Page 1

Integration Joint Board 
Meeting 
Thursday, 14 December 2023 at 10:00 
Council Chambers, Cunninghame House, Irvine /
Hybrid via Microsoft Teams 
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with provision,
by prior notification, for remote attendance by Elected Members in accordance
with the provisions of the Local Government (Scotland) Act 2003.  Where
possible, the meeting will be live-streamed and available to view
at https://north-ayrshire.public-i.tv/core/portal/home.   
1 Apologies 
2 Declarations of Interest
Members are requested to give notice of any declarations of interest in respect
of items of business on the Agenda. 
3 Minute/Action Note
The accuracy of the Minutes of the meeting held on 16 November 2023 will be
confirmed and the Minutes signed in accordance with Paragraph 7 (1) of
Schedule 7 of the Local Government (Scotland) Act 1973 (copy enclosed). 
4 Director’s Report
Submit report by Caroline Cameron, Director (NAHSCP) on developments within
the North Ayrshire Health and Social Care Partnership (copy enclosed). 
5 2023 - -24 – Month 7 Financial Performance
Submit report by Paul Doak, Head of Service (HSCP Finance and
Transformation) to provide an overview of the IJB’s financial performance as at
month 7 (October) (copy enclosed). 
6 Progress update on Implementation of the National Neurodevelopment
Specification, Neurodevelopment Extreme Team and North Ayrshire
Implementation Group programme of Reform
Submit report by Thelma Bowers, Head of Service (Mental Health) on the
Implementation of the National Neurodevelopment Specification,
1

Page 2

Neurodevelopment Extreme Team and North Ayrshire Implementation Group
programme of Reform (copy enclosed). 
7 Whistleblowing Report: Quarter 2, July to 30 September 2023
Submit report for information in relation to whistleblowing concerns raised in
Quarter 2 (July – 30 September 2023) (copy enclosed). 
8 Urgent Items
Any other items which the Chair considers to be urgent.  
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the Council's
internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the start
of the meeting, the Provost/Chair will confirm if all or part of the meeting is being
filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited to, for
the purpose of keeping historical records and making those records available via
the Council’s internet site.
Generally, the press and public seating areas will not be filmed. However, by
entering the Council Chambers, using the press or public seating area or (by
invitation) participating remotely in this meeting, you are consenting to being
filmed and consenting to the use and storage of those images and sound
recordings and any information pertaining to you contained in them for
webcasting or training purposes and for the purpose of keeping historical records
and making those records available to the public. If you do not wish to participate
in a recording, you should leave the meeting.  This will constitute your revocation
of consent.
If you have any queries regarding this and, in particular, if you believe that use
and/or storage of any particular information would cause, or be likely to cause,
substantial damage or distress to any individual, please contact
dataprotectionofficer@north-ayrshire.gov.uk. 
2

Page 3

IJB Sederunt
Voting Members 
Margaret Johnson (Chair) North Ayrshire Council
Joyce White (Vice-Chair) NHS Ayrshire & Arran   
Cllr Timothy Billing North Ayrshire Council
Cllr Anthea Dickson North Ayrshire Council
Cllr Robert Foster North Ayrshire Council
Christie Fisher NHS Ayrshire & Arran
Tom Hopkins NHS Ayrshire & Arran
Marc Mazzucco NHS Ayrshire & Arran   
Professional Advisors
Caroline Cameron Director
Paul Doak Head of Service/Section 95 Officer
Aileen Craig IJB Monitoring Officer
Iain Jamieson Clinical Director
Scott Hunter Chief Social Work Officer – North Ayrshire
Thelma Bowers Mental Health Adviser
Darren Fullarton Associate Nurse Director/
Lead Nurse
Dr Victor Chong Acute Services Representative
Dr Louise Wilson GP Representative
Sharon Hackney Lead Allied Health Professional
Elaine Young Public Health Representative
Wendy Van Riet Director of Psychological Services   
Stakeholder Representatives
Terri Collins Staff Rep - NHS Ayrshire and Arran
Louise McDaid Staff Rep - NAC/Chair, North Coast Locality Forum      
Pamela Jardine Carers Representative
Clive Shephard Service User Representative
Vacancy Independent Sector Representative
Vicki Yuill Third Sector Rep/Chair Arran Locality Forum
Vacancy IJB Kilwinning Locality Forum (Chair)
Vacancy IJB Three Towns Locality Forum (Chair)
Vacancy IJB Garnock Valley Locality Forum (Chair)
Vacancy IJB Irvine Locality Forum (Chair) 
3

Page 4

4

Page 5

North Ayrshire Health and Social Care Partnership
Minute of Integration Joint Board meeting held on 
Thursday 16 November 2023 at 11.00 a.m. 
involving participation by remote electronic means and physical attendance
within the Council Chambers, Irvine. 
Present (Physical Participation) 
Voting Members
Councillor Margaret Johnson, North Ayrshire Council (Chair) 
Joyce White, NHS Ayrshire and Arran (Vice-Chair)
Councillor Anthea Dickson, North Ayrshire Council 
Professional Advisers
Caroline Cameron, Director of Health and Social Care Partnership 
Paul Doak, Head of Service (HSCP Finance and Transformation)/Section 95 Officer
Scott Hunter, Chief Social Work Officer
Sharon Hackney, Lead Allied Health Professional
Leigh Whitnall, Head of Psychological Specialties 
Stakeholder Representatives
Louise McDaid, Staff Representative (North Ayrshire Council)/Chair, North Coast
Locality Forum 
Present (Remote Participation) 
Voting Members
Councillor Timothy Billings, North Ayrshire Council
Christie Fisher, NHS Ayrshire and Arran 
Professional Advisers
Elaine Young, Public Health Representative 
Stakeholder Representatives
Pamela Jardine, Carers Representative
Vicki Yuill, Third Sector Representative 
In Attendance (Physical Participation) 
Eleanor Currie, Manager, HSCP
Kerry Logan, Head of Service (Health and Community Care)
Michelle Sutherland, Partnership Facilitator, HSCP 
Betty Saunders, Senior Manager (Contracts and Commissioning)
Julie Barrett, NHS Ayrshire and Arran
David Jamieson, Audit Scotland
Fiona Mitchell-Knight, Audit Scotland
Diane McCaw, Committee Services Officer 
Hayley Clancy, Committee Services Officer 
Agenda Item 3
5

Page 6

Apologies
Marc Mazzucco, NHS Ayrshire and Arran
Elizabeth Stewart, Head of Service (Children, Families and Criminal Justice)
Thelma Bowers, Mental Health Adviser 
1. Apologies for Absence 
Apologies for absence were noted. 
2. Declarations of Interest 
There were no declarations of interest in terms of Standing Order 7.2 and Section 5.14
of the Code of Conduct for Members of Devolved Public Bodies. 
3. Minutes 
The accuracy of the Minutes of the meeting held on 12 October 2023 were confirmed
and the Minutes signed in accordance with Paragraph 7(10 of Schedule 7 of the Local
Government (Scotland) Act 1973. 
3.1  Matters Arising from the Action Note 
Updates in terms of the Action Note were detailed as follows: - 
• Implementation of the National CAMHS and Neurodevelopmental
Specifications – Formal report to be presented to IJB in December 2023.
• Director’s Report: Commissioned Services - on the agenda for the meeting.
• Director’s Report: Community Mental Health Fund – Update on year 1 and
year 2 fund to be presented to a future meeting.
• Director’s Report: Audit Scotland report - Update scheduled for February
2024.
• Chief Social Work Officer Annual Report: Justice Services Update – Update
to be brought early 2024. 
4. Director’s Report 
Submitted report by Caroline Cameron, Director (NAHSCP) on the developments
within the North Ayrshire Health and Social Care Partnership. 
The report provided an update on the following areas: - 
• Health and Care (Staffing) (Scotland) Act 2019 comes into force on 1 April
2024;
• The Scottish Government published Good Practice Guidance on Delayed
Discharges that aims to provide HSCPs models of good practice to support a
reduction in delayed discharges where adults lack capacity;
• Section 23 of the Mental Health (Care and Treatment) (Scotland) Act 2003
places a duty on Health Boards to provide sufficient services and
accommodation for all young people up to the age of 18 years who require
hospital admission for the treatment of mental disorder. As part of its monitoring
duties the Commission routinely gathers information about the admission of
young people to non-specialist wards (usually adult mental health wards) and
reports on these admissions on an annual basis. The latest annual report
6

Page 7

published was on 2 November 2023 and can be accessed via this link
https://www.mwcscot.org.uk/node/2096;
• The Mental Health and Wellbeing Delivery Plan 2023-2025 and the Mental
health Welling Workforce Action Plan 2023 – 2025 recently published by the
Scottish Government;
• A new Waiting Well Hub launched on NHS Inform, to support people who may
be waiting to see a healthcare specialist or to get health and social care
services. The Hub aims to provide access to better information to support
people to proactively manage their health and wellbeing, to think about what
matters to them and what health improvements they could make during this
time;
• The Health and Social Care Winter Preparedness Plan for 2023/24, was
published on 24 October 2023 - https://www.gov.scot/isbn/9781835214343;
• On 25 October 2023, the First Minister announced that young people
transitioning from the care system into adulthood are to receive a one-off Care
Leaver Payment of £2,000 to support them to move into adulthood and more
independent living with a public consultation on the Care Leaver Payment
launched and will run until 26 January 2024;
• Carolyn McDonald, Chief AHP Officer with the Scottish Government visited
Ayrshire on Monday 30 October 2023.  The visit provided a useful opportunity
to showcase the positive AHP contribution to the people of Ayrshire;
• The IJB were advised of the Care Inspectorate issuing North Ayrshire HSCP
formal notification of a joint inspection of Adult Support and Protection across
agencies including Social Work, Health, and Police. The partnership position
statement was submitted on 8 November. The first stage of the inspection will
commence on 27 November 2023 with the casefile reading and will be followed
up with focus groups;
• North Ayrshire Libraries were winners at the Scottish Library & Information
Council (SLIC) Awards on 3rd November for their pioneering work in supporting
those recovering from problematic alcohol and/or other drug use;
• The Dirrans Centre had two finalists in the Working North Ayrshire Awards on
2nd November 2023.  Michael was a finalist in the Volunteer of the Year
Category and Abby Anderson was voted Modern Apprentice of the Year;
• Tracey McAllister, Charge Nurse was the recipient this month of The Bill Gray
Award for excellence in dementia care. The photo is of her, the team and
Annabelle Gray who set up the award a few years ago in recognition of the
excellent care her husband Bill received in Iona /Lewis Ward at Ailsa Hospital;
• Students of RAMH North Ayrshire Wellbeing & Recovery College have released
a single as part of the Scottish Mental Health Arts Festival, which took place
during October;
• the appointment of Dr Wendy Van Riet to the Director of Psychological Services
for NHS Ayrshire & Arran based within North Ayrshire HSCP as the Lead HSCP
for Mental Health Services; and 
• Elizabeth Stewart has been appointed the Head of Service (Children, Families
& Justice). 
Noted. 
5. Contract and Commissioning Update 
Submitted report and received presentation by Betty Saunders, Senior Manager
(Contracts and Commissioning) on the current Contracts and Commissioning
7

Page 8

landscape.  The types of care and support services commissioned was set out at
Appendix 1 to the report. 
The presentation highlighted the North Ayrshire Care and Support market profile,
2022-2023 financial year spend, current purchase routes, monitoring the quality of
care, managing care deficiencies, existing supports for providers, challenges and
opportunities, snapshot of mid-October, priorities for 2024, 
Members asked questions and were provided with further information in relation to: - 
• distress brief intervention figures;
• difficulties in commissioning residential step down care and next steps to move
this forward;
• current supports in place for external providers who may fall below the
minimum performance grade. 
Noted. 
6. 2023 – 2024 Month 6 Financial Performance 
Submitted report by Paul Doak, Head of Service (HSCP Finance and Transformation),
on the IJB’s financial performance as at month 6 (September).  Appendix A to the
report detailed the Objective Summary as at 30 June 2023, Appendix B provided the
financial savings tracker and the budget position was set out at Appendix C. 
Members asked questions and were provided with further information in relation to: - 
• the current reserves position following the reserves adjustment detailed in the
Audit Scotland report;
• additional processes in place to understand the reason for the reserves
adjustment and minimise the risk in the future; and 
• the local government pay award settled for the majority of staff, with the back
pay being paid before Christmas. 
The Board agreed to (a) note (i) the overall integrated financial performance report for
the financial year 2023-24 and the current overall projected yearend overspend of
£3.986m, (ii) the progress with delivery of agreed savings and (iii) the remaining
financial risks for 2023-24; and (b) approve the budget reductions set out at section
2.10 of the report. 
7. External Audit Final Report 
Submitted report by Audit Scotland on the External Audit Final Report of the audit
Financial Statements. 
The key messages of the report were: - 
• it was expected that an unmodified audit opinion would be issued;
• appropriate and effective financial management arrangements were in place;
• the IJB reported a £3.7 million underspend against the 2022/23 budget. The
main factor for the underspend was the continued workforce challenges to
recruit and maintain staff in the social care sector;
8

Page 9

• the updated medium-term financial outlook shows a cumulative estimated
savings gap ranging from best case £1.1 million to worst case £22.7 million in
the period to 2026/27;
• work currently ongoing to refresh the Transformation Plan to focus on the
financial challenges ahead;
• The IJB has a clear strategic vision supported by its partners;
• A review of the Integration Scheme currently ongoing. A revised scheme will be
considered by the end of 2023/24 and submitted to the Scottish Government for
approval;
• Governance arrangements were appropriate and generally operate effectively;
• Performance management arrangements were effective with indicators and
targets kept under review. These arrangements contribute to the IJB’s Best
Value duty;
• Performance in relation to the national measures highlights both areas of
improvement and areas of declining performance over the last year. 
The Partnership noted that a report on the reserves adjustment detailed in the Audit
Scotland report would be brought to a future meeting. 
Members asked a question and received clarification on an outstanding action from
2022/2023. 
The Chair thanked Audit Scotland for their work in auditing the IJB. 
Noted. 
8. 2022/2023 Audited Annual Accounts 
Submitted report by Paul Doak, Head of Service (HSCP Finance and Transformation)
on the Audited Accounts for 2022-23, attached at Appendix 1 to the report. Appendix 2
included the letter of representation signed by the Head of Service (HSCP Finance
and Transformation). 
The IJB was required to produce a set of annual accounts for 2022-23. These
accounts were produced within the statutory timescale and subject to independent
audit by the Integration Joint Board’s external auditors, Audit Scotland.  
Audit Scotland have given an unqualified opinion that the 2022-23 financial statements
give a true and fair view of the financial position and expenditure and income of the
IJB for the year, concluding that the accounts have been properly prepared in
accordance with relevant legislation, applicable accounting standards and other
reporting requirements. The overall financial position remains as reported to the
Performance and Audit Committee in June 2023.  Audit Scotland identified an
accounting misstatement during the audit relating to a difference between total IJB
reserves (£17.664million) and the debtor balances due to the IJB from partners’
audited accounts (£16.728million). This is well within the materiality threshold. This
difference requires to be reviewed through the ledgers and any corrective action will
be taken ahead of the 2023-24 audit and reported to the IJB. 
The Board agreed to (a) note that Audit Scotland have completed their audit of the
annual accounts for 2022-23 and have issued an unqualified independent report
auditor’s report; (b) approve the Audited Annual Accounts to be signed for issue. 
9. Risk Appetite Statement 
9

Page 10

Submitted report by Paul Doak, Head of Service (HSCP Finance and Transformation)
on the Risk Appetite Statement, with the Statement set out at Appendix 1 to the report. 
Members asked questions and were provided with further information in relation to: - 
• cultural changes required to have a more flexible innovative workforce and
attract a younger workforce; and
• retaining the workforce with policies such as retire and return, partial retirement,
VER in place. 
The Board agreed to approve the Risk Appetite Statement set out at Appendix 1 to the
report. 
10. Independent Advocacy Strategic Plan 2022-2026 
Submitted report by Julie Barrett (NHS Ayrshire and Arran) on the Advocacy Strategic
Plan, with the Plan set out at Appendix 1 to the report. 
The Board agreed to approve the Advocacy Strategic Plan set out at Appendix 1 to the
report. 
The meeting ended at 12.35 p.m.
10

Page 11

North Ayrshire Integration Joint Board – Action Note 
Updated following the meeting on 16 November 2023 
No. Agenda Item Date of
Meeting
Action Status Officer
1. Implementation of the National
CAMHS and Neurodevelopmental
Specifications
16/3/23 Further update being provided to the IJB,
potentially prior to the summer recess
period.
On agenda December
2023.
Thelma Bowers
3. Director’s Report 12/10/23 Community Mental Health Funding - The
Impact Report for Year 1 and Interim
Report for Year 2 to a future meeting. 
tbc Vicky Yuill
4. Director’s Report 12/10/23 Audit Scotland report for the Auditor
General of Scotland and the Accounts
Commission on Access to Mental Health
Services - a report would be brought to a
future meeting to consider the
recommendations
Update scheduled for
February 2024. 
Thelma Bowers
5. Chief Social Work Officer Annual
Report 2022/2023
12/10/23 Justice Services update report to be
brought to a future meeting.
Update to be brought
early 2024.
Elizabeth
Stewart
6. External Audit Final Report  16/11/23 An update on the reserves adjustment
detailed in the Audit Scotland report would
be brought to a future meeting. 
Incorporated into the
financial monitoring
report presented to IJB
December 2023.
Paul Doak 
11

Page 12

12

Page 13

Integration Joint Board
14th December 2023
Subject : Director’s Report 
Purpose : This report is for awareness to advise members of North
Ayrshire Integration Joint Board (IJB) of developments within
North Ayrshire Health and Social Care Partnership (NAHSCP) 
Recommendation : IJB members are asked to note progress made to date. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
IJB Integration Joint Board
HSCP Health and Social Care Partnership 
1. EXECUTIVE SUMMARY 
1.1 This report informs members of the Integration Joint Board (IJB) of the work
undertaken within North Ayrshire Health and Social Care Partnership (NAHSCP),
nationally, locally and Ayrshire wide. 
2. BACKGROUND 
2.1 This report provides IJB with up-to-date information on recent activity across the
HSCP since the last IJB.  The report will also provide COVID related information by
exception. 
3. CURRENT POSITION 
National Developments 
3.1 Self Harm Strategy and Action Plan 2023-2027 
Scotland’s Self Harm Strategy and Action Plan (2023-2027)  was published on 28th
November 2023.  This is Scotland's first dedicated self-harm strategy and action plan
aims for anyone affected by self-harm, to receive compassionate support, without fear
Agenda Item 4
13

Page 14

of stigma or discrimination. It is jointly owned by Scottish Government and Convention
of Scottish Local Authorities (COSLA) and was published on 28th November 2023. 
3.2 National Care Service (Scotland) Bill – Update to Health, Social Care and Sport
Committee 
Maree Todd, MSP Minister for Social Care, Mental Wellbeing and Sport has written to
the Health, Social Care and Sport Committee in response to Stage 1 Scrutiny of the
Bill.  A copy of the letter is available on the Scottish Parliament website : National Care
Service (parliament.scot) 
The letter includes updates in relation to :- 
• the shared accountability agreement
• the National Care Service Board
• the National Social Work Agency (NSWA)
• children’s services
• justice services 
3.3 Coming Home Report – Implementation Programme 
Maree Todd, MSP Minister for Social Care, Mental Wellbeing, and Sport has also
written to the Convenor of the Health and Sport committee to provide an update on
the recommendations from the Coming Home report which was published in February
2022. 
One of the report’s key recommendations was in relation to Dynamic Support
Registers which were launched in May 2023.    These are locally held records to
improve case management of people with learning disabilities and complex care
needs.    A new national reporting system was developed and the first national
publication of data from these Dynamic Support Registers was published and is
available from Public Health Scotland. 
The data shows that within the first three months of launching, all local areas are
utilising the registers and have recorded 1,243 adults across Scotland. 
The Minister also highlighted progress on the other recommendations within the report
in relation to :- 
• Practitioner Peer Support Network;
• Proposed Learning Disability, Autism and Neurodivergence Bill, which will be
launched for public consultation by end of 2023;
• Development of a new Complex Support Needs Pathway;
• Embed work on the Coming Home report across government;
• Embed the work on the NCS for national commission;
• Promote Positive Behavioural Support (PBS) framework;
14

Page 15

• Annual checks for people with learning disabilities;
• Reform programme to begin process of updating and modernising Scotland’s
mental health legislation.
• Work closely with stakeholders to consider best use of NHS estate in relation
to complex care. 
Ayrshire Wide Developments 
3.4 MAPPA Annual Report 
The Multi Agency Public Protection Arrangements (MAPPA) are a set of statutory
partnership working arrangements introduced in 2007 under Section 10 of the
Management of Offenders etc (Scotland) Act 2005. 
The purpose of MAPPA is public protection and the reduction of serious harm, bringing
together the Police, Scottish Prison Service (SPS), health and local authorities to
assess and manage the risk posed by certain categories of offender. 
The MAPPA Annual Report 2022-23 for the South West Scotland area has now been
published on the NAHSCP website. 
North Ayrshire Developments 
3.5 Drug and Alcohol Services National Performance Audit 
Audit Scotland are currently carrying out an audit of drug and alcohol services in
Scotland and have published the scope of the audit on the Audit Scotland website. 
The overall aim of the performance audit is to consider how effective Scotland’s drug
and alcohol services are in delivering on the Scottish Government’s strategies. 
The three main themes of the audit are : 
1. How well are current leadership and accountability arrangements supporting
the effective delivery of the Scottish Government’s drug and alcohol
strategies? 
2. How effective are the funding arrangements for drug and alcohol services for
achieving objectives in the strategies, and what is the balance of investment
across different types of services? 
3. How responsive are drug and alcohol services to the needs of service users
and is this evidenced in outcomes and performance data? 
The fieldwork element of the audit will be carried out in four sites and North Ayrshire
has been selected as one of the areas.  A number of factors were taken into
consideration in choosing the areas including a mix of rural and urban areas,
geographical spread, rates of drug-related and alcohol related deaths and morbidity,
other recent audit work, and potential examples of good practice and local challenges.
15

Page 16

The ADP welcome North Ayrshire being selected as one of the four areas for the audit
as this is an area of focus and significant priority for us as a whole system.     
Officers from HSCP and the ADP have already met with Audit Scotland and
information and evidence gathering has already commenced.    The findings from the
audit will be shared with IJB members in due course. 
3.6 North Ayrshire Unpaid Work Team Artwork is highly commended by Koestler Awards
team 
A group of six clients of North Ayrshire’s Unpaid Work team
have received recognition certificates from the Koestler
Awards for their original artworks, with one participant also
receiving a Highly Commended certificate for this unique
wooden birdhouse. 
The Koestler Awards for arts in criminal justice started
in 1962. Each year, over 3,500 people in custody and in the
community share their creative work by taking part. The
Koestler Awards provide feedback and encouragement to
entrants of all abilities in visual art, design, writing and
music. 
3.7 New ‘North Ayrshire Protecting People Together’ Facebook page 
North Ayrshire Adult Protection, Children Protection and Alcohol and Drug Partnership
teams have a new joint Facebook page, sharing information on the work being carried
out locally to protect people and what to do if someone is at risk from harm. They'll
also be sharing lots of useful information from our public protection partners. 
Please follow their page and help to raise awareness among North Ayrshire residents
by sharing their posts on your own social media page where appropriate. 
3.8 North Ayrshire Carers Gateway Official Launch 
On Carers Rights Day, an event was held at West Kilbride Village Hall to launch the
expanded North Ayrshire Carers Gateway service. 
Attended by carers, staff of the Carers Gateway and
NAHSCP, representatives from Third Sector
organisations, North Ayrshire Provost Anthea
Dickson and North Ayrshire Carers Champion
Councillor Nairn McDonald, the event offered a
chance to network, hear more about the service and
find out more about additional sources of support
locally. 
16

Page 17

More information on NAHSCP’s improved partnership with North Ayrshire Carers
Gateway and how the expansion will benefit unpaid carers can be found on the
NAHSCP website. 
3.9 New Forum for Recovery Development Workers 
An innovative new group for North Ayrshire’s Recovery Development Workers has
been established and met for the first time on 8 November. 
The North Ayrshire Recovery Development Worker Forum offers an opportunity for
lived experience support workers from NAHSCP’s alcohol and drug recovery service
(NADARS), Service Access and Justice Services team, as well as their counterparts
from Turning Point and Barnardo’s, to come together and share their experiences,
learn more about the work of the other services, identify training requirements or
shadowing opportunities, and provide support for each other as they move forward in
their roles. 
Staff who attended are all peer support workers with lived experience from a range of
backgrounds, including alcohol and/or other drug use, gambling and mental ill health,
who have all been on their own individual journeys to recovery and are now using that
experience and insight to provide relatable support to others embarking on their own
journey. 
As paid staff members within their individual teams, they work with some of North
Ayrshire’s most vulnerable clients, proving to them that recovery is possible and
supporting them in a number of ways, both in group and one-to-one sessions. 
As well as helping clients to
attend essential appointments,
connecting them with community
recovery initiatives such as Café
Solace and supporting them to
maintain relationships with
friends and family members,
they can also assist clients
around further education or
employment opportunities. 
While each of the services involved will continue to offer support to its own Recovery
Development Workers, the forum provides an additional opportunity for these staff
members to support each other in a role that is not without its challenges, and could
be of particular benefit to staff who have recently taken on a recovery worker role. 
The forum also offers the opportunity for staff from different organisations who may
be working with the same individuals to foster joined up support that will benefit those
clients who are involved with more than one service. 
17

Page 18

3.10 Inspection of North Ayrshire Irvine, Garnock Valley & Community Alarm Service 
Following an unannounced inspection between 24 October and 3 November 2023 of
the North Ayrshire Irvine, Garnock Valley Care at Home and Community Alarm
Service, the service received the following grades :- 
How well do we support people’s wellbeing?    5 – Very Good 
How good is our leadership?   5 – Very Good 
How good is our staff team?   4 – Good 
How well is our care and support planned?  4 – Good  
These are excellent grades for a service which has been and continues to be under
extreme pressure.    Inspectors in particular highlighted the passion and commitment
demonstrated by staff to providing the best care possible and highlighted the excellent
partnership working across District Nurses, GPs, Hospital and many others to support
and meet the needs of service users.   
3.11 Inspection of Dementia Support Service 
The Care Inspectorate also conducted an unannounced inspection of our Dementia
Support Service on 22nd November 2023.   This was a pilot inspection to test a new
way of providing assurance that better performing, lower risk services are continuing
to provide good quality care and support.   No grades were awarded following this
inspection however, inspectors concluded that the previous evaluation of good for the
service was maintained. 
The inspectors highlighted a common theme through the inspection of staff working in
partnership with the people they supported, by keeping people and families fully
involved.  Care plans were person-centred and reflected people’s rights, choices and
wishes.    They noted that staff were passionate about their role and it was clear that
the service had a positive impact on the families they support.   
COVID Update 
No update.
4. IMPLICATIONS 
4.1 Financial
None
4.2 Human Resources
None
4.3 Legal
None
4.4 Equality/Socio-Economic
None 
4.5 Risk
None
4.6 Community Wealth Building
18

Page 19

None
4.7 Key Priorities
None
5. CONSULTATION 
No specific consultation was required for this report. User and public involvement is
key for the partnership and all significant proposals will be subject to an appropriate
level of Consultation.   
Caroline Cameron, Director
[Carolinecameron@north-ayrshire.gov.uk/01294 317723] 
Appendices
Nil
19

Page 20

20

Page 21

Integration Joint Board
14th December 2023
Subject : 2023-24 – Month 7 Financial Performance
Purpose : To provide an overview of the IJB’s financial performance as at
month 7 (October). 
Recommendation : It is recommended that the IJB: 
(a) notes the overall integrated financial performance report for
the financial year 2023-24 and the current overall projected year-
end overspend of £3.858m;
(b) notes the progress with delivery of agreed savings;
(c) notes the actions which are being taken to progress financial
recovery;
(d) notes the remaining financial risks for 2023-24; and
(e) approves the budget reductions which are detailed at
paragraph 2.10. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
CAMHS Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
GAE Grant Aided Expenditure
PAC Performance and Audit Committee
MARAC Multi Agency Risk Assessment Conference 
1. EXECUTIVE SUMMARY 
1.1 The report provides an overview of the financial position for the Partnership and
outlines the projected year-end outturn position informed by the projected
expenditure and income commitments; these have been prepared in conjunction with
relevant budget holders and services.   It should be noted that, although this report
Agenda Item 5
21

Page 22

refers to the position at the end of October, further work is undertaken following the
month end to finalise projections, therefore the projected outturn position is as current
and up to date as can practicably be reported. 
1.2  The projected outturn is a year-end overspend of £3.858m (1.2%) for 2023-24 which
is a favourable movement of £0.128m from month 6.  This includes the financial
impact of the NHS pay award, the impact of the Council pay award is still being
finalised. 
1.3  From the core projections, overall, the main areas of pressure are residential
placements for children, supplementary staff in wards and Unplanned Activities
(UnPACs) within the lead partnership for mental health. 
2. CURRENT POSITION 
2.1 The report includes an overview of the financial position including commitments
against the available resource, explanations for the main budget variances and an
update on progress in terms of savings delivery.   
2.2 FINANCIAL PERFORMANCE – AT MONTH 7 
At month 7 against the full-year budget of £311.735m there is a projected year-end
overspend of £3.858m (1.2%).  The Integration Scheme outlines that there is an
expectation that the IJB takes account of the totality of resources available to balance
the budget in year.   Following this approach, an integrated view of the financial
position should be taken, however it is useful to note that this overall position consists
of a projected overspend of £2.500m (£0.079m favourable) in social care services
and a projected overspend of £1.358m (£0.049m favourable) in health services.     
Appendix A provides the financial overview of the Partnership position. The sections
that follow outline the significant variances in service expenditure compared to the
approved budgets. 
The projections for some areas will be subject to fluctuations as they depend on
recruitment plans for new funding and also the capacity of providers to take on work. 
2.3 Health and Community Care Services 
Against the full-year budget of £89.893m there is a projected overspend of £0.382m
(0.4%) and the main variances are: 
a) Care home placements including respite placements (net position after service
user contributions and charging order income) are projected to underspend by
£0.488m (£0.017m favourable movement). 
22

Page 23

The budgeted number of permanent placements is 780 and at month 7 there are
786 placements.  The projection assumes that the current number of placements
will continue to the end of the year. Within the projection there is an assumption
that recent placements which do not have a completed financial assessment
(often due to the pressure to discharge from hospital) are costed with 50% of the
cases at the current average cost of a placement and 50% at the gross or interim
funded rate.  It is likely that there will still be some cases being gross or interim
funded at the year end. Their actual cost will not be known until the financial
assessment is completed and this can impact on the final position. 
The level of income recovered from charging orders is included in the projection
above and is assumed to be £0.204m over recovered (£0.070m favourable)
based on the income received to date.   This income is not easy to project as it
depends on the length of the legal process and time taken to sell the property that
the charging order is registered to. 
b) Interim care beds are projected to underspend by £0.250m (£0.250m favourable)
based on the usage to date and projected usage until the year end. 
c) Care at home (in house and purchased) is projected to be £0.418m underspent
(£0.064m adverse).  The position includes an underspend in in-house services of
£0.919m (£0.080m adverse) as there are vacant posts, but some of the current
capacity is being met by existing staff working additional hours and casual staff. 
Bank staff are being offered contracts and additional staff are being recruited
which will replace the need for existing staff to work additional hours. This is partly
offset by an overspend in purchased services of £0.500m (£0.017m favourable)
as the budget was reduced to reflect the additional costs of bringing some
services in-house after the provider withdrew from the contract. 
d) Reablement services are projected to be £0.125m (£0.002m favourable)
underspent due to vacancies. 
e) Care at Home Charging Income is projected to under recover by £0.060m
(£0.011m favourable) due to an ongoing shift towards personal care which is non
chargeable. 
f) Physical Disability Services - projected underspend of £0.250m (£0.033m
favourable) in community care packages, £0.449m underspend (£0.056m
favourable) in direct payments and £0.458m overspend (£0.018m favourable) for
residential placements. There is also an under-recovery of income of £0.133m
(no movement).   
g) Anam Cara is projected to overspend by £0.073m (£0.004m adverse) due to
covering vacancies and sickness absence (£0.017m) and under-recovered
income (£0.056m).   
23

Page 24

h) Integrated Island Services is projected to be £0.308m overspent (£0.041m
adverse movement).  There is an overspend at Montrose House of £0.241m
(adverse movement of £0.046m) which relates to employee costs (the net cost of
agency staff versus vacancies), supplies and cleaning costs and an under-
recovery of charging income. There is also an overspend of £0.050m due to Band
6 nurses receiving back-dated recruitment and retention premium this financial
year. Arran medical services are projecting to overspend by £0.032m and the
remaining projected overspend is due to supplies costs increasing. The
overspends are partially offset by a projected underspend in care at home costs
of £0.086m (£0.049m adverse movement). There are staffing vacancies which
are included within the payroll turnover savings figures below which offset the use
of agency and bank staff. 
i) District Nursing is projected to overspend by £0.195m (£0.041m favourable
movement) due to an overspend on bank nursing costs and supplies.   The
favourable movement is due to a reduction in the use of bank staff as posts have
been recruited to. 
j) Rehab wards are projected to overspend by £0.202m which is an £0.018m
favourable movement (Redburn ward £0.213m overspent and Douglas Grant
£0.011m underspent).  The overspend is due to cover costs for vacancies as well
as supplementary staffing for patients who require one to one support.   
k) Wards 1 and 2 are projected to overspend by £0.925m (£0.075m adverse
movement) due to increased use of supplementary staffing. 
l) Cumbrae Lodge Continuing Care beds are projected to underspend by £0.150m
(no change) due to a reduced charge to reflect the reduction in beds used during
the transition to the new service. 
2.4 Mental Health Services 
Against the full-year budget of £103.504m there is a projected overspend of £1.618m
(1.6%) prior to the reallocation of the Lead Partnership overspend to East and South
HSCP.  This also excludes any potential variance on the Mental Health Recovery
and Renewal Funding where any underspend will be earmarked at the year-end for
use in 2024-25. The main variances are: 
a) Learning Disabilities are projected to overspend by £0.670m (£0.010m adverse)
and the main variances are: 
• Care Packages (including residential and direct payments) - projected
underspend of £0.109m in community care packages (£0.136m adverse),
projected overspend of £0.384m in direct payments (£0.036m adverse)
and £0.446m for residential placements (£0.114m favourable). 
24

Page 25

• Trindlemoss non-employee costs are projected to underspend by
£0.075m. 
b) Community Mental Health services are projected to underspend by £0.245m
(£0.021m adverse movement) which is mainly due to an underspend of £0.474m
in community packages (including direct payments) and an overspend in
residential placements of £0.244m.   
c) The Lead Partnership for Mental Health is projecting to be £1.188m overspent
(£0.220m favourable movement) and the main variances are as follows: 
• A projected overspend in Adult Inpatients of £0.520m (£0.033m favourable
movement) due to overspends in supplementary staff for enhanced
observations, staff cover due to sickness (inc. covid outbreak) and reduced
bed sale income.  
• The UNPACS (Unplanned Activities) budget is projected to overspend by
£1.410m (£0.003m adverse movement) based on current number of
placements and enhanced costs remaining until the year end. The adverse
movement is due to additional costs for enhanced observations. These
placements are for individuals with very specific needs that require a higher
level of security and/or care from a staff group with a particular skill
set/competence.  There are no local NHS secure facilities for women, people
with a learning disability or people with neurodevelopmental disorder. This can
necessitate an UNPACs placement with a specialist provider which can be
out-of-area.  The nature of mental health UNPACs spend is that it is almost
exclusively on medium or long term complex secure residential placements
which are very expensive so a small increase in placements can have a high
budgetary impact. Due to the complexity and risk involved, transitions
between units or levels of security can take many months. Applications to
approve a placement are made to the Associate Medical Director for Mental
Health who needs to be satisfied that the placement is appropriate and
unavoidable prior to this being agreed. 
• A projected overspend in MH Pharmacy of £0.084m (£0.030m favourable) due
to an increase in substitute prescribing costs. The favourable movement is
due to revising the projection to reflect updated information from the new
prescribing system. 
• Learning Disability Services are projected to overspend by £0.322m (no
movement).  There is a high usage of supplementary staffing due to backfill
for sickness, increased and sustained enhanced observations and vacancies. 
The enhanced observations are reviewed on a daily basis. 
• Elderly Inpatients are projected to overspend by £0.173m (£0.008m
favourable) due to the use of supplementary staffing.  
• The Innovation Fund is projected to underspend by £0.232m (£0.043m
adverse) due to slippage within some of the projects and not all of the funding
was allocated.
25

Page 26

• Addictions in patients are projected to overspend by £0.003m (£0.011m
favourable) due to the use of supplementary staffing.
• The Directorate cost centre is projected to overspend by £0.095m mainly due
and overspend of £0.049m on supplies and £0.012m of legal fees.
• The turnover target for vacancy savings for the Lead Partnership is held within
the Lead Partnership as this is a Pan-Ayrshire target.  There is a projected
over-recovery of the vacancy savings target of £1.254m (£0.191m favourable)
in 2023-24, further information is included in the table below: 
The current projection to the year-end is informed by the recruitment plans and the
confidence in recruitment success and realistic timescales for filling individual
vacancies.   
The areas contributing to this vacancy savings position are noted below:
• Adult Community MH £0.033m
• CAMHS £0.592m
• Mental Health Admin £0.330m
• Psychiatry £0.377m
• Psychology £0.735m
• Associate Nurse Director £0.060m 
Vacancy Savings Target (£0.873m)
Projected to March 2024 £2.127m
Over/(Under) Achievement £1.254m
2.5 Children and Justice Services 
Children’s Services
Against the full-year budget of £39.560m there is a projected overspend of £5.269m
(13.3%) (£0.253m adverse) and the main variances are: 
a) Care Experienced Children and Young People is projected to overspend by
£4.928m (£0.188m adverse). The main areas within this are noted below: 
• Children’s residential placements are projected to overspend by £5.734m
(£0.184m adverse). We started 2023/24 with 32 external placements and
there are currently 35 placements (month 6 was 34 placements) which are
assumed to continue until the end of the year.  Within the £5.734m there is
£0.145m relating to enhanced costs for two placements.  One placement has
also moved from being 50/50 funded with Education to 100% HSCP as the
placement no longer has an education element. There are a number of factors
leading to this challenging position: 
26

Page 27

• We have 32 places available in our internal children’s houses, due to
demand these have been operating at 100%+ occupancy for some
time, leading to increased use of external placements where
residential care is required.
• The requirement to support Unaccompanied Asylum-Seeking
Children (UASC) under the National Transfer Scheme and to support
trafficked young people who have been identified in North Ayrshire.
• A number of young people in residential care have requested
Continuing Care, whereby a young person can remain in their
placement until age 21.
• Where appropriate young people are placed to meet their educational
needs, the cost of Residential School Placements in the most cases
is shared 50/50 with Education services. 
Children’s Services are continuing to work with other services including
Education and Housing to address the challenges. A change programme is
being developed to respond to the pressures of residential care, further detail
of the scope and plan around this work will be presented to a future IJB. 
• Looked After and Accommodated Children (fostering, adoption, kinship etc)
is projected to be £0.486m underspent (£0.013m favourable); this is based on
the current number of placements and reflects additional monies received to
support the uplift in rates for fostering and kinship placements (16+year olds)
and the costs associated with this. 
b) Children with disabilities – residential placements are projected to overspend
by £0.305m (£0.097m favourable). This is based on 9 current placements and
1 further placement which is expected to commence during December.  Direct
payments are projected to underspend by £0.240m (£0.051m favourable). 
Community packages are projected to underspend by £0.119m (£0.015m
favourable) based on 73 current number of packages and assumptions
around further packages until the year end. 
c) Residential respite – placements are projected to overspend by £0.049m (no
movement).    These short-term placements are used to prevent an admission
to full residential care.  There is one short term placement, but this could vary
throughout the year and have an impact on the projection. 
d) Head of Service – is projected to overspend by £0.306m (£0.006m adverse). 
The overspend is mainly due to the planned saving of £0.233m in relation to
the staff reconfiguration in the children’s houses which is not expected to be
fully achieved in 23-24.  There are also projected costs of £0.092m for the JII
(Joint Investigative Interview) project which is not funded. 
27

Page 28

e) Intervention Services – are projected to underspend by £0.020m (£0.068m
adverse).   The adverse movement is due to posts being filled sooner than
planned and increased transport costs. 
f) Justice Services – is projected as being spent in full, however, there is a risk
the service could go into an overspend if there is no additional grant funding
to mitigate the potential impact of the 23/24 pay award. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP) 
The non-employee costs element of the AHP services are projected to be on-line. 
All underspends in employee costs have been taken as payroll turnover. 
2.7 CHIEF SOCIAL WORK OFFICER 
There is a projected underspend of £0.465m (£0.081m favourable) mainly due to a
projected underspend in the Carers Strategy funding. 
2.8 MANAGEMENT AND SUPPORT 
Management and Support Services are projected to underspend by £1.703m
(£0.053m adverse) and the main areas of underspend are: 
• An over-recovery of payroll turnover of £0.723m for social care services and
an over-recovery of payroll turnover of £0.306m for health services as outlined
in the table below.  This is an adverse movement of £0.111m on the health
services element.
• There is projected slippage on the LD and MH transition funding of £0.694m
(£0.141m favourable) due to delays in children transitioning into adult
services. 
The turnover targets and projected achievement for the financial year for Health and
Social Care services outwith the Lead Partnership is noted below: 
The position in the table above reflects the assumption in the current financial
projections.  For social care, a total of £1.937m (64.3% of annual target) has been
achieved to date.   
Social Care Health
Services
Vacancy Savings Target (3.014m) (1.433m)
Projected to March 2024 3.737m 1.739m
Over/(Under) Achievement 0.723m 0.306m
28

Page 29

The health vacancy projection to the year-end is based on the month 7 position and
is informed by the recruitment plans and confidence in recruitment to posts for the
remainder of the year. 
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas.   
The main areas at month 7 are: 
• Children and Families £0.600m
• Learning Disability £0.047m
• Management and Support   £0.196m
• Community Care Service Delivery £0.187m
• Rehab and Reablement £0.174m
• Locality Services £0.205m
• Integrated Island Services £0.220m
• Community Mental Health £0.073m 
There have been no intentional plans to pause or delay recruitment and services
have actively continued to recruit; in some service areas it has proven difficult to fill
posts. 
The turnover target for the North Lead Partnership for Mental Health services is
detailed within the Lead Partnership information at section 2.4. 
2.9 Savings Progress 
a) The approved 2023-24 budget included £4.963m of savings. 
BRAG Status Position at
Budget Approval
£m
Position at
Month 7
£m
Red - 0.273
Amber 2.245 0.322
Green 2.718 0.560
Blue - 3.808
TOTAL 4.963 4.963 
b) The main area to note is that previous amber savings of £0.273m, relating to
the reconfiguration of staffing within Children and Families, have been
escalated to red.  Progress to date suggests that the timescale for this saving
will not be met and the full £0.273m will not be achieved in 2023-24 but this is
accounted for in the projected outturn.   
Work is ongoing to refresh the Transformation Plan to focus on the financial
challenges which the Partnership expects to face in 2024/25 and 2025/26. The plan
is critical to the ongoing sustainability of service delivery. Once it has been endorsed
29

Page 30

by the Transformation Board it will be included within future financial monitoring
reports. The Transformation Board also has responsibility for overseeing the delivery
of the plan and for ensuring that projects remain on track. 
Appendix B provides an overview of those service changes which do have financial
savings attached to them and the current BRAG status around the deliverability of
each saving. 
2.10 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis….
without the express consent of the Integration Joint Board.” 
Appendix C highlights the movement in the budget position following the initial
approved budget. 
Reductions Requiring Approval: 
Ref Description  Amount
1 North Contribution to the TEC team – this
contribution has been made since 2020 but this
makes the contribution permanent.
0.075
2 Trindlemoss GP input – increased cost of service 0.008
3 Support the ongoing availability of Buvidal – transfer
to NADARS
0.002
4 Contribution from CAMHS to Acute for de-
escalation rooms 
0.025
5 Pharmacy tariff transfer to reflect historic NRAC
share.
0.015 
2.11 Pan Ayrshire Lead Partnership services and Large Hospital Set Aside 
Lead Partnerships: - The IJB outturn position is adjusted to reflect the impact of Lead
Partnership services. The outturn for all Lead Partnership services is shared across
the 3 Partnerships on an NRAC basis; this position is currently the default pending
further work to develop a framework to report the financial position and risk sharing
across the 3 Partnerships in relation to hosted or lead service arrangements, which
has been delayed by the requirement to focus efforts on the Covid response. 
The final outturn in relation to North Lead Partnership services would not be fully
attributed to the North IJB as a share would be allocated to East and South
Partnerships; similarly, the impact of the outturn on East and South led services will
30

Page 31

require to be shared with North. At Month 7 the MH lead partnership is projected to
overspend by £1.188m (£0.389m NRAC share for East and £0.340m for South). 
South HSCP (month 6 information) – projected overspend of £0.360m (£0.080m
favourable) of which £0.133m will be allocated to North. The overspend is mainly
due to an overspend of £0.247m in the community store to replace obsolete
equipment, which will reduce maintenance costs in the medium term, £0.107m in
the continence service and £0.010m in the Family Nurse Partnership.   
East HSCP (month 6 information) – projected underspend of £0.149m of which
£0.055m will be allocated to North. The underspend is mainly due to: 
Primary Care and Out of Hours Services (Lead Partnership) 
There is a projected underspend of £0.198m on the Primary Care Lead Partnership
budget and includes a projected underspend in Dental services totalling £0.270m,
where staffing numbers are running at less than establishment. Recruitment over the
remainder of the financial year has to potential to impact on the projected outturn
position at month 6. In addition, there are projected reduced costs within Primary
Care contracting and support £0.340m, largely due to staff turnover. These reduced
costs are partially offset by additional costs in the GP element of Out of Hours
services, as well as additional costs in the overnight nursing service, totalling
£0.470m, as well as a small overspend on projected staff costs in Primary Medical
Services £0.060m. Work is ongoing to address the Out of Hours increased costs as
far as possible over the course of the 2023/24 financial year. This projected outturn
position assumes funding will be allocated to fully offset Urgent Care Pathway
projected costs £1.198m, as well as Covid-19 Therapeutics projected costs £0.257m 
Prison and Police Healthcare (Lead Partnership) 
The £0.065m projected overspend at month 6 is largely due to increased costs
associated with the new national medical contract. 
Set Aside : - preparatory work is well underway with NHS Ayrshire and Arran and
the other Ayrshire partnerships to progress and develop the set aside arrangements
to fully implement the legislative requirement.  This includes arrangements in
relation to the use of Directions, Joint Commissioning Plans and overall progression
towards fair share allocations of resources. The North budget for set aside
resources for 2023-24 is currently £35.547m.  This is based on the 2022-23 figure
of £34.850m inflated by the 2023-24 uplift of 2%.  Ayrshire Finance Leads have
agreed a baseline methodology for set aside budgets which involves using the four
full years prior to the pandemic, 2016/17 – 2019/20 inclusive. This will be included
in a Q2 update for Ayrshire Finance Leads on 15/12/23.  
The annual budget for Acute Services is £421.7m.  The directorate is overspent by
£16.5m after 7 months. This is caused by increasing overspends on agency medical
and nursing staff, together with drug expenditure. These have been required due to
the level of operational pressure being experienced, in common with many other
31

Page 32

areas in Scotland. Several unfunded wards and beds are open across both main
hospital sites. 
There is a material underlying deficit caused by: 
• Unachieved efficiency savings 
• High expenditure on medical and nursing agency staff, high rates of absence
and vacancies causing service pressure.
• Delayed transfers of care and high acuity of patients. 
The IJBs and the Health Board work closely in partnership to maintain service and
improve performance. 
2.12 FINANCIAL RECOVERY PLAN 
The Integration Scheme requires the preparation of a recovery plan if an overspend
position is being projected to plan to bring overall service delivery back into line with
the available resource. 
Heads of Service have closely reviewed expenditure and have implemented actions
which have seen the projected year-end position improve by a net £0.468m since
Month 3. The main contributors to this are noted in the table below: 
TOTAL
Payroll Turnover – Health (non-Lead) 45,000
Anam Cara staffing 104,000
Care Experienced Young People 770,000
Looked After Children 125,000
Transitions funding 286,000
Care Homes 58,000
Physical Disabilities (Community Packages, Direct
Payments and Residential) 
200,000 
Interim Care Beds 250,000
Mental Health Care Packages 201,000
Mental Health Lead Partnership – North element  86,000
Children with a disability  97,000
Carers Funding 81,000
District Nursing 41,000
Rehab Wards 18,000 
These areas of improvement have been partially offset by adverse movements in
Care at Home, Integrated Island Services, Wards 1 and 2 at Woodland View,
UNPACS and intervention services. 
Work is ongoing to further improve the projected position and an updated plan will
be included in the Month 9 report which will be brought to the February IJB. This work
is built on the following general principles:
32

Page 33

• No adverse impact on delayed discharges or patient flow during Winter
• Exercising professional judgement around the use of waiting lists where this
may have an impact elsewhere in the system
• Reviewing the need for more active management of non-frontline vacant posts
• The non-recurring use of reserves
• Working with East and South on lead partnership projections
• The potential for a freeze on non-essential spend. 
As a contingency there is provision of £2m non-recurring funding set aside in the
reserves (appendix D) to contribute towards the 2023-24 position.   This would
reduce the current projected overspend to £1.858m. 
The IJB also holds a General Fund reserve balance of £5.821m of unallocated funds,
this would underwrite the risk of the remainder of the projected overspend if it cannot
be managed downwards in the coming months.  This would be a last resort as this
funding is non-recurring and it does not resolve the areas underlying the projected
overspend. 
2.13 FINANCIAL RISKS 
There are a number of ongoing financial risk areas that may impact on the 2023-24
budget during the year, these include: 
• Current high levels of inflation which impact on costs incurred directly by the
Partnership and on our partner providers
• High risk areas of low volume / high-cost services areas e.g. Children’s
residential placements, Learning Disability care packages and complex care
packages; 
• Progress with the work to develop set aside arrangements and the risk
sharing arrangements agreed as part of this.
• Ongoing implementation costs of the Scottish Government policy directives
• Lead / hosted service arrangements, including managing pressures and
reporting this across the 3 IJBs.
• The impact on Lead Partnership and acute services from decisions taken by
other Ayrshire areas.
• The use of supplementary staffing for enhanced observations across a
number of service areas.
• The use of high-cost agency staff to support frontline service delivery in areas
where there are recruitment challenges.
• Continuing risks associated with provider sustainability.
• The Local Government pay award for 2023-24 has recently been settled and
will be paid from December; the increase is in excess of the budgeted 3%
and will have an adverse impact on the projected financial position unless
sufficient additional funding is forthcoming.
• The NHS Ayrshire and Arran Health Board financial deficit and the risks
around further escalation in the national framework for financial escalation. 
33

Page 34

North Ayrshire IJB have already discussed our position in relation to the
request for payment for delayed discharges. 
These risks will continue to be monitored during the remainder of 2023-24 and any
impact reported through the financial monitoring report. 
2.14 RESERVES 
The IJB reserves position is summarised in the table below. 
The ‘free’ general fund balance of £5.821m is held as a contingency balance; this
equates to around 2.1% of the initial approved IJB budget for 2023-24 which is within,
but towards the lower end, of the target range of 2%-4%. 
General Fund
Reserve Earmarked Reserves
Total 
Unearmarked  External
Funding                      HSCP 
£m  £m £m £m
Opening Balance - 1 April 2023 6.448  6.997 4.219 17.664
Audit Adjustment (0.627)  (0.309) - (0.936)
Corrected Opening Balance 5.821  6.688 4.219 16.728
2023-24 Draw Per the Budget
Paper -  (1.252) - (1.252)
Current Reserve balances 5.821  5.436 4.219 15.476 
The 2023-24 budget approved the use of £1.252m of previously earmarked reserves
to support a balanced budget position for 2023-24. The HSCP earmarked reserves
also includes a further amount of £2.0m which was agreed to support the financial
position during 2023-24. 
The reserves above now reflect the adjustment of £0.936m which was identified in
the external audit of the 2022/23 accounts and reported to the November IJB. This
related to a difference between the total IJB reserves and the balances due to the
IJB from partners’ audited accounts and has now been reconciled. 
3. PROPOSALS 
3.1 Anticipated Outcomes 
Continuing to closely monitor the financial position will allow the IJB to take corrective
action where required to ensure the Partnership can deliver services in 2023-24 from
within the available resource, thereby limiting the financial risk to the funding
partners. 
3.3 Measuring Impact 
Ongoing updates to the financial position will be reported to the IJB throughout 2023-
24. 
34

Page 35

4. IMPLICATIONS 
4.1 Financial
The financial implications are as outlined in the report.   Against the full-year budget
of £311.735m there is a projected overspend of £3.858m. The report outlines the
main variances for individual services.   
4.2 Human Resources
The report highlights vacancy or turnover savings achieved to date. Services will
review any staffing establishment plans and recruitment in line with normal practice
when implementing service change and reviews as per agreement with the IJB, there
is no intention to sustain the staffing capacity reduction on a recurring or planned
basis. 
4.3 Legal
None. 
4.4 Equality/Socio-Economic
None. 
4.5 Risk
Para 2.13 highlights the financial risks.
The report falls in line with the agreed risk appetite statement which is a low-risk
appetite in respect to adherence to standing financial instructions, financial controls
and financial statutory duties and a high-risk appetite in relation to finance and value
for money. 
4.6 Community Wealth Building
None. 
4.7 Key Priorities
None. 
5. CONSULTATION
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team. 
5.2 The IJB financial monitoring report is shared with the NHS Ayrshire and Arran
Director of Finance and North Ayrshire Council’s Head of Finance after the report
has been finalised for the IJB. 
Caroline Cameron, Director 
Author – Paul Doak, Head of Finance and Transformation
Eleanor Currie, Principal Manager Finance 
[pdoak@north-ayrshire.gov.uk/eleanorcurrie@north-ayrshire.gov.uk]  
35

Page 36

PUBLIC INFORMATION
2023-24 Budget Monitoring Report–Objective Summary as at 31st October 2023       Appendix A 
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 70,430 69,219 (1,211) 19,463 20,806 1,343 89,893 90,025 132 366 (234)
: Locality Services 28,193 27,346 (847) 5,354 5,549 195 33,547 32,895 (652) (229) (423)
: Community Care Service Delivery 36,607 35,995 (612) 0 0 0 36,607 35,995 (612) (693) 81
: Rehabilitation and Reablement 2,131 2,136 5 0 0 0 2,131 2,136 5 2 3
: Long Term Conditions 943 1,004 61 10,420 11,449 1,029 11,363 12,453 1,090 1,027 63
: Community Link Workers 181 174 (7) 0 0 0 181 174 (7) (8) 1
: Integrated Island Services 2,375 2,564 189 3,689 3,808 119 6,064 6,372 308 267 41
MENTAL HEALTH SERVICES 29,804 30,234 430 73,700 74,888 1,188 103,504 105,122 1,618 1,804 (186)
: Learning Disabilities 22,959 23,629 670 478 478 0 23,437 24,107 670 660 10
: Community Mental Health 5,961 5,716 (245) 1,753 1,753 0 7,714 7,469 (245) (266) 21
: Addictions 884 889 5 1,837 1,837 0 2,721 2,726 5 2 3
: Lead Partnership Mental Health NHS Area Wide 0 0 0 69,632 70,820 1,188 69,632 70,820 1,188 1,408 (220)
CHILDREN & JUSTICE SERVICES 34,714 39,831 5,117 4,846 4,998 152 39,560 44,829 5,269 5,016 253
: Irvine, Kilwinning and Three Towns 3,183 3,152 (31) 0 0 0 3,183 3,152 (31) 3 (34)
: Garnock Valley, North Coast and Arran 3,062 2,997 (65) 0 0 0 3,062 2,997 (65) (73) 8
:Intervention Services 1,828 1,807 (21) 0 0 0 1,828 1,807 (21) (88) 67
: Care Experienced Children & Young people 22,941 27,869 4,928 0 0 0 22,941 27,869 4,928 4,740 188
: Head of Service - Children & Families 1,070 1,376 306 0 0 0 1,070 1,376 306 300 6
: Justice Services 2,413 2,412 (1) 0 0 0 2,413 2,412 (1) 0 (1)
: Universal Early Years 217 218 1 4,199 4,351 152 4,416 4,569 153 134 19
: Lead Partnership NHS Children's Services 0 0 0 647 647 0 647 647 0 0 0
CHIEF SOCIAL WORK OFFICER 1,858 1,393 (465) 0 0 0 1,858 1,393 (465) (384) (81)
PRIMARY CARE 0 0 0 52,998 52,932 (66) 52,998 52,932 (66) 0 (66)
ALLIED HEALTH PROFESSIONALS 0 10,200 10,200 0 10,200 10,200 0 0 0
COVID NHS 0 0 0 0 (274) (274) 0 (274) (274) (274) 0
MANAGEMENT AND SUPPORT COSTS 8,908 7,539 (1,369) 3,476 3,142 (334) 12,384 10,681 (1,703) (1,756) 53
NATIONAL COMMISSIONED SERVICE 0 0 0 3 3 0 3 3 0 0 0
FINANCIAL INCLUSION 1,335 1,333 (2) 0 0 0 1,335 1,333 (2) (3) 1
OUTTURN ON A MANAGED BASIS 147,049 149,549 2,500 164,686 166,695 2,009 311,735 316,244 4,509 4,769 (260)
Return Hosted Over/Underspends East 0 0 0 0 (389) (389) 0 (389) (389) (461) 72
Return Hosted Over/Underspends South 0 0 0 0 (340) (340) 0 (340) (340) (403) 63
Receive Hosted Over/Underspends South 0 0 0 0 133 133 0 133 133 133 0
Receive Hosted Over/Underspends East 0 0 0 0 (55) (55) 0 (55) (55) (52) (3)
OUTTURN ON AN IJB BASIS 147,049 149,549 2,500 164,686 166,044 1,358 311,735 315,593 3,858 3,986 (128)
(Under)
Spend
Variance
at Period
6
Movement
in projected 
variance
from Period
6
TOTAL
Partnership Budget - Objective Summary
Council Health
2023/24 Budget
36

Page 37

PUBLIC INFORMATION 
2023-24 Savings Tracker            Appendix B 
Savings
ref
number
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
month 7
2023/24
Saving
Description of the Saving
1 Staffing reconfiguration - children &
families
Amber Red 273,000     Review staffing provision within children’s houses with the saving
phased over 2023/24 and 2024/25 – 50/50
2 Deliver the Strategic Plan objectives for
Older People's Residential Services -
Reduction in Care Home Places
Amber Blue 1,000,000  The budget for 23/24 would fund an average 780 places at the
current split of nursing/residential (60/40).  This reflects reduced
demand and investment in CAH to support more people at home.
3 Care Home Respite Amber Green 560,000     All respite care to be provided in-house at Anam Cara and
Montrose House and any use of other respite provision funded via
Carers budget.
4 Montrose House Capacity Green Amber 210,000     Registration amended from 30 beds to 20 beds across 2 staffed
wings.  This is supported by introduction of intermediate care beds
at Arran War Memorial Hospital.
5 Reconfigure respite provision at Anam
Cara
Amber Amber 112,000     The service is currently relocated to Taigh Mor (8 beds) on a
temporary basis and this proposal would reduce capacity from 14
beds to 9 beds in one wing when it reverts to Anam Cara.
6 Trindlemoss pool running costs Green Blue 85,000       Trindlemoss Pool has never opened due to ongoing maintenance
issues.  The historic budgeted running costs are £0.085m but it is
expected actual costs would be much higher.  The pool will not
open and alternative therapies will be provided e.g. bounce
7 Trindlemoss Day Care Green Blue 168,932     Trindlemoss day opportunities staffing was restructured during
2021/22 and 2022/23.  This saving has already been achieved and
will remove the additional staffing budget.
8 Intermediate Placement Scheme -
cessation of service
Green Blue 30,000       The contract has ceased and will not be renewed.
9 Carers Act Funding - Substitution of
Spend
Green Blue 500,000     There is a plan in place to invest across carer service contract,
preparation of carer plans, short breaks and other support to
carers.  This proposal will invest £0.500m in contributions to Red
Rose House, Roslin House, Anam Cara, waiving of charges and
day services.
Children, Families & Criminal Justice
Community Care & Health
Mental Health
Other Areas
37

Page 38

PUBLIC INFORMATION 
Savings
ref
number
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
month 7
2023/24
Saving
Description of the Saving
10 Payroll Turnover - increase to target (social
care)
Green Blue 1,000,000  The saving is based on less than 50% of the 2022/23
overachievement
11 Income Generation - 5% Increase to fees and
charges
Green Blue 46,600       Implement a 5% increase to fees and charges and a 5% increase to
the maximum charge.  The impact will be limited where service
users are already paying the maximum charge.
12 Staffing Reconfiguration - Finance and
Transformation
Green Blue 35,091       Saving released through management and admin structure change
TOTAL SOCIAL CARE SAVINGS 4,020,623 
Health:
Savings
ref
number
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
month 7
Approved
Saving                  
2023/24          
£m
Description of the Saving
13 Payroll Turnover - Health Lead
Partnership
Green Blue 392,245     The saving is based on less than 25% of the 2022/23
overachievement
14 Payroll Turnover - Health Non Lead
Partnership
Green Blue 250,000     The saving is based on less than 50% of the 2022/23
overachievement
15 Reprovisioning of Continuing Care beds Amber Blue 300,000     Currently provided through Cumbrae Lodge Care Home in Irvine
but the provider does not want to continue to provide the service. 
Plans are being developed to relocate the service to Taigh Mor in
Beith with an anticipated saving of £0.3m.
TOTAL HEALTH SAVINGS 942,245    
4,962,868  TOTAL NORTH HSCP SAVINGS
Other Areas
38

Page 39

PUBLIC INFORMATION
2023-24 Budget Reconciliation               Appendix C 
COUNCIL Period 
Permanent
or
Temporary
£'m
Initial Approved Budget     121.408
Less Living Wage Fund not yet
allocated      (2.826)
Revised Budget     118.582
Resource Transfer 1-6 P 24.640
HSCP Fin Circ 3 1-3 T 0.013
Living Wage - final allocation  1-3 P 2.808
ICT Licences Various 1-3 P (0.012)
Island Funds  1-3 T 0.015
Facilities Management Costs -
Montrose House 1-3 P 0.387
West Road - Capital funded from
Revenue  1-3 T (0.300)
Care at Home – Draw from reserves 4 T 0.173
Transport (taxi) budget transferred to
HSCP
6 P 0.247
Curator fees budget transferred from
Legal Services
6 P 0.004
Fostering and Kinship – additional SG
funding re increased rates.
6 P 0.486
Commercial Waste  7 P 0.005
Roundings 7  0.001
Social Care Budget Reported at Month 7 147.049
HEALTH Period 
Permanent
or
Temporary
£'m
Initial Baseline Budget     164.500
Month 10-12 Adjustments     2.473
MDT funding     0.828
Adjust for full year impact of part year
amounts     0.052
Revised Baseline     167.853
Baseline Funding Increase     2.164
Adjust for recurring funding     7.629
Adjust for non-recurring     2.434
Resource Transfer     (23.597)
2023/24 Opening Position     156.483
Net impact of Pan Ayrshire Pressures 1 P 0.028
39

Page 40

PUBLIC INFORMATION
Top Slicing Posts 2022-23 2   (0.054)
MDT Funds to Arran Medical Group 3   (0.033)
Training Grade Adjustments 3   (0.035)
Ward 3 Band 2 Domestic 3   (0.004)
V2 B6 to AHM233 3   (0.061)
Virement 12 Band 2 Domestic 4   (0.010)
Virement 18 Band 3 budget transfer - J
Baird 4   0.019
Lymphoedema Top Slice RX 4   (0.029)
HD Ref 51 Band 2-4 4   0.054
District Nursing Anticipated 5  0.032
HD REF 110 Multi-Disciplinary Teams 5  0.120
Post (EB) transferred to Medical Records 5  (0.037)
Integrated Infant Feeding (South) 5  0.057
Integrated Infant Feeding (SG) 5  0.050
2023-24 RX Budget 6  (0.908)
Training Grade ADJ - August 6  0.270
PFG LOCAL IMPROVEMENT 6  0.457
ADP National Mission 6  0.207
ADP Residential Rehab 6  0.094
ADP AFC Pay Uplift 6  0.091
ADP Lived & Living Experience 6  0.009
ADP Drug Prevalence 6  0.059
ADP Whole Family Approach 6  0.066
ADP MAT 70% 6  0.175
HD126: MENTAL HEALTH AFTER COVID
HOSPITALISATION SERVICE 23-24 6  0.039
REMOVE Anticipate MACH (Mental Health
After Covid) 6  (0.102)
HD185: MENTAL HEALTH OUTCOMES
FRAMEWORK 6  2.178
HD227: DELIVERY OF VETERAN
SPECIFIC MENTAL HEALTH SUPPORT 6  0.105
HD229: DIGITAL THERAPY POSTS 6  0.059
COMMUNITY PHLEBOTOMY - NORTH
SHARE 6  (0.039)
SOUTH ADP WARD 5 W/VIEW PAY
UPLIFT 6  0.003
SOUTH ADP ORT PAY UPLIFT 6  0.005
SOUTH ADP PREV&SERVICES
SUPPORT PAY UPLIFT 6  0.004
Apprenticeship Levy 6  0.225
Training Grade ADJ - September 6  (0.007)
ADP PSST Support - South 6  0.008
40

Page 41

PUBLIC INFORMATION
South Naloxone kits 6  0.002
South MAT Funding - Psychiatry 6  0.029
ADP Pay Uplift 6  0.003
Drug Tarif Anticipate 2023-24 6  0.525
North HSCP Medical Pay Award 23/24 6  0.532
LDS Shortfall - Alloway Place 7  (0.008)
TEC (North) to CSS 7  (0.075)
Budget adj for Buvidal use NADARS 7  (0.002)
MH Strategy Action 15 Workforce 23-24 7  0.879
CAMHS IMP - IPCU 7  0.243
CAMHS IMP - INT HOME TREATMENT
TEAMS 7  0.221
CAMHS IMP - OOH UNSCHEDULED
CARE 7  0.148
CAMHS IMP - LD FORENSIC AND
SECURE 7  0.089
HD305: SPECIALIST COM PERINATAL
MH, INFANT MH & NEONATAL
PSYCHOLOGY INTERVENTION 7 
0.373
ANTICIPATE TRANCHE 2: SPECIALIST
COM PERINATAL MH, INFANT MH &
NEONATAL PSYCHOLOGY
INTERVENTION 7 
0.215
DE-ESCALATION ROOMS TO
RESOURCE 7  (0.025)
Hd254 Pharmacy tariff reduction to
reflect historic NRAC share. 7  (0.015)
Hd256 Increase to the pharmacy tariff to
match the actuals on the national allocation
letter. 7 
0.018
Roundings 7  (0.001)
Anticipated budgets included in the report
but not in the ledger 7  3.000
Health Budget Reported at Month 7 164.686    
TOTAL COMBINED BUDGET      311.735 
41

Page 42

42

Page 43

1 
Integration Joint Board
14th December 2023
Subject: Progress update on Implementation of the National
Neurodevelopment Specification and Neurodevelopment
Extreme Team and North Ayrshire Implementation Group
programme of Reform 
Purpose: The report is for:
• Awareness
• Discussion
Recommendation: IJB are asked to:
• Note the successful implementation in Ayrshire and Arran to
meet the National CAMHS Specification from 1st August 2023;
• Note the whole system Pan Ayrshire Extreme Team
programme of work and recommendations to meet the National
Neurodevelopment Specification including the work of the
North Ayrshire Neurodevelopment implementation group. 
Direction Required to
Council, Health Board or
Both 
Direction to: 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
ND Neurodevelopmental Diagnosis
RTT Referral to treatment time
N-CAMHS Neuro- CAMHS
CAMHS Child and adolescent mental health services
DNA Did Not Attend 
1. EXECUTIVE SUMMARY 
1.1 This report provides an update on the implementation of the National
Neurodevelopment Specification, to ensure the IJB are aware of the progress and
supportive of the work required with partner services in the development of
Neurodevelopmental Services for children and young people where there is no co-
occurring mental health presentation.  This development both on a Pan Ayrshire basis
and within HSCP areas is required to meet the National Neurodevelopmental
Specification for Children and Young People:  National Neurodevelopmental
Specification for Children and Young People
Agenda Item 6
43

Page 44

2 
1.2 The National Neurodevelopmental Specification is for children and young people who
have neurodevelopmental profiles with support needs and require more support than
currently available. Prior to 1st August these children were often referred to CAMHS
but did not always meet the mental health criteria described in the CAMHS national
service specification criteria. 
1.3 In Ayrshire and Arran from the 1st of August the CAMHS service is fully compliant with
the national CAMHS specification.  The service will now only accept referrals for young
people requiring a Neurodevelopmental Diagnosis (ND) where there is an underlying
and co-occurring mental health need evident. It is anticipated that CAMHS will be the
first Board area in Scotland to achieve a referral to treatment response time of four
weeks in alignment with the national specification by early 2024.    
1.4 To fully deliver CAMHS in alignment with the National service specification and ensure
the service can maintain performance and clinical standards, referrals are signposted
to alternative pathways for those young people who do not meet the service
specification access criteria. These are largely for young people requiring a
neurodevelopmental diagnosis in the absence of a mental health need which have
historically been accepted before the national specification was developed and now
account for significant waiting times within the CAMHS service. This is required to
ensure safe service sustainability and to enable CAMHS resources to be allocated to
young people with mental health needs in alignment with the CAMHS pathways
developed by the Extreme Team reform work. 
1.5 To ensure delivery development of the National Neurodevelopment specification a
whole system Neurodevelopment Extreme Team was commissioned by the IJB Chief
Officers in May 2023 concluding with recommendations for Transformation reform in
October 2023. 
1.6 A North Ayrshire Neurodevelopment Implementation Group was established in June
2023 to enable local transformation developments to be delivered. 
2. BACKGROUND 
Neurodevelopmental Specification 
2.1 The Children and Young People's Mental Health and Wellbeing Taskforce reported
and recommended in 2019 that Scottish Government and Partners should: "Develop
a Neurodevelopmental Service Specification for use across services in
Scotland".    The Children and Young People’s Mental Health and Wellbeing
Programme Board and the subsequent Joint Delivery Board took responsibility for
developing these principles and standards of care. 
44

Page 45

3 
2.2 The National Neurodevelopmental Specification for children and young people
published in September 2021, is for children and young people who have
neurodevelopmental profiles with support needs and require more support than
currently available.  The Neurodevelopmental Specification highlights a range of
conditions that come under the broad umbrella term of ‘neurodevelopmental’,
including Autism Spectrum Disorder (ASD), Attention Deficit Hyperactivity Disorder
(ADHD), Foetal Alcohol Spectrum Disorder (FASD), Developmental Language
Disorder (DLD). 
2.3 These children have traditionally been referred to Child and Adolescent Mental Health
Services (CAMHS) in Ayrshire and Arran for assessment of neurodevelopmental
condition; however, consistently, around 50% of the children and young people
referred to CAMHS with neurodevelopmental concerns have not met the criteria
detailed in the CAMHS National Service Specification. 
2.4 On 1st August 2023, Ayrshire & Arran CAMHS fully implemented the CAMHS
Specification.  The need for pathways to access assessment and support for Children
and Young People with a neurodevelopmental concern only (i.e., without moderate-
to-severe mental illness) is clearly urgent.   There is a need for ‘whole system’
mobilisation and commitment to meet the needs of this group of young people, who
may require support, access to assessment and, for a proportion, medication.  It
should, however, be noted that although there was a referral pathway to CAMHS prior
to August 2023, the substantial and rapid increase in referrals for neurodevelopmental
assessment resulted in lengthy waiting lists in CAMHS; hence, the removal of this
referral pathway has not, in practice, changed whether an assessment is rapidly
available. 
2.5 Although CAMHS fully implemented its Specification on 1st August 2023, it will
continue to provide assessments for those C&YP referred prior to this date, including
those who do not meet its criteria.  At present, CAMHS has a waiting list of over three
years for neurodevelopmental assessments. The pathways for Children and young
people with mental health and developmental needs requiring specialist intervention
from CAMHS and Paediatric services remain fully operational.  
The Neurodevelopment referrals received that do not meet the CAMHS specification
with no underlying mental health need received from 1st August 2023 to 30th November
2023 are noted in the table below by HSCP area: 
North South East
GPs/Primary care 20 13 20
School/Education 18 40 26
OOA CAMHS 2 0 1
Community Paediatrics 0 2 0
Outpatient MPP 1 0 0 
41 55 47 
45

Page 46

4 
2.6 The referral themes are those related to the following factors: 
• Request for support in school related to attainment.
• Delays with achievement of developmental milestones
• Social isolation 
• ‘Picky eating’ or factors related to disordered eating.
• Behavioural concerns related to ADHD   
It is particularly evident that a timely response to requests from families and carers
who have concerns about their children’s neurodevelopmental profiles and needs, can
reduce family and carer stress and anxiety, and prevent an escalation of risk and
need.
2.7 The National Neurodevelopmental Specification for Children and Young People 2019
(hereon referred to as The Specification) complements and sits within the Getting It
Right for Every Child (GIRFEC) approach. It reflects the principles of the Universal
Health Visiting Pathway (UNRC) and Ready to Act for Allied Health
Professionals.  The Specification aims to ensure that children and families receive the
supports and access to services that meet their needs at the earliest opportunity,
based on the GIRFEC approach. For many children and young people, such support
is likely to be community based, and should be quickly and easily accessible and
proportionate to need.   
2.8 The Specification stresses the need for co-ordinated working between services and
agencies, and shared responsibility for these children and young people, stating that
they will be able to access additional support, appropriate for their
neurodevelopmental needs. Also, that professionals will “provide assessment,
formulation, recommendations, and where appropriate and helpful, diagnostic
assessment for those children and young people to help them understand their
neurodevelopmental differences and support needs”, however that an “understanding
of support needs can be enhanced by diagnosis but should not wait for diagnosis.’ 
2.9 The Specification outlines that children, young people and their families will be able to
access additional support, appropriate for their neurodevelopmental needs, through
universal services, such as via the named person, and community based mental
health and wellbeing supports and services. Universal services should work closely
with professionals working in neurodevelopmental services, relevant health and social
care and education services. These professionals should be linked with CAMHS so
that children and young people with both neurodevelopmental and mental health
support needs can get the additional support they require. 
2.10 Professionals providing support will also provide assessment, formulation,
recommendations, and where appropriate and helpful, diagnostic assessment for
those children and young people to help them understand their neurodevelopmental
differences and support needs. Understanding of support needs can be enhanced by
diagnosis but should not wait for diagnosis.  
46

Page 47

5 
The National Neurodevelopmental Specification sits along the Service Specification
for CAMHS and the same principles underpin both specifications.  There are 7
standards of care set out to provide the minimum stand of care expected from
neurodevelopmental services.   
These are: 
1. High Quality Care and Support that Is Right for Me
2. I am fully involved In the Decisions about my Care
3. I will receive High Quality Assessment, Formulation and Recommendations
that are right for me
4. My Rights are acknowledged, Respected and Delivered
5. I am fully involved in Planning and Agreeing my transitions
6. We fully involve Children, Young People and their Families and Carers
7. I have confidence in the Staff who support Me 
2.11 The specification sits as part of a whole system, with a single point of access, whereby
health, education, social services and third sector professionals actively seek to
understand each other’s unique contributions and respect each other’s areas of
expertise. A stepped and matched care pathway is needed so additional supports for
example from CAMHS can be accessed as needed, this stepped support from
CAMHS is in place in Ayrshire and Arran with the establishment of the
Neurodevelopment CAMHS service. 
2.12 Professional staff supporting the implementation of the neurodevelopmental
specification will include registered children’s professionals with additional training in
47

Page 48

6 
the identification, assessment, and formulation of neurodevelopmental conditions,
including: 
• Speech and Language Therapists
• General Practitioners 
• Paediatricians
• Occupational Therapists
• Peripatetic Teachers
• Educational Psychologists
• Nurses
• Clinical Psychologists
• Social Workers
• Children and Adolescent Psychiatrists 
• Physiotherapists 
This illustrates the whole system approach and range of professionals required to
support young people. 
2.13 A timely response to requests from families and carers who have concerns about their
children’s neurodevelopmental profiles and needs can reduce family and carer stress,
improve confidence in adopting positive and supporting parenting approaches, and
receive support, guidance and interventions that are tailored to the needs of their
children, increasing the prospects of early improvements in outcomes. It is nationally
recognised that the implementation of the neurodevelopmental specification will
reduce the numbers of children and young people referred to CAMHS, and redirected,
as they do not meet the CAMHS referral mental health and risk/impact criteria. 
Neurodevelopmental Empowerment and Support Team (NEST) 
2.14 Across the three Ayrshires, significant progress has been made toward meeting the
principles of the Specification.   For example, the commissioning of the
Neurodevelopmental Empowerment and Support Team (NEST), has provided a
service that can map and co-ordinate community services for individuals and families,
providing training and workshops for families and professionals, often in conjunction
with local clinicians.  Supports are offered regardless of whether a formal diagnosis
has been given to any individual, and NEST is a lifespan approach which provides the
following services and outcomes :   
• Information access – enables up to date, relevant and accessible information is
freely available for the neurodivergent community and professionals across
Ayrshire. Individuals and families will have a good understanding of what a
diagnosis means for them and will be able to make informed decisions. 
• Empowerment Programme – Individuals and families/carers will have a better
understanding of their neurodivergent differences and through the opportunity to
learn, develop strategies and networks will be empowered to live as full a life as
possible. The NSET team, in partnership with individuals, families and
48

Page 49

7 
neurodevelopmental professionals will design and deliver a systematic pan
Ayrshire, needs based. 
• Community/Services - Communities across Ayrshire will be more tolerant and
understanding of the needs of neurodivergent individuals. This tolerance and
understanding will provide a marked improvement in access and opportunity for
neurodivergent individuals and families. Local services will be aware of the needs
of our neurodivergent community and will systematically incorporate solutions to
these needs into their service delivery. 
2.15 These core critical outcomes are being delivered through collaborative working with
neurodivergent individuals, their families, clinicians, third sector and services across
Ayrshire. 
2.16 This is a unique life span population wide universal service and an examplar across the
rest of Scotland in building a cohesive lifespan pathway of supports to people with
neurdivergent needs.  The NEST service provides the building blocks and foundation in
Ayrshire and Arran to taking forward the full implementation of the Neurological
Specification. 
2.17 Additional funding has been made available to NEST, from the three Health and Social
Care Partnerships, to increase its staff group and provide more localised support
within each of the Ayrshires and a successful recruitment programme has been
completed.   
2.18 In addition, North Ayrshire, through the support of the Children’s Services Strategic
Partnership (CSSP) has also committed a further £400k from the Whole Family
Wellbeing Fund to expand the Family Centred Wellbeing Service (FCWS) from its
current delivery in Irvine and Three Towns, to Kilwinning and the Garnock Valley.  This
will be a multi-disciplinary service, providing pre- and post-assessment family support
to children, young people, and their families in North Ayrshire where there are NDDs. 
The team will work closely with the Neurodevelopmental Empowerment and Strategy
Team (NEST) and will align to existing models of requests for assistance within
children’s services (e.g. Named Person/ Lead Professional RFA to the requested
service). 
2.19 The existing team of 4 x  Grade 7 Family Wellbeing Workers would be expanded as
follows:
• 10 x Grade 7 Family Workers – allowing for 2 workers per mainland locality and
1 in Arran, and 3 to support on a peripatetic basis.
• 1 x Band 6 Speech and Language Therapist
• 1 x Band 6 Occupational Therapist
• 1 x Grade 4 Admin Assistant 
• 1 x Grade 12 Team Manager 
49

Page 50

8 
2.20 The proposed model will ensure equity of access and provision across the whole of
North Ayrshire, ensuring clear pathways of support and resilience from a broader
team. Building on the Family Centred Wellbeing Service is a welcomed development
and builds in the existing strengths of the team who currently are supporting a number
of families with neurodiversity needs. 
Pan Ayrshire Extreme Team 
2.21 Through the commissioning of a C&YP Neurodiversity Extreme Team by the three
Health and Social Care Partnership Chief Officers in May 2023, work has begun
across the whole system to explore and design an alternative approach to support,
assessment and treatment of children where there may be a concern regarding a
neurodevelopmental condition. 
2.22 However, it has become apparent that this is a complex area of work which requires
cultural change, clear leadership, and additional investment to meet the growing need,
while at the same time maximizing the understanding and access to the existing
supports and services that are available for children and young people through each
locality.   
2.23 The Extreme Team established in May 2023 with multiagency whole system partners
from Children’s services, Paediatric services, Education, Mental Health and Primary
Care  has been commissioned to enable a whole system response to the reform
question: 
“In light of the CAMHS and Neurodevelopmental National Specifications, what are;
Ayrshire and Arran, the three HSCP’s, three Councils and their partners doing to
provide timeous access to Neurodevelopmental Assessments, and how can the
“whole system” provide high quality supports to those children and families where
such concerns are identified at an early stage.” 
2.24 The workstreams subsequently developed in response to this reform question
required a significant amount of information gathering, national and local research to
be undertaken to establish what is currently in place and areas of further development
required. 
2.25 The workstreams and scopes identified by the Extreme Team included the following
areas of enquiry: 
1. To have a full appreciation of the data around the number of Children and young
people who would typically be referred to CAMHS with a Neurodevelopmental
concern but do not have a Mental Health condition.   In particular, 
• What is this for Ayrshire and Arran?
• How does this break down by Locality, North, South and East HSCP and
Councils?
• Where do referrals come from in each locality?
50

Page 51

9 
2. To understand what other supports and services are already available across the
“whole system” to assessment and support Neurodevelopmental concerns, such
as; 
• Universal services, (including targeted support) in Education Health and
HSCPs 
• Children Services Planning Partnerships 
• Community Mental Health Supports delivered or commissioned locally. 
• Whole Family Wellbeing fund and resources available to children and young
people
• Existing specialist services, within Health (Community Paediatrics) and
those commissioned Services (Purple House). 
• The contribution by the Third Sector
• What is the co-ordination and governance structure across these services? 
3. To develop a clear communication strategy to support a well-informed
understanding of Neurodevelopmental concerns and engagement with key whole
system stakeholders and referring agencies. 
4. To develop pathways for assessment and access to services for children with
Neurodevelopment concerns, within Ayrshire and Arran and task each Children
Services Planning Partnership to consider the use of existing resources to deliver
on Neurodevelopment supports locally. 
5. To underpin that the access to assessment and supports for children and young
people with Neurodevelopmental concerns and their families, is a duty and
responsibility of the “Whole System”. That this duty is underpinned by GIRFEC
(and its refresh), The Promise, and the Additional Support for Learning Act. As
well as the national specifications mentioned above on CAMHS and
Neurodevelopment. 
6. Ensure there are appropriate screening and access criteria in place and pathway
development to ensure appropriate and meaningful signposting to the right
service or supports at the right time. 
7. Timely access to neurodevelopmental assessment, diagnosis and interventions
or medical treatments and prescribing where required and clarity about how this
is to be delivered. 
8. Involvement of children, families, and people with lived experience in shared
planning and local decision making 
9. To understand the current and anticipated future demand for
neurodevelopmental assessments for C&YP to guide resource planning.  This
is essential to be able to endorse a model that will be sustainable. 
51

Page 52

10 
10. Consideration of Digital solutions to improve timely access to the right supports
including the development of a SPOC and Directory of Services. 
2.26 In addition to the work of the Extreme Team each HSCP area has been requested
to establish a Neurodevelopment Implementation Group to deliver local planning and
tailored solutions. 
3 PROPOSALS 
3.1 The Pan Ayrshire and Arran Children and Young People Extreme Team has now
concluded and delivered on the original commission. There has been full engagement
and scoping of the issues identified for resolution. Through the process of “Extreme
Teaming” there is now whole system acknowledgement that there requires to be a
reformed approach to accessing support for neurodivergent children and young
people who require it across Ayrshire and Arran. 
3.2 Pan Ayrshire whole system engagement workshops have been undertaken and
through these an exemplar model of practice proposed which will require further local
development and tailoring. 
3.3 The proposal is to now move to a Transformation Programme Board for
Neurodevelopmental Support and Assessment for Children and Young people on a
pan Ayrshire and Arran basis, this will focus on six distinct areas: 
• Access to robust guidance, information, and family support within localities.
• Access to pan Ayrshire diagnostic assessments where appropriate.
• Access to prescribing services medication and monitoring of medication use
where required.
• Access to supports via a locality-based SPOC.
• Access and use of evidence based innovative digital tools, in the first instance
Strata Digital SPOC with Decision Support, Essence D and the national ALLIS
database.
• To develop a business case for investment to ensure a sustainable approach
to Neurodevelopmental needs across Ayrshire and Arran. 
Specifically, the Transformational Programme Board will: 
• Undertake an options appraisal and agree the fundamentals of an exemplar model,
this model is currently in development. 
• Support the locality implementation groups, building on and developing a locality
approach built around the seven standards of care, laid out in the national
specification, and the essential local learning from the engagement work of the
Extreme Team.   
52

Page 53

11 
3.4 The Extreme Team requested that each of the Locality areas establish an
implementation group to ensure local detailed work is taking place. North Ayrshire has
established this group in June 2023 while East and South Ayrshire are at the early
stages of establishing these. 
3.5 The North Ayrshire Locality Implementation group has been established since
June 2023 and has been developing a programme of reform work in North Ayrshire
based on five key areas: - 
1. Family Support
Workstream is currently scoping existing support within North Ayrshire for children
with Neurodevelopmental Differences (NDD), predominantly focusing on
community and universal support.  The work will also identify gaps in provision
and look to identifying solutions.  From this, a directory of family support will be
made available which will be held centrally.  Further, North Ayrshire’s Children’s
Services Strategic Partnerships agreed a significant investment from the Scottish
Government’s Whole Family Wellbeing Fund (£600,000 per annum for the life of
the fund) into an expansion of the current Family Centred Wellbeing Service to
enable it to become a hub of early family support for children with NDD.  The NEST
team provision in North Ayrshire has also received investment with the additional
staff recruited that will focus on North Ayrshire support network and building
community capacity. 
2. Children’s Services’ Workforce Development 
The Group is currently in the process of commissioning a training needs analysis
for the children’s services’ workforce including health visiting, education, school
nursing, Allied Health Professionals and primary care to determine the baseline of
confidence and competence in supporting children with NDD and their families. 
This will inform a comprehensive training plan for the North Ayrshire workforce. 
3. Multi-agency Screening and Assessment 
Build on and develop the Pan Ayrshire exemplar model and tailor this for North
Ayrshire by identifying and confirming a local Single Point of Contact (SPOC) to
ensure “No Wrong Door” and an equitable locality response to receiving and
screening referrals, and accessing and sign posting children, young people and
their families to the right support, assessment at the right time, right place, every
time. The form and function of our proposed exemplar model will require to be
developed over the next 12 months as part of a whole system Business Case. 
North Ayrshire is currently testing a screening panel which will support
professional discussions around requests for assessment and diagnosis in the
main but will also be linked in with community and universal supports where these
are deemed more appropriate.  The Panel needs to form part of a clear pathway
for children which is supported by GIRFEC and aligns to wellbeing assessments
and the role of named person and lead professional.  The MAP will also provide a
route to any newly commissioned services, including prioritisation of those children
who they believe to be in need of a diagnostic assessment.
53

Page 54

12 
4. Children and families’ engagement
Building on the quality engagement work undertaken with families over the
summer, the Implementation Group will undertake further detailed engagement
with families who have received support or who are awaiting support, to inform
progress in North Ayrshire.  This will take the form of focus groups and interviews
with individuals, and seeks to also hear the voice of the child through direct
involvement with children and young people. 
5. Digital transformation
Liaise with the NHS Ayrshire & Arran Mental Health Digital Transformation group
to consider digital options to facilitate effective and efficient operational referral
management and access to appropriate supports and services for the local and
Ayrshire wide digital solutions. The SPOC/MAP and all pathways into services will
be enabled and have access to a range of digital tools. In the first instance these
will be facilitated through a pilot of STRATA Digital SPOC and a programme of
work in collaboration with Glasgow University utilising an integrated assessment
approach: ‘Essence D’. The Full Business Case will include the associated costs
of digital which will be directly related to whole system outcomes. 
3.6 In addition, North Ayrshire’s Implementation Group aims to: 
• Engage with all appropriate experts and leadership to contribute to and support
the development of a pathway for prescribing and monitoring, as developed by the
Transformational Programme Board. 
• To deliver on the Communication Scope undertaken by the Pan Ayrshire Extreme
Team and, 
• Develop a North Ayrshire focused engagement plan. 
3.7 There is unanimous agreement by the Pan Ayrshire Extreme Team and the North
Ayrshire Implementation group that any model developed must be predicated on the
provision of support first and foremost. 
3.8 In line with the specification and feedback from local and Pan Ayrshire engagement,
it is also accepted that there must be full consideration given to the availability of a
diagnostic assessment.  The development of such a service is complicated by the
following factors: 
• The extremely high demand there is for an assessment service, leading to a risk
that any assessment service becomes overwhelmed rapidly, leading to extensive
waiting lists and difficulties with recruitment and retention of professionals involved
in delivering assessments.
• Resource requirements to deliver or commission a diagnostic assessment service.
• Local differences on what professionals would be involved in assessment.
• Local and national work force limitations in the professions who could form an
assessment team. 
54

Page 55

13 
3.9 It is proposed that diagnostic services are commissioned initially, (for up to 12 months)
until a local diagnostic solution can be developed. 
3.10 The North Ayrshire implementation group are currently assessing demand and
modelling what will be required with access criteria on a short-term basis as a business
case with future workforce plans are developed and appropriate resources identified.   
3.11 Anticipated Outcomes 
IJB has assurance that risks are identified and managed appropriately to ensure the
safe and sustainable delivery of the National Neurodevelopment Specification.  
Ayrshire and Arran will have a sustainable and world class CAMHS service that meets
the needs of young people that require support under the national CAMHS service
specification. 
Full alignment and compliance with the national CAMHS service specification with
improved Children and Young People’s Mental health and wellbeing outcomes, timely
access to services and support to Children, young people, and their families at a
locality level in alignment with the CAMHS extreme team reform question. 
The positive delivery of a whole system Neuro-developmental Service in Ayrshire and
Arran.  CAMHS will be able to progress through the current Neurodevelopmental list
more timeously and be able to offer more therapeutic interventions. Young people
coming through N-CAMHS will be seen by the right person, in the right place at the
right time. 
Opportunity for whole system partnership approach to developing alternative service
or community wellbeing solutions for young people that do not need a CAMHS referral
and building on the good practice already being commissioned by Education and
Children’s services across the whole system. 
3.12 Measuring Impact 
CAMHS can monitor the number of referrals that come to the N-CAMHS service and
the referrals that are meaningfully redirected to more appropriate partner services. 
Benson Wintere has been commissioned since 2020 and is able to produce locality
and school level information on referral activity, work force modelling, capacity, and
demand with live dashboards to reflect service activity. This information is utilised to
continue to inform wholes system service planning and workforce development. 
Common themes from the referrals received from 1st August relate to :- 
• Support in school for attainment, 
• Not meeting milestones, 
• Sleep, 
• Social isolation, 
55

Page 56

14 
• Picky eating and, 
• Behavioural concerns in relation to ADHD as there is still no agreement around
medication. 
A multiagency panel continues to review referrals across the system to monitor need
and ensure that appropriate supports are in place. 
HSCP engagement officers continue to facilitate engagement and consultation with
both adults and children and young people in service design and to inform service
improvements. 
4. IMPLICATIONS 
4.1 Financial
Creating a Neuro-developmental Service for Children and Young People who do not
meet the CAMHS Specification will require financial investment from system partners,
as the model and pathways are designed and developed the financial implications will
be quantified.  There is no funding provided or aligned to the National Neuro
specification. 
• Each locality must develop a future model of care involving a Single Point of
Contact (SPOC)/Multi agency Panel with pathways for diagnosis and prescribing
that will ensure the future needs of local people can be met.  This will require
investment into new systems and structures. 
• For diagnostic services, until the workforce and recruitment requirements have
been addressed to enable a mainstream delivery of service, access to
assessments must be available for each locality.  This will need to be locally
determined and based on proposed locality arrangements, access criteria and
demand modelling. This temporary interim allocation will ensure continuation of
necessary assessment and diagnosis and management of waiting lists while a full
business case is written. 
• There will be a future financial requirement for prescribing and monitoring services,
particularly if this involves General Practice and Advanced Specialist prescribing
skills and roles. This new innovative model requires further development, however
without this type of approach the current models will be unable to deliver
prescribing and monitoring for the future predicted numbers within our local
population. 
• Each locality will require to be supported to further develop and implement their
own family support service, considering whole family wellbeing and linking this to
Children Service Planning. These supports will be accessed through the proposed
SPOC/MAP. In North Ayrshire the CSSP group has identified additional resources
to enhance an existing family support model. A recruitment programme is
underway to enable the expanded service to be launched.  Additional investment
has also been provided to enhance the Pan Ayrshire NEST service.   
56

Page 57

15 
• The management of a Pan Ayrshire Transformation programme and development
of a future business case will require experienced programme management and
support capacity to be identified. The Pan Ayrshire Extreme team have
recommended a contribution from each locality to dedicated programme
management and administration. 
• Any digital tools and solutions will require prioritisation and further investment. Both
Strata Digital SPOC and Essence D have one-year non-recurring funding. 
4.2 Human Resources
In North Ayrshire a training needs analysis has been commissioned by the
Neurodevelopment implementation group and the whole system workforce will need
to undertake elements of retraining and operate new roles to meet future models of
care. It is likely that following business case development and workforce planning that
the whole system workforce will also need to increase in the future to meet anticipated
and current demand trajectories. 
4.3 Legal
There are a group of children who, due to their lack of capacity, require guardianship
orders to be put in place via the Scottish Court system from the age of 16 years. This
legal issue and its implications for child psychiatry require further exploration. 
4.4 Equality/Socio-Economic
A full equality impact assessment will be required. There is inherent risk of inequality
between and across the respective localities if there is significant deviation from the
proposed exemplar model framework. The prescribing and monitoring pathways may
require to be pan Ayrshire due to interdependency with other pan Ayrshire services. 
4.5 Risk
In North Ayrshire a multi-agency panel continues to monitor referral activity and
ensure that referrals are redirected to appropriate supports, monitor risk, and ensure
appropriate escalation where additional intervention or assessment may be required. 
4.6 Community Wealth Building
None
4.7 Key Priorities
Meets Caring for Ayrshire, GIRFEC, The Promise, HSCP strategic objectives,
Ayrshire conversation Mental Health priorities, Mental Health and wellbeing strategy. 
Delivery of a fully resourced and compliant Neurodevelopment service in alignment
with the national specification is a key national and local HSCP strategic priority. This
will enable full realisation of investment for Children and Young people’s Mental health
in Ayrshire and Arran, improving mental health and wellbeing and enabling timely
access for young people and their families to the right service or support in the right
place and the right time. 
57

Page 58

16 
It is a key priority of all Partners across the whole system to ensure that there are fully
developed wellbeing services and supports for Children, young people, and their
families and to enhance current models of best practice in relation to
neurodevelopment diagnostic and support provision. This is evidenced by the initial
investments by the three HSCP’s in the NEST service and Autism support Ayrshire
which provide information, training and community supports at a population wide
universal level.     
5. CONSULTATION 
A Pan Ayrshire community engagement survey has been undertaken. Users of the
service, stakeholders, workshops, and the Extreme Team members have informed
the proposals within this paper. 
6. CONCLUSION 
IJB are asked to:
• Note the successful implementation in Ayrshire and Arran of delivery of the
National CAMHS Specification with improved service access response times for
children and young people with underlying mental health needs. 
• Note the outcome of the Pan Ayrshire Extreme team proposals with development
of a local and Pan Ayrshire Transformation programme. 
• Note the significant progress and reform work underway within North Ayrshire by
the North Ayrshire Neurodevelopment implementation group.
• Note the significant investment in North Ayrshire in development of Family Support
services. 
Caroline Cameron, Director, NAHSCP
Thelma Bowers, Head of Service, Mental Health, 
thelmabowers@north-ayrshire.gov.uk,
01294 317849 
58

Page 59

1 of 7
Paper 20
NHS Ayrshire & Arran
Meeting:  Ayrshire & Arran NHS Board
Meeting date: Monday 4 December 2023 
Title: Whistleblowing Report: Quarter 2, July to 30 September
2023 
Responsible Director:  Jennifer Wilson, Nurse Director 
Report Author: Karen Callaghan, Corporate Governance Coordinator 
1. Purpose 
This is presented to the NHS Board for: 
• Discussion 
This paper relates to: 
• Government policy/directive 
This aligns to the following NHSScotland quality ambition(s): 
• Safe
• Effective
• Person Centred 
2. Report summary 
2.1 Situation
The National Whistleblowing Standards and Once for Scotland whistleblowing policy
(the Standards) were introduced on 1 April 2021.  NHS Board Members are asked to
discuss the report on organisational activity in relation to whistleblowing concerns
raised in Quarter 2 (July – September 2023).   
2.2 Background 
The National Whistleblowing Standards (the Standards) set out how the Independent
National Whistleblowing Officer (INWO) expects all NHS Boards to manage, record
and report whistleblowing concerns.  It is a requirement of the Standards that
whistleblowing data is reported quarterly to the NHS Board and under our local
governance arrangements to NHS Board.   
The Standards also require that Boards publish an annual report setting out
performance in handling whistleblowing concerns.  The annual report will summarise
and build on the quarterly reports produced by the board, including performance
against the requirements of the Standards, Key Performance Indicators (KPIs), the
issues that have been raised and the actions that have been or will be taken to
improve services as a result of concerns.  
Agenda Item 7
59

Page 60

2 of 7 
In NHS Ayrshire & Arran the agreed governance route for reporting on whistleblowing
is to Staff Governance Committee and then to the NHS Board.  The NHS Board report
will be shared with Integration Joint Boards following the NHS Board meeting. 
This report provides information in accordance with the requirements of the
Standards.  This provides information on our performance for Quarter 2 (July –
September 2023).   
2.3 Assessment
Appendix 1 provides details of Whistleblowing concerns raised across the
organisation by staff and those who provide services on behalf of NHS Ayrshire &
Arran.  This demonstrates our performance in the national key indicators as required
by the INWO and includes key areas of Whistleblowing handling, as well as
highlighting outcomes and providing more detail on Whistleblowing themes. Over
time, this approach will illustrate trends and more importantly, allow us to evidence
necessary improvement and learning in response to the trends and themes
demonstrated. 
The report at Appendix 1 provides performance information on: 
• Whistleblowing concerns raised
• Learning, changes or improvements to service or procedures
• Experience of individual raising concern/s
• Level of staff perceptions, awareness and training
• Whistleblowing themes, trends and patterns 
2.3.1 Quality
Procedures for raising concerns should provide good-quality outcomes through a
thorough but proportionate investigation.  The approach to handling whistleblowing
concerns ensures that learning and improvement is progressed for upheld
whistleblowing concerns and are shared across all relevant services. 
2.3.2 Workforce 
The Standards support our ambition for an open and honest organisational culture
where staff have the confidence to speak up and all voices are heard.  This is focused
through our organisational Values of ‘Caring, Safe and Respectful’ and promoting a
culture of psychological safety.   
2.3.3 Financial
There is no financial impact. 
2.3.4 Risk assessment/management
If staff do not have confidence in the fairness of the procedures through which their
concerns are raised, or do not feel assured that concerns raised will be acted upon,
there is a risk that they will not raise valid concerns about quality, safety or
malpractice. The opportunity to investigate and address these concerns will have
been lost, with potentially adverse impact on quality, safety and effectiveness of
services.   
There is also a wider risk to organisational integrity and reputation, if staff do not
believe they will be listened to and do not feel senior leaders in NHS Ayrshire & Arran
60

Page 61

3 of 7
are fulfilling the organisation’s Values of ‘Caring, Safe and Respectful’ and promoting
a culture of Psychological Safety.   
2.3.5 Equality and diversity, including health inequalities
A local Equality Impact Assessment (EQIA) for the Standards is in place and
published on our public facing web.  This assesses the impact of the Whistleblowing
Standards on staff and those who provide services on behalf of the NHS with
protected characteristics.   
2.3.6 Other impacts
• Best value: Governance and accountability and Performance management. 
The delivery of an effective process for whistleblowing concerns will support the
Board’s commitment to safe, effective and person-centred care. Effective
handling of concerns supports the delivery of the Healthcare Quality Strategy.
• Compliance with Corporate Objectives - Create compassionate partnerships
between patients, their families and those delivering health and care services
which respect individual needs and values; and result in the people using our
services having a positive experience of care to get the outcome they expect. 
2.3.7 Communication, involvement, engagement and consultation 
There is no requirement for formal engagement with external stakeholders in relation
to the formulation of this paper. There has been wide communication of the Standards
across the organisation. 
2.3.8 Route to the meeting
This has been previously considered by the following groups as part of its
development. The groups have either supported the content, or their feedback has
informed the development of the content presented in this report. 
• Whistleblowing Oversight Group on 17 October 2023
• Staff Governance Committee on 07 November 2023 
2.4 Recommendation
For discussion.  Board Members are asked to discuss the performance report in
relation to concerns raised in Quarter 2 (July – September 2023). 
3. List of appendices 
• Appendix 1 - Whistleblowing Report for Quarter 2 July to September 2023.  
61

Page 62

4 of 7
Appendix 1 - Whistleblowing Report Quarter 2 – July to September 2023. 
1. Introduction 
This report provides details of Whistleblowing concerns raised across the organisation by
staff and those who provide services on behalf of NHS Ayrshire & Arran.  This report will
demonstrate our performance in the national key indicators as required by the INWO and
includes key areas of Whistleblowing handling, as well as highlighting outcomes and
providing more detail on Whistleblowing themes. Over time, this approach will illustrate
trends in and more importantly, allow us to evidence necessary improvement and learning in
response to the trends and themes demonstrated. 
2. Whistleblowing handling performance 
2.1 Whistleblowing concerns received
Table 1 below shows the total number of concerns received in quarter 2 through the
whistleblowing process. 
Total no of concerns
received Q2
Appropriate for WB Stage 1 Stage 2
2 1 0 1
Table 1 
No immediate risk was identified to patient safety in the concerns received in Q2, no action
required.     
Both concerns were reviewed by the Whistleblowing Decision Team (WDT).  The WDT
agreed that one of the concerns raised was not appropriate to be reviewed using the
Standards as it related to personal experience.  The individual who raised the concern was
advised the most appropriate route to take their concerns forward.  These included the use of
the NHSScotland Workforce Investigation Policy. 
The concern taken forward is a monitored referral from the Independent National
Whistleblowing Officer (INWO), this is a result of the individual contacting the INWO for
advice.  We provide the INWO with regular updates on progress.   
Chart 1 below shows the total number of concerns raised and progressed as whistleblowing
in 2023/24.  Concerns received are represented by the blue columns and the number
progressed by the orange column.  The investigation taken forward as Whistleblowing is
ongoing, this is due to the complex nature of the concerns raised.     
Chart 1 
0
1
2
3
4
April May June July Aug Sept
2023/24 concerns raised and progressed
Received Progressed
62

Page 63

5 of 7
2.2 Concerns closed 
The table below provides the numbers of concerns closed at Stage 1 and Stage 2 of the
procedure as a percentage of all concerns closed in Q2. 
The concern taken forward as Whistleblowing in Q2 is ongoing, this is due to the complexity
of the concern raised.  The investigation period for this investigation has been extended
beyond the 20 working day timescale.  The Whistleblower is aware of the need to extend the
investigation period. 
Total no of concerns
received Q2
Nos closed Nos ongoing % Closed against all received
Stage 1 0 - - -
Stage 2 1 0 1 0%
Table 2 
Table 3 shows the performance against the 20 working days target in 2023/24 of concerns
progressed at Stage 2. 
Whistleblowing
cases 2023/24
Number  Comments
Q2 1 Ongoing > 20 working days (excludes public holidays)
Table 3 
2.3 Concerns outcomes 
This section provides detail on concerns upheld, partially upheld and not upheld at each
stage of the whistleblowing procedures as a percentage of all concerns closed in full at each
stage.   
As the investigation for the concern received in Q2 is ongoing there is no outcome. 
2.4 Responding to concerns
As the investigations into the concerns received in Q2 is ongoing it is not possible to provide
the time in working days for a full response. 
2.5. Breakdown of concerns by service 
The Q2 concern received relates to Ayrshire Central Hospital (ACH), North Ayrshire Health
and Social Care Partnership (NA HSCP). 
3. Learning, changes or improvements to service or procedures 
Table 5 shows the status of improvement plans from concerns raised in 2021-22 and
2022/23.  Of the plans that remain open progress is ongoing.  The plans remain open until
all actions are complete.  Progress continues to be monitored through Directorate
Governance routes with feedback on closure to the Whistleblowing Oversight Group. 
Number Investigations
complete
Number Improvement
Plans
Number Learning Plans
In Progress Closed In Progress Closed
2021/22 5 1 3 0 1
2022/23 1 1 0 - -
Table 4 
At this time there is no data for 2023/24 as investigation is ongoing. 
63

Page 64

6 of 7 
4. Experience of individuals raising concern/s 
All those who raise concerns are given the opportunity to feedback on their experience of
using the Whistleblowing procedure in order that we can learn and make any improvements
in our processes as appropriate. 
An anonymous feedback survey is shared with all those involved on completion of the
investigation.  This includes the individual who raised the concern and those involved with the
investigation.   
Feedback provided will be reported in future reports, where this can be shared without
compromising confidentiality.  Returns to date have been limited 
5. Level of staff perception, awareness and training 
Communication continues to be shared widely across the organisation, via 800+ managers,
for use in team meetings, noticeboards and shared work spaces.  Also communication via
Daily Digest and weekly e-News has been refreshed and continued.   
Whistleblowing continues to be highlighted to new staff as part of Corporate Induction
Programme and to newly appointed managers and leaders during training sessions.     
It is no longer mandatory for staff to undertake the eLearning Whistleblowing Turas
Module it is mandatory for all management level staff, supervisors, line managers, those
who may receive concerns, Speak Up Advocates, Confidential Contacts and those
involved in Whistleblowing investigations.  To date approximately 67% of line managers
and senior managers have completed the appropriate Turas modules, this is an increase
of 2% on the previous quarter. 
This year’s iMatter survey included two statements specifically relate to raising concerns.
These were: 
1. I am confident that I can safely raise concerns about issues in my workplace;
2. I am confident that my concerns will be followed up and responded to. 
Of the 8738 staff who responded 89% of respondents agree or strongly agree with
statement 1 and 82% of respondents agree or strongly agree with statement 2.   
6. Whistleblowing themes, trends and patterns 
This section provides information on themes from whistleblowing concerns raised and will aid
identification of any improvement priorities, and to progress learning in a targeted manner.   
64

Page 65

7 of 7
The one concern taken forward in Q2 had multiple themes. 
Table 5 
7.  Independent National Whistleblowing Officer referrals and investigations
A clear indicator of the satisfaction of those who raise concerns can be derived from the
number of concerns that are escalated to the Independent National Whistleblowing Officer
(INWO).  At this current time, there have been no referrals to the INWO. 
8.  2022/23 Case Update 
Table 6 below provides an update on the position of the investigations which were ongoing
from Q3 and Q4 2022/23.  Of the three cases that remained open one has been closed with
the concern recorded as partially upheld.  This means that following investigation and review
of evidence some of the concerns raised in this whistleblowing case were upheld but some
were not. 
Update for Stage 2
Concern 2022/23
Area Ongoing  Closed Not
Upheld
Partially
Upheld
Fully
Upheld
Q3 ISS 1 - - - -
Q3 EAHSCP - 1 - 1 -
Q4 Acute- UHA 1 - - - -
Table 6 
9. Update 
• Confidential Contacts: 
A Sway communication was shared across the organisation via Daily Digest, eNews and by
email to the 700+ line managers, to introduce and raise awareness of the new Confidential
Contacts who were appointed in August 2023. 
• National Speak Up Week: 
Is an annual engagement event launched by the INWO in 2022, NHS Ayrshire & Arran
supported National Speak Up week, which took place from 2 to 6 October 2023.  The
purpose of this was to provide an opportunity for Boards to promote and celebrate speaking
up.  We engaged with staff at various locations across the organisation, this included Acute
and HSCP sites.  The programme of events included face to face drop in sessions and a
Whistleblowing Ask Me Anything via MS Teams. 
Theme 2021/22 2022/23 2023/24
Q1–Q4 Q1-Q4  Q1 Q2
Patient Care 4 2 0 1
Patient Safety 4 2 0 1
Poor Practice 3 2 0 1
Unsafe working conditions 0 1 0 1
Fraud 1 0 0 0
Changing or falsifying information about performance 0 1 0 1
Breaking legal obligations 0 1 0 0
Abusing Authority 0 1 0 0
65

Page 66

66