Democracy Spraffa

Building Standards Performance Report 2023-24

Argyll and Bute Council · 19 June 2024
Back to Planning, Protective Services and Licensing Committee — 19 June 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

ARGYLL AND BUTE COUNCIL                        PLANNING, PROTECTIVE SERVICES 
AND LICENSING COMMITTEE 
DEVELOPMENT AND ECONOMIC GROWTH        19 JUNE 2024 
BUILDING STANDARDS PERFORMANCE REPORT 2023-24 
1.0 HEADLINES 
1.1 This paper updates members of the Planning, Protective Services and
Licensing (PPSL) Committee on the progress which has been made to deliver
the Building Standards Balanced Scorecard 2023/25, highlighting
achievements and performance in 2023-24, and identifying additional priorities
for the forthcoming year. The Building Standards Balanced Scorecard 2023-25
was approved by PPSL Committee on the 21st June 2023. 
1.2 Building Standards is a statutory service with its duties and powers detailed in
the Building (Scotland) Act 2003 and relevant legislation. The purpose of the
Building Standards service is primarily to secure the health, safety, welfare and
convenience of persons in or about buildings and of others who may be
affected by buildings or matters connected with buildings; further the
conservation of fuel and power; and further the achievement of sustainable
development. We also ensure that the service operates in a customer focused
manner which facilitates development and assists the local economy. 
1.3 Building Standards have made positive progress in delivering the service plan
priorities and exceeding the targets for 2023/24. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that members of the Planning, Protective Services and
Licensing Committee consider and note the positive performance by Building
Standards in 2023/24. 
3.0 BUILDING STANDARDS BALANCED SCORECARD 
3.1 The Building (Scotland) Act 2003 and associated regulations, sets out the
essential standards required to be met for works to existing buildings or to new
construction. Building Standards assess detailed applications for proposals to
ensure that building work meets these standards; and inspections of works on
site, although these are limited to a minimal necessary to ensure compliance
with statutory requirements and the approved building warrant consent. The
control of work on site is a matter for contracts and arrangements in place
between a builder and client. Argyll and Bute Council are the duly appointed

Page 2

verifier for the Argyll and Bute Council area. We are one of 32 local authority
verifiers as appointed by Scottish Ministers and thus are responsible for the
verification process within Argyll and Bute. 
3.2 Building Standards have responsibilities, in addition to their verifier’s functions,
which account for approximately 19% of surveyor workload averaged over the
authority area and is increasing. These include responding to dangerous
buildings and structures, unauthorised works, document searches, maintaining
the Building Standards register and working with partners across a range of
issues including licensing, events and the built environment. 
3.3 Good progress has been made in delivering the priorities outlined in the
Building Standards Balanced Scorecard 2023-25 and targets for the key
national performance measures have been exceeded. Appendix 1 of this
report provides a progress report on each of the key priorities but key
achievements to highlight are as follows: 
i. The Councils Building Standards service was awarded with a verification
licence by the Scottish Government for a six year period. This is the
maximum duration of licence and allows for the verification of building
warrants for developments within Argyll and Bute and for other
commercial work on behalf of other local authorities.
ii. Met and exceeded all targets for key performance measures in 2023-
24. 
Key National  Performance measure 2023/24
Target 
2023/24
Actual 
The percentage of requests for a building warrant
responded to within 20 days
95% 97.2%
The average time taken to respond to a requests for
completion certificate
3 days 2 days
The percentage of building warrants issues (or
otherwise determined) within ten days
90% 99.2%
The percentage of completion certificates
issued/accepted (or otherwise determined) within 3
days
90% 100%
The percentage of applicants providing feedback 
either satisfied or very satisfied with our service
90% 100% 
iii. The cost of living crisis and increased building costs is resulting in a
reduction in building warrant applications across Scotland. This is
evident in Argyll and Bute, with an 8% reduction in warrants from 22/23
with a total of 1690 warrants received and determined, including 335
applications from other local authorities. Building warrant income for
23/24 was £1,108,751 and £7,667 above the projected 23/24 budget.
iv. Processed a total of 1690 warrants which were received, compared
with 1844 in 2022/23. Argyll and Bute generated warrants actually
increased from 1262 to 1355 in 2023/24.
v. The service was reaccredited with the Customer Services Excellence
(CSE) Award on the 23rd April 2024, increasing the number of

Page 3

compliance-plus criteria to 26, the highest across all Council
services. This reflects the excellent “customer-focus” across the
team and the auditor concluded that:- 
“you clearly remain at the forefront of excellence and the
recommendation for retention of the CSE Standard is well deserved”. 
vi. Presentations were given to stakeholders and contractors in regards
to the new updates to the Domestic and Non-Domestic Technical
Handbooks. These were well received by our customers.
vii. Completed the actions outlined in the Building Standards Internal
Audit Improvement Plan 2023 increasing our resilience to report from
systems.
viii. Our workforce strategy focusing on “growing our own” continues to
be successful. In 2023/24, two Assistant Building Standards
Surveyors achieved professional membership and met the criteria to
be promoted to Building Standards Surveyors. At the same time we
appointed another Assistant Building Standards Surveyor, taking the
staff complement back to two Assistants.
ix. There have been 104 dangerous/defective building cases raised and
responded to by Building Standards in 2023/24 at various properties
across Argyll and Bute, including the former White Hart Hotel,
Campbeltown. 
3.4 Challenges and issues facing Building Standards service for 2024/25 are: 
i. Our reliance on commercial income from other local authorities is
unsustainable as there has been a downturn in building warrant
numbers across Scotland. This creates an additional budget pressure
and need for action going forward.
ii. Buildings in disrepair. There is an ever increasing workload associated
with action being required by Building Standards in relation to non-
maintained buildings in disrepair to assess whether they pose an
imminent risk to public safety. This work is being progressed through
the Councils Housing Emergency Action Plan.
iii. Changing landscape for Building Standards. A number of changes are
being introduced to the Building Standards system through the work of
the Building Standards Futures Board Programme. This follows the
recommendations made by the expert review panels on Compliance &
Enforcement and Fire Safety, in the aftermath of failings in Edinburgh
School buildings and the Grenfell Tower fire, to strengthen the Building
Standards system in Scotland. The changes to strengthen the system
will require additional verification compliance capacity and financial
resources for local authority verifiers over the coming years. The
increase in the building warrant fees is part of a planned 3-year model
to increase fees annually, dependent on the outcome from monitoring,
reporting, and auditing of the application of increased building warrant
fee income at local authority level in support of increased verification
service capacity. It is intended that the increase in fees will be used by
local authorities to support and invest in their Building Standards

Page 4

Teams as necessary to meet revised Verification Operating and
Performance Frameworks being introduced from 1st of April 2024 and
to meet future increased inspection and other compliance workload.
An Action Plan will be developed over the coming months. 
4.0 CONCLUSION 
4.1 The Council’s Building Standards service continues to deliver its statutory duties
with a continued focus on providing performance and customer focussed
services. The team have worked hard in 2023/24 to deliver the Balanced
Scorecard and reaccreditation of the Customer Services Excellent Award with
26 compliant plus criteria, is testament to the team. 
5.0 IMPLICATIONS 
5.1 Policy – consistent with Council policies for built environment and public safety. 
5.2 Financial – the Service is self-financed through income generated from
building warrant verification activity. 
5.3 Legal – statutory service under the Building (Scotland) Act 2003 and associated
legislation. 
5.4 HR – none. 
5.5 Fairer Scotland Duty – the Fairer Scotland Duty, Part 1 of the Equality Act
2010, came into force in April 2018. The duty places a legal responsibility on
particular public bodies in Scotland, such as Argyll and Bute Council, to pay
due regard to (actively consider) how they can reduce inequalities of
outcome, caused by socio-economic disadvantage, when making strategic
decisions and how this has been implemented. 
5.5.1 Equalities - all activities comply with all Equal Opportunities/Fairer
Scotland Duty policies and obligations.
5.5.2 Socio-economic Duty - all activities have complied with the council’s
socio-economic duty.
5.5.3 Islands – interventions have been delivered across the Argyll and
Bute area, including island communities. 
5.6 Climate Change – work of the Service supports climate change and net zero
through the implementation and enforcement of building standards. 
5.7 Risk – sustainability of securing commercial work from other local authorities
together with increasing demand from dangerous buildings work and Scottish
Governments drive for increased pre-completion inspections, reduces
capacity and creates additional resilience issue. 
5.8 Customer Service – the Service achieved Customer Standards Excellence.

Page 5

5.9 Rights of the Child (UNCRC) – none. 
Executive Director with overall responsibility for Development and Economic
Growth: 
Kirsty Flanagan 
Policy Lead for Planning and Regulatory Services: Councillor Kieron Green. 
13 May 2024/0834 
For further information contact: 
Fergus Murray, Head of Development and Economic Growth
Fergus.Murray@argyll-bute.gov.uk 
Alan Morrison, Regulatory Services and Building Standards Manager
alan.morrison@argyll-bute.gov.uk. 
Appendix 1: Progress report against Building Standards Balanced Scorecard
2023/25

Page 6

Appendix 1: Progress report against Building Standards Balanced Scorecard 2023/25   
Priority Progress report May 2024 Status
1. Managing performance and
workload against available
resources and in the Councils
finance outlook 2024-27.
This is ongoing and work is aligned to Councils Budget Strategy. Continuing to provide
support on a commercial basis with one other Scottish local authority and securing
additional income 
Professional resource reduced by 0.5FTE from May 2024 due to maternity leave
Ongoing
2. Continue to provide a verification
service to our customers and our
statutory duties under the Building
(Scotland) Act 2002
Ongoing and exceeding national performance standards and targets.  Ongoing
3. Monitor the external environment
and the impact of the Scottish
Building Standards Hub and Scottish
Governments Construction
Compliance and Notification Plan
(CCNP)
Ongoing at a local and national level through the Local Authority Building Standards
Scotland (LABSS) 
Actively participated in work associated with Argyll and Bute Councils Housing
Emergency.
Ongoing
4. Ensuring compliance with the new
updates to the Technical
Handbooks post February 2023 and
further changes in June 2023. 
Implemented new Technical Standards and completed training across the team
Impact of changes discussed at Building Standards User Forum and through newsletters
to agents and customers
Complete
5. Tackle the pressures on Building
Warrant fee income due to the
economic downturn.
Budget income for building warrants in 2023/24 of £1,108,751, exceeding the target by
£7,667
National downturn out with our control but continuing to source commercial income from
another local authority and Babcock
Revised RICS Building Cost Information Surveys (BCIS) of Tender prices were adopted
and posted on our website. This information is used to calculate the appropriate Building
Warrant fee payable in £/square metres for works of different character
New Scottish Government fee structure implemented as of 1 April 2024
Ongoing
6. Workforce planning and the
replacement of experienced officers
due to retire over the next 3-5 years
Workforce plan revised with HR
Assistants promoted to Building Standards Surveyors
Recruited new Assistants and currently have two undergoing training and development
plans 
Ongoing

Page 7

7. Continue to grow and develop our
team in meeting the national
building standards competency
framework
Continued training and development to existing team
Team Day in March 2024
Ongoing
8. Maximising our use of digital
technology and new ways of
working including remote verification
and improvements to software
information management
Implemented “Near-me” platform which provides video/audio communications as an
alternative to MS Teams and Skype. This is less data-driven and supports our Remote
Verification Inspection work.
Completed the actions outlined in the Building Standards Internal Audit Improvement Plan
2023 increasing our resilience to report from systems.
Ongoing
9. Migration of Document
Management System in line with e-
Building Standards
This project has been delayed due to a variety of issues relating to ICT, the systems
functionality and testing arrangements. Timescale revised to September 2024 and Project
Board to review the direction of the project.
Delayed
10. Make preparations for
assessment of the Customer
Services Excellence Award 
This work is complete and Building Standards successful gained reaccreditation of the
CSE award (following an audit on the 9 April 2024) with a further 2 compliance plus
criteria, taking the total to 26. This is the highest across the Council. 
Complete
but will
prepare
for 2025
11. Working and supporting our
customers and stakeholders
This work continues  Ongoing 
12. Working with service partners as
part of Argyll Property Action Group
(APAG) in tackling non-maintained
properties prior to any potential
enforcement action
Work continues to support all Property Action Groups. Safety Advisory Groups and to
respond to dangerous building reports 
Ongoing