Integration Joint Board 
Meeting 
Thursday, 09 May 2024 at 10:00 
Council Chambers, Cunninghame House, Irvine /
Hybrid via Microsoft Teams 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with provision,
by prior notification, for remote attendance by Elected Members in accordance
with the provisions of the Local Government (Scotland) Act 2003.  Where
possible, the meeting will be live-streamed and available to view
at https://north-ayrshire.public-i.tv/core/portal/home.   
1 Apologies 
2 Declarations of Interest
Members are requested to give notice of any declarations of interest in respect
of items of business on the Agenda. 
3 Minute/Action Note
The accuracy of the Minutes of the meeting held on 14 March will be confirmed
and the Minutes signed in accordance with Paragraph 7 (1) of Schedule 7 of
the Local Government (Scotland) Act 1973 (copy enclosed). 
4 Community Nursing Transformation Update
Submit report by Dalene Steele, Associate Nurse Director (NHS) and Kerry
Logan, Head of Service (Health and Community Care HSCP) on the progress of
the outputs from the Community Nursing Review whilst noting the current
identified risks (copy enclosed).  
Primary Care Update   
5 Primary Care General Medical Services Update
Submit report by Vicki Campbell, Head of Primary and Urgent Care Services on
the provision of General Medical Services (GMS) across Ayrshire and Arran
(copy enclosed).
1

Page 2

6  Primary Urgent Care Update
Submit report by Vicki Campbell, Head of Primary and Urgent Care Services on
the on the provision of primary urgent care services delivered through the
Ayrshire Urgent Care Service (AUCS) (copy enclosed). 
7 Dental Services Update
Submit report by Vicki Campbell, Head of Primary and Urgent Care Services on
the current position of dental services (copy enclosed). 
8 Brighter Pathways: Re-Modelling Care Options
Submit report by  Elizabeth Stewart, Head of Service (Children, Families and
Justice) on the programme of work and current pressures on placement
availability and alternative care for any child and young person in the looked after
system (copy enclosed). 
9 Director’s Report
Submit report by Caroline Cameron, Director (NAHSCP) on developments within
the North Ayrshire Health and Social Care Partnership (copy enclosed). 
10  Communities Mental Health & Wellbeing Fund Update
Submit report by Vicki Yuill, Arran Community & Voluntary Service
on Communities Mental Health & Wellbeing Fund (copy enclosed). 
11  Equality Mainstreaming and Outcomes Report 2022- 2024
Submit report by Caroline Cameron, Director (NAHSCP) on Equality
Mainstreaming and Outcomes Report (copy enclosed). 
12  Unpaid Carers Service Developments in North  Ayrshire
Submit report by Scott Hunter, Chief Social Work Officer (NAHSCP) on
the developments to expand and improve support for unpaid carers in North
Ayrshire (copy enclosed). 
13  Strategic Inspection of Adult Support and Protection in  North Ayrshire
Submit report by Scott Hunter, Chief Social Work Officer (NAHSCP) on the
outcomes of the strategic inspection of adult support and protection completed
by the Care Inspectorate, Health Improvement Scotland and His Majesties
Inspectorate of Constabularies (copy enclosed). 
14  Community Alarm and Telecare Service transition  from Analogue to
Digital Update
Submit report by Kerry Logan, Head of Service (Health and Community Care)
on the Community Alarm and Telecare Service transition from Analogue to
Digital Service (copy enclosed). 
15  Whistleblowing Report Quarter 3, October – 31 December  2023
Submit report for information in relation to whistleblowing concerns raised
in Quarter 3 (October – 31 December  2023) (copy enclosed).
2

Page 3

16  Urgent Items
Any other items which the Chair considers to be urgent.  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the Council's
internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the start
of the meeting, the Provost/Chair will confirm if all or part of the meeting is being
filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited to, for
the purpose of keeping historical records and making those records available via
the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However, by
entering the Council Chambers, using the press or public seating area or (by
invitation) participating remotely in this meeting, you are consenting to being
filmed and consenting to the use and storage of those images and sound
recordings and any information pertaining to you contained in them for
webcasting or training purposes and for the purpose of keeping historical records
and making those records available to the public. If you do not wish to participate
in a recording, you should leave the meeting.  This will constitute your revocation
of consent.
If you have any queries regarding this and, in particular, if you believe that use
and/or storage of any particular information would cause, or be likely to cause,
substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
3

Page 4

IJB Sederunt
Voting Members 
Margaret Johnson (Chair) North Ayrshire Council
Joyce White (Vice-Chair) NHS Ayrshire & Arran   
Cllr Timothy Billing North Ayrshire Council
Cllr Anthea Dickson North Ayrshire Council
Cllr Nairn McDonald North Ayrshire Council
Jean Ford NHS Ayrshire & Arran
Tom Hopkins NHS Ayrshire & Arran
Marc Mazzucco NHS Ayrshire & Arran   
Professional Advisors
Caroline Cameron Director
Paul Doak Head of Service/Section 95 Officer
Aileen Craig IJB Monitoring Officer
Iain Jamieson Clinical Director
Scott Hunter Chief Social Work Officer – North Ayrshire
Thelma Bowers Mental Health Adviser
Darren Fullarton Associate Nurse Director/
Lead Nurse
Dr Victor Chong Acute Services Representative
Dr Louise Wilson GP Representative
Sharon Hackney Lead Allied Health Professional
Elaine Young Public Health Representative
Wendy Van Riet Director of Psychological Services   
Stakeholder Representatives
Terri Collins Staff Rep - NHS Ayrshire and Arran
Vacancy Staff Rep
Vacancy Carers Representative
Clive Shephard Service User Representative
Vacancy Independent Sector Representative
Vicki Yuill Third Sector Rep/Chair Arran Locality Forum
Vacancy IJB Kilwinning Locality Forum (Chair)
Vacancy IJB Three Towns Locality Forum (Chair)
Vacancy IJB Garnock Valley Locality Forum (Chair)
Vacancy IJB Irvine Locality Forum (Chair) 
4

Page 5

North Ayrshire Health and Social Care Partnership
Minute of Integration Joint Board meeting held on 
Thursday 14 March 2024 at 10.00 a.m. 
involving participation by remote electronic means and physical attendance
within the Council Chambers, Irvine. 
Present (Physical Participation) 
Voting Members
Councillor Margaret Johnson, North Ayrshire Council (Chair) 
Joyce White, NHS Ayrshire and Arran (Vice-Chair)
Councillor Anthea Dickson, North Ayrshire Council
Councillor Nairn McDonald, North Ayrshire Council
Tom Hopkins, NHS Ayrshire and Arran 
Professional Advisers
Caroline Cameron, Director of Health and Social Care Partnership 
Paul Doak, Head of Service (HSCP Finance and Transformation)/Section 95 Officer
Scott Hunter, Chief Social Work Officer
Thelma Bowers, Mental Health Adviser
Kimberley Mroz, SDS Policy Review Manager
Darren Fullarton, Associate Nurse Director/Lead Nurse
Dr. Louise Wilson, GP Representative
Sharon Hackney, Lead Allied Health Professional 
Stakeholder Representatives
Louise McDaid, Staff Rep (North Ayrshire Council)/Chair, North Coast Locality Forum 
Present (Remote Participation) 
Voting Members
Councillor Timothy Billings, North Ayrshire Council
Marc Mazzucco, NHS Ayrshire and Arran 
Professional Advisers
Elaine Young, Public Health Representative
Iain Jamieson, Clinical Director
Vicki Yuill, Third Sector Rep/Chair Arran Locality Forum 
Stakeholders Representative
Pamela Jardine, Carers Representative
Michelle Sutherland, Partnership Facilitator 
In Attendance (Physical Participation) 
Agenda Item 3
5

Page 6

Kerry Logan, Head of Service (Health and Community Care)
Lee Ballantyne, Senior Manager (Strategic Planning and Transformation)
Corry McDonald, Senior Manager (Childre, Families and Justice)
Eleanor Currie, Principal Manager, (Finance)
Raymond Lynch, Senior Manager (Legal Services)
Linda Taylor, Team Manager, Litigation (Legal Services)
Karen Andrews, Team Manager (Governance)
Shannon Wilson, Committee Services Officer 
1. Apologies for Absence 
There were no apologies. 
2. Declarations of Interest 
There were no declarations of interest in terms of Standing Order 7.2 and Section 5.14
of the Code of Conduct for Members of Devolved Public Bodies. 
3. Minutes 
The accuracy of the Minutes of the meeting held on 14 December 2023 were
confirmed and the Minutes signed in accordance with Paragraph 7(10 of Schedule 7
of the Local Government (Scotland) Act 1973. 
3.1  Matters Arising from the Action Note 
Updates in terms of the Action Note were detailed as follows: 
• Director’s Report: Community Mental Health Fund – Scheduled for May
2024.
• Director’s Report: Audit Scotland report - Update scheduled for May 2024.
• Chief Social Work Officer Annual Report: Justice Services Update – Update
scheduled for June 2024. 
4. Director’s Report 
Submitted report by Caroline Cameron, Director (NAHSCP) on the developments
within the North Ayrshire Health and Social Care Partnership. 
The report provided an update on the following areas: 
• the National Care Service;
• publication of the Whole Family Wellbeing Funding (WFWF) Year 1 Report;
• the consultation on draft statutory guidance on Part 2 and Part 3, Section 18 of
the UNCRC Act running until 26 May 2024;
• the consultation on the Terrorism (Protection of Premises) Bill, also known as
Martyn’s Law running until 18 March 2024;
• the Public Health Scotland baseline evaluation findings as part of the wider
National Drug Deaths Mission;
• the draft Community Justice Outcomes Improvement Plan 2024-29;
• the Break the Silence local charity providing support to people affected by
Childhood sexual trauma;
• progress in terms of the North Ayrshire Care at Home Service Delivery;
6

Page 7

• the commendable outcome in relation to a recent joint inspection of the adult
support and protection work across; and
• grant funding for projects which reduce drug and alcohol related harms. 
A member asked a question and was provided with further information in relation to
premises within North Ayrshire which may be affected by Martyn’s law and whether a
consultation response was submitted. 
Noted. 
5. Appointments 
Submitted report by Caroline Cameron, Director (NAHSCP) on the recent
appointments and changes to the IJB and IJB Performance and Audit Committee
membership. 
The report detailed information as follows: 
• Councillor Nairn McDonald’s appointment to both the IJB and IJB PAC as a
replacement for Councillor Robert Foster; and
• an expression of interest from Tom Hopkins, NHS Ayrshire and Arran to sit on
the IJB PAC. 
The Director further advised: 
• that one vacancy still remained on the IJB PAC
• a Voting Member replacement would be identified for Christie Fisher in due
course and
• discussions were ongoing in terms of staff representations on the IJB. 
The Board agreed (a) to approve the recent changes to Membership as indicated
within the report; and (b) otherwise, to note the terms of the report. 
6. Self Directed Support Learning Review (Phase 2 – Implementation) 
Submitted report by Scott Hunter, Chief Social Work Officer on the implementation of
Phase 2 of the review of activity to improve the application of Self Directed Support in
North Ayrshire. 
Members asked questions and were provided with further information in relation to: 
• progress made in implementing funded care for island residents; and
• the action plan for staff training. 
The Board agreed to (a) note the development work ongoing to improve choice,
control and flexibility in the delivery of Social Work services; and (b) endorse the
approach designed to focus on outcomes and implement the necessary change. 
7. 2023 – 2024 Month 10 Financial Performance 
Submitted report by Paul Doak, Head of Service (HSCP Finance and Transformation),
on the IJB’s financial performance as at month 10 (January).  Appendix A to the report
7

Page 8

detailed the financial overview of the Partnership position, while Appendix B provided
an overview of those service changed which did not have financial savings attached.
Appendix C highlighted the movement in the budget position following the initial
approved budget. 
Members asked questions and were provided with further information in relation to: 
• the potential risk of the Health Board setting a savings target; and
• whether the increased annual cost justifies a business case. 
The Board agreed to note (i) the overall integrated financial performance report for
the financial year 2023-24 and the current overall projected year end overspend of
£4.171m, (ii) the progress with delivery of agreed savings, (iii) the actions being taken
to progress financial recovery, and (iv) the remaining financial risks for 2023-24; and
(b) approve the budget reductions set out at section 2.10 of the report. 
8. Revenue Budget 24-25 and Beyond 
Submitted report by Paul Doak, Head of Service (HSCP Finance and Transformation),
on the financial position for the Partnership for 2024-25, including the proposed
delegated funding, services budget pressures, plans developed to set a balanced
budget and the associated risks.  Appendix A to the report provided a summary of the
2024-25 budget and the net budget increase while Appendix B provided information
on service pressures.  Savings in relation to NAC and NHS commissioned services
were detailed in Appendic C to the report with Appendix D detailing the Scottish
Government finance Settlement letters. 
Members asked questions and were provided with further information in relation to: 
• the potential risk of the Health Board setting a savings target;
• the communication plan to inform staff on the current financial position; and
• a future review of figures to potentially improve the reserves position. 
The Board agreed (a) to approve (i) the budget for 2024-25 for the Partnership
inclusive of all pressures, savings and reserves while noting that the funding position
is subject to confirmation by NHS Ayrshire and Arran and (ii) the new hourly rates for
commissioned providers and Personal Assistants; and (b) otherwise, to note the risks
associated with the budget. 
9. Transformation Plan 2024-27 
Submitted report by Lee Ballantyne, Senior Manager (Strategic Planning and
Transformation on the Transformation Plan 2024-2027.  The full Plan was detailed at
Appendix 1 to the report. 
8

Page 9

Members asked questions and were provided with further information in relation to: 
• input from the third sector organisations who deliver children’s services across
North Ayrshire; and
• the ambition of the plan to assist in overspend reduction to reach a balanced
budget. 
The Board approved the Transformation Plan 2024-27 set out at Appendix 1 to the
report. 
10. Unscheduled Care Plan 
Submitted report by Kerry Logan, Head of Service (Health & Community Care) 
on performance in relation to Unscheduled Care in Ayrshire and Arran, highlighting
areas of risk and detailing an update on the progress of winter plans and actions being
progressed to reduce delays and unmet need within the North Ayrshire Health and
Social Care Partnership’s Community Care Services.  Full detail on the plan and
performance was detailed in Appendix 1 to the report. 
Members asked questions and were provided with further information in relation to: 
• the plan in place around Acute services and how this was addressed;
• the impact and success of advertising campaigns for the community to assess
whether a visit to A&E was required;
• the focus on adults with incapacity and the work and advertising campaigns
undertaken to ensure that early intervention takes place where necessary;
• the frequency which the discovery debrief was updated and reissued;
• people choosing not to attend A&E until they had been unwell for some time
and eventually requiring to be hospitalised for treatment; and 
• work undertaken to address access to services within the community and
outpatient appointments to potentially alleviate the pressure on A&E. 
Noted. 
On behalf of the Committee, the Provost, with the permission of the Chair, wished
Louise McDaid a happy retirement, expressing gratitude for her input in the Integration
Joint Board and highlighting her pragmatic questioning, staff focus and strong desire
to see success and improve staff and service delivery for service users. Councillor
Johnson, Chair, presented Louise with flowers and on behalf of the Committee
expressed her gratitude for the contribution she had made to the Integration Joint
Board. 
11. Urgent Items 
There were no urgent items. 
The meeting ended at 12:35pm 
9

Page 10

North Ayrshire Integration Joint Board – Action Note 
Updated following the meeting on 14 March 2024 
No. Agenda Item Date of
Meeting
Action Status Officer
1. Director’s Report 12/10/23 Communities Mental Health Fund - The
Impact Report for Year 1 and Interim Report
for Year 2 to a future meeting. 
Scheduled for May 2024.  Vicky Yuill
2. Director’s Report 12/10/23 Audit Scotland report for the Auditor
General of Scotland and the Accounts
Commission on Access to Mental Health
Services - a report would be brought to a
future meeting to consider the
recommendations
Scheduled for May 2024.  Caroline
Cameron/
Thelma Bowers
3. Chief Social Work Officer Annual
Report 2022/2023
12/10/23 Justice Services update report to be
brought to a future meeting.
Scheduled for June 24  Elizabeth
Stewart 
10

Page 11

Integration Joint Board
9th May 2024
Subject : Community Nursing Transformation Update
Purpose : • Awareness 
Recommendation : It is recommended that IJB Note the progress of the outputs from
the Community Nursing Review whilst noting the current identified
risks. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
NMaHP Nursing, Midwifery and Health Professions
CTAC Community Treatment and Care
ICT Integrated Care Teams
GPn General Practice Nursing
ANPs Advanced Nurse Practitioners 
1. EXECUTIVE SUMMARY 
The Community Nursing review, which took place late 2021/early 2022, reviewed the
community nursing care models being delivered across Ayrshire and Arran with the
aim to develop care models which meets the needs of the changing demographics.  
This review covered 24 hour/7 day per week community nursing services. 
Through the Pan Ayrshire Community Nursing Governance Group we have been
progressing the work identified through the four main recommendations of the review: 
new models of care; workforce planning and workforce competence; IT and Digital;
and governance. 
This update information was tabled at Ayrshire and Arran’s Health and Care
Governance Group on 6 November 2023.  It has already been shared with East IJBs
and will be shared at a future South IJB meeting. 
2. BACKGROUND 
Agenda Item 4
11

Page 12

2.1  Demand for our health and care services is ever-increasing as people live longer,
often living with multiple long-term conditions, reduced independence and
increasingly complex needs for health, care and social support. 
The “Transforming Nursing, Midwifery and Health Professions’ (NMaHP) Roles:
pushing the boundaries to meet health and social care needs in Scotland - The
District Nursing role in integrated community nursing teams” (2017) document
outlines what is required to enable Community Nurses to support the shifting the
balance of care from hospital to community and primary care settings.   
To deliver on the Transforming Nursing and Caring for Ayrshire agendas it requires
new and innovative ways of working. This includes more joined-up, collaborative
ways of working which provides seamless interfaces with other professionals and
services. 
The Community Nursing review commenced in September 2021 with a focus on the
current nursing care delivery models across Ayrshire and Arran with the aim to
develop a model which better meets the changing needs of the people in our
communities.  Related to this, the review highlighted the need for improved
workforce planning with clear career progression pathways for both registered and
unregistered staff. 
The review included all levels of Community Nursing staff (in hours and out of hours)
across teams within District Nursing, Primary Care, Community Treatment and Care
(CTAC), Integrated Care Teams (ICT), General Practice Nursing (GPn) and
Community Advanced Nurse Practitioners (ANPs) across NHS Ayrshire & Arran.   
There is a Pan Ayrshire and Arran Community Nursing Governance group with four
main subgroups progressing the four main themes of the review: 
• New models of care;
• Workforce planning and workforce competences;
• IT and digital systems to support clinical care;
• Improved governance. 
2.2 Community Nursing Review Update 
Over the last year, not only have our front line clinicians explored new and
innovative ways of designing and delivering our health and care services, but our
administrative team members, Caring for Ayrshire Quality Improvement team and
Programme Management have been key in supporting the rollout of the outputs from
the review.   
Each of the four work streams have a work plan which feeds into the main
Community Nursing Governance group, and the management representatives from
the Health and Care Partnerships (HSCPs) are responsible for communicating this
work into their governance arrangements. 
12

Page 13

The main areas within each of the work plans will be summarised, with examples of
developments and the impacts being reported for each of the four areas.  Many of
the developments are led by one sub group but will impact on others, for example
ReSPECT (Recommended Summary Plan for Emergency Care and Treatment) sits
within the IT and Digital subgroup but will have implications for new models of care,
workforce related to staff training and supervision and governance due to the need
to audit the quality of the plans and measure the impact to patients and their
families/carers.  
2.3 New models of Care: 
The following is a summary of the main topics which short life working groups are
progressing – 
Referral criteria to District Nursing document have been agreed; 
• The ratified lower leg wound Standard Operating Procedure with progression
to audit development in partnership between Podiatry and Community
Nursing;
• Progressing the administration of IV antibiotics/ fluids by community nurses 
• within people’s homes;
• Diabetes care – Short life working group is in place to improve processes, 
including when patients are admitted or discharged from acute hospital sites; 
• Continence Care – update training programmes being developed and referral
data is being reviewed;
• Catheter care – A short life working group has been set up with the aim of
identifying the number of catheters in situ, reduction in cost and infection
rates.  They will also provide guidance on learning, supervision and
standardising care; 
• Adherence to a wound formulae and electronic PECOS ordering of wound 
• dressings;
• Advanced Nurse Practitioner role in Care Homes around team around the
person and future care plans;
• District Nurse Specialist Practitioner role;
• Antimicrobial prescribing;
• Further developing the role of Community Nursing in Palliative and End of Life 
Care. 
Example of New Models of Care work being progressed: PECOS 
A joint initiative, between Pharmacy and Community Nursing, is progressing the
adherence to a wound formulae and electronic Professional Electronic Commerce
Online System (PECOS) ordering of wound products.  NHS Fife and NHS Tayside
have been using PECOS to order both wound products and catheter supplies for a
number of years.  They have demonstrated cost efficiency and reduction in waste by
13

Page 14

changing the way that dressings are supplied to patients by district nurses, treatment
room nurses in GP practices and Care homes by ordering through PECOS.  Only
formulary items are available via the PECOS system thus improving formulary
compliance which promotes safe and effective care. 
The main staff advantages identified from the Fife experience included stock
delivered to base, no prescription writing, no waiting for GPs to sign prescriptions,
monitoring of dressing usage, improved budget control, right product right time. 
NHS Ayrshire & Arran spend in 2020/21 on these products was:- 
• Wound Management Dressings £1.695M.
• Catheters/Bags/Sheaths/accessories spend £1.726M. Of this catheters spend
is £1.208M. 
A small test of change with two District Nursing Teams in South HSCP commenced
in October 2023.  Since then this process of ordering wound products has been fully
rolled out in South HSCP and underway in East Ayrhire.  Roll out for North HSCP is
planned from July 2024 (North Coast - July, Irvine - August, Kilwinning/Garnock
Valley - September and Three Towns - October).  This work is being supported by
the recruitment of a band 7 nurse who has been funded from Pharmacy but
managed within Community Nursing.  Data has been gathered to show prescription
spending over the last four years and PECOS spending will be added to this in order
to identify any savings (see tables below). 
14

Page 15

2.4 Workforce Planning/Competency 
The following is a summary of the main topics which short life working groups are
progressing – 
• Job description and person specifications for all bands of staff have been
reviewed and in draft form to ensure consistency.
• The development of competency frameworks for all levels of staff using
national frameworks are being progressed;
• Piloting different shift patterns to support retainment of staff, skills mix,
equitable training access and balance of workload.  Changing the shift
patterns also helps prevent delays in District Nurse responses to patients,
especially those who are palliative, during the transition from “in hours” to “out
of hours” teams and vice versa;
• Exploring the use of recruitment videos to increase the pool of people
applying for community posts;
• Developing a range of supervision models to ensure safe and effective care;
• Career pathways for both registered and unregistered staff;  
• Exploring a mentoring role for individuals transitioning into promoted posts by
individuals leaving senior posts for retirement;
• Reviewing the Community Treatment and Care (CTAC) Educator Role;
• Workforce planning – a short life working group is in place.  They are
reviewing workforce profiles as well as public health population demographic
information.  In addition, the impact of the shorter working week on meeting
the demands of the workload will be explored. 
15

Page 16

Example of workforce planning/competency work being progressed: different shift
patterns- 
The test of change commenced formally in September 2023 for a period of 3
months.  Six staff from the clinical team agreed to be included in this initial test of
change.  Staffing ratios are being monitored on a daily basis. The outcomes of this
test, including any benefits to both patients and staff, will be brought to the
Community Nursing Governance group in early 2024 for agreement for next steps. 
The table above demonstrates that out of 26 data points, 13 of those were related to
higher than average (n:3) staffing ratio at four staff per shift.  Eight data points were
related to lower than average staffing ratio however four of these specific data points
were weekends when staffing levels typically drop to one staff member per shift. 
The initial feedback from the staff involved in this test of change is extremely positive
and other areas are keen to review the outcome findings in early 2024.   
Example of workforce planning/competency work being progressed: introduction of
band 7 District Nurse Specialist Practitioner (DNSP) posts- 
Workforce is one of them main work-streams of this programme to ensure we
continue to deliver safe and effective care.  One of our aims is to have clear career
pathways for both registered and unregistered staff.  From a registered nurse
perspective, a direct outcome of the Community Nursing review was the introduction
of band 7 District Nurse Specialist Practitioner (DNSP) posts to limit the number of
people on the caseloads having to be admitted to acute hospitals for care and/or to
16

Page 17

promote quicker discharges: these specialist, generalist nurses have advanced skills
to provide complex care at home.  We recognised that the band 7 Clinical Team
Leaders, whilst supporting clinical demands, also had large operational/staff
management responsibilities which can impact on the time they have to support the
most vulnerable/complex patients on the DN caseloads.  This along with the
changing demographics of our populations and the number of band 6 who had
completed Specialist Practitioner course who then left their post for promoted band 7
posts out with the District Nursing teams influenced the introduction of the DNSPs. 
The DNSPs have been introduced in Out of Hours, East and South HSCP. 
2.5 IT and Digital 
The following is a summary of the main topics which short life working groups are
progressing – 
• The development of Single Point of Contacts in the HSCPs resulting in patient
and their carers now speaking with a person instead of leaving voice
messages;
• A change to the management of referrals onto EMIS Web. 
• The use of Trakcare for receiving referrals from Acute and Community
Hospital sites has been introduced;
• Clinical photography Standard Operating Procedure (SOP) developed and
ratified by all relevant stakeholders ahead of introduction of new wound
management application to support clinical treatment plans;
• Streamlining the process of information sharing between DN day services and
out of hours teams;
• Blood sampling labelling issues have been resolved;
• Improved access to Community Nursing information for both public and staff –
an AthenA site has been identified for staff and the Ayrshire and Arran public
facing website will be used for members of the public;
• GP Electronic Referrals (East) – test of change - Only 2 GP practices have
not participated in testing referrals to DN service via e-form and email to
clinical mailbox 
Example of IT/digital work being progressed: changes to management of referral
process
• The move from Netcall to admin colleagues providing a “live” call service has
resulted in excellent feedback since both a service user and staff perspective.
It has improved patient experience, with 12-15% of patients who have called
in being dealt with at point of call and this has resulted in additional time being
released for the nursing teams to provide care.  The below table
demonstrates the percentage of live calls taken by SPOC in the first 3
months.  
17

Page 18

In early October 2023, positive feedback was received via a District Nurse from a
palliative patient’s family about how the SPOC admin team supported them during a
very challenging and upsetting time. The family member said 
“every single person she spoke to on the phone were very supportive, kind and
made her feel at ease when she was looking to get in touch with the DN Team
urgently (she mentioned ****** name a couple of times too). She wanted to pass on
how greatly appreciative her and the family are. 
18

Page 19

Example of IT/digital work being progressed: changes to management of referral
process 
North HSCP have been piloting the management of referrals on EMIS Web. A staff
survey was carried out which found an improvement in the quality of information
contained within referrals and reduction in the number of tasks being responded to,
which in turn have released time to care for nurses.  The below table demonstrates
the clinical time saved by admin colleagues changing the way they processed
referrals. 
Example of IT/digital work being progressed: Trakcare 
South HSCP have rolled out the use of Trakcare for receiving referrals from Acute
and Community Hospital sites. Time has been saved both for admin staff and District
Nurses and is demonstrated in the below table. 
Beith/Dalry/Kil
Saltcoats go live
Cumbrae/Largs
/Skelmorlie /West
Kilbride go live
Bourtreehill go live
Ardrossan go live
Ballot
Road/Kilwinning go
live 0
100
200
300
400
500
Minutes
Time saved for District Nurses following introduction of
new management of referral process
time saved (4 mins per referral) Median
NB:  median is calculatedfrom 2/6/23
19

Page 20

A staff survey was carried out which found an improvement in the quality of
information contained within referrals and reduction in the number of tasks being
responded to, which in turn have released time to care for nurses. 
2.6  Governance   
This sub group is focusing on the professional governance structure for community
nursing, which ensures consistency of agenda, framework, report templates and
frequency of reporting.   
The following is a summary of the main topics which short life working groups are
progressing –  
• Development of Clinical Supervision - Plan to implement supervision along
with the time lines and trajectories of NMAHP strategy and implementation of
the National policy;
• Aligned Budget Codes - to support Nursing leaders to align their Budgets to
allow accurate workforce reports;
• Monitoring Arrangements - Develop process for real time escalation of risk.
Develop and agree reporting mechanisms and standardised reporting
template. Agree our standards for audit, audit tool and how data will be
recorded. Develop dashboard for community nursing;
• Developing a process and Standard Operating Procedure for real time staff
escalation needs;
• Staff Governance and Support - Implementation of appropriate standards for
team meetings. Appraisals, one to one meetings, Psychological safety
20

Page 21

questionnaires, NES safety cards Professional. Clinical and professional
supervision.
3.  PEOPLE WHO USE SERVICES AND CARERS IMPLICATIONS   
3.1  With an increasing amount of health and social care being delivered at community
level, we recognise that our community nurses are pivotal in providing health care
services communities want and need. Staff recognise that change is necessary to
meet ongoing changing health needs to ensure the right care is delivered in the right
place at the right time.
3. PROPOSALS 
3.1 For the IJB member to recognise the progress of the outputs resulting from the
Community Nursing Review whilst noting the current identified risks. 
3.2 Anticipated Outcomes 
With the complexity of health care needs in our communities, we are having to
transform our nursing teams in order to meet these needs to promote people getting
the right care, at the right time, by the right person. 
Also with the extended clinical skills of community nurses there should be a reduction
in work for our primary care colleagues for patients on the district nursing caseloads. 
3.3 Measuring Impact 
Impact measures have been identified in all community nurses developments and
pilots following the Community Nursing review.  Some of these have been illustrated
earlier in this paper. 
Through the Community Nursing Governance sub group on going quality and care
measures are being scoped in order assurance can be provided and reported on. 
It is the intention that as a minimum, a yearly Community Nursing governance paper
will be shared with each of the IJBs through their Health Care governance
arrangements.
4. IMPLICATIONS 
4.1 Financial
Currently there are no cost implications for the work from the community nursing
review.  To date, all the work has been done within existing budgets. However, as the
balance of care continues to shift into community and homely settings there will be a
future need for additional resources within community nursing.
4.2 Human Resources
There are no direct Human Resource implications arising from this report.
4.3 Legal
There are no direct legal implications arising from this report.  However given the
Community Nursing review was based on Caring for Ayrshire and the National
Transforming Nursing roles papers, there are policy implications.  The Pan Ayrshire
21

Page 22

Community Nursing Governance group oversees the outputs of the review and
reports to each of the three HSCPs through the membership of the group and
through formal IJB update reports.  
4.4 Equality/Socio-Economic 
There are no direct Equality implications arising from the report. 
4.5 Risk
The risks identified as part of the current works are: 
i. Issues with staff recruitment and retention of staff;
ii. Information related to prescribed medications by Community Nurses not
always being available due to EMIS access issues;
iii. Risk associated with the current ways Community Nurses have to record care
and also connectivity issues. Associated to this IT risk relates to cost
pressures, for example android phones supplied by the organisation are
required for nurses to take clinical photographs;
iv. Increased community nursing activity within an environment of reduction in
NHS staffs’ working week.
4.6 Community Wealth Building
Community Nurses are key in ensuring people are cared for within their own homes
through the care they provide as also role within the multi-disciplinary team.  Being
aligned to GP surgeries allows the nurses to know what is available in community they
work in therefore accessing local services, statutory and voluntary, to meet the holistic
needs of their patients.
4.7 Key Priorities
To continue to engage with our patients, families, the multi-disciplinary team, wider
teams and local communities to promote the wellbeing of patients, including to ensure
a good life and good death.  
5. CONSULTATION 
Consultation for the Community Nursing review is detailed in the pages 17-24 in
appendix 1.  Consultation with HSCP community nurses is ongoing through the Pan
Ayrshire Community Governance group and its subgroups with managers within each
of the HSCPs linking in through their local governance and communication channels.   
Dalene Steele (Associate Nurse Director, EAST) and 
Kerry Logan (Head of Service, Health and Community Care – NORTH) 
dalene.steele@aapct.scot.nhs.uk and klogan@north-ayrshire.gov.uk 
Appendices
• Appendix No1, Community Nursing Review 
22

Page 23

1 of 33
Corporate Management Team (CMT) SBAR 
DATE 
Subject: Community Nursing Review
Author(s): Dalene Steele, Associate Nurse Director 
Situation
1.1 A Community Nursing review (appendix 1) took place during September and October
2021 with a focus on the current nursing care delivery models across Ayrshire and
Arran with the aim to develop a model which better meets the needs of our changing
demographics and also to support improved workforce planning with clear career
progression pathways. 
Background
2.1 Demand for our health and care services is ever-increasing as people live longer
but are often now living with multiple long-term conditions, reduced
independence,nd increasingly complex needs for health, care and social support. 
The “Transforming Nursing, Midwifery and Health Professions’ (NMaHP) Roles:
pushing the boundaries to meet health and social care needs in Scotland - The
District Nursing role in integrated community nursing teams” document outlines
what is required to enable  to Community Nurses to support the shifting the
balance of care from hospital to community and primary care settings. 
To deliver on the transforming nursing and Caring for Ayrshire agendas it
requires new and innovative ways of working. This includes more joined-up,
collaborative way of working which provides seamless interfaces with other
professionals and services. 
The age profile of our Community Nursing workforce and the high turnover of
band 6 District Nurses, especially those who had been supported by NHS
Ayrshire and Arran to complete the Specialist Practitioner Qualification (District
Nurse) course, was observed by the author and was one of the main reasons for
requesting this review to be commissioned. 
Assessment 
3.1  Shifting the balance of care will allow more of our 65+ population to remain at
home and receive care and treatment there and fits with Caring for Ayrshire. 
‘Transforming Nursing, Midwifery and Health Professions’ (NMaHP) Roles:
pushing the boundaries to meet health and social care needs in Scotland - The
District Nursing role in integrated community nursing teams’ outlines the
23

Page 24

2 of 33
proposed District Nursing role in the wider transformational change agenda in
health and social care in Scotland. 
Engagement with all levels of Community Nursing staff (in hours and out of 
hours) was facilitated through virtual focus groups and a questionnaire
developed with support from NHS Ayrshire and Arran’s engagement team.  The
questionnaire was sent to staff working in District Nursing, Primary Care,
Community Treatment and Care (CTAC), Integrated Care Teams (ICT) and
Community Advanced Nurse Practitioners (ANPs) across Ayrshire & Arran. 
The findings of the review concluded the following four main themes:
• Implement a new model of care;
• Review of workforce planning and establishment of a 3 year workforce
plan;
• Establishment of robust governance structures;
• IT and digital systems to support clinical care. 
Recommendation
4.1 For CMT to endorse the recommendations of the Community Nursing review; 
4.2      To agree a support resource to take forward the findings of the review; 
4.3        For the 2021/22 second increment of Scottish Government’s District Nurse uplift     
investment to be used across all areas (HSCPs and Out of Hours) for Band 7 
Clinical posts; 
4.4       To share the Community Nursing review with all stakeholders. 
24

Page 25

3 of 33 
Ayrshire & Arran
Community Nursing Review
September/October 2021 
25

Page 26

4 of 33 
Section  Page number 
Aim and Methods  3
Timescale  3
Background  4-5
Current Workforce
- Whole Time Equivalent Resource
- Age Profile 
5-6
Health Needs of the Population  6
Nursing Roles  7
Stakeholder Engagement  7-14
Recommendations  15-16
Reference documents
• Appendix 1 - Workforce analysis 
• Appendix 2 - Agenda/questions
virtual focus groups 
• Appendix 3 - Feedback from virtual
focus groups
17-31 
26

Page 27

5 of 33 
Aim of the work:- 
To review current care models delivered in the community across Ayrshire to develop
a model which meets the needs of the changing demographics. This will take into
account District Nursing (DN), Advanced Nurse Practitioners (ANPs), Intermediate
Care Teams (ICT), and Community Treatment and Care Teams (CTAC) spanning
Ayrshire and Arran. Administration staff supporting these services will also be
included. The review will consider all resources over the 24 hour period, i.e. in hours
and out of hours services. 
With more and more health and social care being delivered at community level, it is vital that
health and social care staff in the community are supported to provide the services
communities want and need. Staff recognise that change is necessary to meet ongoing
health needs. They also recognise that while change is often challenging, it presents
opportunities. 
Caring for Ayrshire is an exciting and ambitious 10 year programme that will transform health
and care services across Ayrshire and Arran. The vision is that care shall be delivered as
close to home as possible, supported by a network of community services with safe, effective
and timely access to high quality specialist services for those whose needs cannot be met
in the community. The programme will explore new and innovative ways of designing and
delivering health and care services. 
This review will propose a new service delivery model for communities of Ayrshire & Arran
that aims to meet the challenges we face now, and will face in the future. 
Methods
Stakeholder engagement is central to this review. Virtual focus groups were undertaken with
over 50 staff members. In addition, a questionnaire survey was sent to all community nursing
staff to allow them the opportunity to contribute. 
National guidance has been reviewed to offer a perspective on the national direction
ensuring Ayrshire & Arran is aligned to that. 
Timescales 
Time period Activity
13/09/21 – 20/09/21 Collate details of all community nursing teams -
DNs, CTAC, ICT, ANPs
20/09/21 – 20/10/21 Workforce analysis
27/09/21 – 11/10/21 Virtual focus groups with staff/discussions with
staff regarding their ideas for improvement 
08/10/21 – 22/10/21 Development of questionnaire to all staff/
distribution of questionnaire
11/10/21 – 18/10/21 Review CNO document ‘Transforming Roles’
considering new, innovative roles
Write up findings and recommendations for
comments 
Week beginning 25/10/21 Submission of findings 
27

Page 28

6 of 33 
Background
The coming decades will see a rise in the number of older people, many of whom will have
a long-term condition, and a fall in numbers of people of working age. Action is needed now
to prepare a health care workforce to meet the challenges of delivering a community nursing
service for people of all ages in the future. 
We have changing demographics - people are living longer but are more unwell for longer.
Demand for our health and care services is ever-increasing as people live longer but are
often now living with multiple long-term conditions, reduced independence, and increasingly
complex needs for health, care and social support. 
The percentage of the population that is aged 65+ across Ayrshire (including each local
authority areas) is higher than the national average. In recognition of this, there is a
comprehensive Frailty programme spanning primary care, community and acute settings.
Within Ayrshire and Arran we already offer a wide range of health and care services in our
communities so that people have access to the healthcare they need as close to their home
as possible. However, many people are still unaware of the wide range of health and care
professionals they can seek help and support from. As a result, the demand on GP time and
the number of people attending our Emergency Departments continues to increase, often
resulting in waiting times that are longer than we would like. We need to look at how we can
better support people to access the health and care services they need at the right time and
in the right place. 
Hospital is not always the best place to provide care. Evidence shows that the best place
for people to recover is at home or within a homely setting. Long stays in hospital negatively
impact on a person’s ability to return to normal activity, particularly for older people. We
know that all three local authority areas in Ayrshire have a significantly higher rate of multiple
hospital admissions (65+) than other areas, with an increasing trend in admissions.  We
need to look at different ways to deliver care in the community so that long stays in hospital
are the exception and not the norm.
The pandemic has led us to use technical and digital solutions at times in order to continue
delivering care within the constraints thrust upon us. These new ways of working will be
considered during this review to ensure we are making full use of the technical and digital
solutions available. 
Sustainable and vibrant services within communities is key to the future of health and social
care delivery. At the same time, the needs of patients and families are changing as they
become increasingly active participants in their own care or the care of loved ones. With this
comes a need to ensure that all health and social services are planned and delivered with
the needs of users, rather than providers, in mind. It also requires a move to re-focus all
health and social care services on the enablement of patients and carers. 
The Public Bodies (Joint Working) (Scotland) Act 20141 sets out the policy and procedures
for integrated services to improve the wellbeing of people in Ayrshire & Arran. The aim is to
better support those who use health and social care services, particularly those whose
needs are complex and involve support from health and social care at the same time. In
addition the act seeks to develop further the provision of preventative and anticipatory
approaches.
28

Page 29

7 of 33 
Transforming Nursing, Midwifery and Health Professions’ (NMaHP) Roles: pushing the
boundaries to meet health and social care needs in Scotland - The District Nursing role in
integrated community nursing teams2 outlines what is required to shift the balance of care
from hospital to community and primary care settings. Delivering on these aims requires
new and innovative ways of working. A more joined-up, collaborative way of working is
needed which provides seamless interfaces with other professionals and services. 
Community nursing services have much to offer in realising this vision and responding to
the challenges associated with caring for an ageing population. However, new ways of
working are highlighting the need for a wider range of skills and knowledge across district
nursing teams, from appropriately prepared and supervised health care support workers and
assistant practitioners to registered nurses working from level 5 through to advanced practice. 
Description of Current Workforce and Current Service Provision 
Workforce analysis for District Nursing, ANPs, CTAC, and ICT - all teams across each
partnership has been undertaken by Linda McLaughlin, Workforce Staffing Lead. This is
appended to this report. Appendix 1 outlines the compositions of all community teams along
with all leave and sick leave for each team. 
Whole Time Equivalent (WTE) Resource
There is a significant resource working in communities across Ayrshire & Arran. 
The total WTE across Ayrshire & Arran for registered nursing staff is in the region of 253.95
WTE.
The total WTE across Ayrshire & Arran for non-registered nursing staff is in the region of
74.21 WTE. Figure 1 below outlines the WTE resource in each partnership across banding
levels 2 - 8A. 
Figure 1 - WTE Resource 
WTE 
Band
8A
Band
7
Band
6
Band
5
Band
4
Band
3
Band
2
East Ayrshire H&SCP 1.60 5.40 11.00 46.00 0 25.00 5.00
North Ayrshire H&SCP 1.00 8.00 11.00 73.00 0 22.00 0
South Ayrshire H&SCP 1.00 4.00 12.00 61.00 2.00 20.00 4.00 
Total 3.60 17.40 34.00 180.00 2.00 67.00 9.00 
Age Profile 
The age profile of staff highlights that, in some areas, the percentage of staff over 50 years
old is high, i.e. 88% of band 7s in North Ayrshire are over 50; 67% of band 7s in South
Ayrshire are over 50; 67% of band 8As are over 50 in East Ayrshire; 63% of band 3s are
over 50 in both East and South Ayrshire. 
29

Page 30

8 of 33
Figure 2 - Age profile of community nursing resource 
Please note that due to the inaccuracy of Cost Centre data, information required to
be pulled manually 
In terms of registered staff, the forthcoming changes in pensions in March 2022 may have
a bearing on some staff retiring earlier than expected. The age profile, and contingencies
for an ageing workforce who are close to retirement age, should be taken into consideration
in the development of a sustainable workforce plan. 
Health Needs of the Population
When compared to national averages, we know that Ayrshire has an older population (aged
65 years and over) than Scotland. During the pandemic we have heard feedback from staff
to indicate that older people have become frailer and have increased rehabilitation needs. 
A review of data also shows that the Ayrshire population of people aged 65 and over are
more likely to have multiple hospital admissions than their counterparts across Scotland. 
Shifting the balance of care will allow more of our 65+ population to remain at home and
receive care and treatment there. 
Population 65+ - The percentage of the population that is aged 65+ across Ayrshire
(including each local authority areas) is higher than the national average. 
Multiple Hospital Admissions - All three local authority areas have a significantly higher
rate of multiple hospital admissions (65+), with an increasing trend in admissions. 
East
Ayrshire
North
Ayrshire
South
Ayrshire
Scotland Time
period
Mid-year population estimate
- aged 65+ (NRS**)
20.45% 22.66% 25.53% 19.11% 2019
Multiple emergency hospital
admissions, aged 65+ (Public
Health Scotland/ISD)
6812.87
per
100,000
6259.98
per
100,000
6705.65
per
100,000
5455.96
per
100,000
2017-
2019
For both of these reasons, it is acknowledged that changes are required in our ways of
working. 
Nursing Roles
Review of national guidance ‘Transforming Nursing, Midwifery and Health Professions’
(NMaHP) Roles: pushing the boundaries to meet health and social care needs in Scotland
- The District Nursing role in integrated community nursing teams’ outlines the proposed
District Nursing role in the wider transformational change agenda in health and social care
in Scotland. 
It highlights that integrated community nursing teams will play a key role in planning,
providing, managing, monitoring and reviewing care, building on current roles and best;
practice to meet the requirements of people with more complex health and care needs in a
range of community settings. 
30

Page 31

9 of 33 
The embedded document sets out responsibilities and roles in the wider community nursing
team, with examples of levels of knowledge and skills from healthcare support worker level
to advances practitioner. The framework is organised around the four pillars of practice -
clinical practice, facilitation of learning, leadership, and evidence, research and
development. 
Stakeholder Engagement 
Virtual focus groups were undertaken over a 2 week period. From staff working at band 3
level to Senior Nurses, over 50 staff members participated in a virtual focus group. The
agenda and themes from each of these focus groups are appended in Appendix 2. 
A questionnaire was also developed with the support of our Engagement Team. The link to
the questionnaire survey was sent to all staff working in District Nursing, CTAC, ICT, ANP
services across Ayrshire & Arran. A total of 117 completed responses were received. The
responses have been collated into a 60 page report. It is too lengthy to append to this report
but is available to all should you wish to read it. 
Contributions from community staff have been fantastic - there is a strength of feeling which
is palpable and a desire to ensure community services are the best they can be. 
What did stakeholders feedback? 
Firstly, staff taking part in the virtual focus groups reported that COVID had given the
opportunity for the development of stronger working relationships between individuals and
teams. There had been increased cross boundary working and good, collaborative links
made between teams and services. 
Healthcare Support Workers indicated that they felt they were an integral part of the DN
team, and very much trusted and valued by their nursing colleagues. They provided each
other with a high level of support and were there for their team members, to listen and look
after each other. 
The themes which emerged during the virtual focus groups were:- 
Communication - between individuals and different teams/services. Whilst there were
some positive elements and examples offered regarding practice during the
pandemic, there were some aspects which could be improved upon. 
“Lack of communication between teams and repetitive visits by more than one team could
be more stream-lined, freeing up staff rather having more than one nurse visiting, share
nursing duties / responsibilities instead of referring onto other nursing colleagues”. 
“There is inequity across the three partnerships and AUCS, due to the fact we are not one
discipline and managed accordingly; there are differences across teams and information is
not cascaded timeously to all staff”. 
CNO Transforming
Nursing Roles.pdf
31

Page 32

10 of 33
Workload - excessive caseloads with a need for consistent ways of working,
streamlining of current processes. 
“The DN service delivers best care, prioritises patient care over taking breaks, starting early
and finishing late”. 
“We are very responsive/accessible, take referrals from anyone, we know our communities
well and in my opinion, patients get a very good service”. 
“Huge lack of investment in district nursing, understaffed, poor skill mix”. 
“Poor management, lack of safe staffing, lack of time for training and documentation.
Ongoing problems of this kind for more than 5 years so staff are burnt out and leaving
because of this”. 
“On Arran, the service has been beset by chronic recruitment issues, limiting services and
putting a great deal of pressure on the remaining team who are doing an excellent job with
the time they have. There is no overnight nursing care on Arran, despite growing demand
and an ageing demographic, and this is resulting in poor care or a lack of care particularly
for palliative and terminal care. There are no trained staff to respond to, for instance, syringe
driver problems overnight”. 
“Under resourcing and a lack of workforce planning has resulted in poor staffing levels. High
use of bank staff, often without the clinical skills required to deliver quality, safe care. District
Nurse teams are not able to attend training sessions to maintain skills due to workload”. 
“Increased demand on activity from GP Clinical Pharmacists requests - there has been
impact on activity and frequency and duplication of task, BP, weight and height to be
recorded frequently”. 
“INR Star machines could be in all GP surgeries, this varies currently - therefore reducing
the need for community nursing to go out to Care Homes”. 
Systems - the functionality of current systems (EMIS-PC and EMIS-Web) was
mentioned frequently. As systems are not compatible, there is duplication for staff
inputting to these systems. 
“The EMIS system is very problematic and cumbersome, wastes a lot of time with data input
rather than actual nursing”. 
“We need IT systems which speak to each other rather than the separate systems which
are currently in place - GP / DN / OOHs”.
Role definition - clarity is required for all roles and work undertaken to extend
practice. 
“I feel that the services do not meet the changing needs of patients very well. For example,
in the CTAC role you come across patients who may have some off days and are unable to
attend for dressings. It would be useful, rather than adding to an already hectic workload, if
we as CTAC staff members could visit these patients at home for the short time they may
require a home visit”. 
32

Page 33

11 of 33
“We need better role clarity - referral criteria needed too as there is huge variation in requests
for support”. 
“Band 3 role definition is required and how it compares with other service areas/wards”.
“We need definition of role - across the Bands - what each does and does not do”.
Opportunities - there is a need for clear career progression and succession planning. 
“We have strong leadership and now we have one senior manager and Interim CNM in post
this has been invaluable for the communication channels for all staff”. 
“Career progression routes should be defined (note that Care at Home staff are better paid
than some Community Nursing Service jobs”. 
These themes were corroborated by feedback from the questionnaire survey. 
95.4% of community staff felt that there is room for improvement in
community nursing/healthcare services across Ayrshire & Arran. 
50% of those who responded to the questionnaire work in District Nursing. 
35.7% of respondents work in East Ayrshire. 
32.1% of respondcents work in South Ayrshire. 
28.6%of respondents work in North Ayrshire. 
3.6% of respondents work pan-Ayrshire. 
The questionnaire asked respondents what currently works well, what could be improved,
and how we could be better in delivering care across our communities. The breadth of
comments over the next 6 pages shows the range of just some of the qualitative comments
received from the questionnaire survey. 
What currently works well?
Collaborative working between teams and services was highlighted, along with some
changes in the ways of working which had been adopted during the pandemic. 
“The DN leading care when they have extended skills, prescribing - we can see the patient
from diagnosis, during treatment, palliation ACP/DNACPR, medications, starting/adjusting
syringe drivers to confirming death - complete holistic care driven and managed by the DN
team”.
“I feel that CTAC integrates well with other health services such as pharmacy, mental health
practitioner, etc., and that there are good connections available such as lymphoedema
services”.
“In specific cases, we have shown the ability to provide excellent care. One instance was
pulling together to get a hospital bed, walking aid, increased homecare and ongoing DN
support for a palliative patient within one working day. Another instance was a DN raised a
concern regarding function, ICT visited the same day, a stand aid was ordered and delivered
promptly to ensure the safe transfer for a young patient at home”. 
33

Page 34

12 of 33
“EMIS Web, however, it doesn't get used by the out of hours service”. 
“Fast response time from referral to initial assessment”. 
“I think having Mental Health Practitioners (MHP) and Physiotherapists within GP practices
and within the community works well. I have had patients come to me due to being extremely
stressed and anxious to the point it has been affecting their health and I have been able to
refer the straight to the MHP for a chat as a starting point”. 
“The community nursing team on Arran meet twice weekly with the GP team to proactively
review and plan care on active, complex and palliative community patients and this has
greatly improved care but vitally is a chance for the teams to talk, reflect and support each
other”. 
“Holistic care, not task orientated - using our experience to make advanced clinical
judgements, and having the ability to recognise deteriorating patients”. 
“Link nurses within teams - nurses who have a special interest in a certain specialty and
have the skills and knowledge to assist the wider team, e.g. palliative care, tissue viability,
continence”. 
“ICT responds immediately to referrals. We also have good communication with other teams
working in the community”.
“The daily AM huddle - charge nurses, team leaders, managers from social work, mental
health, East Ayrshire Community Hospital (EACH), CTAC, and service managers are all on
the call - it last approximately 15 minutes with each service giving a brief status and overview
and whether they need assistance that day. We can also address any issues and get an
answer from the senior service manager on the call”. 
How could we improve? 
Similar themes of challenges with communication, excessive workload, incompatible IT
systems, lack of clarity regarding role definition, and lack of opportunities for career
progression were all highlighted. 
“Better communication between services in/out of hours”. 
“Easier access to services, less time trying to contact people”. 
“More staff, more equipment, more experienced staff, better training, better support and staff
care”. 
“We could be more joined up with social services, it doesn’t feel like a partnership”. 
“Development of a leg ulcer service and community diabetic support”. 
“We need more extended skill, investing in experienced staff who do not wish to do SPQ but
could become prescribers/undertake advanced assessment. We need to raise the DN profile
as few services appreciate the extended role”. 
“Education for patients/families and carers in order to understand the role of the community
nursing team as well as promoting self-management where appropriate”.
34

Page 35

13 of 33 
“Inappropriate referrals, continence and equipment issues take up far too much of our time
that we could be putting to better use”. 
“There are bureaucratic barriers to effective team working and communication within teams
using separate note recording and IT systems which requires additional time and introduces
the potential for patient safety issues when attempting to navigate them”. 
“EMIS Web is not fit for DN needs - too much duplication and time consuming”. 
“There needs to be clarity for the role of the District Nurse. The public and other
professionals appear to view us as their ‘go to’ person, when no-one else will help”. 
“I think there should be more training and progressions of the Healthcare Support Workers
(HCSW) as the District Nursing role becomes more complex”. 
“I think there is opportunity for development of the CTAC role. With appropriate training there
is no reason why catheters, piccs cannot be done in clinic where mobile patients are able to
attend”. 
“We need more skill mix to allow the right person to deliver the right skills for the
patient/family”. 
“If an OT or physio undertakes an assessment for equipment, why does it fall to DN's to
order equipment for a patient we have not met?” 
“There is an expectation for DNs to pick up all referrals no matter what. One of the main
issues is regarding continence support. This is an entire job role in itself and there are
several calls a day to the office where patients are expecting a DN to sort a pad order.
Referrals come to DNs from practices whereby the GP has automatically said the 'DN will
get you pads' there is no appreciation for the complexity of this as an 8-week assessment
needs to be undertaken, followed by urine screening and ongoing support. It is an extremely
time-consuming part of the job and should not fall under the remit of a DN”. 
How could we be better? 
“Introduction of band 7 for our charge nurses with a post graduate diploma - they are highly
educated members of staff who are not paid according to their education or the management
of teams, this would hopefully retain them in their roles and we would not lose them to
primary care or ANP jobs”. 
“District Nursing has no waiting list and patients are seen instantly however recently we have
had to triage and put off visits that are still essential. ICT and DN teams should be
amalgamated into one team. Also - DN teams have no access to patient results portal and
PMS which can, at times, hinder our assessment”. 
“Referrals from hospitals/GPs/AHPS to District Nursing - a new referral form should be
devised to give appropriate information to the DNs regarding the patient. Phone numbers
and clinical mailboxes should be given to all staff for DNs as some wards are still using old
numbers. Ensuring any discharges home have an adequate supply of dressings/continence
aids for at least 1 week”. 
35

Page 36

14 of 33
“A robust referral system into the DN service to prevent it from being viewed and used as a
default service when MDT colleagues are unsure where to sign post patients”. 
“Managers need to be more aware of constraints and complications when working with
people who are ill, our online diaries are packed full, often running until 7pm some nights,
which means breaks are reduced and writing up has to be  done at home”. 
“ICT nurses could support DNs more if they had a budget for dressings, blood bottles, etc.
ICT nurses should be able to request equipment such as hospital beds and hoists”.
“Consistency - there is no consistency in what we do and what patients we see.
Communication and support from management. We need guidelines for what patients are
considered “housebound”. 
“Admin/band 4 clinical staff to have personal touch when patients make referral, signpost,
triage. Admin support to keep eESS, SSTS, training calendars up to date”. 
“Ask GPs to stop and think who is being referred and for what reason. As nurses can we not
share responsibilities? i.e. could ICT nurses not take on more of the hands on nursing tasks
if visiting patients anyway to free up DNs? This would benefit patient and reduce footfall”. 
“I think we require a phlebotomy service attached to the DN bases due to the high increase
of blood requests from GP surgeries, even more so since COVID and a lot of these patients
are not on the DN caseload”. 
“Better use of CTAC service: CTAC and DNs could work more closely together - CTAC could
help DN workload by doing housebound wound management, B12s. This will allow DNs
more time with palliative patients. CTAC could take on more skills by doing training on
catheter care. (Not all patients who have catheters are housebound, therefore they could
attend the surgery), alongside picc line care and nephrostomy care. Make the CTAC service
more uniform, all GP practices work differently, have clearer guidelines for CTAC so that we
can work anywhere. Make CTAC more aware of the integrated team by providing
information about what services are available for patients”. 
“Improved integration of teams in primary care, community, community hospitals and social
care teams such as homecare and residential care would be hard but will be worthwhile”. 
“Patients could be empowered to take ownership of their care, i.e. being shown how to
administer eye drops and Fragmin at pre-op appointments”. 
“If community stores deliver a hospital bed with a BiWave mattress why can it not be inflated
by the delivery team? A District Nurse has to be phoned to come out and set up the mattress
and inflate it”. 
“When I started in general practice there were 2 District Nurses aligned with our practice -
they were in and out throughout the day, leading to a better understanding of what was
happening to the patients and better and more effective communication. Since this was
stopped (to improve the service) there has been a dramatic reduction in the relationship
between DNs and the practice. This is a cause for concern. The change was made and as
far as I am aware there was no review to establish if the change had improved the service
or made it worse. At present the DNs seem to be working in isolation and this will cause
increased stress for the nurses and health care assistants”. 
36

Page 37

15 of 33
“There needs to be integration of all community nursing resource to a much better degree
as, at present, we are working in silos with impact on service delivery palpable. Secondly,
there needs to be investment and consideration of skill mix with increased numbers of bands
2/3/4 to support the community nursing teams”. 
“There is a need for admin staff to help with organisational tasks freeing up nursing time,
and easier ways for GPs to communicate with the DNs”. 
“Support for SPQ candidates - prescribing time, backfill, and study leave to allow them to
shadow other services and explore far reaching learning opportunities”. 
“I was due to finish at 5 and it is now 6.15pm but I wanted to fill this in before the deadline -
I haven’t had a chance to do it before now. We are short-staffed and having to help another
area. We have had a vacant post for nearly 2 years and no bank staff hardly to cover. Please
fix this situation for me, for my colleagues and most of all, for my patients. They need us in
full working order”. 
Ideas for improvement 
There were many ideas for improvement - a small number are highlighted below. The recommendations
take into account a wider range of the ideas to improve community services. 
Provide adequate admin support
to all community teams to allow
them to focus on clinical skills
and patient needs
More training for HCSWs to free
up time for registered staff to
deliver more complex care
Improve communication
especially between day and out
of hours - needs a dedicated
nurse to nurse for complex
handovers
From a community ANP
perspective I am in a good position
to mentor and provide training to
staff while working with all partners
to prevent hospital 
With a SPOC we could reduce
inbound referrals as we know
many could be signposted
elsewhere 
During the pandemic the DN service
has been put under extreme pressure.
As patients stopped being admitted to
hospitals and hospices, the % of
people dying at home increased by
43% - a specialist palliative care
service is needed or we need other
activities removed to allow us to
deliver palliative care well 
Safety huddles each morning could
be built upon but we need some
clear escalation plans too when
pressure is excessive
More agile working, telephone
consultations and Near Me
consultations 
37

Page 38

16 of 33 
Recommendations 
Review of the workforce analysis, feedback from stakeholders, and national guidance have
led to these recommendations below:- 
1. Implement a new model of care 
• Staff feedback indicated that utilisation of all staff groups could be maximised by
implementing a Community Hub model with a Single Point of Contact (SPOC) and robust
triage of referrals. 
• Development of clear, robust referral criteria to services, e.g. a standardised definition of
‘housebound’ to ensure reduced variations in practice across Ayrshire. 
• Skill mix/maximum utilisation of registered workforce. Feedback from staff suggested
that some activities could be undertaken by others to free registered and unregistered
staff to focus on their key responsibilities. Activities which could be undertaken by others
included:-
Administrative support; Equipment ordering (currently this is undertaken via the District
Nurse, even in instances where the DN is not involved in the person’s care); Phlebotomy
(not all areas have phlebotomists); Care Home inreach, e.g. INRs for Care Home residents;
some aspects of continence care and treatment. 
• Development of new pathways to maintain people at home for as long as possible, i.e.
step-up to and step-down from Community Hospitals. 
• Advancement of clinical Band 7 posts to meet the growing complexities of care in our
communities and retain experienced, skilled staff in community services. 
• Further clarity regarding staff roles and responsibilities. The development of a
competency framework which outlines clearly all responsibilities in relation to each
banding is required. 
• Development of clear pathways for patients which ensure smooth handover at transition
points of care, i.e. patients being discharged from acute care, patients being
signposted/referred onto Third Sector and other agencies/services. 
I have used Near Me consultations
at patients’ homes when using
specialist services - this has saved
a lot of travel time for patients and
nurse specialist
38

Page 39

17 of 33
• Management of public expectations in terms of care provision by community services,
i.e. promotion of anticipatory care, palliative care, and raising the self-management/self-
care agenda. 
2. Review of workforce planning and establishment of a 3 year workforce plan 
• A robust workforce plan which takes into account an ageing workforce, and implications
of changes in the pension scheme in March 2022. The COSLA document ‘An Integrated
Health and Social Care Workforce Plan for Scotland’ highlights that a 3 year workforce
plan is vital. National guidance will be issued to support local areas to develop their own
plan. 
integrated-health-soc
ial-care-workforce-pla
• Development of competency frameworks for all levels of community staff. 
• Clear strategies for recruitment and retention of staff (We know that in one partnership
area in Ayrshire, only 2 band 6 staff members out of 9 who have completed the Specialist
Practitioner Qualification have remained in District Nursing - a retention rate of 22%). 
• Development of clear routes for career progression. 
• Development of Band 4 posts. This is being driven nationally with phase 1 due to be
completed by 10 December 2021. 
3. Establishment of robust governance structures 
• A clear management structure which promotes the professional identity of community
nurses. 
• Further development of clinical supervision for all staff to ensure they are fully supported
in their roles. 
• Aligned budget codes which accurately reflect workforce location. 
• Monitoring arrangements to support quality control and assurance of care delivery. 
4. IT and digital systems to support clinical care 
• Review of IT systems such as EMIS-PC and EMIS Web to reduce/eliminate duplication. 
• A streamlined referral system fully supported by the IT system in place. 
39

Page 40

18 of 33
• Further utilisation of digital solutions to deliver care, e.g. Near Me consultations 
Reference Documents 
1. The Public Bodies (Joint Working) (Scotland) Act 2014
https://www.legislation.gov.uk/asp/2014/9/contents/enacted
2. Transforming Nursing, Midwifery and Health Professions’ (NMaHP) Roles: pushing the
boundaries to meet health and social care needs in Scotland - The District Nursing role
in integrated community nursing teams 
https://www.gov.scot/publications/transforming-nursing-midwifery-health-
professionals-roles-district-nursing-role-integrated/ 
3. An Integrated Health and social care: integrated workforce plan 
https://www.gov.scot/publications/national-health-social-care-integrated-workforce-
plan/ 
Appendix 1 - Workforce analysis
Appendix 2 - Virtual focus group template/questions 
Appendix 3 - Virtual focus groups feedback 
40

Page 41

19 of 33 
APPENDI
X 1
41

Page 42

20 of 33 
42

Page 43

21 of 33 
43

Page 44

22 of 33 
44

Page 45

23 of 33 
45

Page 46

24 of 33 
46

Page 47

25 of 33 
APPENDIX 2
47

Page 48

26 of 33 
Virtual Focus Groups - Band 3 staff
APPENDI
X 3
48

Page 49

27 of 33
What currently works well?
• Level of support we provide for each other, to listen, be there and look after each other
• All working really hard
• Good communication between staff 
• Care at Home services are pro-active and communicate well indicating early request for
assistance
• Team members feel part of a team, have a level of responsibility and involved in decision
making process
• Increased involvement in supporting palliative care individuals during COVID
• Good relationships with patients and families/carers and other services e.g. Podiatry
• Allocation of a duty nurse during the day to cover tasks (not all teams have this)
• Recently covering other service areas which has created opportunities to work elsewhere
eg. Prisons, other teams
• COVID has given the opportunity for stronger working relationships across individuals
and teams. Cross boundary working CTAC supporting DNs
• HCSW/NA see as an integral part of the DN Team, trusted and valued by nursing
colleagues
What could be better?
• A lot of time spent doing admin functions – duplication of tasks on numerous systems.
Use of EMIS web and EMIS PCS (EMIS PCS GP system) to record the same patient
information
• Activity not recorded well on EMIS – does not translate into measure of time taken to
undertake tasks – misrepresentation of activity
• Need for experienced, dedicated admin support to ensure clinical tasks are the priority
• Variation of practices – some Home Care Services dispense eye drops and apply creams
whilst others don’t.  Where Home Care services do not do these tasks HSCW/NA need
to pick up – clarity and definition required around roles and responsibilities
• GP Blood requests – consistent approach would help
• Housebound patients – who takes their bloods?  – variation again. Time  pressure on
house visits where patient not necessarily housebound
• Increased demand on activity from  GP Clinical Pharmacists requests – impact on activity
and frequency and duplication of task, BP, weight and height recorded frequently
• Constant multi-tasking
• Care Homes – some homes have registered nurses however some nursing tasks are
given to DN staff to undertake – bloods, INR etc.  The purchase of an INR star machine
would reduce the demand for community nursing staff to undertake these functions if
they were supported in the Care Homes
• Better level of respect for the role undertaken
• Patients ask for a GP visit however the CNS is allocated the visit – patient and families
wish a GP – managing expectations can be challenging
• Although being done well – some additional support for the palliative care elements
• Some communication is over reliant on IT systems and a phone call to staff is at times
better and more efficient/effective and key to providing timeous patient care
Opportunities for Change?
• Same system across all areas – SOPs
49

Page 50

28 of 33
• Band 3 role definition and how it compares with other service areas/wards
• Career progression routes defined (note that Care at Home staff better paid than some
CNS jobs) Community Nursing Service (CNS)
• INR Star machines to be in all GP surgeries , varies currently – therefore reducing the
need for CNS to go out 
• INR blood vials? Issues with samples not being able to be processed by labs
• Definition of role – across the Bands – what each does and does not do
• Avoid numerous visits – if GP does a home visit then asks for the CNS to do bloods,
another visit – why does the GP not take bloods there and then to avoid additional visit?
Themes
• Communication – positive elements however aspects which could be improved on 
• Systems – functionality of current systems and duplication for staff on a regular basis 
• Role definition – clarity required – expansion of the role, increased activity and demand 
• Opportunities –  career progression and succession planning 
• Workload – need for consistent ways of working, streamlining of current processes
Virtual Focus Groups - Band 5 staff
What currently works well?
• Good example of working alongside the Tissue Viability Nurse – patient on Arran was
provided specialist support by nurse providing a photo and sending over to TVN with
good outcome for patient
• Good examples of working alongside the Hospice staff – Patricia Hood and GPs
• Hospice provides 24/7 on call support and advice on medication/triage calls which stop
crisis points
• Diabetic Nurse support is also a good example 
• Podiatry services are now re-mobilised and provide support for wounds from the ankle
down and support can be accessed by a phone call to the ICT number
• CTAC came together as a cluster and shared vaccine vials which reduced the wastage
of products.  This could be spread by formalising clusters within CTAC to operate better
vaccine campaigns
• Good link with Social Worker colleagues e.g. Kilbirnie meet every two weeks and any
other concerns between meetings are picked up and shared
• CTAC nurse roles are very positive – October flu vaccine programme
• Local Operational Meeting – an example of Housing, Police, SW, GP in Three Towns
where patients are discussed to reduce risks.  Largs also has benefits of being co-located
with GP, SW and police next door which offers a quicker response
• Community Store
What could be better?
• Employing dedicated Continence Nurse as a lot of time is taken up ordering of supplies,
assessments and re-assessments.  If one dedicated team were to focus on this it would
50

Page 51

29 of 33
mean that we had expert advice rather than each DN covering this with only the one day
training course
• Unrealistic expectation from GPs, SW, carers on what can be delivered – the DN
pathway is outdated (2010) and GPs tend to pass the buck – hand everything over to
the DN
• Better role clarity – referral criteria needed as huge variation in requests for support 
• CTAC development – PICC lines.  Could they provide housebound support with vaccines
and wound care etc?  This would allow the DNs to focus on more palliative care at home. 
Further training and role development for the CTAC staff 
• Professional development in the role – CTAC nurse better alignment with the roles which
staff can undertake – clarity and definition
• Development of the Band 3 role – INR and Nephrostomy care 
• ?? CTAC nurse in surgery in the morning and then out in Community in the afternoon to
assist DNs??
• Care Homes to invest in INR machines – which would reduce the need for DNs to visit
to carry out tasks
• Ordering of equipment through the Community Stores – why does this have to come via
DNs?  The patient is not always known to services and the assessment information is
best completed by the area where the patient is – in-patient ward area.  Huge duplication
of activity
• Additional phlebotomist capacity
• Lack of information when a patient is discharged from hospital where there is a request
for DN support.  Times when people come out without a Kardex, any information/details. 
Opportunities for Change?
• Same system across all areas – SOPs
• Group lifestyle advice and patient education would support early intervention and
prevention of some conditions rather than waiting until a crisis and services having to be
sent in.
• INR Star machines to be in all GP surgeries and care homes – therefore reducing the
need for CNS to go out 
• Definition of role – across the Bands – what each does and does not do
• Admin tasks being done by qualified nursing staff – not a good skill mix
• Concise triage process – prior notification of discharge 
• Signposting to other services rather than taking everything on
• Integrated care is failing because it appears easier and quicker to pass the buck to the
DN service
• CTAC could support the Long Term Conditions in the community, wound care, urology,
catheters, continence and provide training
Themes
Communication – positive elements however aspects which could be improved on
Systems – functionality of current systems and duplication for staff on a regular basis
51

Page 52

30 of 33
Role definition – clarity required – expansion of the role, increased activity and demand
Virtual Focus Groups - Band 6 staff
What currently works well?
• Good examples of working alongside the Hospice staff – very responsive outreach
intervention
• Hospice provides 24/7 on call support and advice on medication/triage calls which stop
crisis points
• MS Teams – Arran example of GPs now twice weekly calls with DNs which has improved
communication, improved response times and better time management
• MS Teams works well and can support some training
• Services are very much patient focused rather than task focused
• ‘We never say NO to a patient’
• Communication is good – very accessible and feel part of a bigger team
• Good thinkers, problem solvers and excellent at spinning plates and co-ordinating plans
• EMIS Web good at recording some data/activity which previously has not been captured 
What could be better?
• Band 6 role doesn’t reflect that of other Band 6s in a ward environment – pay structure
needs to be looked at
• Job retention – turnover of staff is considered high
• Referral document needs progressed to provide criteria, education particularly of
discharge planning from wards.  Better interface between Acute Services and
Community
• Gatekeeper of community store – needs revised and role – expectation that DNs will
check equipment set up etc.
• Enablement ethos to be applied across all services
• Dedicated Continence Team/service
• National Procurement Contract
• Gap in service provision – OOHs and Weekends – 4.30-5.30pm gap – who covers?
• Admin support
Opportunities for Change?
• Skill mix – each team to have dedicated Band 2 phlebotomist
• IT system which speaks to each other rather than the separate systems which are
currently in place – GP /DN / OOHs
• Care Homes – requiring a lot of support and further education on syringe drivers, wound
management
• Peripatetic nursing staff – invest in the whole system rather than looking at fragments
• Development of the Community Hub model
• Invest in Staff governance and support 
• More visible leadership
• Raise the profile of the profession – will be supported by a defined role/referral system
52

Page 53

31 of 33
• ‘Knock back some referrals’
• Signposting to other services rather than taking everything on
Themes
Communication – positive elements however aspects which could be improved on
Systems – functionality of current systems and duplication for staff on a regular basis
Role definition – clarity required – expansion of the role, increased activity and demand
Skill mix
Whole system approach rather than silo working 
Virtual Focus Groups - Band 7/8A staff
What currently works well?
• Provision of  end of life/palliative and continence care across DM teams works well in
EA, use of bladder scanners, managing patient in their localities, saving a trip and
appointment within Secondary Care and staff having to travel.  Huge commitment as
patients need scanned twice a day
• Clinical Nurse Manager Role (interim) in EA works well, supporting DN care home work
working well re links to senior staff with social work background.  Very valuable role
supporting DMs to work as one team.  Routes of communication, line management
arrangement and escalation routes much better.  Arrangement has worked well during
COVID-19
• CNM role moving areas of work forward quicker now e.g. audits
• ANPs working in COVID-19 Centre now working at EACH x 1 ANP currently
• Opportunities to work as Community Team in future
• Working alongside Professional Advisors with regular meetings required
• ANP in General Practice, lots of positives, need to navigate across various roles
What could be better?
• DN Service would be better as a Pan Ayrshire model would give a consistent approach,
currently different approached in different areas
• Need to be united as a services as per previous structure
• Most other nursing services managed by nurses
• Looking at new model  (CNM role) but impact of COVID - affecting this
• Need to move forward with change when resources and time allow
• Where there are operational leaders without district nursing background, senior nurses
have to work hard to define professional roles and responsibilities
• Links forming with Service Managers re input to operational issues
• Community Hospital nursing input being reviewed (SAHSCP) bring MDT together
• DN teams want to work to the top of their profession
53

Page 54

32 of 33
• Improvement needed re close working relationships with GPs, OT, Social Work Team
leaders.  Integration could have worked with professional leadership retained
• 3 HSCPs have different opinions on DN service
• Need for robust referral criteria
• Informal working arrangements result in DNs “helping out” taking on work
• Issues with retaining staff, work life balance and career progression
Opportunities for Change?
• Band 6 staff undertaking Post Grad Diploma, dissertation required to achieve Masters,
not require for Band 6 role. Should be Band 7 role requiring this qualification.  2 year
study period a hard slog.  Staff join DN teams as they are dedicated to Community
Nursing. 
• Band 6s should be developed to Band 7 role in different ways rather than Post Grad
route would help with succession, contingency planning and retaining staff.  Align with
transforming nursing role paper
• More Band 7 staff required at clinical level a team leaders bogged down with admin work
• Other HB work in different way, services aligned to the specific needs of localities, works
well in NHS Lanarkshire
• Current volume of caseloads significant, caseloads need to be manageable.  Increase in
Band 7 workforce would help with this
• Band 6 and 7s currently doing lower level work need for competency framework, this
would release time for more appropriate work
• Development of Band 4 posts, clarity of career structure and career progression
• Teams swamped with blood test requests from GPs, challenging and need to push back
work that keeps coming
• Consistency needed in what is appropriate for DN services and what is not
• Query Band 3 work – doing Band 4 tasks
• Having professional identify and leadership would strengthen professional position
• Historical budgets have not moved on?
• Opportunity to work well as pan Ayrshire services as many staff very experienced, skilled
and knowledgeable
• Health Visiting service now standing strong, DN services has been left behind
• Strong leadership declined when review of DN service and changes implemented in
2010
• Lots of anxiety re 2010 review and reduction in DN workforce
• New referral processes written up for GP Sub Committee had not been progressed,
concerns re feedback on this, need to move this forward
• Other services have an opinion on what DN services should be doing
• CTAC? – Practice Educator, Primary Care roles required – Band 6 to support learning
and development of workforce, currently real gap in Band 6 role.  Development lacking
due to work pressures.
• DN and Practice Nurses have been support work pressure but this is not sustainable
• Support for HCSW development
• Care at home and DN services required across the wider community nursing roles e.g.
CTAC
• New Band 6 roles would be attractive to Band 5 staff, without having to undertake 2 years
study
54

Page 55

33 of 33
• Consider retiring and returner roles, would not be for everyone a balanced approach
would be required
• Approach being taken by NHS Borders 
55

Page 56

56

Page 57

Integration Joint Board
9 May 2024
Subject : Primary Care General Medical Services Update
Purpose :  This report provides an update to the Integration Joint Board on
the provision of General Medical Services (GMS) across Ayrshire
and Arran. 
The report also details the current position with implementation of
the 2018 GMS contract and wider development work across
general practice.
Recommendation : It is recommended that the Integration Joint Board: 
i. Note the current position of Primary Care GMS
ii. Note the progress of implementation of the 2018 GMS
contract as well as the wider areas of development work
across General Practice. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required x
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
BMA British Medical Association
CAU Combined Assessment Unit
CTAC Community Treatment and Care
EMG Expert Medical Generalist
GMS General Medical Services
GP General Practice / Practitioner
HIS Healthcare Improvement Scotland
HSCP Health and Social Care Partnership
IJB Integration Joint Board
MDT Multi-disciplinary team
MHP Mental Health Practitioner
MoU Memorandum of Understanding
MSK Musculoskeletal
NHS AA NHS Ayrshire & Arran
PLT Protected Learning Time
PCIF Primary Care Improvement Fund
PCIP Primary Care Improvement Plan
TOC Test of Change
WTE Whole Time Equivalent   
Agenda Item 5
57

Page 58

1. EXECUTIVE SUMMARY 
1.1  General practices continue to face challenges with increased demand.  Ongoing
review of data and feedback has demonstrated that patients are presenting to General
Practice with more advanced health concerns than they would have pre-pandemic.
This in part can be attributed to this cohort of patients having more complex conditions
and being managed longer by their GP whilst awaiting appointments in other parts of
the system.  Many of these patients require an extended (sometimes double)
appointment time and clinicians may need to do a greater degree of follow up with the
patient which again increases workload and appointment capacity. 
1.2  Progress continues to be made implementing the 2018 GMS contract which provides
the basis for an integrated health and care model with a number of additional
professionals and services multi-disciplinary teams (MDTs) including nursing staff,
pharmacists, mental health practitioners, MSK physiotherapists, and community link
workers as well as signposting a number of patients, where appropriate, to other
primary healthcare professionals within the community. This is aligned to the NHS
Ayrshire & Arran Caring for Ayrshire vision to create a whole system health and care
model focussing on individuals, families and communities with general practice and
primary care providing accessible, continuing and co-ordinated care.  
1.3  The Ayrshire and Arran Primary Care Team was successful bidding on behalf of the
three Health and Social Care Partnerships (HSCPs) to be a Primary Care
Improvement Phased Investment Programme Demonstrator site to work with NHS
Health Improvement Scotland (HIS). 
This is to demonstrate what a model of full GMS Contract 2018 implementation of the
MDT (focussing on Community Treatment and Care (CTAC) and Pharmacotherapy
teams) can look like in General Practice. This is a 12-18 month programme which will
be nationally funded and delivered by a local programme team with local governance
arrangements. Data will be collected which will be used to model full national
implementation of priority areas of the GMS 2018 Contract.   Ayrshire and Arran will
be one of four demonstrator sites across Scotland. 
1.4  Development work will also continue alongside this to further embed MDT teams into
practice through the GMS Contract which would continue in tandem with the focussed
work on Pharmacotherapy and CTAC.   
1.5  This report has also been presented to: 
i. East Ayrshire IJB – 20 March 2024
ii. NHS Ayrshire & Arran Board – 25 March 2024
iii. South Ayrshire IJB – 3 April 2024 
58

Page 59

2. BACKGROUND 
2.1  The Public Bodies (Joint Working) Scotland Act 2014 provides a legislative framework
for the delivery of Primary Care Services in Scotland. East Ayrshire HSCP, through
Lead HSCP arrangements, are responsible for the delivery of Primary Care Services
across Ayrshire and Arran.  In addition NHS Ayrshire & Arran directly commission East
Ayrshire HSCP to conduct Primary Care Contracting on behalf of the Board, this being
a function that cannot be delegated to IJBs at this time.   
2.2  The 2018 GMS contract was introduced to facilitate a refocusing of the GP role as
Expert Medical Generalist (EMG).  The contract is a joint agreement between the
Scottish Government and the British Medical Association (BMA) which sets out to: 
• Provide a new direction for general practice in Scotland which aims to improve
access for patients, address health inequalities and improve population health
including mental health 
• Provide financial stability for GPs, and reduce GP workload through the
expansion of the primary care multidisciplinary team
• Redefines the role of the GP as an expert medical generalist focusing on
complex care, reduce the risks associated with becoming a GP partner and
encourage new entrants to the profession as well as help retain existing GPs 
2.3  The first Primary Care Improvement Plan (PCIP) (2018-2021) set out the plan to
implement the new contract across NHS Ayrshire & Arran by 2021.  The PCIP 2 (2020-
22) was approved at each of the IJBs, NHS Board and Local Medical Committee in
December 2019.  It set out a collaborative approach for delivery across the three
Ayrshire IJBs, the NHS Board and the local GP sub-committee / Local Medical
Committee. This inclusive collaboration has been essential in developing an the
ambition for all parties to develop our Primary Care services to be both sustainable
and meet the future needs of our communities within each of the partnership areas. 
2.4  In 2022 Scottish Government advised that there would be greater focus on the delivery
of Pharmacotherapy, CTAC and Vaccinations following agreement with the BMA that
these would be the contractual elements of the 2018 contract.  This then became the
priority across Ayrshire and Arran. 
3. PROPOSALS 
3.1 Overview of General Practice 
Primary Care is usually a patient’s first point of contact with NHS Ayrshire & Arran and
it is estimated that around 90% of NHS contacts take place within general practice. 
There are 53 GP practices across Ayrshire and Arran who all operate as separate
independent businesses in their own right, and are not directly employed by the NHS
Ayrshire & Arran. 
59

Page 60

Within Ayrshire and Arran there are currently no Health Board managed practices,
however the Primary Care Team continue to work closely with those practices that
require support. 
The core elements of a general practice contract includes: 
• An agreed geographical or population area the practice will cover 
• Require the practice to maintain a list of patients for the area and sets out who
this list covers and under what circumstances a patient might be removed
from it 
• The establishment of essential medical services a general practice must
provide to its patients 
• Outlines key policies including indemnity, complaints, liability, insurance,
clinical governance and termination of the contract. 
3.2 GP Practice Activity 
Whilst every GP Practice delivers general medical services through their contract with
NHS Ayrshire & Arran, they have flexibility to deliver that in a manner that best suits
their patient population as well as business model. One size does not fit all and all
practices operate very differently in terms of clinics that operate on a daily basis, their
clinical workforce model, and also how appointments are triaged and allocated.   
Recent available data shows that 55% of practices offer a triage first model for all
requests for a clinician with the remaining 45% offering straight to clinical appointment.   
The majority of practices offer pre-bookable appointments.  The small number of
practices not offering pre-bookable appointments fed back that they feel that either
their “same day” demand is too high to adopt the system, or they feel their
appointments are already well managed without it. 
Those not operating triage first felt that it was unpopular with patients, duplicated work
or was unnecessary given the current availability of pre-bookable and same day
appointments at their practices. 
Data from the primary care information system shows that there has been a 20%
increase in consultations from 2019 to 2023 with patients contacting their GP with
more complex conditions. Patient Consultations currently sit at 2.5 million per year
compared to just under 2 million pre-pandemic. 
During the pandemic a number of practices introduced an online platform for their
patients to access practice services and clinical advice.   
Practices reported that this was easier for their working population to access services
out with core opening hours and allowed staff to respond to patients directly without
requiring an appointment and a time suitable to the practice/patient.  This has also
supported more efficient use of admin time.
60

Page 61

Reasons provided by practices for not using the online platform include: 
• Concerns their patient population not being able to access due to no digital
access
• Not popular with patients, uptake low, and some patients found it difficult to
use or access
• Not enough staff to manage another entry route into the practice 
• Current systems suffice for patient management 
To fully understand the current status of each GP Practice in detail it was agreed in
December 2023 to carry out a survey of all practices to inform a wider deep dive review
of General Practice in Ayrshire and Arran.  The questions in the survey were based
on regular feedback or themes reported through various forums, including patient
feedback which would allow the primary care team to present an overall position of
primary care at the current time: 
• Practice staffing levels (including workforce numbers and hours worked by
each profession – this included those hours worked over and above
committed time)
• Consultation capacity per professional
• Patient access – including extended opening times
• Feedback on areas that cause increased activity and pressure 
As anticipated, the findings have highlighted areas of variance in service delivery
models, with key areas such as consultation numbers and gaps in workforce that need
explored further at an individual practice level.  The data also confirms that patient
demand is exceeding capacity.  The findings will be shared with the practices and
taken through local forums to inform next steps in response to the areas that have
been reported on.  This will also include how we engage with the public. 
As GP Practices are only open for a certain number of hours per day, there is a
maximum number of consultations that can be carried out.  Practices are often at
capacity by mid-day or earlier.   
It is also important to note that the increased demand from patients waiting for
outpatient treatment is in the main being absorbed into General Practice and is not
being referred onto hospital services. GP referrals to University Hospital Crosshouse
CAU (Combined Assessment Unit) from General Practice remain similar to pre-
pandemic levels whilst GP referral rates into University Hospital Ayr CAU have
reduced. 
The consistent downward trend in Emergency Department attendances also suggests
that patients are engaging with their GP in the event of deteriorating health rather than
making unplanned hospital attendances in greater numbers. 
61

Page 62

To support practices with the high volume of unscheduled care demand at the end of
the day an Urgent Care test of change (ToC) was initiated in December 2023.  
Generally all clinical resource within the practice is aimed at unscheduled care with
no capacity for planned care.  It is hoped this model will allow for practices to structure
planned care time late afternoon. 
This involves the Ayrshire Urgent Care Services (AUCS) working alongside General
Practice to support local practices with home visits between the hours of 3.30pm and
5.30pm. 
This was developed recognising the impact on General Practice when patients
present to the practice late in the afternoon with an urgent care need requiring a home
visit, and the requirement to ensure this is sufficient workforce in place to respond to
this daily. 
To ensure safe delivery of the ToC, it is being rolled out on a phased basis at cluster
level to ensure activity is monitored and evaluated. To date this now covers all of
South Ayrshire, three practices within the Irvine Valley Cluster and most recently the
Kilmarnock Cluster.   This covers a total population of 108,376 patients. 
Numbers of referrals from the practices involved are growing week on week. 
Feedback has been positive from the practices taking part and early reports highlight
this has allowed clinicians within practice to focus on planned appointments or patient
engagement of results or care plans without having to block time in the event the
clinician is required to attend a last minute home visit. The ToC will continue to be
monitored and evaluated with a plan to extend wider across Ayrshire early throughout
2024 with a view to developing the model further to include in-person appointments.   
This model aligns to the urgent care principles within the 2018 contract as well as the
vision of creating a 24/7 seamless urgent care pathway with general practice and
AUCS working together. 
3.3 Update on 2018 GMS Contract - Primary Care Improvement Plan 
In September 2023 Scottish Government provided an update on the implementation
of the Memorandum of Understanding (MoU) nationally. This update confirmed that
there was still commitment to the 2018 GMS contract and the principles within it, but
it was recognised there was significant variation across the country. 
Board areas were advised there was a need to understand what a sustainable model
of full delivery of the 2018 GMS contract looks like, and what additional outcomes it
will achieve.     
The additional ‘phased investment programme’ was announced in this update stating
that additional investment of £10-£15 million would be made available for a maximum
of 2-3 areas in Scotland to bid to be a demonstrator site.   
62

Page 63

The aim of the demonstrator sites would be to look at the different stages of
implementation to demonstrate what a model of full implementation can look like in
practice.  It was proposed this would then build the case for additional investment in
a sustainable and evidence-based way. 
Ayrshire and Arran bid on behalf of the three HSCPs to continue with a pan Ayrshire
approach locally. The selection process took place in December 2023 which involved
an interview with Scottish Government and NHS HIS.  Applications and the interview
feedback was then considered by a panel made up various senior stakeholders across
Scottish Government and NHS Scotland.  Ayrshire and Arran were successful in their
bid for an additional £3.5 m (approx. 60wte additional) to further implement the
contractual elements of the GMS contract. 
Following the Scottish Government announcement in 2022 to ensure greater focus on
the agreed three main contractual elements of the contract (Pharmacotherapy, CTAC,
and vaccinations) Ayrshire Arran, as demonstrator site, will be supported to use
improvement methodologies to fully implement Pharmacotherapy and CTAC services
as far as possible locally, while maintaining full delivery of the Vaccination
Transformation Programme.  The aim of this work is also to understand the impact for
people, the workforce and the healthcare system, with reduction in GP and practice
workload and improvement in patient outcomes a key aim. The work will collect
evidence on the impact and the cost-effectiveness of MDT working which will then
inform and support future model and long term investment associated with the GMS
contact. 
Whilst the focus will be on these two services, all MoU Services will be considered in
the monitoring and evaluation of the demonstrator sites as part of a whole systems
approach to quality improvement. 
In 2018 Ayrshire and Arran developed a detailed delivery framework to implement the
contract with timelines aligned to the agreed phased financial investment at that time. 
There has been significant progress across each of the contract areas with
vaccinations transferred and the majority of practices accessing the additional roles
described within the contract. 
For each area of the programme there is delegated involvement, responsibility and
accountability from representatives across the three HSCPs, NHS Board, and GP Sub
Committee within Ayrshire and Arran. There are co-leadership arrangements with
MoU workstream leads and local GP Sub Executive Members to oversee decision
making and progress through the current implementation structure. This is further
strengthened with involvement from the Clinical Director and GP Stakeholder role from
each of the HSCP areas who are well engaged with practice teams and wider
community teams on the ground.   
This group come together every 8 weeks as the GMS Oversight Group.  Consideration
will be given to the frequency of these meetings in 2024/25 to ensure an appropriate
level of oversight and input being a Demonstrator Site.
63

Page 64

General practice and wider community teams have been fully engaged in developing
service specifications aligned to the MoU.  We are confident with additional support
and focus we could demonstrate what full delivery could look like for a Board wide
area. 
A two day site visit took place with NHS HIS on 29 February / 1 March to understand
our system and further explore our bid which is outlined below.  Funding has been
confirmed for the 18 month programme – full year 2024/25 and part year 2025/26. 
The programme will be continuously evaluated by NHS HIS with discussions on the
future recommendations of the contract taking place throughout. 
3.3.1  Pharmacotherapy – a three year trajectory was set (2018-2021) to establish a
sustainable pharmacotherapy service to every practice. This included a skill mix of
pharmacists, pharmacy technicians and pharmacy support workers. The service was
front loaded in terms of recruitment and training with an agreed service specification
in place. 
The delivery model has continuously been refined adjusting the ratio of pharmacists,
pharmacy technicians, and the introduction of pharmacy support workers. 
The Pharmacotherapy Service is now made up of 103.3 WTE roles with all GP
Practices having access.  Although reaching the agreed compliment of staff, there are
still a number of challenges with implementation.  These relate to a range of areas
including: 
• Systems and processes
• Further development work required with current teams to embed the agreed
service specification
• Improved digital enablers to reduce administrative burden
• Developing central hubs to support remotely during absence or high demand 
Recent data shows the Pharmacotherapy Team are delivering the majority of
medicines reconciliation across all GP practices.  Locality based hubs are in place to
cover planned or unplanned leave to ensure work is not diverted back to the GPs.
There is currently no resilience in these hub teams and the recent successful bid
includes additionality requirements.   
A target has been developed locally to enable pharmacy teams to manage acute
prescribing workload safely and effectively. Current data demonstrates significant
variation across practices in the number of acute prescriptions. The additional Quality
Improvement support from NHS HIS will support closer review of these processes at
scale. Achieving and sustaining this target will be essential to delivery of this element
of the contract.   
There is also variation with pharmacist confidence in making prescribing decisions
balancing risk and safety.  The bid includes clinical supervision funding to support
pharmacists to become more confident prescribers.
64

Page 65

3.3.2  Community Treatment and Care (CTAC) Services – a total of 52 practices have full
access to CTAC services with one practice not supportive of the CTAC service
specification. There is ongoing dialogue with this practice.  There is also a hub model
tried and tested which has supported areas where accommodation has been
challenging. 
It was previously estimated that 90 WTE staff, skill mix of Band 5 registered nurses
and Band 3 Healthcare Support Workers would be required to fully deliver on CTAC.
There is a total of 103.6 WTE mix of staff in post with an agreed service specification
in place. 
Recent audits to understand what CTAC activity was still being undertaken by general
practice staff has identified, that the main reasons for practice staff still undertaking
the CTAC interventions is due to CTAC allocation not enough or CTAC staff being on
annual leave or sick leave.   
There is a request within the demonstrator site bid to increase the CTAC resource
required to meet the gaps, as well as mitigate the need for general practice to cover
any leave to ensure full task transfer.   
The recent audit indicated that 72% of CTAC activity was undertaken by CTAC staff
and 28% undertaken by practice staff.  In order to provide full task transfer, to include
additional resilience, there is a requirement to increase the workforce as well as further
review the skill mix of total workforce. 
During the CTAC development phase there has also been fixed term investment of
two Band 6 Practice Educator roles per HSCP to provide a robust education and
supervision model whilst implementing the service specification.  Due to the size of
the workforce, and scale of working across a large number of practices within each
HSCP, it has been agreed the continuation of these roles is fundamental to the
ongoing safe delivery of CTAC services.  These roles will also be explored as part of
the demonstrator site work. 
3.3.3  Extended Multi-Disciplinary Team (MDT) Professional Roles – Since its
implementation, significant progress has been made to roll out the 2018 GMS
Contract. 
• All Practices have access to Pharmacotherapy staff
• All Practices have access to all immunisations through the Vaccine
Transformation Programme (except pregnancy and non-routine adult
vaccinations)
• All Practices have access to a Community Link Worker
• All Practices except one in South Ayrshire have access to a CTAC Nurse /
Healthcare Support Worker 
Due to the funding constraints there is a high risk of not being able to providing these
services across all practices in Ayrshire and Arran creating an inequality of access. 
65

Page 66

This is creating health inequalities and access to services for patients based on a post
code lottery.   Unfortunately the financial envelope within the new GMS contract does
not allow additional funding to be allocated to services at this stage.  A breakdown of
the MSK and MHP roles is noted in the table below. 
HSCP MSK MHP
North 4.05WTE provide cover for 13 of 19
practices
9.9WTE provide cover for 16 of 19
practices
South 4.2WTE provide cover for 16 of 18
practices
8.4WTE provide cover for 18 of 18
practices
East 3.5WTE provide cover for 12 of
16 practices
9.6WTE provide cover for 16 of
16 practices 
The overall additional MDT resource in total is split 30% in the East, 35% in the North
and 30% in the South. This is largely in keeping with the partnership patient list size –  
• East Ayrshire – 134,137 patients (35%) across 16 Practices
• North Ayrshire – 145,290 patients (37%) across 19 Practices
• South Ayrshire – 110,006 patients (28%) across 18 Practices 
It should be noted that the analysis of the extended MDT workforce aligned to the new
GP contract has been captured at a moment in time and can vary across the year. 
3.4 Primary Care Improvement Fund (PCIF) Update 
The implementation of the 2018 General Medical Services contract for Scotland
intended to see an additional investment of £250m per annum in support of General
Practice by 2021.  This was part of an overall commitment of £500 million per annum
investment in Primary and Community health services that was previously committed
by Scottish Government.   
Since 2021/22 and 2022/23 Primary Care Improvement Fund (PCIF) was allocated as
tranche 1 and tranche 2 based on projections and spend against each of the IJBs
National Resource Allocation Committee (NRAC) share. 
Although the focus changed in 2022 to pharmacotherapy and CTAC, the HSCPs
continued to invest in the additional wider roles set out as above.  Each area has been
at different stages throughout, and prioritised different services based on their
population need. 
It should be noted that as the PCIF is ‘flat cash’ all pay awards/uplifts are consumed
within the budget itself.  This has impacted significantly on the available funds
available for additional investment. 
66

Page 67

The final allocation for 2023/24 was confirmed in February 2023 which is line with
what was anticipated.  The allocation is noted below per IJB: 
• East Ayrshire - £4,915,035 (includes non-recurring carry forward of £466k from
2022/23)
• North Ayrshire - £4,821,036 (-£157k was deducted start of year due to
overspend in 2022/23)
• South  Ayrshire - £4,202,060 (includes non-recurring carry forward of £65k
from 2022/23) 
East Ayrshire IJB carried forward a higher underspend than was expected from
2022/23 year as noted above due to a large number of senior vacancies across the
pharmacotherapy team and no replacement workforce, as well as vacancies across
the MHP team. 
Joint discussions have taken place, and are ongoing with the North Ayrshire HSCP
senior team to work through their budget allocation and committed resource. 
The final end of year position for each IJB is not available from the finance team at
the time of report submission, but will be updated verbally at the IJB. 
3.5 Premises 
Many GP practices are facing increasing challenges to accommodate the number of
additional staff aligned to them through the PCIP. The lack of availability of
assessment rooms means some practices are unable to access their full allocation of
MDT resource therefore capacity to appoint patients to these practitioners is reduced. 
Many of the buildings within the GP practice estate are also needing significant
investment or alternative accommodation identified for longer term viability. 
Infrastructure planning for Primary Care Services commenced in October 2023 along
with the three Ayrshire HSCPs aligned to Caring for Ayrshire to look at greater cluster
level models of care.  This examined patient populations and premises across each
of the three HSCP areas and considered the best use of the estate, virtual
appointment delivery and scoping potential for some MDT services to be provided
from local community hubs and where these could be located. The sessions also
included engaging with each GP Practice to understand their premises and service
delivery models, along with community facilities to identify our areas of greatest
challenge as well as opportunity for future models of care.  There was 100% return
rate from General Practice.  The outputs of this will also be included within the NHS
Ayrshire & Arran whole system plan.  It is anticipated this will progress over the next
three years aligned to the organisation’s short/medium/long term plans. 
67

Page 68

3.6 Digital 
In line with national requirements to phase out analogue telephone lines by 2025, the
proposal agreed locally in 2022 in Ayrshire and Arran was for a single digital system,
hosted by the health board, with improved functionality and enhanced patient access
to be offered to all practices. 
The proposed system allows for better call handling and monitoring in the style of a
“Call Centre” where multiple calls come through a queuing system and call recording
functionality is available.  It was anticipated that this single solution would also be
more cost effective for practices who were signed up to long contracts with a range of
different providers, often at high costs. 
Following initial agreement to proceed in 2022, the project experienced initial delays
due to difficulties in recruiting to the technical support team and also delays in the
delivery of necessary new equipment which did not arrive until February 2023.   
To date, two practices have been successfully transferred and a further eleven are in
progress.  Delays in implementation and technical issues with legacy infrastructure
have meant that some practices have chosen to opt out of the proposed Board model
with two practices recently entering new long-term contracts with alternative providers. 
There is a risk that further practices will follow suit which in turn creates uncertainty to
the proposed pricing structure and programme costs which were originally based on
an agreed number of practices making the switch. 
The Digital Team have set out to transfer one practice per month onto the new system
and it is hoped that this could be increased to two practices per month as the
programme gathers momentum, and processes are fully embedded.  There are
currently two practices on target to transfer over in January 2024.  It should be noted
that successful transfers are also dependant on the collaboration with the external
commercial telephone providers which can lead to delays. 
GP IT Re-provisioning - NHS Ayrshire & Arran has progressed with a single award
to one provider in January 2024 with transition roll out planned currently scheduled to
happen across all GP Practices from February to December 2025.   
The primary care team will be scoping and defining the requirements alongside digital
services colleagues to ensure service delivery to patients is not compromised during
the transition.  This will be a new significant piece of work across both teams under
the leadership and direction of the new GP IT Re-provisioning Programme Board.   
The Programme Board has wide representation across primary care management,
clinical leadership, and digital services.  The Scottish Government has agreed to fund
the increase in costs associated with the new IT system as well as central costs over
the implementation period.   
68

Page 69

3.7 2024/25 Priorities 
There is a national focus on short term actions to sustain the current system and
reduce risk be taken forward over one year that include: 
• Stabilisation plan for General Practice – focus to be on retention and
supporting the core building blocks of general practice.
• Chronic Disease Management – recovery plans to focus on what is needed
to enable proactive management and review
• MDT Working – consideration, sharing learning and understanding variation
with a focus on team working and changing ways of working to fully realise
the role of the EMG. 
These actions align to the priorities locally and objectives set out within local delivery
plans.  Key areas being taken forward include: 
• GP Contract Reviews - Annual reviews of General Practice GMS Contracts
were stood down in 2018 but have now been reinstated by the Primary Care
Management Team. A programme for annual review will review practice
operating models, quality indicators (including chronic disease management)
and identify any improvement work. 
In advance of each review, the practice will be asked to complete paperwork
which will then facilitate a face to face meeting with the practice
representative and primary care manager, supported by the Clinical Director
as required to provide assurance of delivery of their contractual obligations. 
It also allows for any specific concerns to be discussed. 
This programme of work will enhance oversight of core service delivery by
the Board and help to early identify any issues or additional support
practices may require to sustain service delivery. 
• Demonstrator Site – this will be an extensive programme carried out at pace
supported by NHS HIS with the local teams and GP Practices.  The Ayrshire
and Arran high level action plan is due to be submitted on 29 March 2024
which will inform the work plan and expectation across the next 18 months. 
• GP IT-Provisioning – Further work is now being taken forward to understand
the scale of the transition work in year and also 2025/26 in terms of
preparatory work for digital services and for practices in advance of the
transition as well as the detailed roll out, including additional workforce to take
forward the roll out plan.  A business case will be developed through the
Programme Board and progressed through local governance groups.   
69

Page 70

3.8 Quality / Patient Care 
Quality improvement within General Practice Clusters has continued to develop and
strengthen throughout 2023.  A range of improvement work has been carried out by
the Clusters with some pieces of work done in collaboration with NHS HIS. Online
Continual Professional Development events are hosted fortnightly with an open invite
to staff in the whole MDT working in General Practice. 
Clinical Directors meet regularly with Stakeholder GPs to understand any barriers for
improvement within clusters and ensure they are supported to undertake quality
improvement initiatives identified through local data analysis. 
An All Ayrshire GP call is scheduled fortnightly and hosted by the Deputy Medical
Director of Primary and Urgent Care.  This is an open invite for all GPs and Practice
Managers to attend and provides a forum for two-way communication to share
information on developments and current challenges across the system, particularly
across the interface with acute services.  Invites are also extended to other key
members of the wider healthcare community to provide expert knowledge on issues
scheduled for discussion.   
Attendees have fed back that they find these sessions useful and provides them with
an insight on current system pressures and how this is impacting on the patient
journey. 
All GP Practices across Ayrshire and Arran are offered regular afternoon sessions
throughout the year for Protected Learning Time (PLT).  This allows the practice teams
to come together as a practice to focus on reviewing service delivery models, staff
development, discuss any opportunities for learning or improvements and
opportunities for future ways of working.  Calls into the practices participating in PLT
on these afternoons are re-directed to AUCS to support patients during this time. 
3.9 Anticipated Outcomes 
The purpose of the work underway is to help people access the right person, in the
right place, at the right time in line with the Scottish Government Primary Care Vision
and Outcomes.  Including: 
• Maintaining and improving access
• Introducing a wider range of health and social care professionals to support
the Expert Medical Generalist 
• Enabling more time with the GP for patients when it’s really needed
• Proving more information and support for patients. 
As we have worked to build our devolved Health and Social Care System in Ayrshire
and Arran, the critical role of primary care has been emphasised throughout
implementation to date, and is viewed as a core component of an integrated
community based care system.
70

Page 71

This provides a solid foundation for developing a whole system health and care model
which focuses on individuals, families and communities with general practice and
primary care providing accessible, continuing and co-ordinated care. 
The aim is to empower people to take control of their own health and care as far as
possible, enabling self-management, promotion of wellbeing and prevention of ill-
health, use of telecare and telehealth and maximising care provided in and around
communities. 
3.10 Measuring Impact 
Implementation of the PCIP has created opportunities seen in the context of the aim
of the Caring for Ayrshire agenda to design a fully integrated system wide approach
to ensure people are able to access the right care at the right time in the right place.  
Primary care clinicians have more interactions with patients than other parts of the
NHS therefore the whole system transformational change relies on sustainable and
accessible primary care services. 
4. IMPLICATIONS 
4.1 Financial 
Primary Care Improvement Fund – the allocated fund available for the PCIP is not
sufficient to ensure full roll out of the wider MDT roles.  The projected additionality for
CTAC and Pharmacotherapy is captured within the Demonstrator Site bid and funding. 
This will create and inequity across practices and different populations.  There has
been a request to NHS HIS to capture the impact of this as part of the evaluation
process.  Discussions have taken place nationally to baseline the PCIF into core
budgets, but there is no agreement on this to date.  Until the budget is baselined, the
cost pressure associated with agreed pay awards will continue to impact on the
number of roles that can be recruited to. 
Phased Investment Programme Demonstrator Site – the funding associated with
this programme of work has only been confirmed for 2024/25 and part year 2025/26. 
There is no commitment beyond this time period.  The detailed work being taken
forward as a demo site will inform future investment, but there is no guarantee of
ongoing funding.  Discussions will take place as the programme progresses to
determine staff turnover projections and the risk appetite at an IJB level to determine
permanent vs fixed term job roles.   
GP IT-Provisioning – although the system costs will be funded nationally, there will
still require to be a local business case for additional implementation resource given
the size and scale of work required.  There is minimum shared learning available at
this time from other Board areas to help inform projected resource requirements.  This
will become clearer during 2024/25 and the planned scoping work. 
71

Page 72

GP Practice Sustainability – there has been an increase in the number of practices
who have indicated to the primary care team that they have sustainability concerns
either relating to practice income or relating to their premises.  Historic payments have
been agreed with practices which will be reviewed 2024/25 and the primary care team
will also be working closely with practices to understand sustainability concerns in
more detail, providing guidance and support with the Local Medical Committee also. 
There is no dedicated funding allocation available for practices.  The national GP
Sustainability Loan scheme has been in place since 2018 which is open to all GP
Practices who own their building to apply for an interest free sustainability loan up to
the value of 20% of their property.   
The deadline for applications is 31 March 2024, but there has already been guidance
issued to confirm that only those payments that have already gone through the
extensive legal process will be progressed over the next 12 months.  Since the
scheme was introduced in 2018, 14 practices have applied from Ayrshire and Arran. 
Five practices have withdrawn their application, six practices have received their loans
and three practices have their application in process. 
4.2 Human Resources 
GP workforce remains a risk with a number of GPs retiring or choosing to leave the
profession.  There is ongoing work with current GPs and also trainees to make GP
roles as attractive as possible in Ayrshire and Arran.   
The majority of roles within the additional workforce bid aligned to the demonstrator
site bid ranges focusses on creating career pathways from schools or colleges.   
Availability and recruitment of the wider MDT staff and professional groups is
becoming more challenging as other Health Board areas also progress their workforce
plans. 
Many of the roles being created within the new service developments are new job
roles and require job evaluation ahead of recruitment.  Services plan ahead as much
as possible when workforce planning, but there can still be significant delays when
recruiting to these services. 
4.3 Legal 
None. 
4.4 Equality/Socio-Economic 
The aim through the reformed primary care service is not just to extend life, but aim
to reduce the time spent in poor health.  Implementing the 2018 GMS contract is an
opportunity to mitigate health inequalities where possible. 
72

Page 73

4.5 Risk 
Continued sustainability of GP practices is at risk while the new GMS contract is being
implemented.  For those practices who have highlighted risks to service delivery or
workforce availability, the Primary Care Managers carry out bi-monthly meetings with
the Practice Manager and GP Practice Quality Lead to understand the practice issues
and risks. 
There is a risk that GP Practices will be unable to recruit to GP or Locum roles due to
availability of workforce. The Primary Care Team have supported a number of
successful rolling media programmes to promote GP Practices in Ayrshire and Arran
and will continue to work with practices to forecast potential vacancies. 
There is a risk of not being able to implement all aspects of the 2018 GMS contract
due to financial constraints and the ability to recruit to additional professional roles to
either expand the MDT teams, ensuring sufficient resilience for leave or vacancies
within each of the services. 
4.6 Community Wealth Building 
The wellbeing of people and communities is core to the aims and successes of
Community Planning.  The Primary Care Improvement Plan, delivered as an integral
part of the Wellbeing Deliver Plan, Integration Authorities Strategic Commissioning
Plan of both the NHS and Council, will contribute to support this wellbeing agenda. 
4.7 Key Priorities 
The strategy and programme outlined in this report will assist the IJB to deliver the
following Strategic Objectives from its Strategic Plan to: 
• Provide early and effective support
• Improve mental and physical health and wellbeing
• Develop and support our workforce 
5. CONSULTATION 
Consultation has taken place through the Primary Care structures involving all
stakeholders across each HSCPs and GP Sub Committee. 
Ongoing communication with all stakeholders and the population will be critical as
implementation and reform progresses post COVID-19 arrangements and challenges. 
Vicki Campbell
Head of Primary and Urgent Care Services
Vicki.campbell@aapct.scot.nhs.uk 
73

Page 74

Implementation Officer and Person to Contact:
Claire McCamon
Senior Manager Primary Care Services
Claire.McCamon@aapct.scot.nhs.uk 
07 March 2024 
74

Page 75

North Ayrshire Integration Joint Board
9 May 2024 
Subject : Primary Urgent Care Update
Purpose :  This report aims to provide an update to the Integration Joint Board
(IJB) on the provision of primary urgent care services delivered
through the Ayrshire Urgent Care Service (AUCS).  This report also
updates on innovative pathways developed and tested throughout
2023.  
Recommendation : It is recommended that the Integration Joint Board:
a) Note the progress of the Urgent Care agenda across
Ayrshire and Arran
b) Note the increased activity within AUCS as a result of the
new pathways introduced to ensure patient care is delivered
as close to home as possible 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
ANP Advanced Nurse Practitioner
APP Advanced Practice Paramedic
AUCS Ayrshire Urgent Care Service
COPD Chronic Obstructive Pulmonary Disease
ESMH Emergency Services Mental Health
FNC Flow Navigation Centre
GP  General Practitioner / General Practice
HSCP Health and Social Care Partnership
IJB Integration Joint Board
NHS AA NHS Ayrshire & Arran
OOH Out of Hours
PLT Protected Learning Time
RRR Rapid Respiratory Response
SARCS Sexual Assault Response Co-Ordination Service
SAS Scottish Ambulance Service 
Agenda Item 6
75

Page 76

1. EXECUTIVE SUMMARY 
1.1  AUCS operates 7 days per week 24 hours a day as a GP led Flow Navigation Centre
(FNC). Further information on this unique joint approach and the development and
growth of pathways are outlined in this report.  
1.2  This paper provides an overview of the activity of the service, including new innovative
pathways in operation to support an improved patient journey, with continued focus
on community based services.  The data presented demonstrates the effectiveness
of the service avoiding hospital attendances or avoidable admission to hospital which
has better outcomes for patients.  
1.3  The success of the new pathways and ways of working is a result of good working
relationships across Ayrshire and Arran and wider system partners including NHS 24,
Scottish Ambulance Service (SAS), Police Scotland, as well as strengthened
connections with GP practices and Community Pharmacy.  All new service
developments are created in partnership across clinical and managerial leadership
teams from relevant stakeholders.    
1.4 Ayrshire and Arran were invited to attend the Winter Summit in August 2023 which
was focussed on working together to develop winter resilience plans with health and
social care partnership colleagues, COSLA and Scottish Government.  This was an
opportunity to share our approach in developing primary and community led pathways
within urgent care which support patients to be receive their care as close to home as
possible. 
1.5 The Cabinet Secretary for NHS Recovery, Health and Social Care visited AUCS in
October 2023 to meet the teams and get an overview of Ayrshire and Arran’s 24/7
community urgent and out of hours care system.  The presentation outlined the
successes of managing urgent care demand through to community pathways and
provided an opportunity to share the drivers for change, successes and challenges to
achieve the right outcomes for patients the first time. 
1.6 This report has also been presented to: 
• East Ayrshire IJB – 20 March 2024 
• NHS Ayrshire & Arran Board – 26 March 2024
• South Ayrshire IJB – 3 April 2024 
2. BACKGROUND 
2.1 The Public Bodies (Joint Working) Scotland Act 2014 provides a legislative framework
for the delivery of Primary Care Services in Scotland with powers and duties delegated
variously to both the NHS Board and the IJBs. Through these arrangements the three
Ayrshire IJBs commission, through Directions, NHS Ayrshire & Arran (NHSAA) to
provide Primary Care Services. 
76

Page 77

This includes provision of Out of Hours (OOH) Primary Care Services through AUCS. 
This is delivered through the Director of East Ayrshire Health and Social Care
Partnership (HSCP) in a lead partnership arrangement.  In addition, NHSAA directly
commission East Ayrshire HSCP to conduct Primary Care Contracting on behalf of
the Board, this being a function that cannot be delegated to IJBs at this time.   
2.2  AUCS fulfils the vision of developing a multi-disciplinary integrated approach to OOH
services in Ayrshire.  AUCS continues to build on the unique 24/7 model which
incorporates OOH and FNC through continuous review of all pathways to evaluate
efficiency and effectiveness to create and sustain fully person centred pathways for
all patients, getting the right care in the right place at the right time.    
3. PROPOSALS 
3.1 Service Overview and Activity 
There are various services and pathways included within AUCS, some of which are
available 24/7 and others during the OOH period (Monday to Friday 6 pm – 8 am and
Saturday/Sunday).  The OOH District Nursing and OOH Social Work teams are
managed through East Ayrshire HSCP and the OOH Mental Health Crisis Team who
are managed through North Ayrshire HSCP.  All other pathways and services are
supported within the current AUCS management structure. This includes pathways
such as SAS Call before Convey, Emergency Services Mental Health Pathway and
the Palliative End of Life Support line, all of which operate on a 24/7 basis. 
Call handling service - The call handing service has the highest volume of activity
within the OOH service, when acting as the single point of contact for various services
across East, North and South Ayrshire HSCPs. It includes calls from families and
patients trying to reach, Care at home, Social work and District Nursing Services.
During January – December 2023 the service saw an increase in calls 5743 (4967 in
2022) reflecting an additional 776 calls per month. 
GP Out of Hours Service – The OOH service is accessed via calls to NHS24 111
which are then passed to AUCS with a priority based on clinical need of one, two or
four hours.  Throughout 2023 the monthly average of contacts was 9448; an increase
of 948 monthly from the 8500 contacts reported for 2022.  
Proportionately 55% of workload comes through the NHS 24 pathway; the remaining
45% from the other pathways supported through AUCS. 
All patients that are referred to AUCS OOH from NHS 24 go through a full clinical
assessment within the triage time set by NHS 24 with an outcome of either: 
• Self-Care
• A prescription issued for collection at local pharmacy
• An Appointment at a local Primary Care Urgent Care Centre 
• A home visit undertaken by GPs / Advanced Nurse Practitioners in dedicated
cars with driver support colleagues. 
77

Page 78

In 2022 the service reported an average 89% of patients being clinically assessed
within the set timeframe from NHS 24.  This has increased to 92% for 2023 and
reflects improvements to pathways and clinical resources with a consistent number of
clinicians actively undertaking sessional shifts with the service.  Factors impacting this
performance includes periods of high demand where clinicians will prioritise the most
vulnerable patients, including calls received with one and two hour response times,
and patients who are non-contactable for several hours following receipt of the case
from NHS24. 
A non-urgent patient transport service is available to take patients to OOH urgent care
centres, in Ayr, Kilmarnock or Irvine if they have no other means of transport. All
clinicians are aware of the criteria outlined below of this resource which is fully funded
by the service: 
• Those who are deemed to need further clinical assessment at hospital on a
non-urgent basis and are not suffering from conditions that are life
threatening or deemed as an emergency
• Patients who have been assessed face to face, virtually or via telephone by
a clinical member of GP practice or AUCS clinical staff
• Patients who have no alternative means of transport to the requested
destination 
Ayrshire and Arran covers an expansive caseload due to patients living in rural areas
with infrequent / limited access to public transport, who particularly benefit from this
element of patient transport.  In 2023 there were a total of 1640 journeys recorded.  It
should be noted that this service also supports GP Practices and both hospital front
doors where an ambulance is not required, and the patient has no means of transport.  
The use of patient transport has also reduced the number of home visits required to
be undertaken by a mobile clinician.  This has allowed the service to adjust and flex
the workforce to other areas of demand.   
The ‘clinical triage first model’ for all out of hours calls from NHS 24 remains in place.
This results on average 56% of calls closed off remotely through 2023; an increase of
10% from the previous year. The majority of remote consultations will relate to
pharmaceutical enquiries, a change in symptoms or clinical advice.   
The remote first model reduces the number of urgent care home visits and centre
appointments across the three sites, prioritising face to face assessment time for those
most in clinical need.  It should be noted that a full clinical remote assessment can still
take 15 minutes therefore robust clinical capacity is still required.   
Further extended data analysis has been carried out during 2023 which has provided
the AUCS management team greater insight into the service delivery model required
to meet projected seasonal demand.  This has enabled the implementation of two
model types - Spring/Summer (1 April – 31 October) and Autumn/Winter (1 November
– 31 March) which ensures safe delivery of all services.  
78

Page 79

This has allowed a flex in workforce to the busier months and weekends utilising the
resource from the reduced spring/summer model.   
The current model relies heavily on GP engagement for service delivery. In 2023 an
additional 41 GPs joined the services from within Ayrshire and Arran, but also other
NHS Board areas. 
111 Emergency Department/Minor Injuries – patients who think they require to
attend the Emergency Department are directed to contact NHS 24 (111) for their
urgent care needs as a first point of contact.  NHS 24 assess the patient’s needs and
then route patients who require further assessment to the FNC operational within
AUCS over the 24/7 period.  The Senior Clinician, usually a GP, will clinically assess
the patient remotely and determine the best outcome through the most appropriate
care pathway which could include: 
• Closed as assessment and care provided by a clinician over the phone with
self-care advice
• Directed to their GP practice (during in-hours)
• Scheduled for a home visit by an AUCS clinician (during out of hours)
• Appointed to a Primary Care Treatment Centre (during out of hours)
• Onward refer to a community service and
• Appointment at the Minor Injury Unit 
OOH District Nursing Team - continues to operate within the main AUCS hub at
University Crosshouse Hospital to provide planned and urgent community based care
to patients including palliative care where necessary.  In October 2023 the
professional management arrangements for the service were transitioned to East
Ayrshire HSCP. 
Throughout 2023 there has been an increase in patient referrals into the service with
an average of 1900 per month compared to 1500 during the previous year. 
Pan Ayrshire OOH Social Work Team - a range of Senior Practitioners and
sessional social work staff ensure the delivery of a professional out of hours response
to the immediate needs of individuals and families across all social work services,
including those considered as vulnerable or at risk.  Established links with Police
Scotland, Health and Education services remain a constant with the team.   
Throughout 2023 the service has seen an increase in referrals to 715 referrals per
month.  In 2022 this was 561 referrals.  OOH Social Work colleagues have highlighted
that the number of referrals received in 2023 matches that of 2019 however the
complexity and needs of referrals has significantly increased.   
79

Page 80

Mental Health Crisis Team - continues to operate as part of AUCS in the OOH period
providing urgent access to relevant community mental health services.  The Mental
Health Crisis Team support a range of services out with AUCS in the OOH period with
a consistent average of 150 calls via NHS 24 / AUCS on a monthly basis throughout
2023, matching the average seen in 2022. 
COVID-19 Therapeutic Service - the service has been delivered through AUCS since
December 2021 within the Community Clinical Treatment Centre. This supports a
specific cohort of patients deemed as very high risk of progression to severe disease
and/or death if they develop COVID symptoms and test positive for the virus and
therefore require intervention in the form of COVID therapeutics. 
Whilst the frequency of COVID outbreaks has reduced throughout the past 12 months,
the criteria of people identified as potentially eligible has increased with those newly
eligible having been notified by letter with information on how to access this treatment
locally as part of their care. There remains a facility for patients to self-refer or via their
GP if they think they are eligible for treatment. 
The table below shows a breakdown of referrals throughout 2023:   
Year Referrals Receiving Antiviral
Treatment
Later Admitted to acute
hospital for further Covid-
19 related illness
2022 1784 901 10
2023 625 423 6 
The COVID Therapeutic Service was funded in 2022/23 and 2023/24 on a non-
recurring basis utilising bank and vaccination staff.  The model is flexed up and down
to meet demand on a week to week basis.  Discussions are ongoing regarding how
this service will be taken forward and funded in 2024/25. 
National Hub - Sexual Assault Response Coordination Service (SARCS) self-
referral service – AUCS continues to act as the National Hub for all SARCS self-
referrals Scotland wide, working in collaboration with NHS 24 and ensuring that all
referrals, regardless of where the person is in Scotland, are managed within agreed
timescales.   
The Hub operates 24/7 and ensures that all referrals from NHS 24 are triaged and
directed to the appropriate Board pathway.  The Hub delivers a back office function
without the need to speak to the person self-referring into the service. 
Between the period of 1 April 2023 and 26 February 2024, a total of 334 referrals were
processed by the National Hub (297 x acute; 32 x historic; 5 x 13-15yr old). A similar
number to the previous year of 387 referrals (328 x acute; 33 x historic; 6 x 13-15yr
old).   
80

Page 81

Whilst there is no clearly identifiable trend to enable forecasting the volume of self-
referrals being received on particular days / times, peaks in October / November 2022
and 2023 were noted. 
Strong relationships have developed with NHS 24 and national SARCS Policy Unit
colleagues within Scottish Government through regular engagement to share
learning, identify emerging issues with solution focussed discussions. 
It was recognised as part of the bid to host this national service that Ayrshire and Arran
had a robust infrastructure in place 24/7.  The only additionality required were two
Agenda for Change Band 2 call handlers to bolster that cohort of staff.  Non-recurring
national funding has been agreed to fund this. 
Care and Nursing Home Pathway – as reported previously, this pathway provides
direct access to the FNC within AUCS during the OOH period as an alternative to the
NHS 24 process, reducing delays by using NHS 24 route and replicating in hours
service by a care home’s own GP practice.  Direct calls to the FNC for clinical advice
/ assessment reached 3963 in 2023; an increase of 1331 from the previous year. 
This local model has seen 8% of calls through this pathway attending hospital with
only 3% going on to be admitted. This compares to admittance rates via SAS 999 of
22% and NHS 24 16%.  The pathway through AUCS allows access to all community
pathways under the 24/7 FNC and has contributed to and maintains around a 30%
reduction in SAS attended calls for care home residents since the 2019 baseline. 
Referral process in place for GP Practices - to schedule Minor Injury Appointments
via the FNC where patient transport can also be arranged.  This has reduced the
number of ambulances being requested and the majority of patients are seen within
the minor injury unit around their appointment time therefore reducing the crowding in
Emergency Departments. There were 703 GP Practice referrals to the FNC through
2023, which also includes any referrals from GP Practices to request a revisit or
patient follow up from a clinician in the OOH period. This reflects a reduction of 202
referrals from the previous year.   
Emergency Services Mental Health (ESMH) Pathway - was fully launched on 30
May 2022 following a successful pilot in early 2022.  SAS and Police Scotland refer
mental health related calls which do not require emergency medical intervention to the
FNC.  This 24/7 service is a whole life pathway with no upper or lower age limits. 
This process involves the FNC facilitating the call to the Emergency Mental Health
Team for initial assessment which includes conversations with the referrer and the
patient, after which a joint decision is made about whether an in-person mental health
assessment is needed, either at the patient’s own home or a specific location within
the community.  This is a more individualised and person-centred approach, providing
the right care in the right place at the right time, and reduces pressure and capacity
on Police Scotland, SAS and the Emergency Department teams as well as the
opportunity for ongoing follow up within the community.
81

Page 82

In 2023 a total of 1882 calls were received: an increase of 150% from the 748 calls in
2022. Calls are routed via the FNC to the Emergency Mental Health Team from Police
Scotland or SAS.  These patients would otherwise have formerly been conveyed to
the Emergency Departments by Police Scotland or SAS which was not always the
most appropriate place for the specific care needed by these vulnerable individuals.
Plans are underway to establish an Urgent Mental Health assessment unit within the
Woodland View hospital site.  The unit will provide short stay beds for patients
requiring further assessment for a period of up to 72 hours. 
Scottish Ambulance Service (SAS) Call before Convey Pathway – the pathway
for SAS crews attending calls or reviewing calls on their dispatch screens to consider
what input and support the FNC could provide has been fully embedded with positive
feedback from crews. AUCS clinicians have continued to attend to confirm life extinct
for non-suspicious deaths for SAS and Police Scotland which helps our emergency
services to prioritise patients with life threatening conditions.   
In 2023 there were 3291 referrals to AUCS from SAS, of which only 9% went on to be
referred to hospital as final outcome Approximately 91% of referrals didn’t require a
SAS crew to convey to the hospital front door (2022 data – 1730 calls and 10% went
on to be transferred to hospital).  It is noted that 30% of the Call before Convey
contacts with AUCS are between 8am and 6pm at weekends. 
AUCS clinicians are able to access hospital clinical systems, emergency care
summary, and previous encounters with AUCS. This provides greater insight to the
landscape of a patient’s needs and allows more robust assessment of individual risk. 
SAS contact with patients is not reported back to general practice whereas all referrals
logged via the FNC are recorded via the FNC clinical system (Adastra) and reported
back to general practice.  This allows visibility for the GP Practice to follow up where
appropriate. 
Rapid Respiratory Response Service (RRR) - Ayrshire and Arran has the second
highest Chronic Obstructive Pulmonary Disease (COPD) rate in Scotland with
emergency COPD admissions 34% longer than other emergency admissions.  The
vision for this service which used a targeted and data driven approach to service
delivery is to enable patients to remain at home whenever possible.   
The aim of this service is to: 
• Provide specialist respiratory support during exacerbations 
• Improve patient’s ability and confidence to self-manage symptoms
• Support earlier discharge from hospital 
An initial cohort of 17 GP practices able to refer to the pathway have identified a
reduction of COPD related attendances to hospital reduce by 50%.  Recent recurring
funding will support the service to expand to a pan-Ayrshire model collaborating with
all 53 GP practices making it available to all 11,835 patients currently diagnosed with
COPD. 
82

Page 83

Community Pharmacy - a dedicated professional to professional pathway into AUCS
in the OOH period should a patient present at community pharmacy and the
Pharmacist is unable to fully treat them or needs support from a senior clinical decision
maker from FNC.  If a senior clinical decision maker is not available, a call back to the
patient will be arranged within an agreed timeframe with the Pharmacist.  Prior to this
pathway, patients would normally be directed to NHS 24 if community pharmacy were
unable to help therefore reducing the amount of services the patient has to navigate
through. 
This pathway is still in development with learning gathered routinely – a total of 719
patient referrals have been received into FNC from Community Pharmacy in 2023
which is an increase from 614 in 2022. 
Protected Learning Time (PLT) – throughout 2023 AUCS provided clinical and
operational support for 12 x five hour sessions of PLT.  Each block of three sessions
enabled an average of 50 Ayrshire and Arran GP Practices to deliver protected
learning time for primary care staff, safe in the knowledge that urgent contacts were
managed by AUCS.  This has proved to be a valuable service to primary care
colleagues and arrangements have been agreed to continue throughout 2024. 
3.2 Additional Improvement Projects 
Palliative End of Life Support Line - this new call handling service went live on 7
October 2023 and was created to facilitate a single point of contact for palliative
patients in their last 30 days of life through the FNC using existing call handling
services.  The service is designed to enable timely management of unscheduled care
episodes for palliative patients in the community and to address care needs effectively
in their usual place of residence and prevent hospital admissions which may not be of
benefit to them.  A total of 39 patients have been referred to the service between 7
October 2023 and 31 December 2023.  Work continues to scope what a 24 hour
telephone support service could like for the benefit of patients, their families and carers
aligned to wider community services. 
Test of Change: Appointing to Community Pharmacy – an appointment system
with a community pharmacy in the Maybole / Carrick catchment area was successfully
tested for ten weeks from 9 December 2023 to 10 February 2024.  A total of 18
appointment slots were made available each Saturday for common conditions such
as sore throats, ears, and suspected chest infections for persons over five years of
age.   
This additional resource provided a person centred, local appointment to patients and
allowed AUCS clinicians time to focus on more complex patients within centres.  The
pathway also encourages members of the public to utilise Pharmacy First, with the
support of AUCS if clinical treatment is out with the scope of the Community
Pharmacist.  A robust review of the impact and benefits of this test of change is
ongoing. 
83

Page 84

Test of Change: Support to GP Practice Home Visits 1600-2200 weekday
evenings – it was highlighted that GP practices required additional support for
patients who contacted them after 3pm and had been clinically assessed as requiring
a home visit and were safe to wait a maximum of four hours to speak to a clinician. 
AUCS facilitated a test of change for eligible patients initially with only four GP
practices.  The scope gradually expanded and now includes a total of 25 GP practices.   
Over the 11 week period from 11 December 2023 to 23 February 2024, demand
increased steadily, from five home visits in the first week to 27 in the final week.  Work
continues to identify the full benefits and impact of this service, as well as further data
analysis in respect of widening the scope to further general practice clusters. 
SAS Advanced Prescribing Paramedics (APPs) - AUCS is hosting six APPs over
a 14 week period which commenced on 4 December 2023.  This is aimed at
supporting development of a learning framework for OOH services which further
bolsters the relationship between AUCS and SAS. 
3.3 Quality 
The further development of reporting mechanisms to provide assurance on the
delivery of safe, effective, person centred care in line with the dimensions of the quality
strategy has supported processes to fully investigate complaints and adverse
incidents. This ensures lessons learned are identified and necessary changes and
improvements implemented to mitigate any recurring issues across the service. 
The FNC supports a number of pathways to wrap the professional services around
the patient with an average 1644 calls per month over and above OOH activity.  It is
noted that only 25% (411) of the calls received via FNC attend hospital within 48 hours. 
The remaining 1,233 are assessed and treated via services within AUCS or navigated
back to community services.  This has also been linked to the sustained reduced level
of Emergency Department attendances post pandemic.   
The FNC operates with one clinician and call operator 8am to midnight 7 days per
week.  The model fully integrates with the wider OOH team during the OOH period. 
Moving to a 24/7 service with multiple pathways there was also a requirement to
increase the number of shift team managers to ensure sufficient management
oversight as well as increased clinical support to ensure the pathways operate
efficiently and safely.  Discussions are ongoing to finalise the funding for 2024/25.   
3.4 Next Steps 
The main aim for AUCS is to provide a prompt and seamless experience for citizens
across Ayrshire and Arran as well as an opportunity to schedule an appointment or
home visit when necessary.  Clinicians and administration staff within the service
feedback on a daily basis that patients are happy with their outcome either when they
receive a scheduled appointment or are directed to the right service first time, and
often at home.
84

Page 85

The teams will continue to build on the core OOH service and create innovative
solutions to challenges through engagement with the workforce and stakeholders. 
Commitment to adopting continued learning, improvement and development to ensure
the most efficient and effective service delivery model and services in light of the data
informed knowledge that demand, overall activity and patient need for urgent care
continues to evolve. 
Continuous review of current and new pathways must be undertaken to evaluate
impact and effectiveness to ensure improved patient journeys.   
Creative and innovative response to emerging challenges within our region should
continue to play a part in the service ethos. 
Collaborative work with a wide range of individuals and agencies, including acute and
community professionals, stakeholders including patients, their families and carers,
will continue in order to achieve the vision of providing the right care in the right place
at the right time. 
3.5 Anticipated Outcomes 
The main aim for AUCS is to provide a prompt and seamless experience for citizens
across Ayrshire and Arran as well as an opportunity to schedule an appointment or
home visit when necessary.  Clinicians and administration staff within the service
feedback on a daily basis that patients are happy with their outcome either when they
receive a scheduled appointment or are directed to the right service first time, and
often at home. 
The learning to date offers important opportunities seen in the context of the aim of
the Caring for Ayrshire programme which is to design a fully integrated system wide
approach to ensure people are able to access the right care at the right time in the
right place.   
3.6 Measuring Impact 
Continuous review of all new pathways is undertaken to evaluate impact and
effectiveness to ensure improved patient journeys which will benefit citizens of
Ayrshire and Arran to access appropriate care at the point of contact wherever
possible. 
4. IMPLICATIONS 
4.1 Financial 
The AUCS budget was originally set in 2016/17 based on activity at that time.   
85

Page 86

Despite the gradual increase of activity, which has been consistently 20% in 2022 and
2023, the service has continued to manage within budget, working efficiently and re-
designing where possible using data and trends to match the required workforce to
demand. 
Due to unfunded additional public holidays in 2023, increasing GP pay rates, and an
increased workforce required during peak demand times, this has been an extremely
challenging year to manage within budget and has required tight budget management
week to week.  The service will end the year within budget due to vacancies in the
management team and reallocation of funds from wider service budgets.   
Further discussions will take place in collaboration with other system partners and to
determine the future of the FNC model beyond 31 March 2024 and funding to support
this. 
A review of the COVID-19 Therapeutics Service is currently ongoing nationally to
understand future resource requirements beyond 31 March 2024. 
4.2 Human Resources 
A range of staff engagement sessions sharing data and themes in relation to the
AUCS service delivery model and resources has successfully informed changes which
will be tested during 2024/25 to ensure best practice and best value.   
Throughout 2023 AUCS has consistently improved on the projected shift cover
reported to the Scottish Government on a weekly basis. The average shift cover
projection is 92%, with actual shift cover average improving to 95%.  This reflects the
improvements in take-up of shifts with commitment from the spectrum of clinicians
working within AUCS.  In previous years this was as low as 43% at times. 
Recent developments have seen the senior management workforce model
strengthened along with a wider multi-disciplinary team approach to deliver core
urgent care services to patients.   
4.3 Legal 
None. 
4.4 Equality/Socio-Economic 
Changes to how urgent care services are accessed may positively impact patients
who have reduced mobility or multi co-morbidities where travel can be difficult as there
will not be a need to travel, and the infection risk will be reduced.   Current and future
users of urgent care will continue to access all services through NHS 24 / 111 route. 
This will ensure patients are seen in the right place with the right team at the right
time. Access will remain unchanged for all emergency care needs and access to GPs
will remain unchanged.  
86

Page 87

The suite of current and new pathways in response to emerging challenges and issues
allow for more seamless care by healthcare professionals for patients who try to
access urgent care rather than patients trying to navigate various systems or having
various ‘touch points’ across the system. 
4.5 Risk 
Like most other NHS Boards, the ability to fill sessional GP shifts remains a consistent
risk to service delivery. By utilising a multi-disciplinary clinical team providing OOH
services along with the recruitment of GPs with Extended Roles who work between
primary and urgent care, this core workforce mitigates the risk of solely using
sessional GPs. 
There is a risk to the future of the FNC model and impact on the hospital front doors
if sustained funding can’t be identified beyond 31 March 2024.   
The AUCS OOH component of the service has seen an increase of 20% in activity
and there has been no update to core funding since 2016.  Demand and funding
associated to match clinical capacity will require close monitoring on an ongoing basis.   
4.6 Community Wealth Building 
The wellbeing of people and communities continues to be core to the aims and
successes of Community Planning.  Ensuring we deliver the right care in the right
place at the right time, is an integral part of the Wellbeing Delivery Plan, Integration
Authorities Strategic Commissioning Plan of both the NHS and Council, will contribute
to support this wellbeing agenda. 
4.7 Key Priorities 
The strategy and programme outlined in this report will assist the IJB to deliver the
following Strategic Objectives from its Strategic Plan to: 
• Provide early and effective support
• Improve mental and physical health and wellbeing
• Develop and support our workforce 
5. CONSULTATION 
5.1 NHS Ayrshire & Arran has an ongoing commitment to engage with the public through
television, radio and social media as well as in a range of community venues.  AUCS
will continue to participate in appropriate platforms and events to publicise how to
access pathways available within AUCS and ensure that people are supported to
access the right care at the right time at the right place. 
87

Page 88

AUCS will continue to actively engage with and seek the assistance of the wider
services with pathway design and expand the use of the FNC as a central hub. The
management team is fully engaged with the National Urgent and Unscheduled Care
Collaborative and work continues to respond to emerging barriers and challenges to
the citizens of Ayrshire and Arran. 
Vicki Campbell
Head of Primary and Urgent Care Services
Vicki.campbell@aapct.scot.nhs.uk 
7 March 2024 
88

Page 89

Integration Joint Board
9 May 2024
Subject : Dental Services Update 
Purpose :  This paper is presented to update members of the North Ayrshire
Integration Joint Board (IJB) of the current position of dental
services. 
The paper also outlines the actions and measures that have been
taken forward in the last six months to further sustain service
delivery as well as the current status with the ongoing review for
the vision of dentistry across Ayrshire and Arran. 
Recommendation :  Members of the Integration Joint Board are asked to: 
i. Note the current position of access to dental services
across Ayrshire and Arran.
ii. Note the ongoing review work to establish clear aims
and objectives for the vision for dentistry across
Ayrshire and Arran. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required x
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
AGP Aerosol Generating Procedures 
DBC Dental Body Corporates
DHSW Dental Health Support Worker
EU European Union
GDC General Dental Council
GDP General Dental Practitioner
GDS General Dental Service
HIS Health Improvement Scotland 
HSCP Health and Social Care Partnership
IJB Integration Joint Board
NAHSCP North Ayrshire Health and Social Care Partnership
NHS AA NHS Ayrshire & Arran
OOH Out of Hours
PDS Public Dental Service
SIMD1 Scottish Index of Multiple Deprivation (ranking – 1 as most
deprived) 
Agenda Item 7
89

Page 90

1. EXECUTIVE SUMMARY 
1.1  Previous updates to the IJBs and NHS Board highlighted the risks associated with
dental access and the wider impact on general health, especially to those in vulnerable
groups and those in deprived areas.   
Although General Dental Services (GDS) remains a risk to due to workforce
availability and financial sustainability, the Dental Management Team have not
noticed any significant shift in demand or increased risk following the last update in
August 2023.  There has been a focus on business continuity and trigger tool
approaches to understand as early as possible if a practice is going into difficulty.  The
processes and tools that have been put in place has allowed greater understanding
at a practice level. 
Overall there has been an increase in the number of General Dental Practitioners
(GDPs) who are accepting new registrations although there are waiting lists.  Initial
feedback from the new payment structure has been positive, but as this has only been
in place since November 2023, it will take until around May 2024 to measure the
impact of this. 
The Public Dental Service (PDS) continues to be a safety net service for those patients
who cannot access their own GDP in an emergency, or are not registered.  Although
there is variation month to month, demand is not increasing at the rate that was
anticipated to the PDS.   
It was proposed in 2023 the service may need to consider introducing dental access
centres, but the current demand, as well as local intelligence from the GDPs has not
indicated a need for these at this stage.   
Recognising the workforce and access challenges, as well as the opportunity to
enhance what we can deliver in Ayrshire and Arran collectively across all dental
services, representatives from the Dental Management Team, Public Health, Area
Dental Professional Committee and clinicians working across the service have
engaged in a programme of work from December 2023 to consider the future vision
and ambitious service model.   
1.2  This report has also been presented to: 
i. East Ayrshire IJB – 20 March 2024
ii. NHS Ayrshire & Arran Board – 25 March 2024
iii. South Ayrshire IJB – 3 April 2024 
90

Page 91

2. BACKGROUND 
2.1  The Public Bodies (Joint Working) Scotland Act 2014 provides a legislative framework
for the delivery of Primary Care Services in Scotland. East Ayrshire Health and Social
Care Partnership (HSCP), through Lead HSCP arrangements, are responsible for the
delivery of Primary Care Services across Ayrshire and Arran.  In addition NHS
Ayrshire & Arran directly commission East Ayrshire HSCP to conduct Primary Care
Contracting on behalf of the Board, this being a function that cannot be delegated to
IJBs at this time. 
2.2 NHS GDS is typically the first point of contact for NHS dental treatment for patients
within the community.  People register with a dentist in order to receive the full range
of NHS treatment available under GDS 
The PDS acts as both a specialised and safety-net service providing care for
individuals who are unable to obtain care through the GDS such as those with special
care needs or patients living in areas where there were few NHS dentists providing
GDS.   
Secondary care is a referral based service which supports referrals from medical and
dental practitioners.  For example, maxillofacial surgery which specialises in the
diagnosis and treatment of diseases affecting the mouth, jaws, face and neck.  Those
patients who are unable or not suited to be treated locally are referred to the General
Dental Hospital who not only specialist on oral health care but deliver education and
research in West and Central Scotland. 
3. CURRENT POSITION 
3.1 The Vision for Dental Services in Ayrshire and Arran 
3.1.1  A programme of work commenced in November 2023 to reset the vision and strategy
for Dental Services in Ayrshire and Arran. 
The aim of this work was to allow greater understanding of the population need, the
current status of all services within dental, and determine what a future delivery model
for dental services in Ayrshire and Arran.  There was acknowledgement that the
current challenges being faced with workforce retention and access also provided
opportunity to ensure our services are in the right place to deliver care wrapped
around individuals. 
Three workshops took place between December 2023 and February 2024. These
looked for ways to improve access for patient care within dental practices taking into
account views of service providers and users.  The workshops included representation
from across GDP and PDS services, public health, the dental management team and
the Area Dental Professional Committee. 
91

Page 92

An agreed purpose was set out from the first workshop to:  
• Develop a clear vision for the service which takes into account both the
views of service providers and users
• Identify a base level of appropriate and equitable access.
• Support patients to manage their oral health for better health outcomes.
• Invest in the development of our workforce. 
In addition to the workshop sessions, public health colleagues led a Health Needs
Assessment with a number of focus groups established to understand the needs of
the population. 
A number of early priorities and suggested proposals to think about more integrated
care across all the dental services from Public Health, GDP, PDS, and Specialist
Services have come out of the workshops.  The last workshop only took place at the
end of February therefore outputs have not been shared widely with the networks
aligned to them.  The health needs assessment survey also closed on 29 February
and will be used to inform next steps with the proposals. 
3.2 Determination 1 – Dental Remuneration 
3.2.1  The Scottish Government launched a new dental payment reform on 1 November
2023 - Determination 1, which went live with the stated purpose of supporting the oral
health needs of every patient in Scotland.   
The aim of the reform is to make it easier for patients to understand what treatments
are available.  To simplify the remuneration for practices themselves, the items list
has reduced from 700 to 45 items.  All items can now be claimed for both adults and
children unless stated otherwise, and there will no longer be a distinction between
treatments available to registered and non-registered patients. 
The new fees also incorporate the Doctors and Dentist Review Body uplift of 6% on
fee items and Capitation and Continuing Care payments.  This was backdated to 1
April 2023. 
Patients who pay for treatment will continue to pay 80% of the cost with a maximum
fee per treatment now introduced at £384.  The revised payment structure was shared
as part of a national campaign as well local communication campaigns. 
There is no data available locally or nationally to determine the impact of the new
payment structure, but feedback throughout various forums indicates this has been
positive for practices and their income, as well as greater clarity for patients.   
92

Page 93

3.3  Access in North Ayrshire  
3.3.1  Since the last update in August 2023, six of the 28 GDPs listed with the Health Board
who are committed to providing NHS care within North Ayrshire are accepting new
NHS registrations – four of these are accepting both NHS adults and children with two
practices only accepting children. This is an improvement from four practices reported
in August 2023, although it should be noted there is a waiting list to first assessment
of up to six months, but can be less.   
The Dental Team continue to keep in regular contact with GDPs to understand in detail
the status of their service delivery to be aware of any issues early to be able to resolve
and support where possible.  The service also continues to prioritise prevention and
oral health improvement to reduce the possible burden of dental disease and mitigate
the impact of reduced dental access. 
The Dental Management Team have developed a comprehensive risk and resilience
plan which contains a detailed data set and early warning triggers to identify areas
which may be at risk of reducing or experiencing challenges in accessing dental
services.   The plan also sets out the steps that would be taken should a practice or
body corporate seek to de-register patients.  This includes how the PDS services
would re-structure their service provision to maintain a sustainable services as well as
support wider access to emergency dental care if required.  
3.4 Public Dental Service 
3.4.1  The PDS core function operates Monday to Friday with emergency appointment slots
available as a safety net for practices who are unable to offer emergency
appointments.  The service has increased the number of available slots available per
month from July 2023 due to a projected increase in demand.  There has not always
been the workforce to cover these sessions, but on a monthly basis overall, the
demand for emergency appointments has not increased, with the exception of
December 2023 where there was a slight increase.  On average between 127 and
147 patients are seen per month with the majority of attendances being non-registered
patients.  Only 30% of the total number seen are registered patients seeking to use
the service when they can’t access their own registered dental practice. 
The Out of Hours (OOH) service has seen an increase in the number of registered
patients attending the weekend emergency dental service for an appointment since
August 2023.  The service operates Saturday and Sunday 9 am – 3 pm with 44
appointment slots available. Some weekends the service will get near to capacity but
has not exceeded capacity.  The service has contingency arrangements in place for
a stand by team should the reach capacity. 
The OOH service is accessed via NHS 24 and on review of the national reporting,
demand has not increased to NHS 24 from Ayrshire and Arran. 
93

Page 94

3.5 Wider PDS 
3.5.1 Prison Service 
The current waiting time is 19 weeks to treatment with 21 patients awaiting treatment. 
This is an improving position from the previously reported 22 weeks to treatment.
Emergency appointments are being seen in the prison and where possible routine
work that does not include aerosol generating procedure as the site is still not fit for
purpose. 
The wait time is being impacted due to prisoners not being brought down on time for
their appointments at 8:30am. It was agreed the clinic times would commence at
10am.  The prison healthcare team are keen to support how the dental team can
maximise the clinical session on site as the number of people who can be seen has
reduced. There is a plan in place to appoint the 21 patients awaiting assessment and
treatment which should in turn further improve the waiting time. 
3.5.2 Paediatric Service 
The total number of paediatric patients on the waiting list as at end of February 2024
is 1225.  The waiting time for this service is 18 weeks to initial assessment and 19
weeks to treatment thereafter. 504 of the 1225 patients currently on the list are
awaiting initial assessment – this broken down by locality area below. 
• 154 - South Ayrshire
• 194 – North Ayrshire 
• 156 – East Ayrshire 
The remaining 721 patients are now on an active treatment plan.  Examples of the
ongoing treatment plans are noted below: 
• 143 of the 721 patients are waiting to be treated under general anaesthetic
at University Hospital Crosshouse.
• 420 of the 721 patients are being treated by a dental therapist.  These
patients will be allocated an appointment at a clinic closest to their home if
possible or next available date.  
• 158 of the 721 are receiving treatment under the Paediatric Senior Dental
Officer or a PDS dentist either at North West Kilmarnock or Ayrshire Central
Hospital sites. 
3.5.3 Sedation Service 
The number of patients currently waiting for treatment under the PDS sedation service
is 171 compared to 74 in August 2023.  Work continues with local GDPs to confirm if
there any alternative methods to support patients due to the number of patients now
waiting.
94

Page 95

3.5.4 Domiciliary Service 
There are currently 29 patients awaiting treatment with routine lists growing month on
month. This is slightly higher than 27 patients that was reported previously in August
2023. 
3.5.5 Adults with Additional Support Needs 
There are currently 26 patients awaiting treatment. This is slightly higher than 19
patients that was reported previously in August 2023. 
As the service continue to keep protected emergency slots available on each of the
three PDS sites, this does impact on the activity that can be scheduled.  It is also
difficult to quantify how long emergencies can take which also impacts on the actual
clinical capacity available for routine work. 
3.5.6 Oral Health Prevention 
Oral Health prevention is a key priority across Ayrshire and Arran.  The Oral Health
Improvement Team continue to strengthen links within the community, delivering local
training programmes, educating the population on good oral health practices with a
priority on prevention and providing support for local groups and events. 
The team deliver training and interventions for priority groups following recognised
national training programmes. The training programmes are tailored to individual
needs of the population within each of the priority groups. 
At a population level this includes: 
• Providing training materials for nursery, primary and secondary schools
(these can be borrowed free of charge)
• Promoting how the benefits of good oral health can improve general health
via training and social media
• Actively participate in National Oral Health Improvement initiatives such as
National Smile Month and Mouth Cancer Action Month. 
In addition, directed support targeting priority groups in greatest need through: 
• Deliver the Caring for Smiles programme to every care home in Ayrshire 
• Provide Caring for Smiles training for care home staff
• Provide Mouth Matters training and interventions for prisoners and prison
staff
• Provide Open Wide training and interventions for adults with additional
needs
• Provide Smile4Life training and interventions for homeless/addictions 
95

Page 96

• Facilitate a referral service (Dental Access Programme) for
homeless/addictions to the Public Dental Service 
• Deliver bespoke training and interventions for children with additional needs 
During April and December 2023 there were 328 training sessions carried out
involving 6,395 individual staff.  There has also been agreement with HMP Kilmarnock
to resume the oral health support programme for prisoners.  A start for this has still to
be agreed. 
3.5.7 Childsmile Programme 
The Childsmile Toothbrushing Programme is a supervised programme aimed at
helping children develop an important life skill at an early age, supporting positive
development in their immediate social and physical environment.  Across Ayrshire the
program is delivered in:- 
• 135 Early Years/nursery schools
• 9 Additional Support Needs (ASN) schools 
• 98 Primary 1 & 2 classes in all priority primary schools. 
- Current School year August 2023 – June 2024 
The Childsmile Fluoride Varnish Programme is delivered in all priority Early
Years/nursery schools and primary schools from age 2 through to P4, again targeted
to areas of highest dental decay and deprivation. Fluoride varnish is applied to
participating children twice in the academic year. 
The Childsmile team also have a dedicated team of Dental Health Support Workers
(DHSW) who support family’s additional support and oral health advice. 
In total 6,641 children have received one fluoride varnish application between August
2023 and January 2024. 
A breakdown of the number of schools visited is noted below: 
• 42 in East Ayrshire – 11 still to complete before submission in early June.
• 50 in North Ayrshire – with 20 still to complete before end of May
• 42 in South Ayrshire – with 11 still to complete before end of May 
A total of 1,288 children receiving fluoride varnish were then offered additional support
from the Childsmile team.   
Following the COVID-19 pandemic the Childsmile Programme was given additional
funding by Scottish Government to reduce oral health inequalities and to specifically
target 0 - 5 year olds in SIMD1 areas and ethnic minority groups. 
96

Page 97

For 2023/24 a total of 554 children were identified under this programme and offered
support by the Childsmile Dental Health Support Workers. They contacted the
families, signposted them to dental services, assisted with dental registration and
offered oral health advice. 
3.6 Key Priorities 2024/25 
3.6.1  To support sustainability of services, the priorities will be: 
• Continue to ensure the appropriate skill mix and workforce to maintain core
PDS provision for vulnerable populations to access these referral based
services.
• Continue to explore organisational resilience and how necessary processes
could be supported and expedited such as recruitment and procurement.
• Identification of funding sources and financial incentives for recruitment,
retention and ongoing service provision. 
• Continuing to prioritise prevention and oral health improvement to reduce
the possible burden of dental disease and mitigate the impact of reduced
dental access. 
3.7 Anticipated Outcomes 
3.7.1 The main aim for dental services is to provide a prompt and seamless experience for
citizens across Ayrshire and Arran as well as support people’s ongoing oral health
needs.   
The learning to date offers important opportunities seen in the context of the aim of
the Caring for Ayrshire programme which is to design a fully integrated system wide
approach to ensure people are able to access the right care at the right time in the
right place.   
3.8 Measuring Impact 
3.8.1  Continuous review of general dental services and public dental services is undertaken
to evaluate impact and effectiveness to ensure improved patient journeys which will
benefit citizens of Ayrshire and Arran to access appropriate care. 
4. IMPLICATIONS 
4.1 Financial 
There is still a financial risk that a large body corporate organisation could de-register
large numbers of patients and the NHS Board would be responsible for their dental
care.   
Due to the current financial position, it is unlikely there will be ready available funds to
quickly step up dental centres or scale the PDS up to cope with the demand without
97

Page 98

additional financial investment.  The Dental Management team are in regular contact
with GDPs to assess their financial sustainability and any expected risk would be
escalated via the local governance route. 
Unscheduled care is one of the main drivers for long waiting lists across GDPs and
PDS.  As noted above under the vision work that is being taken forward, there is
consensus across the dental professional groups that a consistent access route for
emergencies would relieve the pressure across all services.  The plan for this will be
taken forward under the reform work, but would require investment. 
4.2 Human Resources 
There continues to be a national risk with dental recruitment due to availability of
workforce.  There was a pause in dental students progressing through the Universities
across Scotland during the COVID-19 pandemic, due to the restrictions imposed. This
pause meant that dental students did not graduate for one year, and therefore left
numerous Associate posts unfilled. This, coupled with a number of practitioners
choosing to retire early due to the pandemic and uncertainty in the profession has
resulted in a decrease in workforce. Despite the challenges, the PDS has recently
recruited a dental practitioner based on Arran.   
As dental recruitment is a widespread issue across the country there is greater
competition in recruitment, with many practitioners choosing to stay closer to cities
rather than moving to Ayrshire and Arran. Brexit has also impacted the balance of
practitioners in Scotland, as fewer individuals are choosing the UK as a place to work
and many have chosen to leave the UK and return to the EU. 
The General Dental Council (GDC) had suspended their Overseas Registration Exam
for a period of over two years, meaning that any inflow of clinicians from other parts
of the world has stopped. The Overseas Registration Exam has now recently
restarted, but, since the process takes several months or years to complete, this will
not be an immediate or short term solution. 
There is also a risk in recruiting Dental Nurses due to a number leaving the profession
during the pandemic.  Feedback is the current pay structures for a trainee Dental
Nurse in GDP is not attractive against the other competing job opportunities currently
available. 
The service has increased the number of training places from 15 to 18 on the dental
nurse training programme.  This is a Modern Apprenticeship programme for trainee
Dental Nurses in Ayrshire and Arran, enabling them to gain the required professional
qualification which meets the GDC criteria for mandatory registration as a fully
qualified Dental Nurse. 
98

Page 99

4.3 Legal 
None. 
4.4 Equality/Socio-Economic 
There is a risk that those who already experience socio-economic deprivation will be
disproportionately affected by dental access issues as they will be unable to pay for
private dental care. The financial and social impacts of additional travel to access
dental care should not be underestimated. 
Comprehensive Equality Impact Assessments will be in place for any service
developments and equality should be a primary driver in the work to secure dental
access. 
4.5  Risk 
Sustainability of Public Dental Services - The uncertainty of GDS will continue put
the sustainability of PDS at risk.  This impacts on PDS being able to deliver on all
aspects of the PDS.  Long waits across GDP practices may result in an increase in
registered and unregistered patients attempting to access emergency dental care via
OOH and PDS.   
4.6 Community Wealth Building 
The wellbeing of people and communities is core to the aims and successes of
Community Planning.   
Ensuring we sustain access to NHS dental services for our citizens in Ayrshire and
Arran is an integral part of the Wellbeing Delivery Plan, Integration Authorities
Strategic Commissioning Plan of both the NHS and Council, will contribute to support
this wellbeing agenda. 
4.7 Key Priorities 
The strategy and programme outlined in this report will assist the IJB to deliver the
following Strategic Objectives from its Strategic Plan to: 
• Provide early and effective support
• Improve mental and physical health and wellbeing
• Develop and support our workforce 
5. CONSULTATION 
5.1  Consultation has taken place through current structures across dental services as well
as regular engagement with the Area Dental Professional Committee.
99

Page 100

Ongoing communication with all Stakeholders and the population will be critical as
implementation and reform progresses.  No public consultation is planned at this time,
but should the need for public consultation arise, due process will be followed in line
with service guidelines and governance structures. 
Report by: Vicki Campbell
Head of Primary and Urgent Care Services
Vicki.Campbell@aapct.scot.nhs.uk 
Implementation Officer and Person to Contact:
Claire McCamon
Senior Manager Primary Care Services
Claire.McCamon@aapct.scot.nhs.uk 
07 March 2024 
100

Page 101

North Ayrshire Integration Joint Board
9th May 2024
Subject: Brighter Pathways: Re-Modelling Care Options 
Purpose: To update the IJB on the programme of work and current pressures
on placement availability and alternative care for any child and
young person in the looked after system.  These challenges are
not unique to North Ayrshire and compounded by a number of
factors which are outlined in the report. 
Recommendation: The Integration Joint Board are asked to: 
• Note the Brighter Pathways programme of work and
proposals to address the pressure areas with service
developments and alternative resources to prevent high
costs residential resources for children and young people. 
• Note the intention to build capacity and provide more local
resources and choice to young people who require to be
looked after with increased family-based care and
alternative options for young people leaving care. 
• Note the review of current service provision to ensure it
meets current context, changing landscape of the care
system and the demographic young people and families. 
Direction Required to
Council, Health Board or
Both
(where Directions are required,
please complete Directions
Template)
Direction to: - 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership 
Agenda Item 8
101

Page 102

1. EXECUTIVE SUMMARY 
1.1 The HSCP have embarked on a programme of work to address the current challenges
associated with resources and accommodation for looked after and care experienced
young people. A Programme Manager has been appointed and will work alongside a
Planning Manager and Senior Management, to deliver and support the
transformational change over the next two years. A Programme Board has been
established and chaired by the Chief Social Work Officer, Scott Hunter with
membership from key stakeholders and Corporate Parents, to provide strategic
leadership and governance to support the workstreams and allocate resources where
required. 
There are consolidated evidence-based messages from local authorities that there is
significant challenges and pressures across the system which has been growing for
some time prior to the mandation of the National Transfer Scheme in 2021. Indeed,
there is a clear message that whilst the volume of Unaccompanied Asylum Seeking
(UAS) children and young people arriving has increased the pressure on the system,
it has not in isolation caused today’s significant pressures in care. 
1.2  The Project Board will work jointly with key stakeholders to deliver a significant
transformational change agenda, with a focus on shifting the balance of care from high
cost purchased residential accommodation to alternative community resources,
supported carers, supported accommodation, family placements (foster / kinship care)
and to provide support to families in need of intensive support.   
There is a substantial body of evidence to support the fact that additional tailored
flexible support provided to children, young people and their families aimed at keeping
young people engaged in their local communities and schools produces better
outcomes regarding changed behaviour, active citizenship and keeping families
together. 
1.3  The work of the Brighter Pathways programme board will be closely aligned with The
Promise development plan and the work of the Corporate Parenting Steering Group
which is responsible for overseeing the six Corporate Parenting duties and each
corporate parent upholds the rights and safeguard the wellbeing of Care Experienced
people. 
It is proposed the transformational change and service developments will be delivered
through establishing focussed workstreams on the following areas: 
1. Housing and Throughcare
2. Fostering and Kinship
3. Education including Residential School Placements
4. Internal Children’s Houses – Model of Care
5. Early Intervention and Crisis/Intensive Support Pathways
6. Strategic Needs Assessment/Data/Workforce
7. Best Practice Models and Research
102

Page 103

2. BACKGROUND 
2.1 Children’s Placements 
Overall, the number of Looked After Children has steadily reduced over the last few
years but the numbers in residential care have not followed the same trend, and the
number of requests for Continuing Care has increased significantly. Positively the
number of Kinship placements has increased over the same period. The graphs below
illustrate the movement/trends since 2018. 
Residential Care 
At present within North Ayrshire Health and Social Care Partnership there is a
significant overspend associated with Children’s Residential Placements, over £5m
across the HSCP and Education. The overspend predominately relates to costly
External Residential Placements.   
We started 2024 with 32 external placements. These placements are costly and do
not always deliver the best outcomes for children, young people, and their families.
Overall, the number of Looked After Children has reduced over the last few years but
the numbers in residential care have not followed the same trend, and the number of
requests for Continuing Care has increased significantly, at present we have 53
Children and Young People in Continuing Care, it is predicted that the number of
Children receiving Continuing Care will continue to rise, resulting in older children
103

Page 104

staying longer within Residential Care settings.   The HSCP acknowledge that some
children will always require more specialist resources due to their needs and
complexity and in some situations an external residential placement will be
unavoidable. 
There are a number of factors leading to this challenging position: 
• We have 32 places available in our internal children’s houses, due to demand
these have been over occupancy for some time, at points in the last year we
have had 39 young people within the houses, leading to increased use of
external placements where residential care is required. 
• We have limited availability of alternative care provision and community
options, supported carers or supported accommodation options within North
Ayrshire. 
• Acute crisis in recruitment and retention of foster carers within North Ayrshire
which has created capacity issues and limited family-based options for children
and reliance on external fostering providers or residential care. 
• The requirement to support Unaccompanied Asylum-Seeking Children (UASC)
under the National Transfer Scheme and to support trafficked young people
who have been identified in North Ayrshire. We currently have 31 young people
living within North Ayrshire, across both our residential houses and semi-
independent living who have come to us through these routes.
• A number of young people in residential care have requested Continuing Care,
whereby a young person can remain in their placement until age 21. 
• Where appropriate young people are placed to meet their educational needs,
the cost of Residential School Placements in most cases is shared 50/50 with
Education services. 
The landscape and demographic of young people in residential care has shifted with
an increase in young people aged sixteen and above with a high number requesting
continuing care which supports them to remain in residential houses until they are
aged 21. This changing landscape is a result of Continuing Care legislation and
Staying Put Guidance for Local Authorities and other Corporate Parents which
promotes supporting looked after children and young people to remain in care, as part
of a staged transition towards adulthood and greater independence. 
Unaccompanied Asylum-Seeking Children/Trafficked Young People 
Unaccompanied asylum-seeking children (UASC) and separated migrant children
under the age of 18 who have been trafficked to Scotland, are looked after and
accommodated by local authorities as children in need under Section 25 of the
Children (Scotland) Act 1995. 
Over the last few years there has been an increase in young people coming to North
Ayrshire through the mandation of National Transfer Scheme in 2021. There are
currently 12 Unaccompanied Asylum-Seeking Children and Trafficked Young People
104

Page 105

in residential care and 19 who are supported in the community in shared tenancies, 1
in supported care. There has also been an increase in Trafficked Young People, 7
have been supported and provided accommodation in residential care. Trafficked
young people are spontaneous arrivals and the local authority is required to identify
appropriate accommodation for these young people at short notice as the notification
is usually through out of hours social work and there is lack of opportunity to plan and
resource accommodation options. 
North Ayrshire receives funding from the Home Office for young people placed via the
National Transfer Scheme, this is set at £1,001 per week for young people under 18
and £270 per week for young people over 18. The HSCP receive a lesser payment of
£798 per week for a child who presents spontaneously (trafficked child) in the area.
Funding from the Home Office falls far short for the costs associated with residential
care for young people under 18 and is significantly lower for young people who remain
in residential care under continuing care post 18. 
North Ayrshire is proud of the support that we offer displaced and disadvantaged
young people and we are committed to supporting these young people into adulthood
and support their asylum process, educational needs and their transition from
residential care to semi-independent or independent living. 
North Ayrshire is not alone in facing these challenges, the Scottish Government
recently undertook a scoping exercise working with areas across Scotland to better
understand the pressures on the care system and the impact of responding to the
needs of UASC. The report highlighted the significant lack of placement availability,
which is compounded by the number of children arriving, the impact of continuing care,
a decline in the number of foster carers, reduction in internal residential capacity,
restrictions on residential capacity, growing pressures on stretched social work teams
and a lack of suitable move on accommodation due to housing pressures. This often
leads to extremely high costs due to increased use of costly external placements. 
Family Based Care 
Kinship Care 
There has been significant progress and increasing numbers of children in kinship
care in North Ayrshire and this is being explored at an early stage with families which
is supported further by the Signs of Safety approach, kinship care is the preferred and
first option for children who require alternative care which aligns to the HSCP Kinship
Care Strategy and the ethos of The Promise. Kinship options are being explored and
are continually considered throughout a child/young person’s care journey and before
a permanence plan is agreed. 
There are currently 340 children in kinship care placements supported by the HSCP.   
Foster Care 
105

Page 106

As at 31 March 2024 the fostering service had 72 fostering households who care for
131 children, the service has approved 5 family and friends’ carers and 11 short break
carers who offer support to the main foster carers.   
There are also 9 children placed with external fostering providers. 
During the period from 2019 until 2023, there were 16 interim carers approved by the
fostering services, in the same timescale 31 carers were de-registered. 
The acute crisis in foster care recruitment and retention has been widely documented
and the significant shortfall of foster carers is having an impact on Independent
Fostering Providers and Local Authorities across Scotland and the UK. Within North
Ayrshire there has been more de-registrations than approvals of new carers which
has created pressures resulting in fostering being a diminishing resource for children
of all ages. As result of continuing care young people are choosing to stay with their
foster carer until aged 21 which prevents them from caring for any other children. 
The biggest challenge facing the fostering sector is the retention and recruitment of
high-quality foster carers who can meet the needs of children in care. 
In addition, the fostering service has not accommodated any young people over the
age of 12 since 2020.   There is lack of capacity or pool of carers who have been
assessed/approved to provide care to teenagers and the current enhanced carers are
at capacity and placement limit.   
Due to capacity issues and lack of recruitment of carers willing to care for children
over the age of 12, fostering services have become a resource mainly for children
under 12 and any enquiries/alerts for older children for a fostering placement from the
community can’t be resourced, with a reliance on them being accommodated in
residential care. The service is reporting challenges with resourcing external fostering
provision due to them also facing significant challenges with recruitment.   
The Scottish Government are acutely aware of the foster carer crisis, there is much
work in progress by the Scottish Government who formed a group around a year ago
on the back of the staying together and connected implementation group and all the
gaps identified in achieving the sibling’s legislation (The Children (Scotland) Act 2020
and the Looked After Children (Scotland) Amendment Regulations 2021).  The
Scottish Government are currently consulting with practitioners, through two
Association Fostering Kinship and Adoption Forums and carers currently and there
are a number of key areas that are likely to be taken forward with a focus on both
recruitment and retention. 
There were only 196 applications to Foster across Scotland in 2023, a 4.8% decrease
from the previous year and the lowest in 6 years, research by The Fostering Network
has indicated 12 per cent of foster carers retire or leave every year and that another
500 foster families are required across Scotland. 
106

Page 107

Factors impacting on Recruitment/Retention: 
• Increase in home/agile working and spare room used as an office. 
• Inflation/Cost of living crisis/allowances – NAHSCP paid higher than National
Minimum allowances Scottish Government introduced – apart from 16plus –
Flat rate £400 per week.
• New minimum allowance unlikely to have a significant impact in
recruitment/retention. 
• Financial risks associated with fostering (secure employment & pension), no
income if no children in your care. 
• Fostering not financially viable if only have one child at £400 per week, annual
income of £20,800 (tax free). 
• Fewer young people leaving home lack of spare bedrooms.
• Carers retiring, age and stage of life, carer burnout. 
In light of these challenges, in retaining and recruiting foster carers and the impact on
children when family-based care is not available, this is an area of significant concern
to the HSCP and the current fostering schemes will be reviewed to consider
allowances, contractual short breaks, training and support within the workstream and
recommendations made to the Programme Board to support the retention and
recruitment of foster carers within North Ayrshire. 
Transformation Programme – Brighter Pathways 
There are concerns that lack of local placement availability necessitates children being
placed out with their local area and is an increasing concern that the level of
displacement will grow further due to lack of local options and capacity. 
The current situation with regards to care options and alternative resources for
children and young people is very challenging and there is a need for transformational
change and to consider different models to support and care for young people and
consider re-modelling of current resources with a view to having alternative options
for young people moving on from care and to create capacity in the residential houses
to prevent children being placed in high cost external resources. 
The current position within North Ayrshire is that there is a lack of alternative options
to support young people’s transition from residential care to supported care and semi-
independent living and them requesting continuing care is an option of choice due to
lack of alternative resources/options.   
The Brighter Pathways Programme Board has been established.  There is a shared
awareness with regards to the current pressures and a commitment from all corporate
parents and key stakeholders to contribute to the work of the project to deliver services
differently and for children and young people to have access to the appropriate
resources and supports into adulthood.   
107

Page 108

The work of the Brighter Pathways programme board will be closely aligned with The
Promise development plan and the work of the Corporate Parenting Steering Group
which is responsible for overseeing the six Corporate Parenting duties and each
corporate parent upholds the rights and safeguard the wellbeing of Care Experienced
people. 
The transformational change and service developments will be delivered through
establishing focussed workstreams to support the Brighter Pathways Programme
Board with a focus on the following areas: 
1. Housing and Throughcare:
Review the current housing protocol for care leavers and pursue alternative
accommodation options to support and prepare young people to transition
from residential care to live independently in the community. The workstream
will consider the use of supported care and look at models of supported
accommodation.
2. Fostering and Kinship
Address the challenges around recruitment and retention of foster carers and
a review of current fostering schemes and how we can support and sustain
children in family-based care with foster carers and kinship carers and prevent
placement disruption and children being placed in internal and external
residential care.
3. Education including Residential School Placements
Review the current educational provision for looked after children and to
ensure children who are looked after are provided with the appropriate support
to sustain them in mainstream education and to prevent additional pressure
on their carers/placement if require to be out of school.
4. Internal Children’s Houses – Model of Care
Review the current model of care within the four children houses and the
changing demographic and increase in young people over sixteen.
Consideration will be given to is the current model providing the necessary
support to young people to increase capacity for independent living.
5. Early Intervention and Crisis/Intensive Support Pathways
Map out the current supports from early intervention to crisis and intensive
support to identify if there are any identified gaps in service provision to
support children and families and to ensure that the services and interventions
are targeted appropriately to provide early help and more intensive support to
prevent children requiring alternative care.
6. Strategic Needs Assessment/Data/Workforce
Explore the current and future demographic and date to inform future
resources and staffing levels. The work stream will project and model likely
future need of care setting for children and young people.
7. Best Practice Models and Research
This workstream will scope out current models and approaches currently
utilised and undertake research and benchmarking with other areas and
consider new ways of working to support children and families.
108

Page 109

3. PROPOSALS 
3.1 The role of the Programme Board is to provide strategic leadership and oversight to
the programme of work, in addition, the Programme Board will: 
• Inform, engage, and take collective action on key issues identified.
• Own and be accountable for the delivery of agreed actions. 
• Resolve strategic issues and remove barriers. 
• Ensure all members have a shared situational awareness. 
• Support the work of the project groups and allocate resource where required, 
and as appropriate. 
3.2 Anticipated Outcomes 
• To improve local resources and range of choices for young people leaving care. 
• To improve long term outcomes for young people/ care leavers.  
• Review current service provision to ensure it meets current context, changing
landscape and demographic of young people and families. 
• Support innovation in supporting children to remain in family-based care, with
parents, foster carers or kinship carers.  
• Review and analyse the effectiveness of the preventative, early intervention
and community-based supports for children, young people and families.
• Review the model of support and alternatives for UASC/Trafficked young
people. 
• All care experienced children and young people in North Ayrshire grow up
feeling loved, safe and respected so they can realise their potential. 
3.3 Measuring Impact 
The Project Board will be tracking the progress of work plans or developments within
the workstreams.   
There will be analysis of data and a needs analysis to project future demands for
supports and services and how services need to be delivered.  This will be an ongoing
process that will review all young people within internal and external residential
resources and their pathway to a supported community-based alternative or
independent living.   
4. IMPLICATIONS 
4.1 Financial
As part of the programme of work there will be recommendations for short term
investment and future re-alignment of financial support in specific areas with a view to
longer term financial sustainability for the IJB.   As noted whilst financial outcomes are
not the main driver for the change programme which is focussed on quality outcomes
for young people and families, there is an underlying overspend of over £5m in
109

Page 110

external residential placements which requires to be addressed, recognising the work
and time required to make the changes required the IJB provided for an additional
£4m of resource as a budget pressure in 2024-25 to support this cost pressure with
an expectation of this reducing over time. 
4.2 Human Resources
Any possible impact on staff due to re-modelling or service redesign will be explored
fully in the workstreams and project board, affected staff and Human Resources will
be consulted. 
4.3 Legal
There is legislation and policy that govern looked after and care experienced children
and young people and the programme of work will adhere to the legislative
frameworks and relevant policies and regulations. 
Legal services will be consulted on any legal matters that arise throughout the
programme of work. 
4.4 Equality/Socio-Economic
The aspirations of the programme board are in line with the vision of The Promise to
address the inequality of outcomes experienced by our children and young people
who have been or are in the care system.  If the ambitions of The Promise are realised,
not only will there be improved outcomes but also a reduction, and ideally, an
elimination of the inequity that exists between care experienced children and young
people and children and young people with no experience of care. 
4.5 Risk
The programme board has a risk log to identify any identified risks from each service
represented on the board.   
When trying to project and plan resources for looked after children there is an element
of uncertainty as children who require alternative care is usually in a crisis situation
and their admission to care is unplanned with limited opportunity to plan and seek
appropriate resource. Trafficked young people are spontaneous arrivals and it is
unknown how many we will need to support in the near future.   
The current care system we are operating with is under significant pressure with
capacity issues within foster care and residential care and limited options to support
care leavers. The risk of not embarking on the programme of work and
transformational change could lead to increased costs of external provisions and
further overspend.   
4.6 Community Wealth Building
None. 
110

Page 111

4.7 Key Priorities
The work of the Programme Board fully aligns and supports the work of the Councils
strategic plans: 
• The Promise – Plan 21-24.
• The United Nations Convention on the Rights of the Child (UNCRC).
• Kinship Care Strategy.
• Getting it Right for Every Child (GIRFEC).
• North Ayrshire Councils Corporate Parenting Plan 2023-2026.
• Children’s Services Plan 2023 -26. 
The proposal and recommendations support the spirit of The Children and Young
People (Scotland) Act 2014, which outlines the need for appropriate accommodation
for young people over 16 years of age, to support them to prepare for independent
living. 
5. CONSULTATION 
Throughout the programme of work there will be ongoing consultation and
collaboration with service areas, national bodies, third sector colleagues and
consultation and co-production with service providers, young people, families, and
carers. 
Caroline Cameron
Director HSCP 
For further information please contact Elizabeth Stewart, Head of Service, Children,
Families and Justice, on 01294 317727 
Appendices
• Appendix No, Title of Document   
111

Page 112

112

Page 113

Integration Joint Board
9th May 2024
Subject : Director’s Report 
Purpose : This report is for awareness to advise members of North
Ayrshire Integration Joint Board (IJB) of developments within
North Ayrshire Health and Social Care Partnership (NAHSCP) 
Recommendation : IJB members are asked to note progress made to date. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
IJB Integration Joint Board
HSCP Health and Social Care Partnership
HIS Healthcare Improvement Scotland
COSLA Convention of Scottish Local Authorities
UDP Ukrainian Displaced People 
1. EXECUTIVE SUMMARY 
1.1 This report informs members of the Integration Joint Board (IJB) of the work
undertaken within North Ayrshire Health and Social Care Partnership (NAHSCP),
nationally, locally and Ayrshire wide. 
2. BACKGROUND 
2.1 This report provides IJB with up to date information on recent activity across the HSCP
since the last IJB.    The report will also provide COVID related information by
exception. 
Agenda Item 9
113

Page 114

3. CURRENT POSITION 
National Developments 
3.1 COSLA Excellence Awards 
Applications for the COSLA Excellence Awards are now open for 2024.
These awards recognise the outstanding work that takes place in local government
across Scotland. Last year, COSLA received a record number of applications and are
hoping to surpass that number once again this year. 
The are five different categories for the nominations, including Achieving Better
Outcomes for the Most Vulnerable in Partnership and Tackling Inequalities and
Improving Health and Wellbeing (sponsored by Public Health Scotland). The deadline
for applications is 5pm on Monday 3rd June. 
All the information including FAQs, key dates and last year’s winners can be found on
COSLA’s website. The North Ayrshire HSCP will give due to consideration to
nominations for our teams and services. 
3.2 Mental Health Nursing Review 
Scottish Government has launched a national review of mental health nursing in
Scotland: Mental health nursing: review - gov.scot (www.gov.scot).   
Through a national Leadership Advisory Group HSCPs have been asked to plan local
engagement events within the following timeframe: 
Date Activity
Week 1 to 2
W/C 22/04
Identify engagement leads, working collaboratively with the
Practitioner Reference Group.
Week 3
W/C 06/05
Coaching Session with facilitators to discuss approach, share
engagement pack, and format for feedback
Weeks 4 to 7
W/C 13/05
Conversations take place.
Week 8
W/C 10/06
Collation of local feedback and submission to the Mental Health
Nursing Review Team. 
The partnership will promote this through already planned roadshow events in the
coming weeks and the Mental Health Nursing Celebration event planned for May 17th
2024. 
All other opportunities to engage with nursing staff in the review or promote the
national link to the MS Form will be prioritised. 
114

Page 115

3.3 Ageing and Frailty Standards - April 2024 
Healthcare Improvement Scotland (HIS) are developing standards for the care of older
people living with frailty.  The proposed standards will replace the current Care of
Older People in Hospital standards and will support national improvements in frailty
services. They further aim to promote positive, healthy and active ageing and cover
older people who may experience frailty as they age and apply in all settings.   
Feedback on the draft standards are welcomed by completing an online survey. The
consultation on the draft standards closes at 11.59pm on 18 June 2024.  The final
standards will be published in November 2024. 
North Ayrshire Developments 
3.4 Holly Health App 
People and registered with a GP practice in North Ayrshire can now enjoy a year’s
free access to Holly Health, a mobile app that can support people to make small,
achievable changes that could help boost their health and wellbeing.   This offer is
also open to HSCP providers in North Ayrshire.
Using a personalised approach tailored to an individual’s health goals, interests and
activities, the app can help reduce stress and anxiety, rebuild relationships with food,
increase exercise and movement and improve sleep.
Holly Health will assist in making small but consistent changes to daily behaviours,
helping to build healthier habits, promoting mindfulness and encouraging people to be
more kind to themself.
In-app coaching is available through a supportive chat bot system, with friendly,
motivational reminders by text or email to keep people on the right track. The app also
contains a wealth of useful articles and videos.
Funded by NAHSCP, people will initially enjoy six months’ free access to the app,
before being invited to a further six-month subscription for free once that expires.
Sign up by visiting the Holly Health page on our website and clicking on the name
of their GP surgery. 
3.5 Mental Health Engagement Newsletter 
The April to August issue of the NAHSCP Mental Health Engagement Newsletter
has been published on Microsoft Sway, with up to date info on the engagement work
happening throughout the Partnership. 
115

Page 116

The newsletter looks at some of the engagement activity that has occurred over the
past few months, with updates on upcoming events and how you or your team can
get involved. 
3.6 Relaunch of the North Ayrshire Perinatal Wellbeing Team 
Following increased demands upon the service, the former North Ayrshire Perinatal
Mental Health Nursing team within Universal Early Years, has rebranded to the
Perinatal Wellbeing Team. The service continues to provide mental health support to
expectant and new mums with low level mental health and wellbeing concerns and at
any one time, can be supporting between 50 and 60 women. 
In 2017 the HSCP service was initially established as a single nurse service, focusing
on the Kilwinning and Irvine areas. As the Perinatal Mental Health Nurse for the
service at the time, supported 62 women in the first year – a clear indication of the
demand for perinatal mental health support in the community. Over the following
years, demand continued to increase to the point that in 2022, a second Perinatal MH
Nurse joined the team followed by one more in 2023. The team is also supported by
a Healthcare Support Worker, who provides ongoing support in newly established
group sessions, facilitating play and nutrition workshops, and offering additional
assistance in homes and communities to support mums and babies to engage fully in
community activities. 
The expansion of the team means that all of North Ayrshire now has support from the
team. The team also works closely with the Ayrshire and Arran Perinatal Mental Health
service which supports mums with more severe mental health concerns. 
Over six years, the service has assessed and supported 573 women, primarily through
referrals from health visitors, midwives, family nurses and GPs. The Irvine and
Kilwinning locality continue to account for the highest number of referrals and demand,
constituting approximately 50 per cent of all referrals received. 
Despite increasing demand, the team remains steadfast in its commitment to uphold
the core values of meeting maternal wellbeing needs, combatting mental health
stigma and providing empathetic support, while also facilitating connections between
mums and with their local communities. 
3.7 Refugee Support Team – supporting the health needs of asylum seekers, refugees
and Ukrainian Displaced People (UDP) in North Ayrshire 
North Ayrshire’s HSCP Refugee Support Team was established in May 2023 to
provide all newly arrived refugees, asylum seekers and Ukrainian Displaced People
(UDP) to North Ayrshire with an initial physical and mental health assessment, migrant
screening for TB and Blood Borne Viruses, immunisation support and support to
access local primary care services, including GPs and Dentists.   
116

Page 117

The team has been working closely with Mears to support asylum seekers and has
also recently taken on support to Unaccompanied Asylum Seeker Children (UASC)
as part of the UK Government’s asylum dispersal programme. 
To date, 88 adults and 60 children have been supported through screening and health
assessments. 97 TB screening forms have been completed and returned to Public
Health for assessment and triage and 19 individuals have been supported to access
immunisation appointments. 
Outwith the main urban centres for asylum seekers, this service is unique to North
Ayrshire and has received positive feedback from across partner agencies. The
service is funded until March 2025 with discussions ongoing re future sustainability. 
3.8 Partnership with National Charity Dads Rock 
The Universal Early Years service has partnered with national charity Dads Rock
through the Whole Family Wellbeing Fund to bring a dedicated Dads Worker into the
existing integrated early years’ service.  This is the first role of its kind in Scotland. 
Due to the differing nature of family structures in modern society Dads that do not
reside in the home of the children may at times miss out on engagement with statutory
services but still have much to offer and provide great benefit to the children. This role
connects with Dads of all circumstances to grow their skills and confidence in
providing care and support to their children and families regardless of family
composition. By working more with Dads, we are able to create a more scaffolded
approach enabling Dads to meet the needs of their families within a support structure
that holds them at the centre. Working outside of the traditional model of 9-5, face to
face, in-home support this project is more inclusive of modern family structures and
the differing family parental dynamics. 
The Dads Worker came into post in October 2023, and despite only being in post a
short time, great results have been achieved already.  Over 30 Dads have connected
with the Dads Worker, on a 1:1 basis, via the group and informal quick intervention
support.   A weekly group has been established and the first Dads and kids trip took
place in March.  Plans are in place to create unique resources such as Dad and Baby
sensory sessions, swimming lesson and infant feeding workshops in the coming
months. 
In addition, the worker has been mapping areas across health visiting and community
midwifery services which could be reframed to be more inclusive of dads. This has
included how we communicate with families and how we involve dads in antenatal
classes for example. 
117

Page 118

3.9 Boost for those with dementia and their families as North Ayrshire respite facility
reopens after extensive upgrade 
The Anam Cara respite centre in Kilbirnie has re-opened following an extensive
refurbishment project. 
The specialist dementia respite centre can accommodate up to 9 guests aged 60
years or over, offering critical respite services within single room, en suite
accommodation for periods of up to 21 nights. 
The service was temporarily relocated to the
Taigh Mor site in Beith to allow the service to
continue while works were carried out at Anam
Cara. The service received a ‘very good’ rating
from the Care Inspectorate after an
unannounced visit in February, with the report
commending it’s quality of care and the team’s
fantastic work in relocating and continuing this
vital community support service under
challenging circumstances. 
The refurbishment project included a complete
transformation of the main garden area, including new
garden furniture, with a ramp installed from the conservatory
to allow better access for guests to enjoy the outdoors. An
additional, smaller garden area adjacent to the dining area
has also had some landscaping improvements made. 
A full revamp of the internal areas of the
building has also been carried out, with
works including wet wall installation in
several of the bathrooms, replacement
light fittings with energy-efficient LED
bulbs and a full upgrade to the
reception area. An archway has been
created within the dining area to
improve the space, allow better access
to the outdoors and create an improved
flow for staff moving around the area,
and a new boiler and generator have
been installed. 
118

Page 119

New flooring has been installed throughout the
ground level, with new décor, furniture and soft
furnishings creating a welcoming and homely feel
for guests and staff. In addition, new TVs have
been located in each room and WiFi connection
has been improved throughout the building. 
Externally, the building has undergone repairs to
the roof, fascias, gutters and roughcast, with
new windows in the dining room area. 
Artworks for the walls of Anam Cara were very
kindly donated by members of both Beith and
Irvine camera clubs, featuring recognisable
images taken throughout North Ayrshire to help
stimulate memories for guests staying at the
facility. 
3.10 Mental Health and Wellbeing ‘Connect’ Event 
North Ayrshire Health and Social Care Partnership hosted a Mental Health and
Wellbeing ‘Connect’ event on Monday 29 April at Ardeer Community Centre in
Stevenston. The event was attended by support services, included stalls and a variety
of workshops focussing on a range of mental health topics. 
Some of the services who attended the event included VoiceAbility advocacy, North
Ayrshire Carers Gateway, the NHS A&A Health Improvement team, the Primary Care
Mental Health team, Community Link Workers, North Ayrshire Alcohol and Drug
Partnership, the NHS A&A Suicide Prevention team and North Ayrshire Wellbeing and
Recovery College. 
A series of mental health and wellbeing workshops were held on the day, with
attendees having the opportunity to take part in all of these, as well as some creative
or active movement taster sessions. 
The event registrations sold out and was busy with a good mix of staff, service users
and individuals from the community.  Feedback was positive with many stating they
would like more regular events, with a future request for an event to focus on young
people’s mental health. 
119

Page 120

3.11 Supported Carers Recruitment 
North Ayrshire Health and Social Care Partnership (NAHSCP) is currently recruiting
supported carers who can offer a spare room in their home to a young person who
has previously been looked after by the local authority, as well as providing the day-
to-day support that a young person needs to grow in confidence and develop the skills
they will need to live independently in the future. 
Our young people come from a
wide range of backgrounds and
may be leaving residential schools,
children's houses or foster care.
They will often have had
challenging home and family lives,
and just need that extra bit of
support to help them achieve in
employment, education, developing
hobbies and maintaining links with
friends and family. 
Supported care can also be an option for assisting young people through the National
Transfer Scheme for unaccompanied asylum-seeking children, which is supported by
North Ayrshire Council. 
NAHSCP welcomes enquiries from anyone who is patient, understanding, and has
genuine interest in supporting vulnerable young people and providing them with a safe
and caring environment. 
Supported carers must be 25 years of age or above (there is no upper age limit) and
have a spare bedroom (you don’t have to own your own home), be single, married, in
a civil partnership or co-habiting. 
Once approved all carers will receive induction training, followed by ongoing training
and support from a qualified social worker.   You will also receive an allowance for
each young person in your care. 
Anyone interested in finding out more about being a supported carer, should visit
https://www.nahscp.org/children-young-people-families/adoption-fostering-short-
break-and-kinship-care/supported-care to find out more about the assessment
process and how to apply, or call NAHSCP’s Families for Children team on 01294
310300 (option 4 then option 1). 
COVID Update 
No COVID update. 
120

Page 121

4. IMPLICATIONS 
4.1 Financial
None
4.2 Human Resources
None
4.3 Legal
None
4.4 Equality/Socio-Economic
None 
4.5 Risk
None
4.6 Community Wealth Building
None
4.7 Key Priorities
None
5. CONSULTATION 
No specific consultation was required for this report. User and public involvement is
key for the partnership and all significant proposals will be subject to an appropriate
level of Consultation. 
Caroline Cameron, Director
[Carolinecameron@north-ayrshire.gov.uk/01294 317723] 
Appendices
Nil
121

Page 122

122

Page 123

1 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
COMMUNITIES MENTAL HEALTH & WELLBEING
FUND 
YEAR 1 REPORT & INTERIM DATA YEAR 2                                                                                                                                                                                 
November 2023 
Agenda Item 10
123

Page 124

2 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
Contents
Page
3. Introduction
4. Applications
5. Background & Approach – Fund Management
6. Active, Connected, Included
8. Year 1 – Project Focus
9. Independent Evaluation – Key Highlights
10. Year 1 Locality Spread & Project Types
11. Emerging from the Pandemic
12. Training, Networking & Collaboration     
---------------------
13. Project Outcomes & Examples 
13. Provision of essential household items 
14. Debt management, income maximisation and housing advice 
14. Free & engaging activities promoting wellbeing 
16. Green Health 
17. Men’s Shed     
---------------------
17. Taking care of our Volunteers 
18. Specialist Support 
19. Community Food       
---------------------
19. Cost of Living Crisis
20. Suicide Prevention
21. Considerations for Year 3 and beyond
22. A few words from project 
124

Page 125

3 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
Introduction 
The Scottish Government’s Communities Mental Health and Wellbeing Fund for Adults was established in
October 2021 and to date has distributed around £36 million to community initiatives supporting mental
health and wellbeing across Scotland. A third year of funding (£15 million) was announced in April 2023.
The ongoing funding reflects the importance placed on community support as part of the Scottish
Government’s overall mental health infrastructure. The fund will continue to be distributed by Third
Sector Interfaces (TSI) in communities across Scotland.
The Fund has a strong focus on prevention and early intervention and aims to support grass roots
community groups in tackling mental health inequalities and addressing the priority issues of social
isolation and loneliness, suicide prevention, and tackling poverty and inequality. There will be a continued
emphasis in Year 3 on responding to the cost-of-living crisis and on those facing socio-economic
disadvantage. The fund aims to take a preventative approach and allow communities to develop their own
solutions, including developing stronger partnerships. 
Funds were distributed by Arran Community & Voluntary Service (Arran CVS), as a partner in the Third
Sector Interface North Ayrshire with the Ayrshire Community Trust. Arran CVS took the lead in
administering the Fund and securing input from the Integration Authority and wider partners throughout.
And as the grant holders lead on reporting to national monitoring processes as well as to local evaluation. 
In Year 1, 61 North Ayrshire projects collectively received funding
to the value £813,345, which benefitted significantly from inclusion
of £353,134 in support from North Ayrshire Council (NAC). This was
made possible by additional Covid recovery funding, to back high-
quality bids which particularly focussed on the local priorities of
social isolation, mental wellbeing, and financial inclusion. £52,999
was received and disbursed in collaboration and a parallel process
with the Children, Families & Young People CMH&WB Fund.  This
enabled an estimated 33,000 North Ayrshire residents to benefit
from activities that improved their mental health and wellbeing.   
125

Page 126

4 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
In Year 2, due to budget constraints, the level of contribution from NAC was understandably impacted. 
The Green Health Partnership included provision of a contribution amounting to £46,125 in Year 2, for
projects specifically focussed on ‘green health’ related activity. This resulted in a total of £516,107 being
distributed to 55 projects across North Ayrshire. Early monitoring demonstrates that so far, an additional
5,000 North Ayrshire residents have already benefitted from the Year 2 projects. 
David Meechan 
Senior Project Officer, Green Health Partnership
The Communities Mental Health and Wellbeing Fund is a fantastic initiative that supports local community
groups and organisations at the heart of their communities. Helping them have a positive impact on the mental
health and wellbeing of the population. North Ayrshire Green Health Partnership committed funding to Year 2 of
the grant fund as it aligns closely to our vision and aims. Improving the health and wellbeing of the population in
North Ayrshire through participation and exploration of North Ayrshires fantastic greenspaces and green health
activities. We recognise the ability this fund has in achieving this as well as reducing health inequalities that exist
in North Ayrshire and improving biodiversity of those local greenspaces. 
126

Page 127

5 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
The Fund was significantly over-subscribed in both year 1 and 2. Due to the NAC contribution amount in
Year 1, 67% of the application value received was paid out, versus 50% in Year 2. Year 2 saw a drop in the
total value of applications, which may be due, in part, to the reduction in the maximum grant award, from
£50,000 in Year 1, to £20,000 in Year 2. Most of the Year 1 funded projects (74%) focussed on both
prevention and early intervention.
Project Focus – Year 1 
Background and Approach – fund management
A Steering Group was formed and led by the Third Sector Interface North Ayrshire. This included a range
of representatives from the Health & Social Care Partnership, the NHS, North Ayrshire Council, Third
Sector Groups, and people with lived experience of mental health challenges. They came together to
provide governance and oversight throughout the process, including agreement and alignment of the
local and national priorities to the fund criteria, defining the application, and designing the scrutiny and
scoring process. Many of the members became involved in the scoring panels and ultimately determined
whether the projects would be funded. The entire process was developed to be both transparent and
fair. Calibration sessions were held with each scoring panel and with the wider steering group to ensure
consistency of approach and to discuss the projects where scoring was particularly close.
The Year 1 application process was launched across all North Ayrshire localities in October 2021 with a
series of online and in-person information sessions for each. One-to-one support from development
officers was made available to groups and organisations who required further guidance or support. 
The Fund has acted as a mechanism to galvanise communities across North Ayrshire, bringing together
people from a wide variety of projects and organisations, with the collective ambition of improving the
lives of people in our communities. Sharing learning, resources, and skills, and working collaboratively to
improve the reach and outcomes being delivered. 
127

Page 128

6 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
Additional Focus – Inclusion Year 1 
TSI North Ayrshire highlighted its commitment to inclusion as part of the roll out of The Communities
Mental Health & Wellbeing Fund from Year 1. 
Through collaboration with the North Ayrshire Learning Disabilities team and The Scottish Commission
for People with Learning Disabilities (SCLD), a series of online workshops were held to introduce their
Active, Connected, Included resource, which is designed to help people with learning disabilities become
more included in their communities. Although geared towards people with learning disabilities, the
principles can be applied to anyone disadvantaged and feeling excluded. The work done in North Ayrshire
in this area was picked up by the Scottish Government after the interim monitoring for Year 1 was
submitted and several questions focussing on inclusion, were added to the monitoring returns thereafter
for all projects across Scotland. 
40% of the Year 1 funded projects in North Ayrshire
indicated that they found the Active, Connected,
Included resources to be either Useful or Extremely
Useful in helping them plan their approach and
reconsider how they try to ensure their projects are
as accessible as possible. This is in line with the
attendance levels at the sessions, so further work is
still required to continue to raise the profile of this
resource and inclusion more widely. 
Dominic Jarrett   
Learning Disabilities Development Manager,
North Ayrshire Health and Social Care Partnership 
Working within Learning Disability services in North Ayrshire, I have been particularly grateful for the
opportunity my involvement has created to contribute to weaving the concerns of that population,
and of inclusion and accessibility in general, throughout the activity linked to the fund. The
opportunity it created for promoting the Active, Connected, Included resources developed by the
Scottish Commission for Learning Disabilities (SCLD) was one which has had real impact, and which
has been highlighted by SCLD themselves as an exemplar of good practice. I very much hope to see
the fund go from strength to strength, enabled by the Scottish Government's visionary leadership in
this regard. 
128

Page 129

7
COMMUNITIES MENTAL HEALTH & WELLBEING FUND
In the final Year 1 monitoring, each project was asked to highlight and provide examples of how they are
working to improve inclusion across at least three of the target groups indicated below. The results below
indicate the total number of times each area was highlighted.
You can see from the chart that people with a long-term health condition or disability have the largest
area of with one in five projects supporting this area.    
“Due to having limited mobility, we have found that people are often lonely and only have access to
a small number of people generally immediate family members. Our rides enable them to be visible
within our community, to connect with people and build new and lasting friendships.”
“Having a fully accessible venue and offering supportive transport, removes common barriers to
participation.”
“We contacted organisations such as Trindlemoss, Cornerstone and the NAC NHS Integrated
Community Learning Disability Team, who were already supporting adults with learning disabilities,
liaising with managers to organise the time and date of sessions which could then be shared with
communities.”
129

Page 130

8 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
Independent Evaluation
An independent evaluation report for Year 1*, conducted by Blake Stevenson on behalf of the Scottish
Government, highlighted that 96% of respondents rated their experience of the application process as
Good or Very Good, 86% rated the advice & support offered as Good or Very Good and 100% rated
communication with the TSI as Good or Very Good. 82% of respondents also stated that they felt they
were able to influence the focus on local community organisations to a large extent, with 68% stating
they felt they were able to influence the local nature of the funding to a large extent. 
“The TSI-led local partnership model has delivered the Fund creatively and collaboratively to suit local
circumstances and need. It has worked well with local partners and increased the capacity of grassroots
organisations to deliver services within local communities.” 
Evaluation of the Communities Mental Health & Wellbeing Fund for Adults, Scottish Government. 
*https://www.gov.scot/publications/evaluation-communities-mental-health-wellbeing-fund-adults/ 
130

Page 131

9 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
Year 1 Locality Spread & Project Types
In Year 1 almost 45% of the projects funded were completely new projects, with 43% of projects running
for between 6 to 12 months and 45% running for more than 12 months. 50% of the projects funded in
Year 2 were for continuations of year 1 funded projects. 
The impact of the Communities Mental
Health & Wellbeing Fund has reached right
into the heart of communities in North
Ayrshire with over 33,000 people directly
benefitting from Year 1 funded projects to
date, with a good spread of projects offering
services across all localities, except for Arran
which reflects the size of the population.  
A broad variety of projects were funded in
Year 1, as illustrated here.   
131

Page 132

10 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
Central to every single project
funded, is the powerful impact of
human connection, developing
meaningful friendships, and
providing people with a sense of
acceptance, belonging, and
understanding. 
Year 1 Priorities 
The Fund prioritises a range of ‘at risk’ groups. A high percentage of the North Ayrshire Projects are
focussed on people with a long-term health condition or disability (43%), older people (37%) and people
facing socio-economic or severe and multiple disadvantage (57%). People from minority ethnic
backgrounds, and LGBTI communities were under-represented, and this is an area of ongoing and
targeted focus for Year 3. 
Priority groups benefitting from Year 1 projects 
132

Page 133

11 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
Emerging from the Pandemic
The impact of the Pandemic cannot be under-estimated, and the far-reaching consequences are still
being felt today. In Year 1, there was a requirement to only fund new projects, and many organisations
experienced challenges engaging with, and gaining the trust of community members. It took patience,
persistence, and for many, a change in the language being used around mental health when promoting
their services, to coax people back into group situations and to help them to feel safe again. 
Ayrshire Film Club 
We only take a small number of passengers on our wheelchair
transporter, everyone we meet and everyone who volunteers,
benefit from connections made with those who are less able than
themselves. All gain more understanding, empathy and above all,
friends. Some people are reluctant to try something new, so it
sometimes takes a degree of persuasion to get people to join on
the trishaws and transporter. But once they are on, they love it
and want to come back time and time again. 
Cycling Without Age     
“We have found that many of our visitors
and volunteers are very keen to talk about
things that are troubling them and have
been bottling up through the pandemic.”
“When it comes to mental health, we so
over-complicate the solution. So often
people just need to make one meaningful
connection or friendship which can turn
their life around.” 
133

Page 134

12 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
Training, Networking & Partnership Working
Since the launch of the Fund, a wide variety of networking and training events were organised to
encourage peer support, shared learning opportunities and to create an environment to encourage
partnership working. Also introducing other organisations and statutory services to what is on offer in our
communities to support people improve their mental health and wellbeing. 
Many of the projects funded have subsequently come together in partnership to jointly deliver services,
or where appropriate, refer on to other Third Sector or Statutory services, to enhance the overall support
being offering within their communities. 
77% of the groups
funded in Year 1 have
reported they are
now working in
partnership with at
least one other
organisation.
46% of the groups funded in Year 1
attended at least one training session
offered, with many attending all.
In addition, across the two years of
the fund so far, four networking
sessions were arranged and very well
attended, with around 40
organisations at each. 
“Arran CVS has continued to offer direction in relation to possible partnership opportunities which
proved invaluable and helped us create an excellent working relationship with Bridgend Community
Centre, where we have now established a 2nd outreach hub for residents of the Garnock Valley.”
“Super big thanks to Arran CVS for facilitating so much networking, some of which has led to ongoing
partnerships and / or ally acquisition.”
0%
10%
20%
30%
40%
50%
CMH&WB Fund Year 1 Training Attendance
Shared Learning      Adult Support    Suicide Prevention    Measuring Social   
& protection                                                Impact                         
134

Page 135

13 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
Project outcomes & examples
Whilst the numbers are impressive, it’s the stories of the many people benefitting that really tell us about
the true impact of the projects. People who attended the projects funded in Year 1 have reported
significant improvements in their mental health and general wellbeing. Participants have reported
increased confidence and self-esteem, improved energy levels and a greater sense of purpose, through
developing new skills and more frequent opportunities for social interaction and peer support. 
Provision of essential household items
Other projects are providing families with much needed essential household items, furniture, and
clothing, that eases the burden for low-income families, many of whom say that they feel overwhelmed
by guilt and anxiety about not being able to provide a suitable home that meets the basic needs of their
families. This in turn leads to poor mental health and anxiety. 
“I have learned so much about myself,
learned some new skills and learned how to
laugh again and have fun.”
“I have stepped out my comfort zone many
times, this has been great for my confidence
as has the support from everyone at the
café.”
“My children shouldn’t suffer because of the
things that affect me, sometimes the guilt is
overwhelming, sometimes I feel that I’m not
good enough for them, but just knowing that
someone is there and that I don’t need to
keep asking for help, really helps.”
“Families are sleeping in their own beds,
clothes are being washed, food is staying
fresher for longer, several secondary schools
have had their nurture rooms furnished, over
a thousand families have had their homes
furnished including over 100 refugees.”
“Hundreds of families have had their houses
turned into homes because we have furnished
their properties. Children jump for joy because
they now have bedrooms, thirty-year-old men
are over the moon that they now have a
furnished home to invite family to.”
135

Page 136

14 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
Debt management, income maximisation & housing advice
A client was referred to one of the funded projects by their Community Link Worker for help with their
Income and Expenditure, plus income maximisation. Their adviser noted that the client has enduring
mental health difficulties and helped them to apply for a council tax reduction based on the severity of
their mental health impairment. This application was successful, and the client received a rebate of over
£3000, which was backdated by several years. Additionally, this meant that the client had no ongoing
council tax liability. With the client’s permission, their adviser also contacted their social worker to
request self-directed support budget to assist the client with care costs. The client disclosed that they had
issues with how they were spending their money. As this presented a significant risk, the adviser
discussed this with their social worker and together they encouraged the client to access support from
relevant organisations. The client has now engaged in preliminary healthcare support for the troubling
issue and their social worker has ongoing involvement. 
Free & engaging activities promoting wellbeing
Providing access to free and engaging activities for people during the cost-of-living crisis is also vital. 
Many people simply would not be able to afford to go out or take part in activities if there was a cost
associated with them. Many of the projects try to include free food where feasible, even a cup of tea and
a cake, or soup and a sandwich, can make all the difference to someone facing financial hardship. 
“My MH issues are a big part of my life. I attempted
suicide 7 years ago; I have high anxiety depression and
have experienced a lot of trauma. I now have WRAP – A
Wellness Recovery Action Plan and I am in continuous
therapy. But I have mainly good days now. I volunteer
here, it helps my MH – I want to contribute back into
society.”
“It gets me out of the house. I feel I am learning and
using new skills and new talents. I find it really calming. I
love interacting with other people.”
“The group is the best part of my week. I have made
friends who understand how I feel, look out for me, and
show they care.”
136

Page 137

15 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
Attending activities where people can express themselves creatively, whether that be through writing a
song or poem, making artwork, or learning to cook, has given attendees and volunteers a real sense of
achievement and pride. 
“I am really chuffed
with myself making
this! Doing these
crafts is very
therapeutic, I feel a
sense of calm and
purpose, it’s really
enrichening.”
These past few months I have been working on the loveliest project. Poetry. But not as I’ve ever
worked with it before . . .
I’ve been working in Trindlemoss Day Opportunities in Irvine with adults with learning disabilities —
and it has been the most wonderful process of exploration and creation, all inspired by the theme of
“How We See Ourselves.” Artist Lynn McNally (pictured) has also worked onsite, facilitating art
workshops, and the gorgeous results of these will be combined with newly created short films to
complete this expansive (and excellent) project. Next, an exhibition of poetry, art, and film, showing
the project in all its splendour, will open in September in the Harbour Arts Centre, Irvine. I am so happy
to have played a role in this incredible project. I have learned so much and met some awesome,
inspiring folk. I’m heart happy. Through creation, we really can express “how we see ourselves”.      
Simon Lamb
137

Page 138

16 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
Green Health
The health benefits, both physical and mental, of being outdoors and immersed in nature are well
documented. Several of the funded projects have focused on bringing people together to enjoy nature
and encourage people to spend more time outdoors.
People attending these sessions, especially when they engage on a regular basis, report an increase in
their happiness, confidence, and self-esteem. They are more willing to try new things, their
communication and connection with others improves, and they get out independently on a more
regularly basis to benefit from being outdoors. They develop an increased awareness of nature and learn
to use it, alongside mindfulness, as a self-regulation strategy, enabling them to feel a greater sense of
calm and peace. 
“I loved lying in the hammocks – something I have
never done before.”
“Nature has been very good for my mental health.”
“When life deals you lemons, say, “Sod it” and sign up
for a family day at Forest School. The summer holiday
juggle has officially kicked in and my head is swirling
with trying to juggle childcare and keep everyone
smiling, including myself. I conceded defeat yesterday
and cleared the diary for today and gave myself
permission to have 1:1 time with little big man. We
had a ball! We made bread on the campfire, played on
the rope swing, and made a den together. Money can’t
buy these memories and most importantly, I was a
happy mum today and not work mummy, telling
everyone to keep the noise down when I’m on a call.
Thank you to the most amazing team at Woodland
Wakeup for allowing us to sign up last minute and for
giving us an incredible day to remember.”  
Linda, parent (attending open day)
138

Page 139

17 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
Men’s Sheds
The Men’s Sheds throughout North Ayrshire provide a hub for local men to come together for
companionship and conversation, whilst undertaking tasks that utilise existing skills, or help them to
develop new skills, and provide an excellent community service at the same time.  
Most of the Men’s Sheds build planters and other furniture and ornaments that are either donated or
sold within the community to help fund their projects. Some also offer bicycle refurbishment, that sees
them repairing and recycling donated bicycles that, once in good working order again, are donated back
to members of the community in need, including many of the New Scots who have moved into the area.
Scott’s story, from Dalry Men’s Shed, is a perfect example of the positive impact the shed can have on
lives of people in the community. Click link below to watch a short video of his story. 
Taking care of our Volunteers 
Recognising the value and importance of the role that volunteers
play in supporting the delivery of projects in the third sector is
very important. Many volunteers don’t recognise their own
worth and the true value of their impact. Helping them to
understand the importance of self-care and talking about their
own experiences is important, especially when they are often
working closely with people who are experiencing very poor
mental health, or suffering with grief, which can be traumatic for
them. 
Funding projects specifically focussed on self-care for volunteers,
has enabled them to develop their own peer support network
and come together more as a team to support each other,
ultimately benefitting the people who access their services.   
Video Link: Scott’s Story North Ayrshire
139

Page 140

18 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
Specialised support provision
Year 1 funded several projects that focussed on specialised areas of need, such as people suffering with
very poor mental health due to, for example, gambling addiction, bereavement, domestic violence, or
families affected by imprisonment. Although more targeted in their reach, these projects provide vital
support to high-risk target groups, where suicidal thoughts are known to be more prevalent.
“Domestic abuse is on the increase, and I have learned that the entire family and extended family are
affected. By supporting the female on her own recovery from abuse and increasing her self-efficacy, it
can stop the cycle and really self-empower everyone affected.”
The impact of providing specialised peer support and raising awareness, providing a safe space for people
to express themselves in a group with others who understand what they are going thorough, cannot be
under-estimated.   
“It was very scary taking that first step through the door, but I was made so welcome and felt safe
from the start. Anyone dealing with mental health must feel safe in the environment they are in and
from day one that’s what Sliding Doors offered me. I met people from every walk of life who heard
me without being judgmental or thinking I was “off my head” which had been said to me often.”
“No one can understand the beauty of being understood and appreciated in their life and that is
what Sliding Doors has given me. Sliding Doors has been my lifeline.”
“I buried my thoughts, feelings and emotions during the daytime and would then sit at night in
hopelessness. The support I received from your volunteer counsellor Sally in 2022 literally saved my
life.”
140

Page 141

19 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
Community Food
Many of the Community Garden projects, Community Centres and Hubs, have teamed up with local food
larders or food banks to make their produce available to the community. They have also been providing
practical support on how to cook nutritious food on a budget, by creating and demonstrating recipes, as
well as providing many of the ingredients. 
Cost of Living Crisis
Food insecurity and the cost-of-living crisis is a growing concern. Projects that provide access to free or
low-cost nutritious food, other essential household items or advice on debt management and income
maximisation strategies, have been a lifeline to many, through the Projects funded in Year 1. 
The focus on projects that have a
direct impact on the cost-of-living
crisis, where free food, food growing
or advice on managing debt and
other issues relating to the cost of
living, has remained constant
between Year 1 & Year 2 at 19% of
the total projects. Free activities,
which indirectly benefit people
during the cost-of-living crisis, have
increased from 53% of the projects
in Year1, to 60% of the projects in Year 2. 
“The Soup Club has been a massive help, I’m
out all day on a Monday otherwise I’d be in
my jammies all day!”
“I also help at the family club, I don’t need to,
but I opt to stay, and I really enjoy it. I make
sure everyone gets some soup or toast or a
scone.”
141

Page 142

20 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
Additional Focus Year 2 - Suicide Prevention 
One of the priorities of the Fund is suicide prevention, again a challenging medium to measure. During
the Year 2 CMH&WB Launch event table discussions, the need for more resources and input around
Suicide Prevention tools and techniques was identified. In addition to the training offered, the Third
Sector asked for a resource to be developed to support them in this vital work. 
A short-life working group was formed, which involved members from
11 local groups and organisations, as well as North Ayrshire Council’s
Choose Life Manager and a Senior Manager from Public Health.
100% of the people involved fed back that they were extremely
satisfied or satisfied with the content and format of the toolkit and
how their input was represented. 100% also confirmed they are
extremely likely or likely to volunteer for other similar working groups
in the future.                                                                                             
Sarah Watts                                                                                                        
Choose Life Manager - North Ayrshire                                                                                 
13. 
The toolkit is not complicated, yet I believe it will save lives.
Excellent resource & great group to be part of.
Thank you for making this happen & showing there is help out there.
Equality of opportunity to give input.
The diversity of experiences and thoughts was invaluable in the group.
I would like to stay active in this work moving forward. 
The collaborative work and energy which was involved in producing the Community Suicide
Prevention Toolkit was a really positive experience and illustrates that the process and journey are
as important as the final outcome. Ownership of the process and respectful collaboration have
meant the document produced is informative and meaningful and hopefully will prove to be
supportive to local groups, but it has also illustrated the power of a community-based approach to
this work. It is hoped that this can be built on and developed going forward. 
142

Page 143

21 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
Considerations for Year 3 and beyond
As we move into Year 3 it will be important to continue to build on what has gone before. To nurture and
develop the existing relationships and cross sector partnerships that have evolved, encouraging greater
collaboration and the creation of new opportunities to benefit the communities of North Ayrshire that
are most in need. The belief that we are all created equal is flawed, our lives are dependent on many
circumstances, but it’s important to help people recognise that everyone has their own unique strengths
and something to contribute. With some extra help to get through life’s challenges, people can have a
more equal chance of success in life and outcomes can be improved earlier and with reduced need for
medical intervention. 
This fund is an enabler in creating these positive outcomes, but consideration must be given to how the
legacy of the Fund is sustained for the future, to ensure this valuable work can continue. 34% of Year 1
projects were funded to continue through Year 2, with 31% able to incorporate the project with existing
funding, however 15% stated the project had to end when the funding ended. Providing love, care,
guidance, and mentoring are vital aspects missing from the lives of many people and it needs to be
valued and recognised as such. “By continuing to invest in these organisations and the support and
activities they offer, we will be investing in prevention of ill health, community resilience and a sense of
wellbeing for individuals, which undoubtedly will improve lives and consequences for so many across
North Ayrshire.”
Vicki Yuill
CEO - Arran Community & Voluntary Service 
143

Page 144

22 
COMMUNITIES MENTAL HEALTH & WELLBEING FUND 
A few words from our projects 
“The future is looking good as we have more funding for the group to continue as it is within the
community.”
“The first year has been really challenging with setting everything up for the first time as a CIC.  We
look forward to collaborating more in the second year and building our trust with the communities we
serve.” 
“The allotments are building a community hub. The funding for year 2 will see an outdoor kitchen. This
will be an added asset for the community.”
“Our new facilities will be permanently available to our local community and our continuing
partnership with Harbourside Men's Shed has been strengthened.” 
“We as a club have been in existence for 20 years and this is one of our best and most important and
interesting projects and our successful projects that brings the social side of table tennis outwith the
competitiveness of the sport.”
“Our services in Ayrshire & Arran face an uncertain future for funding reasons. Multi-year, sustainable
funding is required to allow us to secure the service.”
“Your funding enabled them to have greater opportunity to try new things and learn.” 
“Referring individuals to our project activities can improve patient outcomes by positively impacting
mental health and well-being. The project offers a cost-effective intervention that complements
primary care, reduces healthcare costs, and fosters a collaborative approach to care.”
“The grant allowed the project to run indefinitely, and it will continue to grow and become part of the
local community.”
“Arran CVS introduced us to Mairi at Bridgend Community Centre last year at the Child Poverty event,
which ultimately started the conversation that made the partnership and project possible.” 
“Great to work with such a fantastic Organisation.”
“The difference this money is making in adding meaning and connection and hope to people lives
have been significant and has made a difference to people’s mental health and wellbeing. It is a joy to
be involved and see plans coming to fruition.”
“Arran CVS advises us of various leads for future possible projects and also sends invites to events and
meetings which we attend if possible.”
144

Page 145

Integration Joint Board
9th May 2024
Subject: Equality Mainstreaming and Outcomes Report 2022-
2024
Purpose: This report is for:
• Approval
Recommendation: It is recommended that the Board review the attached Equality
Mainstreaming and Outcomes Report and approve for
publication. 
Direction Required to
Council, Health Board or
Both 
Direction to:- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
HSCP Health and Social Care Partnership
EHRC Equality and Human Rights Commission
NADARS North Ayrshire Drug and Alcohol Recovery Service
PSED Public Sector Equality Duty
EHCRIA Equalities and Children’s Rights Impact Assessment 
1. EXECUTIVE SUMMARY 
1.1 The IJB approved its current Equalities Outcomes Plan for 2022-2025 at the meeting
on the 16th of March 2023. 
1.2  It published its previous Equalities Mainstreaming Report for 2021-2022 at the IJB
meeting on 11th May 2023. 
1.3  This report provides an overview of progress made to deliver the agreed equalities
outcomes, and further efforts made to mainstream the Public Sector Equality Duty
(PSED) between 1st of April 2022 and 31st March 2024. 
2. BACKGROUND 
2.1 The Equality Act 2010 (Specific Duties) (Scotland) Regulations 2012 requires public
bodies in Scotland, including IJBs, to publish an Equalities Outcomes Plan every 4
years. The IJB approved the current plan, which covers a 3-year period to align with
its Strategic Plan review period, in March 2023. 
Agenda Item 11
145

Page 146

2.2 The Equalities and Human Rights Commission (EHRC) supported officers to develop
suitable equalities outcomes for this plan, which were designed to promote equality
and fairness across our services. These outcomes include a set of actions to be
achieved by the 31st of March 2025. 
2.3 The Scottish Regulations include an additional duty for public authorities, which is to
report at least every 2 years on its progress to mainstream the Public Sector Equality
Duty (PSED). This was last approved by the IJB on the 11th of May 2023, and covered
the period of 2021-2022, which aligned to the one-year Strategic Bridging Plan. 
2.4 This report presents the progress the HSCP has made towards delivering its adopted
equality outcomes, as well as its progress towards mainstreaming the equality duty
between the 1st of April 2022 and 31st of March 2024. 
2.5 Due to the current 3-year plan and requirement to publish reviewed Equality
Outcomes in April 2025, the next Mainstreaming Report will be provided for the next
1 year and will be published alongside the next Outcomes Plan. After this, it will return
to a biennial reporting cycle. 
3. PROPOSALS 
3.1 As a public body, the IJB is required to publish reports on the progress made to deliver
its Equalities Outcomes, and on mainstreaming the public sector equality duty. This
report combines both duties for the period 1st of April 2022 to 31st of March 2024. It is
recommended the contents are noted as a presentation of the positive work carried
out in this time and is approved for publication. 
3.2 Anticipated Outcomes 
3.2.1 The 4 Equality Outcomes that were published for 2022-2025 were: 
1. People with complex care needs are supported to live independently at home
for as long as possible.
2. People and communities who make North Ayrshire their home can effectively
access the health and social care services they need.
3. Children and families in need are supported to live healthy and safe lives. 
4. Through improved engagement practices and access to a greater range of
health and social care opportunities, people with a learning disability, or those
with complex health conditions, achieve better health outcomes. 
3.3 Measuring Impact 
3.3.1 The Equalities Outcomes Plan contains 21 actions across the four outcomes.
Progress has been made towards delivering these with many being achieved already,
and some presenting further challenges. An overview has been provided for each
outcome below.
146

Page 147

3.3.2 Outcome 1: There have been continued challenges regarding reducing the waiting
lists for social work assessments and care, but there is ongoing work to address this.
However, waiting lists have been successfully reduced for the Community
Occupational Therapy due to ongoing service improvements. 
3.3.3 Outcome 2: The HSCP’s Resettlement team is supporting new Scots to access the
right health and social care services to meeting their needs. It is also working with the
Council’s Refugee Task Force and other partners to ensure this is a person-focussed
approach. 
3.3.4 Outcome 3: There have been many achievements to support children and families,
including the including the ongoing implementation of Signs of Safety approach to
social work case work, and current development of Mini Minds Matter Infant Mental
Health Service. ‘Care experience’ was also successfully included in the Equalities and
Children’s Rights Impact Assessment (EHCRIA) templates which have been adopted
for use by the HSCP in December 2023. 
3.3.5 Outcome 4: During the last 2 years there has been a renewed effort to ensure we are
working with service-users to understand their need and support them to shape the
development of services. There has been accessible engagement with users of the
Learning Disability service in order to develop a Strategy in 2024/25, and ongoing
work to understand the transition from children’s to adults’ services, with a particular
focus on learning disability and mental health services. 
3.3.6 The report also outlines efforts to mainstream the Public Sector Equality Duty,
including a new approach to locality planning which will involve targeted engagement
with equalities groups, the delivery of the North Ayrshire Drug and Alcohol Recovery
Service’s (NADARS) Equality and Diversity Plan, and how we are embedding
equalities into our Transformation approach. 
3.3.7 Further details are available in the report in Appendix 1. 
4. IMPLICATIONS 
4.1 Financial
None
4.2 Human Resources
None
4.3 Legal
In publishing this report, the IJB remains compliant with the Public Sector Equality
Duty outlined in the Equality Act 2010, and the reporting duties outlined in the Equality
Act 2010 (Specific Duties) (Scotland) Regulations 2012.
4.4 Equality/Socio-Economic
This report outlines how local equalities outcomes are being advanced, and how
equalities are being embedded in the day-to-day running of the HSCP.
4.5 Risk
147

Page 148

None
4.6 Community Wealth Building
None
4.7 Key Priorities
This report provides an overview of efforts to progress equalities outcomes which
support the delivery of all 5 priority areas within the Strategic Plan. However,
particularly relevant priorities are Enable Communities and Tackle Inequalities.  
5. CONSULTATION
5.1 The information provided in this report were provided by Heads of Service and their
respective Senior Management Teams.   
Caroline Cameron, Director
Author: Seony Ross, Team Manager Strategic Planning and Equalities,
seonyross@north-ayrshire.gov.uk 
Appendices
• Appendix 1, Equality Mainstreaming and Outcomes Report 2022-2024
148

Page 149

1 
EQUALITY MAINSTREAMING
AND OUTCOMES REPORT
2024
Repor�ng period 1st April 2022 to 31st March 2024
North Ayrshire Health and Social Care Partnership 
Biennial Report on Mainstreaming the Equality Duty &
Mid-term Report for the Equali�es Outcomes Plan 2022-2025 
149

Page 150

2 
Contents
1. Introduc�on ........................................................................................................................................ 3
1.1 Equality Act 2010 .......................................................................................................................... 3
2. Mainstreaming the Equality Duty ....................................................................................................... 3
2.1 Integra�on Joint Board .................................................................................................................. 3
2.2 Ayrshire Equali�es Partnership ..................................................................................................... 4
2.3 Transforma�on .............................................................................................................................. 4
2.4 Strategic Planning.......................................................................................................................... 4
2.5 Working in Locali�es ..................................................................................................................... 5
2.6 Understanding Our Communi�es ................................................................................................. 6
How We See Ourselves ................................................................................................................... 6
Mental health and Wellbeing Service in Primary Care consulta�on .............................................. 6
Mental Health and wellbeing digital consulta�on .......................................................................... 6
Gypsy Traveller engagement ........................................................................................................... 6
Neurodevelopmental Differences engagement .............................................................................. 6
2.7 North Ayrshire Drug and Alcohol Recovery Service ...................................................................... 7
2.8 Communica�on and Accessibility ................................................................................................. 7
2.9 Staff Understanding, Development, and Training ......................................................................... 8
2.10 Embedding Equality in Procurement .......................................................................................... 9
2.11 Equality Impact Assessment ....................................................................................................... 9
3. Progress Against our Equali�es Outcomes ........................................................................................ 10
3.1 Equality Outcome 1: People with complex care needs are supported to live independently at
home for as long as possible. ............................................................................................................ 11
3.2 Equality Outcome 2: People and communi�es who make North Ayrshire their home can
effec�vely access the health and social care services they need. .................................................... 16
3.3 Equality Outcome 3: Children and families in need are supported to live healthy and safe lives.
.......................................................................................................................................................... 18
3.4 Equality Outcome 4: Through improved engagement prac�ces and access to a greater range of
health and social care opportuni�es, people with a learning disability, or those with complex
health condi�ons, achieve beter health outcomes. ........................................................................ 21
4. Next Equali�es Outcomes Plan ......................................................................................................... 26
Appendix: Equality Outcomes and our Strategic Priori�es ................................................................... 27 
150

Page 151

3 
1. Introduc�on
This report provides an update on the progress that North Ayrshire Health and Social Care
Partnership has made to advance our Equali�es Outcomes and to mainstream the equality duty
within the day-to-day running of the organisa�on. The report covers the period of 1st April 2022 to
31st March 2024.
North Ayrshire Health and Social Care Partnership published its Equali�es Outcomes Plan 2022-2025
in March 2023. Outcomes need to be developed every 4 years; however, this plan covers a 3-year
period in order to align with North Ayrshire Council outcome repor�ng cycles and our strategic plan.
The previous Equality Mainstreaming and Outcomes Report for ac�vity carried out in 2021-2022 was
published in May 2023. Public bodies are required to publish progress towards mainstreaming the
equality duty every 2 years.
1.1 Equality Act 2010
The Equality Act 2010 brought into force the Public Sector Equality Duty for all public authori�es in
the UK. The public authority must have due regard to the need to:
a) eliminate discrimina�on, harassment, vic�misa�on, and any other conduct that is prohibited
by or under the Act.
b) advance equality of opportunity between persons who share a relevant protected
characteris�c and persons who do not share it.
c) foster good rela�ons between persons who share a relevant protected characteris�c and
persons who do not share it.
The Equality Act 2010 (Specific Du�es) (Scotland) Regula�ons 2012 outlines a duty for Sco�sh Public
Authori�es to publish equality outcomes and report progress, and to report progress on
mainstreaming the equality duty.
Due to the legisla�ve structure of Integra�on Joint Boards (IJB), Health and Social Care Partnerships
are exempt from certain specific du�es as they are not employers, and all staff members remain
employees of either NHS Ayrshire and Arran or North Ayrshire Council. These du�es are related to
gender pay gap informa�on, equal pay statements, and employee informa�on. 
2. Mainstreaming the Equality Duty
This sec�on outlines the progress the HSCP has made towards embedding equality into the day-to-
day running and work of the partnership. By doing so, we ensure that people can access services in a
way that best suits their needs and can share their experiences to support the development and
progression of the way our services are delivered.
2.1 Integra�on Joint Board
The North Ayrshire Integra�on Joint Board is the decision-making Board for all func�ons delegated
by North Ayrshire Council and NHS Ayrshire and Arran in terms of health and social care services. The
Board meets monthly, and minutes and reports are published on the North Ayrshire Council website
for transparency.
Equali�es is considered in all of the decisions made by the Board through the implica�ons sec�ons of
all papers presented to the Board. Anyone presen�ng a report, proposed policy, proposed service or
service change, or anything else requiring Board decision-making, is required to explain how they
151

Page 152

4 
have considered the Equality Duty and the Fairer Scotland Duty under sec�on 4.4 of the cover
report.
2.2 Ayrshire Equali�es Partnership
The Ayrshire Equali�es Partnership meets quarterly and brings together Equali�es officers from
across different Ayrshire organisa�ons in the area for the purpose of shared learning and planning.
This includes officers from North, South and East Ayrshire’s Councils, each of the HSCP’s, NHS
Ayrshire and Arran, Police Scotland, University of West of Scotland, and Ayrshire College. 
This Partnership has developed broad shared outcomes for the area:
1. In Ayrshire, people experience safe and inclusive communi�es.
2. In Ayrshire, people have equal opportunity to access and shape our public services.
3. In Ayrshire, people have opportuni�es to fulfil their poten�al throughout life.
4. In Ayrshire, public bodies will be inclusive and diverse employers.
These high-level outcomes helped inform more specific local outcomes, which are reported on in
sec�on 3.
2.3 Transforma�on 
The NAHSCP Transforma�on Plan 2024-2027 is an ambi�ous programme of change consis�ng of a
range of improvement and reform projects to improve the quality of our health and care services,
and was approved by the Integra�on Joint Board on 14th March 2024. Transforma�on is a planning
process that sets out to achieve our high aspira�ons of health equity, improved social circumstances,
and long-term sustainability for the people of North Ayrshire by making best use of available
resources to transform products and services to achieve beter outcomes and experiences. The
Transforma�on Plan is aligned to our Strategic Priori�es, and promo�ng equality, and the principles
of equality and fairness, are central to the plan, and the approach.
The governance structures required to effec�vely manage the programme of work have been
reviewed and updated to support robust planning and effec�ve and consistent monitoring, with an
increased focus on benefits realisa�on, user-centred design, and a move to more data-driven and
value-based approaches. This is to ensure we deliver what people want and need, and that this is
evidenced. The impact on equality is a considera�on from the beginning, and screening is part of the
project proposal process. Once approved an equality impact assessment is carried out, along with
user research and stakeholder engagement. The end-to-end process, from ini�al proposal to post-
project evalua�on, is designed to ensure each project delivers improved outcomes and experiences,
contribu�ng to a more equal and more sustainable North Ayrshire. 
2.4 Strategic Planning 
North Ayrshire HSCP’s Strategic Plan, Caring Together 2022-2030, was published on 17th March 2022,
and is the first �me the partnership has developed a plan that outlines our longer-term ambi�ons for
local health and care. The plan outlines the priori�es of the partnership to be: 
• Enable communi�es.
• Develop and support our workforce.
• Provide early and effec�ve support.
• Improve mental and physical health and wellbeing.
• Tackle inequali�es.
152

Page 153

5 
In addi�on to the final priority being specifically regarding inequality, the 5 priori�es are delivered in
a holis�c way to ensure equali�es are considered every step of the way. We aim to enable
communi�es by involving groups in developing our priori�es and suppor�ng them to improve local
capacity and resilience which can enable different equali�es groups. We support our workforce to
understand equali�es through training and learning, and to use that understanding in their everyday
jobs. We also seek to understand how different groups use our services in different ways and ensure
that service design considers these differences.
Although the current strategic plan is in place un�l 2030, it will be reviewed by March 2025 to ensure
it is s�ll fit for purpose, which will be the same �me the HSCP will publish our revised Equali�es
Outcomes. These plans will be developed in partnership to ensure equali�es goals are embedded
within the strategic plan. Addi�onally, our locality work will be reflected in this update, which means
the feedback and ongoing conversa�ons we have with people in locali�es, will be reflected in the
overall planning for the whole of North Ayrshire. 
2.5 Working in Locali�es
The Covid-19 pandemic meant that a lot of face-to-face mee�ngs and engagement were suspended
temporarily or moved online. Prior to the pandemic we had 5 established Locality Planning Forums,
which worked in smaller areas across North Ayrshire which were supported by a lead officer within
the partnership. However, these were impacted by the pandemic and the Partnership felt that we
should reinvigorate the process by establishing a new process led by the Senior Management team
and with more involvement from local communi�es within each area. 
North Ayrshire is comprised of 6 locali�es which are used for local service delivery planning, by the
Health and Social Care Partnership as well as the wider Community Planning Partnership. These are:
• Arran
• Garnock Valley
• Irvine
• Kilwinning
• North Coast and Cumbrae, and
• Three Towns
Within each locality on the mainland, there will be a biannual locality conversa�on which will be
established to maintain ongoing dialogue with service-users and ensure their voices are con�nually
involved in the strategic planning process within their communi�es. These will be followed up by a
mee�ng of the Locality Planning Review Group, which will analyse the results of the conversa�ons,
local data, community planning priori�es and local knowledge of services within the locality.
Work to develop this new locality planning process began in spring 2023, since when we have
developed a new process to beter integrate with community planning processes, involve a wider
group of service-users, and make more use of exis�ng data and knowledge about each area. Ini�al
scoping Locality Conversa�ons took place in April 2023, and the start of the new Locality Planning
Process is being kicked off by the first set of Locality Conversa�ons in April 2024, and Locality
Planning Review Groups in June 2024.
Locality plans will be developed in late 2025, a�er 2 years of data-gathering and ongoing dialogue
with the community. In this �me, work will be ongoing to involve people from different equali�es
groups to gain their viewpoint as we develop priori�es and ac�ons for each area.
153

Page 154

6 
2.6 Understanding Our Communi�es 
As outlined above, a new locality planning model is being implemented in order to maintain ongoing
dialogue with our communi�es and develop plans important to them for each area. This work will
feed directly into the review of the Strategic Plan, as well as the development of a new Equali�es
Outcome Plan, both to be developed by Spring 2025. The Locality Conversa�ons will be a con�nued
route for the community to feed into this planning work, but there is also a great deal of work that
has occurred to understand more about our communi�es, par�cularly those with addi�onal
challenges, barriers, or shared characteris�cs. For example: 
How We See Ourselves
The ‘How We See Ourselves’ exhibi�on took place at the Harbour Arts Centre in Irvine in September
2023. The project used poetry, visual art, and anima�on to highlight the lives, interests, and talents
of people with learning disabili�es as well as raising awareness of the challenges they face.  The
project brought together collabora�ve partners from Trindlemoss Day Opportuni�es, Neighbourhood
Networks, and local ar�sts across North Ayrshire. A short film was produced as an outcome of the
project, so that experiences of those involved can be shared on a con�nuing basis. 
Mental health and Wellbeing Service in Primary Care consulta�on
This engagement took place in January 2023 and involved a public and a staff survey to understand
people’s current experience with the service and exploring self-care and wellbeing. This engagement
process involved targeted engagement with different equali�es groups, including focus groups for
people with lived experience of mental health and long-term health condi�on, people with learning
disabili�es, and the local gypsy-traveller community. The surveys were made in a range of alterna�ve
languages and work was carried out with the New Scots team within North Ayrshire Council in order
to encourage and support individuals with different new to the area with different language or
cultural backgrounds to engage with the forms or atend a focus group.
Mental Health and wellbeing digital consulta�on
A pan-Ayrshire engagement project led by North Ayrshire HSCP in March 2023, this examined the
usage of mental health and wellbeing apps and digital resources rela�ng to mental health. The aim of
this consulta�on was to gain further insight into online ac�vity in the hope of improving engagement
with digital mental health and self-care resources in the future. This piece of work contributed to
wider digital transforma�on plans within mental health services. 
Gypsy Traveller engagement
Following the engagement work with the gypsy traveller community related to the Mental Health
and Wellbeing service outlined above, the group was iden�fied as a priority group to encourage
addi�onal engagement in order to understand the poten�ally unique needs of the community. A
gypsy traveller engagement working group was established, and an engagement event was organised
to be part of a local gypsy traveller mission event. The event took place on the 21st of August 2023 at
Eglinton Country Park, and was well atended with approximately 200 community members camped
on site. The outputs from this engagement event supported the development of an engagement plan
for the Mental Health and wellbeing of this group and there are currently plans for a further
engagement project exploring male mental health and suicide preven�on.
Neurodevelopmental Differences engagement
Over the past year, North Ayrshire HSCP has been working jointly with South and East Ayrshire HSCPs
and NHS Ayrshire and Arran to redesign neurodevelopmental diversity specifica�on and supports. 
North Ayrshire HSCP led work to carry out different phases of engagement with different groups,
154

Page 155

7 
including individuals and parents and carers of those with a suspected or confirmed
neurodevelopmental difference (NDD). Phase 2 of this work is underway with further engagement
being conducted with parents and carers of children and young people with possible or diagnosed
NDD to explore support available in our communi�es.
2.7 North Ayrshire Drug and Alcohol Recovery Service
This is an integrated health and social care service that works with clients who have complex and
dependent substance use, who are supported by a range of different professionals to develop a
recovery care plan.
This service is used by a range of people with different shared characteris�cs, and equality and
diversity is important to the service which has priori�sed embedding it into their daily prac�ce and
strategic priori�es. The service developed its own Equality and Diversity Improvement Plan for 2023-
24 with the following aims:
• Develop and sustain a diverse, skilled and commited workforce able to deliver equitable,
diverse and inclusive services to meet the needs of local people. 
• Raise awareness of equality, diversity and inclusion to promote that the service is safe and
accessible for LGBTQIA+ individuals and trans communi�es.
• Ensure all new Local Opera�ng Plans, Standard Opera�ng Plan or any guidance are reviewed
to ensure that unlawful discrimina�on is eliminated, and equality of opportunity promoted.
The plan had a set of ac�ons including staff training and educa�on, awareness raising resources, and
inclusive guidance, that were achieved by March 2024.
2.8 Communica�on and Accessibility 
A brand new NAHSCP website was launched in April 2023 as the first step in helping the Partnership
meet its commitments under the Public Sector Bodies (Websites and Mobile Applica�ons) (No. 2)
Accessibility Regula�ons 2018.
The work carried out so far has been to improve access to health and social care informa�on for
North Ayrshire residents, par�cularly those with a visual impairment, making the site easier to read
on a mobile device and navigate using a keyboard, improving colour contrast, and moving away from
the use of PDF documents in favour of uploading content as HTML pages to ensure compa�bility
with screen-reading so�ware. Where documents require to be included on the site in PDF format,
then these are being created in a more accessible way, with the web team having run a series of well-
atended staff drop-in sessions throughout 2023 to demonstrate the process of crea�ng accessible
documents. 
A number of Accessibility Champions were iden�fied and trained across Partnership services in 2023,
giving staff a point of contact for advice and support when crea�ng documents. In addi�on, any staff
member crea�ng a document for the website who requires further informa�on on how to solve
accessibility issues can also now book a one-to-one session with a member of the web team through
the IT portal on the intranet.
The work carried out so far has increased the website’s accessibility score on SiteImprove to 99.9%,
however improvements will be ongoing in the long term as we strive to ensure fairer access to
informa�on for all and adapt to any changes in the legisla�on. Further manual tes�ng of the site is
necessary to iden�fy user experience barriers that individuals with a disability may encounter while
155

Page 156

8 
using the site, with work also required to improve the readability of the site in terms of the
complexity of language used.
2.9 Staff Understanding, Development, and Training
The Health and Social Care Partnership places a great deal of value on developing our staff and
ensuring that there are progression and training opportuni�es. The Learning and Development
Service published a new strategy Be the best you can be 2023-2028, approved by IJB on the 12th
October 2023.
The strategy considers the professional and technical learning and development needs of the social
work/social care workforce opera�ng within the Health and Social Care Partnership, aiming to
achieve improved outcomes for people through a competent and educated workforce.
In addi�on to outlining the aims in terms of policy and prac�ce, the strategy outlines the
organisa�on’s commitments to values, principles and ethics, specifically outlining goals for equality
and diversity. It includes commitments to design and deliver an�-racist prac�ce in Social Work
training (which will begin this year), protected space to explore ethical dilemmas through forum
opportuni�es, and to design and deliver promo�ng equality training with essen�al atendance for
social work students and NQSWs (now in place). 
Total numbers for different staff training delivered from April 2022 to March 2024:
• Adult Mental Health Awareness – 32 trained (new course)
• Au�sm Awareness – 6 trained
• Bri�sh sign language eLearning – 31 trained
• Adult Support and Protec�on Scotland Act – 41 trained
• Adult Support and Protec�on eLearning – 111 trained
• Adult Support and Protec�on overview – 67 trained
• Adults with incapacity act – 29 trained
• Adults with incapacity act refresher – 37 trained
• Promo�ng equality awareness - 86 trained (new course)
• Child protec�on awareness face to face – 101 trained (new course)
• Child protec�on awareness eLearning – 62 trained
• Child protec�on inves�ga�on – 5 days training - 16 trained
• Child protec�on refresher – 18 trained
• Deaf awareness eLearning – 21 trained
• Dea�lind awareness eLearning – 15 trained
• Domes�c abuse understanding (ASP) – 19 trained
• Equali�es awareness eLearning – 1195 trained
• Introduc�on to Neurodiversity – trained 244 from 28/04/2023 (new course)
• Learning disability awareness – 34 trained
• LGBT awareness (new course) – 8 trained
• ASIST suicide preven�on – 2 full days – 8 trained
• Ask Tell Save a Life suicide preven�on – 64 trained (new course)
• Parkinsons awareness – 56 trained (new course)
• Pallia�ve/end of life care – 57 trained
• Care at home induc�on which includes adult support and protec�on and child protec�on
and other condi�ons – 530 trained
• Safe and together overview – 254 trained
156

Page 157

9 
• Safe and together core – 74 trained
• Signs of safety – 207 trained 
2.10 Embedding Equality in Procurement
In the previous Equali�es Mainstreaming report for 2021-2022, it was reported that our
procurement process had recently had work carried out to embed equality into the process. This
included:
• Mandatory compliance for bidders with the Council's Equality Cer�ficate for all tenders 
• A mandatory sec�on for Fair Work Prac�ce included within the tender award criteria aligned
to promo�ng equality of opportunity and developing a workforce which reflects the
popula�on of Scotland in terms of protected characteris�cs, and a fair and equal pay policy
that includes a commitment to suppor�ng the Living Wage.
• A commitment to the Charter for Involvement, which reflects 12 statements aligned to
Human Rights in rela�on to how people who use support services want to be involved in the
services they get; in the organisa�ons that provide their services; and in their wider
communi�es.
• Involving users of services and/or significant others in the procurement process. They are
invited to take part in the award of contracts through designing quality ques�ons in the
award criteria and si�ng on evalua�on panels that select preferred bidders for award.  
These commitments have con�nued to be taken forward, and we are currently working on how to
involve service-users in the evalua�on of commissioned services, in order to inform service
improvement requirements.
2.11 Equality Impact Assessment 
Equality Impact Assessments are used to assess any proposed policy, plan, or service, whether the
proposal is a new or suggested change. 
Since the launch of the partnership in 2015, we have applied the same Equality Impact Assessment
process to both Council and NHS budget proposals that affect the Partnership. This has afforded the
Partnership to achieve a greater level of consistency in equality impact assessments across the wider
partnership. This has been a useful mechanism to both embed equali�es prac�ce in the partnership
and further the process of integra�on.
Amendments to the assessment process in the past few years include the addi�on of further
elements to assess the impact of both equality and inequali�es. The HSCP now uses the NAC Equality
and Children’s Rights Impact Assessment process which includes: 
• Children’s Rights 
• The Fairer Scotland Duty 
• Island proofing
• Care experience as a protected characteris�c.
Equality Impacts Assessments are published on the HSCP website. However, as men�oned above, the
website was recently revised to ensure accessibility and the impact assessments require to be
accessibility checked in order to be uploaded to the new website. This will be done as soon as
possible but, in the mean�me, people can request copies of impact assessments.
157

Page 158

10 
3. Progress Against our Equali�es Outcomes
North Ayrshire Health and Social Care Partnership agreed the following equali�es outcomes for 2022
to 2025:
1. People with complex care needs are supported to live independently at home for as long as
possible.
2. People and communi�es who make North Ayrshire their home can effec�vely access the
health and social care services they need.
3. Children and families in need are supported to live healthy and safe lives. 
4. Through improved engagement prac�ces and access to a greater range of health and social
care opportuni�es, people with a learning disability, or those with complex health
condi�ons, achieve beter health outcomes.
The below table outlines progress against achieving our equality outcomes through the iden�fied
suppor�ng ac�ons. These equali�es outcomes will be reviewed in 2025.  
158

Page 159

11 
3.1 Equality Outcome 1: People with complex care needs are supported to live independently at home for as long as possible.
No.  Suppor�ng Ac�on  Progress for April 2022 – March 2024  Protected Groups 
1.1  Reduce the wai�ng list for
Social Work Assessment and
Review 
Wai�ng list informa�on is reported quarterly to our performance audit commitee. This
refers to Single Shared Assessments for adults over 65 with a physical disability. Since April
2022, the wai�ng list length has been: 
Goal Q1 Q2 Q3 Q4
22/23 150 229 224 247 226
23/24 150 198 226 227 tbc 
Over this period the number of people wai�ng on an assessment has fluctuated with a high
of 247 and low of 198 during the repor�ng periods but remains consistently around the 225
mark.
Efforts to reduce the wai�ng list have been made over the last 2 years, such as addi�onal
social work staff in early 2023 within the locality teams which saw a reduc�on reflected in
quarter 1 of 23/24. The Community Link Worker service con�nues to offer support to
people on a wide range of issues that can affect people’s health and well-being, such as
money worries, unemployment, social isola�on, bereavement, alcohol and drug use,
managing stress, and living a healthier lifestyle. The service can also support people to
manage low mood and anxiety and assist people to access the resources they need to keep
them well.
Ongoing challenges remain, and the service con�nues to experience significant challenges
related to workforce, recruitment, and an increasingly complex demand for services. During
the most recent quarter, there were 37 new starts to the service and 23 leavers, which
causes some delays in terms of gaps and training. However, our health and social care staff
con�nues to provide high quality interven�ons and a number of pilots and service reviews,
with the goal of con�nually improving our service delivery.
Age (Older People) 
Disability 
159

Page 160

12 
1.2  Reduce the wai�ng list for
Care at Home Services (both
at home and in hospital) 
Wai�ng list informa�on for Care at Home is also reported quarterly to our performance
audit commitee. Since April 2022, the wai�ng list length has been:
COMMUNITY 
Goal Q1 Q2 Q3 Q4
22/23 90 157 174 243 174
23/24 90 191 189 195 tbc 
Over this period the number of people wai�ng in the community for Care at Home services
has been consistently higher than the target and, with the excep�on of a spike then drop
between quarters 3 and 4 in 2022/23, has been gradually ge�ng higher over the repor�ng
period. 
HOSPITAL 
Goal Q1 Q2 Q3 Q4
22/23 12 19 11 26 24
23/24 12 21 22 26 tbc 
For people wai�ng in hospitals for Care at Home, the number has fluctuated over the last 2
years with a high of 26 and a low of 11.
A number of interven�ons have been planned in order to address the wai�ng lists. The
Reablement Care at Home service commenced in Quarter 2 of 23/24, which included a
review of the wai�ng lists for people in the community awai�ng a Care at Home service,
u�lising a reablement focussed approach, aiming to deliver an assessment of outcomes for
each service user iden�fying strengths, ac�ons, and interven�ons to encourage
independence, reduce reliance on formal care services, and improve overall individual
outcomes. This review was completed in early 2024 and will be further expanded in
Quarter 4 with a 4-week ini�a�ve around accessing Care at Home supports.
Age (Older People) 
Disability 
160

Page 161

13 
There have been ongoing recruitment challenges, staff absence, and increasing community
demand in this repor�ng period. Addi�onally, a number of external providers have
con�nued to review their posi�ons in the market which led to a major provider ceasing
their contract in March 2023. The partnership has con�nued to increase capacity for in-
house services over this �me with plans to bring all Care at Home services in house over
Quarter 1 of 2024/25. 
The wai�ng lists will con�nue to be monitored quarterly to measure the impacts of the
interven�ons.
1.3  Remobilise Day services for
Older People, enhancing
op�ons to include both at
home and residen�al
provision. 
All mainland day services have re-opened with targets set to ensure full capacity is reached
within Day services, and wai�ng lists are managed effec�vely. All staff vacancies have now
been filled and funding for 4 outreach posts has been approved and will be adver�sed
shortly.  All day services are currently offering outreach within their current establishment
of services, and this will be increased once outreach workers are appointed.  A Care
inspectorate varia�on was submited for all Day Services to facilitate this, and a day service
project plan and working group has facilitated ongoing improvements and developments
within the service.
Age (Older People) 
Disability 
1.4  Review Local Models of
Respite Provision 
Anam Cara Demen�a Respite Centre temporarily transferred to Taigh Mhor, Beith following
significant damage to the building, which ensured con�nuity of 8 respite care beds.
Extensive repair and development of the Anam Cara site took place, with the service
returning to Anam Cara in March 2024.  This return has facilitated the re-opening of 9
respite beds in Anam Cara. 
A review of the current staffing model is being undertaken, alongside a review of
emergency respite placements requested throughout North Ayrshire to determine capacity
and requirement for addi�onal respite provision within Anam Cara.
Age (Older People) 
Disability 
Other - Carers 
1.5  Reduce wai�ng list for people
needing an Occupa�onal
Therapy assessment and
improve access to aides and
The Community Occupa�onal Therapy services within NAHSCP provide assessment and
interven�ons to children, adults and older adults who experience barriers to independence. 
Interven�ons include provision of equipment and adapta�ons (both minor and major),
Age (Older People) 
Disability 
161

Page 162

14 
adapta�ons to support
independent living.  
advice, signpos�ng, and support to obtain charitable funding, blue badge assessment, input
into Self-Directed Support, and assessment and care management.
The Sco�sh Government published an updated version of the Guidance in the Provision of
Equipment and Adapta�ons on 17th January 2023 to support HSCPs to deliver a more
equitable and accessible service.
Community Occupa�onal Therapy has historically had high wai�ng �mes for service due to
the volume of referrals coming through the service, which was not sustainable and North
Ayrshire HSCP carried out a review increase efficiency across the service. Developments
were made throughout 2023 to address wai�ng lists and pressures on the service. This
included:
• Increased staffing resource – the recruitment of addi�onal posts including 2
Occupa�onal Therapists and 3 Occupa�onal Therapy Assistants
• 2 new posts were created and recruited, including 1 Permanent Occupa�onal
Therapy Team Manager and 1 Adapta�ons Officer.  
• A change of referral intake pathway via Enhanced Intermediate Care and
Rehabilita�on Hub – which commenced on 05/06/2023. 
• Comple�on of a Transforma�on Project to streamline processes and iden�fy areas
for development.
The most significant change to the service has been the change of referral intake process. 
This has moved away from referrals being received directly into the OT service CareFirst
baskets to enable a greater level of control and autonomy of what referrals are being
received into the service.
These ac�ons have successfully resulted in reduced wai�ng lists. Between March 2023 and
March 2024, the wai�ng list in the North locality (over 65s) went from 192 to 90, a
reduc�on of 52%, and in the South locality (over 65s) from 349 to 88, a reduc�on of 75%.
The wai�ng list for the under 65 team (authority wide) went from 176 to 47, a reduc�on of
73%.
Other - Carers 
162

Page 163

15 
The maximum wait �me went form 550 days to 227 days, and the average wait �me has
gone from 163 days to 60 days. 
This ac�on will be reported at the end of the outcomes plan period, but it has been
successfully delivered.
1.6  Review Day Services on Arran
for Older People 
A pilot to review the day service for older people on Arran was carried out between May
2023 and August 2023. This first phase of the review was to look at the poten�al for an
outreach-based day service based in smaller villages around Arran. This first phase found
that although some good outcomes were achieved there were only a small number of
service users who benefited. A second phase began in December 2023 and ran un�l March
2024. This was based in Stronach Day Unit at Montrose House in Brodick and there were six
users in the pilot who atended one day per week. Feedback from families and carers was
included in the review. This is now being evaluated with a report due at the end of April
with recommenda�ons based on both aspects of the review, which will then determine the
next steps for Day services for older people on Arran.
Age (Older People) 
Disability 
Other - Carers 
1.7  Con�nue to develop
community-based MDTs to
ensure appropriate support
for people in communi�es to
support them to remain at
home. 
Mul�- Disciplinary Teams to support people with complex care needs are now in place
across all locali�es, which meet monthly.
One MDT is s�ll outstanding for the Irvine area, which is currently being developed and will
be in place and opera�onal by October 2024.
Age (Older People) 
Disability 
Other - Carers 
1.8  People who have received a
period of care within Acute
will have access to a range of
services to support their
transi�on back home. 
Prior to discharge from hospital a comprehensive assessment is undertaken by the Care At
Home Hospital based team.  At this �me referrals will be made to community-based
services including Care at Home, Community Alarm, Appe�to meals, Community
Connectors as well as Primary Care services to facilitate a safe discharge home. If required,
the hospital team will undertake further visits to support the person on their return home
or liaise with community colleagues to provide support to the person returning home.  This
may involve follow up visits from Reablement Team Occupa�onal therapists and/or social
work assistants to support the person home, enabling them to be as independent as
Age (Older People) 
Disability 
Other - Carers 
163

Page 164

16 
possible in their home environment. The hospital team may also link with Red Cross to
request ini�al services to support transi�on home.
1.9  Apply the principles of the
Ayrshire end of life and
pallia�ve care model. 
This ac�on is currently under development and will be reported at the end of this plan
period, in March 2025. 
Age (Older People) 
Disability 
Other - Carers 
3.2 Equality Outcome 2: People and communi�es who make North Ayrshire their home can effec�vely access the health and social
care services they need. 
No.  Suppor�ng Ac�on  Progress for April 2022 – March 2024  Protected Groups 
2.1  Develop a plan to support the
transi�on of new Scots away
from Refugee Taskforce
support and onto mainstream
health and social care
supports 
The HSCP has an established Resetlement team which supports the health and social care
needs of refugees and asylum seekers, primarily Syrian and Afghan. With the arrival and
coordina�on of the new Ukrainian scheme in 2022, the pre-exis�ng Resetlement Team,
which includes both HSCP and housing colleagues, mainstreamed support into exis�ng
health and social care supports for new Scots. 
The Resetlement Team, providing health, housing and wellbeing assessments and
screening, ensured the delivery of long-term council tenancies and registra�on with GP
prac�ces. It is through this GP registra�on that the new Scots can access suitable early
years, public health screening, mental health, immunisa�on, dental services, and other
health/social care supports as required, and that access to mainstream health services is as
�meous and efficient as possible.
In May 2023, a new nursing team was established to support the ini�al health assessment
and screening of Ukrainian Displaced People, including physical and mental health
assessments, migrant screening, and immunisa�ons.  The team empowers individuals and
families to access mainstream health supports as quickly as possible, only remaining open
Race and Ethnicity 
164

Page 165

17 
to new Scots for a short ini�al period. This team has now been expanded to include asylum
seeker arrivals, Unaccompanied Asylum Seeker Children, and trafficked young people.
The HSCPs role in the North Ayrshire Council led Refugee Task Force ensured a posi�ve
partnership approach with Housing, Connected Communi�es and Educa�on colleagues to
ensure a whole system holis�c approach was put in place to support new Scots e.g. social
clubs, language classes. 
2.2  Undertake a needs
assessment of the possible
long-term health and social
care needs of new Scots 
With the arrival and coordina�on of the new Ukrainian scheme the HSCPs contributed to
the North Ayrshire Refugee Task Force posi�on statement. This posi�on statement engaged
with all services and GP clusters to be developed. The posi�on statement highlighted the
current service pressures, specific locality issues, gaps and opportuni�es faced by HSCP
services in accommoda�ng addi�onal new arrivals. The new Scot long-term health and
social care needs have been met locally.  
Race and Ethnicity 
2.3  Deliver locally the ac�ons to
support new Scots as
iden�fied in the Mental
Welfare Commission for
Scotland’s Equality Outcome
Plan 2021.  
The Equality and Human Rights Commission engaged with the HSCP Strategic Planning and
Equali�es lead to ensure that new Scots were captured as part of their Scotland’s Equality
Outcome Plan 2021. The ac�on is regarding engagement with diverse communi�es,
including ethnically diverse communi�es, gypsy/travellers, refugees and asylum seekers,
LGBT people, disabled people, older people.
As part of the Refugee Task Force, the pre-exis�ng Resetlement Team, Connected
Communi�es and Educa�on colleagues con�nue to engage with new Scots on a regular
basis to meet their needs effec�vely.
Addi�onally, the HSCP has a programme of engagement with diverse communi�es.
Currently, there is ongoing engagement with the gypsy/traveller community, par�cularly
around male mental health, an iden�fied issue for that demographic.
Disability 
Race and Ethnicity 
165

Page 166

18 
3.3 Equality Outcome 3: Children and families in need are supported to live healthy and safe lives. 
No.  Suppor�ng Ac�on  Progress for April 2022 – March 2024  Protected Groups 
3.1  Implement Signs of Safety
approaches to improve how
we work with families to
develop meaningful childcare
plans. 
The HSCP is implemen�ng the Signs of Safety strength and safety organised approach to
social work case work that analyses detailed informa�on for a balanced risk assessment. It
is a rela�onship-based model working within the context of child welfare and protec�on
and will provide a prac�ce framework that revolves around balanced risk assessment, risk
management and effec�ve safety and care planning. 
Signs of Safety integrates professional knowledge with knowledge from families and their
wider networks to rigorously explore harm and complica�ng factors alongside exis�ng
strengths and safety. 
It involves partnership working with families to reduce risks and increase safety by building
upon the family's strengths, resources and networks to change the everyday lived
experience of the child so that we are confident the child is safe. As a consequence of
working in a risk sensible approach with families more children will be supported to remain
within their family network. 
Prepara�on for implementa�on commenced in April 2022, with a 2-year intense
implementa�on period which will conclude in October 2024, fully embedding the approach
in every day social work prac�ce for future years.
Age (Children) 
3.2  Improve the quality and
accessibility to services for
children and young people
who themselves (or
parent/care givers) are at risk
due to the harmful effects of
alcohol or drug use, by
establishing a speciality
The Child and Adolescent Specialist Substance Team has been in place since February 2021,
working with 5–21-year-olds affected by their own or parental drug and/or alcohol
use. Currently, the CASST team is running with a collec�ve caseload of 60. The team is
based within the Three Towns Locality, but the team covers all of North Ayrshire and works
closely with Children & Family Social Work, Jus�ce Services and NADARS (adult alcohol
services). The team has done a number of things over the repor�ng period to improve the
quality of the service, including:
Age (Children) 
Sex 
166

Page 167

19 
support team in Partnership
with the ADP. 
• In August 2023, recruitment of a care experienced modern appren�ce on an 18-
month contract to complete their SVQ3, revitalising the ethos of the group, morale,
and team spirit. It has also been wholly successful thus far, with the modern
appren�ce now also undertaking their HNC in social care on day release at college.
• Con�nuing to u�lise CORRA funding for diversionary supports with the overall
purpose of preven�ng CASST service users or their parents from using drugs or
alcohol and/or for access to treatment.  The funding has been used to build skills
and promote social ac�vi�es and interests/hobbies for young people and provide
them with alternate experiences to encourage aspira�onal growth. This has
included gym memberships, equine courses, par�cipa�on in sports etc.
During the 2023 Summer holiday period, the team ran a hip-hop dance therapy summer
scheme for children and young people affected by trauma and impacted by their own or
parental drug or alcohol use, teaching dance classes to aged 5–11-year-olds and 12+. The
aim of the dance therapy sessions was as an interven�on to help with aten�on and focus,
to improve communica�on, and to reduce feelings of isola�on, social anxiety, and chronic
pain.  Overall, 24 children and young people atended across the summer holidays.
Feedback was gathered from young people and their parents/carers using evalua�on forms
and was overwhelmingly posi�ve. 100% of the children and young people who atended
reported as enjoying the dance therapy classes and expressed that if given the op�on, they
would atend again. Three of the parent’s feedback was [anonymously] as follows: “While
home life is very difficult and her sister’s needs tend to take up most of my �me, it has been
great for her to have something so posi�ve that is just hers. The posi�vity and energy of the
class has really given her a much-needed boost”, “I love that X has her own thing, has made
friends (which she normally finds difficult) and dance improves her balance and
coordina�on”, “Y is so happy and gets so excited when it comes to a Thursday, she said this
is the best thing about the Summer holidays”. Due to the success of this, plans are in
progress to commence further dance therapy sessions for age groups 12m - 5 years, 5-10
and 11+. The dance therapy sessions will be star�ng again in March 2024. 
167

Page 168

20 
CASST and Children 1st have recently established a groupwork programme suppor�ng
primary school aged children in St Mark's Primary School offering weekly sessions focussing
on early interven�on, reducing s�gma, and educa�ng children around the risks of
alcohol/drug use. There is also an a�erschool group due to start in the coming weeks which
will work with children and young people directly affected by parental drug/alcohol use.
This will include educa�onal/informa�ve sessions as well as ac�vity-based opportuni�es to
promote social and emo�onal inclusion.
3.3  Enhance early interven�on
and preven�on provision
within the established Infant
Mental Health Service 
Ayrshire & Arrans Mini Minds Mater (Infant Mental Health Service) is currently under
development.
In 2019, the Sco�sh Government commited to implement and fund a Scotland-wide mul�-
agency model of IMH provision: “to meet the needs of families experiencing significant
adversity, including infant developmental difficulties, parental mental illness, parental
substance misuse, domestic abuse and trauma.” 
The service is an infant mental health system of support with GIRFEC at the core as well
as na�onal guidance on highligh�ng the voice of the infant, the specific needs of infants
outlined in “The Promise”, and UNCRC work on infants’ rights. Training is also being
provided by NES Infant Mental Health training Plan. The service aims to promote emo�onal
wellbeing for infants by suppor�ng them and their important rela�onships with their
parents and carers as well as working together with exis�ng services to understand how,
where and when the service can be helpful. 
A pan-Ayrshire steering group working on the ongoing development of the service, and a
series of engagement sessions has been carried out through 2023 to ensure co-produc�on
from the outset. This has included focus groups with kinship carers, parents, and services,
and iden�fied Infant Mental Health champions.
Age (Children) 
Sex  
Disability 
3.4   Work with leadership across
HSCP, NHS and North Ayrshire
Council to locally agree that
people with Care Experience
A mo�on was tabled at a North Ayrshire Council mee�ng on 29th March 2023, outlining that
in recogni�on of the Council’s commitment to the Promise and responsibility as corporate
parents, the Council should support adding “Care Experienced” to be treated as a protected
characteris�c in North Ayrshire’s Equality impact assessments to ensure all decisions made
Age (Children) 
168

Page 169

21 
are considered as a protected
characteris�c. 
by Council give specific focus on how we can improve the lives of care experienced young
people.
A follow up report was presented on 13th December 2023, seeking approval to adopt the
following defini�on of ‘care-experienced’ for the purpose of Equality and Children’s Rights
Impact Assessments: 
“Anyone under the age of 26 years in the North Ayrshire area for whom North Ayrshire
Council is, or has been, the Corporate Parent, or who is, or has been, looked a�er by North
Ayrshire Council or any other local authority at any stage of their childhood, no mater how
short. By ‘looked a�er’ we mean that the child or young person has been looked a�er by a
local authority in foster care, kinship care or in residen�al care, or has been living at home
subject to a compulsory supervision order made by the children’s hearing or has been
subject to a kinship care order made by the court.”
New templates for ECRIA assessment and screening were produced for use across the
Council and the HSCP in January 2024. 
3.4 Equality Outcome 4: Through improved engagement prac�ces and access to a greater range of health and social care
opportuni�es, people with a learning disability, or those with complex health condi�ons, achieve beter health outcomes. 
No.  Suppor�ng Ac�on  Progress for April 2022 – March 2024  Protected Groups 
4.1  Undertake a Learning
Disability Needs Assessment
with all current LD Service
users to beter understand
long-term need and resource
requirements and consider
processes for implemen�ng 
The support needs of clients are regularly reviewed and responded to as part of their
ongoing involvement with the service and engagement informa�on is currently being
gathered in order to develop a Learning Disability Strategy.  Work to develop the strategy
began in late 2023 and has carried on into 2024, priori�sing service-user and carer
engagement.  Ongoing engagement has been framed around the ques�on of ‘What Makes
a Good Life’, but other engagement with clients has taken place on topics such as respite
provision, and mental health and wellbeing.  
Disabili�es, 
Other – Carers 
169

Page 170

22 
the Annual Health check for
all service users. 
Arts based ac�vity has been an important aspect of our development work, resul�ng in the
delivery of the ‘How We See Ourselves’ exhibi�on (a piece of work in collabora�on with
Neighbourhood Networks and local ar�sts), and ongoing work to explore transi�ons within
the ‘What Comes Next?’ project.
Posi�ve progress has been made around the implementa�on of Annual Health Checks, and
it is intended to provide a light-touch report on that work in late April/early May.  To date
(2nd April 2024), 68 checks have been completed, and the learning regarding their
implementa�on, and the poten�al role of Primary Care moving forward, con�nues to
accrue.
Work planned over the next year includes further development of the new Learning
Disability Strategy. A cri�cal aspect of the plan will be a commitment to finding a prac�cal,
meaningful, and sustainable way to involve clients and other stakeholders in an ongoing
conversa�on regarding the development of the Learning Disability Service, and inclusive
communi�es more broadly.  
4.2  Undertake robust stakeholder
engagement ac�vity to
iden�fy the range of available
support op�ons to service
users and their families. 
The health and social care sectors rely on local providers of care from the third and
independent sectors, and there is a lot of ac�vity locally to ensure service users understand
local services and local providers understand local need.
The commissioning team has regular communica�on with providers and currently complete
biannual contract management mee�ngs with services that are commissioned, annual
visits, and daily communica�on where any concerns may arise within services. 
Within these visits and mee�ngs we discuss outcomes for service users, reviews, concerns
and discuss service ac�on plans. Updated KPIs are also monitored for our mee�ngs to
capture progress of service delivery and if any gaps within service provision can be
iden�fied. The service also carries out regular provider’s forums, most recently on 18th
March 2024, in order to maintain communica�on.
The Community Link Worker (CLW) Service directs and refers service-users to the local
services they need and so have taken on the role of managing Referral Partners, which led
Disability  
Other – Carers 
170

Page 171

23 
to improved knowledge of service provision across North Ayrshire and within NHS Ayrshire
& Arran.
Guest speakers are invited to atend the CLW Steering Group mee�ng each month to
update the team on service developments that can be shared with service users, and CLWs
have atended a range of community events with the aim of promo�ng the CLW service and
linking with service providers from across Ayrshire. 
A community mapping exercise was carried out in 2023 which saw CLW’s upda�ng
community guides for each of the locali�es that we work in.  The follow up work from this
exercise is s�ll ongoing but we are confident that this will be completed by the end of May
2024.
A further community mapping exercise was carried out earlier this year and this has led to
an A-Z list of support services being added to the NAHSCP to make residents aware of the
support op�ons available to them.  This is also accessible via the NAC Cost of living page to
increase reach.
4.3  Host regular informa�ve
drop-in sessions with service
users and families to inform
them of the range of local
community opportuni�es
available. 
Following some recruitment challenges within the Community Link Worker service, it now
has a full complement of staff and is planning to carry out drop-in sessions. The service is
currently planning drop-in sessions to be carried out in all towns across Garnock Valley and
North Coast between June 2024 and March 2025.
The Mental Health Service has previously hosted events on a drop-in basis and has further
plans to implement a regular event for informing service-users of local mental health
services. The Sco�sh Mental Health Arts Fes�val was established in 2007 and is run by the
Mental Health Founda�on annually, in order to explore how the arts can improve mental
health and wellbeing, engage diverse communi�es and challenge s�gma and percep�ons.
In October 2023 North Ayrshire ran a local Mental Health Arts Fes�val, organised
collabora�vely between the HSCP, NHSAA, NAC, RAMH North Ayrshire Wellbeing and
recovery college, KA Leisure, and Arran CVS.
Disabili�es  
Other – Carers 
171

Page 172

24 
In addi�on to hos�ng arts shows and performances, partners presented their work to raise
awareness of local services, including: Beith Community Development Trust, in-pa�ent
mental health services, Tidelines, Trindlemoss Day Opportuni�es, and North Ayrshire
Wellbeing & Recovery College – RAMH. This raised the profile of local services on the
launch night, before the 3-week fes�val consis�ng of over 30 local events commenced. 
In addi�on to a second Mental Health Arts Fes�val being planned for October 2024, the
Mental Health Service is hos�ng its first Mental health and Wellbeing Connect event on
Monday 29th April which will be atended by a range of services and supports available to
North Ayrshire residents, including Carers Gateway North Ayrshire, VoiceAbility, NHS 24,
and Community Link Workers, giving people in the community the opportunity to learn of
local services.
4.4  Undertake a review of respite
provision, including
engagement with LD services
users and families on their
respite/short break
aspira�ons. 
Building on the service’s involvement in the Promo�ng Variety programme in 2023 (led by
Healthcare Improvement Scotland and Shared Care Scotland), engagement work was
undertaken with clients and carers in late 2023.  The outputs of that work will form a key
part of our con�nuing work around developing a broader perspec�ve on respite provision. 
Red Rose House remains our main offer in this respect, and a greatly valued one.  It has
seen management changes in recent months, and Hansel (the provider) con�nues to be a
key contributor to the ongoing discussions regarding respite. 
Going forwards, we will build on the engagement ac�vity undertaken so far, and intend to
establish a staff member linked to promo�ng short breaks ac�vity within Carers Gateway. 
The service also con�nues to work with Hansel regarding further refining exis�ng systems
to ensure best use of the available resource, as well as taking on board learning generated
by the engagement ac�vity.   
Disabili�es  
Other – Carers 
4.5  We will review our Transi�on
processes across Partnership
Services. This will include
undertaking meaningful
The HSCP is currently reviewing the Transi�ons Processes used within different services and
teams, including health, educa�on, and social care services, with a specific focus on mental
health and the learning disability service. The term ‘transi�ons’ is used to refer to the
process of young people moving from children’s to adult’s services, but transi�ons
pathways within learning disability services can occur at different stages.
Age 
Disability 
Other – Carers 
172

Page 173

25 
engagement with service
users.  
Different teams o�en operate using different criteria or processes, so this review aims to
iden�fy any differences, best prac�ce, and inconsistency. To do this, a comprehensive
period of engagement was planned and is currently on phase 4:
Phase 1 involved focus groups with targeted staff groups, implemen�ng the Principles into
Prac�ce framework to explore a range of themes rela�ng to our current transi�on process. 
Phase 2 invited parents and carers of those with learning disability or mental health
condi�ons to share their experience of transi�on. This was done with semi structured
interviews. 
Phase 3 involved focus groups with young people about their transi�on experience. This
adapted the Principles into Prac�ce framework, so the same ques�ons were asked but in
methods that were more accessible. Workshops were held in 2 parts, to build rela�onship
with each young person to ensure meaningful engagement and a transi�on workshop
explored the move from school into the future.  
Phase 4 is currently underway, which is con�nued engagement and the forma�on of a
transi�on parents peer group across North Ayrshire.
The engagement process is ongoing, a�er which the Chief Social Work Officer will report
recommenda�ons for improving the partnership’s transi�on processes. There is scope for
further ongoing engagement with young people to consider the transi�on process for
young people in mainstream schools. 
173

Page 174

26 
4. Next Equali�es Outcomes Plan
The next Equali�es Outcomes Plan will be published in Spring 2025. The current outcomes will be
reviewed to ensure progress has been made and ac�ons have been completed. New or reviewed
outcomes will be developed following engagement with groups with shared protected characteris�cs
about their experiences accessing health and social care in North Ayrshire. 
The next plan will be developed alongside the review of the current Strategic Plan, to ensure that the
voices of people with shared protected characteris�cs will be reflected in the overall strategic
planning of the area, as well as reflected within our Locality Planning Structures.  
174

Page 175

27 
Appendix: Equality Outcomes and our Strategic Priori�es
HSCP Equality Outcome  Ayrshire Shared Equality Outcome  HSCP Strategic Priority 
Older people with complex
care needs are supported to
live independently at home
for as long as possible 
1. In Ayrshire, people have
opportuni�es to fulfil their
poten�al throughout life    
Enable Communi�es 
Provide Early and Effec�ve
Support 
Improve Mental and Physical
Health and Wellbeing 
People and communi�es
who make North Ayrshire
their home can effec�vely
access the health and social
care services they need 
1. In Ayrshire, people
experience safe and inclusive
communi�es  
2. In Ayrshire, people have
equal opportunity to access
and shape our public
services  
3. In Ayrshire, people have
opportuni�es to fulfil their
poten�al throughout life    
Enable Communi�es 
Improve Mental and Physical
Health and Wellbeing 
Tackle Inequali�es 
Children and families in
need are supported to live
healthy and safe lives. 
1. In Ayrshire, people
experience safe and inclusive
communi�es  
3. In Ayrshire, people have
opportuni�es to fulfil their
poten�al throughout life  
Enable Communi�es 
Provide Early and Effec�ve
Support 
Improve Mental and Physical
Health and Wellbeing 
Tackle Inequali�es 
Through improved
engagement prac�ces and
access to a greater range of
health and social care
opportuni�es, disabled
people or those complex
health condi�ons, achieve
beter health outcomes. 
1. In Ayrshire, people
experience safe and inclusive
communi�es  
2. In Ayrshire, people have
equal opportunity to access
and shape our public
services  
3. In Ayrshire, people have
opportuni�es to fulfil their
poten�al throughout life    
Enable Communi�es 
Improve Mental and Physical
Health and Wellbeing 
Tackle Inequali�es 
175

Page 176

176

Page 177

1 
Integration Joint Board
9th May 2024
Subject: Unpaid Carers Service Developments in North
Ayrshire
Purpose: To update Integrated Joint Board members on progress to date
with developments to expand and improve support for unpaid
carers in North Ayrshire.
Recommendation: Integration Joint Board members are asked to:
• Note the advancement and impact for improved carer
information and support services.
• Agree to annual progress updates to be brought to the IJB
in future 
Direction Required to
Council, Health Board or
Both 
Direction to: - 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
1. EXECUTIVE SUMMARY 
1.1 This update brings forth progress to date of the local North Ayrshire Carer Strategy:
Building Caring Communities 2023 – 2025 and reprovision of the expanding Carer
Gateway North Ayrshire Service, as well as plans for the coming months into 2024/
2025. 
1.2 The paper highlights the collective priorities and range of activities being taken forward
as a strategic partnership with Unity Enterprise and their rebranded Carers Gateway
North Ayrshire service, launched in October 2023.   
The report demonstrates the early effect of improvements and the continued
commitment and importance of identifying, informing, involving and supporting carers
to sustain caring roles and offer a life alongside caring.  It also ensures NAHSCP
continues with the implementation of the Carer (Scotland) Act 2016 and the statutory
responsibilities therein.     
2. BACKGROUND 
2.1 The Carer’s (Scotland) Act 2016, which took effect on 1st April 2018, aims to enable
unpaid carers to be better supported so they can continue to care, if they wish to do
so, while also having a life alongside caring.  The Act sets out several responsibilities
including: 
• the right to an adult carer support plan or young carer statement based on each
carers personal outcomes and need for support, 
Agenda Item 12
177

Page 178

2 
• a duty to provide support for carers based on local criteria, and consider
support in the form of a break from caring,
• the establishment and maintenance of an information and advice service and
publishing of a Short Breaks Service Statement,
• a duty for local councils and health boards to involve carers in the planning and
evaluation of services that support carers, including the publication of a local
carer strategy
• a duty on health boards to inform the carer and invite their views before the
cared-for person is discharged from a hospital stay. 
In Summer 2023 NAHSCP launched a revised interim local carer strategy: Building
Caring Communities 2023 - 2025, with clear aspirations for supporting carers.  This
was in conjunction with a threefold investment in the reprovision of the local carer
service which has been rebranded and launched as a more visible locality-based
Carers Gateway for communities across North Ayrshire.  The report details progress
on strategic priorities and Carer Gateway service plans.   
For context, 1,580 (1,213 adult & 367 young carers) carers were known and registered
with the Carers Gateway on 31st March 2024. This shows a reduction in adult carers
since last reporting in August 2023 due to data cleansing and archiving of around 200
carer records within the service for all carers aged 18 and over.  Most new registrations
for adult carers are predominantly coming from self-referral. 
Improvements to the young carer data set had already been completed and shows a
28% increase for young carer registrations and reflects good progress based on the
work and messaging of the carer services partnership.  New registrations
predominantly are coming from primary school referrals for young carers. 
NAC Education Services lead on young carer identification and support.  Across our
primary and secondary schools at the last count on 16th April 24, 417 young carers
under 18 years were identified on SEEMiS – pupil record management system, an
increase of 32% since last reporting in August 2023.  There will be expected crossover
in the Carer Gateway and Education figures as we offer young people a choice of how
they wish to be identified and supported through multiple routes. 
3. PROPOSALS 
3.1 Priorities remain highlighted within the local carer strategy for growing young and adult
carer services.  NAHSCP continue to work closely with carers, our commissioned
Carer Gateway service and other key partners to improve and implement information
and support options with systems that are easier for carers to access to ensure: 
178

Page 179

3 
• Carers are actively sought and identified.
• Carers are informed, have increased confidence in their caring role and feel
supported.
• Carers are offered and supported to prepare an Adult Carer Support Plan or
Young Carer Statement.
• Variety in breaks from caring.
• Carers feel involved as equal partners in care design/ delivery.
• Strong partnership working/ engagement is evident.
• Improved identification, information and support for Young Carers with a
focus on transition periods through to adulthood. 
Primary areas of focus for the Carers Gateway service in the initial months of
expansion fell under the following workstreams: 
• Continuity and monitoring of current carer service as the service grows.
• Recruitment & HR. 
• Partnership mapping to promote the new service.
• Marketing of the rebranded ‘Gateway’ carer service.
• Digital developments, scoping the right resource and market testing for young
and adult carers.
• Property discussions and establishing a new administrative base (no firm date
to leave the current facility).
• Financial planning. 
The outcomes of the expansion have been positive to date and the report shares some
of these below: 
Recruitment 
A programme of recruitment has seen the Carers Gateway team expand from 4.5 to
15 staff with only two positions remaining vacant.   
Adult locality workers are more present in community spaces and at various groups
sharing the Carer Gateway aspirations with existing and new networks.  The young
carers team are also operational across schools with each worker supporting 3
clusters on a rota across their designated areas. 
The NAHSCP Carers Team also welcomed Claire Wiseman – Project Delivery Officer
for Carers and Self-directed Support developments on 25th March.  Claire will continue
the work that commenced with our in-house teams and services to improve and
increase our messaging for adult and young carers.  Areas of focus will be to improve
uptake/conversion for Adult Carer Support Plans and to encourage the offer of Adult
Carer Support Plans and Young Carer Statements across Children and Family
services. 
179

Page 180

4 
Digital Support 
The Carers Gateway have commissioned Bridgit Digital Carer Support Services, a 24/
7 digital resource to reach and identify more carers, provide access to online self-help,
access to referral and registration with the Gateway Service, local and national
information and support, access to build personal plans, WhatsApp and multi- channel
support for regular contact.  The resource also has built in analytics and reporting for
service tracking and development.  The resource went live on 11th March with a full
launch proposed in the coming weeks. 
The objectives for North Ayrshire carers with the resource are: 
1. Improving information; advice and guidance – Bridgit, through AI can access
a real time directory of local and national information, events and services for
instant support.
2. Identifying carers; the Carers Gateway is exploring joint campaigns with the
resource and local Primary Care services, initial conversations in Kilwinning
have been positive.  The resource is also supported by targeted advertising
campaigns through google searches.
3. Staying healthy; self-help plans are available to build and include various
topics, health conditions, wellbeing solutions and things important to each
individual carer circumstances.
4. A Life outside of Caring; Local events, groups and services are signposted to
help identify opportunities away from the caring role.
5. Assessment & Support; carers can access a level of self-assessment with
active engagement and support chat along the way.
6. Emergency/ Contingency Planning; carers can create and log ‘what to do in
an emergency’ when they are unable to care.  Links to the local Carer
Appreciation Card are being explored also to make this a digital offer.
7. Recognition & Value; ensuring that carers have access to a resource and
services they have engaged with in the design, operation and content through
various focus groups and that it signposts and provides valued support. 
The resource is predominantly aimed at adult carers but additionality agreed from the
Bridgit Care Service as part of this project is scoping a resource more suitable for
young carers.  There will also be an area of work to promote local short breaks from
caring on the Bridgit platform.  Integration work between Bridgit to the Carers Gateway
record management system – Charity Log has also taken place to capture online
referrals, registrations and plans.  On 31st March Carers Gateway reported 6 new
registrations and 73 personal carer plans already created by carers self-accessing
and exploring Bridgit while seeking information and support. 
Engagement work for the resource highlighted the following challenges by carers and
it is hopeful Bridgit digital resource will be a starting point to help to guide, support and
improve on some of these areas for carers: 
180

Page 181

5 
• Lack of carer recognition.
• Lack of communication. 
• Lack of joined up working across the health and social care system. 
• Carers navigating the care system alone and feel unsupported. 
• Carers have higher levels of poor mental health than national averages. 
• Restricted engagement within the hospital system. 
Carers Gateway are also improving their website to correlate with and showcase the
changes to the new approach and model, and ensuring more current, correct
information is available for local carers Carers Gateway | Information, support and
advice for carers of all ages.  This went live on 11th March.  The service are also
making full use of Carers Gateway North Ayrshire | Irvine | Facebook which is a lively
hub for identifying, communicating, engaging and promoting information and support. 
A first suite of accompanying printed communication resources (leaflets, banners) has
also been developed for staff to connect with other agencies at local events and for
carers who are not able or do not wish to access information and support options
digitally. 
Carers Assessments 
Adult Carer Support Plans: In 2023/24, across all Social Work services 1,290
Supported Self-Assessment Questionnaires (SSAQ) have been completed for adults
seeking support.  In 65% of these assessments there was no offer of an Adult Carer
Support Plan, which may be the case for some as no unpaid carer exists or were
present at the time of assessment.  35% (452) of these assessments identified a carer
and offered the opportunity to complete an Adult Carer Support Plan and 81% (368)
of those people declined the opportunity to have a conversation about their caring
needs.  There is no record of the reason for any of those who declined the offer.  19%
(85 carers) accepted the offer to complete an Adult Carer Support Plan.  In total over
the year 116 Adult Carer Support Plans have been completed.  This is an increase of
just over 50% from the previous year.   
In October 2022 capacity was added to NAHSCP carer team with a Carer Support
Officer (CSO) to offer an alternative route to early and preventative carer support, for
those who are not already known to Social Work teams, where the cared-for does not
meet eligibility thresholds for services or for young carers aged 16 - 18 years who are
not in school. The introduction of this role has seen the carers team complete 56%
(65) of all Adult Carer Support Plans for the year with the remainder being completed
by Health & Community Care teams. 
Young Carers: Across North Ayrshire primary and secondary schools 376 young
carers under 18 years were identified and offered the opportunity to complete a Young
Carer Statement.  This is a 50% increase from those reported in 2022/ 2023 Scottish
Government census return and is representative of the good partnership links with
Education Services and strength of messaging and promotion. 30 young carers
declined and 346 completed Young Carer Statements have been returned from NAC
181

Page 182

6 
Education Services.  CareFirst reports that a further 2 have been completed by the
CSO role. 
Young Carer Statements are beginning to be carried out by Carers Gateway but work
is still required to agree appropriate process, access routes to funds for support,
recording and reporting and how/when the statement will be reviewed but progress is
encouraging with a further route for assessment and good caring conversations for
young carers.  There will be the same offer for adult carers over the coming months. 
Variety in Short Breaks from Caring
A break from caring is any form of support which can be taken in several ways to
enable a carer to have time away from their caring routines and responsibilities. The
purpose is for carers to have a life outside or alongside the caring role. Short breaks
support the carer and often the cared-for, the caring relationship and promote
sustained or improved health and wellbeing. It can provide a change of scenery,
improve carer confidence, increase ability to cope or succeed, reduce isolation,
improve emotional wellbeing, improve general quality of life and increase the ability to
sustain the caring role.
The Carers Gateway received £77k for breaks from caring from Shared Care Scotland
for 2023/24 which supported 3 phases of carer breaks with around 120 applications
per phase supporting a variety of requests at a spend of £69K.  The remaining £8K is
accounted for in the additional routes for support with breaks and hardship fund at
point 3 below where a further 26 carers and families have been supported.  £80K has
been awarded from Shared Care Scotland for 2024/25. 
Carers Gateway also forecast a further £59k spend on carers breaks over the Spring
of 2024, as follows:  
• £5k (£2.5 each) to the constituted locality carer groups in North Coast and
Three Towns to support self-management and growth.  It was also used for
trips to the Waverly, Healthy Walks and an outing to the Ayr Flower Show.
• £5k for an adult carer trip to bring different carers across the localities together,
widening carers opportunity to form peer networks, provide respite and the
opportunity to engage in activities which may not always be financially viable.  
• £12k (including the £8K mentioned above) for an additional round of short
breaks/ hardship funding which will be progressed by the new Short Breaks
Officer recently in post. 
• £10k for short breaks funding to networks such as NADARS/ Café Solace/
LGBTQIA+/ New Scot – harder to engage carers across these groups
(ringfenced). 
• £23k for young carers Easter activities including Arty Party, Inverclyde Sports/
Activities in conjunction with Active Schools, Umbrella Holistic Therapies at
Fullerton ConneXions, Family Day to the Science Centre, Pony Trek at
Kelburn, Watersports at Castle Semple, In Time Escape Room and a weekend
sailing trip for 10 young carers with Ocean Youth Trust.
182

Page 183

7 
• The remainder was used for staff for organising and processing the above
routes to breaks from caring and to issue funds at pace. 
Over the festive period Carers Gateway also used £7K to support families who were
struggling with food vouchers and presents in addition to the annual festive activities. 
For young carers there have been 110 requests for a break from caring this financial
year through the HSCP/ Education fund with 74 processed, 10 with no cost due to
accessing the KA leisure pass scheme and 26 in final stages with families and
supporting services with a total cost of £20,047.  Below are some examples of how
the fund has contributed to meeting young carer outcomes and looked further to
enhance life opportunities. 
Young carer applied to complete a Widening Access course to improve their chance
to gain entry to Glasgow School of Art.  Financial pressures on the family meant the
young carer would struggle with weekly travel costs and extra materials to complete
the course.  £230 was allocated allowing the young carer to have a break from their
caring role, pursue their interests and open opportunities after leaving school. 
Young carer was the only one in his under 13 ice hockey team to be invited to play
competitively for Scotland in Bratislava.  This would open further opportunities to
represent his country at other games over the coming year, help to find sponsorship
and potentially offer pathways beyond school and his caring role for an older relative
whilst mum worked.  Ice hockey is his break from caring and the family were
experiencing financial difficulties, with £1,200 the young carer was accompanied to be
part of trial competitions, it relieved him from his caring role and mum did not have to
take on extra work and could provide more care to her mother… good news … the
young carer has made it to the final selection for the 2024 Scotland team due to his
attendance, ability, commitment and effort. 
Young carer with their own health issues engaged in a conversation though school,
they lacked confidence, were unhealthy and quite unhappy.  School applied for a KA
Leisure Membership to help support the young carer’s own health and wellbeing
through the current programme.  Other routes were sought for the young carer through
the ILF Transition Fund to support driving lessons due to a transport element to the
caring role for appointments and family shopping and to promote independence and
reduce feelings of anxiety.  A final request for £300 from the HSCP/ Education fund
was submitted towards the cost for the young person to attend end of year prom to
ensure the young carer had the best experience leaving school as they had undergone
an extremely difficult time throughout school, this supported a positive end. 
There have been many other young carers supported with small, meaningful
purchases such as football boots to play in the school tournament which was turned
around in one day with help from HSCP business support and from the Resettlement
Team to fully understand the young person’s support needs, ice skates to join friends
at the local skating rink, vouchers for sports clothing to go to the gym to improve
wellbeing.
183

Page 184

8 
Carers Act funding secured 240 KA Leisure memberships for young carers across
North Ayrshire as a route to improved wellbeing and social opportunities with peers. 
236 have been allocated to date with final requests being processed.  25 young carers
through a survey issued have told us that this has been good for their physical and
mental health.  For some it helped with feelings of anger, for some they could go
swimming with mum as it was the least painful activity for her, it was about family time,
for some it was about body positivity and for many it reduced the financial barriers of
being able to join in and be with friends whilst taking a break from caring. 
For adult carers in 2023/ 24 there have been 127 referrals to the Carers Team – CSO. 
Not all requests required access to funding but through these conversations we have
supported carers with a variety of requests at a cost of £9,722 and can share the
impact on support for the following carers:
Gentleman cares for his wife who receives palliative care and have no wider network
or family support.  Allocated Social Worker contacted the CSO for help to identify a
break from caring.  The carer had a caravan in the back garden where he liked to
spend time which felt close enough to be able to get time alone but care for his wife,
but it required work to repair the electrics.  £300 was awarded and this encouraged
further conversations to assist the carer to access No One Dies Alone and the Men’s
Shed. 
Service Access referred to the CSO for a gentleman (carer) and his wife waiting for a
package of support.  The gentleman was finding the caring role increasingly difficult. 
They have family close by, use the services of a cleaner, handyman and Wiltshire
Farm Foods for meals.  The CSO placed a referral initially to the Sensory Impairment
Team, North Ayrshire bin pull out service, Community Alarm and advised how to install
a key safe.  It was suggested to use the cleaner more than once per week and
purchase a slow cooker as the gentleman enjoyed making home cooked meals at the
weekend.  The wife’s health improved slightly over a number of weeks and the
gentleman felt more able to cope and no longer felt the need for formal support.  They
have been in touch again for support to access a podiatry service.  This was all at no
cost other than time to listen, understand and advise.
CSO supported a family with multiple caring roles.  Father was allocated £200 to
purchase a gym membership to support his mental wellbeing and was signposted to
the Wellbeing Recovery College for confidence building after a previous diagnosis of
cancer.  Other opportunities for computer courses and the Men’s Shed were offered
when ready to engage.  Mum was offered £200 to continue to attend exercise classes
for physical and mental wellbeing and with a referral to CLASP and Money Matters for
income maximisation and benefit advice.  The Son has autism and formal support had
been removed.  He was advised of a local film club and attends independently twice
per week.  He has been signposted to Equal Futures and has since returned to
university to finish a master’s degree in Broadcast Production.
NAHSCP’s longstanding Carers Appreciation Card has 1,107 young and adult carers
benefitting from the cards ability to identify them in their caring role across their
184

Page 185

9 
community and provide carers with discounts and concessions from 40 local
businesses often supporting a break from caring.       
Carer Involvement & Engagement
NAHSCP is committed to the principle of carer involvement with our longstanding
Carers Advisory Group, our Carer Champion and nominated Carer Representative on
the IJB all of which widen the pool of views being represented locally for carers.  
Carer involvement continued with the Carers Gateway and the launch of their service
in October 23 in West Kilbride.  This was the first in a suite of roadshows forecast to
meet and engage with more carers and showcase the renewed service – future dates
include June in Irvine, August in Arran, September in Kilwinning and November in
either Garnock Valley or North Coast (TBC).  
The final Carers Advisory Group was held 27th November 2023 which included
discussions to move away from the corporate approach of engagement with limited
access for all carers to an open network or collaborative.  The Carers Gateway
Marketing and Engagement Officer is moving forward with the Carers Participation
and Engagement strand of work adopting the underlying principles of a Champions
Board approach (Equality, Empowerment, Collaboration and Action) as the foundation
of a new model for carers voices.
An inaugural North Ayrshire Carers Conference will take place on 12th June at the
Riverside Hotel, Irvine in line with celebrations for Carers Week – June 2024.  This
will invite 100 carers from across North Ayrshire localities to express our gratitude for
the care they provide for their loved ones, to showcase the value and regard we have
for carers and to share information, ideas and routes for improvement for carer
services, as well as to celebrate the first year of the remodelled Carers Gateway
service. 
NAHSCP Carer Development Officer has been working with the HSCP
Transformation Team, Arran CVS, Arran schools, Brodick Patient Participation Group
and the Carers Gateway Arran family worker following a period of initial engagement
on the Island which highlighted the need to increase carer awareness, information,
advice and support on the Island.  A phased plan of activity is underway (March to
October 2024) to explore understanding and use of adult carer support plans, young
carers statements and Carers Gateway service.  The work will investigate young
people’s understanding of caring and explore the impact caring has on future life
options and choices, along with the general populations understanding of the caring
role, carer rights, and use of the Carers Gateway service.  The final phase will identify
specific carer needs, gaps in information and carer support.  The work will generally
raise awareness with a view to increasing reach and referrals for the Carers Gateway
service.  Green shoots are already evident with 12 new carer registrations due to this
activity (6 adult and 6 young carers). 
185

Page 186

10 
3.2  Anticipated Outcomes 
The report demonstrates the early effect of improvements and the continued
commitment and importance of identifying, informing, involving and supporting carers
to sustain caring roles and offer a life alongside caring.  Ensuring the IJB continues
with the implementation of the Carer (Scotland) Act 2016 and the statutory
responsibilities therein.     
3.3 Measuring Impact 
We will demonstrate improvements and what good carer support looks like through
governance and performance monitoring of the local strategy and Carer Gateway
Service Development Plan 2024 – 2025.  The carer services and its associated
developments remain accountable to the IJB and North Ayrshire Council.  Scheduled
updates will be tabled through appropriate governance routes for continued oversight
and direction with escalation where required.  It is proposed the formal reporting to
the IJB moves to an annual reporting cycle. 
Bi-annual contract monitoring also measures quality and impact through agreed KPI’s
linked to outcomes in the local strategy.   
Carers Gateway have worked to improve their data collection system – Charity Log
with a cleansing exercise and staff training for all delivered in February 24.  NAHSCP
have highlighted the importance of accurate recording and reporting through our
governance system and the need for timely information, as well as statutory reporting
of the annual Scottish Government Carer Census.  Carer identification, increased
reach and access to support will be tracked through referrals, registrations or short
break applications as well as completed ACSP and YCS. 
Improvements to the carer engagement model will also provide a measure of impact/
success as we move to a more inclusive and collaborative model.  Developments will
be monitored through the voices, wisdom and experiences of our carers.   
Carers Gateway also began work with Evaluation Support Scotland but did not feel
they were the right fit and have now accessed support from Matter of Focus who
support organisations to measure, monitor and report on their impact for improvement. 
4. IMPLICATIONS 
4.1  Financial 
North Ayrshire have been awarded Carer’s Act Implementation funds from the
Scottish Government since 2018.  The use of this funding is not ringfenced or
stipulated but should enable and support the implementation of carer duties under the
Act.  The revised annual budget for 2023/24 was £1,188,716.  The following shows
annual spend for carer support services in 2023/24: 
186

Page 187

11 
Actual Annual Spend 23/ 24 £
Carer Service Contract  566,066
Staffing Carer Support Team (2 team posts-SDS/ mainstream)  57,727
Light touch breaks for adult carers 9,722
Young Carers Wellbeing through Education  20,047
Digital Resource (Carers UK)  2,500
NAHSCP SDS Learning Review 8,250
TOTAL SPEND 666,312
TOTAL BUDGET 1,188,722 
NB: Carer funds were also realigned to the provision of in-house respite services
4.2 Human Resources
There has been positive progress with filling all positions, with updates contained in
the report for both Unity - Carers Gateway NA and NAHSCP Carers Team. 
4.3 Legal
North Ayrshire Council and NHS Ayrshire and Arran must meet their duties under the
Carers (Waiving of Charges for Support) 2014 Regulations, Carers (Scotland) Act
2016, Terminal Illness Regulations (July 2021), in relation to carers ‘Rights to Breaks
from Caring’. Unpaid carer legislation should be held in the same regard as any other
directive pertaining to professional assessment of need and provision of support. 
4.4 Equality/Socio-Economic
Under the Fairer Scotland agenda, it is commonly noted that unpaid care places
added strain on multiple areas of a person’s life including personal health,
relationships and social opportunities, finances, appropriate housing, ability to retain
education or employment.  It is also known that carers predominantly are female and
in the mid – older stages of life. 
The strategy and plans for continued carer service growth contained in the report bring
together a range of priorities, new approaches and better routes for information and
support to ensure carers are equally recognised, informed and supported whilst trying
to reduce any negative impacts caring may have.   
4.5 Risk 
The work outlined goes some way to mitigate the risks which are well understood in
relation to not getting the right supports in place for unpaid carers, including: 
• Carers not being be aware of their rights or how to access information and
support at the right time on their caring journey impacting on multiple factors of
their life.
• Carers are not be identified, informed and supported resulting in carer roles/
relationship breakdown and carers experiencing further impact on their own
physical and emotional wellbeing.
187

Page 188

12 
• Carers may not be included, listened to or involved in carer services design to
support them or care planning for their loved ones. 
• The impact on wider HSCP services if Carers are not supported, further
overwhelming and increasing demands on statutory care services and
increased costs for health and social care services.                                                                                                                   
4.6 Community Wealth Building
Community benefits are a contractual requirement within the reprovision of the carer
service.  The NAC Community Benefit wish list has also been considered.  Quarterly
reporting of community benefits will be adhered to with a final report within 2 weeks of
contract end date – 2nd July 2026.  Below are the agreed benefits from Unity. 
• Attend 5 employers fairs.
• Employ 1 x FTE who has been unemployed for more than a year.
• Employ 1 x 0.5 FTE who has been unemployed for more than six months.
• Four student work placements lasting at least two weeks.
• One instance of support via the NA Community Benefit wish list (two
opportunities currently being explored in a local care home and on Arran). 
4.7 Key Priorities
NAHSCP priorities remain linked to those highlighted in our local carer strategy -
Building Caring Communities 2023 – 2025.  The Carers Gateway Service
Development plan ‘Visibility, Value and Voice 2024 – 2025’ is being finalised and
works in conjunction with local strategy aims.  Plans are to help carers reduce
isolation, develop skills, improve wellbeing and feel more empowered and valued.   
As a partnership we will focus on the following in the coming year: 
• North Ayrshire Short Breaks Statement will be reviewed and published with
development in variety of breaks following the recent appointment of a Short
Break Officer and Wellbeing & Activities Officer.
• Communication and marketing materials to encourage carer identification and
carer conversations, promote carers rights and inform how to access carer
services.
• Wider carer engagement will continue from the work in Arran across to our
mainland communities to begin to develop a medium – long term strategy
commencing 2026.
• Information, awareness and support to improve our offer for carers across all
HSCP teams enhancing staffs understanding of their duties, carers rights,
ACSP/ YCS and the support available. 
• Creation of a communication and activities plan for the coming year, making
the most of the national calendar events, local roadshows and annual carer
celebration.
• Continued networking, mapping and partnership building with local
organisations.
188

Page 189

13 
• Engagement with carers through development of the Carer Champions Board,
building on established and constituted peer groups and involvement in locality
planning groups. 
• Continuing to develop Bridgit and the opportunities the digital resource offers. 
• Improved social media presence and sharing positive carer stories empowering
carers voices.
• Identifying and supporting carers who experience financial pressures.
• Improved strategies to identify and support minority carers.
• Localised work within North Coast, Garnock Valley and Arran where there are
low registrations and less carers seeking support.
• Improved process and pathways for all carers with identification, registration,
ACSP and YCS options.
• Development of Section 28 – Involving Carers in Hospital Discharge, learning
from the pan Ayrshire work and identifying a model and approach for North
Ayrshire community hospitals. 
Specifically for young carers we will continue to:
• Forge partnerships with education, health, social care teams and third sector
staff to identify potential young carers.
• Develop better systems and safe spaces for self-identification and sharing
experiences for students.
• Support schools to establish peer groups and buddy supports as young carers
transfer from primary to secondary.  This also ensures the transfer of
information meaning schools are prepared to support the young carer on
arrival.
• Host awareness campaigns, sessions, events to encourage disclosure and
minimise stigma for professionals and carers.
• Encourage YCS completion and access to support.
• Develop activities and short breaks opportunities with young carers.
• Engage with parents to understand what information and support is required
and when for families. 
Focusing on these areas and fostering collaborative partnerships ensures that all
young carers in North Ayrshire, including those from underrepresented communities,
receive the support, recognition, and resources they need to thrive. 
5. CONSULTATION
5.1 Carer involvement and collaborative working is a key principle and duty under the Act
and in all our ambitions for carers, we recognise carers are equal, expert and valued
partners in caring decisions, care delivery and reforming carer services.  Fuller
consultation and engagement plans are through the body of the report.
Caroline Cameron, Director
Lead: Scott Hunter, Chief Social Worker 
Kimberley Mroz, Manager – Professional Standards (SDS/ Carers), kmroz@north-
ayrshire.gov.uk
189

Page 190

190

Page 191

1 
Integration Joint Board
9th May 2024
Subject: Strategic Inspection of Adult Support and Protection in
North Ayrshire.
Purpose: To advise board on the outcomes of the strategic inspection of
adult support and protection completed by the Care Inspectorate,
Health Improvement Scotland and His Majesties Inspectorate of
Constabularies.
Recommendation: Board members are asked to:
• Note the outcomes of the inspection.
• Note the submission of the improvement plan and the
governance of this through the Adult Protection Committee
and Chief Officers Group. 
Direction Required to
Council, Health Board or
Both 
Direction to: - 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
1. EXECUTIVE SUMMARY 
1.1 This paper updates board on the process, outcomes and submission of the action plan
as it relates to the strategic inspection of Adult Support and Protection (ASP) in North
Ayrshire which was undertaken between September and December 2023.  The
inspection team scrutinised the records of 89 adults at risk of harm for the preceding
two-year period, from September 2021 to September 2023. 
This paper will reference those parts of the inspection report that apply to delegated
services only with observations offered if this impacts the interface between the HSCP
and NHS Ayrshire and Arran and/or Police Scotland. 
The full Inspection report can be found here. 
1.2 The inspection found clear strengths in ensuring adults at risk of harm are safe,
protected and supported. The inspection highlighted key strengths and also identified
areas for development including:  
• Overall, adult support and protection inquiries were undertaken in line with the
code of practice. They were of a high quality, prompt and competently
determined whether to proceed to full investigation.
• The quality and competence of adult support and protection investigations was
a clear strength. They reflected multi-agency contributions and supported
effective risk assessment.
Agenda Item 13
191

Page 192

2 
• The creation of an NHS Ayrshire and Arran associate nurse director for public
protection and other initiatives impacted positively on health operational
practice and strategic partnerships.
• The partnership’s strategic leadership was committed to continuous learning
and improvement. This was channelled through well-established, and regularly
undertaken, audit and self-evaluation activities.
The inspections also reported key areas for improvement. These included:   
• Access to independent advocacy was limited. The partnership aimed to
address this through their refreshed advocacy strategy. This should be a
priority area for improvement.
• Police Scotland inconsistently applied policy and practice across several
areas, which when combined weakened the operational effectiveness of the
partnership’s adult support and protection activity. These require to be
promptly addressed to ensure parity of service levels across the partnership
2. BACKGROUND 
2.1 Inspection activity in relation to ASP nationally concluded its first phase and in the first
phase North Ayrshire was inspected in 2017.   
Learning from this national activity prompted Scottish Ministers to request that the
Care Inspectorate lead a second phase of joint inspection and development of adult
support and protection in collaboration with Healthcare Improvement Scotland and His
Majesty’s Inspectorate of Constabulary in Scotland.  Phase two is closely linked to the
Scottish Government’s improvement plan for adult support and protection, and the
national implementation groups which support it. 
The joint inspection focus: 
Phase two joint inspections aim to provide national assurance about local partnership
areas’ effective operations of adult support and protection key processes, and
leadership for adult support and protection. 
Updated codes of practice were published in July 2022.  In recognition that adult
protection partnerships were at different stages of embedding these, the Care
Inspectorate issued a single question survey to all partnerships in Scotland. This
asked respondents to describe their approach to inquiry and investigation work and
outline the role of council officers. Twenty-two partnerships responded, and findings
showed that practice and adoption across Scotland is variable, with most areas having
work to do in this respect. North Ayrshire partnership fully adopted the codes of
practice from March 2023. 
The focus of the inspection was on whether adults at risk of harm in the North Ayrshire
partnership area were safe, protected and supported. 
192

Page 193

3 
The joint inspection took place between September and December 2023. The
inspection team scrutinised the records of adults at risk of harm for the preceding two-
year period, from September 2021 to September 2023. 
Progress statements 
To provide Scottish Ministers with timely high-level information, the joint inspection
report includes a statement about the partnership’s progress in relation to our two key
questions. 
• How good were the partnership’s key processes for adult support and
protection? 
• How good was the partnership’s strategic leadership for adult support and
protection? 
Joint inspection methodology: 
In line with the targeted nature of the joint inspection programme, the methodology for
this inspection included five proportionate scrutiny activities. 
• The analysis of supporting documentary evidence and a position statement
submitted by the partnership. 
• Staff survey. 319 staff from across the partnership responded to our adult
support and protection staff survey. This was issued to a range of health, police,
social work and third sector provider organisations. It sought staff views on
adult support and protection outcomes for adults at risk of harm, key processes,
staff support and training and strategic leadership. The survey was structured
to take account of the fact that some staff have more regular and intensive
involvement in adult support and protection work than others. 
• The scrutiny of social work records of adults at risk of harm. This involved the
records of 39 adults at risk of harm who did not require any further adult support
and protection intervention beyond the initial inquiry stage. 
• The scrutiny of the health, police, and social work records of adults of risk of
harm. This involved the records of 50 adults at risk of harm for whom inquiries
used investigative powers under sections 7-10 of the 2007 Act. This included
cases where adult support and protection activity proceeded beyond the inquiry
with investigative powers stage. 
• Staff focus groups. We carried out three focus groups and met with 38
members of staff from across the partnership to discuss adult support and
protection practice and adults at risk of harm. 
193

Page 194

4 
3. PROPOSALS 
3.1 Key Themes
There are three key themes within the report that board should be reflective of, these
are: 
1. Key Processes: The inspectorate concluded, “Overall, the quality of North
Ayrshire’s adult support and protection work across social work and health is
commendable. While there is always room for improvement performance was
strong and collaborative in every area of core adult support and protection
business including inquiries, investigations, risk assessments and protection
planning. This reflected our findings in the 2017 inspection and was evidence
of the partnership’s sustainability and push for excellence.” 
While there is much detail in the report it is worthy activity to acknowledge the
quality and consistency of key processes.  The scrutiny activity reflected on
timely inquiries, good quality risk assessments and protection plans and noted
the high quality of case conferences.  These key processes and the consistent
level of quality is directly linked to a confident, competent and skilled workforce. 
The link between confident and well-trained practitioners and outcomes for
people is well established.  The approach to learning and development by both
the Adult Protection Committee and the recent Partnership Strategy, Be The
Best You Can Be, signals our commitment to continue to support and develop
the workforce into the future. 
2. Collaborative Working:  The report is consistent in its reflection upon the scale
and efficacy of collaborative working across the partnership area.  Specific
reference is made in relation to: 
• Almost all staff believed they were supported to work collaboratively.
• Police sharing information to keep people safe.
• The investment by NHS Ayrshire and Arran in its Public Protection
Team.
• The third and independent sector are providing a strong supporting role
within the ASP Partnership. 
Collaborative working in this area of practice is critical.  Practitioners very rarely
have all the information and exert professional judgement on a daily basis. 
Effective collaborative working reduces risk through sharing of information and
more effective risk management practices. 
3. Governance:  The report highlights the governance of ASP activity at all levels
as a strength.  The report highlights key aspects in relation to staff development
and the presence of governance in almost all Social Work records.
194

Page 195

5 
At a strategic level the work of the Chief Officers Group is highlighted with
reference to effective strategic leadership, governance of ASP and oversight of
performance and strategy. 
Areas for Improvement: 
Adults at risk of harm will have access to independent advocacy 
The partnership were aware of the need to improve access to quality independent
advocacy services for adults.  A new Independent Advocacy service, provided by
Voiceability, is in place and links have been made with Adult Protection Services.  The
ASP Lead Officer will carry out quarterly monitoring of Adult Support and Protection
statistics to ensure improvement on the number of adults receiving advocacy following
referral.  The Advocacy Strategy and monitoring framework will be reviewed annually
to evaluate the ongoing effectiveness of advocacy and highlight any gaps/identify
future needs. 
Improvement in consistency of police resilience matrix research and assessments 
Policy and practice reviews by NRAC, will review professional curiosity,
rational/decision making and legal pathways used for sharing all types of vulnerability
as part of the risk matrix protocol.  New iVPD general user “why” training will highlight
the need to widen focus to ensure this is not solely on criminality where a vulnerable
individual is involved.   
Domestic Abuse Safety plans are under development and a planned future iVPD will
include a safety plan template to facilitate and encourage local policing input on ASP,
especially for adults already subject to partner support but still requiring a policing
response. 
Training to be offered for local policing CWU to attend tier two ASP training where
benefit will be gained from input from outside agencies.
Improve compliance of PAARoH training. 
3.2 Anticipated Outcomes 
The recent joint inspection feedback and report provides reassurance of the North
Ayrshire approach to Adult Support and Protection across a range of agencies.  Whilst
there is always scope for improvement and learning, the most recent inspection
reflects the non-negotiable priority of striving to safeguard and protect adults from
harm in North Ayrshire. 
3.3 Measuring Impact 
A multi-agency improvement plan in response to the findings of the inspection has
been submitted to the Care Inspectorate by the ASP Lead Officer.  Monitoring of the
195

Page 196

6 
local delivery will be via the Adult Protection Committee and on to Chief Officers Group
for strategic oversight.   
The individual improvement agencies will liaise with partners in relation to single
agency issues. 
The Partnership will continue its referenced multi agency audit activity to ensure
performance and outcomes are subject to strong ongoing governance. 
4. IMPLICATIONS 
4.1 Financial
There are no financial implications. 
4.2 Human Resources
There are no human resource implications. 
4.3 Legal
There are no legal implications. 
4.4 Equality/Socio-Economic
There are no equality or socio-economic implications. 
4.5 Risk
Public Protection activity remains an area of high risk.  While there is assurance from
this report that key processes and governance structures are working well, our
practitioners in this area often work with out the full picture.  This results in the
exercising of professional judgement at all stages.   
4.6 Community Wealth Building
There is no implication for community wealth building. 
4.7 Key Priorities
The key priorities will naturally focus around the areas for improvement and for the
HSCP this relates primarily to the issue of access to advocacy.  This work has been
subject to a recent paper to IJB on our refreshed advocacy strategy and retendering
process.  Work will progress to ensure ASP referrals and supports become a regular
part of business with our new advocacy service.  The other priority area related to
Police Scotland who will be supported by HMICS to support improvement. 
The other priority will be to ensure we continue to support and look after our
practitioners to maintain this high level of professional practice.  Ultimately this is to
ensure we continue to collectively respond in a compassionate way to those in our
community subject to circumstances where protection is needed. 
196

Page 197

7 
5. CONSULTATION
5.1 The inspection preparation, facilitation and improvement activity has been overseen
by a multi-agency group.  Regular updates on the process and outcomes have been
provided across services through management structures. 
Public Protection Lead: Scott Hunter, Chief Social Work Officer
scotthunter@north-ayrxhire.gov.uk 
Adult Support and Protection Lead Officer: Julie Mitchell 
juliemitchell@north-ayrshire.gov.uk 
197

Page 198

198

Page 199

Integration Joint Board
09 May 2024
Subject : Community Alarm and Telecare Service transition
from Analogue to Digital Update Report 
Purpose : To provide an update to the Integration Joint Board on the North
Ayrshire programme of work for Community Alarm and Telecare
Service transition from Analogue to Digital Service
Recommendation : The Integration Joint Board is asked to: 
(i) Note the content of the report and the update on progress
provided, including noting the risks 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
HSCP Health and Social Care Partnership
ARC Alarm Receiving Centre
PSTN Public Switched Telephone Network
SHU Sheltered Housing Unit 
1. EXECUTIVE SUMMARY 
1.1 This report provides an update on how the North Ayrshire Health and Social Care
Partnership is supporting North Ayrshire service users through the
Telecommunication Providers Analogue to Digital switchover.   
Community Alarm and Telecare users in North Ayrshire traditionally accessed this
critical Community Care service via technology that is supported by analogue phone
lines and voice band data.  Analogue Community Alarm and Telecare equipment is
designed to send calls over the Public Switched Telephone Network (PSTN) and is
not designed to be compatible with digital network(s) and digital communication
protocols.   As such, to ensure people can continue to access this much needed
service, there is a requirement to replace all analogue technology with a digitally
enabled equivalent. 
1.2 The Partnership’s Analogue to Digital transition plan has been in progress since 2022
and at the onset of this there was recognition that there were a number of unknowns
associated with the transition.   Since this date there have been ongoing challenges
in progressing with the transition which has impacted on the project, including many
which are outwith the Partnership’s control.  This includes the impact of the COVID
Agenda Item 14
199

Page 200

Pandemic, timescales associated with the telecommunications switchover,
technology developments and financial costs.   
2. BACKGROUND 
2.1 North Ayrshire Health and Social Care Partnership delivers a Community Alarm and
Telecare service to over 4,300 individuals across North Ayrshire both on the mainland
and the islands of Cumbrae and Arran.  Service Users who access the Community
Alarm and Telecare system either have technology installed by HSCP staff, which was
traditionally connected through their analogue phone lines, allowing them to access
and request help and support via a Call Monitoring and Alarm Receiving Centre, or
access this via a Call Warden System within Sheltered Housing properties.  The Call
Monitoring and Alarm Receiving Centre will direct any calls it receives to a variety of
sources including HSCP social care staff, medical services, emergency services,
family and next of kin.   
Users of the Community Alarm and Telecare service in North Ayrshire generate in
excess of 20,000 calls per month via Community Alarm/Telecare equipment, with the
HSCP’s dedicated team responding to over 6,000 activations on a monthly basis
which require a physical response to provide assistance to people in their homes.  The
HSCP has a team of Care at Home Assistants who provide a response service to calls
and alarm activations across 24 hours per day, 7 days per week on the mainland, with
a reduced response service on the islands. 
2.2 Since as early as 2023 it has not been possible for some customers to purchase an
analogue phone service from many of the main telecommunication providers and all
telecommunication providers are expected to have fully transitioned their analogue
telephone networks to a digital equivalent by 2025. Therefore, Community Alarm and
Telecare users will require to have a digital solution in place within their homes in
order to access Telecare and Community Alarm technology and supports.   
Ofcom and telecommunication providers have confirmed that systems which are
currently reliant on analogue and voice band data will be affected by this change.   This
includes systems such as security alarms, cash terminals, fire alarms and Community
Alarm/Telecare systems.   
2.3 The move to digital systems is well underway and many providers previously
accelerated their switchover to be complete by the end of 2023.  As a result of
accelerated timescales from telephony providers, the Scottish Local Government’s
Digital Telecare Office encouraged Telecare Providers to make the shift to digital
solutions from as early as 2023, and the North Partnership is progressing to have
digital solution(s) in place by the end of 2024.  Unfortunately, however, there has been
no clear roadmap provided by the telecommunication providers, and whilst many
people have transitioned to a digital line from an analogue line, there is awareness
within the Telecare community that the timescales for providers to switch over may
now extend well beyond the original 2025 deadline meaning that there will continue to
200

Page 201

be a mix of telephone network arrangements for at least the next 2 years (ie both
analogue and digital telephone lines). 
2.4 Hanover (Scotland) are the current provider of Call Monitoring and Alarm Receiving
Services for North Ayrshire’s Community Alarm and Telecare services.  Following a
recent procurement exercise Hanover (Scotland) have been awarded a further
contract to provide this service in North Ayrshire for a period of up to 4 years. 
2.5 The HSCP has an Analogue to Digital Transition Project Board, which is supported by
attendance from across North Ayrshire Council and the Partnership.  The Project
Board provides governance for the implementation of the project plan and monitors
the team’s progress.  The project plan lays out the actions that will require to be taken
to support the transition and progress updates and escalations are provided on a
regular basis to the Partnership’s Transformation Board.  The project plan has
included the development of a robust communication strategy and risk register. 
The Partnership has employed a dedicated project team, consisting of a TEC Lead
and 4 x Technicians, to support the transition and they are currently progressing an
implementation plan with an anticipated project completion date of early 2025. 
3 ASSESSMENT 
3.1 Digital Equipment Procurement 
As the North Partnership predominantly use Tunstall branded Community Alarm and
Telecare equipment there was a requirement for the new digital alarm solution to be
compatible with the range of Tunstall devices already installed in North Ayrshire
homes – of which there can be several in each home in addition to the base alarm unit
with an approximate stock value of over £800k.  This limited the options available to
only 2 Telecare equipment providers and there have been significant concerns during
the period alarms required to be purchased around the rising cost and reduced
availability of digital equipment, which had been impacted by the COVID pandemic
and a global shortage of parts impacting on equipment supply. 
As such, a decision was made to procure Tunstall branded digital alarms which
ensured compatibility with both the existing Call Handling software platform and the
current stock of Community Alarm and Telecare equipment.  Tunstall are an ISO
accredited technology provider and one of the largest Telecare providers in the UK. 
The service purchased a digital alarm solution and have a stock of 3,000+ digital alarm
units for installation to support the transition plan.  No analogue alarms have been
purchased since 2023 and an installation plan is in place to complete the replacement
of all existing dispersed analogue alarms by the end of August 2024. 
There remains a requirement to procure an additional number of digital devices and
the team are continuing to explore new digital alarm technologies and testing these to
ensure there is a range of equipment available which will increase resilience and
201

Page 202

support business continuity plans.  It is expected the remaining alarms will be
purchased in the next few months. 
3.2 Installation Plan 
The programme for replacing alarms commenced in 2023 with approximately 3,500
dispersed analogue Community Alarms requiring to be replaced.  To date around
2,200 digital alarms have been installed across North Ayrshire and the project plans
to complete the full replacement of analogue alarms by the end of August 2024.  There
is, however, a final stage of the installation plan linked to reprogramming that will mean
the timescale for project completion extends to early 2025.   
The installation plan and replacement programme is being undertaken geographically
based on the most populated areas in North Ayrshire, with the majority of analogue
alarms in the Irvine and Kilwinning and Three Towns area replaced.  The team
currently installing replacements in the North Coast Locality and following this will
move on to the Garnock Valley and the Islands of Cumbrae and Arran.   
3.3 Call Monitoring and Alarm Receiving Centre/Connectivity Risks 
Community Alarm units have been operating via analogue telephone lines for the last
30-40 years. They communicate with the alarm receiving centre (ARC) using
traditional landlines and rarely fail. Unfortunately, leading up to the deadline date of
December 2025, analogue connectivity is expected to become less reliable. An
example of this occurred recently when analogue units using the Talk Talk network
failed to fully connect to the Call Monitoring Centre and presented as ‘Handshake Fail’
calls. This affected most Tunstall providers across the central belt in Scotland. The
situation settled after a couple of weeks. 
Digital alarms use mobile connectivity via an in-built SIM card (via both an analogue
route and a digital route) and can also connect to a broadband router if this is in place.
If both communication paths are available, the reliability is similar to analogue units. If
there is only one path available, there is a greater risk that calls may fail. 
3.4 All of the digital alarms currently being installed by the team in this phase of the
implementation plan are installed via the in-built SIM card (analogue route).  This is
due to the current ARC not yet being fully digitally enabled to receive end to end digital
alarm activations.  The timescale for ‘digital readiness’ has been pushed back several
times and delayed by approximately 18 months so far.  It is anticipated that the new
‘go-live’ date for digital readiness with the call handling provider will be June 2024 and
operational teams and commissioning colleagues have been working with the call
handler to resolve this issue and urgently progress. 
It was not possible to delay the implementation of digital alarms until the call handling
provider could accept digital calls as more and more alarm users were finding their
telephone lines transitioned to digital which meant their existing analogue alarm was
not compatible and required to be replaced.  Therefore, the current implementation
202

Page 203

plan is working with a temporary interim solution, in that digital alarms are connected
to the ARC via the in-built SIM card, and will require a final stage of the implementation
plan to re-programme each alarm once the ARC can fully receive end to end digital
calls. 
3.5 It is important to note that whilst the in-built SIM card connection is favoured by the
Scottish Digital Office as the first route of connection, with broadband connections
considered vulnerable due to power outages, there is a risk of call failure without the
additional resilience of the back-up connection via the broadband router.  There was
a Europe wide SIM outage in June 2023 which resulted in 400 SIM units (Digital units
and analogue GSM units) in North Ayrshire all failing to work simultaneously, leaving
service users affected for approximately 14 hours.  Fortunately, these outages are
very rare and there has been no further issue since June 2023.  This interim solution
could not be avoided as described there is not an alternative solution as telephony
providers had commenced transition to digital lines rendering existing analogue
alarms obsolete and unreliable. 
In terms of risk mitigation the service has learned from the incident in June 2023, and
has a SIM Outage Standard Operating Procedure in place to respond to such
incidents in the future and to ensure the most vulnerable service users are safe and
prioritised.  Furthermore the status of all installed digital units can be monitored
through an online portal. The digital technicians monitor this portal daily to ensure that
any units losing connection are identified quickly. 
3.6 The requirement to have a final stage of installation, which will require the
reprogramming of over 2,000 alarms if not more, was unexpected and has impacted
on the proposed completion of the project.  Re-programming can be undertaken
remotely, however this would be a last resort and the preferred option will be for a
further home visit to each service user to safely re-programme and test Community
Alarm equipment. 
It is anticipated that all Community Alarm and Telecare service users in North Ayrshire
will have a digital alarm solution installed in their home by the end of August 2024 and
as such are not at risk when analogue phone lines are withdrawn/unavailable.  The
re-programming of alarms to ensure a second layer of connectivity via the broadband
(where available) will be undertaken as soon as possible.  Tunstall have agreed to
provide a technician dedicated to the North Partnership to support the reprogramming
for a period of 3 months.  Final timescales on the full completion of installation and re-
programming will not be fully understood until the ARC has a final go live date, as this
will be dependent on the number of alarms to be reprogrammed which is increasing
week on week, however it is anticipated that the re-programming will be fully
completed in early 2025. 
3.7 The team remain vigilant around the potential challenges related to connectivity issues
in the more rural locations in North Ayrshire including on the islands of Arran and
Cumbrae and in some areas of the mainland.  A number of scoping visits have already
203

Page 204

been undertaken on the islands to consider the current mobile environment and the
potential issues that may arise from this. 
As part of the project planning the team have opted to plan transition in areas of poorer
connectivity, such as on the islands of Arran and Cumbrae, until the end of the
replacement programme. By then it is expected that the team will have more expertise
and experience of mainland issues to ensure that the best possible option(s), including
alternative technology, which could be provided to users in these areas.  There may,
however, be scenarios where there is either no mobile signal or no broadband router
available and the desired resilience of connections will not be possible and as such
robust planning and risk assessment will be required to mitigate risk associated with
this. 
3.8 Shared Alarm Receiving Centre/Call Handling Platform 
Unlike a number of other Local Authority’s, including both East and South Ayrshire,
the North Partnership does not provide an inhouse Call Monitoring and Alarm
Receiving Centre.  As such, Call Handling is commissioned externally, and whilst
within the terms of the contract and service specification the service can describe and
detail service requirements, there are often limits to this from a technical perspective
and this can be subject to change based on the Call Handlers own specifications and
contractual arrangements.   
The Scottish Digital Office have appointed Chubb Skyresponse (CS) as the preferred
supplier of its ‘Shared ARC’ contract. Several local authorities have stated their
intention to use the CS platform. The Partnership’s Call Handler, currently have a
Tunstall ARC platform, however this may be subject to change due to their own
contractual arrangements. 
Non-Tunstall platforms are technically unable to support the analogue protocols
(languages) built into Tunstall alarm units.  Analogue protocols will be used as an
important backup after transition, for when digital connectivity fails, which can happen
occasionally. This presents a risk as it means alarms will be less resilient, especially
those relying on SIM connectivity alone. This could result in various issues, in
particular ‘Handshake Fail’ calls where the unit fails to fully dial through to the platform.  
3.9 Sheltered Housing Unit Installation Plan 
NAC have a number of Sheltered Housing Units (SHUs), each containing a warden
call system. These systems will also have to be upgraded to be compatible with digital
landlines.  This work is delayed until the ARC is fully digitally enabled.  Property
Management colleagues have been in contact with Openreach and await information
on when various SHU units will switch to digital. This will allow planning to prioritise
the units which need to be targeted first.   
204

Page 205

3.10 Financial update 
The North Ayrshire Council capital budget for the analogue to digital project is just
over £1m which included £50k of temporary Scottish Government funding.  The cost
of digital alarm equipment is more expensive at around double the cost of the
traditional analogue alarms, costing from £225 - £335 per alarm unit with ongoing
yearly sim card costs of around £45 per year from year 3 onwards.  These units have
also increased in cost in recent years and the initial project was based on a cost of
around £200 per alarm unit.   
There remains around 500 digital alarm units to be purchased and with a potential
extension required for the project team to be extended to approximately March 2025
resulting in a shortfall within the capital budget of around £221k.  A request has been
made to the Capital Programme Group for additional funding and it is expected that
this will be approved to support the remainder of the project to completion.   
It is also recognised that there will be ongoing yearly SIM costs for each alarm and
there may be a requirement to permanently recruit to some new posts due to a
technical requirement linked to Community Alarm technology.  Financial planning is
ongoing in relation to these increased ongoing annual costs. 
4 SUMMARY 
There are several plans in place to mitigate the risks that have been identified within
this report.  The Analogue to Digital Programme Board continues to meet regularly
and holds a Risk Register linked to the project.  The Project Team have robustly risk
assessed various scenarios associated with Call Handling arrangements and continue
to introduce plans to manage and mitigate any emerging risks.  This includes ongoing
engagement with stakeholders including the Scottish Digital Office, other Health and
Social Care Partnership’s and Telecare Provider colleagues.   
The team have developed a Communication plan which has been implemented
throughout the project to increase awareness of the Partnership’s plans for the
Analogue to Digital transition and there has been ongoing communication directly with
users of the service.  In addition, the team have completed a plan of Routine Visits to
all Community Alarm and Telecare users and are now developing plans for future
undertaking of these, including the plan and programme for testing equipment.   
As the programme develops it will be essential in the next few years to consider future
equipment lifespan and a longer-term equipment replacement programme and costs. 
5 PROPOSALS 
5.1 The IJB are asked to note the updates provided in the report and acknowledge the
highlighted project risks, as summarised below. 
205

Page 206

• Call Handling and Alarm Receiving Centre digital readiness and call handling
platform proposals
• Financial Position including project costs and ongoing yearly costs
• Connectivity and risk of call failure
• Project Timescale linked to re-programming 
5.2 Anticipated Outcomes 
The robust programme approach and planning for the Analogue to Digital switchover
for our Community Alarm service users is anticipated to minimise any disruption,
deliver a safe and effective switchover and secure the future resilience of the service
provided for Community Alarm/Telecare users in North Ayrshire. 
5.3 Measuring Impact 
The ongoing progress and impact of the analogue to digital transition will be measured
via the Analogue to Digital Project Board and via the Transformation Board. 
6 IMPLICATIONS 
6.1 Financial
There will be financial implications linked to the costs associated with the analogue to
digital switchover.   Financial planning is ongoing in relation to potential increased
ongoing annual costs. 
6.2 Human Resources
None 
6.3 Legal
None 
6.4 Equality/Socio-Economic
None   
6.5 Risk
Medium 
6.6 Community Wealth Building
None 
6.7 Key Priorities
The Partnership are committed to investing in technology solutions to provide Early
and Effective Support to people in our communities. 
206

Page 207

7 CONSULTATION 
Representatives from Community Care Services have been involved in regular
consultation with the TSA, Scottish Government, Telecommunication and Telecare
providers.  This consultation will continue throughout the transition from analogue to
digital.  There has been ongoing engagement with Community Alarm users and their
families via the developed communication strategy.   In addition, staff from the
Community Care Services team and the project team are members of the networking
groups who meet to discuss this transitional programme of work and the
implementation of the analogue to digital strategy. 
Kerry Logan – Head of Service, Health and Community Care
North Ayrshire HSCP
klogan@north-ayrshire.gov.uk 
207

Page 208

208

Page 209

1 of 4
Paper 24
NHS Ayrshire & Arran
Meeting:  Ayrshire and Arran NHS Board
Meeting date: Tuesday 26 March 2024 
Title: Whistleblowing Report Quarter 3, October – 31 December
2023
Responsible Director:  Jennifer Wilson, Nurse Director 
Report Author: Karen Callaghan, Corporate Governance Coordinator 
1. Purpose 
This is presented to the NHS Board for: 
• Discussion 
This paper relates to: 
• Government policy/directive 
This aligns to the following NHSScotland quality ambition(s): 
• Safe
• Effective
• Person Centred 
2. Report summary 
2.1 Situation
The National Whistleblowing Standards and Once for Scotland Whistleblowing policy
(the Standards) were introduced on 1 April 2021.  NHS Board Members are asked to
discuss the report on organisational activity in relation to Whistleblowing concerns
raised in 2023-24 Quarter 3 (October – 31 December 2023).   
2.2 Background 
The National Whistleblowing Standards (the Standards) set out how the Independent
National Whistleblowing Officer (INWO) expects all NHS Boards to manage, record
and report whistleblowing concerns.  It is a requirement of the Standards that
whistleblowing data is reported quarterly to the NHS Board and under our local
governance arrangements to NHS Board.   
The Standards also require that Boards publish an annual report setting out
performance in handling whistleblowing concerns.  The annual report summarises and
builds on the quarterly reports produced by the board, including performance against
the requirements of the Standards, Key Performance Indicators (KPIs), the issues that
Agenda Item 15
209

Page 210

2 of 4
have been raised and the actions that have been or will be taken to improve services
as a result of concerns.   
In NHS Ayrshire & Arran the agreed governance route for reporting on whistleblowing
is to Staff Governance Committee and then to the NHS Board.  The NHS Board report
will be shared with Integration Joint Boards following the NHS Board meeting. 
2.3 Assessment
In Quarter 3 (Q3) there were three direct staff contacts to the Speak Up mailbox.  The
contacts were seeking advice and support on how to progress issues or concerns. 
From the information provided the concerns raised related to individual staff conduct,
bullying and harassment and health and safety issues about a work environment.  On
all occasions the individuals were provided with guidance and directed to the most
appropriate route to raise their concerns and also information on who to contact to
seek support.   
No immediate risk to patient safety was identified in the contacts received in Q3 and
no action required. 
As no Whistleblowing concerns were received in Q3 a detailed report is not possible
therefore an update on recent whistleblowing activity to support the Standards is
provided below.     
• Case Update: Table 1 below provides an update on the position of the
investigations which were ongoing from Q3 and Q4 2022/23.  Of the two
concerns that remained open one is closed with the concerns raised being
partially upheld.    
Update for Stage 2
Concern 2022/23
Area Ongoing  Closed Not
Upheld
Partially
Upheld
Fully
Upheld
Q3 ISS - 1 - 1 -
Q4 Acute- UHA 1 - - - -    
Table 1 
• Learning:  For each complaint that is investigated an improvement or learning plan is
put in place to address any recommendations.  The Q3 2022/23 investigation
closed in this quarter identified several areas of improvement these included: 
o Ensure an induction plan is in place for new staff which includes training
and mentoring support
o Ensure an annual audit programme is planned and scheduled to include
audits of premises, processes and training/competency of all staff
o Improved visibility of senior managers
o Review of departmental Risk Assessments
o Improved record keeping, for example - ensure records are updated
timeously, the use of digital systems where available
o Refresh training on the use of PPE. 
• Improvement plans: Table 2 shows the status of investigations from
whistleblowing concerns raised in 2021-2022 and 2022-2023.  All plans from
2021-2022 have now been completed, with the remaining improvement plan
closed in Q3 2023-24.  Both improvement plans for 2022-23 are currently in
210

Page 211

3 of 4
progress.  These plans are monitored through the department’s governance
group as advised by the Commissioning Director, with feedback on closure to
the Whistleblowing Oversight Group.  Progress is followed up by the Corporate
Governance Coordinator.                      
Number
Investigations 
Numbers of Improvement
Plans 
Number of Learning Plans 
In Progress Closed In Progress Closed
2021-22 5 0 4 0 1
2022-23 2 2 0 - -
Table 2 
• Training: It is worth noting that in Q3 there was an increase of 8% in the number
of managers completing the Turas Whistleblowing e-Learning modules.  This
may be a result of refreshed communication through Daily Digest (DD) in
November 2023 reminding managers that it is mandatory for them to complete
the relevant module.  Communications will continue through 2024 to highlight
this training to managers 
Total Complete  Increase 
30/09/2023 31/12/2023
An overview (STAFF) 3272 3506 234
For Line Managers 112 162 50
For Senior Managers 424 439 15
Table 2 
Monthly reports continue to be produced to monitor completion of the Turas
Whistleblowing eLearning modules.   
• Confidential Contacts: A new poster with information on the Confidential
Contacts and how to contact them has been shared via email with all
management level staff for dissemination to all staff groups with a request that a
hard copy is placed in Staff areas.  A plan is in place to produce a video of each
CC with these being issued via the DD & eNews. 
• A refresh of Whistleblowing communications is in progress as a reminder to staff
on how to raise a Whistleblowing concern and includes refreshed and updated
7-minute briefings.  This is supported by our Communication Team.   
2.3.1 Quality
Procedures for raising concerns should provide good-quality outcomes through a
thorough but proportionate investigation.  The approach to handling whistleblowing
concerns ensures that learning and improvement is progressed for upheld
whistleblowing concerns and are shared across all relevant services. 
2.3.2 Workforce 
The Standards support our ambition for an open and honest organisational culture
where staff have the confidence to speak up and all voices are heard.  This is focused
through our organisational Values of ‘Caring, Safe and Respectful’ and promoting a
culture of psychological safety.   
211

Page 212

4 of 4
2.3.3 Financial
There is no financial impact. 
2.3.4 Risk assessment/management
If staff do not have confidence in the fairness of the procedures through which their
concerns are raised, or do not feel assured that concerns raised will be acted upon,
there is a risk that they will not raise valid concerns about quality, safety or
malpractice. The opportunity to investigate and address these concerns will have
been lost, with potentially adverse impact on quality, safety and effectiveness of
services.   
There is also a wider risk to organisational integrity and reputation, if staff do not
believe they will be listened to and do not feel senior leaders in NHS Ayrshire & Arran
are fulfilling the organisation’s Values of ‘Caring, Safe and Respectful’ and promoting
a culture of Psychological Safety.   
2.3.5 Equality and diversity, including health inequalities
A local Equality Impact Assessment (EQIA) for the Standards is in place and
published on our public facing web.  This assesses the impact of the Whistleblowing
Standards on staff and those who provide services on behalf of the NHS with
protected characteristics.   
2.3.6 Other impacts
• Best value: Governance and accountability and Performance management. 
The delivery of an effective process for whistleblowing concerns will support the
Board’s commitment to safe, effective and person-centred care. Effective
handling of concerns supports the delivery of the Healthcare Quality Strategy.
• Compliance with Corporate Objectives - Create compassionate partnerships
between patients, their families and those delivering health and care services
which respect individual needs and values; and result in the people using our
services having a positive experience of care to get the outcome they expect. 
2.3.7 Communication, involvement, engagement and consultation 
There is no requirement for formal engagement with external stakeholders in relation
to the formulation of this paper. There has been wide communication of the Standards
across the organisation. 
2.3.8 Route to the meeting
This has been previously considered by the following groups as part of its
development. The groups have either supported the content, or their feedback has
informed the development of the content presented in this report. 
• Whistleblowing Oversight Group on 25 January 2024
• Staff Governance Committee on 12 February 2024. 
2.4 Recommendation
For discussion.  NHS Board Members are asked to discuss the paper for Quarter 3
(October - December 2023) 
212