Integration Joint Board
Meeting
Friday, 13 March 2026 at 14:00
Council Chambers, Cunninghame House, Irvine /
Hybrid via Microsoft Teams
Meeting Arrangements - Hybrid Meetings
This meeting will be held on a predominantly physical basis but with provision,
by prior notification, for remote attendance by Elected Members in accordance
with the provisions of the Local Government (Scotland) Act 2003.  Where
possible, the meeting will be live-streamed and available to view at
https://north-ayrshire.public-i.tv/core/portal/home. 
1 Apologies
2 Declarations of Interest
Members are requested to give notice of any declarations of interest in respect
of items of business on the Agenda.
3 Minutes
The accuracy of the Minutes of the meeting held on 12 February 2026 will be
confirmed and the Minutes signed in accordance with Paragraph 7 (1) of
Schedule 7 of the Local Government (Scotland) Act 1973 (copy enclosed).
4 Director’s Report
Submit report by Caroline Cameron, Director (NAHSCP), on developments
within the North Ayrshire Health and Social Care Partnership (copy enclosed).
5 2025-26 – Month 10 Financial Performance
Submit report by Eleanor Currie, Chief Finance Officer and Section 95 Officer,
providing an overview of the Integration Joint Board’s financial performance as
at month 10 (January) (copy enclosed).
6 Transformation Plan Update
Submit report by Stuart Macmillan, Principal Manager (Planning, Performance &
Transformation) on the Transformation Plan (copy enclosed).
1

Page 2

7 Revenue Budget 2026-27
Submit report by Eleanor Currie, Chief Finance Officer and Section 95 Officer,
on the financial position for the Partnership for 2026-27, including the proposed
delegated funding, service budget pressures, plans developed to set a budget
and the associated risks.(copy enclosed).
8 Budget Consultation and Eligibility Criteria for Social Care Services
(copy to follow)
9 Urgent Items
Any other items which the Chair considers to be urgent.
Webcasting
Please note: this meeting may be filmed/recorded/live-streamed to the Council's
internet site and available to view at https://north-ayrshire.public-
i.tv/core/portal/home, where it will be capable of repeated viewing.  At the start
of the meeting, the Provost/Chair will confirm if all or part of the meeting is being
filmed/recorded/live-streamed.
You should be aware that the Council is a Data Controller under the Data
Protection Act 2018.  Data collected during the webcast will be retained in
accordance with the Council’s published policy, including, but not limited to, for
the purpose of keeping historical records and making those records available via
the Council’s internet site.
Generally, the press and public will not be filmed. However, by entering the
Council Chambers and using the press or public seating area, you acknowledge
that you may be filmed and that any information pertaining to you contained in
the video and oral recording of the meeting will be used for webcasting or training
purposes and for the purpose of keeping historical records and making those
records available to the public. In making this use of your information the Council
is processing data which is necessary for the performance of a task carried out
in the public interest.
If you have any queries regarding this and, in particular, if you believe that use
and/or storage of any particular information would cause, or be likely to cause,
substantial damage or distress to any individual, please
contact dataprotectionofficer@north-ayrshire.gov.uk
2

Page 3

IJB Sederunt
Voting Members
Joyce White (Chair) NHS Ayrshire & Arran
Cllr Chloe Robertson (Vice-
Chair)
North Ayrshire Council
Cllr Tom Marshall North Ayrshire Council
Cllr Anthea Dickson North Ayrshire Council
Cllr Nairn Angus-McDonald North Ayrshire Council
Linda Semple NHS Ayrshire & Arran
Tom Hopkins NHS Ayrshire & Arran
Marc Mazzucco NHS Ayrshire & Arran
Professional Advisors
Caroline Cameron Director
Eleanor Currie Interim Chief Finance Officer
Aileen Craig IJB Monitoring Officer
Iain Jamieson Clinical Director
Scott Hunter Chief Social Work Officer – North
Ayrshire
Thelma Bowers Mental Health Adviser
Julie Barrett Associate Nurse Director
Vacancy Acute Services Representative
Dr Louise Wilson GP Representative
Sharon Hackney Lead Allied Health Professional
Lisa Davidson Public Health Representative
Wendy Van Riet Director of Psychological Services
Stakeholder Representatives
Lorna Sim Staff Rep - NHS Ayrshire and Arran
Lynda MacFarlane Staff Rep
Paul Smith Carers Representative
Vacancy Service User Representative
Vacancy Independent Sector Representative
Vicki Yuill Third Sector Representative
3

Page 4

4

Page 5

North Ayrshire Health and Social Care Partnership
Minute of Integration Joint Board meeting held on
Thursday 12 February 2026 at 10.00 a.m.
involving participation by remote electronic means and physical attendance
within the Council Chambers, Irvine.
Present (Physical Participation)
Voting Members
Joyce White, NHS Ayrshire and Arran (Chair)
Councillor Chloe Robertson, North Ayrshire Council (Vice-Chair)
Councillor Anthea Dickson, North Ayrshire Council
Tom Hopkins, NHS Ayrshire and Arran
Professional Advisers
Caroline Cameron, Director of Health and Social Care Partnership
Thelma Bowers, Head of Service (Mental Health) (NAHSCP)
Eleanor Currie, Chief Finance and Section 95 Officer
Scott Hunter, Chief Social Work Officer
Sharon Hackney, Lead Allied Health Professional
Julie Barrett, Associate Nurse Director/ Lead Nurse
Lisa Davidson, Public Health Representative
Present (Remote Participation)
Voting Members
Councillor Tom Marshall, North Ayrshire Council
Marc Mazzucco, NHS Ayrshire & Arran
Stakeholder Representative
Lynda McFarlane, Staff Representative
In Attendance (Physical Participation)
Elizabeth Stewart, Head of Service (Children, Families & Criminal Justice)
Kerry Logan, Head of Service (Health and Community Care)
Michelle Sutherland, Partnership Facilitator (Health & Community Care)
Karen Andrews, Team Manager (Governance)
Stuart MacMillan, Principal Manager (Planning, Performance and Transformation)
Seony Ross, Team Manager (Strategic Planning & Equalities)
Michael Mclennan, Lead Officer (Alcohol & Drugs Partnership)
Raymond Lynch, Senior Manager (Legal Services)
Ruth Wilson, Team Leader (Litigation)
Craig Stewart, Committee Services Officer
John Hutcheson, Senior Communications Officer
Agenda Item 3
5

Page 6

Apologies
Councillor Nairn Angus-McDonald, North Ayrshire Council
Linda Semple, NHS Ayrshire and Arran
Lorna Sim, Staff Representative NHS Ayrshire and Arran
Vicky Yuill, Third Sector Representative
Aileen Craig, IJB Monitoring Officer
1. Apologies for Absence
Apologies for Absence were noted.
2. Declarations of Interest
There were no declarations of interest in terms of Standing Order 7.2 and Section 5.14
of the Code of Conduct for Members of Devolved Public Bodies.
3. Minutes
The accuracy of the Minutes of the meeting held on 11 December 2025 were
confirmed and the Minutes signed in accordance with Paragraph 7(10 of Schedule 7 of
the Local Government (Scotland) Act 1973.
3. Review of Decision relating to Island Communities Impact Assessment for
Montrose House Care Home on Arra
Submitted a report by Aileen Craig, Head of Service (Democratic Services) on the
review of the Island Communities Impact Assessment (ICIA) relating to the decision of
21 August 2025 in respect of provision at Montrose Care Home, Arran. The Island
Communities Impact Assessment was set out at Appendix 1, a redacted copy of the
review form set out at Appendix 2 and a summary of the views expressed in the written
representations was set out at Appendix 3 to the report.
The Chair outlined the process for the Island Community Impact Assessment Review
and advised that the applicant had declined an invitation to be present to address the
IJB in terms of the review application. The position was noted in this regard.
The Team Manager (Litigation) then outlined the terms of the review for an Island
Communities Impact Assessment and summarised the position, it was also noted the
review was of the Impact Assessment itself rather than the decision to redesign the
model of care at Montrose House, Arran.
The Director (NAHSCP) then addressed IJB in relation to the ICIA undertaken in
relation to the decision to redesign the model of care at Montrose House, which included
a permanent reduction in bed capacity.
Having heard the Chair, the Board agreed that the Island Community Impact
Assessment appended to the 21 August 2025 IJB report was sufficient, and no further
action was required. There being no amendment the motion was declared carried.
6

Page 7

Accordingly, the Board agreed (i) the Island Community Impact Assessment appended
to the 21 August 2025 IJB report was sufficient and no further action was required;
and (ii) that any relevant statutory notice to reflect the decision of IJB be issued within
the appropriate timescales.
4. Director’s Report
Submitted report by Caroline Cameron, Director (NAHSCP) on the developments
within the North Ayrshire Health and Social Care Partnership.
Noted.
5. Alcohol & Drug Partnership Strategy 2025-2028
Submitted a report by Michael McLennan, ADP Lead Officer, on the Alcohol & Drug
Partnership Strategy 2025-28, set out at Appendix 1 to the report.
Officers responded to members’ questions on various aspects of the report.
The Board agreed to endorse the North Ayrshire Alcohol and Drug Partnership Strategy
2025-28.
6. Participation and Engagement Strategy 2026-2030
Submitted a report by Caroline Cameron, Director (NAHSCP) on the updated
participation and Engagement Strategy for 2026-2030, set out at Appendix 1 to the
report.
Officers responded to members’ questions on various aspects of the report.
The Board agreed to approve the updated strategy, replacing the Participation and
Engagement Strategy for 2022-2025, to support the delivery of the refreshed Strategic
Plan for 2026-2030.
7. 2025-26 – Month 9 Financial Performance
Submitted report by Eleanor Currie, Chief Finance Officer and Section 95 Officer
(HSCP) on the Integration Joint Board’s financial performance as at Month 9
(December).  Appendix A to the report detailed the financial overview of the
Partnership position, while Appendix B provided an overview of the service changes
that did not have financial savings attached and the BRAG status around the
deliverability of each saving.  Appendix C highlighted the movement in the budget
position following the initial approved budget, with further detail on the reserves set out
at Appendix D.  The proposed recovery action was outlined in Appendix E, while
Appendix F highlighted information on the costs of bank and agency staff.
Officers responded to members’ questions on various aspects of the report.
The Board agreed to (a) note the overall integrated financial performance report for
the financial year 2025-26 and the current overall projected yearend overspend of
£4.479m reducing to £3.276m after planned recovery actions; (b) note the progress
with delivery of agreed savings; (c) approve the proposed and current actions (para
2.14) being taken to progress financial recovery; (d) note the remaining financial risks
7

Page 8

for 2025-26; and (e) authorise the Director (NAHSCP) to formally write, on behalf of
the Board, to North Ayrshire Council around the £2.9m funding gap that was being
forecast and to the NHS Ayrshire & Arran Health Board on the particular issue raised
in the ‘Agenda for Change’.
8. Fees and Charges 2026-27 - Social Care Services
Submit report by Eleanor Currie, Chief Finance Officer and Section 95 Officer, on the
proposed charges for provided adult social care services for 2026/27.  The schedule set
out Appendix 1 to the report, detailed the current charges, proposed 2026/27 charges and
indicative charges for the following two years.
Officers responded to members’ questions on various aspects of the report.
The Board agreed to approve the proposed charges and remit to a meeting of North
Ayrshire Council for formal ratification.
9. Whistleblowing Quarter 2 Report: 1 July – 30 September 2025
Submitted report for information in relation to whistleblowing concerns raised in Quarter 2
(1 July – 30 September 2025).
Officers responded to a member’s question on the report. Noted.
The meeting ended at 11.40 a.m.
The full meeting proceedings can be viewed at 
https://north-ayrshire.public-i.tv/core/portal/home
8

Page 9

Integration Joint Board
13th March 2026
Subject : Director’s Report 
Purpose : This report is for awareness to advise members of North
Ayrshire Integration Joint Board (IJB) of developments within
North Ayrshire Health and Social Care Partnership (NAHSCP) 
Recommendation : IJB members are asked to note progress made to date. 
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
IJB Integration Joint Board
HSCP Health and Social Care Partnership
CSAE Child Sexual Abuse and Exploitation
SCAI Scottish Child Abuse Inquiry
UNCRC United Nations Convention on the Rights of the Child
PVG Protecting Vulnerable Groups
AI Artificial Intelligence
HIS Health Improvement Scotland 
1. EXECUTIVE SUMMARY 
1.1 This report informs members of the Integration Joint Board (IJB) of the work
undertaken within North Ayrshire Health and Social Care Partnership (NAHSCP),
nationally, locally and Ayrshire wide. 
2. BACKGROUND 
2.1 This report provides IJB with up to date information on recent activity across the HSCP
since the last IJB.     
Agenda Item 4
9

Page 10

3. CURRENT POSITION 
National Developments 
3.1 Accounts Commission Report – Integration Joint Boards : Finance Bulletin 2024/25 
Accounts Commission published their report Integration Joint Boards: Finance Bulletin
2024/25 on 26th February 2026 which states Integration Joint Boards (IJBs), together
with their NHS and council partners, must urgently take decisions on where to
redesign, reduce or discontinue services. 
The report highlighted that funding to Scotland’s 30 IJBs
increased by over two per cent in 2024/25 to more than £12
billion.  But this was insufficient to meet rising costs and
demands, with many IJBs using dwindling reserves to help
meet the almost £450 million gap between demand and
available funding. This is not sustainable. 
Increasing demand, rising costs and a growing number of
people with long-term complex needs are placing mounting
financial pressures on IJBs.  The boards have reached a
critical point, with a significant risk they will become
financially unsustainable within the next 12 to 24 months. 
Alongside savings and using reserves, IJBs have been relying on substantial
additional funding from their partners in the NHS and councils. IJBs need to plan their
finances more realistically to reduce this reliance, as health boards and councils face
their own significant financial pressures.   A copy of the full report can be viewed on
the Audit Scotland website. 
3.2 IJB Voting Rights 
The 40-day Parliamentary process to consider the statutory instrument to revise IJB
voting rights has drawn to a close. This means that the instrument will come into effect
from September 2026, extending voting rights on IJBs to unpaid carer, lived
experience and third sector representatives. 
Representations from Local Government and partners provided additional scrutiny in
Parliament, including a call for written views and oral evidence. 
IJB members will be kept updated on the changes and implications prior to
implementation in September 2026. 
10

Page 11

3.3 Public Inquiry into Group-Based Child Sexual Abuse 
Scottish Government announced on 25th February 2026 that Professor Alexis Jay
will chair a statutory Public Inquiry to examine Scotland’s response to group-based
child sexual abuse and exploitation (CSAE). 
The Inquiry will focus on the prevalence of group-based CSAE now and in the recent
past, whether brought forward by survivors or relating to findings from the
independent National Review being led by four Inspectorates. 
The new Inquiry will be distinct from the Scottish Child Abuse Inquiry (SCAI), chaired
by Lady Smith. The Scottish Government will ensure the new Inquiry does not
duplicate the valuable work of the SCAI. 
The scope of the Inquiry and its detailed terms of reference will be finalised
and confirmed in due course, following input from Professor Jay. 
The Education Secretary also announced that the Government intends to establish a
Truth Project in Scotland, to enable victims and survivors of CSAE to share their
experiences to help inform change and access support.   
3.4 National Review of Group Based Child Sexual Abuse and Exploitation 
As well as the Public Inquiry, a national review into group based child sexual abuse
and exploitation also commenced on 9th February 2026.    This is following a ministerial
request in December 2025. The review will be led by the Care Inspectorate and HIS
Majesty’s Inspectorate of Constabulary in Scotland (HMICS), working with Healthcare
Improvement Scotland (HIS) and His Majesty’s Inspectorate of Education in Scotland
(HMIE) and other scrutiny bodies as appropriate.   
The review will consider how well public protection partners are working together to
prevent, identify and act appropriately on instances of group-based child sexual abuse
and exploitation and group-based child criminal exploitation. The review will take a
phased approach, with phase one lasting for six months and a report on this is
expected by Summer 2026, in accordance with their standard reporting practice. 
Chief Officers’ Groups have been asked to facilitate the provision of information and
supporting evidence regarding how each of the 32 local authority partnership areas
recognise, identify, assess and respond to incidences of group-based child sexual
abuse and exploitation and group-based child criminal exploitation.  Scott Hunter,
Chief Social Work Officer has been identified as the co-ordinator for North Ayrshire
and will lead the collation of responses and represent the HSCP in any discussions
with the inspection team. 
11

Page 12

3.5 Changes to PVG Scheme Membership 
Significant changes to the  Protecting Vulnerable Groups (PVG) scheme in
Scotland are being implemented under the Disclosure (Scotland) Act 2020. From 1
April 2026, there will be a shift from lifetime membership of the Scheme to mandatory
five-year renewals, stricter legal requirements for regulated roles, and reduced
disclosure levels to enhance safeguarding. 
From 1 April 2026, PVG Scheme membership In Scotland will change from lifetime
membership to a five-year renewable membership. This change applies only to new
applications made on or after that date. 
Disclosure Scotland will begin moving all existing PVG members to the five-year
model in phases, starting with those who first joined the scheme in 2011.  North
Ayrshire have not yet been advised on when our employees will be contacted. 
An existing PVG member will shift to the new five-year model if they submit a new
PVG application on or after 1 April 2026, including: 
• a new application to join the PVG Scheme, or
• an update application due to moving into a role requiring a different PVG category,
or an update is required due to a Consideration for Listing. 
Employees who joined the PVG Scheme before 1 April 2026 will be moved to the new
model gradually, based on the year they originally joined. 
3.6 Carers  Scotland Power of Attorney Day 
Carers Scotland and Standard Life have joined
forces to launch the first ever UK-wide Power of
Attorney Day which will take place on Wednesday 22
April 2026. 
This initiative aims to raise awareness and understanding of
powers of attorney, supporting the 627,700 unpaid carers in
Scotland who care for someone who is older, disabled or
seriously ill. 
�� Learn more: https://powerofattorneyday.org.uk/ 
�� General info on powers of attorney: https://www.mygov.scot/power-of-attorney 
12

Page 13

3.7 Update on the Children (Withdrawal from Religious Education and Amendment of
UNCRC Compatibility Duty) (Scotland) Bill 
On 17 February 2026, the Scottish Parliament passed the Children (Withdrawal from
Religious Education and Amendment of UNCRC Compatibility Duty) (Scotland) Bill.
The Bill has two key parts, this update focuses on Part 2 of the Bill, which will amend
the UNCRC Act. 
Part 2 of the Bill, once commenced, will add an exemption to the section 6
Compatibility Duty in the UNCRC Act.  This exemption would make clear that a public
authority would not be acting unlawfully under the UNCRC Act where it is required,
under an Act of the Scottish Parliament, to act in a way that is incompatible with
UNCRC requirements. The exemption would only apply where a public authority has
no discretion as to whether to act incompatibly, and the legislation cannot be read or
given effect in a way that is compatible with UNCRC requirements (under section 24
of the Act). The Scottish Government has not thus far identified any existing
circumstances in which the exemption would apply. 
The exemption is intended to provide clarity and legal certainty for public authorities
where they face conflicting statutory duties. It is designed to avoid situations where a
public authority may feel compelled to pause or disrupt the delivery of services
because it believes it cannot provide those services in a way that is compatible with
UNCRC requirements due to a requirement to act in a particular way by, or under, an
Act of the Scottish Parliament. The exemption could also reduce the risk of
unnecessary legal challenge against public authorities in circumstances where the
issue lies in the legislation itself, rather than in the authority’s actions. 
The Bill will place a statutory notification duty on public authorities listed under section
19 of the UNCRC Act. Where a listed authority is of the view - when discharging its
duties under the UNCRC Act - that it cannot read and give effect to legislation in a
UNCRC-compatible way, and is therefore of the view that the exemption applies in
connection with the exercise, or potential exercise, of a relevant function, it must notify,
as soon as reasonably practicable: 
• The Scottish Government, 
• The Children and Young People’s Commissioner Scotland, and 
• The Scottish Human Rights Commission. 
The Scottish Government sought views from a number of listed authorities through
existing networks. The majority of responses did not raise significant concerns. Many
welcomed the fact that the duty would be linked to existing obligations under the
UNCRC Act and therefore viewed the approach as proportionate. 
13

Page 14

A separate notification duty will apply where the exemption is raised in legal
proceedings, with notifications issued to the Lord Advocate, the Children’s
Commissioner, and the Scottish Human Rights Commission. The Bill will also require
Scottish Ministers to report annually, through the Children’s Rights Scheme, on the
use of the exemption and any actions they intend to take in response. 
3.8 Clinical Governance Standards 
Healthcare Improvement Scotland have published the Clinical Governance standards. 
The standards are intended to enhance improvements in health and social care for
everyone, regardless of their age, disability, gender identity, marriage and civil
partnership, pregnancy and maternity, race, religion or belief, sex, sexual orientation,
socioeconomic status or any other status. Suggested aspects to consider and
recommended practice throughout these standards should be interpreted as being
inclusive of everyone living in Scotland. 
The standards have been developed to provide assurance that
organisations are providing high quality and safe healthcare in
line with best practice, national policy and legislation. Standards
can support internal and external quality assurance. 
The standards will apply to all clinical services planned,
commissioned or delivered within the health and social care
system in Scotland.     
You can read the standards on the HIS website. 
North Ayrshire Developments 
3.9 Feedback – North Ayrshire meeting with Cabinet Secretary 
I met together with Craig Hatton, Chief Executive of North Ayrshire Council on
Thursday 12th February with the Cabinet Secretary and Minister to discuss the
financial position of the IJB. This was following a request in December for me to write
to set out our challenges and request consideration of further funding for North
Ayrshire IJB particularly to meet demands and needs for social care services. 
The meeting provided the opportunity to discuss and share in more detail our
pressures and challenges, including the ability to align resources to meet the needs
of our local population, our local demographic drivers of demand, those including
remote and rural services, high levels of poverty and deprivation and an ageing
population.   
14

Page 15

I outlined our current year financial position and projections for next year, service
performance, including delayed transfers of care and waits within community services
and our public consultation approach for social care eligibility criteria.  The Cabinet
Secretary and Minister acknowledged the difficulties we face and referred to
opportunities to work with NHS Ayrshire and Arran on shifting the balance of care and
risk-share and hospital at home service developments and confirmed there is no
further funding available from Scottish Government.   
In the absence of additional funding being made available I reaffirmed our commitment
to continuing to do the best with the resource we have available including improving
performance were possible. 
3.10 Magic Notes Trial 
Mental Health and Learning Disabilities social work teams began a six to eight-week
trial of Magic Notes in March 2026. 
Magic Notes is an AI tool that records conversations and produces draft case notes,
helping to reduce administrative tasks so that social workers can remain fully present
and engaged during visits. 
Studies across UK councils show that by removing the need for note taking during
meetings, staff are able to focus more on meaningful, person-centred conversations
and capture richer, more accurate information. Other UK councils have shown time
savings on administrative tasks, consistency in documentation, and improved
accessibility for staff with dyslexia or visual impairments.
The trial will evaluate how the tool affects the quality of interactions, documentation,
and overall practice, including impacts on time spent on administrative tasks, quality
of written work and conversations, and practitioner wellbeing. 
Findings will inform whether a wider roll-out would bring benefits to staff and the
people we support.
3.11 Brighter Pathways - New Fostering Scheme – North Ayrshire 
A new scheme to recognise the hard work and commitment
of foster carers - and to positively impact on the recruitment
of new carers - is being launched by NAHSCP on April 1. 
A key part of the new scheme is a review of the financial
support offered to foster carers.  It will see the fostering fee increased from £200 per
week to £250 per week for all Fostering First carers who agree to transfer over to the
new scheme, as well as all newly approved carers. The new scheme will also
introduce a welcome payment of £1000 for all newly approved foster carers, which will
be awarded 12 months after the first child is placed.  
15

Page 16

North Ayrshire Council is a Fostering Friendly Employer, with its Special Leave
Scheme giving greater flexibility to staff for exploring fostering opportunities. 
Employees who are foster carers (or who are interested in becoming foster carers),
as well as kinship carers, can benefit from the time off detailed below: 
• Assessment and initial training prior to approval as a foster carer - maximum three
days
• Attendance at panel for approval - maximum one day
• Child review meetings, annual foster carer review meeting and training - up to five
days 
You can read more about becoming a foster carer with NAHSCP by visiting the
website or emailing adfos-enquiry@north-ayrshire.gov.uk. 
3.12 Care Home Staff Training – Ayrshire Hospice 
A group of twelve Care at Home staff have
completed a six-week training programme with
the Ayrshire Hospice to increase their
knowledge and skills around palliative care. 
In North Ayrshire, Care at Home teams
currently support around 1,900 service users
each day, including those with chronic life-
threatening illnesses or who have chosen to
be at home rather than in hospital in the final
stages of life. 
The programme was delivered over six half-day sessions and aimed to increase skills
around practical care for palliative and end of life patients, as well as communication
and conversation, symptom management, grief and bereavement, and support for
families. Staff also gained invaluable experience from a week spent shadowing staff
within the hospice environment. 
4. IMPLICATIONS 
4.1 Financial
None
4.2 Human Resources
None
4.3 Legal
None
4.4 Equality/Socio-Economic
None 
4.5 Risk
None
16

Page 17

4.6 Community Wealth Building
None
4.7 Key Priorities
None
5. CONSULTATION 
No specific consultation was required for this report. User and public involvement is
key for the partnership and all significant proposals will be subject to an appropriate
level of Consultation. 
Caroline Cameron, Director
[Carolinecameron@north-ayrshire.gov.uk/01294 317723] 
Appendices
Nil
17

Page 18

18

Page 19

Integration Joint Board
13th March 2026
Subject: 2025-26 – Month 10 Financial Performance 
Purpose: To provide an overview of the IJB’s financial performance as at
Month 10 (January). 
Recommendation: It is recommended that the IJB: 
(a) notes the overall integrated financial performance report for
the financial year 2025-26 and the current overall projected year-
end overspend of £2.802m reducing to £2.251m after assumed
funding for the reduced working week;
(b) notes the progress with delivery of agreed savings; 
(c) approves the budget reduction in para 2.10; and 
(d) notes the remaining financial risks for 2025-26. 
Direction Required to
Council, Health Board or
Both 
Direction to: - 
1. No Direction Required X
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
MH Mental Health
MDT Child & Adolescent Mental Health Services
BRAG Blue, Red, Amber, Green
UNPACS UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
NRAC NHS Resource Allocation Committee
PAC Performance and Audit Committee
MHOF Mental Health Outcome Framework
MDT Multi-Disciplinary Team
1. EXECUTIVE SUMMARY 
1.1 The report provides an overview of the financial position for the Partnership and
outlines the projected year-end outturn position informed by the projected
expenditure and income commitments; these have been prepared in conjunction with
relevant budget holders and services.   It should be noted that, although this report
refers to the position at the end of January further work is undertaken following the
Agenda Item 5
19

Page 20

month end to finalise projections, therefore the projected outturn position is as current
and up to date as can practicably be reported. 
1.2  The projected outturn is a year-end overspend of £2.802m (0.8%). This is a
favourable movement of £1.677m from month 9.   
Financial balance will not be achieved in 2025-26, the projected outturn position is
summarised below with the residual risk following already identified financial
improvement actions: 
TOTAL Health/  
NHS AA
Social
Care/NAC
Projected Overspend @ mth10 2.802 0.861 1.941
Reduced Working Week (RWW)
funding assumed (0.551) (0.551) -
Residual Projected Overspend 2.251 0.310 1.941 
The Integration Scheme describes the required approach where there is a projected
overspend on the IJB integrated budget, which includes the requirement to agree a
recovery plan to balance the overspending budget.  Only if the recovery plan is
unsuccessful will the Health Board and Council consider making available interim
funds.   
At month 9 following approval by the IJB, the Chief Officer wrote formally to North
Ayrshire Council and NHS Ayrshire and Arran to request additional in-year funding
to support the remaining overspend.  This was subject to pursuing further recovery
actions. The amount requested at month 9 is shown below along with an updated
month 10 position: 
Month 9 Month 10
Health / NHS A&A 1.111 0.310*
Social Care / NAC 3.368 1.941
TOTAL  4.479 2.251
*assumes full funding of the RWW 
1.3 The movement in the projected outturn position for the 2025-26 financial year is
illustrated in the graph below, this illustrates the movement in the gross and net
projected overspend and the residual overspend or risk split between NHS and LA
funding partners. 
20

Page 21

This demonstrates significant progress in reducing the anticipated overspend since
this was first projected at £5.187m in at Period 3 to the current projected outturn of
£2.251m at Period 10. This has been achieved through tight financial management
controls and the implementation of the actions in the financial recovery plan.  As in
previous years the impact of financial recovery actions is eroded by new demand and
pressures, particularly in relation to social care and low volume high cost placements
and areas where service occupancy is high and supplementary staffing costs are
incurred. 
1.4  From the core projections, overall, the main areas of pressure are: care at home,
residential placements for children, physical disability care packages, supplementary
staff in wards, staff costs in Montrose House and Unplanned Activities (UnPACs)
within the lead partnership for mental health. 
The main areas of movement from Period 9 to Period 10 are: 
Favourable:
• Care at Home
• Physical Disability Care Packages 
• Lead Partnership for Mental Health 
• Care Experienced Children
• Payroll turnover
• Transition slippage
• Savings inc contractual inflation 
Adverse:
• Various smaller adverse variances
21

Page 22

1.5 The projected IJB outturn position has been adjusted to reflect the impact of Lead
Partnership services. The overspend in relation to North Lead Partnership services
for Mental Health is not fully attributed to the North HSCP as a share has been
allocated to East and South HSCPs, similarly the impact of the outturn on East and
South led services has been shared with North, both on an NRAC basis in line with
the agreed risk sharing mechanism.  There is a requirement for the 3 IJBs to be
aware of the position for Lead Partnership services and plans to deliver services from
within allocated budge. Note that the information for East and South HSCPs is the
previously reported month 9 information as they do not report at month 10. 
1.6 Since the setting of the budget in March 2025 the 2025-26 financial position has been
adversely impacted by the below factors out-with the control of the IJB. 
• National Care Home Contract (NCHC) – the increase to the NCHC rate to
reflect the impact of the nursing pay award resulted in an additional unfunded
cost of £0.175m.
• NHS Board allocation for the Employers National Insurance increase
confirmed at 60% of funding – full year impact £0.664m 
• The current allocation for the Agenda for Change costs in relation to the
reduced working week are currently being queried with the NHS finance team
to ensure we receive our ‘fair share’ of the funding.  The current funding
allocated is £0.659m, the cost of covering all reduced hours is £1.497m. A
recent exercise collated from services on the actual impact and cost indicated
that the cost of cover is £1.210m (84% of staff covered) which is £0.551m
higher than the current allocation.  A request has been submitted to NHS A&A
to review the funding allocation on a recurring basis, NHS AA Director of
Finance offered a compromise agreement to fund 50% of the shortfall,
following the discussion at IJB the Chief Officer has communicated back that
this is not acceptable.  A response is awaited.
• Pay settlements for both NHS and Local Government staff have been agreed
for 2025-26.  The NHS element has been funded, and the current assumption
is that the shortfall between budget planning assumptions and actual
settlements will be fully funded for Local Government staff. 
2. CURRENT POSITION 
2.1 The report includes an overview of the financial position including commitments
against the available resource, explanations for the main budget variances and an
update on progress in terms of savings delivery. 
2.2 FINANCIAL PERFORMANCE – AT MONTH 10 
At month 10 against the full-year budget of £339.487m there is a projected year-end
overspend of £2.802m (0.8%).  The Integration Scheme outlines that there is an
expectation that the IJB takes account of the totality of resources available to balance
the budget in year.   Following this approach, an integrated view of the financial
22

Page 23

position should be taken, however it is useful to note that this overall position consists
of a projected overspend of £1.941m in social care services and a projected
overspend of £0.861m in health services.   
Appendix A provides the financial overview of the Partnership position. The sections
that follow outline the significant variances in service expenditure compared to the
approved budgets. 
Appendix E provides information on the costs of bank and agency staff. 
2.3 Health and Community Care Services 
Against the full-year budget of £99.611m there is a projected overspend of £1.978m
(2%) which is a favourable movement of £0.979m and the main variances are: 
a) Care home placements – net projected overspend of £0.298m (£0.026m
favourable). This includes an overspend on placements of £0.760m (£0.014m
favourable) which includes a provision for an average of 5 interim beds and
reflects the recent increase to the NCHC to reflect the impact of the nursing pay
award resulted in an additional unfunded cost of £0.175m.   
The budgeted number of permanent placements was 765 and at month 10 there
were 776 placements resulting in a projected overspend of £0.760m. 
The plan to manage down the number of permanent placements to reach the
target is challenging due to the need to respond to referrals from hospital and to
continue to support those in critical and substantial need in the community, this
has led to a growing waiting list for access. 
The overspend is partially offset by income recovered from charging orders and
gross funded placements which is projected to be £0.460m over recovered
(£0.010m favourable). This income is challenging to predict as it depends on the
length of the legal process and time taken to sell the property that the charging
order is registered to and access to the funds or estate of service users. 
b) Care at home is projected to be £0.019m overspent (£1.124m favourable). The
position reflects the cost of meeting the significant demand and level of provision
for care at home support. The favourable movement is due to the action being
taken to reduce the overall level of provision and reflects the contribution to
specific SDS care packages from the Unscheduled Care funding received by
NHS AA. The level of vacancies in the service has increased and whilst favourable
it is coupled with increased levels of unmet need.   
c) Physical Disability Services – projected overspend of £0.230m (£0.096m
favourable) split as follows: £0.963m over in residential placements, £0.416m
under in direct payments due to increased clawbacks and £0.317m under in
community care packages.  
23

Page 24

d) Integrated Island Services is projected to overspend by £0.465m (£0.052m
adverse).  The most significant variance is a projected overspend at Montrose
House of £0.358m which relates to the net overspend on agency staff (i.e. net of
underspend on employee costs).  There is also an under recovery of income and
a write off of aged debt.  In addition, outwith Montrose House there are
overspends across property, continence and medical supplies, admin and
transport.   The Arran Patient Transfer contract is projected to overspend by
£0.035m. 
e) Specialist Rehab wards – projected overspend of £0.206m (£0.011m adverse)
(Redburn ward £0.191m overspend and Douglas Grant £0.015m overspend). 
The overspend is due to cover costs for vacancies as well as supplementary
staffing for patients who require one to one support. 
f) Wards 1 and 2 – Projected overspend of £0.750m (£0.047m adverse). The
overspend is due to increased use of supplementary staffing.   All rehabilitation
wards are operating at 100% occupancy supporting a high level of patient
needs/complexity, which places pressure on staffing levels and the use of bank
and agency staff to support additional patient observations.   
The projection for Health and Community Care services assumes that the allocation
of unscheduled care funding will be fully utilised. 
2.4 Mental Health Services 
Against the full-year budget of £118.613m there is a projected overspend of £1.374m
(1.2%) which is a favourable movement of £0.346m prior to the re-allocation of the
Lead Partnership variance to East and South HSCP.   
The main variances are: 
• Learning Disabilities are projected to overspend by £1.188m (£0.011m
favourable).  This covers for Children and Adults - residential placements,
community packages, direct payments, property costs and an under recovery
of charging income. 
• Community Mental Health services are projected to underspend by £0.113m
(£0.002m favourable movement). The main reason for underspend in
community packages is the availability and capacity of adult community
providers to deliver new packages of care. 
• There is a projected underspend of £0.353m in relation to the cost of Hospital
Based Complex Continuing Care (HBCCC), this reflects the impact of change
in provision for these services.  There were plans to reinvest this in the service,
but these plans are on hold as holding the funding was agreed as part of the
recovery plan at month 3. 
24

Page 25

• The Lead Partnership for Mental Health is projected to be £0.641m overspent
(£0.335m favourable) and the main variances are as follows: 
• Adult Inpatients – projected overspend by £1.473m (£0.044m adverse)
due to very high levels of occupancy, patient mix and complexity and
levels of continuous intervention which require additional
supplementary staff and enhanced observations (1:1 and 2:1) and use
of bank staff. 
• The UNPACS (Unplanned Activities) budget – projected overspend of
£1.103m (£0.079m favourable) based on current placements. UnPACS
placements are for individuals with very specific needs that require a
higher level of security and/or care from a staff group with a particular
skill set/competence.  There are no local NHS secure facilities for
women, people with a learning disability or people with
neurodevelopmental disorder. This can necessitate an UNPACs
placement with a specialist provider which can be out-of-area.  The
nature of mental health UNPACs spend is that it is almost exclusively
on medium- or long-term complex secure residential placements which
are very expensive so a small change in placements can have a high
budgetary impact. Due to the complexity and risk involved, transitions
between units or levels of security can take many months. Applications
to approve a placement are made to the Associate Medical Director for
Mental Health who needs to be satisfied that the placement is
appropriate and unavoidable prior to this being agreed. Part of the
additional control measures agreed in month 3 was to expand the high-
cost care package review group to include all UNPACS placement
requests, the projected position includes provision for any new
placements approved. 
• Learning Disability Services – projected to overspend by £0.468m
(£0.033m adverse).  The overspend relates to the delay in achieving
the saving from Ward 7A.  Whilst the ward closed there are still legacy
costs as the staff are still being redeployed and some patients remain
within Woodland View. 
• Elderly Inpatients – projected overspend of £0.103m (£0.026m
favourable) due to the use of supplementary staffing.  The elderly
mental health wards continue to operate at full occupancy with waiting
lists, with several patients who are on enhanced observations and bank
costs remain high. 
• Eating Disorders – projected to overspend by £0.137m (£0.002m
adverse) due to the staffing level being higher than the funding
25

Page 26

allocation.  This is being considered alongside the overall resource
allocation. 
• Enhanced Mental Health Outcome Framework (EMHOF) – projected
underspend of £0.624m (no movement).  There was £0.624m of
reserves held for EMHOF and the recovery plan approved the draw
down of these reserves. 
• Psychiatry – is projected to overspend by £0.355m (£0.040m adverse)
mainly due to junior doctor costs. A mitigation plan is being developed
and the rota for junior doctors is being reviewed.  A wholescale
workforce review has been commissioned to determine longer term
solutions for sustainability. 
• MH Pharmacy/Substitute Prescribing – is projected to underspend by
£0.219m (£0.283m favourable). The favourable movement is due a
further pharmacy rebate of £0.160m.  Prior to this rebate there was an
overspend due to increased demand and cost of medicines, and
particularly the cost of Buvidal.  This position is after investing £0.510m
on a Pan Ayrshire basis (£0.170m per HSCP). 
• Action 15 – is projected to underspend of £0.412m (£0.037m
favourable). There was £0.487m of reserves held for Action 15 and the
recovery plan approved the draw down of these reserves which is the
main reason for the underspend.  The projected underspend is after
considering the legacy costs from the 2024-25 review of funding.   
 Innovation Fund – projected underspend of £0.021m (no movement)
assuming that the posts to be redeployed as part of the EMHOF review
are actioned. 
• The turnover target for vacancy savings for the Lead Partnership is held
within the Lead Partnership as this is a Pan-Ayrshire target.  There is a
projected over recovery of the vacancy savings target of £1.412m
(favourable movement of £0.065m) in 2025-26.  Further information is
included in the table below: 
Vacancy Savings Target (£1.160m)
Projected to March 2026 £2.572m
Over/(Under) Achievement £1.412m  
26

Page 27

2.5 Children and Justice Services 
Against the full-year budget of £42.320m there is a projected overspend of £1.413m
(3.3%) which is a favourable movement of £0.214m and the main variances are: 
a) Care Experienced Children and Young People is projected to overspend by
£1.996m (£0.150m favourable).  Some of these costs are offset by the
contribution from the Home Office for Unaccompanied Asylum-Seeking Children
which is detailed below. 
The main areas within this are noted below: 
• The children’s residential placements are projected to overspend by £2.874m
(£0.096m favourable) based 32 placements in month 10. There are several
factors leading to this challenging position: 
o We have 32 places available in our internal children’s houses, due to
demand these have been operating at 100% occupancy or over for some
time, leading to increased use of external placements where residential
care is required.
o There remains an acute shortage of foster carers leading to residential
care being necessary in emergency placement situations. 
o The requirement to support Unaccompanied Asylum-Seeking Children
(UASC) under the National Transfer Scheme and to support trafficked
young people who have been identified in North Ayrshire.
o A number of young people in residential care have requested Continuing
Care, whereby a young person can remain in their placement until age
21.
o Where appropriate young people are placed to meet their educational
needs, the cost of Residential School Placements in the most cases is
shared 50/50 with Education services. 
o Contractual inflation has still to be agreed for 4 providers. If this is higher
than the assumed contractual inflation and it is likely that this will increase
the projected costs of residential places which is outwith the control of the
service.
o Children’s Services are continuing to work with other services including
Education and Housing to address the challenges through the work of the
‘Brighter Pathways’ Programme and associated workstreams. 
Note that the costs associated with mobilising Boyle Street are being finalised and
will be funded by an underspend in the Service Redesign Fund. 
• Looked After and Accommodated Children (fostering, adoption, kinship etc)
is projected to be £0.820m (£0.031m adverse) underspent. 
27

Page 28

• Residential respite – placements are overspent by £0.056m (no movement).
These short-term placements are used to prevent an admission to full time
care or to avoid placement breakdown. 
• Employee costs – are projected to overspend by £0.055m (£0.059m
favourable), largely due to staffing levels in the children’s houses and the
outcome of job evaluation for posts. 
• Care Leavers – projected underspend of £0.046m (no movement) in rent
costs. 
• Section 29 Payments (Throughcare Team) are projected to overspend by
£0.130m. 
b) Head of Service – is projected to underspend by £0.724m (£0.066m favourable).
This consists of a projected overspend of £0.158m in relation to the previous staff
reconfiguration saving in the children’s houses which was not achieved in 23-24
or 24-25 and this is offset by the grant funding in relation to Unaccompanied
Asylum-Seeking Children (UASC), which is projected to amount to £0.779m
£0.003m favourable) and which contributes to costs incurred across a number of
C&F service areas.   
c) C&F Health Team – is projected to overspend by £0.127m (£0.010m favourable)
mainly in relation to the Band 6 to 7 regrade for Health Visitors and the
progression of posts up the Band 7 scale.  Part of this recurring cost was
incorporated into budget pressures for 2025-26. 
d) Lead Partnership – Children’s Services – projected underspend of £0.065m as
monies carried forward from 2024-25 are being taken towards the overall
underspend. 
In line with the Brighter Pathways Re-Modelling Care Options Plan which was
approved by the IJB in November 2025, the budget for care experienced children
and young people will be re-aligned moving into 2026-27 with progress monitored in
line with the planned reduction and re-alignment of placements. 
2.6 ALLIED HEALTH PROFESSIONALS (AHP) 
The non-employee costs element of the AHP services are projected to be on-line. 
All underspends in employee costs have contributed to payroll turnover. 
2.7 CHIEF SOCIAL WORK OFFICER 
This is projected to underspend by £0.109m (£0.036m favourable). The favourable
movement is due to reduction in spend for young carers. 
28

Page 29

2.8 MANAGEMENT AND SUPPORT 
Management and Support Services are projected to underspend by £1.907m
(£0.309m favourable which is primarily due to additional vacancy savings), the
overall main areas of variance are: 
• There is projected slippage on the LD and MH transition funding of £0.631m
(£0.098m favourable) due to delays in children transitioning into adult
services. This involves complex planning by services with service users and
families and can change over time based on assessed need when moving into
adult services.
• The 2024-25 budget included a budgeted deficit on the social care side of
£0.437m which is offset by a budgeted surplus of £0.437m on the health side
of the budget.   
• There is also a balance of overachieved savings of £0.181m (£0.044m
favourable) and contractual inflation of £0.268m (£0.268m favourable).
• NHS shortfall in savings of £0.124m (£0.106m favourable) which is not coded
to specific areas and held centrally until recurring savings can be identified.
• The funding for the Reduced Working Week (non-Lead Partnership element)
is coded to Management and Support pending final confirming of the
allocation.  It is projected to underspend by £0.293m as the overspends in
relation to these costs are shown on other lines outwith Management and
Support. 
• An over-recovery of payroll turnover of £0.450m (£0.300m favourable) for
social care services and an over-recovery of £0.469m (£0.187m favourable)
for health services as outlined in the table below.   
The turnover targets and achievement for the financial year for Health and Social
Care services outwith the Lead Partnership is noted below: 
Social Care Health
Vacancy Savings Target (£3.400m) (£1.567m)
Projected to be achieved by March
2026
£3.850m £2.036m
Over/(Under) Achievement £0.450m £0.469m 
The areas contributing to the health and social care vacancy savings are spread
across a wide range of services with vacancy savings being achieved in most areas.  
As part of the recovery plan, the vacancy scrutiny group has been enhanced with the
Heads of Service and professional leads attending.  Each post is scrutinised and
filled only where deemed necessary with a recruitment freeze now implemented for
all non-essential posts. 
For 2025-26 there will be a further recruitment delay with vacancy scrutiny approved
vacancies being held for four weeks before they are advertised to create more payroll
29

Page 30

turnover.  This will be for all vacancies except clinical or registered services
vacancies or those which will incur cover costs. 
The turnover target for the North Lead Partnership for Mental Health services is
detailed separately within the Lead Partnership information at section 2.4. 
2.9 Savings Progress 
The approved 2025-26 budget included £4.019m of savings. 
BRAG Status Position at
Budget Approval
£m
Position at
Month 10
£m
Red - 1.000
Amber 2.984  1.027
Green 1.035 -
Blue - 1.992
TOTAL 4.019 4.019   
Appendix B provides an overview of those service changes which do have financial
savings attached to them and the BRAG status around the deliverability of each
saving. Any shortfall in relation to the red and amber rated savings are already
reflected in the projected outturn. 
2.10 Budget Changes 
The Integration Scheme states that “either party may increase it’s in year payment to
the Integration Joint Board.  Neither party may reduce the payment in-year to the
Integration Joint Board nor Services managed on a Lead Partnership basis….
without the express consent of the Integration Joint Board.” Appendix C highlights
the movement in the budget position following the initial approved budget. 
Reductions Requiring Approval: 
Ref Description  Amount 
(£000)
1 MAT Standards Funding Adjustment 6 
2.11 Pan Ayrshire Lead Partnership services and Large Hospital Set Aside 
Lead Partnerships: - There is a requirement for the 3 IJBs to be aware of the position
for Lead Partnership services and plans to deliver services from within allocated
budget. East and South HSCP do not report at month 10 so there is not updated pan
Ayrshire report.   
30

Page 31

Set Aside: - Work has been undertaken with partnerships to progress and develop
set aside arrangements to fully implement the legislative requirement.  This includes
arrangements in relation to the use of Directions, Joint Commissioning Plans and
overall progression towards fair share allocations of resources.       
Further work has been undertaken through the Ayrshire Finance Leads group to
establish baseline resources for each partnership and how these compare to the
NRAC “fair share” of resources. Ayrshire Finance Leads have now agreed a
baseline methodology for set aside budgets which involves using the four full years
prior to the pandemic, 2016/17 – 2019/20 inclusive.  
The HSCPs require to agree their final share of the baseline with each other,
however the aggregate will remain unchanged. The table below shows the cost of
the historic baseline at 2024/25 prices. The 2025/26 actual usage information is not
known until later in the year.   
IJB
Baseline at
2024/25
prices     
(£)
East 31.870
North 39.966
South 34.488
Total 106.324 
The annual budget for Acute Services is £496.7million.  The directorate is overspent
by £30.5 million after 10 months including legacy CRES. 
This was caused by overspends on medical and nursing staff, together non pay
overspends on equipment and supplies. These are required due to the level of
operational pressure experienced. Unfunded wards contributed an overspend
of £5.7m after 10 months. 
Within the overall £30.5 million overspend Medicine are over by £12.2 million,
Emergency Care by £9.9 million, Surgery by £3.8 million, Labs and Diagnostics by
£3.4 million and Women and Children by £2.2 million. 
There is a material underlying deficit caused by:
• Length of Stay (LoS) and emergency admission rates in NHS Ayrshire and Arran acute
hospitals are above the Scottish average.
• High expenditure on medical and nursing agency staff, high rates of absence and vacancies
causing service pressure.
• Delayed transfers of care and high acuity of patients.
31

Page 32

The IJBs and the Health Board work closely in partnership to maintain service and
improve performance.
2.12 FINANCIAL RISKS 
There are a number of financial risk areas that impact or may impact on the financial
position.
• Current overspend areas, especially in low volume / high-cost services e.g.
Children’s residential placements, UNPACs, and supplementary staffing
across community, mental health and learning disability wards.
• Growing demand for services.
• Staff recruitment and retention challenges across a number of service areas.
• The expectation that performance will continue to be maintained or improved
despite the significant resource challenges.
• Ongoing delivery costs of Scottish Government policy directives, particularly
where these are not fully funded or inflation proofed.
• Pay settlements for both NHS and Local Government staff have been agreed
for 2025/26.  The NHS element has been funded, and the current assumption
is that the shortfall between budget planning assumptions and actual
settlements will be fully funded for Local Government staff.
• Unearmarked reserves are depleted, there is no scope to absorb in-year
variances, with any overspends requiring additional funding from partners.
• The ongoing review of the Integration Schemes, where there is a focus on
financial arrangements and risk share. 
• The wider system financial challenges and impact across the whole system,
for example the financial position of NHS AA and the decisions taken to
reduce the Board’s deficit may have impacts on other parts of the health and
care system. 
• Removal of brokerage for NHS Boards, NHS AA have been asked by Scottish
Government to deliver further financial improvement beyond their Board
approved financial plan and have now been escalated to Level 4 of the NHS
Scotland Support and Intervention Framework. 
• The overall sustainability of commissioned care providers, with eNICs
compounding historic challenges re financial sustainability, there is a
heightened risk of provider failure leading to handing back of care and
contracts.
• The ongoing ability to source packages of care for service users.
• Progress with the work to develop set aside arrangements and the risk
sharing arrangements agreed as part of this.
• The recurring underlying levels of overspend which may impact on the
Partnership’s ability to continue to sustain service levels in the future.
• The use of supplementary staffing for enhanced observations across a
number of service areas and the use of high-cost agency staff to support
frontline service delivery in areas where there are recruitment challenges.
• Agenda for Change Pay Reform programme – including Nursing Band 5-6 re-
grade, protected learning time and reduction to the working week. 
32

Page 33

• Scotland Excel inflationary increases for children’s services have been
significantly higher than assumed.
• There is a risk in relation to recovering recharge income in relation to the LD
Assessment and Treatment patients from outwith Ayrshire.
• Risk related to NHS Reform investment being allocated by Scottish. 
These risks will continue to be monitored. 
Audit Scotland’s recent audit of the IJB Annual Accounts concluded that North
Ayrshire IJB has effective financial management and reporting arrangements in
place. The audit also highlighted success in achieving approved recurring savings.
This demonstrates that the current financial recovery situation is not a result of
inadequate financial oversight, poor reporting, or an inability to deliver efficiencies. 
Instead, the ongoing challenge relates to rising levels of need within the North
Ayrshire population and the wider, and national, issue of ensuring the long-term
financial sustainability of health and social care services.   It is essential that the IJB
works with all partners to accelerate and resource service redesign and
transformation, in order to provide sustainable care for the future. 
An Internal Audit review of IJB transformation submitted to the September 2025
Performance and Audit Committee gave an opinion of substantial assurance in
relation to the governance of the Transformation Plan.  The next planned IJB Audit
will focus on Financial Sustainability. 
2.13 RESERVES 
The IJB opening reserves position are summarised in the table below. 
General Fund
Reserve Earmarked Reserves
Total 
Unearmarked  External
Funding                      HSCP 
£m  £m £m £m
Balance – 1 April 2025 -  2.381 0.780 3.161
Anticipated Drawdown -  (2.381) (0.780) (3.161)
Balance – 31 March 2026 -  - - - 
The £0.780m HSCP earmarked reserve relates to the Service Redesign and Change
Fund which is fully committed in 2025-26. Further detail on the reserves is given in
Appendix D. 
33

Page 34

2.14 Financial Recovery Plan 
Since the initial recovery plan was agreed in June 2025 there has been a £2.833m
reduction in costs.  Whilst the full benefit of this has not been realised in-year in the
bottom-line outturn, it has supported the delivery of mitigating a further deterioration
to the position introduced through other in-year unexpected financial pressures of
£2.168m. This has resulted in a net achievement of £0.665m recovery action per
below: 
Given the proximity to the financial year end there is no new recovery plan action
being proposed and instead a focus on continuing to progress the previously agreed
actions and enhanced governance, oversight and escalation of spend and approvals. 
It is anticipated that the management and recovery actions developed during 2024-
25 and 2025-26 will require to continue into 2026-27. 
PROPOSALS 
3.1 Anticipated Outcomes 
Continuing to closely monitor the financial position will allow the IJB to take corrective
action where required to deliver services in 2025-26 from within the available
resource, thereby limiting the financial risk to the funding partners. 
The transformational change programme will have the greatest impact on the
financial sustainability of the partnership, the IJB require to have a clear
understanding of progress with the delivery of the transformation plan. 
3.3 Measuring Impact 
The final outturn will be reported to the IJB.  
34

Page 35

4. IMPLICATIONS 
4.1 Financial
The outturn is an overall year-end overspend of £2.802m (0.8%) . The report outlines
the main variances for individual services.  The IJB unearmarked reserve balance is
zero. This current position poses a financial risk to North Ayrshire Council and NHS
Ayrshire and Arran. 
4.2 Human Resources
The report highlights vacancy or turnover savings achieved during the year. Services
will review any staffing establishment plans and recruitment in line with normal
practice when implementing service change and reviews as per agreement with the
IJB.  Tight vacancy scrutiny management arrangements are in place for the HSCP. 
4.3 Legal
None. 
4.4 Equality/Socio-Economic
None. 
4.5 Risk
Para 2.12 highlights the financial risks. 
The report falls in line with the agreed risk appetite statement which is a low-risk
appetite in respect to adherence to standing financial instructions, financial controls
and financial statutory duties and a high-risk appetite in relation to finance and value
for money. 
The ‘financial viability of the HSCP’ risk is on our strategic risk register. 
4.6 Community Wealth Building
None. 
4.7 Key Priorities
The ability to deliver on our strategic priorities may be compromised due to the
greater financial risk faced in 2025-26 and the increased focus required on financial
rather than service improvement. This will be kept under close scrutiny throughout
2025-26. If we are unable to successfully develop a financial recovery plan to achieve
financial balance, consideration may be given to revising the strategic commissioning
plan. 
5. CONSULTATION
5.1 This report has been produced in consultation with relevant budget holders and the
Partnership Senior Management Team. 
35

Page 36

5.2 The IJB financial monitoring report is shared with the NHS Ayrshire and Arran
Director of Finance and North Ayrshire Council’s Head of Finance after the report
has been finalised for the IJB. 
Caroline Cameron, Director
Author – Eleanor Currie, Chief Finance Officer [eleanorcurrie@north-ayrshire.gov.uk] 
36

Page 37

PUBLIC INFORMATION
2025-26 Budget Monitoring Report–Objective Summary as at 31st January 2026                                                                 Appendix A 
Budget Outturn
Projected 
Over/
(Under)
Spend
Variance
Budget Outturn
Projected 
Over/
(Under)
Spend
Variance
Budget Outturn
Projected 
Over/
(Under)
Spend
Variance
£'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000
COMMUNITY CARE AND HEALTH 78,717 79,578 861 20,894 22,011 1,117 99,611 101,589 1,978 2,957 (979)
: Locality Services 32,539 33,267 728 5,789 5,789 0 38,328 39,056 728 747 (19)
: Community Care Service Delivery 41,957 41,730 (227) 0 41,957 41,730 (227) 803 (1,030)
: Rehabilitation and Reablement 2,093 2,102 9 0 2,093 2,102 9 51 (42)
: Long Term Conditions 904 952 48 10,628 11,584 956 11,532 12,536 1,004 944 60
: Community Link Workers 339 338 (1) 0 0 0 339 338 (1) (1) 0
: Integrated Island Services 885 1,189 304 4,477 4,638 161 5,362 5,827 465 413 52
MENTAL HEALTH SERVICES 41,157 42,242 1,085 77,456 77,745 289 118,613 119,987 1,374 1,720 (346)
: Learning Disabilities 32,078 33,266 1,188 727 727 0 32,805 33,993 1,188 1,199 (11)
: Community Mental Health 7,069 6,956 (113) 1,801 1,801 0 8,870 8,757 (113) (111) (2)
: Addictions 2,010 2,020 10 1,879 1,880 1 3,889 3,900 11 9 2
: HBCCC 0 0 0 353 0 (353) 353 0 (353) (353) 0
: Lead Partnership Mental Health NHS Area Wide 0 0 0 72,696 73,337 641 72,696 73,337 641 976 (335)
CHILDREN & JUSTICE SERVICES 36,425 37,801 1,376 5,895 5,932 37 42,320 43,733 1,413 1,627 (214)
: Irvine, Kilwinning and Three Towns 3,249 3,292 43 0 0 0 3,249 3,292 43 46 (3)
: Garnock Valley, North Coast and Arran 3,598 3,690 92 0 0 0 3,598 3,690 92 83 9
:Intervention Services 1,841 1,839 (2) 0 0 0 1,841 1,839 (2) 0 (2)
: Care Experienced Children & Young people 22,791 24,787 1,996 0 0 0 22,791 24,787 1,996 2,146 (150)
: Head of Service - Children & Families 1,413 689 (724) 0 0 0 1,413 689 (724) (658) (66)
: Justice Services 3,101 3,101 0 0 0 0 3,101 3,101 0 0 0
: C&F Health Team 432 403 (29) 5,015 5,117 102 5,447 5,520 73 82 (9)
: Lead Partnership NHS Children's Services 0 0 0 880 815 (65) 880 815 (65) (72) 7
CHIEF SOCIAL WORK OFFICER 1,959 1,851 (108) 0 0 0 1,959 1,851 (108) (73) (35)
PRIMARY CARE 0 0 0 53,262 53,259 (3) 53,262 53,259 (3) (3) 0
ALLIED HEALTH PROFESSIONALS 0 11,489 11,489 0 11,489 11,489 0 0 0
MANAGEMENT AND SUPPORT COSTS 8,195 6,922 (1,273) 4,038 3,404 (634) 12,233 10,326 (1,907) (1,598) (309)
OUTTURN ON A MANAGED BASIS 166,453 168,394 1,941 173,034 173,840 806 339,487 342,234 2,747 4,630 (1,883)
Return Hosted Over/Underspends to East 0 0 0 0 (210) (210) 0 (210) (210) (320) 110
Return Hosted Over/Underspends to South 0 0 0 0 (183) (183) 0 (183) (183) (279) 96
Receive Hosted Over/Underspends South 0 0 0 0 33 33 0 33 33 33 0
Receive Hosted Over/Underspends East 0 0 0 0 415 415 0 415 415 415 0
OUTTURN ON AN IJB BASIS 166,453 168,394 1,941 173,034 173,895 861 339,487 342,289 2,802 4,479 (1,677)
Over/
(Under)
Spend
Variance at
Period 9
Movement in  
variance
from Period
9
TOTAL
Partnership Budget - Objective Summary
Council Health
2025/26 Budget
37

Page 38

2025-26 Savings Tracker          Appendix B 
Social Care:
Ref Description
Deliverability
Status at budget
setting
Deliverability             
Month 10
2025/26 Saving
Previously Agreed Savings (Full year impact)
1 Review of Day Care provision Green Blue 0.100
2 Service redesign  (CAAST Team and Corporate
Parenting team)
Green Blue 0.034
Adjustments
3 Payroll Turnover Green Blue 0.099
Mental Health
4 LD Responder Service Amber Amber 0.150
Children, Families & Criminal Justice
5 Brighter Pathways Amber Red 1.000
Community Care & Health
6 Review of Day Care provision Amber Blue 0.107
7 Care at Home Amber Blue 0.500
8 Care Package Review (all services) Amber Blue 0.200
9 Deletion of vacant posts Green Blue 0.056
10 Increase to charging Green Amber 0.186
11 Admin Post Savings Green Blue 0.114
12 Financial Inclusion Green Blue 0.357
TOTAL SOCIAL CARE SAVINGS 2.903
Cross Service
38

Page 39

Health:
Ref Description
Deliverability
Status at
budget
Deliverability             
Month 10
2025/26
Saving
Adjustments
13 Increase recharge to East Ayrshire for beds at
Woodland View
Green Blue 0.010
14 Payroll Turnover Green Blue 0.079
Other Savings
15 Admin Savings Amber Blue 0.186
16 Trindlemoss House - move to social care model Amber Amber 0.250
17 EICT/Rehab Amber Blue 0.150
18 Community MH/Wellbeing Review Amber Amber 0.100
19 Ward 7A - Woodland View Amber Amber 0.341
TOTAL HEALTH SAVINGS 1.116
TOTAL NORTH HSCP SAVINGS 4.019
39

Page 40

2025-26 Budget Reconciliation               Appendix C 
COUNCIL Period Permanent or
Temporary £'m
Initial Approved Budget 137.739
Adjustments to baseline 0.039
Revised Budget 137.778
Resource Transfer 25/26 1-3 25.026
Additional Funding - 24/25 Adult Social Care RLW 1-3 P 0.073
Additional Funding  RLW 1-3 P 0.126
Additional Funding - Money Smart 1-3 P 0.094
ICT Transfers 1-3 P (0.005)
Additional Funding - Whole Family Wellbeing Funds 1-3 T 0.179
CJSW - S27 1-3 P 3.280
Development of People working in Childrens SW 1-3 P (0.390)
Change Fund Allocation - HSCP FIO Team 7 T 0.021
Internal Commerical Waste 7 P 0.009
ICT Transfers 9 P (0.004)
CSC Pay Uplift 10 0.163
SRA Kinship 10 0.058
Change Fund Allocation - HSCP FIO Team 10 0.047
ICT Transfers 10 (0.004)
Roundings 10 0.002
166.453
HEALTH Period Permanent or
Temporary £'m
Initial Budget exc set aside 161.934
Month 10-12 Adjustments and adjusting for the
full year impact of part years amounts and
temporary funding.
8.532
Revised Budget 170.466
Resource Transfer 24/25 24.640
Resource Transfer 25/26 (25.026)
NORTH NATIONAL INS 25-26 AMBUS 1 0.997
PRESCRIBING 25-26 AMBUSH 1 2.754
PRESCRIBING CRES 25-26 AMBUSH 1 (0.715)
Training Grade Adj - April 1 (0.058)
Training Grade Rates Adj - April 1 0.030
MH: Anticipate PDS Dementia (North) 25/26 1 0.094
MH: Anticipate Delivery of Veteran Specific 25/26 1 0.105
Anticipated RWW from SG 1 0.659
Anticipate 20% Tranche 2 ADP 1 0.174
Social Care Budget Reported at Month 10
40

Page 41

HEALTH Period Permanent or
Temporary £'m
Training Grade Adj - May 2 (0.013)
Bwp 25-26 East Chest Heart Stroke 2 0.001
Bwp 25-26 East Nest Expansion 2 0.023
Bwp 25-26 East - Sds Advice Service 2 0.013
Bwp 25-26 East Sub Prescribing 2 0.170
25-26 South Budget Paper - North Substitute Prescribing 2 0.170
25-26 South Budget Paper - Pan Ayrshire Chest Heart
And Stroke 2 0.001
25-26 North Budget Paper - Pan Ayrshire (vision
Support Service 2 (0.005)
25-26 North Budget Paper - Pan Ayrshire
(communitystore) 2 (0.155)
HD52: EARLY INTERVENTION PSYCHOSIS 3 0.100
25-26 Pay Award Increase North 3 1.179
Training Grade Adjustment (Dean Funding) 4 0.011
Medical Pay Award - Senior Medical - Additional 1% 4 0.086
Medical Pay Award - Specialty Doctors - Additional 1% 4 0.006
Virement to Medical Directorate from Mental Health
Admin 4 (0.028)
Transfer MAT Standards Psychiatrist 0.2 WTE 4 0.029
Primary Care Prescribing Tariff Reduction 4 (0.556)
BBV transfer from Public Health 4 0.269
Training Grade Adjustment (Dean Funding) - August 5 0.129
Budget transferred to Capital for INV-3395435821 5 (0.006)
Transfer from South - ANP contribution 5 0.030
Primary Care Prescribing Budgets reworked 5 0.130
HD157 3% pay award ADP North 5 0.057
North MDT funding to Arran Medical Group (Virement 11) 5 (0.043)
Training Grade Adjustment (Dean Funding) - September 6 0.018
Transfer Methadone LES to East GMS 7 (0.008)
Post to Medical records 7 (0.037)
GP Prescribing budget adjustment 7 (1.094)
ADP MAT Standards Allocation 7 (0.045)
ADP ABI to East 7 (0.010)
Drug Death Co-ordinator funding returned to PH (retiral -
post funding returned) (0.040)
BBV funding returned to PH (reduction in hours) 8 (0.008)
Training Grade Adjustment (Dean Funding) - December 8 (0.071)
Training Grade Rates Adjustment - December 9 0.086
Early Years funding 0.49 WTE Band 4 - MIN Alloca 9 0.020
GP Prescribing budget adjustment 9 (0.365)
Training Grade Adjustment (Dean Funding) -
January 10 0.019
Junior Doctors Pay Award - additional 0.25% 10 0.008
MAT Standards Adjustment 10 (0.006)
ANTICIPATED BUDGETS INCL HERE (NOT IN LEDGER) 10 (1.150)
Roundings (0.001)
173.034
TOTAL COMBINED BUDGET 339.487
Health Budget Reported at Month 10
41

Page 42

25-26 IJB Reserves Position      Appendix D 
Area of Reserves
Balance
at 31
March
2025
Earmarked Funds £
: Alcohol & Drug Partnership 353           
: Mental Health Action 15 135           
: Primary Care Improvement Fund 46              
: Service Redesign / Challenge Fund 780           
: Family Wellbeing Fund 934           
: Breastfeeding Network 36              
: MH Recovery and Renewal /Enhanced MH
Outcome Framework 365           
: Early Intervention in Psychosis 92              
: LD funding 82              
: Donation (Police Scotland) 1                 
: Primary Care Improvement Fund IP 303           
: GP Premises Improvements - tranches 1 and 2 3                 
: Dental Practice Improvement 29              
: Appropriate Adult 2                 
Total Earmarked 3,161       
42

Page 43

Bank and Agency Costs to Month 10      Appendix E 
1) NHS
4863
(Registered)
4864
(Unregistered)
4853
(Registered)
4854
(Unregistered)
4865 (Agency
Locum
Consultant) TOTAL
NORTH CORE SLT ADULT 3,098              3,098            
WARD 1 WOODLANDS VIEW 47,525           235,032           282,557        
WARD 2 WOODLANDS VIEW 25,567           346,633           372,200        
ACH REDBURN REHAB WARD NRS 24,251           164,162           188,413        
ACH DOUGLAS GRANT REHAB WD NRS 34,699           75,855             110,554        
WARD 3 WOODLANDS VIEW NURSING 12,324           328,558           340,882        
WARD 4 WOODLANDS VIEW NURSING 1,605             37,804             39,409          
NEW CLONBEITH NURSING(JURA) 89,093           144,959           234,052        
WVIEW THE GLEN ECT 5,197         11,959             17,156          
WVIEW WARD 10 ACUTE MH NRS 5,576             238,505           244,081        
WVIEW WARD 8 ACUTE MH NRS 23,316           760,489           783,805        
WARD 5 WOODLANDS VIEW 4,033             47,347             51,380          
WVIEW WARD 7B REHAB MH NRS 7,419             7,419            
NEW DUNURE NURSING(CLONBEITH) 35,937           192,942           228,879        
MH BED MANAGEMENT 21,726           21,726          
TRINDLEMOSS 60,040           282,690           342,730        
ARRAN HOSPITAL NURSING 69,006           41,701         110,707        
CAMHS MANAGEMENT 1,944             1,944            
CAMHS UNSCHEDULED CARE 1,903             1,903            
EARLY YRS-C/F TEAM 1 923               923               
EARLY YRS-C/F TEAM 3 974               974               
IMMUNISATION NURSING 55,249           17,611             72,860          
ARRAN HV 137               137               
ARRAN DN 13,862           13,862          
PACKAGE OF CARE (P) - AMG 109,773           109,773        
PACKAGE OF CARE (P) - LMO 879                 879               
NC POC TEAM 2 990                 990               
NC POC TEAM 3 3,843              3,843            
THREE TOWNS DN 1,187             1,187            
FOXGROVE(NSAIS)ADVANCE RECRUIT 29,246             29,246          
NORTH AHP MANAGEMENT TEAM 7,329              7,329            
IRVINE DN 16,516           16,516          
NORTH WEST COAST DN 31,318           31,318          
GARNOCK VALLEY DN 53,541           53,541          
LADY MARGARET NURSING 8,467             4,520              12,987          
PREVENTION + SERVICES SPT TEAM 4,719             4,719            
LD HEALTH CHECKS 12,238           12,238          
NORTH CLDT 6,806             164                 6,970            
LDS MANAGEMENT 2,332             2,332            
MHANPS MH UNSCHEDULED CARE 38,721           57                   38,778          
MHS INPATIENT MGT 15,845           520                 16,365          
CMHT NURSING-NORTH AYRSHIRE 9,362             5,890              15,252          
WVIEW WARD 7C FORENSIC REHAB N 9,224             138,927           371               148,522        
INTENSIVE COMMUNITY NURSING TEAM 44,893           3,978              48,871          
ADULT MENTAL HEALTH LIASION TEAM 343               343               
PCMHT NORTH 4,108             4,108            
WVIEW WARD 6 LOW SECURE NRS 53,282           162,602           215,884        
WARRIX AVE 110,637         83,409             194,046        
ICFN - COMMUNITY PHLEBOTOMY 12,456             12,456          
FORENSIC PSYCHOLOGY 3,248             3,248            
CHILD HEALTH ADMIN 25,610           1,797              27,407          
WVIEW WARD 7A LD A+T NRS 23,436           425,962           1,804            14,532            465,734        
WVIEW WARD 9 ACUTE MH NRS 45,418           384,223           226               429,867        
WVIEW WARD 11 ACUTE MH NRS 299,680       299,680        
ADULT EAST 1,131              1,131            
OLD AGE 60,253             60,253          
1,063,557      4,605,590        2,401            14,532            61,384             5,686,080      
2) SOCIAL CARE
Mth 10 Spend
327,922       
158,510       
15,000         
89,483         
590,915       
Mh Acm
Agency
Montrose House Brodick
Unscheduled Care Funding
Ld Acm
Bank
43

Page 44

44

Page 45

Integration Joint Board
13th  March 2026
Subject : Transformation Plan Update
Purpose : The purpose of this report is to provide an update on the HSCP’s
Transformation Plan:-
• Awareness 
• Approval
• Discussion
Recommendation : The Integration Joint Board are asked to note the contents of the
report and progress to date.   
Direction Required to
Council, Health Board or
Both 
Direction to :- 
1. No Direction Required 
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
HSCP Health and Social Care Partnership
IJB Integrated Joint Board
PMI Property Management and Investment
TEC Technology Enabled Care
DPIA Data Protection Impact Assessment 
1. EXECUTIVE SUMMARY 
1.1 This report provides an update to the Integrated Joint Board (IJB) on progress with
the HSCP Transformation Plan 2024–27. Following external scrutiny and an internal
review, the Plan has been refreshed to improve focus, deliverability and alignment
with financial plans, with a reduced number of clearly defined projects now overseen
by the Transformation Board. 
A formal benefits realisation approach has been introduced, strengthening
governance, transparency and reporting of cashable and non-cashable benefits. The
Programme has delivered £1.824m in savings to date, with total savings of over £4.8m
anticipated by 2026/27, subject to successful delivery of projects in progress. 
The report proposes that the IJB note the progress made and the strengthened
arrangements now in place. 
Agenda Item 6
45

Page 46

2. BACKGROUND 
2.1 In March 2024, the Integration Joint Board (IJB) approved the Transformation Plan for
2024-27.  The Plan was established to deliver transformation projects and
programmes across the Partnership.  It was agreed that updates on the
Transformation Plan would be provided to the IJB every six months.  The previous
update was in August 2025.   
In September 2025, Audit Scotland produced its annual audit report of the North
Ayrshire Integration Joint Board.  The audit highlighted the importance of
the Transformation Plan in managing within budget, while also recognising that future
recurring savings will be delivered in other areas, such as workforce changes and
service reviews.   
2.2 Internal Audit carried out an audit of the IJB Transformation arrangements with the
final report in August 2025 reporting Substantial Assurance.  The objectives of the
audit being that there are adequate governance arrangements in place for
transformation workstreams, adequate financial monitoring arrangements are in place
for the transformation workstreams and that there are adequate programme
management arrangements in place for transformation workstreams. 
Substantial Assurance is an assessment that indicates there is - “A sound system of
governance, risk management and control exist, with internal controls operating
effectively and being consistently applied to support the achievement of objectives in
the area audited.” 
The audit opinion summarised that: 
• Overall, substantial assurance was obtained with regard to the governance of
the HSCP’s Transformation Plan. The current governance arrangements
include clear reporting lines and involve senior managers at an appropriate
level. The Transformation Board meets regularly and has a good overview of
the projects, including access to a tracker which is summarised in a 1-page
dashboard. A low priority action has been recommended to correct a
discrepancy in the Terms of Reference for the Board. 
• Projects have governance arrangements which are appropriate to their size.
The documentation required for the projects is clearly laid out and includes the
requisite elements to give managers and sponsors the information they require
for decision-making. Risk registers are maintained for the projects and regularly
reviewed. Exceptions are escalated and appropriate actions put in place.
Financial monitoring arrangements are in place that would highlight any
significant divergences from budget.    
46

Page 47

2.3 In light of the scale of challenge faced across the HSCP and critical importance of the
transformation plans a further internal review was undertaken of the projects on the
Transformation Plan in November.  The objective of the review was to: 
• Rationalise the number of projects on the Transformation Plan to a more
manageable set of projects.
• Ensure that projects on the Plan were appropriately scoped and detailed, and
could be delivered within the lifetime of the Transformation Plan.
• Improve reporting mechanisms so that all involved in delivering projects and
overseeing governance of the Plan had improved oversight of project
objectives.  
• Improve alignment with HSCP savings plan and financial challenges. 
A number of outputs have resulted from the review.  
i. An updated Transformation Plan has been produced
ii. A new approach to monitoring the impact of projects has been introduced as
part of a new Benefits Realisation approach
iii. Improved reporting and governance arrangements 
(i) Updated Transformation Plan 
2.4 The review of Transformation Projects made clear that projects varied in their scope
and size.  Over time, the number of projects on the Plan had grown to 77.  Where
some projects were clearly defined with set objectives and savings, others were found
to be part of wider workstreams or strategic policy reviews. Some of this activity was
also considered business as usual. 
The following steps were taken as part of the review: 
• Condensing any workstreams into one singular project with defined benefits. 
• Closing or accelerating to completion any projects that are nearing their end
and/or unlikely to deliver benefits. 
• Removing items from the Plan which are not projects, e.g. research, reviews,
strategy updates. 
• Ensuring any remaining projects have clearly defined objectives and benefits
and support the HSCP’s financial plans. 
Appendix 1 shows the current new Transformation Plan.  The visual diagram provides
the following information: 
• The current status of each project, from proposal status, through to business
case and onto benefit delivery
• The RAG status of each project that is in delivery, allowing an ‘at a glance’
view of projects 
• Which projects are anticipated to deliver financial benefits 
47

Page 48

The Transformation Plan is reviewed by the Transformation Board every 2 months. 
(ii) Benefit Realisation 
2.5 Introducing a framework to monitor and measure the impacts of projects
can help address the recommendations outlined by Audit Scotland.  On 4 December
2025, the Transformation Board approved Benefit Realisation and Management
Approach.  This defines what a benefit is, how it should be measured and also the
roles and responsibilities for ensuring benefits are achieved.   
All projects that have an approved business case will now also have a benefit tracker,
which outlines what is the expected benefit of each project.  Benefits are defined as:
• Cashable
• Quantitative
• Qualitative. 
In introducing this framework, the Transformation Board ensures that: 
• Projects can be appraised on what they are forecast to achieve. 
• Monitoring of project impact is clear and transparent. 
• Steps can be taken at an early stage to take corrective action should progress
slip. 
• Evidence can be readily provided to externally bodies examining the impact
and progress of transformation and other initiatives.   
As noted above, all projects on the Transformation Plan will have benefits trackers, to
monitor the delivery of all project benefits, including cashable benefits. 
Appendix 2 provides an example of what a benefit tracker looks like for projects.  Three
benefits for the Brighter Pathways project have been included to demonstrate the way
in which benefits are baselined, tracked and monitored. 
(iii) Enhanced Governance  
2.6 The introduction of benefit trackers has enabled a clearer picture of the financial
benefits aligned to projects on the Programme and the progress in achieving these
benefits.  This is also underpinned by close working with HSCP finance colleagues. 
While this good working relationship is not new, sharing the position on project
progress with cashable benefits contributes to improved planning and coordination. 
In addition, a new process has been introduced for projects being appraised and
approved by Transformation Board, with a move to a streamlined project
documentation approach.  This is outlined below:  
48

Page 49

Planning Managers complete Status Update reports every two months for discussion
at Transformation Board.  These are attached as an appendix and discussed in more
detail in section 2.8-2.10.   
Transformation Update 
2.7 In addition to the updates and changes to the Transformation approach outlined
above, the following key activities have taken place this period: 
• The Terms of Reference for the Transformation Board has been updated and
approved.  This was an action from a recent internal audit.
• During March, Planning Managers will receive training on Service Design. 
Delivered by the Service Design Academy, the training will equip Planning
Managers with a new skillset aimed at supporting teams and services through
service changes in a collaborative and dynamic way
• A new Digital Working group has been established which aims to better
coordinate the Partnership’s digital approach.  This group will report to the
Transformation Board and be a space to share knowledge, issues, updates
and best practice with colleagues from IT in the Council and Health Board
being core members.
• Senior Officers are participating in a corporate trial of Microsoft CoPilot.  This
is designed to explore the benefits of CoPilot in speeding up routine and every
day tasks, thereby improving productivity.   
Appendix 1 displays all of the projects on the Transformation Plan.  Appendices 3-5
provide greater detail on progress within each of the three Services: Children, Families
and Justice, Health and Community Care and Mental Health and Learning Disabilities.
This section will provide a spotlight on a selected project within each area, to provide
members with more detail and information on some of the initiatives currently taking
place.   
2.8 Children, Families and Justice
Project spotlight: Brighter Pathways 
Brighter Pathways has a number of workstreams established to deliver the
programme.  The residential placement workstream targets the creation of a new
residence for young people supporting them to make the transition to sustain tenancy,
Boyle Street.  The building will have capacity for 6 young people.  Significant activity
49

Page 50

is therefore currently taking place to have the new service operational for April.  This
is happening on a number of fronts including working with colleagues to identify
individuals to move into Boyle St, working with Property Management and Investment
(PMI) to ensure building works are complete and mobilising the contract and service
with the new provider Blue Triangle. 
Overall, works are progressing well and currently on course for opening in April.  It is
anticipated this step down model will have a positive impact on use of internal and
external residential placements. 
2.9 Health and Community Care
Project spotlight: Technology Enabled Care Hub 
The Technology Enabled Care (TEC) Hub is a key element of the refreshed
Transformation Plan and supports a shift towards a TEC First approach across North
Ayrshire HSCP. The project brings together technology, equipment and professional
expertise in a single, community-facing hub, with the aim of supporting earlier
intervention, greater independence and reduced reliance on traditional care
packages. It aligns with national digital health and care priorities and local ambitions
around prevention and sustainability.  Our North Ayrshire Hub will be based at
Castleview Hub in Ardrossan, co-located with our moving and handling hub for staff
and carers. 
Good progress has been made, with the business case developed and preparatory
work underway to establish the hub space, including layout planning, clearance works
and early procurement of technology and equipment. The next phase will focus on
completing refurbishment, installing and testing technology and moving towards
operational delivery, with a clear focus on benefits realisation, including supporting
discharge, reducing pressure on care at home services and increasing confidence in
the use of technology enabled care. 
2.10 Mental Health and Learning Disabilities 
Project Highlight: Magic Notes  
Magic Notes is an AI-powered meeting summarisation tool developed specifically for
social work.  It records, transcribes and summarises meetings into templates built
bespoke to suit the requirements of the case management system.  With funding from
the North Ayrshire Council Change Fund, the HSCP has procured a trial of Magic
Notes to test and evaluate the benefits it may bring to Services.   
The Mental Health and Learning Disabilities teams will trial its use for 6-8 weeks
beginning on 2 March 2026.  Evaluations from other areas have shown positive time
savings, increased quality of interactions and practitioner sentiment.  A thorough Data
Protection Impact Assessment (DPIA) was completed as part of the procurement to
ensure data is processed safely and any risks are mitigated.  As a part of this process,
a robust consent procedure has been developed and will be followed by staff prior to
the use of the product.  Assuming positive benefits are achieved from the trial, a
50

Page 51

business case outlining expected benefits from a roll out across all social work
services will be developed. 
3. PROPOSALS 
3.1 It is proposed that IJB note the contents of the report and the progress made to date.
3.2 Anticipated Outcomes 
Informing IJB and the people of North Ayrshire on the progress of the Transformation
Plan and also providing assurance of the governance arrangements and that the
Transformation Board has appropriate oversight. 
3.3 Measuring Impact 
Stakeholders are assured of progress. 
4. IMPLICATIONS 
4.1 Financial 
Some projects on the Transformation Plan will deliver financial benefits and progress
towards this has been outlined in section 2.6. 
4.2 Human Resources
None
4.3 Legal
None
4.4 Equality/Socio-Economic
None
4.5 Risk
None
4.6 Community Wealth Building
None
4.7 Key Priorities
None 
5. CONSULTATION 
Consultation has taken place with members of Transformation Board, which includes
Heads of Service and Planning Managers. 
Caroline Cameron, Director 
Stuart MacMillan, Principal Manager
stuartmacmillan@north-ayrshire.gov.uk 
Appendices
51

Page 52

• 1.  Refreshed Transformation Plan
• 2. Brighter Pathways Benefit Tracker
• 3. Children, Families and Justice Update
• 4. Health and Community Care update
• 5. Mental Health and Learning Disabilities Update   
52

Page 53

Appendix 1 – Transformation Plan 
53

Page 54

Appendix 2: Brighter Pathways Benefit Tracker 
Benefit
Type
Benefit
Category Benefit Name Baseline
Measurement
Baseline
Date
Baseline
Source
Benefit 
Target
Value
Benefit 
Target
Date
Frequency of
Measurement
Benefits
Owner
Non-Cashable Quantitative
Reduction in the
number of external
residential
placements
34 2025/26
Brighter Pathways
Report presented
to IJB Nov 2025
(Page 46)
25 31-Mar-27 Quarterly Elizabeth
Stewart
Cashable Rationalisation
Reduction in the cost
of external
residential
placements
£8,442,349 2025/26
Brighter Pathways
Report presented
to IJB Nov 2025
(Page 46)
£6,706,621 31-Mar-27 Quarterly Elizabeth
Stewart
Non-Cashable Quantitative
Increase in the
number of foster care
placements
135 2025/26
Brighter Pathways
Report presented
to IJB Nov 2025
(Page 46)
138 31-Mar-27 Quarterly Elizabeth
Stewart 
54

Page 55

Appendix 3: Children, Families and Justice update 
55

Page 56

Appendix 4: Health and Community Care update 
56

Page 57

Appendix 5: Mental Health and Learning Disabilities Update 
57

Page 58

58

Page 59

OFFICIAL INFORMATION
OFFICIAL INFORMATION 
Integration Joint Board
13th March 2026
Subject:  Revenue Budget 2026-27 
Purpose:  To update the IJB on the financial position for the Partnership for
2026-27, including the proposed delegated funding, service budget
pressures, plans developed to set a budget and the associated
risks.   
Recommendation:  That the Board:
(a) approves the budget for 2026-27 for the Partnership inclusive of
all pressures, savings and reserves, noting that the funding position
is subject to confirmation of the NHS Ayrshire and Arran budget
(b) approves the new hourly rates for commissioned providers and
Personal Assistants; and
(c) notes the risks associated with this budget. 
Direction Required to
Council, Health Board or
Both 
Direction to:- 
1. No Direction Required 
2. North Ayrshire Council 
3. NHS Ayrshire & Arran 
4. North Ayrshire Council and NHS Ayrshire & Arran √ 
Glossary of Terms 
NHS AA NHS Ayrshire and Arran
IJB Integration Joint Board
NAHSCP North Ayrshire Health and Social Care Partnership  
NAC North Ayrshire Council
CAMHS Child and Adolescent Mental Health Services
FPC Free Personal Care
PCIF Primary Care Improvement Fund
ADP Alcohol and Drugs Partnership
UnPACs UNPACS, (UNPlanned Activities) – Extra Contractual Referrals
SLA Service Level Agreement
AfC Agenda for Change 
1. EXECUTIVE SUMMARY 
1.1 The report outlines the funding allocations from North Ayrshire Council and NHS
Ayrshire and Arran, the service pressures, resulting budget gap and the savings plan
for 2026-27. The Council budget was set on 25th February and NHS AA will set their
budget on 7th April 2026; if the funding assumption from NHS AA changes from the
planning assumption set out, the plans for the IJB will require to be re-visited.   
Agenda Item 7
59

Page 60

OFFICIAL INFORMATION
OFFICIAL INFORMATION
1.2 The Scottish Government finance settlement set out a number of conditions and
requirements for Health Boards and Councils in relation to funding delegated to
Integration Authorities. The delegated funding outlined in the report (indicative for NHS
AA) meets those Scottish Government requirements. 
1.3  The financial context for this budget is exceptionally challenging. Cost and demand
pressures across both health and social care continue to grow at a pace that
significantly exceeds available funding, and this is compounded by a recurring
underlying deficit carried forward from 2025–26. Against that backdrop, the primary
focus of this report is to ensure that the IJB is able to set a legally compliant, in-year
balanced budget, while being transparent about the scale of risk, the level of reliance
on savings and policy decisions, and the implications for future financial sustainability.
1.4 The table below summarises the overall financial position for 2026-27: 
Social
Care
(NAC)                     
£m
Health                                                  
(NHS
AA)                    
£m
Total                     
£m
Funding Increase 11.147 4.714 15.861
Service Pressures – Appendix B (17.152) (4.855) (22.007) 
Budget Gap  (6.005) (0.141) (6.146)
Funded by:       
- Savings – Appendix C  1.577 1.239 2.816
2026/27 Budget Position  (4.428) 1.098 (3.330)
Estimated Opening Gap from 2025-26 (1.400) (1.592) (2.992)
2026/27 Opening Budget Gap Position  (5.828) (0.494) (6.322) 
Note that green highlighted line represents the new in-year budget gap for 2026-27
and the legal requirement to set an in-year balanced budget and in the case of the
Health/NHS budget this is a surplus. 
Further savings are required in recognition that there will be an overspend from 2025-
26 carried into 2026-27 relating to a number of pressures areas regularly reported to
the IJB. Approving additional savings at this stage is prudent and necessary to ensure
early action is taken to minimise any overspend in 2026-27. 
1.5 The Partnership has undertaken extensive community engagement which
commenced early December 2025 on the challenges of delivering social care services
within budget.  There is a separate paper on the IJB agenda for consideration, it is
recommended that the remainder of the Social Care/Council gap is met through the
review of eligibility criteria for access to funded adult social work and social care
services. 
The remaining budget gap for Health/NHS services is smaller in value and primarily
reflects current year pressures recurring to an extent next financial year, rather than
a significant pressure on core funding, therefore it is recommended that the remaining
health services gap is monitored closely in-year during 2026-27 with further recovery
actions identified as required. 
60

Page 61

OFFICIAL INFORMATION
OFFICIAL INFORMATION
1.6  A number of financial risk areas are highlighted in the report and the IJB are asked to
note these at this stage; the IJB may be asked during 2026-27 to approve any
appropriate action to mitigate or manage these areas. 
1.7 The IJB Finance Working Group (FWG) has supported the development of the
proposals presented and the financial position and options have been discussed in
more detail in that forum; this has supported the opportunity to bring forward some
proposals earlier for approval such as the 2026-27 Charges for Services. The FWG
will play a critical role as we move into next financial year to provide additional
oversight, scrutiny, challenge and support to further monitor the position and develop
the budget further. 
1.8  The proposed integrated budget for the IJB is £343.390m (inclusive of the estimated
Set Aside budget of £42.670m). A summary of the 2026-27 budget and net budget
increase is detailed within Appendix A. 
2. BACKGROUND
2.1 Key Budget Principles 
A number of key guiding principles were set out for the approach to developing the
IJB budget for 2025-26.  We have been guided by these principals in setting the
budget for 2025-26, in managing in-year pressures and in developing the budget for
2026-27 and are able to provide examples of how these principals have been taken
forward in practice – including the recent budget consultation, review of charging
policy, our transformation plans, the roll out of digital solutions, our communications
approach and escalations to parent bodies and Scottish Government of our funding
challenges. 
It is recommended that these key principles remain in place, these are set out below:
• Maximise income from charging for services to protect the delivery of frontline
services, ensuring that only individuals who have the means should pay more for
the services they receive directly.
• Manage within available budget limits – including re-design to deliver service within
available resource. 
• Maximise efficiencies in the way services are delivered through a structured
service review process.
• Maximise opportunities for shared service and lead partnership delivery across the
Ayrshires.
• Values-based health and care– eradicating effort that provides no benefit for the
person and a focus on self-management and prevention. 
• Tighten the eligibility criteria for targeted services to prioritise delivery of services
to those with the highest levels of need and risk.
• Improve services through digital innovation and maximise the use of digitally
enabled care technology, where appropriate
• Be transparent and open in our challenges, having honest conversations with our
staff and communities.
• Advocate for a better funding deal for North Ayrshire for community-based health
and care services & actively pursue opportunities for additional funding.
61

Page 62

OFFICIAL INFORMATION
OFFICIAL INFORMATION
2.2 The Integration Scheme outlines a process of planning for budgets in future years
where the Chief Officer and the Chief Finance Officer develop the funding
requirements for the Integrated Budget based on the Strategic Plan and present it to
the Parties for consideration as part of the annual budget setting process. This
includes consideration of pay awards, contractual uplifts, prescribing, resource
transfer and ring-fenced funds. 
The Integration Scheme approved by Scottish Ministers states that following
determination of the Council and NHS payments to the IJB, the IJB will refine its
Strategic Plan to take account of the totality of resources available and there is an
implicit requirement to set a balanced budget prior to the new financial year.   
In December 2025 the IJB approved a refreshed Strategic Plan to 2030 which updates
the HSCPs priorities for delivery and long-term planning. The new vision in the plan is
“To empower people in North Ayrshire to live safe, healthy and active lives with fair
and equal access to sustainable health and care services”. The new plan will be in
place for the new reporting period beginning on the 1st of April 2026.   
In recent years, the budget process has moved away from that outlined in the
Integration Scheme, with Scottish Government directives and expectations in relation
to funding levels to be passed on to IJBs.  Whilst the IJB are required to engage with
the partner bodies in relation to budget pressures and savings, the overall funding
allocation reflects an element of ring fencing and settlement conditions in relation to
funding for IJBs.  This has to some extent in previous years driven or led the approach
to local decision making for resource allocation for IJBs across Scotland with the
Scottish Government minimum prescribed level of funding being the default. 
2.3 The benefits of a delegated funding approach from both partners are:
• The IJB can manage the budget process in terms of developing pressures and
savings (including providing for those pressures not planned to be funded by
partners), providing greater transparency and governance re decision making.
• Allows resource to be allocated by the IJB in line with the priorities in the
Strategic Plan. 
• Allows the SG directive to be followed, not only in terms of application of the
uplift but also in terms of policy areas to be prioritised (e.g. Mental Health and
Drug and Alcohol services).
• Facilitates the ongoing in-year management of the IJB financial position in
relation to the funding and budget being managed on an integrated way to
deliver financial balance.
• Supports future years planning and the development of a Medium-Term
Financial Outlook, supporting an earlier approach to financial planning and an
integrated approach to distribution of resource.  
• Aligns with the proposals in the review of integration for budget planning and
resource delegation for IJBs. 
2.4 Scottish Government Budget 2026/27 – Settlement for IJBs 
For 2026/27 the Health and Social Care Budget and directives to Councils and Health
Boards included the following. 
Local Government: 
62

Page 63

OFFICIAL INFORMATION
OFFICIAL INFORMATION
For 2026-27 there was no directive in the North Ayrshire funding settlement letter and
instead it referred to: 
• Having listened carefully to the arguments set out in ‘Strong Councils, Strong
Communities’, I have sought to balance the desire to ringfence additional
funding towards social care with the Verity House Agreement commitment to
maximise fully flexible funding. In conclusion, I have allocated as much as
possible of the additional revenue funding as General Revenue Grant for
Councils to allocate as they see fit. I do, however, recognise the importance of
sustainable adult social care services and as I set out in my statement, the
government is committed to working together with local authorities on the
delivery and improvement of social care.
• Following our engagement work over the autumn, I am confident that Local
Government will pass more in total to IJBs than is provided as an in-year
transfer by Scottish Government. However, I do acknowledge that partnership
working will be even more critical this year to ensure that the technical changes
applied to the Adult Social Care GAEs are appropriately reflected locally. 
Health Boards: 
For 2026-27 there was no directive in the NHS Ayrshire and Arran funding settlement
letter: 
• NHS Boards will receive a 2% uplift on baseline funding in 2026-27. This will
provide funding towards the costs of the 2026-27 pay deals and provides a 2%
uplift for non-pay costs to support inflationary pressures. Additional funding will
be provided to meet the costs of the 2026-27 pay deals where uplifts exceed
3% in line with public sector pay policy, and full funding has been included for
the agreed Agenda for Change pay settlement. Pay funding should cover all
staff including those delegated to Integration Authorities (IAs).
• A further £150 million of recurring funding has been included to support
territorial boards’ continued implementation of the reforms committed to as part
of the 2023-24 Agenda for Change (AfC) pay deal, including the additional one-
hour reduction from 1 April 2026. Together with the £150 million recurring
funding issued in 2024-25, this increases total available recurring funding to
£300 million for territorial boards. This funding covers all staff under AfC terms
and conditions, including those staff working in functions delegated to IAs.
• While funding for reform and improvement measures will be routed through
NHS Boards, elements will support activity in the community and delivered via
IAs. Part of this package will be used to directly support our shared ambition to
alleviate pressure across the health and social care system.
• There is a specific reference in the NHS Board funding letter to - The funding
allocated to IAs should be additional and not substitutional to 2025-26 budgets
for services which are delegated. Therefore, Local Authority social care
budgets for allocation to IAs must be at least £167 million greater than 2025-
26 recurring budgets.  However, this is not reflected in the Local Government
settlement and contractility to the position communicated to Local Government
directly. 
Full detail is included in the settlement letters in Appendix D. 
To ensure some stability in funding for future years, when there is no direction included
in the funding circular, then the funding consideration by both partners should be
63

Page 64

OFFICIAL INFORMATION
OFFICIAL INFORMATION
aligned to the Integration Scheme. This includes consideration of pay awards,
contractual uplifts, prescribing, resource transfer and ring-fenced funds.  This will be
considered for budget planning in 2027-28.
2.3 PARTNER FUNDING 
2.3.1 North Ayrshire Council 
North Ayrshire Council met on 25th February to set their budget for the coming year
including the contribution to the IJB.
There is no direct general investment in the Scottish Government budget for social
care and no national directive about the level of resource for Councils to pass on and
this will be locally determined. As noted, the settlement letter references “I am
confident that Local Government will pass more in total to IJBs than is provided as an
in-year transfer by Scottish Government. However, I do acknowledge that partnership
working will be even more critical this year to ensure that the technical changes
applied to the Adult Social Care GAEs are appropriately reflected locally.”
The draft Scottish Government Budget included the transfer additional funding of
£167million to Local Government to support social care and integration for 2026-27.
This relates specifically funding for the following areas:
• Real Living Wage for Adult Social Care     
• Free Personal and Nursing Care
The allocation for the Real Living Wage was reviewed at the draft budget stage with
Scottish Government allocating an additional £20m in total to make up the shortfall.
This takes the national funding to:
• £174.7m for adult social care workers in commissioned services. 
• An additional £13.4m to improve pay for early learning and childcare workers
in commissioned services. 
• £13.9m to support development of people working in children’s social work. 
• £7m to support provision of Free Personal and Nursing care.
The North Ayrshire share of the additional £20m has still to be confirmed but is
included at an estimated £0.500m for the budget estimates.  
Additionally, in line with the agreed approach North Ayrshire Council have passed
through all other funding or adjustments to Social Care allocations in the budget
settlement, including:
• Adjustments to allocations for Children’s Services, Disability Assistance
administration and Justice Social Work
• Funding received for the 2026-27 pay settlement difference between 3% and
3.5% - note the core pay settlement of 3% is not directly funded.
• Additional funding approved at the Council budget setting meeting on 25th
February which reflected North Ayrshire Council’s General Grant uplift and a
Council Tax increase of 7% - £4.961m 
This has resulted in a net increased contribution to the Partnership of £13.759m
through the NAC budget setting process.  Some elements of this relate to previous
years and were already assumed in the Partnership base budget and this is shown in
the table below.
Category £m
64

Page 65

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Funding to meet new expenditure requirements:  
Childrens Services Additional Funding  0.651
Scottish Disability Assistance – reduction in grant (0.094)
Health & Social Care Uplift – Real Living Wage 4.688
HSCP share of SG Funding to meet pay awards:  
SG Funding for 26-27 Pay Award 0.441
Baseline additional Uncommitted Funding to HSCP 4.961
Share of the additional £20m funding (estimate) 0.500
Per the HSCP budget plans 11.147
Reconciling Items to the Council Budget Paper  
Amounts already included in HSCP base budget:   
- SG Funding for 25-26 Pay Award 0.777 
- Criminal Justice Social Work 2.335
Share of the additional £20m funding (estimate) still to be
distributed (0.500)
Per Council Budget paper 13.759 
2.3.2 Adult Social Care GAE – Budget Context 
The Scottish Government’s Local Government Finance Settlement for 2026-27
includes technical changes to the Adult Social Care Grant Aided Expenditure (GAE)
methodology, which underpins the distribution of core local government funding for
adult social care across councils. 
The updating of Population Census variables has resulted in the revision of 3
indicators - Personal & Nursing Care of Older People, Residential Care for the Elderly
and Services for Home-based Elderly.  Together the indicators distributed about £2.33
billion in 2025-26. Much of the underlying data has not been updated since 2011 or
2001, and the current formulae, which have not been updated since 1997 or 2002,
have been found to be either incorrect, or not using needs-based indicator
methodology, and so not reflecting the expected numbers of clients in each authority. 
These changes affect the relative share of funding received by individual councils,
representing a redistribution of existing resources rather than the introduction of new,
ring-fenced funding for adult social care. 
Noting that these changes are exceptional in nature and may create volatility between
councils, and to mitigate the impact of this the funding floor for 2026-27 has been
increased to 0.5% below the average change, limiting the scale of any relative
reduction in funding.   The Scottish Government has stated an expectation that the
technical changes to Adult Social Care GAEs are appropriately reflected locally and
has emphasised the importance of partnership working between councils and
Integration Joint Boards (IJBs) in this context. 
While the settlement provides councils with a high degree of flexibility over the use of
General Revenue Grant, the policy intent is that revised assessments of adult social
care need should inform local resourcing decisions for integrated services. 
65

Page 66

OFFICIAL INFORMATION
OFFICIAL INFORMATION 
North Ayrshire Position: 
• For North Ayrshire, the revised Adult Social Care GAE methodology will have
influenced the Council’s overall settlement position for 2026-27, with implications
for the resources available to support adult social care services.
• The shift in Social Care based indicators is an increase of £3.3m based on the
previous year.  Other GAE indicators for funding have also been updated and have
gone up and down in line with distribution.  Despite this update for Social Care
indicators and a greater relative share for North Ayrshire, what North Ayrshire
Council gain through a more up to date assessment of need through the GAE
indicators has been negated through less financial support through the floor
mechanism in the local government funding settlement.
• The extent to which this change is reflected in the Council’s contribution to the
Integration Joint Board will be a matter for local agreement, taking account of:
• the revised GAE distribution,
• existing IJB financial commitments and demand pressures, and
• the sustainability of integrated services. 
North Ayrshire Council has agreed to increase the IJB funding by £4.961m for 2026-
27 which reflects the increase in core revenue funding above the assumed 0% flat
cash settlement for the Council overall. 
Financial Planning Considerations: 
• It should be noted that changes to the Adult Social Care GAE distribution do not
remove underlying demand, cost, or workforce pressures facing adult social care
services, however the updated distribution formula does highlight that appropriate
funding reflecting demand for adult social care services through the Local
Government Finance Settlement has fallen short for a number of years in North
Ayrshire.
• This increase in funding is not directly passed through to the IJB for the delivery of
social care services and is instead part of the overall consideration of the funding
allocation to the IJB by North Ayrshire Council. 
• There remains a risk that any future GAE driven changes to council funding do not
fully align with the IJB’s assessed cost pressures, reinforcing the need for early
and ongoing engagement between partners as part of budget setting and financial
planning. 
2.3.3 For years 2027-28 and 2028-29 the financial planning assumption of North Ayrshire
Council is that, out with specific funding to be passed though by Scottish Government,
that financial pressures facing the IJB will be fully met by savings, i.e. a flat cash
financial settlement.  This reflects the flat cash position predicted for Local
Government in these years.   
2.3.4 NHS Ayrshire and Arran 
NHS Boards will receive a 2% uplift on baseline funding to meet any anticipated pay
deal, with pay fully funded and provides 2% inflation on non-pay lines.  Additional
funding will be provided to meet the costs of the 2026-27 pay deals where uplifts
exceed 3% in line with public sector pay policy, and full funding has been included for
the agreed Agenda for Change pay settlement. Pay funding should cover all staff
including those delegated to Integration Authorities (IAs).  NHS Ayrshire and Arran are
66

Page 67

OFFICIAL INFORMATION
OFFICIAL INFORMATION
required to passport the 2% through to IJBs (£2.890m to North Ayrshire) and
furthermore the difference in the pay award for Agenda for Change staff from 2% and
3.75% (£1.824m for North Ayrshire delivered services).   It is therefore anticipated that
an additional £4.714m of funding contribution towards pay and inflation pressures will
be allocated from NHS AA.   
NHS Ayrshire and Arran will meet on 7th April 2026 to set their budget for the coming
year, the financial allocation for the IJB will be set at that meeting, however there is
minimal risk of a deviation from the Scottish Government directive and allocation
methodology from previous years. 
Additionally, there is funding of £150m nationally for Agenda for Change Pay Reform. 
A share of this funding will be allocated to the IJB towards the associated costs for
NHS staff, this is being followed up for 2024-25 to ensure the correct roll-forward into
2025-26 and it is anticipated at this stage that the costs of the pay reform will be fully
funded moving into 2026-27 including the implementation to the final hour reduction
to the Reduced Working Week. 
While funding for reform and improvement measures will be routed through NHS
Boards, elements will support activity in the community and delivered via IAs. Part of
this package will be used to directly support our shared ambition to alleviate pressure
across the health and social care system. 
Continuing from 2025-26, brokerage will not be available to support overspends, and
NHS Boards must work towards a break-even position which remains the statutory
responsibility of the Accountable Officer. Historic brokerage remains repayable and
has not been written off. Non-recurring sustainability funding of £150 million will be
provided to territorial boards on an NRAC basis. This funding must be used in full to
reduce pressures and the reported deficit. NHS Boards at stage two and above on 2
the NHS Scotland Support and Intervention Framework for finance will receive
additional support in 2026-27 to improve financial sustainability, including non-
recurring deficit support funding as notified in early September 2025. 
The NHS AA financial position for 2026-27 is very challenging, on 13th February 2026
NHS AA Board was escalated to Stage Four of the NHS Scotland Support and
Intervention Framework.  This applies across three areas financial sustainability,
financial control and financial governance and leadership. It is noted that the Board
has been at Stage Three on the Framework since 2018 and the financial position
remains unsustainable over the short to medium term.   NHS AA has the highest level
of outstanding brokerage of any Board in Scotland at over £130 million. The Board
has also recently had a Section 22 report published by Audit Scotland and are not
forecasting to meet their targeted deficit funding in 2025-26. 
2.4 2025-26 FINANCIAL POSITION 
The overall projected outturn position for 2025-26, as at month 10, is a projected year-
end overspend of £2.802m (0.85% of the annual budget). This excludes the Reduced
Working Week funding request of £0.551m which if awarded in full would reduce the
overspend to £2.251m.
Since the initial recovery plan was agreed in June 2025 there has been a £2.833m
reduction in the projected overspend.  Whilst the full-year benefit of the financial
recovery plan has not been realised in-year in the bottom-line outturn, it has supported
the delivery of mitigating a further deterioration to the position introduced through other
67

Page 68

OFFICIAL INFORMATION
OFFICIAL INFORMATION
in-year unexpected financial pressures and supported addressing or reducing
overspends in core services moving into the new financial year.   
The main areas of budget and demand pressure are: care at home, residential
placements for children, physical and learning disability care packages,
supplementary staff in wards, staff costs in Montrose House and Unplanned Activities
(UnPACs) within the lead partnership for mental health. 
Demand for services, particularly for social care support is volatile and there are
significant costs and risks associated with responding to the requirement for low
volume high-cost placements. 
The graph below illustrates the volatility over the year in the projected outturn position,
and the significant improvement made during the year, noting that for 2025-26 financial
balance will not be achieved. 
Many of the underlying overspend areas will continue into 2026-27 and services
require to address these or there will continue to be a reliance on other budgets
underspending and short-term high-risk measures to cease or delay spend. 
2.4.1 2026-27 Opening Position 
The 2025-26 projected outturn of £2.802m has been reviewed to establish the
anticipated impact on the 2026-27 position and any element of recurring over and
underspends.  Following a robust review by the Finance Team and budget holders the
adjusted opening projection for 2026-27 is a predicted £2.992m overspend.  This is
higher than 2025-26 as the in-year position includes one off underspends due to a
draw on reserves as part of the recovery plan. 
This reflects the full year impact of part year cost reductions achieved in 2024-25,
including - care at home, Brighter Pathways, care packages, vacancy management
and supplementary staffing – targeted improvement in other areas.  Further
information is contained in the Financial Monitoring Report for Period 10 which is also
on the IJB agenda. 
68

Page 69

OFFICIAL INFORMATION
OFFICIAL INFORMATION
It assumes all mitigations and controls established in 2024-25 and 2025-26 continue
throughout 2026-27 as it is recognised that the same uncertainty and risks remain into
2026-27 and there needs to be tight grip and control over expenditure overall. 
The opening projected overspend for 2026-27 is predicated on maintaining Financial
Recovery Plan Controls, and: 
• Removing the care home overspend and manging the number of placements in
line with the budgeted level.
• Reducing agency costs at Montrose House on Arran 
• The Brighter Pathways programme of work bringing children’s placement
budgets into line across different settings including residential, fostering, kinship
– recognising the impact of the change programme and new supports in place
for 2026-27.
• Significant reduction or removal of overspends on supplementary staffing
across wards through focussed improvement work supported by the General
Manager, Lead Nurse and responsible Senior Managers 
The main areas of continued risk and where overspends are anticipated as part of the
£2.992m are: 
• Physical Disability Care Packages
• Integrated Island Services
• Learning Disability Care Packages
• Section Payments
• Inpatient Ward Staffing – for Community Rehab and Mental Health Wards
• UnPACs
• Psychiatry 
There are inherent risks in moving into 2026-27 with the level of overspends across a
range of service areas and focus will remain across services to manage these, the IJB
will receive regular updates through the financial monitoring report for 2026-27 on
progress and on the final outturn position for 2025-26. 
3. PROPOSALS 
3.1 2026-27 REVENUE BUDGET PLANS 
The NA HSCP 2026-27 integrated budget is expected to be £300.720m (excluding Set
aside) and £343.390m (including Set Aside budget of £42.670m). 
A summary of the 2026-27 total budget and net funding increase is detailed within
Appendix A.  The pressures and savings are detailed separately in Appendices B and
C respectively.  Sections 3.1.1 to 3.1.5 provide an overview of the pressures and
savings. 
3.1.1 BUDGET PRESSURES 
Service cost and demand pressures are detailed within Appendix B. 
Total net budget pressures for health and social care services total £22.007m. These
have been developed in partnership, with Finance supporting front line services to
identify current and emerging financial pressures, considering historic demand and
costs and potential future variations.
69

Page 70

OFFICIAL INFORMATION
OFFICIAL INFORMATION 
The provision of funding for pressures has the impact of increasing the budget gap to
be addressed through savings, therefore the pressures are only included in budget
plans where these are assessed as being absolutely unavoidable.  
The pressures are noted below with full detail in Appendix B: 
Category
Social Care
(NAC)
Health
(NHS A&A) TOTAL
£m £m £m
Pay pressures  10.325 4.262 14.587
Demographic Pressures 0.420  0.420
Transition Pressures 1.056  1.056
Contract Inflation 4.902 0.025 4.927
Lead Partnership Pressures:   
Pan Ayrshire Pressures  0.077 0.077
Other Pressures 0.449 0.491 0.940
Total New 2026-27 Pressures 17.152 4.855 22.007 
Note that this excludes any expectation or plan for any debt repayment to North
Ayrshire Council or NHS AA for the 2025-26 overspend, the Council and NHS Board
would require to consider on what basis they would plan to fund any year-end
overspend, i.e. through an additional contribution or repayment basis. 
Provision has been made for Health pan-Ayrshire pressures recognising the North
Ayrshire contribution towards pressures faced for services led by East or South. 
These pressures were agreed with the Chief Officers and Chief Finance Officers with
an agreement that the IJBs have a shared responsibility to fund.  These will be
monitored during the financial year. 
3.1.2 LIVING WAGE 
The Living Wage will increase from £12.60 per hour to £13.45 per hour from April
2026. 
This uplift will be applied in the same way as the £10.90, £12 and £12.60 uplifts in the
last three financial years. This will mean an uplift will be applied to a set percentage
(national weighting) of contract values, in line with the average full workforce costs for
residential and non-residential services. A separate agreed weighted percentage has
been set for Personal Assistants who are paid directly through SDS Option 1 budgets. 
After the weightings are applied and the national insurance increase is taken into
account the hourly rates being paid to providers and personal assistants as follows: 
70

Page 71

OFFICIAL INFORMATION
OFFICIAL INFORMATION 
*The 2026-27 rates continue to align with those which are proposed by East Ayrshire
and South Ayrshire, ensuring a consistent pan-Ayrshire funding approach for our
commissioned providers. 
2025-26                               
Rate                     
Per Hour
2026-27                               
Rate                     
Per Hour
Care at Home and Housing Support £23.08* £24.44*
Sleepovers £15.45 £16.50
Personal Assistant Day Time Hourly Rate £16.94 £18.02
Personal Assistant Sleepover Hourly Rate £15.83 £16.89
3.1.3 NEW FUNDING GAP FOR 2026-27 
The table below summarises the overall new funding gap for 2026-27: 
Social Care
(NAC)                     
£m
Health                                                  
(NHS AA)                   
£m
Total                   
£m
Funding Increase 11.147 4.714 15.861
Service Pressures – Appendix B (17.152) (4.855) (22.007)
Budget Gap  (6.005) (0.141) (6.146) 
£6.146m is the new budget gap for 2026-27 only and does not include the £2.992m
underlying deficit from 2025-26 which also requires to be addressed through savings
plans, the table below demonstrates the full budget gap which requires to be met
through savings.  
Social
Care
(NAC)                    
£m
Health                                                 
(NHS
AA)                   
£m
Total 
£m
Funding Increase 11.147 4.714 15.861
Service Pressures – Appendix B (17.152) (4.855) (22.007) 
Budget Gap  (6.005) (0.141) (6.146)
Estimated Opening Gap from 2025-26 (1.400) (1.592) (2.992)
Total 2026/27 Opening Budget Gap (7.405) (1.733) (9.138) 
3.1.4 BUDGET SAVINGS 
Savings in relation to NAC and NHS commissioned services are detailed within
Appendix C.   The savings are RAG rated informed by an overall assessment of the
ease of delivery and the impact on services, indicating an overall risk of deliverability. 
The savings are split into:
• Previously agreed savings 
• Adjustments (payroll turnover and recharges)
• Operational savings
• Policy – Models of care or efficiency
• Policy – Service reduction or cessation
• Eligibility Criteria – Subject to a separate report
71

Page 72

OFFICIAL INFORMATION
OFFICIAL INFORMATION 
The IJB are recommended to approve the savings proposals. Approval will allow: 
1. The IJB to work towards a balanced budget – with all savings being recurring.
2. Give the maximum time to implement the savings.
3. Reduce the risk around financial sustainability.
4. Reduce the risk to our funding partners. 
These savings proposals do not fully address the funding gap, as illustrated below: 
Social
Care
(NAC)                     
£m
Health                                                  
(NHS
AA)                    
£m
Total                     
£m
Budget Gap  (6.005) (0.141) (6.146)
Funded by:       
- Savings – Appendix C  1.577 1.239 2.816
2026/27 Budget Position  (4.428) 1.098 (3.330)
Estimated Opening Gap from 2025-26 (1.400) (1.592) (2.992)
2026/27 Opening Budget Gap Position  (5.828) (0.494) (6.322) 
RAG Deliverability
Status
Social Care
(NAC)                     
£m
Health                                                  
(NHS A&A)                    
£m
Total                   
£m
Red - - -
Amber 0.100 0.041 0.141
Green 1.477 1.198 2.675
TOTAL 1.577 1.239 2.816 
The Partnership has undertaken extensive community engagement which
commenced early December 2025 on the challenges of delivering social care services
within budget.  There is a separate paper on the IJB agenda for consideration, it is
recommended that the remainder of the Social Care/Council gap is met through the
review of eligibility criteria for access to funded adult social work and social care
services. 
The remaining budget gap for Health/NHS services is smaller in value and primarily
reflects current year pressures recurring to an extent next financial year, rather than a
significant pressure on core funding, therefore it is recommended that the remaining
health services gap is monitored closely in-year during 2026-27 with further recovery
actions identified as required. 
3.1.5 LEAD PARTNERSHIP MENTAL HEALTH SERVICES 
The North partnership lead on acute and specialist Mental Health services across
Ayrshire and therefore require to ensure that the services have plans to balance the
budget moving into 2026-27. We have developed plans to ensure that lead partnership
72

Page 73

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Mental Health services are sustainable and are not impacted by pressures elsewhere
in services.   
The overall position for the lead partnership element of the North managed budget is
summarised below: 
£m 
2026-27 Baseline Increase 2.550
Pay Pressures (2.557)
Demand Pressures  (0.029)
Budget Gap/Savings Requirement (0.036)
Previously agreed savings  -
Adjustments (payroll turnover and recharges) 0.090
Operational savings 0.016
Policy – Models of care or efficiency 0.272
Policy – Service reduction or cessation 0.511
Net position – surplus 0.853
Estimated Opening Gap from 25/26 (0.892)
Net position – deficit (0.039) 
3.2 ACUTE SET ASIDE BUDGET 
Each Health Board, in partnership with the Local Authority and IJB, must fully
implement the delegated hospital budget and set aside budget requirements of the
legislation, in line with the statutory guidance published. 
The full implementation of the set aside arrangements is key to delivering a
commitment to planning across the whole unplanned care pathway and partnerships
must ensure that set aside arrangements are fit for purpose and enable this approach.   
Work has been ongoing with partnerships to progress and develop set aside
arrangements to fully implement the legislative requirement.  This includes
arrangements in relation to the use of Directions, Joint Commissioning Plans and
overall progression towards fair share allocations of resources.   
Further work has been undertaken through the Ayrshire Finance Leads group to
establish baseline resources for each partnership and how these compare to the
NRAC “fair share” of resources. Ayrshire Finance Leads have now agreed a baseline
methodology for set aside budgets which involves using the four full years prior to the
pandemic, 2016/17 – 2019/20 inclusive.  
The HSCPs require to agree their final share of the baseline with each other, however
the aggregate will remain unchanged. The table below shows the cost of the 2024-
25 activity at 2025-26 prices inflated by 2% for 2026-27 prices.  Note that this is
estimate pending final information being available.  
IJB
2024-25 Activity at 2025-
26 prices inflated by 2%
for 2026-27
East 34,003
North 42,670
73

Page 74

OFFICIAL INFORMATION
OFFICIAL INFORMATION
South 34,844
Total 111,517 
The NHS AA Chief Executive had previously requested the development of a joint  
strategic commissioning plan to enable the setting of directions to provide to NHS
Ayrshire and Arran for Unscheduled Care, aligned with the Set Aside resources. 
The NHS AA Chief Executive had previously requested the development of a joint
strategic commissioning plan to enable the setting of directions to provide to NHS
Ayrshire and Arran for Unscheduled Care, aligned with the Set Aside resources. 
Furthermore, seeking the support from the 3 IJBs in the review, and onward approving
and monitoring of the delivery of a Strategic Commissioning Plan in line with the
provisions laid out in the Integration Schemes, as outlined below: 
The NHS Board will consult with the Ayrshire Integration Joint Boards to ensure that
any overarching Strategic Plan for Acute Services and any plan setting out the capacity
and resource levels required for the Set Aside budget for such Acute Services is
appropriately coordinated with the delivery of Services across the Ayrshire and Arran
area. The parties shall ensure that a group including the Director for Acute Services
and Chief Officers of the three Ayrshire Integration Joint Boards will meet regularly to
discuss such issues. 
The initial Set Aside base budget for each Integration Joint Board will be based on
their historic use of Acute Services. The actual unit cost which would apply as part of
any change to activity or service redesign is dependent on the scale of change planned
and requires agreement in advance by all Parties. Any redesign of service requires to
be agreed across the three Integration Joint Boards and be reflected in the Strategic
Plans. 
In year pressures in respect of Set Aside budgets will be managed in year by the
Health Board, with any recurring over or underspend being considered as part of the
annual budget setting process. 
In any joint strategic commissioning plan each IJB will consider and outline a clear
framework for commissioning, at a strategic level, the urgent and unscheduled care
service funded from the ‘set aside’ budget. 
There is an ambition that the commissioning plan will indicate an expectation of
service delivery that will see sustained and affordable improvement in relation to
performance outcomes for the citizens of Ayrshire and assure best value to support
the financial balance of urgent and unscheduled care provision through a review and
system wide redesign of the preferred models of care. 
This work remains ongoing and there is an opportunity to refresh this alongside the
national focus on NHS Renewal for Unscheduled Care.  There have been recent
discussions on a Pan Ayrshire and the recent establishment of an Ayrshire
Transformation Board with representation from the 3 HSCPs, 3 Councils and Health
Board to progress this work during 2026-27. 
3.3 NHS RENEWAL – Operational Improvement Plan – Unscheduled Care 
In January 2025, the First Minister described plans to renew the health service and
deliver the change that people in Scotland need. This Operational Improvement Plan
is the first component, to be followed by publication of a population health framework
74

Page 75

OFFICIAL INFORMATION
OFFICIAL INFORMATION
and a health and social care service renewal framework. Together these plans will
progress reform to ensure long-term sustainability, reduce health inequalities, further
harness the benefits of digital technology, and improve population health outcomes in
Scotland. They will set out how we will plan our services for our whole population over
the short, medium and longer term. 
This Operational Improvement Plan describes a number of commitments and actions
across NHS Scotland that are needed to improve the experience of patients. 
The plan brings focus to four critical areas that the Government is committed to
delivering: 
• improving access to treatment 
• shifting the balance of care 
• improving access to health and social care services through digital and
technological innovation 
• prevention – ensuring we work with people to prevent illness and more
proactively meet their need 
NHS Boards, in collaboration with Health and Social Care Partnerships, were asked
to evidence how they would deliver whole-system and sustainable improvement
through the £100 million to deliver the Operational Improvement Plan.  In 2025-26 the
level of funding requested from Boards across Scotland exceeded the total additional
funding available and the Scottish Government were unable to approve the entirety of
each NHS Boards plan. 
In June 2025, the Scottish Government confirmed £10.079 million additional funding
for NHS Ayrshire & Arran for 2025/26. This allocation is designed to support whole-
system transformation and is broken down as follows: 
• £1.681m – Hospital at Home (H@H) expansion, including virtual capacity and
care closer to home.
• £6m – Discharge without Delay (DwD) and Frailty Services, embedding early
discharge planning and front-door frailty models.
• £2.399 million – Core Unscheduled Care funding to maintain essential flow and
resilience. 
North Ayrshire HSCP has £1.081 million ring-fenced within this allocation as follows: 
• £746k – Enhanced hospital-based multi-disciplinary team (MDT) to deliver
seven-day working, front-door frailty, and discharge-to-assess.
• £335k – Mental Health Officer (MHO) capacity to address statutory compliance
and reduce Adults with Incapacity (AWI)-related delays. 
The NHS Renewal allocation of £10.079m for Ayrshire & Arran, including £1.081m
ring-fenced for North Ayrshire, has enabled progress on enhanced hospital-based
MDTs and MHO capacity. However, delays in approval and recruitment have limited
impact to date, and the non-recurring nature of funding poses significant risks to
sustainability. Revised improvement trajectories show slower progress than originally
planned, with delayed discharge numbers projected to remain high into mid-2026
unless additional interventions are implemented. Community unmet need is also
escalating, with average waiting times for care packages for those who experience a
delay in the community exceeding 120 days.
75

Page 76

OFFICIAL INFORMATION
OFFICIAL INFORMATION 
Funding is conditional on achieving agreed outcomes such as embedding DwD
principles, implementing front-door frailty services, and expanding virtual capacity,
with robust monitoring and trajectory reporting required to secure future recurrent
funding. 
The Scottish Government budget for 2026-27 includes £100m across Scotland, the
individual allocations to Health Boards and IJBs have not been received to date.  There
remains a risk of recurring funding to meet the existing financial commitment in North
Ayrshire of over £1m in addition to the further release of funds to take forward
investment in other areas which would support hospital demand and flow. 
3.3 FINANCIAL RISKS 
There are a number of ongoing financial risk areas that may impact on the 2026-27
budget during the year, these include: 
• Growing demand for services.
• Staff recruitment and retention challenges across a number of service areas.
• The expectation that performance will continue to be maintained or improved
despite the significant resource challenges.
• Ongoing delivery costs of Scottish Government policy directives, particularly
where these are not fully funded or inflation proofed.
• Unearmarked reserves are depleted, there is no scope to absorb in-year
variances, with any overspends requiring additional funding from partners.
• The ongoing review of the Integration Schemes, where there is a focus on
financial arrangements and risk share. 
• The wider system financial challenges and impact across the whole system,
for example the financial position of NHS AA and the decisions taken to reduce
the Board’s deficit may have impacts on other parts of the health and care
system. 
• The ability to re-pay funding partners in-year for previous year overspends
given continued financial challenges. 
• The overall sustainability of commissioned care providers 
• Progress with the work to develop set aside arrangements and the risk sharing
arrangements agreed as part of this.
• The recurring underlying levels of overspend which may impact on the
Partnership’s ability to continue to sustain service levels in the future.
• The use of supplementary staffing for enhanced observations across a number
of service areas and the use of high-cost agency staff to support frontline
service delivery in areas where there are recruitment challenges.
• Agenda for Change Pay Reform programme – including Nursing Band 5-6 re-
grade, protected learning time and reduction to the working week. 
• Risk related to NHS Reform investment being allocated by Scottish
Government on a payment by results basis and in arrears.
• A risk of meeting legal obligations to deliver a balanced budget set against
continued increased demand for services, inflationary impacts on the cost of
care and the more difficult decisions which are required to reduce spend. 
These risks will be monitored during 2026-27 and any financial impact reported
through the financial monitoring report. 
76

Page 77

OFFICIAL INFORMATION
OFFICIAL INFORMATION
3.4 IJB RESERVES   
The IJB is established as a Local Government body therefore has the ability to hold
reserve balances.  Reserve balances are held as part of an approach to good financial
management, the purpose of reserves is as follows:
a) As a working balance to help cushion the impact of uneven cash flows.
b) As a contingency to manage the impact of unexpected events or emergencies; and
c) As a means of building up funds, often referred to as earmarked reserves, to meet
known or predicted liabilities. 
The balance of reserves should be considered as part of the budget setting process.
The IJB has a reserves policy in place which outlines an optimum value of reserves to
be held uncommitted in contingency, this is currently set as 2% to 4% of net
expenditure, based on the lower value this would be around £6.014m of the 2026-27
budget (exc set aside). 
The IJB reserves position projected to 31st March 2026 is summarised in the table
below. This reflects a significant in-year draw on both earmarked and unearmarked
reserves. 
General Fund
Reserve Earmarked Reserves
Total 
Unearmarked  External
Funding                      HSCP 
£m  £m £m £m
Balance – 1 April 2025 -  2.381 0.780 3.161
Anticipated Drawdown -  (2.381) (0.780) (3.161)
Projected Balance – 31
March 2026 -  - - - 
The final position for reserves will be outlined in the year-end outturn report in June
2026 and in the Annual Accounts, however at this stage it is anticipated that the IJB
will not carry any reserves moving into the new financial year. 
Whilst the ambition would be to plan to replenish the contingency reserves for the IJB
in future years, the reality is in the current financial operating environment there is not
the ability or scope to plan for this in the short term. 
3.5 2027-28 and 2028-29 
3.5.1 A detailed Medium-Term Financial Outlook was presented to the IJB in December
2025.  At that time the projected position for 2027-28 and 2028-29 was as follows: 
77

Page 78

OFFICIAL INFORMATION
OFFICIAL INFORMATION 
3.5.2 The MTFO uses three possible scenarios to estimate what our additional funding could
look like across the financial years 2027-28 and 2028-29. These are as follows: 
• Best Case – an annual uplift of 2% for social care and health. The funding
assumptions have been scaled back based on the Scottish Govt Medium Term
Financial Strategy 2025. This includes a forecast 3.3 per cent real-term average
growth per annum, however, this is before required savings and efficiencies.
• Medium Case – this allows for 1% uplift in 2027-28 and 2028-29.  This is linked
to the midpoint between Best- and Worst-case scenario. 
• Worse Case – flat cash from both Council and NHS Board. 
The MTFO sets out a range of cost pressures across each of the financial years. These
cover pay inflation, demand and demographic pressures across health and social care
services, and the possible costs of delivering national priorities. As Scottish
Government budgets continue to be for one year only, assumptions are made for
future years. 
Cost pressures are currently estimated at £11.536m for 2027-28 and £11.592m for
2028-29. 
3.5.3  The modelling from December 2025 has been updated to reflect updated pressures
and savings (full year impact of 2026-27 savings).  This has been carried out across
best, medium and worst-case scenarios has identified the following potential positions
for 2027-28 and 2028-29: 
78

Page 79

OFFICIAL INFORMATION
OFFICIAL INFORMATION 
3.5.4 Our budget position for 2026-27 has proven to be closest to the medium and the worst-
case scenario which was previously projected for that year and it would be prudent to
assume a similar position for the following years. 
• For 2027-28 this would mean identifying savings between £7.971m and
£10.761m 
• For 2028-29 this would mean identifying savings between £5.842m and
£11.592m. 
Cost pressures have continued to be assumed on a consistent basis with 2026-27
excluding the impact of the increased to employers’ superannuation contributions in
2026-27. 
3.5.5 On that basis, it is highly likely that the IJB will continue to face significant budget gaps
which will require to be addressed in order to set a balanced budget. 
The IJB Finance Working Group will continue to meet regularly and will be presented
with opportunities and options to work towards a sustainable financial position for
future years. 
3.6 NATIONAL FINANCIAL POSITION OF IJBs 
AUDIT SCOTLAND FINANCE BULLETIN 2024-25 (published 26-02-26)
Local government in Scotland: Financial bulletin 2024/25 | Audit Scotland 
79

Page 80

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Key Messages for IJB Members:
• Despite a 2.3% real-terms increase in funding, IJB finances continue to
deteriorate as cost pressures outstrip available resources.
• Total IJB reserves are now lower than the forecast 2025/26 budget gap, reducing
financial resilience.
• Audit Scotland is explicit that difficult decisions are unavoidable, including
potential changes to service models, eligibility criteria, charging, or withdrawal of
non-essential services.
National Financial Position (2024/25)
• Net cost of IJB services: £12.5 billion
• Savings delivery: 78% of planned savings achieved nationally
• 22 of 30 IJBs reported an in-year deficit
• Increasing reliance on additional in-year partner contributions, which Audit
Scotland considers unsustainable
Reserves and Financial Resilience
• Total reserves at year-end: £404 million (of which £316 million is earmarked)
• Reserves fell by 12% compared to 2023/24
• Almost half of IJBs hold no contingency reserves
• Only two IJBs meet the commonly referenced 2% contingency reserve threshold
Savings and Transparency
• Savings targets increased to £364 million in 2024/25
• Public reporting remains inconsistent, particularly on recurring versus non-
recurring savings
• Reliance on non-recurring savings (e.g. vacancies) presents significant financial
risk
2025/26 Financial Outlook
• Forecast national budget gap: £449 million
• Average gap: 3.6% of net service costs
• Gap-bridging plans include unidentified savings (10%) and use of reserves (5%),
which is not sustainable
Governance and Leadership
• 86% of IJB audits raised financial sustainability risks
• Over 50% of IJBs experienced senior leadership turnover in 2024/25
• Leadership instability undermines long-term financial planning and transformation 
Implications for IJB Decision-Making 
Audit Scotland concludes that maintaining current service levels within existing
resources is not feasible. IJBs will need to lead strategic service redesign, review
eligibility thresholds, consider charging and prioritisation, and engage transparently
with communities about the impact of change. 
3.6.1 Presentation of position
There is regular reporting by IJBs of the individual and collective financial position
thorough internal governance mechanisms but also through audit and directly through
returns to Scottish Government Health Finance directorate.  Chief Officers met with
the Cabinet Secretary on 5th March 2025 to present an overview of the national picture
for IJBs, some of the context around the rising pressures and cost of services, and to
bring to life the impact of a critically challenging financial position for service delivery,
risks and performance expectations in the coming year. 
80

Page 81

OFFICIAL INFORMATION
OFFICIAL INFORMATION
North Ayrshire IJB is not alone in facing these challenges and whilst there is variation
around the scale of the gap for IJBs, there are many similarities in the pressures facing
us across Scotland.   
The Cabinet Secretary received a presentation which highlighted: 
• 2025-26 projected budget gap, including the worsening position for reserves.
• Historical funding settlements for IJBs
• Trends in health and adult social care spend.
• Risks to the financial position, service provision and performance 
• Scale of the impact in terms of service provision levels
• Social Care provider sustainability risks
• A case study from an area illustrating the link between financial resources and
delayed discharge performance.
• Priority of need and risk management
• Links to national priorities and policy directives 
Chief Officers set out a number of asks in relation to: 
• appreciated the opportunity to share the scale of the collective challenge and
have this understood and heard – and want the opportunity to build in more
regular visibility of this
• recognise there is limited resource available which has not already been
committed on other priorities – however would seek to influence decision
making around priorities for future resources.  Currently working within local
systems on the whole system plans to inform the NHS Renewal submissions. 
Chief Officers would ask that consideration is given to the priority for investment
in community services and that any resource asks from IJBs are prioritised  
• Would ask that there is a greater appreciation that there is local variation and
complex reasons for this, the solutions and decisions required across areas
may therefore be different
• Lastly, seek that our positions are understood and appreciated at a national and
local level, and that there is a level of understanding and honest reflection of
the reality of the financial pressures and difficult decisions required.  Would ask
for support to manage public and political expectations around the scale of
change, service impacts and implications for performance. 
COSLA highlighted a significant gap for social care services moving into 2026-27 and
called for an urgent £750million investment to stabilise the sector and prevent service
crisis.  Raising concerns of a structural financial crisis facing social care, warning that
failure to invest results in reduced care packages and increased pressures on families.  
This investment is not reflected in the Scottish Government budget for 2026-27. 
The North Ayrshire IJB Chief Officer met together with Craig Hatton, Chief Executive
of North Ayrshire Council on Thursday 12th February with the Cabinet Secretary and
Minister to discuss the financial position of the IJB. This was following a request in
December 2025 for the Chief Officer to write to set out our challenges and request
consideration of further funding for North Ayrshire IJB particularly to meet demands
and needs for social care services. The Cabinet Secretary and Minister acknowledged
the difficulties we face and referred to opportunities to work with NHS Ayrshire and
81

Page 82

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Arran on shifting the balance of care and risk-share and hospital at home service
developments and confirmed there is no further funding available from Scottish
Government.   
3.7 Strategic Risk Register 
The Strategic Risk Register (SRR) is normally made available on the same agenda as
budget setting, with the IJB last reviewing this is in June 2025.  The SRR helps to
ensure the IJB are proactive in identifying and managing the risks to the successful
delivery of our Strategic Plan. 
The scoring of risks on the SRR are informed by the severity of risk multiplied by the
likelihood of it happening.  Given the significant budget challenge and significant
recommendations to balance the financial position the SRR will be reviewed following
the budget meeting and presented to the next IJB.  The current risks on the SRR are: 
SRR01  Financial Sustainability  
SRR02  Infrastructure (ICT Integration) 
SRR05  Transformational Change Programme 
SRR06  Governance 
SRR07  Demography and Inequality Pressures 
SRR08  Workforce 
SRR09  Local Impact of Scottish Government Policies 
SRR12   Clinical and Care Governance 
SRR13  Provider Failure (commissioned services) 
SRR14   Asylum Arrivals 
SRR15  Risk of Harm  
SRR16  Growth and expansion of specialist complex care developments   
3.8 Anticipated Outcomes 
There are a number of outcomes anticipated in relation to the 2026-27 Budget:
• The proposed plans will work towards a balanced budget for 2026-27. 
• Transformational Change for financial and service sustainability will feature at
the forefront of the IJB and NAHSCP agenda throughout 2026-27 and beyond.
• The remaining financial gap will require further decisions to be considered in
relation to eligibility criteria for social care services, this will overall lead to a
reduction in the level of care delivered next year. 
3.8  Measuring Impact 
• Full year financial outturn forecasts will be compiled monthly with variance
analysis and relevant explanations.
• Regular financial review sessions will be undertaken with the Director, all Heads
of Service and relevant senior managers in NAHSCP to ensure timely action is
being taken where needed to stay within budgets. 
• Regular financial performance reports will be presented to the IJB to ensure it
is kept fully informed of performance and importantly any major areas of
concern requiring corrective action.
• The Transformation Board will meet regularly to review progress with savings
and any corrective action required to bring any plans back online.
82

Page 83

OFFICIAL INFORMATION
OFFICIAL INFORMATION
4. IMPLICATIONS 
4.1 Financial
It is essential that the IJB and NAHSCP operate within the 2026-27 delegated budget,
this is supported by approving a balanced budget before the new financial year. 
The report outlines estimated delegated funding and the pressures required to be met
from within the overall integrated budget.  It is estimated there is a requirement to
deliver £9.138m of planned savings during 2026-27 alongside dealing with a number
of other known pressures and the risk of managing fluctuating demand for services. 
There remains a balance of £6.322m of savings to be approved, with most of this
aligned to the requirement to re-set eligibility criteria for access to social care. 
The estimates are based on a robust understanding of the additional resources
available, the risks and challenges faced by the Partnership and the anticipated
budget pressures. 
Appendix A shows the total 2026-27 IJB Budget 
Appendix B shows the proposed service pressures.
Appendix C shows the proposed savings.
Appendix D shows the Scottish Government Finance Settlement letters. 
4.2 Human Resources
There will be full consultation with the Trade Unions as appropriate. 
4.3 Legal
The IJB has an implicit obligation to funding partners to set a balanced budget prior to
the start of the new financial year.  The financial position and funding as detailed out
would result in both partners complying with the Scottish Government directives re
delegated funding for Integration Authorities.  Legal advice has been sought on
proposals aligned to the budget, to ensure alignment with the Council and Health
Board continuing to meet their statutory duties and obligations. 
4.4 Equality/Socio-Economic
All budget proposals are assessed for any potential impacts using Equalities and
Children’s Rights Impact Assessment (ECRIA) Screenings. If any potential impacts
are identified, a full assessment is carried out. 
The previously agreed savings were assessed as part of the 2025-26 budget. 
A copy of all the relevant assessments across the budget savings categories is
available. 
4.5 Risk
Failure to operate within the delegated budget would impact on the overall financial
sustainability and reputation of the partnership and would expose both funding
partners, North Ayrshire Council and NHS Ayrshire and Arran to additional financial
risk.  The IJB has no reserves available to mitigate the risk to partner bodies. 
4.6 Community Wealth Building
Effective delivery of services as per the 2026-27 budget and associated plans should
allow key strategic priorities to be met which should maximise benefits for the North
Ayrshire community as a whole but also benefit those areas of the community most in
83

Page 84

OFFICIAL INFORMATION
OFFICIAL INFORMATION
need, with a focus on ensuring HSCP resources are directed to those most in need in
our communities. 
4.7 Key Priorities 
The IJB approved a refreshed Strategic Plan in December 2025, this plan highlighted
the fiscal constraints and impact and risk on achieving outcomes and ambitions.  
Whilst the HSCP Strategic Plan Priorities would remain unchanged a follow up
assessment will be carried out to review the performance and service delivery
ambitions in light of the significant financial saving requirement and impact on service
delivery. 
5. CONSULTATION 
5.1 The budget plans detailed in this report have been produced in consultation with
relevant budget holders, the Partnership Senior Management Team, the Finance
Working Group and IJB members.   
The funding assumptions align with information shared and agreed with the Head of
Finance at North Ayrshire Council and the NHS AA Director of Finance. 
The financial position, outline savings proposals and approach to reviewing and
budget consultation was shared with NHS Ayrshire and Arran and North Ayrshire
Council.  Engagement has been undertaken with all Elected Members as part of North
Ayrshire Council’s budget planning process including an HSCP hosting an all
members session in January 2026. 
Extensive public engagement has been undertaken on proposals relating to social
care eligibility criteria with further details included in the separate report on the
agenda.   
For more information please contact: 
Eleanor Currie, Chief Finance Officer at eleanorcurrie@north-ayrshire.gov.uk   
84

Page 85

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Appendix A 
North Ayrshire Health and Social Care Partnership 
2026-27 Total Budget 
NAC                      
£m
NHS AA                     
£m
Total                   
£m
Baseline Budget 140.359           144.500           284.859          
Baseline Funding Increase 11.147             4.714               15.861            
2026-27 Budget excluding set aside 151.506           149.214           300.720          
Draft set aside budget -                    42.670             42.670            
2026-27  Budget including set aside 151.506           191.884           343.390          
2026/27 Budget
85

Page 86

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Appendix B
North Ayrshire Health and Social Care Partnership 
2026-27 Budget Pressures 
Council 
NHS                     
(non lead) 
NHS                   
(lead) TOTAL Basis of Budget Pressure
£m  £m  £m £m
Pay:
Pay awards  3,067,090      1,604,007     2,406,010   7,077,107      Council 3.5% NHS 3.75%
Superann increase impact 7,243,087      7,243,087      Reflects the increased rate of 17.5% employer contributions
Apprenticeship Levy 15,335          8,020           12,030        35,385           0.5% of the payroll increase
NHS ENICs shortfall 92,800         139,200      232,000         This is the shortfall carried forward from 25-/26
TOTAL PAY PRESSURES 10,325,512    1,704,827     2,557,240   14,587,579   
Non Pay:
Demand Pressure  Mental Health 139,747        139,747          Reflects historic demand
Transition Pressure  Mental Health 162,113        162,113          Reflects historic demand
Demand Pressure  Learning Disabilities 280,000        280,000          Reflects historic demand
Transition Pressure   Learning Disability 893,874        893,874          Reflects historic demand
NCHC Pressure 1,579,373      1,579,373      Estimated increase (final increase TBC when the 2026-27
rate is confirmed )
Contract Inflation outwith the NCHC 3,322,721      25,000         3,347,721      Reflects the increase in the Living Wage
Care at Home Management System 75,000          75,000           Additional annual contract cost (full year)
Analogue to Digital 80,000          80,000           Additional hardware costs
Brighter Pathways Programme 785,313        785,313         Net cost of Boyle Street, new foster scheme and achieving
an online position
Resource Transfer inflation 490,960-        490,960        -                2% applied
TOTAL NON PAY PRESSURES 6,827,181      515,960        -             7,343,141     
Pan Ayrshire Pressures 
: Palliative Care Service 18,000        18,000           
: Mattress Replacement 25,000         25,000        50,000           
: Office 365 increased costs 4,263           4,263          8,526           
TOTAL PAN AYRSHIRE PRESSURES -                29,263         47,263        76,526          
TOTAL 2026/27  PRESSURES 17,152,693    2,250,050     2,604,503   22,007,246   
Agreed on a pan Ayrshire basis with East and South
2026/27
86

Page 87

OFFICIAL INFORMATION
OFFICIAL INFORMATION
Appendix C
North Ayrshire Health and Social Care Partnership 
2026-27 Savings 
Council 
NHS  (non
lead) 
NHS
(lead) TOTAL
RAG
Deliverability
Status  Description
Adjustments and Previously Agreed Savings:
Inflate Payroll Turnover 107,348     60,150        90,225   257,723      Green Increased target to reflect the pay award
Recharge to East for Ward 2 beds -            25,000        -         25,000        Green Increased charge to reflect the pay award
Financial Inclusion Review 32,500       -             -         32,500        Green Full year impact of the 2024/25 saving
Social Care Model at Trindlemoss House -            175,000      -         175,000      Green
Moving from a nursing led model to a
social care led model
139,848     260,150      90,225   490,223     
Operational
Council 
NHS  (non
lead) 
NHS
(lead) TOTAL
RAG
Deliverability
Status  Description
Social Care Fees and Charges 5% increase
100% included 120,000     -             -         120,000      Green
Increased income to reflect the 2026/27
charges
LES Payment - Buckreddan Care Home
43,000       -             -         43,000        Green
Service will be ither cease or be funded by
the care home
LES Payment - Toddhill 22,000       -             -         22,000        Green Service will cease
Third Sector Capacity Building 34,000       -             -         34,000        Green Reduction of a post
Business Admin - Phase 1 - Quick wins 251,979     -             -         251,979      Green Reduction in 6.8 WTE posts
Moving and Handling post 55,000       -             -         55,000        Green Reduction of a post
Business Admin Team - senior structure
-            40,000        -         40,000        Green
Saving following a retiral and resultant
revised structure
Carers UK Annual Subscription 3,500         -             -         3,500         Green Cease the subscription
NADARS NHS non staffing budget -            26,771        -         26,771        Green Saving in non staffing costs
Pan Ayrshire Alcohol & Drug Services
Management Team -            16,478        16,478   32,956        Green Saving in staffing costs
Removal of SW Trainee Post 54,000       -             -         54,000        Green Removal of a SW trainee post
Child Health Assessment -  Charge for Out
of Authority cases -            6,000          -         6,000         Green
New charge for Out of Authority health
assessments
Children and Families Throughcare Review
87,000       -             -         87,000        Green Reduction in staffing (WTE TBC)
Support Services outwith business support
100,000     -             -         100,000      Amber
Reduction in staffing (WTE TBC as it is a
target)
770,479     89,249        16,478   876,206     
87

Page 88

OFFICIAL INFORMATION
OFFICIAL INFORMATION 
Policy - Model of Care or Efficiency Council 
NHS  (non
lead) 
NHS
(lead) TOTAL
RAG
Deliverability
Status  Description
Roslin House - shared respite/residential
model
300,000     -             -         300,000      Green Moved to respite and residential model. 
Assumes 4 external placements will move
to Roslin House
Trindlemoss - review of care delivery model 116,989     -             -         116,989      Green Review of care delivery model.
Budget reduction regarding the Pan
Ayrshire Prevention & Service Support
Team
-            -             40,817   40,817        Green Saving in non staffing costs
Phase 1 - Children and Families -quick
wins re: retirements, WLB and vacant posts
250,000     -             -         250,000      Green Reduction in staffing (7 WTE)
Phase 1 - Psychology -            -             231,138 231,138      Green Reduction in staffing (2.5 WTE and a
reduction in grade for 1 post)
666,989     271,955 938,944     
Policy - Service Reduction/Cessation            
(all agreed with East and South HSCP) Council 
NHS  (non
lead) 
NHS
(lead) TOTAL
RAG
Deliverability
Status  Description
DBI - Distress Brief Intervention service
-            -             157,500 157,500      Green
Cessation of the Distress Brief Intervention
service (7mths assumed)
MH Innovation Fund (reduction of posts)
-            -             41,331   41,331        Amber
Reduction of Innovation Funded posts. 
3mths of savings assumed as the posts will
be redeployed. (2.7 WTE)
RISE Team - Resilience in Stressful Events
-            -             192,131 192,131      Green Reduction in the RISE service
Mental Health Practitioners (MHPs) in GP
practices -            -             120,000 120,000      Green Reduction in the MHPs ( est 3 WTE posts)
-            -             510,962 510,962     
TOTAL DRAFT SAVINGS PROPOSALS 1,577,316  349,399      889,620 2,816,335  
88

Page 89

OFFICIAL INFORMATION
OFFICIAL INFORMATION 
Appendix D 
SCOTTISH GOVERNMENT FUNDING LETTERS 2026-27 
89

Page 90

1 
Directorate for Health and Social Care Finance
Fiona Bennett, Interim Chief Finance Officer 
E: Fiona.Bennett@gov.scot 

Chief Executives, NHS Scotland 
Copy to: NHS Chairs  
NHS Directors of Finance  
Integration Authority Chief Officers  
Integration Authority Chief Finance Officers 
Issued via email 
13 January 2026 
Dear Chief Executives 
Scottish Government Budget 2026-27 
Following the announcement of the draft Scottish Government Budget for 2026-27 by the Cabinet Secretary for
Finance and Local Government in Parliament today, I am writing to provide details of the indicative funding
settlement for NHS Boards. A breakdown of the total is provided in Annex A to this letter. 
The budget aligns to and supports our improvement and reform priorities across the Operational Improvement
Plan, Service Renewal Framework and Population Health Framework. We must continue to work as a whole
system and across boundaries to improve outcomes and deliver the best possible care within our available
resources. 
As in previous years, the budget announced will be subject to any amendments agreed through the Scottish
Parliament’s Budget Bill process. 
Budget Uplift 
NHS Boards will receive a 2% uplift on baseline funding in 2026-27. This will provide funding towards the costs of
the 2026-27 pay deals and provides a 2% uplift for non-pay costs to support inflationary pressures. Additional
funding will be provided to meet the costs of the 2026-27 pay deals where uplifts exceed 3% in line with public
sector pay policy, and full funding has been included for the agreed Agenda for Change pay settlement. Pay
funding should cover all staff including those delegated to Integration Authorities (IAs). Funding of £32.8 million
ensures no Board is further than 0.6% from NRAC parity in 2026-27. 
A further £150 million of recurring funding has been included to support territorial boards’ continued implementation
of the reforms committed to as part of the 2023-24 Agenda for Change (AfC) pay deal, including the additional
one hour reduction from 1 April 2026. Together with the £150 million recurring funding issued in 2024-25, this
increases total available recurring funding to £300 million for territorial boards. This funding covers all staff under
AfC terms and conditions, including those staff working in functions delegated to IAs. For territorial boards this will
be allocated on an NRAC basis and work will continue with national boards to understand the impact of the AfC
reforms as in previous years. This level of funding should be assumed to continue in future years and will remain
under review. 
2026-27 Financial Support and Approach to Brokerage 
Continuing from 2025-26, brokerage will not be available to support overspends, and NHS Boards must work
towards a break-even position which remains the statutory responsibility of the Accountable Officer. Historic
brokerage remains repayable and has not been written off. 
Non-recurring sustainability funding of £150 million will be provided to territorial boards on an NRAC basis. This
funding must be used in full to reduce pressures and the reported deficit. NHS Boards at stage two and above on
90

Page 91

2 
the NHS Scotland Support and Intervention Framework for finance will receive additional support in 2026-27 to
improve financial sustainability, including non-recurring deficit support funding as notified in early September 2025.
Further assumptions on longer term sustainability funding and deficit support funding will be shared in due course. 
Discussion will be held with each Board to review their three-year financial plans and what support is required to
improve their financial position. Overspends in excess of available funding will be reflected in annual accounts. 
Three-year Financial Planning 
A commission was issued on 12 December 2025 for three-year financial plans, and this budget announcement
should be factored into those plans. To account for the later 2026-27 Scottish Budget date, an abridged plan is
required on 2 February 2026 before final plans are submitted on 16 March 2026. 
Planning assumptions have already been shared with Directors of Finance, including the continued requirement
to achieve 3% recurring savings against baseline budgets. NHS Boards should ensure they undertake
appropriate impact assessments prior to implementing financial savings. 
In line with the sub-national planning guidance outlined in DL(2025)25, it is important for financial plans to align
with sub-national structures. Further information is set out below. 
Financial Savings 
The 15 Box Grid (the Grid) sets out areas of focus for NHS Boards to support delivery of 3% recurring savings
and improve the financial sustainability of NHS Scotland. It collates various national programmes of work, and
has been effective through sharing best practice and benchmarking across the finance community and beyond. 
The Grid will be refreshed for 2026-27 with a renewed focus on tangible actions that underpin reform priorities
set out in the Operational Improvement Plan, Service Renewal Framework and the Population Health
Framework. Opportunities for efficiency improvements in relation to shifting the balance of care, value based
health and care, and prevention will feature in 2026-27.    
The 15 Box Grid is effective due to continued collaboration across NHS Scotland, which is increasingly important
as we implement sub-national structures. The Finance Delivery Unit will continue to support NHS Boards to
implement savings and deliver the 3% recurring savings target. 
Sub-National Planning 
DL(2025)25 and the Ministerial Direction issued on 13 November 2025 outlined key requirements for NHS
Scotland to improve outcomes and financial sustainability through two sub-national structures. 
East and West structures are responsible for designing their approach to delivering the requirements of the DL,
including improving financial sustainability. Local NHS Board financial plans should be developed in tandem with
sub-national work, particularly around delivering Part 2 objectives as set out within the Ministerial Direction. Each
structure has discretion to include relevant information regarding the financial challenges arising from these
plans and potential efficiencies that can be delivered over the course of the three year period. Accountable
Officers for individual NHS Boards remain responsible and accountable for their financial position throughout
sub-national planning. All Boards will be continually assessed against the NHS Scotland Support & Intervention
Framework. 
Sub-national plans addressing the Part 2 objectives, as set out in the Co-operation and Planning Directions
2025, are to be submitted to the NHS Scotland Chief Operating Officer by 31 March 2026. These plans should
be consistent with individual NHS Board financial plans submitted on 16 March 2026. 
The Scottish Government will continue to work with Boards and sub-national structures during the course of
2026-27 to understand progress with sub-national planning and its financial implications and efficiencies. This
will extend to all objectives as set out in the DL. 
Operational Improvement Plan 
The Scottish Government’s Operational Improvement Plan (OIP) set out a focused programme of work to improve
waiting times performance across the system in 2025-26. This focussed on reducing unscheduled care pressures,
improving flow through hospitals, and tackling long waits in planned care. 
91

Page 92

3 
In 2026-27, the OIP will continue as a core framework for delivery, with renewed focus on reforming the services
to work towards prevention and delivering improved access to treatment through digital innovation. Non-recurring
funding of £100 million will be provided for the OIP in 2026-27, and further information on this will be provided in
due course. This replaces the value in 2025-26 rather than being additional. 
Policy Funding 
In addition to the baseline uplift, funding aligned to policy commitments will be allocated to Boards in 2026-
27. Scottish Government remain committed to continuing to rationalise the in-year allocation process by reducing
the number of in-year allocations and issuing as early as possible within the financial year. 
Health and Social Care Integration 
The Health and Social Care Portfolio will transfer additional funding of £167 million to Local Government to support
social care and integration for 2026-27, this includes funding towards the uplift for pay for adult social care workers
to the Real Living Wage of £13.45 per hour (£160 million) and inflationary uplift on Free Personal Nursing Care
rates (£7 million). 
There is also additional investment to support improvements to wider terms and conditions for Adult Social Care
workers and support for advocacy within social care, as well as investment to support a digital telecare pilot as
part of commitment to remove non-residential charges. Further information around these will be provided in due
course. 
The funding allocated to IAs should be additional and not substitutional to 2025-26 budgets for services which are
delegated. Therefore, Local Authority social care budgets for allocation to IAs must be at least £167 million greater
than 2025-26 recurring budgets. 
While funding for reform and improvement measures will be routed through NHS Boards, elements will support
activity in the community and delivered via IAs. Part of this package will be used to directly support our shared
ambition to alleviate pressure across the health and social care system. 
Capital 
The Budget will provide capital investment for the Portfolio’s priority projects of the University Hospital Monklands,
Princess Alexandra Eye Pavilion, the Belford Hospital, the Barra and Vatersay Community Campus, as well as
contractual commitments relating to our construction programme. Out with these priorities, the capital programme
will continue under the Whole System Infrastructure Planning (WSIP) process as outlined per DL (2025) 15 with
all Boards required to submit strategic assessments in 2026-27, although any decision on which priority projects
can be supported within the Portfolio’s capital funding envelope will not take place before 31 March 2027. 
Approved projects from the Business Continuity Plans (BCP) will continue to be supported alongside funding made
available for BCP Equipment and Sustainability programmes. NHS Boards’ formula capital will remain in line with
2025-26 levels. 
Alongside capital spending plans, as set out in DL (2025) 15 and aligned to the Service Renewal
Framework,  a  revenue funded primary and community care infrastructure investment programme is being
developed. Work is underway to explore use of modern Public Private Partnership structures to support delivery
and it is our expectation that, through a Mutual Investment Model, a significant programme of community health
and wellbeing centres can be delivered over the coming decade, with initial construction anticipated from 2029-30
following establishment of the revenue funding model. 
Considering suitability for revenue funding, along with community need, demand pressures and estate issues,
twelve areas (Annex B) have been identified for pilot and first phase projects and meetings will be arranged with
those local Health Boards to discuss this further. Following successful completion of the initial phase, it is
intended that there will be further tranches, including smaller projects that are not suitable candidates for
revenue funding, subject to funding availability and aligned to the overarching WSIP work. 
Summary 
It remains our collective duty and responsibility to ensure the funding allocated is used effectively to deliver the
best possible care for the population of Scotland. This requires us to work collectively across organisations,
using the new sub-national planning arrangements to make the best possible use of our resources. 
92

Page 93

4 
I am grateful for your support to date and your continued engagement moving into the next financial year. 
Yours sincerely, 
Fiona Bennett
Interim Chief Finance Officer Health and Social Care  
93

Page 94

St Andrew’s House, Regent Road, Edinburgh  EH1 3DG
www.gov.scot  
Annex A – Board Funding Uplifts 
2025-26
Allocation
(£m)
Recurring
Allocations*
(£m)
Updated
Allocation
(£m)
Uplift**
(£m)
Transfer to
NHS
Delivery***
(£m)
2026-27 Total
Allocation
(£m)
NRAC
Funding
(£m)
Distance from
NRAC Parity
(%)
Ayrshire and Arran 1,006.6  45.5  1,052.1  42.7  N/A 1,094.8  0.0  -0.3%
Borders 303.7  16.2  319.9  13.0  N/A 332.9  0.0  -0.4%
Dumfries and Galloway 425.4  19.4  444.8  18.0  N/A 462.8  0.2  -0.6%
Fife 937.9  40.8  978.8  54.1  N/A 1,032.8  13.7  -0.6%
Forth Valley 751.7  34.9  786.6  32.1  N/A 818.7  0.0  -0.5%
Grampian 1,346.8  61.8  1,408.7  68.8  N/A 1,477.5  11.4  -0.6%
Greater Glasgow and Clyde 3,123.5  141.1  3,264.5  100.2  N/A 3,364.7  0.0  1.4%
Highland 940.2  40.3  980.5  39.6  N/A 1,020.0  0.0  -0.6%
Lanarkshire 1,713.0  72.9  1,785.9  72.9  N/A 1,858.8  0.0  -0.4%
Lothian 2,113.0  96.6  2,209.5  91.0  N/A 2,300.5  1.7  -0.6%
Orkney 74.9  5.0  79.8  5.1  N/A 84.9  1.9  -0.6%
Shetland 74.8  4.8  79.6  7.0  N/A 86.6  3.8  -0.6%
Tayside 1,094.3  48.4  1,142.7  45.9  N/A 1,188.5  0.0  0.1%
Western Isles 106.8  6.1  112.9  4.3  N/A 117.2  0.0  6.2%
Territorials Total  14,012.6  633.6  14,646.2  594.5  N/A 15,240.7  32.8    
National Waiting Times Centre 98.0  9.8  107.8  3.1  N/A 110.9   
Scottish Ambulance Service 437.2  18.7  455.9  15.7  N/A 471.5   
The State Hospital 49.0  1.6  50.6  1.7  N/A 52.4   
NHS 24 118.3  5.6  124.0  4.3  N/A 128.3   
NHS Education for Scotland 648.9  135.1  784.0  24.8  (808.7) 0.0   
NHS National Services Scotland 428.5  25.3  453.8  12.6  (466.4) 0.0   
Healthcare Improvement Scotland 37.6  3.3  40.9  1.4  N/A 42.3   
Public Health Scotland 67.8  8.7  76.5  2.5  N/A 78.9   
NHS Delivery  0.0  0.0  0.0  0.0  1,275.1  1,275.1   
Nationals Total 1,885.3  208.1  2,093.4  66.1  0.0  2,159.5   
Total NHS Boards 15,897.9  841.7  16,739.6  660.6  0.0  17,400.2   
* Includes recurring allocations from 24-25        
** Includes NRAC parity adjustments.        
*** NHS Delivery to be formed via merger of NES & NSS.       
94

Page 95

St Andrew’s House, Regent Road, Edinburgh  EH1 3DG
www.gov.scot  
Annex B – Revenue funded primary and community care infrastructure investment programme 
The three pilot projects, selected for their health, population demographic and estate needs, will be in the following areas:
1. Port Glasgow  
2. East Calder and East Livingston  
3. Cowdenbeath and Lochgelly 
Other projects identified for the first tranche of this primary and community care investment programme include: 
• West Edinburgh
• Edinburgh City
• Cumbernauld area of Lanarkshire
• Hamilton area of Lanarkshire
• South Glasgow, Langside  
• East Dunbartonshire  
• West area of Ayr  
• Inverness and Nairn
• Dunfermline and Kincardine (including intervening areas) 
95

Page 96

Cabinet Secretary for Finance and Local
Government
Shona Robison MSP 
F/T: 0300 244 4000
E: scottish.ministers@gov.scot 

Councillor Morrison
COSLA President 
Verity House
19 Haymarket Yards 
Edinburgh 
EH12 5BH 
Copy to:
Councillor Heddle
Scottish Local Authority Leaders 
Scottish Local Authority Chief Executives 
___ 
13 January 2026 
LOCAL GOVERNMENT SETTLEMENT 2026-27 
Earlier today I formally set out the Scottish Government’s proposed Budget for 2026-
27 to the Scottish Parliament. Next year’s budget is accompanied by the results of
the Scottish Spending Review, providing a forward planning horizon of three years
for resource and four for capital. 
Focusing on four priorities set out in the Programme for Government, the Budget
invests in the wellbeing of our society and seeks to ease the pressure on families
and family budgets by continuing and expanding the best cost-of-living support
package available anywhere in the UK. 
At the very heart of that is a commitment to more effective and more efficient policy
delivery. It will mean a smaller, more modern public sector, with smarter use of
technology, including digital delivery, making it easier for citizens to access the
services they need. 
Our ambition is clear – a Scotland where public services work seamlessly for people,
modern in their design and delivery, accessible where and when they are needed,
flexible in how they respond, and consistently focused on the best outcome. In short,
96

Page 97

public services that are centred on the needs of the person, not the needs of the
system. 
Local Government are central to that ambition.  As I outlined to COSLA political
group leaders last week, in some areas my statement set out a direction of travel
and funding allocation on key themes – such as child poverty - and Local
Government will remain key partners in how those propositions are further
developed and ultimately delivered, alongside our valued third sector and
communities themselves.  Examples include our proposals around expanding
Breakfast Club provision; enhancing wrap-around childcare; and sporting
opportunities for young people, capitalising on Scotland’s summer of sport. 
Over recent months, the First Minister and I, as well as my officials, have engaged
extensively with Local Government and I am proud that we were able to work with
you to agree and put into practice the first Fiscal Framework between Scottish
Government and Local Government.   
The Budget today reflects the evidence gathered throughout that engagement and,
further to my budget statement, here are the details of the Local Government
Finance Settlement for 2026-27. 
The Budget delivers record funding of almost £15.7 billion through the Local
Government Settlement.  That represents a £650 million uplift since the last Budget
publication.  As you are aware, additional funding was made available to support the
costs of the UK Government’s changes to employer National Insurance
Contributions through the budget process last year and I have baselined this funding
as part of that figure. 
Even adjusting for the eNICs funding, the Local Government Settlement overall has
increased by £506.9 million – a 3.3% cash increase or a 1.0% increase in real terms. 
The revenue settlement budget to budget increases by £746 million, including the
eNICs funding.  Whilst the capital settlement falls by £95.7 million, this is wholly
explained by the expiration of time-limited funding and agreed profiling of flood
prevention funding to better align with councils’ spending requirements.
97

Page 98

The settlement includes:
• an additional £253 million of General Revenue Grant to provide a meaningful
contribution to the second year of the local government pay deals and to
support other local priorities, including Adult Social Care; 
• baselines £79.7 million and £30 million that was previously provided in-year
from non-recurring sources to support the pay deals;
• allocates a further £17 million to reflect the legacy costs of the first year of the
SNCT pay deal;
• baselines a further £773.8 million of funding previously provided as in-year
transfers, taking the total funding baselined since the Verity House Agreement
was signed to almost £2.3 billion;
• an additional £160 million and £22 million to fund the Real Living Wage uplift
for commissioned services across adult social care and early learning and
childcare respectively;
• £7 million to support an inflationary uplift in free personal nursing care;
• £0.7 million increase to the School Clothing Grant;
• £3 million to support expansion of Free School Meals;
• enhanced revenue and capital support for inter-island connectivity; 
• extended support for the Climate Emergency with a further £20 million of one-
off capital funding; and
• Local Authorities will retain all the funding paid to local authorities by PackUK
under the Extended Producer Responsibility scheme with no adjustment to
the Settlement. 
The Settlement also provides councils with full discretion over decisions on council
tax, with no freeze and no cap. The Scottish Budget prioritises cost of living
measures and, with over a quarter of a billion of additional General Revenue Grant in
the Settlement, it should also enable councils to protect family budgets by minimising
any proposed increases in council tax. 
Having listened carefully to the arguments set out in ‘Strong Councils, Strong
Communities’, I have sought to balance the desire to ringfence additional funding
towards social care with the Verity House Agreement commitment to maximise fully
98

Page 99

flexible funding. In conclusion, I have allocated as much as possible of the additional
revenue funding as General Revenue Grant for Councils to allocate as they see fit.   
I do, however, recognise the importance of sustainable adult social care services and
as I set out in my statement, the government is committed to working together with
local authorities on the delivery and improvement of social care. The Cabinet
Secretary for Health and Social Care will be engaging with local government and
health and social care partners over the coming weeks on proposals to strengthen
our response to complex care and delayed discharge. While there is not a specific
allocation within the settlement for this work at this time, we want to develop
proposals together to deliver new approaches which could improve our collective
endeavour to support people with complex needs who require specialist support and
services. If proposals can be collectively developed at pace, I will consider with the
Cabinet Secretary for Health and Social Care how these may be supported. 
In providing £160 million for the Real Living Wage in Adult Social Care and £22
million for children services, I am acknowledging that employers, including Local
Authorities where appropriate, are subject to statutory duties to meet increases in the
National Living Wage. I have therefore fully funded the difference between the
National Living Wage and the Real Living Wage in those services in recognition of
our shared commitment to paying valued care workers at least the Real Living Wage. 
Following our engagement work over the autumn, I am confident that Local
Government will pass more in total to IJBs than is provided as an in-year transfer by
Scottish Government.  However, I do acknowledge that partnership working will be
even more critical this year to ensure that the technical changes applied to the Adult
Social Care GAEs are appropriately reflected locally.  Recognising the impact of this
exceptional change in distribution and to balance the needs of councils who stand to
receive more funding through this change with those seeking to ensure sustainable
delivery locally, I have taken the decision to increase the funding floor in 2026-27 to
0.5% below the average change.  This is up from the current level of 0.75%. 
In addition to the Real Living Wage funding, the budget honours the historic
commitments to support local government pay deals.  However, in light of the
99

Page 100

decision by the Cabinet Secretary for Education & Skills, Jenny Gilruth MSP, to
extend the Scottish Attainment Challenge Programme, including Pupil Equity
Funding, at current levels into 2026-27, I would offer assurance in line with the
original agreement that the £30 million previously re-deployed to support the 2023-
24 pay deal will now be refunded in full following the revised timeline for expiration of
the scheme, rather than in 2026-27 as originally envisaged.  Similarly, the £79 million
of capital funding for flood prevention has been reprofiled in full over the course of
the Spending Review to align more accurately with the evidence on spending
requirements provided through the Joint Scottish Government and COSLA Flood
Risk Management Funding working group rather than in a single year. 
Having fulfilled our commitments on local government pay deals, the Budget I have
set out today is designed to build on the increase in teacher numbers and the
improved pupil teacher ratio in 2025, which were the result of most councils making
positive choices to invest the additional funding I announced in last year’s budget.
This uplifted the ring-fenced funding for teacher numbers and provided our councils
with extra funding specifically to support additional support needs. I am pleased to
maintain that investment this year, allowing councils to maintain and build on those
additional teachers in 2026/2027. 
The Education and Skills Portfolio budget also includes an additional £1m to support
pilot approaches to implement a reduction in class contact time, as a catalyst for
deeper professional engagement, improved workload, and better outcomes for every
learner. It is the intention of this government that this will lead to wider agreement,
including on the use of the 90 minutes, through the SNCT.   
The Fiscal Framework between Scottish Government and Local Government agreed
in the autumn, is not only the first such arrangement since devolution but it is unique
across the UK.   
As previously communicated to Directors of Finance, it remains our aspiration to
issue council by council allocations today (13 January 2026).  My officials have
provided officers with a full reconciliation of the funding announcements set out in
100

Page 101

the Budget today and briefing sessions are planned for Chief Executives and
Directors of Finance over the course of tomorrow.   
The £281.4 million of new General Revenue Grant in the settlement compares
favourably with the £307 million of resources consequentials accruing from the UK
Budget in November and is materially more than the £5.7 million of consequentials
accruing from increased expenditure on Local Government in England.  Successive
budgets since the Verity House Agreement was signed have baselined almost £2.3
billion into the core local government budget. We have delivered powers for a Visitor
Levy, made council tax more progressive (focusing to date on second and empty
homes), and have now funded for the preliminary work necessary to progress two
new high value council tax bands from 01 April 2028 in order to increase local
revenues.  As the design and legislation for those new bands progresses, this
government will continue to work in partnership with COSLA and local authorities on
the detail, including design considerations which may arise from the results of the
live consultation on council tax reform. 
The Spending Review sets out multi-year planning assumptions for local authorities
with provisional resource allocations up to 2028-29 and provisional capital
allocations available to 2029-30. I fully anticipate that trajectory will change going
forward as was the case with the 2022 Spending Review – the original 2026-27 core
revenue allocation of £10,716 million is now £13,917 million – and further discussion
with local government in future years will inform that.   
Alongside the Scottish Budget, I have also published a number of other supporting
documents including Portfolio Efficiency and Reform Plans and an integrated pay
and workforce policy statement.  Whilst these documents have been developed and
published by Scottish Government, it is clear that the policy intent set out in each will
only be achievable for the public sector as a whole if local government and the
Scottish Government work in partnership with one another.  I would therefore intend
to prioritise these matters through my engagement, and to support the prioritisation
of discussion of these matters through engagement with all relevant Cabinet
Secretaries and Ministers. 
101

Page 102

The Budget invests in the wellbeing of our society and following significant joint
investment in the engagement process throughout the financial year, the Local
Government Settlement now delivers a strong outcome for Councils.  I hope this is
recognised locally and I look forward to further engagement with COSLA for the
remainder of this Parliamentary session.  
Yours sincerely, 
SHONA ROBISON 
102