Agenda Document Pack - Integration Joint Board - 20/10/2022

North Ayrshire Council · 20 October 2022
Back to Integration Joint Board — 20 October 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Integration Joint Board 
Meeting 
Thursday, 20 October 2022 at 10:00 
Council Chambers, Cunninghame House, Irvine /
Hybrid via Microsoft Teams 
Meeting Arrangements - Hybrid Meetings 
This meeting will be held on a predominantly physical basis but with
provision, by prior notification, for remote attendance by Elected Members
in accordance with the provisions of the Local Government (Scotland) Act
2003.  Where possible, the meeting will be live-streamed and available to
view at https://north-ayrshire.public-i.tv/core/portal/home.   
1 Declarations of Interest 
Members are requested to give notice of any declarations of interest in
respect of items of business on the Agenda.  
2 Minutes/Action Note 
The accuracy of the Minutes of the meeting held on 22 September 2022 will
be confirmed and the Minutes signed in accordance with Paragraph 7 (1) of
Schedule 7 of the Local Government (Scotland) Act 1973 (copy enclosed).  
3 Director's Report 
Submit report by Caroline Cameron, Director (NAHSCP) on developments
within the North Ayrshire Health and Social Care Partnership (copy
enclosed).  
1

Page 2

4 Woodland View Ward 7B Service Redesign Proposals and future
models of Care Delivery 
Submit report by Caroline Cameron, Director (NAHSCP) seeking approval
for service redesign proposals with delivery of new model of care at
Woodland View and wider Community services which are in line with
service demands and pressures, investment, national and local priorities
(copy enclosed).    
5 NAHSCP Workforce Plan 2022-25 
Submit report by Scott Bryan, Interim Programme Manager – Strategic
Planning on the Workforce Plan 2022-25 (copy enclosed).  
6 Mental Welfare Commission Report - Authority to Discharge 
Submit report by David Thomson, Head of Service (Health and Community
Care) on progress in relation to the action plan developed in response to
the Mental Welfare Commission – Authority to Discharge Report (May
2021) (copy enclosed).  
7 Unscheduled Care Update 
Submit report by Caroline Cameron, Director on the above (copy to follow).  
8 Annual Delivery Plan 
Submit Annual Delivery Plan by Gillian Arnold, Head of Planning and
Information for noting by Members (copy enclosed).  
9 IJB Dates 2023 
Submit report by Karen Andrews, Team Manager on the proposed
timetable for meetings of the IJB and PAC for 2023 (copy enclosed).  
10 Urgent Items 
Any other items which the Chair considers to be urgent. 
2

Page 3

Webcasting 
Please note: this meeting may be filmed/recorded/live-streamed to the
Council's internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the
start of the meeting, the Provost/Chair will confirm if all or part of the meeting
is being filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited to,
for the purpose of keeping historical records and making those records
available via the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However, by
entering the Council Chambers, using the press or public seating area or (by
invitation) participating remotely in this meeting, you are consenting to being
filmed and consenting to the use and storage of those images and sound
recordings and any information pertaining to you contained in them for
webcasting or training purposes and for the purpose of keeping historical
records and making those records available to the public. If you do not wish
to participate in a recording, you should leave the meeting.  This will
constitute your revocation of consent.
If you have any queries regarding this and, in particular, if you believe that
use and/or storage of any particular information would cause, or be likely to
cause, substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
3

Page 4

Integration Joint Board 
Sederunt 
Voting Members 
Bob Martin (Chair) North Ayrshire Council
Cllr Margaret Johnson (Vice-Chair) NHS Ayrshire & Arran 
Cllr Timothy Billings  North Ayrshire Council 
Adrian Carragher NHS Ayrshire and Arran
Cllr Anthea Dickson North Ayrshire Council 
Christie Fisher NHS Ayrshire and Arran
Marc Mazzucco NHS Ayrshire and Arran 
Cllr Louise McPhater North Ayrshire Council 
Professional Advisors 
Caroline Cameron Director 
Paul Doak Head of Service (HSCP Finance & Transformation)/ 
Section 95 Officer
Iain Jamieson Clinical Director
Scott Hunter Chief Social Work Officer – North Ayrshire
Alistair Reid Lead Allied Health Professional Adviser 
Darren Fullarton Associate Nurse Director/IJB Lead Nurse
Dr Louise Wilson GP Representative
Janet Davies Lead Psychologist 
Stakeholder Representatives 
Terri Collins Staff Representative – NHS Ayrshire and Arran
Louise McDaid Staff Representative – North Ayrshire/ 
Chair, North Coast Locality Forum
Pamela Jardine Carers Representative
Clive Shephard Service User Representative
Vacancy Independent Sector Representative
Vicki Yuill Third Sector Representative
Vacancy IJB Kilwinning Locality Forum (Chair)
Vacancy IJB Garnock Valley Locality Forum (Chair)
Louise Gibson IJB Irvine Locality Forum (Chair) 
4

Page 5

North Ayrshire Health and Social Care Partnership
Minute of Integration Joint Board meeting held on 
Thursday 22 September 2022 at 10.00 a.m. 
involving participation by remote electronic means and physical attendance
within the Council Chambers, Irvine. 
Present (Physical Participation) 
Voting Members
Bob Martin, NHS Ayrshire and Arran (Chair) 
Councillor Margaret Johnson, North Ayrshire Council (Vice Chair) 
Councillor Timothy Billings
Councillor Anthea Dickson, North Ayrshire Council 
Professional Advisers
Caroline Cameron, Director of Health and Social Care Partnership 
Paul Doak, Head of Service (HSCP Finance and Transformation)/Section 95 Officer
Scott Hunter, Chief Social Work Officer – North Ayrshire 
Stakeholder Representatives
Louise McDaid, Staff Representative (North Ayrshire Council)/Chair, North Coast
Locality Forum 
Pamela Jardine, Carers Representative 
Present (Remote Participation) 
Voting Members
Adrian Carragher, NHS Ayrshire and Arran 
Christie Fisher, NHS Ayrshire and Arran 
Marc Mazzucco, NHS Ayrshire and Arran 
Professional Advisers
Darren Fullarton, Associate Nurse Director/IJB Lead Nurse 
Stakeholder Representatives
Louise Gibson, IJB Irvine Locality Forum (Chair)
Vicki Yuill, Third Sector Representative 
In Attendance (Physical Participation) 
Alison Sutherland, Head of Service (Children, Families and Criminal Justice) 
Thelma Bowers, Head of Service (Mental Health) 
David Thomson, Head of Service (Health and Community Care)
Peter McArthur, Senior Manager (Addictions) 
Raymond Lynch, Senior Manager (Legal Services)
Craig Stewart, Committee Services Officer
Angela Little, Committee Services Officer
Agenda Item 2
5

Page 6

In Attendance (Remote Participation) 
Michelle Sutherland, Partnership Facilitator, HSCP 
Eleanor Currie, Principal Manager – Finance 
Apologies 
Councillor Louise McPhater, North Ayrshire Council
Alistair Reid, Lead Allied Health Professional Adviser
Aileen Craig, IJB Monitoring Officer 
1. Apologies and Chair’s Remarks 
Apologies for absence were noted. 
2. Declarations of Interest 
There were no declarations of interest in terms of Standing Order 7.2 and Section 5.14
of the Code of Conduct for Members of Devolved Public Bodies. 
3.  Minutes/Action Note 
The accuracy of the Minutes of the meeting held on 25 August 2022 were confirmed
and the Minutes signed in accordance with Paragraph 7 (1) of Schedule 7 of the Local
Government (Scotland) Act 1973. 
3.1  Matters Arising from the Action Note 
It was noted that matters arising from the action note were on track. 
Noted. 
4. Chief Social Work Officer Annual Report 2021/22 
Submitted report by the Chief Social Work Officer on the Annual Report required by
the Scottish Government. The report set out at Appendix 1, highlights the range of
Social Work activity throughout the year and places that in the context of the
socioeconomic challenges faced locally. 
Members asked questions and were provided with further information in relation to:- 
• Recruitment of social workers, particularly given the current challenging
financial landscape;
• Mental health matters; and
• Child protection arrangements. 
The Board agreed to note (a) the contents of the report and, in particular, the
successes and challenges detailed therein; and (b) the skilled and compassionate
interventions of our practitioners and managers.
5. Director’s Report 
Submitted report by Caroline Cameron, Director (NAHSCP) on developments within
the North Ayrshire Health and Social Care Partnership. 
6

Page 7

The report provided an update on the following areas:- 
• National developments that included the New mental health and well-being
platform for employers, outlined in more detail in the reports;
• Ayrshire wide developments that included Discharge Without Delay – 7 Minute
Briefing and Child Health Report 2022;
• North Ayrshire Developments that included ‘Near Me’ (a video calling service
used by many health and public services) based at Kilwinning Library, Respite
fund applications open for unpaid carers, Impact Arts opportunities for young
people and a recent team-building day involving North Ayrshire Drug & Alcohol
Recovery Service (NADARS) through a successful application to the Staff
Well-being fund; and
• An update on the Covid vaccination programme including a pause to the
remaining asymptomatic testing in place for health and social care staff and in
high risk settings and updated guidance in relation to the use of face masks in
social care alongside the seasonal flu vaccination programme. 
Members asked questions and were provided with further information in relation to:- 
• The ‘Near Me’ service and whether it would be rolled out to other public libraries
in North Ayrshire, following evaluation; and
• The current testing arrangements for health and social care staff and whether the
test kits were still suitable for any future strains of the Covid-19 virus that might
emerge. 
Noted. 
6. Annual Performance Report 2021-22 
Submitted report by Paul Doak, Head of Service (HSCP Finance and Transformation)
on the key achievements during 2021-22 and the publication of the Annual
Performance Report. The Annual Performance Report was set out at Appendix 1 to
the report. 
Noted. 
7. 2022-23 – Month 4 Financial Performance 
Submitted report by Paul Doak, Head of Service (HSCP Finance and Transformation)
on the IJB’s financial performance. Appendix A to the report provided the financial
overview of the partnership position, with the full Transformation Plan for 2022/23
provided in Appendix B. Appendix C provided an overview of those service changes
with financial Savings attached to them and the current BRAG status around the
deliverability of each saving. Appendix D outlined the movement in the overall budget
position for the Partnership following the initial approved budget. The local finance
mobilisation plan submission was provided at Appendix E to the report with Appendix
F showing the IJB reserves position in detail. 
The Board agreed to (a) note (i) the overall integrated financial performance report for
the financial year 2022-23 and the current overall projected year-end underspend of
£0.389m, (ii) the progress with delivery of agreed savings, (iii) the remaining financial
risks for 2022-23, including the impact of remaining Covid-19 estimates and costs; and
(b) approve the budget reductions which were detailed at paragraph 2.11 of the report. 
8. Reserves Policy
7

Page 8

Submitted report by Paul Doak, Head of Service (HSCP Finance and Transformation)
on the updated Partnership reserves policy. The updated policy was set out at
Appendix A to the report. 
The Board agreed to approve the updated reserves policy. 
9. North Ayrshire Health and Social Care Partnership and Alcohol and Drug
Partnership Implementing Medication Assisted Treatment – update report and
Improvement Plan 
Submitted report by Peter McArthur, Senior Manager (Addictions), on the
implementation of new Medication Assisted Treatment (MAT) Standards and
requesting endorsement of the North Ayrshire MAT Improvement Plan. The MAT
annual summary report 2021 to 2022; RAG Status - for MAT standards 1 to 5 - July
2022; North Ayrshire MAT Implementation Plan finalised draft - for endorsement &
approval 080922; and Correspondence from Minister for Drugs Policy - MAT
requirements and accountability 2022 was set out at Appendices 1 – 4 to the report,
respectively. 
The Board agreed to (a) endorse the MAT Improvement Plan and (b) note the obligations
placed on Chief Officers and Chief Executives in relation to governance and
accountability. 
10. Recovery & Renewal for Mental Health 
Submitted report by Thelma Bowers, Head of Mental Health, on the Scottish
Government Programme of work for Mental Health Recovery & Renewal investment
and service development in alignment with Scottish Government strategic priorities. 
Members asked questions and were provided with further information in relation to:- 
• Funding arrangements particularly involving the Third Sector. 
The Board agreed to (a) note the update on the programme of work for Mental Health
Recovery and Renewal; (b) endorse and support the programme as set out in the
report; and (c) that a seminar be arranged to give more information to Members in this
area. 
11. Whistleblowing Report – Quarter 1, April to 30 June 2022 
Submitted report by Karen Callaghan, Corporate Governance Co-ordinator, in relation
to whistleblowing concerns raised in Quarter 1 (April-30 June 2022). 
Noted. 
The meeting ended at 11.40 p.m.
8

Page 9

North Ayrshire Integration Joint Board – Action Note 
Updated following the meeting on 22 September 2022 
No. Agenda Item Date of
Meeting
Action Status Officer
1. Mental Welfare Commission
Report: Authority to Discharge
21/10/21 The Board agreed to (a) note the terms of
the report; (b) approve the North Ayrshire
Health and Social Care Partnership
response to the recommendations; and (c)
receive an update report to the IJB in 12
months in terms of progress with the
recommendations of the Mental Welfare
Commission report.
Update by October 2022 
David
Thomson
2. Communities Mental
Health & Wellbeing Fund
17/3/22 The Board agreed to (a) note the terms of
the report; and (b) note that a report would
be brought to a future meeting of the Board,
for consideration, which would provide
learning and an evaluation of what worked,
and what did not, in respect of the Fund
distribution process, etc. 
Update to a future
Board (date: tbc)
Vicki Yuill
3. Medium-Term Financial
Outlook
17/3/22 The Board agreed to (a) note the Medium-
Term Financial Outlook and the potential
financial position in years 2 and 3; and (b)
approve the setting up of a Workshop, at
the appropriate time, in order to help and
facilitate consideration of matters going
forward once the funding position, by the
Scottish Government, had become clearer. 
Agreed to Set up a
Workshop, at the
appropriate time,
once funding position,
by the SG, had
become clearer.
Update – IJB
Development
Workshop taking
place on 22
September 2022.
Paul Doak
9

Page 10

4. Unscheduled Care Performance  16/6/22 The Board agreed to (a) (b) receive a
performance update at the next meeting
in August and thereafter consider any
further interventions required; and (c) 
Verbal update
provided 25 August
2022
Caroline
Cameron
5. Director’s Report 25/8/22 A future report to be provided to the IJB on
suicides, drug and alcohol related deaths.
Date tbc Caroline
Cameron
6. The Promise in North Ayrshire:
Update on Progress
25/8/22 The Board agreed to note (b) that a further
progress report and action plan will be
remitted to IJB following The Promise
Conference to be held in November 2022. 
Date tbc Alison
Sutherland
7. North Ayrshire HSCP and ADP
Annual Performance Management
Report – Alcohol and Drugs
25/8/22 A future report to IJB from the ADP giving a
clearer understanding in terms of drug
types which have contributed to drug death
statistics.
Date tbc Caroline
Cameron/
Peter McArthur
8. Recovery & Renewal for Mental
Health
22/9/22 The Board agreed that a seminar be
arranged to give more information to
Members in this area. 
Date tbc Caroline
Cameron/
Thelma Bowers 
10

Page 11

Integration Joint Board
20 October 2022
Subject : Director’s Report 
Purpose : This report is for awareness to advise members of North
Ayrshire Integration Joint Board (IJB) of developments within
North Ayrshire Health and Social Care Partnership (NAHSCP) 
Recommendation : IJB members are asked to note progress made to date. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
IJB Integration Joint Board
HSCP Health and Social Care Partnership
IRISR Independent Review of Inspection, Scrutiny and Regulation 
COSLA Convention of Scottish Local Authorities
NCS National Care Service
CSWO Chief Social Work Officer
PEAR Prevention, Early Intervention and Recovery
CLASP Community Led Action and Support Project 
1. EXECUTIVE SUMMARY 
1.1 This report informs members of the Integration Joint Board (IJB) of the work
undertaken within North Ayrshire Health and Social Care Partnership (NAHSCP),
nationally, locally and Ayrshire wide. 
2. BACKGROUND 
2.1 This report provides IJB with up to date information on recent activity across the HSCP
since the last IJB.    The report will also provide COVID related information by
exception. 
Agenda Item 3
11

Page 12

3. CURRENT POSITION 
National Developments 
3.1 Creating Hope Together : Scotland’s Suicide Prevention Strategy 2022-32 
The Scottish Government launched the Creating Hope Together : Scotland’s new
Suicide Prevention Strategy and Action Plan on 29th September 2022. 
The Strategy sets out an ambitious plan for Scotland to implement the first stage of
the 10 year strategy and includes four long term outcomes.  To achieve the vision
within the strategy these outcomes must be delivered to affect change across society,
services, communities, and individual experiences.   
The action plan identifies which areas will continue to be focussed on and identify new
areas of future work to support delivery of the outcomes.  The actions are built around
6 action areas and a workplan will be developed to detail which level the actions will
be delivered, e.g., national, local, regional (or a combination), lead partners,
resourcing and timescales.   Finalisation and publication of the outcomes framework
will include key indicators to measure progress in delivering the plan.  A copy of the
strategy is available through the attached link 
3.2 Launch – National Conversation for New Dementia Strategy 
The Scottish Government launched their “National Conversation” for the New
Dementia Strategy on 29th September 2022. 
The aim of the ‘National Conversation’, informed by a short discussion paper, is to
meaningfully capture the experiences of people living with or caring for someone with
dementia and to enable them to develop a new Strategy that covers all aspects of life
for someone living with dementia. 
It will run from 29th September until 5th December, and can be responded to via Citizen
Space. 
To enable people to respond how they choose, they will also be open to receiving
video and audio clips and will also hold a series of online conversations on the
Strategy, and will work with partners to facilitate face-to-face discussions in the coming
months. 
For further information, please get in touch at dementiapolicy@gov.scot. 
12

Page 13

3.3 National Care Service Forum 
The first National Care Service Forum took place in Perth on Monday 3 October and
was well attended by people online and in person. 
The keynote speaker at the event was Kevin Stewart MSP, Minister for Mental
Wellbeing and Social Care, and with input from Humza Yousaf MSP, Cabinet
Secretary for Health and Social Care, and Angela Constance MSP, Minister for Drugs
Policy. 
The forum provided an opportunity for stakeholders, people who access social care,
the social care workforce, carers and unpaid carers to share their thoughts about the
National Care Service. Group discussion took place around a number of questions
and Scottish Government undertook to ensure that the information gathered at the
event would be used to help inform the co-design of the NCS. 
The forum will become an annual event. 
3.4 Independent Review of Inspection, Scrutiny and Regulation of Social Care in Scotland 
On 21st September 2022, Kevin Stewart, Minister for Mental Wellbeing and Social
Care announced the commission of an Independent Review of Inspection, Scrutiny
and Regulation (IRISR) across social care support services.    Dame Sue Bruce has
been appointed as Chair of the IRISR, supported by Stuart Currie as Vice Chair. 
The IRISR will :- 
(a) explore how regulation and inspection of social care services and partners who
contribute to care and wellbeing can be effectively supported to improve
outcomes and experiences for the people of Scotland; 
(b) ensure regulation, scrutiny and inspection of social care arrangements have a
basis in human rights and; 
(c) ensure appropriate scrutiny of all aspects of the National Care Service (NCS). 
Two advisory panels will be appointed to strengthen and assist the IRISR by
providing specialist advice to the Chair, and to inform any recommendations that
may be made regarding social care regulation, inspection and scrutiny. 
The review will include a call for evidence and include a programme of stakeholder
engagement in the coming months to ensure input from a wide range of voices,
including those seldom heard, to help support the review process. 
Dame Sue Bruce has been asked to report back to Ministers by June 2023. 
13

Page 14

3.5 Inquiry : Health Inequalities in Scotland 
The Scottish Parliament’s Health, Social Care and Sport Committee published a report
of the findings of its recent inquiry into health inequalities in Scotland.   The inquiry
explored evidence on the fundamental causes of health inequalities and heard a range
of evidence from policy-makers across a wide spectrum of policy areas.   The report
sets out areas for future action at local authority, Scottish Government and UK
Government levels and highlights areas where further action is required.    A copy of
the report can be accessed through this link. 
3.6 Health and Social Care : Winter Resilience Overview 2022-2023 
On 4th October 2022, the Cabinet Secretary of Health and Social Care published the
annual progress update on the NHS Recovery Plan 2021-2026 which set out a joint
set of 8 priorities, agreed with COSLA designed to prepare for winter.     A copy of the
Winter Resilience Overview document can be found through this link. 
Ayrshire Wide Developments 
3.7 Staff Wellbeing Centre, Ayrshire Central Hospital 
During the covid pandemic, staff wellbeing areas were set up across sites within NHS
Ayrshire & Arran using existing clinical and training areas that had temporarily closed
due to the pandemic.   
These areas became safe havens for staff and served not only as somewhere for staff
to rest and reflect, but also as places to access to a range of well-being services at a
time when stress and anxiety was heightened and emotional, physical and mental
support was vital.   
NHS Ayrshire & Arran wants to ensure staff continue to have these essential spaces
to enhance their emotional, physical and psychological well-being going forward, with
newly refurbished centres currently in development at University Hospitals Ayr and
Crosshouse and Ayrshire Central Hospital, which will give staff improved access to
rest areas separate from the public.   
The Staff Well-being Centres are accessible to all clinical and non-clinical staff from
across our entire health and social care system, with the vision of providing a
sanctuary for them to be able to stop, reflect and reconnect with themselves.  The
centre has rest areas with comfortable seating, along with 2 consulting rooms. Staff
are welcome to take their breaks in the centre as it will be open in line with the dining
room’s operating hours.   
The first of the new Staff Well-being Centres was officially opened at Ayrshire Central
Hospital on 29 September 2022.  The centre makes up part of the existing building for
the Gallery Dining Room and is a place for all health and social care staff to take a
much-needed pause and relax. The official opening was marked with a ribbon cutting
14

Page 15

by the Chief Executive, Claire Burden, and Chair of Ayrshire and Arran NHS Board,
Lesley Bowie.   
3.8 Caring for Ayrshire Events 
The Caring for Ayrshire Informing and Engagement Programme will recommence
during November 2022 starting with three formal launch events in the following
areas;  
• East Ayrshire – 15 November 2022, Take a Bow, Kilmarnock KA3 7PH 10-
12noon
• North Ayrshire – 21 November 2022, Fullarton ConneXions, Irvine KA12 8PE
10-12noon
• South Ayrshire – 24 November 2022, Ayr Town Hall, Ayr KA7 1JX 1430-1630  
These events provide an opportunity to restart the Caring for Ayrshire conversation
and provide an update on progress and next steps. 
North Ayrshire Developments 
3.9 Social Work Leadership Event 
The partnership hosted it’s first Social Work Leadership Event on Friday 30th
September 2022 attended by over 60 participants.  The event was hosted by Scott
Hunter, CSWO and included presentations from Dr Martin Kettle from Glasgow
Caledonian University on Professional Identity which looked at how to strengthen the
professional identity of Social Works unique contribution in the context of integrated
working.  A presentation from Colin Turbett from Common Weal on Community Social
Work and the opportunities this presents for North Ayrshire and a presentation from
Stuart Muirhead from IRISS on the factors required for effective innovation in Social
Work Services.  Participants also heard from 2 local managers on examples of
successful service development within family support and mental health services. 
3.10 Our Community Space Sessions 
A new community project launched in the Garnock Valley earlier this summer is
proving to be a huge success. 
‘Our Community Space’ sessions run monthly in three Garnock Valley Towns, offering
residents a chance to enjoy a chat and meet new people, explore ways to improve
their mental and physical well-being and find out what’s going on in their communities. 
The main aim of the drop-in sessions is to reduce social isolation and loneliness,
providing a welcoming and informal atmosphere where people can come together to
enjoy the company. 
15

Page 16

Local organisations and services have also been attending to share valuable
information and advice, with representatives from NAC’s Housing service, NAHSCP’s
Money Matters team, the Lennox Partnership, the Scottish Fire Service’s Home Safety
team, CLASP (Community Led Action & Support Project) and NHS Ayrshire & Arran’s
Musculoskeletal Pain team having been among the guests to attend so far. 
Staff from Turning Point Scotland’s Prevention, Early Intervention and Recovery
(PEAR) Service have also been delivering Naloxone training as part of the project.
Naloxone is a life-saving medication that can rapidly reverse an opioid overdose. 
3.11 Foxgrove Art and Therapeutic Design Newsletter 
Foxgrove will provide the first medium secure adolescent inpatient service for young
people in Scotland and is a key strand of the Scottish Government’s Mental Health
Strategy 2017-2027. 
The purpose-built facility, which is currently under construction within the grounds of
Ayrshire Central Hospital in Irvine, will ensure that children can be cared for closer to
home and will receive appropriate care, treatment, therapies, security and on-going
education. 
The latest Foxgrove Art and Therapeutic Design Newsletter has now been published,
containing information on the inspiration behind the feature wall design at the heart of
the building. 
3.12 Unpaid Carers Update 
Two new staff been appointed to the Carers Team to commence work to examine
service approaches to identifying and supporting all carers.  These appointments also
allow the softer front door approach to begin with carers completing a self-referral,
proportionate assessment and low-level resource release.  The communications and
guidance for this are being developed with plans to commence in November. 
A Prior Interest Notice (PIN) for retender of the Carer information and Support service
has been issued to engage a strategic partner to support the design and delivery of
our carer services.   
Pan Ayrshire plans to meet duties under Section 28 Carer Involvement in Hospital
Discharge are underway with support from Health Improvement Scotland.  This
involves two new staff, a referral process and signposting function agreed thus far. 
Improvement work with NAC Education to increase the identification of young carers
and offer of Young Carer Statements is underway with YC Co-ordinators assigned
across schools, awareness sessions beginning 11th October and a review of guidance
and resources to support YC’s and staff. 
16

Page 17

3.13 SDS Learning Review 
The SDS Learning Review Board is well established with the fourth meeting scheduled
at the end of October.  This is chaired by Scott Hunter, Chief Social Work Officer, and
the membership is representative of local and national partners.  The overarching aim
of the review is to bring forward a range of recommendations and best practice to
strengthen our mainstream model of service delivery across all services in Children &
Families and Health & Community Care. 
Early agreements have been reached to consider best practice community social work
approaches and delivery.  The branching projects have been agreed and are being
populated and will commence November 22 – April 23.  The scope of these is: 
A) Policy & Procedure
B) Social Work Practice & Systems
C) Intake & Review Systems 
COVID Update 
3.14 Social Care Staff Support Fund 
The Social Care Staff Support Fund was due to end on 30th September 2022.   The
Scottish Government and COSLA have agreed to extend the fund to 31 March 2023. 
This fund is available for social care staff who are absent from work due to having
COVID19, or self isolating in line with public health guidance, and will remain in place
to support and encourage infection prevention and control in social care settings.   
Further guidance and eligibility criteria on the funding can be found here. 
4. IMPLICATIONS 
4.1 Financial
None
4.2 Human Resources
None
4.3 Legal
None
4.4 Equality/Socio-Economic
None 
4.5 Risk
None
4.6 Community Wealth Building
None
4.7 Key Priorities
None  
17

Page 18

5. CONSULTATION 
No specific consultation was required for this report. User and public involvement is
key for the partnership and all significant proposals will be subject to an appropriate
level of Consultation. 
Caroline Cameron, Director
[Carolinecameron@north-ayrshire.gov.uk/01294 317723] 
Appendices
Nil
18

Page 19

Integration Joint Board
20th October 2022
Subject : Woodland View Ward 7B Service Redesign Proposals and
future models of Care Delivery     
Purpose : To inform and seek IJB approval for service redesign proposals
with delivery of new model of care at Woodland View and wider
Community services which are in line with service demands and
pressures, investment, national and local priorities.
Recommendation : IJB to endorse the option appraisal recommendations and
approve proposal for use of Ward 7B as a 72-hour Unscheduled
Care Unit, delivery of an alternative outreach rehabilitation model
from Warrix Avenue and future planning for delivery of a CAMHS
Assessment Hub 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required 
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran X 
Glossary of Terms 
AMH  Adult Mental Health
AUCS  Ayrshire Unscheduled Care Service  (AUCS)
CAMHS  Child and Adolescent Mental Health Service
CMHT  Community Mental Health Team
EMH  Elderly Mental Health 
ECT  Electro Convulsive Therapy 
ED  Emergency Department
HSCP  Health and Social Care Parternship
IPCU  Intensive Psychiatric Care Unit 
MHANP  Mental Health Advanced Nurse Practitioner
UHA  University Hospital Ayr
UHC  University Hospital Crosshouse 
1. EXECUTIVE SUMMARY 
1.1 As a requirement of Covid contingencies, mental health inpatient rehabilitation
services were reconfigured – this has led to the development of an enhanced outreach
Agenda Item 4
19

Page 20

model from Warrix Avenue that has released the Ward 7B physical ward environment
for other purposes and the staffing budget for this area to be reallocated to support
this new model. 
1.2  Through an option appraisal, a proposal has been developed to re-open Ward 7B as
a Nurse Led 72 Hour Assessment Unit with an expected impact of reducing Adult
Mental Health (AMH) Acute beds. This freed bed capacity could be consolidated in
one AMH acute bedroom wing to potentially become a self-contained unit for a Child
and Adolescent Mental Health Service (CAMHS) Assessment/Support Hub. Ward 7A
can also retain the additional space ‘borrowed’ from Ward 7B. 
1.3  These proposals for new unscheduled care services are not reliant on the funding
associated with previous Ward 7B staffing provision.  Existing staffing resource has
been redirected to sustain the enhancement to Warrix Avenue to continue to
develop/provide their outreach model and remaining financial resource will be utilised
to address pressures across inpatient services including Woodland View page-holder
capacity, Electro Convulsive Therapy (ECT) staffing, Intensive Psychiatric Care Unit
(IPCU) supplementary staffing avoidance and patient flow within Elderly Mental Health
(EMH) inpatient services. 
2. BACKGROUND 
2.1 Ward 7B Availability 
As part of the response to the Coronavirus pandemic, the use of Warrix Avenue and
Ward 7C (Forensic Rehabilitation) was optimised to allow a ward (7B) to be vacated
as a contingency as a Covid ‘Red Zone‘ ward. 
This change later also facilitated the opportunity of the vacated ward to allow for a
number of ward decants from 2020 until late 2021 to support Fire Damper/Fire Stop
works across Woodland View. On the completion of this programme, it was agreed to
invite pan-Ayrshire bids for alternative use of this valuable resource. 
2.2 Staffing Resource and Funding 
Key to being able to keep Ward 7B vacated from its original purpose has been the
development of the Warrix Avenue model. 
To allow for this reduction in beds at Wards 7B/7C a new model has been developed
at Warrix Avenue - providing intensive outreach support to individuals for up to one
year in their own homes (pan Ayrshire) – typically for those who have passed through
Warrix Avenue as part of their rehabilitation programme, but also to individuals who
may be referred direct from all adult community services or AMH acute for direct
support. This new model also eases some of the pressure on pressured Community
Mental Health Teams (CMHTs) with a very phased transition of persons with complex
needs. 
20

Page 21

Staff displaced by the restructuring of rehabilitation services as a Covid contingency
temporarily supported Warrix Avenue as this model was developed and funding
released from Ward 7B requires to be vired to substantively support the required
increased staffing resource to sustain this model and allow Ward 7B to remain
vacated. 
3. PROPOSALS 
3.1 Nurse Led 72 Hour Unscheduled Care Unit 
Approval be given for the six beds and associated public spaces within Ward 7B not
utilised as additional space for Ward 7A (4 bedrooms) to be utilised to provide a nurse
led Unscheduled Care service. 
3.2 CAMHS Assessment/Support Hub 
Approval be given to further explore the anticipated released resource within AMH
Acute to be redeveloped to provide a CAMHS Assessment/Support Hub. 
The anticipated function would be to provide inpatient care for young people aged
12-18 years for crisis admissions, mealtime support (Eating Disorders) and complex
neurodevelopmental assessments. 
3.3 Impact/Anticipated Outcomes 
Nurse Led 72-hour Assessment Unit 
• Reducing need for Adult AMH Acute beds
• Reducing length of stay through very focused assessment on admission with
clear decision point within 72 hours of admission
• Improved patient care experience, simpler pathway and removing risk of
multiple assessments and waits within busy emergency departments
• Releasing time from ambulance and police services accompanying persons
requiring psychiatric assessment to Emergency Departments (EDs)
• Reduce need for sole practitioner assessments, pressure for these assessing
staff and benefit of joint assessments  
• Benefit of wider support from Woodland View in case of distressed or agitated
persons
• Maximise use of condition appropriate environment at Woodland View – better
for service user and families
• 24/7 hub for unscheduled care including crisis and Mental Health Advanced
Nurse Practitioners (MHANP) services with links to NHS 24 overnight,
Ayrshire Unscheduled Care Service (AUCS) and out of hours social work. 
• Bringing together numerous unscheduled functions (one stop shop) to ensure
seamless care / rapid transition.
• Video assessment room for ‘Attend Anywhere’ assessment to support remote
urgent psychiatric assessment
21

Page 22

• Reduce workload for AMH Acute staff group in terms of reduced number of
admissions 
CAMHS Assessment/Support Hub
• Would allow for a significant number of young persons requiring inpatient
assessment, short term care to remain in Ayrshire and Arran
• Would reduce burden/expectation of pressured paediatric services within
University Hospital Crosshouse (UHC) currently asked to support young
persons requiring a place of safety during psychiatric crisis 
• Reduce requirement for a young person to be admitted to an AMH Acute ward 
• Address increasing concern as to accessibility of Skye House due to service
changes/limitations set by NHS Greater Glasgow & Clyde and identifies a local
solution
• Meets with Caring for Ayrshire ambitions and would lead to better care
experience and maintaining connections with families
• Whilst Nurse Led 72-hour assessment becomes operational and impact is
assessed, allows time for this model to be further considered including required
physical changes to released AMH Acute environment, staffing model required
and proposed pathways to see if would be viable
• Increase likelihood of recruiting and retaining staff with commitment to
development of service model having specific NHS Ayrshire and Arran CAMHS
inpatient provision
• Would test aim/ambition to develop a new build bespoke unit for CAMHS in
longer term
• Maximises use of valuable Woodland View estate and support that can be
offered from wider staff group 
4. IMPLICATIONS 
4.1 Financial 
Staffing for the Nurse Led 72-hour assessment unit will be delivered from within
existing funded Unscheduled Care staff group. 
Monies for Ward 7B running costs, domestic, meals, portering etc will be met within
previous funded services. 
Physical works – bid has been included within Mental Health Infrastructure requests
for one off spend for preparatory works to make small number of changes to make
Ward 7B fit for new proposed use. Costs of required works are awaited. 
The Warrix Avenue outreach model will require to be vired and funded from the
existing Ward 7B rehabilitation service budget to substantively support the required
increased staffing resource to sustain this model and allow Ward 7B to remain
vacated. There has also been other reinvestment in cost pressure areas at Woodland
22

Page 23

View including ECT delivery and Ward 8 staffing model to address resource required
for enhanced observations. 
There is further financial modelling work underway to fully develop the CAMHS
assessment hub proposal which is predicated on the successful delivery of the 72-
hour Mental Health Unscheduled Care Unit. 
4.2 Human Resources 
Remaining previous Ward 7B staff group have gone through organisational change
process and been matched in to posts at Woodland View or Warrix Avenue (assumed
uplift to Warrix Avenue to offer outreach model). There would be no-one remaining in
redeployment situation if uplift to Warrix Avenue is agreed. 
4.3 Legal
None. 
4.4 Equality/Socio-Economic
Both proposals allow for persons experiencing mental disorder/distress opportunity to
have urgent condition specific assessment/support in an appropriate environment
within their own Board area – the right service, at the right time by appropriate
competent staff. 
4.5 Risk
Overall
If funding changes for augmentation to Warrix Avenue staffing are not agreed, then
this model of rehabilitation is not sustainable and Adult Acute service will become
increasingly occupied by persons not requiring that level of care and be unable to
accept admissions of those requiring that care as a result – High risk of adverse
event in community. Ward 7B would therefore need to be retained for its original
function and the space afforded to Ward 7A to be reclaimed. 
As alluded to in the paper, the remaining staffing budget from current Ward 7B would
be utilised to address a number of service pressures across inpatient services
including supporting page holder function at Woodland View, supporting development
of ECT Team, addressing reliance on supplementary staff within our Intensive
Psychiatric Care Unit and further progressing test of change work around facilitating
earlier discharge from Elderly Mental Health inpatient setting. Cumulatively, not
progressing with these requested changes would have significant impact financially
and clinically across inpatient services. 
Nurse Led Unscheduled Care and CAMHS Hub proposal. 
There are currently care pathways for both these client groups – based in community
and Emergency Departments. 
23

Page 24

The need for urgent decisions to be made around need for inpatient admission within
pressured circumstances (and in case of EDs inappropriate environments) can lead
to decision for admission to be made when, if time could be afforded for de-escalation
and longer assessment, there could frequently be opportunity to identify alternative
support in community setting when there is increased confidence situation has de-
escalated and there has been time for community supports to be mobilised/engaged. 
High risk - avoidable admission being agreed in need to make decision in pressured
situation.
Medium risk – adverse event - harm to self or others of person in ED setting engaging
in act of deliberate self-harm more possible within that environment or person
exhibiting stress/distress behaviours assaulting staff.
High risk – adverse outcome of assessment due to lone practitioner
assessment/decision making that could be mitigated through joint assessment.   
Being admitted to adult acute inpatient care can lead to a lengthy inpatient stay whilst
all assessments are completed, time until consultant review and the risks of being in
a busy adult inpatient ward. 
High risk – lengthier inpatient stay than is required. 
Currently for young persons, the admission pathway would preferably be to Skye
House via our Service Level Agreement meaning care out with Ayrshire and Arran
and High risk of challenge for families to keep in contact, increasing young person’s
isolation and medium risk for services in liaising with the Skye House care team. 
High risk – admission to Adult Acute bed due to lack of availability at Skye House or
young person remaining in Paediatric care setting, increased opportunity of adverse
event due to risk to self/others of being in a non-age/condition specific environment. 
4.6 Community Wealth Building
Progressing proposed changes should allow for significant part of monies being spent
out-of-area care for CAMHS persons to be spent instead within Ayrshire and Arran. 
When supplementary staff are required, this can often require to be escalated to
agency level for shifts to be filled and such staff often reside out with Ayrshire. 
Use of released Ward 7B staff budget for other purposes will lead to a number of new
substantive posts within our service. 
If agreed enablement works for Ward 7B and to scope required works for CAMHS
development should lead to opportunity for Ayrshire based companies/businesses
both in design and physical work changes. 
24

Page 25

4.7 Key Priorities
As described throughout the paper progression of these proposals align with North
Ayrshire Council and North Ayrshire Health and Social Care Partnership (North
HSCP) Strategic ambitions of
• Tacking and reducing inequalities
• Improving individual and family wellbeing
• Prevention and early intervention
• Bringing services together
• Improving mental health and wellbeing 
As well as according with the Caring for Ayrshire ambitions of Ayrshire residents
receiving the right care, locally and by staff with appropriate skills to do so. 
5.  CONSULTATION 
A pan-Ayrshire approach has been maintained throughout this process from asking
for ideas/bids for alternative usage of Ward 7B to inclusion on the option appraisal
panel to finalise preferred bid for future use of Ward 7B. 
Papers around these proposals have already been presented to the Partnership
Senior Management team (PSMT) and NHS Ayrshire and Arran Corporate
Management Team, approval was given by these groups to submit to Integrated Joint
Board for final approval. 
Copies of papers have also been provided for sharing/discussion at South and East
HSCP equivalent groups and Strategic Planning and Operational Group. 
Caroline Cameron, Director 
William Lauder, General Manager Ayrshire Central Hospital
William.Lauder@aapct.scot.nhs.uk 01294 323489 
25

Page 26

26

Page 27

North Ayrshire Integration Joint Board
20th October 2022
Subject : NAHSCP Workforce Plan 2022-25
Purpose : • Approval
• Discussion
Recommendation : IJB to note the content of the Workforce Plan 2022-25
IJB to approve Workforce Plan for publication by 31st October
2022 and subsequent implementation. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required 
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
IJB Integration Joint Board
SPF Staff Partnership Forum
PSMT Partnership Senior Management Team
HR Human Resource
FTE Full Time Equivalent 
1. EXECUTIVE SUMMARY 
1.1 All Health and Social Care Partnerships are obligated to produced three-year
Workforce Plans. Following a period of development, the Workforce Plan for NAHSCP
for the period to March 2025 is now ready for publication and implementation. 
1.2  All plans must be published by 31st October 2022.
1.3  The plan sets out the key challenges facing the HSCP workforce in North Ayrshire,
and a vision for how our services and workforce will change over the short and medium
term. 
1.4 An initial draft plan was submitted to Scottish Government at the end of July 2022.
This plan was to be reviewed by Scottish Government Officers, with feedback on
Workforce Plans to be returned by the end of August 2022. The draft plan was
reported to IJB in August. 
Agenda Item 5
27

Page 28

1.5 At the time of report submission, no feedback from the Scottish Government has been
received by NAHSCP. 
2. BACKGROUND 
2.1 The Scottish Government published its National Workforce Strategy for Health and
Social Care in Scotland in March this year. This strategy sets out the Governments
intentions for growing the health and social care workforce across Scotland and
achieving its vision of:
o ‘a sustainable, skilled workforce with attractive career choices where all are
respected and valued for the work they do.’ 
Following this publication, guidance was provided to HSCPs to support them in the
development of their individual Workforce Plans. In short summary, the guidance
proposed that HSCPs should reflect current Workforce profiles and future implications
and develop a workforce plan focused on the Scottish Governments five pillars. 
2.2 The guidance provided by Scottish Government indicated IJBs should seek to achieve
the following: 
• Provide an overview of the current workforce, including key challenges and risks
• Provide a reflection of the local workforce implications over the short and medium
term. This includes, looking at workforce priorities over the short-term (next 12
months), considering medium-term workforce development over the medium-term
(three years) and consider the establishment gap between the current and future
workforce.
• A workforce action plan built around the five pillars of workforce planning, Plan,
Attract, Train, Employ, Nurture. The pillars should be used as a framework to
detail the actions which organisations will take to recruit and train staff in sufficient
numbers to deliver the future workforce. 
2.3 An initial draft workforce plan was submitted to Scottish Government at the end of July
2022, keeping within identified timescales. It was indicated that draft plans would be
reviewed by Scottish Government Officers and feedback provided back to
partnerships by the end of August 2022. 
At the time of submitting this paper, no feedback from the Scottish Government has
been received. 
3. PROPOSALS 
3.1 In developing the Partnership’s Workforce Plan, we have sought to follow the
guidance set out by the Scottish Government. 
28

Page 29

3.1.2 The plan identifies five local workforce priorities. The priorities help support a clearer
workforce planning vision and form the basis of workforce action planning.
o Understanding our workforce (PLAN)
o Promoting our organisation (ATTRACT)
o Investing in our people (TRAIN)
o Building our Workforce (EMPLOY)
o Growing our people (NURTURE) 
The priorities are mapped directly to the Scottish Government’s workforce planning
pillars. 
3.1.3 Building on current workforce data and management feedback, the plan sets out the
key workforce challenges facing the partnership. These include:
• Vacancy levels and challenges of recruitment
• Staff turnover
• High levels of staff absence
• A lack of appropriately trained/qualified workers across the health and social
care sector
• A predominately older workforce, with many close to age of retirement 
3.1.4 The plan offers a view of the future workforce, identifying Social Work and Nursing
projections over the next 3 years.
In addition, where available, the plan includes our aspirations for our future workforce.
Following management feedback, a profile of future required roles by service area
over the next three years is provided. 
However, the plan underlines that these future requirements are aspirational, as it is
unclear if future financial resources will allow all identified posts to be realised. 
3.1.5 In complementing the future required workforce, the plan also provides an overview
of key service developments planned over the short and medium term. Many of these
proposals aim to reduce demand on health and social care service and reduce
pressure on the partnership’s workforce. 
3.1.6 A workforce action plan has been produced and will be structured in line with the local
priorities as set out in paragraph 3.1.2. 
Further information on the outcomes of the plan is available in section 3.2 below. 
3.2 Anticipated Outcomes 
Overall, the plan aims to help ensure that North Ayrshire HSCP is seen as great place
to work and build a career. The plan will set out our commitment to growing and
retaining our people by offering clear career pathway information for all staff, to
encourage them to develop a life-long career with North HSCP. 
In implementing this plan, we anticipate the identified workforce priorities to be
realised over the next three years. 
29

Page 30

Understanding our workforce (PLAN)
In progressing this priority, we will seek to improve the workforce planning functions
across the partnership, supporting teams at all levels to think more about workforce
planning matters. We will seek to improve the access to workforce intelligence to help
embed effective workforce planning. 
Promoting our organisation (ATTRACT)
Our goal against this priority is to deliver a clear message that North Ayrshire HSCP
is a great employer that offers real job satisfaction and development opportunities. 
Investing in our people (TRAIN)
This priority will provide effective training and upskilling opportunities for our
workforce. Actions will cover supporting staff to access formal health and social care
qualifications and degrees, as well as additional training opportunities. 
Building our Workforce (EMPLOY)
We will improve our recruitment processes, making applying for jobs in the
partnership more accessible, and will promote the benefits of working in the HSCP.
In addition, we will work closely with NAC and NHS colleagues to improve how we
share and promote our employment opportunities, ensuring our vacancies are shared
widely on multiple platforms and advertised through a variety of methods. 
Growing our people (NURTURE)
This priority seeks to support members of staff in their daily roles, as well as further
their development and career progression. Actions here will deliver wellbeing supports
to staff members, ensuring they are supported to continue fulfilling their roles. 
In addition, further actions will also be implemented to support the ongoing
development of staff by providing guidance on succession planning and creation of
career pathway guidance for all staff. 
3.3 Measuring Impact 
The Workforce plan is supported by a Workforce Action Plan, that will set out key
actions to help further develop our workforce and support the development and
wellbeing of staff. 
This action plan is structured around the Partnership’s identified workforce priorities.
These in turn map directly to the Scottish Government’s five pillars of workforce
planning. 
Progress against actions in the Workforce Plan will be monitored regularly and be
subject to the HSCPs performance review processes. 
30

Page 31

4. IMPLICATIONS 
4.1 Financial
The Workforce plan is aligned to the Partnership’s Medium-Term Financial Outlook
(MTFO). It has been recognised that the ability to meet the aspirational aspects of the
workforce plan, for example increases in the size of the workforce are likely to be
impacted by the Partnership’s financial situation in the coming years.
4.2 Human Resources
The Workforce plan will have significant implications for Human Resource as we seek
to better understand our workforce, and implement actions to support its development,
particularly in relation to growing the workforce, investing in developing staff, and
supporting staff wellbeing.
4.3 Legal
In publishing this plan, the Integration Joint Board are complying with the legal
obligation to produce a new Workforce plan within set timescales.
4.4 Equality/Socio-Economic
An Equality Impact Assessment will be completed on the Workforce Plan prior to
publication to ensure our intentions do not discriminate or adversely impact on any
protected group.
4.5 Risk
Risk identified suggests that failure to adequately support workforce development –
including failure to recruit or retain appropriate staff - will result in inadequate staffing
levels. In turn this will negatively impact on the quantity and quality of care provision
to local residents.
4.6 Community Wealth Building
Aspects of Community Wealth Building will be recognised through effective
commissioning of local third and independent sector organisations in the delivery of
health and social care services. By commissioning additional services from within the
North Ayrshire social care market, we can effectively invest back into local
communities.
4.7 Key Priorities
Further development of the workforce will assist the partnership in working towards all
five strategic priorities. It also directly contributes to the priority of ‘Develop and
Support our Workforce’. 
5. CONSULTATION 
In development of this workforce plan, engagement has been undertaken across all
partnership service areas. This has included the distribution and analysis of a
Workforce Planning Survey completed by Service Managers and ongoing discussions
with service leads. 
Engagement has also been undertaken with providers from local Third and
Independent Sector organisations with a focus on delivering services that support
Health and Social Care. 
The draft plan was presented to IJB in August for further comment and feedback,
which has been incorporated in the final version of the plan.
31

Page 32

The Plan has been presented to Partnership Senior Management Team, and was the
subject for discussion and feedback at the Extended Senior Management Team
meeting in September. 
The Plan was also presented to the Strategic Planning Group on 18th October 2022.   
Caroline Cameron, Director
For further information please contact Scott Bryan, Interim Programme Manager -
Strategic Planning, (sbryan@north-ayrshire.gov.uk) 
Appendices 
Appendix 1 – NAHSCP Draft Workforce Plan 2022-25
32

Page 33

2022
Workforce Plan
2022-25
FINAL DRAFT
NORTH AYRSHIRE HEALTH AND SOCIAL CARE PARTNERSHIP
NORTH AYRSHIRE
Health & Social Care Partnership
33

Page 34

1 
Governance Review
Group / Development Date Comments
1st Draft submitted to Scottish
Government Workforce Planning
Office
02/08/2022 Initial submission. Comments due
back by end August 2022 
Partnership Senior Management Team
(PSMT) 
04/08/2022 Broad endorsement of approach,
with offers of support to develop
plan going forward.
Highlighted data gaps to be
considered.
North Ayrshire Integration Joint Board  25/08/2022 Draft presented to IJB for
discussion and feedback.
Comments provided have been
considered and included in later
draft.
Feedback received from Scottish
Government Workforce Planning
Office 
11/10/2022 
Extended Partnership Senior
Management Team Meeting (EPSMT) 
07/09/2022 Feedback collected from HSCP
Leaders and Senior Managers on
the draft plan and suggested
actions for inclusion.
Staff Partnership Forum  27/09/2022 Meeting Cancelled
Strategic Planning Group 18/10/2022 
Integration Joint Board 20/10/2022 
Version Control
Detail Version Date Changes
1st Draft submitted to Scottish
Government Workforce
Planning Office
V2 02/08/2022 Initial submission. Comments
due back by end August
2022 
Changes following Scottish
Government submission
V3 03/08/2022 Inclusion of NHS protected
characteristic data. 
Version updated post EPSMT V4 03/10/2022 Inclusion of additional
actions and reference to
service developments.
Additional Workforce Data
Included          
34

Page 35

2 
Contents
1. Introduction .................................................................................................................................... 3
2. Workforce Plan Summary ............................................................................................................... 4
3. North Ayrshire Health and Social Care Partnership ...................................................................... 8
4. Policy Drivers .................................................................................................................................. 9
5. Our Workforce Priorities .............................................................................................................. 12
6. Our Workforce Now ..................................................................................................................... 13
7. Workforce Challenges .................................................................................................................. 19
8. Workforce Projections and Future Requirements ........................................................................ 26
9. Our Workforce in 12 Months ........................................................................................................ 29
10. Our Workforce in 3 Years.......................................................................................................... 33
11. Third and Independent sector workforce ................................................................................ 36
12. Supporting Wellbeing ............................................................................................................... 41
13. Our Workforce Action Plan ...................................................................................................... 43
14. Appendices ................................................................................................................................ 50
Appendix A - NAHSCP .................................................................................................................... 51
Appendix B - Aligning and Defining our priorities ......................................................................... 53
Appendix C Workforce Planning Approaches ............................................................................... 55
Appendix D - Policy Drivers ........................................................................................................... 56
Appendix E - Additional Workforce Requirements ....................................................................... 60 
35

Page 36

3 
1. Introduction
In recent years, North Ayrshire Health and Social Care Partnership has endeavoured to meet
the unique challenges presented to us through the Covid-19 Pandemic. All NAHSCP staff,
including frontline care workers, administrative support staff, and senior leaders, have had to
quickly adapt to new ways of working, often in very challenging circumstances. Through the
pandemic, we truly learned how determined and hard-working our workforce is, and how
vital it is to ensure our on-going recovery from Covid-19.
Now more than ever the importance and value of our workforce is prominent, their support
in our Covid-19 recovery is and ability to meet the growing demand for health and social care
services in North Ayrshire are critical. Further, we are also mindful of the wider economic and
workforce challenges that are a result of other national and global factors. This focus on our
staff is recognised in our new Strategic Commissioning Plan (2022-30) with ‘Developing and
Supporting our Workforce’ being included as one of our five strategic priorities. 
This plan sets out our ambitions for our workforce, how we intended to shape our services to
ensure we provide the best health and social care to local people in need in line with our
strategic, operational, and financial plans. We expect, through implementation of this plan,
the HSCP workforce is ready to meet the future health and social care needs of local people,
and a career with NAHSCP in health and social care is celebrated for the value it brings to the
lives of local people.
How we developed this plan
This plan is the product of many months of development, involving review of relevant
national and local policies and publications, engagement with HR and workforce planning
colleagues, consultation with HSCP leaders and senior managers and with local Third and
Independent Sector organisations. To help guide and inform the development of the local
plan, a working group was established that includes Strategic Planning Leads, Human
Resource officers, Workforce information analysts, Partnership Planning Managers, and TSI
representation. Engagement has also taken place with other key stakeholders, including HSCP
professional leads, Learning and Development leads, and Union representatives.
The NAHSCP Workforce plan is strongly influenced by the Scottish Government’s National
Workforce Plan for Health and Social Care Service. We have created a local set of five
workforce priorities, based on the Government’s five pillars of workforce planning.  
Workforce statistics have been provided for both Local Authority and NHS contracted staff
and presented to provide an overview of the current Health and Social Care Workforce in
North Ayrshire. This information provides key insights into the challenges facing the local
workforce. To help identify our future workforce, we surveyed managers and senior leads
across our service areas and local Third and Independent Sector organisations. The feedback
received helped us to identify local workforce challenges as well as the aspirations over the
short (12 to 18 month) and medium (3 year) term. 
36

Page 37

4 
2. Workforce Plan Summary
The health and social care landscape across Scotland is changing. In North Ayrshire we are
seeing demand for support increasing across all age groups and service areas. To effectively
meet this demand and support local people to live safe, health and active lives, we must
ensure the social care workforce is appropriately prepared. 
Our Current Workforce
As of April 2022, the North Ayrshire Health and Social Care Partnership had a workforce of
3,622 people, with a compliment of 3,059 Full Time Equivalent (FTE) posts. Of this, 1,869
people (52%) were employed by North Ayrshire Council (NAC), and 1,783 (48%) employed by
NHS Ayrshire and Arran.
The HSCP workforce is predominately female, with 85% of staff being made up of women.
The Chart below shows the age breakdown of all partnership staff. Of note, is that 43% of the
workforce is made up of people over the age of 50. 
More details on the partnership’s workforce, including breakdown by service, employment
type, absence and turnover and protected characteristic profiles can be found in section 6. 
Workforce Projections and Future Requirements
Section 8 provides further information on the future workforce of NAHSCP. Building on
historical staffing data, we have projected the change in our Social Work and Nursing
Workforce over the next three years. As the table below indicates, both the Social Work and
NHS Nursing workforce are expected to grow over the three years of this plan. 
Staffing Group 2021 Workforce (FTE) 2025 Projected Workforce (FTE)
Social Work 191.3 212.3
Social Work Assistants 76.8 86.8
Nurse 1011 1112 
While increases are expected across most service areas for both Social Work and Nursing
posts, trend data has highlighted challenges in Mental Health Nursing. This service area has
seen a decrease in its workforce over the past few years. Number have fallen from 614 (FTE)
Nurses in 2018, to 567.6 (FTE) in 2022. Forecast suggest this number to decrease to 532.8
(FTE) by 2025
Section 8, also provides information on future roles required by service area. Feedback from
HSCP management identified a number of key roles that will be required over the next three
9 106 249 373 406 444 474 625 556
303
77
<20 20 - 24 25 - 29 30 - 34 35 - 39 40 - 44 45 - 49 50 - 54 55 - 59 60 - 64 65 +
NAHSCP Age Breakdown
37

Page 38

5 
years to ensure services can deliver effective care and help improve the health and wellbeing
of service users and local people. 
However, it is stated that both workforce projections and the identified future roles are
aspirational and will be subject to the financial resources available to the HSCP.
Key workforce challenges
An overview of the key workforce challenges facing the Partnership can be found in section 7.
While the key focus is on challenges with North Ayrshire, it is mindful of the wider social and
economic challenges that are being experienced across the Country. This section also reflects
some of the key demographic and health and social care challenges that are increasing
demands for local health and social care services. This includes the rising older population,
the high levels of poverty and deprivation in North Ayrshire, and a rising demand in mental
health services.
From a service perspective, the key challenges identified include:
▪ Widespread challenges in recruiting to vacant posts, experienced across all service
and professional areas
▪ Staff retention – likely as a result of the high level of vacancies and competition across
the health and social care market.
▪ A lack of appropriately trained/qualified workers – particularly for professional roles
(e.g. shortage of trained Mental Health Officers)
▪ High levels of staff absence, exacerbated by the high pressure of working through the
pandemic
▪ High levels of staff turnover in specific services
▪ A high proportion of older workers heading towards retirement age 
Workforce priorities
Our local workforce priorities are identified in section 5. Building on the five pillars outlined
on the National Workforce Strategy for Health and Social Care, we identified five local
priorities that also reflects the workforce planning approaches by our parent organisations.
Our five priorities for Workforce Planning are: 
These priorities have been used in producing our local workforce action plan.
Priority 1. Understanding our Workforce
Actions aligned to this priority will seek to improve workforce planning functions to demands
and needs on our services. Actions will look at improving provision of and access to
Understanding
our Workforce
(Plan)
Promoting our
Organisation
(Attract)
Investing in our
people
(Train)
Building our
Workforce
(Employ)
Growing our
people
(Nurture)
38

Page 39

6 
workforce intelligence information to support effective planning and embed effective
workforce planning processes.
Priority 2. Promoting our Organisation
Our goal against this priority is to deliver a clear message that North Ayrshire HSCP is a great
employer that offers real job satisfaction and development opportunities. Actions will focus
on promoting career development in health and social care and promoting the benefits of
working with the HSCP.
Priority 3. Investing in our People
Actions identified against this priority will seek to provide effective training and upskilling
opportunities for our workforce. Actions will cover supporting staff to access formal health
and social care qualifications and degrees, as well as additional training opportunities. 
Priority 4. Building our Workforce
In recognising the current challenges in recruitment in the HSCP, actions aligned to this
priority will seek to improve our recruitment processes. Building on the actions identified in
previous priorities, we will promote the benefits of working in the HSCP through our
recruitment processes. 
In addition, we will work closely with NAC and NHS colleagues to improve how we share and
promote our employment opportunities, ensuring our vacancies are shared widely on
multiple platforms and advertised through a variety of methods. 
Priority 5. Growing our People
Actions aligned to this priority will seek to support members of staff in their daily roles, as
well as further their development and career progression. Actions here will deliver wellbeing
supports to staff members, ensuring they are supported to continue fulfilling their roles. 
Actions will also be implemented to support the ongoing development of staff by providing
guidance on succession planning and creation of career pathway guidance for all staff. 
Workforce of the Third and Independent Sector
We recognise that many health and social care support services are provided through Third
and Independent sector organisations. As such, we engaged with representatives across
North Ayrshire to identify the workforce challenges facing the sector and their aspirations
over the next three years.
In total, 26 Third or Independent sector organisations that deliver health and social care
services across North Ayrshire responded to a local workforce survey. More detail on the
feedback provided can be found in Section 11.
Some of the key challenges facing the sector include:
39

Page 40

7 
• Recruitment and retention, with organisations reflecting the high level of competition
in the social care market and a general inability to pay the same rates workers can
expect in statutory services.
• Staff training and development, with training being limited to only statutory
requirements and challenges over accessing training subsidies.
• Delivery of rural care packages, with many services delivered in the more rural parts
of North Ayrshire unable to pay worker travel costs.
• Access to ongoing funding, with many funding streams only awarded for one year,
making long-term planning difficult in the sector.
Over the course of the life of this plan, aspirations in the sector are to be supported to be
able to provide more sustainable services and care to the people of North Ayrshire. The
sector hopes to deliver more person-centred care services, working closer with families and
carers to deliver better care services and support for local people across North Ayrshire.
Actions within the action plan identify need to work closer with the third and independent
sector and improving processes for how local organisations can access funding and be
commissioned by the HSCP. 
Staff Wellbeing
We recognise the importance of maintaining the positive wellbeing of our workforce. If
wellbeing in the workforce is low, it presents a real risk to individuals themselves, their
colleagues and the people they support. As such, it is essential that we recognise the factors
that can lead to low wellbeing and support staff to remain rested, healthy and able to carry
out their roles. 
Section 12 of this plan identifies the key factors that can impact the wellbeing of HSCP staff.
These include:
• Concerns over health and safety in the workforce, particularly in relation to Covid-19
• Lack of peer support that has been lost during the pandemic, with many staff feeling
isolated
• Impact of long-term absences on individuals and colleagues
• High workload levels
To support staff wellbeing a number of initiatives and supports have been put into place,
including:
• Staff wellbeing support hubs
• Provision of safe spaces for staff members
• Informal team social interactions during the day, ‘team blethers’
• Wellbeing grants available to all staff  
40

Page 41

8 
3. North Ayrshire Health and Social Care Partnership
North Ayrshire Health and Social Care Partnership (the Partnership) provides locality-based
health and social care services for people throughout their life: from birth through childhood,
teenage years, adulthood and end of life. 
Our service areas and key partners include: 
• Delivery Services
o Children, Families and Justice Services
o Adult Health and Community Care Services 
o Mental Health, Addictions and Learning Disability Services 
• Support Services
o Business Support Services
o Finance and Transformation 
• Key Partners
o Citizens of North Ayrshire
o North Ayrshire Third Sector Interface
o Independent Sector
o Wider Community Planning Partners (Ayrshire Justice Partnership, Scottish
Fire and Rescue, Police Scotland) 
More information on the range of services delivered by North Ayrshire Health and Social Care
Partnership can be found in Appendix A. 
41

Page 42

9 
4. Policy Drivers
The plan had been developed in alignment and recognition of a number national and local
strategic and operational plans and strategies. Highlighted below are several relevant local
and national policy drivers that have influenced the development of this workforce plan.
Further information and details in relation to these policies and strategies can be found in
Appendix D.
Local Strategies
Caring Together – NAHSCP Strategic Commissioning Plan 2022-30
Published in April 2022, the Partnership’s Strategic Plan sets out our commitment to
achieving our vision that, “People who live in North Ayrshire are able to have a safe, health
and active life”. To help achieve this vision, we have identified five strategic: 
Caring Together represents the first time that a strategic priority around the development of
our staff has been identified for action. The priority to, ‘Develop and Support our Workforce’
reflects the HSCPs recognition of the value our staff have on ensuring we can achieve our
vision. 
Our workforce is one of our most valuable assets and it is essential that it is developed
appropriately to meet the health and social care needs of local people. We will endeavour to
ensure that our workforce is fully supported to undertake their roles while also offering clear
career pathways for those who wish to develop further and progress within the Partnership.
Primary Care Improvement Plan – ‘Ambitious for Ayrshire’
Ambitious for Ayrshire was initiated following the implementation of the Scottish General
Medical Services Contract in 2018. This contract changes how local GP and Medical practices
operate, with a change in the role of GPs. Instead of being predominately GP led, medical
practices are moving towards multi-disciplinary team models, where each practice will have a
range of medical professionals available.
The development of multi-disciplinary teams across the Primary Care sector will mean a
greater diversity in the skill set of staff. However, this also brings the challenge of ensuring
appropriate supply is available to ensure MDTs can operate at capacity.
The Promise
The Partnership will work closely with our national and local partners as we help to deliver
‘The Promise’ for Children, Young People and Families. The Promise seeks to improve the
experience of all children, young people and their families if they require additional support,
creating a more compassionate care system for young people and families.
Enable
Communities
Develop and
Support our
Workforce
Provide Early
and Effective
Support
Improve Mental
and Physical
Health and
Wellbeing
Tackle
Inequalities
42

Page 43

10 
The implementation of The Promise will have a significant impact on the Children and
Families Workforce. The Promise Plan for 2021-24 can be accessed here:
https://thepromise.scot/plan-21-24-pdf-spread.pdf 
Scottish Living Wage 
As a large local employer, it is essential that people who work for the partnership receive a
fair wage that affords them a decent standard of living. To support this approach, the
Partnership is dedicated to ensuring each of our employees receive the ‘Real Living Wage’.
This wage is independently calculated by the Resolution Foundation, who undertake regular
analysis on the cost of living (including, housing costs, childcare, food costs and transport). In
November 2021, the Real Living Wage was increased to £10.90. This has been implemented
by North Ayrshire Council and will be received, as a minimum hourly rate, by all NAC
contracted Partnership employees. Conversations are currently ongoing regarding
implementation for NHS staff and it is anticipated these will be concluded soon. 
The Real Living Wage goes beyond the National Living Wage and the National Minimum
Wage. By providing the living wage, we help to tackle local poverty and inequalities and
ensure all partnership employees are valued for the work they do. 
National Strategies
National Workforce Plan for Health and Social Care
The National Workforce Plan for Health and Social Care was published in early 2022 and set
out the Scottish Government’s vision for Scotland’s health and social care workforce. The
vision is that Scotland has: “A sustainable, skilled workforce with attractive career choices and
fair work where all are respected and valued for the work they do.”
In setting out its approach, the national strategy sets out three key ambitions for the health
and social care workforce, which is to support its ‘Recovery’ from the impact of the Covid 19
pandemic, support the ‘Growth’ of a sustainable workforce, and ‘transform’ how our health
and social care services operate.
To support the future development of the national health and social care workforce, the
Scottish Government has identified five national pillars for action. These are:
PLAN – ATTRACT - TRAIN - EMPLOY - NURTURE
It is advised that these five pillars are employed by health and social care organisations across
Scotland in the development of their own workforce plans. 
Development of a National Care Service
Following the publication of the Independent Review of Adult Social Care (2021) the Scottish
Government has agreed to progress legislation to develop a National Care Service.  The
Scottish Government will continue to develop legislation and prepare for the creation of this
43

Page 44

11 
new national service, which is expected to be implemented by the end of the current
parliamentary period in 2026.
The move to a National Care Service will have a significant impact on the Health and Social
Care Workforce. As of October 2022, the full details of what service delegated to IJBs will be
transferred to the NCS is unclear. There is concern that the close integrated and partnership
working relationships formed under IJBs may be at risk as the NCS is created. Integrated
teams may be separated as Council employed social work and social care staff are transferred
to the new national body, with health contracted colleagues remaining with the NHS.  
As the legislation and plans develop, North Ayrshire IJB and HSCP will continue to engage and
provide constructive feedback to ensure the wellbeing of staff and people who access our
services is maintained. 
44

Page 45

12 
5. Our Workforce Priorities
As identified, there are many key policy drivers informing the NAHSCP workforce plan. As an
integrated partnership, it is important that we offer a blended approach to workforce
planning, ensuring that the methods used by our parent bodies, and national organisations
are reflected. More information on the approaches used by our parent bodies can be found
in Appendix C.
To support this, we have developed a set of local workforce planning priorities to help shape
and guide our approach to workforce planning. These priorities were developed through a
mapping exercise with other local and national approaches.
In delivering our workforce plan, we will work towards the following priorities. A definition of
each of these priorities and how they align to our parental bodies can be found in Appendix
B.  
4. Building our Workforce (Employ)
We recruit the right people, using a variety of methods and approaches.
5. Growing our People (Nurture)
We support career development, building knowledge and experience.
We maintain the positive wellbeing of staff
3. Investing in our People (Train)
Our staff have access to the training and development they need to ensure
they have the right skills for their roles.
1. Understanding our Workforce (Plan)
We make full use of our workforce data to help plan for the future.
2. Promoting our Organisation (Attract)
NAHSCP is viewed as an excellent organisation and considered a great place to
work.
45

Page 46

13 
6. Our Workforce Now
A snapshot of the HSCP workforce was collected on 1st April 2022. Information provided has
been aggregated for both the North Ayrshire Council and NHS Ayrshire and Arran Workforce. 
As at April 2022, North Ayrshire Health and Social Care Partnership had a total workforce of
3,622 people (FTE 3059) across all our delivery areas. In terms of headcount, 52% (1869) of
our Workforce are contracted by North Ayrshire Council, with the remaining 48% (1753)
contracted by NHS Ayrshire and Arran. In terms of FTE, 49.5% (1514) are NAC contracted,
with 50.5% (1544) NHS A&A contracted.
Most of our workforce, 86.4%, are under a permanent employment contract, with only
13.4% of staff under temporary conditions. Overall, 51.9% of staff are employed full-time,
with 48.1% working part-time. There is a greater proportion of part-time workers contracted
by NAC (55.2%), compared with NHS A&A (40.6%) 
Workforce by service area
The chart below shows our workforce by our key service areas. 
As demonstrated, Health and Community care is the largest service in terms of workforce,
accounting for approximately 45% of NAHSCP.
The Health and Community Care workforce also accounts for the highest proportion of part-
time staff, with 89% of staff under a part-time contract. 
372
529
689
289
142
1217
224
160
Children, Families and Justice
Health and Community Care
Mental Health, Learning Disability and Addictions
Management and Support
WORKFORCE BY CONTRACT TYPE (HEADCOUNT)
Full time
Part time
462
1367
846
382
Children, Families and
Justice
Health and Community
Care
Mental Health, Learning
Disability and Addictions
Management and Support
NAHSCP Workforce by service area (FTE)
46

Page 47

14 
Workforce profile
The chart to the right provides and
overview of the age and sex profile.
of the NAHSCP workforce.
As is demonstrated the workforce of
NAHSCP is predominately female.
In addition, the workforce also has a
high number of older employees of
50 plus. 
Workforce by Sex
As indicated above, the NAHSCP workforce is
predominately female, with women accounting for
85% (3,074) of all employees.
A breakdown by contract type highlights that 52% of
the female workforce are part-time. This compares to
only 26% for males. 
Workforce by Age
Again, as indicated, NAHSCP has an aging workforce. As demonstrated in the chart below,
there are high volumes of staff in older age brackets. 
Overall, 43.1% of the NAHSCP workforce are 50 years old or over. This presents a particular
risk due to staff retirement ages. NHS employees are eligible to retire at 55, and currently
20.1% of the NHS contracted staff in NAHSCP fall in this age bracket. The minimum
retirement age for NAC employees in the local government pension scheme is 60 years,
currently there are 13.2% of NAC contracted staff in this age bracket.
1
12
28
54
49
70
73
104
96
49
12
8
94
221
319
357
374
401
521
460
254
65
<20
20 - 24
25 - 29
30 - 34
35 - 39
40 - 44
45 - 49
50 - 54
55 - 59
60 - 64
65 +
NAHSCP Workforce by Age and Sex
Female Male
Male
15%
Female
85%
NAHSCP Workforce by Sex
0
100
200
300
400
500
600
700
<20 20 - 24 25 - 29 30 - 34 35 - 39 40 - 44 45 - 49 50 - 54 55 - 59 60 - 64 65 +
North HSCP Age Profile
NAC NHS Total
47

Page 48

15 
Workforce Equality Information
In addition to collecting information on gender and age, the Partnership also produces
workforce statistics on other protected characteristics. Providing information on protected
characteristics is voluntary by members of staff. As such, the information often contains data
gaps. 
Disability
Of the 1,869 NAC this information
was reported on, 67 (4%) identified as
living with some form of disability.
The types of disability are not
disclosed. In addition, information
was not available for a further 24% of
staff members (452). 
For the NHS Workforce, 19 (1%) of staff
reported as living with a disability or
long-term condition. 844 members of
staff (47%) did not disclose this
information. 
Ethnicity
Of the 1,869 NAC employees this information was reported on, the majority of the workforce
identify as ‘White Scottish’ (1,320, 70.63%). A further 421 staff members (22.53%) have not
provided any ethnicity information. The chart below shows the ethnicity of all other staff
members. 
3 3 3 2 1 4 2 1 6 5 3 5
90
African
(Scottish or
British)
Asian -
Chinese
(Scottish or…
Asian - Indian
(Scottish or
British)
Asian - Other
Asian -
Pakistani
(Scottish or…
Mixed or
Multiple
Other
Other - Arab
(Scottish or
British)
White - Other
White - Polish
White
Eastern
European
White Irish
White Other
British
African Asian Mixed Other White
HSCP (NAC) Workforce by Ethnicity
Yes
4%
Not disclosed
24%
% NAC workforce with a disability
Yes
1%
Not
Disclosed
47%
% NHS Workforce with a disability
48

Page 49

16 
The NHS workforce has similar profile to the NAC. Overall, 73.76% (1,324) of NHS employed
staff identified their ethnicity as ‘White Scottish’. A further 17.16% (3080 of staff did not
disclose an ethnicity. The reported ethnicities of the remaining 9% of staff is highlighted
below. 
Religion and Belief
In terms of reporting on religion and belief, over 60.4% (1,129) of the NAC workforce did not
disclose any information in relation to this characteristic. 21.6% (404) of the workforce
identified as having No religion. The chart below shows the identified religion of all other
staff members 
Within the NHS Workforce, the majority of staff (682, 37.99%) identified as having No religion
or belief. 22.34% of staff (401) identified as members of the Church of Scotland. A further
22.17% of staff (398) chose not to disclose this information. All responses by percent of the
NHS workforce is highlighted in the chart below. 
1 7 3 4 5 3
24 21
95
Chinese,
Chinese
Scottish or
Chinese
British
Indian,
Indian
Scottish or
Indian
British
Pakistani,
Pakistani
Scottish or
Pakistani
British
Other Mixed or
Multiple
Ethnic
Group
Other
Ethnic
Group
Irish Other Other
British
Asian Mixed Other White
HSCP (NHS) Workforce by Ethnicity
60.4%
21.6% 9.7% 5.4% 2.0% 0.4% 0.2% 0.1% 0.1% 0.1%
Not
disclosed
No Religion Church of
Scotland
Roman
Catholic
Other
Christian
Other
Religion/
Belief
Humanist Buddist Muslim Pagan
Percent NAC Workforce by Religion
37.99%
22.34% 22.17%
10.25% 5.68% 0.89% 0.28% 0.22% 0.17%
No Religion Church of
Scotland
Not
disclosed
Roman
Catholic
Christian -
Other
Other Hindu Muslim Buddhist
Percent NHS Workforce by Religion or Belief
49

Page 50

17 
Staff Absence
NAC and NHS Ayrshire and Arran use different methodologies to reports staff absence with
NHS reporting a percentage figure, and the Local Authority report Average Working Days
Lost. Both Local Authority and NHS reported increased absence figures in 2021/22 compared
with the previous year with NHS returning a rate of 5.35% absence (up 0.83%), and Local
Authority at 15.29 Workdays Lost per Employee (up 3.82 workdays). All main service areas,
without exception, reported an increase in sickness absence in 2021/22. 
In both years, it appears the greatest reason for absence was related to Anxiety, stress,
depression, or other psychiatric illness. The second most common reason has been identified
as Musculoskeletal problems.
The charts below show the absence levels by parent organisation and service area. 
1.42 1.77
4.64 5.17
2.71 2.72
5.09
6.24
Business Support North (Dir) Children's Health / Care &
Justice Services North (Dir)
Community Health & Care
Services North (Dir)
Lead Partnership North (Dir)
NHS Absence Rates (Percentage)
2020/21 2021/22
10.82 12.56
3.35
19.94
14.21
17.34
7.28
20.64
Child, Families&Justice Health & Community Care HSCP Finance & Transform Mental Health
NAC Absence Rate (Avg Days Lost)
2020/21 2021/22
50

Page 51

18 
Staff Turnover
The Employee Turnover rate for 2021/22 is 8.5%, an overall increase, compared with the
previous year, of more than 40%. Figures indicate that whilst employee turnover has
increased across both NHS and Council settings, numbers of employees leaving are
significantly higher within the Local Authority in each of the last 3 years, with most recent
187 leavers (NAC) compared to 118 (NHS), in 2021/22.   
As the chart above indicates, and the chart below underlines, the staff turnover rate in North
HSCP has increased in 2021-22. It is likely that the turnover rate in 2020-21 was lower due to
the pandemic, making the 2019-20 information a more meaningful comparator. Even so,
turnover in 2021-22, is still higher than in 2019-20.
The high absence rates highlighted in information above have been identified as a challenge
by senior leaders in the Partnership and are discussed in later sections.  
101 99 118
167
108
187
268
207
305
2019-20 2020-21 2021-22
Volume of leavers by service year
NHS NAC TOTAL
6.1% 5.8%
6.8%
9.8%
6.1%
10.1%
8.0%
6.0%
8.5%
2019-20 2020-21 2021-22
HSCP Turnover Rate
NHS NAC Combined Avg
51

Page 52

19 
7. Workforce Challenges
The Health and Social Care Workforce currently faces several challenges. In each case, the
identified challenges can impact on the Partnership’s ability to deliver safe and effective
health and social care services. In addition, some of the wider global challenges identified
may negatively impact the overall health and wellbeing of the local population, driving
demand for more health and social care services. Some of the key risks to our workforce are
set out below.
Global and National Challenges
Following the negative impact of the COVID-19 pandemic and its subsequent restrictions, it
appears that overall the Scottish economy is in recovery. Employment levels in Scotland are
exceeding those recorded in 2019, and rates of unemployment and economic inactivity are
also lower. However, the Scottish workforce is still subject to many challenges:
• Cost of living crisis: Due to rising inflation, increases in the cost of living are placing
additional pressures on individuals and families. In 2022 Scotland has rising levels of
employment, coupled with real wage increases. However, wages are being exceeded by
inflation, meaning employees are becoming worse off.
• Recruitment challenges: Despite high levels of employment, there are still a high volume
of vacant posts across Scotland as employers struggle to recruit new staff. This is
particularly noticeable in the Health and Care Sector.
• Staff retention: Due to workforce supply issues, there appears to be increased levels of
competition between employers; to secure suitable staff. Including improved wages or
‘golden hello’ incentives.
In summary, despite high levels of employment, there remains a high level of vacancies
across many key sectors in Scotland. Due to the cost-of-living crisis, worker pay is effectively
decreasing, as such employees are likely to be more open to moving to better paying work.
This means employers are finding it more difficult to recruit and retain staff, and therefore
negatively impacting on service delivery.
Demographics of North Ayrshire
In addition to wider social and economic challenges, and the direct challenges facing our local
workforce, the changing demographic profile of North Ayrshire also presents a particular
challenge. Local information suggests that the changing local population and high levels of
poverty and deprivation indicate a growing demand for health and social care services in the
long term.
Most information projections suggest that the population of North Ayrshire is changing. As
such, the health and social care workforce must adapt to ensure it continues to meet the
demands of local health and care need. Overall, the total population of North Ayrshire
continues to decrease, and is expected to shrink by 3.9% between 2018 and 2030, falling to
129,987. 
52

Page 53

20 
Within this falling population, we see a growing older people population. By 2025, those 65+
will account for 25% of the population, and almost 27% by 2030. This correlates with a
shrinking younger (0-15) and working age (16-64) population. 
In addition, there will be a more significant growth in those over 75 years. From 2018 to
2030, the 65-74 age group is forecast to increase by 12% (from 17,093 in 2018 to 19,207 in
2030). However, over the same period, the population who are 75 or over will increase 30%
(12,981 in 2018 to 16,905 in 2030). 
Considering the complexity of health concerns increase as we age, the increase in older
people population implies a greater demand on Health and social care services in the future.
For example, it is likely that both the Care at Home and District Nursing Service workforce will
need to increase to meet greater demands of people require health and social care support
in their own homes and communities.
North Ayrshire continues to have areas of high deprivation contributing to social and health
inequalities across the population. The most recently published Scottish Index of Multiple
Deprivation figures suggest as much as 41% of North Ayrshire’s population live within areas
that are considered among the most deprived areas in Scotland. 
In addition, information published by the charity EndPovertyNow also suggests that more
than 1 in 4 children (28.3%) in North Ayrshire live in poverty.
Health & Care Strategic Needs Assessment
Since 2012, the life expectancy for both men and women in North Ayrshire has seen a
decrease. In the reporting period 2012/14, life expectancy in North Ayrshire was 80.8 years
19% 18% 18% 17%
59% 57% 55% 53%
22% 23% 25% 27%
2018 2022 2025 2030
Population Structure by Age Group
65+
18 - 64
0 - 17
17093 19207
12981
16905
2018 2019 2020 2021 2022 2023 2025 2024 2026 2027 2028 2029 2030
Projected trend of 65 to 74 and 75 plus population
65 - 74 75 +
53

Page 54

21 
for women and 76.1 years for men. In 2018/20, this has dropped to 80.1 years for women,
and 75.3 years for men. However, Healthy life expectancy for men in North Ayrshire has
increased in recent years. However, we see a decreasing trend for women. In the latest time
period available (2018-2020 3-year aggregate), the average healthy life expectancy in North
Ayrshire was 58.5 years for men and 56.3 years for women in 2017-2019.
Currently, 27% of local people are living with a Long-Term Condition (LTC) which could
include Arthritis, Asthma, Diabetes, or COPD). Projected prevalence up to 2025/26 shows
there is to be a gradual increase in the population living with an LTC. Long-term conditions
are more common in older age groups, with the proportion of people living with one or more
LTC increasing with age. 
By 2026, only 2 in every 10 people in North Ayrshire under the age of 65 will have a long-
term condition. For those 85 and over, 8.2 in every 10 people will live with an LTC. 
Further, the proportion of people living with more than one long-term condition (multi-
morbidity) increases with age, with approximately 15% of over 65s with multi-morbidities,
compared with less than 5% of under 65s for 3 LTCs.
There is also strong evidence for a rise in the prevalence of those affected by poor mental
health. For example, in North Ayrshire, the percentage of local people being prescribed
medication for Anxiety, Depression or Psychosis increased each year, and was reported at
22% in 2020. This is higher than the Scottish average.
Service Challenges
In developing this plan, a survey was completed by senior managers and service leads. This
survey afforded managers the opportunity to specify the key challenges facing their services.
Some of the key challenges experienced are detailed below. Overall, the key workforce
challenges that where highlighted across all services included:
o Recruitment difficulties - despite high levels of job vacancies
o Staff retention – as a possible result of the high level of competition in the job market
at present.
o Lack of appropriately qualified/experienced staff – particularly for more
enhanced/professional roles
o High levels of staff absence
o High levels of potential retirements, resulting in a loss of workforce experience
Children, Families and Justice Services
Overall, the Children, Families and Justice Service is managing with all essential business
requirements. However, there remains a considerable amount of pressure on the service due
to high levels of vacancies and staff absence. The service is also reporting high volumes of
staff preparing for absence to undergo medical procedures that were delayed due to Covid-
19 restrictions.
54

Page 55

22 
The service recognises the challenge of recruitment for Social Workers across locality teams
and in Service Access. This is also being compounded with an increase in service referrals,
meaning that demand on the service is greater than current capacity.
In our early years’ service, and number of additional challenges have been identified,
including high retiral levels. The service also has an aging workforce that brings with it the risk
of further retirals and increased chance of periods of ill health. The service is already
experiencing the impact of long-term absence on caseloads.
In addition to recruitment challenges for both clinical positions and seasonal roles, the
service is seeing an increase in staff wishing to move to part-time working for better work/life
balance.
Health and Community Care
Across our Health and Community Care services, we are experiencing challenges of
recruitment and high levels of turn-over, particularly in our Care at Home Service. Care at
Home traditionally has high levels of vacancies but are now finding it harder to recruit to and
retain staff. This is attributed to both retirement due to ill health or opportunities in other job
sectors. The role of Care at Home worker is often viewed negatively.
In our Long-term conditions service, we are seeing low level of applications for Registered
General Nurses (RGN), with number of applications having fallen over the past 4 years. There
are also low numbers of Registered Mental Health Nurses (RMN) applying for community
posts, presenting an on-going challenge. The service is also noting challenges in recruiting
Senior Charge Nurses and Clinical Team Leaders, which could indicate a lack of experienced
leaders in teams. The absence levels, mostly as a result of Covid-19, have continued to
provide challenges to the service.
There continues to be recruitment challenges for Adult Social Workers, highlighting a low
number of applicants for vacant posts, issues of retention and ongoing staff absence levels.
Island Services on Arran currently have a high level of vacancies in Care at Home and
Montrose House Care Home, with additional vacancies in primary care posts, including GPs,
nursing and physiotherapy. 
Arran faces additional demands to recruitment due to it being an island, these include
housing costs, cost of living on the island and a reliable ferry service for an effective
commute.
Allied Health Professional services identify ongoing support to other services as a current
challenge. Following support to other services during the pandemic, the service is now facing
the challenge of returning to normal service delivery in providing moderate AHP
consultations to local people. This is further exacerbated by a public perception that all
services should be back to ‘normal’. The service also reports low levels of administration
support, requiring professionals and clinicians to be redirected to undertake admin functions.
These challenges are in the face of rising demand for the AHP service from both the
community and primary care services.
55

Page 56

23 
In our Primary Care services, a number of challenges have been identified: 
o Mental Health Practitioners - the service has not been able to recruit to the island of
Arran and remote sessions are now being delivered. The service is under pressure as
there is currently no in-built resilience cover and the service has requested additional
posts via new Primary Care Mental Health monies. The team are challenged by a lack
of space in some GP practices and some staff deliver sessions remotely.
o Community Link Workers - the growth in digital supports requires the digital navigator
post to be made permanent and it is hoped that new Primary Care Mental Health
monies can support this ambition. The team are challenged by a lack of space in some
GP practices and some staff deliver sessions remotely.
o Pharmacotherapy - the service has not been able to recruit to the island of Arran and
the island team is exploring the expansion of skills across technical grades with GP
training support. There is a lack of resilience in the team and team is exploring a 10%
growth across teams. There is a limit of senior pharmacotherapy staff across Scotland
and the Ayrshire team have very successfully skill mixed. The team are challenged by
a lack of space in some GP practices and some deliver sessions remotely.
o MSK physiotherapists - The service is currently under pressure as there is no built-in
absence resource and a lack of availability of senior MSK professionals to recruit due
to marketplace shortages across Scotland. The service is currently exploring skill mix
to build a wider career path in primary care. 
o CATC the service continues to refine and develop its clinical specification to enhance
the interventions and patients supports available. The team are challenged by a lack
of space in GP practices and work continues to resolve this issue.
All of the service above requires the support of GPs to ensure clinical training, supervision
and support. Due to a lack of GPs across the Ayrshire system, this can be a challenge.
However, Ayrshire & Arran are now exploring a 'Primary care Training Academy' to support
this training need.
Mental Health, Learning Disability and Addictions
As in other service areas, there are significant challenges facing our Mental Health, Learning
Disability and Addictions Service. As Lead Partner for Mental Health Services across the
Ayrshire and Arran Health board areas, many challenges faced by the service also impact in
the two other partnership areas in Ayrshire.
The Community Mental Health Team (CMHT) have not seen the same levels of investment as
other services in recent years (for example unscheduled care and perinatal mental health
services). This has led to a significant gap in service demand and capacity. While reviewing
the current CMHT workforce, it has been identified that there are gaps in both staff volume
and experience. With the expected retirement of a number of CMHT staff in the near future,
the skill/experience level in the service will significantly shift. With high levels of
inexperienced staff, the service has the challenge of skills development.
North Ayrshire Drug and Alcohol Recovery Service (NADARS) identified the challenges of both
recruitment to vacant posts and the retention of staff members. It was highlighted that there
56

Page 57

24 
is a high level of competition in the market at present, making recruitment additionally
challenging. In addition, due to recent changes in pension legislation, more experienced staff
are now considering retirement at some point in the future. 
In Psychological Services (Pan-Ayrshire Service), there are challenges in recruiting to specific
priority posts, including Child (CAMHS and neurodevelopmental) and Adult Mental Health in
the Community. In the past year, SG has provided additional dedicated funding to all Boards
to increase specialist Psychology provision to clear long waits and support Boards to achieve
the waiting times standard by March 2023.  Although training places are increasing year on
year, there is currently an insufficient specialist workforce to fill all vacant posts across
Scotland so there is currently a competitive workforce context and an increase in staff
movement between Boards as high numbers of new posts are being developed. 
The greatest challenge in Psychological Services has been recruiting to the established larger
services of CAMHS and AMH Community as staff have opportunities to take posts in smaller,
new, developed specialist services.
In AHP services several challenges have been identified. As in other areas, recruitment to
specialist posts is proving challenging. As a result, staff are spread thinly across the large
geographic area of Ayrshire and Arran. In addition, the current cost of fuel is an additional
concern for members of staff. The service is also impacted by high levels of staff absence and
special leave. This is also in conjunction with an increase in demand for AHP services with
inward migration to Ayrshire causing particular difficulties.
Concern was also raised by the service over adequate investment/ provision of training and
development opportunities. 
Management and Support Services
NAHSCP has several support services, working to ensure our operational delivery services can
carry out their functions effectively. These are covered across our Business Support and
Finance and Transformation services.
In our Business Support Services, we are experiencing a high level of staff turnover as
employees move onto more promoted posts in other areas, particularly to other council
services. Further, while additional staffing funding is often proved to operational service
areas across the HSCP, Business Administration is often overlooked. 
Our Money Matters service also reports recruitment difficulties for experienced welfare
rights and income advisor posts.
Across AHP and Independent Living Services, there is a lack of appropriate administration
support, meaning clinical and professional staff often have to undertake admin tasks, leading
to a detrimental impact on workloads. 
57

Page 58

25 
Financial Context
North Ayrshire IJB agreed its Medium-Term Financial Outlook (MTFO) covering the period
from 2022-2025 in March 2022. This is a critical part of the strategic planning process as it
sets out the resources which the Partnership expects to have available to deliver services. 
It assists with ensuring that these resources are aligned to the strategic priorities as well as
with annual financial planning. The financial context for the public sector remains extremely
challenging and so it is vital that our strategic ambitions are set against the financial
resources which are anticipated to be available. 
The MTFO looks at the economy, the fiscal outlook and the resource spending outlook in the
context of national policies and demand pressures and local priorities. It projects the financial
gap which will need to be addressed through service transformation and financial savings to
deliver the services which will help us achieve our strategic priorities. The Scottish
Government has published a one-year budget for 2022-23 and so the financial position for
2023-24 and 2024-25 is projected through three different scenarios – best, medium, and
worst case. The Government published it’s Resource Spending Review in Summer 2022;
whilst this is not a detailed budget it will facilitate future refresh of the MTFO. 
58

Page 59

26 
8. Workforce Projections and Future Requirements
For the purposes of this plan, a long-term analysis of staffing trends was undertaken. This
analysis also offered workforce projections over the medium term.
NAC – Social Work Workforce
For North Ayrshire Council staff, information was provided on the Social Work and Social
Work Assistant Workforce. Data provided covered the long-term period from 2008 to 2021.
Based on workforce analysis, the 3-year average workforce change was identified as 15.7 FTE
posts for Social Workers and 7.5 FTE posts for Social Work Assistants. Applying these figures
to the most recent workforce information, we are able to offer a projection of the local
workforce. For Social Workers, based on the 2021 workforce of 191.3 (FTE), this will increase
to 212.4 (FTE) by 2025. Likewise for, Social Work Assistants, we project the workforce to
consist of 86.8 (FTE) by 2025, based on the 2021 workforce of 76.8 (FTE). 
Projections by broad service area are identified in the chart below. 
212.3
86.8
0
50
100
150
200
250
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2024 2025
SW and SWA Workforce Trend and Projections
All SW All SWA SW (proj) SWA (proj)
0
20
40
60
80
100
120
Children Adults Justice Generic Children Adults Justice Generic
Social Workers Social Work Assistants
SW and SWA FTE projections
2019 2020 2021 2024 2025
59

Page 60

27 
NHS - Nursing Workforce
Further information provided also highlighted the numbers of nursing staff employed with
the Health and Social Care Partnership over the past few years. In 2022, 1,128 (FTE) nursing
staff were working across the Partnership. While historical information for the nursing and
midwifery workforce is limited (only being available since 2018), we have provided basic
forecasts calculations up to 2025. This was carried out by taking an average of the annual
workforce variance across the previous five years of data and using that average figure to
calculate a forward projection. Using this method, we anticipate the nursing workforce to
increase by approximately 29 FTE nurses each year. 
Information on the nursing workforce was also provided broken down to service area level.
While the overall demand for nurses has increased over recent years, we are seeing a
decrease in the number of nurses within the Mental Health Service. Considering the
prevalence of Mental Health concerns, and demand on service, this trend presents a
particular challenge for the Partnership, as while the number of MH nurses decreases, the
prevalence of complex mental health concerns is increasing. 
Future Requirements
In addition to the professional workforce projections outlined above, we also engaged with
HSCP Senior Management to identify the future additional workforce required for each
914 911
1027 1011 1028 10561056 1084 1112
800
900
1000
1100
1200
2018 2019 2020 2021 2022 2023 2024 2025
Nursing and Midwifery (FTE) Projections
Actual Projected
0.0 80.3 220.1
614.0
2.1 83.0 225.5
600.1
4.7 88.6
318.5
614.8
5.7 89.1
330.5
585.9
4.5 94.0
361.6 567.6
5.6 97.4
397.0 556.0
6.7 100.8
432.4 544.4
7.8 104.2
467.8
532.8
0
100
200
300
400
500
600
700
Business Support North
(Dir)
Children's Health / Care &
Justice Services North (Dir)
Community Health & Care
Services North (Dir)
Mental Health - Lead
Partnership North (Dir)
NURSING AND MIDWIFERY FTE PROJECTIONS
2018 2019 2020 2021 2022 2023 2024 2025
60

Page 61

28 
service team. It should be highlighted that these are aspirational requirements that managers
have identified to be able to effectively deliver future health and social care services,
however, it is unclear at present if these requirements can be effectively resourced.
Summary charts highlighting the required workforce are set out below. All figures are Full
Time Equivalent (FTE). The detailed requirements can be found at Appendix E. Note, that for
some services, medium term workforce requirements are yet to be identified and are subject
to both internal and external review factors, such as the AHP National Rehabilitation
Commission.
1
2
2
1
3
2
1
3
5
4
4
Band 3
Band 4
Band 5
Band 6
Band 7
Band 8
Grade 4
Grade 7
Other Officers (Grade not known)
Mental Health Practitioners
Health and Community Care - Additional
Workforce Requirements
2023 2025
13
0.8
2
5
5
16
15.5
2
4
6
5
1
2
5
7
4
2
Band 4
Band 6
Band 7
Grade 10
Grade 7
Other Officers
Social Work Assistants
Social Worker
Students
Team Managers
Children, Families and Justice - Additional
Workforce Requirements
2023 2025
8
2
4.5
21.8
2
4.6
Band 3
Band 4
Band 5
Band 6
Band 7
Other posts
AHP - Additional Workforce Requirements
2023
1
1
1
8
0.6
2
25
2
2
1
1
1
1
1
1
B4/5 Assistant Psychologists
Band 7
Band 8
MH Nurses
Occupational Therapists
Prescribing Pharmacists
Psychological Therapists
Social Workers
Specialist GP prescribers
Staff Nurse
Ward 5 (Nurse or AHP)
Service Manager
Band 3 OT Assistant
Mental Health Service - Additional Workforce Requirements
2023 2025
61

Page 62

29 
9. Our Workforce in 12 Months
To support our on-going recovery from COVID it is essential that our workforce has the
appropriate capacity and skill set to continue to deliver effective health and social care
services to the people of North Ayrshire. Over the next 12 months, we will seek to address
many of the immediate and pressing challenges on our workforce while also implementing
procedures to improve our overall approaches to workforce planning.
As restrictions ease and confidence increases, we will expect to see a full role out of Agile
working for staff across the partnership. This will mean much of our workforce will have a
flexible approach to their work location, with more people expected to return to office-based
working while still balancing working from home. 
In summary, over the next 12 months we will seek to build greater capacity across all our
services. This will include continuing to develop an experienced and skilled workforce,
ensuring we attract motivated and skilled staff to the HSCP and ensure the experience held
within our organisation is maintained and passed on. To do this we will develop clear
pathway for skills development.
We will have developed a Succession Plan approach for our workforce, to ensure we are
identifying future leaders and supporting them with appropriate skills development and
opportunities. In addition to Succession Planning, we will provide clear career pathways to
support all staff members and effective career route plan. To support both career
development pathways and succession planning, our leadership will consider the overall
management structure of the HSCP to ensure there are clear manageable career steps for
progression.
How the workforce of each of our services will look in 12 months is highlighted below.
Children, Families and Justice Services
Overall, in Children, Families and Justice Services, we will seek to build our workforce and
processes to ensure delivery of the Promise. This will include further developments in:
o Early help and intervention approaches
o Whole Family Wellbeing
o Co-located, multi-disciplinary team working
o Supporting local families address poverty
o Child protection procedures (Signs of Safety and Safer and Together)
o Trauma informed practice
To support these developments the service will need a full complement of staff within
existing resources plus further lead posts in areas such as Trauma informed work, additional
social workers and social work assistants (across each NA locality) to reduce caseloads. This
will also require additional more team managers to provide leadership and oversight.
In our Early Years’ Service, the increased complexity and vulnerabilities in families has been
noted following the Pandemic. This means an additional amount of time is now required to
support families and children in the early years. As such, additional capacity is required across
62

Page 63

30 
a range of early years teams to improve service delivery, reduce waiting lists and reduce
dependency on costly bank staff approaches to plug workforce gaps. The service will seek to
enhance capacity across the following services:
o Health Visiting
o Children’s immunisations
o School Nursing Staff
o Support worker capacity for school age children
o Peri-natal mental health services
o Creation of a ‘Dad’, support worker
The service will also develop a workforce development programme to support the retention
of a staff, support staff to develop additional skills and experience that would support their
career development within the Partnership.
In our Justice Services we will seek to enhance our Making a Difference Programme to
improve engagement with Service Users and supporting community sustainability. This
development would see the team allocated additional Project Workers and Social Work
Assistants. 
Health and Community Care
To support our developments in primary care, over the next 12 months we hope to see the
successful transfer of PCIF services (including CTAC, Pharmacotherapy and MSK
Physiotherapy) to the HSCP. This help ensure primary care services are at appropriate
capacity and resilient to demand.
To support the effective delivery of primary care services, we would also seek to enhance the
following capacity in local GP practices:
o Mental Health Practitioners
o Community Link Workers (digital navigator)
o Occupational Therapists
Recognising the shortage of local GPs to oversee and support those within the multi-
disciplinary Teams, the service – along with NHS Ayrshire and Arran – are exploring the
potential for a ‘Primary Care Training Academy’ to support training need.
In Community Care Assessment and Review, the newly appointed posts created from
additional Scottish Government Funding will be used to help to reduce waiting times for
social care assessments.
In our Care at Home Services, we will continue our recruitment drives, succeeding in
recruiting to all community care positions. This will be further supported by a review of the
Care at Home assistant role profile. We will roll out our new models of day services for older
people in North Ayrshire. To support improvements in our registered services, we will
consolidate recent inspection reports, and work with local providers to deliver improvement
plans.
63

Page 64

31 
In our Island Services, we will complete he work on an integrated hub for Arran including a
workforce plan that will be developed to support the new model of care we will deliver in the
hub which will include modelling of future demand based on an home first model utilising
overnight care on Arran (which we don't currently provide). By completing the project plan
and business case for the hub we will look at a single 24/7 rota for our bed-based services.
In our Long-Term Conditions service, we will consider the best approaches for the District
Nurse weekend workforce, to ensure safe and efficient staffing levels. We will continue to
increase our community district nursing resource in order to develop pathways and new
models of care. In the ward environment, we aim to increase the number of Band 3 HCWS as
part of band 2 review. We will also develop dedicated CNM support for community services.
The service will also build in 22.5% contingency within community nursing, to support Annual
Leave, Sickness Absence and study leave. 
Mental Health, Learning Disability and Addictions
In North Ayrshire, Drug and Alcohol Recovery Services will respond to both local and national
priorities including delivering on the Medicated Assisted Treatment Standards, non-fatal
overdose, developments in Housing First approaches, and enhanced Dual Diagnosis support. 
The workforce will adopt a hybrid approach to working, including at home, base and
community venues. The NADARS workforce will be fully flexible and adaptable to changing
priorities. The service will also be supported by a robust Information Management and
Technology (IM&T) in place to support them
The Community Mental Health Team (CMHT) will develop the appropriate capacity to meet
growing local demand. It is anticipated that a portion of demand on the CMHT will be
addressed through the effective resourcing of Mental Health supports in primary care MDTs
across North Ayrshire. Despite this positive development, on review of current caseloads,
current capacity within the team will still not meet growing demand for service. As such,
additional capacity is required. In recognising recruitment challenges for qualified Mental
Health workers (with many posts expected to take up to a year to fill), the service will
consider new advanced/ enhanced roles and different ways of working. 
In Psychological Therapies, the service will recruit to established vacancies and utilise all new
dedicated Scottish Government funding. Recruitment to these posts will help to reduce
waiting lists across mental health services, particularly in areas with the longest waits, such as
CAMHS, Community Paediatrics and AMH Community. The service will use new Scottish
Government funding to expand Psychology services in established clinical areas where there
is recognised unmet need (for example, Addictions, Older Adults, Acute services).
The service will seek to increase the capacity of the senior Psychology Leads team to ensure
appropriate leadership of our expanding service, including, Perinatal, Infant MH, Eating
Disorders, In-patient, Children and Young People Medium Secure/Foxgrove, provision to
Acute - ICU/post-Covid.
64

Page 65

32 
Allied Health Professionals
Our AHP service will seek to enhance the support it provides across all service areas.
Over the next twelve months, the services priority will be to recruit to vacant posts, and to
work with partners across the system to maximise the capacity and impact of AHPs.  
We will seek to improve access to those services where waiting times are currently most
challenging, and to resume any services that remain paused post pandemic, and still have
relevance in our new context.  
We will continue to make greatest use of additional funding opportunities.  
We will progress work to ensure efficient pathways and processes, to maximise registrant
time and capacity.
We will continue work to better understand how the current AHP workforce aligns to the
delivery of safe, quality care. 
The service will continue to place focus on staff wellbeing and development, with increased
focus on ensuring all AHP staff have access to regular supervision 
Management and Support Services
While embracing our new ways of working, our Business Support Services will consolidate our
support services to ensure a more consistent approach to service provision across all
partnership services. In addition, Business Support will also develop and implement a
Personal At-Risk Distribution System (PARD). This system will improve our workforce’s ability
to identify and respond to the most vulnerable local people in the event of local or national
emergencies. A review of the function of Moving and Handling/CALM Team will also be
undertaken to increase capacity to better support training to frontline staff members.
In our Finance Section, we will require to monitor the workload demand of the Financial
Intervention Team. While there are currently no plans to increase staff numbers, this may be
reviewed in caseload increases to a point where there is a potential risk to service users and
families in terms of not being able to access services. Due to the current profile of the
Finance Section, in terms of team members close to retirement age, the section would seek
to benefit from a succession planning approach.
Across AHP Services and Multi-Disciplinary Teams, we will seek to enhance administrative
support capacity to services. This will include, generic administration support, IT system
support and production of monthly management reports. This support will free the capacity
of service managers and team leads to focus on clinical duties and leadership.
65

Page 66

33 
10. Our Workforce in 3 Years
By 2025 we anticipate our North Ayrshire Workforce to have developed appropriately to face
the local health and social care demands of local people. Our teams will be appropriately
staffed and resourced and have a clear understanding of their purpose.
North Ayrshire HSCP will be recognised as a great place to work, as we demonstrate our
commitment to investing in our people, enhancing their skills, and supporting them to build
long and meaningful careers within the Partnership. 
We will continue to prioritise the wellbeing of our workforce and provide a range of options
to ensure our staff are supported and motivated to thrive in their roles.
What our workforce will look like across each of our service areas is highlighted below. 
Children, Families and Justice Services
Across Children and Families Services we will effectively deliver on the Promise for children
and young people. We will have developed a workforce that is able to respond effectively to
the needs of local children and families at the earliest possible stage and provide more
intensive support to those who need it.
In our Early Years’ Service, we will have additional Health Visiting capacity in our most
vulnerable communities in-line with wealth of robust evidence around the impact high
quality health visiting services has on children's outcomes.  
We will have secured recurring SLA funding for student Health Visitor placements, supporting
students in there learning and supporting them to choose a career in North Ayrshire. We will
have developed an Improved skill mix within the School Nursing team to meet the needs of
the school nursing pathway and to support models of whole family support.
We anticipate our Child Immunisation Team may undergo further developments as a result of
the Current Public Health Immunisation review. 
By 2025, in Justice and Intervention Services we will have realised the following workforce
developments:
o Consolidated a robust process for the electronic monitoring of Bail and will have
developed a staffing group to support this.
o Developed, consolidated, and enhanced our Making a Difference Project to improve
Service Users engagement, support community sustainability and reduce the length
of time involved in statutory services. Increase in referrals to Making a Difference.
o Consolidated and enhanced our early intervention and preventative approaches
through development of the Family Centred Wellbeing Team.
o Restructured and appropriately staffed the Service Access Team, responding faster,
robustly, and proportionately to high numbers of referrals and complex cases. This
will reduce referrals onto other statutory services.
66

Page 67

34 
o Established a robust team of Recovery Development Workers/ staff with lived
experience complimenting the work across our services and developing strong links
with community resources and services.
Health and Community Care
By 2025, we will continue to develop and enhance our Primary Care Services, attracting the
required workforce across all MDT in our localities. This work will complement the
development of the Caring for Ayrshire programme and its associated property improvement
programme.
On Arran, we will have established a Single point of contact for all people on the island to
access Health and Social Care Services. Our Home First Model will be in place with enhanced  
overnight care provision, supporting vulnerable people to be cared for at home or in a
community setting. The established Multi-Disciplinary Team will be supported by an
additional Advanced Nurse Practitioner in complex care/frailty cases. 
There will also be a full Business case completed to support the build of an integrated hub on
Arran.
In Community Care, our registered services have improved on Care Inspectorate Gradings
following support and joint working with HSCP services.  To support staff, we will have in
place an online training portal and learning and development opportunities for the
Community Care workforce to support staff development and career progression.
Over the next three years, we will provide a specific focus on the development of the
Partnership's Reablement service, ensuring capacity and skillset is within the service to
support our strategic commitment to care for people back to health at home or at least in a
local community setting.
By 2025, our Long-term Conditions service we will deliver our service and any operational
changes in line with the recommendations from the forthcoming Community Nursing Review. 
The service will also be prepared for the handover of the Community Treatment and Care
Service.
Over the next three years, the service will also consider the feasibility of the development of
an outreach service for stroke and general rehabilitation
Mental Health, Learning Disability and Addictions
In our Drug and Alcohol Recovery Service, we will have the capacity in service to respond
quickly to the needs of local service users, meeting all established local and national
standards and targets. The workload and capacity of the service will be closely monitored,
and any additional resources will be identified and allocate quickly.
By 2025, we will have developed a new Primary Care Mental Health Service and are able to
attract qualified and experienced individuals into these roles. This service will work closely
with other Community Mental Health Teams and acute mental health services, to address
the demand on local mental health services.
67

Page 68

35 
In our Psychological Therapy service, we will continue to build on the developments as
identified over the next 12 months. However, in addition, we also endeavour to consolidate
the service areas that are currently being developed over the next 18 months. This also
includes a further expansion into new Scottish Government clinical areas such as
Neurodevelopmental across the lifespan, MHS in Primary Care, and Early Intervention in
Psychosis.
Allied Health Professionals
Over the next three years the service will undertake an AHP workforce review and
Rehabilitation Commission exercise, to better understand service capacity against demand.
This work will help the service identify appropriate actions to improve, which may include re-
modelling AHP service provision.
We will continue to have a strong contribution to practice based learning, offering
placements to pre-registration students, and influencing the national agenda around AHP
workforce and education for the future. 
The direction of travel for AHPs over the next three years will be increasingly to provide
universal and targeted interventions; taking a population health, consultative approach to
ensure earlier access to support when required, with a focus on prevention and self-
management.  In parallel, we will progress plans to support timely access to specialist
services when this is indicated and continue to work as part of multi-disciplinary teams in
progressing the wider partnership agendas – for example concerning the review of the eating
disorders service, the commencement of the national Foxgrove services, the enhancement of
community rehabilitation and primary care, and our contribution to early years services. 
In this way, and over the lifetime of this plan, our Allied Health Professional Services will
continue to work collaboratively with partners, to embed improvements across all service
areas of the Partnership, and to maximise the reach and impact of AHPs. 
Management and Support Services
In our Finance Section, there is a stable workforce with effective skills development and
succession planning in place to ensure the team is always at capacity and skills and
experience are maintained within the team.
In Business Support services, we will have function centralised support service that provides
effective administration and clerical support across the Partnership. Following a feasibility
investigation, the service will also consider creating a centralised Minute Taking team for
provision across the HSCP. 
We will have created a Community Hub for Occupational Therapy Services, which will
manage all service referrals and administrative support for the service. 
68

Page 69

36 
11. Third and Independent sector workforce
To gather a better understanding of the workforce of Third and Independent organisations in
North Ayrshire, a survey was distributed by our TSI partners. A total of 26 surveys were
completed from across Independent, Voluntary and Third Sector organisations. Of those who
responded, 23% were from the independent sector, with the remaining 77% from third and
voluntary sector organisations. 69% of respondents are commissioned to provide services for
North Ayrshire Health & Social Care Partnership, with 58% of all respondents having their
own workforce plan in place.
Services provided
The respondents provide a range of services as outlined below, with the majority (54%)
offering care services, either in a residential setting or within the home and community. The
balance of respondents offers community-based support services, either in a more
specialised and formal way, often with a focus on early intervention, or through informal
activities and community groups.
Services Provided % Respondents
Care Sector (including Care at Home / in the community & residential) 54%
Specialist Community Support Services (offering for example counselling,
training, or more formal mental health inputs etc)
19%
Community Support Services offering activities to support wellbeing and
mental health (such as befriending, group activities etc)
27% 
Localities covered 
50% of the respondents operate in all
localities in North Ayrshire, with 35% only
operating in 1 locality, 8% in two localities,
the remaining 8% operating in 3 or more
localities. Of those not operating across all
localities, the Three Towns has the biggest
representation at 23%, with the Garnock
Valley and North Coast and Cumbrae
following. 
Respondent organisation headcount 
Of the organisations and groups who
responded, 52% have fewer than 10 staff,
with 1 having no paid staff at all and only
16% have more than 100 staff. 27% of the
respondents are heavily reliant on
volunteers to allow their service to
operate, as well as funding for their paid
posts.
13
5 3 4
0-10 11-25 26-100 100+
COUNT OF ORGS
HeadCount
5
2 3 4
8
13
Garnock
Valley
Irvine Kilwinning North
Coast
Three
Towns
All North
Ayrshire
COUNT OF ORGS
Localities Covered
69

Page 70

37 
Due to the variety of organisations and the type of support services offered, the findings have
been split between Independent Sector (mostly offering Care at Home, in the Community or
residential) and the Third / Voluntary Sector, mostly offering more targeted support and
activities linked to early intervention, reducing social isolation, and improving mental health
and wellbeing.
Key Workforce Challenges 
Care Sector
Staff retention and recruitment
The pandemic has had a massive impact on the care sector nationally, with staff experiencing
burnout and stress due to the undue pressure they have been under. Staff sickness rates are
high, and some have gone without annual leave for lengthy periods, as well as having to work
overtime to cover rotas due to vacancies and absence. This results in frequent rota changes
and operational pressures in trying to manage capacity and demand. 
Social care jobs nationally are not being recognised as a profession but should be, and they
should remunerated accordingly. Independent sector organisations have highlighted that
there is a lack of parity on rates of pay and terms and conditions, causing many staff to
migrate to work with statutory services or other providers.  Organisations have reported that
the commissioned rates for services make it very difficult to operate on a level playing field.
Recruitment is in crisis and extremely labour intensive for many organisations who are seeing
increased numbers of no shows at interview and when at final offer stage, due to being
offered other opportunities.  Some organisations are bypassing the usual pre offer protocols,
such as taking up references, to get offers out faster. This may present risks to service
delivery and service users in the future if appropriate employment checks are not carried out.
Part time work is in much less demand due to the current economic climate.  This is making it
more difficult for organisations to service packages of care efficiently.
There is also an ageing workforce in social care, many of whom were deemed to be at risk
during the pandemic themselves and as such, were leaving the profession or choosing to
retire early.  Attracting nurses to nursing care roles is also particularly challenging which is
leaving service gaps in more specialised care packages.
Staff training and development
Staff training and development opportunities have been restricted only to statutory
requirements. Government employment schemes that are available to subsidise employers
to take on and train staff cannot be accessed by most of the care providers.  There is a
minimum requirement of 35 hours per week, which is not necessarily feasible when someone
is being recruited, as they are usually linked to packages of support and their hours may only
increase over time. There are also barriers from the Care Inspectorate about taking on
trainees.
Rural care packages
70

Page 71

38 
Staffing care packages in the Garnock Valley and other more rural locations is exceptionally
challenging due to travel time and associated costs, which are not funded, as well as the
efficiency challenges this causes at a time when resources are under immense pressure.
It has been reported that there has been an increase in Social Work requests for
organisations to take over packages of support that are deemed to be in Crisis, often where
another provider has given notice to end their service provision due to staffing or feasibility
issues.  This can result in service users potentially being left without any support for extended
periods.
Providers that are not part of the HSCP commissioning framework are only able to offer
support under an Option 2 agreement, which requires the carer to have guardianship in place
to make this decision and sign the agreement on their behalf, slowing down the process of
putting care packages in place. 
Community Groups / Third Sector
Accessing ongoing funding for more than one year to allow sustainability of projects is a key
challenge for the majority of third sector organisations and directly links to their capacity to
support people. Short term funding impacts on recruitment and retention of staff. More
opportunities to be commissioned to provide their service via the local authority would be
welcomed. 
Recruitment of volunteers is also difficult. Most of these groups and organisations were not
able to operate fully throughout the pandemic and regular volunteers fell away. Encouraging
people back to volunteering, following a return to a more normal service, has proved difficult. 
With the current economic climate and rising cost of living and petrol especially, people are
more reluctant to volunteer, even if they are being reimbursed some of their travel costs. The
mileage allowance for volunteers and staff has not been reviewed in line with the rise in
petrol costs. 
Current Service Gaps
The recruitment and retention crisis within the social care sector has led to a significant gap
in capacity for existing clients and new referrals requiring service provision. Many
organisations are still operating below core headcount requirements, limiting availability for
new contracted care packages.
Community and Third Sector organisations are highlighting the gap in provision for people,
especially older people, and whole families, requiring support. Often where they are not in
receipt of statutory services, even though they might previously have been entitled to it.
Some organisations feel it may be due to the pressure on social work teams managing their
referral pipeline or the increase in eligibility criteria restricting access.
71

Page 72

39 
Community groups also reported challenges in finding suitable venues for activities that they
can afford, in addition to challenges around promoting services and targeting the right
people most in need. Many of these groups lack the administration and social media
knowledge or personnel to optimise awareness. 
Short Term Ambitions
Care Sector
Ultimately, the aim of the independent care sector is to provide good quality care, with
sustainable high service standards. 
The short-term ambitions are centred around stabilising the workforce and promoting a
better work-life balance. This will be achieved by increasing management capacity, improving
staff retention, building an adequate compliment of relief workers, and removing reliance on
overtime and cancelling annual leave to meet capacity demands. Innovation is seen as key, as
is engaging with supported people to help review and develop more creative approaches to
services, staff development and training opportunities, which will allow expansion to meet
the capacity demand for new referrals. 
Some respondents are keen to identify and explore opportunities for more partnership
working with community support services to enhance the service offering and one
respondent is looking to become an accredited SQA centre.
Community Groups / Third Sector
For community groups and the third sector, short-term ambitions centre around the
sustainability of existing projects and developing new initiatives, with securing funding to
enable the employment of more paid workers, thereby reducing the reliance on volunteers,
being a priority. 
Other priorities include: 
Creating lasting connections for people within their communities and continuing to expand
the services offered, responding to challenges people are facing, ensuring they are offered
support and advice as needed.
Looking at ways to increase the number of trained volunteers in the sector, as well as
identifying ways to help volunteers progress to paid employment, should they wish.
Looking at new ways to promote the services and connect with people needing help,
increasing the visibility of projects within community settings. 
Headcount Impact of Short-Term Ambitions 
Of the 26 respondents, although the majority indicated that additional staff would be
needed, only 12 were able to provide an estimate of the potential short-term headcount
72

Page 73

40 
implications. Many organisations said that it was too soon to tell. Of those who responded,
the average headcount increase was 3.5 FTE, in addition to an increase in volunteer numbers.
Primary Risks of Failing to Develop the Services Offered
Within the care sector it was identified that existing capacity may not be sustainable, let
alone growth to meet increased demands. If there is no opportunity to focus on strategic
planning and innovation, this could further exacerbate staff attrition and gaps in service
provision.
Within the Voluntary and Third sector it was clear that if longer-term funding cannot be
sourced, organisations and services would disappear completely.  This would result in an
increase in loneliness and isolation within communities in North Ayrshire and would
undoubtedly put statutory services under greater pressure at a time when they are already
stretched. 
Key Developments in next 3 years
Within the care sector there is an ambition to work towards developing a more person-
centred approach, increasing involvement of service users and families in the service design
process. Building robust and collaborative relationships with the HSCP, especially
commissioning and social work, looking at opportunities to expand the supported
accommodation model, as well as creating a hub for meaningful opportunities to be
experienced out with the traditional day service model, is also a priority. A further increase in
contract rates from the HSCP to allow for greater wage parity, improved conditions and
training has also been identified as fundamental.
Within the Voluntary and Third Sector, many have identified that they struggle to plan 3
years out due to the short-term nature of funding, resulting in a reactive approach. There is a
desire to increase visibility and the service provision within the Garnock Valley and Island
Communities, as well as looking at ways to focus more on early intervention and new referral
pathways. 
Headcount Impact of 3-year goals
Most respondents commented that they were not able to determine headcount implications
at this time.
Risks of failing to deliver 3-year goals
The risks are very similar to those highlighted already. It is very evident to see the significant
impact and value that the Third and Voluntary Sector offers to the communities they operate
in. There is a real risk of these organisations disappearing entirely, leaving significant gaps in
the communities of North Ayrshire, which will result in an increase in social isolation,
loneliness, and mental health problems - and reduce the amount of choice available for
people in need. All of this will put severe and undue pressure on statutory services that are
already struggling to cope with the demands on them. 
73

Page 74

41 
12. Supporting Wellbeing
Maintaining the positive wellbeing of our staff is a priority for the Partnership. When people
have high levels of wellbeing at work, they are happier, more motivated, and more likely to
thrive in their daily role. Alternately, when wellbeing is, low, people may become more
anxious about work that may negatively impact their ability to undertake their duties. As
highlighted previously, staff wellbeing is currently a key challenge for our workforce,
particularly following on from the impact and uncertainty of the Covid-19 pandemic.
What affects our wellbeing
Feedback from HSCP managers indicated several factors they recognised that has negative
impact on the wellbeing of staff. Many of the negative factors identified can be seen as a
direct result of the pandemic, with senior managers highlighting that staff members are still
concerned over the health risks of returning to the workplace. Alternately to that, the impact
of continued home working has also had a negative impact on staff, who have reported
feelings of isolation and alienation from the workplace. There is also a concern that staff
groups have lost some measure of their resilience due to uncertainty created during the
pandemic, and this may be in part due to the lack of peer support in agile working conditions.
Other negative factors which have been exacerbated by the pandemic include the impact of
long-term absences on the workforce, and the subsequent increase in workloads for the
remaining workforce. It is widely recognised that our workforce has risen to the challenge of
the pandemic, however staff are now facing the prospect of unmanageable workloads. In
addition to being unsustainable in terms of service delivery, the high workload levels lead to
staff not prioritising their own wellbeing, with many thinking they simply do not have the
time to take care of themselves.
In some areas, due to shortages of relevant staff resources (e.g. admin and clerical), officers
and practitioners often have to divert their time away from service delivery to undertake
administrative tasks. This can lead to anxiety in staff as they feel they are not doing their ‘day
job’ effectively.
Other factors identified that negatively impact on staff wellbeing include:
o A lack of adequate rest areas for staff in the workplace. No areas for staff to take
effective time out from their day to focus on their rest and wellbeing.
o It was also suggested that many staff groups feel that their hard work over the past
few years has been unrecognised by management and senior leaders.
o Concern was also highlighted about the continued separate terms and conditions for
staff within the partnership, depending on the employing body. 
Improving our wellbeing
To address concerns over wellbeing and to support a positive working group, the HSCP has
several programmes, services and approaches in place for our workforce. These supports are
74

Page 75

42 
both formal services available to staff, and informal approaches used at the team and
individual level. 
During the pandemic, the HSCP quickly established Staff Wellbeing Support hubs across
several sites in North Ayrshire. These hubs provided a place of respite for staff members,
where they could access wellbeing advice and support from trained colleagues. 
Learning from this staff hub approach, other services have also provided spaces for staff
members to participate in listening and reflection sessions. Senior Managers have underlined
the need for staff interaction and peer support, staff being encouraged to have informal
catch ups and “team blethers”. Some teams have prioritised 10 minutes in each day to take
time-out for brief well-being activities. Other members of staff enjoyed organised wellbeing
and fitness challenges, such as the ‘step-challenge’, held regularly in North Ayrshire.
Making best use of available funding, the Partnership have made wellbeing grants available
to staff groups, affording colleagues the opportunity take time away from the workplace on
much needed wellbeing activities. Teams can identify their own activities, with some
choosing to access wellbeing retreats, mindfulness sessions and spa days, while others have
chosen more traditional team exercises such as fun days out, escape rooms, or going for a
mean together.  
Feedback from managers and team leads has also identified the fantastic support provided
from Human Resource, Occupational Health, and Trade Union as a strong element to help
improve and maintain staff wellbeing.
In terms of Work/Life balance, several new policies and working practices are supporting the
wellbeing of our workforce. The roll out of agile working and greater flexible working
approaches have benefitted many staff members. The opportunity to work from home on a
more regular basis has had a positive impact on many members of staff. A positive side effect
of the agile and flexible working arrangements is that staff feel more trusted by HSCP
management. What has also been reported as useful is automatic prompts from email
systems for those working at home, reminding them not to send emails out of hours, support
staff to retain that work / home split.
The special leave policies of both the NHS and NAC provide additional support to many
members of staff in the advent adverse events (such as needing to take emergency or
parental leave). More staff are also taking the opportunity to compress their working week to
be provided with an extra day off. This is a recent development within the NHS (but has been
available in NAC for many years).
Staff are also being encouraged to make full use of their annual leave and to try to plan their
leave well in advance to make sure it is taken. 
Going forward, North Ayrshire HSCP will learn from the good practice of the past in
supporting staff wellbeing and continue to ensure the wellbeing of our workforce is
prioritised over the lifetime of this plan.  
75

Page 76

13. Our Workforce Action Plan
To build the workforce that is needed to meet our identified current and future demands we have identified several key actions that we will
progress over the next 3 years. These actions will help us to create the workforce necessary to provide effective care and support to all those in
North Ayrshire who need it.
We have aligned our actions to our five workforce priorities. 
Understanding our Workforce (NWS Pillar – PLAN)
No# Action Desired Outcome Completion Date Service Area
01.01 Service leads will meet with HR
representatives on a quarterly basis to
review and inform workforce plans
Heads of Service and Service leads have a
clear overview of the current workforce,
service demands and future planning
requirements 
Mar 2023 (on-
going)
All
01.02 Review the suite of workforce
information available to partnership
leaders and managers. 
The workforce information we have is up to
date and accurate and contains all relevant
workforce metrics to support decision
making. 
Mar 2025 Finance and
Transformation
01.03 Develop an enhanced suite of workforce
reports to be cascaded to all Team
Managers.
Workforce planning is embedded in teams
across the partnership, supported by
meaningful workforce reports containing
team specific workforce information. 
Mar 2025 Finance and
Transformation
01.04 Develop a focused workforce plan for the
integrated hub on Arran supporting the
new models of care.
Workforce plan will set out the future needs
and staffing requirement for the Integrated
Hub on Arran 
March 2023 Health and
Community Care
76

Page 77

44 
01.05 Participate in the Allied Health
Professional (AHP) Workforce
Commission
The Commission provides clear
recommendations for the future
development of the AHP workforce 
March 2025 AHP
01.06 Continue to work closely with local
independent and third sector providers to
identify workforce challenges and
opportunities 
We have a strong understanding of the third
and independent sector workforce in North
Ayrshire and work together to strengthen the
sector.
March 2025 Contracts and
Commissioning     
Promoting our Organisation (NWS Pillar – Attract)
No# Action Desired Outcome Completion Date Service Area
02.01 Engage with education colleagues (LA,
FE and HE) to support the promotion of
the wide range of careers available in
Health and Social Care in North Ayrshire
HSCP 
The HSCP is well promoted across all
educational institutions in North Ayrshire and
the benefits and opportunities of a career in
Health and Social Care are widely recognised
March 2025 All
02.02 Engage with education colleagues (LA,
FE and HE) to support the promotion of
Health and Social Care courses. 
Seeing a career in Health and Social Care as a
meaningful opportunity, people are
encouraged to uptake relevant health and
social care related courses and will see
NAHSCP as an employer of choice when they
graduate
March 2025 
02.03 Continue the delivery of locality-based
recruitment events for Health and
Community Care. 
We actively attract people to available
vacancies in the HSCP, offering meaningful
employment in people’s own communities.
March 2025 Health and
Community Care
77

Page 78

45 
02.04 We will create/identify a calendar of
wider job fairs and recruitment events
ensuring HSCP representation. 
HSCP services are aware of all local
promotional events and actively promote the
partnership as a fantastic place to work.
March 2025 
02.05 We will create clear career pathways for
potential and existing staff to highlight
possible career progression routes and
promotion possibilities. 
All staff within the HSCP will be aware of
their career development and progression
prospects.
North Ayrshire HSCP will be known as an
organisation that offers excellent career
development opportunities for potential
staff. 
March 2025 All
02.06 All posts created and advertised, will be
highlighted for their professional and
career development opportunity and for
their value in supporting the HSCP. 
Future applicants for HSCP vacancies will be
aware of the development and career
potential the post will bring. 
March 2025 All     
78

Page 79

46 
Investing in our People (NWS Pillar – Train)
No# Action Desired Outcome Completion Date Service Area
03.01 Publish and Implement Learning and
Development Strategy for all Health and
Social Care Partnership Staff. 
The HSCP has in place a clear Learning and
Development Strategy that supports the skills
development of the workforce. 
Apr 2023 Social Work, Standards,
Practice and Governance 
03.02 Explore feasibility of developing a ‘Primary
Care Training Academy’
Staff within primary care multi-disciplinary teams
have all their training needs support in the
absence of the traditional GP-led approach. 
Oct 2023 Health and Community
Care
03.03 Develop and implement a Universal Early
Years (UEY) Staff Development Programme
Universal Early Years staff have a designated
development programme that builds experience
and upskills team members effectively.
The knowledge base with the UEY team is
retained and passed on to newer team members.
Oct 2023 Children, Families and
Justice Services
03.04 Support staff members: encourage and
support to access Social Work degree
courses and SVQs
We have invested in the development of our
staff, and created ‘home-grown’ social
workers.
Beneficiaries will consider NAHSCP their
employer to continue their career. 
March 2025 Social Work, Standards,
Practice and Governance
03.05 Actively promote the completion of
Personal Development Reviews/ Our
Time To Talk on an annual basis to
support staff development.  
All staff have a clear understanding of their
role and responsibilities and have their
training needs identified and reviewed on a
regular basis.
Oct 2023 All
03.06 Develop an online training portal for
Community Care Staff 
Community Care Staff have an easy to
access training and advice portal to support
their skills and professional development.
March 2025 Health and
Community Care
79

Page 80

47 
Offer GP trainees, GP WSI opportunities
to remain in North Ayrshire
Increase GP/ Specialist Support in Primary
Care
March 2024 Primary Care 
Continue Wellbeing programme for Staff All staff across sectors can attend wellbeing
activities to enhance their wellbeing
March 2024 Business Support     
Build our Workforce (NWS Pillar – Employ)
No# Action Desired Outcome Completion Date Service Area
04.01 Continue all recruitment drives for Care
at Home Services 
The Care at Home service is maximised with
little to no vacancies across all localities
On-going Health and
Community Care
04.02 Review the role of Care at Home
Assistant.
A revised role profile will attract a greater
volume of applicants to care at home
vacancies.
Oct 2023 Health and
Community Care
04.03 Utilise the NAC Modern Apprenticeship
Scheme, offering young people (under
20) the opportunity to start a career in
Health and Social Care with NAHSCP
We provide meaningful career and learning
opportunities for school leavers and young
people in North Ayrshire.
Through these opportunities, young people
will build a long-term career within health
and social care in North Ayrshire 
March 2025 All
04.04 Utilise the NAC Graduate Scheme,
offering recent local college and
university graduates the opportunity to
start a career in Health and Social Care
with NAHSCP
We provide meaningful career opportunities
for recent graduates from North Ayrshire.
We will achieve the mutual benefit of
employing fully qualified individuals into
appropriate roles and encouraging new
graduates to build a career within health and
social care in North Ayrshire 
March 2025 All
80

Page 81

48 
04.04 Contribute to on-going review work by
NAC HR Resources to improve the scope
of platforms/methods to advertise vacant
posts.
North Ayrshire Council and the HSCP has an
enhanced range of methods and platforms to
advertise vacant posts to ensure maximum
distribution
Mar 2025 NAC Human
Resources 
Continue to expand Primary Care MDT
Teams
Support for GP practices and communities
from MDT Teams
March 2023 Primary Care     
Developing our People (NWS Pillar – Nurture)
No# Action Desired Outcome Completion Date Service Area
05.01 Develop a staff Health and Wellbeing
Programme to include:
▪ Online mindfulness training
▪ Opportunities to access a range of
activities
▪ Commission psychological wellbeing
workshops
We have improved the wellbeing of our staff and
our staff are active in maintaining and improving
their own mental and physical well-being.
Oct 2023 Business Support
05.02 Develop a ‘Succession Planning’
guidance/toolkit for the Partnership.
Potential future managers and leaders are
identified and provided key development
opportunities to prepare them for future roles in
leadership positions
Oct 2023 Finance and
Transformational
Change
05.03 Monitor the roll out of ‘Agile Working’ across
impacted work groups to ensure positive
wellbeing benefits are realised.
Staff have fully adopted agile working procedures
and are confident in balancing their work from
home with location-based working.
TBC Business Support
05.04 Develop a ‘career pathway’ guidance for all
staff, to highlight possible career progression
routes for the NAHSCP workforce.
All staff will have the information available to
make informed choices about their future career
development
TBC All
81

Page 82

49 
05.05 Review the management and governance
structure within the partnership, considering
all levels of management.
The Partnership’s management structure offers a
stepped pathway as people progress in their
careers.
March 2025 PSMT/Heads of Service     
82

Page 83

North Ayrshire
Health and Social Care Partnership 
14. Appendices
Workforce Plan 2022-25 
Appendix 
83

Page 84

51 
Appendix A - NAHSCP
North Ayrshire Health and Social Care Partnership Services
The information below highlights the range of services delivered by the North Ayrshire Health
and Social Care Partnership.
Partnership Services
Most of our services are delivered in collaboration between North Ayrshire Council and NHS
Ayrshire and Arran. Our service delivery teams include Allied Health Professionals (dieticians,
physiotherapists, occupational therapists, speech and language therapists), addictions
workers, care at home, care homes, child immunisation, community alarm and digital health,
community link workers, welfare rights officers, nurses (including specialist nurses), paid
carers, psychologists and psychiatrists, social workers (across all age groups) and social work
assistants, residential adult and childcare staff and volunteers in
a range of teams. In many services, we also have peer support workers, who are
staff members with lived experience of services. 
In addition, dentists, GPs, optometrists, and pharmacists (primary care professionals) 
work together with us. We also work closely with the Third sector, the Independent 
Sector, Housing Services, NHS acute hospitals, Alcohol and Drug Partnerships, the 
other Ayrshire Health and Social Care Partnerships, Police Scotland, local councillors 
and many others. 
To ensure our service delivery and frontline services are able to do their job as best they can,
our Business Support Services work to provide essential clerical, administration and technical
support. Business Support plays a key role in supporting the wellbeing of all Partnership staff,
providing guidance on health and safety, wellbeing at work and supporting staff attendance. 
Our Finance and Transformation service provides key strategic support for the Partnership.
The service oversees the Partnership’s funding allocation, manages how we commission and
procure services, undertakes our planning and performance function, and leads on our key
transformation and change projects. 
In delivering effective health and social care services, we appreciate many things are out with
the scope of either the NHS or North Ayrshire Council to achieve. That is why our partnership
includes representation from the Third Sector Interface and from the local independent
sector. 
North Ayrshire Third Sector Interface
Third Sector Interface (TSI) North Ayrshire provides a single point of reference for all third
sector organisations and community groups. TSI North Ayrshire is best placed to support the
84

Page 85

52 
development and growth of local voluntary services that can provide invaluable health, care
and wellbeing support for local people. The TSI North Ayrshire’s vision is of improved quality
of life for the people and communities of North Ayrshire by building a strong, effective, and
sustainable Third Sector.
In North Ayrshire, the TSI is a partnership made up of Arran Community and 
Voluntary Service (Arran CVS) and The Ayrshire Community Trust (TACT). 
Both organisations have a long history of engaging with the local community, 
volunteers, community organisations and service providers.   
Independent Care Sector
The independent sector in Scotland provides a wide range of care services for older people,
those with long term conditions, learning disabilities, physical disabilities, dementia or mental
health problems. 
Working together, we endeavour to meet the increasing local demand for community based
social care services. This includes: 
• Independent Care Home Provision
• Delivery of Care at Home Services 
Our independent care colleagues work closely with HSCP staff to meet our health and social
care vision for the people of North Ayrshire and there is independent sector representation
on the Integration Joint Board.  
85

Page 86

53 
Appendix B - Aligning and Defining our priorities
In defining the workforce priorities for NA HSCP we reviewed the approaches of our parent
organisations, North Ayrshire Council and NHS Ayrshire and Arran. In aligning these
approaches, while still considering the five pillars of workforce planning, we identified five
local priorities. 
How our Priorities Align to NAC and NHS Approaches
HSCP Workforce
Priorities
National Workforce
Strategy Pillars
NAC Skills Pipeline NHS Ayrshire and Arran
Workforce Plan
Understanding our
workforce
PLAN 6 Steps Approach
(Define, Map,
Identify,
Understand,
Develop,
Implement)
Ensure workforce is
affordable and
sustainable
Promoting our
organisation
ATTRACT Attracting our
future Workforce
Improve the image of NHS
A&A as an attractive
employer
Investing in our people TRAIN Developing our
Talent*
Deliver an effective
people strategy
Building our workforce EMPLOY Recruiting
Employees
Implement improved
businesses process to
improve the utilisation
and deployment of the
workforce
Growing our people NURTURE 6 Steps Approach
(Define, Map,
Identify,
Understand,
Develop,
Implement)
Support the health and
wellbeing of staff
Understanding our
workforce
PLAN Attracting our
future Workforce
Ensure workforce is
affordable and
sustainable 
Defining our Priorities
Understanding our Workforce: To effectively develop our workforce to meet the current and
future health and social care needs in North Ayrshire, it is vital that we have a high level of
insight into our current staffing structures and both current and future demands of our
service. We will make best use of our workforce and staffing information, ensuring it is
available at all levels of the partnership. Through aligning our understanding of our workforce
to our performance information and strategic needs assessment, we can better scope future
need and plan our future workforce more effectively.  
This maps to the Scottish Government pillar of PLAN
86

Page 87

54 
Promoting our Organisation: We hope to promote the positive image of working in North
Ayrshire Health and Social Care Partnership. The HSCP can offer a range of employment
options and has need for range of skills, specialities and qualifications. We will promote our
organisation as a great place to work, a place that will value its staff, providing excellent
opportunities for development and enhancement. This promotion will focus on: 
▪ Existing health and social care professionals, who will see North Ayrshire HSCP as a
place to build or further their career
▪ School pupils and college/university students, encouraging them to consider a career
in health and social care
▪ Local people, through our various recruitment drives
This maps to the Scottish Government pillar of ATTRACT
Investing in our people: To ensure we continue to deliver the highest levels of health and
Social Care Services, we will ensure our staff have the skills and experience needed to
undertake their roles. We will ensure that all professional qualification and accreditation is in
place and that staff are provided with appropriate training and development opportunities. 
This maps to the Scottish Government pillar of TRAIN
Building our workforce: We have recognised that, in the face of both the local and national
health and social care landscape, our workforce will need to change and adapt to ensure that
we can achieve our vision for the people of North Ayrshire. We will use appropriate methods
to grow our workforce. We will seek to employ a variety of methods and mechanisms to
promote our vacancies to ensure as wide a distribution as possible. We will consider our
application and interview processes to ensure they are accessible to all, and those who
require additional supports to work within the HSCP are provided with them.
This maps to the Scottish Government pillar of EMPLOY 
Growing our people: In aligning with our other ambitions for our workforce, we hope to be a
caring workplace that helps to support and maintain the positive wellbeing of our staff. By
providing a supportive and nurturing working environment, we hope our staff will be happier
in their day to day roles and motivated to deliver the best services they can.
We will provide our workforce with greater career planning options, highlighting how each
individual can progress in their chosen field. In addition, we will also put in place a Succession
Planning tool, to help identify and grow the HSCP leaders of the future
This maps to the Scottish Government pillar of NURTURE 
87

Page 88

55 
Appendix C Workforce Planning Approaches
Workforce Planning - Approaches by parental bodies
In developing this workforce plan we were mindful to recognise the approaches to workforce
planning set out by our parent bodies in North Ayrshire Council and NHS Ayrshire and Arran.
North Ayrshire Council Approach to Workforce Planning
North Ayrshire Council have set out an agreed approach to workforce planning. The approach
recognises the need to both ensure a workforce that meets current demands, but one that is
also mindful of future requirements over the medium to long-term.
It highlights the key factors that must be considered when developing a workforce plan, and
offers clear advice on workforce management and designing a future workforce as well as
providing a six step approach to workforce planning. These six steps are:
1. Define the plan
2. Map the service change
3. Define the required workforce
4. Understand workforce availability
5. Develop and Action plan
6. Implement monitor and revise
As part of this workforce plan, we will ensure we adopt the advice and guidance in the NAC approach. 
NHS Ayrshire and Arran Workforce Plan (2019-2022) 
The NHS Ayrshire and Arran Workforce Plan sets of the vision for the organisation as it
continues to review and improve its workforce and service delivery.
The plan sets our clear workforce objectives for NHS Ayrshire and Arran which are:
1. Deliver a robust, quantifiable and iterative workforce plan that sets out how it will
achieve its future workforce.
2. Implement improved businesses process to improve the utilisation and deployment of
the workforce
3. Deliver an effective people strategy to improve the image of NHS A&A as an attractive
employer
4. Support the health and wellbeing of staff 
I addition, the workforce plan aims to implement a culture of workforce planning across the
organisation, ensuring that it is everyone’s business. It hopes to embed the idea that
workforce planning is not a standalone activity but should be considered by all teams and
services on a regular basis. 
88

Page 89

56 
Appendix D - Policy Drivers
Local Strategies
Our local policies and plans are informed by close engagement with local people and reflect
the needs and priorities of North Ayrshire. 
Caring Together – NAHSCP Strategic Commissioning Plan 2022-30
In April 2022 we published our longer-term strategy, Caring Together, which provides
strategic direction for the North Ayrshire Health and Social Care Partnership for the eight-
year period up to 2030.
The plan identifies our vision for the people of North Ayrshire, which is that:
“People who live in North Ayrshire are able to have a safe, healthy and
active life” 
To help achieve this vision, we have identified 5 strategic priorities to work towards, these
are: 
We see these priorities as interlinked and expect that where we see success against one
priority, it’s effect will positively impact against others.
Caring Together represents the first time that a strategic priority around the development of
out staff has been identified for action. The priority to, ‘Develop and Support our Workforce’
reflects the HSCPs recognition of the value our staff have on ensuring we can achieve our
vision. 
Our workforce is one of our most valuable assets and it is essential that is developed
appropriately to meet the health and social care needs of local people. We will endeavour to
ensure that our workforce is fully supported to undertake their roles while also offering clear
career pathways for those who wish to develop further and progress within the partnership. 
Primary Care Improvement Plan - Ambitious for Ayrshire
In April 2018, the new Scottish General Medical Services (GMS) Contract came into effect.
This contract changed the way how local GP and Medical Practices operate, and effectively
changes the role of GPs. The contract aims to build on the strengths and values of traditional
general practice by building multi-disciplinary teams. These teams contain a range of health
professionals, including Advance Nurse Practitioners, Mental Health workers, Community
Link Workers and Allied Health Professionals. The aim of this approach is to ensure you get
Enable
Communities
Develop and
Support our
Workforce
Provide Early
and Effective
Support
Improve Mental
and Physical
Health and
Wellbeing
Tackle
Inequalities
89

Page 90

57 
the right care you need at the right time. By redirecting many tasks traditionally done by GPs
to more appropriate health professionals, local people will receive better care - and freeing
up GP capacity to focus on more complex health cases.
Locally, the three Ayrshire Health and Social Care Partnerships have worked together to
deliver the local Primary Care Improvement Plan (PCIP), ‘Ambitious for Ayrshire’ and have
agreed the following vision for primary care:
To deliver safe, effective, person centred, sustainable Primary Care Services at the
heart of the healthcare system for the people of Ayrshire and Arran
Through the implementation of the PCIP we shall remodel how we deliver primary care
locally, ensuring that multi-disciplinary teams are available in each medical practice across
North Ayrshire. This will help ensure that when needed local people will get the right care
and support, they need.
The development of multi-disciplinary teams across the Primary Care sector will mean a
greater diversity in the skill set of staff. However, this also brings the challenge of ensuring
appropriate supply is available to ensure MDTs can operate at capacity.
The PCIP will link closely to the Caring for Ayrshire programme of work. Caring for Ayrshire is
a 10-year programme in partnership with NHS Ayrshire and Arran and the three Ayrshire
HSCPs to redesign how we provide local health and care services in the future. The
programme understands the many demands on health and care services nationally and the
need to do things differently.
This strategic transformation programme that will build on developing an integrated health
and care service model. This model will look at all aspects of health and care from birth, to
end of life, with people being at the heart of the proposals ensuring our future services
consider the changing population demographics (e.g. ageing population and increasing
inequalities, particularly as a result of poverty).
The Promise
The Partnership will work closely with our national and local partners as we help to deliver
‘The Promise’ for Children, Young People and Families. The promise is responsible for driving
the work of change demanded by the findings of the Independent Care Review. Made on 5th
February 2020, the Promise seeks to improve the experience of all children, young people
and their families if they require additional support. The promise will create a more
compassionate care system for young people and families.
In keeping the promise, five key foundations have been outlined against which all change
must be grounded.
• Voice: All children must be listened to and respected and appropriately involved in
decisions about their care. Our decision-making culture must be compassionate and
caring
90

Page 91

58 
• Family: Children must remain with their families when they feel safe and loved.
Families will be supported to overcome challenges, and to continue to love and
nurture their children.
• Care: When remaining with their family is not possible, siblings will not be separated
and placed together in a nurturing, loving home.
• People: Those who deliver care services to children and families will be supported to
develop compassionate working relationships with those they support. These closer
working relationships will lead to more compassionate decisions making and care.
• Scaffolding: Children, families and the workforce must be supported by a system that
is there when it is needed. The scaffolding of help, support and accountability must
be ready and responsive when it is required. 
The implementation of The Promise will have a significant impact on the Children and
Families Workforce. The Promise Plan for 2021-24 can be accessed here:
https://thepromise.scot/plan-21-24-pdf-spread.pdf 
National Policies
Scottish Government National Workforce Plan for Health and Social Care
The National Workforce Plan for Health and Social Care was published in early 2022 and set
out the Scottish Governments vision for health and social care in Scotland:
o People are able to live more years in good health, and that we reduce the
inequalities in health life expectancy
This compliments the overall vision for the national health and social care workforce:
o A sustainable, skilled workforce with attractive career choices and fair
work where all are respected and valued for the work they do
The national strategy sets out a tri-partite ambition to:
• Recover: Create the conditions through which our workforce, and by extension our
Health and Social Care services, can successfully Recover from the pandemic
• Grow: Grow the Health and Social Care workforce sustainably, in line with Scotland’s
population demographics, and the demands on our Health and Social Care services
• Transform: Transform the ways in which our workforce is trained, equipped and
organised to deliver Health and Social Care services, in order to achieve long-term
sustainability through increased effectiveness and improved population health
outcomes.
To support the future development of the national health and social care workforce, the
Scottish Government has identified five national pillars for action. These are:
o Plan, Attract, Train, Employ, and Nurture
91

Page 92

59 
It is advised that these five pillars are employed by health and social care organisations across
SCOTLAND in the development of their own workforce plans. More information on these five
pillars can be found in the methodology section of this plan (page 9) 
Development of a National Care Service
Following the publication of the Independent Review of Adult Social Care (2021) the Scottish
Government has agreed to progress legislation to develop a National Care Service.  The
Scottish Government will continue to develop legislation and make preparations for the
creation of this new national service, which is expected to be implemented by the end of the
current parliamentary period in 2026.
In originally considering the proposals of a National Care Service, North Ayrshire Health and
Social Care Partnership identified several positive opportunities that this new national service
will bring, but also several challenges that must be addressed. These considerations were
submitted to the Scottish Government in October 2021 in consultation response.
In September 2022, the North Ayrshire Integration Joint Board submitted a response to a the
Scottish Parliament’s Health, Social Care and Sport Committee consultation on the
publication of the National Care Service (Scotland) Bill. The Bill highlighted a number of key
concern areas for the IJB and the Health and Social Care Partnership, including how the
future health and social care workforce will be structured, how services will be aligned and
integrated, and the possible negative impact the development of a National Care Service
could have on local people, service users and patients. 
The move to a National Care Service will have a significant impact on the Health and Social
Care Workforce. As the legislation and plans develop, North Ayrshire IJB and HSCP will
continue to engage and provide constructive feedback to ensure the wellbeing of staff and
people who access our services is maintained.  
92

Page 93

60 
Appendix E - Additional Workforce Requirements
The table below highlights the additional workforce requirements identified by HSCP service delivery teams. It identifies current gaps, short-term
requirements needed over the next 12 months and future staffing required by 2025. 
The requirements set out below are aspirational as it is currently unknown if there is resource capacity to create and appoint to all these roles.
CHILDREN FAMILIES AND JUSTICE SERVICES
Team Current Requirements Additional Posts by 2023 Additional Post by 2025
Universal Early Years Band 7 Team Manager -
Children's Services 
Band 7 Health Visitors: 3.0 WTE 
Band 6 School Nurses: 3.8 WTE 
Band 4 Health Visiting Support
Worker: 0.8 WTE 
Band 6 Perinatal Mental Health
Nurse 
Band 7 Community Infant Feeding
Nurse – (interim until Nov 22) 
Band 5 Immunisation Staff nurse
Band 4 support worker roles –
ideally 2 per locality. 
Band 6 Perinatal Mental Health
Nurse (Early Intervention) – 0.6-
0.8 WTE 
Band 4 Health Visiting Support
Worker/ Dad’s Worker 1.0 WTE
HV students – aim for 2 students
on an annual basis
As a minimum:
Health Visitors x5 (locality based) 
Student Health Visitors x2 per annum 
Band 4 Support Workers x6
Justice and Intervention
Services
Electronic Monitoring Officer
(Bail) – 1x 1WTE (temp)
Family Centred Wellbeing Team
– x 5 full time grade 7 staff. 
Rosemount Team - 2 x grade10
Project Worker Posts with
irregular hours and 2 x Social
Family Centred Wellbeing Team - 2 full
time grade 7 staff. 
Rosemount Team - 1 grade 10 Project
Worker Posts with irregular hours and
93

Page 94

61 
Work Assistant grade 8 posts
with irregular hours. 
Justice Locality Team - 2 x staff
for EM Bail, 1 x Social Work
Assistant for Making a
Difference Projects, 1 x Court
Social Worker, 1 x court Social
Work Assistant. 
Partnership Delivery Team - 2
desistence Officers 
Unpaid Work – 1 x Employability
Mentor 
Service Access Teams  - 4 x
Social Workers and  4 x Social
Work Assistants 
MAASH - 1.5 x Social Workers
and 2 x Social Work Assistants
1 Social Work Assistant grade 8 post
with irregular hours. 
Justice Locality Team - 1 staff for EM
Bail, 1 Court Social Worker, 1 court
Social Work Assistant. 
Partnership Delivery Team - 1
Desistence Officers 
Unpaid Work - 1 Employability Mentor 
Service Access Teams - 2 Social
Workers and  3 Social Work Assistants 
MAASH - 1 Social Worker and 2 Social
Work Assistants 
Unpaid Work Team -   1 Community
Payback Officers, 1 Supervisors
Children Families & Justice
Services 
We need a full complement of
staff within existing resources
(eg Team Manager Residential
Care & 3 SW posts which are
vacant) plus further lead posts
eg Trauma informed lead officer 
As before
94

Page 95

62 
Additional Social Workers (x6;
one per locality) 
Additional Social Work Assistants
(x6) 
Team Managers (x3) 
95

Page 96

63 
HEALTH AND COMMUNITY CARE SERVICES
Team Current Requirements Additional Posts by Oct 2023 Additional Post by March 2025
Long term Conditions and
Locality Services
No outstanding vacancies Band 8a Clinical Nurse Manager
1x 1WTE 
Band 3 HCSWs – x4
Arran Services 11 x Care Home Workers
(Montrose House)
10 x Care at Home Posts
(including 4 overnight posts) 
2 x Emergency Nurse Practitioner 
1 x GP post 
1 x Band 6 Physio post
1 x ANP for complex care/frailty
2 x Band 5 Nurse vacancies
1 x Admin Officer
1 x HCSW 
No future workforce need
identified. Focus is on current
recruitment to ongoing
vacancies
NA
Intermediate Care &
Community Rehabilitation
Hub
Referral management/AHP
administration
Admin support to service
managers/team leads limited due
to reduced workforce for AHP
services.
2 x Band 4 WTE
1 x Band 3 WTE
Likely 2x Grade 4 Administration Staff
Older people and physical
disability locality services/
hospital SW/ care home
review team/ sensory
impairment/ senior officers
1 x Social Worker WTE 
2.5 Social Work Assistants
None anticipated None Anticipated
Primary Care  5 x WTE Mental Health
Practitioners 
Subject to consultation and AHP
Rehab commission
96

Page 97

64 
1 x Community Link Worker
1 x 8a Pharmacotherapy post
(Pan Ayrshire)
2 x Band 7 MSK Physio
2 x Band 5 MSK Physio
3 x CTAC posts (grades being
determined)
1 x Band 7 OT
2 x Band 6 OT
Community Care Gaps across all community Care
Services
• Care at Home
• Day Services
• OT Reablement
• Anam Cara
No Additional workforce
identified as required.
NA 
97

Page 98

65 
MENTAL HEALTH LEARNING DISABILITY AND ADDICTIONS SERVICES
Team Current Requirements Additional Posts by 2023 Additional Post by 2025
Alcohol and Drug Services Challenges in recruiting to the
following posts:
• Recovery Development
Workers (3 posts)
RMN (2 posts)
NADARS (core service):
• Social Worker x 2 (short
term ADP funding
identified);
• Occupational Therapist x
0.6 (ADP funding
identified);
NADARS– Essential for
Medication Assisted Treatment
Delivery (MAT)
• 2 x Pharmacist Prescribing
sessions;
• 2 x GP Specialist Prescribing
sessions
No funding identified.  A
Business Case is being prepared
Additional post for Ward 5 (nurse or
AHP) following review of core
programme and impact of new
additional residential rehabilitation
pathways 
Identify other staff through
monitoring of service
Community Mental Health
Services
Service experiencing gaps in:
Psychology (two rounds of failed
interviews)
Psychiatry
6 x Social Work/MHO
8 x MH Nursing Staff
8 WTE MH Nursing Staff In Primary Care Mental health,
additional posts will be required:
• Mental Health Practitioners
• Enhanced Psychological
Practitioners
Details on volume of staff required is
still to be identified. 
In Community MH/Disorder Team
Consideration of expanding workforce
beyond 8 WTE identified for the short-
term.
98

Page 99

66 
Psychological Services Continue to face challenges in
recruiting to CAMHS and AMH
Community posts.
Made more challenging due to
competitive context.
B4/5 Assistant Psychologists
B7 Clinical Associates in Applied
Psychology
B8a Clinical Psychologists 
Additional 25 WTE Psychological
Therapists (for deployment
across several services)
Resourcing of Multi-Disciplinary Teams
including
B7 Psychology Posts
B8a Psychology posts
Learning Disability Service Social Work Team 
Team Manager (Social Work –
just gone out to advert for 3rd
time in 2 years)
2 x social workers (at interview
stage but poor response)
1 x social work assistant 
Intensive Support Service 
2 x Band 6 charge nurses
1 x Band 3 support worker
1 x social worker 
Band 3 Occupational Therapy
Assistant (or similar) 
Additional Service Manager
Identify through monitoring service
development requirements. 
99

Page 100

67 
ALLIED HEALTH PROFESSIONAL SERVICES
Team Current Requirements Additional Posts by 2023 Additional Post by 2025
AHP - Occupational therapy
and Physiotherapy (Children
and Families)
1 x Physiotherapy Team Lead
1 x Skilled Practitioner
3 x Band7 Specialist Physio
4 x Physio Support Workers 
3 x WTE Band 5 Occupational
Therapists
Review of Workforce to be undertaken 
Will await outcome of AHP
Commission.
AHP - Occupational therapy,
Physiotherapy, Dietetics
(Mental Health)
2.1 WTE Physiotherapists
4 WTE Occupational Therapists
1 x Band 7 Physiotherapist
(Foxgrove)
3 x B6 Physiotherapist (Forensic)
0.5 x Band 5 Physiotherapist
1 x Band 4 Exercise Practitioner
1 x Band 3 Physio Support
Worker
4 x Band 6 Physiotherapist
1.5 x Band 6 Physiotherapist
3 x Band 3 Exercise Practitioners
1 x Band 3 Physio Support
Worker 
North Learning Disability:
1 x Band 6 Physiotherapist
2 x Band 5 rotational
Physiotherapist
3.3 x Band 6 Physiotherapist 
3 x Band 4 Physiotherapist
1 x Band 2 Physio Assistant 
2 x Occupational Therapy
integrated support worker
Undertake AHP national rehab
commission exercise to examine
demand
100

Page 101

68 
1 x WTE Perinatal Worker
(increase from 0.6 WTE)
Review OT skill mix 
2 WTE x Band 6 Dietician (CMHT)
2 x Band 6 Dietician (CAMHS &
CEDS)
1 x Band 3 Dietician
1 x Band 3 Support worker
1 x Band 6 Dietician (LD)
AHP - Dietetics, OT, Physio
and Podiatry (Health and
Community Care)
1 WTE Occupational Therapist
2 x Band 6 Physiotherapist
1 x Band 7 Physiotherapist
1 x Podiatry Manager (across
North/East HSCPs)
1 x Band 7 Advanced Podiatrist
0.6 WTE x Dietetics Service
Manager
1 x Band 6 Dietetics Worker
0.6 WTE x Dietetics Support
worker
1 x Physio Team Service Lead
1 x Band 6 Physio (Arran)
1 x Band 6 Physio (Mainland)
Band 3/ 4 Staff to support
admin.
Possibility to include a Band 5
rotation post 
1 x Band 5 Occupational
Therapist
2 x Neuro Support Worker
1 x Band 6 Stroke Specialist
1 x Band 6 Dietician
1 x Band 5 Dietician
1 x Dietetics Support Worker 
1 x Band 7 Advanced Podiatrist
Undertake AHP national rehab
commission exercise to examine
demand 
101

Page 102

69 
FINANCE AND TRANSFORMATION & BUSINESS SUPPORT SERVICES
Team Current Requirements Additional Posts by 2023 Additional Post by 2025
Finance Admin Assistants (Grade 5): 1x
1WTE, 1x 0.4 WTE and 1x 0.3
WTE (temp) 
Finance assistant (Grade 7) 1x
1WTE 
Finance Officer (Grade 12)
1x1WTE
No planned increases No planned increases
Business Support Additional admin support to
service delivery teams required.
2 x WTE Staff to Moving
Handling/CALM Team
Future requirement subject to
feasibility study.     
102

Page 103

Integration Joint Board
20 October 2022
Subject : Mental Welfare Commission Report - Authority to
Discharge
Purpose : To provide an update on progress of the North Ayrshire Health
and Social Care Partnership in relation to the action plan
developed in response to the Mental Welfare Commission –
Authority to Discharge Report (May 2021).
Recommendation : IJB members are asked to note the report and the NAHSCP
response to the recommendations. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MWC Mental Welfare Commission 
1. EXECUTIVE SUMMARY
1.1 This report presents the progress made by the NAHSCP in relation to the action plan
developed following receipt of the MWC Authority to Discharge report which was
issued on 20 May 2021. 
The full report can be accessed here: 
AuthorityToDischarge-Report_May2021.pdf (mwcscot.org.uk) 
2. BACKGROUND
2.1 As highlighted in the previous paper presented to the IJB on 21st October 2021, the
Mental Welfare Commission (MWC) has specific legal duties in relation to
safeguarding the rights of people who are subject to the welfare provisions of the
Adults with Incapacity (Scotland) Act 2000 (AWI Act) and has a statutory safeguarding
role in respect of adults whose capacity to made decisions or take actions to promote
or safeguard their welfare is impaired due to a mental disorder.  During the pandemic
a number of stakeholders raised concerns with the Commission regarding whether
the appropriate legal authority was used to safeguard people being discharged from
hospital to care homes who did not have the capacity to make an informed decision
Agenda Item 6
103

Page 104

to agree the move. These discharges are made under the powers of Section 13ZA of
the Social Work (Scotland) Act 1968. 
2.2 The Commission therefore carried out a review of the practice with specific reference
to moves from hospital to care homes from 1 March 2020 to 31 May 2020 supported
by information from HSCPs across Scotland on the moves during that period.  The
Commission then made further inquiries as to the rights-based practice and legal
authority supporting the moves. The focus of this work was to identify any learning
and to ensure that this learning takes place, where required, to support and uphold
the rights of individuals. 
2.3 The commission made 11 recommendations to be considered by HSCPs and the Care
Inspectorate. In response and as agreed at the IJB in October 2021, a local focussed
action plan was developed, and work undertaken to ensure improved processes and
sustained good practice. 
3. PROPOSALS 
3.1 In responding to the recommendations North Ayrshire HSCP have attached a RAG
status to each of the 8 recommendations relevant to HSCPs, a further 3
recommendations are specifically for the Care Inspectorate. 
3.2 The position within North Ayrshire can be summarised below with full responses
attached at Appendix 1: 
• There remains a robust system of recording AWI where a formal decision in
respect of an adult with incapacity is agreed. 
• The HSCP hospital based social work team have extensive experience of
discharge and the legal requirements. 
• Practitioner guidance is consistent with the principles of the legislation, but a need
has been identified to update the Management Guidelines which were last
reviewed in 2014. The guidelines have been reviewed and updated and will be
tabled for ratification at the Social Work Governance Board in December 2022.
Robust processes and decision making remains in place for all 13ZA discharges. 
• There continues to be an established learning and development programme in
relation to AWI with the addition of a refresher training programme now established
in response to the recommendations. This is delivered on a continuous rolling
programme to all relevant staff. 
• The development and installation of a self-evaluation process including collating,
reviewing and developing an audit framework with regards to AWI remains in
progress. This has been delayed through changes in personnel and is now seen
as a priority for completion and ratification via the Social Work Governance Board.
Although the self-evaluation of process is not fully established and ratified, there
is however continuous assurance activity by way of auditing on a continuous basis
undertaken by a variation of personnel i.e., Learning & Development Team
Manager, locality Team Managers and Senior Officers who all audit files regularly
104

Page 105

which will include those subject to AWIA measures. An example of audit template
is attached in Appendix 2. 
3.3 Support to service continues to be provided from the North Ayrshire Council Legal
Services and team managers to ensure our local processes are robust and will ensure
all moves are made with the legal authority in place.   
3.4 Anticipated Outcomes 
The work of the Mental Welfare Commission is to support and safeguard the rights of
people who lack mental capacity, the report and associated recommendations should
ensure the rights of those individuals are protected.   
3.5 Measuring Impact 
The North Ayrshire HSCP response to the recommendations will be monitored
through the HSCP Social Work Governance Board with oversight by the Chief Social
Worker. 
4. IMPLICATIONS 
Financial: None
Human Resources: None
Legal: Required compliance with provisions in the Adults with
Incapacity (Scotland) Act 2000 (AWI Act).
Equality: Focus of the report is that people who lack mental
capacity have their rights respected, have equality of
access to representation and are safeguarded.
Children and Young People None
Environmental & Sustainability: None
Key Priorities: None
Risk Implications: Taking forward actions in relation to the
recommendations minimises the risk of moving
individuals with no legal capacity to do so. 
Community Benefits: Confidence in the activity of the NAHSCP. 
5. CONCLUSION
5.1 IJB Members are asked to 
(i) IJB members are asked to note the report and the NAHSCP response to
the recommendations. 
Caroline Cameron, Director
For further information please contact David Thomson (Head of Service, Health and
Community Care) on (01294) 317806 or davidthomson@north-ayrshire.gov.uk 
105

Page 106

Appendices
• Appendix 1 - Action Plan
• Appendix 2 - Casefile Audit Template
106

Page 107

Appendix 1
NORTH AYRSHIRE HSCP – RESPONSE TO RECOMMENDATIONS
MENTAL WELFARE COMMISSION REPORT
AUTHORITY TO DISCHARGE: REPORT INTO DECISION MAKING FOR PEOPLE IN HOSPITAL WHO LACK CAPACITY 
Recommendation RAG
Status
Comments/Actions
1 HSCPs should undertake a full training
needs analysis to identify gaps in
knowledge in relation to capacity and
assessment, associated legislation,
deprivation of liberty definition and the
human rights of individuals (as detailed in
the report) to inform delivery of training
programmes to ensure a confident,
competent multidisciplinary workforce
supporting safe and lawful hospital
discharge planning.
GREEN A programme of learning and development in relation to Adults With Incapacity is in place within
NAHSCP, with two full days of training as part of the programme.  The Partnership has reviewed
this position and has identified an area for improvement in the provision of refresher training to
bring parity with CP and ASP arrangements.  Consideration is being given to including this in
training programme, for a ½ to 1 day refresher course, with plans to have this in place by March
2022.  Team Managers from locality adult Social Work Services are being consulted as part of
this exercise and agreement and priority will be agreed through Social Work Governance Board. 
October 2022 update:
The refresher training programme is now in place and is being delivered on a rolling progamme
basis. Activity will be reported via the Social Work Governance Board on an annual basis.   
2 HSCPs should establish a consistent
system for recording when an assessment
of incapacity has been conducted, by
whom and in relation to which areas of
decision making. 
GREEN Our social work information system records requests for assessment of incapacity, decisions and
who carries out that assessment.  The assessment is very specific in terms of recording details
in relation to what specifically a person has capacity to agree to and the timeline of the capacity
assessment and outcome.  The system is accessible by all social work staff and there is standard
protocol for recording which is consistently followed.   
3 HSCPs should ensure that staff facilitating
hospital discharges are clear about the
status of registered care home placements,
in terms of law (see EHRC vs GGC in the
report) and with regards the financial and
welfare implications of different types of
placements for the individual.
GREEN All NAHSCP teams across localities and including the hospital team have extensive experience
of safely discharging to care homes in terms of the law. The Senior Manager responsible for
these services held a session with team managers in July 2021 to reinforce responsibilities and
ensure all had a comprehensive understanding of the guidance on discharge, with particular
emphasis on 13za.  Any 13za discharge cannot proceed by only a social worker and requires
Team Manager approval with oversight from the Senior Manager.
4 HSCPs should ensure that practitioners
facilitating hospital discharges have copies
of relevant documents on file detailing the
powers as evidence for taking action on
behalf of the individual who is assessed as
lacking capacity. 
GREEN As detailed in NAHSCP guidance practitioners require to ensure documentation is in place and
on file regarding any evidence on capacity of individuals.  The Hospital Based Social Work Team
have access to the social work information system and patient medical notes which both include
information pertaining to assessment of capacity.   A Team Manger has been identified to lead
self-evaluation of processes including collating, reviewing and developing audit frameworks in
regard to AWI.  In terms of those discharging from hospital into care homes, these assessments
require to be agreed by two Senior Managers which ensures consistency and quality of
assessment. All assessments require to be explicit in regard to the legal basis for discharge.  This
107

Page 108

Appendix 1
requires to be in line with NAHSCP guidance and the Adults With Incapacity (Scotland) Act 2000.
5 HSCPs should ensure that assessments
reflect the person as a unique individual with
focus on outcomes important to that
individual and not external drivers that have
the potential to compromise human rights
and/or legality of moves.
GREEN It is embedded into practice from Social Workers, Social Work Assistants and Team Managers
that assessments require to be outcome focused and have the person who owns that assessment
and/or their representative at the heart of same. Assessments must be authorised by Team
Managers before being signed by service users or their representative.
6 HSCPs should ensure that processes are in
place to audit recording of decisions and the
legality of hospital discharges for adults who
lack capacity in line with existing guidance
and the principles of incapacity legislation. 
AMBER It was previously identified that there is a need to update the Management Guidelines for the
provision of discharging individuals who lack capacity. This document dates from 2014 and forms
the basis of Team Manager and Social Worker practice in terms of ensuring the rights of
individuals are upheld and that those discharged from hospital who lack capacity are discharged
on a legal basis.  A briefing note was produced by legal colleagues in March 2021 around the
use of 13za in discharges, this was circulated to all team managers with consultation through
locality social work meetings.  Discussions have begun with the North Ayrshire Council legal team
and suggestions have been made in updating the guidance, particularly in relation to deprivation
of liberty. This work is ongoing. 
A Team Manger has been identified to lead self-evaluation of processes including collating,
reviewing and developing audit frameworks regarding AWI.  This will be strengthened by
proposals to provide refresher training. This improvement work will be overseen by the Social
Governance Board.   
(Timescales for updated Management Guidelines – by June 2022) 
October 2022 update: 
• The guidelines have been reviewed and updated by Senior Management Team and will
be finally ratified at the Social Work Governance Board in December 2022. 
• The development and installation of a self-evaluation process including collating,
reviewing and developing an audit framework with regards to AWI remains in progress.
This has been delayed through changes in personnel and is now seen as a priority for
completion and ratification via the Social Work Governance Board. Although the self-
evaluation of process is not fully established and ratified, there is however continuous
assurance activity by way of multiple auditing activity on a continuous basis undertaken
by various personnel i.e., Learning & Development Team Manager, locality Team
Managers and Senior Officers who all audit files regularly which will include those
108

Page 109

Appendix 1
subject to AWIA measures.  It is proposed that the self-evaluation framework be
presented to the Social Work Governance Board by March 2023. 
7 HSCPs’ audit processes should extend to
ensuring evidence of practice that is
inclusive, maximising contribution by the
individual and their relevant others,
specifically carers as per section 28 Carers
(Scotland) Act 2016. 
Refer to requirements 5 and 6
8 HSCPs should ensure strong leadership
and expertise to support operational
discharge teams. 
GREEN Operational leadership at Team Manager and Senior Manager level and skilled, experienced staff
are in place to continue to ensure appropriate legislative frameworks.  Enhanced Social Work
Hospital Team in summer 2021 with dedicated Team Manager overseeing assessments for
complex care arrangements including consistent application of guidance and legislation.
9 The Care Inspectorate should take account
of the findings of this report regarding the
use of s.13ZA of the Social Work (Scotland)
Act 1968 and consider the scrutiny,
assurance or improvement activity to take in
relation to this. 
n/a – Care Inspectorate Recommendation
10 The Care Inspectorate should take account
of the broader findings of this report beyond
use of s.13ZA and consider how this might
inform future scrutiny, assurance and
improvement activity in services for adults. 
n/a – Care Inspectorate Recommendation
11 The Scottish Government should monitor
the delivery of the above recommendations
and work with Health and Social Care
Partnerships and the Care Inspectorate to
support consistency and address any
barriers to delivery of the next two years. 
n/a – Care Inspectorate Recommendation 
109

Page 110

Case File Audit 
SERVICE USER DETAILS 
SURNAME: 
FORENAME: 
CAREFIRST NO: 
DOB: 
AGE: 
GENDER: 
ETHNICITY: 
TEAM                        
Other – Please State: 
Team Location: 
Team Manager: 
Allocated Worker:                                                 Time taken to complete Audit   
File Read By:                                                            Date                     
Senior Officer – Feedback to Team Manager                                                     Date                             
Team Manager – Feedback to Social Worker                                                     Date                           
Please ensure you answer every question within this tool and include comments to enable full
understanding of your findings and inform improvement.  This must be completed with reference to
the practice guidance. 
To rate the quality from level 1 – 6.
Level 6 – Excellent, Level 5 – Very Good, Level 4 – Good, Level 3 – Adequate, Level 2 –
Weak, Level 1 - Unsatisfactory 
Y N
110

Page 111

Section A1 - Chronologies
1.1 Is there a current chronology in the Care Record (paper or electronic)
CareFirst/Care Partner  
1.2 Is there evidence the chronology is being used across agencies?  
1.3 Is there evidence that the chronology is used to inform the care plan?  
1.4 Overall rate the quality of the chronology on file.  Grade 1 – 6 (see rating) 
Comments:  There is only a very short chronology recorded electronically, more
work needs to be done to update this. 
Section A2 - Assessment
Y N
2.1 Is there a current assessment on file?  
2.2 Is the timing of the completion of the most recent assessment, in keeping with
the needs of the service user and identified outcomes? 
2.3 Overall rate the quality of the assessment on file.  Grade 1 – 6 (see rating) 
Comments: 
Section A3 – Risk
Y N
3.1 Is there any risk of harm to themselves, others or both? – Please specify in
comments box below. 
3.2 Is there an appropriate risk assessment in the file?  
3.3 Overall rate the quality of the risk assessment on file.  Grade 1 – 6 (see rating) 
Comments: 
3.4 Is there an appropriate current risk management plan in the file?  
3.5 Overall rate the quality of the risk management plan on file.  Grade 1 – 6 (see
rating) 
Comments: 
3.6 Is there evidence that the risk management plan has been appropriately
implemented?  
Comments: 
3.7 Is there evidence that the risk management plan has been reviewed?  
Comments: 
Section A4 - Consent
Y N
4.1  Is there evidence that consent has been sought?  
4.2 Is there evidence of a signature to support consent?  
Comments: 
111

Page 112

Section B – Care Plans
Y N
1.1  Is there evidence that the Plan is outcome focused rather than a list of tasks?  
1.2 Is there evidence that the plan is appropriately linked to the assessment and
risk assessment?  
1.3 Overall rate the quality of the plan.  Grade 1 - 6 
1.4 Is there evidence that the plan has been appropriately reviewed?  
Comments: 
Section C – Support/Services Provided 
Y N
1.1  Is there evidence that support and services received have followed the
contents of the care plans?  
1.2 From the information held in the records comment to what extent you consider the support
provided and services received met their outcomes and minimised the identified risks?
Comments: 
Section D – Service User Involvement
Y N
4.1  Is there evidence that the service users views have been sought?  
4.2 Is there any barriers to engagement identified?  
Comments:   
Section E – Partnership working
Y N
1.1  Is there evidence that partnership working in the following (proportionate to the
level of risk, need and statutory duties)?  
a. At the assessment stage?  
b. At the risk assessment and management planning stage?  
c. At care planning stage?  
d. At review stage?  
Comments: 
Section F – Monitoring Overview
Y N
1.1  Is there evidence that team managers have had oversight of this case file?  
1.2 Is there evidence that this case has been discussed within supervision
discussions?  
112

Page 113

Comments: 
Section G - Summary
Please note below the overall strengths.
Comments: 
Please note below the areas highlighted for improvement.
Comments: 
113

Page 114

114

Page 115

Annual Delivery Plan 
April 2022 - March 2023 
Agenda Item 8
115

Page 116

Version:  1.06               Date Approved:  03.10.22              Status:  Final               Page 2 of 18 
Author:   Gillian Arnold, Head of Planning & Information   
Name Job Title or Role Signature Date 
Authored by: 
Gillian Arnold  Head of Planning & Information   
Completion of the following signature blocks signifies the approver has read,
understands, and agrees with the content of this document.   
Version          Date
Approval Scottish Government  1.06 22.09.22 
NHS Ayrshire & Arran Board Meeting
East Ayrshire Integration Joint Board
North Ayrshire Integration Joint Board
South Ayrshire Integration Joint Board 
1.06 
1.06 
1.06 
1.06
03.10.22 
19.10.22 
20.10.22 
12.10.22 
116

Page 117

Version:  1.06               Date Approved:  03.10.22              Status:  Final               Page 3 of 18 
Author:   Gillian Arnold, Head of Planning & Information   
Table of Contents
1.0 Introduction                                                                                                        4 
2.0 Workforce                                                                                                          5 
2.1 Recruitment and Retention of Our Health and Social Care Workforce 
2.2 Staff Wellbeing 
3.0 Recovery and Protection of Planned Care                                                        6 
3.1 Funding 
3.2 Planned Care Recovery 
3.3 Outpatients 
3.4 Inpatients and Daycases 
3.5 Diagnostics 
3.5.1 Endoscopy 
3.5.2 Medical Imaging 
3.6 Cancer 
3.7 National Treatment Centre 
4.0 Stabilising and Improving Urgent & Unscheduled Care                                   11 
4.1 Primary Care 
4.2 Redesign of Urgent Care 
4.3 Unscheduled Care 
4.4 Mental Health and Wellbeing 
4.5 Tackling Health Inequalities
5.0 Supporting and Improving Social Care                                                            16
6.0 Sustainability and Value                                                                                  17 
6.1 Cash Releasing Efficiency Savings 
6.2 Covid-19 Costs in 2022/23 
117

Page 118

Version:  1.06               Date Approved:  03.10.22              Status:  Final               Page 4 of 18 
Author:   Gillian Arnold, Head of Planning & Information   
1.0 Introduction  
The Annual Delivery Plan (ADP) has been prepared collaboratively with our partners,
to provide Scottish Government with confirmation that we have plans in place to
demonstrate how our health and care system will stabilise and improve as we recover
from the Covid-19 pandemic.  It will focus on a set of priorities for 2022/23 to enable
our system and workforce to recover from the incredible pressure experienced over
the past two years, whilst we start to take forward improvement work that will
strengthen our services for any future Covid-19 waves and the demands of winter.  
Building on the previous two year’s Remobilisation Plans, the ADP sets out our key
priorities for 2022/23 as we seek to build back stronger as part of medium to longer
term recovery and stabilisation. 
This plan sits alongside our 10 year strategic ambition, Caring for Ayrshire, which is
our whole system health and care redesign and reform ambition. The Caring for
Ayrshire vision will deliver care as close to home as possible, supported by a network
of community services with safe, effective and timely access to high quality specialist
services for those whose needs cannot be met in the community. Partnership working
with local communities, third sector, voluntary and independent organisations will be
essential in delivering the right care, in the right place, at the right time for people in
Ayrshire and Arran. 
NHS Ayrshire and Arran Realistic Medicine priorities aim to embed Realistic Medicine
and it’s principles in to the redesign of Caring for Ayrshire. We want it to become
second nature within Ayrshire and Arran to support people using healthcare services,
and their families, to feel empowered to discuss their treatment. That is why the
promotion of shared decision making is high on NHS Ayrshire and Arran Realistic
Medicine Team’s agenda. We strive to facilitate a move away from the “clinician knows
best” culture and encourage the professional and the patient to have more meaningful
discussions about the treatment options available as well as their risks and
benefits.  This move requires a strong Realistic Medicine Network.  We have
established and are continuing to grow our network of Realistic Medicine champions
to help us spread the message and to gain feedback from them also.  We will continue
to develop our local Realistic Medicine Network by encouraging Champions to join us
from each department and by embedding education around Realistic Medicine into
training junior clinical staff when they join the board. 
This plan closely aligns with the NHS Recovery Plan 2021/26 and offers opportunities
with regard to the proposed National Care Service to ensure right care in the right
place at the right time by the right person. 
Detailed actions for the recovery and stabilisation of our services are included in
Delivery Plan Appendix 2 and align with our four agreed Organisational Priorities for
2022/23:
• Right Sizing the Bed Footprint 
To deliver safe, effective and quality care within agreed funded footprint
118

Page 119

Version:  1.06               Date Approved:  03.10.22              Status:  Final               Page 5 of 18 
Author:   Gillian Arnold, Head of Planning & Information   
• Right Sizing the Workforce 
Aligned to the right sizing of the acute bed footprint 
• Electronic Patient Record (EPR) and Records Management 
Digital Services activities contributing to the EPR and Records Management
Programme 
• Distributed Working and Estate Rationalisation
Right-sizing the estate through rationalisation of non-acute support
accommodation in line with new Distributed Working Policy 
2.0 Workforce 
The deliverables set out in the Annual Delivery plan mirror those that are included
within the NHS Ayrshire and Arran Workforce Plan.  This plan, when taken in
conjunction with the three Health & Social Care Partnership Workforce Plans, provides
a composite health and social care economy view for Ayrshire.  This narrative sets an
overview of what is articulated within the NHS Ayrshire and Arran workforce plan. 
NHS Ayrshire and Arran has a pre-existing People Strategy which directly informs our
Workforce Plan and is thematically built around four pillars – Attract, Retain, Develop,
Support.  These local pillars effectively encompass the thematic content and intent of
the five pillars detailed within the National Health & Social Care Workforce Strategy
and reflect the direct read across between our People Strategy and Workforce Plan. 
2.1 Recruitment and Retention of Our Health and Social Care Workforce  
A key workforce issue relates to the supply and capacity of our registrant workforce. 
As set out in our Workforce Plan the Board has a corporate risk relating to this issue
and our actions thematically aligned to our four pillars all materially contribute to
ongoing efforts to mitigate and control the level of risk associated with this. 
Fundamentally, in common with other Boards we have a perfect storm of wicked
problems – latent and emerging vacancies with associated national supply limitations;
increased demand for clinical registrants from all health providers both regionally and
at wider Scottish, UK and indeed international contexts;  having additional beds on our
Acute sites in excess of baseline bed complement due to demand and flow
requirements; and the residual ongoing impact of both Covid-19 and Non-Covid
sickness absence materially impacting upon workforce capacity. 
Against this challenging operating backdrop, as a system, we recognise the need to
stabilise and reset post pandemic in order to provide a strong foundation on which to
base our strategic service reform agenda articulated by Caring for Ayrshire.  In the
context of our workforce this, as a basic principle, means we need to right size our
workforce in year and forward plan in terms of sustained delivery, and encompasses: 
119

Page 120

Version:  1.06               Date Approved:  03.10.22              Status:  Final               Page 6 of 18 
Author:   Gillian Arnold, Head of Planning & Information   
• Reducing our reliance on high cost supplemental staffing solutions in medical
and nursing job families;
• Transitioning staff aligned with unfunded beds into funded roles as we right size
our bed complement;
• Recommencing our routine application of nursing and midwifery workforce and
workload planning tools; and
• Supporting our staff health and wellbeing to improve our unplanned absence
rates, and encouraging wider access and uptake of wellbeing services that
have successfully been deployed during the pandemic. 
Successful delivery of these stabilising actions are essential as we seek to progress
wider innovation in terms of longer term workforce supply and capacity, namely using
international recruitment as a lever, development of complementary clinical roles –
including Medical Associate Professions (MAPs) roles but also our advanced practice
roles, consideration of skill mix e.g. Band 4 nursing roles, and implementing our
Employability Strategy which will directly support those from disadvantaged
backgrounds and far from the workplace and strengthen our role as an Anchor
Institution and contribute to community wealth building.   
All of these actions materially contribute to ensuring the ‘best care every time’ which
ergo can only be achieved by ensuring the quality of our staff experience is high and
we are able to attract and retain staff. 
2.2 Staff Wellbeing 
We are committed to valuing, supporting and retaining our current workforce, as such
we are embedding our current Staff Wellbeing Programme through this next stabilising
stage and into the winter period, encouraging staff to take time to rest and recover and
to access the local and national resources that are available. 
We have made capital investment in creating three Staff Wellbeing Hubs, at our Acute
sites and on the Ayrshire Central Hospital Site, and these were delivered over the
summer / early autumn.  During 2022/23 we will commence work in developing a
Health & Social Care Wellbeing programme and this will be underpinned by a staff
wellbeing needs assessment.  We have organisationally communicated the
importance of all staff utilising their annual leave entitlement for rest and recuperation
at regular intervals throughout the year. 
3.0 Recovery and Protection of Planned Care 
Planned care recovery is being approached through a process of Protect, Stabilise
and Recover. The Covid-19 pandemic has resulted not only in significant backlogs of
patients awaiting assessment and treatment, but also a number of practical constraints
which are restricting our ability to return to pre-pandemic levels. All services are now
re-mobilised and are working towards the targets set out in the National Clinical
Prioritisation Framework. 
120

Page 121

Version:  1.06               Date Approved:  03.10.22              Status:  Final               Page 7 of 18 
Author:   Gillian Arnold, Head of Planning & Information   
On 6 July, the Cabinet Secretary announced a set of ambitious targets aimed at
addressing the long waiting times that have arisen during the pandemic. The targets
are to eliminate:  
• two year waits for outpatients in most specialities by the end of August 2022;
• 18 month waits for outpatients in most specialities by the end of December 2022;
• one year waits for outpatients in most specialities by the end of March 2023;
• two year waits for inpatient/day cases in most specialities by September 2022;
• 18 month waits for inpatient/day cases in most specialities by September 2023;
and
• one year for inpatient/day cases in most specialities by September 2024 
We are working closely with the new National Elective Coordination Unit (NECU) and
Centre for Sustainable Delivery (CfSD) developing a targeted action plan which will
look to deliver the new targets, including opportunities for insourcing, outsourcing and
accelerating planned improvements. Insourcing is in place for Neurology, Dermatology,
Respiratory Medicine and Ophthalmology, and is being explored for gastroenterology and
ENT/Audiology. Outsourcing is currently being explored for ENT.
In addition, to reduce backlogs of care specifically longest waiting patients the NHS
will work together through the provision of mutual aid, and that will mean some patients
will be offered appointments out with their local health board area to provide treatment
more quickly – for example the Golden Jubilee University National Hospital or at
National Treatment Centres as they become operational over the next year. 
3.1 Funding 
The Scottish Government have recently provided clarity regarding the financial
allocation process, to support NHS Board plans to deliver planned care and
specifically reduce the number of long waiting patients.  NHS Ayrshire and Arran have
submitted plans setting out the impact on long waiting patients by specialty and the
overall cost and await confirmation of funding allocation. It is expected that activity will
increase as new initiatives are embedded. However, it should be noted that this will
fund many existing initiatives which have repeatedly been funded non-recurringly and
are already incorporated into existing activity. 
May require further input once confirmation of funding received. 
3.2 Planned Care Recovery 
NHS Ayrshire and Arran are working through the updated National Clinical
Prioritisation Framework to guide clinical prioritisation, with the revised guidance being
fully implemented by 31 August 2022. This guidance supports a change in prioritisation
to include how long a patient has already waited as one of the factors influencing the
relative priority for each patient.  We will initiate this process firstly in those services
where this re-prioritisation can be absorbed with least impact on other clinically urgent
pathways, whilst we continue to pursue other options to create additional routine
121

Page 122

Version:  1.06               Date Approved:  03.10.22              Status:  Final               Page 8 of 18 
Author:   Gillian Arnold, Head of Planning & Information   
capacity in other more challenged specialties.  We will also use information on the
volume of long waiting patients in each specialty to inform decisions on the allocation
of operating theatre capacity. 
As we make progress towards tackling long waits, a number of service changes
designed to support and protect service provision through the pandemic have already
been implemented. These include the reconfiguration of trauma and elective
orthopaedics onto separate hospital sites, relocation of day case chemotherapy and
outpatient breast cancer clinics services to a non-acute site and focussing of Covid-
19 critical care on one site. In addition, we increased the use of Digital technologies,
including the use of NHS NearMe, video calls and telephone consultations to allow
appointments to continue to be provided during the pandemic. The learning from this
change in working practice, in particular, telephone consultations, has been accepted
as good practice across many specialties and will continue to be embedded to provide
an alternative to 'face to face' consultations, where appropriate. 
Other potential service changes to some of our surgical specialties which would further
separate emergency and elective care, are being considered. However further
understanding of capacity and impact is required and we are working on a series of
recovery modelling scenarios with our colleagues at Cap Gemini to develop a resource
modelling tool. We anticipate that this resourcing tool, when used in conjunction with
the Regional Planned Care Modelling Tool, will allow us to better plan the allocation
of beds, operating theatres and other resources. It should be noted that although this
work continues to progress, the Cap Gemini tool still requires some work before it will
be ready to deliver this. Meanwhile, there will be a close focus on utilisation of capacity
and redesign opportunities in order to maximise activity. 
Working alongside the NECU to support and plan further remobilisation, whilst
refocusing our current activity to urgent and long waits: 
NHSScotland Approach to
Delivery
NHS Ayrshire and Arran Actions
Working across
boundaries - regionally
and nationally
We are working actively with other Health Boards and NECU
to access mutual aid, in particular around Neurology, General
Surgery and Urology. Further options are being explored for
Trauma and Orthopaedics and Gastroenterology
Maximising theatres
sessions and evening and
weekends
We are focussing significant attention on maximising theatre
utilisation, and have demonstrated good improvement in this
regard since June 2022.  We are seeking additional capacity
by opening evening and weekend sessions where possible,
although this is limited by staff availability. 
Adopting robust waiting
list validation
We are undertaking robust waiting list validation for both
outpatients and inpatients/daycases and have put in place
some additional administrative resource to support this. As a
minimum we are following a 2-stage validation process, and
where clinical capacity allows we are adopting 3-stage clinical
validation of waiting lists. 
Accelerating high impact
changes such as ACRT
and PIR
ACRT and PIR are implemented in some specialties, and
further roll out as part of our Bringing it Together programme
continues to be a priority.  We are monitoring this in
122

Page 123

Version:  1.06               Date Approved:  03.10.22              Status:  Final               Page 9 of 18 
Author:   Gillian Arnold, Head of Planning & Information   
conjunction with CfSD colleagues using a HEAT map
approach
Accelerating roll out of
national initiatives such as
the NECU 
We are working closely with NECU to maximise opportunities
to benefit from national approaches, including clinical
validation support
Increasing activity to pre-
Covid levels by March
2023  
We monitor activity against pre-Covid levels on a continual
basis, and are progressively implementing initiatives to
increase this.  As at July 2022 the current re-mobilisation
rates are : 
Outpatients : 74%
Inpatients and Daycases : 68%
Endoscopy : 68% 
We are exploring further opportunities to work to achieving
pre-Covid levels by March 2023, including the potential
acquisition of mobile theatre units (staffed) 
3.3 Outpatients 
Outpatient activity has remobilised to 74% as at July 2022 of pre Covid activity
levels. The table below details expected remobilisation by end of March 2023. 
Access Plan Target 22/23 July Activity as % pre-Covid-19
Outpatients 93% 74% 
Sustained high referral rates in some areas still pose some challenges to reducing
overall waiting lists. Workforce capacity is a significant contributing factor with a high
level of vacancies existing as referred to in the 3 year Workforce Plan.  Additional
actions across most specialities which will contribute further improvement in 2022/23
include: 
• Outpatient redesign through the Bringing it Together programme and
implementation of High Impact Changes such as ACRT;
• The reinstatement of an outpatient clinic suite which had been re-purposed
during the earlier pandemic waves; and
• Expansion of 3-Stage waiting list validation 
3.4 Inpatients and Daycases 
Inpatient and Daycase activity has remobilised to 68% as at July 2022 of pre Covid
activity. The table below details expected remobilisation by end of March 2023. 
Access Plan Target 22/23 July Activity as % pre-Covid-19
Elective Surgery 75% 68% 
123

Page 124

Version:  1.06               Date Approved:  03.10.22              Status:  Final               Page 10 of 18 
Author:   Gillian Arnold, Head of Planning & Information   
The challenge to achieving the waiting time targets for Inpatient and Daycase is multi-
faceted and relates to workforce capacity with a high level of vacancies existing as
referred to in the 3 year Workforce Plan and constraint on access to recovery space. 
The day surgery recovery area at University Hospital Crosshouse, continues to be re-
provisioned for use by Critical Care Service. The use of this space, and other
alternative options to address this are under review along with the progression of
recruitment to vacancies.  Additional actions across most specialities which will
contribute further improvement in 2022/23 include: 
• Maximise operating theatre productivity - NTIG Theatre utilisation data (April –
June 2022) indicates an average overall theatre utilisation of 89.5% for this
period which is close to the Scottish average but affords room for further
improved utilisation as we work towards a local target of 95%; 
• Weekly theatre utilisation meetings are giving further focus and scrutiny through
a new Theatre Utilisation and Governance group;
• Maximising Daycase rates as part of the CfSD improvement work and HEAT
map monitoring. Daycase rate in June 2022 is reported as 96.7% against a
target of 96.4%, demonstrating a high BADS performance during the
remobilisation process;  
• Review approach to ensuring that surgical procedures planned are in line with
the Effective and Quality Interventions Pathways guidance (EQuIP);
• Additional operating theatre sessions run as ‘Super-Saturdays’ or similar will be
targeted at the longest waiting patients;
• Embed a clinical validation step into the current administration validation
process; and
• Trial a prehabilitation screening approach for the longest waiting patients and
we expect this to complement waiting list validation processes. 
3.5 Diagnostic 
3.5.1 Endoscopy 
To reduce the number of patients waiting for an Endoscopy, a 4th Endoscopy Room at
University Hospital Ayr will be created by the end of 2022. In addition, the following
developments have been implemented and work continues to further embed them in
practice: 
• Waiting list validation, focused around the use of qFIT as a risk screening tool
with an initial trial of qFIT validation of the longest waiting patients awaiting
colonoscopy undertaken in May 2022, and will be scaled up through 2022/23;
and
• Colon Capsule Endoscopy (CCE) and Cytosponge continue to be delivered
with the aim of 28 and 25 procedures per month respectively. Work is ongoing
to further embed these new methods of care with the clinical teams, and it is
hoped that a national clinical guideline for Cytosponge will be developed to
provide some added governance and assurance to clinical staff. 
124

Page 125

Version:  1.06               Date Approved:  03.10.22              Status:  Final               Page 11 of 18 
Author:   Gillian Arnold, Head of Planning & Information   
3.5.2 Medical Imaging 
Additional capacity for MRI, CT and Ultrasound is being progressed to reduce the level
of patients waiting long periods to access.  Improvements include a mobile MRI
scanner being located at University Hospital Ayr for 12 months with a 2nd mobile
scanner for 3 months currently being sourced and the progression of extended 7 day
working for CT and MR scans.   
3.6 Cancer 
A prehabilitation service for cancer patients is currently in national discussion although
cancer patients can access existing rehab services within NHS Ayrshire and Arran. 
Early Cancer Diagnostic Centre has now been in place for 12 months and is working
well. An additional ANP has been recruited to support with patient care, assist with
education and expansion of the service for secondary care referrals. 
3.7 National Treatment Centre 
NHS Ayrshire and Arran will host one of ten National Treatment Centres (NTC) across
Scotland.  Within the Ayrshire and Arran National Treatment Centre the focus will be
on Orthopaedics. The new Centre will plan to treat 800 patients per year who need hip
or knee replacements, 1200 patients who require a Daycase orthopaedic procedure
and 700 orthopaedic patients who need minor procedures requiring local
anaesthetic.  There is capacity in addition to this for local anaesthetic procedures from
other specialties.  The NTC will be operational by 2025.  It is expected that recruitment
will be phased over the next 18 months to allow time for training and education.   
4.0 Stabilising and Improving Urgent and Unscheduled Care 
4.1 Primary Care 
As primary care services recover from the Covid-19 pandemic, a framework of
measures is underway to support remobilisation and continued safe and effective
delivery of services to patients. General Practice is currently facing national workforce
and recruitment challenges which is being experienced locally.  Going forward local
oversight will be monitored through the Practices Sustainability Oversight Group to
look at focussed options for any Practice experiencing difficulty from workforce gaps. 
Specific dedicated support is being provided to those Practices struggling to fill GP
posts as well as working with the local GP community to promote the benefits of
working within Ayrshire and Arran to attract new recruits.  A review of Enhanced
Service provision will also support sustainability of General Practice and ascertain how
potential changes could improve service delivery models for practices and patients. 
125

Page 126

Version:  1.06               Date Approved:  03.10.22              Status:  Final               Page 12 of 18 
Author:   Gillian Arnold, Head of Planning & Information   
Work continues to implement the new GMS Contract 2018 via the Primary Care
Improvement Plans. Scoping is ongoing to provide an urgent care service within
General Practice and consideration being given to how this could align to the Redesign
of Urgent Care (RUC) programme. The Community Treatment and Care service is
embedding well with most GP practices having access to the service. Further roll-out
of staff is ongoing though accommodation continues to prove challenging as additional
MDT roles are incorporated into General Practice. Various models are being
considered for further implementation of the Primary Care Improvement Programme,
including the use of community monitoring and investigation hubs to enable transfer
of care into a community setting which would increase accessibility for patients.
Focussed work is ongoing with all practices and the pharmacy team to achieve full
task transfer for Level 1 Pharmacotherapy Service by end of 2022/23, although there
are risks to achieving this in every practice.  The position of this will be more
understood in October 2022.  Pharmacotherapy has recruited a significant proportion
of their workforce from community pharmacy and acute services with recruitment now
becoming more of a challenge.  Various innovative actions are being progressed
through the Workforce Plan to maximise skill mix. 
Various digital programmes are ongoing across primary care to enhance patient
pathways and increase access to services. Further roll-out of E-Consult across
General Practice is being encouraged as well as community pharmacy and optometry
having access to the digital clinical portal to support decision making.  Community
Optometry is working closely with Acute to increase shared care which will support
additional eye conditions being screened or managed by Community Optometrists and
thus reduce waiting times for treatment or the need for urgent referrals.   
Since the easing of infection control measures, General Dental Practitioners have
increased activity to an average of 90% of pre-pandemic levels facilitating more
patients to receive routine care.  There is still a significant backlog for dental practices
to work through as they re-introduce routine care. Dental practices are facing
challenges to fill Dentist vacancies therefore ongoing national workforce initiatives will
be essential in recovering the dental sector further.  An increase in Dental Body
Corporates could also create additional challenges with recruitment and retention of
dentists within General Dental Practices which can impact on the availability of routine
NHS dental care.  Additional recruitment is underway within the Public Dental Service
to increase provision of emergency dental services and care to non-registered patients
whilst General Dental Practices continue to recover. 
Further recruitment will sustain our 7 day delivery of the Covid-19 Therapeutic service.
This provides assessment and treatment for a specific cohort of patients deemed as
very high risk of progression to severe disease and/or death if they develop Covid-19
symptoms and test positive for the virus. 
126

Page 127

Version:  1.06               Date Approved:  03.10.22              Status:  Final               Page 13 of 18 
Author:   Gillian Arnold, Head of Planning & Information   
4.2 Redesign of Urgent Care 
Phase 2 of the Redesign of Urgent Care programme will further enhance the pathways
implemented during Phase 1. The Flow Navigation Centre (FNC) will continue to be
developed as a single point of access for many services across the whole system. 
One of the most successful introductions to date is the joint working with Scottish
Ambulance Service (SAS) to support patients by a GP within the FNC or be supported
to alternative pathways.  NHS Ayrshire and Arran were also a pathfinder for a mental
health pathway. The first phase has been to implement a direct pathway via the FNC
for Emergency Services (Police Scotland and SAS) with direct access to specialist
practitioners within the Emergency Mental Health Teams, avoiding unnecessary
attendance at Emergency Departments, and provision of interventions from the right
services as quickly as possible for these patients. 
Scoping and analysis of demand will define all available pathways across the system
to ensure patients can access the most appropriate urgent care pathway suited to their
condition. A MSK urgent care pathway is being scoped which would optimise self and
community care and allow direct referral. A communication strategy will be developed
to engage with the general public and inform of available health services and
professionals accessible for urgent care. This will support signposting patients to
access appropriate care to prevent conditions worsening or as an alternative to
presenting at Emergency Departments.  This pathway is also linked to the Primary
Care Improvement Plans within general practice for MSK.  Additionally there is a
Community Pharmacy pathfinder in development based on access via the FNC, into
and out of Emergency Departments.  This will ensure that patients accessing
Pharmacy First, who should be attending Minor Injury Unit or Emergency Department
will do so via the FNC and be provided with an appropriate appointment, and will also
support redirection pathways out of Emergency Department back into Community
Pharmacy. 
4.3 Unscheduled Care 
As Covid-19 restrictions have lifted urgent and emergency attendances and
admissions have returned to pre pandemic levels.  This increase in attendances,
combined with high levels of delayed discharges, recruitment gaps in allied health
professionals and community-based care professional impacted patient flow.  As the
bed base increased to accommodate demand, infection control measures and staff
absence was added to the complexity of managing patient flow our acute care settings
became congested, with occupancy being >96% consistently. The existing
Unscheduled Care Programme including Discharge without delay, Interface Care,
Virtual Capacity and Redesign of Urgent Care are delivering internal improvements,
however more is needed.  We have completed a whole system Urgent & Unscheduled
Care self-assessment, in response to the SG relaunch of Urgent & Unscheduled Care
Collaborative and we have system support to progress with our High Impact Changes,
as highlighted through our Self-Assessment. 
127

Page 128

Version:  1.06               Date Approved:  03.10.22              Status:  Final               Page 14 of 18 
Author:   Gillian Arnold, Head of Planning & Information   
NHS Ayrshire and Arran will work with the national Urgent & Unscheduled Care teams
with an initial  focus on the top three High Impact Changes:- 
High Impact Change  Virtual Capacity
High Impact Change  Urgent & Emergency Assessment
High Impact change   Community Focused Integrated Care 
In addition to this we will be continuing our Discharge without Delay (DwD) programme
started through our pre, intra and post hospital groups and amalgamate this with the
newly launched collaborative high impact changes. 
NHS Ayrshire and Arran are committed to increase Hospital at Home capacity from 6
to 28 virtual beds by January 2023. In addition, we will scope and analyse the demand
for our outpatient antibiotic therapy service, which will inform and enable a business
case to help reduce in patient bed days and create an alternative to in-patient stays. 
Further scoping of remote health monitoring, near patient testing and community
diagnostics will be undertaken through a directed programme of work with three
distinct Delivery Programmes each with their own area of focused work which will tie
in with the Urgent & Unscheduled Care Collaborative work high impact changes.   
In addition NHS Ayrshire and Arran will hold a programme of focused Full System
discharge without delay events throughout the summer months with the ambition of
achieving the lowest bed base possible throughout the winter to ensure our remaining
areas are as well-resourced as possible.  We will run a full system event for three days
monthly and in addition hold a 7 day event in September. These events are multi
agency and multidisciplinary events with senior sponsorship from across the Health
Board and its partners – these events will be held at executive level to support real
time problem solving for patients stranded in the acute setting.  These events will be
additional to the “business as usual” DwD work which will be led by x 2 senior
appointed members of staff and a team of DwD “Home First” practitioners. 
4.4 Mental Health and Wellbeing 
It is the vision to create a Mental Health and Wellbeing service for Primary Care that
is consistent across Ayrshire and Arran.  Work will continue over the next few years to
develop detailed plans.  It is our ambition that by March 2026, the service will comprise
a multi-disciplinary team composed of Mental Health Practitioners, Community Link
Workers and Occupational Therapists.  Self-help Workers, Enhanced Psychological
Practitioners (EPPs), Administration and other roles will also be under consideration
as detailed planning is completed. 
At present, the multi-disciplinary team offers a triage and assessment service
predominantly for adults (although younger age ranges are available within some
areas).   At present there is limited scope for treatments.  It is the anticipation that as
staff levels rise, the age range and treatments offered will expand to all ages and a
limited range of short treatments.  Online treatment options and group sessions are
areas that will be explored alongside more traditional psychological therapies. 
128

Page 129

Version:  1.06               Date Approved:  03.10.22              Status:  Final               Page 15 of 18 
Author:   Gillian Arnold, Head of Planning & Information   
There are great benefits to having these roles working directly in GP Practices,
however, as the team grows in numbers so too will the space requirements.    
The first year of funding (2022/23) for the Mental Health and Wellbeing in Primary Care
Service will focus on the recruitment of Mental Health Practitioners whilst taking time
to scope subsequent years of funding and actions in greater detail. 
The transition and recovery plans for mental health continue to deliver targeted actions
to ensure a whole system response to the challenges presented, addressing backlog
management as we continue to innovate; adapting our offer, providing new pathways
to services, redesigning services and using digital delivery to retain and maximise as
much support as possible as services increase face to face activity and group therapy. 
Within North, South and East Ayrshire Health and Social Care Partnerships there are
specific Drug Related Death (DRD) Prevention Groups with identified
Improvement/Action Plans in place to prevent DRD’s.  Working in partnership with
local Alcohol and Drug Partnerships there has been a focus on specific actions to
prevent DRD’s which include, but is not limited to, the following:
• Implementation of new Medication Assisted Treatment (MAT) standards;
• New responses and pathway of support for individuals following a Non-Fatal
Overdose;
• Delivering on a new Substance Use Treatment target;
• Improving the multi-agency pathways of support for individuals with a ‘Dual
Diagnosis’; and
• Identification of pathways to support individuals to access residential
rehabilitation support 
4.5 Tackling Health Inequalities 
Health inequalities have been compounded by the socio-economic impact of the
Covid-19 pandemic and are likely to have a disproportionate impact on people living
in areas of multiple deprivation; those who were not in a good position prior to the
pandemic and those from ethnic minority groups.   
Tackling inequalities is a key priority and we believe by helping to reduce the impact
of inequalities locally, we can improve the long-term economic, social and health
outcomes for the people of Ayrshire and Arran. However, we recognise that
addressing local inequalities is not something we can do alone and it will take a
collaborative effort. As such, we will continue to work closely with our partners and the
people of Ayrshire and Arran to help tackle inequalities together.  
129

Page 130

Version:  1.06               Date Approved:  03.10.22              Status:  Final               Page 16 of 18 
Author:   Gillian Arnold, Head of Planning & Information   
5.0 Supporting and Improving Social Care 
Whilst we are optimistic that we may be over the worst of the direct impact of the
pandemic, its long-term impact is not as well understood. We expect our services to
face on-going challenges, including supporting those who have not been able to
access, a health and social care professional due to demands and restrictions, and
addressing the rise in poor mental wellbeing in our communities. We have learned
much from our pandemic experience, such as recognising the strength and resilience
within our communities, discovering how truly determined and hard-working our
workforce is and finding greater ways to work in collaboration with our partners.  One
consequence of the Covid-19 restrictions has been the increasing deployment of
digital technology; both for providing flexible services to those we support and in
enabling HSCP staff to operate in a dynamic way using a range of remote access
technologies. We will ensure our future way of working embraces the opportunities
that digital platforms provide.  Our collective ambition is for strong engagement with
service users and carers, driven by quality data and information and committed to
continuous service improvement. 
Across Ayrshire and Arran we continue to find new and innovative ways to shift the
balance of care, ensuring people are supported within the community where possible
rather than in a hospital or institutional setting to improve outcomes for people, with a
focus on bringing down delayed transfers of care to ensure capacity for those patients
that require acute hospital care. 
130

Page 131

Version:  1.06               Date Approved:  03.10.22              Status:  Final               Page 17 of 18 
Author:   Gillian Arnold, Head of Planning & Information   
6.0 Sustainability and Value 
Cash Releasing Efficiency Savings 
The CRES we were able to achieve in 2021/2022 was c£10 million and in 2020/2021
it was about c£11 million. 
Below is a table showing planned CRES for 2022/2023: 
Service Level Agreements £2,000,000
Acute prescribing £1,561,000
Primary Care prescribing £2,000,000
National services £350,000
Energy efficiency £69,000
Corporate £600,000
Acute  £1,600,000
Total £8,180,000 
Corporate schemes for estate rationalisation, reducing energy consumption and
clinical waste are being scoped therefore there is a higher degree of risk regarding
delivery of these. 
Excluding IJBs and New Medicines Fund, 68% of budgets for acute and corporate
services are pay for workforce. During 2021/2022, securing enough workforce has
been a challenge therefore very little CRES in 2022/2023 is targeted against
workforce. This restricts the scope for savings to about 32%, or £254 million of budget,
therefore the savings of £8.2 million shown above represent about 3.2% of this
restricted scope. 
COVID-19 Costs in 2022/23 
Scottish Government will not receive any Barnett Consequential funding in 2022/2023 in
relation to Covid costs.  The projected Covid costs for 2022/2023 require to be reduced
as far as possible.  The contact tracing staff have fixed term contracts until the end of
September 2022 but will be redeployed where possible from May or June. 
After three months of 2022/23 Covid related expenditure was around £8.0 million across
the health economy and this is likely to grow to c £36 million. A Covid-19 envelope of
£16.5 million for non-delegated services has been advised by Scottish Government. 
The Health Board is actively engaging with IJBs and Scottish Government in order to
minimise Covid-19 costs incurred during the year. 
131

Page 132

Version:  1.06               Date Approved:  03.10.22              Status:  Final               Page 18 of 18 
Author:   Gillian Arnold, Head of Planning & Information   
The table below shows the Health Board projected Covid-19 costs for 2022/23. 
The above estimated costs exclude Test and Protect, Point of Care Testing,
Laboratory Capacity, and Contact Tracing. These are expected to be funded
separately by Scottish Government. 
2022/23
fund
£000
Additional PPE              600
Covid-19 & Flu Vaccination          8,000
Scale up of Public Health Measures              400
Additional Bed Capacity/Change in Usage          5,910
Cleaning              665
Other Additional Staff Costs           8,827
Digital/ IT costs              200
Patient Transport              200
Sub-Total Covid-19 Costs - NHS Board        24,802
Additional Beds              545
Additional Staff Costs          3,145
PPE              981
Social Care Provider Sustainability Payments          3,147
Social Care Support Fund Claims              410
Children and Family Services           2,340
Additonal FHS Contractor Costs                75
Primary Care                68
Loss of Income              571
Other                31
Total Covid-19 Costs- HSCP 11,313
Total planned spend in 2022/23 36,115
Availabe Reserves 36,332
Reserves c/f to 2023/24 217
£000s
132

Page 133

Contents
1 Staff Wellbeing
2 Recruitment & Retention
3 Recovering Planned Care
4 Building Resilience & Recovery in Urgent & Unscheduled Care
5 Supporting Social Care
6 Sustainability & Value
133

Page 134

Region Board Priority Area
select from drop down list
Service Area Reference Jun'22 status Key Deliverable - Name and
Description
Key milestones Progress against deliverables end June 22 Lead delivery body Key Risks Controls/Actions Outcome(s) Major strategies/ programmes the deliverable relates to Impact of deliverable on health inequalities
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Outpatients
2021-AA123 Green To reduce waiting list size and
waiting times for Outpatients by
increasing clinic capacity and
reducing referral demand
Pain Service Redesign
Ref Template 2 : Activity projections
Ref Template 3 : Wait List Trajectory
Phase 1 recruitment complete and service established.
Evaluation of success against deliverables to be undertaken
Phase 2 recruitment to be undertaken once Access funding
confirmation is received from SG
Recruitment PC1 Pain Management Recovery Framework
NHS Recovery Plan
This initiative positively benefits patients with a level of disability
(due to chronic pain), this also being more prevalent in higher
deprivation populations
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Outpatients
2021-AA123.1 Suspended To reduce waiting list size and
waiting times for Outpatients by
increasing clinic capacity and
reducing referral demand
Ophthalmology Clinic Redesign
(Ophthalmology Improvement
Programme)
Ref Template 2 : Activity projections
Ref Template 3 : Wait List Trajectory
This remains a risk and priority area for NHS Ayrshire and Arran,
but has not been funded in the 2022/23 Access funding and so is
paused.
Not funded Interim non-recurring insourcing
initiative in place instead
PC1 NHS Recovery Plan
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Outpatients
2021-AA123.2 Green To reduce waiting list size and
waiting times for Outpatients by
increasing clinic capacity and
reducing referral demand
Create additional clinic capacity through
Insourcing contracts and WLIs
Insourcing contracts awarded
WLIs being scheduled as available
Delivery of Insourcing contract
activity
Staff availability for overtime
PC1 NHS Recovery Plan
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Outpatients
2021-AA123.3 Green To reduce waiting list size and
waiting times for Outpatients by
increasing clinic capacity and
reducing referral demand
Roll out clinical validation 3 stage validation being rolled out. 5 specialties completed and
other specialties underway
Clinician time / capacity Seeking mutual aid from other
Boards
PC1 NHS Recovery Plan Has potential to disadvantage those with lower health literacy
who fail to respond to communications from NHS
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Outpatients
2021-AA123.4 Amber To reduce waiting list size and
waiting times for Outpatients by
increasing clinic capacity and
reducing referral demand
HEAT map / Bringing it Together
Reduction in referral demand through
use of Active Clinical Referral Triage
(ACRT) (numbers to be agreed with
CfSD in July 22)
ACRT Top 9 specialities :
ACRT T&O :
Reduction in clinic demand through use
of Patient Initiated Review (PIR)
PIR Top 9 Specialities :
PIR T&O :
Reduction in referral demand through
use of national pathways for
gastroenterology - coeliac disease
pathway, IBS Pathway, community nurse
IBD follow up
Centre for Sustainable Delivery (CfSD) have prepared new HEAT
map template. Workshop attended and revised HEAT map to be
submitted end June 22
Progressing with individual projects and quarterly Steering Group
meetings to coordinate overall programme.
Clinician & Management time /
capacity
Clinician engagement
Dashboard in development
Shared learning with other
Boards
PC1 CfSD HEAT map Has potential to disadvantage those with lower health literacy
who fail to respond to communications from NHS
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Outpatients
2021-AA123.5 Suspended To reduce waiting list size and
waiting times for Outpatients by
increasing clinic capacity and
reducing referral demand
Rapid Access Speciality Unit
Development of new service/facility for
management of urgent outpatient
referrals same week, and focus on rapid
Active Clinical Referral Triage (ACRT) of
non-urgent referrals.  Based on
successful model of care implemented in
Cardiology, but rolled out to other medical
specialities
Roll out service model in new facility July
22
This remains a risk and priority area for NHS Ayrshire and Arran,
but has not been funded in the 2022/23 Access funding
Where possible, some small local changes will continue to be
progressed within existing resources
Lack of revenue funding
Lack of capital funding
Recruitment
Clinician time to progress changes
Where possible, some small
local changes will continue to be
progressed within existing
resources
PC1 NHS Recovery Plan
Redesign of Urgent Care (RUC)
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Elective Surgery
2021-AA124 Amber To reduce waiting list size and
waiting times by increasing elective
surgical activity and creating an
Orthopaedic elective centre of
excellence (UHA) to create
sustainable orthopaedic elective
capacity and a National Treatment
Centre within Ayrshire and Arran
Elective Surgery
Introduce extended operating days
Create additional planned care beds to
support additional throughout.
By September 21
Failed to recruit additional theatre nursing and so unable to
implement as a permanent feature at present, but additional
extended day sessions being delivered on an adhoc basis as WLI
Additional 17 beds for planned care at UHA to be available from
August 2022 on redesign of WoS vascular service
Further slippage in dates for
vascular service reconfiguration
Theatre Nursing Recruitment
Surgeon / Anaesthetist capacity
International recruitment
Introduction of Allocate system
to assist with job planning
PC1 NHS Recovery Plan
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Elective Surgery
2021-AA124.1 Green To reduce waiting list size and
waiting times by increasing elective
surgical activity and creating an
Orthopaedic elective centre of
excellence (UHA) to create
sustainable orthopaedic elective
capacity and a National Treatment
Centre within Ayrshire and Arran
Elective Surgery - Ortho Elective Centre
for Excellence (UHA)
All in-patient elective surgery delivered at
UHA
Roll-out of 4 joint day
Creation of additional arthroplasty
theatre, linked to vascular reconfiguration
Elective inpatient orthopaedics remobilised in May 22
4-joint days underway where possible
Urgent care pressures may result in
further pausing of elective
orthopaedics
Further slippage in dates for
vascular service reconfiguration may
delay access to additional theatre
Patient deconditioning during
pandemic will mean that many
patients required longer in operating
theatre, impacting deliverability of 4-
joint days
Risk balance analysis
undertaken to support re-start of
elective orthopaedics
Realistic Medicine funded
project re. pre-operative
screening and pre hab for
longest waiting patients
PC1 NHS Recovery Plan
Trauma and Orthopaedic Recovery Plan
Reconfiguration of vascular services
WoS Trauma Service Redesign
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Elective Surgery
2021-AA124.2 Green To reduce waiting list size and
waiting times by increasing elective
surgical activity and creating an
Orthopaedic elective centre of
excellence (UHA) to create
sustainable orthopaedic elective
capacity and a National Treatment
Centre within Ayrshire and Arran
Elective Surgery - National Treatment
Centre NHSAA
Planning Work
FBC submission by December 22
Capital works estimated to commence
June 23
Projected completion date December 23
Design and FBC work is progressing as per plan Cost drift on capital project
FBC approval not granted
Failure to recruit
Clinician /managers time & capacity
to contribute
Risk Register being maintained
for programme
PC1 National Treatment Centres
Trauma and Orthopaedic Recovery Plan
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Medical Imaging
2021-AA125 Proposal Reduce waiting list and waiting
times by creating additional capacity
for MRI, CT and Ultrasound
Secure capital funding for CT/MRI hub at
ACH
Capital build programme
Procurement of MRI scanner
Staff Recruitment
CMT support in principle pending identification of capital funding
Awaiting confirmation from SG re capital funding availability
This is dependent on Access
Funding being confirmed
Mobile scanner remains in place PC1 SG Radiology 5-Year plan Will improve access to MR/CT service particularly in North
Ayrshire, with less travel for patients from this area
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Medical Imaging
2021-AA125.1 Green Reduce waiting list and waiting
times by creating additional capacity
for MRI, CT and Ultrasound
Mobile MRI scanner at UHA for 12
months
2nd mobile MRI scanner for 3 months
Mobile scanner contract finalised and scanner in place
Still seeking availability of 2nd mobile scanner
Availability of scanner
Cost increase due to demand and
availability
NHS Scotland national
framework
PC1 SG Radiology 5-Year plan
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Medical Imaging
2021-AA125.2 Amber Reduce waiting list and waiting
times by creating additional capacity
for MRI, CT and Ultrasound
Extended Working day/7 day working for
CT and MRI scans
Recruitment of various grades of staff still to be undertaken This is dependent on Access
Funding being confirmed
PC1 SG Radiology 5-Year plan
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Medical Imaging
2021-AA125.3 Amber Reduce waiting list and waiting
times by creating additional capacity
for MRI, CT and Ultrasound
Train / Appoint 3.46WTE sonographers Awaiting confirmation of funding to progress recruitment Staff recruitment Interim use of locums where
available
PC1 SG Radiology 5-Year plan
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Medical Imaging
2021-AA125.4 Amber Reduce waiting list and waiting
times by creating additional capacity
for MRI, CT and Ultrasound
Train 3 Assistant Practitioners Awaiting confirmation of funding to progress recruitment Staff recruitment
Free up staff time to deliver training
PC1 SG Radiology 5-Year plan
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Endoscopy
2021-AA126 Amber Additional endoscopy capacity. 
Reduction in Endoscopy waiting list. 
Reduction in Endoscopy waiting
times. 
Cancer pathway - improved
performance against 62 day target
for colorectal & upper GI pathways
Re-divert ring-fenced funding for mobile
endoscopy unit to create 4th Endoscopy
Room at UHA and staff with agency
team
Completion of works by end 2022
Design work completed
Capital work to commence June 22
Equipment ordered
Funding for staffing confirmed, recruitment in June 22
This is dependent on Access
Funding being confirmed
Funding for agency staffing as
contingency for any delays in
permanent staff recruitment
PC1 NHS Recovery Plan
Recovery and redesign: Cancer Services
Framework for Effective Cancer Management
Reduction in waiting times for investigation
Positive benefit for more deprived populations where incidence
of cancer / later stage cancer is higher
134

Page 135

West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Endoscopy
2021-AA126.1 Green Additional endoscopy capacity. 
Reduction in Endoscopy waiting list. 
Reduction in Endoscopy waiting
times. 
Cancer pathway - improved
performance against 62 day target
for colorectal & upper GI pathways
Endoscopy Remobilisation
Establish funded/staffed Cytosponge
Service
Further roll out CCE usage
300 Cytosponge procedures in 2022/23
336 Colon Capsule Endoscopy (CCE)
procedures in 2022/23
Continuing to engage actively with national programme to support
increased usage
Clinician engagement PC1 CfSD HEAT map Reduction in waiting times for investigation
Positive benefit for more deprived populations where incidence
of cancer / later stage cancer is higher
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Endoscopy
2021-AA126.2 Amber Additional endoscopy capacity. 
Reduction in Endoscopy waiting list. 
Reduction in Endoscopy waiting
times. 
Cancer pathway - improved
performance against 62 day target
for colorectal & upper GI pathways
Roll out of qFIT to routine waiting list/
referrals
Establish qFIT as primary care based
test
Establish qFIT testing capacity & results
which are accessible to GPs
Initial test of change qFIT of cohort of longest waiting routine
patients
Paper to GP sub committee in June 22 re. primary care issuing of
test kits
GP engagement
Laboratory space / staffing
System access
PC1 NHS Recovery Plan
Recovery and redesign: Cancer Services
Reduction in waiting times for investigation
Positive benefit for more deprived populations where incidence
of cancer / later stage cancer is higher
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Cancer
2021-AA127 Amber Improved performance against 31 &
62 day cancer target.  Improved
pathway and experience for patients
Develop and implement Vague
Symptoms Pathway
Progress implementation of Cancer
Management Framework
June 21
Vague Symptom pathway in place and undergoing academic
evaluation
Updated action plan for Cancer Management Framework
submitted in May 22
Significant increase in cancer
referral demand
Constraints in remobilising
investigation capacity (endoscopy)
Staff recruitment (breast radiologist)
Implement Cancer Management
Framework action plan
PC1 Recovery and redesign: Cancer Services
Framework for Effective Cancer Management
Reduction in waiting times for investigation
Positive benefit for more deprived populations where incidence
of cancer / later stage cancer is higher
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care 2021-AA128 Green Workforce HEAT Map ADEPt
Additional capacity across various
areas - endoscopy, elective surgery,
outpatients
Work with CfSD and Workforce
Academy to progress planning and
implementation of new roles.
Bring forward funding proposals for these
new posts.
Progress being made across a number of ADEPt areas including
Anaesthetic Associates, Theatre Practitioners, Endoscopy
Assistants, Peri-operative and Anaesthetic Assistant Nurse
training via NHS Academy
Staff Recruitment
Challenges releasing staff for
training
PC1 CfSD HEAT map
West of Scotland Ayrshire and
Arran
Recovering planned care Rehabilitation 2021-AA31 Amber Workforce Planning and
Recruitment
Delivery of AHP Rehabilitation
Services to achieve safe, high
quality care and support for the
people of Ayrshire and Arran.
Creation of workstreams to plan and
deliver on future workforce requirements.
Submit proposal for Investment in AHP
Services.
Creation of Quality Assurance Measures
dashboard.
Rehabilitation Commission work to
continue into phase 2 including, service
reform, capacity/ demand/ quality
analysis and stakeholder engagement
planning.
Work continues to focus investment on key areas of service
delivery risk in line with Caring for Ayrshire objectives for reform.
This work was further delayed by service demand pressures but
will now commence. Work continues on Quality Assurance
dashboard. Phase 2 of the Rehabilitation Commission
commenced in May 22. This will focus on service reform and job
planning for AHPs in line with the Healthcare Staffing
Programme.  Proposal for investment in AHP Services submitted.
North Ayrshire HSCP
South Ayrshire HSCP
East Ayrshire HSCP
Scale of requirement for investment.
Potential of variable funding from the
3 HSCPs leading to inequity across
Ayrshire. If investment is non-
recurring there is potential for
recruitment challenges.  If funding is
not available future service reform
may be unable to be delivered as
planned.
The need to identify a funding
stream from national investment
for rehabilitation services
pending the work of the National
Rehabilitation Advisory Board
linked to Framework for
Supporting People through
Recovery and Rehabilitation
during and after the Covid-19
Pandemic (2020) remains.
Reduction in service delivery
and further prioritisation of
services using business
continuity plans is ongoing.
PC1 Framework for Supporting People through Recovery and
Rehabilitation during and after the Covid-19 Pandemic (2020).
Caring for Ayrshire. North, East and South HSCP Strategic
Plans (2020/21). NHS Recovery Plan. Redesign of Urgent
Care (RUC)
Six Essential Actions (6EA)
Primary Care Improvement Plans (PCIPs)
Trauma and Orthopaedic Recovery Plan
Winter Preparedness
National Treatment Centres
Realistic Medicine
The impact of AHP services on health inequalities is widely
documented nationally and internationally. This has obvious
implications for patient safety and personal outcomes for our
population. It also has a significant impact on staff health and
wellbeing due to stress, burnout and widely reported challenges
with the quality of care we can provide. Provision of services for
those in the lower SIMD index levels are more at risk of being
unable to access appropriate levels of support and care.
West of Scotland Ayrshire and
Arran
Recovering planned care Rehabilitation 2021-AA32 Red Transforming Roles
Increased development of non-
medical models of care to deliver
the right care in the right place by
the right person whilst improving
performance on national 12 hour
wait target
Mapping exercise of current roles.
Educational needs analysis.
Scoping of funding required for education
and development of workforce.
By June 22
Scoping of reformed services to deliver
future models of care.
There is a National Advanced Practice SLWG which will meet to
progress this work in line with the national AHP education review.
Locally we will work to implement the plans that come from this
work. We are looking to identify training and education funds for
AHPs to develop their skills at all levels of practice including
advanced practice, funding is required to enable our ability to
progress this work.  NES currently re-starting this work nationally
with no agreed timescales in place.
NHS Ayrshire & Arran
North Ayrshire HSCP
South Ayrshire HSCP
East Ayrshire HSCP
Scale of requirement for mapping
and potential investment. Potential of
variable funding from the 3 HSCPs
leading to inequity across Ayrshire.
Timescales for the planning of these
roles to allow for training to be
undertaken by staff and subsequent
academy model supervision
completion. If investment in training
is not available or funding for
recruitment is non-recurring there is
potential for recruitment challenges.
If funding is not available future
service reform may be unable to be
delivered as planned.
Identify funding stream from
NES as this is a National
Programme. Unable to provide
reformed service if funding and
skill development are not
achievable.
PC1 NHS Recovery Plan
Pain Management Recovery Framework
Redesign of Urgent Care (RUC)
Six Essential Actions (6EA)
Primary Care Improvement Plans (PCIPs)
Trauma and Orthopaedic Recovery Plan
Winter Preparedness
National Treatment Centres
Realistic Medicine Framework for Supporting People through
Recovery and Rehabilitation during and after the Covid-19
Pandemic (2020). Caring for Ayrshire. North, East and South
HSCP Strategic Plans (2020/21). Scottish Government
Modernising Patient Pathways Programme
By creating new and transformed roles AHP would be able to
deliver reformed services and reach our population earlier in
their life curve using realistic medicine principles and deliver
safe care closer to their home. AHPs in transformed roles have
a greater ability to reach the wider population and make a
tangible impact on health inequalities.
West of Scotland Ayrshire and
Arran
Recovering planned care Rehabilitation 2021-AA33 Proposal Adult Acute Rehab Services
Facilitation of faster discharge and
reduced length of stay to improve
patient outcomes and deliver the
right care in the right place by the
right person.
Submit proposal for Investment in AHP
Services to address the staffing levels
identified through the AHP Rehabilitation
Commission Workforce Review.
Rehabilitation Commission work to
continue into phase 2 including, service
reform, capacity/ demand/ quality
analysis and stakeholder engagement
planning.
This work remains at proposal stage. No progress has been made
in terms of improving safe staffing levels to reduce patient safety
risks.  Proposal for investment in AHP Services submitted.
NHS Ayrshire & Arran
South Ayrshire HSCP
East Ayrshire HSCP
Scale of requirement for investment.
Potential of variable funding
response from the 3 HSCPs leading
to inequity across Ayrshire. If
investment is non-recurring there is
potential for recruitment challenges. 
If funding is not available future
service reform may be unable to be
delivered as planned.
AHP Rehabilitation Commission
report highlighted to SPOG and
CMT prioritisation of need and
highest risk areas.
PC1 Framework for Supporting People through Recovery and
Rehabilitation during and after the Covid-19 Pandemic (2020).
Caring for Ayrshire. North, East and South HSCP Strategic
Plans (2020/21). NHS Recovery Plan. Redesign of Urgent
Care (RUC)
Six Essential Actions (6EA)
Primary Care Improvement Plans (PCIPs)
Trauma and Orthopaedic Recovery Plan
Winter Preparedness
National Treatment Centres
Realistic Medicine
Missed care and omissions of care have the greatest impact on
those in the lower SIMD index levels are more at risk of being
unable to access appropriate levels of support and care.
West of Scotland Ayrshire and
Arran
Recovering planned care Rehabilitation 2021-AA34 Green ICU
Delivery of AHP services as per
FICM guidelines.
Respond to the Scottish Government
scoping which identified additional
capacity of 2 beds. 
Progress recruitment in response to the
AHP Rehabilitation Commission
Workforce Review which identified deficit
in current safe staffing levels to meet
FCIM guidelines. 
Additional AHP funding secured non recurring for 2 further ICU
beds. Planning to identify permanent funding to make all posts
permanent is ongoing.
NHS Ayrshire & Arran
South Ayrshire HSCP
East Ayrshire HSCP
Non recurring funding for UHA posts
may result in recruitment and
sustainability challenges.
Reconfiguration of posts to ensure
recruitment has been required.
Additional funding was secured
for a skill mix of roles to create a
sustainable model for
succession planning and future
reform planning. Further
planning to extend the reach of
the InSPIRE programme.
PC1 NHS Recovery Plan
Pain Management Recovery Framework
Redesign of Urgent Care (RUC)
Six Essential Actions (6EA)
Primary Care Improvement Plans (PCIPs)
Trauma and Orthopaedic Recovery Plan
Winter Preparedness
National Treatment Centres
Realistic Medicine Framework for Supporting People through
Recovery and Rehabilitation during and after the Covid-19
Pandemic (2020). Caring for Ayrshire. North, East and South
HSCP Strategic Plans (2020/21). Scottish Government
Modernising Patient Pathways Programme  FCIM Guidelines
Delivery of this model will reduce health inequalities as people
will receive the correct care at the right point in their journey.
West of Scotland Ayrshire and
Arran
Recovering planned care Rehabilitation 2021-AA35 Red Ensure timely AHP intervention and
transition of care to community.
Delivery of Home First Model at Front
Door and CAU
Scottish Government funding secured on non recurring basis for
AHP team at front door and CAU. Unable to recruit to non-
recurring roles. SLT and Dietetic roles have been funded for 9
months via EAHSCP, these have been recruited to. Proposal
submitted to CMT to request recurring monies, no funding
secured as yet however planning is ongoing.
NHS Ayrshire & Arran
South Ayrshire HSCP
East Ayrshire HSCP
Funding for these posts from the
Scottish Government was non-
recurring - this has an impact on
AHP recruitment and retention. AHP
Rehabilitation Commission 
workforce review identified high risk
related to recruitment to short term
funded posts. Posts are advance
practice and require training budget
to enable development of staff. 
Current funding covers staff pay
costs.
Secure further funding (£907 K
per annum)  to extend the length
of time for posts to test and
implement  a sustainable AHP
model at front door.
PC1 Framework for Supporting People through Recovery and
Rehabilitation during and after the Covid-19 Pandemic (2020).
Caring for Ayrshire. North, East and South HSCP Strategic
Plans (2020/21). NHS Recovery Plan. Redesign of Urgent
Care (RUC)
Six Essential Actions (6EA)
Primary Care Improvement Plans (PCIPs)
Trauma and Orthopaedic Recovery Plan
Winter Preparedness
National Treatment Centres
Realistic Medicine
Delivery of this model will reduce health inequalities as people
will receive the correct care at the right point in their journey.
West of Scotland Ayrshire and
Arran
Recovering planned care Rehabilitation 2021-AA36 Amber Trauma and Orthopaedics
Delivery of AHP services as part of
trauma and orthopaedic redesign.
Occupational Therapy and
Physiotherapy posts to be approved and
recruited to in response to the recent
AHP workforce review.
Successful completion of recruitment to OT post. Currently
working on Quality Improvements and patient safety standards in
relation to the National Hip Fracture audit data.
NHS Ayrshire & Arran
East Ayrshire HSCP
Lack of investment for dietician and
orthotics demand that may delay
discharge. The QI work on the hip
fracture audit has highlighted a need
to review OT staffing levels.
Identify funding for 1 WTE
dietician and orthotics 1 session
per week to meet demand and
safe staffing.  This was included
in the AHP rehabilitation
commission workforce review but
no funding has been allocated.
PC1 NHS Recovery Plan Pain Management Recovery Framework
Redesign of Urgent Care (RUC) Six Essential Actions (6EA)
Primary Care Improvement Plans (PCIPs) Trauma and
Orthopaedic Recovery Plan Winter Preparedness National
Treatment Centres Realistic Medicine Framework for
Supporting People through Recovery and Rehabilitation during
and after the Covid-19 Pandemic (2020). Caring for Ayrshire.
North East and South HSCP Strategic Plans (2020/21) West of Scotland Ayrshire and
Arran
Recovering planned care Rehabilitation 2021-AA37 Amber Stroke Services
Transform roles in stroke to enable
a flexible approach to the Acute and
Community needs.
Progress recruitment to posts
Complete
East Ayrshire HSCP have secured recurring money for the stroke
posts identified in RMP3 and linked to University Hospital
Crosshouse.  OT, Dietetics, SLT and Physio posts have now
been recruited to. Clinical staff in this area have submitted an
SBAR to the Senior Management team highlighting the gap that
still remains within stroke services.
NHS Ayrshire & Arran
South Ayrshire HSCP
East Ayrshire HSCP
Finance secured for additional bed
capacity at UHC.  AHP
Rehabilitation Commission
Workforce Review has identified
deficits in safe staffing levels across
stroke services.
Identify funding for AHP
workforce identified for safe
staffing of stroke services (4.5
WTE experienced practitioners
and 4 additional HCSW for UHC
and Rehabilitation ward).  This
was included in the AHP
rehabilitation commission
workforce review but no funding
PC1 Framework for Supporting People through Recovery and
Rehabilitation during and after the Covid-19 Pandemic (2020).
Caring for Ayrshire. North, East and South HSCP Strategic
Plans (2020/21). NHS Recovery Plan. Redesign of Urgent
Care (RUC)
Six Essential Actions (6EA)
Primary Care Improvement Plans (PCIPs)
Trauma and Orthopaedic Recovery Plan
Winter PreparednessWest of Scotland Ayrshire and
Arran
Recovering planned care Rehabilitation 2021-AA38 Red Adult Community Hospital Inpatient
Services
Facilitation of faster discharge and
reduced length of stay to improve
patient outcomes and deliver the
right care in the right place by the
right person.
Respond to the AHP rehabilitation
workforce review which identified
resources required.
Rehabilitation Commission work to
continue into phase 2 including, service
reform, capacity/ demand/ quality
analysis and stakeholder engagement
planning.
Investment in AHP Services submitted. Investment achieved does
not mitigate the risks identified within these areas of service
delivery. Different models of care are being explored however the
risk remains.
NHS Ayrshire & Arran
North Ayrshire HSCP
East Ayrshire HSCP
Scale of requirement for investment.
Potential of variable funding
response from the 3 HSCPs leading
to inequity across Ayrshire. If
investment is non-recurring there is
potential for recruitment challenges. 
If funding is not available future
service reform may be unable to be
delivered as planned.
AHP Rehabilitation Commission
report highlighted to SPOG 
Criteria led referral process and
prioritisation of need
PC1 Framework for Supporting People through Recovery and
Rehabilitation during and after the Covid-19 Pandemic (2020).
Caring for Ayrshire. North, East and South HSCP Strategic
Plans (2020/21). NHS Recovery Plan. Redesign of Urgent
Care (RUC)
Six Essential Actions (6EA)
Primary Care Improvement Plans (PCIPs)
Trauma and Orthopaedic Recovery Plan
Winter Preparedness
135

Page 136

West of Scotland Ayrshire and
Arran
Recovering planned care Rehabilitation 2021-AA39 Green EACH (East Ayrshire Community
Hospital)
Facilitation of faster discharge and
reduced length of stay to improve
patient outcomes and deliver the
right care in the right place by the
right person.
Respond to the AHP workforce review of
current service at EACH which identified
deficit in staffing level.
Funding secured from EACH to invest in AHP resource required
to meet staffing requirements. All registered clinical posts have
been filled in this area.
East Ayrshire HSCP Focus is on AHP cover for the
specialist dementia unit at EACH.
Further development of the model is
required.
Work is ongoing to develop the
HCSW roles.
PC1 East Ayrshire Strategic Plan NHS Recovery Plan Pain
Management Recovery Framework Redesign of Urgent Care
(RUC) Six Essential Actions (6EA) Primary Care Improvement
Plans (PCIPs) Trauma and Orthopaedic Recovery Plan Winter
Preparedness National Treatment Centres Realistic Medicine
Framework for Supporting People through Recovery and
Rehabilitation during and after the Covid-19 Pandemic (2020).
Caring for Ayrshire. North, East and South HSCP Strategic
Plans (2020/21). Scottish Government Modernising Patient
Pathways Programme
Delivery of this model will reduce health inequalities as people
will receive the correct care at the right point in their journey.
West of Scotland Ayrshire and
Arran
Recovering planned care Rehabilitation 2021-AA40 Amber Intermediate care and community
rehabilitation
Avoidance of unnecessary acute
hospital admission, and delivery of
high quality rehabilitation and
recovery.
Respond to the AHP rehabilitation
workforce review which identified
resources required.  
Rehabilitation Commission work to
continue into phase 2 including, service
reform, capacity/ demand/ quality
analysis and stakeholder engagement
planning.
Proposal for Investment in AHP Services submitted.  Varied levels
of investment has been secured across the three HSCP's with
further opportunities being explored.
NHS Ayrshire & Arran
North Ayrshire HSCP
South Ayrshire HSCP
East Ayrshire HSCP
Scale of requirement for investment.
Potential of variable funding
response from the 3 HSCPs leading
to inequity across Ayrshire. If
investment is non-recurring there is
potential for recruitment challenges. 
If funding is not available future
service reform may be unable to be
delivered as planned.
AHP Rehabilitation Commission
report highlighted to SPOG 
Clinical triage  and prioritisation
of referrals
PC1 Framework for Supporting People through Recovery and
Rehabilitation during and after the Covid-19 Pandemic (2020).
Caring for Ayrshire. North, East and South HSCP Strategic
Plans (2020/21). NHS Recovery Plan. Redesign of Urgent
Care (RUC)
Six Essential Actions (6EA)
Primary Care Improvement Plans (PCIPs)
Trauma and Orthopaedic Recovery Plan
Winter Preparedness
National Treatment CentresWest of Scotland Ayrshire and
Arran
Recovering planned care Rehabilitation 2021-AA41 Green Pain Services
Delivery of AHP pain services
through MSK to support patients
through self management and
prevention approach
Develop a 5 week Pain Association
Programme that will support the further
enhancement of service for patients to
reduce GP, OOH and Front door
attendances.
Additional physiotherapy post has been advertised as part of
service development plan.  Recruitment to posts has been
completed
NHS Ayrshire & Arran
North Ayrshire HSCP
South Ayrshire HSCP
East Ayrshire HSCP
Difficulty recruiting to 15 hrs
physiotherapy vacancy within core
staffing leading to increased waiting
times and variation in service
delivery.  Digital inclusion for
patients who struggle to access
online resources.
Physiotherapy post has been
increased to 18.75 hours to
attract candidates.  HR process
underway. Development of pain
management service resources
that reduce digital divide.
PC1 Framework for Supporting People through Recovery and
Rehabilitation during and after the Covid-19 Pandemic (2020).
Caring for Ayrshire. North, East and South HSCP Strategic
Plans (2020/21). NHS Recovery Plan. Redesign of Urgent
Care (RUC)
Six Essential Actions (6EA)
Primary Care Improvement Plans (PCIPs)
Trauma and Orthopaedic Recovery Plan
Winter Preparedness
National Treatment Centres
Realistic Medicine. Pain Management Recovery Framework
Delivery of this model will reduce health inequalities as people
will receive the correct care at the right point in their journey.
Reducing digital divide through the use of face to face and
audio podcasts versus all online offer.
West of Scotland Ayrshire and
Arran
Recovering planned care Rehabilitation 2021-AA42 Amber Long Covid
Delivery of a safe clinical pathway
suitable for implementing the
management of Long Covid
ensuring that the person is cared for
by the right clinician at the right
time.
Implement the SIGN161 Guideline
released on 18/12/20 to meet the needs
of people with Long Covid without
significant loss or impact on existing
service recovery.
At present attempting to meet these needs impacts on resource
allocated for recovery for both urgent and routine health care. The
process of a benchmarking exercise with a multi-disciplinary
attendance to gain expert knowledge on the status of the Board’s
current response to Long Covid management and also determine
next steps has been completed.  We have now secured non-
recurring funding for a small Long Covid service within Ayrshire
and Arran. This service will focus on long term condition
management and holistic assessment and onward signposting for
people with long Covid symptoms.
North Ayrshire HSCP
South Ayrshire HSCP
East Ayrshire HSCP
Funding for these posts from the
Scottish Government is non-
recurring - this has an impact on
AHP recruitment and retention.
Current funding covers staff pay
costs and not the digital components
within the bid. A Once for Scotland
approach is being used for this
which may cause delays in
implementation and delivery.
Recruitment is underway and the
service will be hosted within
HARP to increase sustainability
and reduce risk.
PC1 Framework for Supporting People through Recovery and
Rehabilitation during and after the Covid-19 Pandemic (2020).
Caring for Ayrshire. North, East and South HSCP Strategic
Plans (2020/21). NHS Recovery Plan.
Primary Care Improvement Plans (PCIPs)
Winter Preparedness
Realistic Medicine, SIGN 161 Managing the long-term effects
of Covid-19. Cossette Report 2020.
Delivery of this model will reduce health inequalities as people
will receive the correct care at the right point in their journey.
West of Scotland Ayrshire and
Arran
Recovering planned care Rehabilitation 2021-AA43 Proposal Prehabilitation
Prehabilitation, delivered as a
considered part of the rehabilitation
continuum, could have significant
positive impact on the systems and
services which are currently trying
to deal with many of the
issues/conditions that could be
otherwise prevented or at least
minimised if a pro-active approach
was applied.
Progress initial discussions on the
scoping of prehabilitation services.
Review of previous test of change data
and mapping of future reformed service
needs.
Planning and creation of relevant
business case.
Complete
The proposal was submitted to the NTC team writing the business
case for Scottish Government funding for this model, no update
has been received to date.
NHS Ayrshire & Arran
North Ayrshire HSCP
South Ayrshire HSCP
East Ayrshire HSCP
Scale of requirement for investment.
Potential of variable funding
response from the 3 HSCPs leading
to inequity across Ayrshire. If
investment is non-recurring there is
potential for recruitment challenges. 
If funding is not available future
service reform may be unable to be
delivered as planned.
Funding stream from national
investment for rehabilitation
services from the work of the
National Rehabilitation Advisory
Board linked to Framework for
Supporting People through
Recovery and Rehabilitation
during and after the Covid-19
Pandemic (2020) has been
agreed.
PC1 Framework for Supporting People through Recovery and
Rehabilitation during and after the Covid-19 Pandemic (2020).
Caring for Ayrshire. North, East and South HSCP Strategic
Plans (2020/21). NHS Recovery Plan. Redesign of Urgent
Care (RUC).
Six Essential Actions (6EA).
Primary Care Improvement Plans (PCIPs).
Trauma and Orthopaedic Recovery Plan
Winter Preparedness
National Treatment Centres
Realistic Medicine. Care and Wellbeing Programmes. Recovery
and redesign: Cancer Services. Framework for Effective
Cancer Management. Centre for Sustainable Delivery Heat
Delivery of this model will reduce health inequalities as people
will receive the correct care at the right point in their journey.
West of Scotland Ayrshire and
Arran
Recovering planned care Estates and Capital Planning 2022-AA1 Green Delivery of National Treatment
Centre for Orthopaedics
New national treatment centre for elective
orthopaedic care operational and treating
patients by 2025.
Strategic Initial Agreement and Economic Case approved. 
Progress on work to complete Full Business Case proceeding to
programme.  Property acquired and under NHS Ayrshire and
Arran control.
Professional team appointed and in
place.  Adopted programme being
driven at pace.  Ongoing project
scrutiny and engagement via
programme board.
Professional team appointed and
in place.  Adopted programme
being driven at pace.  Ongoing
project scrutiny and engagement
via programme board.
PC1 Caring for Ayrshire Strategy.  Reducing elective care waiting
lists.
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care 2022-AA2 Amber Provision of sustainable safe head
and neck service
Redesign/relocation of Ward 5A to
support Head and Neck (H&N)
inpatients; ensure staff training for airway
care and emergencies
Full recruitment to OMFs consultant
team (3 of 4 posts filled)
Continue discussions with D&G ENT
team to ensure mutual aid is maximised
Increase ENT core weekly theatre and
consideration of weekend working
including cochlear
Internal consultation underway regarding 3 options for protection
of dedicated H&N beds. Further feasibility requires to be
assessed with a decision expected by August 2022
Plan being worked up for additional evening / weekend cochlear
implant theatre lists
Urgent care impact on bed
availability
Staff capacity / willingness to work
overtime
Consultant recruitment
PC1 NHS Recovery Plan
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care 2022-AA3 Red Provision of sustainable safe
Systemic Anti Cancer Therapy
(SACT) service
Build on future service delivery model
work already undertaken by the SACT
Executive and WoSCAN
Investment in Nursing, Pharmacy
workforce to increase Non-Medical
Prescribing
Continue with local delivery plans for
SACT provision including identified
option for community T3 in North, East
Ayrshire
This remains a risk and priority area for NHS Ayrshire and Arran,
but has not been funded in the 2022/23 WoSCAN recurring
funding however non-recurring funding through cancer access
funding will provide some continuation of this work. Recruitment
for medical and nursing is complete. Community support for this is
still being sourced.
This is dependent on Access
Funding being confirmed
PC1 Cancer Strategy - national SACT investment Low risk chemo will be delivered in communities and therefore
reducing health miles.
West of Scotland Ayrshire and
Arran
Recovering planned care Planned Care
Outpatients
2022-AA4 Amber To reduce waiting list size and
waiting times for Outpatients by
increasing clinic capacity and
reducing referral demand
Dermatology
Initiate photo triage service
Employ GPwSI / locum
Staff recruitment underway This is dependent on Access
Funding being confirmed
PC1 NHS Recovery Plan
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Gynaecology
2022-AA5 Green Improve waiting times within
Gynaecology Services
Implementation of Active Clinical Referral
Triage / Enhanced vetting March 23
Develop Education & Relationships with
Primary Care December 23
Improve Digital Resources September 23
Team identified to take work forward Lack of available IT resources to
support
Appointment of 2 new
Consultants
PC1 Waiting Times
Modernising Patient Pathways
Bringing it Together
Caring for Ayrshire
Improve access to meet National Waiting Times Standards and
reduce waits for patients
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Gynaecology
2022-AA5.1 Green Improve waiting times within
Gynaecology Services
Implementation of Patient Initiated
Review September 22
Team identified to take work forward PC1 Waiting Times
Modernising Patient Pathways
Bringing it Together
Caring for Ayrshire
Improve access to meet National Waiting Times Standards and
reduce waits for patients
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Gynaecology
2022-AA5.2 Green Improve waiting times within
Gynaecology Services
Consultant job planning to meet service
needs September 22
Team Service Planning in progress PC1 Waiting Times Improve access to meet National Waiting Times Standards and
reduce waits for patients
136

Page 137

West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Gynaecology
2022-AA5.3 Green Improve waiting times within
Gynaecology Services
Waiting List Initiatives June 22 WLI rolling programme in place Volume of WLI's required becomes
unsustainable
Potential use of Consultant
Retire & Return to mitigate
demands on Consultant
establishment
PC1 Waiting Times Improve access to meet National Waiting Times Standards and
reduce waits for patients
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Gynaecology
2022-AA5.4 Proposal Improve waiting times within
Gynaecology Services
Consultant Retire & Return for additional
capacity October 22
Consultant requests in progress Funding not available PC1 Waiting Times Improve access to meet National Waiting Times Standards and
reduce waits for patients
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Gynaecology
2022-AA5.5 Proposal Improve waiting times within
Gynaecology Services
Develop Business case for nurse
specialist roles June 22
Recruit to Train - courses start October
22
Service Delivery - start October 23
Business case complete Funding not available PC1 Waiting Times
Modernising Patient Pathways
Bringing it Together
Caring for Ayrshire
Improve access to meet National Waiting Times Standards and
reduce waits for patients
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Gynaecology
2022-AA5.6 Proposal Improve waiting times within
Gynaecology Services
Establish feasibility in estate footprint
July 22
Establish suitable patient cohort July 22
Establish equipment / training required
July 22
Deliver unit dependant on outcome of
feasibility study
New deliverable Unit is not feasible due to lack of
estate / funding
Funding for second ultrasound
machine
PC1 Waiting Times
Modernising Patient Pathways
Bringing it Together
Caring for Ayrshire
Positive impact on IP/DC waiting times
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Gynaecology
2022-AA5.7 Green Improve waiting times within
Gynaecology Services
Develop use of Robot Assisted Surgery
March 24
Team identified to take work forward Funding not available
Consultant training time
PC1 Waiting Times
Modernising Patient Pathways
Bringing it Together
Caring for Ayrshire
Positive impact on IP/DC waiting times
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Gynaecology
2022-AA6 Proposal Ensure robust Termination of
Pregnancy (TOP) service
Assess needs of TOP Service,
identifying capacity gaps in light of
increasing demand
Identify additional estate to support
increase in demand September 22
New deliverable inappropriate current
accommodations
PC1 Women's Health Plan Improve health outcomes and health services for all women
and girls in Scotland
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Gynaecology
2022-AA7 Green Develop robust MDT Pelvic Pain
Endometriosis Service
Development of MDT Pelvic Pain
Endometriosis Service / Pathway
December 22
Endometriosis nurse business case July
23
Team identified to take work forward availability of nursing and medical
time for service provision
PC1 Women's Health Plan Improve health outcomes and health services for all women
and girls in Scotland
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Gynaecology
2022-AA8 Green Enhance service for women with
acute menopause symptoms
Enhancement of service for women with
acute menopause symptoms December
22
Primary care education March 22
Workplace wellbeing  August 22
Team identified to take work forward PC1 Women's Health Plan Improve health outcomes and health services for all women
and girls in Scotland
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Gynaecology
2022-AA9 Green Sexual Health Standards
Assess and deliver services to meet
standards - whole system
Completion of Baseline Analysis -
Ayrshire System September 22
Development and delivery of
Improvement Plan - Ayrshire System
(TBC)
Baseline data gathering in progress PC1 Sexual Health Standards Improve Sexual Health Services for young people and adults of
Ayrshire
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Maternity
2022-AA10 Green Best Start
Implementation of the Best Start
Recommendations and
Sustainability of Service.
Complete Gap Analysis of progress and
scope remaining requirements June 22
Gap Analysis and Scoping completed PC1 Best Start Improving access to and quality of services in line with Best
Start recommendations
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Maternity
2022-AA10.1 Green Best Start
Implementation of the Best Start
Recommendations and
Sustainability of Service.
Develop business case for sustainability
of model of care December 22
New deliverable PC1 Best Start Improving access to and quality of services in line with Best
Start recommendations
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Maternity
2022-AA10.2 Green Best Start
Implementation of the Best Start
Recommendations and
Sustainability of Service.
Conclude delivery of implementation of
Best Start recommendations 2025
New deliverable, milestones pending outcomes of gap analysis. PC1 Best Start Improving access to and quality of services in line with Best
Start recommendations
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Maternity
2022-AA11 Green Complex Care
Meeting the needs of complex and
high risk pregnancies
Consultant job planning to meet service
needs commence September 22
Team Service Planning in progress PC1
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Maternity
2022-AA11.1 Proposal Complex Care
Meeting the needs of complex and
high risk pregnancies
Development of Rainbow Clinics
feasibility and capacity review November
22
New deliverable PC1 Improve access to specialist care
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Maternity
2022-AA12 Green Early Pregnancy / Pregnancy Loss
Support for Women experiencing
early pregnancy loss
Develop 7 day scanning service in EPAS
utilising midwife sonographers. March 23
Midwife enrolled on training to start October 22 PC1
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Maternity
2022-AA12.1 Proposal Early Pregnancy / Pregnancy Loss
Support for Women experiencing
early pregnancy loss
Implement Bereavement Liaison pathway
/ clinics  March 23
New deliverable PC1
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Maternity
2022-AA13 Proposal Outpatient Services
Care available closer to home
Establish Outpatient Induction of Labour
Clinics November 22
New deliverable PC1 Caring for Ayrshire
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Maternity
2022-AA13.1 Proposal Outpatient Services
Care available closer to home
GTT / Health Education to be available in
Community settings  December 22
New deliverable PC1 Caring for Ayrshire
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Maternity
2022-AA13.2 Proposal Outpatient Services
Care available closer to home
Suitable Community Accommodation to
be identified in all localities  progress
update March 23
New deliverable Lack of suitable available clinic
space in community settings in any
or all areas.
PC1 Caring for Ayrshire
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Maternity
2022-AA14 Green Service Quality
Access to readily available quality
data
Develop Maternity data Dashboard
March 23
New deliverable Lack of Business Intelligence
Resource
PC1 Best Start
MCQIC
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Paediatrics
2022-AA15 Proposal Improve waiting times within
Paediatric Service
Plan & Costing of refurbishments to
accommodate OP clinic rooms July 22
Agreement to Proceed with works TBC
Scoping in progress Funding not available PC1 Waiting Times
Caring for Ayrshire
Improve access to meet National Waiting Times Standards and
reduce waits for patients
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Paediatrics
2022-AA15.1 Green Improve waiting times within
Paediatric Service
Implementation of Active Clinical Referral
Triage / Enhanced vetting October 22
Develop paediatric handbook for primary
care March 23
Improve Digital Resources March 23
Team identified to take work forward Lack of available IT resources to
support
PC1 Waiting Times
Modernising Patient Pathways
Bringing it Together
Caring for Ayrshire
Improve access to meet National Waiting Times Standards and
reduce waits for patients
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Paediatrics
2022-AA15.2 Green Improve waiting times within
Paediatric Service
Implementation of Patient Initiated
Review November 22
Team identified to take work forward PC1 Waiting Times
Modernising Patient Pathways
Bringing it Together
Caring for Ayrshire
Improve access to meet National Waiting Times Standards and
reduce waits for patients
West of Scotland Ayrshire and
Arran
Recovering planned care Women and Children
Paediatrics
2022-AA15.3 Green Improve waiting times within
Paediatric Service
Consultant job planning to meet service
needs October 22
New deliverable PC1 Waiting Times Improve access to meet National Waiting Times Standards and
reduce waits for patients
West of Scotland Ayrshire and
Arran
Recruitment and retention Workforce 2022-AA16 Amber Improve supply of registrant clinical
staff (ATTRACT)
(1) Latent vacancies within registrant
workforce reduced Ongoing
(2) Reduction in the level of high cost
supplemental staffing being utilised i.e.
agency - by end of Q2 and sustained
(3) Compliance with the forthcoming
Health & Care Staffing (Scotland) Bill - in
line with national direction
(1) NQN recruitment, for those graduating in September 22, has
been completed with candidates matched to funded vacancies
(2) Right sizing workforce group have set targets for reduction in
agency spend for both nursing and medical.  Work underway in
Acute Services to strengthen authorisation of agency usage
(3) Work underway in completing H&C Staffing Bill self
assessment template.  Application of nursing tools re-commenced
with timetable across organisation for the use of the tools.
Corporate risk 764 relates to
registrant workforce supply and
capacity and directly impacts on all 3
deliverables
International recruitment used as
lever
Planned exit programme for high
cost locums in Acute Services
In keeping with WoS colleagues
unified approach to the
recruitment of NQNs
RR1 Right Sizing Workforce
Workforce Plan
Financial Plan
National Treatment Centre Plan
People Strategy
National Health & Social Care Workforce Strategy
137

Page 138

West of Scotland Ayrshire and
Arran
Recruitment and retention Workforce 2022-AA17 Green Introduce new complementary
roles/support development of
existing staff (RETAIN)
(1) Strengthened multidisciplinary team
working and development March 23
(2) New career pathways and
opportunities for both existing staff and
those new to the NHS March 23
(3) Staff enabled through support and
development to work to the top of their
roles March 23
(1) New role development underway.  Anaesthetic Associate roles
for NTC have been advertised.  Advanced Critical Care
Practitioners also in progress.  Agreement on WoS basis to
proceed with Physician Associates for the West region with effect
from FY 2023.
(2) Linked to 1 but also work underway looking at Advanced and
Extended Scope practitioners across nursing and AHPs.
(3) Steering Group established to progress the work for Band 2/3
review of HSCWs
(1) New role development and
ongoing supervision and support to
those in training impacts on clinician
time further impacting on wider
service recovery capacity
(2) staff moving into new roles
creates domino effect of vacancies
in wider workforce
(3) Lead in time associated with new
roles (MAP roles 2-3 years) before
staff can bring capacity to services
(3) Staff willingness to expand
practice
(1) Buy in from clinical teams set
out early and seek opportunities
of scale locally / regionally which
could mitigate capacity issues.
(2) Early planning for
introduction of roles and clear
messaging of associated lead in
times so no false expectation. 
Lack of pump priming from SG
could create an inhibiting factor
(3) Engagement with staff to
encourage working to top of role
RR1 Right Sizing Workforce
Workforce Plan
Financial Plan
National Treatment Centre Plan
People Strategy
National Health & Social Care Workforce Strategy
West of Scotland Ayrshire and
Arran
Recruitment and retention Workforce 2022-AA18 Green Deliver the ambitions of our
Employability Strategy (DEVELOP)
(1) Opportunities for those far from
employment March 23
(2) Growing our own staff, offering non-
linear career routes and pathways March
23
(3) Improving the visibility of the range of
NHS careers and opportunities,
particularly for those in education March
23
(1) Kickstart programme in place
(2) Agreement to proceed with modern apprenticeship programme
at larger scale than undertaken in Ayrshire before - target of
approx. 50
(3) Employability Strategy approved by Corporate Management
Team and work now underway to develop action plan to underpin
strategy.  Intent to take strategy to NHS Board in October along
with Workforce Plan
(1) Funding to support employability
programmes and ensuring that those
undertaking programmes can move
into roles once have completed
programme
(2) Capacity of services to support
employability programmes
(1) Access available funding
routes and consideration of
employability at scale as
opposed to smaller numbers
(2) Engagement with wider
colleagues across Scotland to
take learning from approaches
and models and look for potential
economies of scale.
RR1 Employability Strategy
Workforce Plan
Financial Plan
People Plan
National Health & Social Care
Workforce Strategy
Anchor Institution
Fair Work
Employability
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2021-AA11 Green To continue to meet increased
service demand, and to facilitate
timely hospital discharges and
increased pressures over winter,
including weekends and public
holidays
Complete Re-design of Ayrshire and
Arran unscheduled care service
Recruitment of RN to support complex hospital discharge and
assessment and Store Technician Community Equipment Store. 
Improvement Area - Hospital Discharge
Locality and Community Care Service Update:
Over the past year there has been additional investment in
Hospital based assessment teams
to support a multi-disciplinary approach to discharge.
Roles with teams now include: MHOs, Occupational Therapy
Assistants, and additional SW and Management capacity. 
Weekend and public holiday working continues to be facilitated by
the assessment teams.
Community Care Senior Managers are part of the 'Discharge
without Delay' programme, including the post hospital and planned
data of discharge workstreams.
North Ayrshire HSCP Unable to recruit or recruit fully due
to temporary nature and non-
recurring budget.
Hospital delays will increase into the
winter period putting additional
pressure on staff and the system
Challenge of continued unmet need
in community due to resource focus
on hospital discharge.
Ongoing recruitment activity,
including fairs and events.
Workforce Planning
Discharge without Delay
programme
SC1 NAHSCP Strategic Plan
Caring for Ayrshire
Winter Preparedness
A faster facilitation of discharge from hospital will address
health inequalities by supporting people back to health in a
community setting.
Evidence suggests that there is a detrimental impact to people
staying in a hospital setting or longer than necessary.
A more effective discharge process will support people to leave
hospital care  as soon as is medically possible to allow them to
recover more effectively in their own home.
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2021-AA12 Amber To continue to support Care Homes
within North Ayrshire with the
training and supervision of staff
Undertake a review of the North Ayrshire
Care Home Commissioning Process -
including
(1) Needs Assessment
(2) Market Analysis
(3) Provider engagement
(4) Commissioning modelling
March 23
Progess has been slow to date due to Covid and other competing
priorities. However, new base dataset has been sourced looking at
Care Home data from March 2022. This will now be analysed for
trend information to support a new commissioning strategy.
North Ayrshire HSCP Unable to offer additional support to
Care Homes
Care Home Oversight Group still
in place, meeting weekly to
provide support to local care
home sector.
SC1 NAHSCP Strategic Plan
Caring for Ayrshire
People living in care homes are perhaps among the most
vulnerable in our communities, by supporting care homes to
provide the most effective care will positively impact on
residents. By providing overarching support to all care homes,
we can help ensure a high-level of care is available in all North
Ayrshire establishments, this should positively impact on those
service users living in Care Homes.
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2021-AA13 Amber Increase dementia Post Diagnostic
Service (PDS) capacity in localities
Recruitment of three band 5 community
psychiatric nurses to deliver increased
support for patients diagnosed with a
dementia.
Gather data on compliance against
standards including numbers of patients
referred, numbers offered an
appointment within 7 days and uptake up
the offer of post diagnostic support.
As a service the service has advertised for 3 x 30 hour band 5
RNs without success.  The advert has been reviewed and the
service readvertise for 2 x 37.5 hour staff with a view to increasing
interest.
The service continues to deliver PDS to all patients with a
diagnosis of dementia however as we have been unable to recruit
we cannot at this time expand or develop and implement other
supports.
North Ayrshire HSCP If unable to recruit will be unable to
release experienced CPNs to focus
solely on PDS
Service may not meet key targets in
line with standards and PDS
commitments 
Staff within the team will
continue to offer PDS in line with
standards
Monitor compliance with
standards and data provided to
Scottish Government
SC1 NAHSCP Strategic Plan
Caring for Ayrshire
National Dementia Strategy 2017-2020
Scottish Government Covid-19
Dementia Recovery Plan
Commitment 4 - Post-Diagnostic Support
Through enhancement of this service, those identified with
dementia and their family/carers will be provided with much
needed early support. This service will support families at the
early stages of their journey, ensuring that they are provided
with adequate information, guidance and support and are better
prepared to cope with the dementia diagnosis.
Failure of this service can impact negatively on patients,
families and carers as they may face challenges to identify
suitable support.
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2021-AA15 Amber To meet the ongoing demands of
the Occupational Therapist service
and assist with winter planning &
Covid recovery
Improvement Area - Community waits for
assessment and review
Recruitment to posts has been delayed due to review of scheme
of delegation.  This has now been completed and recruitment
process will now start.
North Ayrshire HSCP Additional risk to service delivery if
funding not available after March
2022
Further risks to service delivery with
other vacancies in the team.
If funding not continued may
have to meet within existing
resources which not sustainable
within the current service
Recruitment to vacant posts is
underway however if unable to
fill posts risks will remain
SC1 NAHSCP Strategic Plan
Caring for Ayrshire
Winter Preparedness
Delivery of this model will reduce health inequalities as people
will receive the correct care at the right point in their journey.
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2021-AA16 Amber Continue to meet the ongoing
demands of the ICT service and
assist with winter planning
Improvement Area - Hospital
Discharge/Admission Avoidance
Enhance role of enhanced ICT -
following review of service. Plan to be
developed - to incorporate
tasks not undertaken and ensure
capacity to support 'Hospital at Home'
Model
Posts have been recruited to - 2 practitioners and the assistant
post on hold
North Ayrshire HSCP Due to the temporary nature of the
posts and the non-recurring monies
the posts may not be recruited
Ongoing risk of demands of service
delivery and increased acuity of
patients treated
Continual prioritisation of
workloads and review of service
SC1 NAHSCP Strategic Plan
Caring for Ayrshire
Winter Preparedness
Delivery of this model will reduce health inequalities as people
will receive the correct care at the right point in their journey.
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2021-AA17 Amber Develop an Integrated Hub on
Arran, including effective review of
care bed provision on the island and
implementation of a sustainable
24/7 care service.
Continue to support the additional GP
rota for AWMH to enable the transition to
the new model of nursing care and
support the Covid response on Arran
Progress the New Models of Care work
building on from the complex frailty MDT
work and Frailty collaborative
Progress Single Point of Contact and
patient flow via care navigation and
introduction of Netcall.
Need to make the GP flex funding permanent to align with the 2
ED posts to ensure service delivery for urgent care. 
Netcall is going live 15th June 22 as key infrastructure for delivery
of SPOC on Arran.
Project Team to take forward Initial Agreement to OBC and FBC
being reinstated in July 22.
North Ayrshire HSCP Unable to continue posts in 2022/23
due to the temporary nature of the
posts and non-recurring budget
Critical and Essential services and
24/7 rotas cannot be sustained due
to workforce challenges and multi-
site delivery model.
Re-submit the Initial Agreement
to Scottish Government for an
Integrated Hub on Arran to
progress to Outline Business
Case and Full Business Case in
line with Caring for Ayrshire
Continue to recruit into all
current vacancies – rolling
advert, recruitment fairs. 
Continue to use bank and
agency staff in interim to ensure
safe services.
SC1 NAHSCP Strategic Plan
Caring for Ayrshire
Winter Preparedness
Establishment of the Integrated Hub will provide a more
effective service to the people of Arran. In particular, the
additional development of a 24/7 care service on the island will
bring particular benefits to many of the islands vulnerable and
at risk people. Many frail or infirm people are often at risk during
the night, leading to high levels of emergency admissions to
AWMH or residential care. With a 24/7 care service, effective
OOH or overnight care can be provided in a patients own
home, reducing the need for hospital admissions.
This service will also provide a similar approach to what  is
available on the mainland.
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2021-AA18 Green To enhance resilience with the care
at home service to improve hospital
discharges and reduce the waiting
list for Care at Home Services
Reduce the number of people waiting for
assessment
Reduce the number of people on the
waiting list for a Care at Home service in
the Community
Winter investment funding – Care at
Home Capacity Plan
Enhance in-house care at home service
Enhance workforce
Plus 2 TEC workers
A number of newly funded posts as part of the winter investment
fund have now been filled.
This remains under constant review with on-going recruitment
activity.
North Ayrshire HSCP Recruitment is unsuccessful and
unable to fill vacant posts.
Retention of existing workforce.
External care at home providers
capacity for care delivery and
ongoing sustainability.
Robust recruitment and
advertising campaign.
Promote health and wellbeing
initiatives for existing workforce.
Ongoing contract management
with External Providers.
SC1 Winter preparedness Enhancing resilience within the care at home service will have
the benefit of ensuring people awaiting community care
packages will receive the needed support faster.
It will also ensure Care at Home workers are adequately
supported to fulfil their role, reduce burnout and ensure they
are able to deliver effective services over the long term.
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2021-AA27 Amber Ensuring people are supported
within the community where
possible rather than in a hospital or
institutional setting to improve
outcomes and reduce delayed
transfers of care
Provide additional capacity in the CAH
service to enable flow from reablement,
minimise DTOCs and prevent
unnecessary admissions
Deteriorated
Commissioned CAH -20% compared to June 21 (9900hrs).  -
22.5% in house capacity compared to June 21.
South Ayrshire HSCP SC1 Adult & Older People Service Plan Home First
Frailty
Winter Preparedness
West of Scotland Ayrshire and
Arran
Social care Care Home Professional Support
Team
2021-AA44 Green Establish Care Home Professional
Support Team (CHPST) to increase
support for Care Homes, improve
professional and IPC standards and
improve standards of care
(1) Establish Care Home Professional
Support Team (CHPST)
June 22
(2) Develop an improvement plan
September 22
(3) Develop an evaluation plan
March 23
Team appointed with the exception of AHP and Clinical
Psychologist.  AHP recruitment progressing.  Alternatives being
considered for the Clinical Psychologist as recruitment has been
unsuccessful to date. Improvement Plan being scoped.
Risk to continuation of programme if
no funding identified for non-
recurring element
Scoping options for alternative
source of recurring funding
SC1 Enhanced Care Home Professional Oversight Arrangements -
Scottish Government Directive
Care Home Framework
Healthcare Quality Strategy for NHSScotland
Independent Review of Adult Social Care in Scotland
Caring for Ayrshire
NHS Recovery Plan
The support from the CHPST will help to address educational
needs and support staff in care homes to provide good quality
care. In doing so, residents will have optional choice to remain
in their place of care with care home staff recognising
deterioration more timeously.
West of Scotland Ayrshire and
Arran
Social care Children's Health Care and Justice 2021-AA8 Green Prison Health Care                                                  
Review of and investment in the
mental health / addictions workforce
within HMP Kilmarnock to address
waiting times and ongoing provision
of timely interventions to the prison
population in line with mental
healthcare, Hep C Elimination and
Medicated Assisted Treatment
Standards (MATS)
Completion of Health Needs Assessment
for HMP Kilmarnock
October 22
MAT standards to be implemented in
early adopter custodial settings
April 23
Stakeholder reference group established. Work of core data
gathering is in progress with patient and staff engagement
planned for the summer period.
Local mapping work on current levels of need and identification of
issues to MAP implementation. Nationally pilot work planned in
HMP Perth September 22. Engagement with the MIST
implementation team
There are continued vacancies in the addiction and mental health
teams.  Caseloads have been triaged to prioritise service delivery.
Successful general nurse recruitment will ease pressure on these
teams to support core duties
East Ayrshire HSCP High levels of staffing turnover,
interdependencies with the adult
nursing workforce, risks through
unplanned staffing absence, limited
training packages being delivered. 
These pressures and mitigating
actions remain in place.
Workforce planning lead
supporting with workforce
review.  Supported to advertise
and recruit to vacancies at the
earliest opportunities.  Close
links with workforce solution. 
Profiling of prison healthcare
services.
Priority area for recruitment
through for newly qualifying
nurses which have identified
successful candidates.
Highlighted for candidates from
foreign nurse recruitment.
SC1 Mental Health Transition and Recovery Plan; Medicated
Assisted Treatment Standards (MATS); Hepatitis C Elimination
in Scotland;  BBV/Sexual Health
138

Page 139

West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA19 Green Reduce the Waiting list for Social
Work Assessment and Review
Use of Scottish Govt Winter Pressures
Funding
Recruit 2 Social Workers plus 3 Social
Work  Assistants - to be in place by April
22
Impact on Waiting list by Q3 October 22
Additional social work posts (SW & SWAs) aligned to locality
Social Work teams to support complex assessment to support
discharge, review, AWI and support ICT social care requirements. 
Improvement Area - Community waits for assessment and review
5 additional posts have been identified through Scottish
Government funding.  Posts include 2 SW and 3 SW Assistants. 
Posts have now been been subject to interview, and appointments
have been made.  Anticipated that all posts will be in place from
July 22
North Ayrshire HSCP Increase in local demand outstrips
worker capacity.
Knock on impact on other service
areas in the HCC system.
Ongoing review by Team
Managers.
Existing risk management
protocols in teams.
Workforce Planning.
SC1 People who require care must receive it as soon as possible
following the presentation of need. Any delays in this process
may result in the need becoming more complex, more difficult to
manage and may require critical intervention.  By ensuring our
SW assessments are completed quickly, and reviews are
routinely carried out, we can support local people to effectively
manage their identified needs supporting them to live a
healthier life for longer.
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA20 Amber Review local models of respite
provision
Review use of respite with Anam Cara
(reflecting on current step down status)
Review current respite use (planned vs
unplanned)
Create working group to review/consider
models
Scoping exercise across private Care
homes to review capacity for respite
opportunities
Programme of review has stalled. No decisions on the review of
respite models have been made.
No indication that low respite opportunities is negatively impacting
on families. This has been since advent of Pandemic.
North Ayrshire HSCP Lack of respite provision negatively
impacts on Carers and Families
Planned Respite is still available
to support demand for those
assessed as most critical.
SC1 The value that local carers bring is widely recognised. Without
the support of local carers, the demand placed on statutory
health and social care services would increase significantly. 
However, it is recognised that role of carer can be both
physically and mentally challenging with the long term risk of
negative health impacts.  Through provision of appropriate
respite opportunities, carers can receive a break from there
caring duties and hopefully be able to continue in their caring
role for longer.
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA21 Green Explore opportunities and extend
model to implement a range of
effective palliative care and end of
life care models through joint
working, including with carers
Establish contracting requirements of
service provider
Develop agreement with Ayrshire
Hospice for 2 Palliative Care Beds / Day
Cases for EA
Clarification sought from Primary Care Contracting Team whether
Primary Care provider must deliver services or whether this can
be delivered by Advanced Practice Nurses. 
Have agreement with the Hospice in relation to Hospice Legacy
Plans within EA to provide additional 2 Palliative Care Beds/Day
Cases supported by the Ayrshire Hospice.
East Ayrshire HSCP There is a risk of delayed
commission for medical services to
the Care Home Palliative Care beds
due to other demands on these
services
Explore viability of ANP
provision instead of GP provision
SC1 Palliative Care Strategy
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA22 Green As part of Caring for Ayrshire,
review and implement
recommendations for Front Door
Services.
Seek approval to appoint Support
Assistants
March 22
Approval to progress recruitment of support assistants is
underway.  Approval awaited for other implementation
East Ayrshire HSCP Recruitment delays may occur which
risk delay in implementation of the
new integrated model
A leadership group has been
established to ensure protected
time for this key area
SC1 Caring for East Ayrshire
Caring for Ayrshire
Technology Enabled Care Programme
Digital Health & Care Strategy
Providing a wider range of services closer to people's homes
may reduce health inequalities within the geographic area and
make more accessible services available within EA. 
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA23 Green As part of Caring for Ayrshire,
review and implement
recommendations for Community
Nursing as part of MDTs.
Progress recruitment to Community
Nursing
March 22
~Senior ANP in recruitment process
- 4 x DN Specialist Nurses appointed
- Community Nursing Clinical Governance established.  EA
representatives in attendance
- 10+ HCSWs appointed
- AND has provided feedback sessions to EA Community Nurses
on next steps in implementation
- Capacity constraints remain due to absence of 2 x CNMs
- Set of meetings planned to determine further implementation
priorities
East Ayrshire HSCP Training, development,
competencies and skills require to be
defined and delivery supported as
implementation progresses.  The risk
of staff absence and capacity may
affect programme milestones and
deliverables.
A leadership group has been
established to ensure protected
time for this key area
SC1 Caring for East Ayrshire
Caring for Ayrshire
Realistic Medicine
Quality Strategy
Technology Enabled Care Programme
Digital Health & Care Strategy
Providing a wider range of services closer to people's homes
may reduce health inequalities within the geographic area and
make more accessible services available within EA. 
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA24 Green As part of Caring for Ayrshire,
implement the new model of care for
East Ayrshire Community Hospital
(EACH) to continue to progress
redesign of place-based models of
care in Cumnock and Irvine Valley
Explore alternative models of medical
staff provision
Develop specification and carryout
consultation
Establish Micro-board to re-engage and
consult on future model of clinical care
March 22
~Explore 2 x alternative models of medical staff provision
- Specification for medical services out for consultation
- Micro-board established to re-engage and refresh previous
consultation around future model of clinical care at EACH
- Regular meetings with Senior Manager AHPs regarding new
clinical models of care
- Ayrshire Hospice currently using the spare ward capacity.  This
has a material impact on implementation
East Ayrshire HSCP Availability of space at EACH is
constrained until June 2024.  This
will limit some implementation of new
models of care within those areas.
Implementation will be prioritised
for recommendations which do
not require reconfiguration,
refurbishment or the temporary
current unavailable space.
SC1 Caring for East Ayrshire
Caring for Ayrshire
Realistic Medicine
Quality Strategy
Dementia Strategy
Technology Enabled Care Programme
Digital Health & Care Strategy
Providing a wider range of services closer to people's homes
may reduce health inequalities within the geographic area and
make more accessible services available within EA. 
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA25 Green Focus on ongoing and intensive
rehabilitation support for people to
recover from the effects of Covid19
and lockdown
Implement the recommendations of the
2020-21 review of older people's mental
health following completion of final
agreement
March 22
EMH Clinical Governance Meeting/Clinical Director have advised
that clinical services should be in a safe position to re-open the
review implementation from late August 22.  This will be confirmed
July 22.
East Ayrshire HSCP Further Covid absences within the
clinical teams will risk the capacity of
the teams to engage and implement
the recommendations.
To prioritise recommendations
and plan delivery of these over
an extended period.
SC1 People at the heart of what we do
Dementia Strategy
Mental Health Strategy
MDT Programme
People living with mental illness/disorder are subject to greater
inequalities than the general population.  The implementation of
this review has deliverables which focus on addressing health
inequalities, health improvement and enablement for the older
person .
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA25.1 Green Focus on ongoing and intensive
rehabilitation support for people to
recover from the effects of Covid19
and lockdown
Develop frailty initiatives, including
Hospital at Home approaches, across
multi-disciplinary teams to reduce
hospital admission and length of stay
March 22
Hospital @ Home "soft launch" in East Ayrshire Apr 22 -
collaborative approach to roll out and alignment of models ongoing
Frailty - awareness raising major focus of learning & development
agenda for all staff; pending release of elearning modules from
NES by end August 22
East Ayrshire HSCP Frontline staff & organisational
capacity to drive forward changes
and release from duties to undertake
learning
Programme oversight via
NHSA&A Urgent &
Unscheduled Care
Collaborative/ DwD Advisory
groups
SC1 People at the heart of what we do Improve access to treatment, care & support for frailest in
society
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA25.2 Green Focus on ongoing and intensive
rehabilitation support for people to
recover from the effects of Covid19
and lockdown
Widen enablement approaches across
the range of Locality Health and Care
Services
March 22
Establishment of Social Care Learning Hub - Enablement a key
focus of learning & development priorities for social care staff; will
be progressed alongside other critical L&D needs
Reablement service to be established - high level framework for
progressing establishment of new service by end July, with
commencement of detailed planning thereafter.
East Ayrshire HSCP Lack of sufficient recruitment to
permanent posts to deliver new
model
Covid spikes
Organisational & staffing capacity to
progress changes
Oversight of progress via
Pentana reporting/ SCLUB
Implementation
SC1 People at the heart of what we do
Caring for East Ayrshire
Improve physical, social and emotional health through improved
focus on achieving outcomes with intensive support
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA26 Green Implementing effective
multidisciplinary teams and models
around Localities, Learning
Communities, GP Clusters and
community assets through
investment in service redesign
Delivery of development programme for
Multi Disciplinary Team working in
Locality Health and Care
March 22
Constituted a transformation programme for the establishment of
integrated multi-disciplinary teams within 5 geographic localities of
EA.  Using Scottish Approach to Service Design Methodology at
design phase
East Ayrshire HSCP Milestone dates and programme
deliverables have been adapted due
to Covid demands
Focussing on recruitment of key
leadership posts and through the
winter planning investment
recruiting additional frontline staff
across Health & Social Care
SC1 Caring for East Ayrshire
People at the heart of what we do
Ensuring there is capacity within locality and place based teams
to address health improvement and health inequalities as well
as service delivery
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA26.1 Green Implementing effective
multidisciplinary teams and models
around Localities, Learning
Communities, GP Clusters and
community assets through
investment in service redesign
Implement Phase II of the Best Value
Review Improvement Action Plan in care
at home with a focus on assessment,
care planning and review in the context
of personalisation and choice
October 22
Progress delayed due to Covid pressures; planning underway with
plans to implement new model of oversight & review for SDS
Option 3 cases transferring to Option 2 following people being
offered "Choices" of care provider. 
East Ayrshire HSCP Organisational & staffing capacity to
progress changes
External provider viability
Regular planning meetings &
clear timescales
Regular monitoring meetings
with providers as part of Quality
assurance/ Contract &
commissioning framework
SC1 People at the heart of what we do Improve physical, social and emotional health through improved
focus on achieving outcomes with intensive support
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA27 Green Developing aligned service redesign
in day opportunities for older people,
local residential services for adults
and across our prevention and early
intervention programmes and
initiatives
Carry out re-phased Best Value Service
Review Programme in Locality Health
and Care Services
Older People's Day Care services reopened on all appropriate
sites by end August 22.
Stages 1 through 6 of rapid review of Older Peoples' Day Care
Services complete with final implementation plan to be ratified at
SCB and IJB August 22.
Parallel development of wider day opportunities for older people -
early discussions of strengthening collaboration with partners.
East Ayrshire HSCP Lack of sufficient recruitment to
permanent posts to deliver new
model
Covid spikes
Regular planning meetings &
clear timescales
Clear Health & Safety guidance
and practices in place with
regular reviews
SC1 People at the heart of what we do Improve physical, social and emotional health through improved
focus on achieving outcomes with tailored support
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA28 Green Build on the learning over the
Covid19 pandemic to improve
interventions to protect people
through our multi-agency public
protection arrangements
Implement any improvement actions
arising from the multi-agency inspection
of Adult Support and Protection
(expected publication date August 2021)
March 22
ASP Improvement Plan established around improvement actions
identified. Good progress achieved - 44% complete. Key Actions,
Performance Indicators and Risk Register review and updated on
an ongoing basis.
East Ayrshire HSCP Increased service pressures, staff
turnover and  vacancies leading to
increased vulnerability of adults at
risk
ASP Multi-Agency reporting data
Governance group established
to provide oversight
SC1 Safe and protected
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA29 Green Ensuring people are supported
within the community where
possible rather than in a hospital or
institutional setting to improve
outcomes and reduce delayed
transfers of care
Improve our approach to commissioning
to ensure we get enhanced quality of
care and best value from our contracts.
Contract development for Learning
Disability
September 22
Contract development for Mental Health
April 23
A new Quality Assurance framework has been implemented and
reports are taken to CSOG for approval and consideration. 
Regular online forums are held. New Flexible Contract for Care at
Home has been implemented effective from 1st April 22 for a
period of 4 years.  Further ongoing contract development for LD
and MH frameworks have been scheduled for September 22 and
April 23 respectively. 
South Ayrshire HSCP SC1 South Ayrshire Health & Social Care Partnership Integration
Joint Board Strategic Plan 2021 - 31
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA29.1 Amber Ensuring people are supported
within the community where
possible rather than in a hospital or
institutional setting to improve
outcomes and reduce delayed
transfers of care
Invest in and redesign our new
Reablement Service to support delayed
discharges and optimise service user’s
independence.
Reduce delays to 0
March 23
Recruitment has stalled over the last year. 
85% of those requiring a POC from hospital come through
reablement.  Mainstream CAH hours has reduced from 12,000 to
around 10,000.  People being reabled is currently 40%.
South Ayrshire HSCP SC1 South Ayrshire Health & Social Care Partnership Integration
Joint Board Strategic Plan 2021 - 31
139

Page 140

West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA29.2 Amber Ensuring people are supported
within the community where
possible rather than in a hospital or
institutional setting to improve
outcomes and reduce delayed
transfers of care
Improving our approach to data analysis
for delayed discharge and unscheduled
care.
Weekly meetings focus on those patients delayed for over 10
days as the operational teams work to identify actions to ascertain
capacity across the system. The system remains challenged due
to a number of factors and the HSCP remains in a position where
demand continues to outstrip capacity.  Progress made -
- Additional resource has been created within the Planning and
Performance Team to support increased delayed discharge
recording and reporting
- Initial process mapping undertaken
- A Test of Change is being implemented to use a Single Point of
Contact to administer and monitor delayed transfers of care
South Ayrshire HSCP SC1 South Ayrshire Health & Social Care Partnership Integration
Joint Board Strategic Plan 2021 - 31
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA29.3 Green Ensuring people are supported
within the community where
possible rather than in a hospital or
institutional setting to improve
outcomes and reduce delayed
transfers of care
Increase our mobile attendant service to
provide capacity to transport individuals
home out of hours from University
Hospitals Crosshouse and Ayr.
In March 22, ELT agreed to the creation of permanent 6 posts
which have been recruited to.  This is having a positive impact on
our ability to respond to alarms, support telecare installation and
discharges from the hospital.  Response times for mobile
attendants have reduced significantly.   Comparing April data from
2020 and 2021:
- There is an average improvement of 37 minutes for personal
care (1hr 26mins in 2020 and 49mins in 2021)
- 5 minutes for no response (39mins in 2020 and 34 mins in
2021)
- 5 minutes for falls (40 mins in 2020 and 35 mins in 2021)   
South Ayrshire HSCP SC1 South Ayrshire Health & Social Care Partnership Integration
Joint Board Strategic Plan 2021 - 31
West of Scotland Ayrshire and
Arran
Social care Health and Community Care 2022-AA29.4 Green Ensuring people are supported
within the community where
possible rather than in a hospital or
institutional setting to improve
outcomes and reduce delayed
transfers of care
Implement a Home First model for
complex discharges
Funding was provided from Scottish Government to support the
delayed transfers of care.   We have focused on this approach
and used interim beds in care home facilities to support those
individuals who are delayed in hospital due to capacity challenges
in care at home services. Going forward we are continuing to work
with our care home providers to progress an interim bed approach,
this will be done in conjunction with the proposals of utilising the
top floor in South Lodge as a “step down” preventative approach.
South Ayrshire HSCP SC1 South Ayrshire Health & Social Care Partnership Integration
Joint Board Strategic Plan 2021 - 31
West of Scotland Ayrshire and
Arran
Social care Public Health
Health Protection
2022-AA30 New Manage Health Protection
outbreaks and contribute to National
Covid Review
Provide a robust response to any
outbreaks and produce a review of local
Covid activity to meet national deadlines
Planning for review has begun, with training being undertaken Winter pressures and flu and other
potential outbreaks may put
considerable strain on the Health
Protection capacity to deliver a
service and undertake a review
A project co-ordinator will be
aligned to support the review
process to provide continuity. 
Should key clinical personnel not
be available to contribute to the
review due to core Health
Protection duties - this will
require to be escalated to SG
SC1 Joint Health Protection Plan Undertaking this review will provide insight into the effect of the
pandemic on health inequalities
West of Scotland Ayrshire and
Arran
Social care Public Health
Caring for Ayrshire
2022-AA31 New Scope and implement programmes
that can deliver on the prevention
aspects of CfA and contribute to
CRES
Plans on a Page to be developed and
implemented
Scoping has commenced Key PH staff taking this work
forward have to be redirected to
Health Protection work should there
be further variants
Prioritise this work alongside
Health Protection activity
SC1 Caring for Ayrshire Prevention programmes will be targeted towards those
populations of greatest need and will have a clear focus on
reducing inequalities
West of Scotland Ayrshire and
Arran
Social care Public Health
Screening
2022-AA32 New Plan and deliver programme of work
to reduce screening inequalities
across all PH screening
programmes
Develop screening inequalities action
plan by September 22
Planning has commenced Many actions require additional
resource and screening inequalities
funding not yet confirmed
Prioritise this work alongside
Health Protection activity
SC1 National screening inequalities strategy currently being
developed by NSO
This work aims to improve uptake of screening among deprived
and/or vulnerable groups, and therefore reduce inequalities in
cancer outcomes.
West of Scotland Ayrshire and
Arran
Social care Public Health
Vaccinations
2022-AA33 New Pneumococcal and shingles catch-
up vaccination programme targeting
care homes residents and
housebound peoples.
Produce data and make available re care
home residents and housebound peoples
who are unvaccinated against
pneumococcal and/or shingles; develop
consent forms for both vaccines; gather
consents for vaccination; develop
housebound clinic lists; progress staff
training.
Complete
Commence service delivery
Catch-up programme on schedule to commence mid June 22. Potential side effects following co-
administration of vaccines to more
vulnerable patients.
Vaccines will be delivered during
separate vaccination visits.
SC1 JCVI Guidance, Vaccination Transformation Programme,
Scottish Immunisation Programme.
Too early to determine.  Demand for new service will be
monitored and patient evaluation planned and implemented in
future months.
West of Scotland Ayrshire and
Arran
Social care Public Health
Vaccinations
2022-AA34 New To deliver an extended Vaccination
Programme including Mass
Vaccination to the peoples of NHS
Ayrshire & Arran
Covid-19 Vaccination
Autumn/Winter Booster Programme
Robust data to support the Vaccination
programme
Publish JCVI Guidance regarding
Autumn/Winter programme; Plan and
agree delivery programme with key
stakeholders; Recruit sufficient workforce
Complete
Commencement of service delivery
September 22
Completion of programme
December 22
With opportunities for mop up available
during January/February 23.
JCVI Guidance expected July 22. Mass vaccination clinic
accommodation not available; delays
to vaccine supply; issues associated
with national scheduling system;
vaccination fatigue amongst peoples;
request from national programme to
enact surge delivery of programme.
Accommodation hire agreed well
in advance of Autumn/Winter
Programme; contingency start
date agreed and expected
vaccine supply dates monitored;
continue to work closely with
NVSS re. national scheduling
and increase local resilience re.
scheduling; work closely with
national programme re.
programme messaging; surge
plan, highlighting risks and
support from national programme
submitted to national programme
(May 2022).
SC1 JCVI & MHRA Guidance, National Vaccination Transformation
Programme, National Covid-19 Pandemic Response, NHS
Ayrshire & Arran Policies & Procedures
Too early to determine.  Demand for new service will be
monitored and patient evaluation planned and implemented in
future months.
West of Scotland Ayrshire and
Arran
Staff wellbeing Workforce 2022-AA35 Amber Support the health and wellbeing of
our staff (SUPPORT)
(1) Staff access and utilise the range of
wellbeing services available - ongoing.
(2) Sickness absence levels remain
below 5% - monthly monitoring.
(3) Staff utilise their annual leave
entitlement in order to ensure they rest
and recuperate - monthly monitoring
(1) Action plan, as per Right Sizing Workforce Group, to do
focused work on ASDOM absence including roll out of stress risk
assessments
(2) Routine monitoring of sickness and Covid absence rates. 
Work ongoing looking at reviewing long Covid staff in line with
recent DL
(3) Guidance note being issued to managers in July reminding
them of policy context and good practice/principles in managing
annual leave
(1) Capacity of OHS services to
manage demand for highest reasons
for absence - ADSOM and MSK
(2) With move to Covid no longer
being recorded as special leave from
Aug 22 the likelihood is that absence
will be in excess of 5%
(3) Staff defer taking annual leave to
provide capacity to support
(1) Review of OHS underway
(2) Monthly monitoring of staff
absence on ongoing basis
(3) Monthly monitoring of annual
SW1 Right Sizing Workforce
Workforce Plan
Financial Plan
National Health & Social Care
Workforce Strategy
People Strategy
National review of Occupational Health Services
West of Scotland Ayrshire and
Arran
Sustainability and value Digital 2022-AA36 Green Distributed Working and Estate
Rationalisation
Identification, procurement and
deployment of digital desk booking and
management system
Q3 2022/23
Limited action completed - target for end of calendar year 2022
(Q3)
Funding for implementation from
Capital Investment Plan.
Requirements, specification and
scope being developed to
establish likely costs.
VS1 NHS A&A key priorities "Distributed Working & Estates
Rationalisation" programme and "Caring for Ayrshire" strategy,
to deliver a future proofed, service focussed and financially
sustainable estate.
Supporting the delivery of a health service to better meet the
needs of the people of Ayrshire by improving flexibility and
patient centred care and reducing ancillary property costs.
West of Scotland Ayrshire and
Arran
Sustainability and value Digital 2022-AA37 Green Electronic Patient Record and
Records Management Programme
Transition to Digital Clinical Records and
transition to the removal of paper case
notes within general hospital settings. 
Q4 2022/23
Transition complete in some outpatient clinics.  Working group
established to rollout programme across acute settings.
Funding for implementation from
Capital Investment Plan.
Requirements, specification and
scope being developed to
establish likely costs.
VS1 NHS A&A key priorities Electronic Patient Record and Records
Management programme and "Caring for Ayrshire" strategy, to
provide a collated digital source of patient information which is
accessible by all relevant staff in order to improve patient care.
Provide a collated digital source of patient information which is
accessible by all relevant staff in order to improve patient care.
West of Scotland Ayrshire and
Arran
Sustainability and value Estates and Capital Planning 2022-AA38 Amber Delivery of National Secure
Adolescent Inpatient Services
(NSAIS) "Foxgrove"
New national mental health facility
Foxgrove.  Operational by Q4 2022/23.
Advance package of work on site.  FBC awaiting final approval
following NHS Assure "supported status".
FBC approval and supported status
by NHS Assure, Construction
Inflation and combined delay impact
upon programme.  Workforce
recruitment.
Ongoing engagement with NHS
Assure to close out remaining
concerns.
VS1 Adolescent mental health - national programme. Delivery of specialist services for patients within Scotland.
West of Scotland Ayrshire and
Arran
Sustainability and value Infrastructure Support Services 2022-AA39 Amber Lead the transition to a full electric
NHS AA commercial fleet to support
the wider organisation function while
ensuring compliance with SG
legislative requirements by 2025
Procurement of new NHS AA EV
commercial vehicles.
Ensure the appropriate infrastructure is
in place across the boardwide estate to
support the transition of the commercial
fleet.
Obtain national funding to support these
changes in full.
The development of business case to
support the transition to an EV
i l fl t
Successful in obtaining funding from Transport Scotland via
2021/22 bid with infrastructure being implemented. Awaiting
outcome of 2022/23 bid to Transport Scotland for further
infrastructure requirements. Working on 2023/24 bid which will be
supported by a Business Case.
Affordability.  Full details on Project
Risk Register.
EV Project transition group set
up to review and oversee
programme progress
VS1 Full compliance with Scottish Government legislative
requirements.  The reduction in greenhouse gas CO2
emissions generated by commercial fleet from baseline.
Climate Change & Sustainability.  NetZero
West of Scotland Ayrshire and
Arran
Sustainability and value Organisational and Human
Resource Development
2022-AA40 Green Distributed Working and Estate
Rationalisation
Build our approach to distributed working,
and any relevant skills development, into
recruitment and induction programmes
and procedures
Q4 2022/23
Limited action completed - note inter-relationship with other
distributed working and estates rationalisation workstreams.
Employee engagement to ensure
that distributed working is
understood and a success.
Programme group responsible
for developing programme
includes HR and Employee
Directors.
VS1 NHS A&A key priorities "Distributed Working & Estates
Rationalisation" programme and "Caring for Ayrshire" strategy,
to deliver a future proofed, service focussed and financially
sustainable estate.
Supporting the delivery of a health service to better meet the
needs of the communities of Ayrshire by improving flexibility
and patient centred care and reducing ancillary property costs.
140

Page 141

West of Scotland Ayrshire and
Arran
Sustainability and value Organisational and Human
Resource Development
2022-AA40.1 Green Distributed Working and Estate
Rationalisation
Produce an Ayrshire and Arran Guide for
Leaders on Distributed Working that
provides a self-management resource
Q4 2022/23
Limited action completed - note inter-relationship with other
distributed working and estates rationalisation workstreams.
Ensure that guidance is user
focussed and positive providing
adequate resources to ensure
positive and effective deployment of
distributed working.
Programme group responsible
for developing programme
includes HR and Employee
Directors.
VS1 NHS A&A key priorities "Distributed Working & Estates
Rationalisation" programme and "Caring for Ayrshire" strategy,
to deliver a future proofed, service focussed and financially
sustainable estate.
Supporting the delivery of a health service to better meet the
needs of the communities of Ayrshire by improving flexibility
and patient centred care and reducing ancillary property costs.
West of Scotland Ayrshire and
Arran
Sustainability and value Property & Strategy 2022-AA40.2 Green Distributed Working and Estate
Rationalisation
Formal implementation of “distributed
working”, “zero desk working” and
“corporate landlord property management
model” policies
Q2 2022/23
Policies have been approved by IPB Advisory Group and
Infrastructure Programme Board (IPB).  Final approval required
from Corporate Management Team (CMT) before implementation.
Integration with HR / OD issues
including alignment with national
policies.
Programme group responsible
for developing programme
includes HR and Employee
Directors.
VS1 NHS A&A key priorities "Distributed Working & Estates
Rationalisation" programme and "Caring for Ayrshire" strategy,
to deliver a future proofed, service focussed and financially
sustainable estate.
Supporting the delivery of a health service to better meet the
needs of the communities of Ayrshire by improving flexibility
and patient centred care and reducing ancillary property costs.
West of Scotland Ayrshire and
Arran
Sustainability and value Property & Strategy 2022-AA40.3 Green Distributed Working and Estate
Rationalisation
Establish Local Authorities common
technology requirements for sharing
accommodation
Q3 2022/23
Limited action completed - target for end of calendar year 2022
(Q3)
Potential difficulties in agreeing
common technical standards across
all 4 organisations (NHSA&A and
NAC, SAC and EAC).
Establish technical forum
involving all 4 organisations
(NHSA&A and NAC, SAC and
EAC).
VS1 NHS A&A key priorities "Distributed Working & Estates
Rationalisation" programme and "Caring for Ayrshire" strategy,
to deliver a future proofed, service focussed and financially
sustainable estate.
Supporting the delivery of a health service to better meet the
needs of the communities of Ayrshire by improving flexibility
and patient centred care and reducing ancillary property costs.
West of Scotland Ayrshire and
Arran
Sustainability and value Property & Strategy 2022-AA40.4 Green Distributed Working and Estate
Rationalisation
Complete draft long term Caring for
Ayrshire property strategy identifying
planned lifespan for existing
accommodation, to plan future
investment & exit / disposal plan
Q4 2022/23
Work underway to update PAMS and to review the demolition
plan.  Dedicated programme managers have been appointed to
work with each of the three partnerships (NAHSCP, SAHSCP &
EAHSCP) and acute services to develop future requirements for
their respective services.  External Healthcare Planners have
been appointed to progress Caring for Ayrshire strategy.
Affordability around delivery of
output strategy - reliant upon
significant SG funding.  Conflict
around prioritisation of projects.
Ongoing engagement with all
stakeholders including CIG
leads.  Adoption of SG data
based modelling and
prioritisation tool.
VS1 NHS A&A key priorities "Distributed Working & Estates
Rationalisation" programme and "Caring for Ayrshire" strategy,
to deliver a future proofed, service focussed and financially
sustainable estate.
Supporting the delivery of a health service to better meet the
needs of the communities of Ayrshire by improving flexibility
and patient centred care and reducing ancillary property costs.
West of Scotland Ayrshire and
Arran
Sustainability and value Realistic Medicine 2022-AA41 Green Ensure the Realistic Medicine
workstream informs the clinical
redesign pathways within the Board
Attend Clinical Senate
Ongoing
The Realistic Clinical Leads were invited to the first Clinical
Senate, led by the Chief Executive and Medical Director.  This will
ensure the Realistic Medicine workstream informs the clinical
redesign pathways within the Board.  RM Team to be included in
future meetings.
Service demands/constraints
influence the impact and buy-in of
Realistic Medicine priorities in the
design of clinical pathways
Attendance and representation
of RM at Clinical senate
VS2 Realistic Medicine / Value Based Health and Care RM is at the heart of caring for Ayrshire redesign, and this will
deliver person centred care, in the right place at the right time
by the right person
West of Scotland Ayrshire and
Arran
Sustainability and value Realistic Medicine 2022-AA42 Green Becoming Improvers and Innovators Realistic Medicine Workstreams and
Collaborative Working
Ongoing
The RM Team are constantly trying to come up with new ways in
which we can highlight RM within the Board, they are also in
many sub groups looking at new and progressive ways of working. 
The RM team support others who approach them with innovative
ideas for improvement and try to link them in with the right people
to further the ideas.
Staff weary due to current clinical
constraints and pandemic fatigue/
weariness.
Bi-annual symposia, quarterly
newsletter to stimulate
innovation.  Value Improvement
Fund annual applications
VS2 Realistic Medicine / Value Based Health and Care
West of Scotland Ayrshire and
Arran
Sustainability and value Realistic Medicine 2022-AA42.1 Green Becoming Improvers and Innovators Progress School Mentoring Programme
September 22
Year 1 of pilot with Robert Burns Academy, Cumnock completed. 
Students wishing to pursue NHS career offered one-to-one
mentoring support for applications.  Challenges due to ongoing
Covid measures in school, and students not comfortable with
email as communication method.  We hope to expand into the 3
locality areas in 2022-23 academic year with face to face
meetings in schools.  Schools to be identified and RM Team liaise
with Senior CDF.
Requires large amount of input from
CDFs who change annually. May
lose momentum and engagement
due to Covid restrictions.
Maintaining regular contact with
CDFs involved
VS2 Realistic Medicine / Value Based Health and Care This programme aims to empower people from a young age to
be involved in their healthcare journey and to learn about
shared decision making so that they too can achieve person
centred care
West of Scotland Ayrshire and
Arran
Sustainability and value Realistic Medicine 2022-AA42.3 Green Becoming Improvers and Innovators Progress School Outreach Programme
August 22
Scripts written, storyboards made, awaiting confirmation of filming
date for "It's OK to Ask" videos school campaign.  Continual
liaison with Senior CDF regarding the mentoring programme and
other school outreach events.
Large amount of time and effort to
produce.  School engagement
required.  CDF doctors change
every year which may thwart
momentum
Maintaining regular contact with
CDFs involved
VS2 Realistic Medicine / Value Based Health and Care This programme aims to empower people from a young age to
be involved in their healthcare journey and to learn about
shared decision making so that they too can achieve person
centred care
West of Scotland Ayrshire and
Arran
Sustainability and value Realistic Medicine 2022-AA42.4 Green Becoming Improvers and Innovators Establish Realistic Medicine Network and
Champions
January 22
A RM champions network has been established and is expanding. 
A quarterly newsletter has been set up and well received, which
communicates info re current work by the RM to champions to
allow info and ideas to be disseminated.  It also contains a
quarterly challenge for the RM Champions.  Feedback on this to
the RM team is encouraged.  Regular meetings with the RM
Champions.
Low numbers of RM champions and
lack of engagement to promote and
share RM aligned work/projects.
Encourage RM champions at
every opportunity, quarterly
newsletter with open
communication to RM team.
VS2 Realistic Medicine / Value Based Health and Care
West of Scotland Ayrshire and
Arran
Sustainability and value Realistic Medicine 2022-AA43 Green Promote and engage with clinicians
and GPs on the Realistic Medicine
agenda
First Hybrid Realistic Medicine Event
June 22
An exciting programme has been pulled together for the event with
attendance from both the Chief Executive and Medical Director
who are providing presentations.  Event has been widely
advertised across the Board, including targeted at clinicians and
GPs, and on social media.  This hybrid event follows an extremely
successful virtual event earlier in the year where the feedback
suggested there was an appetite for a hybrid event.
Covid infection risk with face-to-face
events.  Encouraging attendees to
register for either face-to-face or
virtual attendance. Cancellation of
speakers due to Covid.
Covid friendly conference with
option for virtual attendance.
VS2 Realistic Medicine / Value Based Health and Care
West of Scotland Ayrshire and
Arran
Sustainability and value Realistic Medicine 2022-AA44 Green Shared Decision Making Develop/educate clinicians via NES
Shared Decision Making training module
on TURAS
October 22
Further develop/educate clinicians via discussions at Clinical
Directors' forum and via new TURAS module.
Liaise with Director of Medical Education to get this module
included in FY1 Virtual Induction Passport.  FYPD to get back
with potential dates for educational programme commencing
August.  RM Clinical leads have been asked to speak at GP
trainee education also.
Lack of engagement from clinical
staff to complete the TURAS
module.  Staff well-being following
pandemic demands may contribute
to fatigue and weariness to engage. 
FY educational programme co-
ordinated by FY programme directors
Publicising SDM module via
Medical bulletin/ twitter and
raising awareness via the CD
forum and Daily Digest
VS2 Realistic Medicine / Value Based Health and Care Direct promotion of shared decision making to patients allows
them to understand how to get involved in the decisions relating
to their care. It is hoped this multidirection approach will reach a
wider audience of patients
West of Scotland Ayrshire and
Arran
Sustainability and value Realistic Medicine 2022-AA44.1 Green Shared Decision Making Promote Shared Decision Making via
Social Media Feed
Ongoing
Shared decision making post previously shared on Twitter.  The
aim will now be to have monthly posts on Twitter and Facebook to
maintain the focus.
Maintaining momentum, interest and
engagement with social media
platforms. Low follower engagement.
A programme of regular posts
and engaging material whilst
sharing RM relevant posts from
other HBs
VS2 Realistic Medicine / Value Based Health and Care Direct promotion of shared decision making to patients allows
them to understand how to get involved in the decisions relating
to their care. It is hoped this multidirection approach will reach a
wider audience of patients
West of Scotland Ayrshire and
Arran
Sustainability and value Realistic Medicine 2022-AA44.2 Green Shared Decision Making Promote and raise awareness of BRAN
Questions:
(1) inclusion of BRAN questions in out-
patient invitation letters
September 22
(2) awareness training for clinicians of
BRAN
October 22
(3) promoting BRAN in waiting rooms
and hospital clinics
August 22
Liaise with Head of Health Records to get BRAN (Its OK to ask)
questions incorporated in the out-patient invitation letters.  Letter
has been redesigned and awaiting this to be approved.
Clinical Lead to attend the Clinical Directors' Forum to advise of
plans to include BRAN questions in out-patient and posters within
clinic areas.  Awareness session with clinicians to be arranged.
Quote awaited for printing of It's OK to Ask posters for
dissemination through NHS Ayrshire & Arran.
Targeting the public via outpatient
letters requires sustainable
resources to maintain. Clinical
awareness to allow for BRAN
conversations during consultations
may cost more time and therefore
discourage clinicians.  Promotional
posters require financed/ printed and
displayed across health care
buildings
Maintaining regular contact with
Head of Health Records and
relevant staff to maintain
success of BRAN addition to
outpatient letters.  Clinical
awareness to be publicised at
CD forum.  Poster displaying in
all public facing clinical areas.
VS2 Realistic Medicine / Value Based Health and Care Direct promotion of shared decision making to patients allows
them to understand how to get involved in the decisions relating
to their care. It is hoped this multidirection approach will reach a
wider audience of patients
West of Scotland Ayrshire and
Arran
Sustainability and value Realistic Medicine 2022-AA45 Green Reduce Unwarranted Variation Develop Atlas Maps to identify and tackle
unwarranted variation
Ongoing
Clinical Leads liaise with NSD Team re the Atlas and have
requested consideration of flash reports for new Primary Care
Atlas.  GP Atlas was advertised in June Medical Director's
Bulletin.
Atlas of Variation for Primary Care
new and awareness currently low
amongst GP practices.  Secondary
Care Atlas of Variation currently not
being populated following pandemic
redeployment
Examples of use of Atlas of
Variation publicised as well as its
existence for QIPs.
VS2 Realistic Medicine / Value Based Health and Care
West of Scotland Ayrshire and
Arran
Sustainability and value Realistic Medicine 2022-AA46 Green Reduce Harm and Waste PPE management in line with NHS
Ayrshire & Arran Eco Policy
Ongoing
Liaising with Energy Manager regarding NHS Ayrshire and Arran
Eco Policy.  RM Champions have been challenged to look at eco
policies within their departments, getting involved with PPE
management.
Lack of engagement due to
pandemic apathy
Encourage Reduced Carbon
Footprint projects. 
VS2 Realistic Medicine / Value Based Health and Care
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2021-AA100 Green To increase capacity to undertake
statutory Mental Health Officer
(MHO) reports.  To allow individuals
to meet their own personal
outcomes and support needs where
legal intervention is required.
To provide a Guardianship assessment
and reporting function.
Reduction in waiting times for service
users.
Recruitment ongoing for MHO coordinator and additional MHOs
to create dedicated workforce.
South Ayrshire HSCP Resource through additional funding
Recruitment to posts
UC1
141

Page 142

West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2021-AA101 Green Enhance support to care home to
enable more people to be supported
within care home environment and
reduce unnecessary admissions
Recruitment to posts
Reduce unnecessary admission to MH
Support the transfers of people admitted
to acute
Work in conjunction with existing
CHLNs, ANP and psychiatry colleagues
to support patients and staff within the
care home setting
Additional care home liaison staff are in post and offering support
to care homes across South Ayrshire. Positive feedback received
from both care homes and SW staff.
South Ayrshire HSCP Resource through additional funding
Recruitment to posts. availability of
community venues and facilities to
see individuals
UC1
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2021-AA102 Green Additional Mental Health
Practitioners (MHP) to offer
assessment and triage within GP
practices to enable increased
capacity of other MDT staff to focus
on wider GMS contract activities.
Recruitment to posts
Assessment and triage of individuals at
GP practice level
Developing a Pan Ayrshire model for
2022/23
Confirmation of additional SG funding has been received although
not awarded to date. Consolidated PC team to bring together
MHPs, CLPs and SHWs. Development of scaled up model to
include range of treatment and support options being developed
for 22/23.
South Ayrshire HSCP Recruitment to posts. availability of
community venues and facilities to
see individuals
UC1 PCIP
Primary Care Urgent Care
Assessment and triage of people with mental health in GP
Practices ensuring the right people and provided with the right
support/service at the right time.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Primary Care 2021-AA105 Amber To identify and address issues
impacting on GMS service delivery /
sustainability and understand any
potential implications early.
Regular "check ins" with all practices to
monitor the impact of Covid across
general practice.  Best practice shared
for learning.
3 monthly review
There are a number of GP practices struggling with recruitment of
GP's and workforce capacity issues.  The Primary Care Team are
meeting with these practices on a weekly basis to review and
provide intense support to look at sustainability options.  Practices
Sustainability Oversight Group being established to provide
focussed oversight for those practices in difficulty.  This is
Chaired by the Head of Service and also includes the Clinical
Directors from each HSCP area to provide wider support to the
primary care team.
Continued sustainability of GP
practices while new GMS Contract is
being implemented and practices
work to re-mobilise.
Bi-monthly meetings with
Practice Managers and PQLs to
understand issues and risks to
remobilisation.
Weekly Welfare Checks to high
risk practices.
Programme of PLT (one
afternoon bi-monthly) for service
development and business
planning for GP practices.
UC1 NHS Recovery Plan Supports access and delivery of General Medical Services to
patients ensuring the most vulnerable patients with the most
urgent need are prioritised.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Primary Care 2021-AA106 Amber Progress a digital programme to
support the priorities identified by
primary and community services to
improve access for community
practitioners and peoples of
Ayrshire and Arran.
Providing Comm Pharmacy and
Optometry access to digital portal
March 23
Agreement reached for roll out programme.  Current challenges
being worked through with information governance and IT
Security due to Pharmacies and Optometrists being Independent
contractors and not NHS employed.  Engagement with Digital
Services colleagues to bring this to a resolution.
Dependencies on digital team
providing implementation timeline.
Escalation to senior colleagues
within Digital services via the
Senior Manager for Primary
Care Services
UC1 Digital Health & Social Care Strategy Supports patients to receive improved continuity of care by
community primary care providers able to access and share
relevant information pertinent to a patient's healthcare needs.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Primary Care 2021-AA106.1 Green Progress a digital programme to
support the priorities identified by
primary and community services to
improve access for community
practitioners and peoples of
Ayrshire and Arran.
Roll out E-Consult to GP practices
Mar 23
18 GP Practices are using this platform to support patient access. 
1 Practice chose to close down the use of e-consult due to
reduced clinical workforce.  All  18 practices have participated in
engagement sessions to review the use of e-consult and shared
learning across practices.  A patient experience questionnaire will
also be explored to provide further feedback.  Regular
engagement sessions continue with practices to encourage the
use of this digital platform.
Increased access 24/7 puts more
pressure onto the practice, and all
requests must be reviewed by a
clinician. Until the new system is
fully embedded practices may view
this is an additional workload for GP
Practices whilst running two
systems.  This has resulted in
practices requesting to turn e-
consult off periodically which is
confusing for the public  
Ability to turn e-consult off when
the practice is at reduced
workforce capacity.
UC1 Digital Health & Social Care Strategy Increased uptake by General Practice will allow more patients
to communicate with their GP Practice at a time convenient to
them 24/7, for follow up from the practice within an agreed
timescale.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Primary Care 2021-AA108 Green Increase shared care, access to
services and patient experience
within Community Optometry.
Co-Management Service - Support
additional eye disease being managed by
Community Optometrists in conjunction
with the Hospital Eye Service.
March 23
Three new Optometric Advisors recruited and progressing various
workstreams. 
The Eyecare Integration Group has been reformed and now has
regular scheduled meetings. 
The group are working on expanding the current shared care
model to hopefully include the screening of Juvenile Idiopathic
Arthritis in community practices with other potential services being
discussed such as Anterior Eye Conditions.
Securing funding to move to
implementation.
Potential lack of engagement either
from acute services or community
optometrists to progress
The integration group
membership to be reviewed to
ensure appropriate
representation and leadership to
support implementation
UC1 National introduction for co-management by Optometrists for
more complex conditions.
Increased Shared care between community optometrists and
acute services will support reduced waiting times allowing more
eye treatments to be carried out in the community. This will also
reduce the need for urgent referrals due to a patient's condition
deteriorating whilst awaiting an acute appointment
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Primary Care 2021-AA109 Green Work with General Dental Services
to increase service delivery and
remobilise following Covid-19.
Supporting Dental Practices to increase
activity where possible
Ongoing 2022/23
Activity levels since the relaxation of IPC guidance in April shows
that Dental Practices in NHS Ayrshire and Arran have increased
activity to 90% of pre pandemic income levels.  Some practices
are struggling to recruit Dentists, and therefore the National
Activity as described at 2.1 on the Annual Plan, for Scottish
Government to maximise recruitment and retention opportunities
for the dental team from UK and international graduates will be
essential in recovering the Dental Sector further.
PDS becoming overwhelmed should
emergencies continue to increase.
Oral Health Improvement Plan
NHSAA Oral Health Strategy 10
year Plan 2013-2023
UC1 Oral Health Improvement Plan
NHSAA Oral Health Strategy 10 year Plan 2013-2023
Covid-19 highlighted the health inequalities children and
families face, therefore during the pandemic food banks,
community groups and schools were given oral health products
such as toothbrushes, toothpaste etc. to support home tooth
brushing and this will continue whilst dental practices work to
recover to pre-Covid activity levels.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Primary Care 2021-AA110 Amber Develop the concept of community
monitoring and investigation hubs.
Identify what range of investigations and
procedures could transfer from being
delivered in GP surgery or a hospital
outpatient setting.
Concept is supported due to different ways of working during the
pandemic.  Development groups are established to take forward
by September 22.
Failure to get agreement on services
to be delivered as well as identify
suitable sites leading to inability to
implement community hubs resulting
in disparate access to services
across Ayrshire.
Discussion required with key
colleagues across the wider
system to ascertain timescales
and agree way forward.
UC1 PCIP
Caring for Ayrshire
Right Care, Right Place, Right Time
Care and Wellbeing Programmes
This will support people to access services closer to home
rather than attend an acute setting for specialist care. This will
positively impact patients with reduced mobility or multi co-
morbidities where travel can be difficult.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Primary Care 2021-AA111 Amber Implementation of contractual
elements of the new 2018 GMS
Contract
Implement Level 1 Pharmacotherapy
Service for full task transfer.
March 23
Pharmacotherapy is being delivered to all Practices across
Ayrshire & Arran, with all 53 Practices having full or partial access
to this service. Full task transfer is difficult to measure which has
been recognised across all Health Boards. Work on implementing
Level 1 Pharmacotherapy Service for full task transfer will
continue be taken forward for completion throughout 2022/23.
As at June 2022, a total of 103.3WTE Pharmacotherapy staff
have been provided to General Practice through the PCIP.
Ability to identify additional
professional staff to fill the new roles
within the PCIP.
Some GP practices unable to
accommodate additional workforce
capacity due to infection control
guidance and increased appointment
times reducing capacity. There are
also growing concerns regarding
accommodation within GP Premises
to be able to accommodate staff.
Work closely with Service Leads
to identify recruitment risks.
Monitor allocation of resource to
practices.
Utilise whole system workforce
planning to forecast recruitment
predictions.  Following recent
PCIF discussions, measures in
place to look at added resilience
within the service and  introduce
new roles to support with the
task transfer and aid succession
planning to ensure the service is
more resilient.
UC1 PCIP
Caring for Ayrshire
The aim through the reformed primary care service is not just to
extend life, but aim to reduce the time spent in poor health. 
Implementing the new GMS contract is an opportunity to
mitigate health inequalities where possible.
The purpose of the work  is to help people access the right
person, in the right place, at the right time in line with the
Scottish Government Primary Care Vision and Outcomes. 
Including:
• Maintaining and improving access
• Introducing a wider range of health and social care
professionals to support the Expert Medical Generalist (GP)
• Enabling more time with the GP for patients when it’s really
needed
• Providing more information and support for patients.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Primary Care 2021-AA111.1 Amber Implementation of contractual
elements of the new 2018 GMS
Contract
Roll-out serial prescribing service to
support Level 1 Task Transfer.
March 23
Practices to participate in a QI project to progress and improve on
the current systems and processes in place to ensure we are on
target for task transfer
All GP practices across Ayrshire & Arran are ‘live’ with serial
prescribing. In total there are 26,711 patients in Ayrshire and
Arran currently receiving serial prescriptions. This is just over
12% of all patients on repeat medicines.
Recruitment to posts for key staff will
be vital in order to deliver this
additional work.   Engagement of
some practices to work with the
service to implement changes to
ensure safe transfer.
Monitor the recruitment of staff
within the service.                     
Monitor the engagement of
practices and progress of
improvements.  Identify any GP
Practices that require further
support at an early stage.
UC1 PCIP
Caring for Ayrshire
The aim through the reformed primary care service is not just to
extend life, but aim to reduce the time spent in poor health. 
Implementing the new GMS contract is an opportunity to
mitigate health inequalities where possible.
The purpose of the work  is to help people access the right
person, in the right place, at the right time in line with the
Scottish Government Primary Care Vision and Outcomes. 
Including:West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Primary Care 2021-AA111.2 Green Implementation of contractual
elements of the new 2018 GMS
Contract
Provide all practices with a CTAC
service.
March 23
52 of the 53 GP Practices now have access to CTAC resource. 
Further recruitment is underway to provide resilience within the
service.  There are some challenges with accommodation which is
making it difficult to provide all practices with their full CTAC
allocation.
A test of change is being explored in the North and South
Ayrshire HSCP for CTAC hub model.  This test of change will
support those practices with accommodation issues.
As at June 2022, a total of 45.8WTE CTAC nurses and 19.3
HCSWs have been allocated across 53 GP Practices in Ayrshire. 
In addition to this there are now 6 Practice Educator's aligned to
the CTAC service to support training and development of the
nursing workforce. This is split across all 3 HSCP's and  are fixed
term posts for 2 years.
Lack of accommodation within GP
practices due to increased infection
control and social distancing leading
to practices being unable to access
CTAC staff resulting in inequitable
patient access to services. Due to
the volume of MDT's being allocated
to GP Practices, space is becoming
a real issue and concern.
Discussions ongoing with
practices to identify issues and
proposed solutions. Implement
locality models where GP
practices can't accommodate
additional staff.
Work to identify community hubs
(as per above deliverable) or
shared resource as a medium
term measure. Wider planning
with HSCPs in line with Caring
for Ayrshire for new improved
premises. Practice Educator role
to provide training and support to
CTAC staff across all three
HSCPs
UC1 PCIP
Caring for Ayrshire
The aim through the reformed primary care service is not just to
extend life, but aim to reduce the time spent in poor health. 
Implementing the new GMS contract is an opportunity to
mitigate health inequalities where possible.
The purpose of the work  is to help people access the right
person, in the right place, at the right time in line with the
Scottish Government Primary Care Vision and Outcomes. 
Including:
• Maintaining and improving access
• Introducing a wider range of health and social care
professionals to support the Expert Medical Generalist (GP)
• Enabling more time with the GP for patients when it’s really
needed
• Providing more information and support for patients.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Primary Care 2021-AA111.3 Green Implementation of contractual
elements of the new 2018 GMS
Contract
Provide practices with additional
professional roles to provide a MDT
approach to care enabling GPs as Expert
General Medicalist.
March 23
Discussions have take place with HSCPs to understand priorities
and recruitment plans for implementation during 2022/23.  This
includes additionality and resilience for all additional professional
roles.
As at June 2022, a total of 12.2wte  Advanced MSK Physios are
in place, 28.9 wte Mental Practitioners and 20.1wte Community
Link Workers are in post to support  General Practice across
Ayrshire and Arran.
Lack of accommodation within GP
practices due to increased infection
control and social distancing leading
to practices being unable to access
additional MDT staff resulting in
inequitable patient access to
services.
Discussions ongoing with
practices to identify issues and
proposed solutions. Implement
locality models where GP
practices can't accommodate
additional staff.
Work to identify community hubs
(as per above deliverable) or
shared resource as a medium
term measure. Wider planning
with HSCPs in line with Caring
for Ayrshire for new improved
premises.
UC1 PCIP
Caring for Ayrshire
The aim through the reformed primary care service is not just to
extend life, but aim to reduce the time spent in poor health. 
Implementing the new GMS contract is an opportunity to
mitigate health inequalities where possible.
The purpose of the work  is to help people access the right
person, in the right place, at the right time in line with the
Scottish Government Primary Care Vision and Outcomes. 
Including:
• Maintaining and improving access
• Introducing a wider range of health and social care
professionals to support the Expert Medical Generalist (GP)
• Enabling more time with the GP for patients when it’s really
needed
• Providing more information and support for patients.
142

Page 143

West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Primary Care 2021-AA111.4 Amber Implementation of contractual
elements of the new 2018 GMS
Contract
Provide an urgent care service to
General Practice.
March 24
Each HSCP are currently identifying how they will deliver Urgent
Care within their HSCP and plans are currently being put forward
for spend in 2022/23.
Funding will be key to allow this
workstream to grow and develop.
Establish a school of Primary
Care model to look at 'grow your
own models' for first point of
contact practitioners.
UC1 PCIP
Caring for Ayrshire
RUC
The aim through the reformed primary care service is not just to
extend life, but aim to reduce the time spent in poor health. 
Implementing the new GMS contract is an opportunity to
mitigate health inequalities where possible. 
Changes to how urgent care services are accessed may
positively impact patients who have reduced mobility or multi co-
morbidities where travel can be difficult as there will not be a
need to travel and the infection risk will be reduced.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Unscheduled Care 2021-AA122.6 Suspended Improve discharges across the site
and support the management of
patients delayed awaiting a Care
Home Place or Care at Home
Package
A joint project with Scottish Ambulance
Service (SAS) to pilot taking all patient
ambulance bookings on site negating the
need for ward staff to spend long periods
booking transport via the West of
Scotland booking line.
This has not been progressed to date - will be picked up at a later
date.
UC1 Winter Preparedness
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Redesign of Urgent Care 2021-AA135 Green Provide a Covid-19 Therapeutic
pathway to patients with worsening
Covid symptoms in order to prevent
deterioration and potential acute
admission
Recruit a small team for 12 month period
to sustain delivery of a single pathway in
A&A
June 22
Successfully implemented in December 21.  With a total of 539
patients receiving Covid Therapeutics since that time.  Only 3% of
patients treated have then entered into the acute system.  This
service will continue to be provided during 2022/23.
Unable to secure workforce. Working with skillmix of staffing
teams to identify sustainable
workforce plans and peripatetic
support.
UC1 RUC
Covid 19 Remobilisation & Recovery
Sustainability of providing treatment to our most vulnerable
patients with worsening Covid symptoms reducing the need for
secondary care intervention.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Infection Prevention & Control 2021-AA45 Amber Re-establishment of Core IPCT
Service and compliance with
national IPC standards, National
Infection Prevention and Control
Manual and National Standards and
Indicators (Reduction in CDI, SABs
and ECB's)
Implement the interim planned
programme for 2022-23
March 23
IPCT resource continues to support Covid outbreaks within acute
and community hospitals.    Re-mobilisation of audit and training
has progressed.  Recruitment continues to prove challenging. 
The interim planned programme has been developed for the year
2022-23 and will remain a live document with the ability to react to
changes in Covid guidance.
Unknown prevalence of Covid.
Recruitment due to limited IPC
trained workforce nationally
Continue to work collaboratively
with external agencies such as
ARHAI and SG to highlight the
impact of Covid and recruitment
challenges on IPC service
UC1 National IPC Standards, National Standards and Indicators and
the National Infection Prevention and Control Manual
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Inpatients
2021-AA59 Amber Sustaining safe inpatient service
delivery well in excess of 85%
predictor.
Ensuring safe staffing levels to meet
service need in excess of planned
activity levels and with increased acuity.
With exception of Covid-19 related
absence maintaining staff absence within
22.5%.
No requirement to board persons out of
area.
Bed occupancy in admission wards remains in excess of 90%,
95% for Older Adults. As a result waiting lists are required to
prioritise admission while retaining some capacity for urgent
emergency admissions.  Improvement in overall staff absence
through month of May and June compared to previous periods,
have remained within 22.5% absence rate excluding Covid. 
Despite bed pressures have not required to board anyone out of
area.
North Ayrshire HSCP Adverse incident of person in
community or inappropriate care
setting awaiting psychiatric inpatient
admission.
Risk of poor clinical outcomes,
patient experience due to inadequate
staffing levels/skill mix.
Reputational risk if require to board
person out of area, poor care
experience
Bed management processes to
prioritise admission referrals and
identify beds for unavoidable
admissions.
Focus on discharge from
admission and recording of
Delayed Discharges for review at
Discharge Liaison Groups.
Generation of contingency plans
including internal boarding to
ensure beds available for urgent
admissions.
Supporting staff via Promoting
Attendance Policy to
sustain/improve attendance at
work.
Timeous recruitment to vacant
posts.
Daily huddle to deploy available
staff to best effect - look at next
48 hour demands for early
escalation of shortages.
Process for reporting escalation
when under exceptional
pressure -beds and/or staffing.
Ensuring responsible rostering
practices.
UC1 Caring For Ayrshire, NHS A&A People Strategy, Mental Health
Act, Criminal Procedures Act, Mental Health Strategy, Ayrshire
and Arran Discharge Planning Agreement, NMC Code of
Conduct
Persons requiring psychiatric inpatient assessment/treatment
will receive the right care at the right time by a competent
workforce as close to home as possible
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Inpatients
2021-AA60 Amber Managing risk of Covid-19 outbreak
within MH inpatient setting.
Regularly reviewed Operational
Guidance to support staff to manage
persons on admission until Covid-19
status known, symptomatic persons and
positive cases.
Minimised risk of creating outbreak by
uncontrolled mixing of asymptomatic
Covid positive person after admission.
Effective management/containment of
person symptomatic/positive to avoid
outbreak.
Wards being closed due to outbreaks
affecting availability of beds and not
being available for admissions.
As with the majority of health care settings there have been
outbreaks across inpatient areas and persons identified through
on admission screening as being Covid positive.                                                                                  
Without exception outbreaks have been well controlled in 2022
with little spread after the initial case was identified - test amount
to effective Infection Control practices.
North Ayrshire HSCP Loss of service provision due to
wards closed to admission due to
outbreak = increased chance of
adverse event if unable to admit
someone.
Risk of poor clinical outcomes,
patient experience due to inadequate
staffing levels/skill mix.
Service user/staff health impact if
acquire Covid in hospital.
Longer term inavailability of staff if
develop Long Covid.
Risk of legal/criminal processes if
significant harm due to hospital
acquired Covid infection - financial
and statutory
Increased financial cost of staffing
wards to ensure safe numbers of
large number of staff are absent.
Asymptomatic testing on
admission and at Day 5.
Offering longer term patients
vaccination as per guidance.
Encourage staff uptake of
vaccine.
Monitoring inpatients for Covid
symptoms.
Ongoing adherence with
Infection Control guidance with
regards to hand hygiene
practices and use of PPE
UC1 NHS Ayrshire and Arran Infection Control Standards, NHS
A&A Covid Testing Strategy
Persons requiring psychiatric inpatient assessment/treatment
will receive the right care at the right time by a competent
workforce as close to home as possible. Person will not come
to harm as a result of inpatient admission.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
CAMHS
2021-AA62 Amber Development of Unscheduled Care
Pathway for Children & Young
People (Workforce)
Workforce in place and aligned to roles
July 22
Significant proportion of Charge Nurse Workforce recruited and
Team Leader in post.  Recruitment to Band 5 posts in July in
preparation of full 7 day service being on line 7am - 9pm in
November 22
North Ayrshire HSCP Delays in recruitment
Accommodation capacity
Accommodation requests being
considered
UC1 National Specification for CAMHS 2020
National Specification Neurodevelopment 2021
The Promise
GIRFEC
Better access across the 7 days of the week for children and
young people presenting with risk or psychological distress.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
CAMHS
2021-AA63 Amber Development of Unscheduled Care
Pathway for Children & Young
People
(Care Pathways)
Pathways established
February 23
Working with Paediatric Services and Adult Services to establish
pathways and synergy between services
North Ayrshire HSCP Pathways between services - No
local beds and dependence upon
other services, namely Skye House
(Regional) Woodland View Adult and
Crosshouse Paediatric Services
Full engagement with Paediatric
and Adult Services - Request for
bed capacity in Woodland View
with specific CAMHS ward being
sought
UC1 National Referral to Treatment Targets Psychological Therapies
National Specification for CAMHS 2020
National Specification Neurodevelopment 2021
The Promise
GIRFEC
Better access across the 7 days of the week for children and
young people presenting with risk or psychological distress.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
CAMHS
2021-AA64 Amber Reconfiguration of CAMHS
Unscheduled Care
Neuro Services
Community CAMHS
Workforce in place and aligned to roles
February 23
Organisational change processes underway, Team Leaders
aligned and Admin function developed to meet needs.
North Ayrshire HSCP Accommodation capacity
HR Function capacity
Org Change process and Staff Side
contribution
Regular meetings planned with
the APF and HR
UC1 National Referral to Treatment Targets Psychological Therapies
National Specification for CAMHS 2020
National Specification Neurodevelopment 2021
The Promise
GIRFEC
Better access across the 7 days of the week for children and
young people presenting with risk or psychological distress.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
CAMHS
2021-AA65 Amber Reduce waiting times & backlog Reaching optimum capacity of referrals
to providers by August 22
External contract agreed with two key providers to add increased
capacity for assessment, diagnosis and treatment
North Ayrshire HSCP Capacity within external providers
and internal systems being able to
get enough referrals over to
externals. Families preferring to wait
for CAMHS
Working with providers and
monitoring contract on monthly
basis.
UC1 National Specification for CAMHS 2020
National Specification Neurodevelopment 2021
The Promise
GIRFEC
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Psychological Therapies
2021-AA66 Green Provision of Psychological Services
to Staff Wellbeing.
Monthly data activity reported to SG
regarding number individuals seen, along
with alignment and demographic.
Increase in provision of group work and
tier 1 – 2 level interventions to ensure
capacity of the psychology workforce.
Provision of reflective practice sessions
to staff teams/wards to continue across
all sectors. 
Reflective practice sessions from within the Psychology
component of staff wellbeing, both covering acute, community and
Primary Care/HSCP. Recruitment of an assistant psychologist
has allowed for research project to commence. Back fill for
maternity leave has commenced, meaning limited impact on
service. Group work development continues in conjunction with
Staffcare colleagues. Wider wellbeing work continues through
Consultant supporting the wellbeing and trauma champions within
the HSCP. Wellbeing Hubs have been created in the three main
hospitals in Ayrshire, with a remit of providing supportive and
therapeutic space for staff.
North Ayrshire HSCP Short term funding of 8a post expires
March 23.
Psychology has funded a
temporary bd7 post PT to cover
maternity leave. Potential for
extension being discussed to
cover loss of 8a role.
UC1 A&A Health, Safety and Wellbeing Everyone matters, 2020;
Health Workforce Vision, SG, 2013.
143

Page 144

West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Psychological Therapies
2021-AA67 Green Maternity and Neonatal
Psychological Interventions (MNPI)
and Perinatal CMHT service
developed from dedicated SG
funding.
MNPI recording of national outcomes
has commenced with consultation with
national Psychology group. Local
collaboration with IT and Information
Governance to ensure adequate data
capture and online case-note taking
systems are in place.
Both services have reached full staffing, although vacancies have
arisen through natural attrition within nursing and OT. Further
developments have occurred in terms of the creation of an Infant
Mental Health service, which will sit alongside both teams. Both
Psychology and Nursing have recruited, with start dates
approximately September 22. OT and admin recruitment is in
progress.
North Ayrshire HSCP OT and nursing vacancies Both posts will be advertised in
the coming weeks; consideration
of consolidation of OT post with
IMH to increase attractiveness
UC1
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Psychological Therapies
2021-AA68 Green Intensive Care Unit Psychology
Service in line with the national
Cossette Report recommendations.
The service will formalise the provision of
psychological services to the population
who have been admitted to ICU, with
initial aims linked to the
recommendations of the Cossette
Report.
Continued work has ensured that approximately 75% of the
hospitalised Covid population have been contacted regarding their
experiences and needs, in line with recommendations from the
Cossette Report. This has been achieved through the support of a
fixed term assistant and dedicated administrative cover. It is hoped
this will reach 100% by end of 2022.
SG funding is fixed term until March 23 but Lead Partnership has
given support to recruit to a permanent contract for the Lead
Psychology post.
North Ayrshire HSCP Loss of assistant due to natural
attrition
Funding for assistant will
continue to be provided from
within core budget for
Psychological Services.
UC1 Cossette Report
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Psychological Therapies
2021-AA69 Green Neurodevelopmental Strategy and
Empowerment Team.
To provide a cost-effective
Neurodevelopmental Strategy and
Empowerment Team coordinating a
robust online and physical information
service, the Considerate Communities
award scheme and pre/post assessment
programme.
This work will be in partnership with
clinical services, 3rd Sector and
government agencies.
Service delivery is now underway.  Appointments to the
Programme Lead and Project Lead posts have been made. 
Website will be launched imminently.  Links with local clinical and
3rd Sector services established and a rolling programme of
training will be available in the coming months.  Awaiting
identification of physical base for team to ensure wide accessibility
for the community and to allow the Service to meet all its key
performance indicators.
North Ayrshire HSCP Lack of availability of physical base. Mitigation of absence of physical
base will be made through
temporary booking of meeting/
training spaces in the community
and working from home for
members of the Team. 
However, this does limit
accessibility of the Service for
members of the community. 
UC1 Scottish Strategy for Autism
Ayrshire & Arran Strategy for Autism
Scottish Government Learning/Intellectual Disability & Autism:
Transformation Plan 
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Psychological Therapies
2021-AA70 Green External service commissioning for
neurodevelopmental assessments
within Community Paediatrics.
Procure external provider.
Create data Protection Impact
Assessment.
Monthly feedback regarding case
completion and impact upon waiting lists
within Community Paediatrics
Patients on Community Paediatrics Psychology
neurodevelopmental waiting list are now being sent to external
providers.  Pathways for and processes have been developed and
refined and are working well.
North Ayrshire HSCP Lack of capacity in external
providers.
Communication with external
providers to ensure capacity is
sufficient to meet service needs. 
Preparation to engage with
additional providers if required.
UC1 SG waiting times guarantee for Mental Health Services.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Psychological Therapies
2021-AA71 Green To clear waiting time backlogs by
March 2023 as specified in the MH
Recovery and Renewal Funding
with  additional  Psychological
Therapies staffing resource from
dedicated allocation.
Appoint to vacancies within established
posts.  
All posts to sit within our established
clinical multi-disciplinary teams where
there is clarity on the focus of their
additionality and where there are
established referral criteria and
pathways. 
Local data analysts, with support from
SG data analysts, to develop a waiting
times trajectory plan to identify
requirements to achieve and sustain
90% waiting time compliance for PT by
March 23. 
The SG funding allocations have been utilised.  New postholders
will be appointed through 2022.  Recruitment to vacancies within
established posts is being progressed through local and national
recruitment drives and reconfiguration of posts to increase
attractiveness in the current competitive context.  Awaiting
confirmation of further SG funding for PT to progress identified
priorities for backlog and unmet need.  Trajectory plan, using PHS
national model, has been applied to two clinical services. 
Expansion of the trajectory plan for the whole service is currently
being developed.  Current waiting time compliance is 90.6% May
22.
This additionality is not sufficient to meet unmet need in clinical
service areas where demand is managed relative to available
capacity.  
North Ayrshire HSCP Inability to recruit to new and vacant
posts to develop the required staffing
capacity to achieve and sustain
waiting time compliance.
Reconfiguration of posts to
increase attractiveness -
permanent contracts, variation in
contracted hours, skill-mix,
banding, split-posts
UC1 Psychological Therapies Waiting Times standard.
MH Recovery and Renewal Fund.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Addiction
2021-AA72 Green Prioritise recovery from drugs and
alcohol to significantly improve
outcomes for service users
Comprehensive clinical assessment &
recovery focussed treatment support to
clients with a range of alcohol and drug
problems including mental, sexual and
physical health related issues. 
Involved in alcohol detox, ORT and
medication monitoring, RADAR, Duty.
General waiting times targets will be met.
Implement MAT standards in line with
Drug Death Task Force Investment.
August 22
RADAR is now operational and has shown a 15% increase in
referrals to treatment services.
East Ayrshire HSCP Recruitment and retention of staff.
Lack of suitable
premises/infrastructure to support
delivery.
Team remodelling to support
delivery. Infrastructure
investment in line with Caring for
Ayrshire.
UC1 East Ayrshire ADP Strategic Improvement Plan 2020-24
New Treatment Standards (MAT) for Drug Users
Everybody Matters - Preventing Drug Related Deaths: A
Framework for Ayrshire & Arran 2018-2021
East Ayrshire HSCP Strategic Plan 2021-2030
People affected by drugs and alcohol are some of the most
marginalised in society. Supporting them into treatment support
services provides early access to the relevant support service
enabling change to begin and making recovery possible.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Addiction
2021-AA73 Green Provide Trauma Training Addictions
Services – Decider Skills.
Purchase external training to provide
trauma training for new staff who have
and will be joining the team in keeping
with MAT Standards.
Will be arranged for later in the year
November/December 21 when all new
staff have joined the team.
Trauma training continues to be delivered as new staff join the
team. East Ayrshire HSCP are identifying a key post holder to
continue to drive improvements.
East Ayrshire HSCP Team pressures and vacancies
could result in lack of focus.
Dedicated post holder will
support on-going key
deliverables are met.
UC1 East Ayrshire ADP Strategic Improvement Plan 2020-24
New Treatment Standards (MAT) for Drug Users
Everybody Matters - Preventing Drug Related Deaths: A
Framework for Ayrshire & Arran 2018-2021
East Ayrshire HSCP Strategic Plan 2021-2030
Many people who have drug and alcohol issues experience
multiple complex traumas. This impacts on their ability to
manage their lives effectively and so lessens the opportunities
available to them in terms of training, employment which
contribute towards improved outcomes and less inequalities.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2021-AA74 Amber To support people with severe and
enduring mental health problems
and introduce Physical Health
Checks with patients attending
Depo clinics.
Support improved physical health for
people with severe and enduring mental
health problems.  Less crisis admissions
to acute care.
Job description is going through job evaluation. Recruitment will
follow.
East Ayrshire HSCP Delays in recruitment. Primary and acute care support
till posts holders are in place.
UC1 Mental Health Strategy 2017-2027
East Ayrshire HSCP strategic plan 2021-2030
Framework for supporting People through Recovery and
Rehabilitation during and after the Covid-19 Pandemic 2021
The inter-relationship between poor mental health resulting in
poor physical health and vice versa is well evidenced. Living
with these diagnoses results in reduced opportunities and in
some instances premature death. Supporting improved physical
health will help to reduce the inequalities gap for this population.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2021-AA75 Amber To provide early intervention for
mental health and wellbeing within
the community through support to
GP Practices.
Rapid access to mental health support.
Self- management. Early intervention to
prevent deterioration of symptoms.
Mental health practitioners in place in all GP practices. Self help
workers are aligned to promote self management approaches.
East Ayrshire HSCP Short term funding for 3 self help
worker posts
Considering other sources of
funding to minimise impact on
outcomes.
UC1 Mental Health Strategy 2017-2027
East Ayrshire HSCP strategic plan 2021-2030
Framework for supporting People through Recovery and
Rehabilitation during and after the Covid-19 Pandemic 2021
Supporting early intervention and prevention in Primary Care
reduces stigma often associated with mental health problems.
Improving access for new people presenting enables the right
support at the right time early in the person's journey.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2021-AA76 Red To increase capacity to undertake
statutory Mental Health Officer
(MHO) reports.  To allow individuals
to meet their own personal
outcomes and support needs where
legal intervention is required.
To provide a Guardianship assessment
and reporting function.
Reduction in waiting times for service
users.
Significant pressures on MHO staffing compliment creating risks
in relation to fulfilling statutory responsibilities.
East Ayrshire HSCP MHO recruitment/retention. Increase
in volume and complexity of people
requiring support from MHO.
Disparity across the country in terms
of remuneration leading to attrition.
Chief S/W dedicated focus to
support improvement plan.
Focused recruitment drive
around qualified S/W posts.
Caseload management to free
up capacity to support
compliance with legislative
requirements.
UC1 Mental Health Strategy 2017-2027
East Ayrshire HSCP strategic plan 2021-2030
Mental Health (Care and Treatment) (Scotland) Act 2003
Adequate MHO capacity is required to ensure the rights of the
individual are protected. Lack of capacity in this area
jeopardises this and risks people with mental health, learning
disability and addictions being subject to measures which are
not person centred or proportionate.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2021-AA77 Green Sustain and further develop the
broad range of wellbeing supports
and activity established through the
Wellbeing Coordinator and
associated resources.
Wellbeing Newsletter developed with
information on wellbeing support and
resources.
Wellbeing Learnpro Module developed
on workforce wellbeing.
Mindfulness Course developed and
delivered Lifestyle Medicine Project
developed and delivered in partnership
with Kilmarnock GP Practice.
Training in mindfulness and self-care.
Wellbeing Sessions undertaken with
Independent Care Home Sector.
70 1:1 workforce wellbeing sessions
undertaken since 1 April 2021.
Finding Inner Calm Programme
developed and extended to include Care
Homes, HSCP, Educational Services.
Milestone targets achieved. Continued focus to embed the cross-
cutting wellbeing partnership arrangements established during the
pandemic to ensure continuity of legacy actions and maximise the
opportunities for collaboration  Range of workforce wellbeing
supports developed in response to winter and system pressures
including: Community Wellbeing Hubs with access to restroom
facilities to aid rest and recuperation for primary care and social
care staff working in the community;  First Aid for Mental Health
programme developed targeting the primary care and social care
workforce including the 3rd and independent sectors in
collaboration with the EAC Health Working Lives Team;
communication and promotional materials and resource packs
produced and distributed;  Finding Inner Calm and Mindfulness
wellbeing interventions delivered to ensure workforce has full
access to supportive wellbeing options.
East Ayrshire HSCP Increased demand for wellbeing
supports and interventions arising
from workforce and system
pressures. Impact of work-related
stress on wellbeing and absence
levels.
Ongoing monitoring and review.
Oversight through HSCP SPG
UC1 CPP Wellbeing Delivery Plan 2021-24
East Ayrshire HSCP strategic plan 2021-2030
Covid-19 Recovery and Renewal Framework
Physical and psychological supports firmly focussed on
proactive preventative action to support employees deal with
workforce and system pressures
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2021-AA78 Green To assist in the introduction of
Trakcare within Adult MHS and to
maintain the system when in place.
Develop system ensuring all referrals are
actioned through E vetting.
Develop audit and reporting procedures
All referrals actioned through E vetting and follow up
appointments booked on Trak.  Audit reports in progress and 18
week reporting progressing using a collation of data from
databases and trak.
90 % Complete
North Ayrshire HSCP Backlogs in getting outcomes and
appointments etc onto the system in
a timely manner due to staff
absence.
Waiting lists are being
scrutinised and any queries
resolved promptly in conjunction
with the project team.  Meetings
set up with team leaders and
data analyst to familiarise them
with the reports available.
UC1 Mental Health Strategy 2017-2027
East Ayrshire HSCP strategic plan 2021-2030
Adult with Incapacity (Scotland) Act 2000
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
AHP
2021-AA79 Green Reduction of waiting times to CMHT
Occupational Therapy Service- to
meet RTT target of 18 weeks.
Provision of OT assessment and
interventions to individuals with mental
health difficulties that impact on their
independence in Activities of Daily
Living.
Milestone target has been exceeded and work will continue to
maintain
East Ayrshire HSCP Non-recurring funding for 2 key OT
posts which jeopardises the progress
made leading to poor outcomes for
people.
Consideration of alternative
routes of funding to support
maintenance of progress.
UC1 Mental Health Strategy 2017-2027
East Ayrshire HSCP strategic plan 2021-2030
Framework for supporting People through Recovery and
Rehabilitation during and after the Covid-19 Pandemic 2021
Many people with severe and enduring mental health problems
experience a significant impact on their ability to maintain their
daily functioning. Lack of a dedicated focus around functional
assessment and care planning to support improved outcomes
will result in lack of opportunities for this population.
144

Page 145

West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2021-AA85 Amber Additional Mental Health
Practitioners (MHP) to offer
assessment and triage within GP
practices to enable increased
capacity of other MDT staff to focus
on wider GMS contract activities.
Source Funding by 2nd quarter of
financial year.
Progress recruitment to ensure resource
in place by end of financial year
Service that ensures an individual with
mental health difficulties presenting at
general practice can be seen by a MHP
by beginning of new financial year (at
latest, ideally within this current financial
year).
Funding from Mental Health in Primary Care investment
requested to uplift MHP numbers to previous business case, with
additionality to cover for absences (akin to other primary care
development funding).
Awaiting SG feedback on allocation based on proposal submitted.  
In anticipation of funding, we have relevant paperwork completed
to progress to recruitment ASAP.
North Ayrshire HSCP Without full business case
implementation with appropriate uplift
there continues to be exponential
demand on GP’s for mental health
concerns.   As such, there is a risk
of delay to assessment, duplication
of effort, delay to treatment etc, until
fully funded.
• Currently there are no
mitigations that can be put in
place, without having a negative
impact on other practices.
• Where possible, we have
spread the MHP resource,
primarily based on demand.
• In partnership with East and
South Ayrshire, we plan to
recruit together to minimise risk
of recruiting from same pool, and
hopefully not depleting existing
services.  A publicised targeted
recruitment drive would hopefully
bring others from out with area.
UC1 Caring for Ayrshire
Primary Care Implementation Plan
Mental Health and Wellbeing in Primary Care
This will ensure that at any time an individual with mental health
difficulties presenting at general practice can be seen by a
MHP, this will ensure Right person, first time principle.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2021-AA86 Amber To increase capacity to undertake
statutory Mental Health Officer
(MHO) reports.  To allow individuals
to meet their own personal
outcomes and support needs where
legal intervention is required.
(1) Recruit Staff for both parts of the
service by 2nd quarter of the year.
(1.1) Revised MHO Service will include
Guardianship reviews across North
Ayrshire Partnership, this and
guardianship applications will be the
initial focus of this Team.
(1.2) Revised Care Management Team,
will review care and care provision of
service users and work with care
providers to ensure service users are
receiving the care they require.
After a successful pilot in North Ayrshire it was agreed that the
Mental Health Social Work Team would separate into 2 Teams –
Mental Health Officer Team and Social Work Care Management
Team.
Funding has now been provided by North Ayrshire Health &
Social Care Partnership to ensure the sustainability and
deliverability of this new model.
Whilst navigating recruitment processes, Agency Social Work
and MHO posts have been implemented (although to varying
degrees of success)
North Ayrshire HSCP Ability to recruit to posts Adjustments to the MHO
payment in North Ayrshire will
hopefully attract social workers
and MHO’s from other areas and
from training.
Consideration of MHO training
opportunities to ensure quantity,
quality, and continuity of training.
Utilisation of agency staff where
possible, to plug gap until
successful recruitment.
UC1 National Care Service
Mental Welfare Commission (regarding MHA and AWI
Legislations)
The implementation of this new model will enable legislative
timescales to be achieved and met, including Guardianship
applications and Guardianship reviews, which will help delayed
discharges and planning of care for the residents of North
Ayrshire.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2021-AA87 Red Referrals have increased into the
service, additionality will ensure
timely assessment and treatment of
these individuals.  Ability to respond
to increased demand of CMH
service.  As such, there is a
requirement to increase nursing
staff to meet increase in demand
and current deficit in capacity
Requirement to increase nursing staff to
meet increase in demand and current
deficit in capacity
Submit pressure bid highlighting shortfall
in staff (8 WTE CPN's required to
address current shortfall).
Complete
Updated papers being submitted to
PSMT with new risk mitigations. 
Complete
Further contingency planning
arrangements enacted to ensure safety
and wellbeing of staff and service users.  
Ongoing
Recruitment still remains a challenge and have been unable to
recruit to posts.  No further forward in terms of staffing uplift. 
North Ayrshire HSCP 1) Patient experience or outcome
2) Staffing and competence
3) Service / business interruption
4) Objectives and projects
5) Injury (physical and
psychological) to patient’s staff.
6) Complaints / claims
Risk is not mitigated fully at this time. 
Short term control measures have
reduced some risk, but not of
significance as such, risk has been
entered onto risk register.  Further
control measures required to further
mitigate risks without requested
investment.  Without this, we will be
unable to stabilise core service.
Current control measures:
a) Reduced the frequency of
assessments clinics. We are
now at the point where our
clinics just meet demand and
these cannot be reduced any
further.                       
b) Appointment of a short-
medium term CPN to carry out
all triage activity. 
c) We have implemented ‘Live
documentation’ this is to reduce
work pressures in having to
return to base and type up all
notes. 
d) Reduction of duty hours to
9am-5pm, akin to core hours.     
Long Term control measures:
1) There requires to be
investment in CPN in terms of
finance of new posts.
2) There requires to be
investment in CPN in terms of
training and development.
UC1 The Scottish Government have recently engaged a piece of
work regarding secondary mental health service, in which
community mental health services will be included. 
Parity of esteem is spoken about between, physical and mental
health and tackling this Health inequality was paramount in
government papers, however we are now seeing an inequity
within Mental Health Services themselves, investment in
specialist services has been the focus in recent years –
however Core Service has not had parity in terms of investment
resulting in inequality in care provision across the spectrum of
MH care treatment.
If funding is delivered, these core services will be able to tackle
the incoming increase in referrals (40% increase in recent
years) that has resulted as we move out of the pandemic.
North Ayrshire has extremely high social deprivation and as
such inequalities abound. Investment will mean that those who
require mental health care and treatment will have access to
services at the right time from the right person.
Investment will also mean that those requiring same day care
and intervention from core service will receive this.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Unscheduled Care
2021-AA92 Green Redesign of Mental Health Urgent
(Unscheduled) Care Service
Deliver a 24/7 Emergency Services
Mental Health Pathway
May 22
Deliver an Alcohol and Drug Liaison
Service to operate 7 days
June 22
Develop a Mental Health Unscheduled
Care Assessment Hub to be situated
within Ward 7B, Woodland View.
Awaiting outcome of option proposal. 
Likely to receive July 22.
Following securing further Action 15 monies all posts are filled.
The ESMHP went live from the 3oth May 24/7.
The Alcohol and Drug Liaison Team (ADLT) currently delivering a
5 day service
North Ayrshire HSCP The possibility that referrals to the 
Pathway may outstrip capacity,
especially now that SAS can access
the pathway. 
Accommodation requested for the
Alcohol and Drug Liaison Team
within Mental Health Unscheduled
Care Service at Lister Street.  If this
is unsuccessful then service
provision will be affected. 
Monitor  and review the data as
well as review current workforce
across the  whole  of
Unscheduled Care MH to
ensure that staffing is adequate
to deliver the pathway.
If we are unable to secure
accommodation we will have to
utilise a blended approach for
agile working. This could
however have an impact on
service response times.
UC1 Urgent and Emergency/Unscheduled Care
Redesign of Urgent Care (Locally & Nationally)
Caring for Ayrshrie
Parity of esteem between, physical and mental health
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Addiction
2021-AA94 Green Responding to increased demand
for services and increased
caseloads.
Exploring use of remote clinics in non-
NHS venues, increasing Near Me
uptake.
Development of outreach strategies and
increased Naloxone provision
Increased number of clinical venues within the community to see
individuals as part of MAT standards roll out.
South Ayrshire HSCP Recruitment to posts, availability of
community venues and facilities to
see individuals
UC1
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Addiction
2021-AA96 Green Meet all ‘Access to Treatment Time’
Standards.
Service to continue to be adaptable,
available and flexible in supporting new
clients receive treatment appropriate to
their recovery.
90% of clients referred to commence
treatment within 3 weeks
100% of clients to commence treatment
within 6 weeks
Complete and ongoing South Ayrshire HSCP Resource through additional funding
Recruitment to posts
UC1
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Addiction
2021-AA97 Amber To support Addiction workers to
work more agile.
Purchase laptops for community venues
/facilities to provide addiction services
(rather than in NHS Clinic Space).
Following review of existing equipment and technology it was
identified that iphones offered more versatility either as connection
option for existing laptop or for telephone/NearMe consultations 
in alternative community venues.
South Ayrshire HSCP This equipment was ordered many
months ago however supply issues
have meant that they have yet to
arrive.
UC1
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2021-AA98 Amber Reintroduce range of therapeutic
options.
Delivery of group based interventions:
Creative group.
Increase number of individuals taking
part in therapeutic groups
Group based interventions - some now up and running although
roll out has been challenging due to limited community venues
and suitable accommodation.
South Ayrshire HSCP Resource through additional funding
Recruitment to posts. availability of
community venues and facilities to
see individuals
UC1
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2021-AA99 Green Increase range of treatment options
and create capacity for wider
service redesign.
Delivery of decider skills.
Development and implementation of care
pathways.
Provide clinical assessment and
treatment to people referred to
CMHT/PCMHT
First decider skills group planned for September 2022 South Ayrshire HSCP Resource through additional funding
Recruitment to posts. availability of
community venues and facilities to
see individuals
UC1
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Addiction
2022-AA47 Green Reduce the number of drug and
alcohol related deaths through the
implementation of local plans and
responses
Implement, evaluate and improve our
delivery of the new Medication Assisted
Treatment (MAT) Standards 
By March 23
MAT Standards 1 is partially implemented (Rag status - Amber)
whilst Standards 2 to 5 are fully implemented (Rag status -
Green).  New Improvement Plan to be agreed  by August with
MIST support team
North Ayrshire HSCP Full MAT delivery - delays or inability
to recruit to key posts since by June
2022, no confirmation received from
the Scottish Government regarding
MAT funding.  Also challenges with
HR timescales in job evaluation
processes.  
Work with the SG to transfer the
MAT funding to HB and recruit
to essential posts
UC1 Medication Assisted Treatment (MAT) standards: access,
choice, support;
Scottish Drug Deaths Taskforce - Forward Plan (2021-2022)             
Evidence-Based Strategies for Preventing Drug-Related
Deaths in Scotland - Our Emergency Response;
Improving Scotland's Health - Rights, Respect and Recovery;
North Ayrshire ADP - Preventing Drug Deaths Action Plan 
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Addiction
2022-AA47.1 Green Reduce the number of drug and
alcohol related deaths through the
implementation of local plans and
responses
Delivery of Alcohol Brief Interventions
(ABI) and meet the national standard
By March 23
Engagement and processes in place with services across Priority
and Wider Settings.  Further ABI training made available over the
next 3 months
North Ayrshire HSCP UC1 Medication Assisted Treatment (MAT) standards: access,
choice, support;
Scottish Drug Deaths Taskforce - Forward Plan (2021-2022)             
Evidence-Based Strategies for Preventing Drug-Related
Deaths in Scotland - Our Emergency Response;
Improving Scotland's Health - Rights, Respect and Recovery;
North Ayrshire ADP - Preventing Drug Deaths Action Plan 
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Addiction
2022-AA47.2 Green Reduce the number of drug and
alcohol related deaths through the
implementation of local plans and
responses
Implement, evaluate and improve the
new Non Fatal Overdose (NFO)
response pathway
By March 23
NFO response pathway in place.  Continuing to work with key
partners, including the Scottish Ambulance Service, to improve
the overall pathway.
North Ayrshire HSCP UC1 Medication Assisted Treatment (MAT) standards: access,
choice, support;
Scottish Drug Deaths Taskforce - Forward Plan (2021-2022)             
Evidence-Based Strategies for Preventing Drug-Related
Deaths in Scotland - Our Emergency Response;
Improving Scotland's Health - Rights, Respect and Recovery;
North Ayrshire ADP - Preventing Drug Deaths Action Plan 
145

Page 146

West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Addiction
2022-AA47.3 Green Reduce the number of drug and
alcohol related deaths through the
implementation of local plans and
responses
Continue to deliver training on Naloxone
and continue to supply Naoxone to
priority settings
By March 23
Detailed Improvement Plan in place identifying key partners who
could benefit from the roll out of Naloxone training and supply.
North Ayrshire HSCP UC1 Medication Assisted Treatment (MAT) standards: access,
choice, support;
Scottish Drug Deaths Taskforce - Forward Plan (2021-2022)             
Evidence-Based Strategies for Preventing Drug-Related
Deaths in Scotland - Our Emergency Response;
Improving Scotland's Health - Rights, Respect and Recovery;
North Ayrshire ADP - Preventing Drug Deaths Action Plan 
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Addiction
2022-AA47.4 Green Reduce the number of drug and
alcohol related deaths through the
implementation of local plans and
responses
Work with partner services to increase
and improve the support for individuals
with a 'Dual Diagnosis'
By March 23
Updated 'Dual Diagnosis' Care Pathway is in the process of being
signed off by key partner services.  Plan is to deliver multi agency
awareness sessions over the next year and to re-establish inter
team Community Mental Health Team Alcohol and Drug Services
clinical and support meetings.
North Ayrshire HSCP UC1 Medication Assisted Treatment (MAT) standards: access,
choice, support;
Scottish Drug Deaths Taskforce - Forward Plan (2021-2022)             
Evidence-Based Strategies for Preventing Drug-Related
Deaths in Scotland - Our Emergency Response;
Improving Scotland's Health - Rights, Respect and Recovery;
North Ayrshire ADP - Preventing Drug Deaths Action Plan 
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Addiction
2022-AA47.5 Green Reduce the number of drug and
alcohol related deaths through the
implementation of local plans and
responses
Deliver and meet the new 'Substance
Use Treatment Target'
959 individuals will receive supportive
treatment in North Ayrshire
By April 24
Measures in place, including access to MAT, to ensure an
increase to the number of people in protective treatment. 
North Ayrshire HSCP UC1 Medication Assisted Treatment (MAT) standards: access,
choice, support;
Scottish Drug Deaths Taskforce - Forward Plan (2021-2022)             
Evidence-Based Strategies for Preventing Drug-Related
Deaths in Scotland - Our Emergency Response;
Improving Scotland's Health - Rights, Respect and Recovery;
North Ayrshire ADP - Preventing Drug Deaths Action Plan 
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Addiction
2022-AA48 Green Ensure quick access to treatment
for individuals with alcohol and drug
problems by meeting the national
'Access to Treatment' waiting times
Standard
Ensure that 90% of individuals referred
for alcohol and/or drug treatment
commence treatment within 3 weeks of
referral;
By March 23
Ensure that 100% of individuals
commence treatment within 6 weeks
By March 23
Individuals receiving quick access to treatment.  Most recent
verified data confirms that 99% of individuals were commenced on
treatment within 3 weeks and 100% of individuals were
commenced on treatment within 6 weeks.
North Ayrshire HSCP UC1 National 'Access to Treatment' Standards
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Addiction
2022-AA49 Amber Support implementation of the
Alcohol and Drugs Partnership
Strategic Plan 2020-24
Early intervention for individuals, families
and communities to prevent issues from
arising. Promotion of recovery. Reduction
in stigma. Reduction in trauma.
Good progress around implementation of MAT Standards 1-5.
Further progress being made in relation to progressing MAT 6-10.
Key post holder being recruited to support anti-stigma approaches
across East Ayrshire HSCP. Scale up of local grass roots funding
has supported more people with lived experience being able to
lead and direct innovative approaches to recovery. Feedback from
lived experience representatives is positive in supporting people to
get support early in their journey.
East Ayrshire HSCP Issues with recruitment and retention
jeopardises the progress with MAT 1-
5. Additionally further emphasis is
required from Primary Care and
Justice services to promote
compliance with MAT Standards in
these settings.
Support from HR and scrutiny to
minimise recruitment delays.
Strategic groups established to
ensure momentum in Primary
Care and Justice settings to
support MAT delivery.
UC1 East Ayrshire ADP Strategic Improvement Plan 2020-24
New Treatment Standards (MAT) for Drug Users
Everybody Matters - Preventing Drug Related Deaths: A
Framework for Ayrshire & Arran 2018-2021
East Ayrshire HSCP Strategic Plan 2021-2030
People affected by drugs and alcohol are some of the most
marginalised in society. Supporting them into treatment support
services provides early access to the relevant support service
enabling change to begin and making recovery possible.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Addiction
2022-AA50 Amber Utilise MDT approach to increase
access to residential support for
Drugs and Alcohol Services
Ready access to residential rehabilitation
places.Targeted,person centred
approach to lifestyle change. Retention in
residential programme. Improved
outcomes for individuals following
placement.
S/W post has been recruited to. Referrals are being processed.
Contracting agreements are being developed to support
placements and demonstrate robust model of support and
effective support outcomes.
East Ayrshire HSCP Small numbers of individuals
seeking residential rehab
placements. Inability to meet national
target, approx 7 per annum.
Supporting staff to consider
individuals seeking residential
support options. Marketing to
support uptake.
UC1 East Ayrshire ADP Strategic Improvement Plan 2020-24
New Treatment Standards (MAT) for Drug Users
Everybody Matters - Preventing Drug Related Deaths: A
Framework for Ayrshire & Arran 2018-2021
East Ayrshire HSCP Strategic Plan 2021-2030
Access to residential rehabilitation for some people using drugs
and alcohol is an essential element to support improved
outcomes and recovery some individuals. Lack of access to
this type of support has been an inequalities issue recognised
by SG hence new, welcomed investment.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
AHP
2022-AA51 Green To support the vision from the 2018
General Medical Services Contract
(Scotland) and recent MOU (2021)
for GP Practices to receive
additional professional services, GP
practices will be supported by an
Occupational Therapist. The
ambition is to maximise the
contribution of Occupational
Therapists in providing earlier
interventions to people with mental
and/or physical health needs. The
programme will also enhance the
Occupational Therapy Frailty
Pathway to identify people in mild to
moderate stages of frailty; and to
work with individuals proactively to
maintain or improve levels of frailty.
Occupational Therapists will be based or
closely aligned within practices providing
assessment and interventions for
individuals with mental and / or physical
health and/or frailty needs who are
experiencing an impact on their
occupational performance to enable
independence and prevent further
decline for individuals, at the right time
and in the right place.
Recruitment supported via the funding of Permanent posts has
been successful. Funding was secured via action 15 (3 posts)
and the South Ayrshire HSCP (10 posts).
Recruitment is ongoing for a further 2 posts.
Engagement with practices across Ayrshire is ongoing with
sessional work commenced across 11 of the 15 practices within
South Ayrshire. Work will continue to provide coverage to all GP
Practices within the South Ayrshire partnership.
South Ayrshire HSCP Recruitment challenges and ability to
fill posts
Service pressures and ability to meet
deliverables
For all areas continue to explore
innovative ways to recruit and
remobilise services post Covid.
UC1 Mental Health Strategy 2017-2027
South Ayrshire HSCP strategic plan 2021-2030
Framework for supporting People through Recovery and
Rehabilitation during and after the Covid-19 Pandemic 2021
Caring for Ayrshire
AHPs are able to achieve earlier intervention and see patients
right place, right time to enable more positive patient outcomes.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
AHP
2022-AA52 Amber To meet the ongoing demands of
the AHP service to improve patient
outcomes and deliver the right care
in the right place by the right person
Secure funding for permanent posts
Complete
Progress recruitment
Ongoing
Permanent funding received from North Ayrshire HSCP and
agreement to recruit to posts on permanent basis which has been
successful with the exception of Speech and Language Therapy. 
Have reviewed role and will go back out to recruit on amended role
with greater confidence to recruit.
North Ayrshire HSCP Recruitment challenges and ability to
fill posts
Service pressures and ability to meet
deliverables
For all areas continue to explore
innovative ways to recruit and
remobilise services post Covid.
UC1 NAHSCP Strategic Plan
Caring for Ayrshire
AHPs are able to achieve earlier intervention and see patients
right place, right time to enable more positive patient outcomes.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
CAMHS
2022-AA53 Green Delivery of National Secure
Adolescent Inpatient Services
(NSAIS) "Foxgrove"
Pathways agreed Q3 2022/23
Workforce agreed and in place Q4
2022/23
Unit Operational Q4 2022/23
Recruitment delayed due to NSD North Ayrshire HSCP Delays in recruitment
Referrals
NSD Decision making
Regular stakeholder meetings UC1 Mental Health Strategy 2017-27
Child & Adolescent Mental Health Services: national services
specification
Children and adolescents will be provided with the complex
mental health care and support services they need within an
appropriate environment in Scotland
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
CAMHS
2022-AA54 Green Prevent admission of under 18s to
Intensive Psychiatric Care Unit
(IPCU)
Soft Launch in Jul/ Aug - 7 day working All Band 6 Charge Nurse posts recruited to.  Soft launch imminent
- staff will work 7 days from 9am -5pm
North Ayrshire HSCP Recruitment and Retention of staff
Accommodation capacity 
UC1
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
CAMHS
2022-AA55 Green Develop and implement service to
provide an early intervention for
people with a first episode of
psychosis
Develop Pathway
March 23
Initial conversations being had.  Operational Responsibility and
model to be explored
North Ayrshire HSCP Clinical Governance framework &
accountability yet to be decided
UC1
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2022-AA56 Green Increase access to diagnostic
support for patients with dementia
Recruitment to posts
Develop Care Pathway
Post diagnostic support staff in post. CST groups now up and
running in Troon, Prestwick and Ayr. Girvan planned for August
2022 
South Ayrshire HSCP Resource through additional funding
Recruitment to posts
Post Covid delays in patients
presenting and therefore further
along their illness trajectories
consequently may have difficulty
with understanding
See families and provide support UC1
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2022-AA57 Green To carryout a workforce analysis to
ensure the right people are in the
right place to meet service need
To provide Link Workers in every GP
Practice to link people to voluntary and
third sector support
Adequate Community Mental Health
Team to respond to the new National
Mental Health standards for CMHT
Recruitment complete for community link practitioners. Now
secured 10 CLPs across South Ayrshire servicing every GP
practice as well as offering specific locality based support to the
Wallacetown area.  Workforce analysis completed in CMHT
which identified shortfall in capacity. Additional funding being
sought from range of funding options. In interim, clinical activities
are being RAG rated and prioritised to ensure risks are reduced
as much as is possible. 
South Ayrshire HSCP Resource through additional funding
Recruitment to posts
UC1
146

Page 147

West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2022-AA58 Amber Identify essential infrastructure for
service bases and for delivering
interventions i.e. group therapy and
one to one treatment.
Carry out a scope of accommodation 
across the NHS and Local Authority
estates portfolio so as to be able to
provide interventions as close to local
communities as possible.
By October 22
New key deliverable North Ayrshire HSCP Without this essential infrastructure
it will be difficult to stabilise and
reform.
Utilisation of digital platforms for
on-line groups
Exhaustions of NHS/ NAC
facilities
Exhaustions of community
resources available
Funding of external opportunities
Purchase of accommodation
appropriate to needs
UC1 Delivering Core Service. Accommodation will ensure that services, care and treatment is
delivered local and as close to the individual requiring this care
and treatment as possible.   Without appropriate
accommodation, waiting lists are likely to increase, with
potential for associated risks.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2022-AA59 Green Deliver key 2021-22 actions and
improvements identified in the
Suicide Action Plan
Reduce deaths by suicide. Increase staff
and community awareness in line with
NES training framework. Deliver
outcomes in line with national suicide
prevention strategy. Review all deaths by
suicide to support learning and
improvements.
Actions included in 21/22 action plan were progressed. Also
contributing to the review of national suicide strategy to inform
new approach. Seeking to recruit dedicated post holder to support
progress in relation to East Ayrshire's action plan.
East Ayrshire HSCP Lack of dedicated , full-time resource
to support this agenda. This
important issue becomes subsumed
into a range of additional priority
areas.
Re-energise the agenda to
support key improvements.
UC1 Mental Health Strategy 2017-2027 East Ayrshire HSCP
strategic plan 2021-2030, Every Life Matters 2018
Inequalities is a key issue for those at risk of suicide. Lack of
opportunity, trauma, the increase in cost of living, debt and lack
of employment each have the capacity to result in people
feeling hopeless, helpless and at risk of considering suicide.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2022-AA60 Amber Implement Distress Brief
Interventions pathways
Improved pathways for people in distress Ayrshire is an associate to the national DBI programme.
Pathways are being scaled up in GP practices and ED Ayr. 
Penumbra is the delivery partner and North Ayrshire leads on
contract monitoring.
East Ayrshire HSCP Lack of progress with scale up
across all Ayrshire GP practices.
Lack of scale up in ED due to
competing pressures. Both could
result in disinvestment in DBI
programme.
DBI board is operational and
scrutinising data. Formal review
is scheduled to be undertaken to
support scale up.
UC1 Mental Health Strategy 2017-2027 East Ayrshire HSCP
strategic plan 2021-2030, Every Life Matters 2018
Often people present in distress as a result of poor home
circumstances, trauma and many of the inequalities that result
in poor personal outcomes.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2022-AA61 Amber Re-design Adult Mental Health
Services to simply access pathways
Clearer Access Points for individuals and
referrers to mental health services and
supports. Better outcomes for individuals
with mental health issues. Early
intervention and prevention/ self
management approaches for people with
milder symptoms. Clear treatment
pathways for mild and more severe
conditions.
Mental Health Practitioner 's, self help workers and community
connectors in Primary Care support early assessment and
signposting to community support organisations. Additionally
guided self-help supports development of self management for
lower level symptoms.
East Ayrshire HSCP Lack of recurring funding for 3 self
help worker roles funding via
remobilisation funds could result in
more reliance on more formal
supports.
Consideration being given to
alternative funding routes to
support retention of staff.
UC1 Mental Health Strategy 2017-2027
East Ayrshire HSCP strategic plan 2021-2030
Framework for supporting People through Recovery and
Rehabilitation during and after the Covid-19 Pandemic 2021
Focusing on self management, early intervention and
prevention helps prevent worsening of symptoms and enables
individuals, families and communities to be more mentally well.
This in turn promotes better outcomes.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Community
2022-AA62 Green Undertake a review of the provision
of 24 hour packages of community
based supports:  Right Support in
the Right Way at the Right Time
Fewer people reliant on paid supports on
an individual 1-1 basis. Sharing of
support services across a close
geographical area. Use of technological
devices in order to reduce in person
support where indicated. Robust risk
assessments to ensure safety and well
being outcomes are maintained. People
live more independent lives and develop
personal self management skills and
confidence.
Numerous responder hubs are operating across East Ayrshire
with staff support hubs available for ad hoc supports. Further
responder hubs are in the planning stages.
East Ayrshire HSCP Implications for provider
sustainability as formal  overnight
supports are reduced. Deterioration
of people's condition resulting in
increased care and support needs.
Providers are made aware of the
intention to support individuals to
live as independently as they are
able. Additional opportunities are
available for providers to
consider. Careful planning and
assessment of individual
capabilities is undertaken and
very gradual, individualised
reduction in support hours are
made. If a person requires
additional support at any time,
this is assessed quickly and
facilitated.
UC1 Mental Health Strategy 2017-2027
East Ayrshire HSCP strategic plan 2021-2030
Adult with Incapacity (Scotland) Act 2000
Traditional models of support for people with learning disabilities
was limiting in terms of independence and created a reliance on
formal supports rather than enhancing life skills. This approach
goes some significant way to redressing the balance.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Inpatients
2022-AA63 Amber Consideration of extended response
service for those 65 and over, at
home
Band 6 secondment for 12 months to
scope effectiveness of outreach model to
facilitate early discharge and prevention
of admission/readmission in association
with South CMHT(E).
Expect report out at September 23.   
Recent addition to Elderly Liaison
services will be reviewed and considered
with outreach model above what
preferred new service could be.
Initial agreement given at North PSMT, paper being presented to
SPOG for sign off in July 22.
North Ayrshire HSCP Continued increased demand for
inpatient beds beyond capacity. Risk
of adverse event in
community/inappropriate care setting
of person awaiting psychiatric
inpatient bed. Risk of admission
when community support
could/should have been offered.
Requirement to place person in out-
of-area bed if no capacity in A&A.
Input from CMHT€
Out-of-hours support from
unscheduled care services
Input from Elderly Liaison
services to persons in Acute
Hospital and Community
Hospital settings                           
Effective discharge planning
UC1 Caring For Ayrshire, Mental Health Act, Dementia Strategy,
Mental Health Strategy, Ayrshire and Arran Discharge Planning
Agreement, NMC Code of Conduct
Persons requiring psychiatric inpatient assessment/treatment
will receive the right care at the right time by a competent
workforce as close to home as possible
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Inpatients
2022-AA64 Amber Re-provision of Forensic
Rehabilitation Services within a
community setting at Warrix
Avenue
To develop outline business case
by March 23
Briefing paper to describe request/ambition yet to be tabled at
North OSMT, SPOG - presumably IPB for consideration/approval.
Will aim to do so by September 22.
North Ayrshire HSCP Current provision in Ward 7C both
benefits from co-location and is
hindered by being in a hospital
setting. Success of Warrix Avenue
has proven this could be done
differently and embrace rehabilitation
benefit/freedom being in community
setting would bring.
Current service being
successfully delivered from 7C.          
Warrix Avenue provision useful
to inform this future plan.
UC1 Caring For Ayrshire, Mental Health Act, Criminal Procedures
Act, Mental Health Strategy, Ayrshire and Arran Discharge
Planning Agreement.
Support destigmatisation of 'Forensic' population by being
placed in the community.    More effective delivery of service by
being in the community.  Equitable service for this client group
by being placed in the community as are those in Warrix
Avenue.  Less restrictions as would not be in a Hospital setting
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Learning Disability
2022-AA65 Amber Enhance Mental Health and
Learning Disability teams to support
complex care in the community,
avoiding acute admission and
supporting timely assessment and
review.
Job Descriptions for Nursing Staff
(anticipated Band 6 and Band 3)
submitted for Job Evaluation - June 22;
Set up steering group - June 22
Develop relevant evaluation
plans/capacity - September 22
Complete recruitment to ISS - October
22
Establish team and initial ways of
working/links to existing services -
First meeting of planning group linked to LD Intensive Support
Service took place in June 2022, with a focus on the need to
progress job descriptions for various team roles.
Job descriptions have now been submitted to job evaluation for
Nursing roles in first instance.
North Ayrshire HSCP The potential challenge of recruiting
to the various posts with in the  ISS
has been highlighted.  Roles being
secured by internal candidates thus
putting a strain on other parts of the
service in terms of experienced staff.
B road discussions to take place
with local profession leads
around using existing resource
in different ways (e.g.
supplementing existing hours),
but also careful consideration to
variety of forums posts are
advertised in, as well as how
they are advertised (e.g.
showcasing the ISS as an
innovative development within a
service which is seeing
significant investment on a
variety of fronts)
UC1 Coming Home Report (Scottish Government, 2018); Coming
Home Implementation Report (Scottish Government, 2022);
Keys to Life (Scottish Government, 2013); Keys to Life
Implementation Framework (Scottish Government, 2019);
Caring for Ayrshire; NAHSCP Strategic Commissioning Plan
2022-2030
The ISS will have a key role in supporting individuals with
complex needs to link to and benefit from the broad range of
supports and opportunities within their communities, as well as
skilling up provides and others to better respond to the needs of
individuals.  In this way, it will act to address inequalities in
wellbeing outcomes which can be linked to lack of
flexibility/skills/knowledge in services and communities.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Learning Disability
2022-AA66 Amber Review 7A model of assessment
and treatment in order to establish
necessary capacity in terms of
beds, staffing, and ability to meet
client outcomes.
Gather baseline data and present to
management team – June 22
Establish ongoing data reporting
mechanisms to enable
improvement/capacity revision – August
22
Develop proposal around new model
(environment, bed numbers, practice) –
November 22
7A successfully applied to be part of a learning collaborative led
by Healthcare Improvement Scotland, linked to the SPSP agenda
in Mental Health services.  As part of this, 7A staff are exploring,
in partnership with other involved wards and Quality Improvement
colleagues, improvement activities which relate to the collaborative
aims.  7A has also undertaken some initial data gathering around
activity since opening, and will continue to build on this as part of
exploring/evolving its practice.
North Ayrshire HSCP Sickness/absence and the
challenges of the ward environment
continue to impact on staff
availability and create a frequent
reliance on bank staff who are not
appropriately trained so as to fulfil
the full remit of their role within the
environment and with the client
group.
Address staff welfare as well as
broader good practice as part of
SPSP collaborative work.
UC1 Keys to Life (2013); Keys to Life Implementation Framework
(2019); Caring for Ayrshire; NAHSCP Strategic Commissioning
Plan 2022-2030; Scottish Patient Safety Programme
Ward 7A is an in-patient environment. As part of reflecting on
seclusion/restraint practice within the HIS collaborative, 7A
staff are considering the role of activities and purposeful
engagement, and means of further promoting this within the
ward.  Potentially, any work undertaken in this regard will
impact on the ability of individuals to be included within and
benefit from a broader range of community opportunities. 
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Learning Disability
2022-AA67 Amber Implement new ways of working
within Trindlemoss Day
Opportunities in order to facilitate a
shift from building based to
community focused activities, with
integration, inclusivity, and the
achievement of meaningful
outcomes at their core.
Complete organisational/staffing
restructure – July 22
Establish effective ongoing methods of 
engagement with clients, families, and
other stakeholders – November 22
Evidence a clear shift in the variety and
location of activities clients are linked to,
including an increase in the number of
collaborations with community partners
across North Ayrshire – June 23
As part of this, Trindlemoss has reviewed staffing roles,
implemented a new staff structure, and has almost completed a
significant programme of staff transition and recruitment.  It also
continues to work with HIS, in Phase 3 of a learning collaborative
focused on redesigning day services for people with learning
disabilities
North Ayrshire HSCP Scale of change being sought has
and may in the future meet with
resistance from some stakeholders. 
Should the new ways of working not
be fully embraced and embedded,
sufficient capacity may not be
created to fully meet the needs of
younger people in transition.
Trindlemoss is developing a plan
for ongoing engagement with
stakeholders, and creating new
opportunities for involvement
such as work to be facilitated by
2 interns from the Glasgow
School of Art.  It will also benefit
from an Engagement post which
is to be trialled for 1-year within
the Learning Disability Service.
UC1 Keys to Life (2013); Keys to Life Implementation Framework
(2019); Caring for Ayrshire; NAHSCP Strategic Commissioning
Plan 2022-2030
Greater integration of people with learning disabilities within
their communities is core to the aims of Trindlemoss.  As part of
this, Trindlemoss is linking with a broad range of partners to
create and promote greater equality and new opportunities in
relation to issues such as physical activity (e.g. partnering with
Woodland Wakeup in relation to new outdoor learning
opportunities) and employment (e.g. linking into discussions
within the Local Employment Partnership around new
approaches to promoting employment opportunities for people
with disabilities).
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Learning Disability
2022-AA68 Amber Undertake needs assessment to
identify the future needs of the
population of individuals requiring
complex care arrangements in
North Ayrshire, to meet these needs
and identify infrastructure gaps /
opportunities.
Baseline scoping exercise to be
completed – July 22
Identify models of good practice
elsewhere across Scotland/UK and
visit/connect as relevant – October 22
Engage with existing clients/families and
relevant partners (complex/PMLD)
around their experiences of current
provision with a view to shaping plans
around future provision – January 23
Develop proposal around necessary
infrastructure development – March 23
An initial scoping paper has been drafted regarding the current
state of play in relation to individuals with complex needs in North
Ayrshire, drawing in issues such as Housing and in-patient
provision.
North Ayrshire HSCP Provider economy within North
Ayrshire remains fragile; Providers
continue to open new facilities within
North Ayrshire which draw in clients
from other areas, but place additional
demands on local services. 
Intensive Support Service will
enable a new dialogue with
providers, focused on developing
their existing capacity.  Better
understanding of local complex
needs population and existing
resource will help us to work
better with providers to help
shape the local market
appropriately, and continue to
foster pro-active discussion
about potential future
developments on both sides.
UC1 Coming Home Report (Scottish Government, 2018); Coming
Home Implementation Report (Scottish Government, 2022);
Keys to Life (Scottish Government, 2013); Keys to Life
Implementation Framework (Scottish Government, 2019);
Caring for Ayrshire; NAHSCP Strategic Commissioning Plan
2022-2030
Complex needs are in part a function of the needs and abilities
of individuals, and in part a function of the availability/flexibility
(or lack thereof) regarding local services and opportunities. 
Better understanding the challenges experienced by those who
can be considered as presenting with complex support needs
will help us to shape services and communities appropriately,
and thereby promote greater equality in health and other
outcomes.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Learning Disability
2022-AA69 Green Implement Phase 2 of New Models
of Assisted Living Programme, in
line with East Ayrshire Council's
Strategic Housing Investment Plan
Individuals with complex needs are
supported to live good quality lives as
independently as they are able.
Additional supported accommodation
tenancies are available in line with the
Strategic Housing Investment Plan
There were some build delays as a result of the pandemic. This is
now back on track with the next supported accommodation,
Quarryknowe, on track for opening end August 22. Individuals
have been identified for these tenancies and are being supported
through the legal process to support the moves.
East Ayrshire HSCP Unexpected delays with contractor
could delay handover of the
property. People previously identified
for the property could choose not to
move. Delays in the legal process at
court could delay the move for
individuals.
Regular meetings with the
contractor to ensure any delays
are highlighted. Individuals and
families have been involved
throughout the planning stages
so unlikely that people will
withdraw. If someone chooses
not to move, there are a number
of other individuals who could
also be offered a tenancy. In
terms of the legal process, staff
are being encouraged to process
intervention orders quickly in
order to expedite.
UC1 Mental Health Strategy 2017-2027
East Ayrshire HSCP strategic plan 2021-2030
Adult with Incapacity (Scotland) Act 2000
People with learning disabilities and complex needs are often
subject to stigmatising in their local community. In addition
many people with learning disabilities experience poorer health
outcomes and have less access to services and supports
enabling them to live good quality lives. This approach supports
the person to maximise their independence whilst having
access to ad hoc support should the need arise.
147

Page 148

West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Learning Disability
2022-AA70 Green Implement the new Day Services
Model
Blended model of day service support
which is individually tailored to the
person's needs. Less reliance on building
based supports and more community
based activities. Revision of staffing
structure to support more autonomous
practice.
Day service BSVR has been completed and is fully implemented. East Ayrshire HSCP Complete Complete UC1 Mental Health Strategy 2017-2027
East Ayrshire HSCP strategic plan 2021-2030
Adult with Incapacity (Scotland) Act 2000
Supporting people with learning disabilities to utilise community
based activities supports a reduction in stigma and increases
opportunities to challenge the inequalities faced by this group of
people.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Learning Disability
2022-AA71 Green New South Ayrshire Learning
Disability Strategy  
IJB Endorsed  - Jun 22
Strategy Launch - August 22
Establish SPOC and embed MDT
working within LD Services - December
23
Quarterly report to the local government groups on the
deliverables and action plans culminating from the strategy
South Ayrshire HSCP UC1
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Learning Disability
2022-AA72 Green Implement a 7 day building based
service to develop new ways of
working within Day Opportunities in
order to consider combining building
based services with community
focused activities, and the
achievement of meaningful
outcomes for residents with a LD in
South Ayrshire .
Complete consultation on a 7
day building based service with support
from SCLD and the league of champions
board  – August 22
Establish individual with service users,
carer, legal proxy’s and staff – November
22
Evidence a clear shift in the variety and
location of activities clients are linked to,
including an increase in the number of
collaborations with community partners
across North Ayrshire – June 23
Working with HIS, as part of the learning collaborative focussed
on redesigning day services for people with learning disabilities
South Ayrshire HSCP UC1 Keys to Life (2013); Keys to Life Implementation Framework
(2019); Caring for Ayrshire
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Learning Disability
2022-AA73 Green Undertake needs assessment to
identify the future needs of the
population of individuals requiring
complex care arrangements outwith
South Ayrshire, to look at needs
and identify opportunities to return
home.
ELT paper to be completed requesting a
band 6 and social worker to assess and
review our South residents who are out
of area – July 22
Liaise with establishments in South
Ayrshire to identify models of support to
replicate the care provided required to
bring residents home – March 23
Engage with existing clients/families and
relevant partners (complex/PMLD)
around their experiences of current
provision with a view to shaping plans
around future provision – January 23
Develop proposal around necessary
infrastructure development – March 23
An ELT paper has been drafted to request use of Coming Home
monies from Scottish Government to fully assess and review
South Ayrshire residents and ascertain if we can provide the care
within South Ayrshire
South Ayrshire HSCP UC1 Coming Home Report (Scottish Government, 2018); Coming
Home Implementation Report (Scottish Government, 2022);
Keys to Life (Scottish Government, 2013); Keys to Life
Implementation Framework (Scottish Government, 2019);
Caring for Ayrshire
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Learning Disability
2022-AA74 Green Implement  3rd Core and Cluster in
Ayr Town centre
Individuals with complex needs are
supported to live good quality lives as
independently as they are able. There will
be a supported accommodation flat to
accommodate individuals who are in
crisis and  no longer able to remain in the
family home or community. This will
minimise the need for hospital care.    
The Core and Cluster will be complete and open in December  22. 
Individuals have been identified for tenancies, enhanced telecare
and provider is being secured.
South Ayrshire HSCP UC1 Coming Home Report (Scottish Government, 2018); Coming
Home Implementation Report (Scottish Government, 2022);
Keys to Life (Scottish Government, 2013); Keys to Life
Implementation Framework (Scottish Government, 2019);
Caring for Ayrshire
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Psychological Therapies
2022-AA75 Green Develop and Implement Infant
Mental Health Service
Pathways developed and service
operational
March 23
Infant mental health service recruitment has commenced, with
both nursing and psychology successful in filling all vacancies.
Start dates ca September/October 22. OT and Admin in process
of recruitment.
North Ayrshire HSCP Lack of physical space Initial plan is to use hot desking
within Perinatal services, whilst
long term aims are to raise with
estates and examine further
options.
UC1
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Mental Health
Unscheduled Care
2022-AA76 Green Elderly Mental Health Liaison Team
continue to work at full capacity
To increase the nursing workforce, by
end of financial year.
Secured funding for 2 X permanent Band 6  Charge Nurses and 2
X Band 5 staff Nurses.   All 4 members of nursing staff are in
post.
North Ayrshire HSCP Demand continues to rise as a result
of complex patients being admitted to
acute hospitals.  The impact of
delayed discharges on Elderly
Liaison is having patients longer on
their case loads.
Test of Change is currently
undergoing  with MH ANP within
the team which will benefit both
Nursing staff as well as Medical
staff. Also currently reviewing
what other disciplines within the
team would be  advantageous
thus allowing a more holistic
approach to patients.
UC1 Urgent and Emergency/Unscheduled Care
Redesign of Urgent Care (Locally & Nationally)
Caring for Ayrshire
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Primary Care 2022-AA77 New Review the Enhanced Services
currently provided by GP practices
to ensure fit for purpose and
sustainability.
2022/23
Develop and produce a commissioning
plan to define all enhanced services 
including current activity / cost and agree
clear specification, audit ownership and
assurance plan.
Terms of Reference and Group established with clear aims and
outcomes.
Some Enhanced Services have not
been reviewed for some time
therefore significant input across
organisations/partners may be
needed to ensure still fit for purpose
or service changed / removed from
provision.
EQIAs may be required for any
potential changes impacting on
service delivery.
Engagement from GPs to continue
providing Enhanced Services and
additional financial commitment may
be required.
Any change to service delivery
will be implemented on
consultation with LMC / GP Sub
and CMT. Reps from appropriate
teams will be consulted on
content of ES. Consider use of
EQIA Assessment for relevance
to establish if full EQIA is
necessary for any ES being
changed.
UC1 PCIP and primary care recovery programmes Supports access and delivery of General Medical Services
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Primary Care 2022-AA78 New Delivery of the Recovery of
Children's Oral Health and Dentistry
Delivery of the Additional Toothbrushing
Packs
Implementation of targeted interventions
Recruitment of Additional Dental Health Support Workers in
progress
Development of programmes of work to identify the children for
the targeted interventions
UC1 Oral Health Improvement Plan
NHSAA Oral Health Strategy 10 year Plan 2013-2023
The programmes of work associated with this additional funding
will increase toothbrushing resources and direct support from
Dental Health Support Workers to our most vulnerable families. 
Ensuring these families are registered with a dentist and are
supported to attend appointments regularly. The primary focus
of the work will be supporting families from SIMD1 areas and
ethnic minorities.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Primary Care 2022-AA79 New Recovery of Public Dental Services Return to pre-pandemic waiting times
Increased provision of Emergency Dental
Services while GDS remobilises
Recruitment of additional Dentists, Therapists, Dental Nurses and
other support staff in progress
Development of new Patient pathways
Maximise utilisation of skill mix within the Dental Team
Inability to recruit to key professional
roles resulting in decreased access
to emergency dental care or
increased waiting times for routine
treatment for unregistered patients.
Monthly review of Waiting Times UC1 Oral Health Improvement Plan
NHSAA Oral Health Strategy 10 year Plan 2013-2023
Increased sustainability of the PDS will support patients access
emergency care or unregistered patients to receive routine care
whilst General Dental Practice continues to recover from the
pandemic.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Redesign of Urgent Care 2022-AA80 Green Joint pathway between Ayrshire
Urgent Care Service and SAS to
provide Professional to Professional
decision support to avoid
unnecessary conveyance of
patients to acute hospital sites.
Implement pathway between SAS and
AUCS to support advanced paramedic
practitioners (APPs) who clinically
assess all referrals to support
alternatives or a scheduled presentation
that doesn’t require SAS attendance.
June 22
SAS/FNC model in place to avoid unnecessary conveyance.
Shared experience and knowledge has aided improvement of
pathways.
Call volumes: on average 10 calls per day from SAS supported
with alternative pathways
Pilot initiated to determine a system to encourage information and
advice sharing between SAS Advanced Paramedic Practitioner
and GP from within AUCS with an aim to support appropriate
patients to be redirected to alternative pathways.
Continuation of workforce
commitment and co-location
arrangements.
Shared learning and reflection of
key benefits is being undertaken
and co-location of team is well
established - any arising risk
could be mitigated through
discussion between operational
managers involved.
UC1 RUC
Mental Health Recovery Strategy
Unscheduled Care
Creates a more effective patient journey ensuring patients are
routed to the most appropriate service for follow up care and
potentially prevent an inappropriate acute attendance .
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Redesign of Urgent Care 2022-AA81 Green Enhanced Mental Health Pathway
via FNC for Emergency Services
(SAS/Police Scotland) to access
direct care for patients requiring
emergency mental health
interventions.
Mental Health pathway into Unscheduled
and Urgent Care reviewed and
enhanced.  Building on established
pathways with enhancements based on
RUC Workstream aims.
June 22
Emergency service (SAS/Police Scotland) pathway in place
through FNC to access Urgent Mental Health Services. An
average of 25 people per week have been accessing this
alternative pathway since going live in May 22.
Plans are in place to centralise emergency MH interventions in a
community hospital based hub, to facilitate short term admissions
up to 72 hours.
Recruitment to posts for key staff will
be vital in order to deliver this
additional work. Utilisation of Flow
Navigation Centre as single point of
access to appropriate mental health
team response.
Management of recruitment and
key initiatives has oversight
provided by Service Manager,
Pan Ayrshire Unscheduled Care
Mental Health. Join working
arrangements with AUCS/FNC
team members.
UC1 RUC
Mental Health Recovery Strategy
Unscheduled Care
Supports improved and enhanced patient pathway for patients
suffering from mental health crisis ensuring they receive the
most appropriate care at the point of contact.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Redesign of Urgent Care 2022-AA82 New Implement Redesigned  Community
Pharmacy pathways into Urgent
and Unscheduled Care, and create
pathways for patients to be
redirected to pharmacy
interventions appropriately out of
ED.
Introduce a pathway between Pharmacy
and ED via FNC for appropriate
scheduled referral to ED.
December 22
Scoping work initiated;
Analysis of Demand Profile;
Linking with Primary and Community Teams in signposting to
appropriate primary and community delivered health and care
Ability to schedule appointment in
ED is dependant on availability
Scheduling availability informed
by USC Demand and Capacity
model
UC1 Urgent and Unscheduled Care Collaborative - HI1 Care Closer
to Home and HI2 Redesign of Urgent Care
Ensuring patients access the right pathway of care for them at
the appropriate time is imperative. Scheduling allows patients
with accessibility issues time to arrange transport to the
appropriate care if required, or alternatively to access patient
transport. This ensures that no patient is disadvantaged in
accessing their healthcare needs based on availability of
transport, distance travelled, or caring responsibilities.
148

Page 149

West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Redesign of Urgent Care 2022-AA83 New Implement Alternative pathways to
enable additional
Signposting/Redirections to FNC
where appropriate
Complement the pathways from ED via
FNC for redirection of patients into
appropriate other services.
Utilising Near Me
Scoping work initiated;
Analysis of Demand Profile
Service pressures on ED team may
lead to lack of time to signpost
patients to appropriate services in
future as an alternative to ED
attendance.  Other pressures on the
wider system may reduce the
number of alternatives.
HCSW funded by RUC to
support redirections/signposting
of patients to alternatives
UC1 Urgent and Unscheduled Care Collaborative - HI1 Care Closer
to Home; HI2 Redesign of Urgent Care; HI4 - Urgent and
Emergency Assessment
Ensuring patients access the right pathway of care for them at
the appropriate time is imperative. Scheduling allows patients
with accessibility issues time to arrange transport to the
appropriate care if required, or alternatively to access patient
transport. This ensures that no patient is disadvantaged in
accessing their healthcare needs based on availability of
transport, distance travelled, or caring responsibilities.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Redesign of Urgent Care 2022-AA84 Green Expansion of FNC model to support
each patient's journey, from
community, through each episode
of care, back to the patient returning
home.
Building on phase 1 of RUC Programme
identify alternative referral pathways for
patients to provide the right care, as
close to home as is possible and provide
this as quickly as possible for each
individual patient.
FNC established in November 2020 continues to operate
scheduling to ED/MIU and offer doctor advice or onwards referral. 
Flow Navigation Centre acts as a hub and single point of access
but there is considerable potential for further expansion to refer to
other pathways.
Current risks include system
pressures leading to scheduling
being paused due to two service
delivery models then in place which
creates a two tier service for
patients.
Work to commence in
developing a more sophisticated
model of scheduling to allow
appointments to only be given
when capacity allows.  This will
link to, and be informed by wider
collaborative work on modelling
unscheduled care.
UC1 Urgent and Unscheduled Care Collaborative - HI1 Care Closer
to Home and HI2 Redesign of Urgent Care
Ensuring patients access the right pathway of care for them at
the appropriate time is imperative.  Scheduling allows patients
with accessibility issues time to arrange transport to the
appropriate care if required, or alternatively to access patient
transport.  This ensures that no patient is disadvantaged in
accessing their healthcare needs based on availability of
transport, distance travelled, or caring responsibilities.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Redesign of Urgent Care 2022-AA85 Green Musculoskeletal (MSK) - Urgent
Care Pathway
(1) Scope Demand
(2) Pilot and Embed enhanced triage
(3) Pilot and Embed direct referral
(4) Optimise Self Care
(5) Optimise Community Support
(6) Evaluate, review and improve
Scoping work initiated
Recruitment to key posts initiated
Ability to recruit to key posts central
to the progression of the pathway.
Building consensus for service
delivery model across a broad
spectrum of operational stakeholders
• Detailed Test of Change
documentation and project plan
• Regular Programme
Management Meetings
• Regular Performance
Monitoring and evaluation
UC1 Urgent and Unscheduled Care Collaborative - HI1 Care Closer
to Home; HI2 Redesign of Urgent Care; HI3 - Virtual capacity
Ensuring patients access the right pathway of care for them at
the appropriate time is imperative. Scheduling allows patients
with accessibility issues time to arrange transport to the
appropriate care if required, or alternatively to access patient
transport. This ensures that no patient is disadvantaged in
accessing their healthcare needs based on availability of
transport, distance travelled, or caring responsibilities.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Redesign of Urgent Care 2022-AA86 New Integration of FNC as triage route
for ambulatory interface care
programmes
(1) FNC to facilitate local expansion of
remote health monitoring for respiratory
patients
(2) FNC to expand prof to prof
consultation between SAS crews and
local services such as RRR and Falls
teams
Scoping work initiated;
Analysis of Demand Profile;
Linking with Primary and Community Teams in signposting to
appropriate primary and community delivered health and care
FNC Capacity
Effective use of technology
Predict demand based on
previous activity and resource
FNC appropriately to meet need
UC1 Urgent and Unscheduled Care Collaborative - HI1 Care Closer
to Home; HI2 Redesign of Urgent Care; HI3 - Virtual capacity;
HI8 - Community Focused Integrated Care
Ensuring patients access the right pathway of care for them at
the appropriate time is imperative. Scheduling allows patients
with accessibility issues time to arrange transport to the
appropriate care if required, or alternatively to access patient
transport. This ensures that no patient is disadvantaged in
accessing their healthcare needs based on availability of
transport, distance travelled, or caring responsibilities.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Redesign of Urgent Care 2022-AA87 Green RUC Pathways: Accessible
pathways of care for patients based
on the Scottish Approach to Service
Design (Discover, Define, Develop,
Deliver). Clear public Messaging
and Comms
(1) Assess and define all available RUC
pathways and how they intersect
(2) Assess the best and most effective
ways to communicate these to the
general public, health services and
professionals
(3) Engage with NHS A&A Comms
Team and design and implement a
communications strategy
RUC Phase 1 set out the public messaging around accessing
urgent care and patients being able to access appointments to
MIU/ED.  Next steps would be to build on this.
Lack of accessibility to the
appropriate pathways to ensure all
services help navigate patients to the
appropriate service, regardless of
entry point
Effective communication
channels, agreed service
navigation points, adequate
knowledge within staffing 
groups, monitoring and
evaluation of patient experience
through pathways
UC1 Urgent and Unscheduled Care Collaborative - HI1 Care Closer
to Home; HI2 Redesign of Urgent Care; HI4 - Urgent and
Emergency Assessment
Ensuring patients access the right pathway of care for them at
the appropriate time is imperative. Scheduling allows patients
with accessibility issues time to arrange transport to the
appropriate care if required, or alternatively to access patient
transport. This ensures that no patient is disadvantaged in
accessing their healthcare needs based on availability of
transport, distance travelled, or caring responsibilities.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Redesign of Urgent Care 2022-AA88 New Implementation of a Covid/Non-
Covid Remote Health Monitoring
integrated pathway utilising pulse
oximeters, supported by digital
services
Implement Respiratory RHM pathway
providing pulse oximeters, alongside
clinical advice within GP practices, within
GPOOH services and at Acute front
Door (ED/CAU). July 22
Through provision of pulse oximeter
devices alongside clinical advice and
support integrate the local pathway
approach with the national Covid RHM
pathway to expand the inclusion criteria,
supporting more people to self manage
and escalate to appropriate care as
needed
Development of pathway criteria alongside clinicians to scope
benefit and impact of implementation of local pathway. Sourced
additional devices and distribution plan based on data identifying
areas of need across Ayrshire and Arran.
Development of patient leaflets to advice patients of points of
escalation, as advised by their clinician.
Supply of devices to meet all patient
need.
Management of demand for
devices with registration of
patients through a clinical
mailbox.
UC1 Covid 19 Remobilisation & Recovery
Urgent and Unscheduled Care Collaborative - HI1 Care Closer
to Home; HI2 Redesign of Urgent Care; HI3 - Virtual capacity
Sustainability of providing treatment to our most vulnerable
patients with worsening Covid symptoms reducing the need for
secondary care intervention. Supporting informed self-care
when safe and appropriate to do so.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Unscheduled Care 2022-AA89 Green Right sizing the bed footprint
High Impact Change 3 (Virtual
Capacity)
Develop Hospital at Home & increase
capacity
Scope potential demand to inform
business case for expansion of OPAT
Rapid Respiratory Home Service Model
in place in 3 areas for East Ayrshire
Focus on development of Home First
& rapid response community & hospital
transition teams.
Increase Hospital at Home capacity from 6 to 28 virtual beds by
January 23
Expansion from Lower limb cellulitis to further OPAT service not
developed as yet
Expansion of Rapid Respiratory home service beyond existing
East Ayrshire model not in place as yet.
Home First Band 6 posts out to advert x 4 in post with an
additional 5 required to roll out Home First/DwD work
Inability to recruit & retain adequate
workforce
UC1 Urgent & Unscheduled Care Programme & SG Self-
Assessment RADAR
Pre, intra & post hospital Workstreams as part of the USC
Collaborative work including 6 essential actions, Discharge
without delay & interface work.
7 Days of Solutions/Perfect week & Full System DwD focus
events.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Unscheduled Care 2022-AA90 Green Right sizing the bed footprint
High Impact Change 3 (Urgent &
Emergency Assessment)
Model & develop a data suite to enable
us to right size the acute footprint to
speciality level which includes projected
virtual capacity
Review of rapid access to diagnostics
Review of time to senior decision maker
in ED & CAU
Review & development of alternatives to
inpatient stays including hot MDT
Clinics.
Optimise acute care as a speciality with a
focus on the first 48 hours of the patient
journey.
Information Team working with CapGemini to model
acute footprint to enable right sizing the bed footprint.
Review of diagnostic waits started through the DwD work & will
continue through continuing Full system DwD events
Currently we have an acute cardiac clinic in place further scoping
of other specialities under review.
Acute medicine governance work to be picked up through CAU
teams to identify information & enable an informed plan.
UC1 Urgent & Unscheduled Care Programme & SG Self-
Assessment RADAR
Pre, intra & post hospital Workstreams as part of the USC
Collaborative work including 6 essential actions, Discharge
without delay & interface work.
7 Days of Solutions/Perfect week & Full System DwD focus
events.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Unscheduled Care 2022-AA91 Green Right sizing the bed footprint
High Impact Change 8 (Community
Focused Integrated Care)
Review acute wards LOS & prioritise
areas above
the Scottish average through the DwD
Home First Programme.
Review all community rehab wards LOS
with a focus on benchmarking
comparable H&SCP's & then targeting
through DwD "Home First" work
Undertake System Wide  DwD focus
events as per below information
18th 19th  and 20th July
18th 19th and 20th August
7th - 14th September 7 days of solutions
5th 6th and 7th October
24th 25th and 26th October
14th 15th and 16th November
28th 29th and 30th November
All acute areas have had focused all system DwD event and a 7
days of solutions event by end June 22
Plan to replicate Full System Event in community hospitals with
next full system DwD event.
Inability of teams to participate in Full
system events
UC1 Urgent & Unscheduled Care Programme & SG Self-
Assessment RADAR
Pre, intra & post hospital Workstreams as part of the USC
Collaborative work including 6 essential actions, Discharge
without delay & interface work.
7 Days of Solutions/Perfect week & Full System DwD focus
events.
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Women and Children
Gynaecology
2022-AA92 Proposal Ensure a robust Unscheduled Care
Service for Emergency
Gynaecology
Emergency Gynaecology - formalise
model of care, collection of operational
data & patient feedback as baseline for
future developments scoping 2022 / 23
New deliverable UC1 Unscheduled Care Model Improve delivery of USC for Women experiencing Gynaecology
concerns
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Women and Children
Paediatrics
2022-AA93 Green Develop a Paediatric Forensic
Medical Suite
Build of Paediatric Forensic Medical
Suite July 22
Readiness for facility commencement
July 22
Build on track for handover
Preparation on track
UC1 CMO Taskforce Rape & Sexual Assault (CYP) Improve health outcomes for vulnerable CYP
Child Protection / Child Sexual Abuse
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Women and Children
Paediatrics
2022-AA94 Green Neonatal / Best Start
Deliver all neonatal requirements of
the Best Start Agenda
Fully develop Homecare service
November 22
Test of change in progress UC1 Best Start Improving access to and quality of services in line with Best
Start recommendations
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Women and Children
Paediatrics
2022-AA95 Green Neonatal / Best Start
Deliver all neonatal requirements of
the Best Start Agenda
Review of Neonatal ITU / HDU / SCBU
Space in light of National Best Start
changes March 23
New deliverable UC1 Best Start Improving access to and quality of services in line with Best
Start recommendations
149

Page 150

West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Women and Children
Paediatrics
2022-AA96 Proposal Ensure a robust Unscheduled Care
Pathway for Paediatric Service
Review current USC pathway Ayr / UHC
/ CAU against relevant standards Jul 22
Develop Action plan as required by
review findings (TBC)
Engage stakeholders / family
participation in any required redesign and
deliver redesigned service (TBC)
New deliverable UC1 Serious Case Review Requirements (Child P) Improve delivery of USC for Children and Young People to
ensure safe, effective service
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Women and Children
Paediatrics
2022-AA97 Proposal Unscheduled Care Pathway
Children's Assessment Unit
Plan & Costing of refurbishments to 
ensure fit for purpose  July 22
Agreement to Proceed with works (TBC)
Scoping in progress Funding not available UC1 Serious Case Review Requirements (Child P) Improve delivery of USC for Children and Young People to
ensure safe, effective service
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Women and Children
Paediatrics
2022-AA98 Green Mental Health
Collaborative working with CAMHS
Psychiatric Liaison (Acute Care)
(1) Build of YP De-escalation Suite on
Paediatric Ward, Planning Phase July 22
(2) Build staff confidence with training to
support therapeutic observations -
CAMHS to deliver training March 23
(3) Develop sustainable Psychiatric
Liaison Model with CAMHS
(1) Funding secured, planning in progress
(2) New deliverable
(3) New deliverable
UC1 Caring for Ayrshire Improve outcomes for CYP admitted to Acute Care with
associated mental health needs
West of Scotland Ayrshire and
Arran
Urgent and unscheduled care Women and Children
Paediatrics
2022-AA99 Proposal Mental Health
Collaborative working with CAMHS
Neurodiversity Shared Care
(1) External review of shared care
pathways CAMHS / Community & Acute
Paediatrics including family & CYP
participation TBC 22
(2) Develop clear integrated pathways as
appropriate
(1) Scoping in progress UC1 Caring for Ayrshire Improve integrated care for CYP with Neuro developmental
needs
150

Page 151

NHS Ayrshire & Arran - Annual Delivery Plan 2022 - 2023
Key for status:
Proposal - New Project/funding not yet agreed
New - New project/funding agreed but not yet started
Red - Unlikely to complete on time/meet target
Anber - At risk - requires action
Green - On Track
Complete - Complete/Target met
Suspended - Currently suspended - details of why/how long should be included in  
151

Page 152

the progress update
152

Page 153

153

Page 154

154

Page 155

Integration Joint Board
20th October 2022
Subject : Meeting Dates 2023
Purpose : To advise members of the proposed timetable for meetings of the
IJB and PAC for 2023.   This report is for approval.
Recommendation : That IJB agree the dates for meetings of the Integration Joint
Board and Performance and Audit Committee. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
IJB Integration Joint Board
PAC Performance and Audit Committee 
1. EXECUTIVE SUMMARY 
1.1 The schedule of meetings for the Integration Joint Board (IJB) and Performance and
Audit Committee (PAC) is required for the forthcoming year. 
2. BACKGROUND 
2.1 The IJB in agreed in September 2021 to reduce to 8 meetings during 2022 to avoid
the council recess periods and the period of purdah during the local government
elections in May 2022.   
3. PROPOSALS 
3.1 The number of meetings for 2023 has been reinstated to 9 meetings per year, with ad
hoc private sessions arranged as and when required. 
3.2 The Performance and Audit Committee will continue to meet on a quarterly basis. 
Agenda Item 9
155

Page 156

3.3 As in previous years, the timing of meetings has taken budget reporting and
performance schedules into consideration and the timetable has been created to avoid
clashes with key NHS and Council meetings, avoiding some recess periods of the
Council. 
3.4 The proposed dates for IJB and PAC meetings are detailed below.   The schedule of
meetings is attached in Appendix 1. 
Integration Joint Board Performance and Audit Committee 
9th February 2023 3rd March 2023 
16th March 2023 23rd June 2023 
11th May 2023 1st September 2023 
15th June 2023 24th November 2023 
24th August 2023 
21st September 2023 
12th October 2023 
16th November 2023 
14th December 2023 
4. IMPLICATIONS 
4.1 Financial
None.
4.2 Human Resources
None
4.3 Legal
None
4.4 Equality/Socio-Economic
None   
4.5 Risk
None
4.6 Community Wealth Building
None
4.7 Key Priorities
None 
5. CONSULTATION 
Consultation has taken place with the Chair and Vice Chair, IJB and Chair, PAC as
well as other relevant officers on the proposed timetable. 
Caroline Cameron, Director
For further information please contact Karen Andrews, Team Manager (Governance) on
(01294) 317725 or kandrews@north-ayrshire.gov.uk 
Appendices 
• Appendix 1 – Schedule of IJB Meetings
156

Page 157

Appendix 1 
NORTH AYSHIRE HEALTH AND SOCIAL CARE PARTNESHIP
MEETING SCHEDULE 2022 
INTEGRATION JOINT BOARD / PERFORMANCE AND AUDIT COMMITTEE 
Integration Joint Board  Performance and Audit Committee 
12th January 2023 [Private Session] 3rd March 2023
9th February 2023 23rd June 2023
16th March 2023 1st September 2023
11th May 2023 24th November 2023
15th June 2023 
24th August 2023 
21st September 2023 
12th October 2023 
16th November 2023 
14th December 2023 
157

Page 158

158