Democracy Spraffa

8 - Equality Mainstreaming and Outcomes report 2021-22

North Ayrshire Council · 11 May 2023
Back to Integration Joint Board — 11 May 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Integration Joint Board
11th May 2023
Subject : Equality Mainstreaming and Outcomes Report 2021-22
Purpose : • Approval
Recommendation : It is recommended that IJB review the attached Equality
Mainstreaming and Outcomes Report and approve for publication. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required x
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
EHRC Equality and Human Rights Commission
PSED Public Sector Equality Duty 
1. EXECUTIVE SUMMARY 
1.1 The HSCP last published an Equality Outcomes Plan in April 2021. This plan has now
been superseded by a new Equality Outcomes Plan from April 2022 which was
approved at the IJB meeting in March. 
1.2  As part of meeting our Specific Duties within the Equality Act, the HSCP must publish
a mainstreaming and outcomes report detailing how we have progressed against our
Equality Outcomes. 
1.3  This report for 2021-22 has now been prepared and demonstrated positive progress
towards the mainstreaming of the Public Sector Equality Duty (PSED) and the
identified Equality Outcomes. 
2. BACKGROUND 
2.1 As set out by the Equality and Human Rights Commission (EHRC), public bodies are
required to produce a mainstreaming and outcomes report against an Outcomes Plan
within two years of publication. North Ayrshire HSCP last published an equality
outcomes plan covering 2021-22 in-line with the one-year Strategic Bridging Plan.

Page 2

2.2 The plan set out how, as a public sector organisation, we would mainstream equality
work into our day-to-day practice. In addition, as per the public sector equality duty,
the plan set out eight Equality Outcomes for the HSCP to progress. These eight
equality outcomes were supported by a set of 67 actions that would be delivered
across all HSCP services. 
2.3 In meeting our equality duties, a mainstreaming and outcomes report for the 2021-22
plan has now been produced. 
2.4 A key section of the report outlines how we mainstream equalities practice into our
day-to-day practice. This includes information on: 
o The Governance Structures of the HSCP and IJB
o How Equality is embedded in our Strategic Plan
o Our engagement practices and our locality-based working.
o How we develop and train our staff, providing an overview of the equality-based
training available.
o Embedding equalities into our procurement practices
o Our commitment to undertaking Equality Impact Assessments on all new
policies and proposals. 
2.5 The information to be included in these reports is prescriptive. However, due to the
nature of HSCPs we need not include information on: 
o Our Workforce.
o The Gender pay gap.
o Statements on equal pay.
o Board diversity 
3. PROPOSALS 
3.1 As a registered public body IJBs are required to publish Mainstreaming and Equality
Outcomes reports. The report covering the period for 2021-22 has now been
prepared. It is proposed that this report is approved by IJB for publication. 
3.2 Anticipated Outcomes 
3.2.1 The 2021-22 Equality Outcomes Plan identified the following eight equality outcomes: 
1. Vulnerable adults and older people are cared for, as much as possible, at home. 
2. Vulnerable young people are identified quickly and supported in their own
community. 
3. Services will involve service users in the review or redesign of services that affect
them. 
4. Local people are aware of the various ways they can help shape HSCP services. 
5. Local people understand how to access the right HSCP Service for them.

Page 3

6. Vulnerable people can access meaningful education, training and employment
options. 
7. People at risk of involvement with the Justice System are redirected to positive
outcomes. 
8. We better understand the Diversity in our workforce.
3.3 Measuring Impact 
3.3.1 To support the Equality Outcomes, 67 actions were identified to progress. The
‘progress against equality outcomes’ section provides a summary of the work
progressed against each equality outcome. The more detailed update against all
actions is included as an appendix. 
3.3.2 Overall, progress against the outcomes was positive, with many developmental
actions being completed over the course of the year. 
3.3.3 Many of the development actions progressed work to improve services or
opportunities for those with protected characteristics. This includes improving services
that support: 
o Women at risk of gender-based violence.
o Children and young people at risk of entering the care system.
o Syrian families who are new Scots.
o Older people at risk of social isolation.
o Trans people accessing addiction support services.
o Diverting people in Mental Health Crisis away from the justice system. 
4. IMPLICATIONS  
4.1 Financial
None
4.2 Human Resources
None
4.3 Legal
In publishing this report, the IJB remains compliant with the Public Sector Equality
Duty and the Equalities (Scotland) Act 2010.
4.4 Equality/Socio-Economic
None   
4.5 Risk
No risk implications are associated with the publication of this report.
4.6 Community Wealth Building
None
4.7 Key Priorities
None.

Page 4

5. CONSULTATION 
5.1 The report was presented to Partnership Senior Management Team for review and
endorsement on 20th April 2023. 
Caroline Cameron, Director 
Author: Scott Bryan, Strategic Planning, Policy and Inequalities Officer,
sbryan@north-ayrshire.gov.uk 
Appendices
• Appendix 1, Equality Mainstreaming and Outcomes Report 2021-22.

Page 5

0 
North Ayrshire
Health and Social Care Partnership 
Equality Mainstreaming and
Outcomes Report
2021-22

Page 6

1 
Contents
Introduction ............................................................................................................................................ 2
One Year Equality Outcome Plan – 2021-22 ....................................................................................... 2
Legal Requirements ................................................................................................................................ 3
Mainstreaming the Equality Duty ............................................................................................................ 5
Our Governance .................................................................................................................................. 5
Equality and our Strategic Plan ........................................................................................................... 6
Working in Localities ........................................................................................................................... 7
Engaging Communities ....................................................................................................................... 8
Developing our staff .......................................................................................................................... 10
Embedding Equality in Procurement ................................................................................................ 11
Equality Impact Assessment ............................................................................................................. 12
Our Equality Outcomes 2021-22 ........................................................................................................... 13
HSCP Equality Outcomes ................................................................................................................... 13
Ayrshire Shared Equality Outcomes ................................................................................................. 13
Equality Outcomes – progress against actions ..................................................................................... 14
APPENDIX .............................................................................................................................................. 19
Appendix A – General Equality Duties and Protected Characteristics .............................................. 19
Appendix B. Health and Social Care Partnership Clinical Governance Structure ............................. 20
Appendix C: National Health & Wellbeing Outcomes ...................................................................... 21
Appendix D: Aligning HSCP and Ayrshire Share Equality Outcomes ................................................. 23
Appendix E: Equality Outcomes – Action Updates ........................................................................... 24

Page 7

2 
Introduction
Following the impact of COVID-19, the ability of the Partnership to function effectively in the
routine delivery of its services and duties was impaired. Pandemic safety restrictions led to
many barriers being placed on services in their daily roles. Among these was the ability to
effectively meet, support and engage with service users, carers and local people. While this
was mostly demonstrated in our service delivery to local people in receipt of Health and
Social Care support, it also impacted on the partnerships ability to effectively engage with
local communities to support strategic developments and service improvements.
In April 2021, we published our one-year Equality Outcomes Plan. This one-year plan was
developed to compliment the Partnership’s Strategic Bridging Plan for 2021-22. 
One Year Equality Outcome Plan – 2021-22
Due to the restrictions and limitations placed on the HSCP, effective engagement and
consultation to support any service development was challenging. Methods of engagement
were greatly reduced, and as
For the service year April 2021 to March 2022, North Ayrshire Health and Social Care
Partnership was directed a one-year Strategic Bridging Plan. This bridging plan had been
created to effectively ‘bridge the gap’ between the end of the current plan (Let’s Deliver Care
Together – 2018-21) and the new longer-term strategy ‘Caring Together 2022-30’. 
It was originally expected that a new longer-term strategy would be published by April 2021.
However, due to the impact of the COVID-19 pandemic several barriers were created that
limited the scope for effective development and engagement for a longer-term plan. As such,
approval was granted to create a one-year plan.
To ensure effective mainstreaming of the Equality Duty, it is important that our Equality
Outcomes Plan align with our Strategic Plan. To this end, Equality Outcome Plan for 2021-22
had a short-term focus of one-year, in alignment with our strategic bridging plan. These
short-term outcomes will be superseded by a revised set in-line with our longer-term
strategic plan from April 2022.

Page 8

3 
Legal Requirements
As an identified public body Integration Joint Boards are required to comply with the general
and some specific duties as set out in the Equalities Act 2010. 
The Equalities Act 2010 (the Act), replaced the Race Equality Duty (2002), the Disability
Equality Duty (2006) and the Gender Equality Duty (2007). The Act sets out a general duties
for every public authority to have due regard. The General Duties place an obligation on
public bodies to: 
• Eliminate unlawful discrimination, harassment and victimisation and other prohibited
conduct.
• Advance equality of opportunity between people who share a relevant protected
characteristic and those who do not.
• Foster good relations between people who share a protected characteristic and those
who do not.
The general duties apply to every function within our organisation, including how we plan
and deliver frontline services, our role in policy making and in how we procure and contract
services from outside agencies. The Act refers to this as ‘mainstreaming equality’.
The public sector equality duty covers the following protected characteristics (see Appendix A
for further definitions): 
o Age
o Disability
o Race
o Religion or belief
o Sex
o Pregnancy and maternity
o Sexual orientation
o Gender reassignment, and
o Marriage and civil partnerships 
Specific duties have been designed to help authorities meet the three needs outlined in the
general duty. The specific duties were created by secondary legislation in the Equality Act
2010 (Specific Duties) (Scotland) Regulations 2012. The majority of authorities are required
to:
o Report on mainstreaming the equality duty.
o Publish equality outcomes and report progress.
o Assess and review policies and practices.
o Consider award criteria and conditions in relation to public procurement.
o Publish in a manner that is accessible.
o Gather and use employee information.
o Publish gender pay gap information.
o Publish statements on equal pay.
o Publish gender composition of boards and produce plans to increase diversity.

Page 9

4 
Due to the legislative structure of Integration Joint Boards (IJB), Health and Social Care
Partnerships are exempt from certain specific duties. This is due to the unique structure of
Integration Boards in that they are not employing bodies. 
As such, while IJBs direct the strategy and operations of Primary Health Care and Social Care
services, all staff members remain employees of either NHS Ayrshire and Arran or North
Ayrshire Council.
North Ayrshire Health and Social Care Partnership must:
o Publish a report on how it has mainstreamed equality into the day-to-day operations
of the organisation.
o Publish a set of equality outcomes which it considers would enable it to better
perform the general equality duty. These must be reviewed within four years of initial
publication.
o Publish a report on progress towards these outcomes.
o Make any reports published fully accessible to all.
o Assess relevant policies, procedures and practices through Equality Impact
Assessment
For the 2021 report, we need not: 
o Gather and use employee information.
o Publish gender pay gap information.
o Publish statements on equal pay.
o Publish information on board diversity*
However, while we are not required to report on specific duties in relation to employees, we
will work closely with North Ayrshire Council and the Board of NHS Ayrshire & Arran to
ensure our staff are treated in a fair and equitable manner. 
*In relation to the publishing of board diversity information, this aspect of the Public Sector
Duty has now been legislated but is yet to be implemented.

Page 10

5 
Mainstreaming the Equality Duty
Mainstreaming the equality duty simply means integrating equality into the day-to-day
working of the partnership. This means considering the impact of our actions on all our
services users, particularly those covered by a protected characteristic. Taking equalities into
account in the way we operate should be part of everything we do. Mainstreaming the
equality duty has several benefits including:
• equality becomes part of our structures, behaviours and culture. 
• we can demonstrate how equality is built into everything we do.
• contributing to continuous improvement and fairer and better performance. 
A key part of our business is to support vulnerable people and those who are often face
discrimination or unfair treatment. We build this into everything we do and ensure that for
each need of the general equality duty, we consider each of the protected characteristics.  In
addition, if we operate in a way that gives rise to treatment that is unlawful or discriminatory,
we will change the way we work to prevent this.
Our partnership values were reviewed in 2022 as part of our new Strategic Plan. These values
continue to underpin our approach to how we engage with and support the people within
our communities. Through expressing our values, we demonstrate that we show: 
Care, Empathy and Respect 
Our Governance
Our Integration Joint Board took responsibility for the delegated functions on 1 April 2015.
The IJB will build on these foundations, ensuring they are embedded by our staff, partners
and communities.  The diagram below outlines North Ayrshire Health and Social Care
Partnership Governance Structure. 
The Integration Joint Board is made up of voting members, who are either Councillors of
North Ayrshire Council or non-executive Directors of NHS Ayrshire and Arran, and non-voting

Page 11

6 
members made up of persons nominated by the Council, the NHS Board, third sector bodies,
service users, carers and other key stakeholders.  The North Ayrshire Integration Joint Board
meet monthly and further information about future meetings and previous minutes are
available on the North Ayrshire Council website. You can access this information using this
link, NAHSCP Integration Joint Board - Committee Details
To ensure that the needs of the general Equality Duty are considered in exercising our
business functions and processes, including budget setting and project planning, there is a
mandatory “Equalities Assessment‟ section within all IJB reports, which identifies if the
papers have been assessed for equality and outlined any further action required.
As part of the requirements laid down in the Public Bodies (Joint Working) (Scotland) Act
2014, the Integration Joint Board must produce a Strategic Commissioning Plan that sets out
how we will plan and deliver services and in turn how we will meet the National Health and
Wellbeing Outcomes (appendix c).  In addition, we must outline how the views of localities
must be considered. 
The role of the Strategic Planning Group is to support the Integration Joint Board in the on-
going development the Strategic Plan and the continuing review of the progress of our
delivery against the agreed national and local outcomes.  Within North Ayrshire Strategic
Planning Group every stakeholder has a key role to play in the strategic planning process and
we have developed an effective programme of review and planning that promotes
constructive dialogue.
The following sections set out how we have mainstreamed equalities into our activities to
date.   
Equality and our Strategic Plan
Our medium-term Strategic Plan, Let’s Deliver Care Together’ 2018-21, expired in March
2021. Traditionally, this would have been replaced by a new medium to long-term strategy,
however due to the additional challenges placed upon the HSCP as a result of the COVID-19
Pandemic, the decision was made to produce a one-year bridging plan instead. This bridging
plan would effectively continue the priorities identified in the previous plan and offer a view
of future priorities and areas for action. This approach also allowed the IJB to meet its
strategic planning legal obligations.
In April 2021, the HSCP published its Bridging Strategic Plan 2021-22, maintain the HSCPs
Vision that was originally established in 2015:
All people who live in North Ayrshire are able to have a safe,
healthy and active life. 
In addition, our bridging plan maintained our five strategic priorities to help us meet our
vision, address local health inequalities, and improve the health and wellbeing of local
people:

Page 12

7 
1. Tackling Inequalities
2. Engaging Communities
3. Prevention and Early Interventions
4. Improving Mental Health and Wellbeing, and
5. Bringing Services together 
As stated, this strategic plan south to act as intermediary between our previous medium-
term plan ‘Let’s Deliver Care Together’, and a new longer-term plan that would be published
in April 2022. 
In addition, the bridging plan also provided an overview on the HSCPs pandemic recovery
intentions, highlighting what key actions we would take to re-mobilise our services and
continue to effectively sustain the delivery of health and social care services. 
These recovery actions, where mindful of the overt impact the pandemic had on vulnerable
and marginalised groups. Our plan set out recovery actions to support those most at risk as a
priority, including Children and young people, people with complex mental health conditions,
people with a learning disability, those with drug or alcohol addictions, and older people with
long-term conditions.
A new Partnership strategic plan ‘Caring Together’ has been produced for the period April
2022 to March 2030. It can be found on our website, Caring Together: NAHSCP Strategic
Commissioning Plan 2022-2030. 
This plan compliments the development of a new HSCP Equality Outcome Plan for the same
period. An online version of the Strategic Bridging Plan (2021-22) can be found on the NAHSCP
website. 
Working in Localities
North Ayrshire is home to many different communities with differing needs and aspirations.
We recognise that one single strategic or operational approach will not meet the needs of all
these communities. To overcome this – and to
help us identify how best to deliver the best
service to our local communities - we have
established six Locality Planning Forums (LPFs),
one for each of the localities in North Ayrshire;
these are:
• Arran
• Garnock Valley
• Irvine
• Kilwinning

Page 13

8 
• North Coast, and 
• Three Towns
Each LPF is led by a Chair who is a member of the North Ayrshire IJB and supported by a local
GP and a lead officer who is a member of the partnership senior management team. Other
members include representatives from local health and care services, third and independent
sector organisations and community members.
Each forum has a role in identifying the health and care needs of local people and informing
the overall strategic planning process of the HSCP. Locality Forums are the key link between
local people and the HSCP. 
Engaging Communities
Like all other organisations, restrictions put in place because of the Covid-19 pandemic made
undertaking our daily tasks more challenging. In particular, this placed significant barriers to
how we engaged with our communities and local people. In addressing this, we made best
use of existing technology and engagement methodologies to ensure we could still attract
feedback from local people on key issues facing the HSCP.
The sections below highlight some of the engagement activities the partnership delivered
during the service year. 
Development of the Care Improvement Network
The Care Improvement Network has become an important platform in
enabling the HSCP to engage with people in North Ayrshire while
COVID-19 protections remained in place. 
The purpose of the Care Improvement Network is to give people in
North Ayrshire a platform to engage with the HSCP in a way that is
most suited to them. We recognise that people have busy lives and
may not always be able to commit to joining forums. 
Instead, this platform will give people the opportunity to engage in a way that suits them
whether it be via online or face-to-face meetings or completing a survey.
The network is still developing, but has already enabled local people to play an active part in
contributing to our strategic plan and members have helped to inform how we work to
improve our messaging and communication around mental health and wellbeing. There have
also been opportunities for members to find out more about different parts of HSCP services.
For example, one of our Community Link Workers attended a meeting which gave people the
chance to ask questions and discuss their role.

Page 14

9 
Consultation on a National Care Service
During September and October 2021, facilitated consultation sessions on the Scottish
Government’s proposals for the National Care Service for Scotland. This development would
represent a significant change to how health and care services are delivered in North Ayrshire
and across Scotland. 
To provide an effective response to the consultation, we undertook a series of engagement
activities supported by Scottish Government policy officers. In total, six engagement sessions
were facilitated across the localities in North Ayrshire, either in person (following strict Covid-
19 safety protocols) or virtually. These sessions provided local people the opportunity to
learn more about the proposal and ask any question they may have had.
Sessions were attended by range of people, including community members, carers, service
users, staff, third sector organisations and elected members.
In addition, two virtual sessions were facilitated on the development of the NCS with our
newly formed Care Improvement Network
All responses received during these sessions were collated into a consultation report and
submitted to the Scottish Government. 
Consulting on our New Strategic Plan
In April 2022, North Ayrshire HSCP published its new strategic plan ‘Caring Together 2022-
30’. To support its development an engagement programme was carried out with the North
Ayrshire pubic. This engagement ran from 1st December 2021 to 22nd Jan 2022.
The primary method used to engage with people to enable them to inform the strategic plan
was via an online survey. Due to rising Covid-19 case numbers, safety restrictions meant
there was limited opportunity for face-to-face engagement. 
Overall, 240 people responded to the online survey, of those:
 114, were members of the public
 92, were members of staff in the HSCP
 34, identified as service users
 21, identified as Carers, and
 19, suggested they were ‘other’
The survey asked people their thoughts on: 
• our proposed strategic and locality priorities, 
• the actions that we should take to work towards addressing our priorities, and 
• the values that they look for in their health and social care services. 
Additionally, we facilitated online sessions with our staff and the Care Improvement Network.
The data collected via the consultation on the proposals for the National Care Service for
Scotland will also inform the strategic plan.

Page 15

10 
Developing our staff 
Our Learning and Development section offers a wide range of training courses and
development opportunities for partnership staff. Many courses available cover guidance and
awareness training for working with vulnerable people who may be covered by protected
characteristics. Between March 21 and April 2022, there has been a decrease in the number
of training courses provided due to the pandemic. However, examples of courses delivered,
and uptake is detailed below:
Autism Awareness:
o 2 courses delivered during service year.
o 8 HSCP staff members attended.
Child Protection Awareness Training
o 4 courses delivered during the year.
o 28 HSCP staff members attended. 
Adult Support and Protection:
Between April 2021 and March 2022, 101 training courses were provided to almost 830
members of staff. The majority of courses were delivered through Microsoft Teams (97%),
with the rest (3%) being delivered face to face. The courses provide valuable training to staff
members in order to effectively support and protect vulnerable adults from harm and
exploitation. Many of these vulnerable adults will identify with recognised protected
characteristics. 
In addition to staff groups, the service also provides bespoke training to external
organisations as part of its multi-agency approach. Organisations in receipt of training
include, Millport Care Centre, Scottish Fire & Rescue Service, Community Larder, Cumbrae
Lodge, KA Leisure, North Ayrshire Taxi Owners, Cunninghame Housing Association,
Cooriedoon Care Home, Salvation Army. 
Child Protection Committee
For the reporting period from Jan 2021 to August 2022, North Ayrshire Child Protection
Committee had an overall attendance of 837 across their training events. Training was
provided to organisations across the public sector in North Ayrshire, including HSCP,
Education, Police, Housing and the Third Sector.
An example of the courses delivered include:
o Keeping children safe online (79 participants)
o Child protection awareness (207 participants)
o Child sexual exploitation (83 participants)
o Child sexual abuse awareness module (62 participants)
o Starting a conversation with children (101 participants)

Page 16

11 
Embedding Equality in Procurement
The Equality Act 2010 (Public sector equality duty) or ‘general duty’ and the Equality Act 2010
(Specific Duties) (Scotland) Regulations 2012. The 2012 Regulations specifically require an
authority to consider its’ equality duty when awarding contracts within its award criteria. 
The tender award criteria is the formal mechanism used to determine the award of a
contract. Aligned to the public sector equality duty, compliance with the Council's Equality
Certificate is mandatory and conditional for all tenders undertaken, bidders must complete
the Council’s Equality Certificate satisfactorily at the Qualification (Pass/Fail) stage of the
procurement process or may be excluded at that stage. 
In terms of the workforce, a mandatory section for Fair Work Practice is included within the
tender award criteria aligned to promoting equality of opportunity and developing a
workforce which reflects the population of Scotland in terms of characteristics such as age,
gender, religion or belief, race, sexual orientation, and disability; and a fair and equal pay
policy that includes a commitment to supporting the Living Wage.
The Fairer Scotland Duty, part 1 of the Equality Act 2010 places a legal responsibility on
public bodies in Scotland to pay regard to how they can reduce inequalities of outcomes
caused by socio-economic disadvantage when making strategic decisions (reducing the socio-
economic impact of our policies, strategies, and budget decisions). 
The commissioning body has a responsibility to formally document how the impact of
strategic decisions are considered. The Council is required to assess the ‘equality impact’ of
proposals thoroughly before any decisions are taken proportionate to the decision that is
being made. In addition, we must also ensure we are not impacting negatively on Human
Rights or socio-economic status under the Fairer Scotland Duty. Aligned to this requirement,
an Equality Impact Assessment is undertaken in the pre planning stages before any tender is
undertaken to formally assess, mitigate, and record impact. 
The Human Rights Act 1998 places a legal responsibility to ensure that people are treated
with dignity and respect and has at its core the principles of fairness, respect, equality,
dignity, and autonomy.  
Aligned to protecting the rights of individuals and advancing equality of opportunity for users
of services, the Partnership has made a commitment to The Charter for Involvement. The
Charter reflects 12 statements aligned to Human Rights in relation to how people who use
support services want to be involved in the services they get; in the organisations that
provide their services; and in their wider communities. The Charter relates to anyone who
receives support and covers all abilities, age, gender, race, colour, sexual orientation, or
religion. 
Aligned to Statement 8 ‘We want to be involved in decisions made by the organisations that
plan and run our support’ and Statement 5 ‘We want to be involved in choosing the people
who support us’, HSC commissioned services involve users of services and/or significant
others in the procurement process. They are invited to take part in the award of contracts
through designing quality questions in the award criteria and sitting on evaluation panels that
select preferred bidders for award.

Page 17

12 
Aligned to Human Rights (Article 4: Prohibition of slavery and forced labour) and Modern
Slavery Act 2015, Modern Slavery is a mandatory conditional (Pass/Fail) question at the
Qualification stage of the procurement award criteria to ensure the supply chains bidders
operate are lawful and ethical.  
Monitoring and Review
All legislation referenced is included within live contract terms and conditions, this provides a
formal lever to the Council so that we may at our sole discretion terminate contracts should
breaches of legislation occur. The Partnership’s contract management framework is the
formal routine mechanism to audit provider compliance with equality requirements for live
contracts.  
Equality Impact Assessment
We continue to undertake Equality Impact Assessments on any new policies or budget
proposals that are likely to impact on service users, local people, members of staff or other
stakeholders. 
Since the launch of the partnership in 2015, we have applied the same Equality Impact
Assessment process to both Council and NHS budget proposals that affect the Partnership.
This afforded the Partnership to achieve a greater level of consistency in equality impact
assessments across the wider partnership. This has been a useful mechanism to both embed
equalities practise in the partnership and further the process of integration.
We promote the completion of Equality Impact Screening forms (rapid assessment) at the
development stage of any new policy or service proposal. This supports those developing a
new policy to be mindful of any potential impact on equalities it may have. Towards
completion, a full Equality Impact Assessment is undertaken to ensure all considerations have
been taken. This approach helps to embed thinking about the various aspects of equality at
the earliest stages of project or policy development.
Since 2019, the profile of Equality Impact Assessments has increased across the Partnerships,
with many services actively identifying the need for robust equality assessments to help
inform service redesign work. 
In addition, Equality Impact Assessments are completed at the design stage for
commissioned projects. The learning from these assessments help inform the Service
Specification and Method Statements which are weighted and scored, forming the basis for
award of tender. This ensure that any new commissioned services, meet equality
requirements.  
Amendments to the assessment process in the past few years have seen the inclusion of
additional elements to assess the impact on both equality and inequalities. The HSCP now
uses the NAC Equality and Children’s Rights Impact Assessment process. This process includes
the additional elements of:
o Children’s Rights
o The Fairer Scotland Duty
o Island proofing

Page 18

13 
Our Equality Outcomes 2021-22
As described the Equality Outcomes published in April 2021 were intended for one-year to
compliment the Partnership’s Strategic Bridging plan. These eight outcomes were identified to reflect
the priorities of the HSCP and were intended to be more locally focussed.
HSCP Equality Outcomes
1. Vulnerable adults and older people are cared for, as much as possible, at home.
2. Vulnerable young people are identified quickly and supported in their own community.
3. Services will involve service users in the review or redesign of services that affect them.
4. Local people are aware of the various ways they can help shape HSCP services.
5. Local people understand how to access the right HSCP Service for them.
6. Vulnerable people can access meaningful education, training and employment options.
7. People at risk of involvement with the Justice System are redirected to positive
outcomes.
8. We better understand the Diversity in our workforce. 
These outcomes are aligned to the HSCPs five strategic priorities that were identified in the
Strategic Bridging Plan. The five strategic priorities are highlighted on page 6. 
Ayrshire Shared Equality Outcomes
While the above outcomes were identified to offer a more locally focussed approach by the
HSCP, they still align to the high-level outcomes published by the Ayrshire Shared Equality
Outcomes Partners. Those shared outcomes are:
1. In Ayrshire, people experience safe and inclusive communities.
2. In Ayrshire, people have equal opportunity to access and shape our public services.
3. In Ayrshire, people have opportunities to fulfil their potential throughout life.
4. In Ayrshire, public bodies will be inclusive and diverse employers.
More information on how these outcomes align to the HSCP local equality outcomes can be
found in Appendix D.

Page 19

14 
Equality Outcomes – progress against actions
In order to achieve our established Equality Outcomes, a number of supporting actions were
identified by service leads across the Health and Social Care Partnership. In total 67 actions
were identified for the 2021-22 service year.
A summary of the progress towards the outcomes is provided below. More detailed
information on the progress towards individual actions can be found in Appendix E. 
Equality Outcome 1.
Vulnerable adults and older people will be cared for, as much as possible, at home.
Six actions were aligned to this outcome. Over 2021-22, four were complete with 2 being
progressed into 2022-23.
Throughout 2021-22, a range of service and workforce developments took place across the
HSCPs Care at Home service. This included a review of the externally provided services from
third and independent sector organisations. Due to on-going Covid restrictions, the full
review experienced delays and will progress into the 2022 service year. However, throughout
2021, the Care at Home Service undertook a range of activities to recruit and retain staff in
order to provide greater levels of care to older frail people and those with complex health
conditions. 
In support of community-based care, developments in the Home First Approach in health and
community care, including appointment of additional Occupational Health staff in hospital
settings, should facilitate faster assessment and rehabilitation of patients.
Developments have also taken place to improve community based Mental Health Services.
The HSCP has in part developed a short-term intermediate support services in the Adult
Community Mental Health Team. This team also seeks to support people discharged from
hospital to rehabilitate back home as soon as possible. The service processes are established,
however, is currently relying on bank staff due to delays in permanent recruitment.
The CMHT has also developed and number of early intervention and prevention options,
including enhancing digital support options to support people at home, and established an
effective emergency mental health care community response service. 
Equality Outcome 2. 
Vulnerable young people and families are identified quickly and supported in their own
community.
Twelve actions were identified to support this outcome, all completed during the service
year. Developments have included upskilling School Nurse Teams to better support young
people with anxiety.

Page 20

15 
Throughout the year, a review of the North Ayrshire Named Person Service was completed to
identify improvements to the service, the review was complete in July 2021
A Young persons Suicide Support Pathway was established, to ensure young people who may
be of risk of suicide are provide appropriate and timely support. 
New training and screening processes have been established to support women affected by
gender-based violence and other risk factors. Through collaborative working with Police
Scotland and women’s aid, we have a process to reduce the number of repeat domestic
abuse referrals.
In MAASH and Service Access services, recovery development workers are now available to
support families at risk of substance misuse. We also established an intensive support service
for parents who have experience of trauma, these pathways are available to parents in the
pre-birth stage who are identified as vulnerable. In addition, the development of the
Specialist Perinatal Mental Health Service (across Ayrshire) will provide additional mental
health support to new mothers. Also, new mothers will also be able to access Mental Health
advice from Mental Health Practitioners in their own GP practice. 
Equality Outcome 3.
Services will involve service users in the review or redesign of services that affect them.
Twelve actions were identified to support this outcome. Ten of those were completed during
the service year. Several initiatives took place across range of partnership services which
included engagement with service users.  
Initiatives have included: 
• Engaging with families to support their service transition into the new respite facility at
Roslin House. 
• Communicating effectively with parents as part of the ‘Team Around the Parent
Approach’, an initiative to support parents who have had their children removed from
their care.
• As part of the ‘Promise’ a number of mechanisms have been put in place to ensure
children and young people can have their voices heard, this includes the Champions
Board, and advocacy services provided by Barnardo’s.
• To inform the relaunch of Older Peoples’ Day Service an engagement exercise took place
with existing services users, in the form of telephone interviews, asking them their
preferences on future service options.
• The review of care services on Arran was supported by local engagement activity.
• The appointment of a dedicated Engagement Officer in Child and Adolescent Mental
Health Services. 
• A series of engagements with young people was employed to inform the development of
Foxgrove Secure Adolescent Inpatient Service.

Page 21

16 
• In Learning Disability Services, activity has been undertaken in collaboration with Health
Improvement Scotland and neighbourhood networks, using art-based approaches to
engagement. 
Equality Outcome 4.
Local people are aware of the various ways they can help shape HSCP services.
Four actions were aligned to this outcome. Three actions where complete at the end of the
reporting period with one still under review. Overall, actions were taken to help improve local
engagement activities across the partnership area. One of the recognised gaps was the need
for appropriate operational managers to be present at the locality level for engagement
purposes. Throughout the year, senior managers were aligned to each Locality Planning
Forum. 
In addition, through work delivered by Partnership Organisational Development, all LPFs
undertook a review of their local priorities and identified a new priority set. This new set of
locality priorities will be included in the new HSCP Strategic Plan from April 2022.
Going forward, partnership engagement officers will consider how best to widen the
engagement of LPFs across North Ayrshire to ensure inclusion of those hardest to reach or
seldom heard.
On Arran, the review of the joint Locality Partnership/ Locality Planning Forum model has
been delayed because of pandemic challenges. Work will continue to be progressed into
2022. 
Equality Outcome 5.
Local people understand how to access the right HSCP Service for them.
Ten of the twelve actions aligned to this outcome were competed during the service year.
Among the key developments was the strengthening of the community hub approach that
was established during the Covid 19 period. These hubs proved to be a great resource for
local communities, with a range of services and support options available locally.
Work was progressed during the year to support the young females involved with the Syrian
Vulnerable Resettlement Programme. Known as the ‘Swans group’, the young women took
part in a number of initiatives including creative arts with the National Galleries of Scotland.
An outcome of this programme was to increase the confidence and wellbeing of this group
supporting them to settle more easily in their new home.
Other developments across the service year included work to improve the Transition of
Young People as the move onto adult services, ensuring individuals and their families are fully
informed of the processes involved. Through the identification of locality based mental
health forums, young people are more easily able to access Mental Health advice and
supports. On Arran, a single point of contact was launched, making it easier for local

Page 22

17 
residents to access HSCP services when required. Mental Health services have enhanced the
availability of Digital support options for people, allowing people with low level concerns to
access appropriate support at home.
In NADARS, work has progressed to promote the service as a safe place for the LGBTQ+
community. This includes displaying informative posters and updated the gender options
available on the DAISy system. 
Equality Outcome 6.
Vulnerable people can access meaningful education, training and employment options.
In total, eleven actions were identified to support this action. Several initiatives took place
during the year to improve access to education, training and employment opportunities for
people who require HSCP support. This included a successful 12-week programme of
Community Education delivered by the Rosemount Team to a group of parents and carers,
building an effective CV of skills and experience. 
Other developments over the year include the appointment of Modern Apprentice posts in
the Drug and Alcohol Workers Team, as well as supporting the new Day Services workforce at
Trindlemoss to develop further employment and training opportunities for service users.
The Pear Service, delivered by Turning Point Scotland, supported the development of an
enhanced volunteer programme for those accessing addiction support services, which often
led to subsequent paid employment. The Recovery College continued to deliver positive
outcomes for its students, with many of its graduates moving on to positive destinations.
In Community Mental Health Services, the Individual Placement and Support Services,
supported a number of service users meaningful support in order to meaningfully access the
job market. The ACORN programme continues to provide service users with meaningful skills
and training through its social enterprise approach. 
Equality Outcome 7.
People at risk of involvement with the Justice System are redirected to positive outcomes.
Seven actions were aligned to this outcome. All were completed during the service year. In
summary, over the service year, several developments took place supporting those with
experience of the Justice System. Throughout the year, employability mentors, even facing
covid challenges, supported a number of service users onto positive employability outcomes,
including employment, training and volunteer opportunities.
Throughout the year, we implemented our Housing First model, providing housing,
addictions and mental health support to those released from prison to support their
rehabilitation back into the community and reduce reoffending. This is also complimented by
the review of clinical pathways for those with mental health concerns who come to the

Page 23

18 
attention of the police. The pathway ensures effective support for individuals and reduces
the chance or intervention by the Justice System.
Work was also progressed by the ADP, building on addictions peer support work and the
appointment of a recovery development to better support those living with addictions in our
communities.
Children and Families services also progressed developments to better support women and
children including implementing the Whole Family Approach, delivered by Turning Point
Scotland to support diversionary work for women. In addition, the ‘Safer and Together’
model was established to better support those affected by domestic abuse. 
Equality Outcome 8.
We better understand the Diversity in our workforce.
There were two actions identified against this outcome. A benchmarking exercise carried out
across the Ayrshire Equality Partnership (AEP) in 2020 looked at the availability of protected
characteristic information in the workforce of each organisation. Overall, the benchmarking
exercise showed several gaps in the protected characteristic information available for staff in
North Ayrshire HSCP. This included several areas where information was not known or not
answered. This information was presented to the HSCP Senior Management Team for
information, which agreed was this was an area for improvement.
Through engagement and work with resource officers in the HSCP, a clearer picture of the
protected characteristics of the HSCP workforce has been established. This information has
now been used in the HSCP workforce plan, published in October 2022.
Work is ongoing across the parent organisations HR to improve the return rate of protected
characteristic information.

Page 24

19 
Appendix
Appendix A – General Equality Duties and Protected Characteristics 
General Equality Duty: 
• Eliminate discrimination, harassment and victimisation and other prohibited conduct.
• Advance Equality of Opportunity - between people who share a relevant protected
characteristic and those who do not.
• Foster good relations between people who share a protected characteristic and those
who do not. 
Protected Characteristics:
Characteristic Description
Age The Equality Act 2010 protects people of all ages.
Disability Disability includes people with physical, learning and sensory
disabilities, people with a long term illness and people with mental
health problems.
Race Under ‘The Equality Act 2010’ ‘race’ includes, colour, nationality
and ethnic or national origins. It also includes Gypsy Travellers.
Religion or Belief In The Equality Act 2010, religion includes any religion. It also
includes a lack of religion. Belief means any religious or
philosophical belief or a lack of such belief.
Sex Both males and females are protected under The Equality Act 2010 
Pregnancy and
Maternity
The law covers pregnant women or those who have given birth
within the last 26 weeks, and those who are breastfeeding
Sexual Orientation The Equality Act 2010 protects lesbian, gay, bisexual and
heterosexual people
Gender
Reassignment
The Equality Act 2010 provides protection to someone who
proposes to, starts or has completed a process to change his or her
gender.
Marriage and Civil
Partnership
Marriage is defined as a union between two people of different or
of same sexes. In addition to same sex marriage, same sex couples
can also have their relationship legally recognised as ‘civil
partnerships’.
This category only applies to eliminating unlawful discrimination in
employment.

Page 25

20 
Appendix B. Health and Social Care Partnership Clinical Governance Structure
Text overview of image on page 5.
The image shows:
The Integration Joint Board as the overarching responsible body for the HSCP
Feeding into the IJB is the HSCP Clinical & Care Governance Group
Reporting to the HSCP Clinical & Care Governance Group are the following sub-groups of
HSCP professionals
o Social Work Governance Group
o Community Health and Care (including District Nursing and Health Visiting)
o Public Health
o Psychology
o Allied Health Professionals
o The NHS Governance Development Group (overseeing: the AERG, Addiction Clinical
Governance Group, Community Clinical Governance Group, Inpatient Clinical
Governance Group, Children and Adolescent Mental Health Service Clinical
Governance Group, and Learning Disability Service Clinical Governance Group)
o Technology Enablement Committee 
The image also links the Integration Joint Board to the North Ayrshire Council Scrutiny Board
and to the NHS Healthcare Governance Group.
The image shows the Social Work Governance Group linking into the NAC Scrutiny. It also
shows the NHS Governance Development Group links into the NHS Health Care Governance
Group.

Page 26

21 
Appendix C: National Health & Wellbeing Outcomes 
The Public Bodies (Scotland) Act 2014 defines a complete set of principles for the
implementation of health and social care services in Scotland.  These are the principles
against which integrated services should be delivered and the quality of those services should
be evaluated.  The Act also defines the national outcomes and the health and wellbeing
outcomes that integration is looking to achieve.  These are as follows: 
1. People are able to look after and improve their own health and wellbeing and live in good
health for longer
People in North Ayrshire feel confident and able to make positive personal decisions about
themselves and their families’ health and wellbeing and receive the support they need to
achieve their aims. 
2. People (including those with disabilities or long-term conditions or who are frail are able to
live, as far as reasonably practicable, independently and at home or in a homely setting in
their community 
People in North Ayrshire live as independently as possible, playing an active role within their
local community. 
3. People who use health and social care services have positive experiences of those services
and have their dignity respected
People in North Ayrshire are actively engaged in the design and delivery of services, ensuring
that these are tailored to local needs and preferences. 
4. Health and social care services are centred on helping to maintain or improve the quality
of life of people who use those services
People in North Ayrshire express what matters to them most and help design and deliver
services that help them attain this. 
5. Health and social care services contribute to reducing health inequalities
People in North Ayrshire benefit from improved lifestyles, life circumstances, life
expectancies, health and quality of life, with more rapid improvements in communities that
experience the highest levels of need and deprivation to reduce the inequality gap. 
6. People who provide unpaid care are supported to look after their own health and
wellbeing, including reducing any negative impact of their caring role on their own health and
wellbeing
Carers in North Ayrshire benefit from highly accessible and proactive services designed to
maintain high levels of health and wellbeing. 
7. People using health and social care services are safe from harm
People who use health and social care services in North Ayrshire should do so safely, be free
from fear or harm and have their rights and choices respected.

Page 27

22 
8. People who work in health and social care services feel engaged with the work they do and
are supported to continuously improve the information, support, care and treatment they
provide
Staff – including those of the third and independent sector – who provide health and social
care services in North Ayrshire, actively participate in the programme of continuous
improvement and have ownership of the future model of service delivery. 
9. Resources are used effectively and efficiently in the provision of health and social care
services
Individuals who provide or access health and social care services in North Ayrshire are fully
engaged in assessing and allocating the resources available to local communities, and use a
rigorous and transparent process to agree how maximum benefit can be attained.

Page 28

23 
Appendix D: Aligning HSCP and Ayrshire Share Equality Outcomes 
The table below shows how the HSCP Equality Outcomes align to those of the Ayrshire
Shared Equality Outcomes. 
Ayrshire Shared Outcome
(Long-term)
HSCP Equality Outcome
(Short-Term)
1. In Ayrshire, people experience safe
and inclusive communities
1.Vulnerable adults and older people are cared
for, as much as possible, at home
1. In Ayrshire, people experience safe
and inclusive communities
2.Vulnerable young people are identified quickly
and supported in their own community
2. In Ayrshire, people have equal
opportunity to access and shape our
public services
3.Services will involve service users in the review
or redesign of services that affect them.
2. In Ayrshire, people have equal
opportunity to access and shape our
public services
4.Local people are aware of the various ways
they can help shape HSCP services
2. In Ayrshire, people have equal
opportunity to access and shape our
public services
5.Local people understand how to access the
right HSCP Service for them
3. In Ayrshire, people have
opportunities to fulfil their potential
throughout life 
6.Vulnerable people can access meaningful
education, training and employment options
3. In Ayrshire, people have
opportunities to fulfil their potential
throughout life 
7.People at risk of involvement with the Justice
System are redirected to positive outcomes
4. In Ayrshire, public bodies will be
inclusive and diverse employers
8.We better understand the Diversity in our
workforce

Page 29

24 
Appendix E: Equality Outcomes – Action Updates 
Equality Outcome 1. Vulnerable adults and older people will be cared for, as much as possible, at home.
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
01:01 By 31st March 2022, we will have
reviewed the independent provision of
Care at Home services and identified
future service models for implementation
in 2022.
This is ongoing and in progress, however, continues to experience
delays due to the ongoing challenges presented by the COVID 19
pandemic and on-going economic concerns.
Models of provision are still being considered by senior
management in Health and Community Care Services.
On-going. 
1 TI
PEI 
2, 4, 7, 9
01:02 By June 2021, we will increase the staffing
resource within Care at Home service,
providing greater capacity for people to be
supported in their own home.
Recruitment within the Care at Home service has been ongoing
throughout 2021 and into 2022, to increase the Care at Home
workforce to cope with current levels of service demand. 
Nationally recruitment of social care staff is being highlighted as a
huge challenge and this is being seen in North Ayrshire.  
In addition to attracting new social care staff, retention of the
existing workforce also remains difficult due to a number of factors
including ill health, alternative careers and conduct matters.  
There was a push on recruitment efforts in August and September
of 2021 in advance of increased winter.
Additional winter investment confirmed in late 2021 was
welcomed and provided an opportunity for permanent recruitment
to the Care at Home workforce to address unmet need in the
community in North Ayrshire, however this will be dependent on
successful recruitment which continues to be a challenge. 
Complete.
1 TI
PEI
MHW
2, 4, 7, 9
01:03 By August 2021, Review service models
within the Hospital Assessment teams to
further embed the Home First approach,
basing discharge destination on the
The new model has been mostly achieved within the hospital
assessment team, with a new team manager is in post. A new
Social Worker has also joined the team and the two Occupational
Therapy assistant roles have been advertised. Unfortunately this
1 PEI
BST
1, 2, 5

Page 30

25 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
capability and rehabilitation potential of
patients.
did not generate required interest and these posts will be
readvertised.
Throughout the year the HSCP appointed three Occupational
Assistant roles. Additional Scottish Government funding has been
allocated and will provide a dedicated Mental Health Officer within
the team to support complex discharges and further add to the
establishment.
Complete.
01:04 Develop a short-term intermediate
support service within the Adult CMHT to
provide support at home to prevent
hospital admission, facilitate discharge
from hospital, and support people while
the await implementation of
commissioned services.
Due to delayed discussions with NHS and NAC human resources,
and lack of policy to advertise joint posts below 8A, permanent
posts have been unable to be recruited to.  However, as an interim,
bank nursing staff were employed on a fixed term basis, to trial
new model of care.  This has proven very successful.  
Support continues to be provided via bank workers and continues
to work well.  Permanent posts have now been progressed through
memorandum of understanding and are out to advert.
Ongoing.
1 PEI
MHW
1, 2, 4, 7
01:05 Develop further Mental Health digital
solutions to enhance choice and improve
scope for individuals to remain
independently at home with appropriate
support.
There are a range of alternative solutions available for individuals. 
Computerised CBT continues to be very well received with steady
demand and capacity.  Silver Cloud is now available.  Telephone
and Attend Anywhere has been utilised for one to one
engagements. Both ‘Attend Anywhere’ and ‘Microsoft Teams’ have
been explored as an option for Group Work.  
Face to face appointments have remained open throughout
pandemic where appropriate, and face to face groups have been
commenced and postposed dependent upon government
restrictions.  
We continue to work closely with our Digital Health Nurse
Consultant to develop new innovative ways of working.  N
We continue to work closely with our Digital Health Nurse
Consultant to develop new innovative ways of
1 EC
PEI
BST
2, 7

Page 31

26 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
working.  Confirmation of preferred group work platforms have
now been confirmed and will be utilised moving forward.
Complete.
01:06 Develop a model to respond to emergency
mental health care with a community-
based response, supporting individuals at
home where possible, or facilitating a
speedy discharge from hospital when not.
There are several pathways to urgent mental health services now in
place.  Within the community mental health team, a duty service
provides same or next day assessment for any required referral;
although these are mostly conducted within the community mental
health team base, if necessary, this can be within the individuals
own home.  
A Police Scotland Pathway is available 24 hours per day, in which
police Scotland can contact the Crisis Resolution Team for any
mental health concerns.  The crisis team will provide advice,
telephone, or face to face assessment wherever required. 
Dependent upon risk, this may be within the individuals own home. 
Likewise, the Crisis Resolution Team will respond to any NHS24 or
AUCS calls, providing similar response.  
At this moment in time, the unscheduled care service completed a
scoping exercise for a potential Scottish Ambulance Pathway. A
request to undertake a pilot has been funded through Action 15
monies and recruitment is now progressing.  Following induction,
training and development a start date shall be confirmed. 
Complete.
1 PEI
BST
MHW
3, 4, 7

Page 32

27 
Equality Outcome 2. Vulnerable young people and families are identified quickly and supported in their own community.
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
02:01 Refocus the school nursing role to include
emotional health and wellbeing as a
priority. This will help to improve the
mental wellbeing of children and young
people.
School Nursing team is currently undergoing recruitment into the
service to support the delivery of the School Nursing Pathways and
Priority areas. 
All current school nurses have completed the LIAM training which is
‘Let's Introduce Anxiety Management’ in children.
Complete.
1 PEI
HW
1, 4, 5
02:02 By June 2021, Named Person Service
processes and procedures will have been
reviewed and improvements identified
where applicable, to ensure Named
Persons and Lead Professionals are
provided with effective and efficient early
intervention & preventative support in
meeting the needs of children, young
people and their families.
The review of the Named Person Service has been undertaken and
an evaluation report is pending approval at the next Children's
Services Executive Group meeting on the 27/07/21.
Complete.
1 MHW 7
02:03 Develop and review a Young Person’s
Suicide Support Pathway, to effectively
refer concerns raised at Hospital
Emergency Departments to Service Access
for speedy response for young people
unknown to services.
The Young Person’s Suicide Support Pathway has now been
developed and is operational. The Pathway has been endorsed by
the Social Work Governance Board and the IJB. A process has been
set up on Carefirst to capture the referrals and ongoing work is
taking place to streamline information system. The Pathway will be
evaluated in September 2021.
Complete.
1 PEI
EC
MHW
1, 5, 7
02:04 Routine gender-based violence screens
will be completed by Health Visitors and
Family Nurses.
All women are offered gender based violence routine enquiry at
various points within the health visiting pathway. North Ayrshire
currently sits at a completion rate of 96%, the highest percentage
across the three Ayrshires.  We have set an improvement target for
100% during 2021/22; however, due to the sensitivities around
GBV, it remains to be seen whether this target can be reached.  
All women continue to be offered routine enquiry for GBV at
various points across the HV pathway.
1 EC
TI
PEI
7

Page 33

28 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
Complete.
02:05 Train all Interventions Team Managers
and Senior Officers in ASP process to
ensure that risk is recognised for both
children and adults
Bespoke ASP training has been delivered to all Interventions
Services Team Managers and staff.
Complete.
1 TI
PEI
7, 8
02:06 Embed Recovery Development Workers
within MAASH and Service Access to
improve support to vulnerable families
affected by substance misuse
A pilot using Recovery Development Workers from NADARS within
the MAASH and Service Access Team took place from December
2020 to April 2021. This pilot has now been evaluated with
impressive results with every person referred for this service
engaging with a Recovery Development Worker. An application  has
been made to the CORRA PDI (Partnership Drug Initiative) for three
year funding  to develop this initiative further.
We were asked to submit additional information to the CORRA PDI
by the end of September 21. This information was submitted on
time. 
The CORRA PDI funding application for 2 Recovery Development
Workers has been successful. The award is subject to conditions,
outlined below. 
The Steering Group were interested in this proposal and could see
it had merit.  They felt the proposal had answered the majority of
the queries from the initial stage sufficiently.   
However, they requested that the grant be conditional on:
o Clarity on the roles of people with Lived Experience, to
ensure the post holders receive appropriate roles that
reflect an appropriate skill and responsibility  
o Clarity on the support and supervision those post holders
will receive, with a keen view on how the staff members
will be nurtured and supported appropriately.  
Complete.
1 EC
PEI
TI
1, 3, 7
02:07 We will reduce the number of repeat
domestic abuse referrals through
MAASH now take all domestic referrals when previously they only
followed up on referrals where there were children linked to the
1 PEI 7

Page 34

29 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
collaborative working with the Police and
Women’s aid, to develop a dedicated
multi-agency holistic response to domestic
abuse.
case. Monthly MAASH strategy meetings now take place with
Justice Services Senior Manager, Police Scotland, MAASH Team
Managers and HSCP Performance Officer in attendance. The
Performance Officer prepares a monthly statistical dashboard with
details of monthly referrals to the service The Dashboard and
statistical illustration for EEI/MAASH has provided clarity to
staff/Team Managers regarding where we should be streamlining
and prioritising our service. 
The MAASH Strategy Response meeting continues to take place
every month and the domestic violence referrals are scrutinised.
There have been months where the domestic violence figures have
reduced and months where there has been an increase. 
This action now is complete as we have a robust data dashboard,
meeting schedule and response system in place to scrutinise
referrals/repeat referrals and we respond timeously to vulnerable
young people and families to support to them in their communities.
Complete.
02:08 Develop, with Children First, an intensive
support service for trauma experienced
parents who are reluctant to accept
agency support. Working collaboratively
with Early Years Social Work and Health
Visiting Teams, the service will work
intensively with vulnerable families to
prevent escalation of child protection
concerns.
A contract for the new service was issued in July 2021, with a new
practice initiative agreed with Child Protection Advisors and Health
colleagues to support parents in the pre-birth stage who are as
identified as vulnerable.
Pathways for Prebirth Early Intervention and Prevention work was
established by Safeguarding Midwifery, Community Midwifery and
Third Sector.
Work was undertaken across adult services and Penumbra to
develop effective worker pathways for support.
Service was launched in September 2021 with a pilot period of one
year. 
Since launch, the service has:
1) Has offered this more enhanced approach to a small number of
families, this has included yoga and mindfulness groups. 
1 PEI
TI
1, 6, 7

Page 35

30 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
2) Developed and agreed a pathway for supporting parents
proactively at the Prebirth stage. The families who will be
supported have unborn babies who more vulnerable to CP
involvement due to parental adversity.
3) Developed information leaflets explaining the service, and how it
was developed in consultation with those with lived experience. 
An evaluation of the programme will be undertaken at the end of
the pilot year.
Complete.
02:09 Prioritisation of children and young people
where risk and need are identified as
requiring specialist services intervention
and support.
CAMHS engaged in an organisational change process as the service
moves to configure the service based upon clinical need and
presentation.  The new Service consists of CAMHS, Child &
Adolescent Neurodevelopmental Service and the new Unscheduled
Care Pathway.  
With regards to the prioritisation of children and young people
where risk and need is identified, this service will operate 7 days
per week from 7am in the morning until 9pm in the evening. It will
aim to offer a ‘same day – next day’ response where there is
identified risk or need.
Up until the change process was initiated, CAMHS was delivered
within a Locality context, Monday to Friday 9am – 5pm. 
Through the work of the CAMHS Extreme Team Implementation
group the Administrative and business support capacity which had
been managed within the three HSCP structures in their respective
localities will be formally merged under Lead Partnership by the
end of financial year 2021-22 with staff and finance transferring
over. 
Complete. 
PEI
MH 
02.10 Implementation of Specialist Perinatal
Mental Health Service (Pan Ayrshire)
Reviewed by wider health and social care partnership.
New perinatal mental health service is now in operation, thanks to
1 PEI
MH

Page 36

31 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
providing specialist mental health care for
pregnant and new mums.
internal mental health supports, interim accommodation has been
sourced whilst longer term accommodation found.  
New service consists of:
• Consultant psychiatry (0.7 WTE), 
• Psychology (0.2) 
• Nursing staff (2.6)  
• OT (0.6) 
Accommodation group aware of longer term ask and considering
options. 
Complete.
02.11 GP based Mental Health Practitioners will
be established as first point of contact for
expectant/new mothers who require
mental health advice or support.
The programme seen an increase of 13 Mental Health Practitioners
in North HSCP. The MHPs are aligned to GP practices across North
Ayrshire based on clinical need and priority.
To support governance and supervision of the MHPs a full-time
Team Leader has also been appointed.
MHPs continue to remain within GP practices with every mainland
GP practice now having access.  The ability to engage with patients
faced challenge during the COVID period.  These issues were
addressed at GP practice level and discussed at wider multi-
disciplinary group meetings.
Future developments will look at effective absence cover for the
service, in the event of extended leave- and to reduce service risk.
Complete.
1  
02.12 Adult CMHT to establish protocol to
prioritise assessment for expectant or new
mothers referred direct to the service who
may have bypassed GP MH practitioner
New perinatal service in operation, Perinatal SOP to be reviewed
and updated as appropriate.  The perinatal service has a
professionals advice line that can be utilised when considering
referral to mental health services, not just the perinatal team – the
team would advise on the most suitable route to access the most
appropriate service.
Complete.
1 PEI
TI
MH

Page 37

32 
Equality Outcome 3. We will involve service users in the review or redesign of services that affect them.
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
03:01 Complete the delivery of the ASN campus
and respite house engagement strategy
with the Children and Families Disabilities
team being in situ.
Children and Families Disabilities Team moved into new Lockhart
Campus week beginning 11 June 2021.
Mungo Foundation received keys for Roslin House week beginning
11 June and completed local induction and familiarisation to the
building.  First young people stayed overnight in the facility in July.
Complete. 
2 EC
MHW
1, 3, 4
03:02 Progress the Radical Test Site which has
developed a small Parents Collaboration
Group to inform practice/provide
consultation and advice to the experiences
of parents who have their children out-
with their care, and help shape the care
most suited to them.
The ’Team Around The Parent Approach’ commenced in August
2021. This is a support service for parents who have had their
children removed from their care. The aim is to help them feel
supported and heard at distressing time.
An evaluation protocol has been agreed, including programme
outcomes that will be measured through qualitative data drawn
from parents who have utilised the service. The Parents
Collaboration forum were regularly consulted in regard to
evaluation tools. 
The support programme also provides signposting support, linking
parents with any necessary supports which should assist them to
take part in the parenting assessment at Pathways. The support is
parent led but focused on providing a “tool kit “of practical self-
soothing supports. 
A communication profile has been developed with each parent to
assist them to highlight where barriers or challenges have been
experienced when they have attempted to express their feelings or
opinions. 
The approach involves, individual one to one weekly sessions over
a 6- week period. 
Six parents have now utilised this enhanced support, they have
provided evaluation and feedback enabling ongoing development
of the approach.
2 EC 3,

Page 38

33 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
Complete
03:03 Scope the potential to extend ‘Signs of
Safety’ approaches and enhancing
families/family group conferencing as a
potential dual strategy approach. This
would enhance solution focused support
plans to enable children and young people
to remain within their family units where
at all possible.
The implementation of Signs of Safety will follow the
Implementation of the Safer and Together model. This is to ensure
any new approaches are effectively embedded, whilst not
negatively impacting current operational practice within Child
Protection systems.
The programme, will begin implementation of Signs of Safety from
March 2022. Implementation meetings began in January 2022 to
develop an effective programme roll out. 
Carried Forward.
2 TI
PEI 
03:04 Children and young people have access to
key staff, carers, to discuss and ensure
their voice is heard, in terms, of LAAC
Review, Children’s Hearings, Foster Care
and Kinship Care Reviews.
North Ayrshire has a strong commitment to ‘ The Promise’, the
national commitment to young people which also has a strong
focus on involving children and young people in decisions which
affect their lives.
The HSCP has several support mechanisms for children and young
people to allow their voices and views to be heard.
All children and young people, who are care experienced, are
encouraged and supported to express their views and have their
voices heard, via a range of sources, such as Children’s Hearings
and LAAC Reviews.
The North Ayrshire Champions Board is also a key method for
engagement, as it is made up of a group of care experienced young
people who are involved various engagement opportunities.
Further, commissioned by the HSCP, Barnardos Advocacy Service,
provide advocacy support for children and young people in relation
to attendance at Children’s Hearings, LAAC Reviews and within the
Child Protection process.
Complete 
2 TI
EC 
03:05 From June 2021 begin Remobilisation of
Older People’s Day Service combining
IJB approved a plan for remobilisation of Older People's Day
Services in August 2021 and the planning for remobilisation has
2 EC
MHW

Page 39

34 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
traditional days services with additional
outreach options, using learning from
telephone interviews undertaken with day
service users.
commenced, with anticipated reopening in early 2022.
The service has been engaging with Alzheimer’s Scotland who re-
opened its Day Service in Ardrossan, on a greatly reduced capacity
basis, in late 2021.  It is anticipated that the service will begin to
increase its delivery of Day Services throughout January and
February 2022 to support individuals currently on the waiting list
for day services.  
Enagagment with services users was undertaken to help identify
possible future day opportunities, include alternative options to
traditional location-based services.
Complete
03:06 Progress the redesign of services on Arran,
including the views of local people and
services users.
Local engagements on Arran progressed to help inform the
redesign of local services.
In addition a refresh of locality priorities took place in 2021 with
the Locality Planning Forum members.
Further discussions and consultation planned in relation to the new
National Care Service. This took place on Arran in late October
2021.
Further consultations on local priorities will take place in 2022 as
part of the ongoing developments for Caring for Ayrshire.
Complete.
2 EC 
03:07 Ensure the involvement of young people in
the review of CAMHS service, recruitment
of specialised engagement officer.
Our Engagement and Participation officer is now in post and
actively involved in multiple improvement projects and directly
engaging young people. An example of that is through our Pan-
Ayrshire Leisure project as part of the Autistic Spectrum Disorder
(ASD) pre and post diagnostic pathways. 
Complete.
2  
03:08 Engage services users for involvement in
future developments as we move to
implement the Royal College of Psychiatry
Accreditation Scheme.
CAMHS have appointed an engagement officer to work with
children and families. Discussions with senior leadership have also
taken place to consider how best to support the Patient reference
following the retirement of the latest group chair. Consideration is
2

Page 40

35 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
ongoing as to how best to reinstate and refresh and refocus the
group. 
Carried forward
03:09 Continue engagement with service users
to inform Ayrshire Mental Health
Conversation
Due to the Covid pandemic and the challenges on all services over
the past 18 months we have had little to no opportunity to
progress any substantial engagement activity. We have agreed a
plan to support the Public Reference Group to refresh its
membership and we are arranging meetings with the Chair of this
group to plan how they can lead and advise on wider public
engagement with the partnership. This will include a review of
progress against the current Ayrshire Mental Health Conversation
priorities and outcomes as we come to the half-way mark of the
national Mental Health Strategy (2017-2027) next year. 
We have made progress in the area of engagement with young
people and have appointed a CAMHS engagement officer – we
have also developed the KIDSCREEN tool to better understand the
experience of young people accessing CAMHS. A programme of
engagement work is currently being considered with a focus on
transition from Children’s/young people to adult services to
improve the experience of young people and families in alignment
with national recommendations. 
We have also collated engagement feedback of people’s 
experiences during the pandemic to better inform our mobilisation
and recovery and renewal plans.
Complete.
2 EC
MHW 
03:10 Engage with the Young People’s forum to
support and inform the development and
operationalisation of the new National
Secure Adolescent Inpatient Service,
Young people have been involved in the development of aspects of
design of the facility and the log and further consultation will take
place in the procurement of furniture and the art strategy which
2 EC
MHW
3, 4, 5

Page 41

36 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
Foxgrove, in partnership with the National
Stakeholders Group
binds the therapeutic milieu of the facility.
Complete.
03:11 Progress service user involvement in
Learning Disability strategy
implementation
Our engagement approach linked to the strategy shifted because of
the need to support transition of our day services to Trindlemoss in
2019.  We undertook extensive engagement with staff, carers, and
clients linked to this, but there is a need for us to reconnect with
the broader population we support (and other stakeholders), to
ensure ongoing development of relevant, inclusive, services and
communities.  Our survey work undertaken in Summer 2020 has
informed this, as will recent engagement activity undertaken within
Day Opportunities.  
Further developing our engagement with service users remains an
area for development.  We have linked with the HSCP Engagement
Officer in relation to this, and will continue to work with them to
ensure that people with a learning disability are appropriately
considered within their work, and that we also make appropriate
use of them to support our engagement activity.  We continue to
keep service users and their families informed about key
developments which affect them.
We worked with the HSCP Engagement Officer to facilitate the
input of clients to the new North Ayrshire Strategic Plan in early
2022.  The Engagement Officer is also involved in our ongoing
involvement activity linked to the Day Opportunities service, along
with AIMS Advocacy and the Ayrshire ARC Scotland Development
Worker. The ARC Scotland worker will be linking into Day
Opportunities to support staff there in engaging with customers
and involving them in further developing the new model.  
Complete
2 EC
TI 
03:12 Undertake review of learning disability day
services
We continue to work with Healthcare Improvement Scotland as
part of their Day Services Learning Collaborative and have
benefitted greatly from being linked into sessions run by the
2 TI
EC

Page 42

37 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
National Development Team for Inclusion.  We are now working
with HIS on a process mapping exercise encompassing the
integrated LD team as well as day services, to better understand
the existing process and opportunities for improvement within it. 
We are also hoping to link with PAMIS in the near future with
regard to addressing the needs of people with profound and
multiple disabilities within our day services work.
Our work with HIS around process mapping across the Learning
Disability Service, including Day Opportunities, remains ongoing. 
Linked to the work within the Day Services Learning Collaborative,
we are working with Neighbourhood Networks and other partners
to undertake an arts-based exploration of the lives of people with
learning disabilities, using storytelling as a medium for capturing
and sharing a range of experiences.  
These stories will help us in shifting how communities think about
people with learning disabilities, and also inform our thinking
around the role of services in relation to community inclusion.  
Complete.

Page 43

38 
Equality Outcome 4. Local people are aware of the various ways they can help shape HSCP Services 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
04:01 Hear the voices of local communities
through representation at Locality
Planning Forums.  This will create greater
opportunities for local communities to
have a say on what services are required
within their locality and how they should
be delivered.
HSCP Senior Managers are now active participants in the Irvine and
Three Towns LPF’s. Work has taken place to identify the HSCP LPF
priority areas.  The priorities of each LPF will be affirmed prior to
progressing with the SPG, PSMT and others.
A meeting will take place on the 19/01/22 involving Senior
Management to discuss developing Locality Planning in North
Ayrshire HSCP. The meeting will focus on the following points 
• What value the current approach to locality Planning in North
Ayrshire has brought to the Partnership?
• What measures can be taken in order to improve the current
approach to locality planning in North Ayrshire HSCP to make best
use of the resources we have?
A new set of Locality Priorities have been identified that will be
included into the new Partnership Strategic Plan, due for
publication in April 2022.
Complete.
2 EC 3, 4, 5
04:02 Contribute to the review of the pilot of
the combined LPF and LPP forum on
Arran.
The Arran LPF Pilot has continued to meet during 2021. A date to
review the pilot has yet to be agreed following Covid challenges.
A discussion on the review of the LPF and LPP pilot on Arran took
place at a meeting late February 2022. While no formal review was
planned, it was agreed that specific HSCP engagement should take
place on the island. This will be progressed in 2022 with HSCP
officers.
Ongoing
2 EC 3, 4, 5
04:03 Locality Planning Forums will expand
approaches in engaging with local
communities
Locality Planning Forums have affirmed their priorities for the next
year. A round of meetings will took place between October and
November 2021 and discussed how we can develop our
engagement approach with the local community.
Partnership Engagement officer is to consider possible future
engagement opportunities and forum meeting formats.
2 EC 3, 4, 5

Page 44

39 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
Complete
04:04 Through the North Ayrshire Wellbeing
Conversation, we will identify and induct
members to the North Ayrshire Care
Improvement Network
The Care Improvement Network has been launched and is under
active development. We have contacted approximately 80 people
via surveys and online meetings to establish the best ways of
engaging with people and developing the network. 
We will continue to engage and encourage people to become
involved and made aware of the Care Improvement Network as we
engage on the next strategic plan.
Complete.
2 EC 3, 4

Page 45

40 
Equality Outcome 5. Local people understand how to access the right HSCP Service for them.
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
05:01 Further embed and develop the
Community Hubs established throughout
the pandemic, continuing locally based
partnership working to respond to
community need.
The Community Partnership Forum was developed from the work
and legacy of the community hubs. The Community Partnership
Forum meet monthly and is attended by a range of services across
Council, Partner and Third Sector Agencies and is a forum for
networking, sharing best practice, developing
partnership interventions and approaches to ensure that services
respond to need in the community. 
The group membership continues to evolve with Council,
Partnership, Third Sector and Voluntary groups represented. Given
that we are an island community Arran is represented and the group
has had input from local church groups and the Foodbank. As a
result of the approach locally based partnership to assist our service
users have been strengthened.
A annual report will be produced on the work of the group.
Complete
2 TI
EC
BST
MHW
4, 5, 8, 9
05:02 Ensure the young females involved with
the Syrian Vulnerable Resettlement
Programme are confident, meet their
aspirations, are independent, healthy,
and able to access various services when
required and lead fulfilling participatory
lives as New Scots within their
communities
The young females involved with the Syrian Refugee Resettlement
Programme are involved in a creative initiative with the National
Galleries of Scotland . This initiative which is funded by the Youth
Recovery Fund and is a Partnership between NAHSCP, North
Ayrshire Council and North Ayrshire Alcohol and Drug Partnership
uses art as a platform to promote positive mental health and
wellbeing and to assist young people to build their confidence, self-
esteem and realise their aspirations. Since this initiative commenced
several months ago the young females form the Syrian community
have been regular attenders/contributors at weekly virtual sessions.
The National Galleries have hosted weekly face to face session at
Eglinton Park and the attendees have included 6 young females
from the Syrian Resettlement Programme. 
Females from the Syrian Refugee resettlement Programme
successfully participated in a range of pro social activities with the
2 TI
EC
3, 4, 5

Page 46

41 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
National Galleries of Scotland and an evaluation report will be
completed by the National Galleries. 
The group of young females which are called the Swans Group have
now been taken over by Connected Communities who will embed
this group further into local communities and local community
activities.
Complete
05:03 Young people with additional support
needs in North Ayrshire, and their
families, will be provided with a more
effective transition into adulthood, which
delivers greater access to a range of
provisions and supports in the local
community. 
Children’s Services in North Ayrshire continue to progress with work
to strengthen transitions for young people with additional support
needs, and their families, into adult hood. An Area Resource Group
and Transitions Planning Group has been re-established in this
reporting period. Improvements have also been identified to
improve operational practices, procedures and guidance for
professionals in how best to support families that will be taken
forward in early 2022.
A new transition process was approved by PSMT in early 2022.
Complete
2  3, 4, 6
05:04 By December 2021, Children, young
people and their families will be able to
more readily access appropriate and
timely mental health and wellbeing
supports through establishing a North
Ayrshire Community Mental Health and
Wellbeing Collaborative or collaboratives
across the local authority.   
Within this service year it has been established that there are a
number of locality based forums in place that can support in taking
forward Community Mental Health and Wellbeing priorities and
actions identified by the Community Mental Health and Wellbeing
Framework Steering Group. As a result there is no longer a
requirement for separate collaboratives to be established but
enhancing locality based approaches to address local need remains
a priority.
Complete
2 EC
MHW
1, 4, 5, 6
05:05 Support local implementation of Caring
for Ayrshire programme
The Caring for Ayrshire prioritisation work, highlighting the order in
which each locality should receive capital investment to support
future objectives is under development. A short life working group
will finalise this work by December 2021 and report to the IJB for
approval.
2 TI
PEI
BST
MHW
All

Page 47

42 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
The local Caring for Ayrshire work is now complete and was
approved by NHS Ayrshire and Arran Integrated Property Board.
Complete.
05:06 Implementation of Primary Care
Improvement Plan
The implementation of the primary care improvement programme
continues. Increasing support across all the GP Quality Clusters, with
additional MSK physiotherapy, Community Treatment and Care
Nursing Teams and pharmacotherapy services, all making good
progress. 
This work is clearly aligned with mental health improvements in
primary care and the mental health occupational therapy model,
which was piloted in the north coast cluster, with one senior
Occupational Therapy (OT) staff member successful in supporting
people with long COVID-19, mental health conditions and
individuals with access to employability support.
As a result, two further occupational therapists have been recruited
and roll-out has commenced across other GP practices. The OT
posts work closely with all the MDT staff, e.g. Community link
worker, pharmacy, MSK physio and CTAC nurses, to provide a
holistic support to complex individuals. There is also a continuing
ambition to expand mental health practitioners and their service
resilience model.
There are specific recruitment challenges on the isle of Arran and
new skills mix models are being actioned. All these services are
looking to enhance their services to provide greater levels of
resilience for GP practices, for example to provide cover for sickness
absence, through recruitment and skill mix. 
Complete
2 TI
PEI
MH
BST 
1, 2, 3, 4,
5, 8
05:07 Progress the integration of teams and
implement new models of care to ensure
high quality, safe and sustainable services
Complex Care pilot and MDT meetings are now underway on Arran.
Unscheduled Care new Nurse Practitioner role is currently being
recruited.
New nurse practitioner roles have been appointed and the new
2 BST 8, 9

Page 48

43 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
in our community hospitals and island
services
unscheduled care rota commenced in November 2021. 
Further recruitment planned for early 2022 to unscheduled care
team, complex care/MDT so that new model of care can be
delivered.
Complete.
05:08 Enhance and further refine Intermediate
Care and Rehabilitation hubs, improving
the streamlining of access to
rehabilitation services.
Effort continues to enhance and refine access to intermediate care
in North Ayrshire.  There has been continued focus on streamlining
business support processes and on maximising the workforce
available to support rehabilitation.  In terms of community
rehabilitation, progress has been made to integrate the Health and
Therapy Team, community physiotherapy and falls teams – in
improving efficiency, and experience for staff and service users. 
Focus has also continued to expand the enhanced intermediate care
team in providing fast response, viable alternative to hospital
admission.    Progress has now also commenced to bring referral
management for podiatry services into the Intermediate care and
rehab hub in North Ayrshire.  
2  
05:09 Launch the Single Point of Contact on
Arran by Dec 2021, providing residents of
the island a single access point for all
health and social care services
Infrastructure work for the launch of Netcall on Arran is due to be
completed in August. Single Point of Contact was expected to be in
place by March 2022
Unfortunately, due to a major IT fail on Arran the development has
been delayed. Plans are now being updated and it is anticipated that
this will be back on track by April 2022. 
Complete.
2 EC
PEI
1, 3, 5
05:10 Expand access to the increased range of
supported digital options for Mental
Health supports as part of a tiered model
for service delivery
The service will continue to utilise digital platforms that have been
implemented successfully during the pandemic, this blended model
of service delivery will enable greater access for individuals via the
use of digital technology such as attend anywhere. This service has
also utilised email direct to patients for sharing reading materials for
interventions. The service will also pilot a digital safety plan,
originally devised by NHs Lanarkshire and implemented there to
2 EC 1, 3, 4

Page 49

44 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
extremely good effect.
These developments are likely to remain ongoing as digital
platforms  & technology progresses.
Complete
05:11 Logos and posters to be displayed which
identifies North Ayrshire Drug and
Alcohol Recovery Service as being a safe
space for LGBTQ+ and trans communities.
Posters from LGBT Youth Scotland and Stonewall Scotland are
displayed within the waiting area of Caley Court which identifies
NADARS as being a safe space for LGBTQ+ and trans communities. 
Complete
2 TI
MHW
3
05:12 Standardised data sets to be included in
the Drug and Alcohol Information System
(DAISy) which includes wider gender
identity options.  
We made contact regarding the new national alcohol and drug
recording system (DAISy) system  and here are the options which
have been included in the new national data set::                                   
• Male  
• Female  
• Not Specified (not stated, not recorded)  
• Not known (indeterminate sex, intersex)
Complete
2 TI
MHW
3

Page 50

45 
Equality Outcome 6. Vulnerable people can access meaningful education, training and employment options.
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
06:01 Identify preferred tender for service
provider to implement intensive
employment support programme for care
experienced young people into
employment and training. Seek to improve
confidence and self-esteem post lock-
down using creative approaches.
Programme to launch late 2021.
Off Programme – Action could not be complete due to issues in
identifying and commissioning an appropriate service provider. 
3 TI
PEI
4
06:02 Utilise available funding to undertake joint
initiative with Community education using
adult tutors support literacy development
with families involved with Rosemount
team to improve employability prospects.
Initiative will utilise work placement and
voluntary options and provide adult
learning awards.
A 12-week programme of community education was commenced
in September 2021. In total 6 parents/carers accessed the
programme.
with all participants being provided with Google chrome books and
support with IT literacy. 
The group attended weekly sessions at the Redburn Community
Centre, Irvine, facilitated by staff from Connected Communities and
Rosemount. This provided an opportunity to support parents and
carers to develop their resilience, confidence, and skills, with the
intention of bringing them closer to the job market. 
The programme had set sessions focused on how to build a CV, IT
skills, and setting achievable goals.  However, it was also flexible
enough to respond to the individual needs of each participant with
one-to-one sessions provided to those who required them, e.g., to
support with literacy. 
The group completed a session focused on community mapping,
which increased their knowledge of local groups in Irvine that
either themselves or their families could be involved in. We also
had an input from the Irvine Locality Community Link Worker
service and Money Matters, which created links for future
engagement.
3 EC
BST
MHW
1, 3, 5

Page 51

46 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome 
Finally, during the October holidays, all participants and their
families were invited to engage in two days of activities that were
facilitated by the Arran Outdoor Centre, including Canoeing,
Orienteering, and Rock Climbing. This was well attended and the
feedback from the group was that it had both increased their
confidence and appreciation for the outdoor spaces available to
them in their local community. This was one of several activities
that encouraged participants to focus on positive health and
wellbeing.
Complete.
06:03 Create Modern Apprentice post in the
Drug and Alcohol Workers team. The MA
will be identified from known young
people with experience of family addiction
issues.  
The HSCP was notifies in July 2021, that an application for funding
to the Corra Foundation, Improvement Fund had been approved.
The grant has been awarded specifically for the salary of a Modern
Apprentice and associated costs to develop the Child & Adolescent
Specialist Substance Team (CASST).   
3 PEI
MHW
1, 4, 5, 7
06:04 Through rehabilitation support provided
through the Dirran’s Centre, we will
support service users to develop
meaningful skills, support their
independence and assist them on their
route to positive outcomes.
The Dirrans successfully continued to deliver its supports via
alternative service delivery throughout the pandemic.  The Dirrans
fully re-opened in late 2021, however continues to operate with a
mixed model of delivery based on individual needs
3 TI
MHW
1, 2, 4, 5
06:05 Support development of new Day Services
workforce for those with a learning
disability following the move to
Trindlemoss 
Staff change within Trindlemoss is ongoing, in terms of those
existing staff choosing to move on, and new staff being recruited. 
Staff team consolidation is expected to be complete by end of May
2022.  
As part of our involvement in the HIS Collaborative, we are working
with the other HSCPs in the Collaborative to explore routes for
linking the National Development Team for Inclusion to the Day
Opportunities workforce, with a view to supporting them to
3 MHW 8, 9

Page 52

47 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
enable/develop opportunities for clients, including employment
and training, and expand their awareness of good practice taking
place elsewhere.  HIS themselves will also be undertaking a
workshop with Day Opportunities staff in the coming months.
Complete.
06:06 Implementation of locality-based
development work in Garnock Valley
(Neighbourhood Networks) for services
users with a Learning Disability
Neighbourhood Networks have successfully established themselves
within the Garnock Valley, and earlier this year reached their
operating capacity in terms of the number of individuals they could
support.  They adapted successfully around the restrictions
associated with Covid, developing a range of online opportunities
as well as providing socially distanced opportunities to meet within
communities.  The success of their digital offering led to it being
opened up to clients supported by the integrated community LD
team, but not part of the Garnock Valley network.  Recent staff
changes within the network have created a fresh opportunity to
look at its activity in the context of broader developments within
the Learning Disability Service.
The success of the 1st Neighbourhood Network in the Garnock
Valley (as reflected in a recent activity summary shared by the
Network manager) has led to the establishment of a second with a
wider remit, as well as discussions regarding further
implementation in other North Ayrshire localities.  We aim to work
with Neighbourhood Networks to evaluate their activity, with an
aim to report in the first half of 2022.
Establishment of the Networks has been very positively received by
a range of partners, including colleagues working in Primary Care,
and clearly demonstrates the Partnerships commitment to pro-
active, empowering support for individuals and communities. The
success of the existing Network activity has also been submitted as
a success story to the NHS Board. 
Complete.
3 TI
EC
MHW
4, 5

Page 53

48 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
06:07 Enhance volunteer approaches for those
accessing addiction support services,
focussing on employability support
The Turning Point Scotland, PEAR service received funding to
facilitate a pathway for those with lived experience into volunteer
work within the service and then subsequent paid employment
through sessional or full-time posts. The service has trained nine
individuals to date, three of which have progressed to paid
employment within the PEAR service while two remain currently
active.
Another group of volunteers are being advertised for and hopefully
recruited soon. 
There is further work being carried out by the ADP community link
worker in supporting individuals in to volunteering at the Recovery
Cafe and accessing training, however COVID has prevented the
work being carried out. 
The Wellbeing and Recovery College allows individuals to access
courses aimed at recovery, and individuals from NADARS and PEAR
access this when available. 
The Eglinton Community gardens, part funded by the ADP, provides
supported skills in gardening and growing own food, the garden
also provides for access to volunteer in the work but also access
volunteering through the NA Rangers Service, there is also a
allotment in another area at Eglinton which allows access for self-
growing for those attending the Recovery Cafe and recipes for
cooking. 
The ADP will continue to look at other pathways and sources of
training, volunteering etc. ADP funding and proposals via 'Corra'
national funding will also encourage further developments in this
area.
3 TI
MHW
1, 3, 4, 5
06:08 MH Recovery College will continue to
support people with MH issues to improve
access to education and training.
The mental health recovery college remains in commission until
June 2022.  The College has had several graduates during 2021-22,
given 3 years in operation.  Management is in discussion regarding
3 TI
MHW
1, 3, 4, 5

Page 54

49 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
next opportunities.  Graduates of college, currently have
opportunity for volunteer peer work.   
The Recovery college is in process of going out to tender. This
tender will award the successful provider the contract for a further
5 years. The college has proven hugely successful and recent north
Ayrshire partnership evaluation of the service showed the positive
impact it was having on individuals across North Ayrshire in terms
of their mental health and wellbeing as well as supporting those
suffering from mental illness.
06:09 The individual placement and support
service, will support individuals within MH
services to regain meaningful
employment.
Individual placement and support (IPS) service delivered positive
results for those experiencing Mental illness and access to job
market. 
However, a test of change of having the IPS service open to the
Primary Care Mental Health (PCMHT) aspect of the service did not
prove sustainable due to the deviation from the services core
model and principles. 
The IPS contract will end in 2022, following the provided submitting
notice. 
New employability support models are now being considered by
PCMHT.
Complete. 
3 TI
MHW
3, 4, 5
06:10 College wellbeing and liaison post will
support students to remain in education
with Ayrshire College. Covering all
campuses across Ayrshire.
College wellbeing and liaison worker in post.  
Complete
3 TI
MHW
5
06:11 Develop sustainable social enterprise in
ACORN service, providing training and
ACORN model is currently offering between 1 and 2 half days
workshop/practical training to individuals.  Alongside this the HUB
3 TI
MHW
3, 4

Page 55

50 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
recovery services to people with complex
Mental Health concerns. 
has been developed to offer 'classroom' based education to
compliment this, supporting individuals to positively manage their
mental health.  
Partnership working continues to progress with Ayrshire College to
offer education and training that will help individuals move on.  
Complete. 
Equality Outcome 7. People at risk of involvement with the Justice System are redirected to positive outcomes.
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
07:01 We will improve the employment
opportunities to support people with
criminal records into employment.
Employability mentors sit within Justice services taking referrals for
any service users currently involved in Justice services or involved
within the past year. The aim is to integrate service users into
support for health & wellbeing, vocational and accredited training,
education, volunteering, and successful employment tailored to
their individual needs.  
Due to covid restrictions during 2021 it has been challenging to
secure opportunities for service users. Contact with service users
has been ongoing throughout the pandemic initially via telephone
and a return of face-to-face appointments since April 2021. 
During 2021 the service received 22 completed referrals, aided 1
service user in a volunteering role, 10 into training opportunities
and 12 job outcomes have been gained, alongside the hard work of
service users to achieve these positions.
The service also engages with available employability
opportunities, attending job fayres when possible.
Complete. 
3 TI  3, 4, 5, 7

Page 56

51 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
07:02 Development of a robust formal working
partnership with peer workers in the
Alcohol and Drug Partnership to
encourage additional supports,
inclusiveness, community reintegration
and enhance support to service users
subject to Drug Treatment and Testing
Orders.
The working partnership with peer workers across Ayrshire in the
Alcohol and Drug Partnership (ADP) continues to work well.
The Drug Treatment and Testing Order (DTTO) Service has received
CORRA funding for an addition Recovery Development Worker who
will encourage inclusiveness, community reintegration and provide
support to service users subject to DTTO. 
Following the standard recruitment process a suitable individual
was appointed to the post of Recovery Development Worker, with
the new individual starting their post in November 2021.
Complete. 
3 TI
BST
MHW
1, 4, 5
07:03 Work in collaboration with Police Scotland
and Children First to develop a ‘Whole
family approach’ for Women subject to
Diversion from prosecution
Through monies received from Community Justice Ayrshire to
appoint a "Whole Family Approach" worker to complement the
diversion Team, we have completed a quick quote process and
Turning Point Scotland (TPS) has been awarded the contract.  TPS
Undertook a recruitment process to appoint new worker, who took
up post in November 2021. 
Discussions between TPS and HSCP identified clear outcomes for
the service to progress.
Complete.  
3 TI
BST
MHW
1, 2, 3, 4,
5
07:04 Embed the ‘Safer and Together’ model to
enhance our response to domestic abuse,
providing support to children and their
non-abusing parents. The model will
support children (including pre-birth) and
non-abusing parents to remain together in
a supportive and safe environment, whilst
working with perpetrators to reduce harm
to the child and promote family safety. 
Safe and Together model overseen the training of 20 Social Work
practitioners trained in the Safe and Together institute accredited
programme. 
This approach is about keeping the child Safe and Together with
the non- abusing parent in cases of domestic violence, whilst
working alongside perpetrators to reduce their risk of harm.
Agency response should be more domestically abuse informed
preventing perpetrators utilising child welfare/protection processes
as part of a pattern of coercive control.
3 TI
PEI
3, 4, 5, 7

Page 57

52 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
Additional training was also offered to other Social Work and Police
Staff to support the implementation of the model. 
Additional funding was also approved to appoint an
implementation manager to oversee the mainstreaming of the Safe
and Together approach. 
Five members of staff also complete the ‘Train the Trainer’
accreditation and are now able to provide further training to
colleagues locally. 
In January 2022, a steering group was formed to plan on-going case
audits to review the impact of the model, and address any ongoing
implementation challenges.
Complete. 
07:05 Implementation of Housing First model in
collaboration with housing addictions and
mental health services to support those
released from prison, reduce reoffending
and help deliver sustainable housing and
promote recovery.
A Community Psychiatric Nurse commenced with Housing First
Service in August 2021. This is for an initial period of one-year fixed
term bases as a test of change. This will be reviewed in August 22,
with a possibility to extended funding for an additional two years, if
this model is assessed as being of benefit.
Complete.
3 TI
BST
MHW
3, 4, 5
07:06 Review of clinical pathways for individuals
with mental health concerns coming to
attention of police, police custody and
court.
Individuals who are required to be assessed at Court continue to be
assessed by the Community Forensic Mental Health Team five days
a week.  
Police Custody arrangements and police pathway continue to be
supported via the Crisis Service. 
Complete
3 BST
MHW
3, 4, 5
07:07 Implement the court distress pathway to
provide greater support to those with
The development of the new Court Distress Service was supported
through Action 15. Service has been established with staff
appointed. Those staff were also accepted onto NES Enhanced
3 MHW
BST
3, 4, 5

Page 58

53 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
complex Mental Health issues who face
the justice system.
Practitioner Programme. This learning will inform the model of care
going forward.
The programme steering group included representation from
Health, Justice and Police Scotland.  
Through the NES programme we are receiving backfill money and
plan to use this to supported the team with technology, admin and
a project lead to look at and review all the service outcome
measures. 
Programme went live in October 2021.
Complete. 
Equality Outcome 8. We better understand the Diversity in our workforce.
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
08:01 Report the findings of the Workforce
Benchmarking exercise to Partnership
Senior Management Team with
recommendations for Action.
Benchmarking work carried identified significant gaps in protected
characteristic information provided in Workforce Statistics. This
was identified as an area for improvement.
The findings from this exercise were presented to NAHSCP PSMT
for information and awareness. The report also included an
overview of the findings from Scottish Association of Social Worker
(SASW) on prevalence of racism in Social Work in Scotland.
PSMT agreed improvement in this area would be welcomed. HSCP
officer responsible for Equalities will engage with colleagues in
Parent organisations to identify improvement actions.
Complete.
4 TI
BST
8
08:02 Identify and implement action to address
the protected characteristic information
deficit.
Through engagement with HSCP Resource Officer, a clearer
benchmark picture of the overall HSCP workforce (including both
NAC and NHS staff) and their protected characteristics has been
established.
4 TI 8

Page 59

54 
ID Action Narrative AEP
Outcome
Strategic
Priority
National
Outcome
This information will help establish a partnership wide baseline,
with which to measure future improvements. Information collated
has been used across the HSCP and in particularly used to inform
the development of the HSCP Workforce Plan.
Complete.