Integration Joint Board
14th December 2023
Subject: Progress update on Implementation of the National
Neurodevelopment Specification and Neurodevelopment
Extreme Team and North Ayrshire Implementation Group
programme of Reform 
Purpose: The report is for:
• Awareness
• Discussion
Recommendation: IJB are asked to:
• Note the successful implementation in Ayrshire and Arran to
meet the National CAMHS Specification from 1st August 2023;
• Note the whole system Pan Ayrshire Extreme Team
programme of work and recommendations to meet the National
Neurodevelopment Specification including the work of the
North Ayrshire Neurodevelopment implementation group. 
Direction Required to
Council, Health Board or
Both 
Direction to: 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
ND Neurodevelopmental Diagnosis
RTT Referral to treatment time
N-CAMHS Neuro- CAMHS
CAMHS Child and adolescent mental health services
DNA Did Not Attend 
1. EXECUTIVE SUMMARY 
1.1 This report provides an update on the implementation of the National
Neurodevelopment Specification, to ensure the IJB are aware of the progress and
supportive of the work required with partner services in the development of
Neurodevelopmental Services for children and young people where there is no co-
occurring mental health presentation.  This development both on a Pan Ayrshire basis
and within HSCP areas is required to meet the National Neurodevelopmental
Specification for Children and Young People:  National Neurodevelopmental
Specification for Children and Young People

Page 2

2 
1.2 The National Neurodevelopmental Specification is for children and young people who
have neurodevelopmental profiles with support needs and require more support than
currently available. Prior to 1st August these children were often referred to CAMHS
but did not always meet the mental health criteria described in the CAMHS national
service specification criteria. 
1.3 In Ayrshire and Arran from the 1st of August the CAMHS service is fully compliant with
the national CAMHS specification.  The service will now only accept referrals for young
people requiring a Neurodevelopmental Diagnosis (ND) where there is an underlying
and co-occurring mental health need evident. It is anticipated that CAMHS will be the
first Board area in Scotland to achieve a referral to treatment response time of four
weeks in alignment with the national specification by early 2024.    
1.4 To fully deliver CAMHS in alignment with the National service specification and ensure
the service can maintain performance and clinical standards, referrals are signposted
to alternative pathways for those young people who do not meet the service
specification access criteria. These are largely for young people requiring a
neurodevelopmental diagnosis in the absence of a mental health need which have
historically been accepted before the national specification was developed and now
account for significant waiting times within the CAMHS service. This is required to
ensure safe service sustainability and to enable CAMHS resources to be allocated to
young people with mental health needs in alignment with the CAMHS pathways
developed by the Extreme Team reform work. 
1.5 To ensure delivery development of the National Neurodevelopment specification a
whole system Neurodevelopment Extreme Team was commissioned by the IJB Chief
Officers in May 2023 concluding with recommendations for Transformation reform in
October 2023. 
1.6 A North Ayrshire Neurodevelopment Implementation Group was established in June
2023 to enable local transformation developments to be delivered. 
2. BACKGROUND 
Neurodevelopmental Specification 
2.1 The Children and Young People's Mental Health and Wellbeing Taskforce reported
and recommended in 2019 that Scottish Government and Partners should: "Develop
a Neurodevelopmental Service Specification for use across services in
Scotland".    The Children and Young People’s Mental Health and Wellbeing
Programme Board and the subsequent Joint Delivery Board took responsibility for
developing these principles and standards of care.

Page 3

3 
2.2 The National Neurodevelopmental Specification for children and young people
published in September 2021, is for children and young people who have
neurodevelopmental profiles with support needs and require more support than
currently available.  The Neurodevelopmental Specification highlights a range of
conditions that come under the broad umbrella term of ‘neurodevelopmental’,
including Autism Spectrum Disorder (ASD), Attention Deficit Hyperactivity Disorder
(ADHD), Foetal Alcohol Spectrum Disorder (FASD), Developmental Language
Disorder (DLD). 
2.3 These children have traditionally been referred to Child and Adolescent Mental Health
Services (CAMHS) in Ayrshire and Arran for assessment of neurodevelopmental
condition; however, consistently, around 50% of the children and young people
referred to CAMHS with neurodevelopmental concerns have not met the criteria
detailed in the CAMHS National Service Specification. 
2.4 On 1st August 2023, Ayrshire & Arran CAMHS fully implemented the CAMHS
Specification.  The need for pathways to access assessment and support for Children
and Young People with a neurodevelopmental concern only (i.e., without moderate-
to-severe mental illness) is clearly urgent.   There is a need for ‘whole system’
mobilisation and commitment to meet the needs of this group of young people, who
may require support, access to assessment and, for a proportion, medication.  It
should, however, be noted that although there was a referral pathway to CAMHS prior
to August 2023, the substantial and rapid increase in referrals for neurodevelopmental
assessment resulted in lengthy waiting lists in CAMHS; hence, the removal of this
referral pathway has not, in practice, changed whether an assessment is rapidly
available. 
2.5 Although CAMHS fully implemented its Specification on 1st August 2023, it will
continue to provide assessments for those C&YP referred prior to this date, including
those who do not meet its criteria.  At present, CAMHS has a waiting list of over three
years for neurodevelopmental assessments. The pathways for Children and young
people with mental health and developmental needs requiring specialist intervention
from CAMHS and Paediatric services remain fully operational.  
The Neurodevelopment referrals received that do not meet the CAMHS specification
with no underlying mental health need received from 1st August 2023 to 30th November
2023 are noted in the table below by HSCP area: 
North South East
GPs/Primary care 20 13 20
School/Education 18 40 26
OOA CAMHS 2 0 1
Community Paediatrics 0 2 0
Outpatient MPP 1 0 0 
41 55 47

Page 4

4 
2.6 The referral themes are those related to the following factors: 
• Request for support in school related to attainment.
• Delays with achievement of developmental milestones
• Social isolation 
• ‘Picky eating’ or factors related to disordered eating.
• Behavioural concerns related to ADHD   
It is particularly evident that a timely response to requests from families and carers
who have concerns about their children’s neurodevelopmental profiles and needs, can
reduce family and carer stress and anxiety, and prevent an escalation of risk and
need.
2.7 The National Neurodevelopmental Specification for Children and Young People 2019
(hereon referred to as The Specification) complements and sits within the Getting It
Right for Every Child (GIRFEC) approach. It reflects the principles of the Universal
Health Visiting Pathway (UNRC) and Ready to Act for Allied Health
Professionals.  The Specification aims to ensure that children and families receive the
supports and access to services that meet their needs at the earliest opportunity,
based on the GIRFEC approach. For many children and young people, such support
is likely to be community based, and should be quickly and easily accessible and
proportionate to need.   
2.8 The Specification stresses the need for co-ordinated working between services and
agencies, and shared responsibility for these children and young people, stating that
they will be able to access additional support, appropriate for their
neurodevelopmental needs. Also, that professionals will “provide assessment,
formulation, recommendations, and where appropriate and helpful, diagnostic
assessment for those children and young people to help them understand their
neurodevelopmental differences and support needs”, however that an “understanding
of support needs can be enhanced by diagnosis but should not wait for diagnosis.’ 
2.9 The Specification outlines that children, young people and their families will be able to
access additional support, appropriate for their neurodevelopmental needs, through
universal services, such as via the named person, and community based mental
health and wellbeing supports and services. Universal services should work closely
with professionals working in neurodevelopmental services, relevant health and social
care and education services. These professionals should be linked with CAMHS so
that children and young people with both neurodevelopmental and mental health
support needs can get the additional support they require. 
2.10 Professionals providing support will also provide assessment, formulation,
recommendations, and where appropriate and helpful, diagnostic assessment for
those children and young people to help them understand their neurodevelopmental
differences and support needs. Understanding of support needs can be enhanced by
diagnosis but should not wait for diagnosis.

Page 5

5 
The National Neurodevelopmental Specification sits along the Service Specification
for CAMHS and the same principles underpin both specifications.  There are 7
standards of care set out to provide the minimum stand of care expected from
neurodevelopmental services.   
These are: 
1. High Quality Care and Support that Is Right for Me
2. I am fully involved In the Decisions about my Care
3. I will receive High Quality Assessment, Formulation and Recommendations
that are right for me
4. My Rights are acknowledged, Respected and Delivered
5. I am fully involved in Planning and Agreeing my transitions
6. We fully involve Children, Young People and their Families and Carers
7. I have confidence in the Staff who support Me 
2.11 The specification sits as part of a whole system, with a single point of access, whereby
health, education, social services and third sector professionals actively seek to
understand each other’s unique contributions and respect each other’s areas of
expertise. A stepped and matched care pathway is needed so additional supports for
example from CAMHS can be accessed as needed, this stepped support from
CAMHS is in place in Ayrshire and Arran with the establishment of the
Neurodevelopment CAMHS service. 
2.12 Professional staff supporting the implementation of the neurodevelopmental
specification will include registered children’s professionals with additional training in

Page 6

6 
the identification, assessment, and formulation of neurodevelopmental conditions,
including: 
• Speech and Language Therapists
• General Practitioners 
• Paediatricians
• Occupational Therapists
• Peripatetic Teachers
• Educational Psychologists
• Nurses
• Clinical Psychologists
• Social Workers
• Children and Adolescent Psychiatrists 
• Physiotherapists 
This illustrates the whole system approach and range of professionals required to
support young people. 
2.13 A timely response to requests from families and carers who have concerns about their
children’s neurodevelopmental profiles and needs can reduce family and carer stress,
improve confidence in adopting positive and supporting parenting approaches, and
receive support, guidance and interventions that are tailored to the needs of their
children, increasing the prospects of early improvements in outcomes. It is nationally
recognised that the implementation of the neurodevelopmental specification will
reduce the numbers of children and young people referred to CAMHS, and redirected,
as they do not meet the CAMHS referral mental health and risk/impact criteria. 
Neurodevelopmental Empowerment and Support Team (NEST) 
2.14 Across the three Ayrshires, significant progress has been made toward meeting the
principles of the Specification.   For example, the commissioning of the
Neurodevelopmental Empowerment and Support Team (NEST), has provided a
service that can map and co-ordinate community services for individuals and families,
providing training and workshops for families and professionals, often in conjunction
with local clinicians.  Supports are offered regardless of whether a formal diagnosis
has been given to any individual, and NEST is a lifespan approach which provides the
following services and outcomes :   
• Information access – enables up to date, relevant and accessible information is
freely available for the neurodivergent community and professionals across
Ayrshire. Individuals and families will have a good understanding of what a
diagnosis means for them and will be able to make informed decisions. 
• Empowerment Programme – Individuals and families/carers will have a better
understanding of their neurodivergent differences and through the opportunity to
learn, develop strategies and networks will be empowered to live as full a life as
possible. The NSET team, in partnership with individuals, families and

Page 7

7 
neurodevelopmental professionals will design and deliver a systematic pan
Ayrshire, needs based. 
• Community/Services - Communities across Ayrshire will be more tolerant and
understanding of the needs of neurodivergent individuals. This tolerance and
understanding will provide a marked improvement in access and opportunity for
neurodivergent individuals and families. Local services will be aware of the needs
of our neurodivergent community and will systematically incorporate solutions to
these needs into their service delivery. 
2.15 These core critical outcomes are being delivered through collaborative working with
neurodivergent individuals, their families, clinicians, third sector and services across
Ayrshire. 
2.16 This is a unique life span population wide universal service and an examplar across the
rest of Scotland in building a cohesive lifespan pathway of supports to people with
neurdivergent needs.  The NEST service provides the building blocks and foundation in
Ayrshire and Arran to taking forward the full implementation of the Neurological
Specification. 
2.17 Additional funding has been made available to NEST, from the three Health and Social
Care Partnerships, to increase its staff group and provide more localised support
within each of the Ayrshires and a successful recruitment programme has been
completed.   
2.18 In addition, North Ayrshire, through the support of the Children’s Services Strategic
Partnership (CSSP) has also committed a further £400k from the Whole Family
Wellbeing Fund to expand the Family Centred Wellbeing Service (FCWS) from its
current delivery in Irvine and Three Towns, to Kilwinning and the Garnock Valley.  This
will be a multi-disciplinary service, providing pre- and post-assessment family support
to children, young people, and their families in North Ayrshire where there are NDDs. 
The team will work closely with the Neurodevelopmental Empowerment and Strategy
Team (NEST) and will align to existing models of requests for assistance within
children’s services (e.g. Named Person/ Lead Professional RFA to the requested
service). 
2.19 The existing team of 4 x  Grade 7 Family Wellbeing Workers would be expanded as
follows:
• 10 x Grade 7 Family Workers – allowing for 2 workers per mainland locality and
1 in Arran, and 3 to support on a peripatetic basis.
• 1 x Band 6 Speech and Language Therapist
• 1 x Band 6 Occupational Therapist
• 1 x Grade 4 Admin Assistant 
• 1 x Grade 12 Team Manager

Page 8

8 
2.20 The proposed model will ensure equity of access and provision across the whole of
North Ayrshire, ensuring clear pathways of support and resilience from a broader
team. Building on the Family Centred Wellbeing Service is a welcomed development
and builds in the existing strengths of the team who currently are supporting a number
of families with neurodiversity needs. 
Pan Ayrshire Extreme Team 
2.21 Through the commissioning of a C&YP Neurodiversity Extreme Team by the three
Health and Social Care Partnership Chief Officers in May 2023, work has begun
across the whole system to explore and design an alternative approach to support,
assessment and treatment of children where there may be a concern regarding a
neurodevelopmental condition. 
2.22 However, it has become apparent that this is a complex area of work which requires
cultural change, clear leadership, and additional investment to meet the growing need,
while at the same time maximizing the understanding and access to the existing
supports and services that are available for children and young people through each
locality.   
2.23 The Extreme Team established in May 2023 with multiagency whole system partners
from Children’s services, Paediatric services, Education, Mental Health and Primary
Care  has been commissioned to enable a whole system response to the reform
question: 
“In light of the CAMHS and Neurodevelopmental National Specifications, what are;
Ayrshire and Arran, the three HSCP’s, three Councils and their partners doing to
provide timeous access to Neurodevelopmental Assessments, and how can the
“whole system” provide high quality supports to those children and families where
such concerns are identified at an early stage.” 
2.24 The workstreams subsequently developed in response to this reform question
required a significant amount of information gathering, national and local research to
be undertaken to establish what is currently in place and areas of further development
required. 
2.25 The workstreams and scopes identified by the Extreme Team included the following
areas of enquiry: 
1. To have a full appreciation of the data around the number of Children and young
people who would typically be referred to CAMHS with a Neurodevelopmental
concern but do not have a Mental Health condition.   In particular, 
• What is this for Ayrshire and Arran?
• How does this break down by Locality, North, South and East HSCP and
Councils?
• Where do referrals come from in each locality?

Page 9

9 
2. To understand what other supports and services are already available across the
“whole system” to assessment and support Neurodevelopmental concerns, such
as; 
• Universal services, (including targeted support) in Education Health and
HSCPs 
• Children Services Planning Partnerships 
• Community Mental Health Supports delivered or commissioned locally. 
• Whole Family Wellbeing fund and resources available to children and young
people
• Existing specialist services, within Health (Community Paediatrics) and
those commissioned Services (Purple House). 
• The contribution by the Third Sector
• What is the co-ordination and governance structure across these services? 
3. To develop a clear communication strategy to support a well-informed
understanding of Neurodevelopmental concerns and engagement with key whole
system stakeholders and referring agencies. 
4. To develop pathways for assessment and access to services for children with
Neurodevelopment concerns, within Ayrshire and Arran and task each Children
Services Planning Partnership to consider the use of existing resources to deliver
on Neurodevelopment supports locally. 
5. To underpin that the access to assessment and supports for children and young
people with Neurodevelopmental concerns and their families, is a duty and
responsibility of the “Whole System”. That this duty is underpinned by GIRFEC
(and its refresh), The Promise, and the Additional Support for Learning Act. As
well as the national specifications mentioned above on CAMHS and
Neurodevelopment. 
6. Ensure there are appropriate screening and access criteria in place and pathway
development to ensure appropriate and meaningful signposting to the right
service or supports at the right time. 
7. Timely access to neurodevelopmental assessment, diagnosis and interventions
or medical treatments and prescribing where required and clarity about how this
is to be delivered. 
8. Involvement of children, families, and people with lived experience in shared
planning and local decision making 
9. To understand the current and anticipated future demand for
neurodevelopmental assessments for C&YP to guide resource planning.  This
is essential to be able to endorse a model that will be sustainable.

Page 10

10 
10. Consideration of Digital solutions to improve timely access to the right supports
including the development of a SPOC and Directory of Services. 
2.26 In addition to the work of the Extreme Team each HSCP area has been requested
to establish a Neurodevelopment Implementation Group to deliver local planning and
tailored solutions. 
3 PROPOSALS 
3.1 The Pan Ayrshire and Arran Children and Young People Extreme Team has now
concluded and delivered on the original commission. There has been full engagement
and scoping of the issues identified for resolution. Through the process of “Extreme
Teaming” there is now whole system acknowledgement that there requires to be a
reformed approach to accessing support for neurodivergent children and young
people who require it across Ayrshire and Arran. 
3.2 Pan Ayrshire whole system engagement workshops have been undertaken and
through these an exemplar model of practice proposed which will require further local
development and tailoring. 
3.3 The proposal is to now move to a Transformation Programme Board for
Neurodevelopmental Support and Assessment for Children and Young people on a
pan Ayrshire and Arran basis, this will focus on six distinct areas: 
• Access to robust guidance, information, and family support within localities.
• Access to pan Ayrshire diagnostic assessments where appropriate.
• Access to prescribing services medication and monitoring of medication use
where required.
• Access to supports via a locality-based SPOC.
• Access and use of evidence based innovative digital tools, in the first instance
Strata Digital SPOC with Decision Support, Essence D and the national ALLIS
database.
• To develop a business case for investment to ensure a sustainable approach
to Neurodevelopmental needs across Ayrshire and Arran. 
Specifically, the Transformational Programme Board will: 
• Undertake an options appraisal and agree the fundamentals of an exemplar model,
this model is currently in development. 
• Support the locality implementation groups, building on and developing a locality
approach built around the seven standards of care, laid out in the national
specification, and the essential local learning from the engagement work of the
Extreme Team.

Page 11

11 
3.4 The Extreme Team requested that each of the Locality areas establish an
implementation group to ensure local detailed work is taking place. North Ayrshire has
established this group in June 2023 while East and South Ayrshire are at the early
stages of establishing these. 
3.5 The North Ayrshire Locality Implementation group has been established since
June 2023 and has been developing a programme of reform work in North Ayrshire
based on five key areas: - 
1. Family Support
Workstream is currently scoping existing support within North Ayrshire for children
with Neurodevelopmental Differences (NDD), predominantly focusing on
community and universal support.  The work will also identify gaps in provision
and look to identifying solutions.  From this, a directory of family support will be
made available which will be held centrally.  Further, North Ayrshire’s Children’s
Services Strategic Partnerships agreed a significant investment from the Scottish
Government’s Whole Family Wellbeing Fund (£600,000 per annum for the life of
the fund) into an expansion of the current Family Centred Wellbeing Service to
enable it to become a hub of early family support for children with NDD.  The NEST
team provision in North Ayrshire has also received investment with the additional
staff recruited that will focus on North Ayrshire support network and building
community capacity. 
2. Children’s Services’ Workforce Development 
The Group is currently in the process of commissioning a training needs analysis
for the children’s services’ workforce including health visiting, education, school
nursing, Allied Health Professionals and primary care to determine the baseline of
confidence and competence in supporting children with NDD and their families. 
This will inform a comprehensive training plan for the North Ayrshire workforce. 
3. Multi-agency Screening and Assessment 
Build on and develop the Pan Ayrshire exemplar model and tailor this for North
Ayrshire by identifying and confirming a local Single Point of Contact (SPOC) to
ensure “No Wrong Door” and an equitable locality response to receiving and
screening referrals, and accessing and sign posting children, young people and
their families to the right support, assessment at the right time, right place, every
time. The form and function of our proposed exemplar model will require to be
developed over the next 12 months as part of a whole system Business Case. 
North Ayrshire is currently testing a screening panel which will support
professional discussions around requests for assessment and diagnosis in the
main but will also be linked in with community and universal supports where these
are deemed more appropriate.  The Panel needs to form part of a clear pathway
for children which is supported by GIRFEC and aligns to wellbeing assessments
and the role of named person and lead professional.  The MAP will also provide a
route to any newly commissioned services, including prioritisation of those children
who they believe to be in need of a diagnostic assessment.

Page 12

12 
4. Children and families’ engagement
Building on the quality engagement work undertaken with families over the
summer, the Implementation Group will undertake further detailed engagement
with families who have received support or who are awaiting support, to inform
progress in North Ayrshire.  This will take the form of focus groups and interviews
with individuals, and seeks to also hear the voice of the child through direct
involvement with children and young people. 
5. Digital transformation
Liaise with the NHS Ayrshire & Arran Mental Health Digital Transformation group
to consider digital options to facilitate effective and efficient operational referral
management and access to appropriate supports and services for the local and
Ayrshire wide digital solutions. The SPOC/MAP and all pathways into services will
be enabled and have access to a range of digital tools. In the first instance these
will be facilitated through a pilot of STRATA Digital SPOC and a programme of
work in collaboration with Glasgow University utilising an integrated assessment
approach: ‘Essence D’. The Full Business Case will include the associated costs
of digital which will be directly related to whole system outcomes. 
3.6 In addition, North Ayrshire’s Implementation Group aims to: 
• Engage with all appropriate experts and leadership to contribute to and support
the development of a pathway for prescribing and monitoring, as developed by the
Transformational Programme Board. 
• To deliver on the Communication Scope undertaken by the Pan Ayrshire Extreme
Team and, 
• Develop a North Ayrshire focused engagement plan. 
3.7 There is unanimous agreement by the Pan Ayrshire Extreme Team and the North
Ayrshire Implementation group that any model developed must be predicated on the
provision of support first and foremost. 
3.8 In line with the specification and feedback from local and Pan Ayrshire engagement,
it is also accepted that there must be full consideration given to the availability of a
diagnostic assessment.  The development of such a service is complicated by the
following factors: 
• The extremely high demand there is for an assessment service, leading to a risk
that any assessment service becomes overwhelmed rapidly, leading to extensive
waiting lists and difficulties with recruitment and retention of professionals involved
in delivering assessments.
• Resource requirements to deliver or commission a diagnostic assessment service.
• Local differences on what professionals would be involved in assessment.
• Local and national work force limitations in the professions who could form an
assessment team.

Page 13

13 
3.9 It is proposed that diagnostic services are commissioned initially, (for up to 12 months)
until a local diagnostic solution can be developed. 
3.10 The North Ayrshire implementation group are currently assessing demand and
modelling what will be required with access criteria on a short-term basis as a business
case with future workforce plans are developed and appropriate resources identified.   
3.11 Anticipated Outcomes 
IJB has assurance that risks are identified and managed appropriately to ensure the
safe and sustainable delivery of the National Neurodevelopment Specification.  
Ayrshire and Arran will have a sustainable and world class CAMHS service that meets
the needs of young people that require support under the national CAMHS service
specification. 
Full alignment and compliance with the national CAMHS service specification with
improved Children and Young People’s Mental health and wellbeing outcomes, timely
access to services and support to Children, young people, and their families at a
locality level in alignment with the CAMHS extreme team reform question. 
The positive delivery of a whole system Neuro-developmental Service in Ayrshire and
Arran.  CAMHS will be able to progress through the current Neurodevelopmental list
more timeously and be able to offer more therapeutic interventions. Young people
coming through N-CAMHS will be seen by the right person, in the right place at the
right time. 
Opportunity for whole system partnership approach to developing alternative service
or community wellbeing solutions for young people that do not need a CAMHS referral
and building on the good practice already being commissioned by Education and
Children’s services across the whole system. 
3.12 Measuring Impact 
CAMHS can monitor the number of referrals that come to the N-CAMHS service and
the referrals that are meaningfully redirected to more appropriate partner services. 
Benson Wintere has been commissioned since 2020 and is able to produce locality
and school level information on referral activity, work force modelling, capacity, and
demand with live dashboards to reflect service activity. This information is utilised to
continue to inform wholes system service planning and workforce development. 
Common themes from the referrals received from 1st August relate to :- 
• Support in school for attainment, 
• Not meeting milestones, 
• Sleep, 
• Social isolation,

Page 14

14 
• Picky eating and, 
• Behavioural concerns in relation to ADHD as there is still no agreement around
medication. 
A multiagency panel continues to review referrals across the system to monitor need
and ensure that appropriate supports are in place. 
HSCP engagement officers continue to facilitate engagement and consultation with
both adults and children and young people in service design and to inform service
improvements. 
4. IMPLICATIONS 
4.1 Financial
Creating a Neuro-developmental Service for Children and Young People who do not
meet the CAMHS Specification will require financial investment from system partners,
as the model and pathways are designed and developed the financial implications will
be quantified.  There is no funding provided or aligned to the National Neuro
specification. 
• Each locality must develop a future model of care involving a Single Point of
Contact (SPOC)/Multi agency Panel with pathways for diagnosis and prescribing
that will ensure the future needs of local people can be met.  This will require
investment into new systems and structures. 
• For diagnostic services, until the workforce and recruitment requirements have
been addressed to enable a mainstream delivery of service, access to
assessments must be available for each locality.  This will need to be locally
determined and based on proposed locality arrangements, access criteria and
demand modelling. This temporary interim allocation will ensure continuation of
necessary assessment and diagnosis and management of waiting lists while a full
business case is written. 
• There will be a future financial requirement for prescribing and monitoring services,
particularly if this involves General Practice and Advanced Specialist prescribing
skills and roles. This new innovative model requires further development, however
without this type of approach the current models will be unable to deliver
prescribing and monitoring for the future predicted numbers within our local
population. 
• Each locality will require to be supported to further develop and implement their
own family support service, considering whole family wellbeing and linking this to
Children Service Planning. These supports will be accessed through the proposed
SPOC/MAP. In North Ayrshire the CSSP group has identified additional resources
to enhance an existing family support model. A recruitment programme is
underway to enable the expanded service to be launched.  Additional investment
has also been provided to enhance the Pan Ayrshire NEST service.

Page 15

15 
• The management of a Pan Ayrshire Transformation programme and development
of a future business case will require experienced programme management and
support capacity to be identified. The Pan Ayrshire Extreme team have
recommended a contribution from each locality to dedicated programme
management and administration. 
• Any digital tools and solutions will require prioritisation and further investment. Both
Strata Digital SPOC and Essence D have one-year non-recurring funding. 
4.2 Human Resources
In North Ayrshire a training needs analysis has been commissioned by the
Neurodevelopment implementation group and the whole system workforce will need
to undertake elements of retraining and operate new roles to meet future models of
care. It is likely that following business case development and workforce planning that
the whole system workforce will also need to increase in the future to meet anticipated
and current demand trajectories. 
4.3 Legal
There are a group of children who, due to their lack of capacity, require guardianship
orders to be put in place via the Scottish Court system from the age of 16 years. This
legal issue and its implications for child psychiatry require further exploration. 
4.4 Equality/Socio-Economic
A full equality impact assessment will be required. There is inherent risk of inequality
between and across the respective localities if there is significant deviation from the
proposed exemplar model framework. The prescribing and monitoring pathways may
require to be pan Ayrshire due to interdependency with other pan Ayrshire services. 
4.5 Risk
In North Ayrshire a multi-agency panel continues to monitor referral activity and
ensure that referrals are redirected to appropriate supports, monitor risk, and ensure
appropriate escalation where additional intervention or assessment may be required. 
4.6 Community Wealth Building
None
4.7 Key Priorities
Meets Caring for Ayrshire, GIRFEC, The Promise, HSCP strategic objectives,
Ayrshire conversation Mental Health priorities, Mental Health and wellbeing strategy. 
Delivery of a fully resourced and compliant Neurodevelopment service in alignment
with the national specification is a key national and local HSCP strategic priority. This
will enable full realisation of investment for Children and Young people’s Mental health
in Ayrshire and Arran, improving mental health and wellbeing and enabling timely
access for young people and their families to the right service or support in the right
place and the right time.

Page 16

16 
It is a key priority of all Partners across the whole system to ensure that there are fully
developed wellbeing services and supports for Children, young people, and their
families and to enhance current models of best practice in relation to
neurodevelopment diagnostic and support provision. This is evidenced by the initial
investments by the three HSCP’s in the NEST service and Autism support Ayrshire
which provide information, training and community supports at a population wide
universal level.     
5. CONSULTATION 
A Pan Ayrshire community engagement survey has been undertaken. Users of the
service, stakeholders, workshops, and the Extreme Team members have informed
the proposals within this paper. 
6. CONCLUSION 
IJB are asked to:
• Note the successful implementation in Ayrshire and Arran of delivery of the
National CAMHS Specification with improved service access response times for
children and young people with underlying mental health needs. 
• Note the outcome of the Pan Ayrshire Extreme team proposals with development
of a local and Pan Ayrshire Transformation programme. 
• Note the significant progress and reform work underway within North Ayrshire by
the North Ayrshire Neurodevelopment implementation group.
• Note the significant investment in North Ayrshire in development of Family Support
services. 
Caroline Cameron, Director, NAHSCP
Thelma Bowers, Head of Service, Mental Health, 
thelmabowers@north-ayrshire.gov.uk,
01294 317849