Democracy Spraffa

Urgent and Unscheduled Care Update & North Ayrshire Improvement Plans

North Ayrshire Council · 12 October 2023
Back to Integration Joint Board — 12 October 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Integration Joint Board
12 October 2023
Subject:  Urgent and Unscheduled Care Update & North Ayrshire
Improvement Plans
Purpose:  To highlight to the IJB performance in relation to Urgent and
Unscheduled Care, highlighting areas of risk and to detail the current
plans for winter preparedness, including actions and plans being
progressed to reduce delays and unmet need, within the North
Ayrshire Health and Social Care Partnership’s Community Care
Services.
Recommendation:  The IJB are asked to note the ongoing programme of work in relation
to Urgent and Unscheduled Care and Winter planning across
Ayrshire and Arran and the specific actions being progressed in North
Ayrshire. 
Glossary of Terms 
IJB Integration Joint Board
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
LOS  Length of Stay 
ED Emergency Department
CAU Combined Assessment Unit
UHC University Hospital Crosshouse
UHA University Hospital Ayr
MHO Mental Health Officer
FNC Flow Navigation Centre
EICT Enhanced Intermediate Care Team
SAS Scottish Ambulance Service 
1. EXECUTIVE SUMMARY 
1.1 The Integration Joint Boards have delegated responsibility for elements of Urgent and
Unscheduled Care activity in large hospitals.  A previous report was presented to the
IJB in June 2022 setting out those arrangements, the programme of work in place to
improve performance at that time and the areas where focused action was required
to improve services for the people of Ayrshire and Arran.  This report will provide an
update to the current position and an overview of whole system plans to ensure that
the Integration Joint Board is aware of the current situation, challenges, risks and
potential impact.   
2. BACKGROUND 
2.1 The previous report referred to the impact and legacy of Covid-19 which was evident
in performance measures and trends, not only for Urgent and Unscheduled Care, but
across the health and care system.  This report will detail the programme of work that
has been in place across Ayrshire and Arran to support patient outcomes and improve
performance.

Page 2

2.2 The improvement work has also been supported by a series of Whole System
Intervention(s) which took place across both acute and community hospital sites late
in 2022 through to mid-2023.  These Whole System Interventions were sponsored by
the 3 HSCP Directors and commenced with a 2-week event in November 2022
supported by a range of teams from across both hospital and community settings and
continued with events fortnightly and latterly monthly until April 2023.  The ambition of
the Whole System Intervention(s) was twofold: 
1. To firstly assist with immediate decompression of the acute and community
hospitals in Ayrshire and Arran which at the time were experiencing extended
periods of challenge due to capacity and demand.
2. To identify and support medium to longer term improvements which could be
implemented across the whole system.   
Following the events an action plan was developed and this was monitored through
the Discharge Without Delay Oversight Group.   
2.3 Whilst there have been significant efforts made and some areas of improving
performance and patient outcomes, there remain areas where progress has been
challenging.   
The previous report presented to IJB on unscheduled care provided information on
additional acute hospital bed capacity which had been created across both University
Hospital Crosshouse and University Hospital Ayr as a response to the COVID
pandemic.  This additional bed capacity was however unfunded, and it was estimated
that cost of those beds for 2022-23 would be £9m, to date for 2023-24 after 5 months
the unfunded beds have cost £4.7m.  A focussed programme of work with a view to
closing the unfunded beds, linked to the activity around improving Urgent and
Unscheduled Care Performance, has been in place since 2022.  Whilst a number of
unfunded beds have been closed across University Hospital Crosshouse and
University Hospital Ayr, there remain unfunded beds remain open going into the winter
period.  In addition to this both hospital sites have utilised the Full Capacity Protocol
which results in placing additional patients in unfunded beds in ward areas and other
areas of the hospital.  This also impacts on wider community services including the
use of capacity in downstream beds and support required from HSCP community
teams.   
3.1 Urgent and Unscheduled Care 
Urgent and Unscheduled Care Collaborative 
In June 2022 the Scottish Government announced its plans for reshaping
unscheduled care services in Scotland through the Urgent and Unscheduled Care
Collaborative.  This approach of both investment and reform is designed to facilitate
change using a collaborative improvement methodology across the whole system
moving from a recovery phase to a period of building resilience whilst developing new
models of care to optimise the delivery of unscheduled care and ultimately improve
health outcomes. 
The collaborative aims to facilitate change by supporting organisations to focus efforts
on high impact levers and developing new pathways and models of care from a
perspective focussed on people, not place.  The High Impact Change model is
detailed in the graphic below and this model aims to focus teams on doing the right

Page 3

things to ensure the delivery of Right Care in the Right Place, for Every Person, Every
Time. 
Ayrshire and Arran Urgent and Unscheduled Care Plans 
As part of the Collaborative work, a nationally developed self-assessment tool was
used locally in Ayrshire and Arran by NHS AA and HSCP colleagues to identify and
agree three priority areas from the eight high impact changes detailed within the High
Impact Change model. 
HIGH IMPACT CHANGE PLAN 
These were initially categorised as Pre, Intra and Post Hospital delivery groups as
summarised below:

Page 4

Delivery Group Primary Workstream(s)
Pre-Hospital  • Care Home Urgent Care Pathways
• Medicines in Reserve (COPD)
• FNC/SAS Joint working
• Mental Health
• MSK Pathway
Intra Hospital  • Hospital at Home
• Discharge without Delay
• OPAT Cellulitis Pathway
• Same Day Emergency Care
• ED – Surgical Orthopaedic Flow
Post Hospital  • Discharge without Delay
• Rehabilitation and Reablement
• Multi-Disciplinary Place-based Working 
REVISED NHS AA URGENT AND UNSCHEDULED CARE IMPROVEMENT PLAN
2023-24 
Following a review of progress mid-2023, a revised and updated Urgent and
Unscheduled Care Improvement Plan (2023-24) was developed replacing the original
delivery groups and initially directed into four work stream delivery groups, with a fifth
group latterly added – these are detailed below: 
Workstream and aims Workstream Priorities 
1. Providing alternatives
to front door
attendance   
To provide alternatives to 
front door attendance and
admission, maintaining and
improving reduction in
scheduled and unscheduled
attendances.
• Enhance the Ayrshire Urgent Care Service to
provide care that ensures that less than 15%
of demand requires attendance at hospital.
• Eliminate inappropriate and unnecessary
conveyance to hospital using the Call Before
Convey Pathway.
• Enhance access for Care Homes to AUCS,
including redirection to other appropriate
pathways during the out of hours period.
• Provide alternative navigation to community
mental health services of Urgent Mental
Health Patients.
• Expand the evidence-based Community
Rapid Respiratory Response Pathway across
all three HSCPs.
• Further develop the Community Pharmacy
pathway into AUCS to support patients to
access appropriate care and avoid
unnecessary attendance at the ED.
2. Reconfiguration
(streamlining) of front
door services 
To minimise admission,
stream where possible to
same day care services and
maximise efficiency to
maintain patient flow
• Increase redirection of flow 1 attendances
• Eliminate 12 hour waits.
• Reduce and maintain NHS Ayrshire and
Arran’s median SAS turnaround time in line
with the Scottish median.
• Ensure 100% of patients arriving by
ambulance will be handed over within 60
minutes by August 2023

Page 5

• Stream 75 patients per week to Rapid
Assessment and Care (UHC) and achieve a
same day discharge of 75%
• Stream 60 patients per week to Rapid
Assessment and Care (UHA) and achieve a
same day discharge of 75%
• Reduce the average length of stay in Initial
Assessments in both CAU’s
• Increase same day discharge at both acute
sites
• Use short stay pathways to maximise the %
of patients managed within 72 hours
• Increase Hospital at Home virtual capacity
3. Reducing average LOS 
To reduce the average acute
length of stay (excluding
delayed transfers of care)
using the best practice from
DwD
• Reduce average length of stay for non-delays
by 20%
• Implement Associate Medical Director led
MDT Board rounds 
• Implement MDT board round in every acute
ward
• Increase pre-noon discharges
• Increase the weekend discharge rate as a %
of the weekday rate
• Increase the use of discharge lounges
4. Reducing delayed
transfers of care in all
bed based care models 
To reduce the average
length of stay for patients
delayed in their transfers of
care for South Ayrshire
patients
• Increase Care at Home capacity in South
Ayrshire
• Undertake a test of change in South Ayrshire
for a virtual stroke pathway
• Continue to hold monthly whole system
intervention events
• Implement discharge to assess care home
model in South Ayrshire
5. Paediatrics 
To reduce ED
presentations, reduce time
to assessment and provide
care closer to home 
• Redesign the GP referral pathway
• Reduce the average time from arrival in PAU
to first medical assessment to 60 minutes
• Increase the % of patients that are admitted,
discharged or transferred within 4 hours of
arrival in Paediatric Assessment Unit
• Reduce admissions to, and the length of stay
in, 1B by managing patients in the community
via a paediatric Hospital @ Home service 
In addition to the refocused work streams a renewed governance structure of the
Urgent and Unscheduled Care Improvement Plan (2023-24) has been introduced to
ensure executive oversight and assurance.  This Oversight Group reports directly to
the Strategic Planning & Operational Group (SPOG), which includes membership from
the 3 HSCP Directors, Director of Acute Services and the NHS AA Director of
Transformation & Sustainability, and thereafter to the Corporate Management Team
(CMT) in NHS AA.  The Oversight Group is currently co-chaired by the Head of Health
and Community Care in North Ayrshire and NHS AA Director of Acute Recovery and
Reform. 
It is the ambition of the Urgent and Unscheduled Care Improvement Plan to deliver,
in full, a dedicated improvement project to eliminate SAS handovers of greater than

Page 6

60 minutes, <4 hour journey times for non-admitted patients and to reduce the number
of patients waiting 4, 8 and 12 hours for admission in the Emergency Department(s)
and the Combined Assessment unit(s) of both University Hospital Crosshouse and
University Hospital Ayr. 
It is, however, recognised that whilst significant progress has been made this has not
been at the pace and scale required, particularly as the system moves into respond
to winter pressures.  Most notably significant progress has been made in areas which
relate to the Pre and Post Hospital delivery areas. 
The new Urgent and Unscheduled Care Improvement Plan (2023-24) outlines
ambitious trajectories with clear measures for improvement and whilst there has been
success in some areas, particularly performance linked to Workstream 1, there have
been challenges in achieving and sustaining improvement in Workstreams 2, 3 and 4. 
As such there is currently limited assurance over the scale of improvement delivery
and impact on supporting the whole system, particularly over the winter period.  Plans
are currently being progressed to urgently develop a whole system Urgent and
Unscheduled Care Recovery Plan, which will be linked specifically to improved
performance and whole system winter resilience, through the identification of SMART
actions. 
3.2 Unscheduled Care Performance 
The information below provides an overview of some of the performance in areas
highlighted as a priority and puts into context over time the Unscheduled Care
Performance in Ayrshire and Arran. 
Emergency Department Attendances: 
Since November 2020 Ayrshire and Arran has been implementing The Redesign of
Urgent Care Programme.  This looks to build on opportunities to support the public to
access the Right Care in the Right Place at the Right Time.  This Programme has
been delivering service redesign within Ayrshire and Arran since that time with the
implementation of a Flow Navigation Centre which acts as the hub and single point of
access for calls originating through the NHS24 111 telephone line.  The intent of the
Flow Navigation Centre was that each ED would see a reduction in self-presentations
due to the ability to triage at NHS24, a clinical assessment at the FNC, and the
opportunity to schedule patients to attend either ED or MIU.  Performance of services
prehospital has been maintained above the baseline level with less than 15% of
Ayrshire and Urgent Care Services demand requiring unscheduled care.  In August
2023, 97% of patients who contacted Ayrshire Urgent Care Services (AUCS) and
required a clinician response were contacted within response time, exceeding the
local target of 85%. 
It is evident in the data that the Covid restrictions had an impact at different points,
and data shows that ED attendances reduced considerably whilst lockdown and
restriction measures were in place.  The overall level of ED attendances at both acute
hospitals is currently lower than pre-pandemic levels, as a result of the work on re-
directions of patients to more appropriate settings and the Flow Navigation Centre
supported by senior clinical decision makers screening patients.  There was a
reduction in overall ED attendances from mid 2022 to the lowest level in February
2023 however since then ED attendances have steadily risen to levels similar to early
2022.

Page 7

Despite this, the number of unscheduled ED attendances remain lower than they were
over the same period in 2022: 
ED 4 Hour Wait Target: 
The 4 hour Emergency Department Access target is considered nationally as a clear
barometer of safe and timely care, and whole system effectiveness.  Performance
information shows that the 4-Hour Wait compliance for unscheduled ED attendances
had been on a continuous decreasing trend since April 2021.  However despite
remaining below the 95% compliance target (of people admitted, discharged or
transferred within 4 hours) there had been positive movement in terms of an overall
upwards trend since March 2023.  It is recognised that to achieve this target is reliant
on a whole system response including reducing variation in attendances, admissions,
length of stay and discharges.   
The below demonstrates AA performance against the 4 hour target against national
benchmarking.   Since falling to a low in December 2022, compliance against the ED

Page 8

4-Hour standard continues on a sustained increase trend, reaching 68.9% in August
2023. This rise is within ‘normal’ variation limits, however performance remains below
the 95% national target. Compliance has consistently been higher at UHC than UHA. 
SAS Median Turnaround Times: 
The median SAS turnaround time is the amount of time it takes to reach 50% of
patients and includes the time ambulance crew were waiting to handover a patient to
the care of the hospital staff plus any additional time they spent at hospital.  In Ayrshire
and Arran this had reduced from 53 minutes in August 2022 to 47 minutes in August
2023, with peaks at other times throughout the year.  Weekly data does however
indicate a rise in recent weeks with the median SAS turnaround time increasing to
above 50 minutes for the combined position across both acute sites. 
ED 12 Hour Breaches: 
The combined number of Emergency Department 12 Hour breaches showed a
positive reduction earlier in April 2023 however this was not maintained and since
June 2023 these have been steadily rising.

Page 9

The NHS AA Annual Delivery Plan trajectory for 2023-24 is for no 12 hour breaches
in ED by August 2023. In August 2023, the number of breaches at University Hospital
Crosshouse (UHC) increased to 453 from 404 breaches. The number of breaches at
University Hospital Ayr (UHA) have remained similar in comparison with the previous
month from 314 to 319. 
Average Length of Stay (LoS): 
The average length of stay (in days) for non-delayed patients across wards at Ayr
Hospital has reduced from 8.0 days in August 2022 to 6.5 days in August 2023, having
reached a peak of 8.6 days in April 2023 during this period.  At Crosshouse Hospital
the average length of stay has reduced from 9.1 days in August 2022 to 8.6 days in
August 2023, with a peak of 11.6 days experienced in December 2022.  September
data reports a LoS at UHA of 7.8 days and 8.6 days at XH. 
Any increase in the LoS is a significant area of concern having implications for patient
care and outcomes, as there is evidence that longer lengths of stay result in higher
needs of patients on discharge, with more patients requiring higher levels of care than
would be anticipated on admission due to hospital acquired deconditioning. 
The average LOS also masks the significant variation for patients some of which have
very lengthy stays, in September 2023 there were 286 patients with a LoS over 14
days, in September 2022 there were 334 patients.

Page 10

Below shows the number of patients for both sites with a LoS greater than 14 days: 
Delayed Transfers of Care: 
Timely discharge from hospital is an important indicator of quality and is a marker for
person-centred, effective, integrated and harm-free care. The term delayed discharge
is used to describe a situation whereby a patient in hospital has been assessed as
clinically ready for discharge from inpatient hospital care and continues to occupy a
hospital bed beyond the date they are ready for discharge. 
The graph below shows the number of delayed transfers of care for each HSCP, this
data captures all delays across all NHS AA hospital sites including community and
mental health settings.  The total number of people delayed in their discharge from
hospital has risen from 187 at the end of July 2022 to 251 at the end of July 2023 with
a peak of 261 reached at the end of December 2022.   
It should be noted that not all delayed patients are cared for in the two acute hospitals
and on average about 50% of delays are in acute sites. 
The table below illustrates in more detail the delayed patients for North Ayrshire and
their location:

Page 11

As at 9 October 2023 there were 69 delayed patients for North Ayrshire, these are
split between 40 in NHS Acute hospitals, 18 in A&A Community Hospitals and 11 in
Mental Health wards. Of the total 69 delays, 25 relate to patients where AWI legislation
applies.  For the 40 acute hospital delays, outwith AWI delays, there were only 5
patients delayed for more than 14 days.   Outwith AWI delays, which do have an
extended length of stay, the remaining delayed discharges are very fluid, change on
a daily basis and represent a constantly changing patient co-hort. 
Work has progressed with the three HSCPs to reduce the length of stay for delayed
patients from a median length of 30 days to 21 days by the end September 2023.  
Whilst data shows this did fall from 29 at April 2023 to 23 at June 2023, this has since
increased to 27 in July 2023 in line with an overall increase in delays. 
The formal measure of performance for Delayed Discharges applies to the number of
delays over two weeks, the table below shows the number of delays over two weeks
at the end of month census date for each HSCP.   
There are many factors which impact upon levels of delayed discharges within the
North Health and Social Care Partnership including capacity for onward care provision
and Adults with Incapacity legislation.  The process for supporting individuals to be
discharged when their health and care needs have changed can be very complex. 
Limitations of community capacity in Care at Home, Care Homes and for complex care
services remain the main challenge to further reducing delayed discharges, with plans in

Page 12

place in the HSCP to increase capacity, these plans have been impacted by staff absence,
vacancies and ongoing fragility in the provider market. 
Adults with Incapacity 
Adults with Incapacity delays refer to hospital inpatients who are considered to be a
delayed discharge due to the adult lacking capacity to make informed decisions
regarding their future care and where a need has been identified for a proxy decision
make to be formally appointed under the Adults with Incapacity (Scotland) Act 2000
(hereafter AWI Act).  This allows for a nominated person to make some or all decisions
on the adult’s behalf and ensure that their best interests, views and the least restrictive
options are considered.  For many adults this results in the application of a
Guardianship Order to safeguard their welfare and manage their financial or property
affairs.  Applying for a Guardianship Order under the AWI Act requires the involvement
of several agencies ranging from social work staff, Mental Health Officer’s (MHO),
Independent Advocacy workers, Local Authority and private solicitors, Scottish Legal
Aid Board, Scottish Courts and the Office of the Public Guardian.  Unfortunately, there
can be delays at any point in this process at these various stages and a number of
challenges have been recognised nationally in progressing.   
North Ayrshire Health and Social Care Partnership has experienced high levels of
delays linked to AWI processes.  To date a number of measures have been
implemented including additional MHO capacity and dedicated MHO support within
the hospital social work assessment team.  Despite this, delays linked to AWI in North
Ayrshire remain high, and whilst this can account for around one third of all delays
across the Partnership at any one time, people delayed for the longest time in terms
of delays are usually associated with AWI processes therefore this has a significant
impact on the individual people delayed. 
Accessing Care and Support 
Limitations of community capacity for care and support services continue to be the
main challenge to reducing delayed discharges.  This includes access to Care at
Home services, Care Home placements including interim care beds and long term
placements, and support for adults with complex needs.  There are limited resources
for delivery of care across all of these service areas for both services that are delivered
directly by the Health and Social Care Partnership and those commissioned via third
sector and independent providers.  This is typically impacted by the significant
workforce challenges facing the Health and Social Care sector and continues to limit
the success of plans to expand and enhance service delivery.   
Discharge without Delay: 
NHS AA and the three Ayrshire HSCPs were part of a national pathfinder programme
in relation to Discharge without Delay (DwD), which has now been rolled out across
Scotland. This is supported by the Scottish Government DwD steering group and
improvement teams. One of the aims of the programme is to deliver Discharge without
Delay within both community and acute settings, working in close partnership with
hospital and community teams to agree the most effective and efficient process to
ensure positive outcomes for patients.   
A significant number of patients are discharged without delay, currently sitting at
94.4% of patients across A&A, this has reduced from the 95% reported in June.

Page 13

The proportion of patients discharged without delay has remained fairly constant
between 94% and 95% since May 2022. This varies by HSCP with North Ayrshire
HSCP currently reporting 93.3% and East Ayrshire HSCP reporting generally being
the highest since May 2022. The percentage of discharges without delay in South
Ayrshire HSCP has increased from 87.0% in w/c 2 May 2022 to 94% in w/c 25
September 2023. 
3.3 Winter Preparations 
Winter Preparedness Checklist 
In September 2023, ahead of the Scottish Government’s Winter Plan, Health Boards
and Health and Social Care Partnerships were asked to work in collaboration as a
whole system to complete a Winter Preparedness Checklist to provide an overview of
Ayrshire and Arran’s state of readiness for Winter.  Winter resilience priorities promote
the strengthening of whole system planning to ensure there is resilience across key
areas for supporting seasonal increases in demand.   
The Winter Preparedness Checklist was focused on the key areas as follows: 
• Overview of preparedness and business continuity planning
• Urgent and Unscheduled Health and Social Care,
• Planned Care;
• Primary, Mental Health and Social Care;
• Health and Social Care Workforce and Staff Wellbeing. 
Whole System Discharge Planning Self-Assessment   
In addition to the Winter Checklist, Health Boards and Health and Social Care
Partnerships have also been asked to submit a quarterly Whole System Discharge
Planning Self-Assessment Tool.  The Self-Assessment is designed to provide
assurances to ministers that the Delayed Discharge and Hospital Occupancy Action
Plan is being enacted as part of preparations for winter and the recent submission
was for Quarter 2.  We anticipate feedback from Scottish Government later in October
2023. 
3.4 Service Demands 
3.4.1 Care at Home Service

Page 14

Demand for Care at Home services remains high, and at approx. 30% of an increase
from pre pandemic levels.  Referrals to Care at home services in North Ayrshire are
made from a number of sources – community referrals such as family, self referral,
GP/nurse etc, referrals made from the Enhanced Intermediate Care Team and
referrals to support people on discharge from hospital.  There is an eligibility criteria
with formal Care at Home supports only provided to those who have been assessed
as having critical and/or substantial care needs. 
Across 2023, the service has received an average of 296 referrals per month, with
around 51% of all referrals to support hospital discharge.  Note, some numbers may
be duplicated due to re-referrals where change in discharge status occurs.  The level
of community referrals is fairly static however referrals via the hospital can experience
high peaks in demand.  What is challenging to articulate is the level of need and
complexity for those requiring Care at Home supports however it is recognised that
the landscape of traditional Care at Home supports has changed with people who
have more complex health and social care needs choosing to be supported in their
own homes.  This is reflected in the recent Care at Home Assistant role review which
supports the workforce in the undertaking of more advanced types of care and
support. 
In the month of September 174 Care at Home Packages were confirmed to support
discharge from hospital, with a further 54 in the community.  
The trend is further illustrated by the average number of people who received a Care
at Home service on a weekly basis.  Pre pandemic in 2019 to 2020 an average of
1,239 people on weekly basis across North Ayrshire were receiving care via inhouse
delivery, compared to 863 people via external providers.  Currently an average of
1,767 people on average on a weekly basis receive their care at home via inhouse
Care at Home provision compared to 280 people via external providers.
This has significantly shifted from the position previously reported below: 
0
50
100
150
200
Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23
Demand
Communiy Hospital ICT

Page 15

The level of Care at Home provision in place across North Ayrshire is further
demonstrated by recent figures which detail over 12,300 hours of support (circa 640k
annually) and 31,000 Care at Home visits provided on a weekly basis by the
Partnership’s In-house care at service, with a further 3,000 hours of support (circa
156k annually) provided on a weekly basis by commissioned care providers. 
The most recent Local Government Benchmarking Framework (LGBF) information
published for 2021-22 also demonstrates the impact this investment has on supporting
people to remain supported at home.
The graph below illustrates North Ayrshire performance compared to our family group:
Percentage of people aged 65 years and over with long-term health needs who are
receiving personal care at home: 
North Ayrshire is continuing to improve performance in this area, providing the third
best performance in our family group after West Dunbartonshire and East Ayrshire
Councils (72.9% and 71.13% respectively).  It should be noted, that due to data
completeness issues, some data for this indicator has been modelled by the
Improvement Service.
As noted we have seen an unprecedented increase in demand for Care at Home
Services, which has increased by 30% since pre-pandemic levels.  
The graph below further illustrates this and demonstrates the weekly discharges in
A&A with support required to be in place:

Page 16

We are acutely aware of the local demographic challenges our communities face and
the impact this has on the health of the population.  Being the second highest area for
Child Poverty, the second highest for proportion of the population with Long Term
Conditions and a growing older population.  There is evidence emerging in relation to
the impact of poverty-related health inequalities with more likelihood of ED attendance
and a longer length of stay on admission.  The North Ayrshire HSCP are engaging
with Public Health colleagues and our LIST analyst in Ayrshire and Arran to
understand the impact on our local population and the evident impact this is having
on demand for our services, including Unscheduled and Long-Term Care needs.
3.4.2 Unmet Need 
The HSCPs provide weekly data returns to the Scottish Government to illustrate
unmet need across the system.  This focusses particularly on waits for Care at Home
Services, Statutory Social Care Assessments and Reviews.   
The below table provides a snapshot of this data return from June 2022: 
Unmet Need Data Return Jun-22 Sep-22 Jan-23 Apr-23 Jul-23 Sep-23
Waiting for Social Care
Assessment:            
Hospital 1 3 3 2 2 3
Community 195 231 249 225 189 229
Assessed and Awaiting POC:            
Hospital 27 18 25 25 21 33
Community 147 165 229 188 205 202
Awaiting a Statutory Review 339 299 360 318 297  346
Weekly Hours of Unmet Need            
Hospital 325 216 341 304 251 359
Community  1,284 1,413 1,721 1,170 1,299 1,483 
Over time there has been no significant improvement in the position in terms of unmet
need and whilst the Partnership’s inhouse Care at Home service has continued in its
growth month on month, the benefit of this has been negated by both ongoing demand
for services and the continuous reduction in capacity via independent care providers. 
It is not expected that there will be a demonstrable improvement without additional
workforce resources and capacity being in place. 
There remains a significant difference in the level of unmet need between individuals
awaiting care in hospital compared to community, with almost 80% of the current
hours of unmet need being for individuals on the community waiting list and a
significant number of individuals in the community awaiting assessment and review.
This is reflective of the continued focus on prioritising packages of care for individuals
in hospital to support with wider hospital pressures.  However, the impact of this is the
continued risk posed to those individuals in the community who have been assessed
as requiring support and this is not in place, this is not in line with the early intervention
approach to keeping people safe, fit and well.  A focussed piece of work is underway
to review all individuals on the Care at Home waiting list to ensure any risks are
identified and opportunities are maximised for promoting independence, in the last two
weeks 165 people have been reviewed, with a changes identified for 13.   
The North HSCP has undertaken a significant and ongoing programme of recruitment
across the Care at Home service to ensure sufficient contingency and capacity to
maintain the safe delivery of critical Care at Home supports in North Ayrshire.  Whilst

Page 17

the impact of this recruitment is yet to be fully realised in terms of reducing the levels
of unmet need in the community, it is evident that this has enabled the ongoing delivery
of care to some of the most vulnerable people across our communities in recent times
of crisis and challenge across the health and care sector.  It is anticipated that
reduction in delayed discharges and community waits will be realised upon successful
recruitment of additional capacity planned for the service.  Further information on
recruitment activity can be made available to members on request. 
3.4.3 Care Homes - Pressures and Demand 
There are 17 older people’s care homes in North Ayrshire which provide a mix of both
residential and nursing level care.  Concerns regarding the fragility of the older
people’s care home market in Scotland are well documented and in North Ayrshire
there are particular concerns regarding the pattern of reducing bed availability, quality
of care being provided resulting in moratoriums on new admissions and the future
stability of the market.  There have been a number of changes in the care home market
in North Ayrshire in recent years including Providers taking the business decision to
move from supporting both residential and nursing residents to only considering
residents who have been assessed as requiring nursing care.  There has also been
the permanent closure of 2 care homes in North Ayrshire in the previous 24 months. 
Whilst to date in North Ayrshire demand has not yet outstripped capacity the table
below provides a summary of the current number of Care Home Placements funded
by the Health and Social Care Partnership and bed availability, including interim bed
availability, across older people’s care homes in North Ayrshire.  This evidences a
continued and recent stark decline in bed availability.  In practical terms this
significantly limits the choice available to people and their families and is a further
barrier to supporting people to be discharged from hospital without delay. 
Month
Total
Funded
Placements 
Care Home
Bed
Availability 
Sep-22 759 56
Oct-22 767 64
Nov-22 777 55
Dec-22 782 38
Jan-23 751 71
Feb-23 763 68
Mar-23 757 71
Apr-23 772 46
May-23 765 50
Jun-23 770 45
Jul-23 774 36
Aug-23 772 19
Sep-23 788 28
Oct-23 794 14 
As part of plans to support discharge without delay, the North Partnership has
successfully utilised interim beds throughout 2022 and 2023 to facilitate earlier
discharge from hospital for those people who have been considered medically fit for
discharge and require an assessment of their future care needs, however are unable
to be discharged home.  As detailed in the above table the availability of beds has
been steadily reducing throughout 2023 and there are currently no interim beds
available which presents a challenge to the Partnership’s plans and supporting a

Page 18

discharge to assess model.  The Partnership has been engaging with the market in
recent months and benchmarking across other HSCP’s regarding the approach to
commissioning interim beds.  As a result, the Partnership is in the process of liaising
with care homes who consider nursing referrals to commission 6 beds, ideally in one
care home for a period of 6 months. 
There have been positive developments in relation to support for Care Homes in North
Ayrshire and this will continue over the winter period.  Care Homes in Ayrshire have
direct access to Urgent Care during the out of hours period for their residents.  This
includes redirection to other appropriate pathways.  This results in a reduction in the
need for Care Home residents to be conveyed to hospital for care, with much of this
being provided in the preferred community setting.  Between January 2023 and
September 2023 there were 1,219 contacts to the Urgent Care Service regarding
residents in North Ayrshire Care Homes.  Of these, only 11% required onward referral
to an acute hospital.   
3.4.4 Enhanced Intermediate Care Team (eICT) 
North Ayrshire Health and Social Care Partnership has developed a strong Enhanced
Intermediate Care Team which comprises of a range of practitioners who form a multi-
disciplinary team which is focussed on rapid access and problem-solving for people
in their own homes across all of mainland North Ayrshire.  The service safely supports
a dynamic caseload of around 150 patients at any one time, who require rehabilitation
and reablement due to falls, frailty, low grade infections and general functional decline. 
The team brings together a skilled and experienced group of Physiotherapists,
Occupational Therapists, Technical Instructors, Dieticians, Community Psychiatric
Nurses, Pharmacists, Admin workers, Rehabilitation Nurses, Advanced Nurse
Practitioners (ANP) and Intermediate Care General Practitioners with Special Interest
(GPwSI) into one single team. They provide a rapid response to referrals (same day
or next day) and focus on providing alternatives to hospital admission.  The Enhanced
element of ICT is solely in place in North Ayrshire, and whilst cannot undertake all of
the functions of a Hospital at Home consultant/acute led service (which is being
developed/implemented in East and South Ayrshire), it does provide a robust
alternative and addition in North Ayrshire to our ICT service. 
The ICT model and investment across Ayrshire and Arran was implemented during
2018, with no formal review undertaken of the service since its launch. A review has
commenced with a refocus of the current eICT service to deliver rehabilitation and
enablement as part of a comprehensive rehabilitation pathway utilising and building
on current developments in Wards 1 and 2 of Woodland View to extend options to
deliver home and community-hospital based care.  It is anticipated that the outcomes
of this will include further development of eICT to ensure a service that is able to work
efficiently and effectively in delivering a range of services offered across North
Ayrshire. This will ensure that delivery models are flexible, connected and responsive
and will strengthen community rehabilitation Partnership wide to maximise available
capacity.   
The below tables demonstrate some of the recent performance and activity of the
eICT service:

Page 19

01/04/2022 - 31/03/2023 
3.5 North Ayrshire - Winter Preparedness and Delayed Discharge Improvement
Plan 
The Health and Community Care teams, alongside Mental Health colleagues, have
developed a local winter preparedness and delayed discharge improvement plan in
response to current service performance levels and community unmet need in
anticipation of seasonal demands to ensure resilience across the health and care
system.

Page 20

This is summarised below: 
Workstream Service Lead 
Care at Home Capacity – strengthen and enhance capacity
within the inhouse Care at Home workforce through effective
management of absence, recruitment and retention
Service Delivery
Teams
Key Actions:
• Arran recruitment strategy
• Mainland Care at Home recruitment strategy
• Care at Home recruitment trajectory
• Service specific training plans, for example SVQ opportunities
• Staff engagement and wellbeing support
• Wellbeing at work action plan 
Waiting List and Unmet Need – to provide alternative
approaches to managing capacity and demand and ensure
safe systems for oversight 
Locality Social
Work
/Reablement/Servi
ce Delivery Team
Key Actions:
• Reablement outcomes and skills-based approach to waiting list review
• Reablement outcomes and skills-based approach to review of all care
delivery
• Moving and Handling service developments
• Unmet need oversight and assurance group
• Care management system software developments
• Promotion of tech solutions including Community Alarm services 
AWI/Guardianship – to review current systems, practice and
processes to ensure safe and timely discharge of adults with
incapacity
Locality Social
Work Teams
Key Actions:
• Pan Ayrshire benchmarking
• Pan Ayrshire discharge planning protocol
• Guardianship activity oversight, including the use of 13za
• MHO lead to support discharge planning
• Early Referral pathways
• Timescale for hospital-based capacity assessments 
Discharge to Assess –to further enhance the hospital-based
assessment team systems to support the Discharge without
Delay ethos of good discharge planning 
Locality Social
Work/Service
Delivery/Long
Term Conditions
Teams
Key Actions:
• Interim bed capacity
• Early referral and assessment timescales
• MDT and Planned Date of Discharge
• Daily locality meetings and Senior Management escalation/oversight
• Hospital Co-ordinator and link to community wards
• Develop demand and capacity dashboard
• Arran Unscheduled care response plan including intermediate care and step
down

Page 21

Mental Health and Learning Disabilities – to support
Discharge without Delay and provide alternatives to hospital
admission
Mental Health and
Learning Disability
Teams
Key Actions:
• Interim/Step Down bed capacity for complex needs
• Open Adult MH assessment unit in Woodland View as 72 hour assessment
unit
• Grow Adult provider capacity and sustainability
• Engage with other LA/HSCP/Board areas re OOA patients 
4. CONCLUSION 
4.1 In summary, whilst it is evident that there have been significant efforts made in the
planning and implementation of the programme of work to address ongoing
performance linked to both unscheduled care in North Ayrshire, unfortunately the
desired improvements have not yet been achieved.   
• The Flow Navigation Centre continues to be effective in diverting a high number
of patients to avoid presentations at acute hospital settings.
• Average length of Stay in both acute sites has reduced slightly for non-delayed
patients but still remains high. 
• Priority performance areas, ie 4 hour compliance and 12 hour breaches, have
been set ambitious targets as part of the Urgent and Unscheduled Care
Improvement Plan (2023-24) and whilst there have been some short periods of
improvement these areas both remain off target and an area for concern.
• Delayed discharges in North Ayrshire have fluctuated throughout 2023,
reducing to lower levels in mid 2023 however since July 2023 these have
fluctuated and seen the highest level of delays recorded all year.
• Community unmet need has also fluctuated throughout 2023 – this position had
worsened over the 2022-23 winter period then experienced a period of stability
and improvement however levels of unmet need have increased in recent
months which is a concern going into the 2023-24 winter period.
• There is a significant level of risk being held in the system and in our
communities. 
• North Ayrshire HSCP continues to proactively respond to these demands and
adapt and expand services as necessary, with workforce, provider sustainably
and financial resource challenges being the limiting factor to the pace of
improvement. 
There remains an urgency for Partners across NHS Ayrshire and Arran and the three
Health and Social Care Partnership’s to continue to prioritise efforts and subsequently
improve performance linked to unscheduled care, community unmet need and levels
of delayed discharges to ensure resilience and continued delivery of critical services
over the winter period.  This report has set out the plans in place to improve, via the
Pan Ayrshire Urgent and Unscheduled Care Improvement Plan and the North
Partnership’s specific plans for winter preparedness.  This will be further supported by
whole system planning linked to the recent Discharge Planning Self-Assessment and
Winter Preparedness Checklist. 
3.2 Anticipated Outcomes 
Improved awareness for the IJB of current performance and challenges and the work
underway to improve services for the citizens of Ayrshire and Arran and our local
communities.  This will ensure that the IJB will be in an informed position to monitor

Page 22

performance and direct further interventions if future performance does not improve
in line with plans.   
3.3 Measuring Impact 
Urgent and Unscheduled care measures are tracked through the NHS Pentana
Performance Framework and through the established governance arrangements. 
Performance linked to community unmet need, demand and the Enhanced
Intermediate Care Team review will be tracked through existing Partnership oversight
arrangements. The IJB will receive updates on progress.   
4. IMPLICATIONS 
Financial:  The IJB previously received funding for winter during 2021
which included investment in Care at Home, MDTs and
interim care.  The IJB approved a plan in December 2021 to
invest this resource and this plan remains current.  There
has been no further funding specifically following this
allocation to support winter or unscheduled care pressures
for HSCPs.   
North Ayrshire IJB are reporting a projected overspend for
2023-24 with recovery actions in progress, therefore there
is no further resource available. 
The report highlights that acute services in Ayrshire and
Arran are projecting additional costs due to unfunded beds
which remain open across both sites, a total overspend of
£4.7m to period 5.  As a consequence, the Health Board
Director of Finance has approached the 3 HSCP Chief
Officers to request that HSCPs/IJBs make a payment to the
Health Board for delayed discharges. 
Human Resources:  Workforce across the system remains the greatest
challenge, plans are in place to proactively grow and retain
our health and care workforce and to support staff to respond
to the growing demands placed on services. 
Legal:  The Public Bodies (Joint Working) (Scotland) Act 2014 sets
out the IJBs responsibilities for Unscheduled Care services
delivered from large hospitals, this is further detailed in the
Integration Scheme.  
Equality:  Addressing whole system pressures on acute services,
unscheduled care and levels of unmet need will improve
timely and appropriate access to services for the whole
population of Ayrshire and Arran.
Children and Young People Addressing whole system pressures on acute services,
unscheduled care and levels of unmet need will improve
timely and appropriate access to services for the whole
population of Ayrshire and Arran.
Environmental &
Sustainability:
N/A
Key Priorities: The reshaping of Unscheduled Care activity, access to
services and whole system planning to support seasonal
service demands and improve health outcomes aligns with
the vision and values of the IJB.

Page 23

Risk Implications: Risks are noted in the report, the most important risk being
the risk of harm being posed to patients in hospital and
people in the community as a result of the current lack of
whole system performance improvements  
Community Benefits: N/A 
Direction Required to
Council, Health Board or
Both
(where Directions are required
please complete Directions
Template)
Direction to :- 
1. No Direction Required √
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Kerry Logan, Head of Service Health and Community Care, klogan@north-
ayrshire.gov.uk  oClick here to enter text.  Click here to enter text. 
Links to previous reports: 
• IJB December 2021 – Winter Funding Plans - Document.ashx (cmis.uk.com) 
• IJB June 2022 – Unscheduled Care Performance: 
IJB Report June 2022
- Unscheduled Care FINAL.pdf
• IJB November 2023 – Unscheduled Care Performance Update: 
IJB Report Nov 2022
- Unscheduled Care Follow Up.pdf