Integration Joint Board
16 June 2022
Subject:  2021-22 – Year End Performance
Purpose:  To provide an overview of the IJB’s financial performance for the
year ended 2021-22 and the implications for the IJB’s overall
financial position including an update on the financial impact of the
Covid-19 response.  
Recommendation:  It is recommended that the IJB: 
(a)  notes the overall integrated financial performance for the
financial year 2021-22 and the overall year-end underspend of
£21.148m, adjusted to £2.916m after earmarking; 
(b) notes the updated costs of the Covid response and the funding
received; 
(c)  notes that out-with the IJB overall position, the £1.486m debt
repayment has been made to North Ayrshire Council as planned;
(d)  approve the budget changes outlined at section 2.11; and
(e)  approve the proposed earmarking of £18.232m of reserves as
detailed in the report, leaving a balance of £2.916m in free general
fund reserves 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
CAMHS Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
GAE Grant Aided Expenditure
PAC Performance and Audit Committee 
1. EXECUTIVE SUMMARY 
1.1 This report provides an overview of the financial position for the partnership and
outlines the unaudited year-end outturn position for 2021-22. The outturn is an overall
year-end underspend of £21.148m, which when adjusted for new earmarked reserves
of £18.232m is reduced to £2.916m.

Page 2

1.2 The last reported position to the IJB in March 2022 highlighted a projected underspend
of £1.780m post earmarking assumptions. This favourable movement of £1.136m is
mainly due to increased payroll turnover and the impact of the lead partnership
recharges. 
The £10.247m of Covid-19 funding has been fully allocated to the appropriate service
areas, reflecting the final true outturn position for each service outwith the Covid
impacts. 
Projecting the IJB financial position continued to be challenging during 2021-22 as
service levels fluctuated due to the ongoing impact of the pandemic. The additional
costs associated with Covid were monitored alongside the risk that these costs may
not be fully funded. These challenges will continue into 2022-23 but to a lesser extent. 
1.3 The main areas of pressure continued to be within learning disability care packages,
residential placements for children and Unplanned Activities (UnPACs) within the lead
partnership for mental health. The delivery of an overall underspend has allowed the
IJB to repay £1.486m of the debt to North Ayrshire Council as planned. 
1.4 The final unaudited IJB outturn position is adjusted to reflect the impact of Lead
Partnership services. In line with the current risk sharing agreement for lead
partnership services, an NRAC share of the projected position has been assumed as
this would be in line with the allocation in previous years. The underspend in relation
to North Lead Partnership services for Mental Health is not fully attributed to the North
HSCP as a share has been allocated to East and South HSCPs, similarly the impact
of the outturn on East and South led services has been shared with North. 
1.5  Financial balance has been achieved in 2021-22 and significant progress has been
made to ensure the ongoing financial sustainability of the IJB.  There is additional
investment as part of the 2022-23 budget and there are earmarked funds being
carried forward for use in 2022-23.   
2. 2021-22 UNAUDITED BUDGET OUTTURN POSITION 
2.1 The report provides an overview of the financial position for the partnership and
outlines the unaudited year-end outturn position for 2021-22. 
The report includes the following: 
• Explanations of main areas of variance;
• Update on progress with savings delivery;
• Budget changes requiring IJB approval;
• Impact of the outturn on IJB reserves position;
• Lead partnerships and the impact of risk sharing;
• Detail of the funding and costs of the Covid-19 response; and

Page 3

2.2 FINANCIAL OUTTURN 
Against the full-year budget of £294.400m there is a reported underspend of £2.916m.  
The Integration Scheme outlines that there is an expectation that the IJB take account
of the totality of resources available to balance the budget in year.   Following this
approach, an integrated view of the financial position should be taken, however it is
useful to note that this overall position consists of an underspend of £1.889m in social
care services and an underspend of £1.027m in health services.    This position is
after the earmarking of funds for use in future years.   
Appendix A provides the financial overview of the partnership position, this details the
outturn on an HSCP managed basis, on an IJB delegated basis (following Lead
Partnership recharge adjustments) and the final adjusted outturn position after
accounting for new earmarked reserve balances. 
The sections that follow outline the significant variances in service expenditure
compared to the approved budgets. 
2.3 Health and Community Care Services 
Against the full-year budget of £81.840m there is an underspend, pre-earmarking, of
£4.211m (5.1%) and the main variances are: 
a) Care home placements including respite placements (net position after service
user contributions and charging order income) are underspent by £0.447m after
applying £0.278m of Covid funding. 
The budgeted number of permanent placements is 790 and at month 12 there
were 736 placements.   
The level of income recovered from charging orders was under recovered during
2021-22 by £0.236m. This is included in the overall projected underspend of
£0.278m above. 
b) Care at home was online after applying £2.253m of funding for additional capacity
for Covid and Winter Planning.  Bank staff are being offered contracts and
additional staff are being recruited for the in-house service.  Additionally, the
capacity for care at home will continue to grow to meet the increase in demand for
the service; this is part of our longer-term ambition to shift the balance of care and
will be funded through the recently announced Scottish Government funding for
Care at Home capacity (see para 2.8 below).   
c) Direct Payments are online after applying £0.274m of the recently announced
funding to enhance care at home capacity. 
d) Residential Placements are overspent by £0.279m. The overspend is due to
placements transferring from adult to older people services, new packages and
increases to existing packages. 
e) Adaptations are overspent by £0.202m.  Spend was higher due to increasing
demand combined with increased costs due to supply issues.  The majority of the
overspend relates to the purchase and installation of stairlifts.

Page 4

f) Carers Act funding underspent by £1.114m. Charges for respite were waived per
the IJB 2021-22 budget paper recommendation and a contribution was made to
the increased capacity for children’s respite at Roslin House. 
g) Day Care for Older People underspent by £0.363m as vacancies have been held
whilst the service has been closed due to Covid and the unachieved saving of
£0.050m is assumed to be Covid funded. 
h) Anam Cara is online after applying £0.181m of the Scottish Government funding
for interim care.   
i) District Nursing is overspent by £0.124m due to an overspend on supplies. 
j) Rehabilitation wards are overspent by £0.067m (Redburn ward £0.224m
overspent and Douglas Grant £0.157m underspent).  The overspend at Redburn
is due to cover costs for vacancies as well as supplementary staffing for patients
who require one to one support. 
k) Scottish Government Funding has underspent by £2.238m (Care at Home
Capacity £1.192m and Interim care £1.046m) and this will be earmarked for use in
2022-23. 
2.4 Mental Health Services     
Against the full-year budget of £88.742m there is an underspend of £7.251m (8.2%).
The main variances are: 
a) Learning Disabilities are overspent by £0.214m.  The main variances are: 
• Care Packages (including residential and direct payments) - overspends of
£0.314m in community care packages, £0.243m in direct payments and £0.468m
for residential placements.  
Community Learning Disability Care packages have been one of the most
challenging areas to address overspends and to project spend. This is partly due
to the impact of services still remobilising in the earlier part of the year and also the
impact of the roll out of the CM2000 call monitoring system.  The data from CM2000
will be reported back to the service to allow them to see where care has deviated
from the planned level and focus reviews to those areas.   
• Purchased day care has underspent by £0.153m as day care services have not
fully remobilised. 
• In house day care underspent by £0.473m as a result of reduced service provision
due to Covid restrictions and the ongoing service redesign and staffing model
changes. 
• Trindlemoss – non-employee costs were £0.289m underspent due to lower
maintenance costs and utility costs than budgeted. This was partly due to the
swimming pool being non-operational during this period.   These budgets will be

Page 5

reviewed during 2022-23 to establish what the normal running costs would be when
the facility is fully operational. 
b) Community Mental Health services underspent by £0.650m; included within this is
an underspend of £0.591m in community packages (including direct payments)
and an overspend of £0.072m for residential placements.   
c) Addiction services underspent by £0.577m but £0.543m of this relates to the
Alcohol and Drugs Partnership (ADP) underspend which will be earmarked for use
in 2022-23. 
d) The Lead Partnership for Mental Health was £6.238m underspent (pre-
earmarking) and the main variances are as follows: 
• An overspend in Adult Inpatients of £0.111m mainly due to staff in redeployment
following the closure of the Lochranza ward. There was also reduced bed sale
income of £0.130m but this was covered by Covid-19 funding.
• UNPACS overspend by £0.864m which includes a backdated charge for a patient
in the state hospital. These placements are for individuals with very specific needs
that require a higher level of security and/or care from a staff group with a particular
skill set/competence. This can necessitate an UNPlanned ACtivities (UNPACs)
placement with a specialist provider which can be out-of-area.  Applications to
approve a placement are made to the Associate Medical Director for Mental Health
who needs to be satisfied that the placement is appropriate and unavoidable prior
to this being agreed.
• An underspend in MH Pharmacy of £0.086m due reduced pharmacy spend in the
wards.     
• Learning Disability Services overspent by £0.562m.  This is mainly due to high
usage of supplementary staffing, cross-charging against this budget for a LD
patient whose discharge has been delayed and redeployment staffing costs.
Supplementary staffing costs relate to backfill for sickness, increased and
sustained enhanced observations and vacancies.  The enhanced observations are
reviewed on a daily basis however, due to the individuals being acutely unwell at
present, this level of enhanced observations has been maintained for a lengthy
period of time. 
• Daldorch charging income under recovered by £0.156m.  Previously income was
received from other Health Boards for out of area Children/Young Persons
attending Daldorch but the service has been redesigned and is no longer
chargeable as it is not an education provider. This was approved as a pan Ayrshire
pressure as part of the 2022-23 budget which means it will not be a recurring
overspend in 2022-23.
• The turnover target for vacancy savings for the Lead Partnership is held within the
Lead Partnership as this is a Pan-Ayrshire target.  There was an over-recovery of
the vacancy savings target of £1.875m in 2021-22, further information is included
in the table below: 
Vacancy Savings Target (£0.400m)
Turnover Achieved to March
2022
£2.275m
Over/(Under) Achievement £1.875m

Page 6

The main areas contributing to this vacancy savings position are noted below: 
• Adult Community Health services £0.167m
• Elderly Inpatients £0.257m
• CAMHS £0.598m
• Mental Health Admin £0.304m
• Psychiatry £0.332m
• Psychology £0.565m
• Associate Nurse Director £0.052m 
2.5 Children and Justice Services 
Children’s Services
Against the full-year budget of £36.579m there is an overspend of £1.239m (3.4%).
The main variances are: 
a) Care Experienced Children and Young People overspent by £1.476m.   The main
areas within this are noted below: 
• Children’s residential placements overspent by £2.202m prior to Covid funding and
overspent by £1.261m after £0.941m of Covid funding.  We started 21/22 with 17
placements (which included 1 in Secure) but this had increased to 20 by the end
of the year.
• Fostering placements underspent by £0.214m based on the budget for 131 places
and 117 actual placements (of which 6 are Covid related and are funded through
the Covid-19 mobilisation plan) since the start of the year. Recruitment of foster
carers is an active priority for the team, both to limit the requirement for external
foster placements and reduce pressures elsewhere on the service. This is
promoted through regular targeted recruitment campaigns, community awareness
raising and daily presence on various social media platforms. Our active
recruitment strategy is gaining some interest and we are actively pursuing a
number of enquiries as a result.
• Fostering Xtra placements underspent by £0.156m after £0.086m of Covid funding. 
There was budget for 33 placements and there were 26 actual placements since
the start of the year.
• Private Fostering placements overspent by £0.131m based on the budget for 10
placements and 16 actual placements since the start of the year.
• Kinship placements overspent by £0.099m based on the budget for 353 places and
355 actual placements since the start of the year.  The number of placements was
higher during the first six months of the year hence the level of overspend.
• Adoption placements overspent by £0.099m based on the budget for 57 places
and 68 actual placements since the start of the year. 
b) Children with disabilities – residential placements underspent by £0.059m based
on 7 placements at the year end. 
c) Residential respite – placements overspent by £0.598m due to short-term
placements continuing longer than previously projected. These short-term
placements are used to prevent an admission to full residential care. 
d) Transport costs – underspent of £0.061m  due to less mileage being incurred.

Page 7

Justice Services 
Against the full-year budget of £2.385m there was an underspend of £0.005m
(0.002%) within the MAPPA service. This underspend is not included in the overall
projection as it will need to be paid back to the Scottish Government as a ring-fenced
grant. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP) 
AHP services are underspent by £0.082m due to underspends in non-employee costs. 
2.7 MANAGEMENT AND SUPPORT 
Management and Support Services are underspent by £11.454m pre-earmarking. 
The main areas of underspend are:
• Covid funding of £8.597m which will be earmarked and carried forward for use
against 22/23 costs.
• £0.353m relates to funding set aside for unscheduled care.  £0.277m of this
funding is uncommitted and £0.076m relates to the enhanced hospital social
work team only incurring part year costs.  
• There is also an over-recovery of payroll turnover of £1.259m (£0.729m for
health services and £0.530m for social care) as outlined in para 2.9 below.
• Slippage of £0.717m in funding set aside for transition packages and the
balance of funding from the living wage allocation.
• Underspends on Scottish govt funding of £0.934m which will be earmarked and
carried forward for use in 22/23. 
2.8 ADDITIONAL SCOTTISH GOVERNMENT FUNDING 
The Scottish Government confirmed on 5 October 2021 a range of measures and new
investment that is being put in place to help protect health and social care services
over the winter period, and to provide longer term improvement in service capacity
across health and social care systems.   
This funding is predicated on four key principles: 
• Maximising Capacity. 
• Ensuring Staff Wellbeing.  
• Ensuring System Flow and  
• Improving Outcomes. 
On 4th November, the Scottish Government announced additional funding to support
this. It is expected that NHS Boards, Integration Authorities and Local Authorities will
work collaboratively to ensure a whole system response. 
Specifically it covers the areas below but the Scottish Government have confirmed
that there will be flexibility across the funding streams:

Page 8

NAHSCP
Share 
21/22
(£m)
21/22
underspend
earmarked
for use in
22/23 (£m)
Interim care arrangements* 1.109 1.046
Enhanced care at home capacity 1.719 1.060
Increase hourly rate to £10.02 for adult
social care staff employed by
commissioned providers
0.866 -
Enhancing Multi-Disciplinary Teams
(MDTs)
0.644 0.644
TOTAL 4.338 2.750
*non-recurring beyond 2022/23. 
The underspend on these additional Scottish Government funds at the year-end has
been earmarked and held in reserve for use in 2022/23. Detailed spending plans are
currently being developed to utilise these non-recurring funds. 
2.9  Turnover/Vacancy Savings 
The turnover targets and actual achievement for the financial year for Health and
Social Care services out with the Lead Partnership is noted below: 
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas,
however, the most significant areas are: 
• Locality Services £0.480m
• Care experience young people £0.386m
• Community Care service delivery £0.300m
• Irvine, Kilwinning & 3 Towns £0.156m 
There have been no intentional plans during the pandemic to pause or delay
recruitment and services have actively continued to recruit, in some areas this has
proven difficult to fill posts. 
The turnover target for the North Lead Partnership for Mental Health services is
detailed within the Lead Partnership information at section 2.4. 
Social Care Health
Services
Vacancy Savings Target (2.014m) (0.655m)
Achieved to March 2022 2.544m 1.384m
Over/(Under) Achievement 0.530m 0.729m

Page 9

2.10 Savings Progress 
a) The approved 2021-22 budget included £2.528m of savings. 
BRAG Status Position at
Budget Approval
£m
Position at
Month 12
£m
Red - 0.552
Amber 0.204 0.050
Green 2.324 -
Blue - 1.926
TOTAL 2.528 2.528 
b) The main areas to note are: 
i) Red savings of £0.450m relating to reducing children’s residential
placements, £0.066m adoption allowances and £0.036m external
fostering placements, all of which overspent.   
ii) Whilst all savings remain on the plan to be delivered in 22-23 there are
delays with some savings with delays in implementation due to Covid-
19, for example the savings in relation to day care for adults and older
people. These savings of £0.138m are noted as blue as they were
achieved through vacancies rather than service design funded by Covid
funding.
iii) The confidence with some savings reduced since the budget was set
due to the ongoing impact of Covid-19, for example Care at Home
related savings.  These savings been superseded by the additional
Scottish Government Funding. 
Appendix C provides the final BRAG status around the deliverability of each saving.   
The unachieved savings due to Covid-19 have been reflected in the final outturn
position as the savings delays were compensated with additional Covid funding.  The
delays were included in the mobilisation plan return to the Scottish Government.   
2.11 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis…. without
the express consent of the Integration Joint Board.” 
Appendix D highlights the movement in the overall budget position for the Partnership
following the initial approved budget. 
Reductions Requiring Approval:
: Training grade adjustment   £0.014m
: Dundonald GP admin to Primary Care £0.004m
: North ABI to East HSCP £0.009m
: NSAIS Overclaimed Funding £0.634m
: Douglas Grant Admin to Acute £0.010m

Page 10

2.12 NHS – Further Developments/Pan Ayrshire Services 
Lead Partnerships: 
The IJB outturn position is adjusted to reflect the impact of Lead Partnership services.
The outturn for all Lead Partnership services is shared across the 3 Partnerships on
an NRAC basis; this position is currently the default pending further work to develop
a framework to report the financial position and risk sharing across the 3 Partnerships
in relation to hosted or lead service arrangements, which has been delayed by the
requirement to focus efforts on the Covid response. 
The final outturn in relation to North Lead Partnership services is not fully attributed to
the North IJB as a share is allocated to East and South Partnerships; similarly, the
impact of the outturn on East and South led services will require to be shared with
North. At Month 12 the MH lead partnership was underspent by £6.238m pre-
earmarking (£1.939m NRAC share for East and £1.751m for South). 
East HSCP – Underspend of £8.708m (£2.948m NRAC share for NA IJB).   The main
areas of variance are: 
Primary Care and Out of Hours Services (Lead Partnership) 
On a managed services basis, there is an underspend of £8.350m on the Primary
Care Lead Partnership budget. This includes an underspend of £5.749m on the
Primary Care Improvement Fund which has been earmarked for carry-forward on an
actual spend basis at individual IJB level. The £1.690m underspend in Dental services
includes savings due to reduced service provision with an anticipated increase in
staffing costs going forward. This underspend includes additional funding allocations
for Practice Improvements (£0.715m) and Winter Preparedness (£0.347m), both of
which have been earmarked for carry-forward on an individual IJB basis. There are
reduced costs of £0.395m in Ayrshire Urgent Care Services (AUCS) due to vacancies
within the service, as well as a reduction in the number of sites used for part of the
year, resulting in a reduction in GP costs. The level of GP activity will continue to be
closely monitored going forward. 
Prison and Police Healthcare (Lead Partnership) 
The £0.351m underspend is largely due to net staffing savings. In addition, the
medical contracts at both Prison and Police have reduced and is contributing to the
underspend. The underspend includes RMP4 funding £0.105m which has been
earmarked for carry-forward within the IJB Reserve. 
South HSCP – overspend of £0.061m (£0.022m NRAC share for NAHSCP).  The
overspend is mainly due to an overspend in the community store of £0.143m and
continence service of £0.043m offset by vacancies in the Family Nurse Partnership of
£0.113m.

Page 11

Set Aside:
The budget for set aside resources for 2021/22 is in line with the amount for 2020/21
(£33.054m) inflated by the 2.8% baseline uplift. The 2020/21 value was based on
2019/20 activity as 2020/21 was not considered representative.  
At the time of setting the IJB budget it was noted that this may require to be updated
following the further work being undertaken by the Ayrshire Finance Leads to establish
the baseline resources for each Partnership and how this compares to the Fair Share
of resources.  It was anticipated that 2020-21 would be used as a shadow year for
these arrangements, however, and 2021/22 activity was not representative either due
to the ongoing pandemic. Notwithstanding this a method of capturing up to date local
activity and pricing it for set aside calculations is now in place, subject to IJB review
and refinement. Quarterly updates were issued throughout the year.  
The annual budget for Acute Services is £383.9m.  The directorate is overspent by
£3.4m, caused by increasing overspends on agency medical and nursing staff, as well
as overtime and bank usage. These have been required due to the level of operational
pressure being experienced, in common with many other areas in Scotland at present.  
There is a material underlying deficit caused by: 
• Unachieved efficiency savings 
• High expenditure on medical and nursing agency staff, high rates of absence
and vacancy causing service pressure
• High numbers of delayed discharges 
COVID-19 – FINANCE MOBILISATION PLAN IMPACT 
2.13 Summary of position 
From the outset of the pandemic the HSCP acted very swiftly to respond and
developed a mobilisation plan detailing the additional activities to support our
response, alongside the estimated financial impact.  Financial returns were submitted
to the Scottish Government on a regular basis during 2020-21, on the premise that
any additional costs aligned to mobilisation plans would be fully funded and this
process continued during 2021-22.  There was a risk that if the full cost of the Covid-
19 response was not funded that the IJB may require to recover any overspend in-
year however, the final Scottish Government funding covered all 2021-22 costs and
allowed for a further £8.579m of funding to be carried forward to 2022-23 for future
Covid-19 costs. 
2.14 Mobilisation Plan 
The initial 2021-22 mobilisation plan cost submission was submitted in February 2021
and estimated the costs to be £5.481m to March 2022.  By quarter 4 these costs had
increased to £10.247m.   
The local finance mobilisation plan submission is included as Appendix E.  The main
areas of cost together with the movement over the period are summarised below:

Page 12

Service Area Initial
2021-22
Return            
£m
Quarter 1
Update
£m
Quarter 2
Update
£m
Quarter 3
Update
£m
Quarter 4
Update
£m
Payments to Providers 0.750 2.421 2.119 2.854 3.002
PPE 2.000 2.000 0.581 0.472 0.453
Additional Staff 1.459 1.901 3.704 3.309 4.448
Mental Health 1.172 1.172 0.000 0.000 0.000
Loss of Income 0.100 0.430 0.480 0.569 0.700
Unachieved Savings - 0.138 0.138 0.138 0.138
Children & Families - - 0.949 0.914 1.157
Other Areas - 0.217 0.396 0.594 0.349
TOTAL 5.481 8.279 8.367 8.850 10.247 
The main reason for the increase in costs at quarter 4 was increased staff costs which
reflects the higher level of absence due to the Omicron covid outbreak. 
2.15 Covid-19 Funding Position   
At the outset of the pandemic there was an assurance that subject to any additional
expenditure being fully aligned to local mobilisation plans, including the IJB responses,
reasonable funding requirements will be supported. This was on the basis that a
process would be developed for these to be accurately and immediately recorded and
shared with the Scottish Government. The basis of this reporting was drawn up and
agreed with COSLA and Health and Social Care Partnerships. 
The Scottish Government provided a funding allocation in February 2022 which
brought the funding up to 100% of costs.  On this basis the overall financial risk to the
IJB for 21-22 was fully mitigated. 
2.16 Provider Sustainability Payments and Care Home Occupancy Payments 
COSLA Leaders and Scottish Government have agreed an approach to supporting
the social care sector to ensure that reasonable additional costs will be met.   We have
been making payments to commissioned social care providers in line with the agreed
national principles for sustainability and remobilisation payments to social care
providers during COVID 19.  
Care Home Occupancy Payments - we have engaged with older people’s care
homes in relation to care home occupancy payments and make regular monthly
payments to care home providers with emergency faster payments being made if
required.  The Scottish Government ceased these payments at the end of October
2021, although additional financial support can still be provided where a Care Home
is in a Covid outbreak situation for more than 28 days. 
Sustainability payments - providers are responsible for submitting a claim for
additional support to the Partnership for sustainability payments and this is assessed
as to what support is required on a case-by-case basis based on the supporting
evidence provided.  Each case is assessed by the same group to ensure equity and
consistency across providers.

Page 13

In general, all payment terms have been reduced and once any payment is agreed it
is being paid quicker to assist the cash flow position of providers.  The assessment of
some claims has been difficult due to delays with additional information and supporting
evidence being submitted to support claims, hence there are a number of claims that
are in process. 
The sustainability payments are a significant cost in our mobilisation plan and the
timely submission and assessment of claims is key to ensuring we can accurately
estimate the financial cost and ensure the costs are reclaimed from the Scottish
Government.   
Providers in North Ayrshire are not all strictly adhering to these timescales, and we
have received some backdated claims; the commissioning team are working with
providers to support them to submit claims.  The tables below show the support
provided to date and the outstanding claims as at the end of March.   
The current financial sustainability principles (excluding care home occupancy
payments), guidance and criteria have now been extended until 30th June 2022. 
PROVIDER SUMMARY
NCHC
Care
Homes  Other Total
Total Number of Providers 17 49 66
Number contacting NAC 17 30 47
Providers Supported to date 17 17 34    
OUTSTANDING CLAIMS
NCHC
Care
Homes  Other Total
Total Number of Claims 3 5 8
Value of Claims                 49,635  175,485  225,120 
SUPPORT PROVIDED
NCHC
Care
Homes
Other
Services TOTAL      
£ £ £
Occupancy Payments* 1,143,507 0 1,143,507
Staffing 891,320 136,691 1,028,011
PPE, Infection Control 519,722 94,053 613,774
Other 163,090 54,016 217,105
TOTAL 2,717,639 284,760 3,002,397 
Arrangements for support have been agreed alongside guidance which sets out the
criteria that need to be met for financial support, the approach for payment for care
that cannot be delivered, the categories of additional costs which may be met, the
approach to evidencing additional costs and key principles for requesting and making
payments.  The key principles of this ongoing support include:

Page 14

• Understanding the reasons why care cannot be delivered, only Covid related
impacts can be funded through sustainability payments;
• The ‘planned care’ approach of continuing to pay for undelivered care has been
removed and providers and HSCPs will be required to explore opportunities for
creatively delivering services in a different way, temporarily re-deploy staff into
other HSCP services (voluntarily), where this is not possible providers will be
required to access national supports in the first place, including the potential to
furlough staff;
• Where payment for undelivered care is agreed as the only option this will be at
a reduced level depending on the type of service, for example for care homes
subject to the NCHC occupancy payments will be made at 80% of the rate for
all vacancies, this is dependent on care homes continuing to admit new
residents where it is clinically safe to do so;
• The Social Care Staff Support Fund will remain in place to ensure all staff
receive their full pay during a Covid related absence; and
• Additional reasonable costs that are incurred as a result of Covid which cannot
be covered from other funding sources will be reimbursed, including for
example PPE, infection prevention control and additional staffing costs.   
2.17 RESERVES 
The IJB reserves position is outlined in the table below. 
General Fund
Reserves 
Earmarked
Reserves Total 
Debt to
NAC
Free
GF
SG
Funding HSCP   
£m £m £m £m £m
Opening Balance - 1 April 2021 (3.807) 4.151 5.487 0.681 6.512
Prior Year Adjustment - - 1.245 - 1.245
Revised Opening Balance (3.807) 4.151 6.732 0.681 7.757
Movement in-year:          
Debt Repayment 1.486       1.486
2021-22 Outturn    3.097   (0.181) 2.916
Use of SG Funding    (1.159)  (1.159)
SG Funding – Earmarking per
Appendix B     17.447   17.447
Non-SG Funding – Earmarking
per Appendix B       0.785 0.785
Balance at 31 March 2022 (2.321) 7.248 23.020 1.285 29.232 
The ‘free’ general fund balance of £7.248m is held as a contingency balance, this
equates to around 2.5% of the IJB budget for 2021-22 which falls within the good
practice level of between 2% and 4%. 
The £1.486m will continue to be set aside in future years to support the repayment of
the debt.

Page 15

3. PROPOSALS 
3.1 Anticipated Outcomes 
The final outturn position for 2021-22 and the work services have undertaken to
ensure financial balance during the pandemic are the building blocks for financial
sustainability moving into 2022-23.     
The focus during the year was to ensure the final outturn position was at online for
core service delivery whilst closely monitoring the additional Covid costs. 
This was achieved and the overall debt owed to the Council has reduced. 
The transformational change programme will have the greatest impact on the financial
sustainability of the partnership, the IJB require to have a clear understanding of
progress with plans and any actions that can be taken to bring the change programme
into line, including the impact of the Covid response financially and on the delivery of
the transformation plan. 
3.2 Measuring Impact 
The position reported is the unaudited year-end outturn position for 2021-22, further
information will also be contained within the unaudited IJB annual accounts.  Ongoing
updates to the financial position including the reserves position will be reported to the
IJB throughout 2022-23. 
4. IMPLICATIONS 
Financial:  The outturn is a year-end underspend of £2.916m after
earmarking £18.232m of funds for future use and this is also
after £1.486m of debt repayment budget back to the
Council.   The main areas of overspends and underspends
are highlighted in the report. 
Human Resources: The report highlights vacancy or turnover savings achieved
to date. Services will review any staffing establishment plans
and recruitment in line with normal practice when
implementing service change and reviews as per agreement
with the IJB, there is no intention to sustain this level of
staffing capacity reduction on a recurring or planned basis. 
Legal: None
Equality: None
Children and Young People None
Environmental &
Sustainability:
None 
Key Priorities: None
Risk Implications: Within the projected outturn there are various over and
underspends including the non-achievement of savings.   
There is a review of aged debt being undertaken and this
could have an adverse impact on the final outturn position.
Community Benefits: None

Page 16

Direction Required to
Council, Health Board or
Both 
Direction to: - 
1. No Direction Required 
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran √ 
5. CONSULTATION
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team. 
The IJB financial monitoring report is shared with the NHS Ayrshire and Arran Director
of Finance and North Ayrshire Council’s Head of Finance after the report has been
finalised for the IJB. 
6. CONCLUSION 
6.1 It is recommended that the IJB: 
(a) notes the overall integrated financial performance for the financial year 2021-22
and the overall year-end underspend of £21.148m, adjusted to £2.916m after
earmarking; 
(b) notes the updated costs of the Covid response and the funding received; 
(c) notes that out-with the IJB overall position, the £1.486m debt repayment has
been made to North Ayrshire Council as planned;
(d) approve the budget changes outlined at section 2.11; and
(e) approve the proposed earmarking of £18.232m of reserves as detailed in the
report, leaving a balance of £2.916m in free general fund reserves. 
For more information please contact: 
Paul Doak, Head of Finance and Transformation at pdoak@north-ayrshire.gov.uk or
Eleanor Currie, Principal Manager – Finance at eleanorcurrie@north-ayrshire.gov.uk

Page 17

2021-22 Budget Monitoring Report–Objective Summary as at 31st March 2022       Appendix A 
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 64,253 59,935 (4,318) 17,587 17,694 107 81,840 77,629 (4,211) (1,413) (2,798)
: Locality Services 26,225 24,813 (1,412) 5,348 5,493 145 31,573 30,306 (1,267) 47 (1,314)
: Community Care Service Delivery 31,677 29,848 (1,829) 0 0 0 31,677 29,848 (1,829) (555) (1,274)
: Rehabilitation and Reablement 1,768 1,866 98 1,745 1,726 (19) 3,513 3,592 79 148 (69)
: Long Term Conditions 2,561 1,458 (1,103) 8,269 8,502 233 10,830 9,960 (870) (834) (36)
: Integrated Island Services 2,022 1,950 (72) 2,225 1,973 (252) 4,247 3,923 (324) (219) (105)
MENTAL HEALTH SERVICES 27,054 26,147 (907) 61,688 55,344 (6,344) 88,742 81,491 (7,251) 31 (7,282)
: Learning Disabilities 19,608 19,829 221 479 472 (7) 20,087 20,301 214 1,069 (855)
: Community Mental Health 5,125 4,543 (582) 1,700 1,632 (68) 6,825 6,175 (650) (365) (285)
: Addictions 2,321 1,775 (546) 1,416 1,385 (31) 3,737 3,160 (577) (23) (554)
: Lead Partnership Mental Health NHS Area Wide 0 0 0 58,093 51,855 (6,238) 58,093 51,855 (6,238) (650) (5,588)
CHILDREN & JUSTICE SERVICES 32,488 33,741 1,253 4,091 4,077 (14) 36,579 37,818 1,239 1,319 (80)
: Irvine, Kilwinning and Three Towns 3,597 3,554 (43) 0 0 0 3,597 3,554 (43) (53) 10
: Garnock Valley, North Coast and Arran 1,991 1,954 (37) 0 0 0 1,991 1,954 (37) (49) 12
: Intervention Services 1,686 1,657 (29) 332 332 0 2,018 1,989 (29) (5) (24)
: Care Experienced Children & Young people 21,370 22,846 1,476 0 0 0 21,370 22,846 1,476 1,570 (94)
: Quality Improvement 1,170 1,145 (25) 0 0 0 1,170 1,145 (25) (148) 123
: Public Protection 0 0 0 0 0 0 0 0 0 0 0
: Justice Services 2,384 2,385 1 0 0 0 2,384 2,385 1 0 1
: Universal Early Years 290 200 (90) 3,311 3,275 (36) 3,601 3,475 (126) 4 (130)
: Lead Partnership NHS Children's Services 0 0 0 448 470 22 448 470 22 0 22
PRIMARY CARE 0 0 0 50,073 50,047 (26) 50,073 50,047 (26) 0 (26)
ALLIED HEALTH PROFESSIONALS 0 6,853 6,771 (82) 6,853 6,771 (82) (95) 13
COVID NHS 0 0 0 2,132 2,005 (127) 2,132 2,005 (127) 0 (127)
MANAGEMENT AND SUPPORT COSTS 23,654 13,843 (9,811) 4,527 2,884 (1,643) 28,181 16,727 (11,454) (1,437) (10,017)
OUTTURN ON A MANAGED BASIS 147,449 133,666 (13,783) 146,951 138,822 (8,129) 294,400 272,488 (21,912) (1,595) (20,317)
Return Hosted Over/Underspends East 0 0 0 0 1,735 1,735 0 1,735 1,735 211 1,524
Return Hosted Over/Underspends South 0 0 0 0 1,569 1,569 0 1,569 1,569 200 1,369
Receive Hosted Over/Underspends South 0 0 0 0 22 22 0 22 22 8 14
Receive Hosted Over/Underspends East 0 0 0 0 (1,092) (1,092) 0 (1,092) (1,092) (604) (488)
Allocation of PCIF from East 0 0 0 0 (1,856) (1,856) 0 (1,856) (1,856) 0 (1,856)
Allocate the Action 15 underspend to East 0 0 0 0 204 204 0 204 204 0 204
Allocate the Action 15 underspend to South 0 0 0 0 182 182 0 182 182 0 182
OUTTURN ON AN IJB BASIS 147,449 133,666 (13,783) 146,951 139,586 (7,365) 294,400 273,252 (21,148) (1,780) (19,368)
Less Earmarking (detailed separately on
Appendix A (i) 11,894 11,894 6,338 6,338 18,232 18,232
FINAL OUTTURN POSITION  147,449 145,560 (1,889) 146,951 145,924 (1,027) 294,400 291,484 (2,916) (1,780) (1,136)
Over/
(Under)
Spend
Variance at
Period 10
Movement in
projected 
variance
from Period
10
Partnership Budget - Objective Summary
2021/22 Budget
Council Health TOTAL

Page 18

EARMARKED FUNDS – CARRIED FORWARD FOR USE IN 2022-23 Appendix B 
Earmarked Funds - SG Funding £ 000's Earmarked Funds - Other £ 000's
: Alcohol & Drug Partnership       554 : Neighbourhood Networks     145
: Action 15       511 : NAC Recovery and Renewal – Mental
Health Element       71
: PCIF     1,856 : Joint Equipment         5
: Covid-19 Funding     8,597 : Nethermains Adaptations       40
: MHO Development Grant         41 : Supported Accommodation       50
: Care at Home Capacity     1,192 : Trauma Trainer       48
: Interim Care     1,046 : Perinatal MH Nurse       65
: Trauma Training         50 : Medical photography         4
: Family Wellbeing Fund       106 : Data Sims       28
: Unaccompanied Asylum-Seeking Children         11 : School Nursing        56
: MDTs       644 : Buvidal     109
: Health Care Support Workers       144 : Perinatal and Infant Mental Health       86
: MH Recovery and Renewal      2,057 : Replacement Mattress Programme       78
: AHP Winter Funding         51 Total Earmarked Funds - SG Funding     785
: Cossette Funding         18
: Expansion of Primary Care Estates         55 TOTAL EARMARKING 18,232
: GP Premises Improvements - tranches 1
and 2         81
: Mental Health Wellbeing in Primary Care         40 
: Dental Practice Improvement       265 
: Dental Winter Preparedness       128
Total Earmarked Funds - SG Funding   17,447

Page 19

2021-22 Savings Tracker            Appendix C 
Savings ref
number Description
Deliverability
Status at
budget setting
Approved
Saving                  
2021/22 £m
Deliverability
Status              
Month 12
Saving
Delivered @
Month 12                   
£m
Delivered
during Year                        
£m
Shortfall                
£m
1 Children and Young People - External Residential
Placements
Green 0.450 Red                    -                       -                  0.450
2 Adoption Allowances Green 0.066 Red                    -                       -                  0.066
3 Fostering - Reduce external placements Green 0.036 Red                    -                       -                  0.036
4 Community Support - Children's Care Packages Green 0.008 Blue               0.008                     -                       -  
5 Integration of LD/ MH Teams Green 0.050 Blue 0.050               -                  -                 
6 Learning Disability Day Services Green 0.088 Blue               0.088                     -                       -  
7 Mental Health - Flexible Intervention Service Green 0.008 Blue               0.008                     -                       -  
8 Care Homes Green 0.500 Blue 0.500               -                  -                 
9 TEC Solutions Green 0.150 Blue 0.150               -                  -                 
10 Care at Home - Reablement Investment  Green 0.300 Blue 0.300               -                  -                 
11 Care at Home - Review Green 0.135 Blue 0.135               -                  -                 
12 Day Centres - Older People Green 0.050 Blue 0.050               -                  -                 
13 Charging Policy - Montrose House Green 0.050 Blue               0.050                     -                       -  
14 Payroll Turnover Inflation Green 0.057 Blue               0.057 -                  -                 
15 Business Support Review Green 0.150 Amber 0.100               -                  0.050              
16 Suppprted Accomodation Amber 0.204 Blue               0.204 -                                      -  
17 Transport Green 0.050 Blue 0.050               -                  -                 
18 Charging Policy - Inflationary Increase Green 0.050 Blue               0.050                     -                       -  
TOTAL SOCIAL CARE SAVINGS 2.402 1.800 0.000 0.602
Whole System
Children, Families & Criminal Justice
Mental Health and LD Services
Health and Community Care

Page 20

Savings ref
number Description
Deliverability
Status at
budget setting
Approved
Saving                  
2021/22 £m
Deliverability
Status              
Month 12
Saving
Delivered @
Month 12                   
£m
Delivered
during Year                        
£m
Shortfall                
£m
19 Payroll Turnover Inflation Green 0.010 Blue 0.010 0 0
20 Elderly Mental Health inpatients (lead partnership) Green 0.116 Blue 0.116 0 0
TOTAL HEALTH SAVINGS 0.126 0.126 0.000 0.000
TOTAL NORTH HSCP SAVINGS 2.528 1.926 0.000 0.602

Page 21

2021-22 Budget Reconciliation               Appendix D 
COUNCIL Period Permanent or
Temporary £'m
Initial Approved Budget 100.065
Base budget adjustments 1 (0.053)
Resource Transfer 1 P 21.086
BSL Budget Correction 2 P (0.005)
941 x CAH  O365 Licences (6 months) 2 P (0.017)
Summer Play Funding 4 T 0.042
Education Contribution - Roslin House 5 T 0.311
MH INVESTMENT - EM FUNDS 5 T 0.445
Computer Lines Budget Transfer WAN 6 P (0.002)
£500 Payment reimburse other departments 6 T (0.054)
Commercial Waste - Corporate Adjustment 7 T 0.020
Occupational Health Recharges 7 P (0.121)
Commercial Waste - Corporate Adjustment 8 T 0.007
Wages Uplift Funding - £10.02 9 T 0.866
Fin Circ 9/2021 Living Wage £9.50 9 T 0.861
Fin Circ 9/2021 MH Recovery and Renewal 9 T 0.068
Fin Circ 9/2021 Care at Home Winter Plan 9 T 1.719
Fin Circ 9/2021 Interim Care 9 T 1.109
National Trauma Training 9 T 0.050
Scottish Disability Assistance 9 T 0.028
Telephones - Corporate 9 P (0.053)
Recovery & Renewal Funding - Eglinton
Gardens transfer to Community Gardens 9 T (0.040)
Internal Commerical Waste - Corporate 10 P 0.010
Recovery Development Worker DDTF 12 T 0.026
Whole Family Wellbeing 12 T 0.106
Telecare Fire Safety 12 T 0.028
Computer Equipment - Education funding bulk
Laptop spend in Childrens service 12 T 0.027
21/22 Insurance Allocation 12 T 0.061
HSCP Funding 12 T 1.486
National Transfer Scheme - UASC 12 T 0.011
£500 pyt Income adj to Corporate 12 T 0.054
Resource Transfer Increase 12 P 19.304
Roundings 12 T 0.004
147.449
HEALTH Period Permanent or
Temporary £'m
Initial Approved Budget 154.659
Resource Transfer (21.086)
Month 10-12 Adjustments 18.437
Adjust for Non recurring funding (20.435)
Full Year effect of Part Year Reductions (0.057)
RX Return to reserves 1.027
Additional 1.3% Uplift 1.324
RX Cres (0.828)
REVISED 21-21 BUDGET 133.041
Budget Reported at Month 12

Page 22

HEALTH Period Permanent or
Temporary £'m
Anticipate Trauma Funding 3 P 0.375
Anticipate Vet 1st Point - North Hscp 3 T 0.105
Anticipate Nsais Funding 3 P 0.634
Podiatry Re-align 3 P 0.678
RX Uplift 21.22 3 P 0.756
RX Uplift 21.22 NR 3 P 0.396
DOAC REVERSAL DRUG-NORTH 3 P 0.100
Funding transfer to Acute (Medical Records) 3 P (0.034)
Specialist Pharmacist in Substance Misuse 3 P 0.012
Public Health Outcomes Bundle 3 P 0.242
Training Grade Funding 3 P (0.044)
District Nursing Funding 3 P 0.119
Respiratory Rapid Response 3 P (0.078)
Hd56 Action 15 Tranche 1 3 P 1.180
Hd69  Mat & Neo Psychol Interv 3 P 0.123
Hd70 Perinatal & Infant Mh 3 P 0.303
Hd7 Mh Recovery And Renewal 3 T 2.393
Hd8 Mh Support For Hosp Covid 3 T 0.103
North Hscp Covid Rmp3 M1-3 3 T 0.158
North Hscp Covid M1-3 3 T 0.034
Diabetes Prevention 4 T 0.040
Iona/Lewis Patient 4 T (0.046)
North TEC contribution 4 T (0.053)
ANP Allocation - MIN 4 T 0.020
Long Covid Funding 4 T 0.400
Covid-19 Service Funding North 4 T 0.283
Veterans 1st Point 4 T 0.028
Training Grade Funding 5 P 0.029
PCRS CRES 5 P (0.044)
ADP Funding -Recurring 5 P 0.366
ADP Funding -Non-Recurring 5 T 0.744
Covid-19 Service Funding North 5 T 0.147
Training Grade Funding 6 P 0.001
Hd301-camhs Improve-ipcu 6 P 0.122
Hd302-camhs Improve-ihtt 6 P 0.148
Hd303-camhs Improve-ld, F & S 6 P 0.052
Hd304-camhs Improve-ooh U/care 6 P 0.086
Hd305-camhs Improve-liaison 6 P 0.129
Hd306-camhs Improve-neuro 6 P 0.226
Non Fatal O'dose Fr East 6 T 0.053
Hd264-emerg Covid-eat Disorders 6 T 0.328
Community Store Funding To Sth 6 P (0.017)
Covid-19 Service Funding North 6 T 0.082
Training Grade Funding 7 P (0.021)
GMS Premises to East 7 P (0.140)
Community Store Funding To Sth-corr 7 P (0.001)
Covid-19 Service Funding North 7 T 0.108
Winter Funding Excl Covid-19 7 T 0.112
Pay Award - Band 8A+ 7 P 0.080

Page 23

HEALTH Period Permanent or
Temporary £'m
MSK Physio and physio materials tfr to East 8 P (0.008)
Covid-19 Service Funding North 8 T 0.136
Hd466 Psycholigical Therapies Funding 8 T 0.286
Hd369 Buvidal Funding 8 T 0.295
Covid-19 Service Funding North 8 T 0.016
Trauma 20/21 Underspent To Capital 8 T (0.307)
Training Grade adjuastment 8 P 0.037
Training Grade adjuastment 9 P 0.032
Covid-19 Service Funding North 9 T 0.167
Training Grade adjuastment 10 P (0.013)
Early Years Health Promotion supplies funding
from East 10 T 0.003
GMS LDS Transfer to East 10 T (0.007)
Dist Nrs Bladder Scanners To Capital 10 T (0.023)
Hd305 Camhs Tfr To Cap For Ward 1b 10 T (0.082)
Hd595 Trauma Funding Uplift 10 P 0.023
Covid-19 Service Funding North 10 T 0.187
Min - North Infant Feeding 11 T 0.001
Hd Ref 484 Dementia Pds 11 T 0.095
Training Grade Adj - February 11 P (0.014)
Hd Ref 663 Band 2-4 Staffing 11 P 0.175
CAHMS Admin from South HSCP 11 P 0.011
Hd305 Camhs Tfr To Cap For Ward 1b 11 T 0.082
Hd537 Med & Dent Pay Uplift - North 11 P 0.130
Hd778 Action 15 Tranche 2 11 P 1.430
Covid-19 Service Funding North 11 T 0.166
Covid-19 Service Funding North 11 T 0.271
Further Covid Funding - Social Care 11 T 14.237
Covid-19 Service Funding North 11 T 2.511
Hd Ref 275 Workforce Wellbeing Primary &
Social Care 12 T 0.054
Hd Ref 375 Workforce Wellbeing Primary &
Social Care 12 T 0.054
Dundonald GP Admin to Primary Care 12 P (0.004)
Hd Ref 634 Acceleration Of Mdt Recruitment 12 T 0.089
Hd Ref 662 Multi-disciplinary Teams 12 T 0.555
Hd Ref 818 (mat)drug Death Taskforce 12 T 0.163
North Abi to East HSCP 12 T (0.009)
Medical Discretionary Points 12 P 0.045
NSAIS Funding overclaimed 12 T (0.634)
Douglas Grant Admin to Acute 12 P (0.010)
Camhs Accommodation 12 T 0.300
Lead Rx Offset Sch 5 Overspend 12 T 0.563
Hd954 Camhs Accomodation 12 T 1.106
Apprenticeship Levy 12 T 0.294
Resource Transfer Increase 12 P (19.304)
Roundings 12 T (0.006)
146.951
TOTAL BUDGET AT MONTH 12 294.400
Budget Reported at Month 12

Page 24

Appendix E
Mobilisation Submission – Quarter 4 
£000s April May June July August September October November December January February March
2021-22
Revenue
Total
Additional PPE 167 167 167 0 0 0 (13) (3) (3) (10) (10) (10) 451
Additional Capacity in Community 81 81 139 182 149 149 144 141 140 311 311 310 2,138
Additional Equipment and Maintenance 0 0 0 0 0 19 1 17 4 6 6 7 60
Additional Staff Costs 40 42 155 171 131 145 168 168 167 340 340 341 2,208
Additional FHS Contractor Costs 6 9 8 7 7 11 0 8 12 11 11 12 102
Social Care Provider Sustainability Payments 422 422 422 163 143 157 165 192 192 241 241 242 3,002
Children and Family Services 18 18 18 18 18 18 445 72 72 153 153 153 1,157
Loss of Income 50 50 50 33 33 33 91 48 47 87 88 89 700
Other 0 0 0 25 7 50 (37) 6 6 6 6 6 75
Total Covid-19 Costs 788 790 962 598 479 582 965 649 637 1,145 1,146 1,150 9,893
Unachievable Savings 23 23 23 23 23 23 0 0 0 0 0 0 138
Total Covid-19 Costs - HSCP - NHS 811 813 985 621 502 605 965 649 637 1,145 1,146 1,150 10,031
£000s April May June July August September October November December January February March
2021-22
Revenue
Total
Reducing Delayed Discharge 0 0 0 19 19 19 19 19 19 34 34 35 216
Total Remobilisation Costs 0 0 0 19 19 19 19 19 19 34 34 35 216
Total HSCP Costs 811 813 985 640 521 624 984 668 656 1,179 1,180 1,185 10,247
Total Covid-19 Costs
Total Remobilisation Costs