Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 605522
DX 599700 LOCHGILPHEAD 
4 December 2025 
NOTICE OF MEETING 
A meeting of the COMMUNITY SERVICES COMMITTEE will be held ON A HYBRID BASIS IN
THE  COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT TEAM on
THURSDAY, 11 DECEMBER 2025 at 10:30 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTE (Pages 3 - 10)  
Community Services Committee 28 August 2025 
4. POLICE SCOTLAND ARGYLL & BUTE PERFORMANCE SUMMARY REPORT -
REPORTING PERIOD: APRIL 2025 - SEPTEMBER 2025 (Pages 11 - 22)  
Report by Divisional Commander for Argyll and Bute, West Dunbartonshire Division,
Police Scotland 
5. SCOTTISH FIRE AND RESCUE SERVICE - ARGYLL & BUTE PERFORMANCE
SCRUTINY GROUP 2025-26 Q2 SCRUTINY REPORT (Pages 23 - 38)  
Report by Local Senior Officer, Scottish Fire and Rescue Service 
6. ARGYLL & BUTE HEALTH & SOCIAL CARE PARTNERSHIP - PERFORMANCE
REPORT - FQ4 2024/25 (Pages 39 - 56)  
Report by Senior Manager, Performance & Improvement, Argyll & Bute Health &
Social Care Partnership 
7. ARGYLL & BUTE HEALTH & SOCIAL CARE PARTNERSHIP - PERFORMANCE
REPORT - FQ1 2025/26 (Pages 57 - 72)  
Report by Senior Manager, Performance & Improvement, Argyll & Bute Health &
Social Care Partnership 
Public Document Pack

Page 2

8. ARGYLL & BUTE HEALTH & SOCIAL CARE PARTNERSHIP - ANNUAL REPORT
2024/25 (Pages 73 - 154)  
Report by Business Improvement Manager, Argyll & Bute Health & Social Care
Partnership 
9. CARE EXPERIENCED CHILDREN AND YOUNG PEOPLE 2024-25 ACADEMIC
YEAR REPORT (Pages 155 - 170)  
Report by Executive Director with responsibility for Education 
10. EDUCATION PERFORMANCE DATA ANALYSIS 2024-25 (Pages 171 - 200)  
Report by Executive Director with responsibility for Education 
11. ANNUAL PARTICIPATION MEASURE 2024-25 (Pages 201 - 208)  
Report by Executive Director with responsibility for Education 
12. SCHOOLS (CONSULTATION) (SCOTLAND) ACT 2010 - FURNACE PRIMARY
SCHOOL (Pages 209 - 214)  
Report by Executive Director with responsibility for Education 
13. LIVE ARGYLL - MONITORING AND PERFORMANCE REPORTING (Pages 215 -
260)  
Report by Executive Director with responsibility for Commercial Services 
14. CHILDREN & YOUNG PEOPLE SERVICES PROGRESS REPORT 2025 (Pages
261 - 276)  
Report by Head of Children, Families and Justice Services/Chief Social Work Officer,
Argyll & Bute Health & Social Care Partnership 
REPORTS FOR NOTING 
15. EXTERNAL EDUCATION ESTABLISHMENT INSPECTION REPORT (Pages 277 -
288)  
Report by Executive Director with responsibility for Education 
16. COMMUNITY SERVICES COMMITTEE WORK PLAN 2025 - 2026 (Pages 289 -
292) 
Community Services Committee 
Councillor Maurice Corry Councillor Audrey Forrest
Councillor Amanda Hampsey Councillor Daniel Hampsey
Councillor Graham Hardie Councillor Anne Horn
Councillor Fiona Howard Councillor Jennifer Kean
Councillor Paul Donald Kennedy Councillor Dougie McFadzean (Vice-Chair)
Councillor Julie McKenzie Councillor Yvonne McNeilly
Councillor Gemma Penfold Councillor Dougie Philand
Margaret Anderson Lorna Stewart
Daniel Semple Reverend Dorothy Wallace
Councillor Jan Brown Councillor Kieron Green (Chair)   
Contact: Fiona McCallum  Tel: 01546 604392

Page 3

MINUTES of MEETING of COMMUNITY SERVICES COMMITTEE held ON A HYBRID BASIS
IN THE  COUNCIL CHAMBER, KILMORY, LOCHGILPHEAD AND BY MICROSOFT TEAMS 
on THURSDAY, 28 AUGUST 2025 
Present: Councillor Audrey Forrest (Chair) 
Councillor Gordon Blair
Councillor Maurice Corry
Councillor Amanda Hampsey
Councillor Graham Hardie
Councillor Anne Horn
Councillor Jennifer Kean
Councillor Paul Donald
Kennedy
Councillor Dougie
McFadzean 
Councillor Julie McKenzie
Councillor Yvonne McNeilly
Councillor Iain Shonny Paterson
Councillor Dougie Philand
Margaret Anderson, Church Rep
Lorna Stewart, Teacher Rep
Daniel Semple, Teacher Rep
Reverend Dorothy Wallace, Church
Rep 
Attending: Douglas Hendry, Executive Director
Jennifer Crocket, Head of Education: Wellbeing, Inclusion and Achievement
Wendy Brownlie, Head of Education: Performance and Improvement
Jane Fowler, Head of Customer Support Services
Stuart McLean, Committee Manager
Graeme McMillan, Transformation Programme Manager
Simon Easton, Education Manager
Rhona Grant, Community Learning and Development Manager
Scott McKinnon, Developing the Young Workforce Lead
Chief Superintendent Gary I’Anson, Police Scotland
Chief Inspector Lee Page, Police Scotland
Inspector Bart Simonis, Police Scotland
Group Commander, Brian Wardle, Scottish Fire and Rescue Service
Watch Commander, Tony McGloin, Scottish Fire and Rescue Service
Charlotte Craig, Interim Head of Planning, Performance and Technology,
Argyll and Bute HSCP 
1. APOLOGIES FOR ABSENCE 
Apologies for absence were received from Councillors Daniel Hampsey and Fiona
Howard. 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest. 
3. MINUTE 
The Minute of the Community Services Committee held on 5 June 2025 was approved as
a correct record. 
4. POLICE SCOTLAND ARGYLL & BUTE PERFORMANCE SUMMARY
REPORT - REPORTING PERIOD: APRIL - JUNE 2025 
Chief Superintendent Gary I’Anson presented the Argyll and Bute Performance Summary
Report of Police Scotland’s Policing Priorities for April – June 2025.   
Page 3 Agenda Item 3

Page 4

With the aid of power point slides a presentation on localised activities was also given by
Chief Inspector Lee Page and Inspector Bart Simonis and thereafter Officers responded
questions asked. 
Decision 
The Community Services Committee reviewed and noted the contents of the report. 
(Reference: Report for April – June 2025 by Divisional Commander for Argyll and Bute,
West Dunbartonshire Division, Police Scotland, submitted) 
Councillor Graham Hardie joined the meeting during consideration of the foregoing item. 
5. SCOTTISH FIRE AND RESCUE SERVICE - ARGYLL & BUTE
PERFORMANCE SCRUTINY GROUP 2025-26 Q1 SCRUTINY REPORT 
With the aid of power point slides, Group Commander Brian Wardle and Watch
Commander Tony McGloin presented a report highlighting Scottish Fire and Rescue
Service’s review of local performance and partnership working within Argyll and Bute for
Q1 (1 April – 30 June 2025) and responded to a number of questions asked. 
Decision 
The Community Services Committee reviewed and noted the contents of the report. 
(Reference: Q1 2025/26 Report by Local Senior Officer, Scottish Fire and Rescue
Service, submitted) 
6. ARGYLL & BUTE HEALTH & SOCIAL CARE PARTNERSHIP -
PERFORMANCE REPORT FQ3 2024/25 
A report detailing performance for FQ3 (October – December) 2024/25 for Argyll & Bute
Health & Social Care Partnership along with a presentation on Annual Performance for
2024/25 was before the Committee for consideration. 
Decision 
The Community Services Committee: 
1. acknowledged performance for FQ3 2024/25 (October - December); 
2. acknowledged performance update on the National Health & Wellbeing Outcomes and
Ministerial Steering Group Integration Indicators (Appendix 1); and 
3. noted Delayed Discharge Sitrep as of 06 January 2025 (Appendix 2) 
(Reference: Report by Senior Manager, Performance and Improvement, Argyll & Bute
HSCP dated 28 August 2025, submitted) 
Councillor Paul Kennedy joined the meeting during consideration of the foregoing item. 
Page 4

Page 5

7. ARGYLL AND BUTE EDUCATION SERVICE PROGRESS AND IMPACT
2024-2025 AND STRATEGIC PLAN 2024-2026 
A report updating the Committee on the progress made by the Education Service in
achieving the priorities included in the Argyll and Bute Strategic Plan for 2024/26 (2024/25
update) presented at Community Services Committee in August 2024, and outlining
priority actions for 2025-2026, was considered. 
Decision 
The Community Services Committee: 
1. noted the progress made with respect to priority actions within the 2024-2026
Education Strategic Plan (2024-2025 update) outlined in the Education Service
Progress and Impact Report 2024-2026); 
2. approved the Education Service Progress and Impact Report 2024-2025 and Strategic
Plan 2024-2026 (Appendix 1); 
3. approved the publishing of the Education Strategic Plan 2024-2026 and The Education
Service Progress and Impact Report 2024-2025 on the Council Website; and 
4. approved the submission of the Education Strategic Plan 2024-2026 and The
Education Service Progress and Impact Report 2024-2025 to Scottish Government. 
(Reference: Report by Executive Director with responsibility for Education dated 17 July
2025, submitted) 
8. SQA SCHOOL EXAMINATION RESULTS 2025 
A report providing and update to the Committee on the initial outcome of the Scottish
Qualifications Authority (SQA) 2025 examination diet for young people in Argyll and Bute
was considered. 
Decision 
The Community Services Committee: 
1. noted the guidance from the SQA, detailed below at 4.3 of the report, about qualitative
comparisons of data over the last four years, with reference to ‘pre-pandemic’ data in
2018/19; 
2. noted the outcome of the initial SQA examination results for pupils in academic year
2024/25, and that the performance of Argyll and Bute Schools in 2025 is above the
current national performance of local authority run schools in SQA examinations in one
measure at A-C (Adv Higher), and above in two measures at A-D (National 5 and
Higher).  Within the authority, performance against 2024 improved in four of six pass
rate measures (National 5 and Higher at both A-C and A-D).  Presentation rates for
both National 5 and Higher levels increased.  Twinned with increased pass rates, this
year’s diet saw an overall increase in the number of awards per presenting pupil; and 
3. requested that the Executive Director provide further reports to the Community
Services Committee to allow the consideration of updated statistical school and
Page 5

Page 6

national information, scheduled to be released by Insight (school data analysis tool) in
September 2025 and February 2026. 
(Reference: Report by Executive Director with responsibility for Education dated 28
August 2025, submitted) 
9. DEVELOPING THE YOUNG WORKFORCE 2024-25 
A report summarising work and progress across Argyll and Bute relating to Developing the
Young Workforce (DYW) was considered. 
The report covered all aspects of DYW work and activities across the local authority and
case studies of DYW events, activities and programmes were also provided. 
Decision 
The Community Services Committee: 
1. noted the scope, variety and impact of DYW initiatives and activities across Argyll and
Bute; 
2. acknowledged the importance of the Scottish Government’s continued policy
commitment to DYW, and associated funding for regional DYW Groups; 
3. recognised the contribution of the DYW team and its work towards securing and
sustaining Argyll and Bute a position in the leading 10 Scottish Local Authorities with
regards to the Annual Participation Measure, in which we place 9th out of 32 in the
period April 2023 – March 2024; and 
4. accepted the requirement to make the roles of DYW Lead and DYW Coordinators in
Argyll and Bute permanent and non-dependent on DYW funding from the Scottish
Government. 
(Reference: Report by Executive Director with responsibility for Education dated 28
August 2025, submitted) 
The Chair ruled and the Committee agreed to adjourn the meeting at 1.45 pm for lunch. 
The meeting reconvened at 2.15 pm with all those present as per the sederunt, apart from
Lorna Stewart, Teacher representative. 
10. STRONE PRIMARY SCHOOL - MOTHBALLING 
A report updating the Committee on the current situation of Strone Primary School and
proposing a number of measures under which the Education Service can monitor the
position of the school over the forthcoming year, was considered. 
Decision 
The Community Services Committee agreed that: 
1. Strone Primary School be mothballed on a temporary basis and that the building be
retained for one year on a care and maintenance basis; 
Page 6

Page 7

2. officers would conduct a review of the school’s mothballing ahead of the Committee’s
August 2026 meeting, at which members could decide on a continued period of
mothballing; or request that officers commence a preliminary exercise to examine the
future options for Strone Primary School; and 
3. if requested, the community would have pre-arranged access to the building to
promote community functions during the period of mothballing. 
(Reference: Report by Executive Director with responsibility for Education dated 5 August
2025, submitted) 
At the previous Community Services Committee held on 5 June 2025, the Committee
considered a report detailing a draft Proposal to relocate the current Tobermory 2-18
Campus to a new purpose-built Campus on the site that had been previously selected by
the Council.  After considering that report, the Committee agreed to adopt the draft
Proposal as a “relevant proposal” in terms of the 2010 Act, which would proceed to a
statutory public consultation exercise – commencing on 18th August 2025 and ending on
26th September 2025. 
Standing order 16 states that ‘No motion which seeks to alter or revoke a decision of the
Council or has that effect will be considered within a period of 6 months of the original
decision’. However, it will be competent to review a decision before the end of the 6 month
period, provided that notice has been given on the agenda (the report meets that
provision) and that a material change of circumstances has occurred. 
Given that a Petition for Judicial Review in the Court of Session challenging the Council’s
decision of 7 March 2025 to locate the new campus on the Tobermory South site has
been lodged; the Chair considered this to be a material change of circumstances and
therefore under the provision of standing order 16 agreed that this report could be
considered at this meeting. 
11. TOBERMORY 2-18 CAMPUS - UPDATE AND NEXT STEPS 
In terms of Standing Order 11.10 the Depute Leader of the SNP Group advised that the
Whip had been applied to the Group to vote in favour of an amendment to the
recommendations in the report by the Executive Director which the Committee considered
at this item. 
A report providing update on recent decisions and developments in relation to the project
for a new 2-18 School Campus in Tobermory was considered. 
Following questions, the Chair ruled and the Committee agreed to adjourn the meeting
from 2.35 pm – 2.55 pm to allow Officers to consider the competency of a proposed
amendment to the Chair’s motion.  The meeting reconvened with all those present as per
the sederunt, apart from Lorna Stewart, Teacher representative. 
Following consideration, the Executive Director with responsibility for Legal and
Regulatory Support advised that the amendment was not competent. 
The Chair ruled, and the Committee agreed to adjourn the meeting from 3.05 pm – 3.25
pm, to allow a Member of the Committee to seek advice on the preparation of a competent
amendment.  After consideration, it was confirmed there would be no amendment to the
Chair’s motion.
Page 7

Page 8

Decision 
The Community Services Committee: 
1. considered the information contained within this report; 
2. agreed to endorse officers’ actions not to commence the statutory relocation
consultation exercise on 18 August 2025, given that the Judicial Review proceedings
are ongoing; 
3. agreed to endorse the decision of the Strategic Board, dated 4 August 2025, to pause
all other work on the Project (including design work and development of the Outline
Business Case) whilst the Judicial Review proceedings are ongoing; and 
4. agreed that all further reports should be brought to Members whilst the ongoing Court
proceedings progress. 
(Reference: Report by Executive Director with responsibility for Education, Legal and
Regulatory Support and Commercial Services dated 1 August 2025, submitted) 
Councillor Jennifer Kean and Reverend Dorothy Wallace, Church Representative, left the
meeting during consideration of the foregoing item. 
12. SCOTTISH LANGUAGES ACT 2025 - UPDATE 
A report advising of the Scottish Languages Act 2025 and reporting on the themes
included in this piece of legislation was considered. 
The Act give the Gaelic and Scots languages official status in Scotland and makes
changes to the support for the Gaelic and Scots languages in Scotland, including changes
in relation to Gaelic and Scots education. 
Decision 
The Community Services Committee: 
1. noted the key points contained within the report regarding the Act; 
2. recognised the obligations which would be incumbent on the Council in areas of
linguistic significance; and 
3. agreed that further reports are presented to members in relation to both the general
impact on the Council and specifically to the Education Service following statutory
guidance and explanatory notes being published by the Scottish Government. 
(Reference: Report by Executive Director with responsibility for Education and Executive
Director with responsibility for Customer Support Services dated 1 August 2025,
submitted) 
Councillor Yvonne McNeilly and Councillor Shonny Paterson left the meeting during
consideration of the foregoing item. 
Page 8

Page 9

13. GAELIC LANGUAGE PLAN PROGRESS REPORT DECEMBER 2023 -
DECEMBER 2024 
A report updating Members on progress that the Council is making on the delivery of its
statutory Gaelic Language Plan was considered. 
Decision 
The Community Services Committee considered the good progress that was being made
in relation to the Council’s Gaelic Language Plan. 
(Reference: Report by Executive Director with responsibility for Customer Support
Services dated June 2025, submitted) 
14. LIVE ARGYLL - COMMUNITY LEARNING AND DEVELOPMENT REPORT
2024-2025 
A report providing Members with an update on the performance of liveArgyll’s Community
Learning Services and specifically the provision of Adult Learning and Youth Services in
session 2024/25, was considered. 
Decision 
The Community Services Committee recognised: 
1. the significant improvements and strengths achieved by Community Learning since the
transfer of the service to liveArgyll in 2021, and specifically those outlined by HMIe in
the January 2024 HMIe Progress Visit and the subsequent review in February 2025;
and 
2. the positive outcomes for young people and adult learners in Argyll and Bute resulting
from Community Learning’s understanding of the needs of individuals, groups and
communities, and its subsequent provision to learners. 
(Reference: Report by Executive Director with responsibility for Education dated 28
August 2025, submitted) 
Councillor Julie McKenzie left the meeting during consideration of the foregoing item. 
15. EXTERNAL EDUCATION ESTABLISHMENT INSPECTION REPORT 
A report providing details of all external education establishment inspection reports
received across Argyll and Bute Education Service during the period June to August 2025,
was before the Committee for information. 
Decision 
The Community Services Committee noted: 
1. the contents of the report; 
2. this quarterly report would be presented on an ongoing basis to the Community
Services Committee detailing all establishment inspections conducted and published
by Education Scotland within that period, and 
Page 9

Page 10

3. that Ward members would receive copies of school inspection reports for schools
within their area as published by Education Scotland. 
(Reference: Report by Executive Director with responsibility for Education dated July
2025, submitted) 
16. COMMUNITY SERVICES COMMITTEE WORK PLAN 2025/2026 
The Community Services Committee work plan for 2025/2026 was before the Committee
for information. 
Decision 
The Community Services Committee noted the contents of the work plan. 
(Reference: Community Services Committee Work Plan 2025/2026, submitted) 
Page 10

Page 11

OFFICIAL
OFFICIAL  
x  
Argyll & Bute
Performance Summary Report 
Reporting Period: April to Sep 2025
Total Crime 646 Crimes
Incidents
9805
Overall Dishonesty 430
Domestic Abuse Inc 
374
+14.3% +2% +4.2%
+9.7% +51.8% -42%*
Road Deaths &
Serious Injuries
22
+5.9%*
Sexual Crime
170
-542*PYTD, -1149*5YR AVG +54*PYTD, +121*5YR AVG +9*PYTD, +42*5YR AVG +15*PYTD, +28*5YR AVG
+52*PYTD, +142*5YR AVG +58*PYTD, +52*5YR AVG -16*on PYTD +52*PYTD  
Violent Crime
586
Missing People
86 Counter Terrorism
+8*PYTD
+10.3%*
-11*PYTD, -18*5YR AVG
Common Assault 431
-31.4%
Housebreaking
24 
Disorder Complaints
936
The National Terrorism Threat level is 
SUBSTANTIAL
This means that an attack is likely. 
*PYTD = Previous Year to Date
*5YR = 5-year average 
+19%
-5.2%
Page 11 Agenda Item 4

Page 12

OFFICIAL
OFFICIAL  
SECTION PAGE NUMBER 
Introduction 2 
Executive Summary 3
Demand Analysis 4
Acquisitive Crime 5
Public Protection 6
Road Safety 7
Serious Organised Crime 8
Violence  9
Antisocial Behaviour 10
Public Confidence - Complaints & Allegations 11
Introduction 
I am pleased to present this performance summary report to Committee for its information and         
consideration. The Reporting Period for this report is cumulative for Quarters 1 to 4 of 2024/25, with
available figures being shown from 1st April 2025 through to 30th September 2025. 
Please note that all data included in this report are management information and not official statistics.
All data are sourced from Police Scotland internal systems and are correct as of date of publication.
Unless stated otherwise numerical comparisons are against the previous year to date and the previous
five-year average for the same data period specified. 
Crimes and offences are grouped under recognised categories for statistical purposes.  The Scottish
Government defines these categories, as follows: 
Group 1 - Non-Sexual Crimes of Violence  Group 6 – Anti-social offences 
Group 2 - Sexual Crimes  Group 7 – Miscellaneous Offences 
Group 3 - Crimes of Dishonesty  Group 8 – Road traffic offences
Group 4 – Damage and reckless behaviour PYTD - Previous Year to Date 
Group 5 – Crimes against society CYTD - Current Year to Date 
Page 12

Page 13

OFFICIAL
OFFICIAL 
PRIORITY
AREA EXECUTIVE SUMMARY 
Acquisitive
Crime  
At the end of Qtr.2, acquisitive crimes have seen a slight increase of 2% from
421 to 430 crimes. This has largely been driven by an increase in common
thefts throughout Argyll and Bute (+26.3%), while shoplifting (-20) and
housebreaking offences (-11) have both seen slight reductions year on year.   
Public
Protection  
Group 2 sexual crimes have also risen by 51.8% from 112 to 170 crimes. Both
rape offences and sexual assaults have seen an increase of 8 and 22 crimes
respectively year on year while crimes relating to indecent
images/communications have also recorded a considerable increase (+36
crimes). 
Road Safety &
Road Crime
We continue to record a positive reduction in the number of casualties involved
in road traffic collisions within Argyll and Bute compared to last year. 
The number of fatal road traffic collisions within Argyll and Bute has reduced
marginally from 5 to 3 as at the end of Qtr. 2. 
Road traffic collisions involving serious injuries have also decreased from 33 to
19 and slight injuries reduced from 53 to 42. 
Serious
Organised
Crime 
At the end of Qtr. 2, drug supply offences have reduced marginally with 14
crimes compared to 16 the previous year, whilst possession charges have
shown a notable increase of 17.5% from 206 to 242. 
Across Argyll & West Dunbartonshire 19 crimes linked to persons associated
with serious and organised crime have been recorded and £37,109 has been
seized under POCA since 1st April 2025. 
Violence &
ASB
At the end of Qtr. 2 Group 1 crimes of violence have increased by 9.7% with
586 crimes compared to 534 the previous year to date, while anti-social
behaviour (ASB) related crimes have increased by 21.8% from 504 to 614
crimes. 
1. Acquisitive Crime
2. Public Protection
3. Road Safety & Road Crime
4. Serious Organised Crime   
5. Violence & Anti-social behaviour 
ARGYLL & BUTE POLICING PRIORITIES 2023-2026
Page 13

Page 14

OFFICIAL
OFFICIAL 
CRIME PYTD CYTD INCIDENTS PYTD CYTD
Total Crimes &
Offences 3381 4027 Total number of
incidents 10347 9805
DEMAND ANALYSIS - * PYTD - PREVIOUS YEAR TO DATE CYTD - CURRENT YEAR TO DATE
* *
*
*  
The total volume of crimes and offences recorded within Argyll and Bute has increased by 19%
from the previous year and is currently above the previous 5-year average (3450). All crime types
have experienced a rise in figures compared to the position in 2024/25 as at the end of Qtr. 2.
Road traffic offences have seen the highest increase (+254) followed by Group 6 anti-social
offences (+110) and Group 5 crimes against society (+103). 
Page 14

Page 15

OFFICIAL
OFFICIAL   
ACQUISITIVE CRIME
Common thefts have experienced the highest increase in terms of acquisitive crime from
114 to 144 crimes, which is currently above the 5-year average (122). In Argyll various
thefts have occurred in/around Oban town centre relating to thefts of used cooking oil,
while various thefts of machinery, power tools and construction materials have also been
recorded at building sites and boathouses/marinas throughout the local authority. The
detection rate for common theft has reduced from 31.6% to 22.9%. 
Shoplifting crimes have reduced by 11.7% with 68 crimes recorded compared to 77 the
previous year. The current figure remains above the previous 5-year average (51)
however. The detection rate has increased slightly from 70.6% to 76.4%. 
Fraud has reduced marginally in Argyll and Bute compared to last year, from 99 to 96
recorded crimes. Most fraud types have seen marginal change compared to the position
last year. The detection rate for fraud has increased marginally by 1.7% from 22.2% to
24%. 
During the reporting period we seen a rise in common thefts from farms and other agricultural
places. We continue to look for innovative ways to highlight crime prevention opportunities
within this sector. A farm watch started in Helensburgh and Lomond area connecting many of
the local farmers who are now able to interact in the same way as a neighbourhood watch
scheme. Our preventions team have been visiting our agricultural sites offering advice about
securing equipment and handing out specialist DNA marking kits. Through our involvement in
the Partners against Rural Crime group (PARC) we attended the agricultural roadshow at
Dalmally where we were on hand to discuss concerns and advise. 
We continue our efforts to target fraud by maximising our online footprint to ensure we are
signposting and engaging with our communities. Detecting online fraud can be very challenging
usually as a result of the perpetrators residing out with the United Kingdom. Our youth
engagement team continue to positively influence the younger generations decision making
whilst online. In Oban our PSYV carried out a leaflet drop within the residential areas of the
town to raise community awareness around bogus workers and frauds. In partnership with
Trading Standards, we were in Oban, Dunoon, Helensburgh with the Shut-Out Scammers
Campaign providing information on crime prevention, fraud and scam awareness.
Page 15

Page 16

OFFICIAL
OFFICIAL   
Public protection investigations are often complex, and we rely on close working with our
stakeholders to provide the best service to those affected. By working in partnership, taking a
multi-agency approach, increasing public confidence and raising public awareness, we are better
placed to identify threat, manage risk and prevent harm
The facilities and support we have for child victims and witnesses of serious crime across Argyll
& Bute have benefitted from a new unique and safe venue named ‘Bairns Hoose’. A
transformative space designed to support children as they recover from trauma and harm. It aims
to reduce the trauma children face when navigating the child protection and justice systems by
bringing all the support they need together under one roof - the Hoose offers a safe, welcoming
environment where children can participate in child protection processes and begin their journey
of healing.
The Disclosure Scheme for Domestic Abuse Scotland (DSDAS) launched in 2015 continues to
be a vital preventative tool in tackling domestic violence. This scheme allows concerned
individuals to determine whether their partner has a history of domestic violence. This year across
Argyll & Bute we have received over 85 requests this figure is up 50% from last year.   
At the end of Qtr. 2, Group 2 crimes have increased by 52% with 170 crimes recorded compared to
112 (+58) in the same period last year. Both rape offences and sexual assaults have increased from
20 to 28 (+8) and 42 to 64 (+22) crimes respectively. Crimes relating to indecent
images/communications have also more than doubled from 32 to 68 crimes with approx. 82% being
committed via online platforms. 
Approximately 59% of sexual assaults occurred in a private setting and 80% were committed by
persons known to the victim. One third of sexual assaults reported related to non-recent crimes.
Similarly, approx. 85% of rape offences occurred within a private space and 93% were committed by
persons known to the victim with 12 crimes being domestic related. 
Domestic abuse incidents have seen an increase of 4.2% compared to last year from 359 to 374,
while the number of crimes recorded has also reduced from 368 to 351. The detection rate for
domestic abuse crimes has increased from 57.3% to 65.2% year on year.  
A total of 86 missing person reports had been recorded within Argyll and Bute as at end of Qtr. 2,
which is an increase of 10.3% from last year (+8). MP reports relating to adults remain unchanged
from the position last year, while reports relating to children and children in care have seen an
increase from 26 to 38 (+12) year on year. 
PUBLIC PROTECTION
Page 16

Page 17

OFFICIAL
OFFICIAL 
At the end of Qtr. 2, the number of fatal RTC’s recorded in Argyll and Bute has seen a marginal
reduction from 5 to 3 year on year. RTC’s resulting in both serious and slight injuries have also
decreased from 33 to 19 (-14) and 53 to 42 (-11), respectively. 
Road traffic offences continue to see a considerable increase of 24.2% from 1048 to 1302 (+254).
Speeding offences have experienced the highest increase (+132) followed by vehicle defect such as
construction and lighting offences (+69) and unlawful use of motor vehicle such as licence, insurance
and registration offences (+29). The increase in vehicle offences is largely a testament to proactive
policing within Argyll and Bute during the current reporting period. 
Road Traffic Casualties 2024/25 2025/26 
Number of persons killed on our roads 5 3
Number of persons seriously injured 33 19
Number of persons slightly injured 53 42
Number of children seriously injured 0 1
Our traffic detections continue to increase which is testament to the proactive work by our specialist
officers and our local policing teams. We continue to target those drivers putting people’s safety at
risk as a result of their poor driving standards, decision making or condition of the vehicles being
driven on the roads. 
The circumstances of any fatal road crash are investigated thoroughly by national specialist crash
investigation teams. The expertise and understanding of road traffic legislation is shared locally to
our local officers to ensure we are upskilling our own officers patrolling our communities. 
We continue to develop our Road Safety Partnership meetings, which involves stakeholders from
the Local Authority, Roads, Transport Scotland and others. We now review all fatal crash scenes
to ensure that any contributory factors are assessed and reviewed to reduce the risk of further
accidents at the same location.
During this reporting period we commenced our Fatal 5 - Young Drivers Campaign. The feedback
received from pupils has been very encouraging. We have engaged senior pupils in Rothesay,
Dunoon, Helensburgh, Campbeltown, Lochgilphead, Oban, Tobermory & Tarbert.
The young driver presentations to S6 pupils consists of a case study involving 4 newly qualified
drivers who were racing on a rural road resulting in a double fatality acc. These sessions create
open discussions which the generation of young persons who have just reached driving age. These
sessions allow us to positively influence decision making and to focus awareness on the fatal 5
campaign which include, driving whilst unfit to do so, speeding, not wearing seat belts and
distraction. 
ROAD SAFETY AND ROAD CRIME
Page 17

Page 18

OFFICIAL
OFFICIAL 
Across Argyll & West Dunbartonshire, 19 crimes linked to persons associated with serious and
organised crime have been recorded and £37,109 has been seized under POCA since 1st April 2025.  
At the end of Qtr. 2, drugs supply charges show a marginal reduction compared to last year from 16 to
14 crimes, which remains below the previous 5-year average (20). 
Drug possession charges however have seen a 17.5% increase from 206 to 242 and is also
considerably above the previous 5-year average (222). 
We have been engaging with Crimestoppers Scotland to see how we can promote their vital role
within our rural communities. It is vital that we continue to encourage and empower our
communities to speak up about crime within their villages and towns. Crimestoppers is a unique
anonymous service and more than ever our communities need Crimestoppers unique guarantee
of anonymity to report concerns. Serious and Organised crime often harms the most vulnerable
in our communities, from drug dealing to exploitation via County Lines. It is vital that our we
encourage people to report anonymously and help them on what to do; from spotting the key
signs of crimes to being an active bystander.
An example of where community intelligence can disrupt serious and organised crime can be
evidenced in Dunoon during the reporting period where community information was vital in
support of our intelligence gathering which secured a search warrant for three premises linked to
drug dealing. Three sperate addresses were targeted at the same time for maximum effect
utilising specialist public officers. An individual was arrested and charged with the sale and supply
of drugs and a large amount of cash seized. This coordinated day of action was high-profile in the
community and sent a strong message regarding Police Scotland’s determination to tackle drug
dealing. 
In Oban local officers stopped a vehicle within the reporting period which had been highlighted
via community intelligence, following a proactive search on this vehicle 156 grams of Cannabis
was seized.    
SERIOUS & ORGANISED CRIME
Page 18

Page 19

OFFICIAL
OFFICIAL        
VIOLENCE 
We make full use of our analysts to ensure that all operational officers are briefed daily prior to
deployment to furnish them with the intelligence and information required to be able to identify
those strongly linked to violence and ASB. It is very difficult to prevent sporadic acts of violence
particularly indoors in private dwellings however, we continue to engage with housing partners
to identify problematic neighbour complaints to assess and target ASB which may escalate into
violence. Our officers use analysis and intelligence to make full use of their stop search powers
in targeted areas when it is justified and proportionate to do so.  
We have robust policing plans in place to monitor individuals arrested and thereafter released
with specific bail conditions. 
The Preventions Team are in daily contact with the ASB and Housing Teams to ensure we
maximise our response through a partnership approach.
Our Oban YEO organised an event within Tesco to raise awareness for the ‘It’ll cost you
campaign’ to tackle underage drinking and youth disorder. A stall was staffed within Tesco for
awareness with campaign materials distributed to members of the public.        
Crimes of violence occurring within Argyll and Bute have increased from 534 to 586 (+52) year on
year while the current figure remains 32% above the previous 5-year average (445). Crimes were
largely spilt 56% public and 44% private space with just over half (51%) of all public space crimes
being committed by persons known to the victim. 
Much of the increase is attributed to a 14.6% rise in common assaults from 377 to 431 crimes (+54),
while the majority of other Group 1 crimes of violence have experienced marginal change compared
to the position at the end of Qtr. 2 last year. Approx. 56% of common assaults occurred within a
public space setting and 44% within a residential premise. In 60% of public space crimes offenders
were known to the victim and just over half of all private space crimes were domestic related.
Common assaults on police and emergency workers have continued to see a reduction from 74 to
68 crimes year on year. 
The detection rate for crimes of violence overall has increased marginally by 1.7% from 68.2% in
2024/25 to 69.9%. This equates to an additional 46 crimes in number terms. The detection rate for
common assaults has also risen from 63.4% to 66.7%.   
Page 19

Page 20

OFFICIAL
OFFICIAL 
Across the recording period the number of ASB related incidents in Argyll and Bute have seen
an increase of approx. 7.4% (+90) compared to last year. Group 6 crimes, which include ASB
related offences have also increased by 21.8% with 614 crimes recorded compared to 504 the
previous year. This is largely attributable to a rise in breach the peace/threatening and abusive
behaviour from 461 to 542 crimes (+81) and alcohol related offences (+23) year on year. 
ANTI-SOCIAL BEHAVIOUR 
Over the summer months local policing in Cowal and Bute introduced a community policing
pilot to enhance Police Scotland’s visibility, engagement, and proactive policing on the Isle of
Bute and Cowal. The overarching aim was to reduce crime and the fear of crime through high-
visibility patrols and community engagement, thereby increasing public confidence and the
police profile locally. This pilot was a success resulting in tangible enforcement outcomes
including an increased detection of crime, intelligence gathering and enforcement action,
addressing crime in the community head-on. It also provided in contrast, increased community
engagement, public reassurance, and prevention opportunities. 
We are committed to supporting our nighttime economy. Since 1st April our local policing
teams have recorded over 500 visits to licenced premises. Our Divisional Licensing Team
provides guidance and support to Local Policing in relation to the sale and supply of alcohol
within our communities, ensuring licensed premises operate in accordance with liquor
licensing legislation and promote responsible trading aligned with the Licensing Objectives.
We have a range of options to assist us with any identified issues. These options form a staged
but flexible response, from simply engaging with and advising the staff at licensed premises
at the lower end of the scale, to grading premises as being ‘Problematic’ and requesting a
review of a premise licence by the Licensing Board in relation to more serious matters.   
Page 20

Page 21

OFFICIAL
OFFICIAL 
PUBLIC CONFIDENCE: COMPLAINTS & USER SATISFACTION
Overall satisfaction with Police Scotland
User Satisfaction results show that locally, public confidence levels remain high within Argyll
and West Dunbartonshire with overall satisfaction levels at 77%, which is above the position as
at the end of Qtr. 2 during the 2024/25 reporting period (69%). 
We have some great engagement work ongoing with young persons across Argyll where our
dedicated and passionate officers, often in their own time look for opportunities to break down
barriers act as role models and positively influence decision making. Initiatives including golfing,
youth clubs, running clubs and youth volunteering. In Oban we have 15 officers who volunteer
within the MCR Pathways, a charity which supports care-experienced and disadvantaged young
persons in Scotland. These achievements and initiatives highlight our commitment to enhancing
public safety, reducing crime, and fostering positive community relationships. 
Campbeltown’s emergency services day on Saturday, 16 August was a great family-friendly day out
to meet the teams who help keep the community safe. Alongside Police Scotland, colleagues from
the Scottish Fire and Rescue Service, the Scottish Ambulance Service and the Royal National
Lifeboat Institute– to name a few. 
Over the summer months we were
involved in several large-scale policing
operations across Argyll & Bute providing
a proportionate and professional response
in support of many community events.
These included the Tiree Music Festival,
The Cowal Games, the Highland games in
Luss, Bute, Inveraray and Oban and The
Islay Festival of Music. We have received
great feedback from local community
councils and councillors in relation to the
friendly policing style adopted. 
The recruitment and retention of officers
across Argyll & Bute remains a local
priority for Area Commanders. We
continue to work with our national
recruitment teams to ensure local policing
needs across Argyll & Bute and being
actively progressed. From January 2025
we have had 7 new probationers start with
a further 2, due to start in the coming
period.   
77%
Satisfied/Very
Satisfied
Total of 
298
responses
Page 21

Page 22

This page is intentionally left blank

Page 23

Scrutiny Report
2025-26 Q2
Argyll & Bute Performance and
Scrutiny Group
Argyll and Bute
Page 23 Agenda Item 5

Page 24

202510/11/25 © Scottish Fire & Rescue ServiceReport generated on
About the statistics within this report
The activity totals and other statistics quoted within this report are published in the interests of
transparency and openness. They are provisional in nature and subject to change as a result of ongoing
quality assurance and review. Because all statistics quoted are provisional there may be a difference in
the period totals quoted in our reports after local publication which result from revisions or additions to the
data in our systems. The Scottish Government publishes official statistics each year which allow for
comparisons to be made over longer periods of time.
Summary
Trends
Accidental Dwelling Fires (ADFs)
Accidental Dwelling Fire Casualties
Non-Fire Casualties
Deliberate Fires
Non-Domestic Fires
Unwanted Fire Alarm Signals (UFAS)
Road Traffic Collisions (RTCs)
Home Fire Safety Visits (HFSVs)
Fire Safety Enforcement
Community Safety & Engagement
Glossary of Terms
1
2
3
4
5
6
7
8
9
10
11
12
13
Contents
Scrutiny Report
2025-26 Q2
Argyll & Bute Performance and Scrutiny
Group
Argyll and Bute
Page 24

Page 25

2025-26 Q21. Summary
60
Fires
86 183
False Alarms
329
8 0 0
Fire Fatalities
12 3
69
UFAS
202510/11/25 © Scottish Fire & Rescue ServiceReport generated on
Non-Fire Incidents
People Rescued by
Firefighters
People Receiving
First Aid or Hospital
Treatment (Non-Fire)
People Receiving
First Aid or Hospital
Treatment (Fires)
Non-Fire Fatalities
Top 10 Incident Types
False Alarm
(Due to
Apparatus)
False Alarm
(UFAS)
Inter-Agency False Alarm
(Good Intent)
Fire
(Outdoor)
Fire (Building) Humanitarian Flooding /
Water
Rescue
Other
Non-Fire
Vehicle
(Non-fire)
78 69
38 36
29 27
12 10 10 8
Fire Safety AuditsHome Fire Safety Visits
Total Incidents
(Incl. Incompletes)
8399
In this report, the Scottish Fire and Rescue Service (SFRS) demonstrates a strong commitment to public safety through its response to a wide
range of operational incidents, as outlined above. 
Home fire safety remains a key priority, with updates on our referral pathway provided in section 12 of this report. Fire safety audits and community
engagement initiatives continue to be proactive measures that contribute to making our communities safer places to live, work, and visit.
The overall trend reflects consistent management of incidents, with seasonal variations influencing activity levels. Accidental dwelling fires are
closely monitored, and efforts to reduce deliberate fires and non-fire incidents remain ongoing. 
The data presented highlights a well coordinated approach to fire prevention and emergency response. 
Page 25

Page 26

2. Trends Previous 16 quarters (4 years)
202510/11/25 © Scottish Fire & Rescue ServiceReport generated on
Accidental Dwelling Fires
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
18
17
24
10 10
24
22
13 13
17
11
1616
12
18
20
Deliberate Fires
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
11
16
43
5
40
6
22
16
9 812 13
21 18
11 8
Non-Domestic Fires
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
10
4
11
2
3
10
4
7
6
8 7
5 6
4
8
4
Unwanted Fire Alarm Signals
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
189
69
209
56
142
75 65 636677
150158
185
6968
168
Road Traffic Collisions
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
16
11
26 26
13
18
15
17
18
13
15
12
20 20
12
19
Page 26

Page 27

2. Trends
202510/11/25 © Scottish Fire & Rescue ServiceReport generated on
Previous 16 quarters (4 years)
Accidental Dwelling Fire Casualties
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
1
0
3
0 0 0
2 2
0
1
2
1 1
0
2
1
Non-Fire Casualties
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
18
15
31
13
24
27
22 15
18
27
14 15
23
20
14
17
Road Traffic Collision Casualties
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
13
8
20
610
15
10 6
9 99 9
18
12
8 9
Home Fire Safety Visits
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
311
99
70
198
173
238
221
207239
93
233
183
289
149
237
202
Fire Safety Audits
2021-22
Q3
2021-22
Q4
2022-23
Q1
2022-23
Q2
2022-23
Q3
2022-23
Q4
2023-24
Q1
2023-24
Q2
2023-24
Q3
2023-24
Q4
2024-25
Q1
2024-25
Q2
2024-25
Q3
2024-25
Q4
2025-26
Q1
2025-26
Q2
50 83
151
29
54
100
79
110
142130 138
135
71
111 108 103
Page 27

Page 28

202510/11/25 © Scottish Fire & Rescue ServiceReport generated on
Accidental Dwelling Fires
in this period
Extent of Damage Incidents

Not applicable 8
Limited to item 1st ignited 5
Limited to room of origin 2
External roof only 1
Whole building 1
Source of Ignition (Top 10)
Cooking appliance Electricity supply Electric Lighting Heating equipment Naked flame Other domestic style
appliance
9
4
1 1 1 1
Trend by Quarter (4 years)
10
15
20
17
Incidents by Ward
Helensburgh Central
Kintyre & the Islands
Dunoon
Oban South & the Isles
Cowal
Isle of Bute
Lomond North
Mid Argyll
South Kintyre
4
4
2
2
1
1
1
1
1
2025-26 Q23. Accidental Dwelling Fires
SFRS is dedicated to reducing accidental dwelling fires in domestic properties across Scotland. This commitment is evident through our proactive, 
community engagement, and continuous improvement strategies. SFRS employs a range of proactive measures to prevent fires before they start. 
One of their key initiatives is the HFSV program, where Community Action Teams(CAT) and Operational Crews visit homes to assess fire risks and
provide tailored advice on fire prevention in a domestic setting. These visits often include the installation of smoke alarms and heat detectors to
comply with Scottish Government legislation thus ensuring that homes are equipped to detect fires early. 
Over this quarterly reporting period we seen an increase in accidental dwelling fires from 11 to 17 which we will continue to actively monitor.
Page 28

Page 29

4. Accidental Dwelling Fire Casualties
Non-Fatal
Casualties
Fatal
Casualties
Nature of Injury/Cause of
Death
Casualties

202510/11/25 © Scottish Fire & Rescue ServiceReport generated on
Casualties by Ward
Trend by Quarter (4 years)
0
1
2
3
People
Rescued by
Firefighters
Extent of Harm
(Non-Fatal)
First Aid Given
at Scene
Hospital Slight
Injuries
Hospital Serious
Injuries
2025-26 Q2
0 0 0
0 0 0
SFRS is committed to reducing accidental dwelling fire casualties across all communities in Scotland. This dedication is reflected in our 
comprehensive reduction strategies, community focused initiatives, and continuous efforts to improve fire safety. Through strategic initiatives,
community engagement, a data-driven approach, support for vulnerable groups, and continuous improvement, we strive to make every home in
Scotland safer. Our efforts not only save lives but also promotes a culture of fire safety awareness and prevention within our communities. 
Over this reporting period there were no accidental dwelling fire casualties to report.
Page 29

Page 30

5. Non-Fire Casualties
202510/11/25 © Scottish Fire & Rescue ServiceReport generated on
Casualties by Ward
Oban North & Lorn
Kintyre & the Islands
Oban South & the Isles
Dunoon
Lomond North
Mid Argyll
6
4
2
1
1
1
Trend by Quarter (4 years)
10
20
30
Non-Fatal
Casualties
Fatal
Casualties
People
Rescued by
Firefighters
Extent of Harm
(Non-Fatal)
First Aid Given
at Scene
Hospital Slight
Injuries
Hospital Serious
Injuries
Nature of Injury/Cause of Death Casualties

Cuts/Lacerations 4
Back / Neck injury (spinal) 3
Not known 3
Fracture 2
Bruising 1
Chest pain / Heart condition / Cardiac
arrest
1
Unconscious, fitting or unresponsive
(no other evident significant injury)
1
2025-26 Q2
12 3 8
0 12 0
During this reporting period, we responded to a variety of non-fire-related incidents, including road traffic collisions (RTCs), water rescues, and 
other specialist operations. 
Sadly, three of these incidents involved fatal casualties. Our crews were mainly mobilised to assist partner agencies, including Police Scotland, 
HM Coastguard, and the Scottish Ambulance Service. One fatality resulted from an RTC, while the other two were due to out of hospital cardiac 
arrests.
Page 30

Page 31

6. Deliberate Fires
Property Type Incident

Grassland, woodland and crops 5
Other outdoors (including land) 5
Refuse 4
Dwelling 2
202510/11/25 © Scottish Fire & Rescue ServiceReport generated on
Incidents by Ward
Helensburgh Central
Isle of Bute
Kintyre & the Islands
Lomond North
Oban North & Lorn
Cowal
4
3
3
3
2
1
Trend by Quarter (4 years)
0
20
40
16
Deliberate Fires
in this period
2025-26 Q2
Hour of Day
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
We are committed to reducing deliberate fire-setting due to the risks it poses to people, property, and the environment. These incidents divert resources from real 
emergencies. 
To achieve this, we use the following strategies: 
Community Engagement: Awareness sessions in Argyll and Bute schools, focused on children and young people providing safety focused engagements. 
Partnerships: Working with Police Scotland, Community Wardens, and local schools. 
Reporting: Encouraging the public to report suspicious activity or rubbish build-up. 
Over this recording period we have seen a sharp decline from 43 operational incidents in Q1 to 16 in Q2. 
Page 31

Page 32

7. Non-Domestic Fires
202510/11/25 © Scottish Fire & Rescue ServiceReport generated on
Non-Domestic
Fires in this
period
2025-26 Q2
Top 15 Property Types
Property Type Incidents

Industrial Processing 1
Offices and call centres 1
Other holiday residence (cottage,
flat, chalet)
1
Public Utilities 1
4 (100.0%)
Accidental
Deliberate
Incidents by Ward
Oban North & Lorn
Kintyre & the Islands
Lomond North
2
1
1
Extent of Damage
Not applicable
4
Trend by Quarter (4 years)
5
10
4
We are dedicated to reducing non-domestic fires, recognising the significant impact these incidents can have on local businesses, public buildings, 
and the wider community. Non-domestic fires can lead to substantial economic losses, disrupt services, and pose serious risks to public safety. 
Our local Fire Safety Enforcement (FSE) team acts as the enforcing authority for fire safety legislation in non-domestic premises. This includes 
regular inspections and ensuring compliance with fire safety regulations. The enforcement team also provides support and education to duty holders,
including building owners, managers, and staff, to help them comply with current legislation. 
Over this reporting period, the number of non-domestic fires remained low at four, unchanged from the Q1 report.
Page 32

Page 33

8. Unwanted Fire Alarm Signals
202510/11/25 © Scottish Fire & Rescue ServiceReport generated on
Unwanted Fire Alarm
Signals in this period
2025-26 Q2
Top 15 Property Types
Property Type Incidents

Hotel/motel 18
Residential Home 16
Hospitals and medical care 14
Other Residential Home 5
Boarding House/B&B other 4
Nurses'/Doctors' accommodation 2
Other holiday residence (cottage, flat,
chalet)
2
Warehouses and bulk storage 2
Education 1
Entertainment and culture 1
Hostel (e.g. for homeless people) 1
Offices and call centres 1
Retail 1
Sporting venues 1
Incidents by Ward
Oban South & the Isles
Lomond North
Oban North & Lorn
Cowal
Helensburgh Central
Isle of Bute
Mid Argyll
Dunoon
South Kintyre
Kintyre & the Islands
13
12
10
6
6
6
6
5
3
2
Trend by Quarter (4 years)
0
100
200
69
SFRS introduced a new policy in 2023 aimed at reducing Unwanted Fire Alarm Signals (UFAS). This forms part of our wider commitment to 
improving community safety and making better use of resources across Scotland. 
UFAS are false alarms triggered by automatic fire alarm systems. These can result from accidental activation of manual call points, cooking fumes,
dust, or poor maintenance. Each UFAS incident diverts fire crews from genuine emergencies, leading to unnecessary costs and potential delays in
responding to real fires. 
Since the introduction of this revised policy, we have continued to see a reduction in UFAS incidents. This positive trend is reflected in the data 
presented in this report.
Page 33

Page 34

9. Road Traffic Collisions
202510/11/25 © Scottish Fire & Rescue ServiceReport generated on
Road Traffic
Collisions in
this period
Non-Fatal
Casualties
Fatal
Casualties
People
Rescued by
Firefighters
Extent of Harm
(Non-Fatal)
First Aid Given
at Scene
Hospital Slight
Injuries
Hospital Serious
Injuries
2025-26 Q2
Incidents by Ward
Oban North & Lorn
Kintyre & the Islands
Mid Argyll
Oban South & the Isles
South Kintyre
4
2
2
2
1
Trend by Quarter (4 years)
10
15
20
25
30
11
7 1 0
0 7 0
Property Type Incidents

Car 6
Motorcycle 3
Lorry/HGV 1
Van 1
Incident Type Incidents

Vehicle (Non-fire) 8
Inter-Agency 2
Other Non-Fire 1
The SFRS is committed to reducing the number of Road Traffic Collisions (RTCs) across Scotland’s road network. We recognise the devastating 
impact these incidents can have on individuals, families, and communities. 
We have implemented a range of strategies and initiatives focused on prevention and effective response. We work closely with Police Scotland and
support the 'L' Division Road Safety Governance Group on a quarterly basis. These meetings bring together key stakeholders to identify new and e
xisting risks and coordinate joint road safety strategies across Argyll and Bute. 
In partnership with Police Scotland, we will be holding a series of road safety hub events at our community fire stations in Campbeltown, Oban, 
Dunoon, and Lochgilphead Joint Campus. Further details can be found on page 13 of this report. 
During this reporting period, total incident numbers remain low at 11.
Page 34

Page 35

10. Home Fire Safety Visits
202510/11/25 © Scottish Fire & Rescue ServiceReport generated on
11. Fire Safety Enforcement
Job Type Count

Audit 83
Consultation 3
Specific Visit 1
Audits by Ward
Oban North & Lorn
Lomond North
Cowal
Helensburgh & Lomond South
Helensburgh Central
Kintyre & the Islands
Isle of Bute
Oban South & the Isles
Mid Argyll
South Kintyre
31
13
9
7
6
6
4
4
2
1
2025-26 Q2
HFSVs by Ward
Oban North & Lorn
Helensburgh Central
Lomond North
Oban South & the Isles
Dunoon
Cowal
Helensburgh & Lomond South
Mid Argyll
Isle of Bute
Kintyre & the Islands
South Kintyre
17
14
13
13
11
10
10
5
2
2
2
Home Fire
Safety Visits
99
The SFRS has recently introduced a new referral pathway for Home Fire Safety Visits (HFSVs), aimed at enhancing community safety and better 
supporting vulnerable individuals. This initiative is part of our ongoing commitment to reducing fire risks and improving overall safety in homes 
across Scotland. 
The revised HFSV programme takes a more targeted approach, prioritising high-risk individuals who meet specific eligibility criteria. These criteria 
are based on extensive research into factors that increase the likelihood of fire fatalities. The goal is to ensure that those most at risk receive the 
necessary support and intervention to help prevent fire incidents.
Page 35

Page 36

12. Community Safety & Engagement
202510/11/25 © Scottish Fire & Rescue ServiceReport generated on
2025-26 Q2
Argyll & Bute Fire Skills 
In September, Oban Fire Station hosted an Argyll & Bute Fire skills event, delivered in partnership
with Argyll & Bute Education Service, the Scottish Ambulance Service, Developing the Young 
Workforce, and Live Argyll. The event focused on engaging young people in practical learning 
around fire safety, teamwork, and personal development. 
Participants took part in a range of hands on activities, including basic firefighting techniques, 
safe use of equipment, and simulated emergency scenarios. The programme also included 
sessions on road safety, first aid awareness, and the importance of community responsibility. 
The initiative aims to build confidence, improve communication skills, and promote safer 
behaviours among young people. Feedback from attendees and partners was overwhelmingly 
positive, with many highlighting the value of real-life learning in a supportive environment. 
Well done to the young people who made the week such a success! 
Road Safety Hub Events – November 2025 
As we approach darker nights, these sessions will offer safety advice on driving at night. In 
partnership with Police Scotland, SFRS will host Road Safety Hub night driving safety events on 
22nd and 25th November at fire stations in Campbeltown, Oban, Dunoon, and Lochgilphead High
Joint Campus. 
These free events aim to raise awareness of road safety and offer practical advice to reduce the 
risk of collisions. Visitors can speak with emergency services, access safety materials, and learn
about local initiatives. 
2025 Station Open Days 
We’d like to extend a heartfelt thank you to everyone who joined us at our summer open days 
held at  Helensburgh, Tobermory, and Oban fire stations. It was a pleasure to welcome so many
members of the community through our doors. 
We’re especially grateful to our partners and volunteers, whose support helped the days run 
smoothly and ensured everything was well organised. Their time and effort made a real 
difference. 
We’d also like to thank everyone who kindly donated to the various charities we support. Your 
generosity will have a meaningful impact across local communities in Argyll and Bute. Every 
contribution helps us continue supporting important causes and delivering services that matter.
We hope you enjoyed the opportunity to meet our teams, learn more about the work we do, and 
see the stations in action. We look forward to welcoming you again at future events. 
World Drowning Prevention Day 
On Friday, July 25, we attended World Drowning Prevention Day, a national event organised by
Water Safety Scotland to raise awareness about drowning risks and promote water safety. 
The day included a range of engaging activities such as paddleboarding, canoeing, rescue 
demonstrations, and displays by water rescue dog teams. Various organisations were present 
with information stalls, including the RNLI, Scottish Fire and Rescue Service, and Police Scotland     
Home Fire Safety Visit Referral Process 
This year, we launched a new referral process for Home Fire Safety Visits, designed to better 
identify and support individuals at higher risk. This update introduces a streamlined digital referral
system and enhances collaboration through a new Data Sharing Framework.
To support the roll out, SFRS is providing ongoing training and guidance to partner organisations,
ensuring they can effectively use the new system. These improvements reflect our continued 
commitment to enhancing fire safety and reducing fire-related incidents across Scotland. 
For further information please contact: 
W.EWDABCommunitySafety@firescotland.gov.uk 
Page 36

Page 37

13. Glossary of Terms
Term - What it means
ADF
Accidental Dwelling Fire.
HFSV
Home Fire Safety Visit.
PDIR
Post Domestic Incident Response, a term used to indicate actions taken following attendance at a fire or
other incident in the home. PDIRs include amongst things the offer of a free follow up home fire safety
visit.
RTC
Road Traffic Collision.
Special Service
Calls to incidents which are not fires or false alarms such as RTCs, rescues, flooding, incidents involving
hazardous materials or the provision of assistance to other agencies.
UFAS
Unwanted Fire Alarm Signals. When an automatic fire detection and alarm system is activated as a result
of anything other than an actual fire the activation is classed as a false alarm. If an attendance is made to
such an event by the Scottish Fire and Rescue Service, then the event is recorded as an UFAS incident.
UFAS Policy Change
In response to COVID, on the 6th May 2020, the SFRS decided to send 1 pump to UFAS premises that
did not have their own Predetermined attendance (PDA).
As of 1st July 2023, the COVID interim 1 pump response was ended and a new UFAS policy was
implemented.
The new policy is to call challenge all UFAS incidents with the intention of non-attendance. Hospitals, care
homes, and sleeping risk premises are all exempt and receive either 2 pumps or their premise specific
PDA.
202510/11/25 © Scottish Fire & Rescue ServiceReport generated on
Page 37

Page 38

Design, figures and charts by the Business Intelligence team.
Page 38

Page 39

1   
Community Services Committee       
Date of Meeting: 11 December 2025 
Title of Report:  Health & Social Care Partnership - Performance Report – FQ4 2024/25 (January
– March) 
Presented by:    Kristin Gillies Head of Strategic Planning, Performance & Technology    
The committee is asked to:
• Acknowledge performance for FQ4 2024/25 (January – March 2025) 
• Acknowledge performance update on the National Health & Wellbeing Outcomes
and Ministerial Steering Group Integration Indicators (Appendix 1) 
• Note Delayed Discharge Sitrep as of 31 March 2025 (Appendix 2) 
EXECUTIVE SUMMARY 
This report details performance for the Financial Quarter (FQ) 4 2024/25 (January - March), the
performance outputs are taken from the Integrated Performance Management Framework (IPMF)
Reporting Dashboard with the focus on twelve key service areas. Overall performance for FQ4 notes
36 of 84 measures reporting as on target (43%). 
The report details performance against each of the service areas and the 84 supporting Key
Performance Indicators. National Health & Wellbeing Indicators performance is included alongside
latest performance from the National Delayed Discharge Sitrep. The use of the new performance
Dashboard within SharePoint is designed to offer a more focused approach to the access and
analysis of data, offering scope for self-service.  
The report has been presented to the Clinical and Care Governance Committee and has received
feedback and generated further action for this forum in relation to developing the wider context and
narrative. 
The report presented is a factual report noting that there may be a lag in data presentation due to
verification and governance. 
Q4 saw a dip in performance which is monitored on an ongoing basis as this may have multiple
contributing factors however this has begun to return to normal levels of performance in Q1 2025-
26. 
2. RECOMENDATIONS
The committee is asked to acknowledge current FQ4 24/25 performance report noting that it has
been considered at Clinical and Care Governance Committee and IJB. 
3. DETAIL OF REPORT
Page 39 Agenda Item 6

Page 40

2
The report details the HSCP (Health and Social Care Partnership) performance for FQ 4 2024/25
(January - March) highlighting key performance trends across the 84 KPIs (Key Performance
Indicators). The latest performance against the National Health and Wellbeing Outcomes Indicators
is reported (Appendix 1). Also included is the latest national update on Delayed Discharges
(Appendix 2).   
4. RELEVANT DATA & INDICATORS 
4.1 FQ4 2024/25 (January - March) Performance Summary                                     
Overall performance for FQ4 notes that 84 KPI’s are scoring against target, with 36 (43%) reporting
as on-track. This is a decrease of 7% from FQ3 position, where 42 KPI were on track (50%). The
KPI’s report performance against the target and include the target, actual and variance and is a mix
of both quantitative and qualitative indicators. The use of the green, amber and red graphics within
the Dashboard is used to give an overview of the HSCP’s total performance for each of the twelve
services and 84 KPI’s. 
The use of only green and red for the KPI’s is used to focus delivery with regards to sustaining
performance on or above target.   
4.2 Analysis of Key Performance  
This analysis identifies performance across the 12 service reporting categories within the Integrated
Performance Management Framework (IPMF). 
4.2.1 Children & Families
Across 7 KPIs, Children & Families and Justice performance notes 1 (14%) on track, with1 (86%)
off track, against the targets set for Q4 24/25. This is a decrease with 57% noted as on track in
FQ3.    
Page 40

Page 41

3 
Performance on or above target: 
• FQ4 Number of Public Sector staff who have received at least basic training in how to
identify and respond to women and children affected by Violence Against Women &
Girls reports cumulative 342 against cumulative target of 120. 
Performance below target & areas for improvement: 
• The percentage of Child Protection Register (CPR) cases that have an allocated Social
Worker is off target at 93% for FQ4, compared to the 100% FQ3 position.
• The number of teams that have delivered 75% or more of the Universal Health Visiting
Pathway (UHVP) reports 73% for FQ4, down from 81% FQ3.  
• Percentage of Criminal Justice social work reports submitted 2 days before court reports
is noted at 79% in FQ4, against 90% target and decrease from 90% reported in FQ3 
• The percentage of Child Protection Planning Meetings (CPPM's) held within 28 days of
the initial referral reports 25% in FQ4 against 90% target and a decrease from 33%
noted in FQ3. 
• Mental Health Services (CAMHS) children and young people seen within 18 weeks of
referral reports 57% FQ3 against 90% target. This is an improvement on 39% reported
in FQ3.  
• The number of statutory individual Health Assessments commenced within four weeks
of coming into care in FQ4 reports 67% down from 75% for FQ3 
4.2.2 Telecare and Digital
Performance across 13 Key Performance Indicators (KPIs) for Strategic Planning, Performance &
Technology Services shows 3 KPIs (23%) on track, with 10 KPIs (77%) reported as off track
against the targets set for FQ3 24/25.4 
Performance on or above target: 
• E-health department successfully resolved 100% of IT support requests. 
• Digital blood pressure monitoring in Primary Care continues to expand, with 79 unique
patients now utilizing the service. 
• Telecare services saw an 18% increase in new clients, with 199 individuals joining in the
latest quarter. 
Performance below target & areas for improvement: 
• Near-Me consultations increased by 7% compared to FQ3; however, the target remains
unmet. 
• Telecare digital device adoption reached 74%, below the 90% target set for the end of
2024/25. 
• Enhanced telecare packages are currently utilized by 45% of clients, below the
expected target. Additional work is required to improve tracking accuracy for this metric. 
• Annual reviews for telecare clients overdue for completion decreased to 51%, missing
the 50% target. 
• Just Checking activity monitoring equipment was successfully implemented in four
homes. 
Page 41

Page 42

4
• Silvercloud referrals have declined by 38% from FQ3, with 48 referrals recorded. 
• FOI requests—96% were completed within the statutory timescale, below the 100%
target. 
• Cancer waiting times at 31 and 62 days recorded 13 cases against a target of zero;
however, this represents a 13% improvement from FQ3. 
• New outpatient waiting time breaches (over 12 weeks) were reported at 4.9%, slightly
above the 4.6% target. 
• Outpatient long waiting times (over 52 weeks) were recorded at 6.9%, exceeding the
2.8% target. 
4.2.3 Primary Care
Performance across 10 Key Performance Indicators (KPIs) for Primary Care shows 6 KPIs (60%)
on track, with 4 KPIs (40%) reported as off track against the targets set for FQ3 24/25.  This is a
reported decrease of 10% from 70% on track in FQ2 24/25. 
Performance on or above target: 
• 81% of children who received Fluoride Varnish treatment did not require further dental
treatment, consistent with FQ2 levels.
• 54% of eligible residents have so far received their Winter Covid 19 booster. This is 7%
higher than the national average and up from 4% noted at FQ2 end.
• Across the HSCP GP practices operated the duration of FQ3 without resorting to
contingency measures. Decease from 55 instances noted in FQ2.
• GP practices remained at level zero during FQ3 resulting in no reduction in services
provided. 
• 4.5% of consultations by GPs and other HSCW within the primary care setting were
done digitally, meeting the target set (4.5%)
• Primary Care Out-of-Hours Services covered 50% of all recorded out of hour
consultations during FQ3, an increase from 46% in FQ 2 and exceeding their 45%
target.    
Performance below target & areas for improvement: 
• 2 GP practices were returned to HSCP Control during FQ3, above a zero target and an
increase from FQ2 (0).
• 93% of children at 12 months of age received their 6 in 1 vaccination missing the 95%
national target, down from 96% reported at FQ2. (data for this indicator is 1 quarter
behind due to availability of statistics) 
• The Oral Health Improvement Team only managed to deliver 94% of their planned
activity, down from 95% in FQ2 and against a target of 100%.  
• HSCP Dental services utilised 61% of clinic appointments, missing their 90% target.
This is an improved position from 48% noted in FQ2. 
4.2.4 Public Health
Performance across 5 Key Performance Indicators (KPIs) for Public Health shows 3 KPIs (60%) on
track against the targets set for FQ4 24/25. Performance on track reports a decrease of 20% from
the reported FQ3 24/25 position (80%). 
Page 42

Page 43

5 
Performance on or above target: 
  
• Increase the monthly number of quit dates set, supported by NHS smoking cessation
advisors or jointly through shared care with pharmacy, by people in the most deprived
40% areas in Argyll. In FQ4, we significantly exceeded the target, achieving 43 against a
target of 10. As reported in FQ3 there has been a change in the methodology for counting
measure. 
• Increase the number of referrals to community link workers supported by “We Are with
You”. Performance in FQ4 was significantly above target achieving approximately 90.1%
above the target - 192 against a target of 101.
• FQ4 noted 7 instances of working with Scottish Government or National Agencies on
National Strategy and Policy development.  Examples of instances include meeting with
Scottish Government to discuss Community Link Working, National CLW advisory group
response to SG poverty consultation and participation in the Physical Activity Special
Interest Group.    
Performance below target & areas for improvement: 
• Increase the number of engagement activities delivered in communities and supported
through Living Well Networks.  Performance has fallen off track in FQ4 for the first time
during FY24/25 with a decrease of approximately 52% from FQ3 – 14 against a target of
20.   It was noted that there was a delay in data submission due to staff leave, which could
have affected the number of recorded activities. 
• Increase the number of people in Argyll and Bute attending training in the following areas,
Money Counts, Behaviour Change, Mental Health and Suicide Prevention. The rolling
target from FY23/24 continues into FY24/25, with the expectation of 17 additional clients
each quarter.  In FQ4 we fell approximately 27.9% short of our target with 98 attendances,
against a target of 136.    
4.2.5 Finance 
Across 6 KPIs, Financial services performance notes 1 (17%) on track, with 5 (83%) off track
against the targets set for Q4 24/25. This matches the reported performance for Q3.    
Performance on or above target: 
• Older People External Residential actual spend reports 100%, this matches the
projected target for FQ4, with variance of 4% from the FQ3 position. 
Performance below target & areas for improvement: 
• Costs for Hospital Delayed Discharges in FQ4 reports £445,500 (%) over the target of
£317,000 and an increase from £ in FQ3. 
• GP prescribing expenditure notes actual spend being £248,000 (1%) over the projected
spend target in FQ4.   
Page 43

Page 44

6
• Agency and Locum staffing expenditure reports a reduction of 0%, failing to meet the
target reduction of 10%. However, this is an improvement on the FQ2 position, where a
6% increase was recorded. 
4.2.6 Carers
Performance across 4 Key Performance Indicators (KPIs) for Carers shows 3 KPIs (75%) on track,
with 1 KPI (25%) reported as off track against the targets set for FQ4 24/25. Performance on track
is consistent with the reported FQ3 24/25 position. 
Performance on or above target: 
  
• The number of Unpaid Carers Supported across A&B’s Carers Centres continues to be
over the target of 3000 per quarter, with an increase to 3804 (+9%) from 3483 in FQ3.    
• The ACSP reviews, which now include welfare contacts, are well above target of 700 per
quarter with 2137 (+23%) achieved in FQ4 compared to 1739 in FQ3.   
• Young Carer Statements completed in FQ4 notes 41, down from 53 (-23%) recorded in
FQ3 and remains above the target of 4. 
  
Performance below target & areas for improvement:  
  
• The number of Adult Carer Support Plans completed decreased this quarter (-12%),
from 127 to 112, however the number of plans reviewed over the quarter increased. 
4.2.7 Allied Health Professionals 
Performance across 7 Key Performance Indicators (KPIs) for Allied Health Professionals shows 4
KPIs (57%) on track, with 3 KPIs (43%) reported as off track against the targets set for FQ4 24/25. 
Performance on track is consistent with the reported FQ3 24/25 position.  
It should be acknowledged that nationally waiting time breaches are measured against a zero target.
Local targets have been set to monitor progress and improvements to reduce the number of patients
on waiting lists across varied health specialties    
Performance on or above target:
  
• MSK Outpatient Referral waits breaching >4 weeks are significantly down in FQ4 to 765
(-26%) from 1029 in FQ3 and meeting target of 1120. 
• Outpatients waiting over 12 weeks for AHP services continue their trend downwards in
FQ4 – with a reported total of 425 (-9%) down from 467 in FQ3 against the target of 500. 
• Community Patient Discharges saw a slight decline in FQ4, dropping from 2,027 in FQ3
to 1,991 (-2%), while still exceeding the target of 1,632.  
• The percentage of New versus Return Outpatient Physio AHP Referrals remains above
the 30% target, with 32% noted in FQ4.  
  
Performance below target & areas for improvement:   
  
Page 44

Page 45

7
• FQ4 AHP Priority 1&2 referrals breaching > 4 weeks reported 62 against a target of 48. 
• Priority 3 and 4 Community Patient Referrals breaching over 12 weeks have increased
quarter on quarter, with FQ4 reporting 809 against a target of 400, up 5% from 770 noted
in FQ3.  
• AHP Outpatient Completed Waits decreased by 5% in FQ4, with 882 reported against a
target of 945. 
4.2.8 Delayed Discharges 
Performance across 6 Key Performance Indicators (KPIs) for Delayed Discharges shows 2 KPI
(33%) on track, with 4 KPIs (67%) reported as off track against the targets set for FQ3 24/25.
Performance on track reports a decrease of 50% from the reported FQ2 24/25 position (83%)
For FY 2024/25 Delayed Discharges KPIs, we use a count at the end of quarter census point instead
of full month data, as this aligns better with national reporting. It should be acknowledged nationally
Delayed Discharges are measured against a zero target. Local targets have been set to monitor
progress and improvements to reduce the number of patients showing as a Delayed Discharge.   
Performance on or above target: 
• Reduce the Number of people delayed in hospital with AWI code at Monthly Census
Point. Performance was above target having achieved actual of 4 against a maximum
target of 6. In this quarter, the number of people delayed with AWI code recorded
remained at 3 in October and November and increased to 4 in December. 
• At the end of Q3, the number of people delayed in hospital awaiting assessment (Codes
11A and 11B) was 5, which is 14% of census clients, against a target of 10.  The target
was based on the average for the previous four quarters of 23/24, which ranged from 9
to 11.   This is a noted reduction of 29% from FQ2 position which reported 7. 
Performance below target & areas for improvement: 
• The overall number of people delayed in hospital at Monthly Census Point as at the end
of Q3 was 35, against the target of 31. This reflects an increase of 13% compared to
FQ2 position (31). The target was set based on the average over the last four quarters
of 23/24, where client numbers ranged between 29 and 34. 
• At the end of Q3 census point, the overall length of stay in a hospital (Delayed
Discharge Bed Days) at Monthly Census Point was 907 against the target of 634. This
represents an increase of 48% with 613 recorded in FQ2. The target was set based on
the average bed days over the past four quarters of 23/24, which ranged from 598 to
695. 
• The number of people delayed awaiting a Care Home Placement was 10, compared to
a target of 4, 150% over the target. The actual number of people waiting has increased
by 900% (1 to 10) from FQ2 to FQ3. The target was set based on the average from the
previous four quarters of 23/24, which ranged from 0-5. 
Page 45

Page 46

8
•  At the end of FQ3, the number of people delayed in hospital awaiting care at home
availability was 15, representing 43% of census clients, compared to a target of 12. The
target was based on the average of the last four quarters of 23/24, which ranged from 8
to 14. This has decreased by 25% compared to FQ2 position (20). 
4.2.9 Adult Social Care 
Performance across 4 Key Performance Indicators (KPIs) for Adult Social Care shows 3 KPIs (75%)
on track, with 1 KPI (25%) reported as off track against the targets set for FQ4 24/25.  Performance
on track reports an increase of 25% from the reported FQ3 24/25 position (50%). 
Performance on or above target: 
• Increasing the % of Older People who had their homecare monitoring review completed
within 6 months was noted at 52% for FQ4, against a target of 49%, which is
approximately 6.12% above target.  This reflects a 12% improvement from FQ3 where
actual was 40%. FQ4 is the first quarter in which we have been on track with our target. 
• Increasing the occupancy rates across A&B Care Homes has remained consistently on
target across all four quarters of 2024/25, with a slight 1% decrease compared to FQ3. 
Occupancy rate is now measured against available places (previously all empty beds). 
• In FQ4, our focus was to stay on target following the improvements made in FQ3. We
successfully achieved this by reducing the actual figure to £8,711.82 – a reduction of
approximately 40.8% from FQ3 and well below the FQ4 target. 
Performance below target & areas for improvement: 
• Unplanned Admissions to A&B hospitals directly from a care home in FQ4 is off track,
with an actual of 40 against a target of 36 – approximately 11.1% over target. It was
recognised that previous FQ3 appeared low, prompting further investigation and as a
result, the FQ3 figures have been updated. 
4.2.10 Community Hospitals 
Performance across 5 Key Performance Indicators (KPIs) for Community Hospitals shows 5 KPIs
(100%) on track in FQ4 2024/25.  Performance on track reports a 20% increase from the reported
FQ3 position. 
Performance on or above target: 
• Reduce the rate of unplanned admissions to Community Hospitals for 65+ population.
This KPI is on track reporting 442 admissions, slightly below the target of 452 (2.21%).
This represents 10% improvement compared to FQ3. 
• The average length of stay for inpatients in A&B Community Hospitals was reduced to
6.9 days across the quarter, against the target of 7.8 days. This represents a 7%
improvement compared to FQ3, where the average length of stay was 7.4 days. 
Page 46

Page 47

9
• A&E attendances meeting the 4 hrs wait target reached 96.8%, exceeding the 95%
target. This KPI has a national target and has maintained on track position throughout
each quarter of 24/25 financial year. 
• Maintain A&B Community Hospitals Bed occupancy rates below 80% target.  Bed
occupancy rates remained below target at 74.6% for FQ4, marking a slight increase of
4% from 70.6% in FQ3.  This KPI has maintained on track position throughout each
quarter of 24/25 financial year. 
• Reduce the number of falls being reported in a Community Hospital setting in A&B. In
FQ4, we reported 21 falls, well below the target of 54. This was a slight increase of 5
falls from 16 reported in FQ3.
  
Performance below target & areas for improvement: 
No indicators were reported as off track for FQ4.    
4.2.11 Adults with Long Term Conditions / Adult Support & Protection / Alcohol Drugs
Partnership 
Performance across 8 Key Performance Indicators (KPIs) for Adults with Long Term Conditions
Services shows 3 KPIs (38%) on track, with 5 KPIs (62%) reported as off track against the targets
set for FQ3 24/25. There is no change from FQ2 24/25. 
It should be acknowledged that nationally waiting time breaches for New Mental Health Outpatients
(12 weeks) and Psychological Therapy (18 Weeks) are measured against a zero target. Local
targets have been set to monitor progress and improvements to reduce the number of patients on
waiting lists across varied health specialties 
Performance on or above target: 
• 10 Adults are on the dynamic support register with a category red or amber status, in
line with Q3 target of 10, and down from 12 reported in FQ2. 
• FQ3 noted 30 Adults waiting for a psychological therapy service against the target of
175 or fewer, and a reduction from 40 in the previous quarter. 
• 90.8% of individuals referred to Alcohol and Drug treatment services were seen within
the target waiting period, above the 90% target and an increase from 89.6% at FQ2.   
Performance below target & areas for improvement: 
• 12% of Adults with a Learning Disability were reported as overdue their annual review,
up from 7% in FQ2 and above the 3% target. 
• 502 Adults were waiting for a Mental Health outpatient service, missing the target of 390
or less. And in increase of 13% from FQ2 position (446) 
• FQ3 noted 30% of Adult Support and Protection 'duty to inquire' procedures were
completed within the 5 working day target, below 70% target and no change from FQ2. 
Page 47

Page 48

10
• Only 30% of Adult Support and Protection inquiries requiring investigative powers were
completed within the 15 working day target (70%), down from 55% reported in FQ2 
• 79% of Case Conferences began within 20 days of referral or within 12 weeks of the
initial conference for review, an improvement on previous FQ2 (53%), but below the
100% target. 
4.2.12 Rural General Hospitals (Lorn & Island Hospital) 
Performance across 9 Key Performance Indicators (KPIs) for Rural General Hospitals (LIH) shows
5 KPIs (56%) on track, with 4 KPIs (44%) reported as off track against the targets set for FQ4 24/25.
Performance on track reports an improvement of 11% from FQ3. 
Performance on or above target: 
  
• Reduce the rate of unplanned admissions to LIH 65+ population. FQ4 performance
noted the actual number of unplanned admissions was 295, down 8% from 322 in FQ3,
meeting the target set of 345.  
• Reduce the total number of unplanned bed days in LIH. The actual number of
unplanned bed days reported was 3268 against a target of 3323. This has shown a
reduction in bed days of 2% from FQ3 when we were off track with 3327.    
• Maintain LIH Bed Occupancy Rates below 90% target. FQ4 performance noted an
improvement with actual rate of 85.8%, approximately 6.6% reduction from FQ3 which
was off track at 92.4%. 
• Reduce the number of falls being reported in a hospital setting in LIH. FQ4 performance
noted the actual number of falls was 13 against a target of 26. This reflects an increase
of 1 fall (8%) from FQ3, where 12 Falls were reported. 7 of these falls have been closed
whilst 6 are awaiting review. All falls were patient related. 
• Reduce number of instances of tissue viability in Lorn & Islands Hospital. The target was
to reduce the number of tissue viability instances to no more than 4. FQ4 performance
continues to be on track reporting 4 incidents, an increase of 2 (100%) from FQ3.  All 4
incidents have been closed and are related to Pressure Ulcer Grade 2 incidents.      
Performance below target & areas for improvement: 
• Reduce the Average Length of Stay for inpatients in LIH. FQ4 Performance noted we
achieved an actual rate of 5.0, against the target of 4.8. This is 6% variance from FQ3
where average LOS was 5.3 and off track.  
• Reduce the number of LIH A&E Attendances that result in an unplanned admission. The
FQ4 performance for reducing unplanned admission from A&E attendances fell slightly
off track this quarter at 19.4%, just below the target 19.2%.  This is slight increase of
0.2% from FQ3, where we were exactly on track at the target of 19.2% 
• This KPI has a national target of 95% of A&E attendances to meet the 4-hour target.
Actual FQ4 performance was noted at 90.7%, a 4.5% improvement from FQ3 at 86.2%
but still below the national target. 
Page 48

Page 49

11
• Reduce the number of medication errors in LIH. Quarterly indicative target was set at no
more than 6 per reporting period, 6 based on 23/24 average.  In FQ4 we noted an actual
of 16. An increase of 1 incident (7%) from FQ3. 13 incidents have been closed and 3 are
awaiting review. 
4.2.13 National Health & Wellbeing Outcome Indicators & Ministerial Steering Group
Integration Indicators 
The National Health and Wellbeing Outcomes provide a strategic framework for the planning and
delivery of health and social care services. This suite of outcomes serves to focus on improving the
experiences and quality of services for people using those services, carers, and their families. These
indicators form the basis of the annual reporting requirement for Health and Social Care
Partnerships across Scotland.   
The national indicators will be updated and reported within A&B HSCP’s Integrated Performance
Management Framework to provide the national performance position alongside the local service
Key Performance Indicators suite. 
The latest data in relation to 26 HWBOI and MSG Indicators reports 50% on track, with 13 on track
and 13 off track. An overview of A&B HSCP’s latest performance against the 26 measures is
reported in Appendix 1. It should be noted that reporting periods vary across the suite of national
indicator measures, with some measures reported quarterly affected by national reporting data lag. 
5. CONTRIBUTION TO STRATEGIC PRIORITIES
The monitoring and reporting against Key Performance Indicators using the Integrated Performance
Management Framework and Dashboard ensures the HSCP is able to deliver against key strategic
priorities. This in-turn is aligned with the Strategic Plan and key objectives. 
6. GOVERNANCE IMPLICATIONS
6.1 Financial Impact
Financial performance is evidenced within the IPMF Dashboard ensuring best value as well as
evidencing the impact and performance against organisational budget savings. 
6.2 Staff Governance
Key performance indicators within the IPMF ensure that staff governance requirements continue to
be progressed and developed include health and safety, wellbeing and new service redesign and
working practices. 
6.3 Care and Clinical Governance
Clinical Governance and patient safety remain at the core of prioritised service delivery against the  
new IPMF Dashboard and National Health & Wellbeing Outcomes Indicators. The new governance
structure supporting the IPMF ensures that the Clinical & Care Governance Committee remain
central to performance improvement. The development of the IPMF is focussed on moving away
from previous traditional styles of reporting to a fully collaborative approach with Head of Service
and Service Lead commentary. 
7. PROFESSIONAL ADVISORY 
Page 49

Page 50

12
Data used within the performance dashboard is fully accessible in SharePoint with data trends and
forecasting are identified to give wider strategic context. This provides the HSCP professional
advisors with self –service performance information to inform their role in maintaining professional
standards and outcomes. 
8. EQUALITY & DIVERSITY IMPLICATIONS
The Integrated Performance Management Framework captures relevant indictors used to inform the
HSCP E&D work.
8.1 PROTECTED CHARACTERISTICS
Performance detailed within this report acknowledges the rights of the Child (UNCRC), Islands.
Fairer Scotland, Socio-economic Duty, Equalities - protected characteristics.  
9. GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE 
Data use and sharing within this report and IPMF performance dashboard is covered within the
Argyll and Bute Council & NHS Highland Data Sharing Agreement 
10. RISK ASSESSMENT
Risks and mitigations associated with performance data sources and reporting are managed and
identified within the monthly Performance & Improvement Team- Work Plan. 
10.1 STRATEGIC, OPERATIONAL OR CLIMATE RISK
Performance reports are used by operational management to identify service delivery risk and to
inform mitigation action accordingly. 
11. PUBLIC & USER INVOLVEMENT & ENGAGEMENT
Performance reporting is available for the public via Argyll and Bute Council and NHS Highland
websites. The IPMF dashboard utilises SharePoint to support manager and staff access across the
HSCP. 
12. CONCLUSION 
The committee is asked to consider and acknowledge FQ4 2024/25 performance as detailed in the
IPMF Dashboard   
13. DIRECTIONS 
Directions
required to
Council, NHS
Board or
both.
Directions to: tick
No Directions required x
Argyll & Bute Council 
NHS Highland Health Board 
Argyll & Bute Council and NHS Highland Health Board 
Page 50

Page 51

13 
14. PREVIOUS REVIEW OF THE REPORT 
Meeting  Title of report Date Output (if relevant)
Clinical and
Care
Governance
Committee
Q4 Performance Report  14 August 2025 Review format,
narrative and targeted
scrutiny
Integration
Joint Board 
Q4 Performance Report  17 September
2025
Considered and
acknowledge 
REPORT AUTHOR AND CONTACT 
Author Name: Douglas Hunter- Senior Manager Performance & Improvement
Email: douglas.hunter@argyll-bute.gov.uk 
Page 51

Page 52

14
Appendix 1 – HWBOI & MSG Integration Indicators. 
Core Suite of Integration Indicators 
HWBOI-Outcomes 
Data notes 55.5% (5 of 9) HWBOI Outcomes measures reporting as above the national Scotland Rate. It is worth noting that performance will be influenced and
vary in line with the total number of respondents participating in this voluntary survey. As such, caution should be noted with regards to previous comparison
and trends. Benchmarking performance against 7 comparator HSCPs is noted below. 
HWBOI – Outcomes - Benchmarking 
Page 52

Page 53

15
HWBOI- Performance Data 
Data notes 66.7% (6 of 9) HWBOI Performance measures reporting as above the national Scotland Rate. Note Indicators 17 and 19 are reported at FY 24/25
with measures 11, 12, 13, 14, 15, 16, 18 reported as at Calendar year 2024 as a proxy for 2024/25 due to the national data for 2024/25 being incomplete. This
is in line with guidance issued by Public Health Scotland which was communicated to all Health and Social Care Partnerships. Using more complete calendar
year data for 2024 should improve the consistency of reporting between Health and Social Care Partnerships. 
HWBOI- Performance Data – Benchmarking    
Page 53

Page 54

16  
Ministerial Steering Group Indicators 
MSG Indicators 1.1, 1.2 and 2.1 are reported at Calendar Year 2024 as a proxy form 2024/25. This is in line with guidance issues by Public Health Scotland
which was communicated to all Health and Social Care Partnerships/ MSG Indicators data notes that all MSG measures have sustained higher activity or
have increased in the last reporting year. Activity around Emergency Admissions, Unplanned Bed Days, A&E attendances and Delayed Discharge Bed Days
all noted performance exceeding pre –Covid levels. This highlights the necessity to consider approaches to alleviate systems pressures around Urgent and
Unscheduled Care and expedite hospital flow, particularly around A&E Admissions and Delayed Discharges.
Ministerial Steering Group Indicators 2018/19 2019/20 2020/21 2021/22 2022/23  2023/24 2024/25
MSG 1.1 - Number of emergency admissions* CY 8,374 8,231 6,917 7,820 7,928 8,933  8,879
MSG 1.2 - Number of Admissions from A&E* CY 5,244 4,945 3,668 5,040 4,957 5,097  5,502
MSG 2.1 - Number of unplanned bed days acute
specialties* CY 65,794 64,008 53,390 67,255 77,094 77,882 80.655
MSG 2.2 - Number of unplanned bed days MH
specialties 13,747 13,204 11,208 9,049 9,212 11,575  11.380
MSG 3.1 - Number of A&E attendances 13,985 14,171 10,091 15,646 16,774 17,740  22,456
MSG 3.2 - % A&E attendances seen within 4 hours  93.4% 91.7% 93.1% 88.9% 83.9% 83.0%  83.0%
MSG 4.1 - Number of DD bed days occupied  9,530 7,863 5,354 7,742 11,929 12,757  14,042
MSG 5.1 - % of last six months of life by setting
community & hospital 90.0% 89.6 90.80% 90.80% 89.60% 89.40%  N/A
MSG 6.1 - % of 65+ population at Home (unsupported)  92.1% 92.1% 92.5% 92.6% 93.2% 93.4%  N/A 
Data notes 67% (6 of 9) HWBOI Outcomes measures reporting as above the national Scotland Rate. It is worth noting that performance will be influenced and vary in line with the total number of respondents
participating in this voluntary survey. As such, caution should be noted with regards to previous comparison and trends 
Page 54

Page 55

17
Appendix 2 - Delayed Discharge Sitrep – 31st March 2025 
Page 55

Page 56

This page is intentionally left blank

Page 57

1   
Community Services Committee       
Date of Meeting: 11 December 2025 
Title of Report:  Health & Social Care Partnership - Performance Report – FQ1 2025/26 (April –
June) 
Presented by:    Kristin Gillies Head of Strategic Planning, Performance & Technology    
The committee is asked to: 
• Note revised suite of 77 Key Performance Indicators within the Integrated
Performance Management Framework for 2025/26 
• Consider performance for FQ1 2025/26 (April – June 2025) 
• Note Delayed Discharge Sitrep as of 30 Jun 2025 (Appendix 1) 
• Acknowledge latest performance against the National Health & Wellbeing Outcomes
and Ministerial Steering Group Integration Indicators (Appendix 2) 
EXECUTIVE SUMMARY 
This report details performance for the Financial Quarter (FQ) 1 2025/26 (April - June), the
performance outputs are taken from the Integrated Performance Management Framework (IPMF)
Reporting Dashboard with the focus on twelve key service areas, with a revised set of KPI being
implemented after annual review, ahead of the 2025/26 reporting year. 
Overall performance for FQ1 notes of 77 measures reported as on target (53%). The report details
performance against each of the service areas and the 77 supporting IPMF Key Performance
Indicators. Latest HSCP Activity Summary Dashboard and trajectory analysis across current reporting year
is included, as is the latest performance from the National Delayed Discharge Sitrep and the National
Health & Wellbeing Indicators performance. The use of the new performance Dashboard within
SharePoint is designed to offer a more focused approach to the access and analysis of data, offering
scope for self-service.   
2. RECOMENDATIONS
The committee are asked to note and consider FQ1 25/26 performance. 
3. DETAIL OF REPORT
The report details the HSCP (Health and Social Care Partnership) performance for FQ 1 2025/26
Page 57 Agenda Item 7

Page 58

2
(April - June), highlighting key performance trends across the 77 KPIs (Key Performance Indicators).
For 2025/26, the quarter 1 snapshot national update on Delayed Discharges (Appendix 1), alongside
the latest performance on the National Health and Wellbeing Outcomes Indicators (Appendix 2). 
4. RELEVANT DATA & INDICATORS 
4.1 FQ1 2025/26 (April – June) Performance Summary                                   
Overall performance for FQ1 notes that 77 KPI’s are scoring against target, with 41 (53%) reporting
as on-track. The KPI’s report performance against the target and include the target, actual and
variance and is a mix of both quantitative and qualitative indicators. The use of the green, amber
and red graphics within the Dashboard is used to give an overview of the HSCP’s total performance
for each of the twelve services and 77 KPI’s. The use of only green and red for the KPI’s is used to
focus delivery with regards to sustaining performance on or above target.   
4.2 Analysis of Key Performance  
This analysis identifies performance across the 12 service reporting categories within the Integrated
Performance Management Framework (IPMF). 
4.2.1 Children & Families
Across 5 KPIs, Children & Families and Justice performance notes 4 (80%) on track, with1 (20%)
off track, against the targets set for Q1 25/26. 
Performance on or above target: 
• Improve the percentage of Child Protection Register (CPR) cases that have an allocated
Social Worker met the 100% target this FQ1
Page 58

Page 59

3
• Children & Adolescent Mental Health Services (CAMHS) tier 3 seen within 18 weeks of
referral, 90% target was met in FQ1.
• Improve the number of teams that have delivered 85% or more of the Universal Health
Visiting Pathway (UHVP) met the target this quarter. 
• Health assessments started within 4 weeks of coming into care-exceeded the target of
96% (100%) 
Performance below target & areas for improvement: 
• Percentage of Justice Social Work reports submitted by 12 noon, 2 days before court
was below the target of 90%, reported at 80% this quarter. 
4.2.2 Strategy, planning, performance and digital
Performance across 11 Key Performance Indicators (KPIs) for Strategic Planning, Performance &
Technology Services shows 5 KPIs (45%) on track, with 6 KPIs (55%) reported as off track against
the targets set for FQ1 25/26.  
Performance on or above target: 
• Increase the number of new clients to Telecare services – exceeded the target of 200
(215).
• Increase the number of Telecare service reviews completed – exceeded the target of 85
(125).
• Increase the number of patients utilising ‘Near Me’ clinics – exceeded the target of 800
(972).
• Increase the utilisation of ‘Connect Me’ for blood pressure monitoring within primary
care – exceeded the target of 42 patients (124).
• Percentage of Transformation & Improvement projects on track – exceeded the target of
85% (100%). 
Performance below target & areas for improvement: 
• Increase in new referrals to Silvercloud – below the target of 70 (32).
• Waiting times for cancer appointments at the 31 and 62 day targets – above the target
of 0 breaches (7).
• Reduce new outpatient waiting times breaches >12 weeks – above the target of 46%
(47%).
• Reduce outpatient waiting list long waits >52 weeks – above the target of 0.0% (7.2%).
• HSCP FOI requests responded to within 20 working days – below the target of 100%
(94%).
• IT support requests resolved – below the target of 100% (34%).   
Scottish government has an acute focus on planned care, unscheduled care and CAMHS and this
is being addressed by a weekly high level huddle board wide with direct reporting to the minister
and sign off locally by management supporting an increased focus on booking and waiting list
management. 
4.2.3 Primary Care
Page 59

Page 60

4
Performance across 6 Key Performance Indicators (KPIs) for Primary Care shows 3 KPIs (50%) on
track, with 3 KPIs (50%) reported as off track against the targets set for FQ1 25/26.     
Performance on or above target: 
• 80% of children who received Fluoride Varnish treatment did not require referral for
further dental treatment – exceeded the target of 80% (84%).
• Vaccination delivery against National trends during autumn, winter and spring booster
programmes – met the target of 61% (Scotland wide percentage)
• Percentage of HSCP run GP practices enacting contingency measures – no practices
enacted contingency measures, actual 0 against a threshold of 14 
Performance below target & areas for improvement: 
• Percentage of planned activity carried out to deliver National Oral Health Improvement
Programmes against Service Plan – below the target of 100% (85%).
• Utilisation of HSCP Dental Clinic appointments – below the target of 75% (58%).
• Minimum 95% uptake for 6 in 1 vaccination in children by age 1 – below the WHO target
of 95% (94%). 
4.2.4 Public Health
Performance across 6 Key Performance Indicators (KPIs) for Public Health shows 1 KPIs (17%) on
track, with 5 KPIs (83%) reported as offtrack against the targets set for FQ1 25/26. 
Performance on or above target: 
• Mitigate health inequalities through increasing the number of referrals to community link
workers supported by “With You” ensuring health and wellbeing support is targeted to
areas of rural and socio-economic need. The target was set at 150, and we increased the
number of referrals to 174, exceeding the target by 24 (16%) above target. 
Performance below target & areas for improvement: 
• Increase number of successful quits, supported by NHS smoking cessation advisors or
jointly through shared care with Pharmacy, by people in the 40% most deprived areas in
Argyll and Bute, reporting undertaken a quarter in arrears – We set a target of 20, and we
achieved 14 (30%) below target.
• Report on the number of people in A&B attending training to deliver Community
Reinforcement and Family Training (CRAFT) to families – We set a target of 15 and the
actual reported in FQ1 was 0.
• Increase the number of people in Argyll and Bute attending training in the following areas,
Money Counts, Behaviour Change, Speakeasy, Mental Health and Suicide Prevention -
We set a target of 120 and the actual was 39, approximately 67.5% below target.
• Number of instances working with Scottish Government or National Agencies on National
Strategy and Policy Development. The target was set at 13, and we achieved 8, falling
short of the target by approximately 38.5%.
• Report on the number of engagements relating to planning with people with lived or
living experience of alcohol/or drugs – We set a target of 4, and we achieved 2
engagements, falling short of the target by 2 (50%). 
4.2.5 Finance
Page 60

Page 61

5 
Across 7 KPIs, Financial services performance notes 3 (43%) on track, with 4 (57%) off track
against the targets set for Q1 25/26.    
Performance on or above target:  
• Monitor Older People (OP) - Internal Residential Budget Spend % variance reported at
95% against 100% target
• Monitor Older People (OP) - External Residential Budget Spend % Variance reported at
95% against 100% target
• Monitor Older People (OP) - Homecare Budget Spend was noted at 92% against 100%
target 
Performance below target & areas for improvement: 
• Monitor Lorn & Islands Hospital overall budget is noted as off track and 7.9% over
budget at FQ1. 
• Monitor NHS saving recovery to ensure this remains on track. For Q1 the actual spend
is 35% of the annual budget, which suggests as the financial year progresses this may
go off track.
• Monitor Social Work savings recovery to ensure this remains on track. For Q1 the actual
spend is 49% of the annual budget, which suggests as the financial year progresses this
may go off track.
• Monitor the HSCP total budget to ensure this remains on track currently off track as at
quarter end by £2m (0.3%) 
4.2.6 Carers
Performance across 5 Key Performance Indicators (KPIs) for Carers shows 4 KPIs (80%) on track,
with 1 KPI (20%) reported as off track against the targets set for FQ1 25/26.  
Performance on or above target: 
• Increase the number of Adult Carer Support Plans completed across A&B Carers Centres
exceeded the target of 120 (127).   
• Increase the number of Unpaid Adult Carers supported across A&B Carers Centres
exceeded the target of 2700 (3107). 
• Increase the number of Unpaid Young Carers supported across A&B Carers Centres
exceeded the target of 783 (812).
• Increase the number of ACSP reviews completed by the various Carers Centres
exceeded the target of 1800 (1839). 
Performance below target & areas for improvement:  
  
• Increase the number of Young Carer Statements completed across A&B Carers Centres
below the target of 39 (29). 
4.2.7 Allied Health Professionals 
Page 61

Page 62

6
Performance across 5 Key Performance Indicators (KPIs) for Allied Health Professionals shows 1
KPIs (20%) on track, with 4 KPIs (80%) reported as off track against the targets set for FQ1 25/26. 
It should be acknowledged that nationally waiting time breaches are measured against a zero target
and it is a clear indicator of how many actual people are waiting. Local trajectory reporting allows
monitoring of progress and improvements to reduce the number of patients on waiting lists across
varied health specialties.   
Performance on or above target:   
• Increase the number of monthly AHP Outpatient Completed Waits exceeded the target of
945 (1017).
  
Performance below target & areas for improvement:   
• Reduce New Outpatient Referral waits breaching > 4 weeks for Musculoskeletal (MSK)
reported above the target of 0 (812).
• Reduce New Outpatient Referral waits breaching >12 week waits for AHP services
reported above the target of 0 (477).
• Reduce P1 and P2 Community Patient Referral waits breaching > 4 weeks for AHP
Services noted above the target of 0 (60).
• Reduce P3 and P4 Community Patient Referral waits breaching >12 week waits for AHP
services shows above the target of 0 (970). 
4.2.8 Delayed Discharges 
Performance across 6 Key Performance Indicators (KPIs) for Delayed Discharges shows 3 KPI
(50%) on track, with 3 KPIs (50%) reported as off track against the targets set for FQ1 25/26. 
It should be acknowledged nationally Delayed Discharges are measured against a zero target. Local
targets have been set to monitor progress and improvements to reduce the number of patients
showing as a Delayed Discharge.   
Performance on or above target: 
• The target to reduce the number of people delayed at monthly census point was 34, and
we achieved 32, exceeding the target by 2.
• The target to reduce the number of delays in hospital awaiting a care home placement
at monthly census point was 10, and we achieved 8, exceeding the target by 2.
• The target to reduce the number of people delayed with assessment code at monthly
census point was 10, and we had an actual of 7, exceeding the target by 3. 
Performance below target & areas for improvement: 
• The target to reduce the overall length of stay in hospital at monthly census point was
634, and our actual was 644, approximately 1.58% over the target.
• The target to reduce the number of people delayed in hospital with AWI code at monthly
census point was 4, and our actual was 5, just slightly missing the target by 1.
Page 62

Page 63

7
• The target to reduce the number of people delayed in hospital at monthly census point
due to care at home availability was 10, and our actual performance was 15, exceeding
the target by 50%. 
4.2.9 Adult Social Care 
Performance across 4 Key Performance Indicators (KPIs) for Adult Social Care shows 3 KPIs (75%)
on track, with 1 KPI (25%) reported as off track against the targets set for FQ1 25/26.   
Performance on or above target: 
• Increase the percentage of Older People who had their homecare monitoring review
completed within 6 months - Performance surpassed the target with an actual of 84%,
against a target of 60%. 
• Increase the occupancy rates across A&B Care Homes – We achieved 95%, exactly
matching the target.
• Reduce the number of hours of unmet need for care at home - The target was to reduce
hours to 500, and we achieved 417 hours, exceeding the reduction goal by
approximately 16.6%. 
Performance below target & areas for improvement: 
• Reduce unplanned admissions to A&B hospitals directly from a care home - The new
target set for this KPI was 18.  Our actual was 24, exceeding the target by 33%. 
4.2.10 Community Hospitals 
Performance across 5 Key Performance Indicators (KPIs) for Community Hospitals shows 5 KPIs
(100%) on track in FQ1 2025/26.  
Performance on or above target: 
• Reduce the rate of unplanned admissions to Community Hospitals for 65+ population -
The target was to reduce admissions to 450, and we achieved 449.
• Reduce the average length of stay for inpatients in A&B Community Hospitals – We
aimed to reduce the average LOS to 7.5 days and achieved 6.9, exceeding the target.
• A&E attendances meeting the 4 hrs wait target. The national target for attendances
meeting the 4 hours target is 95%, we achieved 96%.
• Maintain A&B Community Hospitals Bed occupancy rates below 80% target – The target
was to maintain bed occupancy below 80%, and actual occupancy was 61.8%.
• Reduce the number of falls being reported in a Community Hospital setting in A&B –
The target was to reduce falls to 38, and the actual number was 12.
  
Performance below target & areas for improvement: 
None   
4.2.11 Adults with Long Term Conditions / Adult Support & Protection / Alcohol Drugs
Partnership 
Page 63

Page 64

8 
Performance across 8 Key Performance Indicators (KPIs) for Adults with Long Term Conditions
Services shows 3 KPIs (38%) on track, with 5 KPIs (62%) reported as off track against the targets
set for FQ1 25/26.   
It should be acknowledged that nationally waiting time breaches for New Mental Health Outpatients
(12 weeks) and Psychological Therapy (18 Weeks) are measured against a zero target. Local
targets have been set to monitor progress and improvements to reduce the number of patients on
waiting lists across varied health specialties 
Performance on or above target: 
• Reduce the number of people monthly waiting for psychological therapy services (>18
weeks) – exceeded the target of 175 (34).
• Mental Health urgent care referrals response timescales <2 hours – met the target of
90% (100%).
• Mental Health social circumstances report overdue – met the target of 33% (33%). 
Performance below target & areas for improvement: 
• Reduce the number of clients on the Dynamic Support Register with category
Amber/Red – above the target of 10 (18).
• Reduce the number of people waiting for a new Mental Health outpatient service (>12
weeks) – above the target of 390 (757).
• Increase the % of Adult Support Protection screening duty to inquire assessments
completed within 5 working days – below the target of 70% (40%).
• Increase the % of Adult Support Protection investigations completed within 15 working
days – below the target of 70% (32%).
• Drug & Alcohol completed waiting times from referral to first treatment (LDP) – below
the target of 90.0% (83.3%). 
4.2.12 Rural General Hospitals (Lorn & Island Hospital) 
Performance across 9 Key Performance Indicators (KPIs) for Rural General Hospitals (LIH) shows
6 KPIs (67%) on track, with 3 KPIs (33%) reported as off track against the targets set for FQ1 25/26. 
Performance on or above target: 
• Reduce the rate of unplanned admissions to LIH 65+ population. We aimed to reduce
unplanned admissions to 345. We achieved 315, approximately 9% under the target.
• Reduce the total number of unplanned bed days in LIH. We aimed to reduce the total
days to 3323 and successfully achieved 2810, 15.4% below the target.
• Maintain LIH Bed Occupancy Rates below 90% target. We set a target to maintain bed
occupancy below 90% and we maintained performance at 74.6%, 17.1% below the
target.
• Reduce the number of LIH A&E Attendances that result in an unplanned admission. We
set a target to reduce attendances to 19.2%, and we achieved 16.8%.
• Reduce the number of falls being reported in a hospital setting in LIH. We set a target to
reduce falls to 26, and only 7 were reported this quarter.
• Reduce the number of instances of tissue viability in Lorn & Islands Hospital.  We set a
target to reduce the number of instances to 4, with only 1 being reported this FQ. 
Page 64

Page 65

9   
Performance below target & areas for improvement: 
• Reduce the Average Length of Stay for inpatients in LIH – Target is to reduce the
average LOS to 5 days and we reported 7 day this quarter.
• 95% of A&E attendances to meet the 4-hour wait target. This KPI has a national target
of 95% and we achieved 92% in FQ1. 
4.2.13 National Health & Wellbeing Outcome Indicators & Ministerial Steering Group
Integration Indicators 
The National Health and Wellbeing Outcomes provide a strategic framework for the planning and
delivery of health and social care services. This suite of outcomes serves to focus on improving the
experiences and quality of services for people using those services, carers, and their families. These
indicators form the basis of the annual reporting requirement for Health and Social Care
Partnerships across Scotland.   
The national indicators will be updated and reported within A&B HSCP’s Integrated Performance
Management Framework to provide the national performance position alongside the local service
Key Performance Indicators suite. 
The latest data in relation to 26 HWBOI and MSG Indicators reports 50% on track, with 13 on track
and 13 off track. An overview of A&B HSCP’s latest performance against the 26 measures is
reported in Appendix 1. It should be noted that reporting periods vary across the suite of national
indicator measures, with some measures reported quarterly affected by national reporting data lag. 
5. CONTRIBUTION TO STRATEGIC PRIORITIES
The monitoring and reporting against Key Performance Indicators using the Integrated Performance
Management Framework and Dashboard ensures the HSCP is able to deliver against key strategic
priorities. This in-turn is aligned with the Strategic Plan and key objectives. 
6. GOVERNANCE IMPLICATIONS
6.1 Financial Impact
Financial performance is evidenced within the IPMF Dashboard ensuring best value as well as
evidencing the impact and performance against organisational budget savings. 
6.2 Staff Governance
Key performance indicators within the IPMF ensure that staff governance requirements continue to
be progressed and developed include health and safety, wellbeing and new service redesign and
working practices. 
6.3 Care and Clinical Governance
Clinical Governance and patient safety remain at the core of prioritised service delivery against the  
new IPMF Dashboard and National Health & Wellbeing Outcomes Indicators. The new governance
structure supporting the IPMF ensures that the Clinical & Care Governance Committee remain
central to performance improvement. The development of the IPMF is focussed on moving away
from previous traditional styles of reporting to a fully collaborative approach with Head of Service
and Service Lead commentary. 
Page 65

Page 66

10
7. PROFESSIONAL ADVISORY 
Data used within the performance dashboard is fully accessible in SharePoint with data trends and
forecasting are identified to give wider strategic context. This provides the HSCP professional
advisors with self –service performance information to inform their role in maintaining professional
standards and outcomes. 
8. EQUALITY & DIVERSITY IMPLICATIONS
The Integrated Performance Management Framework captures relevant indictors used to inform the
HSCP E&D work.
8.1 PROTECTED CHARACTERISTICS
Performance detailed within this report acknowledges the rights of the Child (UNCRC), Islands.
Fairer Scotland, Socio-economic Duty, Equalities - protected characteristics.  
9. GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE 
Data use and sharing within this report and IPMF performance dashboard is covered within the
Argyll and Bute Council & NHS Highland Data Sharing Agreement 
10. RISK ASSESSMENT
Risks and mitigations associated with performance data sources and reporting are managed and
identified within the monthly Performance & Improvement Team- Work Plan. 
10.1 STRATEGIC, OPERATIONAL OR CLIMATE RISK
Performance reports are used by operational management to identify service delivery risk and to
inform mitigation action accordingly. 
11. PUBLIC & USER INVOLVEMENT & ENGAGEMENT
Performance reporting is available for the public via Argyll and Bute Council and NHS Highland
websites. The IPMF dashboard utilises SharePoint to support manager and staff access across the
HSCP. 
12. CONCLUSION 
The committee is asked to consider and note FQ1 2025/26 (Apr - June) performance as detailed in
the IPMF Dashboard   
13. DIRECTIONS 
Directions
required to
Council, NHS
Board or
both.
Directions to: tick
No Directions required x
Argyll & Bute Council 
NHS Highland Health Board 
Argyll & Bute Council and NHS Highland Health Board 
Page 66

Page 67

11 
14. PREVIOUS REVIEW OF THE REPORT 
Meeting  Title of report Date Output (if relevant)     
REPORT AUTHOR AND CONTACT 
Author Name: Douglas Hunter- Senior Manager Performance & Improvement
Email: douglas.hunter@argyll-bute.gov.uk
Page 67

Page 68

12 
Appendix 1 - Delayed Discharge Sitrep – 30th June 2025 
Page 68

Page 69

13 
Appendix 2 – HWBOI & MSG Integration Indicators. 
Core Suite of Integration Indicators 
HWBOI-Outcomes 
Data notes 55.5% (5 of 9) HWBOI Outcomes measures reporting as above the national Scotland Rate. It is worth noting that performance will be influenced and
vary in line with the total number of respondents participating in this voluntary survey. As such, caution should be noted with regards to previous comparison
and trends. Benchmarking performance against 7 comparator HSCPs is noted below. 
HWBOI – Outcomes - Benchmarking 
HWBOI- Performance Data 
Page 69

Page 70

14
Data notes 66.7% (6 of 9) HWBOI Performance measures reporting as above the national Scotland Rate. Note Indicators 17 and 19 are reported at FY 24/25
with measures 11, 12, 13, 14, 15, 16, 18 reported as at Calendar year 2024 as a proxy for 2024/25 due to the national data for 2024/25 being incomplete. This
is in line with guidance issued by Public Health Scotland which was communicated to all Health and Social Care Partnerships. Using more complete calendar
year data for 2024 should improve the consistency of reporting between Health and Social Care Partnerships. 
HWBOI- Performance Data – Benchmarking       
Page 70

Page 71

15
Ministerial Steering Group Indicators 
MSG Indicators 1.1, 1.2 and 2.1 are reported at Calendar Year 2024 as a proxy form 2024/25. This is in line with guidance issues by Public Health Scotland
which was communicated to all Health and Social Care Partnerships/ MSG Indicators data notes that all MSG measures have sustained higher activity or
have increased in the last reporting year. Activity around Emergency Admissions, Unplanned Bed Days, A&E attendances and Delayed Discharge Bed Days
all noted performance exceeding pre –Covid levels. This highlights the necessity to consider approaches to alleviate systems pressures around Urgent and
Unscheduled Care and expedite hospital flow, particularly around A&E Admissions and Delayed Discharges.
Ministerial Steering Group Indicators 2018/19 2019/20 2020/21 2021/22 2022/23  2023/24 2024/25
MSG 1.1 - Number of emergency admissions* CY 8,374 8,231 6,917 7,820 7,928 8,933  8,879
MSG 1.2 - Number of Admissions from A&E* CY 5,244 4,945 3,668 5,040 4,957 5,097  5,502
MSG 2.1 - Number of unplanned bed days acute
specialties* CY 65,794 64,008 53,390 67,255 77,094 77,882 80.655
MSG 2.2 - Number of unplanned bed days MH
specialties 13,747 13,204 11,208 9,049 9,212 11,575  11.380
MSG 3.1 - Number of A&E attendances 13,985 14,171 10,091 15,646 16,774 17,740  22,456
MSG 3.2 - % A&E attendances seen within 4 hours  93.4% 91.7% 93.1% 88.9% 83.9% 83.0%  83.0%
MSG 4.1 - Number of DD bed days occupied  9,530 7,863 5,354 7,742 11,929 12,757  14,042
MSG 5.1 - % of last six months of life by setting
community & hospital 90.0% 89.6 90.80% 90.80% 89.60% 89.40%  N/A
MSG 6.1 - % of 65+ population at Home (unsupported)  92.1% 92.1% 92.5% 92.6% 93.2% 93.4%  N/A 
Data notes 67% (6 of 9) HWBOI Outcomes measures reporting as above the national Scotland Rate. It is worth noting that performance will be influenced and vary in line with the total number of respondents
participating in this voluntary survey. As such, caution should be noted with regards to previous comparison and trends 
Page 71

Page 72

This page is intentionally left blank

Page 73

1 
Community Services Committee 
Date of Meeting: 11 December 2025 
Title of Report: A&B HSCP Annual Performance Report 2024/25 
Presented by: Kristin Gillies, Head of Strategic Planning, Performance and
Technology 
The  Committee is asked to:
▪ Note and consider the Annual Performance Report for the Health and
Social Care Partnership for the year 2024/25. 
1. EXECUTIVE SUMMARY 
1.1 Each HSCP is responsible for publishing an Annual Performance
Report (APR) which sets out how they are improving on the National
Health and Wellbeing Outcomes (NHWBO). The APR also includes a
core suite of national indicators which contextualises the data and
provides a comparative and broader picture of local performance.   
1.2 The IJB have previously agreed that the Annual Performance Report
would be presented to them each year. There have been seven Annual
Performance Reports to date. Required content of the report is set out
in The Public Bodies (Joint Working) (Content of Performance Reports)
(Scotland) Regulations 2014.
http://www.legislation.gov.uk/ssi/2014/326/contents/made 
1.3 A draft version of this report was reviewed by the IJB in August. The
data for the Health and Social Wellbeing Indictors was not finalised until
early July which means that the final report could not be approved by
the IJB before submission to Scottish Government. SLT signed off the
final report in July 2024 ahead of submission of the draft. 
1.4 Argyll and Bute HSCP - Annual Performance Report 2024-25 
2. RECOMMENDATIONS
2.1       Committee is asked to note and consider the approved Annual
Performance Report for 2024-25. 
3. DETAIL OF REPORT
Page 73 Agenda Item 8

Page 74

2  
3.1 The main body of the APR utilises the Integrated Performance
Management Framework (IPMF).
3.2 The data used in this report focuses on two Key Performance Indicators
(KPI’s) against each of the service areas identified within the IPMF, the
data used utilises the financial year 2024-25 and defines the quarter
data using Financial Year as the benchmark. The data used is reflective
of the wider integrated performance agenda encapsulated within the
IPMF and includes service delivery and performance monitoring from all
services. 
3.3 The report also covers:
• financial performance and best value
• public engagement
• performance monitoring against joint strategic plan (year 3)
– Appendix 1
• Health & Wellbeing Outcome Indicators (HWBOI’s) &
Ministerial Steering Group Indicators (MSG) – Appendix 2 
4. RELEVANT DATA AND INDICATORS
4.2 The APR utilises the National Health and Wellbeing Outcomes (NHWBO)
and the Children and Young People Outcomes as well as the IPMF
indicators. 
5. CONTRIBUTION TO STRATEGIC PRIORITIES
The APR monitors performance against all A&B HSCP Strategic Priorities. 
6. GOVERNANCE IMPLICATIONS
6.1 Financial Impact
No financial impact
6.2 Staff Governance
No staff governance impact
6.3 Clinical and Care Governance
The IPMF is reported quarterly to C&CG and subsequently to the IJB. 
7. PROFESSIONAL ADVISORY
Performance is considered for scrutiny at the clinical and care governance
committee noting required actions and further scrutiny for update to the IJB. 
8. EQUALITY & DIVERSITY IMPLICATIONS
No specific items directly from this report
9. GENERAL DATA PROTECTION PRINCIPLES COMPLIANCE 
No impact on GDPR or current data sharing agreements 
Page 74

Page 75

3
10. RISK ASSESSMENT
Quarter 4 reflected a dip in performance and this is monitored to ensure if is
not a progressive trend. It is not unusual as this is typically the most
pressurised period over the annual cycle however we do not take for granted
and this was monitored into quarter 1 and the performance has improved in
line with expectation. 
11. PUBLIC & USER INVOLVEMENT & ENGAGEMENT
The APR does not require public engagement however performance is
presented at Council Community Services Committee within council
constitution and at area committees after presentation at the IJB. 
12. CONCLUSIONS
Committee is asked to note and consider performance. 
13. DIRECTIONS 
Directions
required to
Council, NHS
Board or
both.
Directions to: tick
No Directions required 
Argyll & Bute Council 
NHS Highland Health Board 
Argyll & Bute Council and NHS Highland Health Board x 
14. PREVIOUS REVIEW OF THE REPORT 
Meeting  Title of report Date Output (if
relevant)
Senior
Leadership
Team
Draft A&B HSCP
Annual Performance
Report 2024/25
6 August approved
Integration
Joint Board
Development
Session 
Draft A&B HSCP
Annual Performance
Report 2024/25
27 August approved
Integration
Joint Board
Draft A&B HSCP
Annual Performance
Report 2024/25
17 September
2025
approved     
REPORT AUTHOR AND CONTACT 
Author Name: Charlotte Craig  
Email: charlotte.craig@argyll-bute.gov.uk 
Page 75

Page 76

This page is intentionally left blank

Page 77

1
Argyll & Bute Health & Social Care
Partnership
Annual Performance Report 2024 – 2025
Page 77

Page 78

2
Contents
1. Foreword....................................................................................... 4
2. Introduction ................................................................................... 5
3. A&B HSCP Performance Management and Governance .............. 5
3.1 Overview .......................................................................................................... 5
4. Integrated Performance Management Framework 2024/25 ........... 6
5. Financial Performance and Best Value ....................................... 19
5.1 Financial Performance.....................................................................................19
5.1.1 Financial Performance 2024-25 .......................................................... 19
5.1.2 Savings Delivery ................................................................................. 20
5.1.3 Financial Outlook, Risks and Plans for the Future ............................... 20
5.2 Principles of Best Value ..................................................................................21
6. Engagement ............................................................................... 23
Appendix 1................................................................................................................24
Health & Wellbeing Outcome Indicators (HWBOI’s) & Ministerial Steering
Group Indicators (MSG) ................................................................................. 24
Appendix 2: Joint Strategic Plan 2022-25 Progress Update Report ...........................28
Children and Young People ............................................................................ 30
Child poverty .................................................................................................. 31
Child Protection .............................................................................................. 33
Violence Against Women and Girls ................................................................ 36
Adult Protection .............................................................................................. 38
Community Justice ......................................................................................... 41
Public Health .................................................................................................. 45
Right Care Right Time .................................................................................... 52
Adult Care –Older Adults/Adults and Hospitals ............................................... 53
Learning Disability & Neurodiversity Services ................................................. 55
Mental Health ................................................................................................. 57
Primary Care (General Practice) .................................................................... 59
Dentistry ......................................................................................................... 62
Alcohol and Drug Partnership ......................................................................... 65
Allied Health Professionals (AHP) .................................................................. 70
Page 78

Page 79

3
Carers ............................................................................................................ 72
Prevention Programme .................................................................................. 74
Digital Health and Care Strategy .................................................................... 76
Technology Enabled Care (TEC) .................................................................... 77
Corporate Services ........................................................................................ 78
Page 79

Page 80

4
1. Foreword
We are pleased to publish the Annual Performance Report for the past year, covering 1 April
2024 to 31 March 2025.
This document sets out how the Argyll & Bute Health and Social Care Partnership (HSCP)
has performed using internal management information, national indicators and performance
against our year three priorities for the Joint Strategic Plan. It builds on the information
published within previous reports to provide an overview on how we have improved, adapted
and reshaped services during the reporting period.
The partnership is responsible for meeting local and national objectives and it is therefore
important that we publicly report on how we are performing against the agreed outcomes.
The Annual Performance Report provides an opportunity to reflect on the past year, noting
successes like the Bairn’s Hoose and reflecting on its challenges.
We thank all colleagues and partners for their ongoing efforts to deliver the vision for health
and social care services and hope we can all share in the aim of delivering longer, healthier
and independent lives.
Graham Bell Evan Beswick
Chair of Argyll & Bute Chief Officer
Integration Joint Board Argyll & Bute HSCP
Page 80

Page 81

5
2. Introduction
Welcome to Argyll and Bute’s Annual Performance Report (APR) for the year from 1 April
2024 to 31 March 2025 as required by Public Bodies (Joint Working) (Scotland) Act of 2014.
Each HSCP is responsible for publishing an Annual Performance Report (APR) which sets
out how they are improving on the National Health and Wellbeing Outcomes (NHWBO).The
APR also includes a core suite of national indicators which contextualises the data and
provides a comparative and broader picture of local performance (see appendix .
Our internal management information reporting notes a dip in performance after a steady build
over the course of the year. While not a significant drop the trajectory is being monitored as to
whether the impact was an anomaly or related to winter pressure, or if other variables such as
workforce availability had an impact. Performance is monitored quarterly as noted within the
report.
A minimum of two data points are provided for each area. Due to the high number of variables
monitored these are rotated within the annual submission.
3. A&B HSCP Performance Management and
Governance
3.1 Overview
Performance management for the HSCP is underpinned by the Integrated Performance
Management Framework (IPMF) and an associated Performance Dashboard. These were
collaboratively developed with the HSCP’s Strategic Leadership Team.
The IPMF includes quality and performance measures for each service area and also includes
an overview of the HSCP’s performance against Health & Wellbeing Outcome Indicators and
Ministerial Steering Group Integration measures.
A quarterly report is provided to the Clinical and Care Governance Group and includes
narrative from Heads of Service and Service Leads to highlight key actions to address
performance, embed ownership, and identify key performance risks.
Each service area receives support from a data analyst. This has been successful in helping
the IPMF evolve, through the revision of performance goals and targets and development of
new more appropriate measures. The annual review of all the Key Performance Indicators
(KPI’s) in 2023-24 led to an increase in the number of specified service areas from 8 to 12
being monitored across 2024/25.
The monitoring and reporting of performance using the IPMF ensures the HSCP is able to
measure delivery against national indicators and the objectives of the current Joint Strategic
Plan which are:
Page 81

Page 82

Page 6 of 78
1. Choice, Control and Innovation
2. Early Intervention & Enablement
3. Living Well & Active Citizenship
4. Community Coproduction
The HSCP is currently working on a new Joint Strategic Plan, including its strategic priorities and
objectives. As a result the IPMF will be reviewed too.
4. Integrated Performance Management
Framework 2024/25
The data used in this report focusses on two Key Performance Indicators (KPI’s) against each
of the 12 service areas identified within the IPMF, the data used utilises FQ1 to FQ4 (2024/25)
and defines the quarter data using Financial Year as the benchmark. The data used is
reflective of the wider integrated performance agenda encapsulated within the IPMF and
includes service delivery and performance monitoring from all services. The Performance &
Improvement Team have developed an annual review cycle which begins at Quarter 3 each
year and forms the basis of an annual review of all the Key Performance Indicators (KPI’s),
with a view to explore new targets, improved performance and the development of new service
KPI’s. This review resulted in an improved alignment across 12 service specified areas being
monitored over 2024/25, an increase from 8 service specified areas monitored in 2023/24.
4.1 Analysis of Key Performance
Overall performance against the 84 KPI has been broadly consistent with FQ1 and FQ3
reporting 49% and 50% KPIs on track respectively. FQ2 24/25 recording a peak of 58% on
track however performance noted a fall to its lowest recorded in FQ4 at 43%. This is explored
further in the narrative.
FY Q1 24/25 FY Q2 24/25 FY Q3 24/25 FY Q4 24/25
Service performance for FQ4 24/25 identifies performance against the 12 service reporting
categories as below:
Page 82

Page 83

Page 7 of 78
The performance narrative attached to each of the KPI’s is used to demonstrate key areas of
continued improvement for the HSCP and is supported by an Annual Performance &
Improvement Review Cycle, this ensure that all KPI’s are revisited yearly, and updates and
improvement made to ensure performance objectives remain both relevant and supportive.
This analysis identifies performance across the 12 service reporting categories within the
Integrated Performance Management Framework (IPMF) and performance commentary is
provided by Heads of Service and Service Leads as part of their one-to-one sessions with
analysts.
4.2 Children & Families
Children & Adolescent Mental Health Services (CAHMS) will increase the proportion of
children and young people seen within 18 weeks of referral
CAHMS services performance is reported nationally with the 18-week target of 90% set at a
national level. Trend analysis indicates that for 2024/25, the CAHMS services have not met the
target of 18 weeks across all four quarters. Quarterly performance peaked at 72.7% in Q2, and
Q3 recorded the lowest at 39.4 being 46% off target. Over the year period 114 young people
were seen by the service with 62 of those being seen within the 18 weeks from referral target
resulting in 54% being seen within the timeframe.
Page 83

Page 84

Page 8 of 78
Improve the number of teams that have delivered 75% or more of the Universal Health
Visiting Pathway (UHVP)
Performance has been stable across the year, with trend analysis indicating that
performance improved through the year with both Q2 and Q3 achieving above target.
There were 2260 UHPV’s due during the year with 1683 being delivered. Teams averaged
a 73% delivery rate across the year
4.3 Strategic Planning & Performance, Telecare & Digital
Increase the percentage of Telecare users with a digital device as a percentage of all
Telecare users.
The proportion of telecare clients with a digital device has increased steadily throughout the
year, rising from 52.5% in Q1 to 73.9% in Q4. This demonstrates consistent progress,
however the rolling target of 90% digital adoption by year end was not achieved, with 73.9%
recorded at FQ4, 16.1% below target.
Page 84

Page 85

Page 9 of 78
Increase the number of patients being seen by ‘Near Me’ Clinics
The number of digital clinic appointments delivered via the Near Me platform for Argyll and
Bute residents varied across the quarters compared to the target of 1,025 appointments per
quarter. The year began close to target with 1,014 appointments in Q1 and 999 in Q2, both
marginally below the target
Health and Social Care Partnership Freedom of Information (FOI) requests are
responded to within statutory timescale of 20 working days
The proportion of Freedom of Information (FOI) responses submitted within statutory
timescales showed high compliance but did not consistently meet the 100% target.
Quarterly target of 100% was met in FQ2. Q3 and Q4 each recorded 96%, while Q1 was
the lowest at 93%
Page 85

Page 86

Page 10 of 78
4.4 Primary Care
Achieve a minimum 95 percent uptake for the 6 in 1 vaccination in children by the
time they reach 1 year old.
Uptake of the 6-in-1 vaccination in children by age one remained close to the 95% target
across all quarters. The target was met in Q2 with a recorded uptake of 96%. In Q1, Q3,
and Q4, uptake was slightly below target at 93%, 93%, and 94% respectively.
All GP practices operating at ‘level 0’ resulting in no reduction of services
GP practices consistently operated at 'Level 0', indicating no reduction in service delivery
across all four quarters. The target of 100% in every period was met, demonstrating full
service availability and no reported service constraints within general practice during the
year. Add locum usage
Page 86

Page 87

Page 11 of 78
4.5 Public Health
Increase the monthly number of smoking quit dates, supported by NHS smoking
cessation advisors or jointly through shared care with pharmacy, by people in the
most deprived 40% areas in Argyll.
Over the past year, performance has consistently exceeded the target of 10 each quarter.
Overall, the number of quit dates set reflected an upward trend in performance, with quit
dates rising from 11 in Q1 to a year end peak of 43 in Q4.
Increase the number of referrals to community link workers supported by the “We
are with you” service.
Performance has consistently exceeded the target of 101 throughout the year,
demonstrating a strong upward trend across all four quarters of 2024/25. Q2 recorded the
highest number of referrals at 212 against a target of 101, representing a 107.8% increase.
above target.
Page 87

Page 88

Page 12 of 78
4.6 Hospital Care & Delayed Discharge
Reduce the number of people delayed in hospital at Monthly Census Point
Over the past year, our target was to sustain our performance in relation to the overall
number of people delayed in hospital to no more than 31 at census point. This was
achieved in Q2 only, and the number of delayed people spiking at 43 by Q4. The
fluctuation in performance highlights the systems pressures faced. There is a significant
ongoing effort to manage delayed discharges.
A&E Attendances in A&B hospitals meet the 4 hrs wait target
Hospital attendances are represented as part of the nationally reported A&E activity
recorded within the Lorn & Islands General Hospital against the four hour national target.
The data notes an average of 91 % across all four quarters of 2024/25, remaining just
below the 95% target. Overall increases in A&E admissions across 2024/25 will be a
contributing factor.
Page 88

Page 89

Page 13 of 78
4.7 Finance
Reduce the cost of hospital stays as a result of a Delayed Discharge
This indicator utilises an indicative cost model which is linked to Delayed Discharge
performance across the HSCP. The target set for this year was only achieved in Q2
(29% below target) with FQ3 reporting 43% above target. Overall, there was an
increasing cost trend over the year, linked to increase hospital bed stays activity across
2024/25
Monitor Older People External Residential Placement Budget Spend (% Variance)
The 2024/25 the older people external budget spend met its target by Q4 with actual spend
just below the forecast spend for the financial year. Q2 was the lowest spend against
forecast with the quarter spend being 28% below the forecast. At no point did the actual
spend exceed the forecast spend. The key target to ensure that spend did not exceed the
preceding year.
Page 89

Page 90

Page 14 of 78
Unpaid Carers across A&B Carers Centres
4000
3500
3000
2500
2000
1500
1000
500
0
The number of carers across the Carers Centres has shown a sustained upward trend,
consistently exceeding the target of 3000. On average, around 3485 carers were engaged
each quarter throughout the year. This reflects ongoing work to engage and support carers
across the area.
Increase the number of Unpaid Carers across A&B Carers Centres
Young Carer Statements completed across A&B Carers
Centres
60
50
40
30
20
10
0
Although there was a small drop to 41 in the final quarter, overall activity remained strong,
with an average of 39 Young Carer Statements completed each quarter. Over the past
year, the number of Young Carer Statements completed by Carers Centres increased
steadily, from 26 in the first quarter to a high of 53 in the third quarter. The preceding year
target of 4 notes the commencement of activity and the forthcoming years target will build
on the 2024-25 performance.
Increase the number of Young Carer Statements completed across A&B Carers
Centres
4.8 Carers
Q1
2024/25
Q2
2024/25
Q3
2024/25
Q4
2024/25
Unpaid Carers supported 3296 3359 3483 3804
Target 3000 3000 3000 3000
Q1
2024/25
Q2
2024/25
Q3
2024/25
Q4
2024/25
Young Carer Statements
completed 26 35 53 41
Target 4 4 4 4
Page 90

Page 91

Page 15 of 78
AHP Community Patient Discharges
2400
2000
1600
1200
800
400
0
Discharges of AHP Community Patients have largely increased over the year, with only a
small recent decline. All quarterly figures remained above the set target of 1632 per
quarter. Discharge monitoring supports capacity within our teams with an whole system
impact is flow is not achieved.
Increase the number of AHP Community Patient Discharges
New Outpatient Referral waits breaching >12 weeks for AHP
services
600
500
400
300
200
100
0
Referral waits breaching the >12-week threshold have steadily declined over the year, now
falling below the set target of 500. An average of 487 waits were recorded across the year
per quarter.
Reduce the number of New Outpatient Referral waits breaching >12 week waits for
AHP services
4.9 Allied Health Professionals
Q1
2024/25
Q2
2024/25
Q3
2024/25
Q4
2024/25
OP referral wait breaching 12
weeks AHP 552 504 467 425
Target 500 500 500 500
Q1
2024/25
Q2
2024/25
Q3
2024/25
Q4
2024/25
Community Patient Discharges 1878 2034 2027 1991
Target 1632 1632 1632 1632
Page 91

Page 92

Page 16 of 78
4.10 Care at Home / Care Homes
Increase the percentage of older people who had their homecare monitoring review
completed within 6 months.
Performance showed gradual improvement per quarter across the year, against a target of
49%. FQ1 noted 31%, with a steady upward trend, reaching 52% in Q4. This
demonstrates a positive, consistent trend with steady progress. The variation reflects
successful efforts to not only meet but surpass the target by the end of the year.
Reduce unplanned admissions to A&B hospitals directly from a care home
The target to reduce the number of unplanned admissions directly from a care home was
36. This was achieved in only one quarter (FQ2), with the average over four quarters
being 42. Q3 had the highest number of admissions at 47, approximately 31% over the
target. Overall, the trend was inconsistent, showing brief improvement/on target position
in Q2, followed by a rise in Q3 and a slight decline in Q4.
Page 92

Page 93

Page 17 of 78
4.11 Adults with Long Term Conditions
Reduce the number of people waiting for a new mental health outpatient service
more than 12 weeks
The number of people waiting more than 12 weeks for a new Mental Health Outpatient
service remained above the target of 390 in all four quarters. The number of waits
increased steadily over the year, from 383 in Q1 to 549 in Q4. This represents a year-on-
year rise in long waits compared to 2023/24, when performance was consistently below
the target. The data suggests growing pressure on service capacity during 2024/25.
Page 93

Page 94

Page 18 of 78
Increase the Percentage of Adult Support and Protection Screening Duty to Inquire
Assessments completed with 5 working days.
Performance against the target of 70% for completing Adult Support Protection
Screening Duty to Inquire Assessments within 5 working days remained below target in
all quarters. The highest performance was recorded in Q1 (56.0%) and Q4 (55.0%), with
lower levels seen in Q2 and Q3 (both 30.0%). While there was some improvement
compared to the lower results seen in parts of 2023/24, the target was not achieved in
2024/25. This data is now recorded in Eclipse and we would expect to see performance
increase on the basis of better measurement.
Page 94

Page 95

Page 19 of 78
5. Financial Performance and Best Value
5.1 Financial Performance
The IJB is committed to the highest standards of financial management and governance. It is
required to set a balanced budget and seeks to deliver Health and Social Care Services to
the communities it serves within the envelope of resources available to it. Financial
performance is reported in detail to the IJB at each of its meetings and to its Finance and
Policy Committee. It also publishes its Annual Report and Accounts which are subject to
independent external audit.
5.1.1 Financial Performance 2024-25
The 2024/25 financial year has been a particularly challenging one for the IJB. As planned, it
has used a substantial element of its general reserves (£4.2m) to fund health and social care
activity during the year beyond its recurring budget. However, the IJB additionally overspent
on its Social Work / Social Care budget by £2m or 2%. This was as a result of increasing
demand for older adult services, unfunded inflationary pressure and increased use of agency
staff to provide services due to staffing shortages. The overspend was funded through the
utilisation of non-recurring savings relating to a temporary reduction in pension fund
contributions due to the Strathclyde Pension Fund.
Reserves increased slightly as a result of additional funding, largely to pay for expected
future costs relating to NHS pay arrangements, however General Reserves, which are
available to the IJB to spend at its discretion, reduced from £7.8m to £2.6m. The overall
financial resilience of the IJB has therefore reduced and reliance upon non-recurring savings
is not sustainable beyond the 2025/26 year. As a result of the small overall increase in total
reserves the accounts present a positive summary of financial performance despite the
overspending on adult social care. Whilst any overspending is of concern, the HSCP has
been able to fund its activities without reliance on extra support from either partner that it is
required to repay. The broader context within which the HSCP is currently operating is
extremely challenging with increasing financial pressures being experienced across health
and care services in Scotland.
The HSCP is managing its financial position and is taking action to bring spend back into
alignment with funding. This will have an impact on how services are being planned and
delivered in the context of:
• on-going inflationary pressure (pay costs and commissioned service costs);
• increasing demand as a consequence of demographic change and social factors;
and
• persistent recruitment and retention (workforce availability) challenges.
These factors are having an impact on financial performance as funding has not kept pace.
The HSCP has been able to operate at a level that is in excess of funding due to the
financial resilience it had built up in prior years, unfortunately this is no longer possible.
Page 95

Page 96

Page 20 of 78
The overall financial position of the IJB is reported in detail in the annual accounts, the table
below summarises overall spend against the funding totals:
Service Spend
£000
Funding
£000
Funds
Transfer
£000
(Surplus) /
Deficit £000
Social Work Services 96,754 80,875 15,879 -
Health Services 284,529 301,276 (15,879) (868)
GRAND TOTAL 381,283 382,151 - (868)
A more detailed analysis of financial performance is available from the published accounts
and from IJB reports which are publicly available.
5.1.2 Savings Delivery
The budget for 2024/25 included a savings target of £6.6m. As at the year end, £5.1m or
77% of the target was delivered. The HSCP needs to continue to improve its efficiency and
deliver best value. It manages its savings programme rigorously and recognises that this is
critical to longer term financial sustainability.
5.1.3 Financial Outlook, Risks and Plans for the Future
The IJB has a responsibility to make decisions and direct service delivery in a
way which ensure it operates on a financially sustainable basis within the finite
resources available to it. There are significant on-going cost and demand
pressures across health and social care services as a consequence of
demographic change, new treatments, increasing service expectations and on-going high
inflation. Managing these pressures and funding uncertainty is becoming increasingly difficult,
the real value of budgets continues to be eroded by price and cost increases. There is on-
going requirement to improve efficiency, deliver savings and transformation plans.
Due to the worsening financial context facing health and social care the HSCP anticipates that
it will be seeking to identify ways in which it can deliver substantial savings in the coming
years, it is likely that this will have some impact on the delivery of care. The priority will be to
continue to support the most vulnerable within the communities we serve.
The HSCP continually updates its forward financial plans to recognise and plan for the impact
of new policy priorities, emerging cost pressures and funding allocations. Additionally, robust
risk management processes are in place which seek to identify and quantify the financial risks
facing the HSCP. Key risks currently facing the partnership include the sustainability of service
providers, the impact of inflation, staff availability and costs, and increasing demand for
services.
The Annual Report and Accounts for the year provide further detail and analysis in respect of
financial performance, financial risks and governance arrangements and improvement plans.
Page 96

Page 97

Page 21 of 78
5.2 Principles of Best Value
The IJB has a statutory duty to provide best value as a designated body under
section 106 of the Local Government (Scotland) Act 1973. The Annual Performance
Report sets out how the IJB fulfilled its obligations for best value in that year. The
Annual Performance Report is publicly available. A short summary against the 8
best value themes is given below:
Vision and Leadership
The IJB and Senior Leadership team set clear direction and strategy as expressed in the
Strategic Plan and Commissioning Strategy. There are strong mechanisms for contributions
from the Locality Planning Groups and the Strategic Planning Group into these documents.
The IJB has approved its budget and Savings Plan for the 2025/26 financial year.
Governance and Accountability
The IJB has an open and transparent governance system in place. It seeks to continually
develop and improve in response to emerging good practice and independent audit review.
Support for the system of governance is provided by Argyll and Bute Council, this ensures that
it is properly administered. Comprehensive and clear Board minutes and papers continue to
be published and meetings are open to the public.
Effective use of resources
The Finance & Policy Committee meet regularly to scrutinise performance against budget, the
delivery of savings and the Transformation Programme. Improving financial management and
governance has been a priority for a number of years, steps taken have contributed to the
improved financial performance and resilience of the HSCP. It continues to seek to identify
ways of improving efficiency and has been able to invest in longer term service transformation.
The financial and demographic challenges facing the health and social care sector are
resulting in increasing financial pressure and renewed focus on efficiency, savings and service
reductions.
Partnership and Collaborative Working
Effective partnership working is a core element of the way in which the IJB has been
established. The IJB works closely with NHS Highland and Argyll and Bute Council. The Chief
Officer is a member of both Strategic Management Teams. In addition the HSCP works closely
with third sector partners and its commissioned service providers by holding regular meetings
with strategic partners and stakeholders. This has continued throughout 2024/25 and
illustrates an ethos of partnership working.
Community Responsiveness
The Locality Planning Groups ensure that local concerns are considered and feed into the
Strategic Plan. A review of these groups has taken place in 2025. The Engagement Strategy
ensures that consultation and engagement is carried out before policy changes are agreed. A
Page 97

Page 98

Page 22 of 78
commitment to co-production is an underlying theme and work is now underway to develop
new models of service delivery with community based partners.
Fairness and Equality
A commitment to fairness and equality is at the core of the IJBs purpose, strategy and vision.
The HSCP provides a wide range of essential and critical services to the most vulnerable in
society. Equality Impact Assessments on new projects plans and strategies include an
assessment of socio-economic impacts and islands impacts.
Sustainability & Carbon Reduction
Carbon reduction is an important objective for all public bodies. There are a number of strands
to the IJB approach which are detailed within Appendix One; JSP Monitoring Report.
Performance, Outcomes & Improvement
The HSCP reports performance in a holistic way and it has implemented its Integrated
Performance Management Framework. It continues to work to increase activity levels and
address the backlog of treatment and diagnosis. Addressing the backlog and long waits are a
priority for NHS services across Scotland. A further priority remains the management of
delayed discharges from the acute sector, within Argyll & Bute and from Greater Glasgow &
Clyde. The HSCP continues to perform well by this measure despite the service challenges
it has faced throughout the year.
Page 98

Page 99

Page 23 of 78
6. Engagement
HSCP Engagement Strategy
In September 2023 the HSCP published a new Engagement Framework to set out our
strategic intentions to effectively engage with staff, partners, carers, people who use
services and the wider population. This strategy, which was ratified by the IJB, ensures the
HSCP meets the requirements of Healthcare Improvement Scotland's national guidance,
Planning with People. Across the organisation, there is recognition that gathering a range of
views can help us to deliver more effective health and social care services.
The Engagement Framework was developed by a working group made up of HSCP officers
and partners including the Third Sector Interface, Healthcare Improvement Scotland and
community representatives. This group has now formally constituted as a subgroup of the
Strategic Planning Group and will meet quarterly. Ongoing activity since September has
focussed on quality assurance of the Framework in line with national standards on Planning
with People.
The Engagement Framework includes the following four quality standards:
• Engagement is planned, proportionate and meaningful and effective
• Representatives are supported in their role
• Engagement of people in service planning
• Positive culture where staff feel valued and engaged
A report on progress against these standards was presented to the IJB and this is available
to view here: Argyll and Bute HSCP Engagement Quality Standards (scot.nhs.uk)
The HSCP collated an action plan of engagement activity to be conducted over 2024-2025.
This included 35 separate projects where engagement would be carried out. The outputs of
this activity are reported within the body of this report.
Link to the 2024-25 Engagement Plan
Full details of the HSCP's approach to engagement can be viewed here: Public engagement
| NHS Highland (scot.nhs.uk)
This report below links to a self-evaluation process undertaken by the Health and Social
Care Partnership (HSCP) in the summer of 2024 to review our engagement strategy and
processes. This process was in-line with Healthcare Improvement Scotland’s Quality
Standards for engagement .
Link to Self-assessment report September 2024.
The Equality Outcomes and Mainstreaming report was presented to the IJB in May 2025
with the outcome for 2025-29 with the survey results.
Argyll and Bute HSCP Integration Joint Board (IJB) on Wednesday, 28 May 2025
Page 99

Page 100

Page 24 of 78
Appendix 1
Health & Wellbeing Outcome Indicators (HWBOI’s) & Ministerial
Steering Group Indicators (MSG)
It is worth noting that the indicators for both the HWBOI’s and MSG are currently being updated
nationally. Public Health Scotland has indicated that a full up to date data set for the 2024/25
Financial Year will not be available until July 2025. The tables below are based on the most
recent published and available data set.
The HSCPs overall performance against the Scotland-wide baseline is noted as below.
HWBOI – Survey Results
The below table shows that for 55.5% (5 of 9) of HWBOI measures A&B HSCP has values
that are above all-Scotland baseline. It is worth noting that performance will be influenced by
and vary in line with the total number of respondents participating in this voluntary survey. As
such, comparisons between different years may not represent true trends. Benchmarking
performance against 7 comparator HSCPs is noted below.
HWBOI Survey Results – Comparison to similar HSCPs
Note Indicators 17 and 19 are reported at FY 24/25 with measures 11, 12, 13, 14, 15, 16, 18
reported as at Calendar year 2024 as a proxy for 2024/25 due to the national data for
2024/25 being incomplete. This is in line with guidance issued by Public Health Scotland
which was communicated to all Health and Social Care Partnerships. Using more complete
calendar year data for 2024 should improve the consistency of reporting between Health and
Social Care Partnerships
Page 100

Page 101

Page 25 of 78
HWBOI Performance Indicators from service data
Looking at the core HWBOI indicators that are based on service data, the HSCP’s
performance is above the all Scotland baseline for 6 out of 9 indicators. Note Indicators 17
and 19 are reported at FY 24/25 with measures 11, 12, 13, 14, 15, 16, 18 reported as at
Calendar year 2024 as a proxy for 2024/25 due to the national data for 2024/25 being
incomplete. This is in line with guidance issued by Public Health Scotland which was
communicated to all Health and Social Care Partnerships. Using more complete calendar
year data for 2024 should improve the consistency of reporting between Health and Social
Care.
Page 101

Page 102

Page 26 of 78
Page 102

Page 103

Page 27 of 78
Ministerial Steering Group Indicators
MSG Indicators 1.1, 1.2 and 2.1 are reported at Calendar Year 2024 as a proxy form
2024/25. This is in line with guidance issues by Public Health Scotland which was
communicated to all Health and Social Care Partnerships/ MSG Indicators data notes that all
MSG measures have sustained higher activity or have increased in the last reporting year.
Activity around Emergency Admissions, Unplanned Bed Days, A&E attendances and
Delayed Discharge Bed Days all noted performance exceeding pre-Covid levels. This
highlights the necessity to consider approaches to alleviate systems pressures around
Urgent and Unscheduled Care and expedite hospital flow, particularly around A&E
Admissions and Delayed Discharges.
Ministerial Steering Group
Indicators 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25
MSG 1.1 - Number of
emergency admissions* CY 8,374 8,231 6,917 7,820 7,928 8,933 8,879
MSG 1.2 - Number of
Admissions from A&E* CY 5,244 4,945 3,668 5,040 4,957 5,097 5,502
MSG 2.1 - Number of
unplanned bed days acute
specialties* CY
65,794 64,008 53,390 67,255 77,094 77,882 80.655
MSG 2.2 - Number of
unplanned bed days MH
specialties
13,747 13,204 11,208 9,049 9,212 11,575 11.380
MSG 3.1 - Number of A&E
attendances 13,985 14,171 10,091 15,646 16,774 17,740 22,456
MSG 3.2 - % A&E attendances
seen within 4 hours 93.4% 91.7% 93.1% 88.9% 83.9% 83.0% 83.0%
MSG 4.1 - Number of DD bed
days occupied 9,530 7,863 5,354 7,742 11,929 12,757 14,042
MSG 5.1 - % of last six months
of life by setting community &
hospital
90.0% 89.6 90.80% 90.80% 89.60% 89.40% N/A
MSG 6.1 - % of 65+ population
at Home (unsupported) 92.1% 92.1% 92.5% 92.6% 93.2% 93.4% N/A
Page 103

Page 104

Year Three Progress Report
Appendix 2:Joint Strategic Plan 2022 -25 Progress Update Report
Page 104

Page 105

Page 29 of 78
Digital Health and Care Strategy ....................................................................... 76
Technology Enabled Care (TEC) ........................................................................ 77
Corporate Services ........................................................................................... 78
Page 105

Page 106

Page 30 of 78
Children and Young People
Priorities Year 3 Progress Update
Carried
over
2025/26
Yes/No
Continue to deliver on the
priorities within the Children
and Young Peoples Service Plan
(CYPSP).
No update provided, however CYPSP priorities continue to be
delivered.
Yes
Continue to monitor and
evaluate progress in all our
service plans.
No update provided, however all service plans continue to be
monitored and evaluated.
Yes
Continue to deliver on the
Corporate Parenting Plan.
No update provided, however the Corporate Parenting Plan
continues to be delivered.
Yes
Develop programme of change
in relation to the Children’s
Promise Change programme.
No update provided, however the programme of change
continues to be delivered.
Yes
Continue to engage with
Children and staff on
transformation agenda.
Engagement continues, a good example is:
Child-friendly Reporting in Argyll & Bute Council |
Improvement Service
Yes
Please outline any activity in relation to service commissioning, i.e. revisions to specifications, new
services, reviews of existing contracts. Terminations of contracts. (previous updates below)
Previous Service Update
The Children’s Services commission services on an as needed basis.
The services which are commissioned are dominated by external specialist placements costing up to £500k a
year. Despite tight governance these placements are increasing in number. It is clear that the damage down
by public health lockdowns is now showing through increasing need. This is does not feel like a ‘blip’ in the
level of need but the new norm. This need will have to be met as often the issues are coming through at the
level of child protection.
Through the Whole Family Wellbeing Fund in conjunction with education & police colleagues we have
commissioned the TSI to consider how we facilitate and mobilise the third sector in A&B.
It is clear that funding streams for children come via Social Work, Education, Health, CPP and other routes.
This can lead to a piecemeal approach. There is an imperative to look at how we consider commissioning and
budgeting beyond professional or organisational boundaries. We need to be acting as a unitary children’s
authority no matter where the organisational boundaries land.
There is now a requirement for all funding to ensure it is child based. Children should not be disadvantaged by
budgetary processes.
Page 106

Page 107

Page 31 of 78
Current Update from Commissioning
There is currently a mapping of children and young people services being undertaken by A&B TSI as well as a
review of all external placements. This will involve capacity building in the third and community sector.
Engagement Activities Taken Place in 2024/2025
Engagement continues, a good example is:
Child-friendly Reporting in Argyll & Bute Council | Improvement Service
Child poverty
Priorities Year 3 Progress Update
Carried over
2025/26
Yes/No
Look at how best to utilise
progress we have achieved in data
analysis in order to target those in
not fully claiming benefit
entitlement and advise them
accordingly.
Considerable progress has been made with
improving ways of identifying those not in full
receipt of benefit entitlement, enabling the benefits
service and advice services to focus on them. Argyll
& Bute has made an important contribution to data
work on child poverty at the national level and
continues to do so, helping to identify and work
towards achieving legal gateways as well as
improved use of data sets.
Yes
Employability Partnership to
employ a Poverty Coordinator to
work with those experiencing
poverty and look at ways to
improve their access to
employment.
This action was completed, and the Poverty
Coordinator has contributed to improving access to
employment, including producing a leaflet to
support understanding, choice and decision making
in this area.
Yes
Financial Advice and Inclusion
Group and Child Poverty Action
Group to continue to work
together to identify and tackle
factors that contribute to local
cost of living concerns.
This has continued to happen, and this working
relationship is proving effective in identifying need,
encouraging joint working, and monitoring change.
Yes
Review and revise the
Communications and Engagement
Plan and use to improve
community engagement with
child poverty work in Argyll and
Bute.
This has not progressed as was hoped in terms of
direct work by the Child Poverty Action Group and
this needs to go forward in the coming year.
However, the Poverty Alliance have worked with the
group on their project “Taking Action on Rural
Poverty”. This project has set up a lived experience
group that is now actively engaged, giving opinions
and advocating actions.
Yes
Review staff training and
development needs in the area of
child poverty and begin to roll out
poverty awareness training to
staff.
Money Counts Training has continued to be rolled
out. However, funds have not been available to roll
out other training, such as awareness raising etc.
that would contribute to service improvement.
Yes
Look at changes in Argyll and Bute
over the last three years, in terms
of demographics and the
Considerable challenges to economies worldwide
and continued instability has made it difficult to
meet targets nationally. In Argyll and Bute transport
Yes
Page 107

Page 108

Page 32 of 78
economy / employability. How do
these changes impact on the work
and actions of the Child Poverty
Action Group and its members?
and childcare provision remain key issues when
addressing both the cost of living and employability,
particularly in remote, rural and island places.
Demographic issues, including an aging and reducing
population, combined with housing shortages in
some areas, to produce key worker shortages. The
Child Poverty Action Group and its members
continue to work together to address employment,
benefit and cost of living challenges whilst
identifying ways to tackle the impacts of child
poverty.
Further develop the role and
purpose of the Child Poverty
Action Group and consider
resource issues.
The Child Poverty Action Group has welcomed new
members. It has also played a key role on a national
basis, with improving the use of data analysis in
tackling child poverty. It has also partnered with the
Poverty Alliance to establish a lived experience
group to directly hear their views. On a national
level, group members have taken part in important
consultations and given evidence to government
committees. Resource issues are currently being
looked at as it is recognised that areas like training
and coproduction require a budget.
Yes
Review the Child Poverty Action
Plan and consider what is
required to meet the Scottish
Government final targets in 2030.
Child poverty reduction targets in
2023.
This took place and key areas identified, such as
transport, housing, childcare provision and the
islands premium were looked at. There are external
factors that mean that child poverty has risen
slightly in nearly every region of Scotland and the
Scottish Government will not reach its interim
targets. However, Scotland is doing significantly
better than England and Wales in this respect.
Yes
Begin to develop a Data Base to
improve monitoring and focus of
resources locally. Begin to use it
to improve the work of the Child
Poverty Action Group and services
locally.
It has not been possible to progress this target this
year and it requires to be carried forward.
Yes
Engagement Activities Taken Place in 2024/2025
Group members worked with the Poverty Alliance to forward the “Taking Action in Rural Poverty Project” and
create and engage with a lived experience group. Children and young people were also asked their views on
what would help to tackle child poverty for the 2023 – 2024 Child Poverty Action Plan Review. In addition, a
graphic version of the Children’s Rights Plan and a graphic Early Years Plan were coproduced, both giving
relevant visual information and pointing to advice / resource websites via QR codes. For the 2024 – 2025
review, the graphic Plan on a Page version of the review will be coproduced with children and young people.
Page 108

Page 109

Page 33 of 78
Child Protection
Priorities Year 3 Progress Update
Carried over
2025/26 Yes/No
Local Initial Case Review
/ Significant Case Review
guidance will be updated
to reflect changes in
national practice and to
provide practitioners
with clear learning
pathways (this work will
be undertaken with APC
colleagues.
The guidance was updated and shared with relevant agencies
to reflect any changes. This included a 7minute briefing
paper. Further changes were announced last month when
considering the interface between ASP and CP; including a
change to reporting instructions to the care inspectorate. The
guidance will need further amendments to reflect this.
Yes
Receive, evaluate and act
on Child Protection
Committee (CPC) &
Performance, Quality
and Assurance reports.
Quarterly CPC will have a
framework to implement
good practice and
develop QI approaches
to improvement based
on existing good
practice. Multi agency
dataset developed based
on national minimum
dataset and used by CPC
to analyse data. Use
improvement
methodology and test of
change to dig deeper into
the data.
There has been agreement to migrate to version 2 of the
National minimum dataset, a report has been completed and
will be shared with CPC next week (8/5). Managers have met
collectively to create an additional analytic list of data that
would be helpful when considering the data to inform local
priorities and inform of key trends within CP activity. Further
meetings are arranged to implement version 2 of NMDS.
Following an audit of inter-agency child protection standards
in March 2024 we established a senior leadership group to
identify and improve standards. This also led to the
development of a inter-agency front line managers group.
Yes
All new CPC members
will receive a CPC
induction pack and will
meet with Lead Officer to
discuss the role of the CP
and expectations of CPC
members All CPC
members will attend CPC
development sessions to
contribute to the role
and function of the CPC
members will be
required to demonstrate
through the delivery of
the CPC improvement
plan that information is
This is complete and all CPC members have met with the Lead
Officer. There is a newly appointed CP Lead Officer in place
who will continue with this role of supporting new members
of the CPC and their induction.
No
Page 109

Page 110

Page 34 of 78
being disseminated
within their organisation
and that actions
attributed to their
organisation are
progressed and reported
to CPC.
Produce and implement
a biennial strategic
improvement plan which
will be monitored by the
Performance, Quality
and Assurance using a
RAG system. Red actions
will be reviewed by
Performance, Quality
and Assurance and
reported to CPC.
The Strategic Leadership Plan and the CPC Improvement Plan
have been merged. Mechanisms to monitor the progress of
the plan (RAG system) has not yet been put in place but
incomplete actions are discussed directly with CPC quarterly.
Further considerations are needed to put a system in place to
record this visually within the plan to report on and measure
outcomes in a quantitative way.
Yes
Multi agency training will
be delivered using a
tiered approach to
learning which will
include: General contact
workforce, Specific
contact workforce and
Specialist contact
workforce.
Level 1 and Level 2 CP training is in place and available on the
training calendar. This is being provided in person in various
locations across the partnership with all agencies/services
encouraged to attend
Yes
Develop and implement
training framework
which supports
practitioner knowledge
and confidence in
working with Child
Sexual Abuse which
includes Child Sexual
Exploitation and child
trafficking .
Input has been provided to the management group to raise
awareness of CSE and CSA but this has not been extended to
practitioner training. The YPSP processes are currently being
updated and this will inform future briefings and training
sessions. This is an active plan for implementation.
Yes
Domestic Abuse
Guidance and Flowchart
implementation to be
evaluated and regular
audits of referrals to be
carried out.
DA guidance has been implemented, and full CP audit
undertaken in March included cases chosen because of DA.
Yes
Improved interface
between children & adult
services particularly
where parental mental
health substance misuse
and domestic abuse are
present.
Multi-Agency practitioner events are arranged, and all
services are encouraged to come along to the training
provided by CPC Training Coordinator. The CPC and APC have
joint meetings every year. Further sessions and development
required to align the child protection and adult protection
processes, including updating the transitions procedures for
children moving from children services to adult services.
Yes
Page 110

Page 111

Page 35 of 78
Advocacy services will
engage with children on
the Child Protection
register to understand
their experience and to
provide the CPC with
recommendations as to
how things can be
improved.
Advocacy remains in place with feedback from young people,
families and agencies being very positive. Children are
receiving a timeously service and building positive
relationships with the advocate to ensure their views are
represented within the CP process. Reports to CPC via report
biannually.
Yes
Engagement Activities Taken Place in 2024/2025
CPC Practitioner Forums arranged to take place:
30th April 25 at 12.30pm – Oban
13th May 25 at 12.30pm – Lochgilphead
22nd May 25 at 9.30am – Helensburgh
28th May 25 at 9.30am – Dunoon
Bimonthly First Line Managers Meetings
Bimonthly Strategic Leadership Meetings
CPC Online Training Calendar – multiagency
Multi agency briefing sessions were put in place to update on the IRD and Pre-Birth Processes
Page 111

Page 112

Page 36 of 78
Violence Against Women and Girls
Priorities Year 3 Progress Update
Carried
over
2025/26
Yes/No
Completion of the Transforming
Responses to Violence Against
Women and Girls Project.
Project Board to carry out the
Domestic Abuse-Informed
Practice and Systems: Self-
Assessment Tool and evaluate
progress.
The Transforming Responses to Violence Against
Women and Girls Project was not concluded
because Developing Equally Safe Funding was
continued for another year.
Project board did not carry out the Domestic
Abuse-Informed Practice and Systems: Self-
Assessment Tool and evaluate progress. Initial
survey parts of the assessment process were
completed. However, staff issues meant that the
board was unable to meet to complete the process.
Yes
Completion of the Research
Project. This is to be published
and add to the evaluation
process relating to the
Transforming Responses to
Violence Against Women and
Girls Project.
The research was completed in 2023, but decisions
were made not to publish at that point. It will be
published in 2025.
No
Consider the funding needs of
the Violence Against Women
and Girls Partnership in relation
to key work areas and develop
and submit a further bid to the
next round of the Developing
Equally Safe Fund.
This process has not been possible or necessary. The
Scottish Government did not make a final decision
on the funding of the Violence Against Women
sector and continued Developing Equally Safe
Funding for another year.
No
Review the Argyll and Bute
Equally Safe Plan.
The Equally Safe Plan was reviewed and a new one
completed; this is awaiting sign off by Chief Officers
Group Public Protection.
No
Deliver Annual Return from
Argyll and Bute to the
Improvement Service / National
Violence Against Women Forum.
This was completed and delivered on time. No
Roll out of the Safe and
Together Model to continue and
this to include 2 in-house
Trainers to be trained.
An in-house trainer did complete the trainer’s course
but has subsequently left the Council. The roll out of
Safe and Together has stalled due to unavoidable
staffing issues.
Yes
Other training areas to be
delivered including: Awareness
Raising; Routine Enquiry;
Harmful Traditional Practices;
The Impact of Domestic Violence
on Children and Working with
Men.
2024 – 2025 saw the delivery of a very full and active
Training Calendar. Between 1/04/2024 and
31/3/2025 a total of 20 training events took place,
with 319 attendances.
Yes
Achieve improvement in
services and pathways relating
Whilst national training and awareness raising
events were attended and information from these
Yes
Page 112

Page 113

Page 37 of 78
to women and girls with a
Learning Disability experiencing
or, at risk of experiencing
domestic abuse.
passed onto relevant staff, it is felt that sufficient
progress has not been made in this area. Further
work remains to be done.
Review progress of the
transformation project and the
delivery of the Equally Safe Plan.
The Transformation Project was not formally
reviewed but continued forward with Developing
Equally Safe Funding. It was noted that the Safe and
Together roll out was not able to move forward and
this point due to staffing issues. The Delivery of the
Equally Safe Plan was reviewed in the Annual
Reporting process and the completion of an updated
Argyll and Bute Equally Safe Plan and Strategy.
Yes
Have in place a Communications
and engagement plan.
This has not been properly developed, and work is
required here. Staffing issues have been the main
delaying factor.
Yes
Use the Domestic Abuse-
Informed Practice and Systems:
Self-Assessment Tool to
establish a baseline for services
prior to training and service
change measures.
This still requires to be done Yes
Research to assess the impact of
the Transforming Responses to
Violence Against Women and
Girls Project, to begin.
Some research has been done with regards to the
wider training delivery. More requires to be done
but the project is to continue for another year.
Yes
Review the Argyll and Bute
Equally Safe Plan.
This is completed. No
Development of Data Base that
will assist us to monitor trends
in Domestic Violence and other
gendered violence.
A Data Group has been created but has yet to meet. Yes
Deliver Annual Return from
Argyll and Bute to the
Improvement Service / National
Violence Against Women Forum.
This has been completed, annual process that will
continue.
Yes
Engagement Activities Taken Place in 2024/2025
Whilst engaging with a broader range of staff in terms of domestic abuse awareness raising did take
place, engagement / coproduction with lived experience women did not, beyond the activity of individual
partnership members. This needs to happen in the coming year. It is hampered by the absence of any
budget for this process.
Page 113

Page 114

Page 38 of 78
Adult Protection
Priorities Year 3 Progress Update
Carried over
2025/26
Yes/No
Monitor likely impact of
national developments,
mental health law review,
national care service and
other safety activity in
trafficking etc.
The Chair of the Adult protection Committee and
Lead Officer continue to monitor national
developments impacting Adult Support and
Protection services in Argyll and Bute via their
membership of the Adult Support and Protection
Scotland Convenors group, The National
Implementation Groups (resulting from the Revised
Code of Practice), Social Work Scotland, Adult
Support and Protection Subgroup and the National
ASP Minimum Dataset sessions.
Yes
Develop enhanced service
user/citizen involvement in
processes and policy.
The revised Code of Practice for Adult Support and
Protection together with the recently developed
Care Inspectorate Quality Improvement Framework
(QIF) for Adult Support and Protection documents
have guided us in developing enhanced service user,
carer and citizen involvement in processes and
policy. Ensuring meaningful involvement in adult
protection case conferences remains a priority
activity working with our colleagues in Advocacy
services to ensure their voices are heard. The QIF
has identified for the Adult Protection Committee
what ‘very good’ involvement of adult at risk and
their unpaid carers should look like. Ensuring
meaningful involvement is a significant APC agenda
item running through 2025/26
Yes
Continue process of review
and audit.
We are currently undertaking a substantial review of
our ASP service. Staffing challenges across social
work have required us to evaluate our processes and
develop new way of working. The QIF again is
serving as an excellent tool to identify where
improvements can be made in our activity. We are
now preparing for our next substantial audit planned
for May. We will be using the Care Inspectorate
audit tool which we have revised, together with our
method of file reading, to enable us to analyse
particular areas of activity.
Yes
Develop improved data
collection based on national
dataset activity.
The Scottish Government has continued to develop
the ASP minimum dataset, via the Institute for
Research and Innovation in Social Services (IRISS),
with the aim of having a shared understanding of
information. To generate more robust meaningful
and comparative data. Collecting our data remains
challenging as we adjust to the national dataset
requirements as modifications are required to our
File Recording system – Eclipse. The Lead Officer,
Yes
Page 114

Page 115

Page 39 of 78
colleagues from our Performance and Data Team
and The Eclipse IT team all contribute to strive to
meet these challenges, recognising the value of
improved understanding of our services activity, and
the ability to plan future services.
Review Significant Case
Review (SCR) guidance and
Code of Practice changes.
We have now ratified and adopted Joint Child
Protection and Adult Protection Guidance on
Learning Reviews which have replaced Significant
Case Reviews. We have received several
notifications requesting consideration of a Learning
Review and have been able to effectively use the
guidance.
No
Develop protection links with
Child Protection, Alcohol and
Drug Partnership and
Violence to Women.
The Adult Protection Committee Chair and The Lead
Officer maintain vital links with the Lead
Professionals for Child Protection, Alcohol and Drug
Partnership and Violence against Women and Girls.
The Lead Officer is a member of their committees
and contributes to events and activities.
Yes
Continue staff support and
contact programme.
Staff support and contact has become more
important than ever as we tackle the staffing
shortages within social work, particularly the
challenges this presents in ensuring safe and
effective adult support and protection action. Team
Manager, Council Officer Forums and the recent
introduction of a daily ASP huddle are all designed to
support staff in the completion of adult protection
activities.
Yes
Meet the Improvement Plan
targets arising from
Inspection.
We continue to strive to meet our Improvement
Plan targets. Improvement in ASP is not a single step
activity, rather an ongoing process. We have
successfully introduced the requirement for
Chronology and Risk Assessments however ensuring
their quality will require continuous monitoring via
regular review and audit.
The Lead Officer is undertaking an overhaul of the
original Improvement Plan to include the key
guidance now addressed within the QIF. It is
recognised that this document was prepared
reflecting potential next stages for Inspection.
Yes
Implement Code of Practice
changes.
The Code of Practice changes continue to be
addressed on a daily basis via 1-1 worker consults,
social work supervision, specific ‘bitesize’ staff
training sessions and at the quarterly ASP Forums.
The changes have been substantial and have
required significant re-evaluation of the way in
which ASP activities have been historically
undertaken.
Yes
Implement guidance for
Primary Care and GP’s.
The Adult Support and Protection Guidance for
General Practitioners and Primary Care Teams
continue to be promoted throughout primary care.
Planned promotion of this guidance through direct
Yes
Page 115

Page 116

Page 40 of 78
contact with surgeries has been limited owing to
competing priorities and further work in this area is
required.
Progress audit activity, case
files.
We continue to request that SW Teams undertake
monthly single agency case audit on a single ASP
intervention and we are committed to ongoing
annual case file auditing after our internal audit
completed in March 2024.
Yes
Develop issues arising from
Initial Case Reviews, Large
Scale Investigation findings.
We continue to use the findings from nationally
reported Learning Reviews to inform our ASP
practice through our ASP Forums, training sessions
and supervision activities. We have focused
particularly on ensuring most effective interagency
communication and improving case recording, not
least evidencing defensible decision making.
Yes
Develop ‘escalation’ policy. We regularly escalate concerns through the formal
ASP Inquiry process as required. A draft escalation
policy is currently being developed which will need
to be adopted by a number of services, all having
significant roles in the support and protection of
adults at risk of harm.
Yes
Engagement Activities Taken Place in 2024/2025
National Implementation Group Chronologies - 10/04/2024
Joint Child Protection (CPC) Scotland and Adult Support and Protection (ASP) Convenors Scotland
Group Meeting - 17/04/2024
ASP Quality improvement Framework Self Evaluation Guidance Workshop – 07/05/2024
Joint APC/CPC Meeting – 09/05/2024
Community Justice Partnership consultation and Engagement Session - 21/04/2024
Page 116

Page 117

Page 41 of 78
Community Justice
Priorities Year 3 Progress Update
Carried over
2025/26 Yes/No
Implement and
monitor our local
Community Justice
Improvement Plan and
performance
framework.
The publication of the Community Justice
Improvement Plan has been delayed, expected
May/June 2025. However, the Community
Justice Partnership has been continuing to focus
on progression of 10 national outcomes, 4
national aims and 13 priority actions. Multi-
agency activity is ongoing across all the
Community Justice Pathways: Point of Arrest,
Through Prosecution (including Bail, Electronic
Monitoring), At Court, Community Sentences and
Liberation from Prison (including Remand).
Production of the Argyll & Bute Community
Justice Annual Report 24/25, submitted to
Community Justice Scotland, is underway. The CJ
Annual Report for 2023/2024 can be found here,
page 104.
(Public Pack)Agenda Document for Argyll and
Bute Community Planning Partnership -
Management Committee, 16/04/2025 10:00
Future reporting will be formatted around the
Community Justice Pathways
Yes
Review the progress of
the Justice Social Work
(Community Justice)
Service Plan, support
future developments.
The JSW service plan 2025 – 28 is being
developed to establish new priorities and areas
for development in line with Scottish
Government policy and revised national
guidance. The service plan will be linked into a
wider overarching Performance and Quality
Assurance Framework for the service.
The need for an overarching framework was
identified as a need following the self evaluation
of JSW by Care Inspectorate in the latter months
of 2024. We are still awaiting formal feedback
from the Care Inspectorate on this.
In relation to the JSW Service Plan 2022 – 25, I
can report that most areas were achieved
including
• Improvements in Diversion from Prosecution
practice,
• Successful Implementation of new national
Justice Social Work report template
• Successful Implementation of new national
Throughcare and Aftercare Release Licence
Reports and protocols.
Yes
Page 117

Page 118

Page 42 of 78
• Continued rollout of Bail Supervision Scheme
and use of Structured Deferred Sentences as
per national policy direction
• All Justice Social Work Staff trained in
Schema Therapy and DBT to improve
interventions and trauma responsive services
• Implementation of Justice Eclipse system
• Monthly Audit Programme ensuring regular
audits across all areas of JSW activity
• Completion of the LAAS pilot project to
deliver voluntary throughcare service
Notable areas of focus for the 2025 – 28 Service
Plan include
Pilot of Advance-D Domestic Abuse Perpetrator
Programme
Implementation of the suite of new/revised
national guidance which will be introduced
throughout 2025: Diversion from Prosecution,
Bail Supervision, Home Detention Curfews,
National Outcomes and Standards for Community
Sentences
Development of Unpaid Work
Joint work with Recovery services
Continuation of audit programme and focus on
quality assurance
Page 118

Page 119

Page 43 of 78
Implement and
monitor the
improvements related
to the jointly
commissioned Violence
Against Women & Girls
research.
There has been a delay in publishing the study,
due in part to wanting to demonstrate progress
on some of the recommendations so that this
could be seen alongside the study.
In the interim progress has been made in:
• Awareness Raising and understanding of the
Safe and Together model.
• Developing a trauma informed workforce.
• Informing staff skills base and understanding
of the lived experience of women and
children through a range of training events in
key areas; these include:
 Trauma Impacts of domestic abuse on
women and children and how to work
with these.
 Routine Enquiry; asking the question.
 How the Police Deal with Domestic Abuse
and support victims.
 Domestic Abuse and Child Contact Issues.
 Domestic Abuse in Single Sex, Female
Relationships.
 Dealing with Disclosure of Sexual Assault.
 Animal Abuse as a Form of Coercive
Control.
 Human Trafficking.
 Commercial Sexual Exploitation.
 Harmful Traditional Practices.
 Working with Perpetrators Towards
Change.
 Working with Men; working with Fathers.
Other things that have happened to improve staff
awareness and skills and, hence, improve services
to lived experience women, have included:
• The increase in the number of key agencies
who are members of the Violence Against
Women and Girls Partnership. This supports
better communication and joint working.
• Information / leaflets for both staff and lived
experience women are currently being
developed.
No
refer to VAWG Section
Carry out a validated
self-evaluation of our
Community Justice
Partnership in line with
the Care Inspectorate
guidance.
Ongoing. Prioritising of Legal Compliance;
Leadership, Engagement & Partnership Planning;
and Public Protection sections. Justice Social
Work carried out a self-evaluation for the service
during 2024/2025, awaiting feedback from the
Care Inspectorate.
No
included as part of
implementation of CJ Plan
Review the learning
from the first phase
jointly commissioned
research report for
Refer to update above No
Page 119

Page 120

Page 44 of 78
During 2024/2025 engagement continued the wide range of organisations and services included
national and local public and third sector, this was based around the four aims, thirteen priority
actions and ten national outcomes for community justice. Engagement with a range of
representatives from the following:
The activity focused on reviewing the requirements within the national documentation, creating
baselines for where we are and identifying where there is capacity for improvement within current
resources and what requires additional national resources.
Engagement Activities Taken Place in 2024/2025
Violence Against
Women & Girls and
implement key
recommendations.
Children, Families & Justice Social Work Employability Partnership
Housing Community Planning Area Planning Groups
Police Scotland We Are With You
Scottish Fire & Rescue Service Carr Gomm
Skills Development Scotland Hope Kitchen
Third Sector Interface Lomond and Argyll Advocacy Service
Drug & Alcohol Recovery Service Blue Triangle
Mental Health Service Inspiralba
Health & Social Care Partnership Bute Advice
Alcohol & Drugs Partnership Community Justice Scotland
Violence Against Women Partnership Scottish Prison Service
Scottish Government Scottish Violence Reduction Unit
Page 120

Page 121

Page 45 of 78
Public Health
Priorities Year 3 Progress Update
Carried over
2025/26 Yes/No
Continuation of
previous year’s
activity and new
activity to be
agreed in
partnership.
Argyll and Bute HSCP Public Health team continued
to work on the below activities, agreed according to
national priorities, assessment of local need and
through joint working with a range of partners.
Yes
Deliver on joint
Health
Improvement plan
between Argyll
and Bute and
north Highland.
A joint Health Improvement plan has been
developed between Argyll and Bute and Highland,
with a view to delivering some activity NHS
Highland-wide. The aim is to share learning and
streamline pieces of work where relevant. In year
three of this workplan, joint training continues to be
delivered as follows:
• Money Counts – virtual training opportunity
which is
available for any staff and partner organisations
across NHS Highland and Argyll and Bute. This is
delivered by Health Improvement staff and in
year 3 was also supported by Argyll and Bute
Council staff. It
aims to raise awareness of poverty, how to raise
the issue of money worries, and where to
signpost/direct people for additional support. It
also raises awareness of the Argyll and Bute
Worrying About Money leaflet. In 24/25, 4
courses were delivered across NHS Highland,
with 27 attendees.
MAP of Health Behaviour Change – The aim of this
course is to give practitioners skills and confidence
to notice, discuss and support opportunities for
patients to make and maintain behaviour changes.
The course focuses on person-centred
communication skills. In 24/25 3 courses were
delivered to 27 attendees. The course continues to
be delivered quarterly across NHS Highland and in
25/26 will be complemented by skills coaching
sessions and training additional trainers.
Yes
Addressing
inequalities: child
poverty; poverty;
children’s rights;
equalities;
The Public Health team have continued to undertake
work addressing inequalities. This is threaded
throughout all our work, and includes specific action
as detailed below:
• In partnership with Scottish Government
Screening Inequalities Fund, we were able to
increase capacity dedicated to reducing
Yes
Page 121

Page 122

Page 46 of 78
inequalities in screening programmes. A Health
Improvement Officer worked with 3rd sector
organisations in Argyll and Bute to build capacity
for promotion of screening programmes using a
£7500 grant fund. Projects included Wellbeing
Walks, a community wellbeing festival, an art-
based community engagement programme and
producing culturally appropriate screening
information for Gypsy/Traveller community.
• The team has led on developing new Equality
Outcomes for Argyll and Bute HSCP and
completing an equalities mainstreaming report.
This involved aligning to NHS Highland & Argyll
and Bute Council equality outcomes, consulting
with staff, services and public. These will be
published in June 2025 with the Equalities
Mainstreaming report 2021-2025, which details
how the HSCP has mainstreamed equalities over
this time period.
• The team support the Welfare Advice and Health
Partnership (WAHP) in Argyll and Bute. This
initiative aims to address financial insecurity for
individuals who may not seek support from
other means of welfare advice and in doing so
contribute to improvements in health and
reduce demands on Primary Care services.
Funding was allocated to Argyll and Bute Council
for additional resource for welfare advice
specialists, for a 2-year remote and rural pilot for
five GP practices.57% of clients had a long-term
condition. Total client financial gain from
Welfare Rights intervention from the start of the
project is £315,560.50.
The team play a role in supporting the HSCP with
their statutory duties under the United Convention
for the Rights of the Child (UNCRC). In 24/25 this has
involved supporting the Argyll and Bute UNCRC
group. The team have led a project on integrating
‘child rights and wellbeing impact assessments’
(CRWIA) into the existing impact assessments. This
integrated impact assessment will be available to
HSCP staff from 2025 onwards.
Support the
strategic direction
and delivery of the
Living Well
Programme board
and initiate
implementation of
the refreshed
Living Well
The Public Health team continue to support the
Living Well programme board with strategic
direction and operational delivery. This programme
board uses the background of the Living Well
strategy to inform a 5-year plan of prevention, by
focusing on wellness, not illness, empowering and
enabling those within Argyll and Bute to live well.
Specific detail on activities is provided below:
Yes
Page 122

Page 123

Page 47 of 78
Strategy. Within
this programme of
work, projects
include workforce
development; self-
management;
community link
working; physical
activity; mental
wellbeing.
• Supporting Living Well Programme by providing
Health Behaviour Change training to new
Wellbeing Practitioners.
• Supporting ‘Community Assets for Living Well’
workstream, which includes development of a
new Walking Development Officer Post, rolling
out Art of Hosting methodology across Argyll
and Bute, and exploring opportunities for ‘single
point of access’ to statutory and community
services.
• Evaluation of the 2019-2024 Living Well Strategy
through focus groups with key stakeholders
• Development of a strategy refresh plan for the
Living Well Strategy 2025-2030.
• Leading the tender process for the new
Community Link Worker contract 2024-2028.
This was informed by evaluation of the previous
service and engagement with CLW and primary
care staff. During 24-25, the service was
available in 121 GP practices. Between March
2022 and December 2024, the service received
1224 referrals & 90% of those who received the
service and completed an outcome
questionnaire reported an increase in their
wellbeing. In addition, the Public Health team
worked with Living Well partners to draw in
external funding for the service. This has
resulted in a remote and rural service expansion
from 2024 onwards and resource for evaluating
CLW in island communities.
• Work has continued to embed RSPB Nature
prescriptions across Argyll and Bute. RSPB
Nature Prescriptions are a free, non-medical
approach based on accessible connections to
nature that will improve wellbeing by engaging
with nature in a personal and meaningful way. In
24/25 these were used by Community Link
Workers to connect people to nature and
increase their wellbeing.
• Living Well Community Capacity fund awarded
Living Well grants to community projects and
services which met the aims and outcomes of
the Living Well strategy. In 2024-2025, the
grants focused on improving health and
wellbeing in rural island communities through
‘connecting people to community activities’.
£23,000 of grants were awarded
1 Note that some practices merged in 24/25, hence the change in GP practice number from 14 to 12. There
was no reduction in service.
Page 123

Page 124

Page 48 of 78
• Support the delivery of the local suicide
prevention action plan working with Argyll and
Bute Strategic Suicide Prevention Group. In
24/25, capacity to support this work was
increased via a new dedicated Health
Improvement Senior post. Since September
2024, a range of suicide prevention and mental
health training opportunities have been
delivered across Argyll and Bute. These include
115 people trained in ASIST (Applied Suicide
Intervention Skills Training), 41 in Scotland’s
Mental Health First Aid (SMHFA), and 53 in
Youth Mental Health First Aid (YMHFA). In
addition, a group of 12 frontline staff took part
in an "Ask, Tell" workshop – a training
programme developed by NES and Public Health
Scotland to improve understanding of suicide,
self-harm, mental health, and compassionate
conversations.
• On World Suicide Prevention Day (10
September), council buildings were lit up in
purple and a social media campaign helped raise
awareness of available support. By the festive
period in December, the Argyll and Bute Mental
Health Hub had been developed to provide a
centralised online resource for those
experiencing distress or needing crisis support:
https://www.ablivingwell.org/mental-health-
hub. Recognising that not everyone has internet
access, printed leaflets were also produced and
distributed through third sector partners to
ensure wider reach and inclusion.
• The Public Health team continues to take an
evidence-informed approach to all actions, and
is committed to using timely and relevant data
to support decision-making. With this in mind,
links have been strengthened with Police
Scotland, and more detailed data is now being
received regularly to help us monitor local
trends and shape targeted prevention activity.
• The Smoking Cessation team within Public
Health continue to deliver a service across A&B
that targets the 40% most deprived communities
but is available to all residents. There are 4
smoking cessation advisors within the team and
during 24-25, they supported 76 people in their
efforts to stop smoking. The team also promoted
their service and highlighted the dangers of
smoking at a number of community events.
Work undertaken to scope sexual health promotion
needs across Argyll and Bute including small focus
Page 124

Page 125

Page 49 of 78
groups with young people. A new Condoms by Post
scheme has been developed in conjunction with NHS
Highland and delivered by Health Information
Resources Service (HIRS). ‘Speakeasy’ training for
trainers has been commissioned from NHS Tayside.
Speakeasy is a preventative community education
programme which helps parents and carers tackle
issues around children growing up, including body
changes, safety, relationships & sexual health. The
course helps parents to build on what they already
know about growing up relationships and sex.
Fifteen individuals representing a diverse range of
professions which work with families and young
people attended the initial training sessions and we
are currently developing a plan for roll out.
Building capacity
for health
improvement:
education;
community
planning; locality
planning;
encouraging and
supporting cross
sectoral
collaboration and
community
empowerment;
engagement;
place-based work.
The Public Health team continued to build capacity
for health improvement in partners and our
communities. Our Living Well networks held
quarterly meetings within their local areas and
coordinators also attended Locality Planning Groups.
In addition, communications, surveys, consultations
etc from various sources (e.g. Public Health team,
Locality Planning Groups, Third Sector) were sent
out by email and social media via the Networks. The
Public Health team regularly attended Area
Community Planning Groups, relevant thematic
Community Planning groups and Locality Planning
groups to build capacity for health improvement and
coproduction
The Public Health team arrange webinar sessions
open to HSCP staff and Third Sector. These have
included webinars on: suicide prevention services by
Breathing Space.
The team have also built capacity through training
delivery and commissioning for a range of topics
including health behaviour change, suicide
prevention, financial inclusion and sexual health.
Further engagement activity is described below.
Yes
Please outline any activity in relation to service commissioning, i.e. revisions to
specifications, new services, reviews of existing contracts. Terminations of contracts.
In 24/25, the Public Health team supported several contracts, and further detail is provided below:
Heartstart: SLA with Greater Glasgow and Clyde - continues
Living Well Network Coordinators: contracts ended in March 2025 following a review. In 25/26 team
are exploring new ways of working with communities.
Community Link Workers: 21-24 contract with We Are With You came to an end in December 2024.
New tender process undertaken with revised specification. We Are With You were the successful
organisation and now delivering the service from December 24.
Page 125

Page 126

Page 50 of 78
Cool2Talk: annual grant payment to Mid Argyll Youth Development Services and SLA with NHS
Tayside ended in March 2025 following a review.
Waverley Care: note that this contract was commissioned and managed by NHS Highland and was a
pan-Highland service which ended in December 2024.
Distress Brief Interventions: Due to operational reasons, the Public Health team have temporarily
taken on oversight and support of the Distress Brief Intervention contract. This has included
evaluation of the 25/25 contract and appropriate contracting process for the 25/26 contract.
Engagement Activities Taken Place in 2024/2025
The Smoking cessation team continue to undertake engagement and awareness raising events
throughout the year. This includes engagement with various professions to raise awareness of the
service and increase referrals – including local pharmacies, AHPs, Social Work, Specialist Nurses,
Primary Care, Community Link Workers, Midwifery, disability employment officers etc…The team also
undertake community engagement, attending community events such as wellbeing festivals and
engaging with Children and Young People during the S2 Drama productions. Every March there is a No
Smoking Week, which sees awareness raising events of the service and the benefits of quitting across
Argyll and Bute. This year smoking cessation advisors attended events in each community hospital,
local shops and supermarkets and worked with Oral Health Improvement colleagues.
There are four Living Well Networks throughout Argyll and Bute, with a dedicated LWN Coordinator
for each Locality funded by the Public Health Team. The purpose of the Networks is to develop local
partnership working and planning for health improvement activity. Although these networks came to
an end in March 2025, they undertook a number of community events in 24/25 including partnering
with Helensburgh Community Hub for a wellbeing festival and hosting a health and wellbeing day in
Tiree.
Engagement has driven the suicide prevention work delivered by the team. In 24/25 suicide
prevention training was refreshed across Argyll and Bute and was informed by community and staff
engagement which sought to find out training needs and preferred locations. Engagement also drove
the development and launch of a new Mental Health Hub — Living Well in Argyll and Bute, a
dedicated space on the Living Well in Argyll and Bute website to find support and resources for
mental wellbeing and suicide prevention. This was developed following a needs assessment and is
continuously updated following feedback from engagement.
As part of the engagement work for the new Community Link Working contract, information sessions
have been held for remote and rural GP practices. This is part of ongoing engagement with GP
practices to scope and ensure the service best meets the needs of remote and rural communities.
Three drop-in information sessions have been set up to provide an overview of the current service,
discuss what the future remote and rural service will look like, and gather feedback from GPs about
aspects of the service.
In order to reduce inequalities in accessing screening programmes and following a request from
Public Health Scotland, engagement was undertaken with the Gypsy/Traveller community via 3rd
sector organisation MECOPP. This feedback will be fed back to PHS and used to tailor screening
literature and identify new initiatives.
Work has continued in 24/25 to engage on lessons learned from the Living well strategy and to inform
the next iteration of the strategy. To-date relevant stakeholders have been invited to provide their
view on what worked well, lessons learned and what could have been better. Previous health and
Page 126

Page 127

Page 51 of 78
wellbeing-related engagement has also been reviewed, in order to identify where there are gaps in
‘what we know’.
Sexual health focus groups were carried out in an Argyll & Bute secondary school with a total of 11
young people in secondary 4 & 5. This was a lively discussion in order to understand their experiences
of sex education, sexual health promotion and issues someone their age might have accessing
contraception, condoms, emergency contraception and other sexual health related services. The
feedback from this was used to inform initiatives.
Page 127

Page 128

Page 52 of 78
Right Care Right Time
Priorities Year 3 Progress Update
Carried over
2025/26
Yes/No
Consider models for
community services with the
aim of minimising different
services/staff visiting people
in community and improving
flow through hospital.
Assessment and care coordination reform.
Focussed work around the review and redesign
of extended community care teams, with re-
ablement. Review and redesign of systems and
processes for assessment and care coordination,
including assessment and care review. TEC and
Digital care. Introduction of reviewing officers
and Discharge Flow coordinator role (whole
system).
Yes
Plan and progress spend on
the recurring funding from
Scottish Government.
All funding linked to KPIs and strategic older
adult work. Sitting within a finance group. SG
whole system action plan and funding bid has
been progressed which is liked to ongoing CfSD
leverage points and strategic drivers.
No
Enhancing multi-disciplinary
community teams to be
responsive, flexible, highly
skilled, continually assessing
with a re-abling and
rehabilitation ethos and high
quality end of life care with
the skills to provide simple
care that currently involves a
hospital admission.
Part of integrated processes and community
standards work. Good progress in terms of
mapping barriers and areas of change. Also
considered above in terms of ‘’models for
community services’’.
Yes
Enhance clinical education for
all staff, develop skill mix,
apprenticeships and health
care support worker skilled
roles.
Sitting under any service change/governance. No
Provide enabling care at
home that is effectively
commissioned and planned
for those who need it, with
enough capacity to be
provided following
assessment at home and at
the point of need.
These needs to link to the wider issue of the
strategic approach to care at home (see below)
and integrated approaches of how assessment
and review of care is carried out. Discharge to
Assess, focussed remodelling of reablement, TeC
and digital are all key factors. Link with Care at
Home below.
Yes
Engagement Activities Taken Place in 2024/2025
Noted below in older adults/adults and hospitals.
Page 128

Page 129

Page 53 of 78
Adult Care –Older Adults/Adults and Hospitals
Priorities Year 3 Progress Update
Carried over
2025/26
Yes/No
Extend the Community
Hospitals into the
community and provide a
greater range of health
related skills and services at
home.
Urgent Community Response and Hospital at
Home ongoing development. Ambulatory
Care. Virtual ward, OPAT and near patient
testing.
Yes
Develop a community
assets approach and
identify a way in which
people can be supported as
much as possible within
their own community
before needing statutory
services.
Single Point of Contact review and redesign.
Links with Living Well Programme and TSI.
Ongoing work round the development of a
‘one front door approach’ which will be co-
produced across all sectors. Standardisation of
materials and processes currently in use.
Assessment ethos to be enabling, with
strengths and assets based approaches.
Yes
Developing a meaningful
conversation with islands
around our health and care
services.
Specific island work has been carried out on
Mull and Tiree in relation to specific service
developments. These needs widened to our
overall island approaches. Link with overall
islands approach
No
Set up a Self-Directed
Support Steering Group in
order to embed Self-
Directed Support
Improvement Standards.
Standards are being reviewed but no steering
group has been established. Consider
integration of SDS across all areas of
assessment and care coordination.
Yes
Support care at home
through a challenging
winter, linking unscheduled
care elements to limit
duplication and make best
use of the total resource
available.
Link all these care at home actions into one
key action for care at home. Links with Care at
Home strategic development and community
services redesign.
Yes
Develop a care at home
strategy to agree and
monitor key developments
to build a flexible and
sustainable service.
Strategy developed and 4 sub-groups linked to
organisational redesign; financial
sustainability; training; digital. Pathways in
and out of the service underway and the
integrated processes work reducing
duplication.
Yes
Develop an Older Adult
Strategy.
Completed and agreed. One year action plan
to be completed. Review process to review
and refocus actions has been developed to
support the delivery of the strategy for its
whole lifespan.
Yes
Develop a robust plan
around winter planning,
Completed – reviewed annually. No
Page 129

Page 130

Page 54 of 78
mapping out all elements of
service delivery, what the
pressures are and how they
impact on each other.
Work in partnership with
providers, supporting
elements such as
recruitment, training to
ensure best use of
resources.
Continuous, would see this as part of ongoing
good governance work rather than a
development in its own right.
No
Review the use of Extended
Community Care Teams and
link them to other
community services.
Underway, again linking with care at home
and community developments.
Yes
Complete a building
appraisal for internal care
homes and develop an
overarching care home and
housing strategy. This will
include the position of
intermediate care within
Argyll and Bute.
The strategic work on care homes and housing
is well underway with a demographic
modelling and the development (underway) of
options appraisal to inform future models.
Closely linked with housing under the Care
Homes and Housing Programme Board. The
work on intermediate care has not yet begun
in terms of its scope.
Yes
Please outline any activity in relation to service commissioning, i.e. revisions to
specifications, new services, reviews of existing contracts. Terminations of
contracts. (previous update below)
Current Update from Commissioning
Care at Home
There is a lot of agency use in OLI care at home due to issues with recruitment and retention.
Options to resolve this are being looked at.
Review of Community Resources Group (CRG) process to ensure equity of services and ensure that
there are links to community assets
Link to discharge protocol and establishment of single point of access; responder; enablement & re-
ablement; palliative care model
Ensure these services are part of a continuum of service
Engagement Activities Taken Place in 2024/2025
Specific engagement with staff groups across the HSCP as part of the older adult strategy. This
included a locality webinar for all LPGs; staff and professional leads workshops; work with the Older
Adult Reference Group.
Two provider forums were established for care at home and care homes.
Page 130

Page 131

Page 55 of 78
Learning Disability & Neurodiversity Services
Priorities Year 3 Progress Update
Carried over
2025/26
Yes/No
Further development
of specialist Core and
Cluster housing to
support individuals
with complex needs
and reduce the
requirement for
individuals to be
placed out with the
area.
Core and cluster for 6 has been developed in Dunbeg
and is at full occupancy.
4 person individual supported adapted tenancies, new
build properties at the Sawmill site Helensburgh as a
replacement for the Campbell St. service now
operational in Partnership with Scottish Autism and
Loretto Housing.
6 person individual supported tenancies in Rothesay
currently being developed in partnership with ACAH
and Affinity Trust. Direct replacement of the
Morningside service with increased capacity.
Other options for new build in Argyll and Bute also
currently under consideration.
Yes
Development of short,
medium and long term
housing strategy to
ensure appropriate
accommodation
models for services
users and affordable
housing for H&SC staff.
Involved with Corporate Services and other A&B and
NHSH Departments to promote available and
affordable housing options in a range of localities. No
great movement to date but reasonable prospect of
small scale limited success in 2 localities.
Yes
Sustain and further
improve on the
positive feedback from
external regulators
regarding the quality of
service provision (both
internal and external).
All internal services, the 5 day Services in Oban,
Lochgilphead, Campbeltown, Rothesay and Dunoon,
and the HMO, Greenwood in Campeltown have all
been inspected with improvements across the grades
in all.
Further work being undertaken aligned to the
priorities of the Services 3 year Improvement Plan.
Yes
Reduce stigma in
relation to learning
disability and autism
through delivery of
joint training and/or
awareness raising for
staff across the HSCP.
Limited training has been undertaken however a more
comprehensive set of objectives are currently being
worked up in respect of the Strategy developments
referenced in the following section below.
Yes
Development of A&B
specific Learning
Disability and Autism
Strategies, in line with
the A&B HSCP
Engagement
Framework.
The Learning Disability and Neurodiversity Strategies
are currently being refreshed with representation and
support from Service users, families, carers,
individuals with lived experience, NAIT, NHSH, A&B,
3rd and Independent Sector partners.
Timescale for completion January 2026.
Yes
Page 131

Page 132

Page 56 of 78
Continue to utilise
technology and
telecare where
appropriate to increase
independence, whilst
ensuring the safety and
wellbeing of service
users.
The use of technology for individuals and service
support providers is a central essential consideration
in all our Service User focussed activity. The
commitment is to maximise Independence,
independence and safety within all situations, models
of care and to recognise the financial challenges
across the Partnership in relation to economies and
budget considerations. In particular the use of Tech
can help build confidence for individuals and their
carers/families as we work in partnership to develop
new models of care.
Yes
Please outline any activity in relation to service commissioning, i.e. revisions to
specifications, new services, reviews of existing contracts. Terminations of
contracts. (previous update below)
Current Update from Commissioning
Increased need for specialist neurodiversity services within Argyll and Bute in order to prevent
requirement for out of area placements and support the repatriation of individuals back to the area,
where appropriate
Review of Day Service provision across A&BHSCP to ensure equity, sustainability and services are fit
for the future.
Review all pre-placements residential care contracts for out-of-area placements, if not covered by
SXL.
Review all supported living contracts.
Lead update: There have been no contract terminations. All services whether internal or contracted
are subject to a programme of review/refreshment as required.
Engagement Activities Taken Place in 2024/2025
Contract/service reviews with all commissioned providers.
Development of new Respite opportunities with Key Housing and Enable.
Development of new outreach Autism support service in H&L
Scoping activities undertaken with HSCP Departments and 3rd/Independent sector providers for
Supported Living, personal care and all the aforementioned.
Page 132

Page 133

Page 57 of 78
Mental Health
Priorities Year 3 Progress Update
Carried over
2025/26
Yes/No
Consider and consolidate
standardisation of processes;
roles and responsibilities;
care and support co-
ordination and utilisation of
effective training and
delivery models (i.e.
specialist / generic).
Community guidelines are progressing well and will
examine interface with other services across the
mental health landscape. Team are progressing
with scoping variance and impact of same
Yes
Further scoping of leadership
and management of teams
have enabled operations
managers across the service.
Full embedded No
Establish clear pathways to
keep patients in local
hospitals before transferring
to acute units and further
develop community supports
and strategies.
A oversight looking at inpatient IPCU and inpatient
dementia beds has been progressed, although at
an early stage
Yes
Progress planned
developments associated
with Transforming Together
agenda for mental health.
Core and cluster not progressed – requires
dedicated support to develop
Yes
Community Mental Health
Services review and
outcomes.
Completed – this is several years on, the majority
of outcomes have been met and those now not
relevant noted
No
Psychological Therapies – we
are working with the Scottish
government to develop a
business case to enhance and
develop our PT services
across A&B and to assist us to
meet the expectations and
demand for services in a
timely and effective manner.
The teams are now realigning
to make an A&B wide service
under one management
structure to ensure better
oversight of waitlist and
service delivery at tier 3 and
4.
Psychological therapies is now 1 team and
managed by Consultant Psychologist, we have
developed a successful partnership with Xyla to
assist in wait times across A&B
No
The primary care mental
health team have also
realigned to work across GP
surgeries and to support
This is fully embedded No
Page 133

Page 134

Page 58 of 78
those presenting with mild
and moderate mental health
concerns. This team have a
Multidisciplinary Team
approach and have a
wellbeing nurse,
Occupational Therapy ,
guided self-help worker and
primary mental health
worker in each locality.
Care Reviews. Required resource to support, scoping commenced Yes
Inpatient services – addition
of a consultant psychiatrist
for the inpatient unit 3 days
per week. Recruitment of
Registered Mental Health
Nurses remains fragile due
to the national shortage and
the inpatient environment
holds large vacancies,
support around recruitment
and retention is well under
way across
NHS Highland.
No progress in Consultant recruitment, currently
sector consultants in reach to the ward.
Recruitment in Mental health remains fragile and
challenging across disciplines. We have the
privilege to welcome International nursing
colleagues over the last 2 years which has
positively impacted and are supporting 4 earn to
learn students. Retention premium is in situ until
2026.
Yes
Standardisation of processes;
roles and responsibilities;
care and support
coordination and utilisation
of effective training and
delivery models (i.e.,
specialist / generic), as
appropriate to support
mental health and dementia
services locally
Dementia team are offering inreach, training and
support, variation will continue to be monitored
and assessed by Clinical service managers
No
Please outline any activity in relation to service commissioning, i.e. revisions to
specifications, new services, reviews of existing contracts. Terminations of contracts.
New contract with Xyla for primary and secondary psychological interventions
Page 134

Page 135

Page 59 of 78
Primary Care (General Practice)
Priorities Year 3 Progress Update
Carried over
2025/26 Yes/No
Assess the impact on GP
practices following the service
redesign of Pharmacotherapy
using a remote hub model.
The hub is now fully staffed from March 2025
and a new skill mix has been introduced to
provide input into the practices remotely.
Systems and processes are still in
development and referrals into the
pharmacotherapy service are being looked at
to identify which team member is the most
appropriate to undertake the task. Once this
is completed there will be consultation with
the GP practices. There are also 2
development posts for pharmacy technicians
in the hub and these reduce the input to
practices.
Yes
Delivery of a strategy for
island health and social care
provision specifically for out of
hours and urgent care.
The draft Island Strategy has been completed
and fully engaged on and awaiting decision
on governance and accountability for actions
prior to full publication.
Yes
Actions within strategy
Establish a sustainable GP out
of hours service for Jura,
linking it with Islay and
building community resilience.
The Jura Out-of-Hours (OOH) working group
has successfully reached a consensus on a
new model for service delivery. This
agreement marks a significant milestone
since last years update, allowing the project
to transition into the design and
implementation phase.
In this next phase, an implementation group
composed of key stakeholders has been
established. This group is tasked with the
responsibility of taking the new model
forward. Their role involves detailed
planning, designing the operational aspects,
and overseeing the implementation to
ensure the model meets its intended goals of
providing a sustainable primary care out of
hour’s model of care.
This phase will involve continuous
engagement with all relevant parties to
address any challenges and make necessary
adjustments, ensuring the model's
sustainability and effectiveness in improving
out-of-hours services.
Yes
Implement transitional
arrangements where practices
continue to provide some
services.
In 2022, the National GMS Oversight Group
approved a Rural Flexibility options appraisal
submitted by the HSCP. The business case
focused on 18 of our more remote and rural
practices where it was clear that an HSCP
delivered Community Treatment and
Yes
Page 135

Page 136

Page 60 of 78
Care(CTAC) and Vaccination service was
neither cost effective or sustainable. 12
practices now receive a rural flexibility
payment and claim reimbursement for
vaccinations under an Item of Service
arrangement.
The HSCP agreed with NHS Highland Local
Medical Committee (LMC) to regularly review
these arrangements with all 18 practices.
This process commenced in February 2025
and is ongoing with the full report to be
submitted to the Primary Care
Modernisation Programme Board and NHSH
LMC in June 2025.
The HSCP is committed to delivery of the
other workstream services agreed under the
2018 GMS contract ( Pharmacotherapy, First
Contact Practitioner Physiotherapy, Primary
Care Mental Health and Community Link
Workers) across urban and rural practices.
Geographical and resource challenges have
seen ongoing development of locally
designed solutions including hub and digital
infrastructure across the multi disciplinary
teams. Where possible, measures have been
implemented to improve equity between
remote and rural and urban GP practices.
Contribute to review of
sustainable services on the
island of Coll.
We have recently appointed new
independent General Practitioners for the
Coll General Medical Services contract, which
took effect on 1st April 2025. This new
contract introduces a change from the
previous model, with three GPs rotating to
cover both in-hours and out-of-hours care on
the island. This new approach offers a more
robust and sustainable healthcare model
compared to the previous system, where a
single GP was responsible for delivering
services year-round, often with limited time
off and little reprieve from the demands of
the role. The rotation system ensures that
the GPs can better manage their workload,
reduce the risk of burnout, and maintain a
healthy work-life balance, ultimately
improving the quality of care provided to the
community. With this model, we anticipate
increased stability in healthcare provision,
offering residents and visitors to Coll a
reliable and accessible service.
Yes
Co-location of Cowal Medical
Practice and Church St Surgery
Due to the funding freeze on Premises
Improvements last year, the original plans for
Yes
Page 136

Page 137

Page 61 of 78
in the Cowal Community
Hospital, Dunoon.
moving GP practices into Cowal Community
Hospital was paused. However, alternative
plans are currently being considered.
Engagement Activities Taken Place in 2024/2025
• Jura Out of Hours Public Engagement event in September 2024 with follow up article inviting
further feedback from Island residents in Jura Jottings following the event
• Patient engagement done in both Inveraray and Furnace in 2024
• Coll and Colonsay Engagement for GP Interviews in 2024
Page 137

Page 138

Page 62 of 78
Dentistry
Priorities Year 3 Progress Update
Carried over
2025/26
Yes/No
Identification of
service needs and
associated
development.
Senior Dental Officer post fixed term recruited part time.
Remainder of post reallocated to fixed term DO post Oban,
0.4WTE due to go to advert imminently. Work to increase
service provision to Oban, Mid Argyll areas continues.
DHT post recruited, NDIP provision now shared between
DHT and DO which allows for more clinical availability.
Yes
Development of
current services for
Island communities
and priority groups
Shared mobile dental unit with Highland HSCP refurbished.
Working with Estates team to ensure water safety and
electrical safety compliance between HSCP areas. Joint
project. Direct collaboration between Coll and Colonsay to
identify services connections for MDU continues.
Tiree – Regular visits from Dental Officer and DHT (Dental
Hygienist Therapist), subject to flights and ferries timetable.
Dental chair identified for refurbishment/replacement.
Working with Estates colleagues to enable installation.
Mull – Tobermory clinic remains extremely busy. Again,
Estates Team input required to improve fabric of building.
Dental Chairs in both surgeries and x-ray unit in one surgery
replaced in 2024. IT/Network connection remains
challenging, other items listed require Estates team input to
progress (staff changing and kitchen/handwashing facilities,
x-ray machine wall support).
Bute – PDS clinic remains busy. General Dental Practitioner
with enhanced ability to provide care for residents of care
homes on Bute.
Priority Groups/Secondary care options –GA or IV sedation
services for complex care cases/anxiety cases: Currently no
provision for this within A&B staffing cohort. External
referral to NHSH North or GGC is only route for these
patients. SLA and boundaries are unclear. Discussion and
informal agreement with NHSH North, who will provide this
service for Oban and will accept referrals to Inverness.
Discussion with GGC on a case by case basis. Will accept
from geographical area near to GGC but boundaries not set
and SLA is unclear. Board input required to determine SLA
with GGC and NHSH North. Collaboration with NHSH N SCP
staff and A&B SDO and DO in Oban to assist with these cases
locally in Oban, and provide robust referral pathway.
Orthodontics: service is maintained within Primary Care,
unlike other board areas where this service is delivered in
secondary care setting. Currently supported by two
Consultants (one GG&C and one Highland) on a rolling 6-
monthly commitment basis. Service development includes
up skilling of SDO to move into orthodontic care.
Appropriate PG course identified and SDO enrolled in PGDip
Yes
Page 138

Page 139

Page 63 of 78
programme. Up skilling of one Dental nurse to Orthodontic
Therapist underway (NES course) and expected completion
Spring 2026
Oral Health Improvement: Looking to recruit to vacant post
to cover Oban, recruited to cover Islay vacancy from Mid
Argyll
Increasing access for
patients in assisted
and looked after
accommodation
settings.
Domiciliary dental care has resumed. Caring for Smiles
Programme for Care Home staff has resumed and is now
expanding to include the ‘care at home’ sector.
Oral health care shop to provide oral healthcare items at
cost price to care homes piloted and successful. Expanded to
other PDS locations in A&B. Feedback remains good.
Yes
Increase skill mix in
association with in-
house training and
also NES partners.
Three Dentists and one Dental Hygienist Therapist are now
providing Inhalation Sedation in PDS settings. All Dentists
have the opportunity to complete AWI training. One clinician
on waiting list for this.
Clinician’s peer group meetings provide PDS focused CPD
and learning.
Child Was not Brought protocol developed in collaboration
with A&B Child Protection Services, cascaded out to all team
members, local familiarisation sessions to all team members.
Yes
Team building. Regular Team meetings and one to one meetings continue.
SMT in person site visits occurring regularly.
Monthly whole team cascade brief/PDS team brief via
Teams to increase team cohesion.
Face to face annual clinician meetings adopted to reduce
professional isolation, along with virtual clinician meetings
bi-monthly.
SMT have established connections with other Primary Care
Teams Leads via Primary Care meetings.
Yes
Standardising
processes.
SOP development continues across service to continue to
improve service provision and ensure best practice is
consistent across the service.
Use of Datix incident reporting tool has been encouraged
and is well used by the Team. This assists with learning and
identification of SOP projects.
Yes
Fixed term
recruitment in
Orthodontic
services.
Weekend Consultant led clinics continue. Local service
development and virtual consultation in progress to allow
more non-Consultant activity during weekdays – end goal to
have a weekday service led remotely by Consultant with
regular but less frequent in-person visits, and staffed by
Orthodontic Therapist and SDO with interest in
Orthodontics.
Yes
In- house
development of
SDO for Orthodontic
services.
Enrolled in PGDip course. Currently Year one – PGCert on
satisfactory completion. University of Plymouth course
provider. Increased Orthodontic case mix locally available.
Yes
Page 139

Page 140

Page 64 of 78
Move to baseline
funding
Baseline funding in operation
Work underway to align SDS and CDS pays templates to
reflect current staffing compliment.
Yes
Capital funding
application for
service
improvements
Capital Funding bids active currently:
Autoclave replacement across all sites. LDU facilities failing.
Ageing stock at end of lifespan.
Dental Chair, Lochgoilhead clinic. Catastrophic failure
necessitates replacement.
Yes
Engagement Activities Taken Place in 2024/2025
Collaborative working with General Dental Services in co-located sites and the associated Bodies
Corporate to assist with pressures around delivery of care.
Continued engagement with Pharmacy team and Child Protection services to ensure robust policies
are in place which are aligned with wider HSCP policy.
Oral Health Improvement Team: Continue to be at the forefront of engagement throughout different
sectors – Education, Health Partners, Social Work colleagues, Care Home Teams, Care at Home
Teams, Addictions Teams, Forces Families Federation, Refugee and displaced persons population,
Service providers for Adults with Additional Care Needs & third sector colleagues and families
associated with the above groups locally over Argyll and Bute.
The Oral Health Improvement team provides accredited training in oral healthcare in the Care Home
setting and for those who Care at Home.
Page 140

Page 141

Page 65 of 78
Alcohol and Drug Partnership
Priorities
Year 3
Progress Update
Carried
over
2025/26
Yes/No
Develop the
ADP strategy.
The final draft of the ADP Strategy Refresh 2025 until 2027 was
presented at the ADP Strategy Group in March 2025 and the final
version will be published after the ADP Strategy meeting in May 2025.
The refresh work was lead by a steering group to who met 3 times
during the project, at beginning, mid-point and end of the process.
11 national strategies and policy documents were identified of
relevance to alcohol and drugs partnerships. 13 local (Argyll and Bute)
strategy and planning documents were identified which showed clear
connections to ADP current priorities. A wide range of engagement
detailed below was conducted including semi structured interviews with
ADP members, people with lived experience and engagement
workshops.
The areas of priority are Strengthening the Partnership, Prevention,
Strengthening Recovery Orientated Systems of Care and A Public Health
Approach to Justice.
A Health Needs Assessment has been carried out in 2024 until 2025 and
on track to be finalised by May 2025. Identification of the key areas will
be progressed with the partnership aligning which the partnerships
strategy and development of short to long term delivery plans. · Any
specific findings highlighted in the HNA or focus groups in relation to JSP
will be aligned and incorporated into this work.
No
Develop
community
hubs
throughout
Argyll and
Bute.
Recovery Café’s and Hubs have been supported by grant funding,
enabling them to develop a wide range of work to support people in
recovery. The Service Level Agreement with Community Learning
Development 2024 until 2025 has enabled dedicated support to
recovery communities in Helensburgh and Dunoon whilst supporting a
test of change in Oban and an Argyll and Bute wide network.
Yes
Expand on
the whole
families
approach.
Scottish Families Affected by Alcohol and Drugs (SFAD) were
commissioned in 2024 until 2025 to raise awareness and engage with
families and services in Argyll and Bute. The high level goal of this work
is to grow a model of family support that is connected and effective,
utilises community assets, sustains, strengthens and upskills
communities to create a cohesive and effective Whole Family Approach.
SFAD in collaboration with stakeholders have developed a partnership
plan informed by the gathering of evidence from families and those in
services and supported by grant funding. SFAD have listened directly to
people personally impacted and to professionals working within the
community to reduce alcohol and drug harms, have held many
conversations, 4 shorter hybrid workshops, and a conference.
Through engagement, they identified priorities to support the
development of a Whole Families Approach. A Whole Families Group
has been re-established to continue to take forward this approach in
Argyll and Bute.
Yes
Page 141

Page 142

Page 66 of 78
Community Reinforcement and Family Training (CRAFT) was
commissioned by the ADP, and to date 20 attendees participated in the
two day training course.
Continue to
deliver to the
requirements
of the
National
Mission.
The ADP continues to work towards delivering the requirements of the
National Mission, primarily through a range of sub groups identified to
take forward the ADP action plan and progress MAT standards, ADP
grant funding have supported activity in relation to the sub groups and
work streams.
Yes
Commissioned Community Alcohol and Drug Recovery
WithYou commissioned work continues to deliver a wide range of
outreach, training, support and services throughout Argyll and Bute.
With You contribute to prevention, recovery, supporting those
preparing, going through and coming out of residential rehabilitation
accommodation, as well as the delivery of MAT services.
A new “Recovery Skills” structured 10 week group work programme in 4
localities was provided and introduced some group work evaluation that
will be gathered at week 1 and week 10. This will enable attendees to
see progression and also help us to look at the content and see if there
is anything that perhaps is not working well. So far verbal feedback has
been very positive.
A showing of Outrun was provided in collaboration with Campbeltown
Cinema and provided an opportunity for celebration and With You
supported people with Lived Experience of Alcohol and Drugs from each
locality attend the Recovery Walk in Glasgow.
This year With You celebrated their 20 year birthday with a heart
warming event in Lochgilphead. Recovery groups attended with some
confident enough to stand up and talk about their Recovery journeys,
the event also enabled them to meet people from other recovery
communities in A&B.
Drug Death Reviews -
A review of the Drug Death Review Group are meeting monthly to
review drug related deaths. A pathway is being developed to ensure
governance and utilisation of existing structures, the review had
identified existing good practise and areas requiring improvement. The
altered pathway will address some of the findings from the review. The
terms of reference for the meetings are also under review. Twenty cases
have been reviewed and concluded since 2022. Four reviews are in
progress; while nineteen cases are awaiting review.
Drug Alerts and Harm Reduction
The local multi-agency group for Local Early Warning Systems has
continued to meet monthly. Improvements to the groups
communication has been implemented including a system of recording
drug related incidents. This group links with Public Health Scotland’s
Rapid Action and Drug Alerts Response (RADAR) team to develop local
Page 142

Page 143

Page 67 of 78
processes for drug alerts. Increased Naloxone supplies were purchased
alongside increased Naloxone Training as part of a plan to mitigate
against potential overdoses from drugs containing nitazenes.
Planet Youth
The ADP agreed to support the Planet Youth Icelandic programme with
five secondary schools currently involved in the pilot. The Icelandic
prevention model aims to keep young people safe, healthy and happy.
Within the five schools, S3 and S4 pupils have completed a
questionnaire and the results have been sent back for the local coalition
groups to review and discuss how to make this a community wide
programme. This work is supported by a full time health improvement
officer and a Health Improvement advisor.
Daniel Spargo Mabbs (DSM) Productions
The DSM Foundation is a drug education organisation. Their drama
production entitled “I love you mum – I promise I won’t die” was piloted
in the Oban and Helensburgh communities. The hard hitting drama tells
the story of Daniel with the aim to help other young people learn the
lessons he sadly no longer could, and make choices that can keep them
safe. The title takes Daniel’s joking last words to his mum, before he left
home for what turned out to be the last time. Further planning is
underway on how to develop this work to introduce it to other
audiences and areas within Argyll and Bute.
The School Drama Productions Programmes
The ADP continues to contribute funding to the school Drama
programme “You Are Not Alone” which is delivered across seven
secondary schools. The performances provide an opportunity for young
people to engage in questions with service providers, understand
support that is available and connect with other services.
The production for 2024 was performed for S2 and S3 and the feedback
from the S2’s was much more informative. Following this review future
delivery of this programme is aimed at the S2 cohort.
Alcohol Brief Interventions
Recordings of Alcohol Brief Interventions (ABIs) have been increasing in
Argyll and Bute. The publication of new guidelines ceased reporting of
ABI number to the Scottish Government. Argyll and Bute will continue
to develop and raise profile of ABI’s in the wider settings.
Developing Recovery Communities
The recovery communities have been supported by the Argyll and Bute
Council, Community Learning Development team in Cowal, Helensburgh
and Oban. This has given dedicated local support to each of the groups
and helping establish more of a Recovery Community. We have also
been supporting a test of change in Oban to scope what each of the
services do to support drug and alcohol recovery and how we can bring
that together. With the support from Scottish Recovery Consortium we
are supporting people with lived experience to be more involved in the
Page 143

Page 144

Page 68 of 78
work of the ADP and provide feedback on the work we are doing in
Argyll and Bute.
Residential Rehabilitation
For the period of 2024 to 2025, 19 placements for drugs and alcohol
were funded by the multi-agency and multidisciplinary Residential
Rehab Steering Group totalling £164,557. The ADP has also been
working alongside Health Improvement Scotland to develop an action
plan for the group.
Bespoke training for GPs and Prescribers
Training was commissioned from the Scottish Drugs Forum following the
identification of learning needs by the Drug Related Deaths Review
Group, and in consultation with GP colleagues. The three training
sessions were held in February and March on the topics of Gabapentin,
Ketamine and Benzodiazepines.
Implement
the revised
approach to
children and
families.
Following a review of the School Support Services a new specification
which was developed in partnership with Education, Education
Psychology, and the ADT Support Team. The contracts commenced for
all council secondary schools in Argyll and Bute in August 2024 and data
and contract monitoring is ongoing. The contracts provide specialist
educational support, supporting young people engage with services, the
Planet Youth project and the Violence Prevention Programme. This test
of change is commissioned until August 2026.
Yes
Initiate MAT
standards.
Progress towards MAT Standards 1 to 10 continued in 2024-2025. The
MAT Standards Steering Group had oversight of this progress and fed
into Scottish Government reporting as required. Grants were provided
to ADP sub groups associated with the ADP Strategy priorities and MAT
to support them progress actions plan. Remote and rural issues and
sufficient resourcing to meet all the standards remains a challenge.
Yes
Please outline any activity in relation to service commissioning, i.e. revisions to
specifications, new services, reviews of existing contracts. Terminations of contracts.
• Community Addictions Recovery Contract with With You extended until March 2026
• New SLA with Argyll and Bute Council, Community Learning and Development for a Test of
Change
• New contract for the Delivery of Community Reinforcement and Family Training Programme
• New contract for the Delivery of School Support Services until September 2026 with a range
of local services
• New contract for the MAT Experiential Programme with Scottish Drugs Forum
• New contract for developing the Whole Family Approach with Scottish Families Affected by
Alcohol and Drugs
Page 144

Page 145

Page 69 of 78
Engagement Activities Taken Place in 2024/2025
ADP Strategy Engagement
Stakeholder interviews: A rolling interview programme was established, building from the ADP
support team out to key partner representatives and including other stakeholders. Interviews began
in August 2024 and ran to November 2024. Overall, 23 representatives were interviewed. Lived
experience input was included through partners’ existing links at key points in the process. A focus
group was held in Helensburgh recovery café and interviews were held at Dunoon recovery café and
Inverary Whole Family Approach conference. Lived experience/frontline worker input was also sought
through third sector partners With You (in Dunoon) and LAAS (online).
The priorities of the emerging strategy were refined through 3 workshops which took place online in
October-November 2024. All partners were invited, plus a range of wider public and third sector
stakeholders. 10-14 people attended each one.
Health Needs Assessment
A HNA was carried out in 2024 to 2025. The surveys were distributed through the HSCP networks and
the ADP networks resulting in 98 online surveys being submitted from Argyll and Bute. The survey
consisted of 7 questions and were also used in focus group discussions which were held in the
communities across Argyll and Bute, those who participated did so with lived experience of substance
use. The aim of the focus groups was to understand community concerns, identify priorities, and
determine indicators of progress in reducing substance-related harm. There were 9 Focus Groups
with 94 participants of which one group of 8 high school children, 15 years old and over with lived
experience of substance use in the home.
Whole Families Approach
SFAD have held 24 engagement meetings with service providers and families affected by alcohol and
drugs to raise awareness of the Whole Family Approach and scope priorities for Argyll and Bute. An
engagement event was held in Inveraray in July with 10 participants, following which a survey was
distributed. In September SFAD hosted a Whole Families Approach Conference in Inveraray with 37
participants, thereafter two design events were held on the days following the conference. The
priorities have been consulted upon and a group has been established to drive these forward.
Addictions Recovery Bill Consultation
The ADP hosted a consultation which was done in an online event on 16th December 2024, with 17
attendees present. Attendees were a wide range of partners from the ADP and HSCP. Following the
consultation event and circulation of draft response, the final response as attached was submitted to
the Scottish Government.
Charter of Rights Consultation
Consultation was done by the Independent ADP Chair and LAAS at the ADP Meeting on 20th May
2024. This was an in person meeting at Lochgilphead with 13 attendees.
The consultation provided information and background on the Charter of Rights for People Affected
by Substance Use and Ailsa provided a presentation on her involvement in the process nationally.
The meeting noted that:
 MATSIN would be focussed on the Charter of Rights;
 That the Draft Charter was currently out for consultation, and AM / TM did a consultation
exercise to seek the views of the ADP Members present on this.
Following this consultation exercise, which asked specific questions, the responses were collated and
fed back to the national group.
Planet Youth
Page 145

Page 146

Page 70 of 78
Allied Health Professionals (AHP)
Priorities Year 3 Progress Update
Carried
over
2025/26
Yes/No
Establish DCAQ or
establishment setting
cycles (as per the Health
Care Staffing Act
implementation).including
development and high-
level data quality for AHP
dashboard.
There is an established AHP dashboard based on a
minimum dataset, taken from multiple systems and paper
records. This has been made available to team leads,
professional leads and managers and it is collated into a
set of KPI’s that report to the IJB. These measures are
currently being evaluated with a move towards a mixture
of quantitative and qualitative data.
As part of the boards implementation of the health & Care
Staffing act five teams, one per large profession, have
carried out a annual tool-run and establishment report.
Findings and learning are currently being collated.
Yes
Deliver remote and rural
MSK triage offer through
PHIO App.
Agreement has been achieved to fund the PHIO App for
the next year to test its use as the front door to all MSK
services across Argyll and Bute which ensures there is a
self-management option for all patients, not just those in
rural smaller practices. This will improve access to first
contact physio and mainstream physio due to a large % of
patients being managed with early self-management. This
roll-out will be robustly evaluated.
Yes
Primary Care-increase of
first contact to other
professions.eg Dietetics.
Our Dietetics service are involved in national discussions
about expansion of primary care to other professions as
part of the MDT. National negotiations for the next GP
contract are underway; any expansion of the MDT will be
dependent on the outcome of this.
Yes
New priority-develop Safe
Quality Care structure to
demonstrate quality
metrics to support
professional assurance.
This programme is underway with an agreed annual audit
cycle to gather relevant quality metrics and share across
managers and professional leads.
Yes
Agree service
specifications for all AHP
Services and roll-out Job
planning within teams.
Service specifications are being drafted. Job Planning tool
developed and is being rolled-out informally.
Yes
Address long waits-all
over 52 weeks become
priority 1. Establish
Due to service pressures and recruitment issues it has not
been possible to reduce all waits over one year.
Yes
The Planet Youth team held an event in Dunoon in September 2024 where we had over 20 stall
holders show casing when activities they had to offer for Children and Young people in the local area.
The day was well attended by 25 families.
We also held a similar event in Lochgilphead where all the sports and clubs came along to give people
taster sessions on what they had to offer and they also presented the volunteers with a certificate of
thanks for all their hard work over the years. 15 families attend the event with most clubs getting
new members signing up.
Page 146

Page 147

Page 71 of 78
rigorous triage in all AHP
teams.
Build in capacity for
universal and targeted
intervention with groups
e.g. Aging adults, nursery
children – whole
population approaches to
healthy living.
The Living well programme has been implemented in each
locality offering adults a physical-activity based prevention
programme. Robust evaluation is in progress with
consideration of longer-term service sustainability models.
Work is developing with partners like Live Argyll to
consider this type of offer for children and young adults.
All professions are considering universal approaches but
the system pressures described above mean it is difficult to
change focus from reactive to preventative work.
Yes
Delivery of actions e.g.
Guest lecturing, increase
in student placement
offers, progress of therapy
apprenticeships.
National discussions progressing about work-based
training offers. We have robust practice placement support
and coordination in place.
Yes
Continue to develop
standard tools and
process for establishment
setting ready for cycle
three. Agree
establishments for A&B
teams.
As part of the boards implementation of the Health & Care
Staffing act five teams, one per large profession, have
carried out a annual tool-run and establishment report.
Findings and learning are currently being collated.
Yes
Develop a dashboard for
visible demand and
activity data for AHP
teams.
There is an established AHP dashboard based on a
minimum dataset, taken from multiple systems and paper
records. This has been made available to team leads,
professional leads and managers and it is collated into a
set of KPI’s that report to the IJB. These measures are
currently being evaluated with a move towards a mixture
of quantitative and qualitative data.
Yes
All AHP staff to do Health
Behaviour Change training
and review the
professions offer to
prevention.
4 courses have been offered. Yes
Engagement Activities Taken Place in 2024/2025
There has been a focussed exercise, as part of the Safe Quality Care programme, to increase patient
feedback through a Forms Survey. Most professions are now collecting feedback routinely. Outputs
are being evaluated.
Page 147

Page 148

Page 72 of 78
Carers
Priorities Year 3 Progress Update
Carried
over
2025/26
Yes/No
Implementation of the Caring
together Strategy.
The Caring Together Strategy was published in 2024
. We are currently in the 2nd year of implementing
the actions and commitments
No
Review of our Short breaks
statement.
Section 38 of the NCS (Scotland) Bill introduces
significant changes to the current Carers (Scotland)
Act 2016. It introduces a new legal entitlement: the
right to personalised short breaks for unpaid carers.
Nationally work has started to address this new
piece of legislation. Whilst this is being carried out,
we will not go out to review and engage on our SBS,
we will wait the new regulations and guidance and
ensure Carers from within A&B are involved in the
national engagement. Our current SBS remains in
use.
Yes
We will work with
educational, cultural and
leisure organisations to
improve access for Carers to
programmes and
establishments across Argyll
and Bute and beyond.
Carer Organisations have expanded services across
all areas of A&B and Carer number have increase by
19%. Education services now have a Young Carers
policy and there are a growing number of schools
involved in the Carers Trust Young Carers Challenge.
No
Review of the current
Eligibility Criteria for Adults
and Young People.
This will be aligned with the new regulations and
guidance that will be releases with NCS Bill- Right to
a break.
Yes
Please outline any activity in relation to service commissioning, i.e. revisions to
specifications, new services, reviews of existing contracts. Terminations of
contracts. (previous update below)
Current update from Commissioning
A new contract was developed and commenced in March 2023; the contract ends on 31st March
2026. This contract introduced a new service specification, updated terms and a clear and robust
framework for contract monitoring. Planning for March 26 will commence in 2025.
A new contract following feedback from unpaid carers was awarded for
Money, Welfare and Related Advice for Unpaid Carers, delivered by ABCAB (2 year contract, ending
January 2027)
A contract is under development for additional Parent Carer Support and expected to be
in 2025/26.
Update
Current contracts which provide Carer Services, remain in place until 31st March 2026. The current
contracts provide the provision of support to individuals identified as unpaid carers, and in line with
Page 148

Page 149

Page 73 of 78
the statutory obligation as set out in the Carers (Scotland) Act 2016. During 2025, we will engage in
contract discussions.
Following feedback from the unpaid carers consultation in 2023, ABCAB have been awarded a
contract to provide Unpaid Carers with Money, Welfare and Related Advice for Unpaid Carers. This
is a 2-year contract and will run until 2027
Work has started to look at an information provision for A&B Parent Carers, who support Children
and Young People with Additional needs in early years and schools. This work will conclude during
2025, with a contract being awarded to support parent carers. This piece of work follows on from a
number of Parent Carers, who advised us of their need for accessible advice, information, and
advocacy appropriate for their needs as parent carers
Page 149

Page 150

Page 74 of 78
Prevention Programme
Priorities Year 3 Progress Update
Carried
over
2025/26
Yes/No
Establish evaluation
framework.
An evaluation subgroup was established to deliver on
the priority of an evaluation framework. The work in
the Community Rehab and Wellbeing stream has
robust evaluation plans in place both Qualitative and
Quantitative.
The Evaluation group will continue to develop an
evaluation framework for the whole Prevention/Living
Well Programme.
Yes
Work in parallel on
delivery of community
rehab and wellbeing
service and developing
sustainable model eg.
Social enterprise.
The delivery of the community rehab and wellbeing
service commenced in January 2025 with good
feedback already. Work is ongoing to develop the long
term sustainable model for the programme with a
Sustainability group meeting to be held in June 2025
to establish options and ensure cohesion between the
community rehab and wellbeing stream and the
community assets stream.
Yes
Continue Health
Behaviour Training and
consider workforce
development of
prevention /public health
agenda.
The Public Health team continues to deliver MAP of
Health Behaviour Change training across NHS
Highland/Argyll and Bute. Training is available
quarterly and a number of new trainers have been
trained in late 24/25. In 24/25, 4 courses were
delivered.
Yes
Continue work outlined in
two subgroups
To enable the delivery of the rehab and wellbeing
stream, Tier 1 and 2 were merged and these are being
delivered by HSCP staff in liveArgyll facilities with
support from liveArgyll staff. The Tier 3 continues to
be carried out in the community assets for Living Well
stream.
Progress update relating to the Community Assets for
Living Well includes:
• Walking Development Officer Post – A Walking
Development Post has been developed to
promote walking initiatives as a means of
improving health, social cohesion, and climate
awareness in Argyll and Bute. The post will
coordinate health walk initiatives at a regional
level, develop communities of practice and
provide overarching guidance and support for
health walks and related activities across Argyll
and Bute. This post is in the process of being
recruited to.
Yes
Page 150

Page 151

Page 75 of 78
• One Front Door – The 'One Front Door to
Wellbeing for All' project aims to improve how
individuals in Argyll and Bute access health and
wellbeing services. The current landscape of
services, while diverse and comprehensive, can be
difficult to navigate due to the region's geography
and the number of service providers working
across various sectors. People often find it
challenging to know where to turn for the support
they need, leading to confusion, duplication of
efforts, and gaps in service provision.
We are currently building a business case and
engaging with HSCP groups to determine whether
to move forward as a distinct third-sector health
and wellbeing initiative or explore a broader,
multi-agency, cross-sector approach. The latter
would significantly widen the project’s reach but
also require a much larger-scale effort
• Working with Communities - Art of Hosting is a
participatory leadership method designed to
empower community leaders. This project aims to
cascade the training across Argyll and Bute,
enabling local leaders to host workshops that
strengthen community resilience. Art of Hosting
training has been delivered to a range of partners,
and work is ongoing to expand this ‘working with
communities’ approach locally.
Engagement Activities Taken Place in 2024/2025
The AHP Prevention Lead engaged with several key groups prior to the launch of the community
rehab and wellbeing physical activity programme. Most notable were the Health Professional
forums, as they would be providing the referrals into the programme. Ongoing engagement is
required with GPs to ensure they are informed about the programme and are supported with
making referrals.
Engagement has also taken place on some of the islands to support delivery of physical activity
programmes on Islay and develop delivery of community rehab and wellbeing physical activity on
Coll. There will continue to be engagement with island groups to further progress delivery options in
these remote and rural areas.
Page 151

Page 152

Page 76 of 78
Digital Health and Care Strategy
Priorities Year 3 Progress Update
Carried over
2025/26 Yes/No
Complete the digital
modernisation
transformation projects
within our records and
appointment services
within the NHS and social
care.
Roll-out of CIVICA electronic document
management system continues with scheduled
completion of adult social care for June 2025.
The next phase will be Children & families.
Trak EPR programme in progress. Oban site due
to go live summer 2025.
Yes
Complete our digital
transformation where more
is accomplished with less
because of new ways of
working by enhancing the
Digital literacy and skills of
our workforce - “Our
people will need to train in
new skills and adopt
working in different ways-
collaboration”.
eHealth continue to provide up to date training
around established IT systems, and future new
systems to support the ongoing development of
digital skills for our workforce.
Yes
Join up our HSCP teams by
improving NHS systems and
Council systems for easier
data sharing. Enhance
communication and
collaboration using MS
Teams federation.
New and innovative ways to increase sharing of
information is ongoing. Use of MS365 power
apps.
Yes
Complete the final phase of
our “Drone” beta service
for clinical logistics in the
West of Argyll leading
national innovation in the
use of this technology in the
Scottish Health service.
The drone trial using the Speedbird DLV2 drone
delivered by Skyports between Islay and Jura
has now been completed. Data from the trial
has been thoroughly analysed, and feedback has
been provided. This initiative, funded by the
Regulatory Pioneering Fund, aimed to
demonstrate the safe integration of drones in
shared airspace and their potential for
transporting school meals, Royal Mail goods,
and NHS medical supplies. Our part in the Trial
focussed on analysis of temperature control of
selected medication and medical supplies during
flight. The analysis and feedback will inform
future decisions on the broader use of drones in
healthcare logistics, enhancing service delivery
and community resilience in Argyll & Bute.
No
Page 152

Page 153

Page 77 of 78
Technology Enabled Care (TEC)
Priorities Year 3 Progress Update
Carried over
2025/26 Yes/No
Ensure all Telecare clients
have a digital solution in
place.
We are continuing to ensure Technology
Enables Care (TEC) is a core service
embedded in all aspects of delivery of care,
which involves the promotion of all
available services throughout
patients/clients' journey and supporting
colleagues to feel more comfortable using
TEC available as a resource to support their
delivery of care and free up time for direct
patient care
Yes
Continue to develop NHS
Near Me clinics to support
clinicians in delivering
remote clinics and supporting
patients to attend
appointments without the
need to travel.
• Continued promotion of NHS Near Me
clinics to support clinicians in
delivering remote clinics and
supporting patients to attend
appointments without the need to
travel
• Supporting roll out of further
Silvercloud pathways
• Trial and evaluation of digital
homecare solutions including remote
medication prompts and digital
hydration kits.
• Work with GP practices to promote
further uptake of remote health
monitoring for blood pressure.
• Scope utilisation of remote health
monitoring for asthma and heart in
A&B HSCP and develop plans for
subsequent years.
• Ensure all telecare clients have a
digital solution in place in time for
switch-over from analogue to digital
telephone lines
Yes
Page 153

Page 154

Corporate Services
Priorities Year 3 Progress Update
Carried over
2025/26 Yes/No
Progress the achievement of
net zero carbon emissions
across NHS commercial fleet,
working in partnership with
Argyll & Bute Council and NHS
Highland.
Progress towards net zero carbon
emissions across HSCP services continues
albeit there is limited funding to improve
the efficiency of properties in any
meaningful way.
Yes
Complete our digital
transformation where more is
accomplished with less
because new ways of working
with or without technology.
Digital transformation is not
about technology only – Our
people will need to train and
adopt working in different
ways- collaboration.
eHealth continue to provide up to date
training around established IT systems,
and future new systems to support the
ongoing development of digital skills for
our workforce.
Yes
Implement the new ECLIPSE IT
system and increase the
number of health staff using
the single health and social
care IT system.
Eclipse Phase 2 implementation- OLM
have provided a project plan for
discussion at April Eclipse Board.
Discovery session are being set-up to
support MH and Child Health Teams as the
last stage of the Eclipse roll-out across
community health teams. This will mean
that all community health teams will be
using Eclipse by June 2026.
Yes
Join up our HSCP teams by
improving NHS systems and
Council systems for easier
data sharing. Enhance
communication and
collaboration using Microsoft
Teams federation.
Awaiting future update from digital
services on second phase of federation.
Yes
Page 78 of 78
Page 154

Page 155

ARGYLL AND BUTE COUNCIL         COMMUNITY SERVICES COMMITTEE 
EDUCATION         11 DECEMBER 2025 
CARE EXPERIENCED CHILDREN AND YOUNG PEOPLE 
2024-25 ACADEMIC YEAR REPORT 
1.0 EXECUTIVE SUMMARY 
1.1 The main purpose of this report is to provide the Community Services
Committee with an update on actions being taken within the Education Service
to support Care Experienced Children and Young People to achieve the best
possible educational outcomes. 
1.2 The report also details the expenditure against the grant allocated by Scottish
Government to Argyll and Bute for session 2024 - 25 from the Scottish
Attainment Challenge Care Experienced Children and Young People Fund. 
1.3 Recommendations 
It is recommended that Community Services Committee: 
a) Continues to endorse the work undertaken by Argyll and Bute Education
Services as part of the Corporate Parenting Board to improve the educational
attainment and life chances of Care Experienced Children and Young People. 
b) Notes that the spending plan for the grant allocated by Scottish Government
to Argyll and Bute for session 2024- 25 from the Scottish Attainment Challenge
Care Experienced Children and Young People Fund has been produced and
monitored by the Education Lead for Care Experienced Children and Young
People, in consultation with key partners and specifically the Social Work
Lead for Care Experience, the Chief Education Officer and Chief Social
Worker. 
c) Note the significant progress made in reducing the attainment gap between
CE and all learners. 
d) Note the continued progress made across key indicators including sustained
reduction in exclusions, increased staff awareness and confidence in
supporting our CE learners and partnership working to drive positive change. 
e) Agree the attainment funding for Care Experienced Children and Young
People will support the continued input from the Care Experienced Education
Team (Virtual Head Teacher and Health and Wellbeing Liaison Officers). 
Page 155 Agenda Item 9

Page 156

f) Agree that the Chief Education Officer continues to provide updates on the
improved outcomes for Care Experienced Children and Young People to the
Corporate Parenting Board and /Community Services Committee. 
Page 156

Page 157

ARGYLL AND BUTE COUNCIL          COMMUNITY SERVICES COMMITTEE 
EDUCATION                                    11 DECEMBER 2025 
CARE EXPERIENCED CHILDREN AND YOUNG PEOPLE
2024-25 ACADEMIC YEAR REPORT 
2.0 INTRODUCTION 
2.1 Corporate Parenting is the responsibility that all local authority bodies in
Scotland have for children and young people who are Care experienced under
the Children (Scotland) Act 1995 and this cohort are known as Care
Experienced Children and Young People (CECYP). 
2.2 The establishment of Argyll and Bute’s Corporate Parenting Board was central
to the Council response to improving outcomes for Care Experienced Children
and Young People and care leavers. It was also a key element of the Getting
it Right for our Care experienced Children’s Improvement Plan alongside our
Education Strategic Plan 2024 - 2026. 
2.3 As employees of the local authority, education staff are Corporate Parents and
have a clearly defined role to play alongside the other 23 Corporate Parents
defined in Schedule 4 of the Act.  Staff working in education require to be aware
of the unique role which they play in ensuring that care experienced children and
young people experience a positive learning environment, strong, nurturing
relationships and are supported to achieve positive destinations as they move
into adulthood.  Senior leaders require to ensure support and ongoing
professional learning opportunities for education staff to allow them to fulfil this
crucial role.   
2.4 During session 2024/25 we have continued to build on the significant
developments during the previous sessions to further support the educational
experiences and outcomes for our children and young people in Argyll and Bute. 
The Care Experience Education Team (CEET) comprises of a Virtual Head
Teacher (VHT) and four Health and Wellbeing Family Liaison Officers.   
3.0 RECOMMENDATIONS 
It is recommended that Community Services Committee: 
a) Continues to endorse the work undertaken by Argyll and Bute Education
Services as part of the Corporate Parenting Board to improve the
educational attainment and life chances of Care Experienced Children
and Young People. 
Page 157

Page 158

b) Notes that the spending plan for the grant allocated by Scottish
Government to Argyll and Bute for session 2024/25 from the Scottish
Attainment Challenge Care Experienced Children and Young People Fund
has been produced and monitored by the Education Lead for Care
Experienced Children and Young People, in consultation with key
partners and specifically the Social Work Lead for Care Experience, the
Chief Education Officer and Chief Social Worker. 
c) Note the significant progress made in reducing the attainment gap
between CE and all learners. 
d) Note the continued progress made across key indicators including
sustained reduction in exclusions, increased staff awareness and
confidence in supporting our CE learners and partnership working to drive
positive change. 
e) Agree the attainment funding for Care Experienced Children and Young
People will support the continued input from the Care Experienced
Education Team (Virtual Head Teacher and Health and Wellbeing
Liaison Officers). 
f) Agree that the Chief Education Officer continues to provide updates on
the improved outcomes for Care Experienced Children and Young
People to the Corporate Parenting Board and Business Continuity
Committee/Community Services Committee. 
4.0 DETAIL 
4.1 In 2018, as part of the National Improvement Framework for Scottish
Education and Attainment Scotland Fund (a targeted initiative focused on
supporting young people affected by poverty and deprivation across
Scotland), specific funding was directed towards supporting Care Experienced
Children and Young People (CECYP). The term 'care experienced' is now a
widely used term within the sector to describe any person who has experience
of being in care, regardless of their placement length or type, or their age; this
term is used (as opposed to the statutory term ‘Looked After Children') to
ensure that our practice is inclusive and provides for all groups of young
people who experience care.  Our work aligns to ‘The Promise’ – a cross party
commitment to ensure that Scotland’s children grow up loved, safe and
respected (The Promise Scotland | Transforming how Scotland cares for children, families,
and care-experienced adults).   
4.2 As at September 2025, we have 283 Care Experienced pupils in our education
settings (2-18).  145 are “Currently Looked After”.  Of those, 107 are looked
after by Argyll and Bute and 38 children have been placed in Argyll and Bute
from other Authorities.  The additional 138 Care Experienced children and
young people in our settings have a status of “Previously Looked After”. 
These figures refer to pupils in Early Years, Primary, Special and Secondary
settings.  Argyll and Bute Education Service also connects to education
Page 158

Page 159

providers in relation to any young person placed in other authorities through
residential, kinship or foster placements. 
4.3 Argyll and Bute Council was awarded a specific grant of up to £131,075
payable over the academic year 2024/25.  As previously agreed with the
Scottish Government, the Council has used earmarked reserves to supplement
the 2024/25 specific grant.
Below is a breakdown of the spend for session 2024/25: 
ITEM AMOUNT
Staffing £146,903
Support Activities/Resources £5196
Travel and Subsistence £1998
Total expenditure £154,097
Funded by:
2024/25 Scottish Government specific
grant 
£131,075
Earmarked Reserves £21,732
Funded from Other Grants  £1290
Total funding £154,097   
4.4 Data on attendance, progress and achievement and exclusions has been
provided throughout the last session to the Corporate Parenting Board.  The
Community Services Committee summary outline is found below: 
4.4.1 EXCLUSIONS 
Argyll and Bute continue to prioritise inclusion for our CECYP and align to
upholding the rights of children and ending exclusions.  This commitment is a
key area of focus in The Promise.   
In line with the draft Scottish Government ‘Improving Educational Outcomes for
CECYP’ framework, we used exclusion data to set a 2024 – 25 baseline target
which was to have less than 2 exclusions across the academic year. 
Due to a range of strategic and operational approaches, we are delighted to
have exceeded our target.  For the second academic year in a row, zero
CECYP were excluded from our settings. Senior Leader commitment to Keeping
the Promise has ensured that our settings have high aspirations for our CECYP
and are supported to meet the needs of each CECYP.
Page 159

Page 160

The Virtual School has seen an increase in early intervention calls for support. 
This has allowed us to work in partnership with young people, their
parents/carers, Corporate Parents and wider agencies to offer bespoke
supports.  These have included Firefighter Experience Days, work experience,
enhanced nurture provision and HWBFLO input. 
4.4.2 ATTENDANCE 
Subject to census checks, CECYP Primary attendance was 92.5% compared to
93.7% of all primary children.  CECYP secondary attendance was 80.9%
compared to 87.6% of all secondary children. Overall attendance of our CECYP
was 86.2% compared to an authority overall figure of 90.9%. The difference
between our CE and all pupil attendance is similar to last year. 
Argyll and Bute have been trialling the draft Scottish Government ‘Improving
Educational Outcomes for CECYP’ framework.  Using baseline attendance data
from session 2020/21 to date, we set a target of 86.4% which matched the
national aspiration for a 0.66% increase in the attendance of CECYP.  Based on
the 2023-24 overall attendance figure of 85.8%, our target was 86.4%.  Our
actual overall attendance was 86.2%. 
The Education Outcomes for Looked After Children 2023-24 statistics notes that
attendance continues to be an area of focus and notes a national gap between
looked atter learners and all pupils has increased in both primary and secondary
with an overall gap of 6.6%.  For comparison our authority gap for the same
period was 4.8% 
The Education Outcomes for Looked After Children 2023-24 show an increase
attendance gap compared to 2022-23 for secondary pupils as 9.3%. In 2023 -
24, the gap between our authority young people cared for at home and away
compared to all pupils was 7.6%. In primary, the national gap was 3.3% and our
authority comparative figure was 1.3%.   
0
50
100
150
200
250
300
350
2020/21 2021/22 2022/23 2023/24 2024/25
CECYP Exclusion Data
No of CECYP in session (incl ELC) No of CECYP Excluded
Page 160

Page 161

Our 2024 – 25 secondary attendance date for CECYP shows a 0.1% increase
for all CECYP on the previous year and primary showing an increase of 1%,
shown in the charts below. 
PRIMARY                                      SECONDARY
Please note these figures are subject to change due to the Attendance, Absence and Exclusions
census. 
Attendance of our CECYP remains a priority, particularly for those children
cared for at home.  As an authority, Argyll and Bute are continually working to
support our learners attend school.  The Addressing Non-Attencace (ANA)
programme continues to focus on improving pupil attendance and engagement.
To date, 70% of secondary schools have engaged with this training. Across the
whole authority for all young people, the overall rate of persistent absence has
fallen 4 percentage points against 2023 -24. 
A new data dashboard and CECYP database application are enhancing
attendance data scrutiny, enabling deeper tracking and real-time monitoring. 
4.4.3 PROGRESS AND ACHIEVEMENT DATA 2024-25
CECYP, P1 – S3, BROAD GENERAL EDUCATION 
Progress and Achievement data is uplifted at three points across the school
year.  Care Experience Data is then extracted and used in focused attainment
meets between the Virtual School and Designated Manager for CECYP in
each education setting. 
By combining cohorts, we can compare Care Experienced (CE) and non-
Care Experienced pupils at an authority level. The table below evidences the
four-year positive progress for our CE learners in P1, 4, 7 and S3. This is a
positive picture with attainment for CE pupils showing an increase in every
area in the 2024 – 25 session, and, illustrating a closing of the gap between
Page 161

Page 162

CE and non-CE pupils in every area with CE pupils, who themselves have
also improved. 
For information: to achieve the level in Literacy 3 components must be
achieved at that level – listening and talking/reading/writing. 
We continue to identify and address themes, ensuring required interventions
are specific and personalised to individual children and young people.   This
includes attendance, alternative to exclusion and transition supports, which all
impact on attainment. 
SCOTTISH QUALIFICATION AUTHORITY ATTAINMENT DATA 2024- 25 
ALL COURSES
Please note this attainment data is prior to the appeals process and to full
attainment data being published by Insight. 
Attainment data for CECYP was shared within the SQA Examination Results
paper, presented to Committee on 28th August 2025 in Section 4.13.  We
include these again in this CECYP focused paper. 
The table below provides an overview of presentations for our CEYP by stage: 
Number of Presentations
Stage Number of
Pupils National 2 National 3 National 4 National 5 Higher Grand
Total
S3 2  5 1   6
S4 29 1 28 48 40 1 118
S5 15  1 6 22 13 42
S6 9   3 4 11 18
Totals 55 1 34 58 66 25 184 
Page 162

Page 163

The table below shows the number of CEYP pupils who presented for National
Qualifications from each CE type: 
Care Experience
Type
Number of
Pupils
Number of
Awards
Awards per
Pupils
Away 28 88 3.1
Home 3 9 3.0
Previously 24 87 3.6
Grand Total 55 184 3.3 
• In 2025 there were 93 completed awards from National 2 to National 4.
These 93 awards came from 36 different pupils, meaning that on average
each CEYP who sat one of these awards completed 2.6 awards.
• In 2025, there were 91 presentations at the graded National 5 and Higher
courses. These presentations came from 33 different pupils, meaning that on
average each CEYP who sat one of these awards completed 2.8 awards. 
Pass rates for the National 5 and Higher awards are provided in the table below: 
Presentation
Type
A-C Pass
Rate
D
Awards
No
Award
A-D Pass
Rate
National 5 62.1% 19.7% 18.2% 81.8%
Higher 72.0% 4.0% 24.0% 76.0% 
The table below provides the underlying numbers of pupils and presentations as
well as a comparison of pass rates against 2024 data:  
National 5
Year Number of
Pupils
Number of
Presentations
Presentations per
Pupil
A-C Pass
Rate
A-D Pass
Rate
2025 27 66 2.44 62.10% 81.80%
2024 29 70 2.41 45.70% 74.30%
Change:   0.03 16.40% 7.50% 
Higher
Year Number of
Pupils
Number of
Presentations
Presentations per
Pupil
A-C Pass
Rate
A-D Pass
Rate
2025 12 25 2.08 72.00% 76.00%
2024 12 24 2.00 33.30% 70.80%
Change:   0.08 38.70% 5.20% 
• The number of pupils presenting for National 5 and Higher awards has
remained similar across the two-year period. The presentation per pupil rate
has increased very slightly across both measures. 
• The A-C pass rate at National 5 has increased by 16.4% points against
2024. This means in 2025, 27 pupils achieved 41 A-C awards compared to
29 pupils achieving 32 awards in 2024. As such, the National 5 awards per
pupil increased from 1.1 in 2024 to 1.5 in 2025.
Page 163

Page 164

• The A-C pass rate at Higher has increased by 38.7% points against 2024.
This means in 2025, 12 pupils achieved 18 A-C awards compared to 12
pupils achieving 8 A-C awards in 2024. As such, the Higher awards per pupil
increased from 0.66 in 2024 to 1.50 in 2025.
• The A-D pass rate at National 5 has increased by 7.5% points, whilst an
increase of 5.2% points also occurred at Higher level. 
ACHIEVEMENT IN LITERACY / NUMERACY -  NATIONAL COMPARISON 
The tables below evidence a national comparison of ‘looked after’ learners in
S5 in relation to literacy and numeracy at SCQF levels 4 and 5, cumulative
attainment by the end of S5 based on original S4 roll.  They present a positive
picture for most years, rather than a singular year. Caution should be given
due to the extremely small cohort numbers in the authority. 
Page 164

Page 165

The tables below show a national comparison of ‘looked after’ school leavers in
S5 in relation to achievement of SCQF Level 6 (Higher) and Level 7 (Advanced
Higher) Awards. 
Level 6 shows an improvement against 2023 leavers cohort and is now ahead of
the national figure for all looked after leavers. 
Page 165

Page 166

Level 7 shows a small decline but remains ahead of the national figure for the
fifth year in a row. 
Across our settings, we aim to support each CECYP to achieve their potential
and access learning in a way which works for them.  Some of our young people
experience significant transitions during their senior phases and we support
them to celebrate success, however that looks for them. 
Some examples of learner success: 
• A learner facing significant challenges in their home environment
demonstrated consistent engagement with their education, supported by
a tailored package of pastoral and academic interventions. Daily
attendance was sustained through access to safe spaces, structured
routines, and therapeutic support provided by the school’s Pupil Support
and Guidance teams. These measures were instrumental in supporting
both wellbeing and attainment. The transition from temporary care
arrangements into the stability of the school setting was managed with
sensitivity and care. The learner’s academic outcomes and continued
progress reflect the impact of effective multi-agency support and their
own resilience in overcoming adversity.
• Learner who experienced significant transitions was supported to regain
confidence and build positive relationships in school – with staff and
friends.  This resulted in increased attendance, in turn, leading to
increased attainment, self-belief and sense of belonging.  The young
person has gone on to a positive destination and is able to share her
views confidently.
• Young person who could not access school due to a situation change
was supported to engage with learning in way that worked for them. A
bespoke timetable and a dedicated hand-picked staff team worked
alongside the young person to ensure they achieved the necessary
qualifications to enter further education.  
• Guidance Team connected with Virtual School to upskill their knowledge
in how best to support a young person in their care.  Their commitment
resulted in the young person remaining in school for longer.  Whilst this
Page 166

Page 167

did not lead to increased national qualifications, the young person gained
a wide range of holistic skills and increased their resilience. This
additional time in education helped them remain safe, included and enter
the world of work. 
• Young person left authority school mid-way through final study year.
School were able to maintain a connection, leading to achievement of a
national qualification, robust transition and continued sense of belonging.
They are now supported by their new authority and have qualifications to
build on. 
• Many of our young people continue their journey in education.  We are
very proud of all our CECYP and are delighted to have a pupil from one
of our school’s Senior Pupil Leadership Team’s join us today.  This pupil
was appointed as Depute Head Girl following a rigorous and competitive
interview process. Pupil Voice on how the Education Service has
supported their learning journey. 
4.5     The profile of our CECYP continues to be actively promoted and elevated
across the Education Service and wider colleagues in the authority.  This
includes the voice of this cohort being reflected in our refreshed Education
Service vision ‘Our Children, Their Future – Thriving Together.’ 
Our Care Experience Education Team continue to deliver Keeping the Promise
training and the VHT participates in the Keeping the Promise Awards Steering
Group, strengthening strategic leadership for care experienced learners. 
We continue to deliver ‘Raising Awareness of our CECYP’ to partners and now
have an established relationship with the University of the Highlands and Islands
to provide this training as part of their Initial Teacher Education Programme. 
Care Experience information has been integrated into mandatory Child
Protection training.  The CEET continues to respond to the increased requests
from settings for support and training, reflecting the growing awareness and
commitment to CECYP. 
4.6 The Virtual School continues to build and strengthen partnership work,
particularly with Health and Social Work.   This helps to ensure that our young
people and their families feel heard and supported, particularly during time of
challenge. 
Wider links with Skills Development Scotland, Developing the Young Workforce
and MCR Pathways are helping to ensure our CECYP are accessing bespoke
supports throughout their learning journey.  63 CECYP are supported by the
mentoring programme with pupil voice evidencing the positive impacts of this
relational support.  This programme is expanding across our secondary schools
and the number of CECYP receiving support will increase.   
The Virtual School were supported via Argyll Community Housing Association
(ACHA) and the Communities Partnership Team to create ‘Always Belong’
welcome bags.  CECYP voice directed this project and we now have bags
Page 167

Page 168

across the authority to be shared as appropriate with our young people ages 2 –
18. Feedback on this to date has been wholly positive. 
The Virtual Head Teacher represents the Education Service/Care Experience
Education Team by reporting and participating in working groups directly related
to CECYP or the services around them.  This includes the Corporate Parenting
Board, Regional Promise Group, Kinship Panel, and CELCIS Virtual Head
Teacher Network.   
4.7 The Care Experienced Education Team consists of the VHT and four Health and
Wellbeing Family Liaison Officers (HWBFLO).  The HWBFLO work operationally
across the authority on a referral basis, working directly with our CECYP. The
team continually show their commitment and dedication to Keeping the Promise
and are highly adaptive whilst working towards defined outcomes. 
During this academic year over 33 CECYP have benefited from the Care
Experienced Education Team input.  Our referral process has been refreshed to
ensure we are supporting young people at the right time, for the appropriate
length of time.  Increased awareness of the positive impact of the HWBFLO’s
has led to an increase in referrals.  We work closely with both the Education and
NHS Wellbeing Teams, aiming to ensure each young person receives bespoke
support. 
Intervention themes include transition support, wellbeing and whole family
support, emotional regulation, positive role modelling and connection to school
community.  The positive impact of this service is evidenced through increased
school attendance, greater sense of inclusion and increased self-esteem
amongst wider impacts.  Recognising the need for consistency around
transitions, particularly in times of crisis, we have reprioritised resourcing to
facilitate greater support in this area across the 2025 – 26 academic year. 
4.8 Feedback from our young people, their parents/carers, education colleagues,
and partnerships continues to shape how the CEET executes their support. 
Our CECYP voice tells us the importance of positive relationships and being
able to access a range of supports in a way which works for them.  Learners tell
us they feel heard and supported by their HWBFLO and describe the impacts on
learning and social connections. Families reflect on feeling heard and
supported, particularly during periods of challenge.
o “I feel good, good, good!” P3 pupil
o “I get it, you are just trying to help me.” S2 pupil
o “I cannot believe I just done that!  Thanks!” S4 pupil
o “Supporting X with her learning has made a massive difference.  We can
see her confidence grow and she is now happy about going to school.”
Carer. 
Education colleagues surveyed at the end of the 2024 – 25 academic year
identified the following Virtual School impacts:
Page 168

Page 169

A survey shared with partner agencies evidenced an increased range of
partnership working to support young people and their families, including family
support, cross-border working and bespoke approaches for individual young
people. 
The survey also evidenced an increased awareness of the role of the Virtual
School across a range of partners. 
Argyll and Bute Education Service have demonstrated their continued
commitment to Keeping the Promise through creation and continued support of
the Virtual School. The Virtual School continues to evolve and adapt to the
needs of our young people, both operationally and strategically.       
5.0 CONCLUSION 
5.1 The Education Service continues to maintain momentum and make significant
improvements for our Care Experienced Children and Young People across
Argyll and Bute in line with our Corporate Parenting Board and Education
Service targets. Our commitment to ensuring all our CECYP have what they
need to thrive is unwavering.  We will continue to address raising attainment and
closing the gap for Care Experienced Children and Young People in session
2025/26. 
Page 169

Page 170

6.0 IMPLICATIONS 
6.1 Policy – None 
6.2 Financial – Appropriate allocation of the Care Experienced Children and
Young People Fund Grant 
6.3  Legal – The statutory duties of the Children (Scotland) Act 2020 and all
previous relevant acts will be met. 
6.4  HR – None 
6.5  Customer Services – Improvements in service to meet individual needs are
being sought 
6.6  Risk – Ongoing scrutiny and audit will provide better outcomes for Care
Experience Children and Young People. Sustainability and future-planning will
mitigate future risk. 
6.7  Climate Change – None 
6.8  Fairer Scotland Duty:  Providing equity and inclusion to meet the needs of all
young people. 
6.9    Equalities - protected characteristics – All legislative requirements will be met 
6.10  Consumer Duty – None 
6.11 Islands – No differentiated impact. 
6.12 Children’s Rights and Wellbeing – This report links to Article 29 (goals of
education). 
Douglas Hendry - Executive Director with responsibility for Education                                                    
Councillor Kieron Green - Policy Lead for Education 
Jen Crocket, Head of Education: Lifelong Learning and Support (Chief
Education Officer) 
For further information contact: 
Jen Crocket, Chief Education Officer/ Head of Education- Wellbeing, Inclusion and
Achievement
jennifer.crocket@argyll-bute.gov.uk  
Page 170

Page 171

ARGYLL AND BUTE COUNCIL        COMMUNITY SERVICES COMMITTEE 
EDUCATION                             11 DECEMBER 2025 
EDUCATION PERFORMANCE DATA ANALYSIS 2024-25 
1.0  EXECUTIVE SUMMARY 
1.1 This report aims to give an overview of essential performance data and
outcomes for all students in Argyll and Bute's ten secondary schools for the
2024-2025 academic session. It utilises local authority attainment data along
with information provided by the Scottish Government's Insight tool.  
1.2 The Insight tool is designed to allow fair comparison of a group of pupils in Argyll
and Bute with larger groups of pupils with similar backgrounds (gender,
additional support needs, stage, and SIMD band) taken from the remaining 31
local authorities. It should be noted that the current Virtual Comparator
methodology does not incorporate any measure of rurality. The Virtual
Comparator (VC) is a key feature of Insight and allows for both school and
authority level comparison. Insight also allows for the comparison of attainment
in Argyll and Bute with national performance. 
1.3 As well as presenting performance data relating to presentations for certificated
subject awards in schools, the report also highlights the broad range of Wider
Achievement awards gained by pupils across the authority, both in schools and
through work with partners. 
1.4 It should be noted that a further update of Insight will occur in February 2026.
Included in this update will be all post-appeal results, further wider achievement
attainment and specific information on the attainment of young people who left
school in 2024-2025. A paper outlining key content of the update will be
presented to committee thereafter. 
1.5  It is recommended that the Community Services Committee: 
a) Considers the information contained in this report. 
b) Commends the hard work and commitment of pupils and staff in securing
these levels of attainment and achievement and recognises the crucial
role in such success played by parents and carers in partnership with
our schools. 
Page 171 Agenda Item 10

Page 172

c) Notes the SQA directive that, because of the different assessment
arrangements in place each year over the period 2020-2023, meaningful
comparison is limited between current results and performance in recent
previous sessions.    
d) Notes that a further report will come to a future meeting of the Committee
once final Insight data for session 2024-2025 is made available in the
February 2026 Insight update.                                                                       
Page 172

Page 173

ARGYLL AND BUTE COUNCIL        COMMUNITY SERVICES COMMITTEE 
EDUCATION                             11 DECEMBER 2025       
EDUCATION PERFORMANCE DATA ANALYSIS 2024-2025   
2.0  INTRODUCTION 
2.1 In August 2025, the Council received notification of SQA awards for all pupils
in Argyll and Bute entered for National Qualifications in session 2024/25.   
2.2 The 2024/25 academic session was the fourth successive year in which pupil
attainment has been determined through a diet of examinations. In 2020 and
2021, examinations were cancelled because of Covid-19, and attainment
was determined through the submission of provisional results to the SQA,
based on teacher professional judgement which considered a wide range of
candidate assessment evidence.   
2.3 The 2022 SQA examination diet was characterised by Covid-related  
modifications. The arrangement whereby internal and external assessment
elements of some courses were reduced was continued into the 2023 diet. 
However, unlike 2022, the 2023 diet did not include SQA advice to
candidates on the range of topics to be assessed in examinations for some
courses, to support their studying and revision activities. 
2.4 The 2024 diet saw a return to established awarding procedures for most
courses, which was again repeated in 2025. As a result of these
modifications, the SQA has advised that comparison to 2019, the last pre-
pandemic diet, is most appropriate for comparative purposes. The SQA has
advised that caution should be applied in comparing 2024 and 2025
attainment data to results produced between 2020 and 2023. 
3.0  RECOMMENDATIONS 
3.1 It is recommended that the Community Services Committee: 
a) Considers the information contained in this report. 
Page 173

Page 174

b) Commends the hard work and commitment of pupils and staff in securing
these levels of attainment and achievement and recognises the crucial
role in such success played by parents and carers in partnership with
our schools. 
e) Notes the SQA directive that, because of the different assessment
arrangements in place each year over the period 2020-2023, meaningful
comparison between results in 2024 and 2025 and the other years in this
period, specifically 2020 and 2021, is limited. 
c) Notes that a further report will come to a future meeting of the Committee
once final Insight data for session 2024-2025 is made available in the
February 2026 Insight update. This update will provide an overview of
the 2025 leavers cohort.   
4.0  PRESENTATIONS AND PASSES 
4.1 Presentation rates measure the average volume of presentations per pupil
across award types and stages. This is important contextualising
information for pass rates and necessary to holistically assess performance.
For example, pass rates could increase at the expense of presentations if
we deterred pupils who were estimated to get a D grade. On the other hand,
if the average presentation per pupil rate increases then a fall in pass rates
may not necessarily be a negative thing if the number of awards per pupil
increases. Presentation rates by stage and commonly presented award
types are provided below. 
4.2 The table below shows the number of S4 pupils who were presented for
National 5 qualifications in each of the last 5 sessions: 
Table 1 – S4 and National 5 Presentations 
S4 Presentations
Year Number of pupils
presented
Number of Nat 5
Presentations
Nat 5 Presentations
per pupil
2021 738 3229 4.38
2022 783 3614 4.62
2023 771 3449 4.47
2024 830 3595 4.33
2025 814 3817 4.69 
• The Nat 5 presentations per pupil rate has increased meaningfully
against 2024 and is the highest in the last five sessions. The final
session prior to the pandemic, 2018/19, saw a S4 Nat 5 presentation
rate of 4.01.
Page 174

Page 175

• In relation to the 2023/24 cohort, the 2024/25 S4 cohort had 16 pupils
fewer present for national qualifications yet presented for 222 extra
National 5 awards. 
4.3 The table below shows the number of S5 pupils who were presented for
National 5 and Higher qualifications in each of the last 5 sessions: 
Table 2 – S5 and National 5/Higher Presentations 
S5 Presentations
Year
Number of
pupils
presented
Number of
Nat 5
Presentations
Number of
Higher
Presentations
Nat 5
Presentations
per pupil
Higher
Presentations
per pupil
2021 659 532 1847 0.81 2.80
2022 563 523 1639 0.93 2.91
2023 593 478 1747 0.81 2.95
2024 588 550 1573 0.94 2.68
2025 634 518 1779 0.82 2.81 
• The Nat 5 presentations per pupil rate has decreased against the 2024
rate but remains in line with 2023 and 2021.
• The Higher presentation rate has risen to 2.81 from 2.68 in 2024. 
• The overall presentation rate (combining both Nat 5 and Higher
presentations) is in line with 2024. However, there has been a small
swing away from Nat 5 presentations towards Higher presentations. 
4.4 The table below shows the number of S6 pupils who were presented for
Higher and Advanced Higher qualifications in each of the last 5 sessions: 
Table 3 – S6 and Higher/Advanced Higher Presentations 
S6 Presentations
Year
Number of
pupils
presented
Number of
Higher
Presentations
Number of
Adv Higher
Presentations
Higher
presentations
per pupil
Adv Higher
presentations
per pupil
2021 448 713 316 1.59 0.71
2022 431 604 339 1.40 0.79
2023 391 556 281 1.42 0.72
2024 410 565 314 1.38 0.77
2025 413 621 248 1.50 0.60 
• The Higher presentations per pupil rate has increased against 2025
and is the highest it has been since 2020/21.
• The Advanced Higher presentation rate has decreased against the
figure of 2023 and remains in line with 19/20 figures.  
Page 175

Page 176

4.5 Pupils in each of the ten secondary schools in Argyll and Bute were presented
for a range of SQA external examination qualifications in April, May and June
of 2025. Following the release of results, Education Services conducted an
initial analysis of the attainment data to support the preparation of a summary
report for presentation to and consideration by Elected Members at
Committee in August 2025.  This can be accessed via the following link: 
August 2025 Community Services Committee - SQA Update 
Additionally, all secondary schools have engaged in analysis of their own
SQA attainment, and will present data and conclusions, following the
February 2026 Insight update, at the relevant Area Committees.  An initial
overview will be presented in January/February during Elected Members’
visits to schools. 
4.6 The pre-appeal A-C SQA attainment results for pupils in academic year 2024-
2025 are outlined in the following table: 
Table 4 – A-C Awards 2025 – A&B/National – National 4, National 5, Higher,
Advanced Higher   
2024 - 2025 
A&B Attainment
A-C %
(pre-appeal)
National
Attainment A-C %
LA Schools only
(pre-appeal)
Difference
A&B 23/24 to
National
A-C (pre-appeal)
Nat 5 77.2% 77.4% -0.2pp
Higher 73.4% 74.8% -1.5pp
Adv H 74.5% 73.8% +0.7pp    
To maintain the integrity of comparison with the national data, the following
analysis reflects on pre-appeal data, as national post-appeal data has not yet
been released. 
• National 5 results are below the national pass rate by 0.2% points.  
• Higher results are below the national pass rate by 1.5% points.  
• Advanced Higher results are above the national pass rate by 0.7%
points. 
Page 176

Page 177

4.7 The pre-appeal A-D SQA attainment results for pupils in academic year 2024-
2025 are outlined in the following table:  
Table 5 – A-D Awards 2025 – A&B/National – National 5, Higher, Advanced Higher       
• National 5 results are above the national pass rate by 0.7% points.  
• Higher results are above the national pass rate by 0.4% points.  
• Advanced Higher results are below the national pass rate by 0.6%
points. 
4.8 The following graphs illustrate A-C and A-D presentation pass rates at school
level across our secondary schools in 2025. Figures for Argyll and Bute and
Scotland are also provided. 
Figure 1: A-C Pass Rates by School, Argyll and Bute and Scotland 
* It should be noted that, because of low presentation numbers, statistical variance at Advanced Higher
level must be carefully interpreted. For example, 100% pass rate can be because of a single pupil
presentation resulting in a pass. 
2024 - 2025 
A&B Attainment
A-D % (pre-
appeal)
National Attainment A-D
% LA schools only (pre-
appeal)
Difference
A&B 23/24 to National A-D
(pre-appeal)
Nat 5 89.9% 89.2% +0.7pp
Higher 89.9% 89.5% +0.4pp
Adv H 88.2% 88.9% -0.7pp
Page 177

Page 178

A-C by School Analysis: 
• Three of our secondary schools were equal to or above the 2025 A-C
national average for National 5 (77.4%). 
• Six schools improved their National 5 A-C pass rates against 2024.
• Five of our secondary schools were above the 2025 A-C national
average for Higher (74.8%). 
• Six schools improved their Higher A-C pass rates against 2024.
• Seven of our secondary schools were above the 2025 A-C
national average for Advanced Higher (73.8%).
• Four schools improved their Advanced Higher A-C pass rate
against 2024, with 1 school matching their figure from 2024 and
another having 100% against no presentations last session.   
Figure 2 - A-D Pass Rates by School, Argyll and Bute and Scotland 
* It should be noted that, because of low presentation numbers, statistical variance at Advanced Higher
level must be carefully interpreted. For example, 100% pass rate can be because of a single pupil
presentation resulting in a pass. 
A-D by School Analysis 
• Five of our secondary schools were equal to or above the 2025 A-D
national average for National 5 (89.2%). 
• Six schools improved their National 5 A-D pass rates against 2024.
Page 178

Page 179

• Seven of our secondary schools were above the 2025 A-D national
average for Higher (89.5%). 
• Six schools improved their Higher A-C pass rates against 2024.
• Six of our secondary schools were above the 2025 A-D national average
for Advanced Higher (88.9%). It should be noted that statistical variance
at Advanced Higher level must be carefully interpreted. For example,
100% pass rate can be because of a single pupil presentation resulting in
a pass. 
• Four schools improved their Advanced Higher A-D pass rate
against 2024, with 1 school matching their figure from 2024 and
another having 100% against no presentations last session.   
4.9 The following graphs detail 2025 attainment for the whole of Argyll and Bute
across National 5, Higher and Advanced Higher against national figures. 
There are separate charts for attainment at grades A-C and attainment at
Grades A-D.  For comparison, data from previous years have also been
supplied: this includes 2019 as the final ‘pre-pandemic session’ and 2022
and 2023 as ‘post-pandemic’ sessions. In 2020 and 2021, there were no
examinations due to COVID-19, rendering comparisons with these years
invalid. 
Figure 3 - National 5 Pass Rates Trend 
• At National 5 level, Argyll and Bute attainment followed the national trend
at both A-C and A-D grades, with both increasing against 2024. 
Page 179

Page 180

• Argyll and Bute performance for A-C is slightly below the national
average, while A-D performance is slightly above the national average. 
• Argyll and Bute performance at A-C is the highest it has been in the last
three sessions. 
Figure 4 – Higher Pass Rates Trend   
• At Higher level, Argyll and Bute attainment followed the national trend at
both A-C and A-D grades, with both increasing against 2024. 
• Argyll and Bute performance for A-C is below the national average, while
A-D performance is slightly above the national average. 
• Argyll and Bute performance at A-C is in line with pre-pandemic
performance. 
• Argyll and Bute A-D pass rates have exceeded the national figure in five
consecutive sessions. 
Page 180

Page 181

Figure 5 - Advanced Higher Pass Rate Trend 
• At Advanced Higher level, Argyll and Bute attainment went against the
national trend at both A-C and A-D grades. Nationally, pass rates at both
levels increased, whilst in Argyll and Bute pass rates decreased. It should
be noted that there are a relatively small number of Advanced Higher
presentations compared to National 5 and Higher awards. This means
variation in pass rates is more likely to occur.
• Argyll and Bute performance for A-C is above the national average for
the fourth session in a row. 
• Argyll and Bute performance at A-D is ahead of pre-pandemic
performance, but has fallen behind the national figure for the first time in
five sessions. 
5.0 Insight Analysis 
5.0.1 The Scottish Government’s Insight tool provides valuable analysis of
attainment from a multitude of perspectives. Below, attainment
analysis is provided from three such perspectives:    
1. attainment in Literacy and Numeracy – a key element of the Scottish
Government’s National Improvement Framework;   
2. average attainment of young people in the context of the top 20%,
middle 60%, and the lowest 20% of attainers within each cohort;   
Page 181

Page 182

3. attainment in the context of the Scottish Index of Multiple Deprivation
(SIMD). 
In line with the Scottish Government’s conditions on the use of Insight,
data presented here is being used both to inform members of key aspects
of attainment in Argyll and Bute and as part of the Education Service’s
self-evaluation and professional reflection. As mentioned above, the
Virtual Comparator is a key feature of Insight which allows comparison of
Argyll and Bute pupils with a larger group of pupils with similar
backgrounds (gender, additional support needs, stage, and SIMD band)
taken from all the other 31 local authorities. Nevertheless, rurality of pupil
is not included in the virtual comparator methodology and may have a
limiting impact on the comparison. 
5.1  Attainment in Literacy and Numeracy 
5.1.1. SCQF levels 4 and 5 Literacy and Numeracy are achieved via the
passing of National 4 or 5 English or Maths, or through the completion of
separate Literacy and Numeracy units at levels 4 and 5 which do not
require an examination. It should be noted that attainment is only included
in the S4-S6 senior phase. Any attainment achieved in S3 is not included
in these figures, so a pupil who ends their Numeracy attainment with a
National 5 in S3 will be presented as not having any numeracy attainment
in senior phase. The same occurs with English/Gàidhlig attainment, which
has an impact on Literacy figures. 
5.1.2. To assess performance in Literacy and Numeracy, two different
measures have been used. The first measure below (Figure 6) looks at the
performance of S4 cohorts in Literacy and Numeracy. Performance at the
end of S4 is a marker of early senior phase performance. Measures at the
end of S4 reflect the entirety of a cohort as no pupil can have left before
this point. The second measure below (Figure 7), looks at performance of
S6 cohorts as a percentage of S6 pupils. This measure reflects attainment
of those pupils who have accumulated achievement over three years of
senior phase. 
5.1.3 Previous board reports had reported on S6 performance as a percentage
of S4 cohort rolls. The limitation of this measure is that performance is
impacted by early leaving (S4 and S5 leavers) as opposed to attainment in
English, Gaelic and Maths. An increase in S4 and S5 leaving rates has
occurred within Argyll and Bute and nationally. This directly impacts S6
performance as a percentage of S4 original roll as the cohort overall has
had relatively less time to accumulate awards. Measuring S6 by S6 allows
us to compare performance of cohorts who have each had 3 complete
years of senior phase attainment. 
Page 182

Page 183

Figure 6 - 2025 Attainment in Literacy and Numeracy at the end of S4 
• In 2025, Literacy attainment at SCQF Level 4 decreased by 1.6% points
to 83.2%, and the gap with the virtual comparator has also grown from
6.2% points to 9.0% points. 
• Literacy attainment at SCQF Level 5 increased by 2.1% points against
2024 to 69.6%. The gap with the virtual comparator has remained at
8.5%. 
• In 2025, Numeracy attainment at SCQF Level 4 increased by 2.5% points
to 85.7%, and the gap with the virtual comparator has decreased to 4.4%
points from 5.0% points. 
• Numeracy attainment at SCQF Level 5 significantly increased by 6.3%
points against 2024 to 63.2%. The gap with the virtual comparator has
decreased from 8.2% points to 5.4% points 
• Of these four measures, attainment of our latest S4 cohort improved in
three. Furthermore, Level 4 and 5 Numeracy figures were the highest
they have been in the last 5 sessions. 
• As part of Attainment Meetings with individual secondary Head Teachers, key
steps are being discussed to improve Literacy and Numeracy attainment in
Page 183

Page 184

all secondary schools. Principal considerations relate to four key principles of
raising attainment: 
o a culture of high expectations underpinning aspirational presentation
policies within schools; 
o rigorous tracking and monitoring of pupils’ attainment in Literacy and
Numeracy at frequent, regular intervals; 
o frameworks of supportive intervention for pupils achieving below their
potential in Literacy and Numeracy;
o and high-quality, learner-centred learning, teaching and assessment
experiences in literacy across the curriculum continuing into the Senior
Phase. 
Figure 7 2025 Attainment in Numeracy (cumulative attainment by the end of
S6, based on S6 roll)   
• In 2025, Literacy attainment at SCQF Level 4 increased by 0.2% points
to 96.4%, and the gap with the virtual comparator has decreased from
1.8% points to 1.3% points. 
• Literacy attainment at SCQF Level 5 increased by 1.1% points against
2024 to 93.6%. The gap with the virtual comparator has decreased from
3.4% points to 1.8% points. 
Page 184

Page 185

• In 2025, Numeracy attainment at SCQF Level 4 increased by 2.5% points
to 95.6%, and the gap with the virtual comparator has decreased from
3.9% points to 1.4% points. 
• Numeracy attainment at SCQF Level 5 increased by 2.0% points against
2024 to 86.0%. The gap with the virtual comparator has decreased from
5.9% points to 3.7% points. 
• Of these four measures, attainment of our latest S6 cohort improved in
all areas. Furthermore, gaps to the virtual comparator closed in each
measure. 
5.2  Improving Attainment for All    
5.2.1 This measure details the average attainment of pupils in three attainment
cohorts – the highest 20% of attainers, the middle 60% of attainers and the
lowest 20% of attainers – using as the key measure tariff points gained for
the passing of courses at different levels. As mentioned in the Literacy and
Numeracy section above, any attainment achieved in S3 is discounted from
these figures, which has a small detrimental impact on Argyll and Bute
figures. The two tables below demonstrate performance over the last 5
years and provides comparison to the Virtual Comparator and National
figures. 
5.2.2 As in the Literacy and Numeracy analysis above, the Improving Attainment
for All data below has been split into two; 1) attainment at the end of S4 as
a marker of early senior phase performance and 2) attainment at the end of
S6 for those who completed three years of senior phase. 
5.2.3 The Insight tool measures attainment in tariff points using two separate
methods. Total tariff points measure all possible attainment achieved by
pupils. Complementary tariff points measure the best 120 SCQF credit
points of each pupil. This, for most pupils, equates to five National 5 or
Higher awards and prioritises the highest tariff point awarding courses. Total
Tariff Points measures the quantity of achievement a pupil accumulates with
an emphasis on breadth, whilst Complementary Tariff Points measures the
quality of achievement and prioritises depth. In the tables below,
Complementary Tariff Points are used to emphasise our prioritisation of
quality over quantity. 
5.2.4 Caution should be applied to data in the 2021 and 2022 sessions as these
were achieved under irregular assessment models. This is especially
important in Table 7 which looks at S6 attainment cumulatively. Some of
these cohorts had multiple sessions of attainment under alternative models
which makes their data incomparable with the latest cohort. For example,
S6 pupils in 2022 had accumulated attainment from two years (2020 as S4
pupils and 2021 as S5 pupils) with alternative assessment models.
Page 185

Page 186

Table 7 - Average complementary tariff points by the end of S4, against Virtual
Comparator and Scotland 
Lowest 20% Middle 60% Highest 20%
Argyll
and
Bute
Virtual
Comparator Scotland
Argyll
and
Bute
Virtual
Comparator Scotland
Argyll
and
Bute
Virtual
Comparator Scotland
2021 106 119 105 331 338 330 430 432 429
2022 105 118 106 325 331 324 429 426 426
2023 99 118 105 310 327 321 429 426 426
2024 62 96 89 295 324 318 437 426 426
2025 66 108 99 313 328 326 428 428 428 
The table above shows that in 2025: 
a. Argyll and Bute pupils in the lowest 20% of attainment performed slightly
better than the previous year’s cohort but remains behind the Virtual
Comparator and National figures.
b. Argyll and Bute pupils in the Middle 60% of attainment performed better
than the cohort in 2024 and 2023. Argyll and Bute pupils in the Middle
60% remain slightly behind the Virtual Comparator and National figures.
c. Argyll and Bute pupils in the Highest 20% of attainment performed
marginally below the previous year’s cohort but remain in line with Virtual
Comparator and National performance. 
d. Longer term declines, as seen in the lowest 20% and middle 60%, have
been seen nationally and in the Virtual Comparator. This likely reflects the
alternative assessment models used in 2021 and 2022. 
Table 8 - Average cumulative complementary tariff points by the end of S6 (by
S6 cohort), against Virtual Comparator and Scotland 
Lowest 20% Middle 60% Highest 20%
Argyll
and
Bute
Virtual
Comparator Scotland
Argyll
and
Bute
Virtual
Comparator Scotland
Argyll
and
Bute
Virtual
Comparator Scotland
2021 305 377 380 903 937 936 1397 1429 1431
2022 305 341 353 879 910 917 1395 1395 1404
2023 277 364 354 840 897 906 1349 1389 1402
2024 302 370 352 854 908 900 1347 1385 1383
2025 271 349 360 769 884 895 1306 1373 1387 
The table above shows that in 2025: 
a. Argyll and Bute pupils in the lowest 20% had a slightly lower average tariff
point score than the previous year’s cohort and performance remains
behind the Virtual Comparator and National figures. Performance
amongst the Virtual Comparator also fell against 2024.
Page 186

Page 187

b. Argyll and Bute pupils in the Middle 60% had a lower average tariff point
score than the previous year’s cohort and performance remain behind the
Virtual Comparator and National figures. Performance amongst the Virtual
Comparator and National also fell against 2024.
c. Argyll and Bute pupils in the Highest 20% had a slightly lower average
tariff point score than the previous year’s cohort and performance remain
behind the Virtual Comparator and National figures.
d. Longer term decline seen in all attainment cohorts have been seen
nationally and in the Virtual Comparator. This reflects the alternative
assessment models used in 2021 and 2022. 
• As well as implementing the clear strategies to raise attainment referenced in
5.1 above, Head Teachers in all secondary schools are being challenged and
supported to continually examine their curriculum structures and options
frameworks to ensure that they allow all young people to attain and achieve
to their maximum potential. This includes planning future learning and
attainment pathways with pupils and their families at the earliest opportunity,
to ensure that, as well as the required breadth of the S1-S3 Broad General
Education, there is also the focus on depth of learning, specialisation and
coherent progression in S1-S3 which reflects each young person’s
aspirations and interests and prepares them for high levels of Senior Phase
attainment. 
• Secondary Head Teachers are also being challenged and supported to
ensure their Senior Phase curricula are wide and dynamic.  Head Teachers
are also ensuring that the curriculum offer in their schools meets the needs,
interests and aspirations of all pupils.  The range of accredited wider
achievement opportunities for young people is expanding, supported by
partnership with UHI Argyll and Community Learning.  This will ensure that
there are meaningful attainment and achievement opportunities for all young
people – not only in the traditional academic context, but also in terms of
vocational and skill-focused courses and certification.  In line with national
policy, schools are also working to develop the culture where there is parity
of esteem between academic and vocational attainment, and all young
people have access to relevant, stimulating courses which take them towards
their preferred post-school positive destinations. 
• Schools are also implementing personalised curriculum arrangements for
individual young people – particularly those who are disengaged – which
involve an element of work-based vocational learning through regular
placement with employers.  These Flexible Learning Plans (FLPs) are
supporting not only attainment and achievement, but also engagement with
school, the development of key skills for life and work, and emotional health
and wellbeing in young people. 
• By ensuring such wide, accessible and equitable senior-phase curricula are
in place in our schools, the attainment and achievement of all young people
Page 187

Page 188

will increase, regardless of their academic ability or to which percentage of
attainers they belong. 
5.3 Attainment in Context of the Scottish Index of Multiple Deprivation (SIMD) 
5.3.1 In interpreting the graphs below, it is helpful for members to acknowledge
that the mechanism nationally for defining the SIMD status of young people
from decile 1 (the most disadvantaged) to decile 10 (the least
disadvantaged), based as it is on post codes, is not always helpful in
categorising families in this way.  In a predominantly rural area region such
as Argyll and Bute, such a mechanism may not be effective in defining the
actual level of poverty experienced by a young person, as the rural
environment and large areas covered by a single post code can lead to many
different levels of advantage and disadvantage existing side by side.  Schools
in Argyll and Bute ensure they know every young person’s situation
individually, regardless of SIMD level ascribed by post code, and work to
meet their individual needs on that basis. 
5.3.2 One limitation of exploring attainment via SIMD data is that the SIMD profile
of Argyll and Bute is skewed to the middle deciles. For example, last year’s
secondary census found that 10% of all pupils were living in SIMD Quintile 1
(20% most deprived), and a further 6% from Quintile 5 (20% least deprived).
Therefore, 84% of all pupils came from SIMD Quintiles 2-4. The use of SIMD
to report attainment gap statistics frequently uses Quintile 1 (20% most
deprived) versus Quintile 5 (20% least deprived). Whilst this undoubtedly has
statistical value at a national level, for Argyll and Bute this essentially
compares the performance of one small group (Quintile 1), with an even
smaller group (Quintile 5). Small sample sizes are open to natural variation
as the under/overperformance of a small number of pupils can skew
significantly the performance of the entire group. 
5.3.3 To overcome the limitation detailed above, the visual below looks at Argyll
and Bute performance using an alternate SIMD grouping split. To better
capture the relationship between SIMD and attainment, the data has been
split into three groups; 1) 30% most deprived, 2) 40% middle and 3) 30%
least deprived. Whereas Quintile 1 and 5 covered only 16% of last year’s
secondary population, comparing the least and most deprived 30% covers
34% of all pupils. This limits the impact of year-on-year natural variation
through increasing the size of each sample group.  
5.3.4 Tariff point averages are used in this measure of performance. Tariff points
are accumulated through gaining attainment at difference levels and across
subjects. Wider achievement awards which operate out with the SQA
national awards also contribute tariff points. As in the two previous
measures, it should be noted that any attainment achieved in S3 is not
included in these figures. Therefore, a pupil with 5 National 5 passes at
Grade A in S3 will be missing 420 tariff points from their Insight profile.
Page 188

Page 189

Understandably this can have a significant impact on those schools who
present at S3 and a smaller impact for the local authority overall. 
5.3.5 As in the previous Insight measures, two data points are presented below.
Figure 8 highlights attainment versus deprivation at the end of S4 when all
possibly pupils are included. Figure 9 highlights attainment versus
deprivation at the end of S6. We should be cautious about the data provided
at the end of S6 as pupils, especially from Quintile 1, have left after S4 or S5
making the sample size even smaller. 
Figure 8 – Average Complementary Tariff Points (at the end of S4) trend and
comparison to Scotland and Virtual Comparator 
The data in Figure 8 shows: 
• The average complementary tariff points of S4 pupils in the 30% Most
Deprived SIMD zones increased by 16 points from 231 to 247. 
• The gap to the National figure for SIMD 30% Most Deprived pupils closed
from 17 points to 10 points.
• The gap to the Virtual Comparator figure for SIMD 30% Most Deprived pupils
closed to 30 points to 25.
• The gap between the 30% Most Deprived and 30% Least Deprived pupils in
Argyll and Bute closed from 93 points to 90 points. Performance in both
groups improved, with the increase amongst the 30% Most Deprived slightly
greater than that achieved by the 30% Least Deprived.
Page 189

Page 190

• Performance in the 40% Middle also improved against 2024 and was in line
with 2023.
• Performance in the 30% Least Deprived was the highest it had been in three
sessions and only exceeded by 2021 and 2022 which operated under
alternative assessment models. 
Figure 9 – Average Complementary Tariff Points (at the end of S6 as of S6 roll)
trend and comparison to Scotland and Virtual Comparator 
The data in Figure 9 shows: 
• The average complementary tariff points of S6 pupils in the 30% Most
Deprived SIMD zones decreased by 29 points from 657 to 628. The National
figure increased by 5 points in 2025.
• The gap to the National figure for SIMD 1-3 pupils grew from 86 points to
120 points.
• The gap to the Virtual Comparator figure for SIMD 1-3 pupils grew from 103
points to 140 points.
• The gap between the 30% Most Deprived and 30% Least Deprived pupils in
Argyll and Bute closed from 329 points to 247 points. Performance in both
groups declined, with the decrease amongst the 30% Most Deprived less
than that achieved by the 30% Least Deprived.
• Performance in the 40% Middle also declined against 2024. 
Page 190

Page 191

• As part of the annual school improvement planning process, in their
Standards and Quality Reports all secondary schools now complete detailed
analysis of the impact their Pupil Equity Fund (PEF) allocation has had on
identified groups of the least advantaged young people.  In their School
Improvement Plans, Head Teachers also present detailed planning of how
their PEF allocation will be spent in the coming year to reduce inequality and
support the wellbeing and progress of pupils from the most deprived
backgrounds.   In their Standards and Quality Reports, schools have provided
numerous examples of PEF funding being used to ensure our most
vulnerable young people reach their potential: 
o PEF-funded Family Liaison Officers (FLOs) support targeted young
people’s attendance, with positive recorded impact. High attendance is a
fundamental requirement for progress and attainment. 
o FLOs are also working successfully to reduce late coming and the
associated missed learning in targeted groups of young people. 
o FLOs are establishing positive family-school relationships with the parents
of vulnerable young people, enabling better support for learning at home. 
o FLOs also are supporting learning at home for young people who struggle
to attend school regularly or full-time, thus allowing learner progress while
they work to re-engage young people with school. Again, significant
progress has been recorded. 
o PEF has been successfully invested in employing trained staff, or to train
existing staff, to help young people with dysregulated and disruptive
behaviours which are barriers to their own progress. 
o PEF has funded Principal Teachers of Nurture to support young people
with social, emotional and behavioural needs in their engagement with
learning, and to improve their wellbeing. 
o PEF has allowed our schools to successfully employ and resource MCR
Pathways Co-ordinators, providing our most vulnerable young people with
adult mentors to support and advise them towards successful pathways
and destinations. 
o PEF has facilitated extra in-class support in schools for the young people
who most need it. 
o PEF has allowed schools to run extra learning sessions for young people
after school. 
o Young people and their families have been supported financially through
PEF with the cost of the school day, regular meals, school equipment and
financing school trips and visits. 
• Through these and other PEF-funded interventions across our secondary
schools, we have been able to support and improve wellbeing, attendance
and the quality of learning experiences for identified young people, all three
of which are central to attainment and achievement in education. 
• Additionally, Head Teachers must account for the attainment and
achievement of the most disadvantaged pupils in their schools as part of the
Page 191

Page 192

annual Attainment Meeting with the Executive Director, Heads of Service,
Education Manager and Education Lead. In 2023, two additional sections
were added to the Attainment Meeting template, requiring schools to analyse
both S3 attainment in the Broad General Education phase of Curriculum for
Excellence, and Senior Phase attainment, in the context of SIMD.  This is in
line with the Argyll and Bute Council’s Stretch Aims, as required by the
Scottish Government, in which the gaps between the lowest and highest
SIMD quintiles in achieving one qualification at SCQF levels 5 and 6 are
measured. From 2024 we have also added a section on presentation rates,
which influence all the Insight measures covered in this report. From 2025 we
have added a specific section on Component Marks which asks Head
Teachers to reflect on areas of improvement on specific components of
subjects from the previous year’s exam diet. 
• Central to achieving such targets is teachers’ understanding of assessment
standards and progression at both Broad General Education and the Senior
Phase, which is being addressed through programmes of in-school and cross
school moderation of assessment. 
• Equally important in maximising attainment and achievement is high-quality
learning, teaching and assessment, which is a focus on every secondary
School Improvement Plan and is supported by Argyll and Bute’s internally
developed and Education Scotland accredited Guided Approaches to
Pedagogical Enquiry (GAPE) programme. 
6  Wider Achievement of Young People in Argyll and Bute 
• Alongside National Qualifications, Argyll and Bute’s secondary schools
offer a wide and ever-increasing range of opportunities for wider
achievement.  Such opportunities develop skills for life and work, broaden
young people’s range of experiences, and are recognised by employers
and further and higher education establishments as valuable indicators of
young people’s attributes and capabilities. 
• The report by Professor Ken Muir on the next steps for Scottish education
(2022), the associated review of secondary assessment in Scottish
education, led by Professor Louise Hayward (2023), and the Independent
Review of the skills delivery landscape by James Withers (2023) all
emphasise the importance of wider achievement and building skills for
young people, and stress the importance of parity of esteem between
such qualifications and the more traditionally academic range of
qualifications. 
• The table below summarises Wider Achievement across the authority’s
secondary schools in the last two sessions, which is broken down in
greater detail by the subsequent graphs. 
Page 192

Page 193

Table 10:  Summary of Wider Achievement Awards 2023-2024 and 2024-25  
SCQF Level Awards 23/24 Awards 24/25
Level 4 285 300
Level 5 645 725
Level 6 377 328
Level 7 8 44
All Awards 1251 1397 
Summary: 
• At SCQF Level 4, 300 Wider Achievement awards were gained in 2025
– an increase of 15 (5%) on 2024.
• At SCQF Level 5, 725 Wider Achievement awards were gained in 2025
– an increase of 75 (12%) on 2024.
• At SCQF Level 6, 328 Wider Achievement awards were gained in 2025
– a decrease of 49 (-13%) on 2024.
• At SCQF Level 7, 44 Wider Achievement awards were gained in 2025 –
a decrease of 36 (450%) on 2024.
• Young people across Argyll and Bute gained a total of 1397 awards, up
from 1251 in 2024 and 1167 Wider Achievement Awards in 2023. This
marks an increase of 11.6% in the last session and 19.7% over two years 
The types of Wider Achievement awards gained by SCQF level are illustrated below.
These are split into SQA and non-SQA based Wider Achievement: 
Page 193

Page 194

6.1 Non-SQA Wider Achievement: 
SCQF Level  
Provider and Course 5 6 7 Grand Total
Open University (OU)     6 6
Engineering: origins, methods, context     1 1
English for academic purposes online     1 1
Law making in Scotland     2 2
Making your learning count     1 1
Spanish Studies 1 (intermediate)     1 1
Royal Environmental Health Institute of Scotland (REHIS) 16     16
Elementary Food Hygiene Course (SCQF 5) 16     16
Sports Leaders UK (SLUK) 31     31
Qualification in Community Sports Leadership 31     31
Young Enterprise Scotland (YES)   20   20
Unit 1 – Setting Up A Company   6   6
Unit 2 - Developing a Business Idea and Launching the Company   6   6
Unit 3  – Running the Company   5   5
Unit 4 - Winding Up The Company   3   3
Grand Total 47 20 6 73 
• Wider Achievement Awards were achieved from four separate providers.
• Eleven different awards were achieved from these providers, with the majority
(64%) being offered at the SCQF Level 5. 
Page 194

Page 195

6.2 SQA Wider Achievement SCQF Level 4 
• Young people achieved 300 awards from 21 separate courses, with the
Employability Award being the most popular SCQF Level 4 wider
achievement. 
Page 195

Page 196

6.3 SQA SCQF Level 5 Awards 
• Young people achieved 678 awards from 40 separate courses, with the
Mental Health and Wellbeing Award being the most popular SCQF Level
5 wider achievement. 
Page 196

Page 197

6.4 SQA SCQF Level 6 Awards 
• Young people achieved 308 awards from 25 separate courses, with the
Leadership Award being the most popular SCQF Level 6 wider
achievement. 
Page 197

Page 198

6.5 SCQF Level 7 Awards 
• Young people achieved 38 awards from 3 separate courses, with the
Scottish FA: Referring award being the most popular SCQF Level 7 wider
achievement. 
7.0  CONCLUSION 
7.1 This report presents an overview of the key attainment performance data,
and details outcomes for all pupils across the ten secondary schools for
session 2024-2025, incorporating the authority’s perspective on both data
received from SQA in August 2025, and data from the Scottish Government’s
Insight tool. The Education Service will continue to take forward its
programme of challenge and support with schools across the authority to
secure further improvement in attainment and achievement outcomes for
young people. 
7.2 Heads of Service, the Education Manager and the Education Lead are taking
forward a programme of challenge and support with secondary schools
across the authority involving a range of actions and measures to support
schools to secure further improvement in examination outcomes and Wider
Achievement for young people.  These include formal School Reviews and
detailed analysis and evaluation on attainment and achievement at
Secondary Attainment Meetings. Increasing attainment and achievement
and ensuring that all young people achieve to their potential, regardless of
location, circumstance or potential barriers, is at the heart of the work of the
Education Service. 
Page 198

Page 199

7.3 Heads of Service and Area Managers continue to meet regularly with Head
Teachers to ensure appropriate levels of both scrutiny and collaboration are
in place in relation to performance and securing positive outcomes for young
people. This work is reinforced and enhanced by Central Team staff through
their involvement with national performance networks which allows them to
share best practice with wider Local Authority colleagues.   
7.4 Additionally, as referred to above, the Education Service has overhauled the
process for analysis and evaluation of attainment data. Attainment Meetings
with individual secondary Head Teachers take place in November/December,
at which all aspects of attainment from S1-S6 are analysed and key
improvement strategies to raise attainment are discussed and agreed. 
7.5 Head Teachers will present individual school performance analysis using the
data currently available, along with a wider holistic update at Local Area
Committees in March 2025. 
8.0      IMPLICATIONS 
8.1   Policy: This report links directly to Education in the Argyll and Bute 
Corporate Plan 2023-2027 (Attaining and achieving at all stages). NIF:
Priorities 3 and 5 
8.2   Financial: None 
8.3  Legal:  None 
8.4  HR: None 
8.5 Customer Service: None 
8.6 Risk: The performance of Argyll and Bute schools in national 
examinations can significantly enhance or detract from the Council’s
reputation and attractiveness as an area to work and live in. 
8.7 Climate Change – None 
8.8 Fairer Scotland Duty: None  
8.9 Equalities – This report links directly to NIF Priority 3: Closing the attainment
gap between the most and least disadvantaged children and young people. 
8.10 Consumer Duty – None 
8.11 Islands Communities – None 
Page 199

Page 200

8.12 Children’s Rights and Wellbeing – This report links to Article 29 (goals of
education)    
Douglas Hendry - Executive Director with responsibility for Education    
Councillor Kieron Green - Policy Lead for Education      
Wendy Brownlie  - Head of Education – Performance and Improvement 
Jennifer Crocket - Chief Education Officer/ Head of Education – Wellbeing, Inclusion and   
Achievement        
Brendan Docherty - Education Manager – Secondary Performance and Improvement 
James Bowness - Education Lead – Benchmarking, Data and Performance   
December 2025 
Page 200

Page 201

ARGYLL AND BUTE COUNCIL       COMMUNITY SERVICES COMMITTEE 
EDUCATION                           11 DECEMBER 2025 
ANNUAL PARTICIPATION MEASURE 2024-25 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to provide members with information on the most
recent Annual Participation Measure published by Skills Development Scotland
(SDS) in August 2025, covering the period April 2024-March 2025. 
1.2 The Annual Participation Measure (APM) reports nationally on the economic and
employment activity of the 16-19 year old cohort in Argyll and Bute, including
those at school.  The measure is used to inform policy, planning and service
delivery and to determine the impact of the Opportunities for All commitment.   
1.3 The APM was incorporated into the Scottish Government’s National Performance
Framework from August 2017 as the data source for the indicator, “increase the
proportion of young people in learning, training or work”, replacing the School
Leaver Destination Reports. 
1.4 The previous measure, School Leaver Destination Reports, collected data on
young people in the senior phase of school (S4-S6) who had left school during
the school year and essentially offered a snapshot at the time of reporting
(October and February).  The APM takes account of the status of all 16–19-year-
olds in Scotland over a full calendar year (1st April – 31st March) and assigns to
each young person the status which applied to them for the greatest part of the
year in question. 
Page 201 Agenda Item 11

Page 202

ARGYLL AND BUTE COUNCIL     COMMUNITY SERVICES COMMITTEE
EDUCATION                               11 DECEMBER 2025 
ANNUAL PARTICIPATION MEASURE 2024-25 
2.0 INTRODUCTION 
2.1  The Annual Participation Measure (APM) is published in August each year and
is used to inform policy, planning and service delivery, and to assess progress
in the delivery of the Scottish Government’s commitment to offer a place in
learning or training to every 16 to 19 year-old in Scotland not already in
employment, education or training. 
2.2 The 2025 APM marks the 11th annual release of statistics detailing the
participation of 16–19-year-olds at a national and local authority level. The
report takes account of the status for 16–19-year-olds from 1st April 2024 to
31st March 2025. 
2.3 The statistics are produced using data collected by Skills Development
Scotland (SDS) and a range of partners, which is shared through the 16+
Participation Portal. 
2.4 The report is based on a cohort of 228,163 young people in Scotland aged
between 16 and 19 (an increase of 6038 on 2023-2024), of whom 3,187 are
from Argyll and Bute (an increase of 84 on 2023-24). 
3.0 RECOMMENDATIONS 
It is recommended that the Community Services Committee: 
3.1 Consider the information in relation to the 2024-2025 Annual Participation
Measure. 
3.2 Note the increase in Participation in Argyll and Bute from 2023-24 to 2024-25,
and the narrowing of the poverty-related attainment gap in Participation during
the same period. 
3.3 Note the consistently strong performance of Argyll and Bute as a council area
in facilitating the participation of 16-19 year-olds. 
Page 202

Page 203

4.0 DETAIL 
4.1 The APM is compiled from data collected from the 16+ Participation Portal, a
multi-partner secure data sharing gateway managed by Skills Development
Scotland (SDS).  Data input is provided from Local Authorities, Colleges, the
Department of Work and Pensions, the Students Awards Agency Scotland and
the Scottish Funding Council.   
4.2 The participation status of each young person is identified by combining the
number of days spent in each status (participating, not participating or
unknown) between 1st April 2023 and 31st March 2024.  Their overall headline
classification is then defined as the heading under which they have spent the
most days over that year. 
4.3 The classifications are defined as: 
Participating – school pupil, higher education, further education, employment,
modern/graduate apprenticeship, training and voluntary work. 
Not Participating – unemployed and seeking employment or training,
unemployed and not seeking employment or training. 
Unconfirmed Status – information on individual not available for reporting. 
Some of these young people may be in employment but not in contact with
partner agencies. 
4.4 The 2025 APM headline figures confirm that 94.6% of 16–19-year-olds in Argyll
and Bute (3,271 young people) were participating in education training or
employment between April 2024 and March 2025, which represents an
increase of 0.3% on 2024’s measure, and is 1.3% above the national
participation figure of 93.3%. Of Scotland’s 32 local authorities, Argyll and Bute
is placed tenth for participation levels. 2024-25 is the eighth year in succession
Argyll and Bute Council has ranked in the top ten local authorities for
participation. 
3.7% of 16-19 year-olds in Argyll and Bute (122 young people) were not
participating, which is an increase of 0.5% on 2024’s measure, and 0.2% below
the national figure for non-participation of 3.9%. 
1.6% of 16-19 year-olds in Argyll and Bute (53 young people) have an
unconfirmed status, which is an decrease of 0.9% on 2024, and 1.2% below
the national figure for Unconfirmed status of 2.8%. 
Page 203

Page 204

The table below summarises participation in Argyll and Bute over time: 
4.5 The 2025 APM figures for Argyll and Bute exceed the Scottish average in all
three classifications (noting that for non-participating and unconfirmed status,
the lower percentage is desirable). 
Nationally, between 2023-24 and 2024-25, the Participation rate rose in 24 of the
32 local authorities by an average of 0.9% and fell in 8 authorities by an average
of 0.2%. 
4.6 Participation – Employment and Education 
• In 2024-25 there was a decrease in the number of 16-19 year-olds in
employment in Argyll and Bute from 28.2% in 2023-24 to 28.0% in 2024-25. 
Nationally, 20.7% of 16-19 year-olds are in employment, which is an increase
of 1.1% on 2023-24.  The figure for 16-19 year-olds in employment in Argyll
and Bute is 7.3% above the national average. 
• Between 2023-24 and 2024-25, the number of 16-19 year-olds in Argyll and
Bute in education has increased from 64.8% to 65.4%. The national figure for
16-19 year olds in education is 70.4%, a fall of 0.8% from 2023-24.  The figure
for 16-19 year-olds in education in Argyll and Bute is 5% below the national
average. 
• It can be seen from the above data that the number of 16-19 year-olds in Argyll
and Bute in employment is significantly higher than the national figure, and
that there are correspondingly fewer 16-19 year-olds in Argyll and Bute in
education – specifically further and higher education – than nationally. 
4.7 Non-Participation  - Unemployment 
• In 2024-25, 1.2% of 16-19 year-olds in Argyll and Bute were classed as
unemployed and seeking employment, an increase of 0.3% on 2023-24 and
0.8% below the national figure of 2.0%.   
2018-2019
Argyll and
Bute
2019-2020
Argyll and
Bute
2020-2021
Argyll and
Bute
2021-2022
Argyll and
Bute
2022-2023
Argyll and
Bute
2023-2024
Argyll and
Bute
2024-2025
Argyll and
Bute
2024-2025
Scotland
Participating 94.8% 94.1%  93.5%  93.9%  94.4% 94.3% 94.6% 93.3%
Not
Participating
2.2% 2.4%  3.2%  3.8%  3.1% 3.2% 3.7% 3.9%
Unconfirmed  3.0% 3.5%  3.3%  2.3%  2.4% 2.5% 1.6% 2.8%
Page 204

Page 205

• 2.5% of 16-19 year-olds were defined as unemployed and not seeking
employment, an increase again of 0.3% on 2023-24 and 0.5% above the
national figure of 2.0%. 
4.8 Equality Characteristics: Gender 
• In Argyll and Bute in 2024-25, females (94.6%) were slightly less likely to
participate than males (94.7%). The percentage of females participating rose
by 0.5% from 2023-24, while the percentage of males participating rose by 0.2
% in the same period 
• In Argyll and Bute, 59.4% of 16-19 year-old males were in education (an
increase of 0.8% on 2023-24 and 5.9% below the national figure), compared
with 71.9% of females (an increase of 0.3% on 2023-24 and 4.0% below the
national figure) 
• 33.7% of Argyll and Bute 16-19 year-old males were in employment (a 0.7%
decrease on 2024-24 and 8.8% above the national figure), compared with
21.9% of equivalent females (an increase of 0.5% on 2023-24 and 5.7% above
the national figure). 
• The above figures show the continuing trend in Argyll and Bute among 16-19
year-olds for a significantly higher number of females than males to remain in
education, while substantially more 16-19 year-old males than females are in
employment, although both gaps have reduced slightly in the last year.  Figures
for both genders in education are below the national level, males particularly
so, while figures for both genders in employment are well above the national
average, again, more so for males. 
4.9 Equality Characteristics – Scottish Index of Multiple Deprivation (SIMD) 
• In Argyll and Bute, participation rates for young people from the most deprived
backgrounds are lower than those of less deprived young people. 92.2% of
16-19 year-olds in the lowest SIMD quintile were participating – a 0.7%
increase on the figure for the same SIMD quintile in 2023-24.  98.8% of 16-
19-year-olds in the highest SIMD quintile – the least deprived – were
participating, an increase of 1.7% on 2023-24. 
The participation gap between SIMD quintile 1 (most deprived) and SIMD
quintile 5 (least deprived) is 4.6%, a reduction of 1.0% on the 2023-24 gap
figure. 
• The addressing of the poverty-related gap in participation levels is one of
Argyll and Bute Council’s “stretch aims”, in the context of the Scottish
Government’s Scottish Attainment Challenge and National Improvement
Framework, and planning and intervention around reducing this gap are
ongoing. DYW will continue its work to further reduce the poverty-related gap
as it applies to participation for 16-19 year-olds. 
Page 205

Page 206

4.9 Equality Characteristics – Disability 
• In Argyll and Bute, the Participation figure for those identified as disabled is
90.7% - the same figure as in 2023-24 - compared to 95.2% for those not
identified as disabled – an increase of 0.3% on 2023-24. 
4.11 Link to Skills Development Scotland Annual Participation Measure 2024-2025: 
https://www.skillsdevelopmentscotland.co.uk/publications-
statistics/statistics/annual-participation-measure 
5.0 CONCLUSION 
5.1 The Annual Participation Measure provides data on the economic and
employment activity of 16 to 19 year-olds and enables local authorities to
measure progress against the National Improvement Framework priority
“Improvement in skills and sustained, positive school-leaver destinations for all
young people.” 
5.2 There was a 0.3% increase in the percentage of young people from Argyll and
Bute participating in education, training or employment in 2024-25 (94.6%). 
Participation rates in Argyll and Bute are above the national average, and the
measures for young people not participating (3.7%) and classified as
unconfirmed (1.6%) are below the national averages. Argyll and Bute Council
ranks tenth of Scotland’s 32 local authorities for participation. 
5.3 Education, Developing the Young Workforce (DYW), Skills Development
Scotland (SDS), Community Learning and Development (CLD), local colleges,
the Third Sector and other partners are working coherently to ensure
participation rates in Argyll and Bute increase, and that all young people move
into their chosen, sustained positive destination post-school. 
5.4 Young people in schools who are at risk of entering a negative, non-
participating destination are being positively targeted for supportive
intervention, and young people are tracked having left school in order that
interventions can be put in place to address any failure to sustain positive,
participating destinations.  Through such practice, Education, SDS, DYW and
their partners seek to continue to increase the number of young people in Argyll
and Bute participating productively and meaningfully in society. 
5.5 The robust, current information provided by the Annual Participation Measure
and the SDS Data Hub will continue to be used to identify potential issues and
inform work with partner agencies.  This will enable all agencies to be proactive
in providing the necessary targeted and tailored intervention to support young
people in achieving and sustaining their chosen area of participation in society. 
Page 206

Page 207

6.0 IMPLICATIONS
6.1 Policy - This report links directly to Priority 1 in the Argyll and Bute Corporate
Plan 2023-2027: Improving educational attainment, achievement and
outcomes for young people within Argyll and Bute to Scotland’s upper-quartile. 
6.2 Financial – None 
6.3  Legal – None
6.4  HR – None
6.5  Customer Service – None 
6.6 Risk - Failure to support young people into positive destinations will impact on
the life chances of young people across the Local Authority area and may result
in outward migration of young people.  A reduction in the number of young
people securing positive destinations post-school risks reputational damage to
the local authority, and detracts from its appeal as a place to live and work.
6.7 Climate Change – None          
6.8 Fairer Scotland Duty – To ensure maximum Participation for 16-19 year-olds,
the Education Service, Developing the Young Workforce (DYW) and partners
are working to maximise the readiness for employment or continuing education
of all young people in Argyll and Bute’s secondary schools. Through such
partnership working to support individualised pathways for all young people,
regardless of situation or place, the Council seeks to address inequalities of
outcome caused by socioeconomic disadvantage.
6.9      Equalities - Protected Characteristics – All work relating to increasing
Participation seeks to address inequalities in employment, training and
education, and to provide support to those who most require it. 
6.10 Consumer Duty – None 
6.11  Island Communities – Young people in island and remote mainland
communities often require extra support to ensure they are prepared for the
personal, geographical, social and cultural changes which can accompany
moving to a positive post-school destination.  As such, the Council and its
partners understand the need to assess such needs, and to work with schools
to ensure young people are able to enter and sustain such positive destinations.            
6.12 Children’s Rights and Wellbeing – The work to increase Participation aligns
directly with Article 29 of the United Nations Convention on the Rights of the
Child: Education must develop every child’s personality, talents and abilities to
the full. 
Page 207

Page 208

Douglas Hendry - Executive Director with responsibility for Education 
Councillor Kieron Green - Policy Lead for Education   
For further information contact: 
Simon Easton, Education Manager
Telephone: 01436 657681 
Email: simon.easton@argyll-bute.gov.uk                                                 
11th December 2025
Page 208

Page 209

Page 1 
ARGYLL AND BUTE COUNCIL  COMMUNITY SERVICES COMMITTEE
EDUCATION                            11 DECEMBER 2025 
SCHOOLS (CONSULTATION) (SCOTLAND) ACT 2010 – FURNACE PRIMARY
SCHOOL 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to update the Community Services Committee on
the current status of Furnace Primary School and invite Members to agree to the
recommendations outlined. 
1.2 Furnace Primary School was mothballed by the Committee in December 2024,
with agreement that a review of the school’s mothballing would be prepared for
the Committee’s December 2025 meeting at which Members will decide on a
continued period of mothballing, or request officers to begin the formal
preliminary engagement process to consider the future options for Furnace
Primary School. 
1.3 It is recommended that the Community Services Committee: 
a) Note the decision of the Committee in December 2024, and the updated
position of the school as set out within this report. 
b) Agree that Furnace Primary School continues to be mothballed on a
temporary basis and the school premises be retained on a care and
maintenance basis. 
c) Note that since December 2024 there have been requests for school lets
and should any further let requests be made, they would be considered in
light of the current condition of the building and any existing lets. 
d) Agree that the Education Service will undertake the required preliminary
engagement for Furnace Primary School, in compliance with the preliminary
requirements as set out in the Schools (Consultation) (Scotland) Act 2010
and thereafter prepare an Options Appraisal for Members’ consideration at
the June 2026 meeting of the Community Services Committee.
Page 209 Agenda Item 12

Page 210

Page 2 
ARGYLL AND BUTE COUNCIL  COMMUNITY SERVICES COMMITTEE
EDUCATION                            11 DECEMBER 2025 
SCHOOLS (CONSULTATION) (SCOTLAND) ACT 2010 – FURNACE PRIMARY
SCHOOL 
2.0 INTRODUCTION 
2.1 Furnace Primary School has been subject to a shared Headship arrangement
with Inveraray Primary School since August 2022. The decision on a Shared
Headship was informed by strong parental support for this approach following
engagement which took place in March 2022, facilitated by the Education
Service.
2.2 A Principal Teacher was recruited for Furnace Primary School to support the
Shared Headship model from August 2022. In June 2023, the Service was
unable to recruit a temporary Principal Teacher at Furnace Primary School
when the current Principal Teacher commenced Maternity Leave. Due to
challenges with staffing cover at Furnace Primary School pupils attended
Inveraray Primary School, as part of an agreement with parents, to ensure
consistency of educational provision. Following further engagement with parents
in the summer of 2023, the decision was made for the pupils at Furnace Primary
School to temporarily attend Inveraray Primary School until such time that the
Principal Teacher returned from Maternity Leave, and the arrangement could be
reviewed. In April 2024, further engagement took place with parents. At this
point, the school had three pupils enrolled from the Furnace catchment, one of
whom was progressing to Lochgilphead Joint Campus at the end of that school
session. One parent of the remaining pupils expressed their desire that the
Education Service proceed with recruiting a 0.4PT to allow their child to return to
Furnace Primary School. The other parent felt strongly that a return to Furnace
Primary School was not in the best interests of their child and was clear that
their child had expressed their desire to remain at Inveraray Primary School.
2.3 In June 2024, further engagement included a new family who had only just
moved into the catchment area. Initially, engagement indicated that the parents
had no preference. However, after taking time to review all of the information
available to them, the parents of this new family indicated their preference for
their four children (one of whom was about to progress to Lochgilphead High
Page 210

Page 211

Page 3 
School in August 2024) to attend Inveraray Primary School. Following the
indication that a placing request would be made to that effect, all parents in the
catchment area were again contacted. The one parent who wanted their child to
return to Furnace updated the Education Service that they were now in the
process of moving away from the area. The remainder of the parents (two
families) believed that it was in the best interest of their children to attend
Inveraray Primary School. Accordingly, there are currently no children attending
Furnace Primary School.
2.4 Additionally, with effect from 31st May 2024, Minard Primary School was formally
closed. As part of that decision, the catchment area of Furnace Primary School
was extended to include the former Minard Primary School catchment area. To
date, this has not yet had, and is currently not projected to have, any material
impact on the projected School roll for Furnace Primary School. Officers will
continue to monitor the projected School roll over the forthcoming months.
2.5 In December 2024, it was agreed by the Committee that Furnace Primary
School be mothballed, pending a further decision in December 2025 by the
Committee: either to continue the period of mothballing or to begin a preliminary
engagement process to consider the future options for Furnace Primary School.
2.6 Since December 2024, there have been school lets requested by; a local parent
and toddler group, Social Work (in relation to fostering and family placements)
and a play therapist. Currently, only the play therapist continues to have a
school let.
2.7 The statutory process for the closure of a rural school is laid out in the Schools
(Consultation) (Scotland) Act 2010 (the 2010 Act), as amended by the Children
and Young People (Scotland) Act 2014. The 2010 Act as amended introduces a
presumption against the closure of rural schools and a requirement to carry out
additional steps, before and during the statutory consultation exercise. 
3.0 RECOMMENDATIONS 
3.1 It is recommended that the Community Services Committee:
a) Note the decision of the Committee in December 2024, and the 
updated position of the school as set out within this report.
b) Agree that Furnace Primary School continues to be mothballed on
a temporary basis and the school premises be retained on a care
and maintenance basis.
c)    Note that since December 2024 there have been requests for school lets     
and should any further let requests be made, they would be considered in
light of the current condition of the building and any existing lets.
Page 211

Page 212

Page 4 
d) Agree that the Education Service will undertake the required preliminary
engagement for Furnace Primary School, in compliance with the
preliminary requirements as set out in the Schools (Consultation)
(Scotland) Act 2010 and thereafter prepare an Options Appraisal for
Members’ consideration at the June 2026 meeting of Community Services
Committee. 
4.0 DETAIL 
4.1 There are presently no registered pupils at Furnace Primary School.
Registration for August 2025 enrolment at the school closed at the end of
January 2025, with no pupils registered. A small number of pupils registering
would not in itself alter the viability of the school. All members of staff from the
school were redeployed into other posts within the Authority.
4.2 It was agreed by the Committee in December 2024 that Furnace Primary be
mothballed and the premises be retained on a care and maintenance basis.
4.3 The mothballing of a school is a temporary closure. It does not require a
statutory consultation to be carried out as it is an informal non-statutory
measure. It is appropriate where the Authority considers that a school is not
presently viable, but do not wish to close it immediately in order to assess the
prospects of the number of pupils in the area increasing to the extent that the
school should be re-opened in the future.
4.4 The Scottish Government’s Statutory Guidance on the 2010 Act1 stresses that
this flexibility to close a school for a temporary period is not used to undermine
the requirements of the 2010 Act to consult on all closure proposals. Mothballing
is only appropriate for a temporary period, should be subject to at least annual
review and, in most cases, should last no more than three years in total.
4.5 Registration for new Primary 1 pupils enrolling in August 2026 will be open from
17th to 21st November 2025. A small number of pupils registering for Furnace
Primary School by 21st November 2025, for entry in August 2026, would not in
itself necessarily alter the viability of the school. However, if a sufficient level of
demand for the re-opening of the school was to be demonstrated, the Education
Service would keep this under review, and present further reports to the
Committee on this matter as appropriate.
4.6 It is proposed that a preliminary assessment of options regarding the future of
the school be undertaken by way of a preliminary engagement exercise and
Options Appraisal report, in accordance with the preliminary requirements of the
2010 Act. It is proposed that the findings of the Options Appraisal will be
presented to the Committee in June 2026 for Members to consider and
determine next steps. 
1 Schools (Consultation) (Scotland) Act 2010: guidance - gov.scot
Page 212

Page 213

Page 5 
5.0 CONCLUSION
5.1 Should Members agree, the Education Service will undertake the required
preliminary engagement for Furnace Primary School, in compliance with the
preliminary requirements as set out in the 2010 Act and prepare an Options
Appraisal for Members’ consideration at the June 2026 meeting of the
Community Services Committee. 
6.0 IMPLICATIONS
6.1 Policy - none
6.2 Financial - The preliminary engagement work, if agreed, will accrue a small
cost for the Education Service. Should it be decided the mothballing of the
school is to continue, there will be costs associated with the upkeep and
maintenance of the school premises.
6.3 Legal - The provisions of the Schools (Consultation) (Scotland) Act 2010 will
subsequently apply if the Authority later decide to formulate a proposal under
that Act in order to determine the future of Furnace Primary School.
6.4 HR- none
6.5 Customer Service – none at present
6.6 Risk – none at present
6.7 Climate Change – none
6.8 Fairer Scotland Duty – none at present
6.9 Equalities - protected characteristics – none at present
6.10 Consumer Duty – none at present
6.11 Island Communities - none
6.12 Children’s Rights and Wellbeing – UNCRC: Article 3 – Adults must do what’s
best for me, Article 28 – I have the right to an education, Article 29 – I have
the right to an education which develops my personality, talents and
abilities. 
Douglas Hendry - Executive Director with responsibility for Education 
Councillor Kieron Green - Policy Lead for Education
7th November 2025 
For further information contact:
Jennifer Crocket
Chief Education Officer/Head of Education – Wellbeing, Inclusion and Achievement
Jennifer.Crocket@argyll-bute.gov.uk 
Page 213

Page 214

Page 6 
Wendy Brownlie
Head of Education – Performance and Improvement
Wendy.Brownlie@argyll-bute.gov.uk 
Simone McAdam
Education Manager
Simone.McAdam@argyll-bute.gov.uk 
Graeme McMillan
Transformation Programme Manager
Graeme.Mcmillan2@argyll-bute.gov.uk
Page 214

Page 215

1 
ARGYLL AND BUTE COUNCIL      COMMUNITY SERVICES COMMITTEE 
COMMERCIAL SERVICES                   11 DECEMBER 2025 
LIVE ARGYLL – MONITORING AND PERFORMANCE REPORTING 
1.0 EXECUTIVE SUMMARY 
1.1  The purpose of this report is to provide the Community Services Committee with
the annual update on the performance and monitoring arrangements between
Live Argyll (LA) and the Council as set out in the various agreements between the
Council and the Trust. 
1.2 Based on the 2025 Annual Report (Appendix 1), LA demonstrated resilience and
adaptability despite challenges such as the Helensburgh Leisure Centre closure
and economic pressures. Key achievements include strong community
engagement and innovative service delivery. Membership remains robust at
11,000 (16% of population), with over 234,800 fitness class visits and 128,000
gym visits. Financially, income reached £7.8m.   
2.0 RECOMMENDATIONS 
It is recommended that: 
2.1 The Community Services Committee consider the contents of this report
together with the Live Argyll Annual Report 2024/25 attached at Appendix 1;
and 
2.2 Note that the Live Argyll Business Plan 2026/27 is currently under production
following initial consideration at Council on 26th November 2025 and will be
brought back to Budget Meeting in February 2026 
3.0 DETAIL 
3.1 The Council approved the implementation of a Leisure and Libraries Trust on
24 November 2016, following a recommendation by the Community Services
Committee of 21 November 2016. 
3.2 Thereafter, LA was constituted on 29 September 2017 and the Council entered
into a Transfer Agreement, Service Agreement, Support Services Agreement
and Facility Licence. These set out a number of reporting and monitoring
requirements.   
Page 215 Agenda Item 13

Page 216

2 
SERVICES AGREEMENT 
3.3 There is a Services Agreement in place between LA and the Council in respect
of the culture, leisure and library services to be delivered by LA on behalf of the
Council. 
BUSINESS PLAN 
3.4 The Council in constituting LA was mindful of the code of guidance on funding
external bodies and following the public pound. In exercising its business plan
and delivering the services LA reports that it continues to adhere to those
principles. The overarching business plan, as with previous plans references 3
key themes set out below, each of which LA advises is: 
• Growth: Leisure and Library type services continue to perform well.  LA
advises that performance information is in line with expectations and
comparable sector data. Income levels have seen considerable growth which
has allowed for an agreed reduction to annual services payments as well as
absorbing significant unfunded cost pressures and importantly has allowed
the continuation of full service specification obligations.     
• Participation:  LA report that Leisure participation rates are strong in the
context of national and sector averages. Leisure membership levels are above
pre-pandemic levels across all areas in which facilities are located.
Helensburgh leisure centre is showing sustained membership and usage
rates and is performing in the top quartile in terms of penetration rates. Across
all demographics the programme of activities in place is deemed to be
addressing local needs.   
• Library performance information indicates small growth across the board
however more specifically Digital usage of library type services has seen
sustained growth with increases in on-line borrowing. LA previously reported
that event type activity and associated audience participation rates was
significantly reduced. Whilst this year has seen a moderate improvement, the
overall position remains flat which unfortunately is reflective of the wider event
market. 
• Active Schools, Community Learning and Community letting services are also
showing strong participation levels in line with forecast, target and where
appropriate comparable indicators. 
• Quality: LA continue to place a significant amount of emphasis on the quality
of product and service on offer and introduced a range of measures and
protocols identified and aimed at ensuring a consistent quality offering across
all their services.   
BUSINESS PLANNING: SECTOR PLANS 
3.5 Members will be aware LA are currently updating their 2026/27 onwards
Business Plan with a copy having been provided to the 26th November Council
Page 216

Page 217

3 
Meeting.  This Business Plan will be more fully considered as part of the Council
Budget process in February 2026.  LA report that they continue with
implementing proposals and priorities for change. As with the vast majority of
services, plans continue to be reviewed and where appropriate updated to
ensure priorities support key objectives. It is understood that good progress is
being made and the plans are on track to deliver or contribute to their proposed
outcomes. The following are examples of current work sector plans: 
• Maintain focus on operational resilience and service continuity.
• Prioritise reopening Helensburgh Leisure Centre and monitor recovery.
• Explore alternative delivery models and partnerships to offset financial
pressures.
• Continue investment in energy efficiency and sustainability projects.
• Enhance digital engagement and community outreach initiatives. 
THE SERVICES / PERFORMANCE MANAGEMENT 
SERVICE SPECIFICATION 
3.6 LA is responsible for delivering leisure, library, halls, community centres,
community learning services, community lettings, museum, archives, active
schools services across Argyll and Bute. The service specification sets out the
specific services LA have committed to deliver and that they are required to
ensure they adhere to those commitments. 
PERFORMANCE MANAGEMENT 
3.7 In order to establish if and to what extent they have complied in the provision
of the services, the Services Agreement requires LA to provide operational
performance information to the Council with a Performance Report on its
operational performance in the second and fourth quarter of each financial year
(namely June and December). LA are also required to provide a complete set
of relevant accounts to the Council no later than 5 months from the end of each
financial year. LA advised draft accounts have been submitted in accordance
with requirements.   
PERFORMANCE REPORT 
3.8 Performance information shows positive trends across a range of services and
overall LA is deemed to be performing well above current sector average rates.
More details are contained within the draft 2026 Business Plan. Facility
upgrades and new programmes have been introduced despite challenges and
now provide 11,000 members, 234,800 fitness class visits, 128,000 gym visits,
141,171 library visits.  Leisure Memberships rates and associated income level
have seen sustained growth in no small part due to their underlying pricing
model.  Libraries, Active Schools and Community Learning services are
performing well. The 2023/24 annual report clearly highlights the positive
Page 217

Page 218

4 
impact of services and LA’s commitment to continuous performance
improvement. 
It should be noted that in some specific circumstances changing customer
behaviour and user trends may result in alternative performance measures
being introduced and / or proposals for amendments to service specification
obligations. 
FINANCIAL POSITION 
3.9  LA continue to actively manage their financial position. LA annual services
payments have reduced year on year and the greater portion of their costs are
now covered by self-generated income. This has allowed the company to
absorb significant payroll inflationary pressures and also re-invest in facilities
and equipment without placing any additional requests on the Council. Self-
generated income has suffered significantly due to the enforced closure of
Helensburgh Leisure Centre in January 2025 and relevant reporting on the
overall Financial Position has been provided to Council in June and November
2025.  The overall financial position of LA will be considered in the context of
Council Budget in February 2025. 
SCHEDULED DEVIATIONS 
3.10 LA have fulfilled the significant majority of service specification obligations. 
Where deviations exist, these have been ad-hoc and primarily due to
unavoidable or extraordinary circumstances out-with their control. The most
notable deviation being enforced closure and service amendments in
Helensburgh caused by Storm Eowyn in January 2025.  It is therefore
considered that LA have fulfilled their service delivery obligations. Like many
organisations, where maintenance is required, this can result in short term
service disruption however it is deemed that this did not materially impact
overall service delivery. 
SUPPORT SERVICES AGREEMENT 
3.11 There is a Support Services Agreement in place between LA and the Council
in respect of central support services delivered by the Council to the Trust. As
part of the requirements of the agreement, the operation of the support services
is kept under annual review by the Council and LA.  LA has advised that from
their perspective, arrangements continue to operate satisfactorily with effective
working partnerships in place. 
4.0 CONCLUSION 
4.1 LA continues to deliver significant social value and community impact despite
financial and operational challenges. Strategic focus for 2026 will be stability,
resource optimisation, and partnership development to ensure resilience and
growth.
Page 218

Page 219

5 
4.2 The current arrangements between the Council and LA are working well and
will be subject to detailed review as part of the 2026 Business Plan process
which has been initially discussed at Council on 26th November 2025 and will
be further considered in February 2026. 
5.0 IMPLICATIONS
5.1 Policy - In line with Council policy in relation to Leisure and Libraries Trust
5.2 Financial – Agreement constituting LA provides for Council part funding LA. 
Review of Business Plan for 2026 is material to Council Budget and will be
reported in February 2026
5.3  Legal  -  In line with relevant contractual agreements between Council and LA. 
5.4  HR – None
5.5 Customer Service - None
5.6 Risk – as outlined in body or report above
5.7 Climate Change - None
5.8  Fairer Scotland Duty -  None
5.9    Equalities - protected characteristics – None
5.10 Consumer Duty -None 
5.11 Islands Communities – None
5.12    Children’s Rights and Wellbeing - None 
Douglas Hendry - Executive Director with responsibility for Commercial
Services 
Ross Moreland – Policy Lead for Finance and Commercial Services
December 2025 
For further information contact: 
Ross McLaughlin, Head of Commercial Services, 01436 658 914 
Kevin Anderson, Chief Officer, LiveArgyll 01369 708505 
APPENDICES 
Appendix 1 – Live Argyll Annual Report 2024-2025
Page 219

Page 220

This page is intentionally left blank

Page 221

Annual Report 2024/25
Appendix 1
Page 221

Page 222

Welcome to our Annual Report   3-4
Our facilities & services     5
Our values & organisation      6-7
Leisure and Library Trusts matter     8-9
Facility developments    10-12
A year in numbers      13
Case studies     14-32
Digital marketing    33
Looking ahead      34
Financial statement    35-39
Thanks to our partners   40
CONTENTS
liveArgyll.co.uk 2
Page 222

Page 223

Welcome to our annual report
2024/2025
Welcome from Kevin Anderson
liveArgyll Chief Officer
liveArgyll.co.uk
As we reflect on 2024/25, it is clear that this
has been a year which has tested liveArgyll’s
resilience, adaptability, and commitment to
the communities we serve. We faced profound
challenges, yet we also saw outstanding
examples of dedication, innovation, and
community impact across Argyll and Bute.
The closure of Helensburgh Leisure Centre
was a significant event in our year, presenting
unexpected hurdles for our operations and
significantly affecting local patrons. Despite this
major setback, our dedicated team remained
steadfast in our mission to deliver high-quality
leisure and cultural services. This was reflected in
the quick response to set up alternative service
offerings in the Helensburgh area immediately
after the storm. These have been well-received
and continue to grow in usage.
Adding to the complexities of the year was the
difficult economic climate. Rising costs and
shifting consumer behaviours demanded a
dynamic approach to service delivery, whilst
endeavouring to continue to provide accessible
and engaging programs. Despite these pressures,
liveArgyll has showcased excellent performance
and innovative solutions, not only sustaining
but strengthening our offer by introducing new
programmes, optimising resources and fostering
partnerships that have bolstered our contributions
to the health and well-being of our residents.
The “Year in Numbers” featured in this report
demonstrates just how much has been achieved.
Beyond the data, our case studies highlight the
human stories - the individuals and groups whose
lives are healthier, richer, and more connected
because of what we do.
liveArgyll is a major contributor to the physical
and mental health and well-being agenda. The
social value we create is immense, although often
underestimated, undervalued, and overlooked.
We play a key role in both intervention and
preventative health strategic, actively making
a positive difference each and every day to our
communities.
3
Page 223

Page 224

We continue to make this difference
by delivering a range of services and
utilising a skilled, experienced, and
dedicated workforce. Our continued
success is due to their diligence, hard
work, and determination.
This report encapsulates not just the
trials of the past year, but also our
determination to emerge stronger,
as we pave the way for a brighter and
more resilient future for liveArgyll and
the communities of Argyll and Bute.
liveArgyll.co.uk 4
Page 224

Page 225

OUR FACILITIES & SERVICES
liveArgyll.co.uk 5
LEISURE
Aqualibrium Leisure Centre
Helensburgh Leisure Centre
Mid Argyll Sports Centre
Rothesay Leisure Centre
The Queen’s Hall Gym
Riverside Leisure Centre
HALLS & COMMUNITY CENTRES
Queen’s Hall, Dunoon
Victoria Hall, Campbeltown
Victoria Halls, Helensburgh
Ramsay Hall, Isle of Islay
The Corran Halls, Oban
Kintyre Community Centre
Lochgilphead Community Education Centre
Moat Centre, Rothesay
LIBRARIES
Campbeltown
Cardross
Dunoon
Helensburgh
Lochgilphead
Oban
Rosneath
Rothesay
Tarbert
Tiree
Tobermory
Sandbank Office (including Library Headquarters
and Local Studies)
Islay Mobile Library
ARCHIVES
PITCHES
COMMUNITY LETS
CAMPBELTOWN MUSEUM
SERVICES
Active Schools and Sports
Community Learning
Page 225

Page 226

“Our communities and
visitors lead richer and
more active lives.”
We have 6 Trustees, all
of whom are volunteers
and support the strategic
direction and governance of
the company led by Kevin
Anderson, Chief Officer.
liveArgyll is a not-for-profit
charitable company, limited
by guarantee.
(Charity No SC047545)
liveArgyll was launched
on 2nd October 2017 and
provides sport, leisure,
recreation and cultural
opportunities for the
communities of Argyll and
Bute.
THE ORGANISATION
OUR VISION
liveArgyll.co.uk 6
Customer Feedback
“I began my fitness journey after I had been
struggling with my physical and mental
health. Since starting my journey, I have
gained more confidence in myself and
found a real passion for fitness. My goals
were to lose fat and gain muscle, and in
addition, make long-term lifestyle changes.
During this journey, I have lost over 2 stone
and seen major changes in my physique.
The instructors at liveArgyll’s Lochgilphead
facilities made such a significant difference
to my fitness by offering great classes,
advice and their time, which pushed me and
motivated me on days when I wasn’t feeling
like getting it done. I now attend the gym
4-5 times a week, and I enjoy seeing such a
difference in myself as well as enjoying what
I’m doing in the gym.”
Rhys Williams
Mid Argyll Sports Centre
Customer Feedback
“Before I joined the gym, all I did
was eat, sleep and work. I rarely left
the house, rarely spoke to people
outside of work, and my anxiety,
depression and stress levels were
at an all-time high. Joining liveArgyll
has changed that for me. I’m not
saying it’s fixed everything - that I’m
the perfect weight, that I’m confident
and socialising all the time, or that
my mental health issues have
vanished - that would be a lie. But
what it has done is give me a routine,
a reason to get up in the morning
and to eat better.”
Chloe McNeill
Rothesay Leisure Centre
Page 226

Page 227

liveArgyll.co.uk 7
OUR VALUES
EMPLOYEES
The trust values all
employees. Through
investment we will maximise
their potential, helping
them to achieve their career
aspirations and deliver high
quality customer service
that exceeds expectations
INCLUSIVE
Continuing to adopt
an inclusive approach,
recognising and respecting
the needs of all within our
communities
A continuous cycle of
improving and introducing
new products, services or
processes
DEVELOPMENT
EXPERTISE
The trust will continuously
build and enhance the
knowledge and expertise of
its workforce and strategic
partners to deliver high
quality services that respond
to our customers’ needs
CUSTOMER
SERVICE
We are passionate about
delivering the highest level
of customer service
INNOVATION
Understanding the need
to be innovative across
all areas of the business
to reach and deliver new
benchmarks in service
delivery
SAFETY
Ensuring the health and
safety of employees
and customers, going
above and beyond legal
requirements to provide a
safe environment for all
EQUALITY
ASPIRATION
Maintaining in depth policies
and procedures to ensure
equality in the workplace
and for customers alike
The trust has a culture
of being aspirational and
will strive to challenge its
status and align itself with
continuous improvement and
examples of best practice
Page 227

Page 228

liveArgyll.co.uk 8
LEISURE AND LIBRARY
TRUSTS MATTER…
Why Charitable Trusts
are great!
Why do Trusts do what they do?
Because all 113 Trusts across the UK share a
passion to improve social, mental and physical
wellbeing and the difference they make together
is remarkable. Improving people’s health and
wellbeing means reducing the cost of treatment
and care later in life. It can help reduce crime
and improve educational outcomes as well as
increasing personal happiness. That carries a
social value of £1.5 billion.
This figure is from the Social Value calculator
developed by Sheffield Hallam University in
partnership with 4global and Experian. The social
value calculator measures 15 outcomes grouped
under 4 categories:
• Physical and mental health
• Mental wellbeing
• Individual development
• Social and Community development
This is an impressive figure but it is hard to
convey or even imagine the thousands of
individual lives
changed for the
better each year. From
people now living
healthier lives after
embarking on their
fitness journey to
those living happier
lives being part of a
creative programme.
Charitable Trusts come in all shapes and sizes
but they all have two things in common; to do
good and make things better, and liveArgyll is
no different as a local charity operating within
Argyll and Bute.
Every penny made is reinvested back into local
facilities and programmes. This cross-subsidy
approach distinguishes the model from other
public leisure services because profit generating
activities subsidise non-profit generating
activities such as health and wellbeing, libraries
and outreach programmes. With a combined
turnover of £2 billion a year, that’s a lot of money
going back into the local economy. It also
enables income from users who can afford to
pay to be ring-fenced to subsidise access to
activities.
Importantly, Trusts don’t have shareholders and
they are not private businesses. liveArgyll is run
by board members from the local community.
liveArgyll work in partnership with the Council,
we listen to communities and are fully
transparent. Each trust delivers slightly different
programmes which reflect the need within the
community. It’s not just councils our members
partner with however.
Partnership working
is part of our DNA
and we work with
health and social
care partners and
other third sector
organisations and
charities both at local
and national level.
How do Charitable Trusts
make a difference?
Page 228

Page 229

liveArgyll.co.uk 9
LEISURE AND LIBRARY
TRUSTS MATTER…
Page 229

Page 230

liveArgyll.co.uk 10
Aqualibrium:
The health suite within the leisure centre
was completely refurbished and modernised
with new lighting, suspended ceiling, wall
covering and both the sauna and steam
rooms replaced. £95,300
Essential water quality improvement work
was undertaken. £10,600
£40,000 invested by liveArgyll to replace all
cardiovascular gym equipment with new
state-of-the-art Technogym equipment.
Kintyre Community Centre:
Improvement work to the internal gutter
system of the building. £5,700
Kintyre
During 2024/2025, several property projects were undertaken to improve our facilities’
sustainability and longevity. These projects, to the value of £954,000, were delivered under the
council-funded Priority Investment Plan (PIP). An additional £66,000 worth of projects were also
delivered through payment by liveArgyll. All projects contributed to enhancing the sustainability of our
facilities and ensuring they are safe and fit for purpose.
The following projects were successfully completed;
FACILITY DEVELOPMENTS
Page 230

Page 231

liveArgyll.co.uk 11
Lochgilphead Community Centre:
A major roof refurbishment, which required
replacing rotten roof trusses and re-slating
the roof entirely, was undertaken. As part
of this project, solar panels were installed,
which, together with the installation of a new
air source heat recovery system, enhanced
the building’s energy sustainability
credentials. £514,000
Mid Argyll
FACILITY DEVELOPMENTS
The Moat Centre:
A full-building re-wire was completed to
ensure regulatory electrical compliance.
£262,000
A water heating upgrade was completed.
£13,700
Bute
Victoria Halls:
The fire alarm system was upgraded. 
£24,000
Lomond
Page 231

Page 232

liveArgyll.co.uk 12
Queen’s Hall:
liveArgyll invested £26,000 to create a new
enclosed reception area within the entrance
lobby, and to design and install new
functional lighting in both studios.
Essential water quality improvement work
was undertaken. £28,700
Riverside Leisure Centre:
Refurbishment work commenced within the
health suite and uncovered some remedial
work that needed to be undertaken. This
has resulted in the commissioning of some
structural work to be completed in late 2025,
but more pertinently, Argyll and Bute Council
has made money available for the feasibility
assessment and planning of a new leisure
and well-being centre - this project is now
underway.
Cowal
FACILITY DEVELOPMENTS
Page 232

Page 233

liveArgyll.co.uk 13
A YEAR IN NUMBERS
young people
completed Bikeability
Training
Active Schools
Volunteers
Visits to
Active Schools
Sessions
679
689
92,221
PressReader issues
opened
Visits to Libraries
Library-led
Bookbug
sessions
141,171
76,000
123,000
609
young people took
part in learn to swim
programme.
1,550
Children attended6,682
Adults attended5,783
Leisure Members
11,000
(16% of the Argyll and Bute
Population)
2,540
Adults engaged in
Community Learning
2,423
Young People engaged
in Community Learning
visits to Campbeltown
Museum
2,000
Accredited learning qualifications/
Awards achieved by Adult Learners
and Young People
402
Wider Achievement
awards  achieved by
Young People
396
A monthly average of
visits to fitness classes
234,800
128,000
visits to a gym
visits to a
swimming pool
Books issued
110,000
Borrowbox issued
31,000
2,106
followers
6,473
followers
331
followers
Archive Enquiries
278
people attended an event at
a hall or community centre
123,000
Page 233

Page 234

liveArgyll.co.uk 14
This is our first year of
undertaking Bikeability sessions.
We have worked through Level 1 and will
be supported with a Level 2 session by an
instructor before summer. We will continue
our journey onto Level 2 after summer.
Children are loving this new aspect to the
curriculum and personally, as an instructor
who trained in the city, bringing this to a rural
island setting has presented new challenges
in terms of teaching about different risks on
our rural roads and also preparing children
for more built up areas. Very pleased I am
able to continue my journey as a Bikeability
instructor in this new setting!
- Keills Primary, Islay
It was good getting to go out
onto the road with our bikes. I
liked going for a longer cycle at the end. I
learned how to be safe on the road, by doing
things like signalling and looking for hazards.
I enjoyed working with Nicola the instructor
because she explained things in an easy way
to understand.
- P7 Pupil, Ulva Primary School
All of the children enjoyed the
course. At least half had not
been on the road, so this was extremely
useful to them, while helping them gain
confidence. Some P7 still continue to cycle to
school.
- Dunoon Primary School
CASE STUDIES
Active Schools: Bikeability in Their Words
Page 234

Page 235

liveArgyll.co.uk 15
Can you please pass on my
thanks to (BSI trained teacher)
for Teaching my son how to ride his bike. He
insisted he wasn’t interested but is delighted
now he has learned and I am very grateful.
(Pupil went on to do L2 training).
- Parent of pupil at Hermitage Primary
School
From BSI Teacher: It has been
fantastic to be able to equip
learners with skills that can keep them safe
outside of school and also build coordination.
All of our children’s life skills, risk assessment
skills and confidence cycling has grown as a
result of their participation in these courses.
- BSI Teacher, Dunbeg Primary School
One of our pupils, at the
beginning of the course was
unable to ride a bike at all, but really
persevered to pass level one. After more
practice with help of staff at school, she
became confident on the bike, enough to join
another course to then pass level two also.
We also have a video in Gaelic
from this pupil. Watch it here:
https://youtu.be/vSuLNozf92A
or scan the QR code
- Sandbank Primary School
CASE STUDIES
Active Schools: Bikeability in Their Words
Page 235

Page 236

liveArgyll.co.uk 16
Active Schools: Healthy Me Programme
collaboration gets Girls Active!
CASE STUDIES
The Active Schools and Sport Team relies on
working in partnership to ensure that extra-
curricular sport and physical programmes in
schools provide opportunities to all young
people across Argyll and Bute.
The Oban Healthy Me programme has been
running for many years and is for P7 girls at
Rockfield Primary School who are transitioning to
First Year in High School. The programme aims to
address the huge drop off in girls participating in
sport between primary and secondary school.
In partnership with liveArgyll Community Learning
and the Oban Youth Café, the sessions offer a
three-week rolling programme of activities that are
available locally. This year the sessions consisted
of physical activity, cooking and arts and crafts all
delivered throughout Oban High School.
This year 24 girls signed up to the programme and
were all very enthusiastic to try different activities,
including some they hadn’t tried before.
Active Schools coordinator, Charlotte Forbes is
involved in organising and running the Physical
Activity programme.
Charlotte organised the Oban High School sport
leaders to deliver the first session, which included
a warm-up game of dodgeball and then a circuit
training session in groups. This was also a great
chance for the Sport Leaders to take the lead on
delivering sessions. The girls worked hard and put
in a lot of effort.
For the second session, Charlotte invited a local
Kids Club Coordinator to deliver a Born to Move
programme. This was a dance and Thai Chi-
inspired workout routine. The girls enjoyed the
variety of routines and had a giggle along the way.
Two gymnastic coaches delivered the final sports
session. Using Oban High School’s equipment,
the girls loved getting a taster of many gymnastic
activities and accomplishing rolls and balances
they thought they were unable to achieve.
The girls’ feedback was that they enjoyed the
variety of sessions, that it was fun getting a chance
to try activities that may be on offer as after-school
clubs in the high school, and that it was a chance
to familiarise themselves with the school building.
The girls came away feeling
inspired by the facilities they
used, especially the gymnastics rings. These
taster sessions got them interested in what
is being offered as after-school clubs in the
High School, and what clubs they could look
forward to joining.
From the confidence they have gained
through the programme, there is the hope
that all of the girls will be participating in at
least one club per week. The collaborative
work was key to the success of the project. It
taught the girls to make positive health and
well-being choices, while learning valuable
skills for their personal development.
- Charlotte Forbes, 
Active Schools Coordinator
Page 236

Page 237

liveArgyll.co.uk 17
CASE STUDIES
Active Schools: Kilmartin Primary Young Leaders
The liveArgyll Active Schools team prides itself
on the work it does supporting young people in
gaining confidence and experience in leadership
skills.
Kilmartin Primary School is a small school in Mid
Argyll comprising a school roll of 31 pupils.
The pupils realise the importance of sport and
physical activity to support their physical and
emotional health, and the value it can add to their
learning in school. With the support of liveArgyll
Active Schools coordinator, Erin Downie, the
school has ten amazing Primary Young Leaders
who don’t let the fact that they are a remote rural
school stop them from trying to create equal
opportunities for their school to participate in
physical activity.
In Term 1 of 2024, Erin supported eager Primary
7 pupils through Young Leader training, allowing
them to gain skills to lead extra-curricular activities
for their younger peers. Erin worked through a
range of techniques and competencies to provide
guidance in organising and running sports and
activities, providing the whole school with more
opportunities to participate in physical activity.
The young leaders were keen to get the whole
school involved in physical activity, especially
the younger children, and came up with the
paralympic sport of Boccia. Boccia is a wholly
inclusive sport that anyone can play. It can be
played anywhere, by anyone, individually or in a
team, and it is easy to deliver and learn.
Every match is
different, every ball
thrown can change a match.
- Stephen McGuire MBE, 
Scottish and GB Paralympian
Erin worked closely with the young leaders over
a couple of weeks to help them set up a Boccia
club. To entice people to join their club, the young
leaders decided to run a competition for the whole
school to join in at the end of the five-week club.
The young leaders took this role seriously, making
sure to create posters and sign-up sheets. They
also adapted Boccia to help teach the younger
ones how to aim and throw the Boccia ball
accurately. The young leaders worked in groups
and led themed weeks to ensure all the pupils
would have fun. Week 1 - Boccia Rainbow, Week
2 - Boccia Ring, Week 3 - Hoop It, Week 4 - Boccia
Surprise, and Week 5 - Boccia Competition. Each
week was different, interesting and challenging.
The Boccia Club was a massive success, with the
majority of the school joining in at lunchtime.
The whole school participated in the Boccia
Competition, with the young leaders supporting
the younger pupils who were a little apprehensive.
The young leaders were encouraging, enthusiastic,
and inspiring to the rest of their peers throughout
the whole project and excelled in their roles.
The message was clear – to promote the
importance of physical activity and to show that
young people can inspire to make changes and
make a difference through good leadership and
enthusiasm.
Well done Kilmartin Young Leaders!
Page 237

Page 238

liveArgyll.co.uk 18
Campbeltown: Ampa PT
CASE STUDIES
I started my PT journey with Ampa in November
2024 and can honestly say it’s the best decision
I’ve ever made.
I’d got to the stage where all my clothes were
too tight, I looked absolutely massive in my work
clothes and was embarrassed to go up another
size in clothes. I had just decided enough was
enough when I saw the advert that liveArgyll were
going to be starting personal training and decided
it was a sign.
I’ve now lost two stone in weight, 16cm from my
hips and 20cm from my waist. It took me a long
time to notice the difference in myself, despite
others telling me how well I was doing, but can
now see how much my body, attitude and life
has changed. It’s the small things like old clothes
now fitting again and seeing my fitness increase
in other areas. I have far more energy and feel so
much more confident!!
Not only do I attend the gym but I now also go
to Indoor Cycling regularly (although I say I hate
it, I secretly love it) and I have begun running at
least once a week. This has all been down to the
constant support and encouragement given to
me by Ampa week in week out, with him pushing
me out of my comfort zone and showing me what
is possible.
Don’t get me wrong there are weeks where I still
find going to the gym a struggle, especially if
things don’t always go to plan when I get there
but I always tell myself to look back at how I was
in October and how far I have come since then.
That being said I will always dread turning up for a
PT session to be told ‘I have something special in
mind for today’s session’.
I am now halfway to the target that I set at the start of
this journey and know that with Ampa’s continued
support, encouragement and motivation, this will
be achievable. I honestly recommend to anyone
who will listen to me that they need to get some
sessions in with Ampa, especially if they are
nervous about going to a gym.
Page 238

Page 239

liveArgyll.co.uk 19
Need for the project/activity                                                             
Having worked together to explore UNCRC article
12 and the need for a ‘youth led’ voice structure that
supports young people to empower themselves
by having a say and influence over issues that
affect them locally, Kintyre and Bute Youth Action
Groups created and developed their own youth
voice model based on positive examples from
other areas, and what they thought would work
at their own local levels. In further developing
these models, the Action Group decided they
wanted to visit the award winning Aberdeen Youth
Movement to learn from their experiences, and
gain advice and insights to progress their own
models moving forward.
Description
Eight young people from each area who had led
on the development of their own models travelled
to Aberdeen for a two-night stay during the Easter
holidays in 2025. The young people spent time
doing fun leisure activities with members of
Aberdeen Youth Movement to get to know them
and begin developing networking relationships,
whilst supporting their social and mental health
and wellbeing. Aberdeen Youth Movement led a
full day of workshops, educating the others about
their movement and how it works, obstacles
and challenges they face, how they bring about
positive change, how they promote their work
and utilise social media, and other important
elements which have helped drive the Aberdeen
movement forward. There were also opportunities
for the young people to have social time together
while staying at the self-catering accommodation,
letting them experience some independent living,
being responsible for themselves and each other
while developing friendships.
Impact
Both groups learned that the work they are
carrying out is not being done in the isolation of
their local areas, but that it is in fact part of a wider
social and democratic movement towards the
development of genuinely youth-led structures
for positive change in support of UNCRC article
12. They learnt that their model is quite unique in
that they have developed it themselves and at a
very young age, given the difference in ages and
experiences between local Argyll and Bute Youth
Action Groups and their Aberdeen counterparts.
This knowledge has proved to be a motivator
for some who are more proud of what they have
achieved at such an early stage.
They gained valuable insights into the
opportunities and challenges they will likely face
moving forward, and how they can better develop
their plans and overcome obstacles when they
appear. Including how to utilise social media
channels to further develop their skills, confidence,
and raise the profile of their work to engage more
local young people in democratic processes.
Each group has now identified Youth Social Media
Leads who will undergo training before taking
control of their social media channels.
Those who took part also noted improvements in
their general confidence, mental health and well-
being, their core/transferable skills, social and
teamwork skills, ability to make new friends, their
self-esteem, their knowledge and understanding
of youth voice, and are now more motivated to
take part in other similar projects and activities to
develop their group’s work further.
CASE STUDIES
Community Learning Services: Kintyre and Bute Youth
Action Group Visit to Aberdeen Youth Voice Movement
Page 239

Page 240

liveArgyll.co.uk 20
CASE STUDIES
Community Learning Services: Kintyre and Bute Youth
Action Group Visit to Aberdeen Youth Voice Movement
I loved meeting new people
from other groups.
It was really good learning about
how we can use social media to
reach and influence other young people.
I learned about how they created
their model and have new ideas
to make our youth voice movement better.
I learned how important it is for
young people to be heard and
get their points across collectively.
It was great to see how young
people can help so much when
they come together and make their voices
heard.
Page 240

Page 241

liveArgyll.co.uk 21
Community Learning Services: Adult Learning
Lochgilphead – Learners Achieving SQA Volunteers
Awards April 2025
CASE STUDIES
Need for the project/activity                                                             
All three learners attended Adult Learning’s health
and wellbeing Give back Group at the MS Argyll-
Snowdrop centre in Lochgilphead to help them
cope with and manage their long-term health
conditions. All of the women involved face many
challenges in their day-to-day life so also attend
the group to reduce feelings of social isolation
and to improve their mental health.
Description
Originally they volunteered with Adult Learning
as part of the Give Back Group and enjoyed the
challenge of learning new skills alongside the
sense of achievement as they gave back to their
local community. Volunteering included raising
funds for the MS Argyll-Snowdrop Centre through
creating homemade crafts and selling them at
their pop-up shop, helping regularly at centre
events and with the local Food Share. The group
agreed that participating in volunteering helped
improve their wellbeing, confidence and self-
esteem while giving them meaning and purpose
in their life.
As a result of participation in the Give Back Group
all three learners felt confident enough to progress
and improve their learning and skills further by
undertaking an SQA Volunteer Award Level 4
through Community Learning in Lochgilphead. The
learners worked hard to complete their Volunteer
Award and this was a challenge for each as they
apprehensively and nervously returned to study
and learning, alongside managing their long-
term health conditions. Each learner/volunteer
demonstrated determination and commitment
as they volunteered in various capacities and
completed their SQA Award early 2025 with flying
colours!
Impact
Completing their SQA Volunteer Award Level 4
has equipped the women with further confidence,
learning and skills; giving them the courage to
develop a new group with Adult Learning called
‘Women Coming Together.’ They identified a need
for this type of group through interaction and
discussion with individuals in their local area, and
have now created a safe, non-judgemental space
for women who are feeling socially isolated to
connect, improve their well-being, engage, learn
and importantly, laugh and have fun together.
Page 241

Page 242

liveArgyll.co.uk 22
Community Learning Services: Adult Learning
Lochgilphead – Learners Achieving SQA Volunteers
Awards April 2025
CASE STUDIES
Evidence
In relation to liveArgyll Outcomes learners
reported the following within their evaluation:
• I achieved a recognised award or
qualification.
• I improved my core skills; communication,
numeracy, ICT, working with others &
problem solving.
• I improved my confidence and self-esteem.
• Improve my physical and mental health and
wellbeing
• I gained a positive experience through regular
attendance on learning programme
• I have improved my aspirations and
motivation
• I have re-engaged with education / lifelong
learning
• I have improved my employability skills and
experience.
• I have started to do voluntary work regularly
• I understand my own progress and
development
• I have been involved in consultation, feel
listened to
• I feel I have been supported to express my
views.
• I feel I have a safe inclusive space to express
my views freely
I have a better understanding of
volunteering in general, I am a
more confident volunteer.
The course has helped me to
understand more aspects of
volunteering but more than anything it has
supported my mental health and well-being
through meeting, socialising and working
with the group every week.
Confidence Boost - In my
SWOT analysis I originally felt
very shy and insecure but with help from
the peer support of the rest of the group
and my assessor I feel I have improved my
confidence.
I also didn’t like to speak in front
of people about the things I was
learning in case I got the wrong answer, I
have been able to talk in front of the group
with more confidence since this course has
progressed.
Page 242

Page 243

liveArgyll.co.uk 23
CASE STUDIES
Corran Halls
Royal National Mod 2024
The Royal National Mod made its long-awaited
return to Oban in October 2024, with the Corran
Halls serving as the main venue. Manran kicked
off the week with a sell-out opening night
performance.
Over the course of the week, the Corran Halls
welcomed more than 3,000 attendees who
came to watch the competitions. Each medal
performance was sold out from Wednesday
through to the closing competition on Friday.
Oban Gaelic Choir walked away with the highly
contested for Lovat and Tullibardine Sheild.
liveArgyll teamed up with An Comunn Gàidhealach
and Scottish trad royalty Trail West to bring the
Mod to a close. The fully sold-out show—sold out
three months in advance—provided an incredible
finale to a fantastic Royal National Mod. That
evening also saw a new bar takings record set at
the Corran Halls.
Clipper Round the World Yacht Race
Oban was the homecoming destination for the
Clipper Around the World race. We welcomed
the crew and organisers to the Corran Halls
for an incredible, sold-out prize-giving award
ceremony, which was followed by a lively ceilidh
organised by liveArgyll.
Page 243

Page 244

liveArgyll.co.uk 24
CASE STUDIES
Corran Halls
The organisers and crew absolutely loved their
time here and have since confirmed they will be
returning to Oban in the summer of 2026.
liveArgyll reached out to one of Scotland’s most
successful and beloved bands, Skerryvore, to
perform and give the boats a memorable send-
off before their final voyage home. The sold-out
night, filled with incredible music and a fantastic
atmosphere, saw the crew and organisers off in
style.
Skerryvore Video 1: https://www.youtube.com/
shorts/T80jANwn_Lo
Skerryvore Video 2: https://www.youtube.com/
shorts/4Dx5uEkS3KI
SAMS Challenger Conference
The Corran Halls proudly hosted the 2024
Challenger Society Conference, welcoming
over 400 international delegates to Oban in
early September.
This renowned event brought together marine
scientists, researchers, and advocates from
around the world to share ground breaking work
in eco-friendly sea practices and advancements
in marine science.
Throughout the four-day conference, stalls and
exhibitions showcased an impressive array of
participant posters, each highlighting innovative
research and sustainability efforts in marine
environments. The Corran Halls also served as
the venue for the evening celebrations, which
included a film premiere presented by one of the
participating groups and a drinks reception for all
attendees.
The event was an outstanding success, reinforcing
Oban’s status as a hub for marine science and
community engagement.
Page 244

Page 245

liveArgyll.co.uk 25
CASE STUDIES
Corran Halls
Argyll Food Festival
Launched in 2023 by Food From Argyll, the Argyll
Food Festival quickly established itself as a
highlight in the local events calendar. Designed
to celebrate and support small businesses
across Argyll and Bute, the festival gives local
sellers and producers the chance to showcase
their incredible food and drink offerings.
The Corran Halls proudly hosted the inaugural
event, which was a resounding success - attracting
over 2,200 attendees over the weekend. Building
on that momentum, the 2024 festival saw an even
greater turnout, with a staggering 3,500 visitors
enjoying the vibrant atmosphere across two days.
Festival-goers were treated to a wide array of
stalls featuring everything from homemade
cakes, fresh shellfish, and artisanal ice cream to
delicatessen meats, specialty coffee and tea, and
much more. Adding to the welcoming, community
spirit of the event, local musicians performed live
from the Main Hall stage, creating a warm and
lively backdrop for both stallholders and guests.
The Argyll Food Festival continues to grow,
celebrating the region’s rich food culture and the
passionate people behind it.
Beyond the stalls, visitors enjoyed live cooking
demonstrations in the Studio Theatre. Local chefs
showcased how to prepare their signature dishes
using fresh Argyll produce, offering inspiration and
practical tips to a captivated audience. A standout
moment came when The Hebridean Baker took to
the stage, sharing his beloved homemade “Wee
Nuns” recipe to a sell-out crowd.
With its perfect blend of food, music, and
community, the Argyll Food Festival has cemented
its place as a beloved annual tradition - and with
The Corran Halls as its home, it promises to
flourish for many years to come.
Page 245

Page 246

liveArgyll.co.uk 26
Dunoon: Queen’s Hall Move Together Class
CASE STUDIES
Our Move Together Class started after the GP
Referral Scheme ceased and we were looking
for an entry level class that would be suitable for
clients who would perhaps struggle with some
of our mainstream classes due to underlying
health issues, recovery from medical procedures
or obesity and the desire to be more active.
The class itself is a gentle exercise class with
clients having the option of chair-based or
standing exercises. It is supervised and overseen
by a Level 3 Gym Instructor and the clients are
carefully monitored and supported throughout
their personal journeys.
The class has been a great addition to our timetable
and has been very popular in encouraging
potential customers to join liveArgyll in order to
improve their physical and mental health.
Karol Emmerson
Due to having Cerebral Palsy in my left side, I
was looking for a way to build up the strength in
my legs. A friend of mine was already attending
the Move Together class here in Dunoon and
recommended it to me.
I’ve been attending the class for just over two
years now.
The class is set at a level which is easy for me to
take part in. The selection of exercises is ideal and
not too demanding. I find it very good company
and the music is great. Having classes like this
available means I have the motivation to get me
out of the house.
When the class first started, I had to use my
mobility walker in order to move from one station
to the next but now I’m able to move without it. I
do still need a bit of assistance, but I don’t need to
rely on the walker each and every time. My mobility
has improved and the strength in my legs has also
improved greatly. My daughter is delighted that
I’m not stuck in the house on my own during the
day and that I’m out attending the class twice a
week socialising at the class. Also, doing everyday
tasks has become easier since attending because
my upper and lower body strength has improved.
The fitness instructors at the Queen’s Hall have
been very encouraging and using their skills
and knowledge has enabled me to improve my
general fitness and I look forward to the class
every week.
Page 246

Page 247

liveArgyll.co.uk 27
Dunoon: Queen’s Hall Move Together Class
CASE STUDIES
Ian Lovell
Prior to attending the Move Together Class at the
Queen’s Hall, my mental and physical health were
in a really bad place. I was so low mentally that I
needed to do something, so I started classes with
the intention of getting the endorphin buzz for my
mental health and improving my cardiovascular
health.
I met with the fitness staff at the hall and joined
the class just over a year ago and have since
progressed with their help to be able to take part
in more advanced classes and I am still going
strong.
I feel my health is the best it’s been for a very
long time. My resting heart rate has dropped
dramatically and my lungs have never sounded
so good (according to my GP).
Because of how well my health and fitness has
come along and with the amazing support from
the instructors, I started college studying health
and fitness with the intention of becoming an
instructor, in the hope of helping others achieve
their goals and improving their health.
Thanks to the Move Together Classes which
started me on this journey, I have been able to
progress and take part in the other classes which
are available. I have also been able to start karate
again after many years and intend to eventually
work my way up to black belt whilst still also
focussing on classes.
My favourite classes are Boxfit, Indoor Cycling,
more Indoor Cycling and Stretch & Flex. To be
honest, there isn’t a class I don’t enjoy as I feel the
benefit from all of them and the instructors keep
the classes fun and challenging no matter what
we do.
UPDATE: Ian has now enrolled to study
Health and Fitness at college. He has recently
gained his qualification in Zumba and started
delivering classes for liveArgyll. He has now
started his Indoor Cycling qualification.
Page 247

Page 248

liveArgyll.co.uk 28
In January, severe storm conditions caused
substantial structural damage to Helensburgh
Leisure Centre, resulting in the closure of the
gym and the swimming pool. In response, the
Helensburgh team acted swiftly and effectively
to ensure continuity of key services, prioritising
community needs during a challenging period.
Gym provision was promptly relocated to the
former Helensburgh Library building, while the
library service itself was moved to Hermitage
Park Pavilion. This agile reconfiguration of facilities
allowed both services to remain operational,
minimising disruption for customers.
Fitness classes were quickly re-established
across alternative venues, including Victoria Halls
and Hermitage Park during favourable weather
conditions. These classes are currently running at
near-optimum levels, with the exception of water-
based activities due to the lack of access to an
alternative swimming pool.
Although the swim programmes has been
temporarily paused, the overall response
demonstrated excellent adaptability, strong
local leadership, and a team-wide commitment
to service delivery. Staff across all areas showed
professionalism and flexibility, ensuring the
community continued to benefit from access to
health, fitness, and learning opportunities during
a period of significant disruption.
CASE STUDIES
Helensburgh Leisure Centre: Storm Recovery
Page 248

Page 249

liveArgyll.co.uk 29
CASE STUDIES
The Victoria Halls Helensburgh
The Victoria Halls Helensburgh continues to
be a well supported venue with Bridge Clubs,
the Heart Chest and Stroke Club, Helensburgh
Alternative Hobby Association, The Art Society,
Flower Club Horticultural Society and various
dance groups keeping us busy.
This year we have hosted the 25th British
Association of Teachers of Dancing’s Stage Dance
Competition, and the Helensburgh Art Club’s 71st
year of having its exhibition here.
We have also had the Day of Dance, another
regular in our diary, working with the local Active
Schools team to host Primary 7 children who are
preparing to start first year at Hermitage Academy.
The children spend time practicing Scottish
Country Dancing in their own schools and then
come together for the Day of Dance. Around 250
pupils visited Victoria Halls to take part in morning
or afternoon sessions of dance.
With the support of the local branch of the Royal
Scottish Country Dance Society, who provide the
music, a Caller and some other members (over
the age of 12) to help keep the dancing going, it
is a superb opportunity for these children to meet
each other for the first time, all while being an
event that meets every aspect of our drive to be a
community venue.
Page 249

Page 250

liveArgyll.co.uk 30
Campbeltown Library: Engaging Our Communities
through Creative Activities
Over the past year, Campbeltown Library
has transformed into a vibrant community
hub, offering a variety of fun and enriching
activities for both children and adults. Through
programmes like Bookbug and Clubtastic,
the library has fostered connections among
families, enhancing children’s love for reading
and creativity.
Programme Highlights
Bookbug sessions have enjoyed a steady
increase in attendance, frequently exceeding
advance bookings. These interactive gatherings
are designed to create a welcoming environment
where children with their grown-ups can explore
and share stories, songs and rhymes. Each week
features a consistent story theme, accommodating
the varying attendance of young participants.
The Stay and Play sessions go beyond storytelling
by incorporating games, colouring activities, and
themed crafts. Noteworthy crafts include creating
puffins from toilet rolls inspired by ‘Puffin Peter’,
making coral reefs from egg boxes after reading
‘The Tale of the Whale’, and assembling toilet roll
telescopes connected with ‘A Shark in the Park’.
Through these efforts, the library has nurtured
strong relationships with parents and caregivers.
Feedback has been overwhelmingly positive,
with parents praising the staff’s dedication and
recognising the significant impact these sessions
have. After Bookbug and Stay and Play, families
often linger for an additional hour, enjoying the
library’s inviting space, which reflects the success
of these programs in creating a family-friendly
atmosphere.
Clubtastic
The Clubtastic initiative is a free club tailored for
children in P3–P7, and it has seen a remarkable
surge in interest, growing from six to 15 members.
This club provides a unique platform for children
from various schools to connect and form
friendships, helping some as they prepare for
their transition to the local grammar school.
The activities within Clubtastic are designed
to inspire imagination, promote teamwork, and
ensure fun. Children actively contribute to library
displays, enhancing their sense of ownership and
engagement. Among the hands-on projects, kids
have created worry boxes using cardboard tubes
CASE STUDIES
Page 250

Page 251

liveArgyll.co.uk 31
CASE STUDIES
and recycled materials, which allow them to
express and manage their concerns creatively. This
initiative has proven to be remarkably effective,
as children actively use these boxes, showcasing
their engagement and the programme’s beneficial
impact on emotional well-being.
The initiatives at Campbeltown Library underscore
the importance of interactive and creative
programmes for engaging children and building
community connections. Through Bookbug
and Clubtastic, the library not only promotes
literacy but also nurtures social interactions and
emotional growth among young participants. The
library continues to adapt and expand its offerings,
ensuring a rich and rewarding experience for
families in the local community.
Intergenerational Events
The library team consistently uses its creativity
to bring people of all ages together through a
variety of events. During the Read for Summer
initiative, children and adults learned the art of
spinning wool from local artisans who shared
their expertise with a diverse audience. Teamwork
thrived when a leisure team member volunteered
to teach crochet during several successful
summer sessions.
Families and friends gathered at the library to
celebrate Harry Potter Book Day, drawing around
100 visitors with engaging displays and fun
activities. This event was a resounding success,
fostering community spirit and sharing the magic
of libraries!
Campbeltown Library: Engaging Our Communities
through Creative Activities
Page 251

Page 252

liveArgyll.co.uk 32
CASE STUDIES
Book Week Scotland
In November 2024, the library team hosted
renowned Scottish crime author Linn Anderson,
captivating around 50 attendees with stories of her
research, writing journey, and creative inspiration.
The event sparked engaging conversations and
thoughtful questions. Thanks to the hard work of
our team, the event was a tremendous success!
Lin expressed her delight, even stopping by to let
the team know how much she had enjoyed the
experience and her interest in returning in the
future.
Libraries are for everyone!
It is essential to share and nurture a love for
reading, unite our communities, and encourage
individuals of all ages to embrace and enjoy
the wealth of resources our libraries offer. The
Campbeltown team, with their exceptional
creativity and dedication, is committed to excelling
in this mission.
Campbeltown Library: Engaging Our Communities
through Creative Activities
Page 252

Page 253

liveArgyll.co.uk 33
DIGITAL MARKETING
One membership, endless memories...
£14.99
YOUNG ADULT MEMBERSHIPS FROM
per month
£26.99
ADULT MEMBERSHIPS FROM
per month
Stay active, bond, and thrive together! Enjoy access to our state-of-the-art
gym, pool, and classes for every member of your household. Scottish Incorporated Charitable Organisation No. SC047545
liveArgyll.co.uk        
FAMILY  MEMBERSHIPS FROM
£42.99
per month
FITNESS FOR THE
WHOLE FAMILY
SWIMMING
LESSONS
£21.99
per month
ONLY
Lessons currently available at
Rothesay Leisure Centre!
No waiting list and lesson slots available across various days, levels and times.
SOFT PLAY
MOAT CENTRE
Moat Community Centre, Stuart Street, Rothesay, PA20 0EP
Soft play and bouncy
castle suitable for ages
8 and under.
Table tennis also
available.
Tea and coffee
available to purchase.
Weekend Sessions
Scan to book
£4 for 1 hour
Let's
Celebrate!
HOGMANAY AT THE QUEEN’S HALL
31
DECEMBER AT 8.30PM
TICKETS
£12 general admission / £8 under 12s / £100 table of 10
8.30pm - 12.30am with soft play open until 11.30pm. Under 12s must be accompanied at all times.
LIVEARGYLL.CO.UK/WHATS-ON
The Queen’s Hall, 9 Argyll Street, Dunoon, PA23 7HH | 01369 800 500 | queenshall@liveargyll.co.uk
Page 253

Page 254

liveArgyll.co.uk 34liveArgyll.co.uk 34
LOOKING AHEAD
As we approach the upcoming business
year, our primary goal is to ensure stability
while maintaining high service levels and
performance across our organisation. In an
increasingly dynamic environment, we recognise
the importance of adaptability and strategic
planning to navigate potential challenges
effectively. As an organisation with a cost
base that is 90% staff-related, it is essential
that sufficient planning time is given should
the Council wish to make strategic alterations
or amendments to their service specification
requirements.
Stability as a Focus
This next year will be dedicated to fostering
stability within our operations, with an early
return to operations at our flagship Helensburgh
Leisure Centre. Our focus remains on consistent
service delivery and reliable performance.  A
number of internal structural changes have
taken place during 25/26 and these may require
time to foster and shape service delivery. It is
therefore prudent to set realistic performance
targets which are focused on maintaining
existing excellent performance, allowing time for
development, growth and improvement.  More
specifically we will look at:
• Operational Resilience: Strengthening our
internal processes and systems to ensure
continuity and reliability in service provision,
regardless of external pressures.
• Resource Management: Optimising existing
resources to maximise efficiency, minimising
waste whilst ensuring that our service levels
are not compromised.
• Service Maintenance and Performance
Enhancement: We will continue with our
performance management strategies to
maintain our service levels while enhancing
performance.
• Performance Monitoring: Establishing
robust performance metrics to track service
delivery and identify areas for improvement,
thus ensuring we meet our commitments to
customers and stakeholders.
• Employee Support: Providing our team
with the tools and training necessary to
sustain high performance levels, supporting
well-being and encouraging a culture of
excellence and accountability.
We recognise that constrained resources may
impact our operations and, subject to agreed
funding levels and Council service specification
requirements, we may be required to review
existing service provision including but not
limited to:
Exploring alternative delivery models
Implementing innovative delivery models
that satisfy service specification requirements
potentially delivers small efficiencies. This may
include leveraging technology, outsourcing
certain functions, or adopting platform-based
solutions to optimise our service delivery.
Increasing collaboration by the way of new
local and strategic partnerships, with the
aim of working with other organisations to
share resources, knowledge, and capabilities,
enhancing our ability and capacity to deliver on
our commitments despite significant financial
constraints.
Regrettably, if resource levels are deemed
insufficient to allow the safe and effective
continuation of service, then withdrawal or
cessation of service may be considered. 
As we look forward to the next business year,
our focus on stability, maintaining service levels,
and performance enhancement will guide our
strategic decisions. By proactively addressing
resource challenges and exploring alternative
delivery models, we hope to ensure that our
organisation remains resilient and responsive to
the needs of our customers and stakeholders.
This approach will position us not only for
sustained performance but also provide a
platform for continued growth and success in the
future.
Kevin Anderson
Chief Officer
Page 254

Page 255

liveArgyll.co.uk 35
FINANCIAL STATEMENT
Consolidated Statement of Financial Activities
(incorporating the income and expenditure account)
for the year ended 31 March 2025
The Statement of Financial Activities includes all gains and losses recognised in the year.
All income and expenditure derives from continuing activities.
Unrestricted
Funds
Restricted
Funds
Pension
Fund
Total
Funds
2025
Total
Funds
2024
£ £ £ £ £
Income:
Donations and legacies 1,393           1,101        -                 2,494        660          
Charitable activities 3,887,470    642,419    -                 4,529,889  4,320,288
Management fee 3,265,604    -               -                 3,265,604  3,834,604
Total income 7,154,467    643,520    -                 7,797,987  8,155,552
Expenditure:
Charitable activities (7,665,831) (719,481) (148,000) (8,533,312) (8,205,187)
Other trading activities -                  -               -                 -                -           
Total expenditure (7,665,831) (719,481) (148,000) (8,533,312) (8,205,187)
Net (expenditure) / income (511,364) (75,961) (148,000) (735,325) (49,635)
Transfers between funds -                  -               -                 -                -               
Other recognised (losses) / gains:
Actuarial (losses) / gains on
defined benefit pension schemes -                  -               148,000 148,000 (250,000)
Net movement in funds (511,364) (75,961) -                 (587,325) (299,635)
Reconciliation of funds:
Total funds brought forward 1,238,343    150,913    -                 1,389,256 1,688,891
Total funds carried forward 726,979 74,952 -                 801,931 1,389,256
Page 255

Page 256

liveArgyll.co.uk 36
FINANCIAL STATEMENT
Company Statement of Financial Activities
(incorporating the income and expenditure account)
for the year ended 31 March 2025
The Statement of Financial Activities includes all gains and losses recognised in the year.
All income and expenditure derives from continuing activities.
Unrestricted
Funds
Restricted
Funds
Pension
Fund
Total
Funds
2025
Total
Funds
2024
£ £ £ £ £
Income:
Donations and legacies 1,393           1,101        -                 2,494        660          
Charitable activities 3,887,470    642,419    -                 4,529,889  4,320,288
Management fee 3,265,604    -               -                 3,265,604  3,834,604
Total income 7,154,467    643,520    -                 7,797,987  8,155,552
Expenditure:
Charitable activities (7,665,831) (719,481) (148,000) (8,533,312) (8,205,187)
Total expenditure (7,665,831) (719,481) (148,000) (8,533,312) (8,205,187)
Net (expenditure) / income (511,364) (75,961) (148,000) (735,325) (49,635)
Transfers between funds -                  -               -                 -                -               
Other recognised gains:
Actuarial (losses) / gains on
defined benefit pension schemes -                  -               148,000 148,000 (250,000)
Net movement in funds (511,364) (75,961) -                 (587,325) (299,635)
Reconciliation of funds:
Total funds brought forward 1,237,264    150,913    -                 1,388,177 1,687,812
Total funds carried forward 725,900 74,952 -                 800,852 1,388,177
Page 256

Page 257

liveArgyll.co.uk 37
FINANCIAL STATEMENT
Consolidated Balance Sheet
as at 31 March 2025
2025 2024
£ £ £ £
Current assets
Stock 19,179 15,862
Debtors 162,994 160,976
Fixed term deposit 1,271,192 1,271,192 
Cash and cash equivalents 104,111 623,716
Total current assets 1,557,476 2,071,746
Current liabilities
Creditors: amounts falling due within one year (755,545) (682,490)
Net current assets 801,931 1,389,256
Net assets excluding pension liability 801,931 1,389,256
Defined benefit pension scheme asset/(liability) (11,000) -              
Net liabilities 790,931 1,389,256
Funds
Unrestricted funds 726,979 1,238,343
Restricted funds 74,952 150,913
Pension reserve (11,000) -              
Total Funds 790,931 1,389,256
Page 257

Page 258

liveArgyll.co.uk 38
FINANCIAL STATEMENT
Company Balance Sheet
as at 31 March 2025
2025 2024
£ £ £ £
Fixed assets
Investments 1 1
Total fixed assets 1 1
Current assets
Stock 19,179 15,862
Debtors 162,994 160,976
Fixed term deposit 1,271,192 1,271,192
Cash and cash equivalents 103,031 622,636
Total current assets 1,556,396 2,070,666
Current liabilities
Creditors: amounts falling due within one year (755,545) (682,490)
Net current assets 800,851 1,388,176
Net assets excluding pension liability 800,852 1,388,177
Defined benefit pension scheme asset/(liability) (11,000) -              
Net liabilities 789,852 1,388,177
Funds
Unrestricted funds 725,900 1,237,264
Restricted funds 74,952 150,913
Pension reserve (11,000) -              
Total Funds 789,852 1,388,177
Page 258

Page 259

liveArgyll.co.uk 39
FINANCIAL STATEMENT
Operating results (excluding the pension adjustment)
The operating results for liveArgyll for the year ended 31 March 2025, excluding the pension
adjustment, report an overall deficit of £587,325
Unrestricted
Funds
Restricted
Funds
Total Funds
2025
Total Funds
2024
£ £ £ £
Income:
Donations and legacies 1,393            1,101            2,494            660              
Charitable activities 3,887,470     642,419        4,529,889     4,070,288
Management fee 3,265,604     -               3,265,604     3,834,604
Total income 7,154,467     643,520        7,797,987     7,905,552    
Expenditure:
Charitable activities (7,665,831) (719,481) (8,385,312) (8,205,187)
Total expenditure (7,665,831) (719,481) (8,385,312) (8,205,187)
Net expenditure (511,364) (75,961) (587,325) (299,635)
Transfers between funds -                   -                   -                   -                  
Deficit from operations (511,364) (75,961) (587,325) (299,635)
Page 259

Page 260

liveArgyll.co.uk 40
THANK YOU
Thank you to our partners, funders and stakeholders for their invaluable support throughout
the year. As a local charity we couldn’t achieve what we do without you!
Page 260

Page 261

ARGYLL AND BUTE COUNCIL     Community Services Committee                                                                      
Children & Young People’s Planning Partnership      11 December 2025 
Children & Young People Services Progress Report 2025 
1.0 EXECUTIVE SUMMARY 
1.1 The Children and Young People’s Service Plan 2023 to 2026 was previously approved
by Community Services Committee. 
1.2 There is a requirement in Part 3 of the Children and Young People (Scotland) Act 2014
to review the report annually and report on the performance and progress to date in
delivering the outcomes set out in the plan. 
1.3 The review considers progress in year two of the current plan, provides information
on developments that have taken place since the plan was published and sets out key
plans in the year ahead.   
1.4 It is recommended that the Community Services Committee:- 
a) Note that Argyll & Bute Council are jointly responsible for children’s services
planning along with NHS Highland through the Community Planning Partnership. 
b) Note the significant work of the wider multi-agency children’s planning partners
including many third sector partners along with the Scottish Reporters 
c)  Administration, Scottish Fire and Rescue and Police Scotland. 
d) Note the progress indicated within the Children and Young People’s Services Plan
2023 -26 Year 2 review; and 
e) Endorse the review submitted to Scottish Government as per legislative
requirement. 
Page 261 Agenda Item 14

Page 262

ARGYLL AND BUTE COUNCIL     Community Services Committee 
Children & Young Peoples Planning Partnership      11 December 2025 
Children & Young People Services Progress Report 2025 
2.0 INTRODUCTION 
2.1 This is this year’s annual review of the Children and Young People’s Service Plan
2023-2026.   The attached report provides an overview of the performance and
progress to date in delivering the outcomes we set out to achieve.
2.2 The review considers:
- Updates on the 2023 – 2026 plan 
- Information on developments since the plan was published
- Key plans for the year ahead   
3.0 RECOMMENDATIONS 
It is recommended that the Community Services Committee:
3.1 Note that Argyll & Bute Council are jointly responsible for children’s services planning
along with NHS Highland through the Community Planning Partnership.
3.2 Note the significant work of the wider multi-agency children’s planning partners including
many third sector partners along with the Scottish Reporters Administration, Scottish Fire
and Rescue and Police Scotland.
3.3  Note the progress indicated within the Children and Young People’s Services Plan
2023 -26; and
3.4 Endorse the review submitted to Scottish Government as per legislative requirement.
4.0 DETAIL 
4.1 The year two review document is attached to this report .
Page 262

Page 263

4.2 The report is divided across the key priorities contained within the 2023 to 2026
plan. Namely:
o Getting It Right for Every Child Leadership & Communication
o Early Help & Support
o Mental Health & Wellbeing
o Children & Young People’s Voice 
4.3 The range of work being carried out by our staff and partners is illustrated
throughout the review document. 
4.4 The voice of young people is clearly evidenced and the aspiration of increasing
this even further. The incorporation of UNCRC has taken place during the life of
this review.
4.5  Core issues of poverty, housing and transport remain. Although not covered in
the review report itself strained budgets and perhaps even more so, the ability to
attract, recruit and retain staff are key barriers to elements of progress. Financial
uncertainty is often most acutely felt by third sector partners. 
5.0 CONCLUSION 
5.1 The Committee is asked to recognise the work being carried out by the Children
& Young Persons Planning Partnership and to note the review report. Progress is
continuing to be made on the goals set out in the 2023 – 2026 plan. The
Committee can be assured work will continue on all aspects of supporting our
young people.   
5.2 The review report will be submitted to Scottish Government.
6.0 IMPLICATIONS
6.1 Policy    
There requires to be recognition of the impact of UNCRC incorporation across all
aspects of the Council’s operations.
6.2 Financial 
None
6.3  Legal
None 
6.4  HR 
None
6.5  Customer Service
Page 263

Page 264

None
6.6  Risk
None
6.7 Climate Change
None 
6.8 Fairer Scotland Duty
None
6.9  Equalities – protected characteristics
None
6.10 Consumer Duty
None
6.11 Island Communities
In each aspect of the plan there is a requirement to ‘island proof’ our efforts. 
6.12 Children’s Rights and Wellbeing
The CYPSP is central to UNCRC efforts
David Gibson, Head of Service Children Families and Justice Services/CSWO
Policy Lead. Cllr McFadzean
28/11/2025                                                  
For further information contact: David Gibson 
APPENDICES
Appendix 1 CYPSP Year 2 Review Report 
Page 264

Page 265

Beth Wiseman Senior Manager Child Health and Maternity November 2025
CYPSP Annual Report 2024 - 2025
Executive Summary
The Children and Young People Service Plan (CYPSP) builds on previous strategies
and was co-produced by listening to children, young people, and families. Its core aim is
to promote wellbeing and improve life chances for all children and young people in
Argyll and Bute. It is legally required under the Children and Young People (Scotland)
Act 2014 and aligns with national priorities.
Governance and Partnership Structure
Governance:
Community Planning Partnership       IJB Community Services Committee
Argyll and Bute’s Children - Strategic Group
Rotating Chair 
Partnership working involves Argyll and Bute Council, NHS Highland, Police Scotland,
education, social care, voluntary sector, and most importantly, children and families.
Integration with other plans: Links to the Local Outcome Improvement Plan (LOIP),
Corporate Parenting Plan, and Child Protection Plan. The evidence-base for the CYPSP
is underpinned by the Joint Strategic Needs Assessment.
Strategic Priorities and Outcomes
The CYPSP sets out a shared vision to improve outcomes for children and young
people across Argyll and Bute. It is underpinned by GIRFEC, UNCRC, and The
Promise, and aligns with national strategies such as the Mental Health Strategy, Healthy
Weight Delivery Plan, and local frameworks including the Local Outcome Improvement
Plan (LOIP), Child Poverty Action Plan, and Corporate Parenting Plan.
Priority 1: Early Help and Support
Aim: Provide timely, accessible support to prevent escalation of issues and promote
healthy development.
Appendix 1Page 265

Page 266

Beth Wiseman Senior Manager Child Health and Maternity November 2025
Key Successes:
• Child Poverty:
o 2024–25 Action Plan approved; poverty rate reduced from 23.5% to
22.1%.
o Children co-produced a graphic version of the plan.
o £70,000 SG Fairer Futures funding secured for “Connecting for Good”
project.
• Breastfeeding:
o Achieved UNICEF Baby Friendly Gold Accreditation.
o Breastfeeding rates: 72.8% at first HV visit; 54.1% at 6–8 weeks.
• Infant Food Insecurity Pilot:
o £30 vouchers distributed to families in crisis
• Childhood Obesity:
o PEACH intervention programme delivered; CAMHS dietitian in post.
o Thrive website under development for lifestyle and parenting advice.
Long-Term Goals:
85% of pre-school children meeting developmental milestones; reduction in child
poverty and obesity; breastfeeding-friendly communities.
Priority 2: Mental Health and Wellbeing
Aim: Improve access to mental health services and embed trauma-informed practice.
Key Successes:
• School Counselling:
o Embedded in all schools; expanded to under-10s.
o 700 pupils accessed counselling; 83% reported positive change.
• Nurture (OCTNE):
o 52 schools engaged; SAC evaluation shows major improvements (94%
pupils ready to learn vs 85% in 2022).
• Parent Project:
o 220 parents supported; 403 sessions delivered; 80–90% report improved
knowledge and confidence.
• Kooth Digital Support:
o Registrations rose from 25 (Q1) to 101 (Q3); 517 logins in Q4.
• Family Liaison Officers:
o Supporting 21 families with attendance and wellbeing barriers.
• Distress Brief Intervention (DBI):
o 90% participants report improved ability to manage distress.
Page 266

Page 267

Beth Wiseman Senior Manager Child Health and Maternity November 2025
• Trauma Training:
o 302 participants trained; strong evaluation scores; DDP training improving
therapeutic relationships.
• Neurodevelopmental Pathways:
o Single Point of Access launching Oct 2025;
o Long-Term Goals:
Positive impact of early mental health support; robust neurodiversity
pathways; advocacy influencing planning.
Priority 3: GIRFEC
Aim: Embed GIRFEC principles across all services to ensure streamlined, child-
centered support.
Key Successes:
• Evaluation of current approaches completed.
• GIRFEC website updated (Aug 2025); stakeholder feedback underway.
• Mapping of training resources (LEON, Turas Learn) and agency tools (Wellbeing
Wheel App).
• Child’s Plan Audit subgroup established; multi-agency audit scheduled for Oct
2025.
• Development of multi-agency 7-minute briefing and GIRFEC Pathway initiated.
Long-Term Goals:
Transformational change embedded; “One Child, One Assessment, One Plan” approach
achieved; improved outcomes for families.
Priority 4: Rights and Participation
Aim: Ensure meaningful participation and embed UNCRC duties across services.
Key Successes:
• UNCRC Implementation:
o Became law July 2024; integrated impact assessment tool live; training
underway.
• Rights Respecting Schools:
o All schools engaged; only 4 yet to gain accreditation (target July 2025).
• Child-Friendly Complaints:
o Training on LEON and Turas Learn; good practice shared nationally.
Page 267

Page 268

Beth Wiseman Senior Manager Child Health and Maternity November 2025
• Planet Youth:
o Surveys planned for all S3 & S4 pupils in Sept 2025; expected 100%
engagement increase.
• Young Carers Challenge:
o 13 schools registered with Carers Trust.
• Children’s Rights Framework:
o Published and adopted for UNCRC Implementation Group.
Long-Term Goals:
Children and young people co-design next CYPSP; improved outcomes for care-
experienced children through active involvement.
Alignment with National and Local Frameworks
• National: GIRFEC, UNCRC, The Promise, Mental Health Strategy, Healthy
Weight Delivery Plan.
• Local: Argyll and Bute Outcome Improvement Plan, Child Poverty Action Plan,
Corporate Parenting Plan, Community Planning Partnership priorities.
Progress and Impact
The CYPSP continues to deliver measurable improvements across its four strategic
priorities: Early Help and Support, Mental Health and Wellbeing, GIRFEC, and Rights
and Participation. These achievements demonstrate a strong commitment to national
frameworks (GIRFEC, UNCRC, The Promise) and local priorities (LOIP, Child Poverty
Action Plan).
1. Early Help and Support
Progress:
• Child Poverty Action Plan reviewed and approved; poverty rate reduced from
23.5% to 22.1%.
• £70,000 SG Fairer Futures funding secured for “Connecting for Good” project.
• Infant Food Insecurity Pilot supported families in crisis with emergency vouchers.
• Breastfeeding rates improved (72.8% at first HV visit; 54.1% at 6–8 weeks);
UNICEF Baby Friendly Gold Accreditation achieved.
• PEACH intervention programme delivered; Thrive website under development for
healthy lifestyle support.
Impact:
Page 268

Page 269

Beth Wiseman Senior Manager Child Health and Maternity November 2025
• Increased resilience in families through targeted financial and nutritional support.
• Improved early years health outcomes and reduced inequalities in breastfeeding
rates.
• Enhanced community capacity to support healthy weight and wellbeing.
2. Mental Health and Wellbeing
Progress:
• School counselling embedded in all schools; expanded to under 10s (700 pupils
supported, 83% positive change).
• Nurture (OCTNE) programme strengthened; SAC evaluation shows major
improvements in readiness to learn and inclusion.
• Parent Project delivered 403 sessions; 80–90% of parents report improved
confidence and strategies.
• Kooth digital mental health support uptake increased significantly (517 logins in
Q4).
• Trauma-informed practice scaled up: 302 staff trained; DDP training improving
therapeutic relationships.
• Neurodevelopmental Pathways: Single Point of Access launching Oct 2025
Impact:
• Improved mental health access and outcomes for children and families.
• Stronger parental engagement and capacity to support wellbeing.
• Reduced barriers to school attendance and engagement through Family Liaison
Officers.
3. GIRFEC
Progress:
• Evaluation of current approaches completed.
• GIRFEC website updated (Aug 2025) and shared for feedback.
• Mapping of training resources and agency tools underway.
• Child’s Plan Audit subgroup established; multi-agency audit scheduled for Oct
2025.
• Development of multi-agency 7-minute briefing and GIRFEC Pathway initiated.
Impact:
Page 269

Page 270

Beth Wiseman Senior Manager Child Health and Maternity November 2025
• Foundations laid for streamlined processes and “One Child, One Assessment,
One Plan” approach.
• Increased consistency and accountability across agencies.
• Improved visibility of child and family voice in planning.
4. Rights and Participation
Progress:
• UNCRC became law (July 2024); integrated impact assessment tool live; training
underway.
• Rights Respecting Schools: all schools engaged; only 4 yet to gain accreditation.
• Child-friendly complaints process implemented; good practice shared nationally.
• Planet Youth surveys planned for all S3 & S4 pupils (Sept 2025).
• Young Carers Challenge promoted; 13 schools registered.
Impact:
• Strengthened rights-based culture across services.
• Increased engagement and empowerment of children and young people in
decision-making.
• Improved compliance with legislative duties and national standards.
Overall Impact
• Better outcomes for children and families: Improved health, wellbeing, and
educational engagement.
• System transformation: Progress toward integrated pathways and trauma-
informed practice.
• Rights embedded in practice: Children’s voices influencing policy and service
design.
Participation and Engagement
Embedding the voice of children, young people, and families is a cornerstone of the
Argyll and Bute CYPSP. This commitment aligns with UNCRC, The Promise, and
GIRFEC principles, ensuring that planning and service delivery are rights-based and
participatory.
Page 270

Page 271

Beth Wiseman Senior Manager Child Health and Maternity November 2025
Current  Actions and Structures
• Young People’s Advisory Panel:
Established to provide direct input into strategic decisions. Argyll and Bute had
their first Youth Conference in November 2025 to influence the priorities of the
next CYPSP
• Co-Design of Plans:
Children and young people have co-created accessible versions of key
documents, including a graphic Child Poverty Action Plan and an animated
CYPSP summary.
• Engagement in GIRFEC Development:
Phase 2 of the GIRFEC workstream (starting Sept 2025) will include a subgroup
dedicated to capturing the voice of the child in service delivery and the Child
Planning process. This will also involve gathering family experiences to inform
improvements.
• Planet Youth Surveys:
Scheduled for all S3 and S4 pupils in September 2025, providing community-
level insights into wellbeing and priorities.
• Rights Respecting Schools:
Nearly all schools have achieved accreditation, embedding a culture of
participation and rights awareness.
• Advocacy Services:
Strengthened through a dedicated Participation Officer role, ensuring care-
experienced children influence planning and service design.
Impact of Participation
• Policy Influence:
Feedback from young people has shaped the Child Poverty Action Plan and
informed priorities for early help and mental health services.
• Improved Accessibility:
Child-friendly complaints processes and reporting tools have been implemented,
making systems easier for families to navigate.
• Future Planning:
Children and young people will co-design the next CYPSP (2026–2030),
ensuring their voices remain central to strategic development.
.Workforce Development
• GIRFEC Training:
o Mapping of online resources (LEON, Turas Learn) underway.
Page 271

Page 272

Beth Wiseman Senior Manager Child Health and Maternity November 2025
o Development of a multi-agency 7-minute briefing to strengthen
understanding of GIRFEC principles.
o Updated training timetable planned for roll-out across agencies.
o Child’s Plan Audit subgroup established to ensure quality and consistency
in practice.
• Trauma-Informed Practice:
o 302 participants trained in Trauma Informed and Skilled levels across
education, health, social work, and third sector.
o DDP (Dyadic Developmental Practice) training and supervision
embedded, improving therapeutic relationships and emotional regulation.
o Evaluation shows strong impact on staff confidence and service culture.
• Children’s Rights Training:
o Turas Learn and LEON platform used for UNCRC and child-friendly
complaints training.
o Monitoring engagement to assess uptake and effectiveness.
o Rights Respecting Schools programme embedded in almost all schools
(only 4 schools pending accreditation).
Embedding Children’s Rights
• UNCRC Implementation:
o Became law in July 2024; integrated impact assessment tool launched
and training initiated.
o Child-friendly complaints process developed and shared as good practice
nationally.
o Children’s Rights, Skills & Knowledge Framework published as a single
point of reference for staff.
• Participation Structures:
o Young People’s Advisory Panel established to influence strategic
decisions.
o Co-design of accessible versions of key plans (graphic Child Poverty
Action Plan, animated CYPSP summary).
o Planet Youth surveys planned for all S3 & S4 pupils to inform priorities.
• Rights Respecting Schools:
o All schools engaged; accreditation nearly complete.
o Promotes a rights-based culture and active participation in school
communities.
.Equality and Rights
Argyll and Bute has taken significant steps to meet its statutory duties under the
UNCRC (Incorporation) (Scotland) Act, which became law on 16 July 2024:
Page 272

Page 273

Beth Wiseman Senior Manager Child Health and Maternity November 2025
• Integrated Impact Assessment Tool:
Developed and launched to ensure children’s rights are considered in all policy
and service decisions. Training is underway to embed its use across services.
• Child-Friendly Processes:
o Child-friendly complaints system implemented, with training available on
LEON and Turas Learn.
o Good practice shared nationally (e.g., with Glasgow City Council).
• Rights Respecting Schools:
All schools engaged; only four remain to achieve accreditation. This embeds a
rights-based culture in education settings.
• Children’s Rights Framework:
Published as a single point of reference for staff, guiding compliance and best
practice.
• Monitoring and Reporting:
Development of a shared framework to track progress against legislative duties.
Engagement data from LEON training is being monitored.
Equality Actions
• Inclusive Engagement:
Planet Youth surveys planned for all S3 & S4 pupils to capture diverse voices
and inform priorities.
Young Carers Challenge promoted across schools to address equality for young
carers.
• Procurement Compliance:
Statement under development for inclusion in contracts to ensure suppliers
consider children’s rights and equality impacts.
• Reducing Inequalities:
o Child Poverty Action Plan implemented, showing a reduction in child
poverty rates (23.5% to 22.1%).
o Breastfeeding initiatives targeted at groups with historically lower rates,
reducing health inequalities.
• Training and Awareness:
UNCRC and equality principles embedded in staff training through LEON and
multi-agency briefings.
Impact
• Rights-based decision-making is becoming standard practice.
• Increased accountability through integrated assessments and audits.
Page 273

Page 274

Beth Wiseman Senior Manager Child Health and Maternity November 2025
• Improved access and inclusion for vulnerable groups, including care-experienced
children and young carers.
Future Plans
1. Early Help and Support
• Early Years Advice Line launching November 2025 to provide parents with early
intervention strategies.
• Development of Thrive website for lifestyle and parenting advice.
• Expansion of school-based prevention programmes for healthy weight (currently
paused due to funding).
• Continued evaluation of PEACH intervention programme and establishment of
Tier 3 pathway for childhood obesity.
2. Mental Health and Wellbeing
• Single Point of Access (SPA) for mental health and neurodevelopmental services
launching August 2025.
• Development of digital resources hub for parents/carers and professionals.
• Ongoing evaluation of Kooth digital support and Parent Project for sustainability
beyond 2025.
• Secure long-term funding for Distress Brief Intervention (DBI) and explore
expansion to younger age groups.
• Strengthen trauma-informed practice through continued training and leadership
engagement.
3. GIRFEC
• Phase 2 (Sept 2025):
o Subgroup to capture child and family voice in service delivery and Child
Planning process.
o Broaden representation from third sector, health, education, and social
work.
• Complete multi-agency audit of Child’s Plans by October 2025.
• Develop and implement GIRFEC Pathway and shared resource platform.
• Update training timetable and roll out multi-agency 7-minute briefing.
Page 274

Page 275

Beth Wiseman Senior Manager Child Health and Maternity November 2025
4. Rights and Participation
• Complete Rights Respecting Schools accreditation for remaining schools by July
2025.
• Deliver Planet Youth surveys for all S3 & S4 pupils in September 2025.
• Monitor engagement with UNCRC training and integrated impact assessments.
• Continue development of child-friendly complaints system and reporting tools.
Cross-Cutting Actions
• Secure sustainable funding for fixed-term posts (e.g., CAMHS dietitian, Family
Liaison Officers).
• Strengthen data collection and evaluation across all workstreams.
• Embed rights-based and trauma-informed approaches in all service planning.
• Ensure efficient cross cutting base line data for future priorities and outcomes.
Page 275

Page 276

This page is intentionally left blank

Page 277

ARGYLL AND BUTE COUNCIL  COMMUNITY SERVICES COMMITTEE 
EDUCATION     11 DECEMBER 2025 
EXTERNAL EDUCATION ESTABLISHMENT INSPECTION REPORT 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides details of all external education establishment inspection
reports received across Argyll and Bute Education Service during the period
August 2025 to December 2025. 
1.2  It is recommended that the Community Services Committee notes:
a) The contents of this report; 
b) This quarterly report will be presented on an ongoing basis to the Community
Services Committee detailing all establishment inspections conducted and
published by Education Scotland within that period, and 
c) That Ward members will receive copies of school inspection reports for
schools within their area as published by Education Scotland. 
Page 277 Agenda Item 15

Page 278

ARGYLL AND BUTE COUNCIL   COMMUNITY SERVICES COMMITTEE 
EDUCATION    11 DECEMBER 2025 
EXTERNAL EDUCATION ESTABLISHMENT INSPECTION REPORT 
2.0 INTRODUCTION 
2.1 This report provides details of all external education establishment inspection
reports received across Argyll and Bute Education Service during August 2025 to
December 2025. 
2.2 As required for the National Improvement Framework, HMIE report on and
provide grades for the following Quality Indicators (QIs) as part of full model
inspections (which typically take place over a full school week): 
QI 1.3 – leadership of change;
QI 2.3 – learning, teaching and assessment; 
QI 3.1 – ensuring wellbeing, equality and inclusion; and 
QI 3.2 – raising attainment and achievement 
In addition, they include a focus on the following themes from other QIs: 
QI 2.2 curriculum: learning pathways 
QI 2.7 partnerships: parental engagement 
2.3 Short model inspections (typically over two and a half days) focus on two
QIs: 
QI 2.3 – learning, teaching and assessment; and 
QI 3.2 – raising attainment and achievement   
HMIE continue to have a focus on safeguarding in every inspection. An
inspection advice note issued in January 2024 advised that Inspectors
intended to strengthen the evidence they gather about relationships and
behaviour in schools and settings during inspections notified from week
beginning 15 January 2024. This evidence is being gathered in a range of
ways, including through an updated child protection and safeguarding
evaluation form. In addition to the inspection advice note, schools have
been provided with supporting local authority guidance. 
Page 278

Page 279

2.4 From September 2025, in inspections of early learning and childcare
settings, HMIE use the QIs from the new ‘Quality Improvement
Framework for the Early Learning and Childcare Sectors’1. 
3.0 RECOMMENDATIONS 
3.1  It is recommended that the Community Services Committee notes: 
a) The contents of this report; 
b) This quarterly report will be presented on an ongoing basis to the Community
Services Committee detailing all establishment inspections conducted and
published by Education Scotland within that period, and 
c) That Ward members will receive copies of school inspection reports for
schools within their area as published by Education Scotland. 
4.0  DETAIL – School Inspections 
4.1  Bunessan Primary School and ELC was inspected the week beginning 19th May
using a full model inspection. The school received positive feedback from the
Managing Inspector with specific reference to: The headteacher and staff work
effectively as a team to improve the bun-sgoil. They make purposeful use of
professional learning and research, leading to high-quality teaching through the
mediums of English and Gàidhlig - Gaelic. Children take responsibility for their
own learning and support others. They learn through real-life, engaging and
meaningful experiences that reflect their island identity, the world of work and
increase fluency in Gàidhlig. Children’s learning is developed in partnership with
parents, partners and the community. Staff and children build positive, caring
relationships. Children engage in a variety of activities that support their health
and wellbeing. They take part enthusiastically in a wide range of sporting
opportunities, in which they achieve success. Children make good progress in
literacy through English and Gàidhlig, as well as in Gaelic (Learners) within the
pre-five unit. They take part in a variety of immersive language and cultural
activities, both independently and with their families. These include storytelling
sessions, author visits, the Mòd and creating bilingual signage for a local nature
trail. 
The published letter and Summary of Inspection Findings (SIF) are available on
HMIE’s Website using the following link: 
Bun-sgoil agus Aonad Ro-chòig Bhun Easain - Bunessan Primary School |
Inspection Report | Education Scotland 
1 Quality Improvement Framework for the Early Learning and Childcare Sectors
Page 279

Page 280

4.2 Rosneath Primary School and ELC was inspected the week beginning 2nd June
using a short model inspection. The school received positive feedback from the
Managing Inspector with specific reference to: Relationships across the school
and nursery are very supportive and positive. Children’s rights and the dignity
of all children are at the centre of staff’s practice. This is supporting all children
in the school to experience success and improve their motivation to learn. In the
nursery, this results in children who are enthusiastic and resilient learners. Led
ably by the headteacher, teachers are reflective practitioners who use
professional learning effectively to improve learning and teaching across the
school. This is impacting positively on children’s experiences and their progress.
Nursery practitioners have developed very well the indoor and outdoor learning
environments and children’s experiences to promote children’s curiosity and
creativity. 
The published letter and Summary of Inspection Findings (SIF) are available on
HMIE’s Website using the following link: 
Rosneath Primary School | Inspection Report | Education Scotland 
4.3 Ulva Primary School was inspected the week beginning 1st September using a
short model inspection. The school received very positive feedback from the
Managing Inspector and was awarded an inspection grading of ‘excellent’ for QI
2.3 Learning, Teaching and Assessment. The managing inspector made
specific reference to: The outstanding leadership of the headteacher, very well
supported by the principal teacher, in improving learning experiences for all
children. Children benefit from very extensive opportunities to develop their
knowledge, skills and understanding in meaningful, real-life contexts. The
school’s exemplary approaches to learning for sustainability and outdoor
learning. Children are passionate, engaged campaigners who relish the
opportunity to learn about their natural environment. They appreciate and
celebrate the uniqueness of their island. Curious, engaged and highly motivated
children. They are polite and welcoming, and demonstrate fully the school’s
values of being kind, respectful and hard-working. The warm, supportive and
nurturing relationships across the school and local community. Children thrive
in the positive ethos that supports their wellbeing. Highly effective partnership
working with local and national partners. Staff work very effectively with others
to provide very high-quality learning experiences for all children. These
partnerships help support the school’s consistently high levels of attainment and
achievement. 
The published letter and Summary of Inspection Findings (SIF) are available on
HMIE’s Website using the following link: 
Bun-sgoil Ulbha (Ulva Primary School) | Inspection Report | His Majesty’s
Inspectorate of Education in Scotland 
Page 280

Page 281

4.4 Tighnabruaich Primary and ELC were inspected the week beginning 17th
November using a short model inspection. 
The link to the published letter and Summary of Inspection Findings (SIF) will
be accessible when these documents have been finalised and are available on
Education Scotland’s Website. 
4.5 A summary of all external school inspection audit reports published by Education
Scotland across Argyll and Bute Education Service establishments during the
period August 2025 to December 2025 is provided in Appendix 1.   
4.6 A summary of the inspection outcomes per establishment detailing strengths and
areas for improvement is provided in Appendix 2. 
5.0 CONCLUSION 
5.1 In summary, currently three published reports are available from the inspections
detailed above at 4.1, 4.2 and 4.3 which took place during the period of May 2025
to September 2025. 
5.2  The Education Service will continue to use the outcomes of establishment
inspections to work collaboratively with our Head Teachers to target support and
challenge to secure improvement for our children and young people. 
6.0 IMPLICATIONS 
6.1 Policy – The Standards in Scotland’s Schools etc. Act 2000 places a duty on 
Education Authorities to provide children and young people with school 
education and (in terms of raising standards) requires Authorities to endeavor 
to secure improvement in the quality of that school education. 
6.2 Financial – None 
6.3  Legal – None 
6.4  HR – None 
6.5  Customer Service – The outcome of establishment inspections of the Education 
Service of Argyll and Bute Council may significantly enhance or detract from 
the Council’s reputation and attractiveness as an area to work and live in. 
6.6  Risk – Reputational risk to the Education Service following a weak report. 
6.7 Climate Change - None  
6.8  Fairer Scotland Duty: – None 
Page 281

Page 282

6.9 Equalities - protected characteristics – None 
6.10  Consumer Duty – None 
6.11  Island Communities - None 
6.12  Children’s Rights and Wellbeing 
Article 28 – I have the right to an education 
Article 29 – I have the right to an education which develops my personality, 
talents and abilities 
Douglas Hendry - Executive Director with responsibility for Education 
Audrey Forest - Policy Lead for Education  
Jennifer Crocket
Chief Education Officer
Head of Education: Wellbeing, Inclusion and Achievement
Jennifer.Crocket@argyll-bute.gov.uk 
Wendy Brownlie
Head of Education: Performance and Improvement 
Wendy.Brownlie@argyll-bute.gov.uk 
For further information please contact:- 
Simone McAdam, Education Manager
Simone.McAdam@argyll-bute.gov.uk 
November 2025 
Appendices
Appendix 1 - Overview of Inspection Outcomes
Appendix 2 - Summary of Inspection Outcomes
Page 282

Page 283

Appendix 1 - Overview of Inspection Outcomes   
Leadership of
Change 
Learning,
Teaching and
Assessment
Ensuring
Wellbeing,
Equality and
Inclusion
Raising
Attainment and
Achievement 
Establishment  Sector  Date of Inspection  1.3  2.3  3.1  3.2
Bunessan Primary School May 2025 good good good good
Bunessan ELC ELC May 2025 good good good good
Rosneath Primary School  June 2025  good  satisfactory
Rosneath ELC ELC June 2025  good  good
Ulva Primary School September 2025  excellent  very good
Tighnabruaich
Primary
School November 2025  not yet published  not yet published
Tighnabruaich ELC ELC November 2025  not yet published  not yet published 
Page 283

Page 284

The Six-point Scale for Inspection Grading
Excellent 6
Very Good 5
Good 4
Satisfactory 3
Weak 2
Unsatisfactory 1 
Page 284

Page 285

Appendix 2 - Summary of Inspection Outcomes
Report Title: Bun-sgoil Ulbha (Ulva Primary School) 
Inspection Agency: Education Scotland 
Key Findings: 
• The outstanding leadership of the headteacher, very well supported by the principal teacher, in improving learning
experiences for all children. Children benefit from very extensive opportunities to develop their knowledge, skills
and understanding in meaningful, real-life contexts. 
• The school’s exemplary approaches to learning for sustainability and outdoor learning. Children are passionate,
engaged campaigners who relish the opportunity to learn about their natural environment. They appreciate and
celebrate the uniqueness of their island. 
• Curious, engaged and highly motivated children. They are polite and welcoming, and demonstrate fully the school’s
values of being kind, respectful and hard-working. 
• The warm, supportive and nurturing relationships across the school and local community. Children thrive in the
positive ethos that supports their wellbeing. 
• Highly effective partnership working with local and national partners. Staff work very effectively with others to
provide very high-quality learning experiences for all children. These partnerships help support the school’s
consistently high levels of attainment and achievement. 
The following areas for improvement were identified and discussed with the headteacher and a representative from Argyll and
Bute Council. 
• Continue to provide high-quality and exciting learning activities which challenge and motivate all children. 
Date of Inspection: September 2025 
Lead Officer to take forward improvement: Susie Carmichael – Headteacher 
Central Officer to support improvement: Rachel Binnie – Education Manager 
Page 285

Page 286

Report Title: Bun-sgoil Bhun Easain - Bunessan Primary School and Pre-Five Unit 
Inspection Agency: Education Scotland 
Key Findings:
The inspection team found the following strengths in the school’s work. 
• The headteacher and staff work effectively as a team to improve the bun-sgoil. They make purposeful use of professional
learning and research, leading to high-quality teaching through the mediums of English and Gàidhlig - Gaelic. 
• Children take responsibility for their own learning and support others. They learn through real-life, engaging and
meaningful experiences that reflect their island identity, the world of work and increase fluency in Gàidhlig. Children’s
learning is developed in partnership with parents, partners and the community. 
• Staff and children build positive, caring relationships. Children engage in a variety of activities that support their health and
wellbeing. They take part enthusiastically in a wide range of sporting opportunities, in which they achieve success. 
• Children make good progress in literacy through English and Gàidhlig, as well as in Gaelic (Learners) within the pre-five
unit. They take part in a variety of immersive language and cultural activities, both independently and with their families.
These include storytelling sessions, author visits, the Mòd and creating bilingual signage for a local nature trail. 
The following areas for improvement were identified and discussed with the headteacher and a representative from Argyll and
Bute Council.
• Across the bun-sgoil and pre-five unit, the headteacher should strengthen further approaches to evaluating the quality of
Bun-sgoil Bhun Easain. Moving forward, the staff team should extend further the involvement of children, parents and
partners in improvement decisions. 
• Develop further children’s awareness of their strengths, next steps and skills gained from learning. By P7, children should
have a well-defined record of their skills across all learning contexts, regardless of where their learning takes place. 
• Continue to raise attainment across the curriculum, with a particular focus on writing, talking and Gaelic (Learners). In the
pre-five unit, accelerate children's progress in numeracy and early mathematics. The headteacher should continue to
guide staff with the newly adopted strategic approach to planning the curriculum. 
• Senior leaders and staff should continue collaborating with parents to maximise immersion in Gàidhlig at the early level. 
Date of Inspection: May 2025
Lead Officer to take forward improvement: Richard Gawthrope – Headteacher
Central Officer to support improvement: Rachel Binnie – Education Manager 
Page 286

Page 287

Report Title: Rosneath Primary School and Early Learning and Childcare Centre 
Inspection Agency: Education Scotland 
Key Findings: 
• The inspection team found the following strengths in the school’s work. 
• Relationships across the school and nursery are very supportive and positive. Children’s rights and the dignity of all
children are at the centre of staff’s practice. This is supporting all children in the school to experience success and improve
their motivation to learn. In the nursery, this results in children who are enthusiastic and resilient learners. 
• Led ably by the headteacher, teachers are reflective practitioners who use professional learning effectively to improve
learning and teaching across the school. This is impacting positively on children’s experiences and their progress. 
• Nursery practitioners have developed very well the indoor and outdoor learning environments and children’s experiences
to promote children’s curiosity and creativity. 
The following areas for improvement were identified and discussed with the headteacher and a representative from Argyll and
Bute Council.
• As a priority, school staff now need to agree a consistent and high-quality approach to the teaching of writing to accelerate
children’s progress and attainment in this area. 
• Teachers in the school should continue to embed their approach to using assessment information to plan better for
children’s learning. This information should help them to provide consistently the right level of challenge in children’s daily
tasks. 
• In the nursery, practitioners should continue to increase the pace and challenge for all children. This should support
children to make better progress in their learning. 
Date of Inspection: May 2025 
Lead Officer to take forward improvement: Adele Flynn – Headteacher 
Central Officer to support improvement: Simon Easton – Education Manager 
Page 287

Page 288

This page is intentionally left blank

Page 289

Community Services Committee Work Plan 2025 - 2026 
This is an outline plan to facilitate forward planning of reports to the Community Service Committee.
Date Paper Designation  Lead Service/
Officer 
Regularity of
occurrence/
consideration 
Comment
11 December 2025 
Police Scotland Argyll & Bute
Performance Summary Report –
Reporting Period: April 2025 –
September 2025
Police Scotland Quarterly 
Scottish Fire and Rescue Service –
Argyll & Bute Performance Scrutiny
Group 2025-26 Q2 Scrutiny Report 
Scottish Fire and
Rescue Service
Quarterly 
Argyll & Bute Health & Social Care
Partnership – Performance Report –
FQ4 2024/25
Argyll & Bute HSCP Quarterly 
Argyll & Bute Health & Social Care
Partnership – Performance Report –
FQ1 2025/26
Argyll & Bute HSCP Quarterly 
Argyll & Bute Health & Social Care
Partnership – Annual Report 2024/25
Argyll & Bute HSCP Annually 
Care Experienced Children and Young
People – 2024-2025 Academic Year
Report
Education   
Education Performance Data Analysis
2024-25
Education   
Annual Participation Measure 2024-25 Education   
Schools (Consultation) (Scotland) Act
2010 Furnace Primary School
Education   
Live Argyll - Monitoring and
Performance Reporting & Live Argyll
Annual Report
Commercial
Services/Live Argyll
Annually 
Page 289
Agenda Item
16

Page 290

Community Services Committee Work Plan 2025 - 2026 
Children & Young People Services
Progress Report 2025
Argyll and Bute
HSCP
Annually 
External Education Establishment
Inspection Report
Education Quarterly 
5 March 2026 
Police Scotland Argyll & Bute
Performance Summary Report –
Reporting Period: April 2025 –
December 2025
Police Scotland Quarterly 
Scottish Fire and Rescue Service –
Argyll & Bute Performance Scrutiny
Group 2025-26 Q3 Scrutiny Report 
Scottish Fire and
Rescue Service
Quarterly 
Argyll & Bute Health & Social Care
Partnership – Performance Report –
FQ2 2025/26
Argyll & Bute HSCP Quarterly 
Luing Primary School Mothballing
Review
Education   
SQA School Examination Results 2025 Education   
External Education Establishment
Inspection Report
Education Quarterly 
4 June 2026 
Police Scotland Argyll & Bute
Performance Summary Report –
Reporting Period: April 2025 – March
2026
Police Scotland Quarterly 
Scottish Fire and Rescue Service –
Argyll & Bute Performance Scrutiny
Group 2025-26 Q4 Scrutiny Report 
Scottish Fire and
Rescue Service
Quarterly 
External Education Establishment
Inspection Report
Education Quarterly 
Future Reports – dates to be determined
Page 290

Page 291

Community Services Committee Work Plan 2025 - 2026 
The Expansion of Funded Early Years
Learning and Childcare in Scotland –
Argyll and Bute Early Learning and
Childcare Updated Delivery Plan
Education   
Care Experienced Children and Young
People
Education   
Argyll & Bute Health & Social Care
Partnership – Annual Report
Argyll & Bute HSCP Annually 
Argyll and Bute Annual Education Plan Education Annually in August 
Live Argyll Monitoring and Performance
Report & Live Argyll Annual Report
Commercial
Services/Live Argyll
Annually 
Gaelic Language Plan Progress Report Customer Support
Services
Annually in August 
Scottish Attainment Challenge Education   
Education Refresh Strategy Education   
Strone Primary School - Mothballing Education   
Scottish Languages Act 2025 – Update Education/Customer
Support Services   
Tobermory 2-18 Campus – Update and
Next Steps
Education   
Page 291

Page 292

This page is intentionally left blank