Local Outcomes Improvement Plan 2022 to 2023 (March
2022)
5) Public Health Scotland, Needs Assessment – North Ayrshire HSCP (January
2022)
6) ibp Strategy & Research for North Ayrshire Community Planning Partnership,
Survey on Local Outcomes Improvement Plan – Report (February 2022)
7) Isle of Arran Local Island Plan (March 2022) 
8) Garnock Valley Locality Partnership, Locality Action Plan 2023/24
9) Irvine Locality Partnership, Locality Action Plan, 2023/24
10) Kilwinning Locality Partnership, Locality Action Plan, 2023/24
11) North Coast Locality Partnership, Locality Action Plan, 2023/24
12) Three Towns Locality Partnership, Locality Action Plan, 2023/24
13) Improvement Service, Mapping of the Place and Wellbeing Outcomes against
the Marmot Principles (June 2025)
14) North Ayrshire Health and Social Care Partnership, Strategic Needs
Assessment 2025

Page 59

North Ayrshire’s third Local Development Plan
48
LDP Committee Version
15) Public Health Scotland, HSCP Profile – North Ayrshire Health and Social Care
Partnership (March 2023)
16) North Ayrshire Council, North Ayrshire’s Localities: Economic Profiles (February
2025)
17) North Ayrshire Council, Economic Briefing (August 2025)
18) North Ayrshire Council, Child Poverty Action Plan 2023
19) Ardrossan North Shore Development Framework
20) Irvine Harbourside Masterplan
21) Hunterston Development Framework
22) Scottish Government, Local living and 20 minute neighbourhoods: planning
guidance (April 2024)
23) The Improvement Service, how to map a 20-minute neighbourhood: data and
methods (May 2025)
24) North Ayrshire Council, 20 Minute Neighbourhood Analysis Report (February
2025)
25) North Ayrshire Council Cabinet Paper – Public Conveniences (18 February
2025)
26) Improvement Service, Place and Wellbeing Outcome Briefing, Spaces: Play
and Recreation
27) Scottish Government, Physical Activity For Health: Scotland’s National
Framework (September 2024)
28) Scottish Government, Play: vision statement and action plan 2025 to 2030
(March 2025)
29) North Ayrshire Council, Open Space Strategy 2016 to 2026 
30) North Ayrshire Council, Play Sufficiency Assessment (March 2025)
31) Scottish Government, A healthier future: Scotland's diet and healthy weight
delivery plan (July 2018)
32) North Ayrshire Council, Allotments Annual Report 2025 (July 2025)
33) North Ayrshire Council, Food growing strategy (June 2024)
34) Gravis Planning incorporating Hargest Planning Ltd. for North Ayrshire Council,
North Ayrshire Retail Capacity Study – Final Report (June 2024)
35) Scottish Government, Relationship between food environment and planning
system: research summary (November 2018)
36) Scottish Government, Creating Hope Together: suicide prevention strategy
2022 to 2032 (September 2022)
37) Scottish Government, Creating Hope Together: suicide prevention action plan
2022 to 2025 (September 2022) 
38) Public Health Scotland, National guidance on action to address suicides at
locations of concern (November 2022)

Page 60

North Ayrshire’s third Local Development Plan
49
LDP Committee Version
Topic 2 – Housing
Affordable and warm homes that meet our needs and are in a thriving community we
want to be part of, near the services we rely on, are central to creating liveable
places. 
National planning policy seeks to encourage, promote and facilitate the delivery of
more high quality, affordable and sustainable homes that meet the diverse housing
needs of people and communities across Scotland. Local development plans have a
key role in housing delivery, including by establishing a local housing land
requirement and the allocation of deliverable land to meet this target. 
To support and inform the preparation of this Evidence Report and LDP3 in relation
to housing matters, a Housing Evidence Paper was prepared. This sets out
information on housing need, housing delivery, and housing land in North Ayrshire.
This chapter of the Evidence Report summarises this evidence, relevant stakeholder
engagement and considers the implications for the Proposed Plan. The
corresponding NPF4 policies are: 16. Quality homes; and 17. Rural homes. 
The Local Development Planning Guidance provides advice on how planning
authorities can take account of policies 16 and 17 when preparing the Evidence
Report. The Evidence Report is expected to: 
• include a section specifically on housing
• include an indicative Local Housing Land Requirement (LHLR), when setting
out what the evidence means for the Proposed Plan; and
• provide a transparent and understandable explanation of how the indicative
LHLR has been arrived at.
Information required by the Act & Regulations
Section 15 of the Act concerns the form and content of local development plans.
Subsection 1(a) requires the local development plan to take account of matters
mentioned in subsection (5), including: 
• the housing needs of the population, including, in particular, the needs of
persons undertaking further and higher education, older people and disabled
people; 
• the availability of land in the district for housing, including for older people and
disabled people. 
Subsection 1A requires the local development plan to include targets for meeting the
housing needs of people living in the plan area.
Section 16(2)(ab) states, in preparing the LDP, the planning authority are to have
regard to the list of persons seeking to acquire land in the authority's area for self-
build housing. This list is required to be prepared, maintained and published in
accordance with section 16E.

Page 61

North Ayrshire’s third Local Development Plan
50
LDP Committee Version
Section 16B of the Act relates to the Evidence Report. As per subsection (3), the
evidence report is to set out the planning authority’s view on the matters listed in
section 15(5), referred to above; a summary of the action taken to support and
promote the construction and adaptation of housing to meet the housing needs of
older people and disabled people; a summary of the action taken to meet the
accommodation needs of Gypsies and Travellers; and an analysis of the extent to
which the action has helped to meet those needs.
The Act also includes the requirement at Section 3A(3)(d) that the National Planning
Framework contain ‘targets for the use of land in different areas of Scotland for
housing’. This has been met at Annex E of NPF4 which sets out the Minimum All-
Tenure Housing Land Requirement (MATHLR) for each planning authority in
Scotland.
The 2023 Regulations provide additional detail to the requirements set out in primary
legislation. Regulation 9 sets out further information and considerations to which the
planning authority are to have regard to in preparing a local development plan.
Included within this list are any local housing strategy prepared and submitted to the
Scottish Ministers in accordance with section 89 of the Housing (Scotland) Act 2001
and the resources available or likely to be available for the carrying out of the
policies and proposals set out in the local development plan.
Summary of Evidence
The summary of the housing evidence is structured into the following sub-sections:
• Policy Context
• Housing Need
• Housing Delivery
• Housing Land and Stock
• Meeting the housing needs of older people and disabled people
• Meeting the needs of Gypsy/Travellers
The proposed indicative Local Housing Land Requirement and Council’s position on
developer contributions are covered under the summary of implications for the
Proposed Plan.
Policy Context
The planning system has an important role to play in supporting the delivery of
homes which meet our future needs. In March 2021, Scotland’s first long-term
national housing strategy, Housing to 2040, was published by the Scottish
Government. Housing to 2040 aligns with the Government’s ambition that everyone
in Scotland should have access to a warm, safe, affordable and energy efficient
home that meets their needs, in a community they feel part of and proud of. 
It is also recognised by Scotland’s Population Strategy that planning at national,
regional and local levels plays a key role in considering the spatial implications of
population change, proactively shaping future land use. The planning system can

Page 62

North Ayrshire’s third Local Development Plan
51
LDP Committee Version
direct development to areas where change is needed to help maintain the viability of
local infrastructure and can also manage pressures on infrastructure arising from
high demand for new homes, enabling good quality development in a way that is
sustainable and reflects the needs of existing communities alongside new residents.
Scotland’s housing and population strategies are reflected in the country’s long-term
spatial strategy set out in NPF4. The intent of NPF4’s policy for housing is to
encourage, promote and facilitate the delivery of more high quality, affordable and
sustainable homes, in the right locations, providing choice across tenures that meet
the diverse housing needs of people and communities. There is a specific focus on
the housing needs of older people and disabled people and homes that meet the
needs of people throughout their lives. 
NPF4 directs local development plans to identify a ‘Local Housing Land
Requirement’ for the area they cover. This is to meet the duty established by Section
3A(3)(d) of the Act for a housing target and is to represent how much land is required
by reference to the number of housing units. To promote an ambitious and plan-led
approach, the Local Housing Land Requirement is expected to exceed the 10-year
Minimum All-Tenure Housing Land Requirement (MATHLR) figure set out in Annex E
of NPF4 for each planning authority in Scotland. The MATHLR figure for North
Ayrshire is 2,950. 
An Assessment Report published by Scottish Government in September 2021
explains North Ayrshire’s MATHLR figure has been determined as follows:
Household Projection + Existing Need + Flexibility (25%) = MATHLR
50 + 2,300 + 588 = 2,938 – rounded up to 2,950
The household projection, representing newly forming households, used in the
calculation is derived from the NRS 2018-based high migration scenario. The HNDA
tool default existing housing need figure of 350 has been adjusted to 2,300,
representing the backlog housing need from the North Ayrshire Housing Register.
This aligns with the approach taken to establishing the housing estimate for North
Ayrshire in the latest HNDA (see below). 
The North Ayrshire Local Housing Strategy (LHS), covering the period 2023 to 2028,
was approved by Cabinet in June 2023. The strategic ambition is for people to live in
the right homes, in great places, with access to any support services they need. Four
overarching outcomes have been established and align to the four key strategies in
‘Housing to 2040’:
• More homes at the heart of great places
• Affordability and choice
• Affordable warmth and zero emissions
• Improving the quality of our homes

Page 63

North Ayrshire’s third Local Development Plan
52
LDP Committee Version
The LHS recognises the importance of housebuilding to North Ayrshire’s economy
and as a way of reversing population decline. An increase in the demand for housing
because of economic recovery and renewal and community wealth building
approaches, linked to the Ayrshire Growth Deal, is anticipated. To support the
outcome of delivering more homes, the LHS sets out minimum housing supply
targets for new build housing in the area. The Housing Supply Target (HST) for the
period of the strategy (2023 to 2028) is 2,925 homes: 1,625 social housing units and
1,300 delivered by the private sector. 
This HST was set considering factors including housing need, taking account of the
HNDA; recent and anticipated build rates; and committed investment in affordable
housing. The approach used to calculate the Housing Supply Target is detailed in a
supporting paper: ‘Setting a Housing Supply Target for North Ayrshire’ (April 2023).
The LHS aligns with North Ayrshire’s five-year Council Plan, with the documents
sharing the same timeframe (2023 to 2028). The Council Plan includes as key
activities within the ‘Wellbeing’ strategic aim: increasing the number of homes in the
area through a mix of private and social developments; bringing empty buildings
back in to use and providing good quality, affordable homes for life that meet the
needs of residents through our own housebuilding programme and wider housing
investment. 
Since the publication of Housing to 2040, NPF4 and the LHS, the Scottish
Government formally declared a national Housing Emergency in the Scottish
Parliament on 15 May 2024. Between June 2023 and November 2024, thirteen local
authorities in Scotland declared local housing emergencies. A housing emergency
has not been declared in North Ayrshire. In November 2024, the Scottish
Government published Planning and the housing emergency: delivery plan, setting
out actions within the remit of planning to tackle the housing emergency. On 2
September 2025, the Cabinet Secretary for Housing announced the publication of
Tackling Scotland's Housing Emergency: Housing Emergency Action Plan to step-up
action and lead Scotland through and out of the housing emergency. It includes
immediate and medium-to-long term measures to deliver affordable, quality homes
of all tenure, and to unlock land and investment to meet the needs of communities
now and in the future.
The action plan expects an ‘an emergency-led approach’ to decision making both in
the preparation of local development plans and in the determination of planning
applications, with the delivery of more affordable homes central. 
Housing need
Housing Need and Demand Assessment (HNDA)
A Housing Need and Demand Assessment has been prepared to inform the LHS and
LDP3. It was submitted to the Scottish Government Centre for Housing Market
Analysis (CHMA) on 16 December 2021 and confirmed as ‘robust and credible’ by
CHMA on 7 February 2022. HNDA20 sets the housing estimate – the number of

Page 64

North Ayrshire’s third Local Development Plan
53
LDP Committee Version
additional housing units required in North Ayrshire – for the period 2022 to 2042 at
2,330 new units. 
Three scenarios are considered within HNDA20 (see Figure 87 of HNDA for full
details). For Scenarios 2 (Principal Migration) and 3 (Economic Resilience), the
backlog need figure used in the HNDA tool is derived from the North Ayrshire
Housing Register and is set at 2,300 households. This is instead of the built-in
figures from the HNDA tool (i.e. those referred to as ‘HoTOC’ and which includes
only homeless households in temporary accommodation plus households who are
both concealed and overcrowded). It is considered the HoTOC figure for North
Ayrshire of 350 does not represent the number households with an assessed need
for housing. How the backlog need figure has been derived from the Housing
Register is explained below. 
North Ayrshire Council, Cunninghame, Trust, and Irvine Housing Associations and
ANCHO operate a ‘groups plus points’ Common Allocation Policy and housing
register, called the ‘North Ayrshire Housing Register.’ When applying to the register,
applicants are awarded points based on their housing need and are placed in a
housing needs group. Those with greatest need have more points; applicants with no
points are adjudged not to have a housing need.
The North Ayrshire Housing Register comprises the following groups:
• Group 1 – Homeless
• Group 2 – Strategic housing needs
• Group 3 – Accessibility needs
• Group 4 – Transfer applicants
• Group 5 – Overcrowding
• Group 6 – General needs
• Group 7 – Location needs
In November 2020, there were just over 6,500 households, comprising 283
homeless, 2,020 transfer and 4,253 waiting list applicants, on the register.
Subtracting the number of households with no assessed need (i.e. no points) and all
transfer applicants, as when they are rehoused, they release a property which can
then be reallocated to another waiting list applicant (effectively cancelling themselves
out of the calculation), gave the ‘backlog’ need figure of 2,300 (283 + 1993 = 2,276,
rounded up to 2,300), representing the existing demand for social housing in North
Ayrshire. This is the figure used by HNDA20 and by the Scottish Government in
setting the MATHLR.

Page 65

North Ayrshire’s third Local Development Plan
54
LDP Committee Version 
The population and household projections used for the HNDA are 2018 based.
Population projections based on several migration and other scenarios all indicate
that the number of people living in North Ayrshire will reduce by between 8% and
14% by 2043. The average of these scenarios suggests a 10% reduction in
population over this time, a number that correlates with the ‘principal’ migration
forecast [see HNDA20, Figure 11]. The ‘Economic Resilience’ scenario included in
HNDA20 is based on ‘high migration’ data. Whilst the population is expected to
decline to 2041, over the same period household numbers will remain more stable
with a projected decrease of only 3% (or c.2,000) over the next 25 years. 
The housing estimate of 2,330 established in HNDA20 for the period 2022 to 2042 is
predicated on the most positive of three scenarios, referred to as ‘Economic
Resilience’ (Scenario 3), rounded up to the nearest 10. This scenario is based on a
more optimistic view which anticipates a positive outcome from local economic
strategies [see Productive Places schedule]. The high migration projection is used in
the HNDA tool for this scenario along with assumptions of higher income growth,
meaning more people currently on the social housing list or in social housing will be
able to afford a private solution. These units are all front-loaded to the first five years
i.e. it is anticipated that the need is met within five years. 
Table 5 – Estimate of additional future housing units for North Ayrshire 2022 to 2042
– Economic Resilience (Scenario 3)
Tenure 22/23 23/24 24/25 25/26 26/27 27/28 - 
41/42 Total
Owner
Occupation 215 215 215 215 215 0 1075
Private 
Rent 88 88 88 88 88 0 440
Below
Market Rent 16 16 16 16 16 0 80
283
1203
1993
817
1993
0
500
1000
1500
2000
2500
3000
3500
4000
4500
Homeless List Transfer List Waiting List
Figure 4: North Ayrshire Social Housing Applicants by type
and need, November 2020 (Source: North Ayrshire Housing
Register)
Assessed Need No Assessed Need

Page 66

North Ayrshire’s third Local Development Plan
55
LDP Committee Version
Tenure 22/23 23/24 24/25 25/26 26/27 27/28 - 
41/42 Total
Social 
Rent 146 146 146 146 146 0 730
Total 465 465 465 465 465 0 2325
Existing housing need is the main component of the housing estimate, with only a
very small amount (1.3%) driven by newly forming households, i.e. future need. 
The key difference between Scenario 2 (Principal Migration) and Scenario 3
(Economic Resilience) set out in the HNDA is the tenure. In Scenario 2, the total
estimate of additional future housing units required is 2310, with just 5 units of
‘owner occupation’ and the remainder social rent. 
It is noted that LDP3 is expected to be adopted in March 2027 (Development Plan
Scheme 2024), five years into the HNDA projection period of 2022 to 2042, and at
which point HNDA20 estimates additional future housing need is zero units across all
tenures. In is acknowledged that delays in the preparation and submission of the
Evidence Report mean that adoption of LDP3 is likely to be later than March 2027.
An updated Development Plan Scheme is required to be prepared, setting out a
revised timetable. 
Specific need
The HNDA also considers the specific housing needs of persons undertaking further
and higher education, older people, disabled people, Gypsy Travellers, and
Travelling Show people. This is summarised below:
• Persons undertaking further and higher education
Ayrshire College is the only further education provider in North Ayrshire. Over 7,000
students are taught at various campuses in North (Irvine and Kilwinning), South
(Ayr), and East Ayrshire (Kilmarnock). With almost 96% of the college’s students
originating from the Ayrshire region, Ayrshire College does not provide student
accommodation. When necessary, the college will provide support to students
moving to the area for study, in order that they can find suitable accommodation [see
HNDA20, para 178]. Accordingly, no requirement to build student accommodation in
North Ayrshire has been identified. 
• Older People and Disabled People
North Ayrshire has an ageing population. The number of residents aged 65 and over
has increased from 25,898 at the 2011 census to 31,663 in 2022 – an increase of
22.3%. This compares to a 3.4% decrease in the total number of people during the
same period. 
The NHS provides advice on housing options for older people, recognising that as
people get older, their homes may become unsuitable, uncomfortable or unsafe.
People may wish to move to a home which is smaller and easier to maintain;
somewhere which is more suited to their physical needs, such as properties without
stairs; nearer friends and family; or with easier access to facilities and services.

Page 67

North Ayrshire’s third Local Development Plan
56
LDP Committee Version
There are several options available, which may or may not involve moving home,
including:
• Adaptation of existing property
• Exchanging a council or housing association property
• Amenity or sheltered housing
• Extra care housing
• Close care
The HNDA considers specialist provision, including accessible and adapted housing
and housing for wheelchair users. Level access homes which support bathing and
food preparation, which are flexible enough to allow for future adaptations and
care/support services and where the use of assistive technology can be maximised
can meet the housing needs of older households, people with physical disabilities
and people with medical conditions which limit mobility. 
While the overall number of households in North Ayrshire is not expected to change
significantly, the HNDA estimates that the types of homes we need to provide will
change, with an emphasis of more specialist accommodation. By considering
forecast changes to household patterns by head of household and applying the
proportion of the population who have long term health conditions by age, the HNDA
forecasts that by 2043 we will need specialist accommodation for approximately
23,500 households, compared to 20,000 in 2018. This is a 16% increase in demand.
[HNDA 20, para. 166, p. 90]. 
To support independent living, the North Ayrshire Health & Social Care Partnership
offers a range of bespoke options. Residents or their representatives can request an
assessment of need, which is carried out by the Community Occupational Therapy
Service. If the need for an adaptation is identified, this will be provided based on
priority of need, with those presenting with high level needs being provided their
adaptation first (this can be subject to demand and budget availability).
A snapshot of the position in March 2025 illustrates how need for property
adaptations presents. Half of those on the list can be supported at home with just the
installation of handrails or grabrails (including bannisters). Solutions to bathing
problems, be it the installation of a shower or a bath, are the second most frequent
type of adaptation required, but do not account for even a quarter of total need. 
In March 2020, the North Ayrshire Health & Social Care Partnership advised that
there were 1,300 people on their list for adaptations. Applying the same forecast
increase in people who need an adaptation, this suggests the list would be at around
1,500 in 2043 [HNDA20, para 169, p. 92].
In terms of supported housing, there are just over 900 care homes spaces in North
Ayrshire, almost all of which are independently owned. The exception is a single
Council owned facility on Arran, which has capacity for 30 people. 
• Gypsy Travellers
No demand issues have been identified by the HNDA in relation to accommodation
for gypsy/travellers. North Ayrshire Council manages the only site in the area for

Page 68

North Ayrshire’s third Local Development Plan
57
LDP Committee Version
gypsy/travellers, Redburn Grove in Irvine. The site provides 16 pitches, each of
which includes an external utility building with a shower room, kitchen, and utility
area. Four pitches are level access. HNDA20 reports that in February 2021, there
were 10 families on the waiting list for a pitch. The figure in October 2024 was 16. 
Between 2010 and 2023, there were an average of 9 void pitches per annum at
Redburn Grove, representing a 50% turnover. This exceeds the turnover rate for
mainstream accommodation and suggests that need is met in a timely manner, with
those on the list waiting around a year, on average, for a pitch [see HNDA20, paras
208-214 – updated with figures to 2023]. 
The Council’s Tenant Participation Team provide support to, and engage regularly
with, the residents of Redburn Grove, including in relation to facilities at Redburn.
Through this engagement, there has been no indication that additional pitches are
required. Housing Services also provide support to families within temporary and
unauthorised encampments in line with the Council’s Unauthorised Encampment
Policy. Data on the number of unauthorised encampments within North Ayrshire
indicate there were 64 during 2024, higher than previous years (51 in the previous
two years). These figures do not equate to individual households, with multiple
counts of the same family who may stay at various locations during their time in our
area included.
A statement on how the Council is meeting the housing needs of Gypsy/Travellers is
noted below. 
• Travelling Showpeople
Travelling Showpeople are a distinct and separate group from Gypsy/Travellers, with
their own history and culture. While shows are a regular feature in North Ayrshire,
including at Ardrossan South Beach and the Towns Moors in Irvine, we do not have a
history of Travelling Showpeople wishing to reside in the area. Our assumption is
that, with over 80% of Travelling Showpeople in Scotland living in Glasgow,
Showpeople will ‘commute’ to North Ayrshire from Glasgow and base themselves
here temporarily, rather than seeking a more permanent base, albeit we have been
unable to confirm this [see HNDA20, paras 215-217].
Further evidence 
A robust and credible HNDA is the established starting point for establishing housing
need. Where CHMA is satisfied that the HNDA is robust and credible, the approach
used is not anticipated to be considered further at the Gate Check. Where
stakeholders consider further evidence may be relevant after a robust and credible
HNDA has been achieved, this may be raised in engagement and reflected in the
Evidence Report [Local Development Planning Guidance, p.63].
Further evidence is presented below in relation to population projections backlog
need, our islands, and an alternative approach to establishing housing need
promoted by Homes for Scotland.

Page 69

North Ayrshire’s third Local Development Plan
58
LDP Committee Version
• 2022-based sub-national population projections
2022-based sub-national population projections for Scottish council areas and health
boards were published by National Records of Scotland on 30 September 2025.
North Ayrshire’s population is projected to decrease by 3.1% in the 10 years from
mid-2022 to mid-2032. The projections anticipate positive net migration over the 10
years to mid-2032 (+3.93%) which is outweighed by natural change – more deaths
than births – accounting for a projected decrease of 7.14%. 
The projected components of population change in North Ayrshire between mid-2022
and mid-2032 due to migration are migration within Scotland (3.2%) and migration
from the rest of the UK (1.74%). The contribution from international migration is
expected fall 1.05%. Across Scotland, there is a pattern of projected negative
internal migration from the cities, with more people leaving these council areas for
other parts of Scotland than arriving from other council areas. This figure for
Glasgow is -9.9%. 
The last set of projections, used within the HNDA, were based on the mid-year
population estimates for 2018. They were rolled forward from Scotland’s Census
2011. This set of 2022-based projections are the first to be based on Scotland’s
Census 2022. This also includes the rebased time series for mid-2012 to mid-2021
following the release of 2022 census data. There is a nominal percentage difference
(0.3%) between 2018-based and 2022-based projections for North Ayrshire to mid-
2032. 
As well as the principal population projections, a number of variant projections are
available. These are based on alternative assumptions of future fertility, mortality,
and migration. The high migration projection variant anticipates population decrease
in North Ayrshire of 5.916% by 2042, compared to the larger decrease shown in the
principal scenario (7.387%).
Homes for Scotland note that both the NRS Local Area Migration Statistics (Mid-
2024) and Household Projections for Scotland (2022-based) are due to be published
before the end of 2025 and may indication additional population growth. 
• Backlog need
As noted above, HNDA20 uses the North Ayrshire Housing Register, rather than the
‘HoTOC’ figure, to determine housing need with in the HNDA. The backlog need
figure (2,276, rounded up to 2,300) – which accounts for the majority of the HNDA
housing estimate figure – used within HNDA20 and the NPF4 MATHLR figure was
drawn from analysis of the North Ayrshire Housing Register carried out in November
2020. 
As more recent review of backlog has been undertaken to inform our understanding
of housing need. At 11 July 2025, there were 6,349 applicants on the North Ayrshire
Housing Register, with 3,111 assessed as having a housing need. These figures are
noted in the latest Strategic Housing Investment Plan (SHIP).

Page 70

North Ayrshire’s third Local Development Plan
59
LDP Committee Version
Table 6 – Breakdown of Total Applications by Group (including Housing Need), July
2025
North Ayrshire
Housing Register
Group
All applicants Applicants with
an assessed
housing need
Applicants with
and assessed
housing need
(excluding
transfer
applicants)
Group 1 –
Homeless
354 354 354
Group 2 –
Strategic needs
44 44 31
Group 3 –
Accessible
housing needs
1,180 1,180 631
Group 4 – Transfer 1,126 475 0
Group 5 –
Overcrowded
607 607 567
Group 6 – General
needs
2,267 675 669
Group 7 –
Relocation needs
533 131 71
Total 6,111 3,466 2,323
The comparative July 2025 backlog need figure – with transfer applicants removed -
is 2,323. This represents an increase of 47 households or 2% compared to
November 2020, recognising that position on these two dates is just a snapshot in
time. This backlog need has increased despite over 800 new social houses being
delivered between April 2021 and March 2025 (see Housing Delivery). 
• Location of need
Applicants to the North Ayrshire Housing Register are not restricted in the number of
letting areas (locations) they can select. An exercise to assess demand
proportionally has been undertaken as part of the SHIP which identified the Three
Towns and Irvine as the most pressured localities in terms of demand for social
housing. Further analysis is required to determine housing pressures within the Arran
and Cumbrae localities as the proportionate analysis is not effective in determining
pressure within smaller localities. 
Table 7 – Proportionate demand for social housing by locality, July 2025
Locality Applicants with an
assessed housing need
Percentage of
applicants with an
assessed housing need
Arran 153 4%
Garnock Valley 336 10%
Irvine 1397 40%
Kilwinning 494 14%

Page 71

North Ayrshire’s third Local Development Plan
60
LDP Committee Version
North Coast (excluding
Cumbrae)
317 9%
Cumbrae 21 1%
Three Towns 736 22%
Source: Strategic Housing Investment Plan 2026 to 2031
• Housing on Arran and Cumbrae
The HNDA concludes that North Ayrshire is a single, contained housing market [para
10-11]. Analysis of the HNDA Data Pack 2020 shows that in 2018/19, 62% of local
house purchases were to people who already lived in North Ayrshire. A further 26%
of purchasers originated from across South Ayrshire, East Ayrshire, and Greater
Glasgow, but with no significant linkages to any one area. HNDA20 also concluded
that North Ayrshire does not have functional sub-housing market areas [para 13]. 
Notwithstanding the conclusions made within the HNDA that North Ayrshire operates
as a single, contained housing market, it is acknowledged that the islands of Arran
and Cumbrae have different housing issues, challenges, and needs. Both islands are
classified as ‘Remote Rural’ by the Scottish Government 6-fold Urban Rural
Classification. Their housing markets are typified by a much higher proportion of
second-homes, short-term lets and house sales to purchasers from beyond the
islands. 
In January 2023, the Arran Housing Task Force was established, aimed at finding
long-term solutions to Arran’s housing challenges. The Task Force involves a wide
range of partners to address the issues which face island residents and businesses.
The Terms of Reference further set out the role of the Task Force and the purpose
and scope of commissioned research aimed at providing an independent, evidence-
based assessment of demand for affordable housing on Arran.
The Arran Affordable Housing Demand Report concludes there are issues with
affordability for those on low and moderate incomes in accessing owner occupation
and that the private sector rented sector is difficult to access. While this is a similar
issue for households across Scotland and the UK, Arran compares to some of the
most expensive areas in Scotland in terms of house prices. Affordable housing
solutions identified include the provision of Mid-Market Rent, Shared Ownership and
Shared Equity properties. 
The Housing Demand calculation set out in the report concludes that, with the recent
and committed new build developments, the supply of social housing is set to
increase significantly (by 12%), and this is expected have a positive impact in
reducing the number of households on the social housing register. The backlog need
of those in affordable housing need will be addressed in one year, and in four years if
those not in housing need are included. 
The report, however, also notes that ambitions for economic growth and to reverse
predicted population decline mean that housing register data should not be the sole
source of demand for housing. Current and future business needs in terms of
employee housing requirements, in addition to concerns over village depopulation

Page 72

North Ayrshire’s third Local Development Plan
61
LDP Committee Version
and means of regenerating these settlements should also be considered to fully
understand housing need on the island, including affordable housing. 
The Arran Housing Task Force launched a survey in January 2025 to learn more
about current housing provision on the island as well as future aspirations as part of
the effort to help shape housing provision on the island. Analysis of the results of the
survey will inform the work of the Task Force and the approach LDP3 takes.
On Cumbrae, 18 additional units were delivered by the Council in 2022, comprising 3
General Needs, 9 Amenity, 3 wheelchair user and 3 ground floor living properties.
The demand for further new build development on Cumbrae is considered annually
as part of the review of the Strategic Housing Investment Plan.
The matters the local development plan must take account of, set out in the Act, and
which the Evidence Report is to include the planning authority’s view on, include the
desirability of allocating land for the purposes of resettlement. No such areas have
been identified, on Arran, Cumbrae, or remote rural and accessible rural areas on
the mainland.
The Rural and Islands Housing Action Plan (2023) recognises that delivering homes
on islands is often more complex and costly than in other parts of Scotland and
highlights the often-generational impact that even a small number of homes of the
right kind, in the right places can have in supporting long-term sustainability.
Supporting the delivery of more homes in rural and island areas is also one of the
key objectives of the Housing Emergency Action Plan.
• Homes for Scotland research
In June 2024, Homes for Scotland (HfS) shared a report on existing housing need in
North Ayrshire prepared by The Diffley Partnership and Rettie & Co., dated January
2024 (Existing Housing Need in North Ayrshire) – the ‘Diffley Report’. This
independent survey commissioned by Homes for Scotland seeks to take a primary
research-led approach to understand housing need across Scotland, providing
estimates at the national level as well as at individual local authority areas.
The report presents the headline findings from a survey of 419 households
(representing approximately 0.6% of all households) across North Ayrshire, aimed at
estimating the proportion and type of existing housing need across the local authority
area. It is acknowledged that the purpose of the report is not to provide definitive
figures, but rather to provide an indication of need based on the primary research. 
The research estimates that around 25% of households are in some form of need,
equating to circa 16,200 households. Within this figure:
• 200 homeless or in temporary accommodation
• 2,000 in unfit properties 
• 2,000 households living in properties that do not have specialised adaptations
or support required
• 5,000 households financially struggling due to high housing costs
• 7,000 households within overcrowded properties and/or concealed

Page 73

North Ayrshire’s third Local Development Plan
62
LDP Committee Version
When accounting for those who can make in-situ repairs, the report reduces the
overall need figure to circa 12,300 households. Based on secondary data analysis, it
is estimated that around half of these households require affordable housing and half
can afford a market housing solution. The report acknowledges that some of this
housing need could be resolved by addressing under-occupancy of existing homes;
promoting available housing in low demand areas; bringing empty homes back into
use; and bringing second homes and short-term lets into longer term use but
concludes that the survey demonstrates significantly higher levels of housing need in
North Ayrshire than is currently being accounted for and that building new homes will
have to be a significant part of meeting net current housing need.
Self-Build Register
Section 16E of the Act requires a planning authority area to prepare and maintain a
list of persons who have registered interest with the authority with the intention of
acquiring land in the authority’s area for self-build housing. Understanding the
demand for self-provided housing is important for both plan-making and decision-
taking.
Details of the North Ayrshire list can be found on our website, including a form for
being added to the list. Our intention is to publish this list – as required by paragraph
(2) of Section 16E – prior to finalising the Evidence Report. At the end of September
2025, 14 expressions of interest in self-build plots were received via the register.
Irvine was the most preferred locality, followed by Kilwinning. 
Housing delivery
Housing statistics collated by the Scottish Government provide long-term data on
housing completions and new housing supply in North Ayrshire based on quarterly
NB1 and NB2 returns for council and private house building completions, annual
Stock 4 returns on conversions and information from the Affordable Housing
Investment Programme (AHIP) on housing association new build and refurbishment.
Over a 29-year period, an average of around 400 new homes have been completed
in North Ayrshire per annum.
Table 8 – Housing completions in North Ayrshire by tenure (Source: Scottish
Government Housing Statistics)
Financial Year Private Social Total
1996-97 375 63 438
1997-98 436 51 487
1998-99 449 91 540
1999-00 258 59 317
2000-01 352 87 439
2001-02 403 13 416
2002-03 352 76 428
2003-04 369 71 440
2004-05 456 71 527
2005-06 479 79 558

Page 74

North Ayrshire’s third Local Development Plan
63
LDP Committee Version
Financial Year Private Social Total
2006-07 556 64 620
2007-08 570 139 709
2008-09 392 99 491
2009-10 148 98 246
2010-11 158 105 263
2011-12 163 104 267
2012-13 175 100 275
2013-14 137 106 243
2014-15 179 254 433
2015-16 194 52 246
2016-17 202 19 221
2017-18 93 118 211
2018-19 208 216 424
2019-20 250 202 452
2020-21 200 79 279
2021-22 238 337 575
2022-23 219 222 441
2023-24 250 155 405
2024-25 283 89 372 
-
100
200
300
400
500
600
700
800
1996-97
1997-98
1998-99
1999-00
2000-01
2001-02
2002-03
2003-04
2004-05
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2019-20
2020-21
2021-22
2022-23
2023-24
2024-25
Figure 5 -All Sector New Build Completions
Private Social Total

Page 75

North Ayrshire’s third Local Development Plan
64
LDP Committee Version
It is noted that in setting the NPF4 MATHLR, account was taken of the 10-year trend
in completions as a comparative benchmark. The Explanatory Report further advises
that past completions provide evidence of past trends in the delivery of new housing
units but completions do not in themselves create demand for new units of housing.
The information is a helpful factor to use as a comparative benchmark to sense
check whether a requirement is reasonable but not a determinant of future housing
requirements. 
Using the Scottish Government housing statistics, comparative benchmarks are
identified in Table 9. These figures indicate an increase in all-tenure completions in
the last 5-years, with a greater proportion of these completions coming in the social
rent sector. 
Table 9 – Average number of annual housing completions by tenure
Period Private Social Total
2020/21 to 2024/25
(5 years) 238 176 414
2015/16 to 2019/20
(5 years) 189 121 311
2015/16 to 2024/25
(10 years) 214 149 363
2005/06 to 2024/25
(20 years) 255 132 387
Performance of LDP2
North Ayrshire’s adopted Local Development Plan (LDP2) was published in
November 2019. Section 2 of this Evidence Report provides an evaluation of the
delivery of LDP2. 
Schedule 10a of LDP2 explains how the plan’s Housing Supply Target (HST) of
4,071 for the period 2019 to 2029 was derived. The starting point was an HNDA
which established a requirement for just 317 new homes in 10-years. 
The Scottish Government’s housing statistics indicate 2,524 units were delivered
during the first six years of LDP2 (2019/20 to 2024/25). This represents an over-
delivery of 81 units for the period versus the annualised HST [4,071/10 x 6 = 2,443].
Current programming, as set out in the 2025 Housing Land Audit – which does not
include completions on small sites – anticipates a further 1,765 completions in the
final four years of the LDP2 plan period. If the programming proves accurate, by the
end of the 10-year period (31 March 2029), 4,289 units will have been delivered in
total, exceeding the HST by 218 homes. 
A significant contribution to exceeding LDP2’s Housing Supply Target is expected to
be made by the five additional housing sites allocated by LDP2 and included within
Schedule 2a of the plan. As demonstrated by Table 8, approximately a quarter of the
LDP2 housing supply target will be delivered on these new sites.
Table 10 – Delivery of LDP2 Schedule 2a sites

Page 76

North Ayrshire’s third Local Development Plan
65
LDP Committee Version
Site Consented  Completed 
March 2025
Programmed
(2025-2035) 
West of Newhouse Drive,
Kilbirnie 112 0 112
Lochlibo Road, Irvine 93 42 51
Wood Farm, Kilwinning 198 166 32
Portencross Road, West
Kilbride 220 0 220
Mayfield Farm, Saltcoats 388 50 322
Total  1,011 258 737
Strategic Housing Investment Plan
The Strategic Housing Investment Plan (SHIP) sets out the priorities and locations
for affordable housing investment by the Council and registered social landlords in
North Ayrshire to support the outcomes in the Local Housing Strategy. It is updated
annually and includes details of individual development projects to be taken forward
over its five-year lifespan. Cabinet approved the North Ayrshire Strategic Housing
Investment Plan 2026 to 2031 on 28 October 2025.
Through the SHIP, the Council has a long-term cumulative new build development
target of 1,666 new Council homes. The current SHIP notes that good progress has
been made towards achieving this target, with 975 new Council homes built at 30
June 2025. The Council and its partners combined progress totals 1,888 new homes
since 2013. Included within this figure is the following types of accommodation:
• Amenity housing – 364 units
• Sheltered housing – 251 units
• Supported accommodation – 62 units
• Wheelchair user – 95 units
It should be noted that 51 of the amenity, sheltered and supported accommodation
units detailed above are suitable for wheelchair users and a further 57 ground floor
living units have been delivered, also suitable for wheelchair users.
In October 2025, the Scottish Government confirmed a £16.125m Resource
Planning Assumption (RPA) for North Ayrshire for 2025/26, £0.477m of which
requires to be focussed on acquisitions to address temporary accommodation
pressures. Officers have assumed funding at 2025/26 baseline levels for the five-
year duration of the Strategic Housing Investment Plan 2026 – 2031 (£15.648m per
annum). The SHIP is therefore based on projected Scottish Government grant
funding of £94.365m for the Council and its partners, for the six years from April
2025 to March 2031. The Council and its partners have contractually agreed funding
commitments totalling £17.762m. The Strategic Housing Investment Plan 2026 –
2031 aims to secure investment for the delivery of a total of 1,038 properties by the
Council and its RSL partners. This figure includes ‘buy backs’ and refurbishments.
Table 11 – Proposed new supply housing (including buy backs and refurbs) by type
and locality – SHIP 2026-2031

Page 77

North Ayrshire’s third Local Development Plan
66
LDP Committee Version  
General
Needs Amenity
Support
ed
Wheelc
hair
Ground
Floor
Living
Gypsy/
Travelle
rs Total
Arran 40 0 0 0 0 0 40
Garnock
Valley 0 0 0 0 0 0 0
Irvine 257 154 0 48 45 16 520
Kilwinning 61 12 0 6 7 0 86
North Coast 3 0 0 0 0 0 3
Three Towns 17 2 0 0 0 0 19
TBA 73 0 0 0 0 0 73
Total 451 168 0 54 52 16 741
A further 297 affordable homes planned within the SHIP 2026 to 2031 are included
within a shadow programme, which can only be progressed if slippage becomes
available within the main SHIP programme, or if additional funding becomes
available. 
Table 12 – SHIP 2026-31 Shadow Programme  
General
Needs Amenity
Support
ed
Wheelc
hair
Ground
Floor
Living
Gypsy/
Travelle
rs Total
Arran 0 0 0 0 0 0 0
Garnock
Valley 0 0 0 0 0 0 0
Irvine 16 0 0 0 0 0 16
Kilwinning 29 5 0 1 2 0 37
North Coast 0 0 0 0 0 0 0
Three Towns 177 39 0 12 16 0 244
TBA 0 0 0 0 0 0 0
Total 222 44 0 13 18 0 297
Buy-back programmes form part of the SHIP, bringing primarily former social housing
stock back into Council or RSL ownership. This can assist with housing management
and maintenance issues, increases housing supply for social rent, supports the
Council’s Regeneration Delivery Plan, and brings long-term empty homes back into
use. Buy backs do not deliver additional housing stock. 102 Buy Backs are included
within the SHIP 2026-2031, plus 3 refurbishments. The redevelopment of the 16
Gypsy/Travellers pitches at Redburn Grove, Irvine is also included. 
The Strategic Housing Investment Plan is not the only funding mechanism available
for delivering new build or acquired affordable housing. The Council and its partners
are exploring alternative delivery and funding models to maximise the funding
available, and units delivered, and reduce demand for the Council’s Resource
Planning Assumptions.

Page 78

North Ayrshire’s third Local Development Plan
67
LDP Committee Version
Windfall and small site completions
Sites which become available for development during the life of a development plan
but are not identified specifically in the plan, including ‘small sites’ of less than four
units which are not allocated in the LDP, are referred to as ‘windfall sites.’
Completions on windfall sites contribute to meeting targets for the delivery of
housing. Since 2019, 393 housing units have been delivered on windfall sites in
North Ayrshire at an average of 78.6 per year. 
Table 13 – Windfall Development (2019/20 to 2023/24)
Year Private Windfall
Completions
Affordable
Windfall
Completions
Total
2019/20 33 58 91
2020/21 19 19 38
2021/22 27 98 125
2022/23 23 22 45
2023/24 46 48 94
Total 148 245 393
Source: NAC analysis of Building Standards Completion Certificate 
The majority of windfall completions have come through the SHIP on Council-owned
sites including Towerlands, Irvine (50 units), Watt Court, Dalry (49 units), and Green
Street, Saltcoats (24 units). Private windfall completions have tended to be on small
sites (1-4 units). On Arran there have been 66 windfall completions between April
2019 and March 2024, of which 44 have been on small sites.
Developments smaller than four units are not programmed in the most recent
Housing Land Audit (2024/25), but of the windfall sites of four units or more, a total of
150 homes are anticipated to be completed over the next 10 years. 39 of these
completions are upon SHIP sites. 
Taking account of past completions, a windfall assumption of 300 units (30 per year)
is proposed as the expected contribution of windfall sites to meeting the indicative
LHLR. This is a conservative estimate aligned to average private windfall
completions over the last 5 years. A large proportion of windfall completions in the
last five years have been affordable homes delivered by the Council on redeveloped
sites, including former schools. We do not anticipate that opportunities to the same
extent will present themselves during the LDP3 period.
Demolitions
Data available from the Scottish Government notes only a limited number of
demolitions in North Ayrshire over the last five years for which information has been
published. Ten demolitions undertaken by the Council are noted, which relate to the
Estate Based Regeneration Programme.
Table 14 – Demolitions 2004/05 to 2023/24

Page 79

North Ayrshire’s third Local Development Plan
68
LDP Committee Version
Period Non-local
authority
demolitions
Local authority
demolitions
Total demolitions
2019/20 to 2023/24
(5 years) 0 10 10
2014/15 to 2018/19
(5 years) 0 161 161
2014/15 to 2023/24
(10 years) 0 171 171
2004/05 to 2023/24
(20 years) 7 832 839
Source: Scottish Government Housing Statistics
Housing land and stock
Housing Land Audits monitor the established housing land supply and the delivery of
new homes. The base date of North Ayrshire’s Housing Land Audit (HLA) is 31
March, and the HLA has been updated annually since 2017. The most recent HLA
covers the 12-month period to March 2025. 
To reflect the Scottish Government guidance on Housing Land Audits, published in
January 2025, we have reviewed sites within our housing land supply to ensure sites
within the current HLA are either allocated within the LDP and/or have extant
planning permission for new homes (including the remaining capacity of sites under
construction, and including PPP) – i.e. removing windfall sites where planning
permission has expired prior to development commencing. This seeks to ensure the
audit programmes what is considered most likely to be delivered not what
theoretically could be delivered. 34 allocated sites have also been removed from the
HLA as they have been assessed as unlikely to come forward, albeit all will require
to be re-assessed in the preparation of LDP3. 
Following engagement with the industry body, Homes for Scotland confirmed their
agreement of our 2024/25 HLA on 5 November 2025 by email. The agreed audit
programmes completions over a 10-year period and anticipates 2,476 completions,
with the majority (72%) delivered by the private sector. Programmed delivery within
the LDP3 plan period (2027-2037) is 1,474.
Table 15 – Programmed Housing Completions (2025-2034). Source: North Ayrshire
Housing Land Audit 2025
Year Private Social Total
2025/26 402 119 521
2026/27 350 131 481
2027/28 269 128 397
2028/29 159 207 366
2029/30 142 83 225
2030/31 129 15 144
2031/32 101 0 101
2032/33 80 0 80

Page 80

North Ayrshire’s third Local Development Plan
69
LDP Committee Version
Year Private Social Total
2033/34 81 0 81
2034/35 80 0 80
Total 1793 683 2962 
It should be noted that the number of completions anticipated in the social sector is
lower than the commitment in the current SHIP to deliver 741 new-build affordable
homes by October 2031, as not all sites are included within the HLA at this stage.
In addition to the 2,476 units programmed over the next 10 years, the HLA contains
a further 2,193 units which are unprogrammed. This gives a total established
housing land supply of 4,601 new homes. Based on current programming, it is
anticipated that the remaining established housing land supply will total 3,599 at the
expected adoption date of LDP3 (March 2027), taking account of programmed
completions in 2025/26 (521) and 2026/27 (481). 
The audit covering the period April 2025 to March 2026 will be prepared in the
months following 31 March 2026. This will be a key audit in informing the preparation
of the Proposed Plan, particularly in relation to our understanding of the current
deliverable housing land supply in North Ayrshire. 
Ineffective stock
Empty homes: At December 2024, around 1,350 homes in North Ayrshire were
registered as empty, for council tax purposes. Only eleven of these were being
actively marketed for sale or rent while over 700 (53%) were ‘long-term’ empty, either
receiving only a 10% Council Tax discount or being penalised with a 100% Council
Tax levy.
Table 16 – Empty Homes by Locality (December 2024)
Locality Empty Homes
(Number)
Empty Homes
(% of overall stock)
Arran 102 3.2%
Garnock Valley 185 1.8%
Irvine 282 1.5%
Kilwinning 96 1.2%
North Coast 319 2.5%
Three Towns 373 2.2%
Total 1357 1.9%
Source: NAC Council Tax Register
Since April 2022 a post within the Council’s Private Sector Advice Team has been
funded from income generated from the reduction in discount for empty and second
homes Council Tax in North Ayrshire, with a focus on bringing empty homes back
into use. An ‘Empty Homes Framework’ is being prepared in collaboration with the
Scottish Empty Homes Partnership; this framework will set out the future actions the
Council will take in targeting empty homes.Over the past four financial years the
Council has acquired four empty homes and brought them back into use as Council

Page 81

North Ayrshire’s third Local Development Plan
70
LDP Committee Version
stock, utilising funding from the Affordable Housing Supply Programme. Table 17
below details the number of empty homes brought back into use in North Ayrshire
between April 2020 and March 2025. All of these homes were subject to the Council
Tax levy (this is where the Council currently focuses empty homes resources).
Table 17 - Empty homes brought into use per annum between April 2020 to March
2025
Duration
Empty
Under 6
months
6 to 12
months
1 to 2
years
1 to 5
years
5 to 10
years
10+
years
Total
2020 to
2021 35 61 15 10 0 0 121
2021 to
2022 18 71 136 109 0 0 334
2022 to
2023 23 3 31 64 2 0 123
2023 to
2024 259 66 5 39 9 0 378
2024 to
2025 172 78 88 19 18 0 375
Total 507 279 275 241 29 0 1331
Second Homes: Also in December 2024, there were nearly 1,500 second homes
classified as such for council tax purposes in North Ayrshire. Second homes account
for less than 1% of total housing stock in the Garnock Valley, Irvine, Kilwinning and
Three Towns. Within the North Coast locality, 3% of properties are second homes. 
On our islands, the situation is very different. On Arran, second homes account for
approximately 18% of all dwellings and on Cumbrae, the proportion is even higher,
with a third of dwellings classified as second homes. There are over 1,000 second
homes across both islands, representing almost 70% of all the second homes in
North Ayrshire. The number of second homes on Arran has reduced from 617 in May
2020 to 575 in December 2024, a 6.8% decrease; the fall has been less significant
on Cumbrae (3.4%). 
In February 2025, North Ayrshire Council agreed to implement a policy to charge a
Council Tax premium on second homes and from 1 April 2025, a 100% premium was
added to the Council Tax bills of properties classed as second homes. It is possible
that the decrease in second homes is partly due to second-home owners self-
assessing their properties as businesses and therefore not liable for council tax. 
Table 18 – Second Homes by Locality (December 2024)
Locality Second Homes 
(Number)
Second Homes
(% of overall stock)
Arran 575 17.8%
Garnock Valley 30 0.3%
Irvine 27 0.1%

Page 82

North Ayrshire’s third Local Development Plan
71
LDP Committee Version
Locality Second Homes 
(Number)
Second Homes
(% of overall stock)
Kilwinning 9 0.1%
North Coast (exc. Cumbrae) 337 3.0%
Cumbrae 451 33.0%
Three Towns 58 0.3%
Total 1487 2.1%
Source: NAC Council Tax Register 
Short Term Lets: Short term Lets licensing statistics were published by the Scottish
Government in October 2025. This statistical publication reports on the operation of
the short term lets licensing scheme under the Civic Government (Scotland) Act
1982 (Licensing of Short-term Lets) Order 2022. Local authority short term lets
licensing schemes opened to receive applications from 1 October 2022, with existing
hosts and operators having until 1 October 2023 to apply for a licence and able to
continue operating whilst their applications are being determined. The data indicates
there are 886 licenced short term let properties in North Ayrshire. Data zones with 10
or more short-term licences in operation are noted below: 
Table 19 – Short term let licences in operation as at 30 June 2025 
Data Zone Total licences in
operation
Licences as % of
dwellings
Arran – 01 107 16.6%
Arran – 06 88 19.8%
Arran – 02  81 17.5%
Largs Central and Cumbrae - 06 73 9.0%
Arran – 07 70 12.2%
Arran – 04 58 17.5%
Arran – 03 52 13.0%
Largs Central and Cumbrae – 04 49 8.6%
Largs Central and Cumbrae – 05 41 5.8%
Arran – 05 23 6.3%
Largs Central and Cumbrae - 07 20 3.6%
Largs South – 02 17 2.8%
Beith East and Rural - 05 11 2.2%
Largs North - 01 11 2.0%
Largs North - 05 11 2.4%
Source: Scottish Government
The majority of North Ayrshire’s licenced short-term lets are in Arran (479),
accounting for 54% of all licences in the local authority area. There are
approximately 149 licences per 1000 dwellings on the island. On Cumbrae (data
zones Largs Central and Cumbrae 06 and 07), there are 93 licences in operation –
representing 6.8% of dwellings. 
Under-occupied homes: The Scottish Housing Condition Survey reports that of
68,000 households in North Ayrshire, a quarter (17,000 households) under-occupy

Page 83

North Ayrshire’s third Local Development Plan
72
LDP Committee Version
their home, i.e. exceed the minimum bedroom standard requirements by two or more
bedrooms. There is significant variation in this measure between social housing (6%)
and owner-occupied (39%). 
Meeting the housing needs of older people and disabled people
Section 16B, part (3)(b) of the Act requires the Evidence Report to set out a
summary of the action taken by the planning authority to support and promote the
construction and adaptation of housing to meet the housing needs of older people
and disabled people in the authority’s area and an analysis of the extent to which the
action has helped to meet those needs. 
The North Ayrshire Health and Social Care Partnership Strategic Commission Plan
(2022-2030), ‘Caring Together’ states successful integration of health and social care
services should provide for more people to be cared for and supported at home, or in
a homely setting. To achieve this, the homes of local people must be suitable
environments for them to receive care and maintain their health. Working alongside
the Council’s Housing Service and aligned with the Local Housing Strategy, the
HSCP has produced a ‘Housing Contribution Statement’ (HCS). This demonstrates
how housing services have a role in the Partnership’s strategic planning processes
and identifies some of the key local housing challenges that impact on the delivery of
effective health and social care service. Some examples include:
• Ensuring housing is suitable for adaptation for people as they age and
develop support needs
• Development of supported housing accommodation for those with learning
disabilities or other complex needs
• Ensuring support is available to those with drug or alcohol addiction, to help
maintain their homes
The HSCP and Housing Services work closely to ensure local homes can facilitate
community-based health and care services, helping people to remain in good health,
at home, for as long as possible. On an operational level, collaborative working
supports households with more complex needs, whether that be prioritising repairs
for vulnerable households, identifying support solutions, including adaptations, or
identifying bespoke housing. 
In addition to ‘general needs’ or family homes, North Ayrshire Council and RSL
partners have built 829 amenity, sheltered, wheelchair accessible and supported
accommodation homes since 2013. Amenity housing is designed to meet the needs
of people with an accessible housing need and has some or all of the following:
• no stairs inside
• raised electric sockets and lowered switches
• handrails in the bathroom
• lever handled taps
• slip resistant flooring in the kitchen and bathroom

Page 84

North Ayrshire’s third Local Development Plan
73
LDP Committee Version
Sheltered housing is designed for older people (60 years of age or over) and has all
the features of amenity housing plus a built-in community alarm service and tenant’s
lounge. 
Households on the North Ayrshire Housing Register can apply for amenity or
sheltered housing through an accessible housing assessment, carried out by an
Occupational Therapist, when somebody within the household is having difficulty
accessing the facilities within their current home. In the first instance, adaptations to
the household’s existing property will be considered. Across North Ayrshire, there are
c.2,500 social rented homes which have been adapted to meet ‘particular’ housing
needs. This includes housing for wheelchair users, those with limited mobility,
sheltered and very sheltered housing, homes with community alarm systems and
adapted homes. 
The LHS confirms the Council’s commitment to ensuring the new social housing
being delivered offers enough flexibility to tenants, so that they will be able to remain
living at home, independently, for as long as they wish, regardless of their stage in
life. All amenity and sheltered housing in North Ayrshire is now expected to be built
to an ambulant housing standard as a minimum. 
To ensure need is met now and in the future, the LHS increases the target to ensure
at least 10% of all tenure new build stock is suitable for wheelchair users (increased
from 7% in the previous strategy). In recognition of the benefits of providing
adaptable housing, and to address demand from the North Ayrshire Housing
Register, the Council and registered social landlord partners developed 205 (11% of
new supply) new build homes suitable for wheelchair users since April 2013. The
SHIP 2026 – 2031 anticipates the delivery of a further 137 (13% of new supply)
homes suitable for wheelchair users.
Working together, the North Ayrshire HSCP and Council’s Housing Service, aided by
the Planning Service, have overseen the adaptation and construction of housing to
meet the housing needs of older people and disabled people in North Ayrshire.
However, it recognised that while this has helped meet specialist housing needs,
North Ayrshire has an aging population and a high proportion of the population have
at least one physical long-term condition. It is expected that demand for amenity,
sheltered, wheelchair accessible and supported accommodation will increase over
the LDP3 plan period.
More detailed analysis of the Housing Register in July 2025, undertaken for the
Strategic Housing Investment Programme (SHIP) 2026 to 2031, highlights specific
housing needs. Please note that the numbers are not mutually exclusive, for
example, applicants can request both amenity and sheltered homes:
• Requests for amenity housing – 1,226
• Requests for sheltered housing – 448
• Requests for wheelchair accessible homes – 248
• Require OT assessed adapted homes – 62

Page 85

North Ayrshire’s third Local Development Plan
74
LDP Committee Version
Meeting the needs of housing needs of Gypsy/Travellers
Section 16B, part (3)(c) of the Act requires the Evidence Report to set out a
summary of the action taken by the planning authority to meet the accommodation
needs of Gypsies/Travellers in the authority’s area and an analysis of the extent to
which the action has helped to meet those needs.
North Ayrshire Council manages the only site in the area for Gypsy/Travellers,
‘Redburn Grove.’ Redburn Grove has sixteen pitches, each with its own amenity
building where hot water, bathing and kitchen facilities are provided. On-site services
include a site manager, regular GP surgery, visits from community link workers, and
an educational tutor for secondary age pupils. 
In October 2022, the Redburn Grove Tenants Group was formed and is a registered
tenant organisation which is tenant-led with a fully elected committee. Around twenty
meetings have been held since 2022, with around 45% of tenants taking part.
Through this engagement with the Gypsy/Traveller population, we understand that
Redburn Grove is their preferred housing solution and that there is sufficient
accommodation for Gypsy/Travellers in North Ayrshire. 
In 2015, the Scottish Government published minimum standards for Gypsy/Traveller
sites. These Standards are now part of the Scottish Social Housing Charter (SSHC).
Compliance with the standards is monitored and reported on by the Scottish Housing
Regulator (SHR). The standards, which were developed, as far as was possible, in
line with the Scottish Housing Quality Standard (SHQS) for existing social housing,
cover two broad areas: physical facilities and fabric, including the quality of fixtures
and fittings, lighting, heating, and a hot and cold-water supply; and services provided
by the site provider and how it treats site residents.
While Redburn Grove meets these minimum standards, the Council has continued to
improve and upgrade the site. In response to requests from site tenants, a £75,000
budget was identified which allowed the installation of new kitchens and doors in
amenity units and the improvement of safety and security on each pitch by installing
gates, fencing, and resurfacing. Free Wi-Fi is available at the on-site community
room, and through the Connected Scotland programme 15 families have been
provided with free Wi-Fi devices – each with 2 years unlimited access to the internet.
The Local Housing Strategy reaffirms the Council’s commitment to engage with
Gypsy/Travellers to ensure that housing solutions meet their needs; listen to
Gypsy/Travellers from unauthorised encampments so that their needs can be better
understood and responded to; and to carry out an options appraisal on potential
Gypsy/Traveller site improvements.The Council has reviewed the condition of the
permanent site at Redburn Grove, Irvine in consultation with residents, and has
created a draft redevelopment proposal, reflecting feedback gathered in relation to
the community’s preferences for future housing. The redeveloped site would create
16 new larger pitches which provide tenants with:
• Space for two caravans 
• Parking provision for two vehicles
• An external clothes drying area

Page 86

North Ayrshire’s third Local Development Plan
75
LDP Committee Version
• Individual fenced garden / amenity space
• An amenity block comprising: 
o Open plan kitchen / dining / living room
o Double bedroom / second lounge with integrated storage space
o Wet floor shower room
o Utility room with space for a washing machine and tumble dryer
The project has been included within the Strategic Housing Investment Plan 2026 -
2031 for Scottish Government funding prioritisation.
The Council’s proactive approach to working with the travelling community extends
to engaging with families within unauthorised encampments. This has minimised the
level of roadside encampments within North Ayrshire, supporting the view there is no
identified need currently to increase provision. On average, we have around 50
unauthorised encampments annually, with this number including multiple counts of
the same family or families. The Council has a dedicated encampment officer who
engages with these families at the earliest opportunity, undertaking a ‘Needs and
Welfare’ Assessment. This helps us to understand the needs and aspirations of
individuals enabling us to provide any necessary support. Housing advice is provided
including in relation to making an application for a pitch at Redburn Grove and, on
occasion, homeless applications.
Summary of Stakeholder Engagement
On 19 December 2024, a draft of the Housing Evidence Paper was shared with
Homes for Scotland; Registered Social Landlords operating in North Ayrshire;
developers and agents included on the LDP mailing list; and parties who have
approached the Strategic Planning team with an interest in having housing sites
allocated in LDP3. On 14 March, the Housing Evidence Paper was reissued (without
substantive changes) more widely for comment via the LDP online hub and emails to
community councils and the remainder of the LDP mailing list. Comments were
invited no later than 4 April 2025. 
Wider place-based engagement with local communities has been focused on the
‘Your Place Survey’ and engagement on the ‘Place Profiles.’ Based on the Place
Standard, the Your Place Survey asked respondents to consider how well the homes
in their area met the needs of the community; what in relation to housing was good
and what could be improved. The Place Profiles present an overview of housing
evidence relating to stock, delivery and sales in each locality. The engagement on
the profiles, including public ‘drop-in’ meetings, focused on the needs and wants of
communities. 
Direct engagement was held with the Redburn Grove Tenants Group in May 2023,
where we used the Place Standard as the basis of engagement with gypsy/travellers
resident at the site. 
Views expressed on the Housing Evidence Paper, and comments relating to housing
arising from wider community engagement are noted in the Record of Engagement

Page 87

North Ayrshire’s third Local Development Plan
76
LDP Committee Version
[in preparation], which includes the Council’s response to the issues raised. This
engagement is summarised below: 
Comments relating to Housing Need
Homes for Scotland note a fuller assessment of existing unmet need and demand
should consider factors such as overcrowded and concealed households; those
living in homes which are unfit, unaffordable, or unsuitable; homeless households
and those in waiting lists for affordable housing. In this context, Homes for Scotland,
The Mac Mic Group and Bellway Homes all refer to survey work prepared by The
Diffley Partnership and Rettie & Co., ‘Existing Housing Need in North Ayrshire’,
stating the report and its findings require to be robustly considered in establishing the
housing need in North Ayrshire and setting the indicative Local Housing Land
Requirement (LHLR), with reference made to the national housing emergency.
Bellway Homes go further in stating, based on the Diffley Report, that housing need
in North Ayrshire is significantly higher than has been identified.
We consider that the HNDA and analysis of the North Ayrshire Housing Register
provides a robust basis for determining housing need in North Ayrshire. Our housing
register has a specific ‘overcrowding’ group (Group 5), people who are considered to
be living in overcrowded circumstances as defined by the North Ayrshire Housing
Allocations Policy, and therefore this included in the social demand calculation. 
Comments relating to the indicative Local Housing Land Requirement
Notwithstanding comments above relating to housing need and the Diffley Report,
Homes for Scotland and the Mac Mic Group are generally supportive of the Council’s
approach to setting the iLHLR. Bellway Homes acknowledge and welcome the fact
that the figure is more ambitious than the iLHLR of other local authorities and is
notably in excess of the MATHLR and HNDA, however, underline it doesn’t nearly
meet the Diffley report figure.
HFS support for the uplift of 1,550 from the Minimum All-Tenure Housing Land
Requirement (MATHLR) to arrive at the proposed Local Housing Land Requirement
(LHLR) of 4,500. 
Our view on the comments received in relation to housing need and the iLHLR and
how these have been taken into account are covered in the Summary of Implications
for the Proposed Plan. 
Comments relating to housing land
Bellway Homes expressed concern that the existing housing land supply is not
sufficient to the ensure the proposed iLHLR is delivered while Homes for Scotland
note that the effective housing land supply is lower than the iLHLR. 
NPF4 is clear that LDPs are expected to allocate deliverable land to meet the 10-
year LHLR, with the LDP delivery programme expected to establish a deliverable
housing land pipeline for the LHLR.

Page 88

North Ayrshire’s third Local Development Plan
77
LDP Committee Version
Comments relating to accessible homes
Bellway Homes and the Arran Development Trust agreed that it is reasonable to
have a target for the delivery of accessible homes, albeit that this should not apply to
self-build homes. Beith & District Community Council state the future need and
demand for appropriate housing for an ageing population should be reflected in
LDP3. 
Comments relating to developer contributions
The Housing Evidence Paper sought the views of stakeholders – and evidence to
support these views – on the requirement for developer contributions in North
Ayrshire to deliver affordable housing. Housebuilders agreed that the absence of an
affordable housing contribution requirement makes North Ayrshire an attractive place
to invest for builders. North Ayrshire is viewed as a “marginal” area still, where an
affordable housing contribution would affect viability. Citing an island build cost uplift
of 30-40% above the mainland, the Arran Development Trust warned the additional
cost of an affordable housing contribution may lead to no houses being built on
Arran. 
To continue attracting developers to the area, Homes for Scotland suggest finding an
alternative to an affordable housing policy. They have suggested that the Evidence
Report is amended to signpost the work that will be undertaken to understand the
potential method for the future delivery of affordable homes in North Ayrshire and to
provide general wording stating that the Council will consult on a potential affordable
housing policy. 
Bellway Homes responded that it was reasonable to request developer contributions
towards affordable housing to help address housing need in North Ayrshire, with
reference to the Diffley Report which estimates 5,000 households within North
Ayrshire are struggling due to high financial costs. 
Beith & District Community Council strongly encourage the reintroduction of an
affordable housing policy and there has been general support across communities
for more affordable housing, including within the West Kilbride Local Place Plan. 
Our view on the comments received in relation to delivering accessible homes and
developer contributions towards affordable housing are covered in the Summary of
Implications for the Proposed Plan. 
Comments relating to windfall development 
Homes for Scotland suggest that past windfall completions should be recalibrated to
exclude completions on sites constituting major development (50 units or more) as
they consider NPF4 restricts the potential for windfall development and is likely to
significantly reduce future supply of windfall. This is expected to reduce the
previously observed windfall contribution.
Only 50 windfall completions out of the total of 393 over the five-year period
(2019/20 and 2023/24) were recorded on sites of 50 units or more – an affordable
housing development built by North Ayrshire Council at Towerlands, Irvine. We have

Page 89

North Ayrshire’s third Local Development Plan
78
LDP Committee Version
based our windfall assumption on private windfall completions in recognition of the
fact that larger windfall developments have been Council-led. Most private windfall
completions (116 out of 148) have come on small sites i.e. under four units. 
Bellway Homes and the Arran Development Trust agreed the windfall assumption of
300 units (30 per year) is reasonable. 
Comments relating to infrastructure capacity 
The capacity of local services and infrastructure was a key concern expressed by
local communities in our engagement and was raised expressly by Beith & District
Community Council in their response to the Housing Evidence Paper. The capacity
of GP practices is a specific concern. 
We acknowledge that infrastructure considerations are integral to development
planning and decision-making within the planning system, particularly in the context
of delivery. National planning policy seeks to encourage, promote and facilitate an
infrastructure first approach to land use planning which puts infrastructure
considerations at the heart of placemaking. As part of an evidence-based approach,
potential impacts on infrastructure and infrastructure needs should be understood
early in the development planning process and the Infrastructure schedule considers
health care, education, energy, digital, waste, and water infrastructure within North
Ayrshire. Transport infrastructure and blue green infrastructure are addressed in the
Transport and Sustainable Places schedules, respectively. 
The capacity and, where required, the delivery of infrastructure will be a key
consideration in the allocation of deliverable land to meet the 10-year LHLR within
the Proposed Plan. 
Comments relating to housing on Arran
A response from The Arran Development Trust (ADT) states there is a pressing need
for affordable accommodation to grow the economy of Arran, reverse depopulation
and maintain public services, including supporting an ageing population. It is
suggested a minimum of 20 affordable homes per annum are required between now
and 2030. ADT advocate the use of additional methods for determining housing need
given its remote rural classification, referring to Argyll & Bute Council’s Community
Housing Assessment Toolkit. This toolkit was used for the 2025 Arran survey.
Arran Development Trust also believed that the number of second homes on Arran is
under-reported, as some properties pay non-domestic rates as self-assessed
businesses. This has been acknowledged within the Evidence Report.
While no areas where it would be desirable to allocate land for the purposes of
resettlement have been identified, it is acknowledged that some communities –
particularly in the north of Arran – are concerned that the age-profile of the resident
population and the number of second homes and short-term lets threatens the long-
term sustainability of these places as communities. 
Our view on the evidence and comments received in relation to rural housing are
covered in the Summary of Implications for the Proposed Plan.

Page 90

North Ayrshire’s third Local Development Plan
79
LDP Committee Version
Summary of Implications for the Proposed Plan 
Our view on what this evidence and stakeholder engagement means for LDP3 is
summarised below in relation to the number of homes the new plan should plan for
(the LHLR); the type of homes LDP3 should seek to deliver; developer contributions
and our approach to delivering homes on Arran and Cumbrae. 
Indicative Local Housing Land Requirement 
LDP3 is expected to identify a Local Housing Land Requirement for North Ayrshire to
meet the duty for a housing target and to represent how much land is required for
housebuilding. To promote an ambitious and plan-led approach, the Local Housing
Land Requirement is expected to exceed the 10-year Minimum All-Tenure Housing
Land Requirement (MATHLR) set out in Annex E of NPF4, which is 2,950 for North
Ayrshire. The MATHLR is therefore the starting point for establishing the LHLR. 
An indicative Local Housing Land Requirement (iLHLR) figure for North
Ayrshire of 4,500 is proposed. 
The explanation of the indicative Local Housing Land Requirement figure is as
follows: 
a) It meets our understanding of housing need  
The indicative Local Housing Land Requirement figure of 4,500 exceeds the
estimate of housing need established by HNDA20 of 2,330 homes during the period
2022 to 2042. 
Existing (backlog) housing need is the main component of the HDNA20 housing
estimate, with only a very small amount driven by newly forming households,
reflecting the long-term trend of population decline in North Ayrshire set out under
Topic 1. At the proposed start date of the LDP3 plan period, April 2027, it is
anticipated that 97% of both existing and future overall need identified by HNDA20
(Scenario 3) will have been met:
Table 20 – HNDA20 housing estimate versus completions
Year 2022/23 2023/24 2024/25 2025/26 2026/27 Total
HNDA housing
estimate 465 465 465 465 465 2325
Housing
completions 441¹ 405¹ 372¹ 521² 481² 2255
Difference -24 -60 -93 +56 +16 -94
¹ Scottish Government Housing Statistics
² NAC Housing Land Audit 2025 Programming
A more recent assessment of backlog need, derived from the North Ayrshire Housing
Register carried out in July 2025, indicates that planning for a residual backlog need
in the magnitude of around 2,400 would be appropriate over the LDP3 plan period
(2027-2038). The iLHLR figure addresses this housing need.

Page 91

North Ayrshire’s third Local Development Plan
80
LDP Committee Version
A much higher estimate of housing need has been suggested by Homes for Scotland
and other developers based on the Diffley Report. We have considered this evidence
and note the view of the Reporter set out in the Notification of Sufficiency following
the Gate Check of the Moray Local Development Plan Evidence Report, who
acknowledged that the research provides “some indication of the urgency and scale
of potential need based on primary data” but was not persuaded that, in that case, it
represented a “robust alternative or additional evidence that the Council need have
relied on”. 
We consider that concerns regarding any underreporting of housing need have been
adequately addressed by using the housing register rather than the HoTOC figure
within HNDA20 and establishing an iLHR significantly higher than the HNDA housing
estimate. It is acknowledged that not everyone with a housing need in North Ayrshire
is captured within the North Ayrshire Housing Register; there are number of reasons
why a person or household would not apply for a Council or RSL property, including
where they do not want or would not be eligible for social housing. However, we
consider the HNDA, informed by the register, forms the most robust evidence of
housing need in North Ayrshire available. 
Overall, Homes for Scotland are supportive of the Council’s approach to setting the
Local Housing Land Requirement and indicative figure of 4,500. 
b) It accords with policy aspirations to increase housebuilding
Beyond satisfying what we understand to be the need for new housing in North
Ayrshire, we want to set a Local Housing Land Requirement that promotes the
development of more homes in North Ayrshire to support aspirations to grow the
population and economy of the area. This continues the approach taken by LDP2.
The North Ayrshire Council Plan, Local Housing Strategy (2023-28), and National
Planning Framework 4 all set out an aspiration to increase housebuilding, and a
national housing emergency has been declared. 
The housing supply target set out in the LHS is 2,925 homes, over the five-year
period of the strategy. National Planning Framework 4, through the Minimum All-
Tenure Housing Land Requirement (MATHLR) figure for North Ayrshire, establishes
a more modest target of 2,950 homes over 10 years. 
NPF4 expects LDP3’s Local Housing Land Requirement for North Ayrshire to exceed
the MATHLR figure. While there is no further guidance on to what magnitude this
minimum requirement should be exceeded, the approach should be ambitious and
plan-led. The indicative Local Housing Land Requirement figure proposed accords
with the expectation to be ambitious, exceeding the MATHLR by 52.5%. The figure
also represents an increase of 429 – 10.5% or around 43 homes per year – versus
the target set by LDP2. 
c) It is considered achievable based on recent completions, programmed
delivery and the established housing land supply 
In seeking to set a housing target that is greater than established housing need, the
question arises what an appropriate target is. Historical housing completion data for

Page 92

North Ayrshire’s third Local Development Plan
81
LDP Committee Version
North Ayrshire demonstrates an average completion rate of around 390 new homes
per year over the last 20 years. Even accounting for recent challenges to housing
delivery relating to material costs, increasing standards and specifications, the cost
of living and interest rates etc., completion rates over the past five years have been
above this rate, at 415 per annum. While not a determinate of future demand, these
figures support the conclusion that the proposed indicative Local Housing Land
Requirement figure of 450 homes per year over the period of LDP3 is credible,
noting infrastructure capacity will be a key factor. 
While still described by the house building industry as a ‘marginal’ area in terms of
viability, we consider the take-up of the LDP2 Schedule 2a sites allocated by LDP2
and other sites including the Montgomerie Park SPZ, West Byrehill in Kilwinning and
Beith Road in Longbar, indicate a strengthening of the housing market in North
Ayrshire that supports an ambitious housing target.
A Call for Ideas exercise undertaken between April and June 2025 saw 53
submissions seeking the allocation of land for housing within LDP3, with these sites
having a combined capacity of over 8,500 new homes, further indicating developer
and landowner interest in building houses in North Ayrshire.
Meeting the Local Housing Land Requirement
LDP3 must allocate enough deliverable land to meet the 10-year Local Housing
Land Requirement, in locations that create quality places for people to live and are
consistent with local living principles and an infrastructure first approach. 
It is anticipated that the remaining established housing land supply will total 3,599 at
the expected adoption date of LDP3 (March 2027), taking account of programmed
completions between April 2025 and March 2027. Completions during the LDP3 plan
period (2027 to 2037) are estimated in the current HLA to be 1,474, reducing the
housing land supply to 2,125.
This portion of the established housing land supply, sites retained within the Housing
Land Audit which are not under construction; LDP2 sites removed from the housing
land supply; sites submitted via the Call for Ideas; and any further sites identified by
the Council will all require to be assessed in line with the proposed site appraisal
methodology, including in terms of their deliverability. This will inform the spatial
strategy for LDP3 and where new housing development to meet the LHLR will be
planned. 
The 2025/26 HLA – representing the position at 31 March 2026 – will be key in
determining how much new housing land will require to be identified and allocated by
the Proposed Plan to meet the LHLR. The contribution of windfall and small site
completions will also be factored in. 
A key consideration for both the volume, location and delivery of new housing
development is the available infrastructure, in line with the Infrastructure First
approach. Blue green infrastructure is covered in Topic 3; transport infrastructure is
addressed within Topic 4 with other forms of infrastructure, including health care and
education considered by Topic 6. Specific concerns are identified in relation to the

Page 93

North Ayrshire’s third Local Development Plan
82
LDP Committee Version
capacity of the Pennyburn roundabout, a key node in North Ayrshire’s transport
network; school capacity at specific locations; and GP practices across the North
Ayrshire mainland. 
Homes to meet specific needs 
Based on the evidence available and through stakeholder engagement, we do not
think it is necessary for LDP3 to deliver housing for persons undertaking further or
higher education; Gypsy/Travellers; or Travelling Showpeople. 
Considering the demographic data, evidence from the HSCP and North Ayrshire
Housing Register and the views of stakeholders, we consider there is a need to
examine how new housing delivered in North Ayrshire will meet the needs of a
population which is growing older. 
North Ayrshire Council is committed to ensuring the new social housing being
delivered offers enough flexibility to tenants, so that they will be able to remain living
at home, independently, for as long as they wish, regardless of their stage in life. All
amenity and sheltered housing in North Ayrshire is now built to an ambulant housing
standard as a minimum. The SHIP continues to deliver amenity and wheelchair
housing. Within the private sector, however, the type of new homes built is largely
left to developers to determine, as shaped by the market. 
The LHS states: “in preparing North Ayrshire’s third Local Development Plan we will
further consider the housing needs of older people and disabled people in North
Ayrshire and the establishment of an appropriate target for the delivery of accessible
or adaptable homes, including wheelchair housing and intergenerational homes
within the private sector, to support independent living particularly, although not
exclusively, among older or disabled people”.
It is also noted that all homes have to meet building warrant requirements that
ensure that they are both accessible and adaptable for current and future users and
that the Government has committed to a new ‘Scottish Accessible Homes Standard’,
which is expected to be part of national building standards by 2026 (see Chartered
Institute of Housing Scotland Briefing). The accessible standard will see accessibility
designed and built into all new homes, increasing the housing choices for people
with disabilities and reducing the need for expensive retrofitting as people age or
their needs change. 
As a result of this standard, we are minded not to include a blanket minimum target
for the provision of accessible housing with private developments across North
Ayrshire within LDP3. Rather, we will ask developers to demonstrate how their
proposals for new homes contribute to delivering accessible, adaptable and
wheelchair accessible homes as part of the Statement of Community Benefit (as
required by NPF4 policy 16 b)).

Page 94

North Ayrshire’s third Local Development Plan
83
LDP Committee Version
Developer contributions
Currently, the delivery of affordable housing in North Ayrshire is independent of the
delivery of market housing. In the preparation of LDP2, the decision was taken not to
seek developer contributions from private housing developments for the delivery of
affordable housing. The rationale for doing so was set out in the Housing Technical
Paper (LDP2 – Housing Technical Paper, October 2018) prepared alongside LDP2
and relates to the significant levels of Council and Scottish Government funding in
affordable housing, reflected in the SHIP at the time and the expectation that the
need element of the housing supply target would be achieved without subsidy from
market sector housing development. Since adoption of LDP2 in November 2018,
North Ayrshire Council has therefore not sought developer contributions for
affordable housing. 
This commitment and investment allowed us to take an all-tenure approach to the
land supply, rather than the previous approach where up to 25% of units on sites had
to be of an affordable tenure. It is recognised that the absence of the requirement for
developer contributions also serves to make developing in North Ayrshire more
attractive to the private sector, particularly where the viability of sites is a challenge.
Policy 16, part e), of NPF4 states proposals for market homes will only be supported
where the contribution to the provision of affordable homes on a site is at least 25%
of the total number of homes, unless the LDP sets out locations or circumstances
where either a higher or lower contribution is justified. Higher contributions may be
justified by evidence of need; while impact on viability; smaller scale development; or
to incentivise specific types of homes as examples of situations that may justify
contribution levels lower than 25%. The policy brings guidance previously contained
in Scottish Planning Policy within the scope of the statutory development plan. 
It is considered that the position now in 2025 is different to that in 2017/18 when
LDP2 was being prepared and the decision was made to remove the affordable
housing developer contribution policy: 
• The level of housing need is higher. The HNDA prepared in advance of LDP2
(HNDA17) defined the total additional future housing need for the period 2016
to 2020 as 1,585. HNDA20 sets the figure for the period 2022 to 2042 at
2,330 new units (Scenario 3). A more recent assessment of backlog need
derived from the North Ayrshire Housing Register carried out in July 2025
indicates that planning for a residual backlog need in the magnitude of around
2,400 would be reasonable.
• There is uncertainly around the long-term availability of grant funding for
affordable housing over the course of LDP3. While the SHIP sets out a five-
year programme, this is based on assumptions of grant funding, with the grant
given to the Council done so on a year-to-year basis. 
• Based on completions and developer interest, we consider the housing
market in North Ayrshire is now stronger than five years ago. Average per
annum private sector completions have increased by 29% when comparing

Page 95

North Ayrshire’s third Local Development Plan
84
LDP Committee Version
2014/15 to 2018/19 to 2019/20 to 2023/24. It is noted that Homes for Scotland
consider North Ayrshire still to be a ‘marginal’ area where an affordable
housing policy would affect viability, however, we have no evidence that the
market could not absorb some level of contribution requirement.
The 2025 SHIP was not fully funded, with a shadow programme amounting to over
380 affordable homes. The Council and RSL partners also continue to experience
significant affordability challenges due to changes in the rate of inflation, higher than
budgeted interest rates for borrowing and increasing housing standards and
specifications, compared to the level of grant funding available to offset these
pressures. It is acknowledged such challenges also apply to private housebuilders. 
Furthermore, the Housing Service has identified the requirement to identify additional
opportunities for affordable housing in North Ayrshire. Recent developments built by
the Council have predominately taken place on Council-owned sites where land has
become available as a result, for example, of school relocations. Such opportunities
are expected to be less prevalent over the LDP3 period. Access to a proportion of
private sector sites could address the need for land. This approach would also help
deliver mixed-tenure developments, something the current approach has not done,
with limited exception. 
A research report published in July 2021 found that around two-thirds of planning
authorities in Scotland use developer contributions to secure affordable housing,
meaning North Ayrshire is unusual in not requiring affordable housing contributions.
Contributions are sought in East (Kilmarnock and Loudoun housing market areas)
and South Ayrshire. 
Taking this evidence into account, North Ayrshire Council is minded to introduce an
affordable housing developer contribution policy, along the lines of the previous
policy. North Ayrshire’s first Local Development Plan (LDP1), adopted in May 2014,
introduced an affordable housing policy (a policy for Arran was previously agreed in
April 2009). It required contributions on sites of 16 units or more (four on Arran) of
25% (North Coast & Arran), 15% (Irvine & Kilwinning) or 10% (Three Towns). No
contributions were required in the Garnock Valley. 
Delivery options set out in the policy were, in order of preference:
1) On-site provision (i.e. built by the developer and transferred to RSL)
2) Transfer of on-site land to RSL
3) Off-site provision 
4) Payment of commuted sum
During the operation of the policy, a contribution requirement was established for 17
of 30 qualifying development proposals, however, only six progressed to the point
where a contribution was required to be made. The policy did deliver 31 on-site units
at Ardrossan Road, Seamill; commuted sums amounting to £66,250 (Arran), used for
Brathwic Terrace and £349,828.80 (Irvine), used for Dickson Drive. 
The need to address, within the Evidence Report, the evidence and engagement
required to pursue the reintroduction of an affordable housing contribution policy is

Page 96

North Ayrshire’s third Local Development Plan
85
LDP Committee Version
acknowledged, as is the ask from housebuilders for further information. Accordingly,
we propose to develop a draft Affordable Housing Developer Contribution (AHDC)
Policy promptly following submission of the Evidence Report, with the intention that it
can inform and be incorporated into LDP3 and provide certainty to developers on
expected contribution levels in advance of the adoption of LDP3 and the policy
coming into effect.
In developing an AHDC policy and the Proposed Plan, we will take an evidence-
based approach to establishing the following, including through engagement with key
stakeholders involved in the delivery of new homes in North Ayrshire: 
• The proportion of the LHLR/number of units that should be delivered as
affordable housing. 
• Affordability of private housing across different localities and
settlements: we will review up-to-date house price and rent levels data for
North Ayrshire, and surrounding authorities, and compare this with income
data to identify areas where entering the housing market is most difficult. 
• The demand for affordable housing across different localities and
settlements: we will review the North Ayrshire Housing Register to determine
where demand for affordable housing is greatest in North Ayrshire, cross-
referencing this this affordability data; existing stock and programmed
affordable housing completions to identify the areas where additional units
are most required. In addition to evidence on affordability, this will shape the
level of contribution within each settlement/locality. 
• Preferred solutions for delivering affordable housing via developer
contributions: we will engage with housebuilders, the Council’s Housing
Service and RSLs to determine preferred options for the type of affordable
housing and mechanism for delivery. 
• Potential thresholds and exemptions: we will consider the circumstances
in which a contribution will not be required, including the threshold in terms of
the overall number of units within a proposed development. 
Further evidence relating to viability is also required to inform the scope of an AHDC
policy, noting Homes for Scotland’s concerns. Engagement with the housebuilding
industry, plus any evidence they might be able to provide, would be welcomed. It is
considered that an AHDC policy should include a mechanism to enable expected
contributions to be set aside where payment of a contribution towards affordable
housing would render a development unviable, taking account, for example,
abnormal site costs. Establishing site specific contribution levels, where possible
agreed in advance with developers, and including these in within the Proposed Plan
is an approach we will explore. 
Island housing
In rural and island areas, NPF4 encourages authorities to set out tailored
approaches to housing which reflect locally specific market circumstances and

Page 97

North Ayrshire’s third Local Development Plan
86
LDP Committee Version
delivery approaches. Evidence gathered, including through the work of the Arran
Housing Taskforce, identifies issues relating to the distinct housing markets on the
islands of Arran and Cumbrae. 
Within LDP2, the Countryside Objective of the Spatial Strategy (Strategic Policy 1)
[p.13] supports several circumstances in which new housing will be permitted outwith
identified towns and villages, including criterion g) which supports small-scale
expansion of settlements on Arran and Cumbrae for community-led proposals for
housing for people employed on the islands. The subsequent publication of NPF4
also provides support for new homes in remote rural areas, which applies to Arran
and Cumbrae, where proposals support and sustain existing fragile communities;
support identified local housing outcomes; and are suitable in terms of location,
access, and environmental impact [NPPF4 policy 17 c)]. 
LDP3 must set out a policy framework that continues to support opportunities for
new housing in Arran and Cumbrae, including through the identification of specific
sites and which supports long-term solutions to housing challenges, including those
identified by the Arran Housing Task Force. Our approach should acknowledge the
difficulties in developing new market and affordable housing on our islands, for
example relating to the availability of labour and increased build costs. These factors
will also be relevant in how any AHDC policy is applied in Arran and Cumbrae. 
Statements of Agreement / Dispute 
Homes for Scotland, in their response to the draft Evidence Report, have re-iterated
their support for the uplift of 1,550 from the Minimum All-Tenure Housing Land
Requirement (MATHLR) to arrive at the proposed Local Housing Land Requirement
(LHLR) of 4,500.
A dispute has been raised by Homes for Scotland regarding the Council’s position
that it is minded to introduce an affordable housing developer contribution policy
(AHDC). Homes for Scotland have requested more general wording, stating that the
Council will consult on a potential affordable housing policy. As noted above, in
developing a AHDC, we will take an evidence-based approach to establishing further
evidence, including through engagement with key stakeholders involved in the
delivery of new homes in North Ayrshire. 
Links to Evidence
1) North Ayrshire Council, Housing Evidence Paper (February 2025)
2) Scottish Government, Housing to 2040 (March 2021)
3) Scottish Government, A Scotland for the future: opportunities and challenges of
Scotland's changing population (March 2021)
4) Scottish Government, North Ayrshire Minimum All-Tenure Housing Land
Requirement Assessment Report (September 2021) 
5) North Ayrshire Council Local Housing Strategy 2023 to 2028
6) North Ayrshire Council, ‘Setting a Housing Supply Target for North Ayrshire’
(April 2023)

Page 98

North Ayrshire’s third Local Development Plan
87
LDP Committee Version
7) North Ayrshire Council, ‘Our Council Plan 2023 to 2028’
8) Scottish Government, Planning and the housing emergency: delivery plan
(November 2024)
9) Scottish Government, Tackling Scotland’s Housing Emergency – Housing
Emergency Action Plan (September 2025)
10) North Ayrshire Housing Needs and Demand Assessment 2020 (HNDA20) (May
2021)
11) Letter from Head of the Centre for Housing Market Analysis, Scottish
Government dated 7 February 2022
12) North Ayrshire Council, Unauthorised Encampment Policy
13) Arran Housing Taskforce Terms of Reference
14) North Star, Arran Affordable Housing Demand Report (August 2024)
15) The Diffley Partnership and Rettie & Co for Homes for Scotland ‘Existing
Housing Need in North Ayrshire’ (January 2024)
16) Scottish Government, Housing Land Requirement Explanatory Report
(November 2021)
17) North Ayrshire Council, Strategic Housing Investment Plan (SHIP) 2026 to 2031
18) North Ayrshire Council, Strategic Housing Investment Plan (SHIP) 2025 to 2030
19) North Ayrshire Council, Housing Land Audit Report 2023 to 2024
20) Scottish Government, Housing Land Audits: Guidance (January 2025)
21) Email from Homes for Scotland, November 2025
22) Scottish Government, Scottish House Condition Survey: Local Authority
Analyses 2010-2012 to 2016-2018 (February 2019) 
23) North Ayrshire Health and Social Care Partnership, ‘Caring Together’ Strategic
Commission Plan 2022 to 2030 (March 2024)
24) Planning and Environmental Appeals Division, Notification of Sufficiency -
Moray Local Development Plan Evidence Report Gate Check (26 August 2024)
25) North Ayrshire Council Housing Technical Paper (October 2018)
26) North Star, North Ayrshire Housing Need and Demand Assessment – Final
Report (September 2017)
27) Scottish Government, ‘The Value, Incidence and Impact of Developer
Contributions in Scotland’ (July 2021)
28) North Ayrshire Council, Affordable Housing Policy: North Ayrshire Mainland
Supplementary Guidance for Developers (March 2011)
29) North Ayrshire Council, Affordable Housing Policy: Isle of Arran Supplementary
Guidance for Developers (revised March 2011)

Page 99

North Ayrshire’s third Local Development Plan
88
LDP Committee Version
Topic 3 – Sustainable Places
National planning policy emphasises the need to reduce greenhouse gas emissions,
adapt to the future impacts of climate change and respond to a growing nature crisis.
North Ayrshire’s third Local Development Plan (LDP3) will have a significant role in
the protection, recovery, restoration and enhancement of our environment and the
planning and delivery of sustainable places. 
To support and inform the preparation of this Evidence Report and LDP3 in relation
to environmental matters, Place Profiles for each of North Ayrshire’s six Localities
and an Environment Evidence Paper have been prepared. This chapter of the
Evidence Report summarises the evidence, relevant stakeholder engagement and
considers the implications for the Proposed Plan relating to the delivery of
sustainable places, including the following National Planning Framework (NPF4)
policies: 
1. Tackling the climate and nature crises
2. Climate mitigation and adaptation
3. Biodiversity
4. Natural places
5. Soils
6. Forestry, woodland, and trees
7. Historic assets and places
8. Green belts
9. Brownfield, vacant and derelict land, and empty buildings
10. Coastal development
11. Energy
12. Zero waste
19. Heating and cooling
20. Blue and green infrastructure
22. Flood risk and water management 
Evidence relating to these topics is presented together in recognition of the strong
policy connections between them; the local development planning guidance advises
development that addresses the global climate and nature crises will be facilitated by
the interaction of all the spatial principles, regional spatial priorities and national
planning policies of NPF4, taken as a whole. 
Reducing the need to travel unsustainably is also an important response to the
climate emergency; this is covered in a separate schedule (Topic 4). Local living and
20-minute neighbourhoods, covered in the Liveable Places (Topic 1) schedule, are
also relevant. 
The Environment Evidence Paper serves as the Scoping Report for the Strategic
Environmental Assessment (SEA) of LDP3. The Evidence Paper presents
environmental evidence organised by SEA topic. The relationship between the nine
SEA topics and NPF4 National Polices is set out in Table 2 of the evidence paper.

Page 100

North Ayrshire’s third Local Development Plan
89
LDP Committee Version
A draft site appraisal methodology has been developed, aligned to the SEA
Assessment Framework set out in the Environment Evidence Paper/Scoping Report.
Application of the site appraisal methodology in the assessment and selection of
future development sites will be key in ensuring LDP3’s proposals deliver on its
environmental objectives. 
Information required by the Act and Regulations
Section 15 of the Planning Act concerns the form and content of local development
plans. Subsection 1(a) requires the local development plan to take account of
matters mentioned in subsection (5), including: the principal physical, environmental
and built heritage characteristics of the area. 
Section 16B of the Planning Act relates to the evidence report. As per subsection (3),
the evidence report is to set out the planning authority’s view on the matters listed in
section 15(5), referred to above. 
The Town and Country Planning (Development Planning) (Scotland) Regulations
2023 (the 2023 Regulations) provide additional detail to the requirements set out in
primary legislation. Regulation nine sets out further information and considerations to
which the planning authority are to have regard to in preparing a local development
plan. Included within this list are:
• the national marine plan
• any regional marine plan
• the national waste management plan
• any open space strategy
• any river basin management plan
• any flood risk management plan
• any local flood risk management plan
Summary of Evidence
Policy Context
Scotland’s plan-led planning system requires plans to manage the development and
use of land in the long-term public interest. This is defined as contributing to
sustainable development and the achievement of the National Performance
Framework’s National Outcomes. A plan-led approach is also central to supporting
the United Nations (UN) Sustainable Development Goals (SDGs). Such is the cross-
cutting nature of development planning; the process contributes to all outcomes. In
an environmental context this means development plans, proposals and planning
policies which balance development aspirations with environmental protection and
enhancement, making the most of natural resources and responding to the climate
emergency.
Several national policies and strategies link to NPF4, including the Climate Change
Plan, Scotland’s National Adaptation Plan 3, Scotland’s Environment, Biodiversity,
Energy and Forestry strategies and National Marine Plan. The Environment Strategy

Page 101

North Ayrshire’s third Local Development Plan
90
LDP Committee Version
for Scotland sets out the Scottish Government’s vision for tackling the twin global
climate and nature crises. Recent global assessments by expert bodies on
biodiversity and climate change have highlighted the scale and urgency of these
challenges.
These crises underpin NPF4. The six spatial principles established by NPF4 will play
a key role in delivering on the UNSDGs and the national outcomes. By applying
these spatial principles, the national spatial strategy supports the planning and
delivery of sustainable places where emissions are reduced, and biodiversity is
restored and better connected. 
To address the global climate emergency and nature crisis, NPF4 policy 1 requires
LDPs to ensure their spatial strategy will reduce emissions and adapt to current and
future risks of climate change by promoting nature recovery and restoration.
Significant weight is to be given to the global climate and nature crises when
considering all development proposals. Implementing this policy will be facilitated by
the interaction of all the spatial principles, regional spatial priorities, and national
planning policies of NPF4, taken as a whole. This reflects the cross-cutting and
interconnected nature of policies relating to the environment. 
Locally, The Council Plan 2023-28 sets out North Ayrshire Council’s commitment to
deliver on tackling climate change. Additionally, the Council published the
‘Sustainable North Ayrshire Strategy’ in December 2023. The strategy is the fourth
iteration of its ‘Environmental Sustainability & Climate Change Strategy’ and
supports the continuing strategic aim of achieving net-zero carbon emissions by
2030 and to halt biodiversity loss and be nature positive by the same date. The
strategy includes five simplified workstreams to link climate change to everyday
behaviour and activities. The workstreams are energy; nature; waste; transport and
adaptation. 
Within the Sustainable North Ayrshire Strategy, the Council demonstrates a
commitment to using the principles of community wealth building to ensure a fair and
green transition to a sustainable society which operates within planetary limits and
where no one in North Ayrshire is left behind. 
The specific policy context relating to each environmental topic is noted below under
each heading. 
Climate mitigation and adaptation
The Scottish Government declared a Climate Emergency in 2019 and updated its
Climate Change Plan in 2020. The update sets out the Scottish Government's
pathway to new and ambitious targets set by the Climate Change Act 2019, to
reduce emissions by 75% by 2030 (compared with 1990) and to net zero by 2045. 
The Scottish National Adaption Plan 2024 to 2029 sets out the actions that the
Scottish Government and partners will take to respond to the impacts of climate
change.

Page 102

North Ayrshire’s third Local Development Plan
91
LDP Committee Version
Reducing greenhouse gas emissions is one of NPF4’s six cross-cutting outcomes.
The national spatial strategy and policies support development that helps to meet
greenhouse gas emissions targets. NPF4’s policy on climate mitigation and
adaptation (Policy 2) has the overarching intent of encouraging, promoting, and
facilitating development that minimises emissions and adapts to the current and
future impacts of climate change. 
The global climate emergency and the nature emergency are twin reinforcing crises.
Decline in biodiversity will exacerbate the climate crisis – and a changing climate will
accelerate the rate of biodiversity loss. The actions we take to address each are
fundamental to our wellbeing and survival as a species. 
North Ayrshire Council declared a Climate Emergency on 11 June 2019 and
consequently committed to achieving net-zero carbon emissions by 2030. The
Sustainable North Ayrshire Strategy details a set of actions exampling how the
Council will fulfil its commitment to net zero. This builds on the work of previous
strategies which have helped to achieve a 69% reduction in emissions from the
Council’s estate and 43% reduction across North Ayrshire overall.
Climate change is identified as a priority by a number of our communities, especially
our younger people, through community, locality, and other place-based plans.
Projects in Stevenston and Cumbrae have led to local action to tackle and adapt to
climate change. 
Between 2020 and 2021, greenhouse gas emissions increased in 358 out of the 374
local authorities in the UK (96%). This is consistent with the increase in overall UK
emissions in 2021, which increased by 5% largely due to COVID-19 restrictions
easing and colder temperatures increasing the use of heating in buildings, though
emissions were still lower in 330 local authorities (88%) than they were in 2019.
Scotland has higher per capita emissions than the UK average in almost every
sector, in particular from agriculture (1.5 tCO2e per person) and land use, land use
change, and forestry (0.4 tCO2e per person).
North Ayrshire has seen a trend in a decline in the total CO2e between 2005 and
2020 with a slight increase between 2020 and 2021, mirroring the UK trend. The
highest contributing sectors for North Ayrshire are waste management, agriculture,
and transport. This is not in line with the national trend, which sees domestic and
transport being the two highest contributing sectors.
However, when all sectors are taken per capita for comparison of the Scottish
average to North Ayrshire, North Ayrshire is consistently lower. Excluding 2020 and
pre-2017 emission estimates for waste management, North Ayrshire has been lower
since 2005 than the Scottish average. 
One of the actions from the Strategy is to complete a comprehensive study to
understand the carbon sequestration capacity and future potential of North Ayrshire’s
natural assets. This study will be carried out by the Sustainability team in the
Council. This study can influence the Plan and help it meet some aims of NPF4.

Page 103

North Ayrshire’s third Local Development Plan
92
LDP Committee Version
The Council’s woodland planting strategy was approved in 2021 and is in the
delivery phase with a view to increasing the area’s ability to naturally capture carbon. 
The overarching aim of the strategy is to facilitate the planting of 108,000 trees by
2030. The trees and woodland section below shows where the current woodland
cover is in North Ayrshire and the soils section below additionally shows where the
carbon rich soils are located. Both of these are significant natural assets vital for
reducing the area’s contribution to climate change. 
Adaptation – actions that reduce our vulnerability to the effects of climate change by
managing the impacts – is also one of five workstreams included within the
Sustainable North Ayrshire Strategy. An action of the strategy is to implement
Adaptation Scotland’s Framework for a Climate Ready Public Sector, including
through the creation of an adaptation capability framework. Nature Networks are one
of the primary vehicles for delivering climate change adaptation.
One example of the impact of climate change arises due to changing weather
patterns and more extreme weather events. Current drainage infrastructure can
become overwhelmed in the more regular occurrences of severe rainfall. Climate
change modelling predicts these occurrences will increase, both in terms of
frequency and intensity. This, combined with population growth and increased paving
over green spaces (urban creep), will put an even greater pressure on infrastructure
in the future – with increased risk of surface water flooding. A Strategic Flood Risk
Assessment has been prepared which highlights surface water flood events and
areas at risk of surface water flooding (see Flood risk and water management). 
Conversely, climate-driven increases in extreme drought are also projected. A
research report published in 2021 notes that the number of extreme drought events
is projected to increase from an average of one event every 20 years in the baseline
period, to one event every 3 years in the near future (2021-2040); and that extreme
droughts are likely to be longer. Water scarcity and extreme drought events –
including related consequences such as an increase in wildfires – can have wide-
ranging impacts, including on human health; ecosystems, many of which are highly
sensitive to changes in hydrology; and water-dependent sectors in industry.
Normal conditions in North Ayrshire are reported in the most recent SEPA water
scarcity report (18 September 2025) and the west coast of Scotland is generally at
less risk of drought compared to the east coast, where there are areas of moderate
and significant scarcity. 
Evidence is presented below on North Ayrshire’s blue green infrastructure.
‘Regulating’ is identified as one of the four categories of ecosystem services gained
from blue and green infrastructure; by contributing to flood management and carbon
storage, blue and green infrastructure has an important role in reducing greenhouse
gas emissions and the adaptation of places to climate change. 
Biodiversity
In November 2024, the Scottish Government published the Scottish Biodiversity
Strategy to 2045. This strategy sets out a clear ambition for Scotland to be ‘nature
positive’ by 2030, and to have restored and regenerated biodiversity across the

Page 104

North Ayrshire’s third Local Development Plan
93
LDP Committee Version
country by 2045. The associated Delivery Plan includes actions needed to ensure
the vision and outcomes in the strategy achieved, focusing on the strategy’s six
objectives. As noted above, the global climate emergency and the nature emergency
are twin reinforcing crises.
In this context, improving biodiversity is also one of NPF4’s cross-cutting outcomes.
The national spatial strategy and policies support development that helps to secure
positive effects for biodiversity; to respond to the global biodiversity crisis nature
recovery is expected to be at the heart of future places. NPF4 seeks also to create
and strengthen nature networks and nature-based solutions to benefit natural capital
and contribute to net zero. 
In accordance with NPF4, LDP3 must protect, conserve, restore and enhance
biodiversity in line with the mitigation hierarchy. It should also promote nature
recovery and nature restoration across the development plan area, including by
facilitating the creation of nature networks and strengthening connections between
them to support improved ecological connectivity; restoring degraded habitats or
creating new habitats; and incorporating measures to increase biodiversity, including
populations of priority species. 
The mitigation hierarchy indicates the order in which the impacts of development
should be considered and addressed i.e. to first avoid, then minimise, restore, and
offset. Potential negative effects should be mitigated in line with the mitigation
hierarchy prior to identifying enhancements. 
To support these policies, The Scottish Government published Biodiversity: Draft
Planning Guidance in 2023. This is expected to be a ‘live’ document that evolves as
Councils continue to consider how to deliver on the aims and outcomes of policies 3
and 4. NatureScot’s Developing with Nature Guidance will be also useful when
formulating LDP3’s spatial strategy and proposals. 
The Nature Conservation (Scotland) Act 2004 states that all public bodies have a
duty to further the conservation of biodiversity when carrying out their
responsibilities, otherwise known as the Biodiversity Duty. Every public body in
Scotland is required to produce a report every three years on the actions which they
have taken to meet this Biodiversity Duty. North Ayrshire Council’s fourth report was
published in January 2024. It should be noted that the Biodiversity Duty is expected
to be updated in 2026 which will also introduce statutory targets. 
An important means of meeting this duty is a local biodiversity action plan. North
Ayrshire’s current Local Biodiversity Action Plan (LBAP) covers the period of 2019-
2031 and comprises of six workstreams. The North Ayrshire Biodiversity Partnership
(NABP) plays a key role in the development and management of the LBAP. The
NABP includes council officers, government bodies, conservation organisations,
landowners, and private individuals. Work has begun to update the Council’s LBAP
to reflect the changes introduced by the Scottish Biodiversity Strategy and the
Natural Environment (Scotland) Bill and is expected to be published by the Council’s
sustainability team by the end of 2026.

Page 105

North Ayrshire’s third Local Development Plan
94
LDP Committee Version
The LBAP identifies 14 priority species across four habitats: freshwater and wetland,
lowland, marine and coastal. 
The starting point for understanding our biodiversity resource are sites which are
designated for their importance. Table 21 provides a summary of designated sites
within North Ayrshire which relate to enhancing and protecting biodiversity. The
hyperlink below provides a map showing the location and extent of the biodiversity
designations in North Ayrshire.
Table 21 – Biodiversity Designations 
Designation Protection Status Number of Sites
Special Protection
Areas (SPA) International 2
Special Area of
Conversation (SAC) International  3
Site of Special Scientific
Interest (SSSI) National  29 
Regional Park Local  1
Local Nature
Conservation Sites
(LNCS)
Local 96 – wildlife
7 – geodiversity 
Local Nature Reserves Local 2
Map of biodiversity designations
NatureScot are currently undertaking an assessment in response to a request from
local environmental groups to designate the Garnock Estuary as a Site of Special
Scientific Interest. This includes parts of the Ardeer Peninsula.
Special Areas of Conservation (SACs) and Special Protection Areas (SPAs) are sites
of European importance. The term ‘European site’ is now used to refer to what were
previously known as Natura sites. This recognises that Special Protection Areas and
Special Areas of Conservation protect species and habitats shared across Europe
and were originally designated under European legislation. There are five European
sites within (fully or partially) North Ayrshire, listed in Table 22 with their qualifying
interests. 
Table 22 – European sites
Site Name Designation Qualifying Interest
Arran Moors SPA Hen harrier (Circus
cyaneus)
Renfrewshire Heights SPA Hen harrier (Circus
cyaneus)
Bankhead Moss SAC Active raised bog
Cockinhead Moss SAC Active raised bogs

Page 106

North Ayrshire’s third Local Development Plan
95
LDP Committee Version
Site Name Designation Qualifying Interest
Degraded raised bogs
Dykeneuk Moss SAC Active raised bogs
Degraded raised bogs
A Habitats Regulations Appraisal will be prepared to assess the potential impact of
the LDP3 on designated European Sites. Stage 2 of the Habitats Regulations
Appraisal will consider the likely significant effects of the Proposed Plan on these
sites – and any European sites out with the Council area which could be affected –
to determine which sites should be assessed as part of the HRA. LDP3 may only be
taken forward if the appropriate assessment concludes that the plan would not
adversely affect the integrity of any European site. 
North Ayrshire Council has undertaken a recent review of Local Nature Conservation
Sites (LNCS) on the mainland and Cumbraes. Arran will be subject to a future review
of locally important sites. Sites have been selected for their biodiversity or
geodiversity value. The review has identified 96 LNCS, with a further thirty-three also
highlighted which did not meet the assessment requirements to be designated. A
separate summary report and survey records for each site are available as part of
the review. It is intended to align the designation of LNCS with the LDP process.
Clyde Muirshiel Regional Park is Scotland’s largest Regional Park, extending to 280
square kilometres across North Ayrshire, Inverclyde, and Renfrewshire. The
designation was created to enable the coordinated management of recreation and
other land uses such as farming and forestry. 
Geodiversity is the variety of rocks, minerals, fossils, landforms, sediments, and
soils, together with the natural processes which form and alter them. It is an integral
and vital part of nature, our economy, cultural heritage. The value of geodiversity and
its role in helping to deliver for biodiversity and help mitigate the effects of climate
change is recognised by Scotland’s Geodiversity Charter. 
Arran Geopark has been recently accredited UNESCO Global Geopark status
covering the whole of the isle of Arran, recognising the island’s outstanding geology
and landscapes of international importance. There are 218 Global Geoparks around
the globe, eight in the UK, and only two others in Scotland. UNESCO Global
Geoparks enjoy the same level of recognition as UNESCO World Heritage Sites. 
Seven LNCS geodiversity sites on the mainland are identified by the LNCS review as
having local geological or geomorphological importance and within North Ayrshire
representing good examples of local geodiversity features. The Council is also
working with the Arran Geopark who have started the process of reviewing the
Geodiversity Sites on Arran. The Geopark have reviewed the existing geodiversity
sites and has proposed nine new sites.

Page 107

North Ayrshire’s third Local Development Plan
96
LDP Committee Version
North Ayrshire Nature Network
The Council is in the process of identifying a nature network. The Scottish
Biodiversity Strategy outlines commitments to protect at least 30% of our land and
sea for nature by 2030 (30x30 Target) and to deliver a Scotland-wide nature network.
These two actions are key components in increasing ecological connectivity and
restoration of nature more widely, helping to deliver the strategy. Each local authority
is responsible for delivering a nature network in their own area. To coordinate this
effort, a North Ayrshire Nature Network Strategy was approved by the Council in
March 2025. This outlines a methodology for developing the North Ayrshire Nature
Network (NANN) and an action plan for its implementation and delivery which is
expected will act as a key part of the delivery of NPF4 policy 3. 
One of the early stages of the NANN Strategy is to undertake a biodiversity audit of
North Ayrshire to create an itinerary of North Ayrshire’s biodiversity resource and
how it is faring. This will allow future biodiversity work to be prioritised based on the
local context of ecosystems, habitats, and species and to target the key pressures
impacting upon these, including the identification of degraded habitats. The audit is
currently at draft stage. The action plan of the approved strategy contains timed
actions and commitments. The Councils Planning Service will work with the
Sustainability team to spatially identify the nature network by 2027.
Water environment features such as rivers, lochs, wetlands, and coastal areas –
otherwise referred to as ‘blue infrastructure’ – can form an integral component of
nature networks. The following water environment related evidence sources,
published by SEPA, are identified as relevant: 
• Recommended Riparian Corridor – indicates the minimum space needed
along rivers (i.e. riparian corridor width scaled to river width) to give rivers
space to adapt to changes in flood frequency and magnitude and to provide a
range of social, environmental, and economic benefits
• Geomorphic Risk Buffer - identifies sections along the river network where
channel adjustment is likely to be significant and where undeveloped riparian
buffers would be beneficial
• Riparian Vegetation Planting Opportunities – identifies, at a catchment scale,
areas where riverbanks could be protected from erosion by improved riparian
vegetation
• Scottish Wetland Inventory – identifies known wetlands
• Obstacles to fish migration – identifies natural and artificial obstacles to
migratory fish, therefore potential opportunities to remove artificial barriers
and restore habitats.
• Water Environment Fund (WEF) projects – current, completed, and potential
physical condition and fish barrier easement project locations. 
• Natural flood management maps – identifies areas where land use change to
restore nature could reduce flood risk

Page 108

North Ayrshire’s third Local Development Plan
97
LDP Committee Version
In addition to informing the Proposed Plan, the outputs of the Strategic Flood Risk
Assessment will also be relevant to the emerging nature network and identification of
existing and future potential opportunities for blue infrastructure. 
Natural places
NPF4’s policy for natural places (policy 4) provides more detailed direction on how
development affecting European sites; National Parks, National Scenic Areas, a Site
of Special Scientific Interest or a National Nature Reserve and sites designated as a
local nature conservation site or landscape area should be considered. The overall
policy intent is to protect, restore and enhance natural assets making best use of
nature-based solutions. Clear linkages exist between NPF4 policy 4 Natural Places
and NPF4 policy 3 Biodiversity, therefore much information and evidence required to
update the Council’s LDP is discussed in previous paragraphs under biodiversity.
Situated on the Firth of Clyde, North Ayrshire has a diversity of landscapes including
rural countryside, beaches, and coastlines. In total, 16 Landscape Character Areas
are identified within North Ayrshire. The island of Arran makes a major contribution to
the wider landscape character of the Firth of Clyde. The outstanding scenic value of
the northern part of the island is recognised in its designation as a National Scenic
Area. 
There are two NatureScot Wild Land Areas (WLAs) in North Ayrshire. Wild Land
Areas are Scotland’s more natural, remote, and uninhabited landscapes whose
strength and extent of wildness is considered to be of national importance. WLAs
have not been identified on scenic grounds and are not a statutory designation.
Nevertheless, LDPs should support development that protects and enhances the
qualifying qualities of these areas wherever possible. The two Wild Land Areas in
North Ayrshire are: 
• North Arran
• Waterhead Muir (Muirshiel) (partly within North Ayrshire, partly within
Renfrewshire) 
A review of local landscape designations in North Ayrshire was undertaken between
April and August 2023. This review involved an initial evaluation of all landscapes in
North Ayrshire, consultation with community groups and detailed field assessment.
The review recommends five local landscape areas (LLAs):
• Portencross to Skelmorlie Coast and the Cumbraes 
• The Clyde Muirshiel Hills
• Lamlash Bay and Holy Island
• South Arran Coast
• Machrie Moor and Coast
In 2024, a sensitivity study of landscapes at the edge of settlements in North
Ayrshire was completed. This provides a strategic-level landscape and visual
sensitivity assessment of potential urban expansion. The study additionally considers
sensitivity to housing development within 45 identified settlement edge sites.

Page 109

North Ayrshire’s third Local Development Plan
98
LDP Committee Version
The recently awarded UNESCO Geopark on Arran is also a landscape designation.
The status recognises the importance of both geology and landscape and promotes
the enhancement and protection of these now internationally important qualities. 
Map of Landscape Character Areas and Designations 
Soils
The importance of soil to Scotland’s environment is highlighted through its
prominence in Scotland’s Biodiversity Strategy. Soil is an important indicator and
promotor of biodiversity and can be a valuable carbon store, a useful tool in climate
adaptation and of vital importance in our areas obtaining a local and productive food
resource. Soil assets can also contribute toward climate adaptation through the
control of flooding and increased resilience to drought. 
Policy 5 of NPF4 aims to protect carbon-rich soils, restore peatlands and minimise
disturbance from development. LDPs should protect locally, regionally, nationally,
and internationally valued soils, including land of lesser quality that is culturally or
locally important for primary use.
Scotland’s Soils website is the primary source of information on peat and soil
information in Scotland. Across North Ayrshire, rural areas are utilised for agricultural
purposes. Land capability for agriculture varies across North Ayrshire, from land
rating 3.1 (capable of producing consistently high yields of crops), to 7 (land of very
limited agricultural value). The majority of soil is rated 4.1 or 4.2 which is capable of
producing a narrow range of crops. There are nearly 15,000 hectares of ‘prime’
agricultural land across North Ayrshire. The largest concentrations are located
around Hunterston in the North Coast, the area between Irvine and Stevenston along
the River Garnock and Irvine southwards extending into the neighbouring South and
East Ayrshire. 
Soils and peatlands are the biggest terrestrial store of carbon in Scotland. North
Ayrshire also contains carbon rich soils including peat, with a concentration of peat
on Arran and in the higher regions south of the Clyde Muirsheil Regional Park. In
total, North Ayrshire has 12,000 hectares of Class 1 or 2 carbon rich soils, which are
defined as nationally important; 55% of these areas are found in Arran. Areas have
also been subject to peatland restoration under the Peatland Action project, which
include areas in north and central Arran as well as the valley of the Gogo Water, east
of Largs. 
Map of agricultural land quality and carbon rich soils and peatland
Forestry, woodland, and trees
National planning policy seeks to protect and expand forest, woodland, and trees.
LDP3 should identify and protect existing woodland and the potential for its
enhancement or expansion to avoid habitat fragmentation and improve ecological
connectivity, helping to support and expand nature networks. 
Trees and woodland comprise around 23% of Ayrshire’s land cover, providing a key
resource for biodiversity and deliver a wide range of environmental benefits. North

Page 110

North Ayrshire’s third Local Development Plan
99
LDP Committee Version
Ayrshire also has 62 tree preservation orders (TPOs), predominately around
settlements and former historic estates, designated for their amenity value and/or
cultural or historical value. The extent of native and ancient woodland and location of
TPOs is shown in the map below:
Map of North Ayrshire’s woodlands 
Section 53 of the Planning (Scotland) Act 2019 inserts the requirement for a planning
authority to prepare a forestry and woodland strategy into the Planning Act. A forestry
and woodland strategy should identify woodlands of high nature conservation value
and set out policies for the protection and enhancement of such woodlands, among
other things. It is acknowledged that the 2014 Ayrshire and Arran Forestry and
Woodland Strategy, while still a relatively sound framework for decision making
relating to trees, forestry and woodland, would benefit from review given its age and
the evolving policy and legislative context. Currently, there is no agreed programme
for preparing a new forestry and woodland strategy – either for North Ayrshire or the
wider Ayrshire region – however, we are working towards this through discussion
with our neighbouring authorities. The development of a regional spatial strategy for
Ayrshire is identified as an opportunity to align the preparation of a new Forestry and
Woodland Strategy. 
The Council recently adopted a new woodland planting strategy. The Strategy aims
to plant 108,000 trees by 2030, recognising the positive impact tree planting can
have on tackling the Climate and Nature Crisis. The woodland planting strategy also
helps deliver on some of the aims and actions of the Sustainable North Ayrshire
Strategy
Historic assets and places
The Place Profiles prepared for each of North Ayrshire’s six Localities include a brief
overview of the area’s history. North Ayrshire has a rich and historic landscape, with
known sites and excavated artefacts dating to as early as the Mesolithic Period.
Many Neolithic and Iron Age sites are still visible, particularly on the higher ground
such as Giants Grave Chambered Cairn on Arran, overlooking Whiting Bay, and the
Bargrennan tombs on Cuff Hill near Beith. 
NPF4 policy 7 and the Historic Environment Policy for Scotland set the national
policy context. LDP3 should support the sustainable management of North Ayrshire’s
historic environment and identify, protect, and enhance valued historic assets and
places. This extends to enabling positive change, for example bringing redundant or
neglected historic buildings back into sustainable and productive uses; supporting
the transition to net zero and ensuring assets are resilient to current and future
impacts of climate change; and recognising the social, environmental and economic
value of the historic environment, to our economy and cultural identity.
There are the following designated heritage assets within the council area:
• 90 Scheduled Monuments
• 13 Conservation Areas
• 813 Listed Buildings (34 category A, 387 category B and 392 category C)

Page 111

North Ayrshire’s third Local Development Plan
100
LDP Committee Version
• 5 Garden and Designed Landscapes
Map of cultural heritage designations
To aid the preservation and enhancement of North Ayrshire’s Conservation Areas,
Conservation Area Assessments were undertaken in 2020 for 10 of the 13
designated areas. These Assessments contain an appraisal of the special historic
character of the areas and a management plan. The 3 Conservation Areas that were
not part of the 2020 review were subject to appraisals previously. These
Conservation Areas include Kilbirnie (reviewed in 2014), Irvine Town Centre
(reviewed in 2012) and Millport (reviewed in 2013).
There are no active Conservation Area Regeneration Schemes (CARs) in place.
Since LDP2 was adopted, one CARs scheme has been delivered in Millport. The
scheme was completed in March 2022 and was jointly funded by Historic
Environment Scotland and North Ayrshire Council. In total, the scheme helped works
on numerous Historic buildings with a total spend of approximately £2 million.
There are currently 43 buildings on the Buildings at Risk Register (BARR) in North
Ayrshire. It is noted the register is not currently being updated by Historic
Environment Scotland while the BARR process is under review. 
It is widely known that the Church of Scotland is currently undertaking an exercise to
consolidate their estate due to declining worship numbers. Buildings are marked as
being to be ‘disposed of,’ ‘deferred decision,’ or ‘to be retained’ within Presbytery
Plans. It should be noted that not all Presbytery Plans are up to date or publicly
available. Development Trust Association Scotland (DTAS) has undertaken work to
research the Presbytery Plans and the real estate market across Scotland and has
provided North Ayrshire Council with the data compiled in September 2025. Within
North Ayrshire, there are 17 buildings included within Presbytery Plans and 7
currently with no data. In total 10 buildings are marked to be disposed of, two are
category A listed, 6 category B listed, 1 category C listed and 1 with no statutory
listing. Two buildings are on the market, three currently under offer and one has been
sold. 30% of the buildings to be disposed of are located within one locality, Arran. 
In addition to the five Inventory Garden and Designed Landscapes, work is
underway to review over 20 locally important sites.
Heritage assets valued by community groups in North Ayrshire have been
highlighted in the Local Place Plans registered to date and in wider place-based
engagement. Examples include 
Green belts
To encourage, promote and facilitate compact urban growth and use the land around
our towns and cities sustainably, NPF4 states LDPs should consider using green
belts to support the spatial strategy as a settlement management tool. In doing so,
and through the application of policy 8 which applies to development proposals
within a green belt designated within the LDP, development will be directed to the
right locations. Green belts can also protect and enhance the character, landscape,

Page 112

North Ayrshire’s third Local Development Plan
101
LDP Committee Version
natural setting, and identity of settlements; support nature networks and enable land
to be managed to help tackle climate change. 
No areas of green belt are designated within North Ayrshire. The existing spatial
strategy for North Ayrshire established by LDP2 is based on the principle that
development is directed to the most sustainable locations. This in principle means  
directing most development to our towns, villages and developed coastline where
there is infrastructure capacity to support new development, where there is access to
existing services and where opportunities exist to re-use and redevelop brownfield
land. Strategic Policy 1 of LDP2 also includes the countryside objective which
applies to all areas outwith the settlement boundary and supports proposals for
development, in principle, in specified circumstances within areas designated as
countryside. The evaluation of LDP2 concludes that it has been successful in
preventing inappropriate urban expansion across North Ayrshire. 
As noted above, a settlement edge sensitivity study has been undertaken to provide
a strategic-level landscape and visual sensitivity assessment relating to the potential
urban expansion of North Ayrshire’s main settlements. The study additionally
considers sensitivity to housing development within 45 identified settlement edge
sites. Outline recommendations are also made (Chapter 8) on where a green belt
designation might be appropriate in terms of protecting and enhancing the character
and identity of settlements and their landscape and natural setting, recognising this
is only one of three policy outcomes for green belts set out in NPF4.
Brownfield, vacant and derelict land, and empty buildings
Green belt policy and the policy intent of NPF4 to encourage, promote and facilitate
the reuse of brownfield, vacant and derelict land and empty buildings are inextricably
linked. In prioritising brownfield, vacant and derelict land and empty buildings for
development, the need for greenfield development is reduced. LDP3 is required to
set out opportunities for the sustainable reuse of brownfield land including vacant
and derelict land and empty buildings. 
It is recognised that vacant and derelict sites, whatever size, have the potential to
have a negative impact on communities. It can blight an area very quickly, create
issues by attracting antisocial behaviour, attracting vermin, fly tipping, contamination,
and invasive species all of which have an impact on the health and wellbeing of the
people who live within our communities. The 2024 Scottish Vacant and Derelict Land
Statistics, published by the Scottish Government in September 2025, show that
North Ayrshire contains 10% of Scotland’s total vacant and derelict land, which is the
second highest proportion of any Scottish local authority after North Lanarkshire
(14%). North Ayrshire has a total of 171 vacant and derelict sites, which covers an
area of 922 hectares. It is noted that this may not reflect all relevant land and sites.
Map of Vacant & Derelict Land Sites
The overall percentage of people living within 500m of a derelict site in North
Ayrshire is 39.1%. This figure rises to 65.6% in the Kilwinning locality (2023 data).
The majority of sites are located within Irvine, which comprise 27% of the overall

Page 113

North Ayrshire’s third Local Development Plan
102
LDP Committee Version
total, followed by the Three Towns locality at 21% and the Garnock Valley locality at
20%. 
However, brownfield sites can also contribute to nature recovery and support surface
water management. Naturalised brownfield, vacant and derelict land can have
significant biodiversity value and become well-used as areas for recreation. 
North Ayrshire’s Vacant and Derelict Land Strategy covers the period 2023 to 2027
provides an action plan to reduce the level of vacant and derelict land in North
Ayrshire. The strategy recognises that some sites may not ever be suitable for
development, but could contribute to green networks, places for nature or open
space, helping to meet carbon net-zero or biodiversity targets. 
Coastal development
Encompassing the mainland and our islands, North Ayrshire has a coastline of
around 225km. Shorelines are dynamic with their social, environmental, and
economic pressures and priorities constantly changing overtime and coastal
communities are often most at risk from the impacts of climate change. NPF4 (policy
10) seeks to protect coastal communities and assets and support resilience to the
impacts of climate change, to enable coastal areas to develop sustainably and
adapt. 
Rising sea levels and more extreme weather events resulting from climate change
will potentially have a significant impact on coastal and islands areas, which should
be recognised by LDP3’s spatial strategy. A Strategic Flood Risk Assessment has
been prepared which identifies areas of current and future coastal flooding. 
The Adopted Local Development Plan (policy 24) classifies the North Ayrshire coast
as either undeveloped, developed, or isolated. It is considered these classifications
remain valid. 
Map of North Ayrshire Coast and Marine Designations
The EU Marine Strategy Framework Directive and the EU Marine Spatial Planning
Directive were transposed into UK law and implemented across the devolved
administrations through the UK Marine Policy Statement and the Marine and Coastal
Access Act 2009. This Act established the legal basis for marine planning in the UK,
setting the foundation for the Marine (Scotland) Act 2010 and a statutory marine
planning system to sustainably manage the increasing, and often conflicting,
demands on our seas. 
LDP3 will be applicable down to Mean Low Water Springs and for marine fish
farming (finfish and shellfish); marine plans extend up Mean High-Water Springs with
the two planning regimes overlapping in the intertidal zone, between low and high-
water springs. 
Scotland’s National Marine Plan provides an overarching framework for all marine
activity in our seas and is the primary guide to decision-making on the use of marine
space and resources in Scotland. The National Marine Plan interactive (NMPi) tool

Page 114

North Ayrshire’s third Local Development Plan
103
LDP Committee Version
has been developed to help the development of national and regional marine
planning. The Clyde Marine Planning Partnership are in the process of preparing a
Regional Marine Plan for the Clyde. Development onshore should align with national,
sectoral, and regional marine plans.
The Ayrshire Shoreline Management Plan (ASMP) is a broad-scale assessment of
the risks associated with coastal processes along the Ayrshire coast, including the
islands of Great Cumbrae and Arran. It considers objectives, policies, and shoreline
management actions for a range of timescales: short-term (0-20 years), medium-
term (20-50 years) and long-term (50-100 years). The ASMP prompted two coastal
studies in Irvine and in Stevenston. The two studies took place in 2024 and were
completed in 2025. 
The studies consider how the areas have changed and predict how they are likely to
change in the future. The studies have been developed into two Local Coastal
Change Adaptation Plans. These documents aim to create a vision for well-adapted
and resilient management, properly integrated into other policies by taking a more
land use planning approach, avoiding locking-in future generations to unsustainable
actions, considering that sea levels are expected to continue to rise well beyond the
end of this century. The Local Coastal Change Adaptation Plans for ‘Sandylands
Promenade & Stevenston Beach’ and for ‘Irvine Harbour & Irvine Beach’ were
approved on 30 September 2025 as the Council’s preferred policy for coastal change
adaptation as the two study areas.
Work to replace the adopted SMP is under way, moving towards an Ayrshire-wide
Coastal Change Adaptation Planning approach. The emerging plan will take account
of predicted effects of climate change and recommendations contained in the
Scottish Government Coastal Change Adaption Plan guidance.  
The Dynamic Coast webmaps provide an indication of predicted coastal erosion for a
high emissions scenario over different timescales. A number of properties in North
Ayrshire are indicated to be at risk from future coastal erosion. Dynamic Coast’s
Erosion Disadvantage data furthermore couples anticipated erosion risk with
consideration of the social vulnerability of Scotland’s coastal communities to produce
an overall Coastal Erosion Disadvantage map. Areas around the Three Towns
locality are classed as Highly Vulnerable, which is the highest level of social
vulnerability classification. 
Coastal waters or inland water bodies are designated as ‘bathing waters’ if it is
expected that a large number of people bathe there, having regard to past trends
and infrastructure or facilities provided, or other measures taken, to promote bathing
at any particular site. Across North Ayrshire, there are five designated bathing
beaches – Largs (Pencil Beach), Millport Bay, Seamill, Saltcoats/Ardrossan and
Irvine. SEPA sample the bathing water quality at all designated bathing beaches and
for the last two years, all beaches have received a classification of ‘Good’ with
Millport receiving an ‘Excellent’ in 2023.

Page 115

North Ayrshire’s third Local Development Plan
104
LDP Committee Version
Energy
The Scottish Government published the Draft Energy Strategy and Just Transition
Plan in January 2023. The strategy seeks to transform the way Scotland generates,
transports, and uses energy. Previously, the onshore wind policy statement
2022 was published in December 2022, introducing a new ambition for a minimum
installed capacity of 20GW of onshore wind in Scotland by 2030. 
NPPF encourages the expansion of renewable, low-carbon and zero emissions
technologies as a key component of reducing greenhouse gas emissions in
response to the global climate emergency. The intent of the policy (policy 11) is to
encourage, promote and facilitate all forms of renewable energy development,
onshore and offshore. This extends to not only energy generation but also storage,
transmission and distribution infrastructure and emerging low-carbon and zero
emissions technologies, including hydrogen. 
LDP3 must seek to realise North Ayrshire’s full potential for electricity and heat from
renewable, low carbon and zero emission sources by identifying a range of
opportunities for energy development. LDPs are no longer required to identify a
spatial framework for wind energy development, however, part b) of the policy is
clear that development proposals for wind farms will not be supported in the North
Arran National Scenic Area. 
Within the ‘energy’ workstream, the Sustainable North Ayrshire Strategy includes an
action to development further municipal renewable energy projects, following the
development of solar farms at Shewalton, Irvine, and Nethermains, Kilwinning.
Aspirations to support community energy generation are supported by the
Community Renewable Energy Generation Fund (CREGF) scheme, which is open to
community organisations to support renewable energy projects in North Ayrshire.
The aim of the scheme is to increase the level of community owned renewable
energy generation opportunities; accelerate community benefit from local renewable
energy generation; and support North Ayrshire’s target of achieving net-zero carbon
emissions by 2030. 
The strategy also includes investigating the feasibility of a green hydrogen
generation project using landfill gas, through the Energy Technology Partnership.
This will also help meet the aims of the Hydrogen Action Plan. The Hydrogen Action
Plan sets out an ambition of 5GW of renewable and low carbon hydrogen production
by 2030 and 25GW by 2045. 
Additionally, East, North, and South Ayrshire councils are working to develop an
investment strategy and policies to help the private and public sector meet energy
and carbon reduction targets. The project is linked to the existing regional economic
partnership through the Ayrshire Growth Deal. The Ayrshire Energy Masterplan Final
Report (March 2025) is a key component of this work and presents a pathway to net
zero energy use that maximises socioeconomic benefits for Ayrshire. The report
seeks to be a catalyst for investment in energy infrastructure relating to heat,
transport and power and influence intervention strategies and pathways to ensure a
just transition to net zero. The recommendations made in the Ayrshire Energy

Page 116

North Ayrshire’s third Local Development Plan
105
LDP Committee Version
Masterplan focus on carbon emissions associated with energy use and are to be
progressed alongside council Local Heat and Energy Efficiency Strategy (LHEES). 
In 2018, Carol Anderson Associates conducted a wind energy landscape capacity
study of Ayrshire. The study provides a landscape and visual sensitivity assessment
for wind farms and wind turbine developments within different landscape character
types in North Ayrshire. The study also provides an appraisal of the scope
forrepowering wind farms and provides design and siting guidance to promote good
practice. 
The Local Landscape Designation review provides guidance for each of the
candidate Local Landscape Areas for managing change.
Since 2009 there has been in total 55 renewable energy projects in North Ayrshire
installed, not including domestic scale developments. The total expected capacity of
these projects is approximately 82 MW. A significant portion of these renewable
energy developments have been developed by the Council across its own estate. 20
education buildings across North Ayrshire have benefited from installation of solar
panels. The Council has also invested in two large solar farms, one at Nethermains
Kilwinning (operational in 2025) and one at Shewalton in Irvine (due to be
operational by the end of 2025). At Nethermains, the development is expected to
generate about 7,600MWh. Once Shewalton becomes operational that figure will rise
to more than 13,000 MWh over the two sites and will result in annual reduction in
CO2 emissions of approximately 2,700 tonnes. The Nethermains solar farm, being
installed and managed by the Council, is considered to be the first of kind in
Scotland. 
Battery Energy Storage Systems (BESS) is an emerging technology that stores
electrical energy in batteries for later use. These systems play a crucial role in
managing the variability and intermittency of renewable energy sources like solar
and wind. During periods of excess energy production, such as when the sun is
shining and the wind is blowing strongly, a BESS system stores the surplus energy.
Across North Ayrshire, eight proposals of commercial scale have been granted
consent since 2023. Two of these proposals were part of wider renewable energy
developments, with six stand-alone developments. Half of these proposals were
determined by the Energy Consents Unit (ECU) of the Scottish Government due to
the scale of the development. 
The energy distribution network in North Ayrshire is covered within the infrastructure
schedule. 
Zero waste
The Scottish Government aims to make Scotland a zero-waste society with a circular
economy. In December 2024, Scotland's circular economy and waste route map to
2030 was published, setting out actions to accelerate more sustainable use of
resources across the waste hierarchy; reduce emissions associated with resources
and waste; and strengthen the delivery of a circular economy. The route map

Page 117

North Ayrshire’s third Local Development Plan
106
LDP Committee Version
acknowledges the progress made against existing 2025 waste reduction and
recycling targets, the areas not met and the lessons to be learnt. 
This policy context is reflected in NPF4 through the spatial principle of ‘conserving
and recycling assets’ – making productive use of existing buildings, places,
infrastructure and services, locking in carbon, minimising waste, and building a
circular economy – and policy 12 which seeks to encourage, promote and facilitate
development that is consistent with the waste hierarchy; prioritising the reduction and
reuse of materials in construction and deliver the infrastructure required for zero
waste and a circular economy in appropriate locations. 
A revised zero waste strategy for North Ayrshire will be developed during 2025 and
2026 which considers the actions from the new national policy, while exploring
further opportunities for improving performance in this area. Scottish Government
also plan to introduce statutory reuse and recycling local performance targets for
household waste services from 2030.
North Ayrshire’s Council Plan includes the key activity of promoting a circular
economy in North Ayrshire to reduce consumption of raw materials and promote
reuse, repair and recycling, and generating energy from residual waste; this is picked
up within Workstream 4 of the Sustainable North Ayrshire Strategy. 
SEPA’s Waste Sites and Capacity Tool lists licenced facilities in North Ayrshire. It
states that across the 50 sites listed, 27 were operational with a capacity of
3,198,682 tonnes with a total of 1,736,291 tonnes of waste accepted in 2023. In
addition to domestic kerbside waste collection, North Ayrshire Council operates four
household waste recycling centres (Kilbirnie, Largs, Irvine, and Brodick on Arran)
and waste transfer stations in Irvine and Brodick. There are three closed landfill sites
that are monitored, at Shewalton and Nethermains in Irvine and Brodick, Arran. An
energy recovery facility (ERF) is in development at Oldhall Industrial Estate in Irvine.
This will recover energy by processing around 180,000 tonnes per year of post-
recycled residual commercial waste, generating enough electricity for the equivalent
of over 30,000 homes. 
North Ayrshire Council is third highest performing Council in Scotland for household
waste recycling in 2023, achieving a rate of 56.1% (Household waste generated and
managed 2023). This was an increase in performance from 55.3% in 2022 (4th
best). The average recycling rate in Scotland for 2023 was 43.5%.
All the Council’s waste is processed via contractual agreements with private
contractors. We have a contract in place until 2045 for the processing of our non-
recyclable waste as part of the Clyde Valley Residual Waste Partnership, which is in
partnership with four other councils (North Lanarkshire, East Renfrewshire,
Renfrewshire, and East Dunbartonshire). Viridor, who is the waste processing
contractor, removes recyclable materials at their pre-treatment facility in Bargeddie,
North Lanarkshire, prior to recovering energy and heat through an energy from
waste facility in Dunbar, East Lothian. The council’s recyclable waste processing
contracts are retendered every few years, so the suppliers that manage the

Page 118

North Ayrshire’s third Local Development Plan
107
LDP Committee Version
separation and processing of our recycling waste streams can change on a regular
basis.
The Council’s Waste Service have advised it does not currently have a local
requirement to build any further waste infrastructure for the Council’s own waste
processing needs at present, only making improvements to existing waste sites. 
Heating and cooling
The Scottish Government published its Heat in Buildings Strategy in November
2021. This strategy aims to transform Scotland’s buildings and the systems that
supply their heat, as part of the route map to net zero and addressing fuel poverty.
The strategy sets a number of ambitious targets on, among others, energy efficiency,
emissions, and low carbon heating system installations.
NPF4 seeks to encourage, promote and facilitate development that supports
decarbonised solutions to heat and cooling demand and ensure adaptation to more
extreme temperatures. LDPs should take into account the area’s Local Heat &
Energy Efficiency Strategy (LHEES) and areas of heat network potential and any
designated Heat Network Zones (HNZ). 
The Local Heat and Energy Efficiency Strategies (Scotland) Order 2022 places a
duty on local authorities to prepare and update a Local Heat and Energy Efficiency
Strategy (LHEES) and Delivery Plan to identify and address heat demand and areas
of poor energy efficiency. North Ayrshire Council published its Local Heat and Energy
Efficiency Strategy (LHEES) and Delivery Plan in January 2024. 
The LHEES is a long-term strategic framework to improve the energy efficiency of
buildings in North Ayrshire and reduce the greenhouse gas emissions resulting from
the heating of these buildings. LHEES support national statutory targets to achieve
net zero emissions by 2045 and reduce fuel poverty. 
The energy ratings for domestic properties were analysed and compared with
Scottish Government energy efficiency targets. This provided a baseline showing
that 40% of North Ayrshire properties will require a heating or energy efficiency
intervention to increase their Energy Performance Certificates (EPCs) to C or better
(aligning with the objective proposed in the Heat in Buildings Strategy for owner
occupied buildings). Further investigation of the entire domestic housing stock
identified that approximately 45,000 individual energy efficiency interventions
(improvements to glazing, wall insulation and loft insulation) could be made to
contribute towards meeting these targets.
Heat network analysis has identified potential zones where district heating networks
could be the most economically viable and deliver low-carbon heat to homes and
businesses in North Ayrshire. The Council has already established mini-district
heating zones in several locations including Irvine, Stevenston, Dalry and Largs.
Selected on the basis of having reliable anchor buildings, a high density of potential
customers and a suitable total heat demand, there are three zones for further
consideration, which are:

Page 119

North Ayrshire’s third Local Development Plan
108
LDP Committee Version
• Ardrossan – potential to include 704 domestic properties
• Saltcoats – potential to include 197 domestic properties
• Irvine Town Centre – potential to include 563 domestic properties
Within the Delivery Plan, there are 23 actions with lead organisations/council
services. Action 12 of the Delivery Plan states that the Sustainability Team will work
with communities, local businesses, and other public sector partners to complete
feasibility studies on proposed heat network zones. This work is already underway
with a feasibility study in Irvine being undertake with communities, local businesses,
and other stakeholders. A report on this is due in March 2026. The Council’s
Sustainability Team are also enrolled on to a District Heating Mentorship Scheme
that provide information from experts in Denmark with experience of delivering heat
network schemes to provide advice and experience. 
Changes to the Building Regulations, post 1 April 2024, mean that new homes have
a reduced heat demand meaning an increased number of homes may be required to
make the heat network commercially viable where new properties are included.
Completing feasibility studies on proposed heat network zones and commencing the
development of business cases on any heat networks deemed feasible are identified
as actions within the Delivery Programme. 
Blue and green infrastructure
Ecosystem services are the direct and indirect contributions ecosystems, also known
as natural capital, provide for human wellbeing and quality of life. Features or spaces
within the natural and built environment (green infrastructure), including water
environment features such as rivers, lochs, wetlands, and coastal areas (blue
infrastructure) can provide a wide range of these services, simultaneously. 
The ‘Benefits from Nature Wheel’ shows the many ecosystem services gained from
blue and green infrastructure, divided into four categories: provisioning (e.g. food
and drink, water supply and energy), regulating (e.g. flood management, clean air
and carbon storage), cultural (e.g. recreation, sense of place, physical health and
mental wellbeing) and supporting (e.g. healthy soils and space for wildlife). 
Scottish Government’s guidance Green Infrastructure: Design & Placemaking sets
out the benefits of green infrastructure in relation to placemaking, economy, climate
change, environment, community and social life, and health and wellbeing. To
ensure blue and green infrastructure is integral to new development, designed to
deliver multiple functions and that communities benefit from accessible, high-quality
blue, green and civic spaces, NPF4 policy 20 seeks to protect and enhance blue and
green infrastructure and their networks. 
The Central Scotland Green Network (CSGN) covers 19 local authority areas across
central Scotland, including North Ayrshire (excluding Arran), and is identified within
NPF4 as a National Development. CSGN seeks to play a key role in tackling the
challenges of climate change and biodiversity loss including by providing multi-
functional green and blue infrastructure that provides greatest environmental, lifelong
physical and mental health, social wellbeing, and economic benefits. It is partnership
between the Scottish Government, public bodies, local authorities, NGOs, private

Page 120

North Ayrshire’s third Local Development Plan
109
LDP Committee Version
sector businesses, and communities within central Scotland, overseen by the Green
Action Trust and delivered through multiple local projects across the area. 
LDPs should be informed by relevant, up-to-date audits and/or strategies, covering
the multiple functions and benefits of blue and green infrastructure. A specific blue
and green infrastructure audit reflecting and bringing together relevant assessments,
audits, strategies and action plans and covering the multiple functions and benefits
of blue and green infrastructure has not been undertaken for North Ayrshire. This is
identified as a potential evidence gap. However, a number of existing audits,
assessments and strategies do exist to support the preparation of LDP3: 
Open space is a key component of green infrastructure. North Ayrshire Council
adopted its ten-year Open Space Strategy in 2016. The strategy aims to provide
clear direction in the co-ordinated management of North Ayrshire’s open space to
ensure it meets the needs of residents and visitors alike. 
Since adoption of the current Open Space Strategy, the Planning (Scotland) Act
2019 has introduced a new duty on planning authorities to prepare and publish an
Open Space Strategy. Section 3G (2) of the Act states ‘an open space strategy is to
set out a strategic framework of the planning authority's policies and proposals as to
the development, maintenance, and use of green infrastructure in their district,
including open spaces and green networks’. The strategy must contain and audit of
existing open space provision and an assessment of current and future
requirements. 
We will seek to progress the preparation of a new Open Space Strategy, setting out
policies and proposals for the development, maintenance, and use of green
infrastructure in North Ayrshire, alongside the Proposal Plan. 
An open space audit – focusing on PAN 65 open space typologies – has, however,
been undertaken and was updated in 2022. The audit considers the quantity and
type of open space in North Ayrshire, its quality and accessibility against locally
established standards. Opportunities for open space enhancements are also
identified for each main settlement. 
The total amount of open space included in the Open Space Audit is 3,198.68
hectares, of which 42% is found in Irvine, reflecting the town’s growth as a New
Town. Using established quantity and quality standards, the audit finds that, overall,
North Ayrshire has good provision of open space, with only three settlements falling
below the standard of 6.55 ha per 1,000 people: Beith, Dalry and Whiting Bay.
Approximately 86% of the sites assessed as fit for purpose following an assessment
of their quality. The Three Towns, Dalry and Beith had the highest percentage of
sites assessed as ‘fair’ or ‘poor.’ 
The audit has informed our 20-minute neighbourhood assessment and play
sufficiency assessment, referred to in further detail within the Liveable Places
schedule. 
The North Ayrshire Core Paths Plan supports statutory rights to most land and inland
water for walking, cycling, horse-riding and non-motorised water-based activities by

Page 121

North Ayrshire’s third Local Development Plan
110
LDP Committee Version
identifying a framework of routes sufficient for the purpose of giving the public
reasonable access throughout the area. These core paths are a key part of outdoor
access provision that aim to promote access and reduce the potential for conflict
between the needs of land managers and those of access users. Core paths provide
links between blue and green infrastructure, contributing to the creation of a network. 
The vacant and derelict land register identifies sites that do or could perform a blue
green infrastructure function, either on a temporary or permanent basis. Brownfield
sites can contribute to nature recovery, support surface water management, and
become well-used as areas for recreation. 
As noted above, work is underway to identify a North Ayrshire Nature Network and
audit North Ayrshire’s biodiversity, including its ecosystems and habitats. We have
also undertaken a review of Local Nature Conservation Sites; mapping of North
Ayrshire’s woodland resources, including relating to the Ayrshire and Arran Forestry
and Woodland Strategy; and the Habitat Map of Scotland, the national repository for
habitat and land use data, contribute to the evidence base to inform the North
Ayrshire Nature Network and LDP3 in respect to our blue green infrastructure
resource. 
The Nature Networks Framework aims to catalyse the urgent and transformative
action needed across Scotland to implement Nature Networks that help halt and
reverse biodiversity loss. It promotes the basic principles which associated action
and delivery, at all levels, should be founded upon.
The outputs of the Strategic Flood Risk Assessment; available data on areas critical
for floodwater storage and conveyance (undeveloped floodplains, SuDS basins and
watercourses); and water environment related evidence sources noted above will
further strengthen our understanding of blue and green infrastructure, its
connectedness and the identification of existing and future potential opportunities for
blue infrastructure enhancements. 
In summary, while a specific blue and green infrastructure audit has not been
undertaken for North Ayrshire, a range relevant assessments, audits, strategies, and
action plans referred to above and covering the multiple functions and benefits of
blue and green infrastructure forms the evidence base for LDP3. 
Flood risk and water management
National planning policy (NPF4 policy 22) seeks to strengthen resilience to flood risk
by promoting avoidance as a first principle and reducing the vulnerability of
development to flooding. LDP3 should strengthen North Ayrshire’s resilience to the
current and future impacts of climate change by taking a precautionary approach to
flood risk. For planning purposes, ‘at risk of flooding’ or ‘in a flood risk area’ means
land or built form with an annual probability of being flooded of greater than 0.5%,
which must include an appropriate allowance for future climate change.
Flooding in Scotland is managed through 14 local plan districts which are areas of
land based on river catchments. Public authorities work in partnership to manage
flood risk within these districts. SEPA published the Ayrshire Flood Risk Management

Page 122

North Ayrshire’s third Local Development Plan
111
LDP Committee Version
Plan in 2021 and North Ayrshire Council, as lead local authority for the Ayrshire Local
Plan District, published the Ayrshire Local Flood Risk Management Plan in 2022. 
In 2021, the Scottish Government published ‘Water Resilient Places’ which identifies
actions to improve how surface water is managed in Scotland. This has a focus on
placemaking and can aid LDPs to protect and enhance blue infrastructure for
communities. Specific plans for managing surface water have been developed for
Irvine (2020) and Saltcoats, Ardrossan, Stevenston and Kilwinning (2021). These
plans set out objectives and actions for sustainable flood risk management within
these areas.
A Strategic Flood Risk Assessment (SFRA) has been prepared to inform the
development planning process. The SFRA provides a summary of existing and future
flood risk from all sources in target areas identified by the Ayrshire Flood Risk
Management Plan; a description of the completed or proposed actions in each target
area since the publication of the previous North Ayrshire Strategic Flood Risk
Assessment in 2018; details of the most up to date sources of flood risk information
for each target area, together with any implications for future planning strategies,
policies or actions; and an overview of flood risk within the wider locality. 
A web map to support this Strategic Flood Risk Assessment has been prepared. This
incorporates the following spatial data currently available to the Council to support
the preparation of LDP3 and the assessment of potential development sites:
• SEPA Flood Maps – River Flooding (high, medium, and low likelihood)
• SEPA Flood Maps – Surface Water and Small Watercourses Flooding (high,
medium, and low likelihood)
• SEPA Flood Maps – Coastal Flooding (high, medium, and low likelihood)
• SEPA Flood Maps – Future River (medium likelihood)
• SEPA Flood Maps – Future Surface Water and Small Watercourses (medium
likelihood)
• SEPA Flood Maps – Future Coastal (medium likelihood)
• River Garnock & Tributaries Flood Risk Model (with 49% climate change
allowance)
• Observed Flood Event Data for North Ayrshire by SEPA
• Historic Flood Events by NAC
• Potentially Vulnerable Areas
• Flood Risk Management Target Areas
• Water Works – Capacity 
• Waste Water Works – Capacity 
The web map will be updated as and when new data and relevant information
becomes available over the course of the plan preparation.
Planning for adaptation measures and identifying opportunities to implement
improvements to the water environment through natural flood risk management and
blue green infrastructure are also roles for the LDP, enabling water resources to be
used efficiently and sustainably.

Page 123

North Ayrshire’s third Local Development Plan
112
LDP Committee Version
River basin management planning seeks to protect and improve the water
environment for the benefit of people, wildlife, and the economy. It encompasses
rivers, lochs, transitional waters (estuaries), coastal waters groundwater and
groundwater dependant wetlands. River basin management plans set out a range of
actions to address problems affecting water quality, the physical condition of water
bodies. Scotland is predominately covered by a single River Basin Management
Plan.
As part of the river basin management planning regime, information on each
waterbody, pressures, measures and the objectives (targets) that SEPA have set is
available on the Water Environment Hub, with annual updates on the condition of the
water environment found at SEPA's Water Classification Hub. There are 45
monitored surface waterbodies in North Ayrshire. In 2023, 4 achieved the overall
status of ‘high’, 16 were ‘good’ and 3 were ‘poor’ and 2 ‘bad’. The area has 114
monitored groundwaters of which 10 were ‘good’ and 2 were ‘poor’ in 2023.
Detail of the key pressures on North Ayrshire’s waterbodies are included within the
Water Environment Hub. Almost all waterbodies are subject to pressures with the
impacts of these including the physical and/or ecological condition of the water body,
their flows and levels, the overall quality of the water and the access for fish
migration. There are 26 surface water bodies in North Ayrshire, with the rural diffuse
pollution being the most common pressure. 
Table 23 – Key pressures on water bodies in North Ayrshire
Pressure Number of surface water bodies
affected by pressure
Rural diffuse pollution 6
Modifications to physical condition
(rural) 5
Acid rain 4
Man-made barriers to fish migration 4
Other – water use by hydropower 4
Modifications to physical condition
(urban) 3
Other – Unknown causes (ecology) 3
Other – Unknown causes (chemistry) 2
Public water supply 2
Summary of Stakeholder Engagement
On 20 February 2025, the Draft Environment Evidence Paper incorporating Strategic
Environmental Assessment (SEA) Scoping Report was sent to the consultation
authorities – NatureScot, Historic Environment Scotland and the Scottish
Environment Protection Agency (SEPA) and the Scottish Government SEA Gateway.
It was also issued more widely for comment via the North Ayrshire Local Biodiversity
Partnership, LDP Online Hub and emails to community councils and the LDP mailing
list. A draft of this schedule was shared with NatureScot, Historic Environment

Page 124

North Ayrshire’s third Local Development Plan
113
LDP Committee Version
Scotland and SEPA on 16 July 2025, and a full draft of the Evidence Report was sent
to all key agencies on 7 October 2025. 
The Strategic Flood Risk Assessment (SFRA) has been prepared in consultation
with SEPA. Comments provided by SEPA on a draft have been incorporated into the
final SFRA, as set out in Appendix B of that document. SEPA provided a ‘statement
of agreement’ on the assessment in March 2025. 
Wider place-based engagement with local communities has been focused on the
‘Your Place Survey’ and engagement on the ‘Place Profiles.’ Based on the Place
Standard, the Your Place Survey asked respondents – among other prompts – to
consider how easy it was to regularly enjoy natural space. The Place Profiles present
an overview evidence relating to the environment. The engagement on the profiles,
including public ‘drop-in’ meetings, focused on the needs and wants of communities. 
Stevenston is one of nine towns across Scotland included in Architecture & Design
Scotland’s three-year ‘Climate Action Towns’ project. The project worked with
communities and other stakeholders to identify the best ways to embed climate
actions in each town. By using the Place Standard with a Climate Lens, and mapping
Stevenston as a ‘carbon conscious place,’ four key topics for climate action were
identified: greenspace, biodiversity and nature networks, and adaptation to the
changing climate. The Sustainable North Ayrshire Strategy proposes the
development of Community Climate Action Plans for each locality, building on the
Climate Action Town Stevenston project. 
Views expressed on the Environment Evidence Paper and draft schedule are noted
in the Record of Engagement [in preparation], which includes the Council’s response
to the issues raised and how the Evidence Report has been amended. Comments
relating to the environment from wider community engagement are also summarised
within the Record of Engagement. Key points arising are summarised below. 
Comments relating to climate change and adaptation
NatureScot suggested that the connections between the climate and nature crises
should be noted; consideration of drought events be included and cross-reference to
blue and green infrastructure included within this section. The Evidence Report has
been updated accordingly. 
Comments relating to biodiversity
SEPA and NatureScot welcomed the approach being taken and intention to develop
a North Ayrshire Nature Network (NANN). NatureScot highlighted the approach to be
taken to coastal and cross-boundary nature networks will be important to consider.
On review of the draft schedule for this topic, SEPA requested that the Evidence
Report (and development of the NANN) be informed by water environment evidence
sources highlighted within their Planning Advice Note on achieving sufficiency of
evidence at the Evidence Report stage. This evidence is equally relevant to blue

Page 125

North Ayrshire’s third Local Development Plan
114
LDP Committee Version
green infrastructure, flood risk and the water environment and has been added to the
Evidence Report under the section on North Ayrshire’s Nature Network.
NatureScot have suggested an evidence gap moving forward relating to ‘townscape’
- urban nature habitats and networks which are considered important elements in
achieving the aims of NPF4. It is noted by NatureScot that due to the increased level
of complexity at urban place scales, sites being appraised for development will
require to be considered, proportionately, in more detail, during the ongoing
preparation of LDP3 and site assessment. 
Comments relating to natural places
Iceni Projects Ltd on behalf of The Mac Mic Group disputes the evidence presented
in the North Ayrshire Settlement Edge Landscape Sensitivity Study in relation to a
specific site. 
The Council considers the study is robust, having been undertaken by a qualified
and experienced landscape architect, and that this is a site-specific issue to be
considered at the site assessment stage of preparing LDP3. 
Comments relating to soils
NatureScot recommended setting out further detail on the condition, land uses, land
use changes, and pressures related to soils, their management and enhancement. 
Homes for Scotland highlighted an approach to mitigating impact on soils from
development through use of a ‘Construction Environment Management Plan’
(CEMP)
Comments relating to forestry, woodland and trees
Scottish Forestry agree that converting relevant policy into practice would benefit
from the inclusion of an up-to-date Forestry and Woodland Strategy that clearly
illustrates the mechanisms by which the region’s forests and woodland will be
protected and expanded to meet Scottish Government objectives. 
Comments relating to vacant and derelict land
The environmental and social importance of vacant and derelict land and its positive
effects on local communities was highlighted in one response from a member of the
North Ayrshire Biodiversity Partnership, with areas of vacant and derelict land in
North Ayrshire identified as “well used and well-loved areas of wild open space” and
as important sites for biodiversity. NatureScot also noted the role and contribution of
vacant and derelict land to nature could be considered, with the potential that
relevant opportunities and priorities could then inform the preparation of
development frameworks or briefs as appropriate. 
Uses that support the management of increasing flood risk from climate change are
highlighted by Scottish Water. 
The potential for brownfield sites to contribute to nature recovery is accordingly
recognised in the Evidence Report.

Page 126

North Ayrshire’s third Local Development Plan
115
LDP Committee Version
Comments on coastal development
NatureScot highlighted the move towards an Ayrshire-wide Coastal Change
Adaptation Planning approach, supplanting the current Shoreline Management Plan.
The relevant section has been updated to refer to this. 
Comments relating to historical assets 
Historic Environment Scotland welcomed the approach of aligning the SEA scoping
report with the publication of the Environment Topic Paper, utilising the same
baseline data and that the information, data, and advice issued by HES has been
utilised in the preparation of the evidence and Scoping Report. 
Encouragement was provided to consider how the historic environment may be
relevant to other topics and the inclusion of a summary of implications for the
proposed plan for the historic environment, drawing on the evidence provided in the
report. Accordingly, reference to the historic environment is made in relation to
placemaking within the Liveable Places schedule and tourism in the Productive
Places schedule. Implications relating the historic environment evidence have been
added below. 
Submitted local place plans and the response from Beith Community Council identify
locally important historical assets. 
Comments relating to green belt
West Kilbride Community Council have proposed the creation of a green belt around
the village within their Local Place Plan. Early engagement with Beith District
Community Council has also raised a suggestion of a green belt around some parts
of Beith. This is also reflected in the Garnock Valley Local Place Plan. 
Comments on heating and cooling
Homes for Scotland advise that Building Regulations post 1 April 2024 mean that
new homes have a reduced heat demand and, therefore, a higher number of homes
are required to make heat networks commercially viable. This is acknowledged
within the summary of evidence. 
Comments on blue green infrastructure
NatureScot and SEPA highlighted limited reference to blue green infrastructure in the
Environment Topic Paper, stating further clarification around this part of the evidence
base was required. A specific section on blue green infrastructure is included in the
Evidence Report above, with implications for the Proposed Plan discussed below. 
Scottish Water support and actively encourage the inclusion of blue and green
infrastructure approaches when making place-based assessments on the local
catchment area. They further note that greater consideration should be taken on
what blue infrastructure can be integrated within new development to help to reduce
the risk of flooding, create water sensitive urban design and accelerate delivery of
water resilient places.

Page 127

North Ayrshire’s third Local Development Plan
116
LDP Committee Version
SEPA also encouraged the final Evidence Report to include reference to the policy
connections across NPF4 policies, including the wider policy connections of blue
green infrastructure. This is highlighted at the beginning of the blue green
infrastructure section. A more comprehensive list of assessments, audits, and
strategies relevant to Blue Green Infrastructure has been provided, as suggested by
NatureScot.
Comments on flood risk and water management
Beith Community Council have highlighted significant surface water drainage
problems in the town arising from culverts.
SEPA required that key pressures on waterbodies were presented in the Evidence
Report to outline the key issues are currently facing waterbodies in North Ayrshire.
This has been included at Table 23. The need to consider opportunities to support
any direct or indirect action to improve the condition of the water environment,
including the alleviation or mitigation of pressures is identified within the implications
of this evidence. 
Strategic Environmental Assessment 
Historic Environment Scotland, NatureScot, and SEPA as Consultation Authorities
also provided comments on the scope and level of detail proposed for the
environmental report and proposed consultation period. The views of the
Consultation Authorities on the evidence, scope and methodology of the SEA have
been considered in the final Environment Evidence Paper and Evidence Report,
including revising SEA objectives, sub-objectives and assessment questions set out
in the SEA Assessment Framework and consequently the site appraisal
methodology. 
Summary of Implications for the Proposed Plan 
Our view on what this evidence and stakeholder engagement means for LDP3 is
summarised below: 
Global climate emergency and nature crisis
LDP3 must address the global climate emergency and nature crisis by ensuring the
spatial strategy will reduce emissions, adapt to current and future risks of climate
change and promoting nature recovery and restoration in the area. Reducing
greenhouse gas emissions and improving biodiversity are cross-cutting outcomes of
NPF4, with linkages across all the national planning policies which will deliver
sustainable places. This should underpin decisions made in the preparation of the
Proposed Plan. 
Strategic Environmental Assessment and Habitats Regulations Appraisal 
The Council will prepare an Environmental Report as part of the Strategic
Environmental Assessment (SEA) of LDP3.

Page 128

North Ayrshire’s third Local Development Plan
117
LDP Committee Version
The Environment Report is statutory obligation that aims to ensure the environment
is a primary consideration in the preparation of qualifying public plans, programmes,
and strategies, including local development plans. It has a key role in the preparation
of LDP3 through the identification and addressing of environmental implications
arising from the policies and proposals of the Proposed Plan. This includes through
the review of reasonable alternatives and identification of mitigation measures. The
SEA and Environmental Report will inform the Proposed Plan in a way that seeks to
avoid adverse environmental effects and enhance positive ones. 
We have aligned the preparation of the Evidence Report with the scoping of SEA in
recognition of the fact that the requirement to set out a view on the environmental
characteristics of the area (Evidence Report) and to identify and consider existing
environmental problems relevant to the plan and to manage environmental
sensitivities (SEA) are informed by the same evidence. The Environmental Evidence
Paper – setting out the environmental baseline – also serves as the Scoping Report
for the SEA. 
Table 22 identifies five European sites within North Ayrshire and their qualifying
interest. A Habitats Regulations Appraisal (HRA) will be prepared to assess the likely
significant effects of the Proposed Plan on these sites and any outwith the Council
area which could be impacted. LDP3 may only be taken forward if the appropriate
assessment concludes that the plan would not adversely affect the integrity of any
European site. 
Site assessment
A site appraisal methodology has been prepared as the basis for assessing
development proposals for inclusion in LDP3 as allocated sites. The methodology
comprises an environmental assessment at stage 1, which is aligned with the
proposed SEA Assessment Framework set out in the Environment Evidence
Paper/Scoping Report.
The environmental evidence gathered will inform the assessment of development
sites and the decisions made to ensure new development achieves the
environmental objectives of NPF4. 
As noted by NatureScot in relation to urban nature habitats and networks, due to the
increased level of complexity at urban place scales, sites being appraised for
development will require to be considered, proportionately, in more detail, during the
ongoing preparation of LDP3 and site assessment. Part of this appraisal process is
required to help achieve compact settlements, reduced land take, and access to
nature for all citizens. 
A Site Assessment Report will be prepared, setting out the relevant evidence and
assessment for all proposed sites (including LDP2 sites which are not complete or
under development which the Council may consider rolling forward) and will inform
the Council’s allocation of sites in the Proposed Plan as well as masterplans,

Page 129

North Ayrshire’s third Local Development Plan
118
LDP Committee Version
development briefs, site specific technical/infrastructure requirements and the
statutory Delivery Programme. 
Blue and green infrastructure and Nature Networks
Blue and green infrastructure has a key role to play in achieving a range of
environmental objectives, including in relation to climate change and biodiversity, for
example reducing CO² emissions by providing non-vehicular travel routes
encouraging walking, wheeling and cycling; providing carbon storage and
sequestration; managing flood risk; and allowing diverse habitats to be created which
are rich in flora and fauna. Nature networks are inherent within green and blue
infrastructure and central to increasing ecological connectivity and restoration of
nature. The Proposed Plan must identify and protect blue and green infrastructure
assets and networks, including the North Ayrshire Nature Network, and set out
opportunities for these to be enhanced and expanded, including by new
development that must be ‘nature positive.’ The existing Open Space Audit, Play
Sufficiency Assessment, Local Nature Conservation Site review, Strategic Flood Risk
Assessment and datasets on woodland cover; areas critical for floodwater storage
and conveyance; and highlighted water environment related evidence sources noted
in the Evidence Report provide an evidence base to support the delivery of
strengthened blue green infrastructure. A biodiversity audit being prepared in support
of the North Ayrshire Nature Network Strategy will further support this work stream.
We are committed to including the above evidence (where relevant) in the mapping
of nature networks and blue and green infrastructure. 
Closer partnership working will support delivery of blue green infrastructure to tackle
both climate and biodiversity emergencies, including through the inclusion of
sustainable surface water management principles, and inform and influence the
design and planning process for new development. This extends to identifying cross-
boundary needs and opportunities. 
The role and benefits of blue and green infrastructure extend beyond environmental
objectives. The ‘cultural’ ecosystem services gained from blue and green
infrastructure, for example recreation, sense of place, physical health and mental
wellbeing, are important to creating liveable places (Topic 1).
Historic assets and places
The LDP3 must support the sustainable management of the historic environment. It
should also identify, protect, and enhance valued historic assets and places as per
NPF4 and the established Local development planning guidance.
The proposed plan must take into consideration the current pause of the BARR.
Implications are that LDP3 may explore the option of new policy or guidance,
showing a pro-active approach to buildings at risk as well as potential masterplans to
support their appropriate reuse.
Local Place Plans have highlighted assets which the immediate community deem to
be culturally significant. LDP3 should explore where possible, whether it can protect

Page 130

North Ayrshire’s third Local Development Plan
119
LDP Committee Version
and enhance these assets. The current review of local designations will also further
aid in identifying valued historic assets. This may result in existing Conservation Area
Management Plans being revised or updated where necessary or identifying future
opportunities for management plans. 
Considering the current sale of ecclesiastical buildings, this may have implications
for LDP3 needing to explore the option of new policy or guidance, showing a pro-
active approach to the re-use of these buildings. Furthermore, an open dialogue will
be kept with our colleagues in Connected Communities and Regeneration, who
support communities to deliver positive change, including the redevelopment of
assets. Internal guidance which can be shared with communities has already been
shared with colleagues, having been informed by information by the Places of
Worship Forum and Built Environment Forum Scotland.
LDP3 will also need to be cognisant of LHEES work and how this will be applicable
to historic assets, ensuring they are protected and manage sustainably. 
Green belts
The preparation of LDP3 must consider the need for green belt to support the spatial
strategy and where there is a significant danger of unsustainable growth in car-
based commuting or suburbanisation of the countryside. 
The Settlement Edge Landscape Sensitivity Study provides a strategic-level
landscape and visual sensitivity assessment relating to the potential urban
expansion of North Ayrshire’s main settlements. The study additionally considers
sensitivity to housing development within 45 identified settlement edge sites; further
assessment of potential development sites not covered by the study may be
necessary. 
The study makes recommendations on where a green belt designation might be
appropriate in terms of protecting and enhancing the character and identity of
settlements and their landscape and natural setting and in relation to clearly
identifiable visual boundary markers based on landscape features. 
However, any potential green belt designations will also be informed by the spatial
strategy of the Proposed Plan itself, the North Ayrshire Nature Network, blue green
infrastructure, and any areas managed for the purpose of tackling climate change.
Two communities have indicated support for green belt designation, and this will also
be a consideration. 
Brownfield, vacant and derelict land, and empty buildings
Conserving and recycling assets and compact urban growth are two of six spatial
principles that shape the National Spatial Strategy set out in NPF4 and will guide
LDP3’s spatial strategy. This means making productive use of existing buildings,
places and infrastructure and optimising the use of land to provide services and
resources by limiting urban expansion. Accordingly, LDP3 should encourage,
promote, and facilitate the reuse of brownfield, vacant and derelict land, and empty
buildings. This will help reduce the need for greenfield development.

Page 131

North Ayrshire’s third Local Development Plan
120
LDP Committee Version
North Ayrshire has over 920 hectares of vacant and derelict land which provides the
starting point for this focus. Forty-three historic buildings at risk are also identified
and it is acknowledged that the vacant and derelict land audit and Buildings at Risk
Register (BARR) do not reflect all relevant sites and buildings. Registered local place
plans which have identified locally significant land and buildings, and the Housing
Land Audit will identify other priority sites. 
Opportunities for the positive and sustainable reuse of brownfield, vacant and
derelict land and empty buildings should be identified by LDP3, acknowledging that
redevelopment will not always be the most appropriate use. The use of unused or
under-used land as green infrastructure – either permanently or temporary – should
be encouraged where appropriate. In this regard, the importance of vacant and
derelict land is not just its value as a redevelopment site but also its potential
inclusion in a Nature Network; there may be sites that have a potential for
redevelopment but also could play and important part in the North Ayrshire Nature
Network, which itself has potential for helping to tackle problematic vacant & derelict
sites. 
The amount of developable brownfield and vacant and derelict land identified in the
spatial strategy will have direct implications for the requirement for urban expansion
and green belt designation, especially in the context of the indicative Local Housing
Land Requirement. The site appraisal process will inform this. 
Energy
LDP3 should encourage, promote, and facilitate all forms of renewable energy
generation, storage, transmission and distribution infrastructure and emerging low-
carbon and zero emissions technologies, including hydrogen. Supporting community
energy generation in particular can bring wider community benefits. 
Hunterston will be a key location for development that supports the transition to net
zero. NPF4 identifies Hunterston as a National Development. The existing
infrastructure offers potential for electricity generation from renewables and
associated infrastructure. 
A wind energy landscape capacity study of Ayrshire provides a landscape and visual
sensitivity assessment for wind farms and wind turbine developments within different
landscape character types in North Ayrshire. Wind farms will not be supported in the
Arran National Scenic Area. 
Flood risk and water management including coastal development
National planning policy is clear that development proposals at risk of flooding or in a
flood risk area – defined as land or built form with an annual probability of being
flooded of greater than 0.5% including an appropriate allowance for future climate
change – will only be supported in specific circumstances. A Strategic Flood Risk
Assessment (SFRA) has been prepared to support the assessment of development
proposals via the site appraisal methodology.

Page 132

North Ayrshire’s third Local Development Plan
121
LDP Committee Version
LDP3 may identify previously used sites in built up areas within a flood risk area
which need to be brought into a positive use, but only where it can be evidenced
long-term safety and resilience can be secured. SEPA advice will be key in any such
considerations. 
The implication of adopting a precautionary approach to flood risk will mean areas
within North Ayrshire are not suitable for most forms of development. These
decisions will be guided by the latest available flood risk evidence and flood risk
assessments may be required. 
Further consideration on coastal change adaptation to inform how LDP3 plans for
future resilience will be an important area of focus in relation to coastal development. 
The condition and pressures facing surface and ground water bodies in North
Ayrshire will be relevant in the formation of the spatial strategy, including in the
context of nature networks and blue green infrastructure. Site allocations should
consider opportunities to support any direct or indirect action to improve the
condition of the water environment, including the alleviation or mitigation of
pressures. 
Statements of Agreement / Dispute 
Historic Environment Scotland confirmed on 15 August 2025 that they are content
with the evidence provided in the report and raise no disputes. No further comments
were made in response to the full Draft Evidence Report.
SEPA provided a statement of agreement to the Strategic Flood Risk Assessment on
11 March 2025 and for evidence relating to nature networks, blue green
infrastructure, and the water environment on 20 October 2025.
After addressing issues relating to disputed evidence for the natural environment to
what it considers an appropriate and proportionate level for this stage of the LDP3
preparation process, NatureScot confirmed its agreement with the draft evidence
report on 24 October 2025. 
Iceni Projects Ltd on behalf of The Mac Mic Group disputes the evidence presented
in the North Ayrshire Settlement Edge Landscape Sensitivity Study in relation to a
specific site.
Links to Evidence
1) North Ayrshire Council, Environment Evidence Paper (April 2025)
2) Scottish Government, The Environment Strategy for Scotland: vision and
outcomes (February 2020)
3) North Ayrshire Council, Sustainable North Ayrshire 2024 to 2027 (December
2023)
4) Scottish Government, Securing a green recovery on a path to net zero: climate
change plan 2018 to 2032 – update (December 2020)
5) Scottish Government, National Adaptation Plan 2024 to 2029 (September 2024)

Page 133

North Ayrshire’s third Local Development Plan
122
LDP Committee Version
6) North Ayrshire Council, North Ayrshire’s 2030 Woodland: A Tree Planting
Strategy (December 2021)
7) Kirkpatrick Baird, F., Stubbs Partridge, J. & Spray, D. 2021. Anticipating and
mitigating projected climate-driven increases in extreme drought in Scotland,
2021-2040. NatureScot Research Report No. 1228
8) Scottish Government, Scottish Biodiversity Strategy to 2045 (November 2024)
9) Scottish Government, Scottish Biodiversity Delivery Plan 2024 to 2030
(November 2024)
10) Scottish Government, Draft Planning Guidance: biodiversity (November 2023)
11) NatureScot, Developing with Nature guidance
12) North Ayrshire Council, Reporting on the Scottish Biodiversity Duty 2020-2023
(January 2024)
13) North Ayrshire Council, Approved Local Biodiversity Action Plan 2019 to 2031
(April 2019)
14) North Ayrshire Council, North Ayrshire Nature Network Strategy (March 2025)
15) SEPA, Planning Advice Note for Planning Authorities. LDP Evidence Gathering:
Achieving sufficiency of evidence relating to flood risk and the water
environment (December 2024)
16) North Ayrshire Council, Review of Local Nature Conservation Sites (LNCS) –
Storymap (2024)
17) Scottish Geodiversity Forum, Scotland’s Geodiversity Charter 2018 to 2023
(2017)
18) Carol Anderson Landscape Architects for North Ayrshire Council, North Ayrshire
Local Landscape Designation Review – Main Report & Background Evaluation
Report (September 2023)
19) Carol Anderson Landscape Architects for North Ayrshire Council, North Ayrshire
Settlement Edge Landscape Sensitivity Study (December 2024)
20) Ayrshire Forestry and Woodland Strategy 2014
21) Historic Environment Scotland, Historic Environment Policy for Scotland (May
2019)
22) Conservation Area Assessments (incorporation Conservation Area Appraisals
and Management Plans), approved 2020. 
a. Beith 
b. Corrie
c. Dalry
d. Dreghorn
e. High Corrie
f. Irvine Harbour
g. Lamlash
h. Perceton
i. Skelmorlie
j. West Kilbride
23) North Ayrshire Council, Vacant & Derelict Land Strategy 2023 to 2027 (February
2023)
24) Scottish Government, Scotland's National Marine Plan (March 2015)

Page 134

North Ayrshire’s third Local Development Plan
123
LDP Committee Version
25) RPS for North Ayrshire Council and South Ayrshire Council, Ayrshire Shoreline
Management Plan (September 2018)
26) Scottish Government, Draft Energy Strategy and Just Transition Plan (January
2023)
27) Scottish Government, Onshore wind policy statement 2022 (December 2022)
28) Scottish Government, Hydrogen Action Plan (December 2022)
29) Carol Anderson Landscape Architects for North Ayrshire Council, North Ayrshire
Landscape Wind Energy Capacity Study – Final Report (October 2018).
30) Scottish Government, Scotland's circular economy, and waste route map to
2030 (December 2024)
31) Scottish Government, Heat in Buildings Strategy (October 2021)
32) North Ayrshire Council, Local Heat and Energy Efficiency Strategy (January
2024)
33) North Ayrshire Council, Local Heat and Energy Efficiency Strategy – Delivery
Plan (January 2024) 
34) Scottish Government, Green Infrastructure: Design and Placemaking
(November 2011)
35) North Ayrshire Council, Open Space Strategy 2016 to 2026
36) North Ayrshire Council, Open Space Audit – Storymap (2022)
37) North Ayrshire Council, Core Paths Plan (January 2009)
38) SEPA, Flood Risk Management Plan: Ayrshire (December 2015)
39) North Ayrshire Council, Local Flood Risk Management Plan: Ayrshire Local Plan
District (2022 to 2028) (December 2022) 
40) Scottish Government, Water-resilient places - surface water management and
blue-green infrastructure: policy framework (February 2021)
41) North Ayrshire Council, Strategic Flood Risk Assessment (February 2025)
42) SEPA, The River Basin Management Plan for Scotland 2021 to 2027
(December 2021)
43) SEPA Classification Evidence
44) SEPA Pressures evidence 
45) Letter from Historic Environment Scotland (15 August 2025)

Page 135

North Ayrshire’s third Local Development Plan
124
LDP Committee Version
Topic 4 – Transport
Mobility is an essential part of a place. The relationship between land use and
transport is critical, with the location of new development fundamental to its
connectivity and the travel choices people are able and choose to make. Transport is
relevant not only in the context of greenhouse gas emissions but also to health and
wellbeing, the fairness of our society and the inclusiveness of our economy. 
To support and inform the preparation of this Evidence Report and the Local
Development Plan (LDP3) in relation to transportation matters, a Transport Evidence
Paper has been prepared. This sets out baseline information and data about the
transport infrastructure and capacity of North Ayrshire. This chapter of the Evidence
Report summarises this evidence and its implications for the Proposed Plan.
References to specific figures and tables in the Transport Evidence Paper are
provided in square brackets. The corresponding NPF4 policy is 13. Sustainable
transport. 
Information required by the Act and Regulations
Section 15 of the Planning Act concerns the form and content of local development
plans. Subsection 1(a) requires the local development plan to take account of
matters mentioned in subsection (5), including:
• the infrastructure of the district (including transport) and how that
infrastructure is used
Section 16B of the Act relates to the Evidence Report. As per subsection (3), the
evidence report is to set out the planning authority’s view on the matters listed in
section 15(5), referred to above. 
The Town and Country Planning (Development Planning) (Scotland) Regulations
2023 (the 2023 Regulations) provide additional detail to the requirements set out in
primary legislation. Regulation 9 sets out further information and considerations to
which the planning authority are to have regard to in preparing a local development
plan. Included within this list is any regional or local transport strategy. 
Summary of Evidence
Policy Context
National Planning Framework 4 sets out a National Spatial Strategy to support the
planning and delivery of sustainable, liveable, and productive places. Six overarching
spatial principles guide implantation of the spatial strategy, including ‘just transition’ –
a fair and inclusive transition to net zero; ‘conserving and recycling assets’ – making
productive use of existing infrastructure; and ‘local living’, which concerns access to
services, greenspace, learning, work and leisure. 
NPF4’s sustainable transport policy (policy 13) seeks to encourage, promote and
facilitate developments that prioritise walking, wheeling, cycling and public transport

Page 136

North Ayrshire’s third Local Development Plan
125
LDP Committee Version
for everyday travel and reduce the need to travel unsustainably. Expected outcomes
are developments in locations which support sustainable travel; more, better, safer,
and more inclusive active and sustainable travel opportunities and investment in
transport infrastructure which supports connectivity and reflects place-based
approaches and local living. 
Local living, including ‘20-minute neighbourhoods’, is further embedded within NPF4
through Policy 14 and Policy 15. These policies intend to encourage, promote and
facilitate the application of the Place Principle and design-led approaches to deliver
development that is well connected, easy to move around and where people can
meet most of their daily needs within a reasonable distance of their home, preferably
by walking, wheeling or cycling or using sustainable transport options thereby
reducing car dependency. 
Strengthening and extending a Scotland-wide walking, cycling and wheeling network
is designated by NPF4 as a national development to support the delivery of liveable
places and reduce emissions from transport, with a focus on areas where
improvements to accessibility are most needed. 
The National Transport Strategy, Strategic Transport Projects Review and Scotland’s
Climate Change Plan are all identified by NPF4 as cross-cutting policies. 
The National Transport Strategy 2 (NTS2) presents a vision for Scotland’s transport
system to 2040: ‘we will have a sustainable, inclusive, safe and accessible transport
system, helping deliver a healthier, fairer and more prosperous Scotland for
communities, businesses and visitors’. The strategy identifies four priorities:
• To reduce inequalities
• To take climate action
• To help deliver inclusive economic growth
• To improve our health and wellbeing
Under each priority, NTS2 sets out three related outcomes and outlines current and
emerging challenges. It recognises that spatial planning can play a key role in
addressing a number of these challenges for our places but needs to be properly
aligned with transport planning to realise its full potential. A range of policies has
been developed that will act as the drivers of change and help address the
challenges, achieve the priorities and outcomes, and deliver the vision. Overarching
these policies is the Sustainable Travel Hierarchy, which promotes walking,
wheeling, cycling, public transport and shared transport options in preference to
single occupancy private car use for the movement of people.

Page 137

North Ayrshire’s third Local Development Plan
126
LDP Committee Version
Figure 6 – Sustainable Travel Hierarchy 
In accordance with the Sustainable Travel Hierarchy, NTS2 describes that when
making planning decisions, for example identifying sites for development, impacts on
transport – and transport accessibility – must be considered as a priority to enable a
positive impact on the choices about the types of journeys we make, when we make
them and how we make them. A planning system that puts in place options that will
discourage people from owning or using cars and transport infrastructure that helps
ensure that places are convenient to get to without having to use a car will, in the
long-term, benefit air quality, reduce greenhouse gas emissions and improve health. 
The NTS2 also includes a Sustainable Investment Hierarchy with ‘reducing the need
to travel unsustainably’ placed at the top, followed by ‘maintaining and safely
operating existing assets’. NTS2 and the National Infrastructure Investment Plan are
clear that we must work with our existing infrastructure assets first, before investing
in additional assets.

Page 138

North Ayrshire’s third Local Development Plan
127
LDP Committee Version
Figure 7 – The Sustainable Investment Hierarchy 
The Strategic Transport Projects Review (STPR2) provides an overview of transport
investment, mainly infrastructure and other behaviour change recommendations, that
are required to deliver the National Transport Strategy priorities and objectives of the
review. 
STPR2 considers the transport needs of Scotland’s people and communities, and
examines current active travel, public transport, and road provision to develop a
strategy that will achieve the vision of the National Transport Strategy. The current
needs and provisions are reviewed from national and regional perspectives to reflect
their different geographies, travel patterns and demands.
Recommendations are made by the STPP2 for sustainable travel improvements;
influencing travel choices and behaviour; decarbonising transport and increasing
safety and resilience on the strategic transport network. Recommendations 18, 24
and 42 have specific relevance to North Ayrshire, supporting integrated journeys at
ferry terminals (18); ferry vessel renewal and replacement, and progressive
decarbonisation (24) and investment in port infrastructure to enable this (42). 
Transport Scotland’s Island Connectivity Plan (ICP) comprises an overarching
Strategic Approach paper and delivery plans and workstreams, including the Vessels
and Ports Plan, Community Needs Assessments, and Monitoring & Evaluation Plan.
Following public consultation undertaken in early 2024, the final versions of each of
these documents were published in 2025. These documents outline a long-term
vision for island transport connectivity, addressing strategic challenges across ferry
services, aviation, fixed links, and onward and connecting travel. Recommendation
18 of STPR2 links to the Onward and Connecting Travel workstream that forms part
of the Islands Connectivity Plan (ICP), which is at an early stage.

Page 139

North Ayrshire’s third Local Development Plan
128
LDP Committee Version
Aligned with the NTS2 priority to take climate action, Scotland’s Climate Change
Plan update, published in December 2020, includes a section on transport and sets
out a commitment to reducing car kilometres by 20 per cent by 2030, to enable
Scotland to meet its net zero emissions target by 2045. This specific policy
commitment is supported by a Route Map.
In April 2025, the Cabinet Secretary for Transport announced the abandonment of
the 20% target at a session of the Public Audit Committee concerning the report
‘Sustainable transport: Reducing car use’, which was produced jointly by the Auditor
General for Scotland and the Accounts Commission. Recent advice from the UK
Climate Change Committee that moving 7% of car trips to walking, cycling, and
public transport by 2035 would be sufficient to meet climate change goals was
referenced. Transport Scotland have advised that the Government “remains
steadfastly committed to reducing car use across Scotland in a way which is fair and
supports a just transition to net zero emissions by 2045” and will publish a renewed
policy statement on car use reduction which further sets out their policy position and,
potentially, a new longer-term target. 
North Ayrshire’s Local Transport and Active Travel Strategy 2023 to 2028 (LTATS)
sets out how the Council intends to contribute to national transportation objectives
and specifies actions which will achieve objectives that are distinctive to North
Ayrshire.
The strategy upholds the vision that ‘North Ayrshire will have a sustainable and well-
connected transport network that meets the needs of all, supports an inclusive
economy, healthier communities and creates an attractive place in which to live,
work, visit and do business.’ Following this vision, the strategy presents three
strategic priorities: accessibility for all, inclusive economic growth, healthier
communities. This then informs the objectives of the strategy which relate to:
• Access to employment and services
• Reducing emissions
• Active Travel and communities
• Confidence in public transport 
• Transport network condition  
Additional objectives are set for active travel which seek to provide a convenient,
attractive, high quality and safer network to increase the proportion of all journeys
made by walking, wheeling, and cycling within local communities and to key
attractions. Key issues and related actions are outlined within the Delivery Plan,
along with specific proposals in each locality. 
Table 6 of the Transport Evidence Paper summarises other national, regional and
local policies relevant to transport and LDP3, including the Regional Transport
Strategy (RTS). Prepared by the Strathclyde Partnership for Transport and covering
the period 2023 to 2038, the RTS draws upon the Sustainable Travel Hierarchy
principles outlined in the National Transport Strategy and recognises that the delivery
of the RTS must be in collaboration with communities, local authorities, and local
development plans.

Page 140

North Ayrshire’s third Local Development Plan
129
LDP Committee Version
North Ayrshire’s Adopted Local Development Plan (LDP2) was published in
November 2019, so pre-dates the latest National Planning Framework, National
Transport Strategy and Strategic Transport Projects Review, plus local and regional
strategies. Policy 28 states interventions identified in the Irvine Bay Transport Model
Protocol will be implemented at the appropriate time. 
In January 2025, a new Supplementary Street Development Guide was approved.
The guidance supports the National Roads Development Guide in promoting well
designed streets that prioritise place and people over the movement of motor
vehicles. 
Irvine Bay Transport Model Protocol
This protocol was adopted in February 2015 following the adoption of the North
Ayrshire Local Development Plan (LDP1) in May 2014. The purpose of the Protocol
is to achieve a consistent approach to determining planning applications for new
development and/or change of use within Irvine Bay likely to result in a significant
material increase in the volume of traffic on the strategic road network and secure
the timely delivery of transport improvements, as and when needed. The Protocol is
accompanied by a Minute of Agreement. 
At this time it was noted that some £3.5 million (May 2013 prices) strategic road
improvements might be needed within Irvine Bay to support the development,
provided for by the LDP, and to achieve no significant detriment in overall network
performance either individually or cumulatively by that development and it was the
Council’s intention to fund and deliver all the improvements, subject to demonstrable
need. 
Table 2 of the Protocol identifies the location and nature of the strategic road
improvements, as agreed with Transport Scotland. These include an enlarged,
signalised Pennyburn roundabout with slip from the A78(T) to the A738 Kilwinning
Road towards Stevenston.
The point at which particular improvements would be required to address the
cumulative transport impacts of the development, provided for by the LDP, and to
mitigate these impacts to a level acceptable to Transport Scotland and North
Ayrshire Council, is identified as the critical point. In order to establish the critical
point, the Protocol and Minute of Agreement provide for updates to the transport
model on a five yearly basis, or when jointly deemed necessary by North Ayrshire
Council and Transport Scotland. 
The most recent transport modelling exercise was carried out in 2022/23 and
focused on Pennyburn Roundabout. Further details are noted below under ‘Road
Network.’ 
Transport poverty
Transport poverty is defined as the lack of transport options that are available,
reliable, affordable, accessible, or safe, that allow people to meet their daily needs
and achieve a reasonable quality of life. People at higher risk of experiencing
different aspects of transport poverty include those on low incomes; those living in
rural and island communities; disabled people; and women. Transport poverty is

Page 141

North Ayrshire’s third Local Development Plan
130
LDP Committee Version
shaped by the transport system, spatial planning, service provision, and
sociodemographic and household circumstances, and has multiple knock-on impacts
on people's economic activity and education, financial security, social engagement,
access to amenities and services, and health and wellbeing. Evidence from Public
Health Scotland (Transport poverty: a public health issue) indicates a key role for
spatial planning in tackling transport poverty by influencing the availability and
relative location of housing, transport infrastructure, key services, amenities, and
employment opportunities.
Existing Transport Network
Active travel
Data from the Scottish Household Survey 2022 continues to show that North
Ayrshire residents walk as a means of transport less frequently than the Scottish
average. According to the travel diary data:
• 43% of North Ayrshire residents reported that they do not usually walk as a
means of transport, compared to the Scottish average of 36%.
• 22% of North Ayrshire residents walk for transport 1–2 days per week, while
only 30% walk frequently (defined as 3–7 days per week), which is lower than
the national average of 45%.
These figures suggest a continued disparity in walking habits between North Ayrshire
and the rest of Scotland.
In terms of broader active travel trends, data from counters across North Ayrshire
indicate a general upward trend in active travel between 2018 and 2022. Notably,
2020 saw a significant spike in walking and cycling, attributed to the COVID-19
lockdowns, which temporarily altered travel behaviours and increased local use of
active travel infrastructure.
North Ayrshire has nationally recognised long-distance walking routes, including the
Arran Coastal Way and Ayrshire Coastal Path, and an extensive wider network of
core paths developed as part of the Council’s responsibilities under the Land Reform
(Scotland) Act 2003. The expansion of Irvine and Kilwinning as New Towns in the
1960s and 1970s has contributed to a good path network in these towns. 
The Annual Cycling Monitoring Report 2023 indicates that 35% of North Ayrshire
residents have access to one or more bikes for private use, which is below the
national average of 45%. A large majority of areas in the region fall below the
Scottish Government target set out in the Cycling Action Plan for Scotland for 10% of
everyday journeys to be made by bike. 
There are three National Cycle Network (NCN) routes within North Ayrshire:
• NCN7 runs from the border with South Ayrshire through Irvine, Kilwinning and
the Garnock Valley, before continuing north towards Paisley and Glasgow.
• NCN73 connects Kilmarnock to Ardrossan and continues on the Isle of Arran
between the ferry terminals in Brodick and Lochranza.

Page 142

North Ayrshire’s third Local Development Plan
131
LDP Committee Version
• NCN753 is still under development. It runs from Ardrossan northwards along
the coast. Work is ongoing to improve this route and create additional off-road
sections. 
Figure 23 of the Transport Evidence Paper maps the cycle network in North Ayrshire.
Just over half of the total route lengths of National Cycle Network is traffic free
(52%). Sustrans Network Development Plan (NDP) maps are shown at Appendix B
of the Transport Evidence Paper. The maps show the condition of current routes
alongside NDP stage 2 and 3 aspirational routes. 
STPR2 reported that the stakeholders felt that the network generally catered for
leisure and recreational cycling rather than day-to-day commuter cycle trips. There
are missing links in the NCN and Scottish Government Cycle route networks in the
region including along the north coast, north of Ardrossan to Skelmorlie via West
Kilbride and Largs. The standard of carriageway was also identified as a problem, as
well as the absence of (and where they do exist, the standard of) footways. 
Data from the Scottish Road Maintenance Condition Survey (SRMCS) reported in
2025 shows that North Ayrshire Council (NAC) achieved an overall RCI score of
30.6, ranking 9th equal out of Scotland’s 32 local authorities. This marks a significant
improvement from previous years, including 2017 when NAC had the highest
proportion of Rural A roads classified as red at 11.0%, compared to 7.3% in South
Ayrshire and 2.1% in East Ayrshire. This may be a factor in wider safety concerns
cited by cyclists.
In addition to forming part North Ayrshire’s transport infrastructure, formal and
informal active travel networks form an important component of the area’s blue green
infrastructure, delivering cultural ecosystem service functions relating to recreation
and health and wellbeing. Connecting people and places is central to many policies
areas, including local living, open space, green networks, and active travel). It is also
a key aim of Nature Networks, creating scope to integrate and align implementation
mechanisms to achieve multiple policy outcomes benefiting people and place. 
Bus
The main bus operating companies in North Ayrshire include McGill’s, Stagecoach,
Shuttlebus and SPT’s MyBus. Commercial services are mapped at Figure 24 of the
Transport Evidence Paper. Notable key bus services include: 
• Stagecoach service 11 connecting Ardrossan, Saltcoats and Stevenston to
Kilwinning, Irvine and Kilmarnock. 
• Stagecoach Service 585 serving the Ayrshire coast from Largs, through West
Kilbride, the Three Towns and Irvine, and towards Prestwick and Ayr. 
• McGill’s Buses’ Clyde Flyer services (901 and 906) between Largs and
Glasgow, via Inverclyde, and their 904-service connecting Largs with the
Garnock Valley and Paisley.
Additional services are provided by Shuttle Buses, which operate smaller vehicle
services between Kilwinning, Irvine and surrounding areas, and also the Largs

Page 143

North Ayrshire’s third Local Development Plan
132
LDP Committee Version
circular service. Ardrossan, Kilwinning and Irvine is a key bus corridor which
experiences delays at peak times, including the high frequency Service 11. 
Data from the Scottish Household Survey in 2019 shows that the proportion of adult
residents in North Ayrshire who did not use bus in the month before the survey was
58%, slightly lower than that for Strathclyde (62%). Almost 20% of respondents travel
by bus at least twice a week [Figure 25]. The LTATS, and the accompanying public
consultation, summarises the decline in bus services in North Ayrshire in recent
years. In general, the bus network in North Ayrshire has contracted and issues with
availability of bus service routes, reliability, frequency, and operating times were
identified through the public consultation for the new LTATS. The key findings from
LTATS are as follows: 
• A lack of bus services impacts people’s ability to access key services without
using a car, particularly in rural areas. 
• There is a significant reliance on subsidised bus services to meet residents’
travel needs. 
• Service frequencies were reduced during the Covid-19 pandemic, and many
have not been restored to previous levels. 
The Scottish Access to Bus Indicator (SABI) for North Ayrshire shows that there are
areas where there is low access to bus services (outwith larger settlements such as
in Dalry, Largs, and West Kilbride) [Figure 26]. 
Bus stop locations and frequencies in vehicle per hour (vph) in the AM peak are
shown in Figure 27 and Figure 28. The data shows that bus frequencies are the
greatest along the route via Irvine-Kilwinning-The Three Towns. Kilbirnie to Beith
route and Largs have some bus stops with 2 to 5 buses an hour. 
Further accessibility analysis has been undertaken to determine the population
within 800m catchment of bus stops. The results show that around 93% of North
Ayrshire population are within the catchment of a bus stop. The Case for Change for
SPT Regional Bus Strategy presents bus stops analysis based on urban/rural
classification. This analysis shows that 18% of households in North Ayrshire do not
have access to a bus stop (under defined walk catchments). 
Of all local authorities in SPT region, North Ayrshire has the highest percentage of
households with convenient access to a bus stop but no direct connection to
Glasgow city centre by bus in the interpeak period (12:00 to 16:00) at 73%. This
proportion reaches 100% during the evening period (19:00 to 23:00). The Council
also has 20% of households with no access to a bus on a Sunday, which is the
highest of all local authorities.
Rail
North Ayrshire has 12 rail stations, situated on the Glasgow to Ardrossan/Largs
and/or Glasgow to Ayr lines. These offer regular connections within North Ayrshire
and onwards to Glasgow and Ayr. The rail network for most of the area is considered
to be good, with high frequency services to/from Irvine and Kilwinning to Glasgow,
and less frequent services on the Ardrossan and Largs lines.

Page 144

North Ayrshire’s third Local Development Plan
133
LDP Committee Version
Scotrail ticket sales data report approximately 2.7 million passengers in North
Ayrshire for the year 2023-24. This is around 85% of the pre-pandemic usage (2019-
20). Kilwinning and Irvine stations are the busiest of all stations in North Ayrshire,
receiving more than half a million passengers per year. Glengarnock and Saltcoats
also attract more than 250,000 passengers annually. As per Office of Rail and Road,
Glasgow Central is the origin or destination for the majority of trips (around 50%)
from all stations. 
The Scottish Household Survey indicates the proportion of the adult residents who
did not use a train in the month before the survey in 2019 was slightly lower than that
for Strathclyde. More than one third of the residents used a train once or twice a
month compared to a quarter doing the same in Strathclyde. STPR2 shows that
there are a number of deprived data zones where residents are unable to access a
rail station, based on a walk time of up to 30 minutes. This includes people residing
in Dreghorn, Kilbirnie and Beith. It is also to be noted that in parts of the region
where people can access rail stations within a 30-minute walk, frequency of services
are often low.
Ferry
Ferry services are an essential part of North Ayrshire Council’s transport network.
Arran and Cumbrae are reliant upon its ferry services to transport residents and
visitors to and from the islands and to access medical and social services, to visit
family and friends and for leisure purposes. Each day, the ferries are assessed to
contribute just under £170,000 to Arran’s economy.
Transport Scotland is responsible for the provision of ferry services in North Ayrshire.
The ferry services in North Ayrshire are part of the Clyde and Hebrides network and
are operated by CalMac Ferries Ltd, with Caledonian Maritime Assets Ltd (CMAL)
managing the port infrastructure.
There are five ferry terminals within North Ayrshire:
• Ardrossan and Largs on the mainland
• Brodick and Lochranza on Arran
• Cumbrae Slip on Great Cumbrae
The main ferry routes in North Ayrshire are:
• Ardrossan – Brodick 
• Ardrossan – Campbeltown (summer only) 
• Largs – Cumbrae 
• Lochranza – Tarbert (summer only)
• Lochranza – Claonaig 
The Campbeltown-Ardrossan crossing did not operate during the summer 2025
timetable period due to the lack of an available vessel to deliver the service, while
Troon continues to be used for some crossings to Brodick while improvements to the
port at Ardrossan are required to serve new ferries.

Page 145

North Ayrshire’s third Local Development Plan
134
LDP Committee Version
In 2023, CalMac Ferry carried over 1.5 million passengers and around 0.43 million
vehicles including cars, coaches and commercial vehicles on North Ayrshire routes
[Table 13], with similar numbers on both the Ardrossan-Brodick and Largs-Cumbrae
Slip services, with the exception of commercial vehicles; over 8,600 commercial
vehicles used the Ardrossan-Brodick route, double the number that travelled
between Largs and Cumbrae. 
Ferry connectivity, reliability, and capacity are identified as key issues, particularly for
our island communities. STPR2 reports capacity issues on the Arran ferry, given the
increased car traffic experienced on the route since the introduction of the Road
Equivalent Tariff (RET) which has reduced deck capacity for other users including
residents, making it more difficult to access the island, particularly during peak
periods. An evaluation on the impact of RET on Arran highlighted that the Ardrossan
– Brodick route was beginning to experience vehicle deck capacity issues on peak
sailings, with 26% of all sailings in 2015-16 having a car deck utilisation of greater
than 80%. In addition, the number of cars carried on the Ardrossan – Brodick route
increased by 34% between 2008-2018 and by 18% on the Largs – Cumbrae route
over the same period. 
The vehicle deck capacity utilisation on the Ardrossan – Brodick route was
forecasted at 67% for 2022. Where routes experience vehicle deck capacity
utilisation of between 50% and 70% full sailings are even more frequent and some
customers may find that their choice of available sailings is limited. Some customers
may choose not to travel as a result; however, volumes are not considered
significant. On routes experiencing vehicle deck capacity utilisation above 70%, of
which there are several, full sailings are a regular occurrence, and an increasingly
significant number of customers choose not to travel as alternative sailing times are
not suitable. In some cases, customers may displace to another route if an
alternative is available.
Transport Scotland’s Islands Connectivity Plan – Strategic Approach presents the
following challenges: 
• Annual operating costs on Clyde and Hebrides Ferry Service (CHFS)
increasing at the greater rate than revenue, resulting in the deficit between the
operational costs and income from ferry fares almost doubling over the last 10
years. This deficit has been met by increasing Government grant payments;
• Demand for vehicle ferries has increased significantly, with 40% increase in
car carryings between 2013 and 2019;
• Shortage of vehicle space on key routes, including Ardrossan-Brodick,
meaning people cannot travel by ferry with their car at short notice; 
• An increase in cancellations and delays on the CHFS network. This has been
linked to worsening weather and an overstretched fleet;
• A lack of spare vessels to cover for breakdowns.
The LTATS, and the accompanying public consultation, also notes concerns with the
reliability and resilience of ferry services. Figure 35 in the Transport Evidence Paper

Page 146

North Ayrshire’s third Local Development Plan
135
LDP Committee Version
shows that over the last decade reliability of services has been decreasing, and the
actual reliability has also been lower than the contractual reliability expectations.
Many Scottish ferries are ageing, and some are overdue for replacement, which has
contributed to the breakdowns and longer repair times. Many ferry ports are also in
need of major renewal or replacement works. In January 2025, the MV Glen Sannox
came into service, but runs from Troon to Brodick rather than Ardrossan as
refurbishment of the Ardrossan port is required. The intention is to reduce the
average age of the fleet to around 15 years by the end of the decade and also retain
a major CHFS vessel to provide resilience.
Public transport integration
At October 2019, of the 10 ferry services operating between Ardrossan and Brodick
each day, analysis showed that there is a wait time greater than 20 minutes between
train arrival and ferry departure for 8 out of 10 services. Similarly, 8 out of 10
services involve a wait time of greater than 20 minutes when departing via train from
Ardrossan Harbour. 
Integration of ferries with other modes of public transport is particularly challenging
when one mode is disrupted by weather or breakdown. This makes travel by ferry
more difficult for people who do not have access to a private vehicle, or who would
prefer to travel without one. Table 14 of the Transport Evidence Paper shows public
transport connections at ferry terminals. The available bus services can be accessed
from the nearest bus stops to each ferry terminal in North Ayrshire, except for
Ardrossan ferry terminal where there is a seven-minute walk to the nearest bus stop.
Road network
North Ayrshire has three major trunk roads managed by Transport Scotland. The A78
follows the west coast between Inverclyde and South Ayrshire, while the A737/A738
runs north-south through the Garnock Valley, connecting to Renfrewshire to the
north, joining the A78 at Kilwinning. North Ayrshire Council is responsible for the
management and maintenance of all other public roads. Other key routes in North
Ayrshire include:
• A738 connecting Ardrossan, Saltcoats, Stevenston
• B714 connecting Dalry to Saltcoats
• A760 connecting Largs and Lochwinnoch, via Kilbirnie. This is a major tourist
route for travellers driving from Glasgow to Largs, and the ferry service to
Millport.
• A841 connecting the ferry terminals at Brodick and Lochranza, and serving
Lamlash and Whiting Bay, making it a key route for tourism on Arran.
• A71 connecting Irvine to Kilmarnock and onwards to the M77/Glasgow
Table 15 of the Transport Evidence Paper provides a breakdown of the type of roads
and respective lengths (km) in North Ayrshire. There is no trunk motorway in the
Council area and 6% of its total road-km are trunk A roads. More than half of the
roads are unclassified which is slightly higher than national average (48%).

Page 147

North Ayrshire’s third Local Development Plan
136
LDP Committee Version
Figure 36 shows that vehicle traffic has been on an upward trend between 2013 and
2019. Following the significant drop in traffic during the Covid 19 pandemic, it is back
to nearly pre-pandemic level. Annual Average Daily Traffic (AADT) based on
Transport Scotland’s Drakewell counter sites data for 2024 and DfT sites data for
2023 are presented in Figure 37 to Figure 39. 
Capacity constraints on the strategic road network, leading to congestion, is
highlighted as an issue in some locations, including the A737 at Kilwinning. This has
been identified as a pinch point on the road network. With regards to the A737,
congestion and delay was identified at two key locations in a 2016 study: in
Kilwinning at the junction of the A737/A738 and on the A738 approach to the A78
Pennyburn Roundabout. Queues of over 200m were recorded in the morning period
and queues of over 600m were recorded in the evening period on the A738
southbound approach to Pennyburn Roundabout. Stakeholders also noted that the
A737/B714 is a key link between North Ayrshire and Glasgow, but these are single
carriageway roads; thus, making the A71/A77/M77 route more attractive.
Data from the Transport Model for Scotland (TMfS14) further shows road network
constraints and potential areas of congestion based on the volume of traffic and road
capacity. Locations with the highest volume capacity ratios were generally recorded
in urban areas such as Ardrossan, Saltcoats, Stevenston, Kilwinning, and Irvine.
Data also shows that traffic levels are forecast to increase in the future; should these
increases become reality then capacity constraints and congestion identified by
stakeholders are likely to be exacerbated.
Capacity issues have been identified at some locations based on traffic data from
online mapping sources. The Strathclyde Regional Transport Model was inspected
for delays at these locations. Appendix C of the Transport Evidence Paper presents
the AM and PM peak delays for forecast year 2025. The following locations were
identified to have some capacity issues: 
• Pennyburn Roundabout: Typical PM peak traffic shows capacity issues with
long queues on the A738 arm from Ardeer Roundabout and the A78 West
arm. 
• A78 south of Seamill: Parking on the verge combined with speed reduction
signs result in slow moving traffic.
• Warrix Interchange: Slow moving traffic on the A78 SB off-slip during AM peak
hour.
• Stanecastle Roundabout: Slow traffic at the Long Rd and Middleton Rd
approaches during peak hours due to higher volume of traffic within the large
circulatory.
• A738 Stevenston Rd/Whitehurst Park Junction: Delays at peak period due to
capacity. 
• A738 Kilwinning: This is a busy road with congestion and slow-moving traffic
during morning and evening peak periods.

Page 148

North Ayrshire’s third Local Development Plan
137
LDP Committee Version
• A738 south of Dalgarven: Slow moving traffic and occasional queues due to
bendy road and speed reduction sign in Dalgarven.
Microsimulation testing around the A78 Pennyburn Roundabout was undertaken in
2022 in relation to local issues egressing from the Hawkhill retail park on the A738,
adjacent to the A78 Pennyburn Roundabout. The study also sought to understand
the impact of future development on the trunk road. The study adopted a Paramics
Discovery microsimulation model of the junction, developed as part of a feasibility
study for a proposed bus lane on the Stevenston Road approach to Pennyburn
Roundabout in 2021, and being the latest and most up to date model available.
The Pennyburn Roundabout Impact Testing Report was finalised in February 2023
and identifies that both LDP2 allocations and the West Byrehill development in
isolation are expected to result in a material impact on the operation of the A78
Pennyburn Roundabout that would indicate a requirement for mitigation. 
North Ayrshire Council is responsible for 874km of roads and 1,015 km of footways
and footpaths. The condition of the network is managed through NAC’s Roads
Assessment Management Plan (RAMP). The RAMP sets out the Council’s approach
to the management and maintenance of its road assets. Local authority road network
condition is assessed via the Scottish Road Maintenance Condition Survey. The
percentage of North Ayrshire roads that are in ‘red’ condition is in line with those in
Scotland. However, a greater percentage of C roads in North Ayrshire are in ‘amber’
condition compared with Scotland [Table 16]. 
The overall condition of the network is measured by the Road Condition Index (RCI),
produced from the annual Scottish Road Maintenance Condition Survey. North
Ayrshire has an improved overall RCI but is above the Scottish average over the
period 2017-19 to 2021-23 [Table 17]. The RCI is derived by adding the lengths of
road categorised as ‘red’ and ‘amber’ together and expressed as a percentage of the
overall network. The higher the RCI, the worse the road condition. A year-on-year
increase in the RCI would indicate deterioration, whilst a decrease indicates
improvement.
The Transport Evidence Paper shows the location of Traffic Regulation Orders
(TROs), which impose traffic restrictions such as road closures, introduction or
varying of speed limits, prohibition of turns (such as right turns and U-turns) and
introduction of waiting or loading restrictions [Figure 40] and Traffic Sensitive Roads
– road with restrictions for road works which are applied according to various
categories [Figure 41].
Parking
The Council operates a number of short stay and long stay parks, with parking
charges only applying at the Seafront and Bellman’s Close car parks in Largs. North
Ayrshire Council introduced the Decriminalised Parking Enforcement (DPE) scheme
on 3 November 2023. DPE is the process the council uses, under the Road Traffic
Act 1991, to enforce on-street parking restrictions and off-street parking in Council
owned car parks. Parking Penalty Charge Notices have been issued for illegal
parking from April 2024.

Page 149

North Ayrshire’s third Local Development Plan
138
LDP Committee Version
Strathclyde Partnership for Transport provides 'Park and Ride' at rail stations across
North Ayrshire. Table 12 of the Transport Evidence Paper below shows the number
of parking places at each station. Kilwinning, Irvine, Saltcoats and Glengarnock,
being the busy stations provide over 100 spaces for cars. Kilwinning offers the most
with 332 spaces, followed by Saltcoats at 155 spaces.
There is no recent data available on car park occupancy level at these stations. 2014
data from a park and ride survey undertaken by SPT shows that the majority of the
stations had an average car park space occupancy between 80-100%, except Largs
and Saltcoats with 55-65% average occupancy level. It is to be noted that rail
patronage level and the number of parking spaces have increased since that survey.
Electric vehicle infrastructure
Electric Vehicle (EV) charging locations across North Ayrshire are predominately
located in Irvine, the Three Towns and Largs, but there are also charging points
located in other towns within the mainland as well as in Brodick, Lamlash and
Millport [Figure 44]. The Council’s Electric Vehicle (EV) Strategy sets a priority to
‘develop a network of strategically located EV charge points.’ 
Supported by Scottish Future’s Trust and Transport Scotland, East, North and South
Ayrshire Council are working in partnership to deliver the EV infrastructure needed to
support future uptake of EVs across Ayrshire. The project was awarded £2.8million
through Transport Scotland’s Electric Vehicle Infrastructure Fund for the installation
of approximately 307 EV charge points across 270 locations via a Concession
Contract. An indicative scope and timetable for the project anticipates awarding of
the contract in February 2026 with a three-year installation period.
In terms of the number of Ultra Low Emission Vehicles (ULEVs) in North Ayrshire,
levels are relatively low at 9.74 ULEVs per 1,000 people compared to the Scotland
average of 16.65 ULEVs per 1,000 people.
Road safety
High volumes of traffic make roads unsafe for active mode users. Rural areas are
more prone to fatal accidents than urban areas. There were 17 fatal accidents in
North Ayrshire during the 5-year period June 2017 to 2024, including one fatal
accident in the Isle of Arran. Almost all of the fatal accidents were reported on single
carriageway roads (three of which are on trunk roads) and seven accidents were
reported on B-roads [Figure 45 and 46].
Freight
The SPT Freight Strategy identifies the A71, A78 and A737 as key routes for road
freight in North Ayrshire and DfT data analysis of LGV and HGV counts [Table 21]
shows that the A738 to Ardrossan (24.5%), A737 between Dalry and Beith (12.5%)
and A760 Largs Road carry the highest proportion of HGVs.
Timber is a strategically important export for Scotland, with a bulk of timber
production coming from heavily forested regions including Ayrshire and Arran. The
overall timber availability figures for Ayrshire and Arran are forecast to be about
136,000 tonnes per annum between 2025 and 2034. Key timber extraction roads in
North Ayrshire include the A841 and B880 ‘String Road’, both on Arran.

Page 150

North Ayrshire’s third Local Development Plan
139
LDP Committee Version
North Ayrshire does not have any airports; however, Glasgow Airport and Glasgow
Prestwick Airport are the two freight hubs in the region. Hunterston provides a deep-
water seaport, with the capability of acting as a major freight hub, accommodating
shipments of a range of commodities.
Travel behaviour
Car ownership in North Ayrshire is generally in line with national averages [Figure
10]. 27% of households in North Ayrshire do not have a car, compared to 31% of
households across the Strathclyde region and 28% of households in Scotland.
Households with no access to cars are concentrated in the towns, especially Irvine,
Kilwinning and The Three Towns. Some data zones have over 60% of households
with no cars in Irvine and Ardrossan [Figure 11]. 
The Scottish Household Travel diary 2019 shows that over half of all trips in North
Ayrshire are made for commuting and shopping. These are followed by ‘visiting
friends’ and ‘going for a walk’ which account for 11% and 9%, respectively. 68% of
people use cars as their mode of travel, which is slightly higher than that for Scotland
(65%). Use of public transport as the main mode of travel in North Ayrshire is
comparable to the national average. A slightly lower percentage of people walk in the
area (19%) than the national average (22%) [Figures 14 and 15]. 
Travel to work (TTW) data from the same sources indicates active travel is used by
10% of people as their usual method of travel, which is lower than the national
average of 15%. Public transport and shared mode use for TTW are comparable for
North Ayrshire and the whole of Scotland. Car trips dominate TTW with a greater
percentage for the council area (73%) than the national average (68%) [Figure 16]. 
More than half of residents work within the council area. The Glasgow City Council
area is the top destination for work outside the council area with 12%, followed by
East Ayrshire at 9% and South Ayrshire and Renfrewshire at 8%. North Ayrshire
Council received commuters mainly from East and South Ayrshire, Renfrewshire,
and Glasgow City Council area [Table 9 and Figure 17].
A greater proportion of commuters living in North Ayrshire travel longer distances
compared to Scotland. 36% of commuter travel is more than 10km, which is much
greater than the national average, 25%. The biggest difference was observed for
trips between 30-40km, with North Ayrshire at 15% compared to the national
average of 7%. In terms of mode of travel to work at a data zone level, a greater
level of public transport use was observed in and around the town centres. Few data
zones in The Three Towns, Irvine and Kilwinning show a lower proportion of car trips
at around 40-45% [Figure 18, 19 and 20].
Connectivity and accessibility analysis
Strathclyde Partnership for Transport (SPT) has undertaken connectivity analysis to
assess transport connectivity within the region, considering connectivity to and of the
transport network to create strategic and local connectivity scores [see Section 4.6 of
the Transport Evidence Paper]. The connectivity index map in Figure 42 shows that
a vast majority of the Council falls under the ‘low’ strategic connectivity index
category. Kilwinning, some parts of Irvine, Dalry and the Three Towns scored

Page 151

North Ayrshire’s third Local Development Plan
140
LDP Committee Version
’medium’ on the index. In terms of local connectivity, all the mainland localities have
‘high’ connectivity index, at least in some areas. Rural areas including Isle of Arran
are scored as having low connectivity. 
North Ayrshire Council has also developed a 20-minute neighbourhood assessment
methodology which calculates accessibility to food and drink outlets, open space,
health care facilities, and schools [see Liveable Places schedule].
Environmental considerations
The Transport Evidence Paper includes information on transport emissions, road
noise, and air quality. North Ayrshire per capita transport emissions are lower than
that of East and South Ayrshire as well as for Scotland. The air quality is good,
maintaining a ‘low’ AQ index. The PM10 and NOx concentration levels are higher in
the towns along the A78 corridor, i.e. Irvine, and the Three Towns. However, the 24-
hour max PM10 concentration at the Irvine monitoring site did not exceed the
threshold limit (40µg/m3) for one day in 2023. CO2 emissions from transport in North
Ayrshire have declined over the years but still represent 22% of all GHG emissions. 
Network resilience
The resilience of the A78 is highlighted as in issue in the STPR2. The number of
incidents recorded on the route totalled 788 between 2015 and 2018, equating to
almost 30% of incidents recorded on Ayrshire & Arran’s trunk road network, with
around 7% of the incidents associated with flooding. Closure of the A78 has an
adverse impact on local residents given it is the only direct coastal route connecting
settlements such as Largs and Skelmorlie, with diversionary routes increasing
journey times by around 55 minutes.
Flooding and inadequate sea defences were also noted as impacting network
resilience, particularly on the railway between Saltcoats and Stevenston. 
The resilience of the ferry service is also a key issue for island life in North Ayrshire.
During the period September 2019 to August 2020, 12.8% of scheduled sailings
were cancelled between Ardrossan and Brodick; with the highest percentage
(38.1%) recorded in February 2020. 
Future Transport and Development Schemes
Committed and planned future transport schemes and development in North Ayrshire
require to be taken account of in the development of LDP3. 
Committed Development
The upgrading of the B714 has been approved as part of a successful North Ayrshire
Council joint funding bid to the UK Government's Levelling Up Fund. The B714 links
the trunk road network from the A78 Sharphill roundabout (Three Towns bypass) to
the A737, south of Dalry. It is a vital link for road users travelling to the west coast
and ferry links to Arran and Cumbrae. The scheme will be delivered in two phases.
Construction of Phase 1 is anticipated to commence in January 2026, with an 18-
month build. Phase 2 is a longer-term aspiration with funding still be secured.

Page 152

North Ayrshire’s third Local Development Plan
141
LDP Committee Version
The Transport Evidence Paper records future structural maintenance works and
strategic road safety schemes. 
Planned strategic transport schemes
Following the Dalry Bypass and Den realignment, further improvements to the A737
are in preparation. The A737 Improvements at Beith scheme involves the
construction of a new single carriageway incorporating two new roundabouts and a
dedicated northbound overtaking opportunity to the east of Beith. The proposals will
improve safety for all road users by improving the geometry of the existing A737. To
promote active travel the scheme also includes a non-motorised user facility and
incorporates a dedicated footbridge to provide safe crossing of the trunk road for
pedestrians and cyclists. It is understood there is currently no funding identified to
progress the scheme. 
Significant infrastructure improvements at the Ardrossan Harbour terminal are
required to accommodate a new vessel, which will operate on the Ardrossan to
Brodick route and provide improved service reliability and resilience. The Ardrossan
Harbour Task Force is a longstanding group coordinated by Transport Scotland and
co-chaired by the Cabinet Secretary for Transport and Leader of North Ayrshire
Council.
The remit of the group is to improve the operational effectiveness of Ardrossan
Harbour in supporting the lifeline ferry services and the new vessel on the Arran
route.
The Local Transport and Active Travel Strategy sets out aspirational infrastructures
to promote active travel across North Ayrshire. These routes should be considered
for the development and appraisal of sites. The infrastructure aspirations are
presented at Section 5.6 of the Transport Evidence Paper.
The preparation of LDP3 and its transport appraisal will also take account of all
committed development. The delivery of the Adopted Local Development Plan
(LDP2) is monitored through the annual Housing Land and Employment Land Audits
and the Delivery Programme, providing an overview of committed development
within the plan area. The 2025 Draft Delivery Programme reports on the
development of the Strategic Development Areas set out by LDP2 and the status of
allocated sites included within Schedules 2-5 of the plan. The land audits also record
‘windfall’ (i.e. non-allocated) sites. 
Summary of Stakeholder Engagement
North Ayrshire Council has appointed SYSTRA Ltd. to support the preparation of
LDP3, including at the Evidence Report stage, by compiling the transport evidence
baseline (Transport Evidence Paper). Engagement with Transport Scotland has
taken place throughout this process and has informed the scope and content of the
Transport Evidence Paper and the preparation of the Evidence Report.

Page 153

North Ayrshire’s third Local Development Plan
142
LDP Committee Version
On 12 November 2025, Transport Scotland confirmed that it is satisfied with the
sufficiency of the transport evidence. Correspondence with Transport Scotland and
how this has been taken into account is detailed in the Record of Engagement.
Through the process of engagement with Transport Scotland, their Development
Management team have indicated that they have significant concerns with regards to
the issues around development impacts on A78 Pennyburn Roundabout and are not
comfortable that the suggested way forward – to review the Irvine Bay Transport
Model Protocol as part of the LDP3 transport appraisal (set out in the summary of
implications for the Proposed Plan) – will satisfactorily address these. Further clarity
and explanation have been sought on the implications of updating the Protocol and
the need to mitigate development impacts at Pennyburn required sooner rather than
later. 
The Council views this as a related – but separate – matter to the sufficiency of the
evidence and, in respect to Section 16B(8) of the Act, whether the Evidence Report
contains sufficient information to enable the planning authority to prepare a local
development plan. Transport Scotland’s concerns are interpreted to centre on the
Council’s intentions regarding its obligations under the Protocol and the timing of any
transport interventions at Pennyburn. 
Stakeholder engagement was undertaken with a range of transport providers and
stakeholders – in addition to Transport Scotland – by SYSTRA of behalf of the
Council in the preparation of and to inform the Transport Evidence Paper. Section 6
of the Transport Evidence Paper summarises this stakeholder engagement. Included
is this engagement were: Strathclyde Partnership for Transport (SPT); neighbouring
road authorities – particularly on cross boundary transport issues relating to the
strategic and local network including on active travel, public transport, and roads;
and public transport service providers and infrastructure operators.
The Transport Evidence Paper also takes account of the engagement carried out
during the preparation of the Local Transport and Active Travel Strategy. 
Wider place-based engagement with local communities has been focused on the
‘Your Place Survey’ and engagement on the ‘Place Profiles.’ Based on the Place
Standard, the Your Place Survey asked respondents to consider how easy it is to
move around and get to where they want to go; what public transport was like; and
how traffic and parking affect how they move around. The Place Profiles present an
overview of active travel and public transport in each locality, in addition to car
ownership and road safety. Engagement following the publication of the profiles,
including public ‘drop-in’ meetings, focused on the needs and wants of communities.
Furthermore, in early 2024, North Ayrshire Council (NAC) commissioned a study of
the opportunities to develop community transport across the local authority area. The
study assessed existing public transport coverage and established community
transport services, currently operating on Arran and in the Garnock Valley, and
carried out public and stakeholder engagement to determine the impacts of poor

Page 154

North Ayrshire’s third Local Development Plan
143
LDP Committee Version
transport on the community and identify how further community transport services
could better support travel needs. 
In the Garnock Valley, a Travel Needs Analysis has been undertaken. This takes into
account the views of over 550 people who responded to a survey in autumn 2024
about how they travel around and beyond the Garnock Valley and highlights how
travel affects everyone's lives across the Garnock Valley. The analysis will inform the
Garnock Valley Place Plan. The importance of accessibility for our island
communities is reflected in the priories set out in Local Islands Plans for Arran and
Cumbrae. 
Key points – including cross-boundary issues – emerging from the wide range of
primary and secondary engagement undertaken include:
• Capacity issues are identified in specific locations, both within and out with
North Ayrshire. 
• Many rural communities and residents of smaller towns feel isolated in
transport terms, with residents experiencing difficulties in accessing
employment and key services such as education, healthcare, and retail by
public transport. This is keenly felt in the Garnock Valley. 
• The reliability of the Arran ferry service, upon which Arran is highly
dependent, is a major issue for islanders. The Isle of Arran Local Island Plan
provides an insight into the scale and variety of the impact an unreliable ferry
service has on the island. Island accessibility is also an issue for Cumbrae.
Fleet replacement and renewal is underway but must be matched by pier and
harbour infrastructure renewal. 
• The active travel network in North Ayrshire is identified as fragmented,
especially within the North Coast and Garnock Valley localities where there
are gaps and an absence of off-road routes. Existing routes are viewed in
many places as more appropriate for leisure, rather than commuting. 
• The Council’s geography is considered a constraint resulting in the lack of
transport choices for cross boundary movements and is also a factor in the
resilience of the transport network.
• There is a perceived lack of integration between different modes of transport,
including active travel routes, and with public transport services, including
ferry services. 
• Parking is regularly raised by residents and traders as an issue within town
centres. Local Place Plans for West Kilbride and Largs, for example, propose
the provision of additional parking. Improvements have been noted following
the implementation of decriminalised parking enforcement (DPE).

Page 155

North Ayrshire’s third Local Development Plan
144
LDP Committee Version
Summary of Implications for the Proposed Plan 
Our view on what this evidence and stakeholder engagement means for LDP3 is
summarised below. 
Spatial strategy 
The overall policy context for transport can be summarised as reducing the need to
travel unsustainably. LDP3’s spatial strategy must reflect the sustainable travel
hierarchy and sustainable investment hierarchy, promoting and facilitating
sustainable travel modes, starting with walking, wheeling, and cycling, and making
better use of existing infrastructure and services. 
A place-based approach should be adopted aimed at reducing car-dominance and
enabling a positive impact on the choices made by people about the types of
journeys they make and when and how they make them. The type, mix and use of
development; local living and 20-minute neighbourhood analysis; car ownership
levels; the accessibility of proposals and allocations by sustainable modes; network
resilience and the accessibility for users of all abilities should all be considered in
defining the locations for future development. 
In doing so, this will contribute to limiting LDP3’s environmental impact, particularly in
relation to air quality, noise, and greenhouse gas emissions. 
Early and effective engagement with public transport operators will be important as
the spatial strategy is progressed and development sites identified to consider how
development can be better served by buses and, potentially, the rail timetable. 
Transport appraisal
LDP3 must be informed by evidence of North Ayrshire’s transport infrastructure
capacity and an appropriate and effective transport appraisal of the proposed spatial
strategy, undertaken in line with the relevant transport appraisal guidance. We are
committed to producing a transport appraisal of the Proposed Plan and have
retained SYSTRA Ltd. to continue engagement with Transport Scotland on North
Ayrshire Council’s behalf on the appraisal as the plan progresses. 
As set out in the Transport Evidence Paper, the appraisal and its outcomes are
required to adopt the Infrastructure First principles focusing on the existing
infrastructure and prioritise sustainable travel consistent with the sustainable travel
and investment hierarchies. An approach for a proportionate, multi-modal transport
appraisal is proposed within the Evidence Paper; however, the view of Transport
Scotland is acknowledged that any methodology is speculative at this stage and may
change depending on any potential spatial strategy options. 
It is also noted that the Development Planning and Management Transport Appraisal
Guidance (DPMTAG) has been replaced by the Development Planning Transport
Appraisal Guidance (DPTAG), published on 2 October 2025. This guidance will
inform our approach to transport appraisal.

Page 156

North Ayrshire’s third Local Development Plan
145
LDP Committee Version
Following submission of the Evidence Report to Scottish Ministers – and only after
report has been assessed as sufficient – we will instruct SYSTRA to engage with
Transport Scotland to reach an agreement on transport appraisal tools and
methodology, scope, reporting and requirements, in line with ‘Appraisal Levels’ set
out in DPTAG. 
Subject to submission date, the Gate Check period and approval, this is expected to
commence in April 2026. A detailed programme for the preparation of LDP3 and the
associated workstreams, including the Transport Appraisal, will be confirmed
following approval of the Evidence Report. 
A call for sites has already been undertaken by the Council, during summer 2025.
We are currently sifting these sites and will engage with Transport Scotland in
relation to potential cumulative and site-specific impacts and to discuss spatial
strategy options. 
Capacity constraints 
Capacity constraints on the strategic road network are highlighted as an issue in
some locations, including the Pennyburn Roundabout at Kilwinning, which has been
identified as a pinch point on the road network subject to congestion and delays and
was subject to transport modelling most recently in 2022/23. The impact of the
spatial strategy and allocated development sites on the strategic (trunk) road
network, in consultation with Transport Scotland, must be assessed as part of the
transport appraisal. 
Where targeted infrastructure improvements are agreed as necessary to facilitate
development, LDP3 and the associated Delivery Programme must set out how and
when new infrastructure is delivered, in accordance with the infrastructure first
approach. 
Irvine Bay Transport Model Protocol 
The Irvine Bay Transport Model Protocol was developed by the Council in 2015 to
mitigate potential congestion impacts arising from developments identified in the first
Local Development Plan (LDP1), should these be found to occur. This approach was
informed by transportation studies in 2012/13. The protocol is referenced within
LDP2.
The preparation of LDP3 and the associated transport appraisal presents an
opportunity to review the protocol – in consultation with Transport Scotland – in the
context of existing and proposed development and transport schemes, including the
upgrade to the B714 (which is expected to affect traffic flows at Pennyburn
Roundabout), current transport policy and aspirations to reduce demands for
unsustainable travel including the commitment to reduce car use. Accordingly, we
anticipate the detail and requirements of the protocol to fall within the scope of the
LDP3 transport appraisal.

Page 157

North Ayrshire’s third Local Development Plan
146
LDP Committee Version
Transport Scotland’s concerns regarding the Pennyburn Roundabout and the
Council’s intentions are noted. It is expected the implications of reviewing the
Protocol as part of the LDP3 transport appraisal are that an agreement between
North Ayrshire Council and Transport Scotland can be reached on: 
a) the detail of the mitigation required to address cumulative transport impacts to
an acceptable level (considering impacts from, existing/current development,
any potential future development and transport policies), which may be
different to those identified by the Protocol in 2013;
b) The potential for alternative funding sources/mechanisms to deliver required
improvements
The requirement for the Protocol to remain in place and the scope to incorporate the
details within LDP3 and its Delivery Programme can also be considered. 
Statements of Agreement / Dispute 
Transport Scotland confirmed that it is satisfied with the sufficiency of the transport
evidence.
Homes for Scotland, on review of the Draft Evidence Report, highlighted two points
relating to the transport evidence. These are addressed in the final report.
Otherwise, Homes for Scotland, does not dispute the evidence set out in this
schedule. 
Links to Evidence
1) SYSTRA for North Ayrshire Council, Transport Evidence Report (January 2025)
2) National Transport Strategy 2
3) Strategic Transport Projects Review
4) Scotland’s Climate Change Plan update
5) Transport Scotland, ‘Reducing car use for a healthier, fairer and greener
Scotland’: A route map to achieve a 20 per cent reduction in car kilometres by
2030 (January 2022)
6) North Ayrshire Council, Local Transport and Active Travel Strategy (LTATS),
2023-2028
7) Strathclyde Partnership for Transport, ‘A Call to Action: The Regional Transport
Strategy for the west of Scotland’ 2023-2038
8) North Ayrshire Council, Irvine Bay Transport Model Protocol
9) North Ayrshire Council, Supplementary Street Development Guide 
10) Trunk Roads Within North Ayrshire
11) Transport Scotland, Strategic Approach - Islands Connectivity Plan (May 2025)
12) SYSTRA for North Ayrshire Council, Pennyburn Roundabout Impact Testing –
Paramics Base Model Development and Testing Report (February 2023)

Page 158

North Ayrshire’s third Local Development Plan
147
LDP Committee Version
Topic 5 – Productive Places
North Ayrshire became Scotland’s first Community Wealth Building Council in 2020,
introducing this approach to ensure social, economic, and environmental justice for
North Ayrshire’s communities. Community Wealth Building (CWB) is about
collaborating with communities and businesses to build a strong local economy. It
seeks to address wealth inequality by supporting fair work; encouraging local spend;
and using the land and property we own to benefit our communities. CWB aligns with
national aspirations, including as set out in the National Planning Framework, to
create a greener, fairer, and more inclusive wellbeing economy. 
This section of the Evidence Report summarises the key evidence relating to North
Ayrshire as a ‘Productive Place’ with community wealth building at its heart. It
considers evidence in relation to policies 25-33 of NPF4: 
25. Community Wealth Building 
26. Business and Industry 
27. City, town, local and commercial centres 
28. Retail 
29. Rural Development 
30. Tourism 
31. Culture and creativity 
32. Aquaculture 
33. Minerals
Information required by the Act and Regulations
Section 15 of the Planning Act concerns the form and content of local development
plans. Subsection 1(a) requires the local development plan to take account of
matters mentioned in subsection (5), including:  
• the principle economic characteristics of the area
• the principal purposes for which land is used.
the desirability of maintaining an appropriate number and range of cultural venues
and facilities (including, but not limited to, live music venues) Section 16B of the
Planning Act relates to the evidence report. As per subsection (3), the evidence
report is to set out the planning authority’s view on the matters listed in section 15(5),
referred to above. 
Summary of Evidence
Policy Context
In managing the development and use of land in the long-term public interest, North
Ayrshire’s third Local Development Plan must facilitate sustainable development and
the delivery of the National Outcomes. In an economic context, this means a plan
which supports a globally competitive, entrepreneurial, inclusive and sustainable
economy, with thriving and innovative businesses, quality jobs and fair work for

Page 159

North Ayrshire’s third Local Development Plan
148
LDP Committee Version
everyone; tackles poverty by sharing opportunities and wealth more equally; and
creates communities that are inclusive, empowered, resilient and safe.
NPF4 acknowledges that the economic performance of different parts of Scotland
varies considerably, with challenges and opportunities for different places and
sectors. At present, some communities – including within North Ayrshire – are
particularly affected by high rates of poverty. There is significant scope to improve
productivity and the scale and rate of business development. Scotland’s National
Strategy for Economic Transformation aims to make Scotland a successful place
with opportunities for everyone, in every region of Scotland, to share in our economic
prosperity. Building community wealth is a key component of the strategy, as are our
town centres. 
One of NPF4’s spatial strategy overarching aims is to support the planning and
delivery of productive places where we have a greener, fairer, and more inclusive
economy. This is supported by the spatial principles of rebalanced development –
targeting development to create opportunities for communities and investment in
areas of past decline – and encouraging sustainable development in rural areas.
Hunterston is also identified by NPF4 as one of eighteen national developments
supporting the delivery of the national spatial strategy. National developments will be
a focus for delivery, as well as exemplars of the Place Principle, placemaking and a
Community Wealth Building (CWB) approach to economic development.
The three Ayrshire local authorities, Scottish Enterprise, Ayrshire Chamber of
Commerce and Industry and individual business leaders provide a strategic direction
to the economic performance of Ayrshire & Arran through the Ayrshire Economic
Partnership. The partnership launched the Ayrshire Regional Economic Strategy in
June 2023, establishing a 10-year vision to build wealth for everyone in Ayrshire by
creating opportunities for those who want to live, work, learn and invest in the region.  
The Partnership are currently developing a new three-year Delivery Plan, which will
run from 2025 to 2028, and joint strategies focusing on the key sectors of food and
drink, engineering, renewables, and tourism. 
The Ayrshire Growth Deal is a key enabler for delivering the vision of the Regional
Economic Strategy vision. It represents a £251.5 million, ten-year programme aimed
at matching business growth opportunities to employment progression, developing
the future workforce and community development. 
There are five Ayrshire Growth Deal projects in North Ayrshire, plus two pan-Ayrshire
projects: 
• Hunterston Strategic Development Area
• International Marine Science and Environmental Centre (IMSE)
• i3 Digital Process Manufacturing Centre and Flexible Business Space
• Marine Tourism (Arran Marina and Cumbrae Marina)
• The Great Harbour (Irvine Harbourside and Ardeer) 
• Regional Skills and Inclusion programme

Page 160

North Ayrshire’s third Local Development Plan
149
LDP Committee Version
• Community Wealth Building
Principal economic characteristics
The Liveable Places schedule (Topic 1) provides an overview of unemployment
economic activity and deprivation, including poverty, in North Ayrshire, informed by
the latest quarterly economic briefing and ‘Wellbeing Economy Dashboard’ prepared
by the Council’s Economic Policy team and drawn from a range of primary sources.
Together these provide an update on key economic indicators for North Ayrshire. 
In general, North Ayrshire experiences higher than average deprivation linked
opportunities relating to employment and income. The area’s employment rate is
around 10% lower than the country as a whole; unemployment and economic
inactivity rates are among the highest in Scotland. Consequently, poverty is a
significant issue in North Ayrshire, with around a quarter of children and young
people in the area living in poverty.
Data included within the dashboard on job density (the number of jobs per working-
age resident) and average earnings indicate progress in the objective of more good
quality jobs, but North Ayrshire continues to lag behind the Scottish average. 
A review of Employment Land in North Ayrshire provides an overview of economic
trends and policy, noting the economic landscape in North Ayrshire is shaped by
evolving policy and market dynamics. The report notes that in 2024, North Ayrshire’s
total estimated Gross GVA was £2,464 million which is 1.7% of total Scottish
economic output compared to its population share which is 2.4%. GVA by industry is
highest within manufacturing (23.9%) with this trend set to continue according to
long-term forecasts. In 2024, GVA per job was £51,500 in comparison with the
Scottish average of £52,000. 
Compared to the Scottish average, North Ayrshire has more people employed in
manufacturing, construction and wholesale and retail trade, with fewer people
employed in comparison with Scotland in sectors including information and
communication, professional, scientific, and technical activities and human health
and social work activities. 
Data from the Scottish Government repeated within the report notes the number of
registered businesses in North Ayrshire in national growth sectors rose by 4% from
1,135 businesses in 2008 to 1,180 in 2024. Sustainable tourism (9%), creative
industries (18%), and energy (including renewables) (125%) are the main growth
industries. 
Community Wealth Building
NPF4 seeks to encourage, promote and facilitate community wealth building as a
new strategic approach to economic development that also provides a practical
model for building a wellbeing economy. How communities and places benefit should
be a primary consideration for local economic development to support local

Page 161

North Ayrshire’s third Local Development Plan
150
LDP Committee Version
employment and supply chains. Community ownership and management of land and
buildings is also supported. 
In accordance with NPF4, LDP3 must be aligned to the Council’s community wealth
building strategy; address community wealth building priorities; identify community
assets; set out opportunities to tackle economic disadvantage; and inequality; and
seek to provide benefits for local communities. 
North Ayrshire Council has adopted community wealth building (CWB) as a new
approach centred on creating a fairer local economy focused on wellbeing and
inclusion. In May 2020, we launched Scotland’s first Community Wealth Building
Strategy. The adoption of community wealth building is a response to the failure of
traditional economic growth to address poverty and inequality and the need for
radical, forward-thinking interventions to ensure a prosperous future. 
The 2020 strategy highlighted some of the challenges facing North Ayrshire which
have led us to adopt a community wealth building approach, including just under a
third of children living in poverty; 16% of workers earning below the living wage; a
higher unemployment rate than the Scottish average and one of the lowest job
densities in Scotland. 
The Council is now in its second iteration of CWB strategy, following a refresh in
2024. The North Ayrshire Community Wealth Building Strategy for 2024 to 2027
builds on the pioneering approach of the first strategy, highlighting the progress
made since 2020 and acknowledges the changing local and national economic
context. This strategy outlines the next steps in North Ayrshire’s journey to create a
Wellbeing Economy and to support the Council Plan’s vision of a North Ayrshire that
is ‘Fair for All.’
Alongside the aspiration of being a Community Wealth Building Council, the strategic
objectives of the CWB strategy are aligned with the five pillars of community wealth
building: 
• Progressive Procurement: a procurement system that actively encourages a
growing, diverse, and resilient local business base
• Fair employment: Encourage the creation of fair and meaningful jobs with
progression opportunities to unlock the potential of our residents.
• Land and assets: Support the regeneration of our communities through
maximising Council owned land and assets including through alternative uses
for community and business benefit. 
• Diverse Ownership: The Council will support plural ownership of the economy
through the implementation of a range of business models including SMEs,
social enterprises, employment ownership, cooperatives, municipal activity,
and community enterprises.

Page 162

North Ayrshire’s third Local Development Plan
151
LDP Committee Version
• Financial Power: The Council will invest locally and encourage regional and
national institutions to invest in our communities.
Since the launch of the CWB Strategy in May 2020, the Council has made significant
progress towards embedding CWB practices within the North Ayrshire economy and
this approach has taken on a regional dimension through the Regional Economic
Strategy and Growth Deal programme. A Community Wealth Building ‘Anchor
Charter’ and Commission bring together organisations, including North Ayrshire
Council, Ayrshire College and NHS Ayrshire & Arran, which are significant local
employers and have buying and selling power, committing them to long-term
collaboration supporting shared CWB goals and the creation of a strong, resilient
and inclusive local and regional economy. 
In parallel with our achievements and progress on CWB, the Scottish Government is
taking forward CWB legislation in the current Parliament which, if approved, may
place a duty on public bodies to embed CWB principles into their economic
development approaches. 
Our approach to community wealth building aims to deliver a wellbeing economy that
works for people and planet and delivers social, economic, and environmental justice
for all. The CWB strategy recognises that the impacts of climate change are likely to
hit the most vulnerable in society the hardest, and that the climate crisis is a key
concern for our young people. CWB encourages everyone think more about keeping
it local, allowing shorter supply chains while adapting our use of land and assets will
support the Council to meet its net zero carbon targets and ensure a sustainable
local environment. CWB is embedded within the Sustainable North Ayrshire Strategy. 
Progress on each of the 53 CWB actions set out in the strategy is tracked, ensuring
objectives are delivered across all CWB pillars and the Wellbeing Economy
Dashboard (previously the ‘inclusive economy dashboard’) has been developed to
track our progress on delivering a wellbeing economy. The dashboard acts as a
framework to ensure our CWB approach is being used to develop our local economy
which is socially inclusive but also within safe environmental limits.
Community assets
North Ayrshire Council is committed to community asset transfer that benefits
communities and contribute towards achieving the council's aims and objectives. The
Community Asset Transfer Policy, updated in June 2024, aims to set out a
transparent, positive and proactive framework that enables and manages the
transfer of assets from the council to voluntary or community organisations in order
to bring about long term social, economic and environmental benefits to the
community and contribute towards achieving the Local Outcomes Improvement Plan.
The Council’s asset portfolio includes buildings, land, playing fields and other
facilities and structures which are used for a variety of different social, community
and public purposes. Details of current asset transfer requests are available on our
website along with register of property that North Ayrshire Council owns or leases.

Page 163

North Ayrshire’s third Local Development Plan
152
LDP Committee Version
Business and industry
NPF4 seeks to encourage, promote and facilitate business and industry uses and to
enable alternative ways of working such as home working, live-work units, and
micro-businesses. 
LDP3 should allocate sufficient land for business and industry, taking into account
business and industry land audits, in particular ensuring that there is a suitable range
of sites that meet current market demand, location, size, and quality in terms of
accessibility and services. This allocation should take account of local economic
strategies and support broader objectives of delivering a low carbon and net zero
economic recovery, and a fairer and more inclusive wellbeing economy.
The adopted Local Development Plan (LDP2) includes a schedule of employment
locations (Schedule 5) totalling around 517 hectares across 15 sites. The
employment land supply – land allocated or consented for Class 4, 5 and/or 6 use –
is monitored through the annual employment land audit. The most recent audit,
covering the period April 2024 to March 2025, identifies 57 sites within the
employment land supply and a marketable employment land supply of 493 hectares.
The allocation of marketable sites is reasonably evenly split between small, mid-
range and larger sites. Around a third of marketable sites (34%) are less than 1
hectare in size. In terms of location, the employment land supply is dominated by
sites within the Irvine locality. Although the North Coast has the largest area of
employment land, this is skewed by the size of the sites at Hunterston. 
Table 24 – Employment Land: area and number of sites by locality 
Locality Area of Employment
Land (hectares) Number of Sites
Arran 1.6 2
Garnock Valley 14.8 11
Irvine 139.6 25
Kilwinning 15.8 3
North Coast 276.7 4
Three Towns 44.8 12
Total 493.2 57
An appraisal of the employment land supply was undertaken in 2024. The purpose of
the appraisal was to inform LDP3 by identifying areas where there may be a need for
additional designated employment sites – or where there is a surplus of land – and
provide a view on how much employment land is required throughout North Ayrshire.
A review of the effectiveness of the employment land supply was also undertaken to
establish whether this meets market demand. 
The appraisal provides evidence on regional economic trends, challenges and
opportunities and a comprehensive analysis of the employment property market in
North Ayrshire. It found that North Ayrshire has a dispersed portfolio of industrial
estates and units around a large core market in Irvine (63% of floorspace). The stock
of 597,000 sq.m. of industrial floorspace is well-occupied with a very low vacancy

Page 164

North Ayrshire’s third Local Development Plan
153
LDP Committee Version
rate of 1.5% but is ageing and in some cases approaching the end of buildings’
lifespans. This limits the choices of units for local and incoming occupiers,
particularly of modern, energy efficient units in their location and size of choice. 
More than 20 units are taken up on average each year, largely by SMEs on
established industrial estates, but only 16 are on the market across the whole of
North Ayrshire. Detailed enquiries and survey responses indicate ongoing demand
for industrial sites and premises, including medium to larger mobile enquiries in
sectors well-aligned with economic priorities.
New industrial development is curtailed by low rents meaning public sector
intervention in the property market is often required to support new development.
There are now several new developments and proposals by both public and private
sectors, particularly at Irvine Industrial Estate, North Newmoor and i3, and at
Hunterston. 
North Ayrshire’s office market is less obviously affected by the market shock caused
by hybrid working than city centres and larger business parks but is adapting to
changing demand. The current low vacancy rate may mask latent under-use and
available flexible space. Thirty-one available suites tend to be very small or sub-
divisible, targeting very small occupiers. The office market records only a few formal
transactions each year – around 6 on average - across North Ayrshire and
particularly in Irvine. 
The appraisal concludes that a combination of new-build industrial and refurbishment
is required to continue to ensure that North Ayrshire’s ageing stock does not
constrain activity, especially in Irvine. It recommends it would be prudent to
anticipate 5 hectares’ employment land take-up each year as a baseline, reflecting
the proven need to continue to modernise the stock of employment property and
invest in property to support economic development. A focus on serviced
developable plots of typically 0.25 – 0.5 hectares, rather than large allocations, to
meet SME and development demand but that current growth sectors in the regional
economy, such as energy, indicate that a significant land reserve is also appropriate
in target locations to accommodate new, mobile and land-hungry uses.
An addendum to the Employment Land Appraisal was prepared in 2025 with a
specific focus on large, ‘single-user’ sites in light of proposed developments at
Hunterston and i3 in Irvine. The report downplays the significance of the potential
take-up of large strategic sites at i3, Hunterston and Portland Road, stating it would
not necessarily undermine the recommended effective employment land supply of 5
hectares per annum (or 50 hectares over a 10-year LDP period). This take-up would
have a disproportionate impact on the supply of large sites in the area suitable for
inward investment and large-scale, land-hungry uses but the report notes that
development is likely to be gradual, and how quickly sites will be developed and
therefore come off the employment land register is unknown. Site interests may
change or fall away as commercial conversations continue.

Page 165

North Ayrshire’s third Local Development Plan
154
LDP Committee Version
If these suggested large-scale sites are developed and removed from the supply it
brings into focus other large-scale sites in the area at Ardeer, i3 and Hunterston
(Estate and NDA site). None of these other large-scale sites, however, have the
perfect combination of market appeal and technical deliverability. 
Hunterston Strategic Asset
Hunterston is one of six national developments designated by NPF4 to support the
delivery of productive places. As Scotland’s largest strategic deep-water port with
direct rail and grid connections, the site has a critical role in Scotland’s energy, blue
economy, offshore wind, and the circular economy futures. The Hunterston Strategic
Asset national development supports the repurposing of Hunterston port as well as
the adjacent former nuclear power station sites and marketable business land of the
Hunterston Estate. Classes of development identified as contributing to the
Hunterston Strategic Asset include those which support the redevelopment and
reuse of the existing strategic assets and land contributing to a net zero economy,
including renewable energy generation, storage, new and replacement transmission
and distribution infrastructure and emerging low-carbon and zero emissions
technologies such as hydrogen and carbon capture utilisation and storage (CCUS).
In June 2022, planning approval was granted for the UK’s first subsea cable
manufacturing facility, at Hunterston. This £1.4 billion project will see development of
50 hectares of the 140-hectare Hunterston PARC site and is expected to support 900
jobs in the area. 
NPF4 also recognises, within the regional spatial priorities for central Scotland, the
Ardeer peninsula as a significant site for redevelopment of the wider Ayrshire area
and that a planned marine centre at Ardrossan will provide further opportunities. In
2022, Ardeer was shortlisted among four other sites as the location of the UK’s first
fusion energy plant, a form of power generation which generates electricity using
heat from nuclear fusion reactions.
A site in Nottinghamshire was ultimately chosen by the UK Government as the
location for the Spherical Tokamak for Energy Production (STEP) project. As noted
under Topic 3, NatureScot are current reviewing the biodiversity value of Ardeer with
regard to a potential designation of a SSSI.
Town centres and retail
The Town Centre Action Plan 2 – the joint response of the Scottish Government and 
COSLA to the independent review of the 2013 Town Centre Action Plan – was
published in April 2022 and reaffirms the commitment to the Town Centre First
Principle. The action plan sets a new vision for town centres and recognises the
critical importance of planning in enabling the diversification of city, town and
commercial centres to better manage their role, help them thrive, improve their
resilience and respond to ongoing changes to the way we shop and access services. 
In this context, NPF4 seeks to encourage, promote and facilitate development in our
city and town centres, to help centres adapt positively to long-term economic,

Page 166

North Ayrshire’s third Local Development Plan
155
LDP Committee Version
environmental, and societal changes, and by encouraging town centre living. Retail
development and the location of shops, specifically, should support vibrant city, town
and local centres and be accessible to communities by a range of sustainable
transport modes including on foot, by bike, and by public transport, as part of local
living.
North Ayrshire’s third Local Development Plan should: 
• support sustainable futures for North Ayrshire’s town and local centres, in
particular opportunities to enhance town centres.
• support proposals for improving the sustainability of existing commercial
centres where appropriate.
• identify a network of centres that reflect the principles of 20-minute
neighbourhoods and the town centre vision.
• identify, if appropriate, any areas where drive-through facilities may be
acceptable.
• consider where there may be a need for further retail provision.
• identify areas where proposals for healthy food and drink outlets can be
supported. 
Schedule 6 of the Adopted Local Development Plan (LDP2) identifies our existing
network of centres, including the role, function, and opportunities within each centre. 
Irvine’s role is identified as a regional centre with an inner retail core. It supports
North Ayrshire’s largest concentration of commercial and civic uses and provides a
hub for retail. Irvine has been successful in securing a UK Government Award under
the ‘Plan for Neighbourhoods’ (previously the Long–Term Plan for Towns
Programme), extended via the ‘Pride in Place’ programme. The funding award
provides for £20 million of investment in the town over 10 years. A Neighbourhood
Board has been established comprising local people, businesses, and political
representatives, to develop, oversee and deliver a Long-Term Plan for the
regeneration of Irvine. North Ayrshire was also successful in receiving £1.5m over
two years under the Pride in Place Impact Fund, with the neighbourhoods to be
selected by the Scotland Office later this year, following an evidence-led process
involving local partners.
Largs, Kilwinning and Saltcoats are considered to have roles wider than a town
centre, while Ardrossan, Stevenston, Beith, Dalry, Kilbirnie, West Kilbride and
Millport have local town centre roles, predominately supporting day-to-day retail
needs. Four commercial centres are included within this network of centres. These
provide for a North Ayrshire-wide need for large comparison retail and bulky goods. 
To inform Local Development Plan 2, we worked with Scotland's Town Partnership
and EKOS to prepare town-centre audits. Published in 2016, the ‘Your Town Audits’
draw on the Understanding Scottish Places (USP) data platform to provide a
comprehensive audit of North Ayrshire’s towns, with data on up to 180 KPIs across

Page 167

North Ayrshire’s third Local Development Plan
156
LDP Committee Version
seven themes – Locality, Accessibility, Local Services, Activities and Events,
Development Capacity, Tourism, and Place and Quality Impressions. 
These town centre audits were refreshed by the Council in 2021, including updated
information on vacancy rates. In 2024, to support the UK Government’s Plans for
Neighbourhoods programme, EKOS consulting were re-appointed by the Council’s
regeneration service to update the town audit for Irvine. 
To inform preparation of LDP3, a Retail Capacity Study for North Ayrshire has also
been prepared. The study reviews retail and leisure trends and provision within North
Ayrshire; provides an assessment of potential future supply and demand for retail
floorspace through to 2037; considers the food environment and access to food
shopping and a review of principal retail and town centre locations within North
Ayrshire. 
A strategic retail model (‘SRM’) for the period to 2037 was prepared using household
survey, detailed floorspace information provided through the Ayrshire Regional
Assessor, data on existing retail and leisure expenditure and growth forecasts.
Different modelling scenarios and sensitivity tests are used within the study to reflect
uncertainties.
An analysis of quantitative and qualitative retail deficiencies has been undertaken
both by comparing expenditure and notional average turnover for North Ayrshire as a
whole, identified study zones, the Irvine market area and taking account of existing
expenditure flows as well as market potential. This concludes: 
• No significant quantitative retail deficiency is identified to support additional
convenience goods floorspace in North Ayrshire overall. 
• In Arran, North Coast (Largs), and Kilwinning, additional floorspace can
address local deficiencies in floorspace.
• Significant new convenience floorspace serving local markets is expected to
adversely impact on existing food stores in North Ayrshire.
• There is a substantial quantitative retail deficiency for comparison goods
floorspace throughout North Ayrshire, however, market trends indicate that
demand is unlikely to support the scale of deficiency identified. National
retailers more likely to reduce space occupied in Irvine town centre, while
there is low likelihood of any significant change in comparison space provision
in principal town centres outwith Irvine. 
• In the long-term, demand for commercial leisure space is expected to grow
significantly, with the potential to offset the decline in comparison goods
retailing. There is also the significant potential for additional leisure space to
serve the long-term growth of tourism especially in Arran and Cumbrae.
Analysis of the food environment has been informed by a review of the distribution of
food shops; analysis of responses to questions about food shopping habits and
experience from the household survey; results from North Ayrshire Council’s
People’s Panel on access to food/fresh food and survey responses from
foodbank/community larder operators. Alongside the distribution of shops selling

Page 168

North Ayrshire’s third Local Development Plan
157
LDP Committee Version
food, affordability is also a key issue. Deprivation and rurality are identified as key
factors in accessing affordable food, including in limited more-affluent areas where
there is less choice resulting in higher prices/limited ranges of food goods available
in shops. 
Local accessibility to retail and related services is also considered in the context of
20-minute neighbourhoods, with only limited areas – notably areas to the north and
east of Irvine and Arran identified as not having relatively easy access to small-scale
local retail/service facilities. More detailed 20-minute neighbourhood analysis has
subsequently been undertaken (see Liveable Places schedule). 
The review of principal retail and town centre locations included within the study
provides the number of units and space for principal types of retail, commercial
leisure and services in each centre; an update to the town centre health check
information; a summary of the perceptions of each centre from the household and in-
centre surveys and an assessment of the retail characteristics of each centre,
including identification of primary and secondary catchment areas, market
penetration/share within North Ayrshire study zones and variation in forecasts of
future turnover according to the Strategic Retail Model based on different future
growth scenarios. Minor changes to the existing Network of Centres are
recommended, including most notably the inclusion of Brodick as a Local Town
Centre. 
Town-centre living
The development of housing – either new-build or the reuse and conversion of
vacant buildings or upper floors – brings more people to live within town centres and
can have a major role in creating strong and sustainable places, as well as
supporting key policy aims around active travel, affordable and independent living,
local living, the wellbeing economy, net zero, and the re-use of existing built assets.
Encouraging more people to live in town centres is a key policy aspiration for
Scottish Government and local authorities, reflected in the Town Centre Action Plan
and Housing 2040. 
The Council’s Local Housing Strategy 2023 to 2028 and Regeneration Delivery Plan
both support the development of town centre living opportunities in recognition that
housing can make a strong contribution to regeneration. The LHS Action Plan
includes as an action the consideration of opportunities to provide homes in and
around our town centres. New homes in Saltcoats town centre, Stevenston and
Largs have been delivered since 2023, with work ongoing to deliver six amenity flats
at the former King’s Arms, a category C-Listed former public house in Irvine town
centre. 
Rural development
The revitalisation of rural areas is one of the six overarching spatial principles and a
cross-cutting outcome of NPF4. The strategy and policies of NPF4 encourage and
support sustainable development that contributes to rural economies and
communities, helping to retain and increase the population of rural areas. The policy
intent is to encourage rural economic activity, innovation, and diversification, whilst

Page 169

North Ayrshire’s third Local Development Plan
158
LDP Committee Version
ensuring that the distinctive character of rural areas and the service function of small
towns, natural assets and cultural heritage are safeguarded and enhanced.
Using the Scottish Government's 6-fold Urban Rural Classification, around three-
quarters of mainland North Ayrshire is defined as ‘accessible rural’. Our islands,
including Arran and Great Cumbrae, are identified as remote rural areas, as is an
area of approximately 80 square kilometres straddling the North Coast and Garnock
Valley localities. In terms of population distribution, around 10% of North Ayrshire’s
total population lives in a rural area. The mainland figure is approximately 5%. Within
the Garnock Valley and North Coast the proportion is higher, 1 in 10, however, the
majority of the population still live in urban areas, including accessible small towns.
The remote rural area of the mainland is not populated, forming part of the Clyde
Muirshiel Regional Park and Clyde Muirshiel Uplands candidate Local Landscape
Areas. 
See 6-fold Urban Rural Classification Map
Ten-year local island plans for Arran and Cumbrae were published in May 2022.
These plans were developed with, and for, the island communities to drive the
development of community, economic and environmental wellbeing of Arran and
Cumbrae. They form the foundations on which to address long standing issues and
challenges and help maximise the potential of Arran and Cumbrae. 
The island plans highlight the characteristics, pressures, community priorities, and
economic needs of both islands. In 2020, the Council commissioned and published
research from the Fraser of Allander Institute (FAI) on the disproportionate economic
impact of Covid-19 on the Arran economy. The work also provided an outline socio-
economic baseline for Arran to support the evidence of need to help understand the
long-term challenges the island economy faces and provide tailored support to the
island. 
The key messages and feedback from the engagement exercise that, along with this
research, informed the Arran Local Island Plan were that the pandemic amplified and
exacerbated issues that existed before COVID, making them more visible and
urgent. These, often interconnected, challenges include: the supply of affordable
housing; a population that is getting smaller and older, with fewer people of working
age; public services, including health and service care; issues with the reliability of
the ferry service; and the dependency of many businesses upon tourism and ‘social
spend’, which can create tensions. 
Similarly on Cumbrae, the Local Island Plan, island accessibility; economic
diversification; community resources and addressing the population profile and
tourism tensions are identified as priorities for the longer-term sustainability of island
life. More recently, Cumbrae Community Council have prepared a Local Place Plan
which prioritises a number of priorities relating to accessibility; climate change; and
housing, including for those requiring additional care.

Page 170

North Ayrshire’s third Local Development Plan
159
LDP Committee Version
Tourism
The visitor economy is an important sector of North Ayrshire’s economy. Scottish
Growth Sector Statistics show that 5,000 people or 8.6% of those in employment,
were employed in tourism within North Ayrshire in 2023, with tourism businesses
accounting for 12% of all businesses. Scottish Tourism Economic Impact Modelling
(STEAM) data from 2022 shows that there were 2.9 million visitor days with an
economic impact of £229 million and supporting 3,391 full time jobs.
NPF4 seeks to encourage, promote and facilitate sustainable tourism development
which benefits local people, is consistent with net zero and nature commitments, and
inspires people to visit Scotland. LDP3 should support the recovery, growth, and
long-term resilience of the tourism sector. Its spatial strategy should identify suitable
locations which reflect opportunities for tourism development, taking account of the
needs of communities, visitors, the industry, and the environment and consider any
areas of pressure where tourism is having adverse impacts and further development
is not appropriate. Built and natural heritage has an important role in attracting
visitors to North Ayrshire but is also vulnerable to unsustainable pressures. 
The Ayrshire Regional Economic Strategy identifies tourism as a key sector and
strength of the Ayrshire economy. The Ayrshire and our Islands Visitor Economy
Strategy establishes a vision, ambition, strategic priorities and actions aimed at
building a thriving, inclusive visitor economy across the region. The strategy was
developed based on the findings of an evidence review, analysis of global
benchmarks, industry consultations, a youth workshop carried out in late 2021, and
input from the members of the Ayrshire Visitor Economy Steering Group (now the
Ayrshire and Arran Visitor Economy Leadership Group, AAVELG) during the period
January to April 2022. 
The strategy seeks to build ‘place prosperity’ through supporting regenerative
tourism which is embeds community wealth building principles. This will ensure
tourism benefits local residents as well as visitors and that the visitor economy offers
good job opportunities, with fair working conditions, as part of a sustainable,
balanced economy. 
Tourism is one of five Ayrshire Growth Deal programmes, comprising two projects:
marine tourism – which will deliver step-ashore and transit marina facilities at both
Cumbrae and Arran; and The Great Harbour, a tourism-led regeneration, place
making and destination development project for Irvine and the wider Ayrshire coast.
Locally, an annual Visitor Management Plan is prepared to provide a strategic
approach to managing the impact of tourism within North Ayrshire on our
communities and our environment, place, and infrastructure assets. The 2025 Plan
takes account of the challenges and opportunities to manage the impact of visitors to
North Ayrshire, setting out priorities and actions for the coming year. 
Key impacts identified within the Plan relate to litter, parking, and public toilet
provision. Some prominent issues continue in relation to ‘hotspots,’ such as
motorhome usage in certain locations. Area specific interventions, such as parking

Page 171

North Ayrshire’s third Local Development Plan
160
LDP Committee Version
bay line marking, have been put in place, with work underway to review the provision
of motorhome facilities across North Ayrshire as a whole. 
Alongside the Visitor Management Plan, Strategic Tourism Infrastructure
Development Plans (STIPs) for the North Ayrshire mainland and islands expand on
the strategic approach to managing the impact of tourism demonstrated in North
Ayrshire Council’s Visitor Management Plans, but take a longer-term view of
potential projects, considering ongoing impacts of a post-pandemic increase in
visitors, changes in behaviour, and the impact on our infrastructure and communities. 
The importance of tourism to our island communities – and the tensions created –
are highlighted in the Local Island Plans for Arran and Cumbrae. Tourists can create
challenges to the capacity of infrastructure and services on Arran and some
residents feel that they can be inconvenienced and occasionally displaced by
tourists. This creates some potential tension between sections of the community who
have differing views on the importance of investment in tourism and the hospitality
sector. The Cumbrae Local Island Plan highlights the impact of spikes in visitor
numbers on local infrastructure, transport provision, and hospitality sector capacity.
This has the potential consequence of negatively impacting the island’s reputation as
a desirable place to live as well as on visitor numbers.
The impact of tourism on local housing markets on Arran and Cumbrae is also an
issue, related to the number of second homes and short-term let properties – see
Housing schedule for further discussion. 
Culture and creativity
Published in March 2022, A Culture Strategy for Scotland shows how important
culture is to Scotland’s prosperity and sets the future direction for supporting culture
in Scotland. Place has in important role in inspiring our rich cultural heritage and
creativity and, conversely, arts, music and culture are among the factors that create
a positive identity for a place that supports a strong sense of belonging. 
NPF4 seeks to encourage, promote and facilitate development which reflects our
diverse culture and creativity, and to support our culture and creative industries to
enable locally distinctive places that reflect the diversity of communities and support
regeneration and town centre vibrancy; the expansion of cultural and creative
industries, providing jobs and investment; and access to cultural and creative
activities for communities. LDP3 should recognise and support opportunities for jobs
and investment in the creative sector, culture, heritage, and the arts.
Place profiles prepared for each of our six localities provide an overview of culture,
creativity, and community within North Ayrshire [located within the ‘Liveable’ section
of the Profile], identifying important events and cultural and community facilities,
including museums, libraries and community centres. Venues include The Harbour
Arts Centre in Irvine; North Ayrshire’s cultural hub offering a varied programme of
theatre, comedy, music and visual arts, classes and workshops; Vikingar! in Largs,
home to an interactive, hands on heritage and cultural experience, the Barrfields
Pavilion Theatre, a swimming pool plus other leisure facilities; the Barony Centre

Page 172

North Ayrshire’s third Local Development Plan
161
LDP Committee Version
forms the heart of Scotland’s ‘Craft Town’, West Kilbride; Garrison House in Millport
and the Town Hall and North Ayrshire Heritage Centre in Saltcoats. 
The 2021 North Ayrshire Town Centre Audits include analysis of the nighttime
economy of each town, which includes public houses and restaurants. The nighttime
economy can be an indication of the vitality of leisure uses within centres that can
often be related to cultural uses. The 2023 Retail Capacity Study contains and in-
depth analysis on leisure uses and forecasts future demands and spends. It advises
that leisure spend is, inherently, discretionary and is, therefore, likely to be more
volatile according to the wider economic situation leading to uncertainty as to the
prospects for growth. Some commentators forecast sustained strong growth,
especially in key sectors such as coffee shops and gyms. Other forecasts are more
circumspect, identifying only modest expenditure growth and reduced margins
resulting in a high susceptibility to business failure. 
The sector is also rapidly evolving, with new formats and experiences coming
forward each year, often linked to new advances in technology with lower potential
impact of the internet affecting the location of leisure services. A greater potential for
ongoing requirement for space for the provision of leisure services rather than for
retail is implied. 
Aquaculture
Involving the farming or culturing of fish, molluscs, crustaceans and seaweed,
aquaculture is an increasingly important industry for Scotland, helping to sustain
economic growth in the rural and coastal communities of the north and west and
producing our most valuable food export. The Scottish aquaculture industry is led by
Atlantic salmon farming but also produces significant quantities of Rainbow trout and
mussels. 
Scotland’s first National Marine Plan (NMP) was adopted and published in March
2015, setting out the Scottish Government’s vision for clean, healthy, safe,
productive and diverse seas, managed to meet the long term needs of nature and
people. Aquaculture is one of 11 sectors for which the National Marine Plan sets out
objectives and marine planning policies; overall, these seek to achieve an
aquaculture industry that is sustainable, diverse, competitive economically viable and
which contributes to food security whilst minimising environmental impact. 
In accordance with the legislation set out in the Marine Acts, statutory reviews of the
National Marine Plan were undertaken in 2018 and 2021 with the 2021 review
concluding that, although the NMP remained effective, there had been significant
developments which could impact the use and management of our seas. In
the Programme for Government 2022 to 2023, Scottish ministers committed to start
developing a new national marine plan for Scotland - National Marine Plan 2 (NMP2)
- to address the global climate and nature crises by carefully managing our shared
marine space. This commitment was reaffirmed in the Programme for Government
2024 to 2025. 
Alongside the national marine planning regime introduced by the Marine (Scotland)
Act 2010, eleven Scottish Marine Regions have been created which cover sea areas

Page 173

North Ayrshire’s third Local Development Plan
162
LDP Committee Version
extending out to 12 nautical miles. The Clyde Marine Planning Partnership (CMPP)
are developing a Regional Marine Plan. North Ayrshire Council is a member of the
CMPP and a draft plan is expected to be published following the Scottish
Parliamentary Elections in 2026. 
The national planning framework (NPF4) seeks to encourage, promote and facilitate
aquaculture development and minimise any adverse effects on the environment,
including cumulative impacts. LDP3 should guide new aquaculture development in
line with National and Regional Marine Planning. 
Scotland’s aquaculture website and database identify the locations of aquaculture
sites. There are two active sites in North Ayrshire, at Kingscross in Arran and Fairlie.  
In March 2025, consent was granted for a terrestrial salmon rearing facility at
Hunterston. The ‘Recirculated Aquaculture System’ is expected to generate 15 direct
jobs and 35 jobs in the supply chain in North Ayrshire when operational. In 2021, an
application for an Atlantic salmon fish farm east of Millstone Point, Lochranza in the
north of Arran was refused planning permission, with the decision upheld on appeal
(ref. PPA-310-2033) on the grounds of the significant landscape and visual impact –
including on the North Arran National Scenic Area – arising from the introduction of a
fish farm to this sensitive and isolated area of coastline. 
Minerals
Aggregates are needed for the construction of transport and renewable energy
infrastructure, housing and other buildings that are a vital part of the Scottish
Government's future infrastructure investment plans. The most important sources for
primary aggregates in Scotland are crushed rock (from igneous rock, sandstone and
limestone) and sand and gravel.
NPF4 aims to support the sustainable management of resources and minimise the
impacts of the extraction of minerals on communities and the environment. LDP3
should adopt a landbank approach to planning for the supply of construction
aggregates, ensuring at least 10 years’ supply of minerals always exists. It should
also safeguard important workable mineral resources and take steps to ensure these
are not sterilised by other types of development.
There are nine active quarries in North Ayrshire (Source: BritPits - British Geological
Survey)
Table 25 – Active quarries in North Ayrshire
Quarry Name Location Commodity
Bogarie Quarry Sliddery, Isle of Arran Igneous and Metamorphic
Rock
Dereneneach Quarry Blackwaterfood, Isle of
Arran
Igneous and Metamorphic
Rock
Garnock West Quarry Ardeer Sand
Hullerhill Quarry Kilwinning Silica Sand
Knowes Farm Clay Pit Beith Clay and shale

Page 174

North Ayrshire’s third Local Development Plan
163
LDP Committee Version
Quarry Name Location Commodity
Loanhead Quarry Beith Igneous and Metamorphic
Rock
Mid Sannox Quarry Sannox, Isle of Arran Sand and gravel
Middleton Quarry Lugton, Beith Limestone
Swinlees Quarry Dalry Igneous and Metamorphic
Rock
The 2023 Aggregate Minerals Survey for Great Britain provides data on UK, national
and regional sales, inter-regional flows, transportation, consumption and permitted
reserves of primary aggregates. This updates the Aggregate Minerals Survey for
Scotland (2019). The response rate for the survey by active quarries was 46% for
Scotland but substantially higher at 78% for Wales and 90% for England.  
The 2023 survey shows that the Ayrshire is one of the largest crushed rock
producing regions in Scotland and a net exporter of minerals, with sales of total
primary aggregates (2,192,000 tonnes) exceeding consumption (1,051,000 tonnes).
Total reserves in 2023 were 87 million tonnes, which would provide a supply of
approximately 40 years. 
Summary of Stakeholder Engagement
The evidence presented above refers to several research studies, reports, plans and
strategies that themselves have been subject to stakeholder engagement and
consultation during their preparation. 
Wider place-based engagement with local communities has been focused on the
‘Your Place Survey’ and engagement on the ‘Place Profiles’. Based on the Place
Standard, the Your Place Survey asked respondents to consider how active their
local economy is and whether there are there good opportunities for work,
volunteering and training. The engagement on the profiles, including public ‘drop-in’
meetings, focused on the needs and wants of communities. 
Registered Local Place Plans, ‘Place Frameworks’ prepared for Kilwinning, Largs
and Saltcoats and Local Island Plans also identify local economic issues and
priorities and have been informed by community engagement. For example; the
Stevenston and Garnock Valley Local Place Plans both identify town centres as a
local priority, with the Garnock Valley plan priorities also including supporting local
business and jobs, including manufacturing. Proposals to enhance visitor and tourist
facilities are included in the plans for West Kilbride, Largs, Cumbrae and the
Garnock Valley. 
Business and industry
A business survey and consultation with stakeholders was conducted as part of the
employment land supply appraisal. While the business survey returned a limited
number of responses (40) from mainly small businesses across a wide range of
sectors, it indicated one third of occupiers had a requirement to expand or relocate,
and a further third had a possible requirement. Potential demand was focused on

Page 175

North Ayrshire’s third Local Development Plan
164
LDP Committee Version
industrial property or industrial/office mix. Occupiers rated their existing properties
and environments positively, although some specific measures such as energy
efficiency scored less well and in some instances transport links and amenity scored
lower too.
Consultations sought to understand stakeholder views on employment property
market in North Ayrshire, availability and constraints, and how to help unlock
opportunities. A structured interview was undertaken with 16 consultees including
Scottish Enterprise, property and land agents, landowners and the Council’s
Business Support and Development, Growth and Investment, and Economic Policy
teams. 
Consultees agreed that the industrial market focus within North Ayrshire is on Irvine,
where stock ranges from dated (with some basic refurbishment) to modern and new
build. Target sectors for North Ayrshire are considered to be the green and blue
economy (at Hunterston in particular), retention of existing companies ensuring
provision for SMEs. Demand for medium to larger offices is considered to be limited
or zero, however there is still demand for small office suites and in business centres.
Large sites are considered to be undevelopable by local businesses and are an area
where the Council could intervene to offer a full range of sites from strategic sites to
small, local sites. 
Town centres and retail
A key component for accurately understanding the operation of retail patterns and
estimates of actual retail turnover is the use of extensive and detailed surveys. A
household survey has been undertaken to establish both behavioural and attitudinal
information about retail habits within the study area. The design of the survey was
undertaken jointly by Gravis Planning/Hargest Planning Ltd and NEMS Market
Surveys and was implemented as a telephone interview survey by NEMS in
December 2023 to January 2024. In total 1000 interviews were completed reflecting
the distribution of population and the zones used in the Strategic Retail Model. This
information was combined with additional data from a recent household survey
undertaken by Hargest Planning/NEMS for other parts of Ayrshire.  
Results from North Ayrshire Council’s People’s Panel on access to fresh food and
survey responses from foodbank/community larder operators were also considered
in the Retail Capacity Study.
Tourism
The tension between the importance of tourism to our island communities and its
impacts is recognised in the Local Islands Plans prepared for Arran and Cumbrae.
The Largs Local Place Plan includes a proposal for a major new tourist attraction in
the form of a cable car. The West Kilbride Local Place Plan has proposals to improve
visitor facilities at Seamill beach.

Page 176

North Ayrshire’s third Local Development Plan
165
LDP Committee Version
Summary of Implications for the Proposed Plan 
Our view on what this evidence and stakeholder engagement means for LDP3 is
summarised below:
Community Wealth Building
Through the actions of our Community Wealth Building Strategy, we are committed
to embedding community wealth building within LDP3 to ensure future development
takes account of local economic priorities and provides benefits for communities. 
Since commencing our community wealth building journey, the Council has
implemented several initiatives to use our organisational power to retain wealth
locally and build a wellbeing economy. This includes increasing local spend with
North Ayrshire businesses; creating a ‘Community Benefits Wish List’ to match
organisations delivering Council contracts with community organisations in need of
support; and developing our approach to using our land and assets for community
benefit through our Regeneration Delivery Plan; Vacant and Derelict Land Strategy
and Investment Programme; and the Sustainable North Ayrshire Strategy.
A strategic approach which enables community benefits to be delivered by all
development, not just Council or other anchor institution projects, is required to be
progressed as an integral part of the preparation of the Proposed Plan, to ensure the
new plan is aligned with the Community Wealth Building Strategy. This will focus on
how local supply chains and the creation of fair and meaningful jobs with training and
progression opportunities and can be boosted through the proposals of private
developers and secured through the development management process. 
The proposed site appraisal methodology includes, at Stage 3, a framework for the
assessment of development proposals in the context of community benefit and
wealth building and incorporates objectives relating to each of the five pillars. The
site appraisal methodology will be used to inform allocations for the Proposed Plan.
The National Development Statement of Need for the Hunterston Strategic Asset set
out in NPF4 notes that a community wealth building approach would be expected to
form a part of future development proposals in that location, to ensure the economic
benefits are retained locally as far as possible, strengthening local supply chains and
supporting businesses and communities across Ayrshire. 
The Proposed Plan’s approach to community wealth building should further the links
between LDP3 and the North Ayrshire Partnership Plan (LOIP), Locality Plans, the
local island plans, Local Place Plans and other community-led plans, by identifying
local priorities and the community and place benefits that new development should
focus on as a central and primary consideration. Community ownership and
management of buildings and land can also be supported by LDP3, including
through the identification of opportunities for community asset transfer.

Page 177

North Ayrshire’s third Local Development Plan
166
LDP Committee Version
Business and industry
Having an adequate supply of employment land allows business to grow, invest and
create jobs. Land and property are key factors in enabling businesses to start up,
scale up or come to North Ayrshire. 
The Employment Land Audit identifies 57 sites within North Ayrshire’s employment
land supply and a marketable employment land supply of around 500 hectares. The
Employment Land Appraisal found existing industrial floorspace is well-occupied with
a very low vacancy rate but is ageing, and in some cases approaching the end of
buildings’ lifespans. Occupancy rates and relatively low turnover restrict the choices
of units for local and incoming occupiers, particularly of modern, energy efficient
units in their location and size of choice.
The appraisal found that only a limited number of allocated employment sites in
North Ayrshire offer both good market potential and likely technical deliverability.
Furthermore, new industrial development is curtailed by low rents meaning public
sector intervention in the property market is often required to support new
development. The recommendation is made that a combination of new-build
industrial property and refurbishment is required to continue to ensure that North
Ayrshire’s ageing stock does not constrain activity, especially in Irvine. 
Our view, informed by the Employment Land Appraisal, is that there is no
requirement to allocate further employment land; the existing supply significantly
exceeds the recommendation of the Employment Land Appraisal to anticipate five
hectares’ employment land take-up each year, which would represent a requirement
of 50 hectares over the plan period for LDP3. However, enabling delivery of new
floorspace, including serviced developable plots of 0.25–0.5 hectares to meet SME
and development demand, is required, albeit this is challenging from a financial
perspective. 
Alignment with the Council’s Regeneration Delivery Plan, as a key mechanism for
delivering new energy efficient commercial property and associated low carbon
infrastructure at key employment locations, including Kyle Road, Annickbank and i3,
will be important for the Proposed Plan and Delivery Programme. An updated
Regeneration Delivery Plan is due to be developed and published in 2026. 
LDP2 allowed for residential uses at established employment locations, including
West Byrehill and North Newmoor, with these sites now delivering new homes. There
is scope for further low scoring employment sites to be de-allocated or identified for
alternative uses, including housing. As with LDP2’s housing allocations, Schedule 5
sites will be assessed as part of the preparation of the Proposed Plan in order that
sufficient land for business and industry is allocated in the new plan.  
Further examination of larger sites at Hunterston, i3 and Ardeer is required to confirm
the feasibility of these as locations for inward investment and large-scale, land-
hungry uses, to ensure a sufficient range of employment land is maintained for future
needs. This will be progressed via the site appraisal process, with any actions
included within the Delivery Programme. A key component of the assessment of
Ardeer will be the biodiversity value of the site and how any future development can

Page 178

North Ayrshire’s third Local Development Plan
167
LDP Committee Version
protect, conserve, restore and enhance biodiversity in line with the mitigation
hierarchy. 
Ayrshire Growth Deal
The Ayrshire Growth Deal has secured £251.5 million worth of funding and aims to
facilitate private sector investment of more than £300m into the region and to support
up to 7,000 new jobs. The five programmes of the Ayrshire Growth Deal are at
various level of progression, and projects have evolved since some were identified
as ‘Strategic Development Areas’ by LDP2. 
LDP3 and its associated Delivery Programme should support and help facilitate
Ayrshire Growth Deal projects, including the Great Harbour in Irvine, aligning with
the Masterplan prepared for the area. 
Town Centres and Retail
Town centres are the beating heart of our communities and are still where most
people access services. In this regard, thriving town, village and smaller local
centres are essential to delivering local living, where people can access most of their
daily needs within a 10-minute walk. LDP3 must support a sustainable future for
North Ayrshire’s network of centres, enabling them to be vibrant, healthy, creative,
enterprising, accessible and resilient places for people to live, learn, work, enjoy and
visit.
Irvine has the principal concentration of retail, service and civic uses across its town
centre and adjacent retail parks and is considered to have a sub-regional role within
Ayrshire. LDP3 should align with proposals for Irvine developed by the Town Board
as part of ‘Plan for Neighbourhoods’ investment. 
A Retail Capacity Study for North Ayrshire has found, overall, there is no quantitative
convenience retail deficiency in North Ayrshire and that significant new convenience
floorspace would likely adversely impact on existing foodstores. In Arran, Largs and
Kilwinning, however, additional floorspace would address local deficiencies in
floorspace. This will be a consideration for the LDP3 spatial strategy for these
locations. Additionally, should the spatial strategy propose urban expansion, the
requirement for new small scale neighbourhood retail development will require to be
assessed in the context of local living; areas to the north and east of Irvine have
already been identified as not having relatively easy access to small-scale local
retail/service facilities. 
The importance of Brodick as a local centre on Arran is not reflected in the Network
of Centres established by LDP2. This, and other minor changes to the geography
and/or function of centres recommended by the Retail Capacity Study, should be
considered in confirming the Network of Centres to be defined by LDP3. This
network should reflect the principles of 20-minute neighbourhoods; smaller ‘local
centres’ could form part of the network centres where 20-minute neighbourhood
analysis identifies important clusters of retail and commercial uses.

Page 179

North Ayrshire’s third Local Development Plan
168
LDP Committee Version
By its very nature, drive-through development encourages unsustainable travel
choices. However, such uses can also provide valuable social spaces for local
communities and service sector job opportunities. In preparing LDP3, we will have to
consider where it may be appropriate to support any future drive-through
development proposals. 
NPF4 states LDPs should identify areas where proposals for healthy food and drink
outlets can be supported. Notwithstanding the difficulty in restricting retail offering
within Class 1A, it is not considered such areas would differ from general retail
provision in accordance with NPF4 Policy 28. 
LDP3 should also consider opportunities for town centre living. Through an urban
capacity study, we will be proactive, working alongside colleagues in Housing and
Regeneration Services, in identifying opportunities to support residential
development in our town centres, recognising that such projects may require public
sector support to be delivered, as was the case with the King’s Arms development in
Irvine.
Rural development
Around three-quarters of North Ayrshire’s mainland is classified as ‘accessible rural’
and our inhabited islands, Arran and Cumbrae, are remote rural areas with their own
challenges. While our rural population is relatively small, our rural areas are vitally
important. They are where our most valuable landscapes and nature sites and
networks can be found; locations that attract visitors and for and outdoor recreation,
agriculture and forestry; and where the most opportunity exists for blue green
infrastructure expansion and development aimed at adapting to climate change and
reducing greenhouse gas emissions, including renewable energy development. 
LDP3 will be required to balance these interests within its spatial strategy, setting out
an appropriate approach to development in rural areas which reflects the
characteristics of our rural areas. This will include directing where and what type of
new housing, employment and energy related development will be supported. 
The community priorities of our islands are set out in Local Island Plans for Arran
and Cumbrae. LDP3 should take cognisance of these plans, and the Cumbrae Local
Place Plan and other emerging community-led plans that encompass rural areas, in
establishing its approach. The new plan will also need to consider how community
services in these areas can be supported, to sustain communities and help reverse
the trend of declining population of working age residents.
Tourism
Informed by our Visitor Management Plan and Strategic Tourism Infrastructure
Development Plans, LDP3 should support the recovery, growth and long-term
resilience of the tourism sector in North Ayrshire and identify locations where tourism
development will be supported. The spatial strategy should take account of the
needs of communities, visitors, the industry and the environment, including as
highlighted by the Arran and Cumbrae Local Island Plans.

Page 180

North Ayrshire’s third Local Development Plan
169
LDP Committee Version
Culture and creativity
LDP3’s spatial strategy is required to recognise and support opportunities for jobs
and investment in the creative sector, culture, heritage and the arts and ensure that
communities have access to cultural and creative activities. A consideration of local
culture should be reflected for proposals to support development that is locally
distinctive. 
The Retail Capacity Study highlights that there is a greater potential for ongoing
requirement for space for the provision of leisure services than for retail. The
Proposed Plan should consider how new commercial leisure developments should
be accommodated within LDP3’s spatial strategy. Where appropriate, existing
cultural assets should be safeguarded, particularly where communities have shown
interest in protecting and enhancing these. 
Aquaculture
The Proposed Plan must align with the current and emerging National and Regional
Marine Plans in guiding new aquaculture development and supporting an
aquaculture industry that is sustainable. Any views from the aquaculture industry
expressed during the preparation of the Clyde Regional Marine Plan may also
usefully inform the preparation of LDP3. 
Other related sections of this Evidence Report, such as the biodiversity, natural
places and coastal development, will be relevant to ensuring any future proposals
are developed within environmental limits to ensure unacceptable adverse impacts
on the environment are avoided. 
Minerals
The Aggregate Minerals Survey for Scotland in 2019 and 2023 Aggregate Minerals
Survey for Great Britain indicate that the Ayrshire region has a significant supply of
permitted sand and gravel and crush rock reserves, around ten-times greater than
the 10-year landbank of construction aggregates NPF4 requires LDPs to support.  
It is considered Ayrshire is an appropriate geography to focus as a market area,
enabling the sustainable management and use of mineral resources while limiting
the distances aggregates require to travel for the construction of important
infrastructure including transport, renewable energy infrastructure and housing.
Further analysis of the position on Arran is warranted, in recognition of transport
costs from the mainland and consequential higher build costs on the island. 
A requirement to undertake a survey of local operators, including on Arran, is
identified to obtain more evidence on quarry outputs, consented reserves,
distribution and any future plans to further inform LDP3. This will be progressed
before the end of 2025.

Page 181

North Ayrshire’s third Local Development Plan
170
LDP Committee Version
Statements of Agreement / Dispute 
No statements from stakeholders have been received highlighting agreement
or disputes with the evidence presented in this schedule. Links to Evidence
1) Scottish Government, Scotland’s National Strategy for Economic
Transformation (March 2022)
2) Ayrshire Regional Economic Strategy (June 203)
3) North Ayrshire Council, (May 2020)
4) North Ayrshire Council, North Ayrshire Community Wealth Building Strategy
for 2024 to 2027
5) Anchor Charter
6) North Ayrshire Council, Community Asset Transfer Policy (June 2024)
7) Ryden for North Ayrshire Council, Employment Land Appraisal (March 2024) 
8) Ryden for North Ayrshire Council, Employment Land Appraisal – 2025
Addendum (September 2025)
9) Scottish Government, Town centre action plan review: joint Scottish
Government and COSLA response (April 2022)
10) Gravis Planning incorporating Hargest Planning Ltd. for North Ayrshire
Council, North Ayrshire Retail Capacity Study – Final Report (June 2024)
11) Ayrshire and Arran Visitor Economy Leadership Group, Ayrshire and our
Islands Visitor Economy Strategy
12) North Ayrshire Council, Visitor Management Plan 2025
13) North Ayrshire Council, Strategic Tourism Infrastructure Development Plans –
Mainland (December 2023)
14) North Ayrshire Council, Strategic Tourism Infrastructure Development Plans –
Islands: Arran and Great Cumbrae (December 2023)
15) Scottish Government, Culture Strategy for Scotland (March 2022)
16) Scottish Government, National Marine Plan 
17) Scottish Government, Programme for Government 2022 to 2023
18) Scottish Government, Programme for Government 2024 to 2025
19) British Geological Survey for Scottish Government, Collation of the results of
the 2019 Aggregate Minerals Survey for Scotland (September 2023)
20) North Ayrshire Council, Great Harbour Masterplan (September 2023)

Page 182

North Ayrshire’s third Local Development Plan
171
LDP Committee Version
Topic 6 – Infrastructure
Infrastructure considerations are integral to development planning and decision-
making within the planning system, particularly in the context of delivery. National
planning policy calls for an infrastructure first approach to land use planning which
puts infrastructure considerations at the heart of placemaking. As part of an
evidence-based approach, potential impacts on infrastructure and infrastructure
needs should be understood early in the development planning process. This section
of the Evidence Report considers health care, education, energy, digital and water
infrastructure within North Ayrshire. 
The evidence presented in this schedule relates primarily to NPF4 policy 18. Blue
and green (including water management) and waste infrastructure is included within
the Sustainable Places schedule (Topic 3). Sustainable transport infrastructure is
addressed in the Transport schedule (Topic 4). 
Information required by the Act and Regulations
Section 15 of the Planning Act concerns the form and content of local development
plans. Subsection 1(a) requires the local development plan to take account of
matters mentioned in subsection (5), including:
• the health needs of the population of the district and the likely effects of
development and use of land on those health needs
• the education needs of the population of the district and the likely effects of
development and use of land on those education needs 
• the capacity of education services in the district
• the infrastructure of the district (including communications, transport and
drainage systems, systems for the supply of water and energy, and health
care and education facilities) and how that infrastructure is used
Section 16B of the Act relates to the Evidence Report. As per subsection (3), the
evidence report is to set out the planning authority’s view on the matters listed in
section 15(5), referred to above. 
Summary of Evidence
Policy Context
National planning policy seeks to encourage, promote and facilitate an infrastructure
first approach to land use planning, where infrastructure considerations are integral
to development planning, placemaking and decision making. Potential impacts on
infrastructure and infrastructure needs should be understood early in the
development planning process, as part of an evidenced based approach which
considers infrastructure capacity, condition, needs and deliverability. Infrastructure
requirements to deliver the spatial strategy and where, how, when and by whom
infrastructure priorities will be delivered should be set out in LDP3 and the Delivery
Programme.

Page 183

North Ayrshire’s third Local Development Plan
172
LDP Committee Version
In line with the infrastructure investment hierarchy, existing infrastructure assets
should be used sustainably, and low-carbon solutions favoured. The infrastructure
investment hierarchy is a Scottish Government-wide common hierarchy to aid
planning and decision-making, which prioritises enhancing and maintaining our
assets over new build. Further detail is set out in the Infrastructure Investment Plan
for Scotland 2021-22 to 2025-26. 
Where required, the type, level (or method of calculation) and location of any
financial or in-kind contributions towards infrastructure should be indicated within the
plan and delivery programme, including the types of development from which they
will be required.
Health Care
The regional health board covering the North Ayrshire Council area is NHS Ayrshire
and Arran. The Health Board is structured into five main operational divisions: Acute
and Maternity Hospital Services; Health and Social Care Partnerships for each of the
three Council areas, East, North and South Ayrshire; and Public Health. 
Acute Services
Acute health services in Ayrshire are delivered by NHS Ayrshire and Arran
predominantly at the University Hospital Ayr and University Hospital Crosshouse,
both outwith North Ayrshire. Some specialties are duplicated on both sites, while
some services are provided for the whole of Ayrshire from one hospital. Similarly, not
all health services can be provided within the geographical boundaries of Ayrshire.
Notably, neurosurgery, radiotherapy, specialist children’s services and some
specialist services are delivered in Glasgow, cardiac and lung surgery is delivered at
Golden Jubilee National Hospital and inpatient vascular care for Ayrshire patients is
at Hairmyres Hospital in East Kilbride. 
Health and Social Care Partnership
The North Ayrshire Health and Social Care Partnership (NAHSCP) is responsible for
community-based health and social care services in North Ayrshire. An Integration
Joint Board (IJB) oversees the operation of the NAHSCP, which also delivers a Lead
Partnership role across all of Ayrshire for mental health services and the children’s
immunisation programmes. Primary Care Services (GP practices, dentistry,
optometry) are managed by East Ayrshire HSCP on behalf of the whole of Ayrshire. 
‘Caring Together’ is the NAHSCP’s Strategic Commission Plan for 2022 to 2030. In
response to population need, the plan informs how health and social care services
are planned and delivered in North Ayrshire. A review of the strategic plan at the end
of 2024 recommended that, due to the circumstances under which the HSCP is
currently operating being significantly different to when the previous plan was
developed, a full refresh should be undertaken. It is anticipated that a new plan will
be finalised by the end of 2025. As with previous plans, the content of the plan will
take account of a Strategic Needs Assessment and community engagement. 
Public Health
The Department of Public Health works to improve health and reduce health
inequalities by addressing the building blocks of health. Key functions include health

Page 184

North Ayrshire’s third Local Development Plan
173
LDP Committee Version
protection, health improvement, healthcare public health, resilience and civil
contingency planning, and public health intelligence and research. As well as its
roles in strategic and service planning, it also delivers a number of operational
services such as immunisation, screening, and smoking cessation programmes. 
Primary health care services
Figure 8 and Table 26, below, taken from the most recent NAHSCP Profile, illustrate
the location and number of health care services located in North Ayrshire. Note:
where a practice has more than one surgery, satellite surgeries are not shown in
Figure 8 or noted in Table 26. For example, the Ayrshire Medical Practice
incorporates The Three Towns Medical Practice and West Kilbride Medical Practice.
The West Kilbride surgery is not identified on this map. 
Figure 8 – Map of services by locality within the North Ayrshire HSCP area 
Table 26 – Number of each type of service in North Ayrshire HSCP
Service Type Service Number
Primary Care GP Practice 18
Accident and Emergency Emergency Department (ED) 0
Accident and Emergency Minor Injuries Unit (MIU) 2
Care Home Elderly Care 18
Care Home Other 18

Page 185

North Ayrshire’s third Local Development Plan
174
LDP Committee Version
The closest Accident and Emergency service to North Ayrshire is provided at
University Hospital Crosshouse. 
Ayrshire Central Hospital in Irvine provides young disabled and rehabilitation
services, and a number of assessment beds for elderly mental health services.
Recent years have seen significant developments on the site, with a new general
outpatient department and rehabilitation centre. Woodland View, NHS Ayrshire and
Arran’s inpatient mental health facilities; Foxgrove, the new National Secure
Adolescent Inpatient Service for Scotland, an inpatient unit for children aged 12 to 18
years who have complex difficulties and need a high level of care; and the Eglinton
Family Practice are also located at Ayrshire Central Hospital. 
On our islands, Arran War Memorial Hospital and Lady Margaret Hospital in
Cumbrae provide minor injury services, staffed by local GPs supported by other
professions, both visiting and in-house. Outpatient services are also available at
Arran War Memorial Hospital and at the Cumbrae Medical Practice.
There are four GP clusters across North Ayrshire, noted below alongside additional
information on NHS dental practices and pharmacies: 
• Garnock Valley Cluster
There are three GP practices within the Garnock Valley Cluster: Beith Health Centre,
Dalry Medical Practice and Kilbirnie Medical Practice. Additionally, the Mistylaw
Medical Practice (Lochwinnoch) has a surgery in Beith. 
One dental practice operates at locations in Beith, Dalry and Kilbirnie. At May 2025,
the practice in Beith was accepting new NHS patients. There are six pharmacies. 
• Irvine / Kilwinning / Dundonald Cluster
There are six practices within this cluster, which extends beyond North Ayrshire into
parts of South and East Ayrshire around Dundonald and Symington. 
There are four GP practices within the Irvine locality: Frew Terrace Surgery, which
has a branch at Lanfine Way; Townhead Surgery; Eglinton Family Practice; and
Bourtreehill Medical Practice. Additionally, the Dundonald Medical Practice has a
surgery in Dreghorn. There are two GP practices within the Kilwinning locality:
Kilwinning Medical Practice; and Oxenward Medical Practice.
Five dental practices within Irvine and Kilwinning are accepting new NHS patients
and there are 13 pharmacies. 
• Three Towns
There are five GP practices within the Three Towns locality: Central Avenue and the
South Beach Medical Centre in Ardrossan; Saltcoats Group Practice and Stevenston
Group Practice plus the Ayrshire Medical Group, also based at the Health Centre in
Stevenston. 
Two dental practices within the Three Towns locality are accepting new NHS patients
at May 2025, with another accepting only children. There are eight pharmacies.
• North Ayrshire and Islands

Page 186

North Ayrshire’s third Local Development Plan
175
LDP Committee Version
This cluster covers the North Coast locality, including the Isle of Cumbrae plus the
Isle of Arran. There are four GP practices identified by the Primary Care Services
and Premises Review: Largs Medical Practice; Cumbrae Medical Practice; Dr Rai's
Practice and the Arran Medical Group, which has three main surgeries, Brodick
Health Centre, Lamlash Medical Centre and Shiskine Surgery. There are also branch
surgeries held in Whiting Bay Surgery. 
The Ayrshire Medical Group additionally has a branch in West Kilbride. One dental
practice within Largs is accepting only children and adults who are exempt as new
NHS patients. Neither dental practice on Arran – Arran Dental Care in Brodick and
Lamlash Dental Clinic – is accepting new NHS patents. There are seven pharmacies
in the North Coast and three on Arran.
Drivers for change 
Led by Ayrshire and Arran NHS Board and the three Ayrshire Integration Joint
Boards, ‘Caring for Ayrshire’ is a whole-system health and care redesign and reform
ambition driven by a vision that care should be delivered as close to home as
possible, supported by a network of community services with safe, effective and
timely access to high quality specialist services for those whose needs cannot be
met in the community.
Caring for Ayrshire recognises that people are living longer and healthier lives,
supported by medical advances, technology and improved public health. This
increases the number of people needing care and means health and care services
need to evolve, to make sure we can look after more people, in better ways now and
in the future.
North Ayrshire’s changing demographics are just one driver for change relevant to
the delivery of Primary Care services and associated heath care infrastructure
requirements. The new General Medical Services contract, published in 2018,
fundamentally changes how primary care services are to be managed and delivered.
It sets out the future focus for the GP role as ‘expert medical generalists’, with the
requirement for some tasks, historically carried out by General Practitioners (GPs),
to be undertaken by a wider multi-disciplinary primary care team. The Ayrshire and
Arran Primary Care Improvement Plan (PCIP) sets out how the three Ayrshire
HSCPs will work alongside General Practice and the NHS Board to deliver the
implementation of the General Medical Services contract. 
Factors including persistent levels of deprivation and inequality and increasing
mental health and drug and alcohol misuse; new housebuilding (notwithstanding the
longer-term trend of population decline in North Ayrshire); the increased use of
technology; the importance of infection control; alongside recruitment and retention
issues for both GPs and other clinical staff all also have implications for models of
service delivery and associated accommodation needs in the future. 
Also relevant is that the Health Board faces an extremely challenging financial
position. The NHS Ayrshire and Arran Delivery Plan 2025 to 2026 indicates the
forecast budgetary gap for the current financial year is £33.1 million. These
challenges are replicated within health and social care partners, and it is

Page 187

North Ayrshire’s third Local Development Plan
176
LDP Committee Version
acknowledged that these financial pressures could impact the delivery of the Caring
for Ayrshire vision over the short to medium term. 
Review of services
A Primary Care Services and Premises Review was undertaken in 2024, as part of
the Caring for Ayrshire Programme. Taking into account these ‘drivers for change’, it
aims to identify the appropriateness and functionality of current accommodation and
assess the estate requirements to support the implementation of the primary care
transformation programme.
As part of the analysis, information was collected from practices across Ayrshire and
Arran to understand better how the current infrastructure was being utilised and
some of the key challenges inherent in the estate. To support this, a data collection
proforma was developed and issued to all practices covering information
requirements related to the current clinic timetable; the number and type of rooms
available within the practice, details of its functionality; and current practice-based
workforce, including any additional visiting services incorporating both whole-time
equivalent (WTE) staffing levels and sessions based at the practice. 
This information provided a snapshot of the space and people currently within
primary care and was further analysed to determine what new workforce roles were
in place in the practice; what space is available (vacant clinic rooms per day) to
accommodate new services; issues relating to the condition of the premises; and
opportunities to convert under-used space, e.g. education rooms, to support clinical
functions.
The review also considers Primary Care Improvement Plan (PCIP) service impacts
and estate asset management information. The ‘Estate Asset Management System’
(EAMS) ‘6 facet analysis’ provides information about the status of all primary care
buildings (NHS, GP-owned, and leased premises). The analysis used information on
four of the six facets: physical condition (building and engineering), functional
suitability, quality, and space utilisation. 
Capacity and condition
Based on the information sources outlined above, a summary of the baseline
position for the North Ayrshire HSCP and associated GP practices is set out by
Figure 2-5 of the Review. This uses a RAG (Red/Amber/Green) scale which scores
room use, timetable gaps, staffing levels and estate.
Overall, the data on GP practices set out in the review shows significant challenges
with overall high room use and a requirement to address gaps in the current
timetable to accommodate the full roll-out of the Primary Care Improvement Fund
(PCIF) expanded roles. Although the estate data is more favourable, the review
indicates that 20-30% of the primary care infrastructure is in poor physical condition,
over 50% has unsatisfactory functional suitability or quality, and 32% of the buildings
are overcrowded. There is surplus capacity regarding timetable gaps at a few
locations, but most noticeably on Arran.
Assessment of future capacity requirements, taking into account the potential impact
of new housing, indicates across the NAHSCP there is a shortfall of 153 clinical

Page 188

North Ayrshire’s third Local Development Plan
177
LDP Committee Version
sessions, equivalent to around 16 rooms, required to enable the full allocation of new
roles to be met.  There are pressure points from new housing developments within
the Irvine / Kilwinning / Dundonald cluster, which will require a long-term solution as
part of any proposed investment [Figure 4-3]. 
A programme for annual review of General Medical Services (GMS) contracts has
been developed and due to be implemented by the primary care team to review
practice operating models, quality indicators and identify any improvement work.
This will enhance oversight of core service delivery by the Board and help to early
identify any issues or additional support GP Practices may need to sustain service
delivery. The NHS Ayrshire and Arran Delivery Plan (2025 to 2026) indicates this
work will be completed by March 2026. 
As noted in the Delivery Plan, all NHS Boards are required to prepare a whole-
system infrastructure plan by January 2026. In response, NHS Ayrshire and Arran
have prepared a whole-system Programme Initial Agreement (PIA) document. The
whole-system PIA narrative it expected to empower the health board to focus on
engaging stakeholders, communities, staff and services in the essential work needed
to drive forward the service reform and redesign required to deliver on the Caring for
Ayrshire ambition. NHS Ayrshire and Arran subsequently advised that the whole
system planning process will now continue through an alternative process involving a
series of Strategic Assessments. 
Education 
The learning estate in North Ayrshire comprises eight standalone secondary and 49
standalone primary schools. In addition, there is one ‘all through’ facility – Garnock
Community Campus – which combines an Early Learning Centre, primary and
secondary school. There is one all-through establishment dedicated to learners with
Additional Support Needs - Lockhart Campus, which was opened in 2021, with six
other facilities also providing services for children and young people with additional
support for learning needs.
Early Years
There are 36 early years classes located across North Ayrshire primary schools and
five Early Years Centres operated by the Council. These are:
• Castlepark Early Years Centre, Irvine
• Dalry Early Years Centre, Dalry
• Largs Early Years Centre within Largs Campus
• Marress Early Years Centre, Irvine
• Springvale Early Years Centre, Saltcoats
Additionally, there are 16 private early years providers. Funded early learning and
childcare (ELC) is available to all 3- and 4-year-olds in Scotland and eligible 2-year-
olds. The entitlement is 1140 hours per year and there are three main operating
models: (term time; AM/PM; or two-and-half days).

Page 189

North Ayrshire’s third Local Development Plan
178
LDP Committee Version
Unlike with schools, there are no catchment areas for early years establishments.
Parents and carers are asked to select up to three suitable establishments when
enrolling their child for an early years place. Early Learning and Childcare
admissions are managed through a central allocation procedure and includes a
priority banding system to ensure places are allocated fairly, based on identified
needs and circumstances. This priority banding policy was updated in October 2025.
Against a background of falling birth rates, taking into account current uptake of
places, and with the input of private sector partners in the Authority area, a recent
review of Early Years capacity across North Ayrshire undertaken by Education
Service has concluded that demand over the next 4 years can be met. Early Years
capacity will continue to be closely monitored.  Demand is measured based upon the
number of births and Public Health Scotland data records.
Key data on the condition, capacity, and suitability of the learning estate in North
Ayrshire is submitted annually to the Scottish Government as part of the School
Estates Core Facts Survey. The reported data for each establishment, published by
the Scottish Government in September 2025, is set out the ‘North Ayrshire Council
Learning Estate: Information for LDP3 Evidence Report’ data prepared by the NAC
Education Service and is summarised below:
Condition 
A measure of the current state of the fabric and of safety and security of each
establishment is given in the form of a rating between A to D. Condition surveys are
undertaken at least every 5 years but are reviewed quarterly during the interim
period between surveys, as part of the management of the learning estate. 
The condition of the majority – 55 out of 59 establishments in 2024 – of schools in
North Ayrshire are rated ‘Satisfactory’ (B). Ardrossan Academy is Category D and is
due for replacement as part of a new Community Campus. Springside Primary
School was reported as ‘C’ in May 2025, and consideration is being given to the
actions required to restore the rating to a ‘B’ as soon as possible. Both Montgomerie
Park and Moorpark Primary Schools are brand new buildings, opened in August and
October 2024, and are rated ‘A’. 
Occupancy 
North Ayrshire Council applies ‘Determining primary school capacity: guidance for
local authorities’ in calculating the reported planning capacity for each primary
school. For secondary schools, a formula is used to determine planning capacity
which includes an allowance for required timetabling of spaces. Each year, the
school census roll number reported for that session is divided by the capacity figure
to find the occupancy rate of each building. Full occupancy of 100% is rarely
achieved due to school size, the number of available classrooms and differences in
class sizes for different stages and composite classes. It should be noted that where
the occupancy rate exceeds 87%, schools can experience operational difficulties. 
Average primary school occupancy within North Ayrshire as reported in May 2025
was 66.2% - this is just below the current national average of 71.4%. Table 27

Page 190

North Ayrshire’s third Local Development Plan
179
LDP Committee Version
provides an overview of occupancy, with the published occupancy of all schools
provided in the ‘North Ayrshire Council Learning Estate: Information for LDP3
Evidence Report’ data. 
Table 27 – Overview of Primary and Secondary Occupancy (2025) 
Occupancy (2024) Number of primary
schools
Number of secondary
schools
<50% 7 1
50-75% 33 3
75-90% 10 5
90-100% 0 0
Over 100% 0 0
Only one school in North Ayrshire has a published occupancy for 2024/25 of 87% or
higher, Annick Primary School in Irvine. This school is noted to have a declining roll
projection, a direct result of the opening of Montgomerie Park Primary School. 
Occupancy provides a snapshot of the pupil numbers in schools at a point in time.
North Ayrshire Council also considers the ‘sufficiency’ of the number of places within
each school catchment area. This supports the management of the learning estate in
line with evolving demand by taking account of the potential number of pupils who
may attend schools, based on the number of dwellings in each school catchment
area. The Education Service has developed a calculation which takes the number of
existing dwellings and active developments within the school catchment area and the
3-year average locality ratio of actual pupils to homes. The number of homes is
multiplied by the local average number of pupils per home to provide an ‘expected’
number of pupils for the catchment. This is compared to the school capacity to
provide an indication of schools which are at risk of exceeding their capacity, based
on this calculation. 
Alongside this calculation, individual school roll projections are updated annually
once pupil census information is finalised and issued. The forecasting school rolls
considers the following:
• Pupil Census data
• Local birth data
• Community Health Index data from Public Health Scotland
• Early Years’ data, including intended primary school, if provided by
parents on registration
• Placing request trends 
• Housing Land Audit projections 
• Stay-on rates for secondary school pupils
Using all of the inputs above, schools are noted as having either increasing, static or
decreasing rolls.

Page 191

North Ayrshire’s third Local Development Plan
180
LDP Committee Version
The Education Service use a specific ‘child per home’ ratio for proposed new
housing developments to calculate the likely number of new pupils coming forward
from the housing. Analysis has shown that typically an average of 0.31 children per
home, up until around year 9 of any development are generated and then numbers
start to fall back to the local long-term average. While some developments have
reached as many as 0.45 children per home at their peak, the applied ratio has
worked in principle and is re-checked with each major development within the
authority area for accuracy, as well as benchmarking with other local authorities.
Based on the school sufficiency measure and taking account current occupancy and
new housing developments with school catchment areas, the current capacity of
North Ayrshire’s educational establishments is summarised below: 
• Schools with capacity 
o All schools within the Garnock Valley locality 
o All schools on the Isle of Arran, except Corrie Primary School
o Lawthorn Primary School
o Skelmorlie Primary School
• Schools with limited capacity
o Six secondary schools (Ardrossan, Auchenharvie, Greenwood, Kilwinning,
Largs and St. Matthews)
o 29 primary schools (see ‘North Ayrshire Council Learning Estate:
Information for LDP3 Evidence Report’)
• Schools without capacity 
o Castlepark Primary School, Irvine – The school merged with John Galt
Primary School 2012, absorbing its catchment area upon its closure.
Despite a four-classroom extension being added, the school breached its
capacity in 2018. Numbers have been reducing, however, development of
the 200 homes at Ayrshire Central, currently under construction, will take
this school to its limit in terms of sufficiency. 
o Fairlie Primary School – This small 5-class school has seen its roll
increase by 51 children over the last 7 years, resulting in a 6-class
structure and the conversion of a small general purpose room into a
classroom. The roll continues to grow as a direct result of new homes and
all parent/carers now choosing their non-denominational provision in the
village, rather than the denominational provision.
o Irvine Royal Academy – Montgomerie Park has contributed around 600
new homes to this school catchment to date, with a further 500 planned,
the majority of which are concentrated over the next 3 years. A reduction in
placing requests made out of the school compounds increased demand for
places here, which is being closely monitored against the school capacity.
o Mayfield Primary School, Saltcoats – a significant sized development of
370 homes adjacent to this single stream school, means that many more

Page 192

North Ayrshire’s third Local Development Plan
181
LDP Committee Version
new children are expected to enrol at the school. The P1 intake has been
capped here in order to protect spaces for these new children. The new
homes take this school to its limit in terms of the sufficiency measure.
o Montgomerie Park Primary School – the school opened in August 2024,
and its catchment covers the adjacent area, as well as the Knadgerhill
area. In planning the new school capacity, all of the homes mentioned
above were taken into account. P1 at the school has been capped in order
to protect places for catchment children, expected to come forward in high
numbers over the next 3 years.
o Pennyburn Primary School, Kilwinning – a development of 426 homes at
West Byrehill, Pennyburn takes this school sufficiency measure to its limit.
Numbers here will be continually reviewed in order to assess actual impact
against expected numbers.
o St. Anthony’s Primary School, Saltcoats – as Mayfield Primary School,
above.
o West Kilbride Primary School – 220 units being built at Portencross Road
have resulted in a developer contribution toward a school hall. The
expected numbers from this development take this school sufficiency
measure to its limit. Numbers here will be continually reviewed in order to
assess actual impact against expected numbers.
Identified future capacity issues
Roll projections – which consider HLA projections – indicate that seven schools in
North Ayrshire have an increasing school roll. Five of these schools are considered
not to have capacity for future housing and are rated ‘Red’: Montgomerie Park
Primary School, Irvine; Fairlie Primary School; Mayfield Primary School; West
Kilbride Primary School plus Irvine Royal Academy. 
Most schools in North Ayrshire (70%) are expected to maintain rolls around their
current level. Three of these schools are noted not to have capacity for future
(unprogrammed) housing: Castlepark Primary School, Irvine; Pennyburn Primary
School, Kilwinning; and St. Anthony’s Primary School, Saltcoats. 
The Planning Services meets quarterly with the Education Service and Housing
Service to monitor the impact of the affordable housebuilding programme and private
sector housebuilding on the capacity of schools. Detail on the number of new homes
programmed to be built within each school catchment area, taken from the 2025
HLA, is included within the ‘North Ayrshire Council Learning Estate: Information for
LDP3 Evidence Report’ spreadsheet. 
Suitability 
Suitability is a measure of how well a school building, and its grounds facilitate the
delivery of the education curriculum. It should be noted that suitability should be
assessed as distinct from condition i.e. the assessment is carried out under the

Page 193

North Ayrshire’s third Local Development Plan
182
LDP Committee Version
assumption that building condition is ‘Good.’ In essence, suitability looks at how
schools use the building that they occupy.
Most schools in North Ayrshire are ranked ‘Good’ or ‘Satisfactory’ meaning they are
performing well and operating efficiently, and the school buildings support the
delivery of services to children and communities or well but with minor problems.
Three schools are rated ‘Poor’ for suitability for school session 2024-25: Ardrossan
Academy and Winton Primary School, which are being replaced as part of the
Ardrossan Community Campus project; and Corrie Primary School. A ‘Poor’ rank
means the school is not operating optimally and/or has major problems meaning the
school buildings impede the delivery of activities that are needed for children and
communities in the school. 
School Estate investment
Despite the challenging economic landscape, North Ayrshire Council has continued
to make significant investment provision within its learning estate. In recent years
this has included a new primary school at Montgomerie Park, Irvine, planned as part
of the Council’s capital investment strategy to support housing-led growth within this
Strategic Development Area. Montgomerie Park can accommodate 342 primary
pupils and up to 47 early years pupils. This school does not have capacity for further
housing development within the catchment, beyond what is programmed within the
Housing Land Audit.
Moorpark Primary School in Kilbirnie was also replaced and opened in October
2024. The school has capacity built in to accommodate new homes within the
catchment. 
The ‘Early Learning and Childcare Expansion Programme’ (ELCEP) across the
learning estate has seen improvement works of varying scale take place across 42
establishments to allow the Council to meet the needs of expanding the provision to
1,140 hours per child, annually. The major project has been the transformation of
Marress House from a vacant office building into a new Early Years Centre and
Training Base. Total expenditure across all 42 ELCEP projects has been in excess of
£11.5 million. 
A new all-through education and community Campus is planned to open in
Ardrossan in 2027. This project will see the merger of Ardrossan Academy and
Winton Primary School, along with community leisure facilities, a shared
school/public library and accommodation for Health and Social Care staff within the
building. The new campus will offer capacity for up to 1400 secondary and primary
school pupils, replacing the current available capacity of 1762 places across both
schools. The current combined current roll is 881. Around 50% funding for this
project was obtained through the Scottish Government’s Learning Estate Investment
Programme (LEIP).
The Council is also committed to ensuring that the learning estate in North Ayrshire
is fully prepared for the introduction of Universal Free School Meals (UFSM). A
number of projects to improve kitchen and dining accommodation have been

Page 194

North Ayrshire’s third Local Development Plan
183
LDP Committee Version
identified, with improvement works planned for completion across all project sites by
2029. Beyond this programme and investment ICT, no further school extensions,
replacements or builds are included within the Council’s Capital Investment
Programme 2025/26 to 2033/34. 
Energy
Electricity
Grid capacity can be a significant constraint to new development, including
renewable energy projects, in terms of connection to the grid. The UK Government
and Ofgem have published a joint Connections Action Plan which sets out actions to
significantly reduce connection timescales and ensure a timely transition to net zero.
This seeks to address the significant delays in network connections by removing
stalled projects to release capacity for viable projects and ensure that remaining
capacity is better utilised. 
The UK Government is looking to support an overall shift from a smaller number of
large-scale generators to a more balanced number of generators. Increasingly, the
grid is required to respond to the intermittent, fluctuating production from renewable
power, and additional energy plants and energy storage are required to facilitate the
transition to renewable and low carbon energy generation. Battery storage proposals
offer benefits in terms of grid management however they still require a grid
connection. Proposals are therefore increasingly required to demonstrate viability to
secure a connection, to ensure that speculative proposals do not take up grid
capacity. 
Power distribution is serviced by Scottish Power Energy Networks (SPEN) on North
Ayrshire’s mainland and Scottish and Southern Energy Networks (SSEN) on the
Cumbraes and Arran. SPEN have produced an interactive indicative map SPD Heat
Map showing the main areas of constraint in terms of grid supply point and primary
substations. For Extra High Voltage lines (EHV), this indicates that the whole of the
network within North Ayrshire is constrained. For High Voltage (HV) lines, which
serve local areas primarily at a street level, this is equally as constrained. For
constrained areas of the grid, detailed network analysis is required to ascertain if a
grid connection can be achieved. Broadly speaking, there are capacity issues across
the Council area and beyond, which may impact energy generation projects coming
onstream, particularly for the short-medium term. 
SPEN have also produced a Network Development Plan which sets out their
approach to upgrading electricity grid infrastructure including distribution plants,
overhead lines, and transmission projects. There are three areas identified within
North Ayrshire: Hunterston Farm; Kilwinning; and Saltcoats (A & B). Expected by
2025/2026, Hunterston Farm will receive the installation of real time fault level
monitoring equipment. At Kilwinning, flexibility services to manage thermal
constraints are expected between 2024 and 2028. Currently underway, Saltcoats A is
receiving installation of real time fault level monitoring equipment and replacement
transformer. Planned for 2025/2027, Saltcoats B will have switchgear replacement
as part of the switchgear modernisation programme.

Page 195

North Ayrshire’s third Local Development Plan
184
LDP Committee Version
SSEN produce Distribution Future Energy Scenarios (DEFS), an annual process
which forecasts future load growth for both demand and generation. The output of
the DEFS inform SSEN’s Strategic Development Plans (SDPs) which provide
information on long term electricity needs. There are two SDPs which cover North
Ayrshire, Inverarnan which covers the Cumbraes, and Port Ann and Carradale which
covers the isle of Arran. 
SSEN have produced Local Energy Net Zero Accelerator (LENZA), a geospatial
planning platform, to support informed decision making, including information on
network capacity, building stock, and energy consumption. All the SSEN identified
primary substations supply areas have been given a rating of green indicating that
they have more than 5% headroom. The majority of secondary supply substations
are also rated green, where there is information available, with two identified as red
(more than 5% overloaded) on Arran at Tighenmenach and Ballygowan substations
and Upper Kirkton on Cumbrae. LENZA also includes the same information for
SPEN. All primary substations supply areas across NAC have a green rating. Where
information is available for secondary supply substations, which is less than half,
areas of constraint are identified around Skelmorlie, Kilwinning train station, south
Stanecastle and Ayr Road in Irvine indicating 5% overloading. These areas identified
as being overloaded or less than 5% headroom, will help aid in identifying suitability
of future sites in LDP3. 
NPF4 policy 11e) states that ‘Grid capacity should not constrain renewable energy
development. It is for developers to agree connections to the grid with the relevant
network operator.’ The grid capacity constraints do not have a direct bearing on the
planning process. It is considered that the indirect impacts of this will be an increase
in applications being resubmitted due to lapsing consents and the implications of
upgraded grid infrastructure coming forward. 
SSEN are investing over £15m in a project which will see the undergrounding of up
to 90km of OHL in designated scenic areas across their distribution network. To date,
approximately a dozen sites on Arran have been put forward for consideration of
undergrounding, with the outcome currently pending. 
Gas
The larger settlements within North Ayrshire’s mainland are connected to the gas
network. MSOA (Middle Layer Super Output Area) non-domestic gas demand is
shown to be highest around the general area of Irvine, extending east to Stevenston
and west towards Kilmaurs. It is typically lower in the rural area which stretches from
the coast in land, above Irvine and below the Clyde Muirsheil Regional Park.
Domestic gas demand, at LSOA (Lower Layer Super Output Area) level is indicated
at being the highest around the north and west of the Three Towns, North of Largs,
and some rural pockets in the east and north of the region. 
As of April 2024, all new housing in Scotland must have a non-carbon-based heat
source. This should result in zero direct emissions from new buildings through the
avoidance of fossil fuels. New housing development should therefore not rely on gas
for their utilities, LDP3 must be cognisant of this.

Page 196

North Ayrshire’s third Local Development Plan
185
LDP Committee Version
Digital infrastructure
‘A changing nation: how Scotland will thrive in a digital world’ presents an updated
digital strategy for Scotland. Key actions set out in the strategy aim to support and
accelerate the country’s journey towards being an inclusive, ethical, and sustainable
digital nation. In this context, NPF4 seeks to encourage, promote and facilitate the
roll-out of digital infrastructure to unlock the potential of all our places and the
economy, ensuring appropriate, universal, and future proofed digital infrastructure
across the Scotland. 
North Ayrshire Council has undertaken an assessment of its digital maturity,
challenges, and ambition as the first step of a comprehensive digital connectivity
strategy for the area. The Council’s ambition is to become a ‘smart connected place’
underpinned by highly available, future proof connectivity. Smarter connected places
can deliver positive social, economic, and environmental impacts and can pave the
way for enhanced service delivery. 
In evaluating ‘digital maturity,’ the state of digital connectivity across the North
Ayrshire has been assessed to provide an insight into the existing digital connectivity
landscape within the Council and more widely across the area, identifying coverage
gaps and the challenges and aspirations for enhancement. 
Overall, North Ayrshire has been found to exhibit a digital attainment gap in its digital
infrastructure landscape, use case development, approach to open data and
leadership. North Ayrshire’s full fibre availability (65%) is above the Scottish (48%)
and UK (58%) average but there are significant disparities across the area. The
estimated minimum investment required to achieve near 100% full fibre availability is
£13-26 million. 
Table 28 – Fibre availability by Locality (September 2023)
Locality Premises Count Premises
Served by fibre
% premises
unserved
Arran 3,348 2,645 20%
Garnock Valley 10,580 9,230 13%
Irvine 20,264 8,214 59%
Kilwinning 8,590 1,644 81%
North Coast and
Cumbraes 12,344 1,705 86%
Three Towns 17,878 16,033 10%
In terms of 4G coverage, there is 96% outdoor availability from four mobile network
operators (MNOs) with only 57% geographic coverage. No areas in North Ayrshire
have 5G coverage from all MNOs; the Scottish average is 11% coverage. Expanding
4G and 5G - focusing on extending geographical coverage for 4G and 5G
connectivity to reach underserved areas, including Arran, and encouraging multiple
operators to provide comprehensive 5G coverage; encouraging investment in fibre
infrastructure to enhance high-speed internet availability and reliability for
businesses and households in addition to establishing outdoor public Wi-Fi hotspots

Page 197

North Ayrshire’s third Local Development Plan
186
LDP Committee Version
in key public spaces, parks, and high-traffic areas to improve digital access for
residents and visitors are identified as recommendations to enhance digital
readiness and to create a more inclusive and digitally empowered and thriving digital
economy.
Water 
Information, in the form of GIS data, was supplied by Scottish Water in August 2025
relating to the capacity of both water treatment works (WTW) as well as wastewater
treatment works (WwTW) for the North Ayrshire Council area. Facilities are given the
status of either: ‘capacity currently available’ or ‘potential future investment required.’
It should be noted that these facilities are not all fully located within North Ayrshire
Council’s boundary but extend into neighbouring authorities to the north, east and
south.
Of the eight WTW’s, six (75%) currently have available capacity. Two have been
given the status of potential future investment required and are both located on
Arran. 
Of the 35 WwTW’s, only eight (22.86%) have been given the status of capacity
currently available. The wastewater treatment works with existing capacity are
located in Fairlie, Stevenston, Blackwaterfoot, Brodick, Kinloch, Lamlash and
Meadowhead plus the Inverclyde WwTW, serving Skelmorlie.
Scottish Water are required to identify and provide new strategic capacity to meet the
demand of new housing and the domestic requirements of commercial and industrial
development. Factors such as the total number of proposed developments, their
scale and their distance from treatment works will impact Scottish Water’s ability to
service them and the need for future growth investment. We will engage with
Scottish Water on the scale and location of any future proposed developments
identified within the status of potential future investment required to inform their
strategic plans and potential future growth investment priorities.
Scottish Water have also installed four ‘Top Up Taps’ in North Ayrshire, at Brodick,
Irvine Harbourside, Largs, and Millport, as part of the wider ‘Your Water Your Life’
campaign. The campaign is aimed at highlighting the vital role water plays in the
lives of people across the Scotland and encourages everyone to refill bottles and
drink water, described as the “nation’s greatest natural resource,” straight from the
tap. The locations of these taps can be viewed online. 
Summary of Stakeholder Engagement
We have engaged with relevant infrastructure providers to obtain the evidence
presented in this schedule: NHS Ayrshire & Arran and the North Ayrshire Health and
Social Care Partnership (NAHSCP); NAC Education; Scottish & Southern Electricity
Networks (SSEN) and SP Energy Networks (SPEN); NAC’s Digital Renewal
Manager and Scottish Water.

Page 198

North Ayrshire’s third Local Development Plan
187
LDP Committee Version
The Strategic Planning Team at North Ayrshire Council has quarterly meetings with
NHS Ayrshire & Arran’s Head of Property Services, Strategy & Partnerships and
Heath Improvement Lead and attends NAHSCP Property Group Meetings.
Engagement with the HSCP Strategic Planning and Equalities Team Manager has
provided evidence to inform the Liveable Places, Infrastructure, and Housing
schedules.
A draft of the full Evidence Report was shared with NHS Ayrshire & Arran on 7
October 2025. Within a combined response received on the 3 November 2026, the
Infrastructure & Support Services directorate raise the issue of developer
contributions, requesting provision for developer contributions towards health is
included within the Evidence Report. Reference is made to the established position
NHS Ayrshire & Arran has with East Ayrshire Council under their LDP, supported by
supplementary guidance. NHS Ayrshire and Arran requested the same calculation
methodology is adopted with North Ayrshire Council and referenced within the
Evidence Report.
Comment was also made in relation to the whole system planning process. This
section of the Evidence Report has been updated accordingly.
Homes for Scotland’s comments on the Infrastructure schedule highlight the
absence of a methodology to determine the capacity for the number of patients
registered at a general practitioner (GP) practice and the number of clinicians
required to manage delivery of General Medical Services based on the number of
patients registered with the practice. Homes for Scotland note, in support of local
living and maximising the use of existing assets. it is likely that more detailed
analysis of local healthcare provision will be required. This is accepted within the
Evidence Report. 
Engagement with local communities has indicated that access to GPs and the
capacity of medical practices is a key concern, particularly in the context of new
housing development. This is also reflected in the engagement caried out by the
Health and Social Care Partnership (see Liveable Places schedule for summary),
which identifies access to services the most consistent concern among North
Ayrshire residents. 
Summary of Implications for the Proposed Plan 
As part of an ‘infrastructure first’ approach, LDP3 must consider infrastructure
constraints and needs in planning future development and identify the key
investment priorities.
Health Care
Primary healthcare services are under considerable pressure across the whole of
North Ayrshire, due to a variety of factors. This applies to both the capacity and
condition of existing infrastructure, including buildings, to deliver primary health care
services. NHS Ayrshire and Arran and the North Ayrshire HSCP are in the process of

Page 199

North Ayrshire’s third Local Development Plan
188
LDP Committee Version
reviewing practice operating models, quality indicators and identifying improvement
work, which in turn will highlight future accommodation requirements to meet these
challenges and deliver on the long-term ‘Caring for Ayrshire’ ambition. LDP3 will
need to reflect emerging solutions to the modernisation of the primary healthcare
estate.
As raised by NHS Ayrshire & Arran, developer contributions may be required to
support investment in the primary healthcare estate, where this required to create
capacity for future housing development. 
Should developer contributions for new or extended medical practices within the
Irvine/Kilwinning/Dundonald cluster, noted to require a long-term solution in light
pressures from new housing developments, or elsewhere in North Ayrshire, any
contributions must be in compliance with the tests within NPF4 Infrastructure Policy
18 and Circular 3/2012: Planning Obligations and Good Neighbour Agreements. It is
noted that seeking contributions towards healthcare could make development
viability challenging, especially if this is alongside potential affordable housing
contributions. 
Further evidence is required to inform LDP3 spatial strategy; site allocations and
support any approach to developer contributions towards primary health care
infrastructure, in the context of NHS Ayrshire and Arran’s Strategic Assessment and
whole-system infrastructure plans, which are expected to emerge next year. We will
continue to work alongside NHS Ayrshire and Arran to understand implications for
the emerging LDP3 and to inform the Proposed Plan, noting the importance of this
issue to local communities. 
Education
Managing the school estate to match the evolving demand for school places with
supply to deliver education and other services is a major challenge for all local
authorities. In North Ayrshire, school rolls overall are declining in line with falling birth
rates. Conversely, increased housebuilding is expected to create capacity issues in
some locations; as settlements have expanded, demand for school places in some
towns has shifted away from town centres and historical school catchment areas.
This has been addressed, in part, within Irvine with the opening of a new primary
school at Montgomerie Park. 
The availability of resources in a difficult financial climate for local government will
impact on future learning estate provision within North Ayrshire. The anticipated end
of Public Private Partnership contracts which manage and maintain four schools in
2037 and a not-for-profit, ‘Design, Build, Finance, Maintain’ (DBFM) contract, due to
end in 2043, is also relevant. 
The current occupancy, school roll projections, and the calculation of the ‘sufficiency’
of the number of school places within each catchment area will be important
considerations in planning the location of new housing in North Ayrshire. This applies
especially within catchments where schools do not have capacity or only limited
capacity due to occupancy or the sufficiency of the number places (based on the

Page 200

North Ayrshire’s third Local Development Plan
189
LDP Committee Version
number of existing catchment homes plus new housing under construction),
including where larger developments are on site and an increase to the school roll is
forecast.
The Proposed Plan should allocate housing development within school catchments
where there is capacity within the catchment schools (primary and secondary) or
where there is an agreeable solution, in line with the infrastructure first principle.
Options within catchments with school capacity issues may include: 
• Phasing – In some instances it may be possible to accommodate new
development without creating additional capacity at a school by controlling
the phasing of completions in line with roll projections. This may be
possible as a school’s roll can fluctuate over time. Where agreed as a
solution, phasing can be controlled by condition limiting the number of
units delivered each year. 
• Reconfiguration – Reflecting the Council’s approach to delivering teaching
and learning and practical issues, for example class formation, options for
repurposing accommodation within a school to create additional teaching
space may be explored where additional capacity is required, based on an
assessment of the existing accommodation at a school. 
• School extension –The creation of additional capacity within a school may
require an extension, where feasible. In addition to classrooms, this may
also include the requirement for additional accommodation, for example
dining/assembly halls, general purpose teaching rooms, staff room, activity
areas, and toilets, in accordance with current standards.
• Rezoning or new school – in larger settlements, the rezoning of school
catchments or the creation of a new school are options where there are
capacity issues arising from new development and, in the case of
rezoning, where there is availability of provision in another school which is
close to the development. Such proposals are likely to be longer-term,
strategic solutions and will only be considered within the wider context of
the spatial strategy of LDP3, the school estate and overall education
provision.
The impact of proposed housing development on the learning estate, along with
potential actions to enable new development where school capacity is restricted, will
be assessed by the Education Service as part of the preparation of LDP3, including
site appraisal. Where options require capital investment because of proposed
development, contributions may be required from developers in accordance with
Planning Circular 3/2012. The capacity, occupancy, sufficiency of places and
condition of the school estate will be a consideration when developing the spatial
strategy at the Proposed Plan stage.

Page 201

North Ayrshire’s third Local Development Plan
190
LDP Committee Version
Energy
North Ayrshire has been the focus of several energy infrastructure projects and
proposals in recent years, including battery storage. The location and infrastructure
at Hunterston are identified as offering potential for electricity generation from
renewables. Grid capacity should not constrain development. It is for developers to
agree connections to the grid with the relevant network operator. LDP3’s spatial
strategy should consider the scope for more localised renewable energy
developments and local connections in the short-to medium term, in line with support
for a transition to renewable and low carbon energy generation. 
Digital Infrastructure
LDP3 should support the delivery of digital infrastructure, including fixed line and
mobile connectivity, particularly in areas with gaps in connectivity and barriers to
digital access. In North Ayrshire, Irvine, Kilwinning and the North Coast and
Cumbraes localities lag behind in terms of the proportion of premises with fibre
internet. 
Water 
Scottish Water are required to identify and provide new strategic capacity to meet the
demand of new housing and the domestic requirements of commercial and industrial
development. A high-level snapshot of current capacity indicates potential future
investment may be required, however, factors such as the total number of proposed
developments, their scale and their distance from treatment works will impact
Scottish Water’s ability to service them and the need for future growth investment.
We will continue to engage with Scottish Water on the scale and location of future
proposed developments in North Ayrshire to inform their strategic plans and potential
future growth investment priorities.
Statements of Agreement / Dispute
No specific statements from stakeholders have been received highlighting
agreement or disputes with the evidence presented in this schedule. 
Links to Evidence 
1) Scottish Government, A National Mission with Local Impact: Infrastructure
Investment Plan for Scotland 2021-22 to 2025-26 (February 2021)
2) North Ayrshire Health and Social Care Partnership, ‘Caring Together’ – Strategic
Commissioning Plan, 2022 to 2030 (March 2022)
3) Public Health Scotland, HSCP Profile – North Ayrshire Health and Social Care
Partnership (March 2023)
4) NHS Ayrshire and Arran, The Ayrshire, and Arran Primary Care Improvement
Plan (PCIP)
5) NHS Ayrshire and Arran, Delivery Plan 2025 to 2026 (August 2025)
6) Buchan Associates for NHS Ayrshire and Arran, Primary Care Services and
Premises Review – Final Report (July 2024)

Page 202

North Ayrshire’s third Local Development Plan
191
LDP Committee Version
7) NHS Ayrshire and Arran, Dental Practices Accepting New NHS Patients
(September 2025)
8) NAC Education, North Ayrshire Council Learning Estate: Information for LDP3
Evidence Report (November 2025)
9) Scottish Government, Determining primary school capacity: guidance for local
authorities (October 2014)
10) Department for Energy Security and Net Zero and Ofgem, Connections Action
Plan, November 2023
11) Scottish Power Energy Networks, Network Development Plan (May 2024)
12) Intelligens Consulting for North Ayrshire Council, An Assessment of North
Ayrshire’s Digital Maturity, Challenges and Ambition (March 2024)

Page 203

North Ayrshire’s third Local Development Plan
192
LDP Committee Version
Site Appraisal Methodology
Local development planning guidance advises that a site appraisal methodology, to
be used to appraise sites and inform allocations for the Proposed Plan, can usefully
be established at the Evidence Report stage. The proposed methodology to be used
by North Ayrshire Council in the preparation of LDP3 is set out in this section of the
Evidence Report. 
Summary of Site Appraisal Methodology
Site allocations – land (or buildings) identified in the local development plan for a
specified use – are an important component of the development plan. An allocation
confirms the principle of future development as part of the LDP’s role in defining
where development should and should not take place. In respect to housing land,
LDP3 must allocate deliverable land to meet the 10-year Local Housing Land
Requirement, in locations that create quality places for people to live. 
Local development plans are required to manage the development and use of land in
the long-term public interest by enabling development that contributes to sustainable
development and seeks to achieve the national outcomes. As demonstrated by the
breadth of evidence presented in this report, this encompasses the consideration of
a wide range of environmental, social, and economic objectives. In this context, we
have sought to develop a straightforward site appraisal methodology that allows an
overview of environmental impact, deliverability, and community benefits to be
highlighted and considered. 
A three-stage appraisal approach is proposed. Stage 1 of the site appraisal
methodology is aligned with the SEA Assessment Framework set out in the
Environment Evidence Paper, which incorporates the SEA scoping report. Stage 2
considers the deliverability of the proposal, taking account of constraints to
development and available infrastructure. Stage 3 considers the benefits of
development, including in relation to community wealth building. 
While a score will be assigned against each topic, it is not the intention to aggregate
or average the scores for each site at Stage 1, 2 or 3, or to provide an overall score.
The site appraisal is not intended to be an empirical exercise, rather, it will inform the
site selection process by highlighting potential issues for each site, which may
warrant further investigation, mitigation, or enhancement. Given the number of topics
and narrow scoring range, the comparison of aggregate or average scores could
obscure potentially significant effects and does not allow for more nuanced
assessment. For a similar reason, no weighting of the individual topics is proposed. 
All existing sites allocated within LDP2 (which are not complete or under
construction); sites which come forward through the ‘Call for Ideas’ exercise; and
other sites identified by the Council with development potential will be subject to
assessment – no site will automatically roll forward from one plan to the next without
being assessed. The outputs of the appraisal will inform the preparation of LDP3.

Page 204

North Ayrshire’s third Local Development Plan
193
LDP Committee Version
It is the responsibility of North Ayrshire Council as the Planning Authority to
undertake the three stages of the site appraisal in accordance with the methodology.
Individuals, community groups, landowners, and/or developers promoting sites via
the ‘Call for Ideas’ are not expected to assess their sites but are encouraged to
provide information to assist the Council in the appraisal.
A Site Assessment Report will be prepared for all proposed sites (including LDP2
sites which are not complete or under development which the Council may consider
rolling forward), setting out the relevant evidence and assessment and will inform the
Council’s allocation of sites in the Proposed Plan as well as masterplans,
development briefs, site specific technical/infrastructure requirements and the
statutory Delivery Programme.
Stage 1 – Environmental Assessment
Stage 1 of the site appraisal will assess each site against the nine SEA objectives
set out in SEA Assessment Framework, using the assessment questions. For each
of the nine topics, a score of between -2 and 2 will be awarded, where 0 equals no or
a neutral impact. 
Table 29 – Stage 1 scoring
Stage 1 Assessment  Score
Significantly positive  2
Positive 1
Neutral  0
Adverse -1
Significantly adverse -2
In relation to water, the flood risk of every site must be fully understood at the time of
appraisal. This can be via the Strategic Flood Risk Assessment, for example the site
is clearly shown to be within or outwith an area of flood risk or if not, that a submitted
Flood Risk Assessment has been undertaken.
The duration of the effects identified, and any potential cumulative and/or synergistic
effects, will be considered as part of the SEA once preferred options and reasonable
alternatives have been established. This will be set out in the Environmental Report.
This stage of the SEA will be informed by the site appraisal and evaluate the
combined significance of any overlapping effects and judge whether, together, they
result in a greater effect than would occur individually. Synergies can result in new
effects and could magnify individual effects, both adversely and advantageously.
Stage 2 – Deliverability Assessment
In addition to being place-based and people-centred, Local Development Plans
should be delivery-focused. All sites proposed to be allocated for development in
plans will be assessed for their deliverability through Stage 2 of the site appraisal
process. Taking an ‘infrastructure-first’ approach is central to this: considering the
infrastructure implications at every stage of the plan making process. Infrastructure
considerations will inform site selection and the evolution of the spatial strategy.

Page 205

North Ayrshire’s third Local Development Plan
194
LDP Committee Version
Stage 2 of the site appraisal methodology considers the deliverability of sites by
assessing key factors relating to delivery, including the capacity and condition of
relevant infrastructure. NPF4 defines ‘deliverable land’ as ‘land that is free from
constraints or there is a commitment to overcome constraints’. In the context of
housing land, the definition extends to development that is able to be delivered in the
period identified for the site within the Deliverable Housing Land Pipeline. LDP3 will
be required to allocate Deliverable Land to meet the 10-year Local Housing Land
Requirement. The Deliverable Housing Land Pipeline is the expected sequencing of
the Local Housing Land Requirement over the short (1-3 years), medium (4-6 years)
and long-term (7-10 years), to be set out in the Delivery Programme. 
Information gathered at this stage and the assessment will inform both site selection
and the Delivery Programme. Sites which are proposed to be allocated should be
free of constraints as far as possible. Where constraints exist, sites can still be
regarded as deliverable providing that the actions required to remove any constraints
are established and there is a commitment and timescale to do so. The actions
required to deliver allocated sites will be set out in the Delivery Programme. 
A score of between -2 and 2 will be awarded against each criterion as follows:
Table 30 – Stage 2 scoring
Stage 2 Assessment Score
Objective met  2
Objective can be met 1
Neutral or not applicable 0
Objective unlikely to be met -1
Objective cannot be met -2
Stage 3 – Community Benefit and Wealth Building Assessment
North Ayrshire Council launched Scotland’s first Community Wealth Building Strategy
in 2020. Community Wealth Building is viewed as a key mechanism for delivering a
wellbeing economy for North Ayrshire – an economy which works for people and
planet. This aligns with the requirement for development planning to manage the
development and use of land in the long-term public interest, contributing to
sustainable development and the achievement of the National Performance
Framework National Outcomes which describe the kind of Scotland we want to see.
Policy 25 of NPF4 supports development proposals which contribute to community
wealth building strategies and are consistent with local economic priorities.
Accordingly, stage 3 of the site appraisal methodology considers how proposals can
provide benefit to local communities, including its potential contribution to the five
pillars of our Community Wealth Building Strategy concerning diverse ownership, fair
employment, financial power, land and assets and procurement. 
The same scoring mechanism as at Stage 2 will apply.
The Site Appraisal Matrix is provided at Appendix 2.

Page 206

North Ayrshire’s third Local Development Plan
195
LDP Committee Version
Summary of Stakeholder Engagement
We launched a ‘Call for Ideas’ to inform the next stage of the local development
planning process in April 2025. At the same time, we published and sought
comments on a draft site assessment methodology and matrix. 
On 16 July 2025, the views of the SEA consultation authorities – Historic
Environment Scotland, NatureScot, and SEPA – were sought on the site appraisal
methodology alongside the draft Sustainable Places (Topic 3) schedule. Meetings
were held with NatureScot on 29 July 2025 and Historic Environment Scotland on 13
August 2025. 
Historic Environment Scotland confirmed it is content with the proposed site
assessment methodology, based on the understanding that it is not the intention to
aggregate and average the scores for each environmental topic. This has been
clarified, above. Advice was given not to factor in potential mitigation or
enhancement measures in the scoring. We have removed this from the matrix. 
NatureScot and SEPA have shared a site assessment template and site appraisal
guidance. Homes for Scotland have also provided a site assessment methodology
template, alongside a guide to deliverability. We have reviewed both templates in
creating our site appraisal methodology, for example including the conditions
identified by Homes for Scotland as indicating deliverability within the objectives at
Stage 2.
Homes of Scotland support the three-stage approach but have expressed concerns
regarding the limited consideration given to the weighting of different factors (with the
position that viability and financial factors should be given significant weight) and the
application of the assessment. As noted above, the site appraisal is intended to
inform the site selection process by highlighting potential issues for each site, which
may warrant further investigation, mitigation, or enhancement. Accordingly, it is not
proposed to include topic weighting or adopt an overly restrictive assessment at this
early stage, in order to ensure the process is proportionate. Where additional
information is reasonably required and not available, this will be sought from site
proposers. 
Iceni on behalf of Mountrose Properties and Lovell Strategic Land have asked that
the site assessment methodology is amended to consider the length of time a site
has been on the housing land supply, with the inference that sites which have been
on the ‘register’ for more than ten years and lack any development activity are likely
to be ineffective and undeliverable and should be negatively weighted. We consider
that the deliverability and viability of proposed developments sites can be adequately
assessed by reviewing sites against the objectives set out at Stage 2, without
reference to the length of time a site has formed part of the housing land supply. It is
the current position which is of most relevance. 
Iceni also encourage the site assessment methodology to ‘bring forward’
consideration of the potential for sites to deliver affordable housing and give
additional weighting to sites which would bring forward proportions of affordable

Page 207

North Ayrshire’s third Local Development Plan
196
LDP Committee Version
housing above the 25% requirement outlined in NPF4. We do not intend to assign a
weighting to topics within the appraisal methodology for the reasons stated. Stages
1-3 will be undertaken concurrently. 
Summary of Implications for the Proposed Plan 
We have proposed a site assessment methodology, supported by the matrix included
at Appendix 2, which will inform the spatial strategy of Proposed Plan and site
selection in a proportionate, pragmatic, and transparent manner. The process will
highlight potential issues for each site, which may warrant further investigation,
mitigation, or enhancement. 
It is acknowledged that there is a requirement to balance different environmental,
social, and economic objectives and consider site deliverability to deliver the
objectives of NPF4 and sustainable development. For this reason, a rigid framework
and approach to site appraisal is not proposed at this stage.
The site appraisal methodology is central to the allocation of enough deliverable land
to meet the 10-year Local Housing Land Requirement, in locations that create quality
places for people to live and are consistent with local living principles and an
infrastructure first approach (see Topic 2). The transport appraisal (Topic 4) will also
inform this process. 
It will also be important to establish the views of the public, key agencies, and other
stakeholders early in the site selection process in the preparation of the Proposed
Plan. Historic Environment Scotland, NatureScot, and SEPA have provided guidance
on their role in engaging with initial site appraisal. 
Statements of Agreement / Dispute
No statements from stakeholders have been received highlighting agreement or
disputes with the Site Appraisal Methodology. 
Links to Evidence 
1) Key Agencies, Local Development Plan: Site Assessment and SEA Checklist
(updated 6 February 2024)
2) Key Agencies, Guidance on Key Agency Engagement with Local Development
Plan Site Appraisals
3) SEPA, Planning Advice Note for Planning Authorities: SEPA engagement in LDP
site appraisal and assessment (May 2025)
4) Homes for Scotland, Site Assessment Methodology

Page 208

North Ayrshire’s third Local Development Plan
197
LDP Committee Version
Position Statement
The following Position Statement is provided to assist with the Gate Check, as
recommended by the Planning and Environmental Appeals Division (DPEA). It
summarises the implications for the Proposed Plan and the main areas where the
evidence is disputed or uncertain.
Summary of the Implications for the Proposed Plan
The Evidence Report sets out North Ayrshire Council’s view on the implications of
the evidence gathered and the views of stakeholders for the Proposed Plan in
relation to the six topic areas plus the evaluation of LDP2 and proposed site
appraisal methodology. This section seeks to bring together these implications,
acknowledging the interrelationships between the topics in the overall aim of
supporting the planning and delivery of sustainable, liveable, and productive places.
It is not intended to be exhaustive but instead summarises the considerations for
LDP3. 
• LDP3 must address the twin reinforcing global climate emergency and nature
crises. Reducing emissions, adapting to current and future risks of climate
change and the promotion of nature recovery and restoration should underpin
decisions made in the preparation of the Proposed Plan. LDP3 should
encourage, promote, and facilitate all forms of renewable, low-carbon and
zero-emission energy generation and infrastructure. Blue and green
infrastructure has a key role to play in achieving a range of environmental
objectives, including in relation to climate change and biodiversity. 
• A place-based approach must be taken to the preparation of LDP3. The plan
should seek to create good quality places that promote people’s health,
happiness, and wellbeing; reduce inequalities and are resilient to the effects of
climate change. This approach should be joined-up, collaborative, and
participative and inclusive. 
• 20-minute neighbourhoods, and blue green infrastructure, with nature
networks at their heart, are important devices for delivering new development
in our urban areas that contributes to creating sustainable, liveable, and
productive places. The accessibility of development proposals should be
assessed in the context of ‘local living’ and protecting, enhancing, and
expanding blue and green infrastructure assets and networks, including the
North Ayrshire Nature Network. 
• LDP3 must encourage, promote, and facilitate the delivery of more high
quality, affordable and sustainable homes, in the right locations, providing
choice across tenures that meet the diverse housing needs of people and
communities across North Ayrshire. We have identified an indicative Local
Housing Land Requirement of 4,500 new homes over the LDP3 plan period to
support this. Within this figure, there is a need to deliver new housing that will

Page 209

North Ayrshire’s third Local Development Plan
198
LDP Committee Version
meet the needs of a population which is growing older and for the continued
delivery of affordable housing. Developer contributions are identified as a
potential means of supporting this. 
• Opportunities for the positive and sustainable reuse of brownfield, vacant and
derelict land and empty buildings should be identified by LDP3,
acknowledging that redevelopment will not always be the most appropriate
use. Making productive use of existing buildings, places and infrastructure
and optimising the use of land to provide services and resources will limit
urban expansion. 
• Informed by a Transport Appraisal, LDP3’s spatial strategy must seek to
reduce the need to travel unsustainably and take account of existing transport
infrastructure capacity constraints. 
• Through the actions of our Community Wealth Building (CWB) Strategy, we
are already committed to embedding community wealth building within LDP3
to ensure future development takes account of local economic priorities,
provides benefits for communities and helps deliver a wellbeing economy that
works for people and planet and delivers social, economic and environmental
justice for all. This will require a strategic approach which enables community
benefits to be delivered by all development, not just Council or other Anchor
institution projects. 
• Infrastructure constraints and requirements and deliverability must be central
to the preparation of the Proposed Plan as part of an ‘infrastructure first’
approach. The capacity of local services, primarily health care facilities, has
been identified as a significant concern by local communities and we must
work with the NHS and HSCP to support emerging models of care. 
Summary of the evidence disputes and gaps
Topic 1 – Liveable Places
Disputed evidence
No disputes identified.
Further evidence required
No requirement for further evidence identified. 
Topic 2 – Housing
Disputed evidence
Homes for Scotland support the uplift of 1,550 from the Minimum All-Tenure Housing
Land Requirement (MATHLR) to arrive at the proposed Local Housing Land
Requirement (LHLR) of 4,500.

Page 210

North Ayrshire’s third Local Development Plan
199
LDP Committee Version
A dispute has been raised by Homes for Scotland regarding the Council’s position
that it is minded to introduce an affordable housing developer contribution policy
(AHDC).
Further evidence required
The requirement for further evidence to support the development of an Affordable
Housing Developer Contribution policy has been identified, including in relation to the
impact any policy would have on development viability in North Ayrshire.
Topic 3 – Sustainable Places
Disputed evidence
Historic Environment Scotland, NatureScot, and SEPA have confirmed that they are
content with the evidence provided in the report and raise no disputes.
Iceni Projects Ltd on behalf of The Mac Mic Group disputes the evidence presented
in the North Ayrshire Settlement Edge Landscape Sensitivity Study in relation to a
specific site. 
Further evidence required
The Council is in the process of identifying a nature network. The North Ayrshire
Nature Network Strategy, approved in March 2025, outlines a methodology for
developing the North Ayrshire Nature Network (NANN) and an action plan for its
implementation and delivery. As an inherent component of blue and green
infrastructure, the NANN will be central to LDP3 increasing ecological connectivity
and restoration of nature. 
The nature network will also inform decisions on the designation of green belt, noting
that the functions of green belt include supporting these. 
Work will continue throughout 2026 to map the NANN, and we will align the
preparation of LDP3 with this process to ensure the spatial strategy and site
selection process is cognisant of the nature network. 
NatureScot have identified a gap in the evidence moving forward relating to urban
nature habitats and networks. This will be addressed, as appropriate, during the site
assessment stage.
Topic 4 – Transport
Disputed evidence
Transport Scotland have confirmed that it is satisfied with the sufficiency of the
transport evidence, which includes a commitment to undertake a transport appraisal
and outlines the next steps.
Further evidence required
We are committed to producing an appropriate and effective transport appraisal of
the Proposed Plan in line with the relevant transport appraisal guidance. The
appraisal will adopt the ‘infrastructure first’ principles, focusing on the existing

Page 211

North Ayrshire’s third Local Development Plan
200
LDP Committee Version
infrastructure and prioritise sustainable travel consistent with the sustainable travel
and investment hierarchies. 
Topic 5 – Productive Places
Disputed evidence
No disputes identified.
Further evidence required
No requirement for further evidence identified. 
Topic 6 – Infrastructure
Disputed evidence
No disputes identified. 
Further evidence required
Further evidence is required to support any approach to developer contributions
towards primary health care infrastructure, in the context of NHS Ayrshire and
Arran’s Strategic Assessment and whole-system infrastructure plans.

Page 212

North Ayrshire’s third Local Development Plan
201
LDP Committee Version 
Appendix 1 – Evidence Index
The table below is included to assist in finding evidence relation to each NPF4 policy
within the Evidence Report. 
NPF4 Policy Evidence Report Section
1. Tackling the climate and nature
crises 
Topic 3 – Sustainable Places
2. Climate mitigation and adaptation Topic 3 – Sustainable Places
3. Biodiversity Topic 3 – Sustainable Places
4. Natural places Topic 3 – Sustainable Places
5. Soils Topic 3 – Sustainable Places
6. Forestry, woodland, and trees Topic 3 – Sustainable Places
7. Historic assets and places Topic 3 – Sustainable Places
8. Green belts Topic 3 – Sustainable Places
9. Brownfield, vacant and derelict
land, and empty buildings
Topic 3 – Sustainable Places
10. Coastal development Topic 3 – Sustainable Places
11. Energy Topic 3 – Sustainable Places
12. Zero waste Topic 3 – Sustainable Places
13. Sustainable transport Topic 4 – Transport
14. Design, quality and place Topic 1 – Liveable Places
15. Local Living and 20-minute
neighbourhoods
Topic 1 – Liveable Places
16. Quality homes Topic 2 – Housing
17. Rural homes Topic 2 – Housing
18. Infrastructure first Topic 6 – Infrastructure
19. Heat and cooling Topic 3 – Sustainable Places
20. Blue and green infrastructure  Topic 3 – Sustainable Places
21. Play, recreation and sport Topic 1 – Liveable Places
22. Flood risk and water management Topic 3 – Sustainable Places
23. Health and safety Topic 1 – Liveable Places
24. Digital infrastructure Topic 6 – Infrastructure
25. Community wealth building Topic 5 – Productive Places
26. Business and industry Topic 5 – Productive Places
27. City, town, local and community
centres
Topic 5 – Productive Places
28. Retail Topic 5 – Productive Places
29. Rural development Topic 5 – Productive Places

Page 213

North Ayrshire’s third Local Development Plan
202
LDP Committee Version
30. Tourism Topic 5 – Productive Places
31. Culture and creativity  Topic 5 – Productive Places
32. Aquaculture Topic 5 – Productive Places
33. Minerals Topic 5 – Productive Places

Page 214

North Ayrshire’s third Local Development Plan
203
LDP Committee Version
Appendix 2 – Site Appraisal Matrix
Stage 1 – Environmental Assessment
Topic Biodiversity Population and
human health Soil Water Air Climatic Factors Material Assets Cultural Heritage Landscape
Objective Protect, maintain, and
enhance biodiversity
Protect and
enhance quality of
life and reduce
health inequalities
Maintain and
improve soil
quality
Reduce flood risk
and protect and
enhance the
water
environment
Maintain and
improve air quality
Minimise
greenhouse gas
(GHS) emissions
and adapt to the
current and future
impacts of climate
change
Promote the
sustainable use
and management
of material assets
Protect and
enhance the
historic
environment and
its setting
To safeguard and
enhance
landscape
character
Sub-Objective(s) See Environment
Evidence Paper
See Environment
Evidence Paper
See Environment
Evidence Paper
See Environment
Evidence Paper
See Environment
Evidence Paper
See Environment
Evidence Paper
See Environment
Evidence Paper
See Environment
Evidence Paper
See Environment
Evidence Paper
Relevant Spatial
Data and
Assessments
Map of biodiversity
designations
Map of North Ayrshire’s
woodlands
North Ayrshire 20-
Minute
Neighbourhood
analysis
Open Space Audit
Map of
agricultural land
quality and carbon
rich soils and
peatland
Strategic Flood
Risk Assessment
Water
Classification Hub
Blank Blank
North Ayrshire
Vacant & Derelict
Land
Map of cultural
heritage
designations
Map of
Landscape
Character Areas
and Designations
Settlement Edge
Landscape
Sensitivity Study
Assessment
Questions
Will the proposal protect
both designated and
non-designated sites
from adverse impacts? 
Will the proposal
contribute towards the
protection and
enhancement of
biodiversity/geodiversity,
including strengthening
habitats and/or nature
networks?
Will the proposal protect
and expand forest,
woodland, and trees?
Will the proposal protect
and enhance protected
species and/or their
habitats?
Is the proposal
consistent with the
principle of local
living? 
Will the proposal
promote and
enhance access
to open
space/green-blue
networks?
Will the proposal
have a positive
impact on health,
wellbeing, and
health
inequalities?
Will the proposal
have an adverse
impact on high
value agricultural
land? 
Will the proposal
protect and
enhance carbon
rich soils?
Will the proposal
contribute to
maintaining or
improving soil
health and
function? 
Will the proposal
protect and
enhance water
quality? 
Is the proposal be
at risk of flooding
(from any source)
or result in
additional flood
risk elsewhere?
Will the proposal
avoid adverse
impacts to air
quality? 
Will the proposal
contribute to
reducing
emissions of key
pollutants?
Will the proposal
contribute to
reducing levels of
nuisance? 
Will the proposal
minimise lifecycle
greenhouse gas
emissions? 
Will the proposal
promote climate
change
adaptation? 
Will the proposal
prioritise
sustainable travel
in accordance
with the hierarchy
Will the proposal
support
development of
renewable
technologies?
Is the proposal
consistent with the
waste hierarchy?
Will the proposal
promote and
facilitate the reuse
of brownfield,
vacant and
derelict land, and
empty buildings?
Will the proposal
safeguard both
designated and
non-designated
sites from adverse
impacts?
Will the proposal
enable the
positive re-use of
historic
environment
assets? 
Will the proposal
improve the
resilience to
climate change of
the historic
environment?
Will the proposal
have an adverse
impact on the
special qualities of
a designated
landscape or area
of wild land?
Will the proposal
maintain or
enhance the
landscape
character of the
area?

Page 215

North Ayrshire’s third Local Development Plan
204
LDP Committee Version
Topic Biodiversity Population and
human health Soil Water Air Climatic Factors Material Assets Cultural Heritage Landscape
Assessment To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed
Potential
Mitigation and
Enhancement
To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed
Summary To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed
Overall Score 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2

Page 216

North Ayrshire’s third Local Development Plan
205
LDP Committee Version
Stage 2 – Deliverability Assessment 
Note: not all topics will be applicable to non-housing proposals. 
Topic Ownership Marketability Viability Access & Accessibility Water and Wastewater
Capacity GP Capacity School Capacity
Objective
Site owned or controlled
by a developer / Site
owned by a public body
and identified for
disposal / Landowner
interest in development
Site located in area with
sales potential (taking
account of market
absorption factors)
and/or developer has
track record of delivery
Site is viable taking into
account land values,
expected sales values,
site abnormals and
infrastructure
requirements
Access to the site is
available, without
needing third party
agreement or a formal
agreement is in place
Existing capacity at
Water Treatment and
Wastewater Treatment
Works
Existing capacity at
catchment GP practices
Existing capacity at
catchment primary and
secondary schools
Assessment  To Be Completed To Be Completed To Be Completed To Be Completed To Be Informed by
Scottish Water
To Be Informed by NHS
Ayrshire & Arran
To Be Completed by
NAC Education
Potential
Mitigation and
Enhancement
To Be Completed To Be Completed To Be Completed To Be Completed To Be Informed by
Scottish Water
To Be Informed by NHS
Ayrshire & Arran
To Be Completed by
NAC Education
Summary To Be Completed To Be Completed To Be Completed To Be Completed To Be Informed by
Scottish Water
To Be Informed by NHS
Ayrshire & Arran
To Be Completed by
NAC Education
Overall Score 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2

Page 217

North Ayrshire’s third Local Development Plan
206
LDP Committee Version
Stage 3 – Community Benefit (note: not all topics will be applicable to non-housing proposals)
Topic
Local Housing
Requirements
(including
affordable housing)
Local infrastructure,
facilities, and
services
Residential amenity
Community Wealth
Building – Diverse
Ownership
Community Wealth
Building – Fair
Employment
Community Wealth
Building – Financial
Power
Community Wealth
Building – Land and
Assets
Community Wealth
Building –
Procurement
Objective
Meets local housing
requirements,
including affordable
homes
Proposal provides or
enhances local
infrastructure,
facilities, and
services  
Proposal improves
the residential
amenity of the
surrounding area
Enable SMEs,
employee-owned
businesses,
cooperatives, and
community
enterprises to locally
generate wealth to
stay within the
community
Create fair pay, local
recruitment,
progression, and
training opportunities
Maximise the impact
of financial
investment and grow
local businesses,
enhance innovation,
and empower
communities
Maximise the function
and ownership of
land and buildings for
the benefit of
communities and
enterprises
Goods and services
are bought locally,
creating dense local
supply chains
Assessment  To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed
Potential
Mitigation and
Enhancement
To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed
Summary To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed To Be Completed
Overall Score 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2 2 / 1 / 0 / -1 / -2