Integration Joint Board
14th December 2023
Subject : 2023-24 – Month 7 Financial Performance
Purpose : To provide an overview of the IJB’s financial performance as at
month 7 (October). 
Recommendation : It is recommended that the IJB: 
(a) notes the overall integrated financial performance report for
the financial year 2023-24 and the current overall projected year-
end overspend of £3.858m;
(b) notes the progress with delivery of agreed savings;
(c) notes the actions which are being taken to progress financial
recovery;
(d) notes the remaining financial risks for 2023-24; and
(e) approves the budget reductions which are detailed at
paragraph 2.10. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
CAMHS Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
GAE Grant Aided Expenditure
PAC Performance and Audit Committee
MARAC Multi Agency Risk Assessment Conference 
1. EXECUTIVE SUMMARY 
1.1 The report provides an overview of the financial position for the Partnership and
outlines the projected year-end outturn position informed by the projected
expenditure and income commitments; these have been prepared in conjunction with
relevant budget holders and services.   It should be noted that, although this report

Page 2

refers to the position at the end of October, further work is undertaken following the
month end to finalise projections, therefore the projected outturn position is as current
and up to date as can practicably be reported. 
1.2  The projected outturn is a year-end overspend of £3.858m (1.2%) for 2023-24 which
is a favourable movement of £0.128m from month 6.  This includes the financial
impact of the NHS pay award, the impact of the Council pay award is still being
finalised. 
1.3  From the core projections, overall, the main areas of pressure are residential
placements for children, supplementary staff in wards and Unplanned Activities
(UnPACs) within the lead partnership for mental health. 
2. CURRENT POSITION 
2.1 The report includes an overview of the financial position including commitments
against the available resource, explanations for the main budget variances and an
update on progress in terms of savings delivery.   
2.2 FINANCIAL PERFORMANCE – AT MONTH 7 
At month 7 against the full-year budget of £311.735m there is a projected year-end
overspend of £3.858m (1.2%).  The Integration Scheme outlines that there is an
expectation that the IJB takes account of the totality of resources available to balance
the budget in year.   Following this approach, an integrated view of the financial
position should be taken, however it is useful to note that this overall position consists
of a projected overspend of £2.500m (£0.079m favourable) in social care services
and a projected overspend of £1.358m (£0.049m favourable) in health services.     
Appendix A provides the financial overview of the Partnership position. The sections
that follow outline the significant variances in service expenditure compared to the
approved budgets. 
The projections for some areas will be subject to fluctuations as they depend on
recruitment plans for new funding and also the capacity of providers to take on work. 
2.3 Health and Community Care Services 
Against the full-year budget of £89.893m there is a projected overspend of £0.382m
(0.4%) and the main variances are: 
a) Care home placements including respite placements (net position after service
user contributions and charging order income) are projected to underspend by
£0.488m (£0.017m favourable movement).

Page 3

The budgeted number of permanent placements is 780 and at month 7 there are
786 placements.  The projection assumes that the current number of placements
will continue to the end of the year. Within the projection there is an assumption
that recent placements which do not have a completed financial assessment
(often due to the pressure to discharge from hospital) are costed with 50% of the
cases at the current average cost of a placement and 50% at the gross or interim
funded rate.  It is likely that there will still be some cases being gross or interim
funded at the year end. Their actual cost will not be known until the financial
assessment is completed and this can impact on the final position. 
The level of income recovered from charging orders is included in the projection
above and is assumed to be £0.204m over recovered (£0.070m favourable)
based on the income received to date.   This income is not easy to project as it
depends on the length of the legal process and time taken to sell the property that
the charging order is registered to. 
b) Interim care beds are projected to underspend by £0.250m (£0.250m favourable)
based on the usage to date and projected usage until the year end. 
c) Care at home (in house and purchased) is projected to be £0.418m underspent
(£0.064m adverse).  The position includes an underspend in in-house services of
£0.919m (£0.080m adverse) as there are vacant posts, but some of the current
capacity is being met by existing staff working additional hours and casual staff. 
Bank staff are being offered contracts and additional staff are being recruited
which will replace the need for existing staff to work additional hours. This is partly
offset by an overspend in purchased services of £0.500m (£0.017m favourable)
as the budget was reduced to reflect the additional costs of bringing some
services in-house after the provider withdrew from the contract. 
d) Reablement services are projected to be £0.125m (£0.002m favourable)
underspent due to vacancies. 
e) Care at Home Charging Income is projected to under recover by £0.060m
(£0.011m favourable) due to an ongoing shift towards personal care which is non
chargeable. 
f) Physical Disability Services - projected underspend of £0.250m (£0.033m
favourable) in community care packages, £0.449m underspend (£0.056m
favourable) in direct payments and £0.458m overspend (£0.018m favourable) for
residential placements. There is also an under-recovery of income of £0.133m
(no movement).   
g) Anam Cara is projected to overspend by £0.073m (£0.004m adverse) due to
covering vacancies and sickness absence (£0.017m) and under-recovered
income (£0.056m).

Page 4

h) Integrated Island Services is projected to be £0.308m overspent (£0.041m
adverse movement).  There is an overspend at Montrose House of £0.241m
(adverse movement of £0.046m) which relates to employee costs (the net cost of
agency staff versus vacancies), supplies and cleaning costs and an under-
recovery of charging income. There is also an overspend of £0.050m due to Band
6 nurses receiving back-dated recruitment and retention premium this financial
year. Arran medical services are projecting to overspend by £0.032m and the
remaining projected overspend is due to supplies costs increasing. The
overspends are partially offset by a projected underspend in care at home costs
of £0.086m (£0.049m adverse movement). There are staffing vacancies which
are included within the payroll turnover savings figures below which offset the use
of agency and bank staff. 
i) District Nursing is projected to overspend by £0.195m (£0.041m favourable
movement) due to an overspend on bank nursing costs and supplies.   The
favourable movement is due to a reduction in the use of bank staff as posts have
been recruited to. 
j) Rehab wards are projected to overspend by £0.202m which is an £0.018m
favourable movement (Redburn ward £0.213m overspent and Douglas Grant
£0.011m underspent).  The overspend is due to cover costs for vacancies as well
as supplementary staffing for patients who require one to one support.   
k) Wards 1 and 2 are projected to overspend by £0.925m (£0.075m adverse
movement) due to increased use of supplementary staffing. 
l) Cumbrae Lodge Continuing Care beds are projected to underspend by £0.150m
(no change) due to a reduced charge to reflect the reduction in beds used during
the transition to the new service. 
2.4 Mental Health Services 
Against the full-year budget of £103.504m there is a projected overspend of £1.618m
(1.6%) prior to the reallocation of the Lead Partnership overspend to East and South
HSCP.  This also excludes any potential variance on the Mental Health Recovery
and Renewal Funding where any underspend will be earmarked at the year-end for
use in 2024-25. The main variances are: 
a) Learning Disabilities are projected to overspend by £0.670m (£0.010m adverse)
and the main variances are: 
• Care Packages (including residential and direct payments) - projected
underspend of £0.109m in community care packages (£0.136m adverse),
projected overspend of £0.384m in direct payments (£0.036m adverse)
and £0.446m for residential placements (£0.114m favourable).

Page 5

• Trindlemoss non-employee costs are projected to underspend by
£0.075m. 
b) Community Mental Health services are projected to underspend by £0.245m
(£0.021m adverse movement) which is mainly due to an underspend of £0.474m
in community packages (including direct payments) and an overspend in
residential placements of £0.244m.   
c) The Lead Partnership for Mental Health is projecting to be £1.188m overspent
(£0.220m favourable movement) and the main variances are as follows: 
• A projected overspend in Adult Inpatients of £0.520m (£0.033m favourable
movement) due to overspends in supplementary staff for enhanced
observations, staff cover due to sickness (inc. covid outbreak) and reduced
bed sale income.  
• The UNPACS (Unplanned Activities) budget is projected to overspend by
£1.410m (£0.003m adverse movement) based on current number of
placements and enhanced costs remaining until the year end. The adverse
movement is due to additional costs for enhanced observations. These
placements are for individuals with very specific needs that require a higher
level of security and/or care from a staff group with a particular skill
set/competence.  There are no local NHS secure facilities for women, people
with a learning disability or people with neurodevelopmental disorder. This can
necessitate an UNPACs placement with a specialist provider which can be
out-of-area.  The nature of mental health UNPACs spend is that it is almost
exclusively on medium or long term complex secure residential placements
which are very expensive so a small increase in placements can have a high
budgetary impact. Due to the complexity and risk involved, transitions
between units or levels of security can take many months. Applications to
approve a placement are made to the Associate Medical Director for Mental
Health who needs to be satisfied that the placement is appropriate and
unavoidable prior to this being agreed. 
• A projected overspend in MH Pharmacy of £0.084m (£0.030m favourable) due
to an increase in substitute prescribing costs. The favourable movement is
due to revising the projection to reflect updated information from the new
prescribing system. 
• Learning Disability Services are projected to overspend by £0.322m (no
movement).  There is a high usage of supplementary staffing due to backfill
for sickness, increased and sustained enhanced observations and vacancies. 
The enhanced observations are reviewed on a daily basis. 
• Elderly Inpatients are projected to overspend by £0.173m (£0.008m
favourable) due to the use of supplementary staffing.  
• The Innovation Fund is projected to underspend by £0.232m (£0.043m
adverse) due to slippage within some of the projects and not all of the funding
was allocated.

Page 6

• Addictions in patients are projected to overspend by £0.003m (£0.011m
favourable) due to the use of supplementary staffing.
• The Directorate cost centre is projected to overspend by £0.095m mainly due
and overspend of £0.049m on supplies and £0.012m of legal fees.
• The turnover target for vacancy savings for the Lead Partnership is held within
the Lead Partnership as this is a Pan-Ayrshire target.  There is a projected
over-recovery of the vacancy savings target of £1.254m (£0.191m favourable)
in 2023-24, further information is included in the table below: 
The current projection to the year-end is informed by the recruitment plans and the
confidence in recruitment success and realistic timescales for filling individual
vacancies.   
The areas contributing to this vacancy savings position are noted below:
• Adult Community MH £0.033m
• CAMHS £0.592m
• Mental Health Admin £0.330m
• Psychiatry £0.377m
• Psychology £0.735m
• Associate Nurse Director £0.060m 
Vacancy Savings Target (£0.873m)
Projected to March 2024 £2.127m
Over/(Under) Achievement £1.254m
2.5 Children and Justice Services 
Children’s Services
Against the full-year budget of £39.560m there is a projected overspend of £5.269m
(13.3%) (£0.253m adverse) and the main variances are: 
a) Care Experienced Children and Young People is projected to overspend by
£4.928m (£0.188m adverse). The main areas within this are noted below: 
• Children’s residential placements are projected to overspend by £5.734m
(£0.184m adverse). We started 2023/24 with 32 external placements and
there are currently 35 placements (month 6 was 34 placements) which are
assumed to continue until the end of the year.  Within the £5.734m there is
£0.145m relating to enhanced costs for two placements.  One placement has
also moved from being 50/50 funded with Education to 100% HSCP as the
placement no longer has an education element. There are a number of factors
leading to this challenging position:

Page 7

• We have 32 places available in our internal children’s houses, due to
demand these have been operating at 100%+ occupancy for some
time, leading to increased use of external placements where
residential care is required.
• The requirement to support Unaccompanied Asylum-Seeking
Children (UASC) under the National Transfer Scheme and to support
trafficked young people who have been identified in North Ayrshire.
• A number of young people in residential care have requested
Continuing Care, whereby a young person can remain in their
placement until age 21.
• Where appropriate young people are placed to meet their educational
needs, the cost of Residential School Placements in the most cases
is shared 50/50 with Education services. 
Children’s Services are continuing to work with other services including
Education and Housing to address the challenges. A change programme is
being developed to respond to the pressures of residential care, further detail
of the scope and plan around this work will be presented to a future IJB. 
• Looked After and Accommodated Children (fostering, adoption, kinship etc)
is projected to be £0.486m underspent (£0.013m favourable); this is based on
the current number of placements and reflects additional monies received to
support the uplift in rates for fostering and kinship placements (16+year olds)
and the costs associated with this. 
b) Children with disabilities – residential placements are projected to overspend
by £0.305m (£0.097m favourable). This is based on 9 current placements and
1 further placement which is expected to commence during December.  Direct
payments are projected to underspend by £0.240m (£0.051m favourable). 
Community packages are projected to underspend by £0.119m (£0.015m
favourable) based on 73 current number of packages and assumptions
around further packages until the year end. 
c) Residential respite – placements are projected to overspend by £0.049m (no
movement).    These short-term placements are used to prevent an admission
to full residential care.  There is one short term placement, but this could vary
throughout the year and have an impact on the projection. 
d) Head of Service – is projected to overspend by £0.306m (£0.006m adverse). 
The overspend is mainly due to the planned saving of £0.233m in relation to
the staff reconfiguration in the children’s houses which is not expected to be
fully achieved in 23-24.  There are also projected costs of £0.092m for the JII
(Joint Investigative Interview) project which is not funded.

Page 8

e) Intervention Services – are projected to underspend by £0.020m (£0.068m
adverse).   The adverse movement is due to posts being filled sooner than
planned and increased transport costs. 
f) Justice Services – is projected as being spent in full, however, there is a risk
the service could go into an overspend if there is no additional grant funding
to mitigate the potential impact of the 23/24 pay award. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP) 
The non-employee costs element of the AHP services are projected to be on-line. 
All underspends in employee costs have been taken as payroll turnover. 
2.7 CHIEF SOCIAL WORK OFFICER 
There is a projected underspend of £0.465m (£0.081m favourable) mainly due to a
projected underspend in the Carers Strategy funding. 
2.8 MANAGEMENT AND SUPPORT 
Management and Support Services are projected to underspend by £1.703m
(£0.053m adverse) and the main areas of underspend are: 
• An over-recovery of payroll turnover of £0.723m for social care services and
an over-recovery of payroll turnover of £0.306m for health services as outlined
in the table below.  This is an adverse movement of £0.111m on the health
services element.
• There is projected slippage on the LD and MH transition funding of £0.694m
(£0.141m favourable) due to delays in children transitioning into adult
services. 
The turnover targets and projected achievement for the financial year for Health and
Social Care services outwith the Lead Partnership is noted below: 
The position in the table above reflects the assumption in the current financial
projections.  For social care, a total of £1.937m (64.3% of annual target) has been
achieved to date.   
Social Care Health
Services
Vacancy Savings Target (3.014m) (1.433m)
Projected to March 2024 3.737m 1.739m
Over/(Under) Achievement 0.723m 0.306m

Page 9

The health vacancy projection to the year-end is based on the month 7 position and
is informed by the recruitment plans and confidence in recruitment to posts for the
remainder of the year. 
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas.   
The main areas at month 7 are: 
• Children and Families £0.600m
• Learning Disability £0.047m
• Management and Support   £0.196m
• Community Care Service Delivery £0.187m
• Rehab and Reablement £0.174m
• Locality Services £0.205m
• Integrated Island Services £0.220m
• Community Mental Health £0.073m 
There have been no intentional plans to pause or delay recruitment and services
have actively continued to recruit; in some service areas it has proven difficult to fill
posts. 
The turnover target for the North Lead Partnership for Mental Health services is
detailed within the Lead Partnership information at section 2.4. 
2.9 Savings Progress 
a) The approved 2023-24 budget included £4.963m of savings. 
BRAG Status Position at
Budget Approval
£m
Position at
Month 7
£m
Red - 0.273
Amber 2.245 0.322
Green 2.718 0.560
Blue - 3.808
TOTAL 4.963 4.963 
b) The main area to note is that previous amber savings of £0.273m, relating to
the reconfiguration of staffing within Children and Families, have been
escalated to red.  Progress to date suggests that the timescale for this saving
will not be met and the full £0.273m will not be achieved in 2023-24 but this is
accounted for in the projected outturn.   
Work is ongoing to refresh the Transformation Plan to focus on the financial
challenges which the Partnership expects to face in 2024/25 and 2025/26. The plan
is critical to the ongoing sustainability of service delivery. Once it has been endorsed

Page 10

by the Transformation Board it will be included within future financial monitoring
reports. The Transformation Board also has responsibility for overseeing the delivery
of the plan and for ensuring that projects remain on track. 
Appendix B provides an overview of those service changes which do have financial
savings attached to them and the current BRAG status around the deliverability of
each saving. 
2.10 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis….
without the express consent of the Integration Joint Board.” 
Appendix C highlights the movement in the budget position following the initial
approved budget. 
Reductions Requiring Approval: 
Ref Description  Amount
1 North Contribution to the TEC team – this
contribution has been made since 2020 but this
makes the contribution permanent.
0.075
2 Trindlemoss GP input – increased cost of service 0.008
3 Support the ongoing availability of Buvidal – transfer
to NADARS
0.002
4 Contribution from CAMHS to Acute for de-
escalation rooms 
0.025
5 Pharmacy tariff transfer to reflect historic NRAC
share.
0.015 
2.11 Pan Ayrshire Lead Partnership services and Large Hospital Set Aside 
Lead Partnerships: - The IJB outturn position is adjusted to reflect the impact of Lead
Partnership services. The outturn for all Lead Partnership services is shared across
the 3 Partnerships on an NRAC basis; this position is currently the default pending
further work to develop a framework to report the financial position and risk sharing
across the 3 Partnerships in relation to hosted or lead service arrangements, which
has been delayed by the requirement to focus efforts on the Covid response. 
The final outturn in relation to North Lead Partnership services would not be fully
attributed to the North IJB as a share would be allocated to East and South
Partnerships; similarly, the impact of the outturn on East and South led services will

Page 11

require to be shared with North. At Month 7 the MH lead partnership is projected to
overspend by £1.188m (£0.389m NRAC share for East and £0.340m for South). 
South HSCP (month 6 information) – projected overspend of £0.360m (£0.080m
favourable) of which £0.133m will be allocated to North. The overspend is mainly
due to an overspend of £0.247m in the community store to replace obsolete
equipment, which will reduce maintenance costs in the medium term, £0.107m in
the continence service and £0.010m in the Family Nurse Partnership.   
East HSCP (month 6 information) – projected underspend of £0.149m of which
£0.055m will be allocated to North. The underspend is mainly due to: 
Primary Care and Out of Hours Services (Lead Partnership) 
There is a projected underspend of £0.198m on the Primary Care Lead Partnership
budget and includes a projected underspend in Dental services totalling £0.270m,
where staffing numbers are running at less than establishment. Recruitment over the
remainder of the financial year has to potential to impact on the projected outturn
position at month 6. In addition, there are projected reduced costs within Primary
Care contracting and support £0.340m, largely due to staff turnover. These reduced
costs are partially offset by additional costs in the GP element of Out of Hours
services, as well as additional costs in the overnight nursing service, totalling
£0.470m, as well as a small overspend on projected staff costs in Primary Medical
Services £0.060m. Work is ongoing to address the Out of Hours increased costs as
far as possible over the course of the 2023/24 financial year. This projected outturn
position assumes funding will be allocated to fully offset Urgent Care Pathway
projected costs £1.198m, as well as Covid-19 Therapeutics projected costs £0.257m 
Prison and Police Healthcare (Lead Partnership) 
The £0.065m projected overspend at month 6 is largely due to increased costs
associated with the new national medical contract. 
Set Aside : - preparatory work is well underway with NHS Ayrshire and Arran and
the other Ayrshire partnerships to progress and develop the set aside arrangements
to fully implement the legislative requirement.  This includes arrangements in
relation to the use of Directions, Joint Commissioning Plans and overall progression
towards fair share allocations of resources. The North budget for set aside
resources for 2023-24 is currently £35.547m.  This is based on the 2022-23 figure
of £34.850m inflated by the 2023-24 uplift of 2%.  Ayrshire Finance Leads have
agreed a baseline methodology for set aside budgets which involves using the four
full years prior to the pandemic, 2016/17 – 2019/20 inclusive. This will be included
in a Q2 update for Ayrshire Finance Leads on 15/12/23.  
The annual budget for Acute Services is £421.7m.  The directorate is overspent by
£16.5m after 7 months. This is caused by increasing overspends on agency medical
and nursing staff, together with drug expenditure. These have been required due to
the level of operational pressure being experienced, in common with many other

Page 12

areas in Scotland. Several unfunded wards and beds are open across both main
hospital sites. 
There is a material underlying deficit caused by: 
• Unachieved efficiency savings 
• High expenditure on medical and nursing agency staff, high rates of absence
and vacancies causing service pressure.
• Delayed transfers of care and high acuity of patients. 
The IJBs and the Health Board work closely in partnership to maintain service and
improve performance. 
2.12 FINANCIAL RECOVERY PLAN 
The Integration Scheme requires the preparation of a recovery plan if an overspend
position is being projected to plan to bring overall service delivery back into line with
the available resource. 
Heads of Service have closely reviewed expenditure and have implemented actions
which have seen the projected year-end position improve by a net £0.468m since
Month 3. The main contributors to this are noted in the table below: 
TOTAL
Payroll Turnover – Health (non-Lead) 45,000
Anam Cara staffing 104,000
Care Experienced Young People 770,000
Looked After Children 125,000
Transitions funding 286,000
Care Homes 58,000
Physical Disabilities (Community Packages, Direct
Payments and Residential) 
200,000 
Interim Care Beds 250,000
Mental Health Care Packages 201,000
Mental Health Lead Partnership – North element  86,000
Children with a disability  97,000
Carers Funding 81,000
District Nursing 41,000
Rehab Wards 18,000 
These areas of improvement have been partially offset by adverse movements in
Care at Home, Integrated Island Services, Wards 1 and 2 at Woodland View,
UNPACS and intervention services. 
Work is ongoing to further improve the projected position and an updated plan will
be included in the Month 9 report which will be brought to the February IJB. This work
is built on the following general principles:

Page 13

• No adverse impact on delayed discharges or patient flow during Winter
• Exercising professional judgement around the use of waiting lists where this
may have an impact elsewhere in the system
• Reviewing the need for more active management of non-frontline vacant posts
• The non-recurring use of reserves
• Working with East and South on lead partnership projections
• The potential for a freeze on non-essential spend. 
As a contingency there is provision of £2m non-recurring funding set aside in the
reserves (appendix D) to contribute towards the 2023-24 position.   This would
reduce the current projected overspend to £1.858m. 
The IJB also holds a General Fund reserve balance of £5.821m of unallocated funds,
this would underwrite the risk of the remainder of the projected overspend if it cannot
be managed downwards in the coming months.  This would be a last resort as this
funding is non-recurring and it does not resolve the areas underlying the projected
overspend. 
2.13 FINANCIAL RISKS 
There are a number of ongoing financial risk areas that may impact on the 2023-24
budget during the year, these include: 
• Current high levels of inflation which impact on costs incurred directly by the
Partnership and on our partner providers
• High risk areas of low volume / high-cost services areas e.g. Children’s
residential placements, Learning Disability care packages and complex care
packages; 
• Progress with the work to develop set aside arrangements and the risk
sharing arrangements agreed as part of this.
• Ongoing implementation costs of the Scottish Government policy directives
• Lead / hosted service arrangements, including managing pressures and
reporting this across the 3 IJBs.
• The impact on Lead Partnership and acute services from decisions taken by
other Ayrshire areas.
• The use of supplementary staffing for enhanced observations across a
number of service areas.
• The use of high-cost agency staff to support frontline service delivery in areas
where there are recruitment challenges.
• Continuing risks associated with provider sustainability.
• The Local Government pay award for 2023-24 has recently been settled and
will be paid from December; the increase is in excess of the budgeted 3%
and will have an adverse impact on the projected financial position unless
sufficient additional funding is forthcoming.
• The NHS Ayrshire and Arran Health Board financial deficit and the risks
around further escalation in the national framework for financial escalation.

Page 14

North Ayrshire IJB have already discussed our position in relation to the
request for payment for delayed discharges. 
These risks will continue to be monitored during the remainder of 2023-24 and any
impact reported through the financial monitoring report. 
2.14 RESERVES 
The IJB reserves position is summarised in the table below. 
The ‘free’ general fund balance of £5.821m is held as a contingency balance; this
equates to around 2.1% of the initial approved IJB budget for 2023-24 which is within,
but towards the lower end, of the target range of 2%-4%. 
General Fund
Reserve Earmarked Reserves
Total 
Unearmarked  External
Funding                      HSCP 
£m  £m £m £m
Opening Balance - 1 April 2023 6.448  6.997 4.219 17.664
Audit Adjustment (0.627)  (0.309) - (0.936)
Corrected Opening Balance 5.821  6.688 4.219 16.728
2023-24 Draw Per the Budget
Paper -  (1.252) - (1.252)
Current Reserve balances 5.821  5.436 4.219 15.476 
The 2023-24 budget approved the use of £1.252m of previously earmarked reserves
to support a balanced budget position for 2023-24. The HSCP earmarked reserves
also includes a further amount of £2.0m which was agreed to support the financial
position during 2023-24. 
The reserves above now reflect the adjustment of £0.936m which was identified in
the external audit of the 2022/23 accounts and reported to the November IJB. This
related to a difference between the total IJB reserves and the balances due to the
IJB from partners’ audited accounts and has now been reconciled. 
3. PROPOSALS 
3.1 Anticipated Outcomes 
Continuing to closely monitor the financial position will allow the IJB to take corrective
action where required to ensure the Partnership can deliver services in 2023-24 from
within the available resource, thereby limiting the financial risk to the funding
partners. 
3.3 Measuring Impact 
Ongoing updates to the financial position will be reported to the IJB throughout 2023-
24.

Page 15

4. IMPLICATIONS 
4.1 Financial
The financial implications are as outlined in the report.   Against the full-year budget
of £311.735m there is a projected overspend of £3.858m. The report outlines the
main variances for individual services.   
4.2 Human Resources
The report highlights vacancy or turnover savings achieved to date. Services will
review any staffing establishment plans and recruitment in line with normal practice
when implementing service change and reviews as per agreement with the IJB, there
is no intention to sustain the staffing capacity reduction on a recurring or planned
basis. 
4.3 Legal
None. 
4.4 Equality/Socio-Economic
None. 
4.5 Risk
Para 2.13 highlights the financial risks.
The report falls in line with the agreed risk appetite statement which is a low-risk
appetite in respect to adherence to standing financial instructions, financial controls
and financial statutory duties and a high-risk appetite in relation to finance and value
for money. 
4.6 Community Wealth Building
None. 
4.7 Key Priorities
None. 
5. CONSULTATION
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team. 
5.2 The IJB financial monitoring report is shared with the NHS Ayrshire and Arran
Director of Finance and North Ayrshire Council’s Head of Finance after the report
has been finalised for the IJB. 
Caroline Cameron, Director 
Author – Paul Doak, Head of Finance and Transformation
Eleanor Currie, Principal Manager Finance 
[pdoak@north-ayrshire.gov.uk/eleanorcurrie@north-ayrshire.gov.uk]

Page 16

PUBLIC INFORMATION
2023-24 Budget Monitoring Report–Objective Summary as at 31st October 2023       Appendix A 
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
Budget Outturn 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 70,430 69,219 (1,211) 19,463 20,806 1,343 89,893 90,025 132 366 (234)
: Locality Services 28,193 27,346 (847) 5,354 5,549 195 33,547 32,895 (652) (229) (423)
: Community Care Service Delivery 36,607 35,995 (612) 0 0 0 36,607 35,995 (612) (693) 81
: Rehabilitation and Reablement 2,131 2,136 5 0 0 0 2,131 2,136 5 2 3
: Long Term Conditions 943 1,004 61 10,420 11,449 1,029 11,363 12,453 1,090 1,027 63
: Community Link Workers 181 174 (7) 0 0 0 181 174 (7) (8) 1
: Integrated Island Services 2,375 2,564 189 3,689 3,808 119 6,064 6,372 308 267 41
MENTAL HEALTH SERVICES 29,804 30,234 430 73,700 74,888 1,188 103,504 105,122 1,618 1,804 (186)
: Learning Disabilities 22,959 23,629 670 478 478 0 23,437 24,107 670 660 10
: Community Mental Health 5,961 5,716 (245) 1,753 1,753 0 7,714 7,469 (245) (266) 21
: Addictions 884 889 5 1,837 1,837 0 2,721 2,726 5 2 3
: Lead Partnership Mental Health NHS Area Wide 0 0 0 69,632 70,820 1,188 69,632 70,820 1,188 1,408 (220)
CHILDREN & JUSTICE SERVICES 34,714 39,831 5,117 4,846 4,998 152 39,560 44,829 5,269 5,016 253
: Irvine, Kilwinning and Three Towns 3,183 3,152 (31) 0 0 0 3,183 3,152 (31) 3 (34)
: Garnock Valley, North Coast and Arran 3,062 2,997 (65) 0 0 0 3,062 2,997 (65) (73) 8
:Intervention Services 1,828 1,807 (21) 0 0 0 1,828 1,807 (21) (88) 67
: Care Experienced Children & Young people 22,941 27,869 4,928 0 0 0 22,941 27,869 4,928 4,740 188
: Head of Service - Children & Families 1,070 1,376 306 0 0 0 1,070 1,376 306 300 6
: Justice Services 2,413 2,412 (1) 0 0 0 2,413 2,412 (1) 0 (1)
: Universal Early Years 217 218 1 4,199 4,351 152 4,416 4,569 153 134 19
: Lead Partnership NHS Children's Services 0 0 0 647 647 0 647 647 0 0 0
CHIEF SOCIAL WORK OFFICER 1,858 1,393 (465) 0 0 0 1,858 1,393 (465) (384) (81)
PRIMARY CARE 0 0 0 52,998 52,932 (66) 52,998 52,932 (66) 0 (66)
ALLIED HEALTH PROFESSIONALS 0 10,200 10,200 0 10,200 10,200 0 0 0
COVID NHS 0 0 0 0 (274) (274) 0 (274) (274) (274) 0
MANAGEMENT AND SUPPORT COSTS 8,908 7,539 (1,369) 3,476 3,142 (334) 12,384 10,681 (1,703) (1,756) 53
NATIONAL COMMISSIONED SERVICE 0 0 0 3 3 0 3 3 0 0 0
FINANCIAL INCLUSION 1,335 1,333 (2) 0 0 0 1,335 1,333 (2) (3) 1
OUTTURN ON A MANAGED BASIS 147,049 149,549 2,500 164,686 166,695 2,009 311,735 316,244 4,509 4,769 (260)
Return Hosted Over/Underspends East 0 0 0 0 (389) (389) 0 (389) (389) (461) 72
Return Hosted Over/Underspends South 0 0 0 0 (340) (340) 0 (340) (340) (403) 63
Receive Hosted Over/Underspends South 0 0 0 0 133 133 0 133 133 133 0
Receive Hosted Over/Underspends East 0 0 0 0 (55) (55) 0 (55) (55) (52) (3)
OUTTURN ON AN IJB BASIS 147,049 149,549 2,500 164,686 166,044 1,358 311,735 315,593 3,858 3,986 (128)
(Under)
Spend
Variance
at Period
6
Movement
in projected 
variance
from Period
6
TOTAL
Partnership Budget - Objective Summary
Council Health
2023/24 Budget

Page 17

PUBLIC INFORMATION 
2023-24 Savings Tracker            Appendix B 
Savings
ref
number
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
month 7
2023/24
Saving
Description of the Saving
1 Staffing reconfiguration - children &
families
Amber Red 273,000     Review staffing provision within children’s houses with the saving
phased over 2023/24 and 2024/25 – 50/50
2 Deliver the Strategic Plan objectives for
Older People's Residential Services -
Reduction in Care Home Places
Amber Blue 1,000,000  The budget for 23/24 would fund an average 780 places at the
current split of nursing/residential (60/40).  This reflects reduced
demand and investment in CAH to support more people at home.
3 Care Home Respite Amber Green 560,000     All respite care to be provided in-house at Anam Cara and
Montrose House and any use of other respite provision funded via
Carers budget.
4 Montrose House Capacity Green Amber 210,000     Registration amended from 30 beds to 20 beds across 2 staffed
wings.  This is supported by introduction of intermediate care beds
at Arran War Memorial Hospital.
5 Reconfigure respite provision at Anam
Cara
Amber Amber 112,000     The service is currently relocated to Taigh Mor (8 beds) on a
temporary basis and this proposal would reduce capacity from 14
beds to 9 beds in one wing when it reverts to Anam Cara.
6 Trindlemoss pool running costs Green Blue 85,000       Trindlemoss Pool has never opened due to ongoing maintenance
issues.  The historic budgeted running costs are £0.085m but it is
expected actual costs would be much higher.  The pool will not
open and alternative therapies will be provided e.g. bounce
7 Trindlemoss Day Care Green Blue 168,932     Trindlemoss day opportunities staffing was restructured during
2021/22 and 2022/23.  This saving has already been achieved and
will remove the additional staffing budget.
8 Intermediate Placement Scheme -
cessation of service
Green Blue 30,000       The contract has ceased and will not be renewed.
9 Carers Act Funding - Substitution of
Spend
Green Blue 500,000     There is a plan in place to invest across carer service contract,
preparation of carer plans, short breaks and other support to
carers.  This proposal will invest £0.500m in contributions to Red
Rose House, Roslin House, Anam Cara, waiving of charges and
day services.
Children, Families & Criminal Justice
Community Care & Health
Mental Health
Other Areas

Page 18

PUBLIC INFORMATION 
Savings
ref
number
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
month 7
2023/24
Saving
Description of the Saving
10 Payroll Turnover - increase to target (social
care)
Green Blue 1,000,000  The saving is based on less than 50% of the 2022/23
overachievement
11 Income Generation - 5% Increase to fees and
charges
Green Blue 46,600       Implement a 5% increase to fees and charges and a 5% increase to
the maximum charge.  The impact will be limited where service
users are already paying the maximum charge.
12 Staffing Reconfiguration - Finance and
Transformation
Green Blue 35,091       Saving released through management and admin structure change
TOTAL SOCIAL CARE SAVINGS 4,020,623 
Health:
Savings
ref
number
Description
Deliverability
Status at
budget
setting
Deliverability
Status at
month 7
Approved
Saving                  
2023/24          
£m
Description of the Saving
13 Payroll Turnover - Health Lead
Partnership
Green Blue 392,245     The saving is based on less than 25% of the 2022/23
overachievement
14 Payroll Turnover - Health Non Lead
Partnership
Green Blue 250,000     The saving is based on less than 50% of the 2022/23
overachievement
15 Reprovisioning of Continuing Care beds Amber Blue 300,000     Currently provided through Cumbrae Lodge Care Home in Irvine
but the provider does not want to continue to provide the service. 
Plans are being developed to relocate the service to Taigh Mor in
Beith with an anticipated saving of £0.3m.
TOTAL HEALTH SAVINGS 942,245    
4,962,868  TOTAL NORTH HSCP SAVINGS
Other Areas

Page 19

PUBLIC INFORMATION
2023-24 Budget Reconciliation               Appendix C 
COUNCIL Period 
Permanent
or
Temporary
£'m
Initial Approved Budget     121.408
Less Living Wage Fund not yet
allocated      (2.826)
Revised Budget     118.582
Resource Transfer 1-6 P 24.640
HSCP Fin Circ 3 1-3 T 0.013
Living Wage - final allocation  1-3 P 2.808
ICT Licences Various 1-3 P (0.012)
Island Funds  1-3 T 0.015
Facilities Management Costs -
Montrose House 1-3 P 0.387
West Road - Capital funded from
Revenue  1-3 T (0.300)
Care at Home – Draw from reserves 4 T 0.173
Transport (taxi) budget transferred to
HSCP
6 P 0.247
Curator fees budget transferred from
Legal Services
6 P 0.004
Fostering and Kinship – additional SG
funding re increased rates.
6 P 0.486
Commercial Waste  7 P 0.005
Roundings 7  0.001
Social Care Budget Reported at Month 7 147.049
HEALTH Period 
Permanent
or
Temporary
£'m
Initial Baseline Budget     164.500
Month 10-12 Adjustments     2.473
MDT funding     0.828
Adjust for full year impact of part year
amounts     0.052
Revised Baseline     167.853
Baseline Funding Increase     2.164
Adjust for recurring funding     7.629
Adjust for non-recurring     2.434
Resource Transfer     (23.597)
2023/24 Opening Position     156.483
Net impact of Pan Ayrshire Pressures 1 P 0.028

Page 20

PUBLIC INFORMATION
Top Slicing Posts 2022-23 2   (0.054)
MDT Funds to Arran Medical Group 3   (0.033)
Training Grade Adjustments 3   (0.035)
Ward 3 Band 2 Domestic 3   (0.004)
V2 B6 to AHM233 3   (0.061)
Virement 12 Band 2 Domestic 4   (0.010)
Virement 18 Band 3 budget transfer - J
Baird 4   0.019
Lymphoedema Top Slice RX 4   (0.029)
HD Ref 51 Band 2-4 4   0.054
District Nursing Anticipated 5  0.032
HD REF 110 Multi-Disciplinary Teams 5  0.120
Post (EB) transferred to Medical Records 5  (0.037)
Integrated Infant Feeding (South) 5  0.057
Integrated Infant Feeding (SG) 5  0.050
2023-24 RX Budget 6  (0.908)
Training Grade ADJ - August 6  0.270
PFG LOCAL IMPROVEMENT 6  0.457
ADP National Mission 6  0.207
ADP Residential Rehab 6  0.094
ADP AFC Pay Uplift 6  0.091
ADP Lived & Living Experience 6  0.009
ADP Drug Prevalence 6  0.059
ADP Whole Family Approach 6  0.066
ADP MAT 70% 6  0.175
HD126: MENTAL HEALTH AFTER COVID
HOSPITALISATION SERVICE 23-24 6  0.039
REMOVE Anticipate MACH (Mental Health
After Covid) 6  (0.102)
HD185: MENTAL HEALTH OUTCOMES
FRAMEWORK 6  2.178
HD227: DELIVERY OF VETERAN
SPECIFIC MENTAL HEALTH SUPPORT 6  0.105
HD229: DIGITAL THERAPY POSTS 6  0.059
COMMUNITY PHLEBOTOMY - NORTH
SHARE 6  (0.039)
SOUTH ADP WARD 5 W/VIEW PAY
UPLIFT 6  0.003
SOUTH ADP ORT PAY UPLIFT 6  0.005
SOUTH ADP PREV&SERVICES
SUPPORT PAY UPLIFT 6  0.004
Apprenticeship Levy 6  0.225
Training Grade ADJ - September 6  (0.007)
ADP PSST Support - South 6  0.008

Page 21

PUBLIC INFORMATION
South Naloxone kits 6  0.002
South MAT Funding - Psychiatry 6  0.029
ADP Pay Uplift 6  0.003
Drug Tarif Anticipate 2023-24 6  0.525
North HSCP Medical Pay Award 23/24 6  0.532
LDS Shortfall - Alloway Place 7  (0.008)
TEC (North) to CSS 7  (0.075)
Budget adj for Buvidal use NADARS 7  (0.002)
MH Strategy Action 15 Workforce 23-24 7  0.879
CAMHS IMP - IPCU 7  0.243
CAMHS IMP - INT HOME TREATMENT
TEAMS 7  0.221
CAMHS IMP - OOH UNSCHEDULED
CARE 7  0.148
CAMHS IMP - LD FORENSIC AND
SECURE 7  0.089
HD305: SPECIALIST COM PERINATAL
MH, INFANT MH & NEONATAL
PSYCHOLOGY INTERVENTION 7 
0.373
ANTICIPATE TRANCHE 2: SPECIALIST
COM PERINATAL MH, INFANT MH &
NEONATAL PSYCHOLOGY
INTERVENTION 7 
0.215
DE-ESCALATION ROOMS TO
RESOURCE 7  (0.025)
Hd254 Pharmacy tariff reduction to
reflect historic NRAC share. 7  (0.015)
Hd256 Increase to the pharmacy tariff to
match the actuals on the national allocation
letter. 7 
0.018
Roundings 7  (0.001)
Anticipated budgets included in the report
but not in the ledger 7  3.000
Health Budget Reported at Month 7 164.686    
TOTAL COMBINED BUDGET      311.735