Development & Economic Growth   
Planning Application Report and Report of Handling as required by Schedule 2 of the
Town and Country Planning (Development Management Procedure) (Scotland)
Regulations 2013 relative to applications for Planning Permission or Planning Permission
in Principle 
Reference No: 23/01358/PP
Planning Hierarchy: Local Application
Applicant: Mr J.  Herrod
Proposal: Erection of dwellinghouse and detached garage, upgrade of
existing access and installation of septic tank with associated
infiltration system
Site Address:  Leananmor Muasdale Argyll And Bute   
DECISION ROUTE 
Committee Decision under Local Government Scotland Act 1973   
(A)  THE APPLICATION 
(i) Development Requiring Express Planning Permission
• Erection of dwellinghouse and detached garage;
• Improvement of existing vehicular access onto A83(T);
• Installation of septic tank and soakaway. 
(ii) Other specified operations
• Connection to public water supply. 
(B) RECOMMENDATION: 
Recommend that planning permission be approved subject to the conditions and
reasons attached. 
(C) CONSULTATIONS:   
Transport Scotland – 15.09.23, 20.09.23, 07.03.24 – No objection subject to conditions
relating to the provision of improvements to the existing access onto the A83(T) to a standards
suitable to serve the development proposed. 
Area Roads Mid Argyll Kintyre And Islay - 07.08.2023 – No objection subject to conditions
prescribing requirements for onsite parking and turning. 
Scottish Water - 26.07.2023 – No objections subject to advice to applicant. 
Scottish Environmental Protection Agency - 03.08.2023 – No objection subject to condition
prescribing a minimum finished floor level to protect the development against risk of flooding.

Page 2

(D) HISTORY:   
04/01130/OUT - Erection of a dwellinghouse – Approved 21.09.2004 
14/00424/PPP - Site for the erection of dwellinghouse and garage. (As amended by email
correspondence received 26.06.14) – Withdrawn 23.07.2015 
15/02370/PPP - Site for the erection of dwellinghouse – Approved 27.10.2015 
16/02681/PPP - Site for the erection of dwellinghouse (amended access relative to planning
permission in principle reference 15/02370/PPP). – Approved 24.11.2016 
18/02627/PP - Erection of dwellinghouse with garage, installation of treatment plant, air source
heat pump and formation of new access off the A83(T) – Withdrawn 28.02.2019       
(E) PUBLICITY:   
Advert Type: Regulation 20 Advert Local Application              Expiry Date: 25.08.2023 
(F) REPRESENTATIONS:   
(i) Representations received from: 
Objection 
1. Jessie Macdougall Isleview Muasdale Tarbert Argyll And Bute 25.07.2023
2. John Macdougall Isleview Muasdale Tarbert Argyll And Bute 25.07.2023
3. Mr Andrew Taylor Ceol Mara Muasdale Tarbert Argyll And Bute 07.08.2023
4. Archie Graham Parklea Muasdale Tarbert Argyll And Bute 01.08.2023
5. Mr Robin Graham The Old Post Office Muasdale Tarbert Argyll And Bute
08.08.2023
6. Margaret Graham Parklea Muasdale Tarbert Argyll And Bute 01.08.2023
7. Anne Maccallum Sunset Cottage  Muasdale  PA29 6XD   04.08.2023
8. Sharon Maccallum Sea Renity House Muasdale PA29 6XD  04.08.2023
9. Gary Breeden Sea Renity House  Muasdale  PA29 6XD  04.08.2023
10. Joseph Loganbill Taigh A' Pheantair  Muasdale  PA29 6XD   09.08.2023 
Support 
n/a 
Representation 
Jeanne Loganbill Taigh A' Pheantair Muasdale Tarbert Argyll And Bute 08.08.2023 
Representations are published in full on the planning application file and are available to view
via the Public Access section of the Council’s website. 
(ii) Summary of issues raised: 
• Concern is raised in relation to road safety and the use of the
proposed means of vehicular access. In particular it is noted that

Page 3

visibility to the south is limited by a hedge which would appear to
be outwith the ownership and control of the applicant. 
• Concern is raised that the existing road layout/40mph speed limit
of the A83(T) is unsuitable to accommodate the new access. 
Comment: It is noted that Transport Scotland have not raised objection to the
proposal on road safety grounds. See assessment below. 
• Concern is expressed that the applicant has failed to maintain
hedgerows within his land. 
Comment: It is noted that Transport Scotland’s acceptance of the proposed access
arrangements is subject to the provision and maintenance of visibility splays, this will
necessitate maintenance of the hedge. The applicants previous actions or lack of
action in this respect are not a material consideration in the determination of this
application. 
• It is highlighted that the existing access is a track that is widely
utilised by the public as a right of way to access the beach from
the A83. Concern is expressed that the application appears to
show that this access will be blocked off by the development. 
Comment: The applicant has confirmed that the existing public access to the beach
will be retained. 
• If public access to the existing track were to be maintained then
concern is expressed that this may bring pedestrians into conflict
with traffic accessing/exiting the new development. 
Comment: It is noted that the proposal will improve the existing means of access to
the beach for all users. ABC Roads have not raised objection on the grounds of
road/pedestrian safety. See assessment below. 
• Concern is raised that the development of this shoreside plot will
have a significant impact on the natural environment and wildlife
habitat. 
Comment: The application site relates to an area of rough grazing which is of limited
biodiversity value. See assessment below. 
• Concern is raised that additional development may impact
adversely on the capacity of the water supply to the locality. 
Comment: The proposal will be served by a connection to the public water supply;
Scottish Water have not raised objection to the proposal. 
• Concern is raised that permitting additional development on the
beachfront would be ‘an environmental blight on the local area and
its natural beauty’. 
Comment: The proposed development lies within the ‘settlement area’ for Muasdale
where there is an established settlement pattern that includes development upon the
shore side of the road. The acceptability of development at this location has
previously been established through earlier, but now expired, grants of planning
permission in principle. The development will not have a significant impact upon the
character or visual amenity of the West Kintyre Local Landscape Area. See
assessment below.

Page 4

• The applicant’s claim of ownership over the existing access track
is queried. 
Comment: The applicant has confirmed that the access track is within the ownership
of a third party. Updated land ownership certification and notification has been
undertaken. 
(G) SUPPORTING INFORMATION 
Has the application been the subject of: 
(i) Environmental Impact Assessment Report:
(if Yes insert EIAR topics below)
No 
(ii) An Appropriate Assessment under the
Conservation (Natural Habitats) Regulations 1994:
(if Yes attach as an appendix)
No 
(iii) A Design or Design/Access statement:
(if Yes insert summary of key issues below)
Yes 
Design Statement identifies that the site has previously benefited from
planning permission in principle for a site the erection of a dwelling
(16/02681/PPP) which has expired. 
Advises that position of building has been located to avoid coastal flood
constraints and that access will utilise an existing opening onto the
A83(T). 
Proposal is for a modest family home with design, proportions and
orientation to reflect the site and surrounds. 
Proposal includes for ASHP and solar panels. 
(iv) Sustainability Checklists (with reference to the
requirements of LDP2 Policy 04) 
TN06 Sustainability Checklist
TN07 Sustainable Buildings Checklist
Yes 
Yes 
(v) A report on the impact of the proposed development
eg. Retail impact, transport impact, noise impact,
flood risk, drainage impact etc:
(if Yes list supporting documents below)
No 
(H) PLANNING OBLIGATIONS 
Is a Section 75 agreement required:  
(if Yes insert details of the terms and heads of agreement and,
grounds for refusal if not completed within 4 months below)
No

Page 5

(I) Has a Direction been issued by Scottish Ministers in terms
of Regulation 30, 31 or 32:  (if Yes insert details of direction
below)
No 
(J) Section 25 of the Act; Development Plan and any other material considerations
over and above those listed above which have been taken into account in the
assessment of the application 
(i)  List of all Development Plan Policy considerations taken into account in
assessment of the application. 
National Planning Framework 4 (Adopted 13th February 2023)
(delete as appropriate) 
Part 2 – National Planning Policy 
Sustainable Places
NPF4 Policy 1 – Tackling the Climate and Nature Crises
NPF4 Policy 2 – Climate Mitigation and Adaption
NPF4 Policy 3 – Biodiversity
NPF4 Policy 5 – Soils
NPF4 Policy 6 – Forestry, Woodland and Trees
NPF4 Policy 9 – Brownfield, Vacant and Derelict Land and Empty Buildings (includes
provisions relevant to Greenfield Sites)
NPF4 Policy 10 – Coastal Development
NPF4 Policy 13 – Sustainable Transport 
Liveable Places
NPF4 Policy 14 – Design, Quality and Place
NPF4 Policy 15 – Local Living and 20 Minute Neighbourhoods
NPF4 Policy 16 – Quality Homes
NPF4 Policy 22 – Flood Risk and Water Management 
Argyll and Bute Local Development Plan 2 (Adopted 2024)
(delete as appropriate) 
Spatial and Settlement Strategy 
Policy 01 – Settlement Areas
Policy 04 – Sustainable Development 
High Quality Places 
Policy 05 – Design and Placemaking
Policy 06 – Green Infrastructure
Policy 08 – Sustainable Siting
Policy 09 – Sustainable Design
Policy 10 – Design – All Development 
Connected Places 
Policy 32 – Active Travel
Policy 33 – Public Transport
Policy 34 – Electric Vehicle Charging Points
Policy 37 – Development Utilising an Existing Private Access or Existing Private Road
Policy 40 – Vehicle Parking Provision

Page 6

Sustainable Communities 
Policy 55 – Flooding
Policy 60 – Private Sewage Treatment Plants and Wastewater Drainage Systems
Policy 61 – Sustainable Urban Drainage Systems (SUDS)
Policy 63 – Waste Related Development and Waste Management 
Homes for People 
Policy 66 – New Residential Development on Non-Allocated Housing Sites within
Settlement Areas 
High Quality Environment 
Policy 71 – Development Impact on Local Landscape Areas (LLA’s)
Policy 73 – Development Impact on Habitats, Species and Biodiversity
Policy 79 – Protection of Soil and Peat Resources 
(ii)  List of all other material planning considerations taken into account in the
assessment of the application, having due regard to Annex A of Circular
3/2013. (delete as appropriate) 
• Third Party Representations
• Consultation Reponses
• Planning History
• ABC Technical Note – Biodiversity (Feb 2017) 
• TN06 Sustainability Technical Note and Checklist (Oct. 2023)
• TN21 VII and LVIA Light Technical Note (Oct. 2023)
• TN07 Sustainable Buildings Technical Note and Checklist (Oct. 2023) 
(K) Is the proposal a Schedule 2 Development not requiring an
Environmental Impact Assessment:  (if Yes confirm date of
screening opinion and reference below)
No 
(L) Has the application been the subject of statutory pre-
application consultation (PAC):  (if Yes provide summary
detail of PAC below)
No 
(M) Does the Council have an interest in the site:  (if Yes provide
detail below)
No 
(N) Requirement for a pre-determination hearing: (if Yes insert
details below)
No 
(O)(i) Key Constraints/Designations Affected by the Development: 
SEPA Flood Zones (River and Coastal)  
SPR Paths

Page 7

West Kintyre Local Landscape Area  
Trunk Roads 
(O)(ii) Soils
Agricultural Land Classification:  Class 4.2 
Peatland/Carbon Rich Soils Classification: N/A 
Peat Depth Classification: N/A 
Does the development relate to croft land? No 
Would the development restrict access to croft or better
quality agricultural land?
No 
Would the development result in fragmentation of croft
/ better quality agricultural land?
No 
(O)(iii) Woodland  
Will the proposal result in loss of trees/woodland?
(If yes, detail in summary assessment)
No 
Does the proposal include any replacement or
compensatory planting?
N/A 
(O)(iv) Land Status / LDP Settlement Strategy
Status of Land within the Application  Greenfield 
ABC LDP2 Settlement Strategy  Settlement Area 
ABC LDP2 Allocations/PDAs/AFAs etc: N/A 
(P) Summary assessment and summary of determining issues and material
considerations 
The proposal seeks detailed planning permission for the erection of a 1½ storey dwellinghouse
and a single storey detached garage within the minor settlement of Muasdale. The development
is considered to be of appropriate scale, siting, design and finishes required to be assimilated
successfully within the existing settlement pattern and without harm to the wider landscape
setting of the West Kintyre Local Landscape Area. 
The proposal has been subject to representation from 11 individuals raising concern on a variety
of matters that include impacts upon road safety, public access, impact on landscape/visual
amenity, impact on biodiversity. 
The proposed development has not been subject to any objection from statutory or non-statutory
consultees, including Transport Scotland, SEPA, Scottish Water and the Council’s Roads
Service. 
The site which is subject of the current application has previously benefitted from planning
permission in principle for the erection of a dwellinghouse; however, these permissions pre-date
the current Development Plan and have been allowed to lapse unimplemented.

Page 8

Notwithstanding the concerns raised by third parties, the proposal is considered to be consistent
with the relevant provisions of the Development Plan (NPF4 and LDP2), and there are no other
material considerations identified to indicate that planning permission should be withheld. 
(Q) Is the proposal consistent with the Development Plan:  Yes 
(R) Reasons why Planning Permission or Planning Permission in Principle Should be
Granted: 
The proposal is considered to be consistent with the relevant provisions of the
Development Plan, and there are no other material considerations of sufficient
significance to indicate that it would be appropriate to withhold planning permission
having regard to s25 of the Act. 
(S) Reasoned justification for a departure to the provisions of the Development Plan 
n/a 
(T) Need for notification to Scottish Ministers or Historic
Environment Scotland: (If yes provide detail below)  
No 
Author of Report: Peter Bain Date: 06.06.2024 
Reviewing Officer: Bryn Bowker Date: 06.06.2024 
Fergus Murray
Head of Development & Economic Growth

Page 9

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 23/01358/PP 
Standard Time Limit Condition  (as defined by Regulation) 
Standard Condition on Soil Management During Construction 
Additional Conditions  
1. PP - Approved Details & Standard Notes – Non EIA Development 
The development shall be implemented in accordance with the details specified on the
application form dated 12.07.2023, supporting information and, the approved drawings
listed in the table below unless the prior written approval of the planning authority is
obtained for an amendment to the approved details under Section 64 of the Town and
Country Planning (Scotland) Act 1997. 
Plan Title. Plan Ref. No. Version Date Received
Location Plan Herrod 23/100-01  Rev A. 13.07.2023
Site Plan Herrod 23/100-02 Rev B. 07.02.2024
Floor Plans and
Elevations of
Dwellinghouse
Herrod 23/100-03 Rev A. 13.07.2023
Floor Plans and
Elevations of
Detached Garage
Herrod 23/100-04 Rev A. 13.07.2024 
Reason: For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.  
2. PP – Timescale to be Agreed for Completion 
No development shall commence until details of the proposed timescale for completion of
the approved development have been submitted to and approved by the Planning
Authority. Thereafter, the development shall be implemented in accordance with the duly
approved timescale for completion unless an alternative timescale for completion is
otherwise agreed in writing with the Planning Authority. 
Reason: In order to comply with the requirements of NPF4 Policy 16F.  
3. PP – Access, Parking and Turning As Shown 
The parking and turning area shall be laid out and surfaced in accordance with the details
shown on the approved plans prior to the development first being occupied and shall
thereafter be maintained clear of obstruction for the parking and manoeuvring of vehicles.
Notwithstanding the details on the approved plans, the access arrangements shall be
implemented to accord with the following requirements with the submission of further
information for approval as specified: 
1. Prior to the occupation of the development, the existing access on the A83 Trunk
Road shall be upgraded, generally in accordance with Herrod drawing No. 23/100-
02 Revision B dated 30.09.2023, to the satisfaction of the planning authority, after
consultation with Transport Scotland. 
2. The first 5 metres from the edge of the A83 trunk road shall be surfaced in a
bituminous surface and measures shall be adopted to ensure that all drainage from
the site does not discharge onto the trunk road.

Page 10

3. Prior to the commencement of development, details of the fencing / barrier
proposals along the trunk road boundary shall be submitted to, and approved by,
the planning authority, after consultation with Transport Scotland and thereafter
implemented prior to commencement of operation. The fencing / barrier proposals
shall be located such that they can be erected and maintained from within the
development without requiring access to the trunk road. 
Reasons: In the interest of road safety; to ensure that the standard of access layout
complies with the current standards and that the safety of traffic on the trunk road is not
diminished; to ensure that drivers of vehicles leaving the site are enabled to see and be
seen by vehicles on the trunk road carriageway and join the traffic stream safely; to ensure
that material from the site is not deposited on the trunk road to the detriment of road safety;
to ensure that the efficiency of the existing drainage network is not affected; to minimise
the risk to pedestrians and animals gaining  uncontrolled access to the trunk road with
consequential risk of accidents.  
4. No built development should take place below existing ground level of 3.76mAOD. 
Reason: In order to prevent unacceptable flood risk to people and property. To ensure a
precautionary approach to flood risk and to ensure the longevity and future resilience of the
development of the site to climate change and sea level rise by promoting flood risk avoidance as
set out in Policy 22 of NPF4.  
5. PP – Submission of Details of Materials 
Notwithstanding the effect of Condition 1, no development shall commence until written
details of the type and colour of materials to be used in the construction of external walls,
roofs, windows and doors have been submitted to and approved in writing by the Planning
Authority. The development shall thereafter be completed using the approved materials or
such alternatives as may be agreed in writing with the Planning Authority. 
Reason: In order to integrate the development into its surroundings.  
6. PP – Full Landscaping Scheme 
No development shall commence until a scheme of boundary treatment, surface treatment
and landscaping has been submitted to and approved in writing by the Planning Authority.
The scheme shall comprise a planting plan and schedule which shall include details of: 
i) Existing and proposed ground levels in relation to an identified fixed datum;
ii) Existing landscaping features and vegetation to be retained;
iii) Location design and materials of proposed walls, fences and gates;
iv) Proposed soft and hard landscaping works including the location, species
and size of every tree/shrub to be planted; 
v) A biodiversity statement demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these
benefits will be maintained for the lifetime of the development;
vi) A programme for the timing, method of implementation, completion and
subsequent on-going maintenance. 
In the interests of biodiversity retention/enhancement, the proposed landscape scheme
should include consideration of the retention of the existing hedgerow along the eastern
and southern boundaries of the site in so far as this may be practicable to comply with the
requirements of condition 3. Which requires the formation of visibility splays and agreement
of boundary treatment along the edge of the A83(T) with Transport Scotland. 
All of the hard and soft landscaping works shall be carried out in accordance with the
approved scheme unless otherwise approved in writing by the Planning Authority.

Page 11

Any trees/shrubs which within a period of five years from the completion of the approved
landscaping scheme fail to become established, die, become seriously diseased, or are
removed or damaged shall be replaced in the following planting season with equivalent
numbers, sizes and species as those originally required to be planted unless otherwise
approved in writing by the Planning Authority. 
The biodiversity statement should refer to Developing with Nature guidance | NatureScot
as appropriate. 
Reason: To assist with the integration of the proposal with its surroundings in the interest
of amenity, and to comply with the requirements of NPF4 Policy 3  
7. PP – Surface Water Drainage – No further detail required 
Notwithstanding the provisions of Condition 1, the development shall incorporate a surface
water drainage system which is consistent with the principles of Sustainable urban
Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS Manual
C753. The requisite surface water drainage shall be operational prior to the development
being brought into use and shall be maintained as such thereafter. 
Reason: To ensure the provision of an adequate surface water drainage system and to
prevent flooding. 
Note to Applicant: 
• Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale
Development – www.sepa.org.uk

Page 12

ADDITIONAL NOTES TO APPLICANT 
• The applicant should have regard to the guidance provided by Scottish Water & SEPA in
their consultation responses. 
• The applicant is required to contact Transport Scotland to identify and obtain any necessary
permissions to work within the trunk road boundary. Further detail is provided in Transport
Scotland’s consultation response.

Page 13

COMMITTEE REPORT
APPENDIX A – RELATIVE TO APPLICATION NUMBER:  23/01358/PP 
PLANNING LAND USE AND POLICY ASSESSMENT 
1. Introduction 
1.1. The proposal seeks detailed planning permission for the erection of one dwellinghouse with a
detached garage, the improvement of an existing access onto the A83(T) and the installation of
a septic tank and soakaway. 
2. Settlement Strategy 
2.1. The proposal is located within the ‘settlement area’ for the Minor Settlement of Muasdale as
defined by the Argyll and Bute Local Development Plan 2 wherein the provisions of ABC LDP 2
Policy 01 sets out general support in principle for development of a non-brownfield site where
the proposal is considered to be acceptable in relation to the overall land supply for the proposed
use, and it is compatible with surrounding uses, is of an appropriate scale and fit for the size of
settlement, and respects the character and appearance of the surrounding townscape. 
2.2. Planning permission in principle has previously been granted for the erection of a single
dwellinghouse at this location in 2004, 2015 and 2016 although these have since been allowed
to lapse unimplemented. These proposals are very similar in nature to that of the current
application with the single exception that they have explored different means of connecting to
the A83(T). 
2.3. In order to address the determining issues, the key considerations in this application are: 
• Compliance with the Development Plan and other relevant planning policy;
• Any other relevant material considerations. 
3. Location, Nature and Design of Proposed Development 
3.1. The application relates to a field of some 0.3ha located on the shore side (west) of the A83(T)
within the defined ‘settlement area’ for Muasdale. The site is bounded to the east and south by
an unkempt hedgerow which demarcates the field boundary. The boundaries to the north and
west are open. The field to the north contains a static caravan; to the west is the natural
foreshore and a sandy beach. 
3.2. Muasdale is identified to be a linear settlement with existing buildings predominantly located to
the landward (east) of the A83(T) public road. There is however an established presence of built
development along the shoreside although this is more sporadic with gaps that allow views out
from the A83(T) to the coast. The current application site lies within a gap set between two
existing buildings with Tigh-na-Cladaidh located some 80 to the south and The Old Post Office
50m to the north. Existing development within Muasdale is relatively low density and consists
primarily of a mix of single, 1½, 1¾ and 2 storey buildings of traditional design emphasis and
orientated to face the A83(T)/coast. There is also an established caravn park within the
settlement which utilises land between the A83(T) and the foreshore. 
3.3. The current proposal is for a 1½ storey building with a general rectangular footprint and pitched
roof dormers set in approx. 5m from the eastern site boundary and parallel to the A83(T). The
proposed 3 bedroom dwellinghouse will be finished in a roughcast render, with horizontal timber
boarding detailing, concrete roof tiles and uPVC window units. The submitted plans do not
include details of colour finishes however these could readily be secured by planning condition.

Page 14

The proposal also includes for the provisions of a detached garage building with finishes to
match the dwellinghouse. 
3.4. Water connection will be by connection to the public water main; foul drainage will be to a new
septic tank and soakaway arrangement. Access will be by means of improvement of an existing
field access from the A83(T) and the formation of a connecting driveway with onsite parking and
turning for 3 vehicles within the application site boundary. 
3.5. NPF 4 Policy 16 and ABC LDP 2 Policy 09 seek to encourage and promote the delivery of high
quality, affordable and sustainable homes. NPF 4 Policy 14 and ABC LDP 2 Policies 08 and 09
all seek to ensure that development proposals are designed to improve and respect the existing
qualities of an area. The application details that the development design will seek to utilise local
aggregates in its construction, that top soil will be retained on site for landscaping. The building
design provides a flexible living space and is adaptable for full accessibility with space for a chair
lift to the upper floor and sockets to be located at accessible levels. Heating will be from an
ASHP with solar PV panels. The garage will provide bicycle storage and an EV charging point
is to be provided to comply with Building Standards Regulations. Waste will be managed onsite
with space for recycling bins provided beside the access to facilitate collection. The proposed
dwelling and detached garage are considered to be of appropriate siting, layout, scale, design
and finishes having due regard to the existing linear settlement pattern and existing built
development to which it will relate. The proposal is sufficiently removed from existing residential
property that it will not give rise to any loss of privacy or residential amenity. 
4. Natural Environment & Biodiversity 
4.1. There are no nature conservation designations relating to the proposed development site or
located within the wider locality that are likely to be impacted by the proposed development. 
4.2. The proposal relates to a greenfield site located within the ‘settlement area’ of Muasdale. The
site is currently utilised as rough grazing and is considered to have limited biodiversity value.
The hedgerow surrounding the eastern and southern boundary is likely to provide opportunities
for nesting birds and shelter for small mammals. Whilst the proposal will see some reduction in
the height of the hedgerow there is scope within the development layout to seek that this is
largely retained aside from clearance required to form and maintain visibility splays. Aside from
a bitumen junction with the A83(T), hard surfaces within the development site will be permeable. 
4.3. The Sustainability Checklist accompanying the application indicate that additional native tree
planting will be provided within the development site however no detail is provided. This could
however be secured by condition to confirm landscaping details which include further proposals
to enhance biodiversity and accord with the requirements of NPF4 Policy 3(c) and ABC LDP 2
Policy 73. 
5. Built / Historic Environment 
5.1. There are no built heritage designations within the immediate locality of the proposed
development. 
6. Impact on Woodland/Access to Countryside. 
6.1. The development will improve an existing field access that is currently utilised by the wider public
to access the beach to the west. The details accompanying the application confirm that the
development will not preclude public access to this location and it is noted that enhancement of
the existing junction will improve accessibility to this location. 
7. Landscape Character

Page 15

7.1. The application is located within the West Kintyre Local Landscape Area as designated within
the Argyll and Bute Local Development Plan 2 wherein the provisions of ABC LDP 2 Policy 71
set out that development which would have a significant adverse impact upon the character of
the landscape will be resisted. 
7.2. Within the context of the wider landscape setting, the proposed development will be viewed
within the context of existing built development. The proposed development is considered to be
of appropriate siting, scale, design and finishes that it will readily be assimilated within its
surrounds without detriment to the character or appearance of the receiving landscape. 
7.3. Having regard to the impact of development upon visual amenity, it is observed that due to the
presence of a tall hedgerow along the eastern boundary of the site there is limited outlook for
users of the A83(T) across the development site to coastal views. The introduction of a new
building at this location will not appear incongruous within the context of the existing settlement
pattern and has potential to open up views through the site to the coast through reduction in the
height of the hedgerow. 
8. Road Network, Parking and Associated Transport Matters. 
8.1. The provisions of NPF 4 Policy 13, and LDP 2 Policies 36, 37, and 40 set out a requirement that
new development is served by appropriate access arrangements and define the appropriate
standards. 
8.2. Access to the proposed development from the A83(T) shall be taken from an existing field
access that serves the adjoining field to the south and which provides public access to the
beach/foreshore to the west. 
8.3. An amended site plan submitted by the applicant (ref. 23/100-02 Rev B) details that the access
will be formed to meet Transport Scotland specifications (DMRB CD 123 and CD 109) with
visibility splays of 2m by 120m in both directions. The existing field access shall be widened out
to a minimum of 3.7m to the point where it connects with a private driveway to serve the
development. Parking and turning for three vehicles shall be provided within the development
site adjacent to the proposed garage. 
8.4. Transport Scotland have not raised objection to the proposed access arrangements from the
A83(T) subject to the access being constructed in accordance with the detail proposed, and
subject to additional conditions that require the first 5m of the field access to be surfaced in a
bituminous material, and for provision of any fencing/barriers along the trunk road boundary to
be submitted and agreed by the planning authority in consultation with Transport Scotland. The
Council’s Roads Service has not raised objection to the proposal and commented that the
proposed parking and turning arrangements are acceptable. 
9. Infrastructure / Flood Risk 
9.1. NPF 4 Policy 15 seeks to ensure that new development will contribute to local living. In this
instance it is identified that the proposal is located a short distance from a local shop, and the
Muasdale GP surgery. The proposal also falls within the catchment area for Glenbarr Primary
School. The development is also located on the A83 bus route. 
9.2. The small portion of the site adjacent to its western boundary is located within the 1:200 plus
climate change coastal flood map provided by SEPA. It has however been confirmed that the
proposed dwellinghouse is located outwith the area subject to flood risk and SEPA have not
raised any objection to the proposal subject to a condition specifying the minimum finished floo9r
level of the development to 3.76m AoD. The details accompanying the application specify a FFL
of 4.3m AoD. The proposal is considered to be consistent with the relevant provisions of NPF 4
Policy 22, and LDP 2 Policy 55 in this respect.

Page 16

9.3. Water shall be by connection to the public water main, Scottish Water have not raised any
objection. 
9.4. Foul drainage shall be to a new septic tank and soakaway; the development is located outwith
areas currently served by public drainage infrastructure and this arrangement is accordingly
consistent with the requirements of LDP 2 Policy 60. 
9.5. The submitted details do not include for surface water drainage, it is however observed that a
requirement to provide SuDS can be secured by planning condition to address the requirements
of LDP2 Policy 62